2024-09-25
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Found 2 temporary construction no parking anytime signs posted with permittee ID IBM number on front and back.
|
2024-05-28
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Water barriers with chain linked fence on top stored in parking lane.
|
2024-02-12
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
ATPO respondent has opened up the sidewalk and patched it up without a valid DOT permit on file.
|
2024-02-03
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection the permittee has their 5 digit i.d number placed on the front, left and right side of the back of their temporary construction signs.
|
2023-12-18
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barriers in p/l in compliance
|
2023-12-07
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
barriers in r/w; no full street blockage
|
2023-11-22
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no crossing work being done at this time
|
2023-10-25
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction material stored in the parking lane in the works zone area.
|
2023-09-14
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Found Sidewalk open to pedestrians clear pathway , no active work at this time , contractor appears to be in compliance with the stipulation
|
2023-08-28
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plastic barriers in parking lane in front of 48.
|
2023-07-01
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barriers found on roadway
|
2023-05-01
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Materials placed in the streets behind barriers. Conventional Bike Lane clear.
|
2023-03-30
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers on site in compliance.
|
2023-03-23
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Debris container in parking lane in front of 48.
|
2023-03-11
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary signs posted/5 digit ID marker visible at this time.
|
2023-02-13
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container in compliance.
|
2023-01-25
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container on site at this time.
|
2023-01-04
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey barriers, scaffolding and sidewalk shed on street in front of 48.
|
2023-01-03
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway occupied by barricades at this time. Permit remains active.
|
2022-11-02
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey barriers in parking lane in front of 48.
|
2022-11-01
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey barriers placed in parking lane.
|
2022-09-12
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers present on the roadway at this time. Permit active.
|
2022-09-06
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material stored in parking lane.
|
2022-06-21
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 124, in driving lane around gas valve the cobblestone restoration remains acceptable.
|
2022-04-22
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container present on roadway at this time.
|
2022-04-05
|
No data
|
WEST 10 STREET, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this time.
|
2022-02-23
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container present at this time. Permit remains active.
|
2022-02-10
|
No data
|
WEST 10 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material visible at time of inspection.
|
2022-02-04
|
No data
|
WEST 10 STREET, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Site not crossing sidewalk, area fully accessible to pedestrians at this time.
|
2022-02-02
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material placed on street.
|
2021-12-22
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New granite curb from #59 to 7 Ave.
|
2021-12-20
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Nov issued to the respondent failure to comply with stipulation 107 by having a concrete truck parked in the lane adjacent to the work zone while pumping concrete into the concrete Pump, and I have notified the superintendent Will Duncan on site.
|
2021-11-05
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No concrete pump on location at this time.
|
2021-08-10
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container on roadway at this time.
|
2021-06-07
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started. There is an OSR adjacent in the roadway.
|
2021-06-01
|
No data
|
BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers present in roadway at this time.
|
2021-01-19
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
having a non-commercial vehicle parked & barricaded within their OCCUPANCY OF ROADWAY area. Respondent failed to comply to stipulation ID:103, which prohibits PARKING OF NON-COMMERCIAL VEHICLES ON WITHIN WORK ZONES.
|
2020-12-08
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no x s/w
|
2020-11-30
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no MATERIAL ON STREET
|
2020-09-12
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Place an open construction debris container on the street AKA 1141 Park Avenue
|
2020-06-16
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
8 Feet adjacent to curb occupied
|
2020-06-03
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plastic jersey barriers within parking lane.
|
2020-06-02
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O 59, spoke with site supervisor Javier while conducting inspections and stated to secure or bring materials and equipment within building due to recent protests. Plastic jersey barriers on roadway in compliance at this time.
|
2020-03-13
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w occupancy in compliance
|
2020-01-02
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material placed on the street.
|
2019-11-20
|
No data
|
WEST 101 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp construction signs posted on north side of segment
|
2019-11-10
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material not visible
|
2019-10-23
|
No data
|
EAST 91 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street at time of inspection.
|
2019-10-23
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadwy is occupied with plastic jersey barriers with reflective tape attached i/f/o 59 Greenwich Avenue
|
2019-10-23
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway is occupied with plastic jersey barriers with reflective tape attached i/f/o 59 Greenwich Avenue
|
2019-08-07
|
No data
|
WEST 101 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on roadway at this time.
|
2019-07-09
|
No data
|
ELDRIDGE STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 135, work within 4 sidewalk flags adjacent to property line are in compliance.
|
2019-05-31
|
No data
|
WEST 101 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w occupancy in compliance
|
2018-09-18
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
construction container on the roadway.
|
2018-09-11
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container on site at time of inspection.
|
2018-06-15
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Occupancy of r/w acceptable
|
2018-06-15
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Const. signs/markings acceptable
|
2018-06-14
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material stored
|
2018-06-13
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no boom stored
|
2018-06-11
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not currently on site.
|
2018-05-29
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
M042018089A06-Latest permit
|
2018-05-10
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
respondent's barriers in the street. Respondent failed to mark the outer surface of their barriers with high intensity fluorescent paint or reflectors capable of producing a warning glow when struck by a car headlamps.
|
2018-05-10
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barriers not visible
|
2018-04-16
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material on sidewalk acceptable
|
2018-04-15
|
No data
|
GREENWICH AVENUE, FROM STREET 7 AVENUE TO STREET PERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway clear at time of inspection.
|
2018-03-29
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk clear
|
2018-03-12
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Active permit M042018066A10 on file. Expires 4-9-18
|
2018-03-07
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers occupying parking lane acceptable.
|
2017-12-29
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material observed on the street i/f/o 74 Perry street
|
2017-12-08
|
No data
|
EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crossing sidewalk not observed
|
2017-09-13
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material placed at this time
|
2017-08-03
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk work at this time.
|
2017-07-15
|
No data
|
ELDRIDGE STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm VAULT construction or alteration acceptable
|
2017-07-13
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-07-13
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2017-06-12
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material found on the street i/f/o 74 perry street
|
2017-06-06
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
at this time onccupancy of s/w is in complinace and construction site is not blocking anything.
|
2017-06-01
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work was completed.
|
2017-04-04
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material on site
|
2017-04-04
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
timber barriers on roadway .. in compliance at this time
|
2017-03-07
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material at time of inspection
|
2017-02-16
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material placed at time of inspection
|
2017-01-14
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk work at this time.
|
2017-01-11
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material at this time
|
2016-12-31
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
valid permit,no container on street
|
2016-12-21
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
pass occupy r/w
|
2016-12-09
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO X-ING AT THIS TIME
|
2016-11-29
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass
|
2016-11-18
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
pass occupy r/w
|
2016-11-15
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
valid permit for occupy r/w
|
2016-11-04
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass s/w
|
2016-11-02
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no aterial observed on the street at the time of inspection
|
2016-09-30
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass occupy s/w
|
2016-08-21
|
No data
|
ELDRIDGE STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2016-07-12
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
occupancy of rdwy w/o permit
|
2016-06-20
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
in compliance timber barriers on the r/w
|
2016-06-20
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
timber barriers in compliance
|
2016-05-24
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupy s/w ok
|
2016-05-18
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2016-05-11
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupy s/w ok
|
2016-04-22
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupy s/w ok
|
2016-04-15
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
s/w acceptable
|
2016-04-08
|
No data
|
ELDRIDGE STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Having a 6ft wide wooden fence placed on sidewalk for vault construction without a valid NYC DOT permit on file as required. DOB permit 122543462-01-EW-OT used to identify respondent. NOV issued.
|
2016-04-08
|
No data
|
ELDRIDGE STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Having an ongoing vault construction without a valid NYC DOT permit on file as required. Construction ongoing behind 6 ft wide fence, from property line. DOB permit 122543462-01-EW-OT used to identify respondent. NOV issued.
|
2016-03-16
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass material
|
2016-02-21
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no crossing s/w
|
2016-02-16
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
valid permit for occupy r/w in compliance.
|
2016-02-11
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crossing s/w observed
|
2016-02-08
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
valid permits for timber barricades, occupy r/w
|
2016-02-02
|
No data
|
EAST 18 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
valid permit,no barricades on street
|
2016-02-02
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w ok
|
2016-02-01
|
No data
|
Manhattan, NEW YORK, NY, 10003
|
No Violation Issued
|
Inspectorate of the Department of Consumer and Workers' Rights Protection
|
Department of Consumer and Worker Protection
|
No data
|
2016-01-10
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/W Occ
|
2015-12-31
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK / s/w open
|
2015-12-28
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence on S/W
|
2015-12-11
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bring area adjacent to stairs to grade.
|
2015-12-08
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp construction signs posted
|
2015-12-07
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no material on street
|
2015-11-14
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence on S/W
|
2015-11-14
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent closed off 30 Feet of the roadway with timber wood barriers without a DOT permit on file. Respondent was ID by permit # M022015259C16 on file.
|
2015-11-05
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No cont. on the r/w
|
2015-09-26
|
No data
|
EAST 94 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FENCE ON S/W
|
2015-09-26
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no container on street
|
2015-08-05
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
PLACE MATERIAL ON STREET
|
2015-03-19
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLACE MATERIAL ON STREET
|
2015-02-03
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No s/w crossing
|
2015-01-06
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
n/a
|
2014-12-29
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLACE MATERIAL ON STREET: Not oin site at time of inspection.
|
2014-12-19
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
2014-12-12
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BARRIERS (1)
|
2014-12-04
|
No data
|
EAST 73 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w okay
|
2014-10-16
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barricades
|
2014-10-15
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
rd/w occupied
|
2014-09-25
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SIGNS POSTED
|
2014-09-03
|
No data
|
PERRY STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WRK NOT STARTED
|
2014-03-26
|
No data
|
MADISON AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2013-08-26
|
No data
|
EAST 73 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
boom truck removed
|
2013-08-26
|
No data
|
MADISON AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk clear
|
2013-08-21
|
No data
|
EAST 73 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
boom trick removed
|
2013-08-20
|
No data
|
MADISON AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk clear
|
2013-06-13
|
No data
|
MADISON AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/W CLEAR
|
2013-06-13
|
No data
|
EAST 73 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RD/W CLEAR
|
2013-02-23
|
No data
|
MADISON AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-04-07
|
No data
|
MADISON AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
install fence
|
2011-05-19
|
No data
|
PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
In compliance.
|
2011-05-04
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-24
|
No data
|
PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-02-22
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2011-02-08
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-01-29
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-01-16
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
In compliance.
|
2011-01-03
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-11-17
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No material in the roadway at this time
|
2010-08-31
|
No data
|
MADISON AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-08-30
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-08-25
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-08-24
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-08-09
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-07-22
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-07-09
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-06-17
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-05-01
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-04-23
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-04-14
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-28
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-17
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-10
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-03
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-24
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-21
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-20
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-17
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-14
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-11
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-09
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-08
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-04
|
No data
|
WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-03
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-01-30
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-01-23
|
No data
|
WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-09
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
removed.
|
2009-10-16
|
No data
|
MADISON AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk
|
2009-09-02
|
No data
|
MADISON AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk
|
2009-09-02
|
No data
|
MADISON AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
OCC of Roadway
|
2009-08-19
|
No data
|
MADISON AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk
|
2009-07-30
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-02-25
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLACE CONTAINER ON THE STREET
|
2009-01-13
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
removed.
|
2009-01-13
|
No data
|
GREENWICH STREET, FROM STREET BANK STREET TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
removed.
|
2008-12-27
|
No data
|
GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-12-11
|
No data
|
GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-09-19
|
No data
|
MORTON STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-09-19
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-09-08
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-09-04
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
No data
|
2008-08-08
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
permit valid container on street
|
2008-07-30
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
No data
|
2008-07-23
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-12
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-07-09
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-06-06
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-04-17
|
No data
|
MORTON STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-04-11
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-04-11
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-02-07
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No data
|
2008-01-11
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-10-31
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-10-31
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
portion of the iron fence pole that the b.o. had install in the roadway
|
2007-10-04
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-08-27
|
No data
|
GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-08-12
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-04-06
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-03-14
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-01-22
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2007-01-03
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w
|
2007-01-03
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2006-11-21
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occ of s/w
|
2006-11-16
|
No data
|
JOE DIMAGGIO HIGHWAY, FROM STREET CHARLES LANE TO STREET CHARLES STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
place equipment
|
2006-11-16
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
temp ped
|
2006-11-15
|
No data
|
CHARLES STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
concrete truck
|
2006-11-15
|
No data
|
JOE DIMAGGIO HIGHWAY, FROM STREET CHARLES LANE TO STREET CHARLES STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crossing s/w
|