2024-09-09
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Emergency generator trailer on street
|
2024-02-06
|
No data
|
EAST 45 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Generator on location
|
2023-07-21
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
LOAD BANK WITH FLATBED TRAILER, pass
|
2023-02-23
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Respondent storing two emergency generator trailers on the street, located in the parking lane with over head shunts. Respondent is obstructing a portion of the Street with equipment, without DOT Permit to do so Permit expired 12/1/2022.
|
2023-01-18
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the respondent with two emergency generator trailers located in the parking lane with over head shunts. Respondent has Use of the Street without DOT Permit to do so Permit expired 12/1/2022.
|
2023-01-13
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
ATPO I observed the respondent with two emergency generator trailers located in the parking lane with over head shunts. Respondent has Use of the Street without DOT Permit to do so Permit expired 12/31/2022.
|
2022-09-02
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
3 emergency generators by the south curb.
|
2022-07-19
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
At time of inspection AHEARN HOLTZMAN, INC. have active permits for the three emergency generators on the roadway. In compliance.
|
2022-07-12
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Emergency generator is occupying the roadway aka the parking lane.
|
2022-06-12
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TRACTOR TRAILER WITH EMERGENCY GENERATOR 3
|
2022-05-07
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
2022-04-11
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TRAILER WITH EMERGENCY GENERATOR On location at time of inspection.
|
2022-02-22
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupancy of roadway is in copliance
|
2021-09-24
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Port-o-San
|
2021-06-24
|
No data
|
WEST 54 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Generator on southside of rw. in compliance.
|
2021-05-18
|
No data
|
56 AVENUE, FROM STREET 141 STREET TO STREET MAIN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Occupancy of roadway AKA 56-45 Main Street
|
2021-05-18
|
No data
|
BOOTH MEMORIAL AVENUE, FROM STREET 141 STREET TO STREET MAIN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Occupancy of roadway AKA 56-45 Main Street
|
2021-05-18
|
No data
|
141 STREET, FROM STREET 56 AVENUE TO STREET BOOTH MEMORIAL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Occupancy of roadway AKA 56-45 Main Street
|
2021-05-18
|
No data
|
MAIN STREET, FROM STREET 56 AVENUE TO STREET BOOTH MEMORIAL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway is occupied with jersey barriers i/f/o 56-45 Main Street
|
2021-05-10
|
No data
|
BOOTH MEMORIAL AVENUE, FROM STREET 141 STREET TO STREET MAIN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Boom lift observed on the street at the time of inspection AKA 56-45 Main Street
|
2021-03-18
|
No data
|
BROADWAY, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
boom lift not visible
|
2021-03-18
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w not occupied
|
2021-02-03
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No closure of roadway/parking lanes at time of inspection
|
2020-07-17
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk occupied as Stipulated.
|
2020-05-19
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk vault alteration in compliance.
|
2020-03-10
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done, permit expired. Refer to permit # M012017300B07 on file.
|
2020-02-11
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material in portion of roadway at time of inspection.
|
2020-02-10
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no water tank on location at time of inspection.
|
2020-02-07
|
No data
|
EAST 66 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway clear with no work started at this time.
|
2020-01-27
|
No data
|
EAST 66 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades on Location acceptable
|
2020-01-04
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material placed on street behind barricades in compliance.
|
2019-10-31
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material on street is in compliance
|
2019-09-25
|
No data
|
EAST 66 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No boom truck on site
|
2019-09-24
|
No data
|
EAST 66 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material on street
|
2019-08-13
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
vault restoration IFO 120 is in compliance
|
2019-08-07
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway occupied with timber wood barricades, 8' adjacent to south curb line. Respondent in compliance at this time.
|
2019-08-06
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent vault restoration is in compliance
|
2019-08-01
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
0214 - PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET /no container on site ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;
|
2019-07-30
|
No data
|
EAST 67 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0211 - OCCUPANCY OF ROADWAY AS STIPULATED/ ROADWAY OCCUPIED
|
2019-07-19
|
No data
|
EAST 66 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street at this time.
|
2019-07-11
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
vault restoration is in compliance
|
2019-06-05
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
vault construction is in compliance
|
2019-05-20
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
vault construction is in compliance
|
2018-03-11
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Vault work done acceptable
|
2018-02-28
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Timber barricades acceptable
|
2018-02-26
|
No data
|
10 AVENUE, FROM STREET WEST 53 STREET TO STREET WEST 54 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
2 Temporary Construction Signs posted without a permit, I/F/O 811
|
2018-02-12
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cobblestone acceptable
|
2018-02-11
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street
|
2017-12-22
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fence removed, vault construction completed. Cobble stones by granite sidewalk slabs in accordance with DOT Standard Specifications. Acceptable.
|
2017-12-18
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence occupying sidewalk, 5' open for ped traffic acceptable.
|
2017-12-18
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work behind fence acceptable.
|
2017-12-10
|
No data
|
43 AVENUE, FROM STREET 22 STREET TO STREET 22 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Maintain Fence (0)
|
2017-10-30
|
No data
|
HAMILTON TERRACE, FROM STREET WEST 141 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupy rdwy
|
2017-10-26
|
No data
|
WEST 141 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupy rdwy
|
2017-10-04
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Vault Construction or Alteration acceptable
|
2017-08-30
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobblestones restoration completed IFO 120 Mercer st. Acceptable.
|
2017-08-07
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to later permit M012017214B84. Vault constrution ongoing. Cobble stones acceptable.
|
2017-08-07
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobble stones restoration acceptable. Another section restores. Contractor will clean stones at end of project.
|
2017-08-03
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Vault construction ongoing. As per cobble stones restoration acceptable. No need for monitoring, crew on site know what to do. Just pointed a couple of easy minor adjustment to take care of. Acceptable.
|
2017-08-01
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobblestones roadway area being restored. Acceptable. Will come back to check progress.
|
2017-07-28
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site about to start replacing cobble stones at location. Acceptable. I will come back to check progress before the end of the day. Photos taken.
|
2017-07-27
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobble stones restoration cancel due to unforseen sidewalk ranite slab that needed reset prior to stones replacement. Restoration will be reschedule for tomorrow.
|
2017-06-28
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
20' oc cobble stones by the curb restored - vault reconstruction. Monitor 7:30-8:50 am and came back now to check final product. Acceptable.
|
2017-06-27
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobble stones restoration to be re-schedule - freight elevator broke down with stones inside.
|
2017-06-17
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupancy of sidewalk in compliance
|
2017-06-02
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobble stones area completed. Waiting on grout cement mix. Acceptable.
|
2017-06-01
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Ongoing cobble stones restoration in compliance. 14.5 ft by 2 ft almost completed only 3" section to go. Will re-visit tomorrow morning.
|
2017-05-31
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractors on site, installing new granite curb, 14.5' X 2.5' cobblestones left to be restored and will be rescheduled first thing tomorrow morning.
|
2017-05-24
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Monitored 20'x2' cobblestones replacement adjacent to east curb IFO 120 Mercer st. --- To be continue. 10:45-3:30PM.
|
2017-05-12
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
active work in progress, vault is currently behind fence
|
2017-04-29
|
No data
|
WEST 43 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W REPAIRED
|
2017-04-26
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOVâs issued for this defect. Permittee placed on hold.
|
2017-04-13
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for failing apply seal to expansion joints on the sidewalk and at the curb. The respondent was notified by CAR#20164030161 on 11/21/2016.
|
2017-03-27
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing at this time.
|
2017-03-16
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades
|
2017-03-08
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active work fence occupied portion of sidewalk acceptable.
|
2017-03-08
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New permit on file M012017058A92
|
2017-03-06
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Vault construction ongoing. Curb & stones disturbed.
|
2017-02-21
|
No data
|
EAST 57 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no sidewalk repairs made
|
2016-12-09
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPLACE SIDEWALK
|
2016-12-06
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPLACE SIDEWALK
|
2016-12-05
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK
|
2016-11-29
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
2016-11-25
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Vault construction ongoing with active permit M012016323B80. Acceptable.
|
2016-11-25
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Vault construction ongoing. Acceptable.
|
2016-11-22
|
No data
|
WEST 42 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags that was replaced is in compliance.
|
2016-11-21
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk expansion joints need to be sealed
|
2016-11-17
|
No data
|
MERCER STREET, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Using street with timber barricades on sidewalk & a temporary pedestrian walkway on roadway without a valid NYC DOT permit on file as required. Permit application #2016110100243470 was denied due to payment not received. NOV issued.
|
2016-10-21
|
No data
|
EAST 70 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
- OCCUPANCY OF ROADWAY AS STIPULATED
|
2016-10-06
|
No data
|
WEST 43 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
5 Sidewalk Flags have been restored I/F/O 214
|
2016-07-21
|
No data
|
KEW GARDENS ROAD, FROM STREET 80 ROAD TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired
|
2016-07-15
|
No data
|
YORK AVENUE, FROM STREET EAST 69 STREET TO STREET EAST 70 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no occupancy of roadway at this time
|
2016-07-06
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway occupancy
|
2016-04-28
|
No data
|
WEST 42 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repair sidewalk
|
2016-04-17
|
No data
|
WEST 43 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
5 Sidewalk Flags have been restored I/F/O 214 "Lyric Theater" entrance. Just West of Entrance 4 Flags are currently barricaded for concrete curing.
|
2016-03-05
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupancy of roadway
|
2014-05-17
|
No data
|
KEW GARDENS ROAD, FROM STREET 80 ROAD TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2013-08-23
|
No data
|
KEW GARDENS ROAD, FROM STREET 80 ROAD TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
replaced plaza
|
2012-10-01
|
No data
|
KEW GARDENS ROAD, FROM STREET 80 ROAD TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB OK
|