M002024316A07
|
2024-11-11
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022024313C79
|
2024-11-08
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024313C78
|
2024-11-08
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024313C84
|
2024-11-08
|
2024-12-31
|
CROSSING SIDEWALK
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024313C83
|
2024-11-08
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024313C80
|
2024-11-08
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024313C81
|
2024-11-08
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024313C82
|
2024-11-08
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M002024306A32
|
2024-11-01
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022024303F75
|
2024-10-29
|
2024-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024303F76
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024303F77
|
2024-10-29
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024303F78
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024303F79
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024303F80
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024292D81
|
2024-10-18
|
2024-11-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024292D79
|
2024-10-18
|
2024-11-03
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024292D78
|
2024-10-18
|
2024-11-03
|
PLACE MATERIAL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024292D80
|
2024-10-18
|
2024-11-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024289B45
|
2024-10-15
|
2024-11-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024289B43
|
2024-10-15
|
2024-11-13
|
TEMP. CONST. SIGNS/MARKINGS
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024289B44
|
2024-10-15
|
2024-11-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024282A44
|
2024-10-08
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024282A45
|
2024-10-08
|
2024-11-14
|
CROSSING SIDEWALK
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024282A39
|
2024-10-08
|
2024-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024282A40
|
2024-10-08
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024282A41
|
2024-10-08
|
2024-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024282A42
|
2024-10-08
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024282A43
|
2024-10-08
|
2024-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024276A03
|
2024-10-02
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024271F63
|
2024-09-27
|
2024-12-07
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FT WASHINGTON AVENUE, MANHATTAN, FROM STREET WEST 165 STREET TO STREET WEST 168 STREET
|
M022024271F64
|
2024-09-27
|
2024-12-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FT WASHINGTON AVENUE, MANHATTAN, FROM STREET WEST 165 STREET TO STREET WEST 168 STREET
|
Q022024270B83
|
2024-09-26
|
2024-12-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HARPER STREET, QUEENS, FROM STREET DEAD END TO STREET MARINA ROAD
|
Q022024270B84
|
2024-09-26
|
2024-12-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HARPER STREET, QUEENS, FROM STREET DEAD END TO STREET MARINA ROAD
|
M022024269A37
|
2024-09-25
|
2024-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024269A40
|
2024-09-25
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CANAL STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024269A38
|
2024-09-25
|
2024-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CANAL STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024269A36
|
2024-09-25
|
2024-11-14
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024269A39
|
2024-09-25
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024262C40
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024262C35
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C36
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C37
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022024262C38
|
2024-09-18
|
2024-12-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024262C41
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C42
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024262C43
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C44
|
2024-09-18
|
2024-12-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C45
|
2024-09-18
|
2024-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022024262C34
|
2024-09-18
|
2024-12-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C33
|
2024-09-18
|
2024-12-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024262C39
|
2024-09-18
|
2024-12-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M002024262A08
|
2024-09-18
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022024257A93
|
2024-09-13
|
2024-12-07
|
CROSSING SIDEWALK
|
FT WASHINGTON AVENUE, MANHATTAN, FROM STREET WEST 165 STREET TO STREET WEST 168 STREET
|
M022024227A24
|
2024-08-14
|
2024-09-29
|
CROSSING SIDEWALK
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024227A23
|
2024-08-14
|
2024-09-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024227A22
|
2024-08-14
|
2024-09-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024227A21
|
2024-08-14
|
2024-09-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024227A18
|
2024-08-14
|
2024-09-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024227A20
|
2024-08-14
|
2024-09-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024227A19
|
2024-08-14
|
2024-09-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
Q022024196A02
|
2024-07-14
|
2024-09-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HARPER STREET, QUEENS, FROM STREET DEAD END TO STREET MARINA ROAD
|
Q022024196A03
|
2024-07-14
|
2024-09-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HARPER STREET, QUEENS, FROM STREET DEAD END TO STREET MARINA ROAD
|
M022024185A06
|
2024-07-03
|
2024-09-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024185A13
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022024185A12
|
2024-07-03
|
2024-09-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024185A11
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024185A10
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024185A09
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024185A08
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024185A07
|
2024-07-03
|
2024-09-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024185A05
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022024185A04
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024185A03
|
2024-07-03
|
2024-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024185A02
|
2024-07-03
|
2024-09-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024185A01
|
2024-07-03
|
2024-09-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024183A80
|
2024-07-01
|
2024-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CANAL STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024183A76
|
2024-07-01
|
2024-09-28
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024183A77
|
2024-07-01
|
2024-09-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024183A78
|
2024-07-01
|
2024-09-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CANAL STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024183A79
|
2024-07-01
|
2024-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024149B96
|
2024-05-28
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CANAL STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024149B95
|
2024-05-28
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CANAL STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024141A35
|
2024-05-20
|
2024-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024141A34
|
2024-05-20
|
2024-06-26
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024141A36
|
2024-05-20
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET VARICK STREET
|
M022024109B72
|
2024-04-18
|
2024-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024109B70
|
2024-04-18
|
2024-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024109B71
|
2024-04-18
|
2024-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024109B76
|
2024-04-18
|
2024-05-17
|
CROSSING SIDEWALK
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024109B75
|
2024-04-18
|
2024-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024109B74
|
2024-04-18
|
2024-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024109B73
|
2024-04-18
|
2024-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022024087A09
|
2024-03-27
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024087A19
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022024087A18
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022024087A17
|
2024-03-27
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024087A16
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024087A15
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024087A14
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024087A13
|
2024-03-27
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024087A12
|
2024-03-27
|
2024-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022024087A11
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024087A10
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024087A08
|
2024-03-27
|
2024-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024087A20
|
2024-03-27
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024075A01
|
2024-03-15
|
2024-03-22
|
PLACE MATERIAL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024075A04
|
2024-03-15
|
2024-03-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024075A03
|
2024-03-15
|
2024-03-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024075A02
|
2024-03-15
|
2024-03-22
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M152024059A16
|
2024-02-28
|
2024-03-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024010B06
|
2024-01-10
|
2024-01-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024010B07
|
2024-01-10
|
2024-01-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024010B05
|
2024-01-10
|
2024-01-28
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024010B04
|
2024-01-10
|
2024-01-28
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022024010B03
|
2024-01-10
|
2024-01-28
|
PLACE MATERIAL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M152024003A00
|
2024-01-03
|
2024-01-28
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012023362A23
|
2023-12-28
|
2024-03-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023362A21
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023362A22
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023362A23
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023362A24
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023362A25
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023362A31
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023362A26
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023362A27
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023362A28
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023362A29
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023362A30
|
2023-12-28
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023362A35
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023362A34
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022023362A33
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012023362A22
|
2023-12-28
|
2024-03-30
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023362A20
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B012023362A06
|
2023-12-28
|
2024-03-24
|
E.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET
|
M022023362A32
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023362A16
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023362A17
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023362A18
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023362A19
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M012023298A94
|
2023-10-25
|
2023-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298C01
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023298C02
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023298C03
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023298C07
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298C08
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298C09
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298C16
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022023298C17
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023298C04
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023298C05
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298C06
|
2023-10-25
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298B98
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023298B99
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023298C00
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023298B96
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023298B93
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023298B92
|
2023-10-25
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023298B95
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023298B94
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012023298A93
|
2023-10-25
|
2023-12-31
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023298B97
|
2023-10-25
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M002023297A25
|
2023-10-24
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M002023297A24
|
2023-10-24
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022023265A32
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012023265A23
|
2023-09-22
|
2023-10-23
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012023265A22
|
2023-09-22
|
2023-10-23
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023265A51
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023265A50
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022023265A49
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023265A48
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023265A47
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023265A46
|
2023-09-22
|
2023-10-23
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023265A45
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023265A44
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023265A43
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023265A42
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023265A41
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023265A40
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023265A39
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023265A38
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023265A37
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023265A36
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023265A35
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023265A34
|
2023-09-22
|
2023-10-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023265A33
|
2023-09-22
|
2023-10-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B012023256A43
|
2023-09-13
|
2023-12-23
|
E.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET
|
M022023214A47
|
2023-08-02
|
2023-08-21
|
PLACE CRANE OR SHOVEL ON STREET
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023214A49
|
2023-08-02
|
2023-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023214A48
|
2023-08-02
|
2023-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M152023212A05
|
2023-07-31
|
2023-08-21
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023206B80
|
2023-07-25
|
2023-08-20
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023206B78
|
2023-07-25
|
2023-08-20
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023206B77
|
2023-07-25
|
2023-08-20
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023206B76
|
2023-07-25
|
2023-08-20
|
PLACE MATERIAL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023206B79
|
2023-07-25
|
2023-08-20
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M152023202A08
|
2023-07-21
|
2023-08-20
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023195A22
|
2023-07-14
|
2023-07-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023195A21
|
2023-07-14
|
2023-07-30
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023195A23
|
2023-07-14
|
2023-07-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M152023195A29
|
2023-07-14
|
2023-08-06
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023195A20
|
2023-07-14
|
2023-07-30
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023195A19
|
2023-07-14
|
2023-07-30
|
PLACE MATERIAL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M152023188A42
|
2023-07-07
|
2023-07-30
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B55
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023178B67
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B65
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023178B64
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023178B63
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023178B62
|
2023-06-27
|
2023-09-24
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012023178A86
|
2023-06-27
|
2023-09-24
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012023178A87
|
2023-06-27
|
2023-09-24
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023178B66
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022023178B51
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023178B52
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B48
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B012023178A73
|
2023-06-27
|
2023-09-24
|
E.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET
|
M022023178B54
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023178B49
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B50
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B53
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023178B61
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023178B60
|
2023-06-27
|
2023-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B59
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023178B58
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023178B57
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023178B56
|
2023-06-27
|
2023-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
B012023164E02
|
2023-06-13
|
2023-06-26
|
E.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET
|
M022023139B42
|
2023-05-19
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B46
|
2023-05-19
|
2023-06-26
|
CROSSING SIDEWALK
|
WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B45
|
2023-05-19
|
2023-06-26
|
CROSSING SIDEWALK
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B44
|
2023-05-19
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B43
|
2023-05-19
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B41
|
2023-05-19
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B40
|
2023-05-19
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023139B39
|
2023-05-19
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023135B42
|
2023-05-15
|
2023-06-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023135B41
|
2023-05-15
|
2023-06-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023135B40
|
2023-05-15
|
2023-06-21
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023125C12
|
2023-05-05
|
2023-05-20
|
PLACE CRANE OR SHOVEL ON STREET
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023125C13
|
2023-05-05
|
2023-05-20
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023125C14
|
2023-05-05
|
2023-05-20
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023087A06
|
2023-03-28
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023087A05
|
2023-03-28
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022023086E66
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012023086A93
|
2023-03-27
|
2023-06-26
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023086E67
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023086E68
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023086E69
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022023086E70
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023086E64
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023086E77
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023086E76
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023086E75
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023086E74
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023086E73
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023086E72
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022023086E65
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022023086E71
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012023086A94
|
2023-03-27
|
2023-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023086E81
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023086E80
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023086E79
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022023086E78
|
2023-03-27
|
2023-06-26
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
B012023079B03
|
2023-03-20
|
2023-06-13
|
E.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET
|
M022023076C66
|
2023-03-17
|
2023-05-17
|
CROSSING SIDEWALK
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C65
|
2023-03-17
|
2023-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C64
|
2023-03-17
|
2023-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C67
|
2023-03-17
|
2023-05-17
|
CROSSING SIDEWALK
|
WEST 56 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C60
|
2023-03-17
|
2023-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C61
|
2023-03-17
|
2023-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C62
|
2023-03-17
|
2023-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023076C63
|
2023-03-17
|
2023-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022363C95
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B012022363D57
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022363D58
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022363D59
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022363D53
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022363D54
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022363D55
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022363D56
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022363D60
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022363D61
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022363D62
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022363D63
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022363D64
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022363D65
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022363D66
|
2022-12-29
|
2023-01-13
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022022363D31
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022363D30
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022363D29
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022363D28
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022363D27
|
2022-12-29
|
2023-01-13
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022363D26
|
2022-12-29
|
2023-01-13
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D25
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D24
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D23
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022363D22
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D21
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022363D20
|
2022-12-29
|
2023-01-13
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022363D19
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D18
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022363D17
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022363D16
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D15
|
2022-12-29
|
2023-01-13
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D14
|
2022-12-29
|
2023-01-13
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363D13
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363D12
|
2022-12-29
|
2023-01-13
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363D11
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D10
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D09
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D08
|
2022-12-29
|
2023-01-13
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D07
|
2022-12-29
|
2023-01-13
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022363D06
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D05
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D04
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D03
|
2022-12-29
|
2023-01-13
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022363D02
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022363D01
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363D00
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363C99
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363C98
|
2022-12-29
|
2023-01-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363C97
|
2022-12-29
|
2023-01-13
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022363C96
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363C94
|
2022-12-29
|
2023-01-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363C93
|
2022-12-29
|
2023-01-13
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022363C92
|
2022-12-29
|
2023-01-13
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
M022022362A76
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022362A78
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022362A79
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022362A80
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012022362A36
|
2022-12-28
|
2023-03-31
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A81
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012022362A37
|
2022-12-28
|
2023-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A75
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022362A77
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022362A70
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022362A71
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022362A72
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022362A85
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A86
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A87
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A82
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022362A83
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A84
|
2022-12-28
|
2023-03-31
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022362A73
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022362A74
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022355B73
|
2022-12-21
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M022022355B74
|
2022-12-21
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B022022348D82
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D81
|
2022-12-14
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D80
|
2022-12-14
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D72
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D71
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D79
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D74
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D75
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B012022348B65
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022348B64
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022348B63
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022348B62
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022348B61
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022348B59
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022348B58
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022348B60
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022348B57
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022348B56
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022348B55
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348E04
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022348E03
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022348E02
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022348E01
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022348E00
|
2022-12-14
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022348D99
|
2022-12-14
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D98
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D97
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D96
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B012022348B68
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022348B67
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022348B66
|
2022-12-14
|
2022-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022348D77
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D76
|
2022-12-14
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D78
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D73
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D87
|
2022-12-14
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D88
|
2022-12-14
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D89
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D90
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022348D91
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022348D92
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D93
|
2022-12-14
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022348D94
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022348D95
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022348D70
|
2022-12-14
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022348D69
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D68
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022348D67
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D66
|
2022-12-14
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D65
|
2022-12-14
|
2022-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022348D86
|
2022-12-14
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D85
|
2022-12-14
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022348D84
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022348D83
|
2022-12-14
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
M022022325A70
|
2022-11-21
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022325A69
|
2022-11-21
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET
|
M002022304A69
|
2022-10-31
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022022291B81
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022291B80
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022291B66
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022291B65
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022291B79
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022291B64
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022291B67
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M012022291A68
|
2022-10-18
|
2022-12-31
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022291A69
|
2022-10-18
|
2022-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022291B78
|
2022-10-18
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022291B77
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022291B76
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022291B75
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022291B74
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022291B73
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022291B72
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022291B71
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022291B70
|
2022-10-18
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022291B69
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022291B68
|
2022-10-18
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022284B41
|
2022-10-11
|
2022-10-16
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022284B45
|
2022-10-11
|
2022-10-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022284B44
|
2022-10-11
|
2022-10-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022284B43
|
2022-10-11
|
2022-10-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022284B42
|
2022-10-11
|
2022-10-16
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280B29
|
2022-10-07
|
2022-10-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280A86
|
2022-10-07
|
2022-10-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280A85
|
2022-10-07
|
2022-10-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280A84
|
2022-10-07
|
2022-10-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280A82
|
2022-10-07
|
2022-10-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280A83
|
2022-10-07
|
2022-10-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280B33
|
2022-10-07
|
2022-10-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280B32
|
2022-10-07
|
2022-10-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280B31
|
2022-10-07
|
2022-10-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022280B30
|
2022-10-07
|
2022-10-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C71
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022263C70
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022263C69
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022263C65
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022263C64
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022263C63
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022263C62
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022263C61
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022263C60
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022263C68
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022263C67
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022263C66
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012022263B05
|
2022-09-20
|
2022-11-14
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022263B06
|
2022-09-20
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C77
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C76
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C75
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C74
|
2022-09-20
|
2022-11-14
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C73
|
2022-09-20
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022263C72
|
2022-09-20
|
2022-11-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B022022258D47
|
2022-09-15
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022257B64
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B63
|
2022-09-14
|
2022-12-14
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257A34
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022257A33
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022257A32
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022257A31
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022257A30
|
2022-09-14
|
2022-12-14
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022257A29
|
2022-09-14
|
2022-12-14
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A28
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A27
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A26
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A25
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A24
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A23
|
2022-09-14
|
2022-12-14
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A22
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A21
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A20
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A19
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A18
|
2022-09-14
|
2022-12-14
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A17
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A16
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A15
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A14
|
2022-09-14
|
2022-12-14
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A13
|
2022-09-14
|
2022-12-14
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022257A12
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A11
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A10
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A09
|
2022-09-14
|
2022-12-14
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022257A08
|
2022-09-14
|
2022-12-14
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A07
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022257A06
|
2022-09-14
|
2022-12-14
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022257B66
|
2022-09-14
|
2022-12-14
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B67
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B68
|
2022-09-14
|
2022-12-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B69
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B70
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B71
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022257B72
|
2022-09-14
|
2022-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022257B08
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022257A33
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022257A34
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022257B06
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022257B07
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022257B09
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022022257B65
|
2022-09-14
|
2022-12-14
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022257A30
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022257A31
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022257A25
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022257A26
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022257A27
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022257A28
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022257A29
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022257A32
|
2022-09-14
|
2022-12-14
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
Q022022251B06
|
2022-09-08
|
2022-11-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
48 STREET, QUEENS, FROM STREET 58 ROAD TO STREET MASPETH AVENUE
|
Q022022251B08
|
2022-09-08
|
2022-11-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
48 STREET, QUEENS, FROM STREET 58 ROAD TO STREET MASPETH AVENUE
|
Q022022251B07
|
2022-09-08
|
2022-11-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
48 STREET, QUEENS, FROM STREET 58 ROAD TO STREET MASPETH AVENUE
|
M012022216B03
|
2022-08-04
|
2022-09-24
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022216B02
|
2022-08-04
|
2022-09-24
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022173F20
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022173F19
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022173F18
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022173F17
|
2022-06-22
|
2022-09-24
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022173F16
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022173F15
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022173F14
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022173F13
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022173F12
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022173F11
|
2022-06-22
|
2022-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022173F07
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022173F06
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022173F05
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022173F04
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022173F03
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022173B85
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022173B84
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022173B83
|
2022-06-22
|
2022-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B012022172A02
|
2022-06-21
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022172A03
|
2022-06-21
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022172A01
|
2022-06-21
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A11
|
2022-06-21
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A12
|
2022-06-21
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A13
|
2022-06-21
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A14
|
2022-06-21
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A15
|
2022-06-21
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A16
|
2022-06-21
|
2022-09-15
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A17
|
2022-06-21
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A18
|
2022-06-21
|
2022-09-15
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022172A04
|
2022-06-21
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022022172A09
|
2022-06-21
|
2022-09-15
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022172A10
|
2022-06-21
|
2022-09-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022168D55
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D56
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D57
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D58
|
2022-06-17
|
2022-09-15
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D60
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022168D61
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022168D62
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022168D63
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022168D34
|
2022-06-17
|
2022-09-15
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022168D35
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D36
|
2022-06-17
|
2022-09-15
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D37
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022168D38
|
2022-06-17
|
2022-09-15
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D39
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D40
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D41
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D42
|
2022-06-17
|
2022-09-15
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022168B69
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022168B67
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022168B66
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022168B65
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022168B64
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D46
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D47
|
2022-06-17
|
2022-09-15
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D48
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D49
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D50
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D51
|
2022-06-17
|
2022-09-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D52
|
2022-06-17
|
2022-09-15
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D53
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022168D54
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022168D44
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D45
|
2022-06-17
|
2022-09-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022168D59
|
2022-06-17
|
2022-09-15
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022168B73
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022168B72
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022168B71
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022168B70
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022168B68
|
2022-06-17
|
2022-09-15
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022022168D43
|
2022-06-17
|
2022-09-15
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022154A87
|
2022-06-03
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B042022154A06
|
2022-06-03
|
2022-06-26
|
REPAIR SIDEWALK
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B022022147C40
|
2022-05-27
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
M022022145A73
|
2022-05-25
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022145A69
|
2022-05-25
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022145A71
|
2022-05-25
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022145A72
|
2022-05-25
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022145A70
|
2022-05-25
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
B022022144A51
|
2022-05-24
|
2022-06-26
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A48
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A47
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A46
|
2022-05-24
|
2022-06-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A45
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A44
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A43
|
2022-05-24
|
2022-06-26
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022144A31
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022144A30
|
2022-05-24
|
2022-06-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022144A29
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022144A28
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022144A27
|
2022-05-24
|
2022-06-26
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022144A26
|
2022-05-24
|
2022-06-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A25
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A24
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A23
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A22
|
2022-05-24
|
2022-06-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A21
|
2022-05-24
|
2022-06-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A20
|
2022-05-24
|
2022-06-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A19
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A18
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A17
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A16
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A15
|
2022-05-24
|
2022-06-26
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A14
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A13
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A12
|
2022-05-24
|
2022-06-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A11
|
2022-05-24
|
2022-06-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A10
|
2022-05-24
|
2022-06-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022144A09
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A08
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A07
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A06
|
2022-05-24
|
2022-06-26
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022144A05
|
2022-05-24
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022144A04
|
2022-05-24
|
2022-06-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A03
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022144A02
|
2022-05-24
|
2022-06-26
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022144A50
|
2022-05-24
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022144A29
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022144A28
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022144A27
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022144A26
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022144A24
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022144A23
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022144A22
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022144A20
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022144A19
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022144A18
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022144A17
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022144A16
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022144A15
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022144A21
|
2022-05-24
|
2022-06-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022144A49
|
2022-05-24
|
2022-06-26
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
M012022140A70
|
2022-05-20
|
2022-06-22
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022137A86
|
2022-05-17
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022137A88
|
2022-05-17
|
2022-06-26
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022137A89
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022137A84
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022137A83
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022137A85
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022137A93
|
2022-05-17
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022137A92
|
2022-05-17
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022137A91
|
2022-05-17
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022137A90
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022137A94
|
2022-05-17
|
2022-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022137A87
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022137A82
|
2022-05-17
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
B042022126A03
|
2022-05-06
|
2022-06-03
|
REPAIR SIDEWALK
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B022022126A04
|
2022-05-06
|
2022-06-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
M012022111A64
|
2022-04-21
|
2022-05-23
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012022111A63
|
2022-04-21
|
2022-05-23
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022111A62
|
2022-04-21
|
2022-05-23
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012022111A61
|
2022-04-21
|
2022-05-23
|
INSTALL FENCE
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M012022111A65
|
2022-04-21
|
2022-05-23
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M042022095A10
|
2022-04-05
|
2022-05-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET HOGAN PLACE
|
M022022095C27
|
2022-04-05
|
2022-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET HOGAN PLACE
|
M042022095A09
|
2022-04-05
|
2022-05-03
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET HOGAN PLACE
|
M022022095C28
|
2022-04-05
|
2022-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET HOGAN PLACE
|
M012022095D47
|
2022-04-05
|
2022-05-04
|
RESET, REPAIR OR REPLACE CURB
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET HOGAN PLACE
|
B022022088C22
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B012022088A83
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022088A84
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022088A85
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022088A86
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022088A87
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022088A88
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022088A89
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022088A90
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012022088A91
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022088A92
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022088B04
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022088B05
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022088B06
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012022088B07
|
2022-03-29
|
2022-05-26
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022022088C32
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C21
|
2022-03-29
|
2022-05-26
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022088C23
|
2022-03-29
|
2022-05-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022088C24
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022088C25
|
2022-03-29
|
2022-05-26
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C26
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C27
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C28
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C29
|
2022-03-29
|
2022-05-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C30
|
2022-03-29
|
2022-05-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C31
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C33
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022088C34
|
2022-03-29
|
2022-05-26
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C35
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C36
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022088C37
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022088C38
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C39
|
2022-03-29
|
2022-05-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022088C40
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022088C41
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C42
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022088C43
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C44
|
2022-03-29
|
2022-05-26
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022088C45
|
2022-03-29
|
2022-05-26
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022088C46
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022088C47
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022088C48
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022088C49
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022088D00
|
2022-03-29
|
2022-05-26
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022088D01
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022088D02
|
2022-03-29
|
2022-05-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022088D03
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022088D04
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022088D05
|
2022-03-29
|
2022-05-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022088D07
|
2022-03-29
|
2022-05-26
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
M012022087B36
|
2022-03-28
|
2022-04-23
|
INSTALL FENCE
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M012022087B40
|
2022-03-28
|
2022-04-23
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012022087B39
|
2022-03-28
|
2022-04-23
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012022087B38
|
2022-03-28
|
2022-04-23
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022087B37
|
2022-03-28
|
2022-04-23
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012022083A66
|
2022-03-24
|
2022-04-24
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012022083A67
|
2022-03-24
|
2022-04-24
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022083A65
|
2022-03-24
|
2022-04-24
|
INSTALL FENCE
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022056B67
|
2022-02-25
|
2022-05-14
|
TEMPORARY PEDESTRIAN WALK
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022056B66
|
2022-02-25
|
2022-05-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022056B65
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056B64
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022056B63
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022056B62
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056B60
|
2022-02-25
|
2022-05-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056B59
|
2022-02-25
|
2022-05-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056B58
|
2022-02-25
|
2022-05-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056B61
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056C72
|
2022-02-25
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022056C71
|
2022-02-25
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M022022056C70
|
2022-02-25
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022056C69
|
2022-02-25
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M022022056B70
|
2022-02-25
|
2022-05-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022056B69
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M022022056B68
|
2022-02-25
|
2022-05-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022056A41
|
2022-02-25
|
2022-03-25
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
M012022056A40
|
2022-02-25
|
2022-03-25
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET BAYARD STREET TO STREET WHITE STREET
|
M012022056A39
|
2022-02-25
|
2022-03-25
|
INSTALL FENCE
|
WHITE STREET, MANHATTAN, FROM STREET BAXTER STREET TO STREET CENTRE STREET
|
M012022056A21
|
2022-02-25
|
2022-03-15
|
INSTALL FENCE
|
CENTRE STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M012022056A20
|
2022-02-25
|
2022-03-15
|
INSTALL FENCE
|
BAXTER STREET, MANHATTAN, FROM STREET WALKER STREET TO STREET WHITE STREET
|
M022022056C73
|
2022-02-25
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CENTRE STREET, MANHATTAN, FROM STREET HOGAN PLACE TO STREET WHITE STREET
|
B012022055B28
|
2022-02-24
|
2022-03-25
|
INSTALL FENCE - PROTECTED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022055B27
|
2022-02-24
|
2022-03-25
|
INSTALL FENCE
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B012022055B57
|
2022-02-24
|
2022-03-25
|
INSTALL FENCE
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022055B30
|
2022-02-24
|
2022-03-25
|
INSTALL FENCE - PROTECTED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022055B29
|
2022-02-24
|
2022-03-25
|
INSTALL FENCE - PROTECTED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022054B71
|
2022-02-23
|
2022-05-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022054B66
|
2022-02-23
|
2022-05-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022054B70
|
2022-02-23
|
2022-05-24
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022035A75
|
2022-02-04
|
2022-04-02
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022035A76
|
2022-02-04
|
2022-04-02
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022035A74
|
2022-02-04
|
2022-04-02
|
TEMP. CONST. SIGNS/MARKINGS
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022035A73
|
2022-02-04
|
2022-04-02
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012022032A04
|
2022-02-01
|
2022-02-23
|
INSTALL FENCE
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B012022032A08
|
2022-02-01
|
2022-02-23
|
INSTALL FENCE - PROTECTED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012022032A07
|
2022-02-01
|
2022-02-23
|
INSTALL FENCE - PROTECTED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B012022032A05
|
2022-02-01
|
2022-02-23
|
INSTALL FENCE - PROTECTED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022032A06
|
2022-02-01
|
2022-02-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012022032A06
|
2022-02-01
|
2022-02-23
|
INSTALL FENCE
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022032A07
|
2022-02-01
|
2022-04-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022032A04
|
2022-02-01
|
2022-04-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022032A00
|
2022-02-01
|
2022-04-02
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022032A01
|
2022-02-01
|
2022-04-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022032A02
|
2022-02-01
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022032A03
|
2022-02-01
|
2022-04-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET BODY OF WATER
|
B022022032A08
|
2022-02-01
|
2022-04-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022032A09
|
2022-02-01
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022032A10
|
2022-02-01
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022032A11
|
2022-02-01
|
2022-02-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022032A05
|
2022-02-01
|
2022-02-23
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022026B25
|
2022-01-26
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022026B20
|
2022-01-26
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022026B21
|
2022-01-26
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022026B22
|
2022-01-26
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022022026B23
|
2022-01-26
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022022026B28
|
2022-01-26
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022026B27
|
2022-01-26
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022026B26
|
2022-01-26
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022026B24
|
2022-01-26
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B152022024A02
|
2022-01-24
|
2022-04-02
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022022013B11
|
2022-01-13
|
2022-04-05
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022022013B12
|
2022-01-13
|
2022-04-05
|
TEMP. CONST. SIGNS/MARKINGS
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022022013B10
|
2022-01-13
|
2022-04-05
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET
|
B022021363A15
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021363A16
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021363C45
|
2021-12-29
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021363C46
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021363C47
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021363C48
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021363C49
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021363C50
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012021363A13
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012021363A14
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021363A15
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021363B05
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021363B04
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021363A16
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012021363A12
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012021363A11
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012021363A10
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012021363A17
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012021363A18
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022021363A01
|
2021-12-29
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021363A02
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021363A03
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021363A04
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021363A05
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012021363B03
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021363A06
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012021363B02
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012021363A19
|
2021-12-29
|
2022-03-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022021363A07
|
2021-12-29
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021363A08
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021363A09
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021363A11
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021363A10
|
2021-12-29
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021363A12
|
2021-12-29
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021363A13
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021363A14
|
2021-12-29
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012021298C10
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021298C16
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B022021298C23
|
2021-10-25
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021298C24
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021298C25
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021298C26
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021298C27
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021298C28
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B022021298C29
|
2021-10-25
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021298C30
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021298C31
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021298C32
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021298C33
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021298C34
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B022021298C35
|
2021-10-25
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021298C36
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021298C37
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021298C38
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021298C39
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B022021298C40
|
2021-10-25
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021298C41
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021298C42
|
2021-10-25
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021298C43
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B022021298C44
|
2021-10-25
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012021298C15
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021298C14
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012021298C06
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021298C05
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021298C04
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012021298C03
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET
|
B012021298C01
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012021298C00
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
BUTLER STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET
|
B012021298C08
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012021298C13
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION WATER
|
DE GRAW STREET, BROOKLYN, FROM STREET NEVINS STREET TO STREET DEAD END
|
B012021298C11
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
DOUGLASS STREET, BROOKLYN, FROM STREET NEVINS STREET
|
B012021298C09
|
2021-10-25
|
2021-12-31
|
DEP CONTRACTOR MAJOR INSTALLATION SEWER
|
NEVINS STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET
|
B012021176A54
|
2021-06-25
|
2021-09-24
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SUMMIT STREET, BROOKLYN, FROM STREET IMLAY STREET TO STREET VAN BRUNT STREET
|
B012021083A99
|
2021-03-24
|
2021-04-20
|
INSTALL FENCE
|
INDIA STREET, BROOKLYN, FROM STREET DEAD END TO STREET WEST STREET
|
B012021083B23
|
2021-03-24
|
2021-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SUMMIT STREET, BROOKLYN, FROM STREET IMLAY STREET TO STREET VAN BRUNT STREET
|
B012021083B19
|
2021-03-24
|
2021-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FERRIS STREET, BROOKLYN, FROM STREET SULLIVAN STREET TO STREET WOLCOTT STREET
|
B012021083B20
|
2021-03-24
|
2021-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FERRIS STREET, BROOKLYN, FROM STREET KING STREET TO STREET SULLIVAN STREET
|
B012021083B21
|
2021-03-24
|
2021-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KING STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET
|
B012021083B18
|
2021-03-24
|
2021-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WOLCOTT STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET
|
B012021055D31
|
2021-02-24
|
2021-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012021055D32
|
2021-02-24
|
2021-04-30
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020366B10
|
2020-12-31
|
2021-02-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020366B11
|
2020-12-31
|
2021-02-28
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020357C76
|
2020-12-22
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WOLCOTT STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET
|
B012020357C78
|
2020-12-22
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FERRIS STREET, BROOKLYN, FROM STREET KING STREET TO STREET SULLIVAN STREET
|
B012020357C77
|
2020-12-22
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FERRIS STREET, BROOKLYN, FROM STREET SULLIVAN STREET TO STREET WOLCOTT STREET
|
B012020357D07
|
2020-12-22
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KING STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET
|
B012020357C80
|
2020-12-22
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SUMMIT STREET, BROOKLYN, FROM STREET IMLAY STREET TO STREET VAN BRUNT STREET
|
B012020338B17
|
2020-12-03
|
2020-12-31
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020338B16
|
2020-12-03
|
2020-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020330C04
|
2020-11-25
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FERRIS STREET, BROOKLYN, FROM STREET KING STREET TO STREET SULLIVAN STREET
|
B012020330C02
|
2020-11-25
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WOLCOTT STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET
|
B012020330C03
|
2020-11-25
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FERRIS STREET, BROOKLYN, FROM STREET SULLIVAN STREET TO STREET WOLCOTT STREET
|
B012020330C07
|
2020-11-25
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SUMMIT STREET, BROOKLYN, FROM STREET IMLAY STREET TO STREET VAN BRUNT STREET
|
B012020330C05
|
2020-11-25
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KING STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET
|
B012020268B07
|
2020-09-24
|
2020-11-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020268B08
|
2020-09-24
|
2020-11-27
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020188C00
|
2020-07-06
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
Q012020183B52
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET COURT SQUARE TO STREET PEARSON STREET
|
Q012020183B44
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012020183B48
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012020183B47
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012020183B46
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012020183B55
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET THOMSON AVENUE TO STREET 44 DRIVE
|
Q012020183B54
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE
|
Q012020183B53
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE TO STREET COURT SQUARE
|
Q012020183B45
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012020183B51
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q012020183B50
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
Q012020183B49
|
2020-07-01
|
2020-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
B012020181A97
|
2020-06-29
|
2020-09-22
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020181A87
|
2020-06-29
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
B012020181A98
|
2020-06-29
|
2020-09-22
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
Q012020178C63
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE
|
Q012020178C53
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012020178C54
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012020178C55
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012020178C56
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012020178C57
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012020178C58
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
Q012020178C59
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
Q012020178C60
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q012020178C61
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET COURT SQUARE TO STREET PEARSON STREET
|
Q012020178C62
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE TO STREET COURT SQUARE
|
Q012020178C64
|
2020-06-26
|
2020-06-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET THOMSON AVENUE TO STREET 44 DRIVE
|
B012020121A73
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
Q012020121A35
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012020121A43
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE TO STREET COURT SQUARE
|
Q012020121A44
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE
|
Q012020121A45
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET THOMSON AVENUE TO STREET 44 DRIVE
|
Q012020121A34
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012020121A33
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012020121A42
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET COURT SQUARE TO STREET PEARSON STREET
|
Q012020121A41
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q012020121A39
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
Q012020121A38
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
Q012020121A37
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012020121A36
|
2020-04-30
|
2020-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012020087A23
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012020087A22
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012020087A21
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012020087A20
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012020087A18
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE
|
Q012020087A19
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012020087A17
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 50 AVENUE
|
Q012020087A15
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
50 AVENUE, QUEENS, FROM STREET JACKSON AVENUE TO STREET VERNON BOULEVARD
|
Q012020087A39
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET THOMSON AVENUE TO STREET 44 DRIVE
|
Q012020087A38
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE
|
Q012020087A37
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE TO STREET COURT SQUARE
|
Q012020087A36
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET COURT SQUARE TO STREET PEARSON STREET
|
Q012020087A35
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q012020087A34
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
COURT SQUARE, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
B012020087B69
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
Q012020087A26
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
21 STREET, QUEENS, FROM STREET 47 ROAD TO STREET JACKSON AVENUE
|
Q012020087A25
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
Q012020087A24
|
2020-03-27
|
2020-04-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
B012020079D52
|
2020-03-19
|
2020-06-24
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012020079D53
|
2020-03-19
|
2020-06-24
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019353C13
|
2019-12-19
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
B012019353C63
|
2019-12-19
|
2020-03-26
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019353C62
|
2019-12-19
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
Q012019351B52
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012019351B71
|
2019-12-17
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
COURT SQUARE, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019351B76
|
2019-12-17
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET THOMSON AVENUE TO STREET 44 DRIVE
|
Q012019351B75
|
2019-12-17
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE
|
Q012019351B74
|
2019-12-17
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE TO STREET COURT SQUARE
|
Q012019351B73
|
2019-12-17
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET COURT SQUARE TO STREET PEARSON STREET
|
Q012019351B72
|
2019-12-17
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q012019351B56
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
Q012019351B55
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
Q012019351B54
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012019351B53
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012019351B51
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012019351B50
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012019351B28
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE
|
Q012019351B27
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 50 AVENUE
|
Q012019351B25
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
50 AVENUE, QUEENS, FROM STREET JACKSON AVENUE TO STREET VERNON BOULEVARD
|
Q012019351B57
|
2019-12-17
|
2020-03-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
21 STREET, QUEENS, FROM STREET 47 ROAD TO STREET JACKSON AVENUE
|
Q012019330C20
|
2019-11-26
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
COURT SQUARE, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019330C21
|
2019-11-26
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q012019330C25
|
2019-11-26
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET THOMSON AVENUE TO STREET 44 DRIVE
|
Q012019330C24
|
2019-11-26
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE
|
Q012019330C23
|
2019-11-26
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 45 AVENUE TO STREET COURT SQUARE
|
Q012019330C22
|
2019-11-26
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET COURT SQUARE TO STREET PEARSON STREET
|
M012019294B50
|
2019-10-21
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FDR DRIVE NB EXIT 2, MANHATTAN, FROM STREET SOUTH STREET
|
M012019294B49
|
2019-10-21
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FDR DRIVE NB EXIT 2, MANHATTAN, FROM STREET SOUTH STREET
|
M012019291B00
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET
|
M012019291A66
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PECK SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
M012019291A67
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PECK SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
M012019291A69
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET DOVER STREET TO STREET PECK SLIP
|
M012019291A68
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET DOVER STREET TO STREET PECK SLIP
|
M012019291A88
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019291A89
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019291A90
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PINE STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019291A91
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PINE STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019291A92
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET MAIDEN LANE TO STREET PINE STREET
|
M012019291A93
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET MAIDEN LANE TO STREET PINE STREET
|
M012019291A99
|
2019-10-18
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET
|
M012019289A52
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET JOHN STREET
|
M012019289A50
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FLETCHER STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019289A49
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE
|
M012019289A48
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE
|
M012019289A47
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MAIDEN LANE, MANHATTAN, FROM STREET SOUTH STREET
|
M012019289A46
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MAIDEN LANE, MANHATTAN, FROM STREET SOUTH STREET
|
M012019289A55
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JOHN STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019289A54
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JOHN STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019289A53
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET JOHN STREET
|
M012019289A51
|
2019-10-16
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FLETCHER STREET, MANHATTAN, FROM STREET SOUTH STREET
|
Q012019280B36
|
2019-10-07
|
2019-11-05
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
216 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET PEDESTRIAN OVERPASS
|
Q012019280B35
|
2019-10-07
|
2019-11-05
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
216 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET PEDESTRIAN OVERPASS
|
M012019277A46
|
2019-10-04
|
2019-10-29
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019277A47
|
2019-10-04
|
2019-10-29
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019267F72
|
2019-09-24
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019267F73
|
2019-09-24
|
2019-12-27
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
M012019262A13
|
2019-09-19
|
2019-10-08
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019259F97
|
2019-09-16
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
Q012019256A84
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE
|
Q012019256A91
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
21 STREET, QUEENS, FROM STREET 47 ROAD TO STREET JACKSON AVENUE
|
Q012019256A79
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
50 AVENUE, QUEENS, FROM STREET JACKSON AVENUE TO STREET VERNON BOULEVARD
|
Q012019256A80
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012019256A83
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 50 AVENUE
|
Q012019256A85
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012019256A86
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012019256A87
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012019256A88
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012019256A89
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
Q012019256A90
|
2019-09-13
|
2019-12-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
M012019235B45
|
2019-08-23
|
2019-09-28
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019235B46
|
2019-08-23
|
2019-09-28
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019204B28
|
2019-07-23
|
2019-08-29
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019204B27
|
2019-07-23
|
2019-08-29
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019186B99
|
2019-07-05
|
2019-07-30
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
M012019184C11
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET JOHN STREET
|
M012019184C10
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET JOHN STREET
|
M012019184C09
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FLETCHER STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184C08
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FLETCHER STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184C07
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE
|
M012019184C06
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE
|
M012019184C05
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MAIDEN LANE, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184C04
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MAIDEN LANE, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184C02
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET MAIDEN LANE TO STREET PINE STREET
|
M012019184C03
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET MAIDEN LANE TO STREET PINE STREET
|
M012019184C01
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PINE STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184C00
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PINE STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184B99
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019184B98
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019184B97
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET
|
M012019184B96
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET
|
M012019184B73
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FDR DRIVE NB EXIT 2, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184B72
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FDR DRIVE NB EXIT 2, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184B67
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET DOVER STREET TO STREET PECK SLIP
|
M012019184B66
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET DOVER STREET TO STREET PECK SLIP
|
M012019184B65
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PECK SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184B64
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PECK SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
B012019184B35
|
2019-07-03
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019184B36
|
2019-07-03
|
2019-09-28
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019184D40
|
2019-07-03
|
2019-07-30
|
INSTALL FENCE
|
COFFEY STREET, BROOKLYN, FROM STREET DRIVEWAY TO STREET FERRIS STREET
|
M012019184C13
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JOHN STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019184C12
|
2019-07-03
|
2019-09-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JOHN STREET, MANHATTAN, FROM STREET SOUTH STREET
|
B012019183B70
|
2019-07-02
|
2019-07-30
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET COFFEY STREET TO STREET DIKEMAN STREET
|
Q012019183A94
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012019183A97
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 50 AVENUE
|
Q012019183A98
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE
|
Q012019183A99
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
Q012019183B00
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012019183B01
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012019183B02
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012019183B03
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
Q012019183B04
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
Q012019183B05
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
21 STREET, QUEENS, FROM STREET 47 ROAD TO STREET JACKSON AVENUE
|
Q012019183A90
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
44 DRIVE, QUEENS, FROM STREET NYCTA SUBWAY TO STREET 21 STREET
|
Q012019183A89
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
44 DRIVE, QUEENS, FROM STREET 11 STREET TO STREET 21 STREET
|
M012019183C56
|
2019-07-02
|
2019-07-30
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019183C57
|
2019-07-02
|
2019-07-30
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019183D82
|
2019-07-02
|
2019-07-30
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET
|
B012019183D81
|
2019-07-02
|
2019-07-30
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
B012019183D79
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
B012019183D74
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GERRY STREET, BROOKLYN, FROM STREET BEND TO STREET MARCY AVENUE
|
B012019183D72
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE
|
B012019183D71
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET HOPKINS STREET
|
B012019183D70
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET HOPKINS STREET
|
B012019183D68
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, BROOKLYN, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE
|
B012019183C96
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NASSAU AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE
|
Q012019183A93
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
50 AVENUE, QUEENS, FROM STREET JACKSON AVENUE TO STREET VERNON BOULEVARD
|
Q012019183A91
|
2019-07-02
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
44 DRIVE, QUEENS, FROM STREET 23 STREET TO STREET HUNTER STREET
|
B012019168E24
|
2019-06-17
|
2019-06-26
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019168E23
|
2019-06-17
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
Q012019162A35
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET ARCH STREET
|
Q012019162A34
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 ROAD TO STREET ARCH STREET
|
Q012019162A33
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE
|
Q012019162A32
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 50 AVENUE
|
Q012019162A31
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
50 AVENUE, QUEENS, FROM STREET JACKSON AVENUE TO STREET VERNON BOULEVARD
|
Q012019162A37
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 AVENUE TO STREET 47 ROAD
|
Q012019162A36
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 47 AVENUE
|
Q012019162A39
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
21 STREET, QUEENS, FROM STREET 47 ROAD TO STREET JACKSON AVENUE
|
Q012019162A38
|
2019-06-11
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 47 ROAD TO STREET 48 AVENUE
|
M012019161B54
|
2019-06-10
|
2019-06-26
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019161B55
|
2019-06-10
|
2019-06-26
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019158B72
|
2019-06-07
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FDR DRIVE NB EXIT 2, MANHATTAN, FROM STREET SOUTH STREET
|
M012019158B67
|
2019-06-07
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FDR DRIVE NB EXIT 2, MANHATTAN, FROM STREET SOUTH STREET
|
B012019156A55
|
2019-06-05
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
Q012019155A29
|
2019-06-04
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
44 DRIVE, QUEENS, FROM STREET NYCTA SUBWAY TO STREET 21 STREET
|
Q012019155A30
|
2019-06-04
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
44 DRIVE, QUEENS, FROM STREET 23 STREET TO STREET HUNTER STREET
|
M012019154C61
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE
|
M012019154C62
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FLETCHER STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C63
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET JOHN STREET
|
M012019154C64
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JOHN STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C85
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET
|
M012019154C86
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET
|
M012019154C33
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019154C23
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET DOVER STREET TO STREET PECK SLIP
|
M012019154C22
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PECK SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C34
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PINE STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C35
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET MAIDEN LANE TO STREET PINE STREET
|
M012019154C36
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MAIDEN LANE, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C37
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET MAIDEN LANE
|
M012019154C38
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FLETCHER STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C39
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET JOHN STREET
|
M012019154C40
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JOHN STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C46
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PECK SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C47
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET DOVER STREET TO STREET PECK SLIP
|
M012019154C57
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019154C58
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PINE STREET, MANHATTAN, FROM STREET SOUTH STREET
|
M012019154C59
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SOUTH STREET, MANHATTAN, FROM STREET MAIDEN LANE TO STREET PINE STREET
|
M012019154C60
|
2019-06-03
|
2019-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MAIDEN LANE, MANHATTAN, FROM STREET SOUTH STREET
|
M012019151C24
|
2019-05-31
|
2019-06-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CATHERINE SLIP, MANHATTAN, FROM STREET UNNAMED STREET
|
M012019151C21
|
2019-05-31
|
2019-06-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CATHERINE SLIP, MANHATTAN, FROM STREET SOUTH STREET
|
M012019151C22
|
2019-05-31
|
2019-06-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CATHERINE SLIP, MANHATTAN, FROM STREET CATHERINE STREET
|
M012019151C23
|
2019-05-31
|
2019-06-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CATHERINE SLIP, MANHATTAN, FROM STREET CATHERINE STREET TO STREET UNNAMED STREET
|
B012019151D16
|
2019-05-31
|
2019-06-26
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
M012019151C25
|
2019-05-31
|
2019-06-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CATHERINE SLIP, MANHATTAN, FROM STREET SOUTH STREET TO STREET WATER STREET
|
B012019149E71
|
2019-05-29
|
2019-06-26
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET COFFEY STREET TO STREET DIKEMAN STREET
|
B012019149E75
|
2019-05-29
|
2019-06-26
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
B012019149E72
|
2019-05-29
|
2019-06-26
|
INSTALL FENCE
|
COFFEY STREET, BROOKLYN, FROM STREET DRIVEWAY TO STREET FERRIS STREET
|
B012019149E74
|
2019-05-29
|
2019-06-26
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET
|
B012019143A48
|
2019-05-23
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, BROOKLYN, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE
|
Q012019143D20
|
2019-05-23
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012019143D19
|
2019-05-23
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
B012019141A79
|
2019-05-21
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET HOPKINS STREET
|
B012019141A83
|
2019-05-21
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GERRY STREET, BROOKLYN, FROM STREET BEND TO STREET MARCY AVENUE
|
B012019141A81
|
2019-05-21
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE
|
B012019141A80
|
2019-05-21
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET HOPKINS STREET
|
Q012019137A45
|
2019-05-17
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
44 DRIVE, QUEENS, FROM STREET 11 STREET TO STREET 21 STREET
|
M012019126B70
|
2019-05-06
|
2019-06-09
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019126E62
|
2019-05-06
|
2019-06-02
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET
|
B012019126E63
|
2019-05-06
|
2019-06-02
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET COFFEY STREET TO STREET DIKEMAN STREET
|
M012019126B71
|
2019-05-06
|
2019-06-09
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019126E64
|
2019-05-06
|
2019-06-02
|
INSTALL FENCE
|
COFFEY STREET, BROOKLYN, FROM STREET DRIVEWAY TO STREET FERRIS STREET
|
B012019126E74
|
2019-05-06
|
2019-06-02
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
B012019126E59
|
2019-05-06
|
2019-06-02
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
M012019119A29
|
2019-04-29
|
2019-05-25
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019100G54
|
2019-04-10
|
2019-05-08
|
INSTALL FENCE
|
COFFEY STREET, BROOKLYN, FROM STREET DRIVEWAY TO STREET FERRIS STREET
|
B012019100G51
|
2019-04-10
|
2019-05-03
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
B012019100G50
|
2019-04-10
|
2019-05-08
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET
|
B012019100G53
|
2019-04-10
|
2019-05-08
|
INSTALL FENCE
|
FERRIS STREET, BROOKLYN, FROM STREET COFFEY STREET TO STREET DIKEMAN STREET
|
B012019100G55
|
2019-04-10
|
2019-05-09
|
INSTALL FENCE
|
WOLCOTT STREET, BROOKLYN, FROM STREET DEAD END TO STREET FERRIS STREET
|
M012019098B81
|
2019-04-08
|
2019-05-10
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019098B80
|
2019-04-08
|
2019-05-10
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019091D55
|
2019-04-01
|
2019-06-12
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
UNION AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
B012019077A42
|
2019-03-18
|
2019-06-19
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019077C43
|
2019-03-18
|
2019-06-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NASSAU AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE
|
B012019077A43
|
2019-03-18
|
2019-06-19
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
M012019074B52
|
2019-03-15
|
2019-04-13
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
Q012019072B88
|
2019-03-13
|
2019-06-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD
|
Q012019072B87
|
2019-03-13
|
2019-06-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
JACKSON AVENUE, QUEENS, FROM STREET 46 AVENUE TO STREET CRANE STREET
|
B012019070A12
|
2019-03-11
|
2019-06-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, BROOKLYN, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE
|
M012019070C74
|
2019-03-11
|
2019-04-10
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019052A88
|
2019-02-21
|
2019-05-29
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET HOPKINS STREET
|
B012019052A90
|
2019-02-21
|
2019-05-29
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE
|
B012019052A92
|
2019-02-21
|
2019-05-29
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GERRY STREET, BROOKLYN, FROM STREET BEND TO STREET MARCY AVENUE
|
B012019052A89
|
2019-02-21
|
2019-05-29
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
MARCY AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET HOPKINS STREET
|
M012019037B36
|
2019-02-06
|
2019-03-11
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019011B14
|
2019-01-11
|
2019-02-09
|
INSTALL FENCE
|
WEST 57 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B012019002B45
|
2019-01-02
|
2019-03-21
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012019002B46
|
2019-01-02
|
2019-03-21
|
TEST PITS, CORES OR BORING
|
EASTERN PARKWAY, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE
|
B012018354B93
|
2018-12-20
|
2019-03-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NASSAU AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE
|
B012018354B91
|
2018-12-20
|
2019-03-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NASSAU AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MANHATTAN AVENUE
|
B012018347A21
|
2018-12-13
|
2019-03-23
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET UNION AVENUE
|
B012018298D19
|
2018-10-25
|
2018-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NASSAU AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET MANHATTAN AVENUE
|
B012018298D20
|
2018-10-25
|
2018-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NASSAU AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE
|
B012018274D63
|
2018-10-01
|
2018-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
METROPOLITAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE
|
X012018201B18
|
2018-07-20
|
2018-08-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 168 STREET, BRONX, FROM STREET CLAY AVENUE TO STREET TELLER AVENUE
|
X012018117A08
|
2018-04-27
|
2018-05-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
TELLER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
X012018117A07
|
2018-04-27
|
2018-05-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
TELLER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
X012018074A00
|
2018-03-15
|
2018-05-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
TELLER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
X012018074A01
|
2018-03-15
|
2018-05-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
TELLER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
X012017355A09
|
2017-12-21
|
2018-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
TELLER AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
X012017355A11
|
2017-12-21
|
2018-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
TELLER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|