Q022024311B81
|
2024-11-06
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND CENTRAL PY EB EN CORONA PK, QUEENS, FROM STREET BEND TO STREET UNNAMED STREET
|
Q022024311B80
|
2024-11-06
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND CENTRAL PY EB EN CORONA PK, QUEENS, FROM STREET BEND TO STREET UNNAMED STREET
|
Q022024311B79
|
2024-11-06
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
GRAND CENTRAL PY EB EN CORONA PK, QUEENS, FROM STREET BEND TO STREET UNNAMED STREET
|
Q022024306A95
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A94
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A93
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A92
|
2024-11-01
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A91
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A90
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A87
|
2024-11-01
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A88
|
2024-11-01
|
2024-12-31
|
CROSSING SIDEWALK
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
Q022024306A89
|
2024-11-01
|
2024-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
99 AVENUE, QUEENS, FROM STREET 222 STREET TO STREET DEAD END
|
B022024303E51
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E52
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E53
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024303E54
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E55
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E56
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E57
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012024303B54
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024303E38
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024303E40
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E41
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024303E42
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E43
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E44
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024303E45
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E46
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E47
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024303E48
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E49
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E50
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024303E25
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E26
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024303E27
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E28
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E29
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024303E30
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E31
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E32
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E33
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E34
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E35
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E36
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E37
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024303E39
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E67
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024303E68
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012024303B56
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE
|
B012024303B52
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B012024303B53
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B012024303B55
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B012024303B57
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
9 AVENUE, BROOKLYN, FROM STREET 39 STREET TO STREET NEW UTRECHT AVENUE
|
B012024303B58
|
2024-10-29
|
2024-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
9 AVENUE, BROOKLYN, FROM STREET 39 STREET
|
B022024303A58
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303A59
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303A60
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303A48
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024303A49
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024303A50
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024303A51
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024303A52
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024303A53
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024303A54
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024303A55
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024303A56
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024303A57
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303A61
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303A62
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303A63
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024303C20
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C21
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C22
|
2024-10-29
|
2024-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C23
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C24
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C25
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C26
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C27
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303E66
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024303E65
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024303E64
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024303E63
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024303E62
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024303E61
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E60
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E59
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303E58
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024303C28
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C29
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303C30
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024303E16
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024303E17
|
2024-10-29
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E18
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024303E19
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E20
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024303E21
|
2024-10-29
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E22
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024303E23
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024303E24
|
2024-10-29
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024302A14
|
2024-10-28
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A15
|
2024-10-28
|
2024-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A20
|
2024-10-28
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A11
|
2024-10-28
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024302A12
|
2024-10-28
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024302A13
|
2024-10-28
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A16
|
2024-10-28
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A17
|
2024-10-28
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A18
|
2024-10-28
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024302A19
|
2024-10-28
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B002024301A00
|
2024-10-27
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
Q022024291A07
|
2024-10-17
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND CENTRAL PY EB EN CORONA PK, QUEENS, FROM STREET BEND TO STREET UNNAMED STREET
|
Q022024291A05
|
2024-10-17
|
2024-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
GRAND CENTRAL PY EB EN CORONA PK, QUEENS, FROM STREET BEND TO STREET UNNAMED STREET
|
Q022024291A06
|
2024-10-17
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
GRAND CENTRAL PY EB EN CORONA PK, QUEENS, FROM STREET BEND TO STREET UNNAMED STREET
|
B022024254A99
|
2024-09-10
|
2024-12-04
|
CROSSING SIDEWALK
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B12
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024254B11
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B10
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B09
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B08
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024254B07
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B06
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B05
|
2024-09-10
|
2024-12-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024254B04
|
2024-09-10
|
2024-12-04
|
TEMP. CONST. SIGNS/MARKINGS
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B03
|
2024-09-10
|
2024-12-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024254B02
|
2024-09-10
|
2024-12-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254B01
|
2024-09-10
|
2024-12-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024254B00
|
2024-09-10
|
2024-12-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024254A98
|
2024-09-10
|
2024-12-04
|
PLACE MATERIAL ON STREET
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024254B09
|
2024-09-10
|
2024-12-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024254B08
|
2024-09-10
|
2024-12-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024254B07
|
2024-09-10
|
2024-12-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024254B06
|
2024-09-10
|
2024-12-04
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024229C53
|
2024-08-16
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024229C52
|
2024-08-16
|
2024-08-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024229C43
|
2024-08-16
|
2024-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024229C54
|
2024-08-16
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024220A43
|
2024-08-07
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A42
|
2024-08-07
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A44
|
2024-08-07
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024220A29
|
2024-08-07
|
2024-08-30
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024220A30
|
2024-08-07
|
2024-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024220A31
|
2024-08-07
|
2024-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024220A41
|
2024-08-07
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A36
|
2024-08-07
|
2024-08-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A37
|
2024-08-07
|
2024-08-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024220A38
|
2024-08-07
|
2024-08-30
|
TEMP. CONST. SIGNS/MARKINGS
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A39
|
2024-08-07
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A40
|
2024-08-07
|
2024-08-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A35
|
2024-08-07
|
2024-08-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A34
|
2024-08-07
|
2024-08-30
|
CROSSING SIDEWALK
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024220A33
|
2024-08-07
|
2024-08-30
|
PLACE MATERIAL ON STREET
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024215A02
|
2024-08-02
|
2024-10-29
|
PLACE MATERIAL ON STREET
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024215B65
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B64
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B63
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B62
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B61
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B60
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B59
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B58
|
2024-08-02
|
2024-10-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B57
|
2024-08-02
|
2024-10-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215A01
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024215A00
|
2024-08-02
|
2024-10-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024215A06
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B012024215B85
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B012024215B86
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B012024215B87
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B012024215B88
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B012024215B89
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE
|
B012024215B90
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
9 AVENUE, BROOKLYN, FROM STREET 39 STREET TO STREET NEW UTRECHT AVENUE
|
B012024215B99
|
2024-08-02
|
2024-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
9 AVENUE, BROOKLYN, FROM STREET 39 STREET
|
B022024215B56
|
2024-08-02
|
2024-10-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215B55
|
2024-08-02
|
2024-10-29
|
TEMPORARY PEDESTRIAN WALK
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024215A09
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024215A08
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024215A07
|
2024-08-02
|
2024-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024215A05
|
2024-08-02
|
2024-10-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024215A04
|
2024-08-02
|
2024-10-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024215A03
|
2024-08-02
|
2024-10-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
9 AVENUE, BROOKLYN, FROM STREET NEW UTRECHT AVENUE TO STREET NYCTA SUBWAY
|
B022024214B12
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024214B00
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214A99
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A98
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024214A97
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214A96
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A95
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024214A94
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214A93
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A92
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024214A91
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214A90
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A89
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024214A88
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214A87
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A86
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024214A85
|
2024-08-01
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214A84
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A83
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A82
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A81
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A80
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A79
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A78
|
2024-08-01
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214A77
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214A76
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A75
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A73
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A72
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214A71
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A70
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214A69
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A68
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214A67
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A66
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214A65
|
2024-08-01
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214A64
|
2024-08-01
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214A74
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024214B02
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024214B03
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024214B04
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214B05
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214B06
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214B01
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024214B07
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214B08
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214B09
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024214B10
|
2024-08-01
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024214B11
|
2024-08-01
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024214B13
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024214B14
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024214B15
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024214B16
|
2024-08-01
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024212B70
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024212B85
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024212B84
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024212B83
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024212B82
|
2024-07-30
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024212B81
|
2024-07-30
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024212B80
|
2024-07-30
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024212B79
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024212B78
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024212B77
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024212B76
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024212B75
|
2024-07-30
|
2024-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024212B74
|
2024-07-30
|
2024-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024212B73
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024212B72
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024212B71
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024212B86
|
2024-07-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024207B44
|
2024-07-25
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024207B43
|
2024-07-25
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B42
|
2024-07-25
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B35
|
2024-07-25
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B34
|
2024-07-25
|
2024-08-01
|
CROSSING SIDEWALK
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B33
|
2024-07-25
|
2024-08-01
|
PLACE MATERIAL ON STREET
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024207B15
|
2024-07-25
|
2024-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024207B14
|
2024-07-25
|
2024-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024207B13
|
2024-07-25
|
2024-08-01
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B41
|
2024-07-25
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B40
|
2024-07-25
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B39
|
2024-07-25
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B38
|
2024-07-25
|
2024-08-01
|
TEMP. CONST. SIGNS/MARKINGS
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024207B37
|
2024-07-25
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024207B36
|
2024-07-25
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024173C07
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C09
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024173C10
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C11
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024173C12
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024173C13
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C16
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C17
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024173C18
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024173C19
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C20
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024173C21
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024173C22
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C23
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024173C24
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024173C25
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C26
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024173C27
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C38
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C37
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C36
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C35
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C34
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C33
|
2024-06-21
|
2024-08-01
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C32
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C31
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C30
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C29
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C28
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C39
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024173C15
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024173C14
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024173B84
|
2024-06-21
|
2024-08-01
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173B85
|
2024-06-21
|
2024-08-01
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173B86
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173B87
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173B88
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173B89
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173B90
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173B91
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173B92
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173B93
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173B94
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173B95
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173B96
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024173C00
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024173C01
|
2024-06-21
|
2024-08-01
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C02
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C03
|
2024-06-21
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C04
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C05
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C06
|
2024-06-21
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024173C08
|
2024-06-21
|
2024-08-01
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
Q012024172H32
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012024172H27
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012024172H28
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012024172H29
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012024172H30
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012024172H31
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012024172H33
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012024172H34
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012024172H35
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012024172H36
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012024172H37
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012024172H38
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024172H39
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012024172H40
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012024172H41
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024172H42
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012024172H43
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012024172H44
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012024172H45
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012024172H46
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012024172H47
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012024172H48
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024172H49
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012024172H50
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024172H51
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012024172H52
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 23 TO STREET 146 STREET
|
Q012024172H53
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WB EXIT 23 TO STREET 148 STREET
|
Q012024172H54
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012024172H55
|
2024-06-20
|
2024-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024172B02
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022024172B01
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024172B00
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024172A99
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024172A98
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024172A97
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024172A96
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024172A95
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024172A94
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024172A93
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024172A92
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024172A91
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024172A90
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024172A89
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024172A88
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024172A87
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024172A86
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024172A85
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024172A84
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024172A83
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024172A82
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024172A81
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024172A80
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WB EXIT 23 TO STREET 148 STREET
|
Q022024172A79
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WB EXIT 23 TO STREET 148 STREET
|
Q022024172A78
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 23 TO STREET 146 STREET
|
Q022024172A77
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 23 TO STREET 146 STREET
|
Q022024172A76
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022024172A75
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024172A74
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024172A73
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022024172A72
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022024172A71
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024172A70
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024172A69
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024172A68
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024172A67
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022024172A66
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022024172A65
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024172A64
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024172A63
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024172A62
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024172A61
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024172A60
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024172A59
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024172A58
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024172A57
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024172A56
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024172A55
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024172A54
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024172A53
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024172A52
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024172A51
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024172A50
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024172A49
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024172A48
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024172A47
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024172A46
|
2024-06-20
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022024172A45
|
2024-06-20
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
B022024169A12
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024169A13
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024169A14
|
2024-06-17
|
2024-08-01
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A15
|
2024-06-17
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A16
|
2024-06-17
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A17
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A18
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A19
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A20
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024169A10
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024169A09
|
2024-06-17
|
2024-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024169A08
|
2024-06-17
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024169A07
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024169A06
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024169A05
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024169A04
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024169A11
|
2024-06-17
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024136B05
|
2024-05-15
|
2024-07-08
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024136C87
|
2024-05-15
|
2024-07-08
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B022024136B06
|
2024-05-15
|
2024-07-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HERKIMER STREET, BROOKLYN, FROM STREET HAVENS PLACE TO STREET VAN SINDEREN AVENUE
|
B012024121A66
|
2024-04-30
|
2024-07-08
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024121A67
|
2024-04-30
|
2024-07-08
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024121A48
|
2024-04-30
|
2024-07-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024121A47
|
2024-04-30
|
2024-07-06
|
CROSSING SIDEWALK
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B93
|
2024-04-16
|
2024-07-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B94
|
2024-04-16
|
2024-07-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B95
|
2024-04-16
|
2024-07-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B96
|
2024-04-16
|
2024-07-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B89
|
2024-04-16
|
2024-07-06
|
CROSSING SIDEWALK
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B88
|
2024-04-16
|
2024-07-06
|
PLACE MATERIAL ON STREET
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024107B92
|
2024-04-16
|
2024-07-08
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B012024107B93
|
2024-04-16
|
2024-07-08
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B97
|
2024-04-16
|
2024-07-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B90
|
2024-04-16
|
2024-07-06
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B91
|
2024-04-16
|
2024-07-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024107B92
|
2024-04-16
|
2024-07-06
|
TEMP. CONST. SIGNS/MARKINGS
|
HAVENS PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
B022024088A60
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012024088A37
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B012024088A30
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012024088A31
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012024088A32
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012024088A33
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012024088A34
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012024088A35
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012024088A36
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012024088A38
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B012024088A39
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012024088A40
|
2024-03-28
|
2024-06-28
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024088A07
|
2024-03-28
|
2024-06-28
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A08
|
2024-03-28
|
2024-06-28
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A09
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A10
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A11
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A12
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A13
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A14
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A15
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A16
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A17
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A18
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A19
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024088A20
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A21
|
2024-03-28
|
2024-06-28
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A23
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A22
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A24
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A25
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A46
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A26
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A27
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A28
|
2024-03-28
|
2024-06-28
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A29
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024088A30
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A31
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A32
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024088A33
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A34
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A35
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024088A36
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A37
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A38
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024088A39
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A40
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A41
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024088A42
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A43
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024088A44
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024088A45
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024088A48
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A49
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A50
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A51
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A52
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A53
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024088A54
|
2024-03-28
|
2024-06-28
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024088A55
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024088A56
|
2024-03-28
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024088A57
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024088A58
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024088A59
|
2024-03-28
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
Q012024085B59
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024085B02
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024085B01
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022024085B00
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022024085A99
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024085A98
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024085A97
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022024085A96
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022024085A93
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024085A92
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024085A91
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024085A90
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024085A89
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024085A88
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024085A87
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024085A86
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024085A85
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024085A84
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024085A83
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024085A82
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024085A81
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024085A80
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024085A79
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024085A95
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024085A78
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024085A77
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024085A76
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024085A75
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024085A74
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024085A73
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024085A72
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024085A71
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024085A70
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024085A69
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024085A68
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024085A65
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024085A64
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024085A63
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024085A62
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024085A61
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024085A60
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024085A59
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024085A58
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024085A66
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024085A94
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024085A44
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022024085A67
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024085B04
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022024085B05
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 23 TO STREET 146 STREET
|
Q022024085B06
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 23 TO STREET 146 STREET
|
Q022024085B07
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WB EXIT 23 TO STREET 148 STREET
|
Q022024085B08
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WB EXIT 23 TO STREET 148 STREET
|
Q022024085B09
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024085B10
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024085B11
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024085B12
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024085B23
|
2024-03-25
|
2024-06-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022024085B24
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012024085B88
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012024085B87
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012024085B86
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012024085B85
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012024085B82
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012024085B81
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WB EXIT 23 TO STREET 148 STREET
|
Q012024085B80
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 23 TO STREET 146 STREET
|
Q012024085B79
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012024085B78
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024085B77
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012024085B76
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012024085B75
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012024085B74
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012024085B73
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024085B72
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012024085B71
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012024085B70
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012024085B69
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012024085B68
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012024085B67
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012024085B66
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024085B65
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012024085B64
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012024085B63
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024085B62
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012024085B61
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012024085B60
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024085B03
|
2024-03-25
|
2024-06-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024085B58
|
2024-03-25
|
2024-06-22
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
B022024080A36
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024080A31
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024080A30
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024080A27
|
2024-03-20
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024080A28
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024080A29
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024080A26
|
2024-03-20
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024080A35
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024080A32
|
2024-03-20
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024080A33
|
2024-03-20
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024080A34
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024080A44
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A43
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A42
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A41
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A40
|
2024-03-20
|
2024-06-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A39
|
2024-03-20
|
2024-06-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A38
|
2024-03-20
|
2024-06-28
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024080A37
|
2024-03-20
|
2024-06-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024033B38
|
2024-02-02
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B39
|
2024-02-02
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B37
|
2024-02-02
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B36
|
2024-02-02
|
2024-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B35
|
2024-02-02
|
2024-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B34
|
2024-02-02
|
2024-03-31
|
TEMPORARY PEDESTRIAN WALK
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B41
|
2024-02-02
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024033B40
|
2024-02-02
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024030B48
|
2024-01-30
|
2024-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024030B47
|
2024-01-30
|
2024-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024030B46
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B45
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B44
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B43
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B42
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B012024030B50
|
2024-01-30
|
2024-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024030B55
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B012024030B48
|
2024-01-30
|
2024-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B012024030B47
|
2024-01-30
|
2024-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET
|
B022024030B18
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024030B49
|
2024-01-30
|
2024-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024030B50
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024030B51
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024030B17
|
2024-01-30
|
2024-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET
|
B022024030B38
|
2024-01-30
|
2024-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B52
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B012024030B49
|
2024-01-30
|
2024-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B41
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B40
|
2024-01-30
|
2024-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B39
|
2024-01-30
|
2024-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
18 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET LONG ISLAND RR
|
B022024030B54
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
B022024030B53
|
2024-01-30
|
2024-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
18 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET LONG ISLAND RR
|
Q012024002A99
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B012024002B55
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012024002B54
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012024002B53
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012024002B52
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012024002B61
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B012024002B60
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012024002B62
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
Q012024002A34
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012024002A35
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012024002A36
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012024002A37
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012024002A38
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012024002A39
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012024002A40
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012024002A41
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012024002A42
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A43
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A44
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012024002A45
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A46
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012024002A47
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024002A48
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012024002A49
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024002A50
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q012024002A51
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012024002A52
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012024002A53
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A54
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024002A55
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012024002A56
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A57
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012024002A58
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A96
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A97
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002A98
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B012024002B58
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q012024002B00
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002B01
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012024002B02
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012024002B03
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012024002B04
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012024002B05
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012024002B06
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002B07
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002B08
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012024002B09
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012024002B10
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012024002B11
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012024002B12
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012024002B13
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012024002B14
|
2024-01-02
|
2024-02-12
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024002B35
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B34
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B33
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B32
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B31
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B19
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024002B18
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024002B17
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B16
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B15
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B14
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024002B13
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024002B12
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002B11
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002B10
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002B09
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002B08
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024002B07
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024002B06
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B05
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B03
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B02
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024002B01
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002B00
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022024002A99
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022024002A98
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024002A97
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022024002A96
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A95
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A94
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022024002A93
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A92
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022024002A91
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022024002A90
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024002A89
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024002A88
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022024002A87
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024002A86
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A85
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024002A84
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A83
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A82
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022024002A81
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A80
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024002A79
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024002A78
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022024002A77
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A76
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A75
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A69
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A68
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A67
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A66
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024002A65
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024002A64
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024002A63
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A62
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A61
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A60
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024002A59
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024002A58
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022024002A57
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024002A56
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024002A55
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022024002A54
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002A53
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024002A52
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002A51
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022024002A50
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024002A49
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002A48
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A47
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022024002A46
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024002A45
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024002A44
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024002A43
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022024002A42
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A41
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A40
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024002A39
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024002A38
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024002A37
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024002A36
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024002A34
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A33
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A32
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024002A31
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A30
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024002A29
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024002A28
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022024002A27
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A26
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022024002A25
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024002A24
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024002A23
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022024002A22
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024002A21
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022024002B04
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022024002A20
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022024002A19
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022024002A18
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022024002A17
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022024002A16
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022024002A15
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024002A14
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024002A13
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022024002A12
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022024002A11
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022024002A10
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022024002A09
|
2024-01-02
|
2024-02-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022024002A08
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022024002A07
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022024002A35
|
2024-01-02
|
2024-02-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B022024002C85
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C84
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C83
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C82
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C81
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C80
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C79
|
2024-01-02
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022024002C78
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C77
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C76
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C75
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C74
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C73
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C72
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C71
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C70
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024002C69
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C68
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C67
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024002C66
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C65
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C64
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024002C63
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C62
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C61
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024002C60
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C59
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C58
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024002C57
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C56
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C55
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022024002C42
|
2024-01-02
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022024002C41
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C40
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C39
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C38
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C37
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C36
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C35
|
2024-01-02
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022024002C34
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C33
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002C32
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C31
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002C30
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C29
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002C28
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C27
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002C26
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C25
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002C24
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C23
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002C22
|
2024-01-02
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022024002C21
|
2024-01-02
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022024002A59
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A58
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A57
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A56
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A55
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A54
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A53
|
2024-01-02
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022024002A52
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024002A51
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024002A50
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024002A49
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024002A48
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024002A47
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024002A46
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024002A45
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024002A44
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024002A43
|
2024-01-02
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024002A42
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022024002A41
|
2024-01-02
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012024002B64
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012024002B63
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012024002B59
|
2024-01-02
|
2024-03-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
X022023317B44
|
2023-11-13
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUTCHINSON RIVER PARKWAY, BRONX, FROM STREET HUTCHINSON RVR PKWY NB EN SCHLEY TO STREET WHITESTONE BRIDGE APPROACH
|
X022023317B43
|
2023-11-13
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HUTCHINSON RIVER PARKWAY, BRONX, FROM STREET HUTCHINSON RVR PKWY NB EN SCHLEY TO STREET WHITESTONE BRIDGE APPROACH
|
B012023307A46
|
2023-11-03
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023307A47
|
2023-11-03
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A42
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A41
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A40
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A39
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A38
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A37
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A36
|
2023-11-03
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023307A35
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023307A34
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023307A33
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023307A32
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023307A30
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023307A31
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023307A29
|
2023-11-03
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
Q022023305A06
|
2023-11-01
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023305A03
|
2023-11-01
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023305A04
|
2023-11-01
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023305A05
|
2023-11-01
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023305A02
|
2023-11-01
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D42
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023304D43
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023304D44
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023304D45
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023304D46
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D47
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023304D48
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D49
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023304D50
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D51
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D52
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023304D53
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023304D54
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D55
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D56
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D57
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D58
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023304D59
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023304D60
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D61
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D62
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D63
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023304D64
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023304F35
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023304F36
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023304F37
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023304F38
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023304F39
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023304F40
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023304F41
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023304F06
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012023304F07
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023304F08
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023304F09
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023304F10
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023304F11
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023304F12
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
M002023304A48
|
2023-10-31
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
Q012023304F13
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F14
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023304F15
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023304F16
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C56
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023304C57
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023304C58
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023304C60
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023304C61
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012023304F17
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023304F18
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304E94
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012023304E95
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023304E96
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023304E97
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012023304E98
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012023304E99
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023304F00
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023304F01
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023304F02
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F03
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F04
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023304F23
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023304F24
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023304F25
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023304F26
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F27
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F28
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F29
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023304F30
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023304F05
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F31
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F32
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F33
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023304F34
|
2023-10-31
|
2023-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C62
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023304D19
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C63
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023304C64
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023304C65
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023304C66
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023304C67
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023304C68
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023304C69
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023304C70
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023304C71
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023304C72
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023304C73
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C74
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023304C75
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023304C76
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023304C77
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C78
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023304C79
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023304C80
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023304C81
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C82
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023304C83
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C84
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C85
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023304C86
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023304C87
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023304C88
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023304C89
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023304D16
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023304C90
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023304C91
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C92
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C93
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023304C94
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023304C95
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023304C96
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023304C97
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304C98
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304C99
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D00
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023304D01
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023304D02
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D03
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023304D04
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023304D05
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023304D06
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023304D07
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023304D08
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023304D09
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023304D10
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023304D11
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D12
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D13
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D14
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023304D15
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023304D18
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D17
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D20
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D21
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D22
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D23
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023304D24
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023304D25
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023304D26
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D27
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023304D28
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D29
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D30
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023304D31
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D32
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023304D33
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023304D34
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023304D35
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023304D36
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023304D37
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023304D38
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D39
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022023304D40
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023304D41
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B022023289A05
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012023289B14
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012023289B11
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012023289B12
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012023289B13
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012023289B15
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023289B16
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B012023289B17
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012023289B18
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B012023289B19
|
2023-10-16
|
2023-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C32
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C31
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C30
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C29
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C28
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C27
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C26
|
2023-10-16
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023289C25
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023289C24
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023289C23
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023289C22
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023289C21
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023289C20
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023289C19
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C18
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023289C17
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023289C16
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C15
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023289C14
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023289C13
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C12
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023289C11
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023289C10
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C09
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023289C08
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023289C07
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C06
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023289C05
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023289C04
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C03
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023289C02
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023289C01
|
2023-10-16
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023289C00
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023289B99
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023289B98
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023289B97
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023289B96
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023289B95
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023289A16
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023289A15
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023289A14
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023289A13
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023289A12
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023289A11
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023289A10
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023289A09
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023289A08
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023289A07
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023289A06
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023289B94
|
2023-10-16
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023286B73
|
2023-10-13
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023286B75
|
2023-10-13
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023286B74
|
2023-10-13
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B002023286A02
|
2023-10-13
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022023286B79
|
2023-10-13
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023286B78
|
2023-10-13
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023286B77
|
2023-10-13
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023286B76
|
2023-10-13
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
X022023271A45
|
2023-09-28
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUTCHINSON RIVER PARKWAY, BRONX, FROM STREET HUTCHINSON RVR PKWY NB EN SCHLEY TO STREET WHITESTONE BRIDGE APPROACH
|
X022023271A44
|
2023-09-28
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HUTCHINSON RIVER PARKWAY, BRONX, FROM STREET HUTCHINSON RVR PKWY NB EN SCHLEY TO STREET WHITESTONE BRIDGE APPROACH
|
Q022023243B07
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A96
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023243A95
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023243B08
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023243B09
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B10
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023243B11
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023243B12
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B13
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022023243B14
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B15
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B16
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023243B17
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023243B18
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023243B19
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023243B20
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B21
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023243B22
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B23
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023243B24
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B25
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C49
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A98
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A99
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B00
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B01
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B02
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023243B03
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023243B04
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023243B05
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B06
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023243B60
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023243B61
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023243B62
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B63
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023243B64
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023243B65
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023243B66
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B67
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023243B68
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023243B69
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023243B70
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B71
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023243B72
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B73
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B74
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023243B75
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023243B76
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023243B77
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023243B78
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023243B79
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023243B80
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B81
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B82
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023243B83
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023243A86
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023243A94
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A93
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023243A92
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A91
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A90
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A89
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A88
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023243B26
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023243B27
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023243B28
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B29
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B30
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B31
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B32
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023243A87
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023243B33
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023243B34
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B35
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B36
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B37
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023243B38
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023243B39
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023243B40
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B41
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B42
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B43
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023243B44
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023243B45
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023243B46
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B47
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B48
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B49
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023243B50
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023243B51
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023243B52
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023243B53
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023243B54
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023243B98
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023243B97
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023243B96
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023243B95
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023243B94
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023243B93
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B92
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023243B91
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B90
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023243B89
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023243B88
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B87
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B86
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023243B85
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023243B84
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023243C77
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C76
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023243C75
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C74
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023243C73
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023243C71
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C70
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023243C69
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023243C68
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023243C67
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023243C66
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023243C65
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023243C64
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C63
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023243C62
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023243C61
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023243C60
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C59
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023243C58
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023243C57
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023243C56
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C55
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012023243C54
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C53
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023243C52
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023243C51
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023243C50
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243A97
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023243C48
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C47
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023243C46
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023243C45
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023243C44
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C43
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023243C42
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023243C41
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012023243C40
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023243C39
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012023243C38
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023243C37
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023243C36
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023243C35
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012023243C34
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023243C33
|
2023-08-31
|
2023-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023243B55
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023243B56
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023243B57
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023243B58
|
2023-08-31
|
2023-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023243B59
|
2023-08-31
|
2023-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
M022023242A58
|
2023-08-30
|
2023-11-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M012023242A22
|
2023-08-30
|
2023-11-03
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A57
|
2023-08-30
|
2023-11-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A56
|
2023-08-30
|
2023-11-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A55
|
2023-08-30
|
2023-11-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A54
|
2023-08-30
|
2023-11-03
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A53
|
2023-08-30
|
2023-11-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A52
|
2023-08-30
|
2023-11-03
|
CROSSING SIDEWALK
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023242A51
|
2023-08-30
|
2023-11-03
|
PLACE MATERIAL ON STREET
|
EAST 51 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
B022023209B60
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023209B61
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023209B62
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023209B32
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B27
|
2023-07-28
|
2023-10-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B26
|
2023-07-28
|
2023-10-25
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B58
|
2023-07-28
|
2023-10-25
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023209B57
|
2023-07-28
|
2023-10-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023209B31
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B012023209B60
|
2023-07-28
|
2023-10-25
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012023209B59
|
2023-07-28
|
2023-10-25
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B30
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B29
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B28
|
2023-07-28
|
2023-10-25
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023209B56
|
2023-07-28
|
2023-10-25
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023209B59
|
2023-07-28
|
2023-10-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
Q022023206B22
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023206A49
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023206A46
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A45
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A44
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A43
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023206A41
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206A40
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206A39
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206A38
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206A37
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023206A36
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023206A35
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A34
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A33
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023206A32
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A31
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023206A30
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A29
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023206A28
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023206A26
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023206A25
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A24
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A23
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022023206A22
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A21
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A20
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023206A19
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023206A18
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023206A17
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A16
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023206A15
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A14
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A13
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A12
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A11
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023206A10
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023206A09
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023206A42
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023206A27
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023206A39
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023206A38
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023206A37
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A36
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023206A35
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023206A34
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023206A33
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A32
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012023206A31
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A30
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023206A29
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023206A28
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023206A27
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A26
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A25
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A24
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023206A23
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023206A22
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023206A21
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A20
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A19
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023206A18
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012023206A17
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023206A16
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012023206A15
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023206A14
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023206A13
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023206A12
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012023206A11
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023206A10
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A53
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A52
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023206A51
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B022023206B34
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023206B33
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B32
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B31
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023206B30
|
2023-07-25
|
2023-10-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B29
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B28
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B27
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B26
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B25
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B24
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B23
|
2023-07-25
|
2023-10-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B22
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B21
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023206B20
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B19
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023206B18
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B17
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023206B16
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B15
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023206B10
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B09
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023206B08
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B06
|
2023-07-25
|
2023-10-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B05
|
2023-07-25
|
2023-10-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023206B07
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
Q012023206A50
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023206A49
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023206A48
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A47
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023206A46
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023206A45
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023206A44
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023206A43
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023206A42
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023206A41
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023206A40
|
2023-07-25
|
2023-08-25
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
B012023206A71
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012023206A72
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012023206A73
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012023206A74
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023206A79
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012023206A80
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012023206A81
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023206A82
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B012023206A83
|
2023-07-25
|
2023-10-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q022023206B10
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023206B11
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023206B12
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023206B13
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023206B14
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023206B15
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023206B16
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023206B17
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023206B18
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023206B19
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023206B20
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023206B21
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
B022023206B54
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B53
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B52
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B51
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B50
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B49
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023206B48
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B47
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B46
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023206B45
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B44
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B43
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023206B42
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B41
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B40
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023206B39
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B38
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023206B37
|
2023-07-25
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023206B36
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023206B35
|
2023-07-25
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
Q022023206B04
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023206B03
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206B02
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023206B01
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206B00
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023206A99
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023206A98
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206A97
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A96
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023206A95
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023206A94
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023206A93
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023206A92
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023206A91
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A90
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A89
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023206A88
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023206A87
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023206A86
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023206A85
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023206A84
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023206A83
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A82
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A81
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023206A80
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A79
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023206A78
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023206A77
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023206A76
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A75
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023206A74
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023206A73
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023206A72
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A71
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023206A70
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023206A69
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A68
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023206A67
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A66
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023206A65
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A64
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023206A63
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023206A62
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023206A61
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A60
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A59
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A58
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A57
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A56
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A55
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023206A54
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023206A53
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023206A52
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A51
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206A50
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023206B05
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023206B06
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023206B07
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023206A47
|
2023-07-25
|
2023-08-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023206A48
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023206B08
|
2023-07-25
|
2023-08-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
B022023205C01
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023205C02
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023205C03
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023205B92
|
2023-07-24
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023205B93
|
2023-07-24
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023205B94
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023205B95
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023205B96
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023205B97
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023205B98
|
2023-07-24
|
2023-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023205B99
|
2023-07-24
|
2023-10-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023205C00
|
2023-07-24
|
2023-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012023171B63
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q012023171D59
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012023171D60
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023171D61
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023171D62
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012023171D63
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012023171D64
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023171D65
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023171D66
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023171D67
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D68
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D69
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023171D70
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D71
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012023171D72
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023171D73
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023171D74
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023171D75
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023171D76
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023171D77
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023171D78
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D94
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023171D79
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023171D80
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023171D81
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D82
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023171D83
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D89
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D90
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D91
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023171D92
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B012023171B65
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023171B66
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B012023171B59
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012023171B60
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012023171B61
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012023171B62
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023171B64
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012023171B67
|
2023-06-20
|
2023-08-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C39
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C04
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023171C05
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023171C06
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023171C07
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023171C08
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023171C09
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023171C10
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023171C11
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023171C12
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023171C13
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023171C14
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023171C15
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023171C21
|
2023-06-20
|
2023-08-01
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C22
|
2023-06-20
|
2023-08-01
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C23
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C24
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C25
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C26
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C27
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C28
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C29
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C30
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C31
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C32
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C33
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023171C34
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C35
|
2023-06-20
|
2023-08-01
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C36
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C37
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C38
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C40
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C41
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C42
|
2023-06-20
|
2023-08-01
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C43
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023171C44
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C45
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C46
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023171C47
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C48
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C49
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023171C50
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C51
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C52
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023171C54
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C55
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C56
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023171C57
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C58
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C59
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023171C60
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023171C61
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023171C62
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C63
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C64
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C65
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C66
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023171C67
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q022023171D21
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D20
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D19
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D18
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D17
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D11
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D10
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D09
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D08
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023171D07
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023171D06
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023171D05
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D04
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D03
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171D02
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023171D01
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023171D00
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023171C99
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C98
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C97
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C96
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023171C95
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023171C94
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C93
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C92
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C91
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C90
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023171C89
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023171C88
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C87
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C86
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023171C85
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C84
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023171C83
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C82
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023171C81
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023171C80
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023171C79
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023171C78
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C77
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C76
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022023171C75
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C74
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023171C73
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023171C72
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023171C71
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023171C70
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C69
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023171C68
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023171C67
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023171C66
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023171C65
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023171C64
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023171C63
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023171C62
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023171C61
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C60
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023171C59
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C58
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023171C57
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023171C56
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C55
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C54
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023171C53
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023171C52
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023171C51
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023171C50
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023171C49
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C48
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C47
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023171C46
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023171C45
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023171C44
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023171C43
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023171C42
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023171C41
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C40
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C39
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023171C38
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C37
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023171C36
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023171C35
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023171C34
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C33
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023171C32
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023171C31
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023171C30
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C29
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023171C28
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023171C27
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C26
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023171C25
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C24
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023171C23
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C22
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023171C21
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023171C20
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023171C19
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C18
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C17
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023171C13
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023171C12
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023171C11
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023171C10
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023171C09
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023171C08
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023171C07
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023171C06
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023171C05
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023171C04
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023171C03
|
2023-06-20
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023171C02
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023171C01
|
2023-06-20
|
2023-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023171E07
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023171E06
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023171E05
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023171E04
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023171E03
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023171E02
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023171E01
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171E00
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D99
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023171D98
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023171D97
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023171D96
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023171D95
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023171D93
|
2023-06-20
|
2023-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B022023166A30
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A31
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A32
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A20
|
2023-06-15
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023166A21
|
2023-06-15
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023166A22
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023166A23
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023166A24
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023166B12
|
2023-06-15
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012023166B11
|
2023-06-15
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023166A25
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023166A26
|
2023-06-15
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A27
|
2023-06-15
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A28
|
2023-06-15
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A29
|
2023-06-15
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023166A19
|
2023-06-15
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
Q012023086A64
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023086A63
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023086A62
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A61
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023086A17
|
2023-03-27
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023086A18
|
2023-03-27
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023086A19
|
2023-03-27
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023086A20
|
2023-03-27
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023086A21
|
2023-03-27
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A83
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023086A82
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023086A81
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A80
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012023086A79
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023086A78
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012023086A77
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A76
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A75
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A70
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023086A69
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A68
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012023086A67
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023086A66
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023086A65
|
2023-03-27
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023083C72
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
B022023083C83
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023083C82
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023083C81
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023083C80
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023083C79
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023083C78
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
Q022023083C79
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023083C64
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C63
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023083C62
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C61
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023083C60
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C59
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023083C58
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023083C57
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023083C56
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023083C55
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C54
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C53
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022023083C52
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C51
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023083C50
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023083C49
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023083C48
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023083C47
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C46
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023083C45
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023083C44
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023083C43
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023083C42
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C41
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023083C40
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023083C39
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023083C38
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023083C19
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023083C18
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023083C17
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023083C16
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C15
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C14
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023083C13
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C12
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023083C11
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023083C10
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023083C09
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C08
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023083C07
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023083C06
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023083C05
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C04
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023083C03
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023083C02
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C01
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023083C00
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083B99
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023083B98
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083B97
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023083B96
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023083B95
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083B94
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083B93
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023083B92
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022023083B91
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022023083B90
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023083B89
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023083B88
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023083B87
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022023083B86
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023083B85
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022023083B84
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023083B83
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022023083B82
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022023083B81
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012023083C99
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012023083D00
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023083D01
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023083D02
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012023083D03
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012023083D04
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023083D05
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023083D06
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023083D07
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023083D08
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023083D09
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023083D10
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023083D11
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012023083D12
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023083D13
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023083D14
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023083D15
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023083D16
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023083D17
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023083D18
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023083D19
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023083D20
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023083D21
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023083D22
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023083D23
|
2023-03-24
|
2023-06-29
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B012023083D72
|
2023-03-24
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B012023083D73
|
2023-03-24
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012023083D68
|
2023-03-24
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012023083D69
|
2023-03-24
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012023083D70
|
2023-03-24
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B012023083D61
|
2023-03-24
|
2023-06-29
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012023083D62
|
2023-03-24
|
2023-06-29
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012023083D63
|
2023-03-24
|
2023-06-29
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012023083D64
|
2023-03-24
|
2023-06-29
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023083D66
|
2023-03-24
|
2023-06-29
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012023083D75
|
2023-03-24
|
2023-06-30
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D86
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D85
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D84
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D83
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D82
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D81
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D80
|
2023-03-24
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D72
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D71
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D70
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D69
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D68
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D67
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D66
|
2023-03-24
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023083D65
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D64
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D63
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D62
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D61
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D60
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D59
|
2023-03-24
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023083D58
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D57
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D56
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D55
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D54
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D53
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D52
|
2023-03-24
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D51
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023083D50
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
Q022023083C88
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C87
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C86
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C85
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023083C84
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023083C83
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023083C82
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C81
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C80
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C78
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023083C77
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023083C76
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C75
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C74
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C73
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
B022023083C84
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
Q022023083C71
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C70
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C69
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C68
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C67
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
B022023083D49
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023083D48
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023083D47
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023083D46
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023083D45
|
2023-03-24
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023083D44
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D43
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D42
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D41
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D40
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q022023083C66
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023083C65
|
2023-03-24
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B022023083D39
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023083D38
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D37
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023083D36
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D35
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023083D34
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D33
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023083D32
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D31
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023083D30
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D29
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023083D28
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023083D27
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022023083C94
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023083C93
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023083C92
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023083C91
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023083C90
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023083C89
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022023083C88
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023083C87
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023083C86
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023083C85
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022023083C76
|
2023-03-24
|
2023-06-30
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023083C77
|
2023-03-24
|
2023-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
Q022023083C37
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023083C36
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C35
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023083C34
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C33
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023083C32
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023083C31
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C30
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C29
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023083C28
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023083C27
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023083C26
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023083C25
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023083C24
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C23
|
2023-03-24
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023083C22
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023083C21
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023083C20
|
2023-03-24
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B012023074C10
|
2023-03-15
|
2023-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012023074C12
|
2023-03-15
|
2023-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012023074C11
|
2023-03-15
|
2023-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B022023067B21
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023067A94
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067A93
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067A92
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067A91
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067A90
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067A89
|
2023-03-08
|
2023-04-01
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067A88
|
2023-03-08
|
2023-04-01
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067B22
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023067A96
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067A95
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067A97
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067A98
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067A99
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067B00
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B022023067B01
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022023067B02
|
2023-03-08
|
2023-04-01
|
TEMPORARY PEDESTRIAN WALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023067B03
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023067B05
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023067B06
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023067B07
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023067B08
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023067B09
|
2023-03-08
|
2023-04-01
|
TEMPORARY PEDESTRIAN WALK
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B10
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B11
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B12
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B13
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B14
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B15
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B16
|
2023-03-08
|
2023-04-01
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023067B17
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023067B18
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023067B19
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012023067B00
|
2023-03-08
|
2023-04-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B012023067A99
|
2023-03-08
|
2023-04-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B012023067A94
|
2023-03-08
|
2023-04-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET LIRR BAY RIDGE DIV
|
B012023067A95
|
2023-03-08
|
2023-04-01
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012023067A96
|
2023-03-08
|
2023-04-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012023067A97
|
2023-03-08
|
2023-04-01
|
NYCDOT-BRIDGES RECONSTRUCTION
|
50 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 19 AVENUE
|
B022023067B20
|
2023-03-08
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET 64 STREET
|
B022023067B04
|
2023-03-08
|
2023-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022023066A25
|
2023-03-07
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023066A30
|
2023-03-07
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023066A29
|
2023-03-07
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023066A28
|
2023-03-07
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023066A27
|
2023-03-07
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023066A26
|
2023-03-07
|
2023-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
B022023066A24
|
2023-03-07
|
2023-04-01
|
TEMPORARY PEDESTRIAN WALK
|
7 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET NYCTA SUBWAY
|
Q022023019A71
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023019A70
|
2023-01-19
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023019A49
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023019A48
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023019A44
|
2023-01-19
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023019A43
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023019A42
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023019A41
|
2023-01-19
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q022023019A40
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023019B11
|
2023-01-19
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023019A47
|
2023-01-19
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q022023019A46
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023019A38
|
2023-01-19
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q022023019A39
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET
|
Q012023019B12
|
2023-01-19
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET
|
Q012023019B13
|
2023-01-19
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023019B14
|
2023-01-19
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 166 STREET TO STREET 167 STREET
|
Q012023019B25
|
2023-01-19
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023019A45
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
166 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023019A72
|
2023-01-19
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
165 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A28
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023017A29
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023017A30
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023017A31
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023017A32
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023017A33
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023017A34
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023017A35
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023017A36
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A38
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023017A37
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A40
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A41
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A16
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A42
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023017A43
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023017A27
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A44
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A45
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A39
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023017A17
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023017A18
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A19
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023017A20
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPWY ET 24 WB, QUEENS, FROM STREET LONG ISLAND EXPRESSWAY
|
Q022023017A21
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023017A22
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A23
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023017A24
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023017A25
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023017A26
|
2023-01-17
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013B03
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012023013B05
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012023013B06
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013B07
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012023013B08
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013B09
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012023013B10
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A18
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013B00
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023013A17
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013A99
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013A98
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012023013A92
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
159 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013A93
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023013A94
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013A95
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012023013A96
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012023013A97
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A44
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
169 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A43
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022023013A42
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A41
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022023013A40
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
167 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A39
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022023013A28
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A27
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
161 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A26
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023013A25
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022023013A24
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023013A23
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022023013A22
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A21
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
160 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A20
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q022023013A19
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET
|
Q012023013B01
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012023013B02
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012023013B04
|
2023-01-13
|
2023-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023013A38
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023013A37
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022023013A36
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022023013A35
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
163 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A34
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023013A33
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022023013A32
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A31
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
162 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022023013A30
|
2023-01-13
|
2023-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023013A29
|
2023-01-13
|
2023-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022023012A76
|
2023-01-12
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A77
|
2023-01-12
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A78
|
2023-01-12
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A79
|
2023-01-12
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A80
|
2023-01-12
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A71
|
2023-01-12
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A70
|
2023-01-12
|
2023-03-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A69
|
2023-01-12
|
2023-03-31
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A68
|
2023-01-12
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A75
|
2023-01-12
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A74
|
2023-01-12
|
2023-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A73
|
2023-01-12
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022023012A72
|
2023-01-12
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022362B70
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012022362C74
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012022362C75
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012022362C76
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
B012022362C01
|
2022-12-28
|
2023-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B012022362C02
|
2022-12-28
|
2023-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012022362C03
|
2022-12-28
|
2023-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012022362C04
|
2022-12-28
|
2023-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012022362C05
|
2022-12-28
|
2023-03-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q022022362B50
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022362B46
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022362B47
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022022362B48
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022362B49
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022022362B51
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022362B52
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022022362B53
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022362B54
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022362B55
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022022362B56
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022362B57
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022022362B58
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022362B59
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022022362B60
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022362B61
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022362B62
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022362B63
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022362B64
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022362B65
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022362B66
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022362B67
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022362B68
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022362B69
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022362C73
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022362B71
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022362B72
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022362B73
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022362B74
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022362B75
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022362B76
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022362B77
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022362B78
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022362B79
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022362B80
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022022362B81
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022022362B82
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022362B83
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022362B84
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022362B85
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
B022022362H36
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022362H37
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022362H38
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022362H39
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022362H40
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022362H41
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022362H42
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022362H43
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022362H44
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022362H45
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022362H46
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022362H47
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022362I04
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022362I05
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022362I06
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022362I07
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022362I08
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022362I09
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022362I10
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022362I11
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022362I12
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022362I13
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022362I14
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022362I15
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022362I16
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022362I17
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022362I18
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022362I19
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022362I20
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022362I21
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
Q012022362C57
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012022362C58
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012022362C59
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022362C60
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012022362C61
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012022362C62
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012022362C63
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022362C64
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012022362C65
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022362C66
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022362C67
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022362C68
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012022362C69
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022362C70
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022362C71
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012022362C72
|
2022-12-28
|
2023-03-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
B022022339C00
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022339C01
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022339C02
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022339C03
|
2022-12-05
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022339C04
|
2022-12-05
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022339C05
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022339C06
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022339C07
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022339C08
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B022022339B03
|
2022-12-05
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012022339B87
|
2022-12-05
|
2022-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET LONG ISLAND RR TO STREET AVENUE I
|
B012022339B86
|
2022-12-05
|
2022-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B012022339B56
|
2022-12-05
|
2022-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B012022339B55
|
2022-12-05
|
2022-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION-PROTECTED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B012022339B54
|
2022-12-05
|
2022-12-31
|
NYCDOT-BRIDGES RECONSTRUCTION
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022339B02
|
2022-12-05
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022339B04
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022339B05
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022339B06
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022339B07
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 56 STREET
|
B022022339B97
|
2022-12-05
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022339B98
|
2022-12-05
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022339B99
|
2022-12-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 14 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET LIRR BAY RIDGE DIV
|
B022022336B76
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022336B74
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022336B73
|
2022-12-02
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022336B72
|
2022-12-02
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022336B83
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022336B82
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022336B81
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022336B80
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022336B79
|
2022-12-02
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022336B78
|
2022-12-02
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022022336B77
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
B022022336B75
|
2022-12-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
17 AVENUE, BROOKLYN, FROM STREET 56 STREET TO STREET 57 STREET
|
Q022022332B14
|
2022-11-28
|
2022-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022332B13
|
2022-11-28
|
2022-12-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022332B12
|
2022-11-28
|
2022-12-27
|
TEMPORARY PEDESTRIAN WALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q042022332A19
|
2022-11-28
|
2022-12-27
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022304A95
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012022304A94
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012022304A93
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022304A92
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022304A91
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022304A21
|
2022-10-31
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022304A20
|
2022-10-31
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022304A97
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012022304A96
|
2022-10-31
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012022301C86
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012022301C85
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022301C84
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012022301C93
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022301C32
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022301C31
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022301C30
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022301C29
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022301C28
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022022301C27
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022022301C26
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022301C25
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022301C24
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022301C23
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022301C22
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022301C21
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022301C20
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022301C19
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022301C18
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022301C17
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022301C16
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022301C15
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022301C14
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022301C13
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022301C12
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022301C11
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022301C10
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022301C09
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022301C08
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022022301C07
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022301C06
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022022301C05
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022301C04
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022022301C03
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022301C02
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022301C01
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022022301C00
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022301B99
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022301B98
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022022301B97
|
2022-10-28
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022301B96
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022022301B95
|
2022-10-28
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012022301C96
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012022301C95
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012022301C94
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012022301C92
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022301C91
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022301C90
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022301C89
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012022301C88
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q012022301C87
|
2022-10-28
|
2022-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
B012022299C56
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022299C55
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022299C54
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022299C53
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022299C52
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022299C51
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022299C50
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022299C49
|
2022-10-26
|
2022-12-07
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET GOTHAM AVENUE
|
B012022299C48
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022299C47
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022299C46
|
2022-10-26
|
2022-12-07
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C45
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022299C44
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022299C43
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022299C42
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022299C41
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C40
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C39
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C38
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022299C37
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022299C36
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022299C35
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C34
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299D57
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012022299D56
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D55
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D54
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022299D53
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022299D52
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022299D51
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012022299D50
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012022299D49
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022299D48
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022299D47
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022299D46
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022299D45
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022299D44
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022299D43
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D42
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D41
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012022299D40
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022299D39
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022299D38
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022299D37
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012022299D36
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022299D35
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012022299D34
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012022299D33
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299D32
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022299D31
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012022299D30
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012022299D29
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022299D28
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D27
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D26
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299D25
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022299D24
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022299D23
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022299D22
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022299D21
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012022299D20
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012022299D19
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022299D18
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012022299D17
|
2022-10-26
|
2022-12-07
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012022299D16
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022299D15
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299D14
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022299D13
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022299D12
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299D11
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022299D10
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022299D09
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022299D08
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022299D07
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012022299D06
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299D05
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022299D02
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022299D01
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022299D00
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022299C99
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022299C98
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022299C97
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022299C96
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C95
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022299C94
|
2022-10-26
|
2022-12-07
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022299C93
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C92
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C91
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022299C90
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022299C89
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022299C88
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022299C87
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022299C86
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022299C85
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022299C84
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022299C83
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022299C82
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022299C81
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022299C80
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C79
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C78
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022299C77
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022299C76
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022299C75
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C74
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C73
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022299C72
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022299C71
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022299C70
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022299C69
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022299C68
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022299C66
|
2022-10-26
|
2022-12-07
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012022299C65
|
2022-10-26
|
2022-12-07
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022299C64
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012022299C63
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012022299C62
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299C61
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299C60
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022299C59
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012022299C58
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C57
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022299C33
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012022299C32
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012022299C31
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012022299C30
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012022299C29
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012022299C28
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012022299C27
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012022299C26
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022299C25
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012022299C24
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012022299C23
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012022299C22
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022299C21
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012022299C20
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022299C19
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012022299C18
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012022299C17
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022299C16
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022299C15
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022299C14
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022299C12
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022299C11
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012022299C10
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022299C09
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C08
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C07
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022299C06
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022299C13
|
2022-10-26
|
2022-12-07
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012022293A89
|
2022-10-20
|
2022-11-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEVY COURT, BROOKLYN, FROM STREET CHANNEL AVENUE
|
B012022293A91
|
2022-10-20
|
2022-11-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ASTER COURT, BROOKLYN, FROM STREET CHANNEL AVENUE
|
B012022293A90
|
2022-10-20
|
2022-11-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CHANNEL AVENUE, BROOKLYN, FROM STREET ASTER COURT TO STREET BEVY COURT
|
B012022292B89
|
2022-10-19
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CHANNEL AVENUE, BROOKLYN, FROM STREET ASTER COURT TO STREET GERRITSEN AVENUE
|
B012022292B92
|
2022-10-19
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEVY COURT, BROOKLYN, FROM STREET CHANNEL AVENUE
|
B012022292B91
|
2022-10-19
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ASTER COURT, BROOKLYN, FROM STREET CHANNEL AVENUE
|
B012022292B90
|
2022-10-19
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CHANNEL AVENUE, BROOKLYN, FROM STREET BEVY COURT TO STREET CELESTE COURT
|
B012022291B72
|
2022-10-18
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CELESTE COURT, BROOKLYN, FROM STREET CHANNEL AVENUE
|
B012022291B71
|
2022-10-18
|
2022-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CHANNEL AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
Q022022278B23
|
2022-10-05
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q042022278A26
|
2022-10-05
|
2022-11-03
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B16
|
2022-10-05
|
2022-11-03
|
TEMPORARY PEDESTRIAN WALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B17
|
2022-10-05
|
2022-11-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B18
|
2022-10-05
|
2022-11-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B19
|
2022-10-05
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B20
|
2022-10-05
|
2022-12-31
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B21
|
2022-10-05
|
2022-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B22
|
2022-10-05
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B24
|
2022-10-05
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B25
|
2022-10-05
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B26
|
2022-10-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B27
|
2022-10-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B28
|
2022-10-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B29
|
2022-10-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B30
|
2022-10-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022278B31
|
2022-10-05
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022264D28
|
2022-09-21
|
2022-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q012022264D27
|
2022-09-21
|
2022-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022022264A65
|
2022-09-21
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q012022264D31
|
2022-09-21
|
2022-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022264A67
|
2022-09-21
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022022264A68
|
2022-09-21
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET 183 STREET
|
Q022022264A69
|
2022-09-21
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022022264A70
|
2022-09-21
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q022022264A71
|
2022-09-21
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022264A72
|
2022-09-21
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022264A66
|
2022-09-21
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 182 STREET TO STREET UTOPIA PARKWAY
|
Q022022264A73
|
2022-09-21
|
2022-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022264A74
|
2022-09-21
|
2022-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
183 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022264D30
|
2022-09-21
|
2022-11-14
|
NYS DOT-CONSTRUCTION - PROTECTED
|
182 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022264D29
|
2022-09-21
|
2022-11-14
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 183 STREET TO STREET 185 STREET
|
Q042022245A03
|
2022-09-02
|
2022-09-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022245A23
|
2022-09-02
|
2022-09-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022245A24
|
2022-09-02
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022245A22
|
2022-09-02
|
2022-09-30
|
TEMPORARY PEDESTRIAN WALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B012022215A59
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022215A60
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022215A61
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012022215A62
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022215A63
|
2022-08-03
|
2022-10-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012022215A64
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012022215A65
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012022215A66
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022215A67
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022215A68
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022215A69
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022215A70
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012022215A71
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012022215A72
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022215A73
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012022215A74
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B022022215A24
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022215A25
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B022022215A26
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022215A27
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B022022215A28
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B022022215A29
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B022022215A30
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B022022215A31
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022215A32
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022215A33
|
2022-08-03
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
Q022022215B38
|
2022-08-03
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B37
|
2022-08-03
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B36
|
2022-08-03
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B35
|
2022-08-03
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B34
|
2022-08-03
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B33
|
2022-08-03
|
2022-09-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B32
|
2022-08-03
|
2022-09-30
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B31
|
2022-08-03
|
2022-09-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B30
|
2022-08-03
|
2022-09-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B29
|
2022-08-03
|
2022-09-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B28
|
2022-08-03
|
2022-09-30
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B27
|
2022-08-03
|
2022-09-30
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022215B26
|
2022-08-03
|
2022-09-30
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B012022215A21
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022215A22
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022215A23
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022215A24
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022215A25
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A26
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022215A27
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A28
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022215A29
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A30
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022215A31
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A32
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A33
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A34
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A35
|
2022-08-03
|
2022-10-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022215A36
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022215A37
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A38
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022215A39
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022215A40
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022215A41
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A42
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022215A43
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022215A44
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022215A45
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022215A46
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022215A47
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022215A48
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022215A49
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022215A50
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022215A51
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022215A52
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A53
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022215A54
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022215A55
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A56
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022215A57
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022215A58
|
2022-08-03
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
Q022022214A90
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022022214A91
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022214A92
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012022214C06
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022214A93
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022214A94
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022214B03
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022214B04
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022214B05
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022214B06
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B012022214B88
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022214B89
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022214B90
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022214B91
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B92
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B93
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B94
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B95
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B96
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012022214B97
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012022214B98
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012022214B99
|
2022-08-02
|
2022-10-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022214C00
|
2022-08-02
|
2022-10-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
Q022022214B08
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022214B07
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
B012022214B87
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012022214B86
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012022214B85
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022214B84
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022214B83
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022214B82
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022214B81
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022214B80
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022214B79
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B78
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B77
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012022214B76
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B75
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022214B74
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022214B73
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012022214B72
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022214B71
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022214B70
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022214B69
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022214B68
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022214B67
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022214B66
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022214B65
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022214B64
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022214B63
|
2022-08-02
|
2022-10-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET GOTHAM AVENUE
|
B012022214B62
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012022214B61
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022214B59
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022214B58
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022214B57
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022214B56
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022214B55
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022214B54
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012022214B53
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022214B52
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022214B51
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022214B50
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022214B49
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022214B48
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022214B47
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012022214B46
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022214B45
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022214B44
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022214B43
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012022214B42
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012022214B41
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012022214B40
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B39
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B38
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022214B37
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012022214B36
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012022214B35
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012022214B34
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B33
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012022214B32
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012022214B31
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012022214B30
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022214B29
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012022214B28
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022214B27
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012022214B26
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012022214B25
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022214B24
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022214B23
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022214B22
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012022214B21
|
2022-08-02
|
2022-10-30
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022214B20
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022214B19
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022214B18
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022214B17
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012022214B16
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022214B15
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B14
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B13
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B12
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B11
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022214B10
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022214B09
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022214B08
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B07
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022214B06
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012022214B05
|
2022-08-02
|
2022-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
Q042022214A35
|
2022-08-02
|
2022-08-31
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022214B91
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022214B92
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012022214B93
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022214B94
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022214B95
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q012022214B96
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022214B97
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012022214B98
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q012022214B99
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012022214C00
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012022214C01
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012022214C02
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q012022214C04
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022214C05
|
2022-08-02
|
2022-10-30
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022214A68
|
2022-08-02
|
2022-08-31
|
TEMPORARY PEDESTRIAN WALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022214A69
|
2022-08-02
|
2022-08-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022214A70
|
2022-08-02
|
2022-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022214A71
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022214A72
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022214A73
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022214A74
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022214A75
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022214A76
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022214A77
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022214A78
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022214A79
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022214A80
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022214A81
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022214A82
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022214A83
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B022022214B28
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B022022214B27
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B022022214B26
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
POST COURT, BROOKLYN, FROM STREET BODY OF WATER
|
B022022214B25
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B022022214B24
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B022022214B23
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022214B22
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022214B21
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022214B20
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022214B19
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
Q022022214A84
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022214A85
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022214A86
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022214A87
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022214A88
|
2022-08-02
|
2022-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022214A89
|
2022-08-02
|
2022-10-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012022203C41
|
2022-07-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022203A23
|
2022-07-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q022022203A22
|
2022-07-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 161 STREET
|
Q012022202D58
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012022202D64
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q012022202D65
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022202A51
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022202A50
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q022022202A49
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022202A48
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022202A47
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022202A46
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q022022202A45
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022202A44
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
Q022022202A43
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q022022202A42
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET LIE WESTBOUND EXIT 24 TO STREET 160 STREET
|
Q012022202D62
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 164 STREET TO STREET ST MARY'S CEMETERY BOUNDARY
|
Q012022202D63
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q022022202A57
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022202A56
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 168 STREET TO STREET 169 STREET
|
Q022022202A55
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022202A54
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET
|
Q022022202A53
|
2022-07-21
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012022202D61
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET
|
Q022022202A52
|
2022-07-21
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LONG ISLAND EXPRESSWAY, QUEENS, FROM STREET 167 STREET TO STREET ST MARYS CEMETERY BOUNDARY
|
Q012022202D60
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 162 STREET TO STREET 163 STREET
|
Q012022202D59
|
2022-07-21
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET
|
B022022187A42
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022187A58
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B022022187A56
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022187A55
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022187A54
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B022022187A53
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B022022187A52
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B022022187A51
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022187A50
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022187A49
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B022022187A46
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B022022187A45
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B022022187A44
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022187A43
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022187A41
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022187A40
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B022022187A57
|
2022-07-06
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B022022186D75
|
2022-07-05
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B022022186D74
|
2022-07-05
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
POST COURT, BROOKLYN, FROM STREET BODY OF WATER
|
B022022186D73
|
2022-07-05
|
2022-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
Q022022180A88
|
2022-06-29
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A87
|
2022-06-29
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A80
|
2022-06-29
|
2022-08-01
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q042022180A52
|
2022-06-29
|
2022-07-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A79
|
2022-06-29
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A78
|
2022-06-29
|
2022-08-01
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A77
|
2022-06-29
|
2022-08-01
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A76
|
2022-06-29
|
2022-08-01
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A86
|
2022-06-29
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A85
|
2022-06-29
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A84
|
2022-06-29
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A83
|
2022-06-29
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A82
|
2022-06-29
|
2022-08-01
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180A81
|
2022-06-29
|
2022-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022180D20
|
2022-06-29
|
2022-07-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180B12
|
2022-06-29
|
2022-07-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180B11
|
2022-06-29
|
2022-07-30
|
TEMPORARY PEDESTRIAN WALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022180D19
|
2022-06-29
|
2022-07-30
|
RESET, REPAIR OR REPLACE CURB
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022180B13
|
2022-06-29
|
2022-07-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B152022179A02
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B152022179A01
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B152022179A05
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B152022179A06
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B152022179A07
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B152022179A04
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B152022179A03
|
2022-06-28
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D80
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175D81
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175D82
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175D83
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012022175D84
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012022175D85
|
2022-06-24
|
2022-07-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022175D86
|
2022-06-24
|
2022-07-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012022175D87
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175F27
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022175F26
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022175F25
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022175F24
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175F23
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022175F22
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022175F18
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022175F17
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022175F16
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022175F15
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022175F14
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022175F13
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022175F12
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022175F11
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022175F10
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022175F09
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022175F04
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022175F03
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012022175F02
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022175F01
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012022175F00
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012022175E99
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022175E98
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022175E97
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022175E96
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022175E95
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012022175E94
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012022175E93
|
2022-06-24
|
2022-07-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012022175E92
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022175E91
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012022175E90
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022175E89
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022175E88
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022175E87
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022175E86
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E85
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E84
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022175E83
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022175E82
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E81
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022175E80
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022175E79
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E78
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022175E77
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E76
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022175E75
|
2022-06-24
|
2022-07-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022175E74
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E73
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E72
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E71
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E70
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E69
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E68
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E67
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022175E66
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022175E64
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022175E63
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022175E62
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022175E61
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022175E58
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022175D88
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D89
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022175D90
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022175D91
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175D92
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D93
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D94
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D95
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D96
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022175D97
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012022175D98
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175D99
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022175E00
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175E01
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012022175E02
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022175E03
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012022175E04
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E05
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E06
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022175E08
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022175E09
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E10
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E11
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E12
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E13
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022175E14
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012022175E15
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022175E16
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022175E17
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022175E18
|
2022-06-24
|
2022-07-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022175E19
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012022175E20
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022175E21
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022175E22
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022175E23
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022175E24
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012022175E25
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012022175E26
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012022175E27
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022175E28
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012022175E29
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012022175E30
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022175E31
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012022175E32
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022175E33
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012022175E34
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012022175E35
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012022175E36
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175E37
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012022175E38
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012022175E39
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012022175E40
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175E41
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175E42
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022175E43
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012022175E44
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012022175E45
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012022175E47
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012022175E48
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022175E49
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012022175E50
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022175E51
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022175E52
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022175E53
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022175E54
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022175E55
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022175E56
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022175E57
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022175E07
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022175D68
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022175D69
|
2022-06-24
|
2022-07-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET GOTHAM AVENUE
|
B012022175D70
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022175D71
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022175D72
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022175D73
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022175D74
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022175D75
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022175D76
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022175D77
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022175D78
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022175D79
|
2022-06-24
|
2022-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B022022174A31
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B022022174A29
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B022022174A34
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B022022174D06
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B022022174A30
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B022022174A32
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B022022174A33
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B022022174D07
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B022022174D08
|
2022-06-23
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
Q012022173C67
|
2022-06-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022173C82
|
2022-06-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022173C81
|
2022-06-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012022173C70
|
2022-06-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B022022173E20
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B022022173E23
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B022022173E24
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B022022173E52
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B022022173E53
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B022022173E54
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B022022173E55
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B022022173E56
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
Q012022173C68
|
2022-06-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022173B15
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022173B16
|
2022-06-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022173C69
|
2022-06-22
|
2022-08-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
B022022173E22
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B022022173E19
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B022022173E21
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
Q022022173A86
|
2022-06-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022173A87
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022173A81
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022173A82
|
2022-06-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022173A83
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022173A84
|
2022-06-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022173A85
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022173A88
|
2022-06-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022173B13
|
2022-06-22
|
2022-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022173B14
|
2022-06-22
|
2022-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022153A44
|
2022-06-02
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022153A96
|
2022-06-02
|
2022-06-30
|
RESET, REPAIR OR REPLACE CURB
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q042022153A12
|
2022-06-02
|
2022-06-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012022153A97
|
2022-06-02
|
2022-06-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022153A43
|
2022-06-02
|
2022-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022153A42
|
2022-06-02
|
2022-06-30
|
TEMPORARY PEDESTRIAN WALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B06
|
2022-05-24
|
2022-06-30
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B08
|
2022-05-24
|
2022-06-30
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B09
|
2022-05-24
|
2022-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B10
|
2022-05-24
|
2022-06-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B11
|
2022-05-24
|
2022-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B12
|
2022-05-24
|
2022-06-30
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B13
|
2022-05-24
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B14
|
2022-05-24
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B15
|
2022-05-24
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B16
|
2022-05-24
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B17
|
2022-05-24
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B18
|
2022-05-24
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022144B07
|
2022-05-24
|
2022-06-30
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A10
|
2022-04-29
|
2022-05-27
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B152022119A08
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B152022119A09
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
Q022022119A21
|
2022-04-29
|
2022-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A20
|
2022-04-29
|
2022-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A19
|
2022-04-29
|
2022-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A18
|
2022-04-29
|
2022-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A17
|
2022-04-29
|
2022-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A16
|
2022-04-29
|
2022-05-27
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A22
|
2022-04-29
|
2022-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A15
|
2022-04-29
|
2022-05-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A14
|
2022-04-29
|
2022-05-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B152022119A03
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B152022119A04
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B152022119A05
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B152022119A06
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B152022119A07
|
2022-04-29
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
Q022022119A13
|
2022-04-29
|
2022-05-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A12
|
2022-04-29
|
2022-05-27
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022022119A11
|
2022-04-29
|
2022-05-27
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B022022109A25
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B022022109A32
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B022022109A33
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B022022109A39
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B022022109A29
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B022022109A41
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B022022109A28
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B022022109A26
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B022022109A27
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B022022109A15
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B022022109A21
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B022022109A30
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B022022109A31
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B022022109A14
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B022022109A13
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B022022109A12
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B022022109A11
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B022022109A22
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B022022109A40
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B022022109A23
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B022022109A24
|
2022-04-19
|
2022-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B022022108A07
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET BODY OF WATER
|
B022022108A16
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B022022108A15
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B152022108A06
|
2022-04-18
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B152022108A05
|
2022-04-18
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B152022108A04
|
2022-04-18
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B152022108A03
|
2022-04-18
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B152022108A02
|
2022-04-18
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B022022108A08
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B022022108A09
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B022022108A10
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B022022108A11
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B022022108A12
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B022022108A14
|
2022-04-18
|
2022-07-17
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B152022104A04
|
2022-04-14
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B152022104A08
|
2022-04-14
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B152022104A07
|
2022-04-14
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B152022104A06
|
2022-04-14
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B152022104A05
|
2022-04-14
|
2022-07-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022095B49
|
2022-04-05
|
2022-06-30
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B022022095B21
|
2022-04-05
|
2022-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B022022095B22
|
2022-04-05
|
2022-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012022095B50
|
2022-04-05
|
2022-06-30
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET
|
B012022095B47
|
2022-04-05
|
2022-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012022095B48
|
2022-04-05
|
2022-06-30
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B022022095B20
|
2022-04-05
|
2022-06-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B022022091C67
|
2022-04-01
|
2022-05-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B022022091C66
|
2022-04-01
|
2022-05-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B022022091C65
|
2022-04-01
|
2022-05-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
Q022022089A10
|
2022-03-30
|
2022-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022089A11
|
2022-03-30
|
2022-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022089A19
|
2022-03-30
|
2022-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022089A20
|
2022-03-30
|
2022-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022089A81
|
2022-03-30
|
2022-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012022089A80
|
2022-03-30
|
2022-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022089A77
|
2022-03-30
|
2022-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022089A76
|
2022-03-30
|
2022-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022022089A12
|
2022-03-30
|
2022-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022089A79
|
2022-03-30
|
2022-06-29
|
NYS DOT-CONSTRUCTION
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012022089A78
|
2022-03-30
|
2022-06-29
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022089A18
|
2022-03-30
|
2022-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022089A17
|
2022-03-30
|
2022-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022089A16
|
2022-03-30
|
2022-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022089A15
|
2022-03-30
|
2022-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022022089A14
|
2022-03-30
|
2022-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022089A13
|
2022-03-30
|
2022-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022089A09
|
2022-03-30
|
2022-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
B012022088C05
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012022088C07
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012022088C08
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012022088C09
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012022088C10
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012022088C11
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012022088C12
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012022088C13
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012022088C14
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C15
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C16
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022088C17
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022088C18
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022088C19
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C20
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C21
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C22
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022088C23
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022088C24
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022088C25
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022088C26
|
2022-03-29
|
2022-06-25
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088C27
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022088C28
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022088C29
|
2022-03-29
|
2022-06-25
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET GOTHAM AVENUE
|
B012022088C30
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022088C31
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022088C32
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022088C33
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022088C34
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022088C35
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022088C36
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022088C37
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022088C38
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C39
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012022088C40
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C41
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C42
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C43
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012022088C44
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012022088C45
|
2022-03-29
|
2022-06-25
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET LOIS AVENUE
|
B012022088C46
|
2022-03-29
|
2022-06-25
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012022088C52
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022088C53
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022088C54
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022088C55
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022088C56
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022088C57
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022088C58
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022088C59
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022088C60
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022088C61
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C62
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012022088C63
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012022088C64
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022088C65
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022088C66
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C67
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C68
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C69
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012022088C70
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012022088C71
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022088C72
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022088C73
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022088C74
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012022088C75
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C76
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C77
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022088C78
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022088C79
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022088C80
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022088C81
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022088C82
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012022088C83
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012022088C84
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012022088C85
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012022088C86
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022088C87
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012022088C88
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C89
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012022088C91
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022088C92
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022088C93
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012022088C94
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022088C95
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088C96
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022088C97
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088C98
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022088C99
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D00
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022088D01
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D02
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D03
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D04
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D05
|
2022-03-29
|
2022-06-25
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012022088D06
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022088D07
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D08
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022088D09
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022088D10
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022088D11
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D12
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012022088D13
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022088D14
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022088D15
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022088D16
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022088D17
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022088D18
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022088D19
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012022088D20
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022088D21
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022088D22
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D23
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022088D29
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012022088D30
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012022088D31
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012022088D32
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012022088D33
|
2022-03-29
|
2022-06-25
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012022088D34
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012022088D35
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012022088D36
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012022088D37
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012022088D38
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022088D39
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012022088D40
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012022088D41
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012022088D42
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012022088D43
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012022088D44
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012022088D24
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012022088D25
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D26
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012022088D27
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022088D28
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012022088B89
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012022088B90
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012022088B91
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012022088B92
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012022088B93
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012022088B94
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012022088B95
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012022088B96
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012022088B98
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012022088B99
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012022088C00
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012022088C01
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012022088C02
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012022088C03
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012022088C04
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012022088C06
|
2022-03-29
|
2022-06-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B152022081A04
|
2022-03-22
|
2022-05-29
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012022069A82
|
2022-03-10
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012022069A84
|
2022-03-10
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012022069A83
|
2022-03-10
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B022022055A23
|
2022-02-24
|
2022-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012022055A66
|
2022-02-24
|
2022-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET
|
B012022055A67
|
2022-02-24
|
2022-04-01
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B022022055A24
|
2022-02-24
|
2022-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B022022055A22
|
2022-02-24
|
2022-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012022055A72
|
2022-02-24
|
2022-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012022055A73
|
2022-02-24
|
2022-04-01
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
Q022022014A41
|
2022-01-14
|
2022-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022014A26
|
2022-01-14
|
2022-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012022014A27
|
2022-01-14
|
2022-04-01
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022014A42
|
2022-01-14
|
2022-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022022014A40
|
2022-01-14
|
2022-04-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022022014A43
|
2022-01-14
|
2022-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B012021358A18
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021358A17
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021358A16
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021358A15
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021358A14
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021358A13
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021358A12
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021358A11
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021358A10
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021358A09
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021358A08
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021358A07
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021358A06
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021358A05
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021358A04
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021358A01
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021358A02
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021358A03
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021358A51
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A52
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021358A53
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021358A54
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021358A55
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A56
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021358A57
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021358A58
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021358A59
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021358A60
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021358A61
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A62
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A37
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A38
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A39
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012021358A40
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012021358A41
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021358A42
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021358A43
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012021358A44
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021358A45
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012021358A46
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012021358A47
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021358A35
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021358A49
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021358A50
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012021358A36
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021358A48
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021358A34
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021358A33
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021358A32
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021358A31
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021358A30
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021358A29
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021358A28
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021358A27
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021358A26
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021358A25
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021358A24
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021358A23
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021358A22
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021358A21
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021358A20
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021358A19
|
2021-12-24
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021357D31
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012021357D29
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012021357D28
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012021357D27
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012021357D26
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012021357D25
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357D24
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012021357D23
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012021357D22
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012021357D21
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021357D20
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012021357D19
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021357D18
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012021357D17
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012021357D16
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012021357D15
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012021357D14
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021357D13
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012021357D12
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021357D11
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012021357D10
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012021357D09
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021357D08
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021357D07
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021357D06
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021357D05
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012021357D04
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021357D03
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357D02
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357D01
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357D00
|
2021-12-23
|
2022-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012021357C99
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021357C98
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021357C97
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021357C96
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012021357C95
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012021357C94
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021357C93
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021357C92
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C91
|
2021-12-23
|
2022-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021357C90
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C89
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C88
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C87
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021357C86
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C85
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C84
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C83
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C82
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C81
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021357C80
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021357C79
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021357C78
|
2021-12-23
|
2022-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021357C77
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021357C76
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021357C75
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021357C74
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021357C73
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357C72
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357C71
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357C70
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021357C69
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021357C68
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021357C66
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357C65
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012021357C64
|
2021-12-23
|
2022-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021357C63
|
2021-12-23
|
2022-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021357C62
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012021357C61
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012021357C60
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021357C59
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021357C58
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021357C57
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012021357C56
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021357C55
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357C54
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021357C53
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021357C52
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021357C51
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021357C50
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021357C48
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021357C47
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021357C46
|
2021-12-23
|
2022-03-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET GOTHAM AVENUE
|
B012021357C45
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021357C49
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021357B89
|
2021-12-23
|
2022-02-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021357B88
|
2021-12-23
|
2022-02-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012021357B87
|
2021-12-23
|
2022-02-25
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET
|
B012021357C67
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021357A02
|
2021-12-23
|
2022-02-25
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B022021357A12
|
2021-12-23
|
2022-02-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B022021357A11
|
2021-12-23
|
2022-02-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B022021357A10
|
2021-12-23
|
2022-02-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012021357D30
|
2021-12-23
|
2022-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012021356B81
|
2021-12-22
|
2022-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012021356B82
|
2021-12-22
|
2022-03-19
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
BARTLETT PLACE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012021356B94
|
2021-12-22
|
2022-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
M022021351C42
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M022021351C41
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M022021351C40
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M022021351C39
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M022021351C46
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M022021351C44
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M022021351C43
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M022021351C58
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M022021351C57
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M022021351C56
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M022021351C55
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M022021351C54
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M022021351C53
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M022021351C52
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M022021351C51
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M022021351C50
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M022021351C49
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M022021351C48
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M022021351C47
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M022021351C45
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012021351A79
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT-PROT
|
STATE STREET, MANHATTAN, FROM STREET BRIDGE STREET TO STREET PEARL STREET
|
M012021351A80
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012021351A81
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012021351A82
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012021351A83
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012021351A84
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012021351A85
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012021351A86
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012021351A87
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012021351A88
|
2021-12-17
|
2022-01-15
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M022021351C34
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
STATE STREET, MANHATTAN, FROM STREET BRIDGE STREET TO STREET PEARL STREET
|
M022021351C35
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
STATE STREET, MANHATTAN, FROM STREET BRIDGE STREET TO STREET PEARL STREET
|
M022021351C36
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
STATE STREET, MANHATTAN, FROM STREET BRIDGE STREET TO STREET PEARL STREET
|
M022021351C37
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
STATE STREET, MANHATTAN, FROM STREET BRIDGE STREET TO STREET PEARL STREET
|
M022021351C38
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M022021351C73
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M022021351C72
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M022021351C71
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M022021351C70
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M022021351C69
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M022021351C68
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M022021351C67
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M022021351C66
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M022021351C65
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M022021351C64
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M022021351C63
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M022021351C62
|
2021-12-17
|
2022-01-15
|
CROSSING SIDEWALK
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M022021351C61
|
2021-12-17
|
2022-01-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M022021351C60
|
2021-12-17
|
2022-01-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M022021351C59
|
2021-12-17
|
2022-01-15
|
TEMPORARY PEDESTRIAN WALK
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
Q022021349A35
|
2021-12-15
|
2022-03-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A34
|
2021-12-15
|
2022-03-31
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A33
|
2021-12-15
|
2022-03-31
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A44
|
2021-12-15
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A45
|
2021-12-15
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A43
|
2021-12-15
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A42
|
2021-12-15
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A41
|
2021-12-15
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A36
|
2021-12-15
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A37
|
2021-12-15
|
2022-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A38
|
2021-12-15
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A40
|
2021-12-15
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021349A39
|
2021-12-15
|
2022-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021348A22
|
2021-12-14
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012021348A99
|
2021-12-14
|
2022-03-31
|
NYS DOT-CONSTRUCTION
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012021348A89
|
2021-12-14
|
2022-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012021348A88
|
2021-12-14
|
2022-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012021348A87
|
2021-12-14
|
2022-03-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022021348A18
|
2021-12-14
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022021348A17
|
2021-12-14
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022021348A19
|
2021-12-14
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022021348A20
|
2021-12-14
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022021348A21
|
2021-12-14
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022021348A25
|
2021-12-14
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022021348A26
|
2021-12-14
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B012021344A28
|
2021-12-10
|
2022-01-09
|
RESET, REPAIR OR REPLACE CURB
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B022021344A14
|
2021-12-10
|
2022-01-09
|
TEMPORARY PEDESTRIAN WALK
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B022021344A15
|
2021-12-10
|
2022-01-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B022021344A16
|
2021-12-10
|
2022-01-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B042021344A04
|
2021-12-10
|
2022-01-09
|
REPAIR SIDEWALK
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B022021344A17
|
2021-12-10
|
2022-01-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B012021337B29
|
2021-12-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021337A58
|
2021-12-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012021337B28
|
2021-12-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
MEEKER AVENUE, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET
|
B012021337B30
|
2021-12-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION - PROTECTED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B022021337A15
|
2021-12-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B022021337A14
|
2021-12-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B022021337A13
|
2021-12-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
Q022021334B10
|
2021-11-30
|
2021-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B12
|
2021-11-30
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B11
|
2021-11-30
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B13
|
2021-11-30
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B14
|
2021-11-30
|
2021-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B15
|
2021-11-30
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B18
|
2021-11-30
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B17
|
2021-11-30
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B09
|
2021-11-30
|
2021-12-31
|
CROSSING SIDEWALK
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B08
|
2021-11-30
|
2021-12-31
|
PLACE MATERIAL ON STREET
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B16
|
2021-11-30
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B20
|
2021-11-30
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q022021334B19
|
2021-11-30
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
B042021312A09
|
2021-11-08
|
2021-12-10
|
REPAIR SIDEWALK
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B012021307B20
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
Q012021307B15
|
2021-11-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012021307B14
|
2021-11-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q012021307B13
|
2021-11-03
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022021307A18
|
2021-11-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q022021307A16
|
2021-11-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022021307A15
|
2021-11-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022021307A14
|
2021-11-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022021307A13
|
2021-11-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q022021307A17
|
2021-11-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
B012021307B24
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021307A93
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012021307C62
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012021307A79
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012021307A80
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012021307A81
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021307A82
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012021307A83
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021307A84
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012021307A85
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012021307A86
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012021307A87
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307A88
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012021307A89
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012021307A90
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012021307A91
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012021307A92
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012021307A94
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021307A95
|
2021-11-03
|
2021-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET GOTHAM AVENUE
|
B012021307A96
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021307A97
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021307A98
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021307A99
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021307B00
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021307B01
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021307B02
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021307B03
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021307B04
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B05
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021307B06
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307B07
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307B08
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307B09
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012021307B10
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012021307B11
|
2021-11-03
|
2021-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021307B12
|
2021-11-03
|
2021-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021307B13
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012021307B14
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021307B15
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012021307B16
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021307B17
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021307B18
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021307B19
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021307B21
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B22
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B23
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021307B25
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021307B26
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B27
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B28
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B29
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021307B30
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021307B31
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021307B32
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021307B33
|
2021-11-03
|
2021-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
GERRITSEN AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307B34
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021307C02
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021307B82
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021307B86
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307B87
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012021307B88
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012021307B89
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021307B94
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021307B95
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307B96
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307B97
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307C00
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021307C01
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021307C03
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021307C04
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021307C05
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021307C06
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021307C07
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021307C09
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021307C11
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012021307C12
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021307C13
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021307C14
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021307C15
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012021307C16
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307C17
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307C18
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021307C19
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021307C20
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021307C21
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021307C22
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021307C23
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021307C24
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012021307C25
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012021307C26
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021307C27
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021307C28
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021307C29
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307C30
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021307C31
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012021307C59
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021307C60
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012021307C61
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012021307C63
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012021307C64
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021307C65
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021307C66
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021307C67
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012021307C68
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021307C69
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021307C70
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021307C71
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012021307C72
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021307C73
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021307C74
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021307C75
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021307C76
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021307C77
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C78
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021307C79
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021307C80
|
2021-11-03
|
2021-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET GERRITSEN AVENUE
|
B012021307C81
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C82
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021307C83
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C84
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021307C85
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021307C86
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C87
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C88
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C89
|
2021-11-03
|
2021-12-31
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021307C90
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021307C91
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C92
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C93
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C94
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C95
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021307C96
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021307C97
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307C98
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021307C99
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021307D00
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021307D01
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021307D02
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021307D03
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021307D04
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021307D05
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021307D06
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021307D07
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021307D08
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021307D09
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021307D10
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021307D11
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021307D12
|
2021-11-03
|
2021-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
Q012021302B60
|
2021-10-29
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET
|
Q022021302A61
|
2021-10-29
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q012021302B59
|
2021-10-29
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET
|
Q012021302B61
|
2021-10-29
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
HORACE HARDING EXPRESSWAY, QUEENS, FROM STREET 150 STREET TO STREET 153 STREET
|
Q012021302B62
|
2021-10-29
|
2021-12-31
|
NYS DOT-CONSTRUCTION
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
Q022021302A62
|
2021-10-29
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
150 STREET, QUEENS, FROM STREET HORACE HARDING EXPRESSWAY
|
B042021278B12
|
2021-10-05
|
2021-11-10
|
REPAIR SIDEWALK
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B012021253A95
|
2021-09-10
|
2021-10-11
|
RESET, REPAIR OR REPLACE CURB
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B042021253A03
|
2021-09-10
|
2021-10-11
|
REPAIR SIDEWALK
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
X012021238A34
|
2021-08-26
|
2021-09-30
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021238A33
|
2021-08-26
|
2021-09-30
|
NYS DOT-CONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021238A32
|
2021-08-26
|
2021-09-30
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021238A31
|
2021-08-26
|
2021-09-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021238A30
|
2021-08-26
|
2021-09-30
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021238A29
|
2021-08-26
|
2021-09-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021238A04
|
2021-08-26
|
2021-09-30
|
REPAIR SIDEWALK
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X042021238A03
|
2021-08-26
|
2021-09-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021238A05
|
2021-08-26
|
2021-09-30
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X012021238A35
|
2021-08-26
|
2021-09-30
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
B012021229A23
|
2021-08-17
|
2021-09-11
|
RESET, REPAIR OR REPLACE CURB
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B042021229A00
|
2021-08-17
|
2021-09-11
|
REPAIR SIDEWALK
|
BEARD STREET, BROOKLYN, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
B012021218B04
|
2021-08-06
|
2021-10-30
|
NYS DOT-CONSTRUCTION
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012021218B05
|
2021-08-06
|
2021-10-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021211A21
|
2021-07-30
|
2021-10-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET
|
X042021211A02
|
2021-07-30
|
2021-08-31
|
REPAIR SIDEWALK
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021211A10
|
2021-07-30
|
2021-08-31
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X012021211A06
|
2021-07-30
|
2021-08-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021211A07
|
2021-07-30
|
2021-08-31
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021211A09
|
2021-07-30
|
2021-08-31
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021211A05
|
2021-07-30
|
2021-08-31
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021211A01
|
2021-07-30
|
2021-08-31
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021211A04
|
2021-07-30
|
2021-08-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021211A00
|
2021-07-30
|
2021-08-31
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X012021211A08
|
2021-07-30
|
2021-08-31
|
NYS DOT-CONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
B012021211A22
|
2021-07-30
|
2021-10-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012021209C04
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021209C06
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012021209C07
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012021209C08
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021209C38
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021209C37
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C36
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C35
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021209C34
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C33
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021209C32
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C31
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C30
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021209C29
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021209C28
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021209C27
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021209C26
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C18
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021209C17
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C16
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021209C10
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021209B85
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021209B86
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021209B87
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021209B88
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021209B89
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209B90
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209B91
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021209B92
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209B93
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021209B94
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021209B95
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012021209B96
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021209B99
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012021209C00
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012021209C01
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021209C02
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021209C03
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012021209C05
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021209A14
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021209A16
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021209A17
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021209A18
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021209A19
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021209A20
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021209A21
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021209A22
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021209A23
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021209A24
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209C25
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021209C24
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021209C23
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021209C22
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021209C21
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021209C20
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021209C19
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C15
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021209C14
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021209C13
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021209C12
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209C11
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021209C09
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021209A25
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021209A26
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A27
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A28
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A29
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012021209A30
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012021209A64
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012021209A65
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021209A66
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021209A67
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021209A68
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012021209A69
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A70
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A71
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021209A72
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021209A73
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021209A74
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021209A75
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021209A76
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021209A77
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012021209A78
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012021209A79
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021209A80
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021209A81
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021209A82
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A83
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209A84
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012021209B13
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021209B14
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012021209B15
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012021209B16
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021209B17
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012021209B18
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021209B19
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012021209B20
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012021209B21
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012021209B22
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B23
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012021209B24
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012021209B25
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012021209B26
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012021209B27
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012021209B28
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012021209B29
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012021209B30
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021209B31
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012021209B32
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021209B33
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021209B34
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021209B35
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021209B36
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012021209B37
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B38
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B39
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021209B40
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021209B41
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021209B42
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B43
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B44
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B45
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021209B46
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021209B47
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021209B48
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021209B50
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021209B55
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021209B56
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012021209B57
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012021209B58
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021209B59
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021209B60
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021209B61
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021209B62
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021209B63
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021209B65
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021209B66
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021209B67
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021209B68
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021209B69
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021209B70
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209B71
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209B72
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021209B84
|
2021-07-28
|
2021-10-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
M012021207A66
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012021207A67
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012021207A68
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012021207A60
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012021207A61
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012021207A62
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012021207A63
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012021207A64
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012021207A65
|
2021-07-26
|
2021-10-26
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
X012021201A17
|
2021-07-20
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021201A19
|
2021-07-20
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X042021201A03
|
2021-07-20
|
2021-08-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021201A13
|
2021-07-20
|
2021-08-01
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021201A14
|
2021-07-20
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021201A15
|
2021-07-20
|
2021-08-01
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021201A18
|
2021-07-20
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021201A16
|
2021-07-20
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X042021201A04
|
2021-07-20
|
2021-08-01
|
REPAIR SIDEWALK
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
B012021187B58
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021187A87
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012021187A88
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187A89
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187A90
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021187A91
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021187A92
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021187A93
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187A94
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187A95
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187A96
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021187A97
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021187A98
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021187A99
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021187B01
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021187B02
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012021187B03
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021187B04
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012021187B05
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021187B06
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021187B07
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021187B08
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021187B09
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012021187B10
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012021187B11
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021187B12
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012021187B13
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021187B14
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012021187B15
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012021187B16
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012021187B17
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187B18
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012021187B19
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012021187B20
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012021187B21
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012021187B22
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012021187B23
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012021187B24
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021187B25
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021187B26
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021187B27
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B28
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021187B29
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B30
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B31
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012021187B32
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021187B34
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012021187B35
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012021187B36
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012021187B37
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021187B39
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021187B40
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021187B41
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021187B42
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021187B43
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021187B44
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021187B45
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021187B46
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021187B47
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187B48
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021187B49
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187B50
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187B51
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187B52
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012021187B53
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012021187B54
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021187B55
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012021187B56
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012021187B60
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021187B61
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B62
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B63
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B64
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B65
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021187B66
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021187B67
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B68
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187B69
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012021187B70
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012021187B71
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021187B72
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021187B73
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021187B74
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021187B75
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021187B76
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021187B77
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021187B79
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B80
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021187B81
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B82
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B83
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021187B84
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021187B85
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021187B86
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021187B87
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021187B88
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021187B89
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021187B90
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021187B91
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021187B92
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021187B93
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187B94
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021187B95
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021187B96
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021187B97
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021187B98
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187B99
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187C00
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021187C01
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021187C02
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021187C03
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021187C04
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021187C05
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021187C06
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021187C07
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021187C08
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021187C09
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021187C10
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021187C11
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021187C12
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021187C13
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021187C14
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021187C15
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021187C16
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187C17
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021187C18
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021187C19
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021187C20
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187C21
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021187C22
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021187C23
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021187C24
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187C25
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021187C26
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021187C27
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021187C28
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021187C29
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021187C30
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012021187C31
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021187C32
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012021187C33
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012021187C34
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021187C35
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012021187C36
|
2021-07-06
|
2021-07-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012021175A35
|
2021-06-24
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012021175A36
|
2021-06-24
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021174B25
|
2021-06-23
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012021174B30
|
2021-06-23
|
2021-08-01
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET
|
B012021169A39
|
2021-06-18
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021169A40
|
2021-06-18
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012021169A38
|
2021-06-18
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
X012021168A31
|
2021-06-17
|
2021-07-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021168A03
|
2021-06-17
|
2021-07-22
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X012021168A37
|
2021-06-17
|
2021-07-22
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X012021168A36
|
2021-06-17
|
2021-07-22
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021168A35
|
2021-06-17
|
2021-07-22
|
NYS DOT-CONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021168A34
|
2021-06-17
|
2021-07-22
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021168A33
|
2021-06-17
|
2021-07-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021168A32
|
2021-06-17
|
2021-07-22
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021168A01
|
2021-06-17
|
2021-07-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X042021168A02
|
2021-06-17
|
2021-07-22
|
REPAIR SIDEWALK
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
M012021159B14
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012021159B13
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012021159B12
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012021159B11
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012021159B10
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012021159B09
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012021159B08
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012021159B07
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012021159B15
|
2021-06-08
|
2021-07-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
X012021145A32
|
2021-05-25
|
2021-06-22
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X012021145A33
|
2021-05-25
|
2021-06-22
|
NYS DOT-CONSTRUCTION
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X042021145A06
|
2021-05-25
|
2021-06-22
|
REPAIR SIDEWALK
|
EAST 174 STREET, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X042021145A05
|
2021-05-25
|
2021-06-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021145A31
|
2021-05-25
|
2021-06-22
|
NYS DOT-CONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET EASTBURN AVENUE TO STREET MORRIS AVENUE
|
X042021145A07
|
2021-05-25
|
2021-06-22
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET MORRIS AVENUE
|
X012021145A30
|
2021-05-25
|
2021-06-22
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021145A29
|
2021-05-25
|
2021-06-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GRAND CONCOURSE
|
X012021145A28
|
2021-05-25
|
2021-06-22
|
NYS DOT-CONSTRUCTION
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
X012021145A27
|
2021-05-25
|
2021-06-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
B012021140A98
|
2021-05-20
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012021140A99
|
2021-05-20
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021140B00
|
2021-05-20
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
B012021138A55
|
2021-05-18
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
HUMBOLDT STREET, BROOKLYN, FROM STREET MEEKER AVENUE
|
B012021138A56
|
2021-05-18
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
B012021138A57
|
2021-05-18
|
2021-06-30
|
NYS DOT-CONSTRUCTION
|
MEEKER AVENUE, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET
|
M012021120A90
|
2021-04-30
|
2021-05-31
|
RESET, REPAIR OR REPLACE CURB
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M042021120A13
|
2021-04-30
|
2021-05-31
|
REPLACE SIDEWALK
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M042021091A01
|
2021-04-01
|
2021-05-01
|
REPLACE SIDEWALK
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M012021091A24
|
2021-04-01
|
2021-05-01
|
RESET, REPAIR OR REPLACE CURB
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M012021088C83
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012021088C84
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012021088C85
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012021088C81
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012021088C87
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012021088C88
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012021088C89
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012021088C86
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012021088C82
|
2021-03-29
|
2021-05-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
B012021084I49
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012021084I59
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084I58
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012021084I57
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012021084I56
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012021084I55
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012021084I54
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084I53
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084I52
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084I51
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012021084I50
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012021084I48
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084I47
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012021084I46
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012021084I45
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012021084I44
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021084I43
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012021084I42
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021084I41
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012021084I40
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012021084I39
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021084I01
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012021084I00
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012021084H99
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012021084H98
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H97
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H96
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H95
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H94
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H93
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021084H92
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021084H91
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021084H90
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012021084H89
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012021084H88
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021084H87
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021084H86
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021084H85
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021084H84
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021084H83
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012021084H82
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H81
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012021084H80
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012021084H79
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084H78
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021084H77
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021084H76
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012021084H75
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021084H74
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021084H73
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021084H72
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021084H71
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021084H70
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021084H69
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021084H68
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021084H67
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021084H65
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012021084H64
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021084H62
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021084H61
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021084H60
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021084H59
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021084H58
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021084H57
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021084H56
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021084H55
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021084H54
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H53
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021084H52
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H51
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H50
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021084H49
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H48
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021084H47
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021084H46
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H45
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021084H44
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H43
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021084H42
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H41
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021084H40
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H39
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012021084H38
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084H37
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021084H36
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084H35
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021084H34
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021084H33
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012021084J04
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021084J05
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021084J06
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012021084J07
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021084J08
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021084J10
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012021084J11
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012021084J12
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012021084J13
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012021084J14
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012021084J15
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021084J16
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012021084J17
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012021084J18
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012021084J19
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021084J20
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012021084J21
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021084J03
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021084J02
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084J01
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021084J00
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084I99
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021084I98
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012021084I97
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012021084I92
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012021084I91
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012021084I90
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012021084I89
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012021084I88
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012021084I87
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012021084I86
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021084I85
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012021084I84
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012021084I83
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012021084I82
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012021084I81
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012021084I80
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012021084I79
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021084I78
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021084I77
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012021084I76
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012021084I75
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012021084I74
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012021084I72
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021084I71
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021084I70
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012021084I69
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012021084I68
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012021084I67
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084I66
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084I65
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084I64
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012021084I63
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012021084I62
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012021084I61
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012021084I60
|
2021-03-25
|
2021-06-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
M012021082A45
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012021082A44
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012021082A40
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012021082A39
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012021082A38
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012021082A37
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012021082A43
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012021082A42
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012021082A41
|
2021-03-23
|
2021-03-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012021060A48
|
2021-03-01
|
2021-04-01
|
RESET, REPAIR OR REPLACE CURB
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M042021060A08
|
2021-03-01
|
2021-04-01
|
REPLACE SIDEWALK
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M042021036A02
|
2021-02-05
|
2021-03-04
|
REPLACE SIDEWALK
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
M012021036A31
|
2021-02-05
|
2021-03-04
|
RESET, REPAIR OR REPLACE CURB
|
WEST 34 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET HIGH LINE
|
B012020363D60
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D61
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020363D62
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020363D69
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020363D68
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012020363D67
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012020363D79
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012020363D78
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012020363D77
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012020363D76
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D75
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D74
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D73
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D72
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D71
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020363D70
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020363D42
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020363D44
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012020363D45
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020363D46
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020363D47
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020363D48
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020363D49
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020363D54
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012020363D55
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020363D56
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020363D57
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363D58
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012020363D59
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363D20
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020363D21
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D22
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020363D23
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D24
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020363D25
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D26
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020363D27
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020363D28
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D29
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020363D30
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D31
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D32
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020363D33
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D34
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020363D35
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020363D36
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020363D37
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020363D38
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020363D39
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
M012020363B62
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
B012020363D40
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020363D41
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020363D43
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
M012020363B63
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012020363B64
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012020363B65
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
B012020363D08
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020363D07
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012020363D06
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020363D05
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020363D04
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020363D03
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012020363D02
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012020363C98
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012020363C97
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012020363C96
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012020363C95
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363C94
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363C93
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020363C92
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012020363C91
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012020363C90
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012020363C89
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C88
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012020363C87
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012020363C86
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012020363C85
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020363C84
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012020363C83
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020363C82
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012020363C81
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012020363C80
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020363C79
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020363C78
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020363C77
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020363C76
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020363C75
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020363C74
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012020363C72
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020363C71
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020363C70
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020363C56
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020363C55
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020363D09
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020363D10
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020363D11
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012020363D12
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012020363D13
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020363D14
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
M012020363B66
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012020363B67
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012020363B68
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012020363B69
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012020363B70
|
2020-12-28
|
2021-03-20
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
B012020363C10
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012020363C11
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C12
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C13
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020363C14
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020363C15
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020363C16
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C17
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C18
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C19
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363C20
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012020363C21
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012020363C22
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020363C23
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020363C24
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020363C26
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012020363C27
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020363C28
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020363C29
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020363C30
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012020363C31
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020363C32
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020363C33
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020363C34
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020363C35
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020363C43
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012020363C44
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020363C45
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020363C47
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020363C48
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020363C49
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363C50
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020363C51
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363C52
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020363C53
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363C54
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020363D63
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020363D66
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020363D65
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020363D64
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020363D50
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020363D51
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020363D52
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020363D53
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020363D15
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020363D16
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020363D17
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020363D18
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020363D19
|
2020-12-28
|
2021-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
Q012020338A21
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020338A11
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020338A20
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020338A19
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020338A15
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020338A10
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020338A14
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020338A13
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020338A12
|
2020-12-03
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020337E57
|
2020-12-02
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET COLFAX STREET
|
Q012020337E56
|
2020-12-02
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012020337E53
|
2020-12-02
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020337E54
|
2020-12-02
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012020337E55
|
2020-12-02
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012020337E58
|
2020-12-02
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
M012020301A07
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012020301A02
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012020301A04
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012020301A05
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012020301A06
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012020301A03
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012020301A08
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012020301A09
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012020301A10
|
2020-10-27
|
2020-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
B012020297C92
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012020297C20
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020297C21
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020297C22
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020297C23
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012020297C24
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020297C25
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020297C26
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020297C27
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020297C28
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020297C29
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020297C30
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012020297C31
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012020297C32
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020297C33
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012020297C34
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020297C35
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012020297C36
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012020297C37
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012020297C38
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297C39
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012020297C40
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012020297C41
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012020297C42
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C43
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C44
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C45
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012020297C46
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012020297C47
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012020297C50
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012020297C51
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020297C52
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020297C53
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020297C54
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012020297C55
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297C56
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012020297C57
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C58
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C59
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020297C60
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020297C61
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020297C62
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020297C63
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020297C64
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020297C65
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012020297C66
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012020297C67
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020297C68
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020297C69
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020297C70
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C71
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C72
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C73
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C74
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020297C75
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012020297C76
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012020297C77
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012020297C78
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020297C79
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020297C80
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020297C81
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020297C82
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020297C83
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020297C84
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020297C85
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020297C86
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020297C87
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020297C88
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297C89
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297C90
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297C91
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297C93
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012020297C94
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020297C95
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020297C96
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020297C98
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012020297C99
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020297D00
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020297D01
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020297D02
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012020297D03
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020297D04
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020297D05
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020297D06
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020297D07
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020297D08
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012020297D09
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297D10
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297D11
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020297D12
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020297D13
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020297D14
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020297D15
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D16
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020297D17
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D18
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020297D19
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D20
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020297D21
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020297D22
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020297D23
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012020297D24
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020297D25
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020297D27
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020297D28
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020297D29
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012020297D30
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020297D31
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020297D32
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020297D33
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020297D34
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012020297D35
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020297D36
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020297D37
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020297D38
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012020297D39
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020297D40
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012020297D41
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020297D42
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020297D43
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012020297D44
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020297D45
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020297D46
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D47
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D48
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D49
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D50
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020297D51
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020297D52
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020297D53
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020297D54
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D55
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D56
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D57
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D58
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020297D59
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020297D60
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020297D61
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020297D62
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020297D63
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020297D64
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020297D65
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020297D66
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020297D67
|
2020-10-23
|
2020-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
X012020259B10
|
2020-09-15
|
2020-10-16
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X012020259A94
|
2020-09-15
|
2020-10-16
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
Q012020216A67
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012020216A65
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A64
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020216A63
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020216A62
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012020216A76
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020216A75
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020216A74
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A73
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012020216A72
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012020216A71
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A70
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012020216A36
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A37
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020216A38
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020216A39
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020216A40
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012020216A41
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012020216A42
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012020216A43
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012020216A44
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A46
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A47
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020216A48
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020216A51
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012020216A52
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020216A53
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020216A54
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020216A56
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020216A57
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020216A58
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020216A59
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020216A69
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012020216A60
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020216A68
|
2020-08-03
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
B012020213A65
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
Q012020213B20
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012020213B21
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012020213B22
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012020213B23
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012020213B24
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012020213B25
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012020213B26
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012020213B30
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020213B33
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
X012020213A29
|
2020-07-31
|
2020-09-11
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
B012020213B21
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020213B20
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020213B19
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020213B18
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020213B17
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020213B16
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012020213B15
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020213B14
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020213B13
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020213B12
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020213B11
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020213B10
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012020213A89
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012020213A88
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012020213A87
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012020213A86
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A85
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A84
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A83
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A82
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A81
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020213A80
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020213A79
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020213A78
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012020213A77
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012020213A76
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020213A75
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020213A74
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020213A73
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020213A72
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020213A71
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020213A70
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A69
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213A68
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012020213A67
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213A66
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012020213C32
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C31
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020213C30
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012020213C29
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020213C28
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020213C27
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213C26
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020213C25
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020213C24
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020213C06
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020213C05
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020213C04
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020213C03
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213C02
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213C01
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012020213C00
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020213B99
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020213B98
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020213B97
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020213B96
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020213B95
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020213B94
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020213B93
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020213B92
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020213B91
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020213B81
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020213B80
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020213B79
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020213B78
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020213B77
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020213B76
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012020213B75
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020213B74
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020213B73
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020213B72
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012020213B70
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020213B69
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020213B68
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020213B67
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012020213B66
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012020213B65
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213B64
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213B63
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213B62
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020213B23
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012020213B24
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012020213B25
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020213B26
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012020213B27
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020213B28
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012020213B29
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012020213B30
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012020213B31
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012020213B32
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012020213B33
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012020213B34
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213B35
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213B36
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020213B37
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012020213B54
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012020213B55
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012020213B61
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
X012020213A28
|
2020-07-31
|
2020-09-11
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
B012020213B22
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
X012020213A30
|
2020-07-31
|
2020-09-11
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE
|
Q012020213B19
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
M012020213A24
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012020213A25
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012020213A26
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012020213A27
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012020213A28
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012020213A29
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012020213A30
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012020213A31
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012020213A32
|
2020-07-31
|
2020-10-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
B012020213C77
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020213C76
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020213C75
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020213C74
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020213C73
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020213C72
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020213C71
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020213C70
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C69
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C68
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C67
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C66
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C65
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020213C64
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020213C63
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020213C62
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020213C61
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020213C60
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020213C59
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020213C58
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C57
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C56
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C55
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C54
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012020213C53
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020213C52
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012020213C51
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020213C50
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012020213C49
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020213C48
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020213C47
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020213C46
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020213C45
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020213C44
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020213C43
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012020213C42
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020213C41
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020213C39
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020213C38
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020213C37
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012020213C36
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C35
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020213C34
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020213C33
|
2020-07-31
|
2020-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
M012020182C59
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
B012020182C18
|
2020-06-30
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
M012020182C58
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012020182C57
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012020182C56
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012020182C51
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012020182C55
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012020182C54
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012020182C53
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012020182C52
|
2020-06-30
|
2020-08-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
X012020177A02
|
2020-06-25
|
2020-07-31
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
BRYANT AVENUE, BRONX, FROM STREET ALDUS STREET TO STREET PEDESTRIAN OVERPASS
|
Q012020175C23
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020175C12
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012020175C13
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020175C14
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020175C18
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012020175C20
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020175C21
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020175C22
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020175C24
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012020175C26
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012020175C27
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020175C28
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020175C29
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020175B72
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020175B73
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012020175B74
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012020175B75
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012020175B96
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012020175B79
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020175B80
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020175B81
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012020175B84
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012020175B85
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020175B86
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020175B87
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020175B88
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020175B89
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012020175B90
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020175B91
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012020175B92
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020175B93
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020175B94
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020175B95
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012020175B97
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012020175B98
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012020175B99
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012020175C01
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012020175C03
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020175C04
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020175C05
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020175C06
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020175C07
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020175C08
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020175C10
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012020175C11
|
2020-06-23
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
X012020170B39
|
2020-06-18
|
2020-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE
|
X012020170B04
|
2020-06-18
|
2020-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X012020170B38
|
2020-06-18
|
2020-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
B012020169B50
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020169B63
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020169B49
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020169B60
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020169B59
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020169B58
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET DEAD END TO STREET SEBA AVENUE
|
B012020169B56
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020169B55
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOVA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020169B54
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020169B52
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020169B62
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020169B51
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020169B61
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020169B53
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET NOEL AVENUE
|
B012020169B57
|
2020-06-17
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B042020167A64
|
2020-06-15
|
2020-07-28
|
REPAIR SIDEWALK
|
COURT STREET, BROOKLYN, FROM STREET JORALEMON STREET TO STREET LIVINGSTON STREET
|
B012020160C17
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020160B58
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012020160B59
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012020160B60
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020160B61
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020160B62
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020160B63
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160B64
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160B65
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160B67
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012020160B68
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020160B69
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020160B70
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020160B71
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012020160B72
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020160B73
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020160B74
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020160B75
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020160B76
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020160B77
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012020160B78
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012020160B81
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012020160B82
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012020160B83
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020160B84
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020160B85
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020160B86
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020160B87
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020160B88
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012020160B89
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020160B90
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020160B91
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020160B92
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012020160B93
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020160B94
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020160B95
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020160B96
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020160B98
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020160B99
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C00
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020160C01
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C02
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020160C03
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C04
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020160C05
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C06
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020160C07
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C08
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020160C09
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C10
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020160C11
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C12
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C13
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020160C14
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020160C15
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020160C16
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020160C18
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020160C19
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020160C20
|
2020-06-08
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
X042020157A07
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A06
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A04
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A03
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET MACE AVENUE
|
X042020157A05
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A13
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A12
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A11
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A10
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A09
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020157A08
|
2020-06-05
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
B012020148A11
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020148A32
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020148A33
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020148A01
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET KAY COURT
|
B012020148A34
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020148A39
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020148A38
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET KEEN COURT
|
B012020148A37
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BEND TO STREET CYRUS AVENUE
|
B012020148A36
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020148A35
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020148A05
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020148A06
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020148A07
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020148A08
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET KAY COURT
|
B012020148A09
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020148A10
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020148A31
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012020148A12
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020148A13
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020148A14
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020148A15
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012020148A16
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012020148A17
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020148A04
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020148A03
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020148A02
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012020148A18
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET GAIN COURT
|
B012020148A19
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020148A20
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET FRANK COURT
|
B012020148A21
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012020148A22
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012020148A23
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012020148A24
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012020148A25
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE
|
B012020148A26
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A27
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A28
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A29
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A30
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148F12
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020148F11
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MELBA COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020148F10
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020148F09
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020148F08
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET BODY OF WATER
|
B012020148F05
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148F04
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148F03
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148F02
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148F01
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET LOIS AVENUE
|
B012020148F00
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LOIS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020148E99
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148E98
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148E97
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012020148E96
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
POST COURT, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020148E95
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET BODY OF WATER
|
B012020148F06
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012020148F07
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012020148A51
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KAY COURT, BROOKLYN, FROM STREET DEAD END TO STREET JUST COURT
|
B012020148A50
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE TO STREET DEAD END
|
B012020148A49
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020148A48
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET MERIT COURT
|
B012020148A47
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A46
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A45
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A44
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A43
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012020148A42
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020148A41
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020148A40
|
2020-05-27
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
Q012020147A51
|
2020-05-26
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012020147A52
|
2020-05-26
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012020147A53
|
2020-05-26
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET WINCHESTER BOULEVARD
|
Q012020147A48
|
2020-05-26
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012020147A49
|
2020-05-26
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET BRADDOCK AVENUE
|
Q012020147A50
|
2020-05-26
|
2020-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
X042020143A24
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EDENWALD AVENUE, BRONX, FROM STREET GRACE AVENUE
|
X042020143A26
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FAIRMOUNT AVENUE, BRONX, FROM STREET STADIUM AVENUE
|
X042020143A27
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020143A28
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020143A29
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020143A30
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042020143A31
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042020143A32
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042020143A33
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042020143A34
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A35
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A18
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A16
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A15
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOGART AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A14
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOGART AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A13
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KINGSLAND AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042020143A12
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KINGSLAND AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042020143A11
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KINGSLAND AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042020143A10
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020143A09
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020143A08
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020143A07
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020143A17
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A19
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042020143A20
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020143A21
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020143A22
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020143A23
|
2020-05-22
|
2020-06-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020142A71
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020142A73
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020142A74
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020142A75
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020142A76
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020142A05
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET OXFORD AVENUE
|
X042020142A01
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020142A02
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020142A03
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020142A04
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET FENTON AVENUE
|
X042020142A06
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET DEWITT PLACE
|
X042020142A07
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020142A08
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020142A09
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020142A10
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
IRWIN AVENUE, BRONX, FROM STREET JOHNSON AVENUE
|
X042020142A11
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042020142A12
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020142A13
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020142A14
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020142A15
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020142A16
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020142A17
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020142A18
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042020142A19
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042020142A20
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A21
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET ONEIL PLACE
|
X042020142A22
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET FENTON AVENUE
|
X042020142A23
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET FENTON AVENUE
|
X042020142A24
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ADEE AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A25
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWITT PLACE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A26
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWITT PLACE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A27
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET MICKLE AVENUE
|
X042020142A28
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET MICKLE AVENUE
|
X042020142A29
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020142A30
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020142A31
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020142A32
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020142A33
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020142A34
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020142A35
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020142A36
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020142A37
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020142A38
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A39
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A40
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET MICKLE AVENUE
|
X042020142A41
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET MICKLE AVENUE
|
X042020142A42
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET TIEMANN AVENUE
|
X042020142A43
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD
|
X042020142A44
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET LODOVICK AVENUE
|
X042020142A45
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020142A46
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020142A47
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020142A48
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A49
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020142A50
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020142A51
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020142A52
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020142A53
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020142A54
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020142A55
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET GUNTHER AVENUE
|
X042020142A56
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET SEYMOUR AVENUE
|
X042020142A57
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET SEYMOUR AVENUE
|
X042020142A58
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET SEYMOUR AVENUE
|
X042020142A59
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET GUNTHER AVENUE
|
X042020142A60
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET GUNTHER AVENUE
|
X042020142A61
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020142A62
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET GUNTHER AVENUE
|
X042020142A63
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020142A64
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020142A65
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020142A66
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET MACE AVENUE
|
X042020142A67
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET MACE AVENUE
|
X042020142A70
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020142A72
|
2020-05-21
|
2020-06-23
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042020134A00
|
2020-05-13
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET MACE AVENUE
|
X042020134A01
|
2020-05-13
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET MACE AVENUE
|
X042020120A42
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET MICKLE AVENUE
|
X042020120A43
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET MICKLE AVENUE
|
X042020120A44
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020120A45
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020120A46
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020120A47
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020120A48
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020120A49
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET MICKLE AVENUE
|
X042020120A50
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET MICKLE AVENUE
|
X042020120A51
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET EASTCHESTER ROAD
|
X042020120A52
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020120A53
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020120A54
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET WESTERVELT AVENUE
|
X042020120A55
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020120A56
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020120A57
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020120A58
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020120A59
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020120A60
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET SEYMOUR AVENUE
|
X042020120A61
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET SEYMOUR AVENUE
|
X042020120A62
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET SEYMOUR AVENUE
|
X042020120A63
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020120A40
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWITT PLACE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A65
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020120A66
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020120A67
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020120A68
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020120A64
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET MORGAN AVENUE
|
X042020120A41
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWITT PLACE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A08
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020120A09
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020120A10
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020120A11
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET OXFORD AVENUE
|
X042020120A12
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020120A13
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020120A14
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
IRWIN AVENUE, BRONX, FROM STREET JOHNSON AVENUE
|
X042020120A15
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020120A16
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020120A17
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020120A18
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020120A19
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020120A20
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020120A21
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020120A22
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020120A23
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020120A24
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EDSON AVENUE
|
X042020120A25
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A26
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARTOW AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A27
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET TIEMANN AVENUE
|
X042020120A28
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET LODOVICK AVENUE
|
X042020120A29
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A30
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A31
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET GUNTHER AVENUE
|
X042020120A32
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET GUNTHER AVENUE
|
X042020120A33
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET GUNTHER AVENUE
|
X042020120A34
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ALLERTON AVENUE, BRONX, FROM STREET GUNTHER AVENUE
|
X042020120A35
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EASTCHESTER ROAD, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A36
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET ONEIL PLACE
|
X042020120A37
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET FENTON AVENUE
|
X042020120A38
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET FENTON AVENUE
|
X042020120A39
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ADEE AVENUE, BRONX, FROM STREET EAST GUN HILL ROAD
|
X042020120A00
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020120A01
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042020120A02
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042020120A06
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020120A07
|
2020-04-29
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST GUN HILL ROAD, BRONX, FROM STREET KINGSLAND AVENUE
|
X042020119A08
|
2020-04-28
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042020119A07
|
2020-04-28
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042020119A06
|
2020-04-28
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042020119A05
|
2020-04-28
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042020119A04
|
2020-04-28
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET DEWITT PLACE
|
X042020119A03
|
2020-04-28
|
2020-05-27
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ARNOW AVENUE, BRONX, FROM STREET FENTON AVENUE
|
Q012020113A89
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET LIBERTY AVENUE TO STREET ROCKAWAY BOULEVARD
|
Q012020113A90
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
105 STREET, QUEENS, FROM STREET 107 AVENUE
|
Q012020113A91
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE
|
Q012020113B01
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET LIBERTY AVENUE TO STREET ROCKAWAY BOULEVARD
|
Q012020113B00
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
Q012020113A99
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET
|
Q012020113A98
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 107 STREET TO STREET 108 STREET
|
Q012020113A97
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 107 STREET
|
Q012020113A96
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 106 STREET TO STREET 107 STREET
|
Q012020113A95
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 105 STREET TO STREET 106 STREET
|
Q012020113A61
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020113A93
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE
|
Q012020113A94
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 105 STREET
|
Q012020113A92
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
Q012020113A60
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD
|
Q012020113A59
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 109 STREET
|
Q012020113A62
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD
|
Q012020113A63
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020113A66
|
2020-04-22
|
2020-05-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
X042020112A06
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POST ROAD, BRONX, FROM STREET WEST 259 STREET
|
X042020112A05
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 253 STREET
|
X042020112A04
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020112A03
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TYNDALL AVENUE, BRONX, FROM STREET WEST 259 STREET
|
X042020112A02
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020112A01
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 253 STREET
|
X042020112A00
|
2020-04-21
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 253 STREET
|
X042020111A61
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 254 STREET
|
X042020111A00
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELAFIELD PLACE, BRONX, FROM STREET WEST 263 STREET
|
X042020111A01
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020111A02
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELAFIELD PLACE, BRONX, FROM STREET WEST 263 STREET
|
X042020111A03
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020111A04
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020111A05
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 263 STREET
|
X042020111A06
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 263 STREET
|
X042020111A07
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020111A08
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020111A09
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 263 STREET
|
X042020111A10
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A11
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A12
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A13
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 262 STREET
|
X042020111A14
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 262 STREET
|
X042020111A15
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 262 STREET
|
X042020111A16
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POST ROAD, BRONX, FROM STREET WEST 255 STREET
|
X042020111A17
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POST ROAD, BRONX, FROM STREET WEST 255 STREET
|
X042020111A18
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 262 STREET
|
X042020111A19
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A20
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A21
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A22
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 261 STREET
|
X042020111A23
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 261 STREET
|
X042020111A24
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAKEVIEW PLACE, BRONX, FROM STREET POST ROAD
|
X042020111A25
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAKEVIEW PLACE, BRONX, FROM STREET POST ROAD
|
X042020111A26
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAKEVIEW PLACE, BRONX, FROM STREET POST ROAD
|
X042020111A27
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 261 STREET
|
X042020111A28
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTONE TERRACE, BRONX, FROM STREET POST ROAD
|
X042020111A29
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTONE TERRACE, BRONX, FROM STREET POST ROAD
|
X042020111A30
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HUXLEY AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A31
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HUXLEY AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A32
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HUXLEY AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A33
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020111A34
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020111A35
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A36
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020111A37
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020111A38
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A39
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020111A40
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 256 STREET
|
X042020111A41
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020111A42
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020111A43
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020111A44
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 256 STREET
|
X042020111A45
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 256 STREET
|
X042020111A46
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET SPENCER AVENUE
|
X042020111A47
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET SPENCER AVENUE
|
X042020111A48
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEREID AVENUE, BRONX, FROM STREET RICHARDSON AVENUE
|
X042020111A49
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 237 STREET
|
X042020111A50
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET MOSHOLU AVENUE
|
X042020111A51
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET MOSHOLU AVENUE
|
X042020111A52
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 236 STREET
|
X042020111A53
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020111A54
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020111A55
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A56
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A57
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020111A58
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET OXFORD AVENUE
|
X042020111A59
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 254 STREET
|
X042020111A60
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 254 STREET
|
X042020111A62
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
IRWIN AVENUE, BRONX, FROM STREET JOHNSON AVENUE
|
X042020111A63
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020111A64
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020111A65
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020111A66
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CRANFORD AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042020111A67
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CRANFORD AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042020111A68
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020111A69
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020111A70
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020111A71
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020111A72
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON TERRACE, BRONX, FROM STREET WEST 251 STREET
|
X042020111A73
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON TERRACE, BRONX, FROM STREET WEST 251 STREET
|
X042020111A74
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020111A75
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020111A76
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020111A77
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020111A78
|
2020-04-20
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET DAVID SHERIDAN PLAZA
|
X012020091A31
|
2020-03-31
|
2020-06-16
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X012020090A83
|
2020-03-30
|
2020-06-16
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X042020090A14
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 261 STREET
|
X042020090A20
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020090A19
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020090A13
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 261 STREET
|
X042020090A12
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 262 STREET
|
X042020090A11
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 262 STREET
|
X042020090A10
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 262 STREET
|
X042020090A09
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET WEST 262 STREET
|
X042020090A08
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 263 STREET
|
X042020090A07
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 263 STREET
|
X042020090A06
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 263 STREET
|
X042020090A05
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELAFIELD PLACE, BRONX, FROM STREET WEST 263 STREET
|
X042020090A04
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELAFIELD PLACE, BRONX, FROM STREET WEST 263 STREET
|
X042020090A18
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HUXLEY AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020090A17
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HUXLEY AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020090A15
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 261 STREET
|
X042020090A16
|
2020-03-30
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HUXLEY AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020087A20
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020087A19
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POST ROAD, BRONX, FROM STREET WEST 255 STREET
|
X042020087A18
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POST ROAD, BRONX, FROM STREET WEST 255 STREET
|
X042020087A17
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TYNDALL AVENUE, BRONX, FROM STREET WEST 259 STREET
|
X042020087A16
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020087A15
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020087A14
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 261 STREET
|
X042020087A13
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020087A12
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SPENCER AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020087A11
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020087A09
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 260 STREET
|
X042020087A10
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET WEST 260 STREET
|
M012020087C49
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012020087C48
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012020087C47
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012020087C46
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012020087C45
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012020087C44
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012020087C43
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012020087C42
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012020087C41
|
2020-03-27
|
2020-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
X042020087A29
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020087A28
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIBBETT AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020087A25
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAKEVIEW PLACE, BRONX, FROM STREET POST ROAD
|
X042020087A22
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020087A27
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTONE TERRACE, BRONX, FROM STREET POST ROAD
|
X042020087A23
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAKEVIEW PLACE, BRONX, FROM STREET POST ROAD
|
X042020087A24
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAKEVIEW PLACE, BRONX, FROM STREET POST ROAD
|
X042020087A26
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTONE TERRACE, BRONX, FROM STREET POST ROAD
|
X042020087A21
|
2020-03-27
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020086A39
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 254 STREET
|
X042020086A27
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020086A28
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020086A29
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020086A30
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020086A31
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020086A32
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEREID AVENUE, BRONX, FROM STREET RICHARDSON AVENUE
|
X042020086A33
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 237 STREET
|
X042020086A34
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 236 STREET
|
X042020086A35
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020086A36
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020086A37
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SYLVAN AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020086A38
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 254 STREET
|
X042020086A40
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RIVERDALE AVENUE, BRONX, FROM STREET WEST 254 STREET
|
X042020086A41
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CRANFORD AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042020086A42
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CRANFORD AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042020086A43
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON TERRACE, BRONX, FROM STREET WEST 251 STREET
|
X042020086A44
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON TERRACE, BRONX, FROM STREET WEST 251 STREET
|
X042020086A45
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 253 STREET
|
X042020086A46
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 253 STREET
|
X042020086A47
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET WEST 253 STREET
|
X042020086A48
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POST ROAD, BRONX, FROM STREET WEST 259 STREET
|
X042020086A49
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020086A50
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CORLEAR AVENUE, BRONX, FROM STREET WEST 240 STREET
|
X042020086A11
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020086A03
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 255 STREET
|
X042020086A04
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 256 STREET
|
X042020086A05
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 256 STREET
|
X042020086A06
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET WEST 256 STREET
|
X042020086A07
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET SPENCER AVENUE
|
X042020086A08
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MOSHOLU AVENUE, BRONX, FROM STREET SPENCER AVENUE
|
X042020086A09
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET MOSHOLU AVENUE
|
X042020086A10
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LIEBIG AVENUE, BRONX, FROM STREET MOSHOLU AVENUE
|
X042020086A12
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020086A13
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JOHNSON AVENUE, BRONX, FROM STREET OXFORD AVENUE
|
X042020086A14
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
IRWIN AVENUE, BRONX, FROM STREET JOHNSON AVENUE
|
X042020086A15
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020086A16
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020086A17
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HENRY HUDSON PARKWAY, BRONX, FROM STREET JOHNSON AVENUE
|
X042020086A18
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020086A19
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020086A20
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020086A21
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDSTON ROAD, BRONX, FROM STREET UNNAMED STREET
|
X042020086A22
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020086A23
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 232 STREET
|
X042020086A24
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020086A25
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAMBRIDGE AVENUE, BRONX, FROM STREET WEST 236 STREET
|
X042020086A26
|
2020-03-26
|
2020-04-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BROADWAY, BRONX, FROM STREET DAVID SHERIDAN PLAZA
|
Q012020085A45
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012020085A08
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012020085A07
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE
|
Q012020085A46
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE
|
Q012020085A47
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012020085A09
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012020085A06
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET
|
Q012020085A05
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012020085A04
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012020085A03
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012020085A02
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
160 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012020085A34
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012020085A35
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012020085A36
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012020085A37
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012020085A38
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012020085A39
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012020085A40
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012020085A41
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012020085A01
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012020085A43
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012020085A44
|
2020-03-25
|
2020-06-28
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
X012020084A88
|
2020-03-24
|
2020-06-16
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE
|
Q012020083A34
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020083A14
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012020083A02
|
2020-03-23
|
2020-05-01
|
TEST PITS, CORES OR BORING
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012020083A13
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012020083A15
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012020083A16
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012020083A17
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012020083A18
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
Q012020083A19
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
Q012020083A20
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012020083A21
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A22
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012020083A23
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012020083A24
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012020083A25
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012020083A26
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020083A27
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020083A28
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012020083A30
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012020083A31
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020083A32
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A33
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020083A35
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012020083A36
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012020083A37
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012020083A38
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A39
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020083A40
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A41
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012020083A42
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012020083A43
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012020083A44
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012020083A69
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012020083A52
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012020083A53
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012020083A54
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012020083A55
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A56
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A60
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012020083A62
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020083A63
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020083A64
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012020083A65
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012020083A67
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012020083A68
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012020083A70
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020083B65
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012020083B67
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012020083B68
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012020083B69
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012020083B70
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020083B71
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012020083B99
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012020083C00
|
2020-03-23
|
2020-06-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
B012020080A72
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A80
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020080A79
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020080A78
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020080A77
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020080A76
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020080A75
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020080A82
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020080A83
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020080A84
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020080A85
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET JUST COURT TO STREET MADOC AVENUE
|
B012020080A86
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020080A87
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020080A90
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012020080A92
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
B012020080A93
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020080A95
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020080A96
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020080A97
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020080A81
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET GERRITSEN AVENUE
|
B012020080A74
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
B012020080A58
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012020080A59
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012020080A60
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012020080A61
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012020080A62
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020080A63
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020080A64
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020080A65
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A66
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A67
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANK COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A68
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A69
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A70
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
IVAN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A71
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JUST COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A73
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A15
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET KEEN COURT
|
B012020080A16
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KEEN COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020080A17
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET KEEN COURT TO STREET LESTER COURT
|
B012020080A18
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LESTER COURT, BROOKLYN, FROM STREET MADOC AVENUE
|
B012020080A19
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT
|
B012020080A20
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET LESTER COURT TO STREET MELBA COURT
|
B012020080A21
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT
|
B012020080A22
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET MELBA COURT TO STREET NOVA COURT
|
B012020080A23
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET NOVA COURT TO STREET SEBA AVENUE
|
B012020080A24
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET SEBA AVENUE
|
B012020080A25
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET OPAL COURT TO STREET POST COURT
|
B012020080A26
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012020080A46
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020080A47
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A48
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020080A49
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A50
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020080A51
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012020080A52
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012020080A53
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012020080A54
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012020080A55
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012020080A57
|
2020-03-20
|
2020-06-16
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET HYMEN COURT
|
B012020079D54
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET ABBEY COURT TO STREET BEACON COURT
|
B012020079D55
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020079D56
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020079D57
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
ABBEY COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012020079D58
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012020079D59
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012020079D60
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012020079D61
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012020079D62
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT TO STREET NOEL AVENUE
|
B012020079D63
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012020079D64
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT
|
B012020079D65
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET NOEL AVENUE
|
B012020079D66
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET JUST COURT
|
B012020079D67
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT
|
B012020079D68
|
2020-03-19
|
2020-03-20
|
TEST PITS, CORES OR BORING
|
CYRUS AVENUE, BROOKLYN, FROM STREET IVAN COURT TO STREET JUST COURT
|
X042020064A04
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET OSGOOD STREET
|
X042020064A46
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A45
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A44
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A43
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MATILDA AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020064A42
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MATILDA AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020064A41
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MATILDA AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020064A40
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020064A39
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020064A38
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042020064A37
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042020064A36
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042020064A35
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020064A34
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020064A33
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020064A32
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020064A31
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONX BOULEVARD, BRONX, FROM STREET EAST 239 STREET
|
X042020064A30
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONX BOULEVARD, BRONX, FROM STREET EAST 239 STREET
|
X042020064A29
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONX BOULEVARD, BRONX, FROM STREET EAST 239 STREET
|
X042020064A28
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONX BOULEVARD, BRONX, FROM STREET EAST 239 STREET
|
X042020064A27
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A26
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A25
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A24
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET ROBERTSON STREET
|
X042020064A23
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET ROBERTSON STREET
|
X042020064A22
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042020064A21
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042020064A20
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET OSGOOD STREET
|
X042020064A19
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET OSGOOD STREET
|
X042020064A18
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET OSGOOD STREET
|
X042020064A17
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A16
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A15
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 242 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A14
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 242 STREET
|
X042020064A13
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 242 STREET
|
X042020064A12
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 242 STREET
|
X042020064A11
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONX BOULEVARD, BRONX, FROM STREET EAST 242 STREET
|
X042020064A10
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONX BOULEVARD, BRONX, FROM STREET EAST 242 STREET
|
X042020064A09
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A08
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A07
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A06
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020064A05
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET OSGOOD STREET
|
X042020064A03
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 243 STREET, BRONX, FROM STREET OSGOOD STREET
|
X042020064A62
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A61
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A60
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A59
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST RAYMOND AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A58
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A57
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A56
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A55
|
2020-03-04
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEBE AVENUE, BRONX, FROM STREET ZEREGA AVENUE
|
X042020064A52
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A51
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A50
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A49
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A48
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042020064A47
|
2020-03-04
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET MATILDA AVENUE
|
M012020058B05
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012020058B06
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
M012020058B07
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
Q012020058C53
|
2020-02-27
|
2020-04-01
|
TEST PITS, CORES OR BORING
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
Q012020058C71
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020058C60
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
105 STREET, QUEENS, FROM STREET 107 AVENUE
|
Q012020058C61
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 105 STREET
|
Q012020058C62
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 105 STREET TO STREET 106 STREET
|
Q012020058C63
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE
|
Q012020058C72
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET LIBERTY AVENUE TO STREET ROCKAWAY BOULEVARD
|
Q012020058C73
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET LIBERTY AVENUE TO STREET ROCKAWAY BOULEVARD
|
Q012020058C74
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD
|
Q012020058C75
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020058C76
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
Q012020058C77
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE
|
Q012020058C64
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 106 STREET TO STREET 107 STREET
|
Q012020058C80
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
B042020058A18
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020058A19
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020058A20
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020058A21
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020058A22
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020058A23
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020058A24
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
Q012020058C70
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD
|
Q012020058C69
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 107 STREET TO STREET 108 STREET
|
B042020058A17
|
2020-02-27
|
2020-04-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
Q012020058C68
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET
|
Q012020058C67
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 109 STREET
|
Q012020058C66
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 107 STREET
|
Q012020058C65
|
2020-02-27
|
2020-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
M012020058A99
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012020058B00
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012020058B01
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012020058B02
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012020058B03
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012020058B04
|
2020-02-27
|
2020-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
X012020056A09
|
2020-02-25
|
2020-04-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE
|
X012020052A10
|
2020-02-21
|
2020-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020052A09
|
2020-02-21
|
2020-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020052A08
|
2020-02-21
|
2020-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020052A06
|
2020-02-21
|
2020-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020052A02
|
2020-02-21
|
2020-03-19
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X042020051A11
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042020051A20
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A19
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A18
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A17
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
POPLAR STREET, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A16
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A15
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A14
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A13
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
SACKETT AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042020051A12
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FAIRMOUNT AVENUE, BRONX, FROM STREET STADIUM AVENUE
|
X042020051A10
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042020051A09
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042020051A08
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042020051A07
|
2020-02-20
|
2020-03-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CLAREMONT PARKWAY, BRONX, FROM STREET FULTON AVENUE
|
X042020050A29
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A36
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020050A35
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020050A34
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A33
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A32
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A31
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A30
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A28
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A20
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X042020050A21
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X042020050A27
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A26
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A22
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 144 STREET, BRONX, FROM STREET SOUTHERN BOULEVARD
|
X042020050A23
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A24
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A25
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A55
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A54
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A53
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A52
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A51
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A50
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A49
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A48
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A47
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A46
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A45
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A44
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A43
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A42
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A41
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A40
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A39
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020050A38
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020050A37
|
2020-02-19
|
2020-03-19
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
B042020045A29
|
2020-02-14
|
2020-03-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A28
|
2020-02-14
|
2020-03-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A27
|
2020-02-14
|
2020-03-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A26
|
2020-02-14
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
KENT STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A25
|
2020-02-14
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A23
|
2020-02-14
|
2020-03-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A22
|
2020-02-14
|
2020-03-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
B042020045A24
|
2020-02-14
|
2020-03-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MANHATTAN AVENUE
|
X042020044A12
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A07
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A06
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A05
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A04
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A03
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A02
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A01
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A00
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A09
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A10
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A11
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A08
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042020044A13
|
2020-02-13
|
2020-03-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
Q012020038B45
|
2020-02-07
|
2020-03-08
|
TEST PITS, CORES OR BORING
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
X042020037A32
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A27
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X042020037A28
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A29
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A30
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A31
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A00
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020037A01
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020037A02
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020037A03
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A04
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A05
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A06
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A07
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A08
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A09
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020037A10
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020037A11
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020037A12
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020037A13
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020037A14
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020037A15
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020037A16
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020037A17
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020037A18
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A19
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A20
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A21
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020037A22
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042020037A23
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042020037A24
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X042020037A25
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020037A26
|
2020-02-06
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020036A07
|
2020-02-05
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020036A08
|
2020-02-05
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020036A09
|
2020-02-05
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BEND, BRONX, FROM STREET EAST 222 STREET
|
X042020036A05
|
2020-02-05
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020036A06
|
2020-02-05
|
2020-03-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020030A41
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042020030A05
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020030A06
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WILDER AVENUE
|
X042020030A07
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020030A08
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042020030A09
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042020030A10
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042020030A11
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042020030A12
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST TREMONT AVENUE
|
X042020030A13
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020030A14
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020030A15
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020030A16
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042020030A17
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042020030A18
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042020030A19
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042020030A20
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAWTON AVENUE, BRONX, FROM STREET PENNYFIELD AVENUE
|
X042020030A21
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042020030A22
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042020030A23
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042020030A24
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET HOLLYWOOD AVENUE
|
X042020030A25
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET KEARNEY AVENUE
|
X042020030A26
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET OSMAN PLACE
|
X042020030A27
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042020030A28
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042020030A29
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020030A30
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020030A31
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020030A32
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042020030A33
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042020030A34
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042020030A35
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEREID AVENUE, BRONX, FROM STREET RICHARDSON AVENUE
|
X042020030A36
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042020030A37
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042020030A38
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020030A39
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042020030A40
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042020030A47
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST 177 STREET
|
X042020030A48
|
2020-01-30
|
2020-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST 177 STREET
|
X042020021A01
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A08
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A07
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A06
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A05
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A04
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A03
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020021A02
|
2020-01-21
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020017A21
|
2020-01-17
|
2020-02-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A04
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A17
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A05
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A06
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A07
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020017A00
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X042020017A01
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X042020017A02
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 144 STREET, BRONX, FROM STREET SOUTHERN BOULEVARD
|
X042020017A03
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A18
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A19
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A20
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A21
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A22
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A23
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A24
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A25
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A26
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020017A23
|
2020-01-17
|
2020-02-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020017A22
|
2020-01-17
|
2020-02-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A27
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A08
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020017A09
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020017A10
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020017A11
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A12
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A13
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A14
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A15
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020017A16
|
2020-01-17
|
2020-02-15
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020017A24
|
2020-01-17
|
2020-02-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012020017A20
|
2020-01-17
|
2020-02-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
Q012020010B17
|
2020-01-10
|
2020-03-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012020009B43
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 109 STREET
|
Q012020009B36
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
105 STREET, QUEENS, FROM STREET 107 AVENUE
|
Q012020009B37
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 105 STREET
|
Q012020009B38
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 105 STREET TO STREET 106 STREET
|
Q012020009B39
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE
|
Q012020009B40
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 106 STREET TO STREET 107 STREET
|
Q012020009B48
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET LIBERTY AVENUE TO STREET ROCKAWAY BOULEVARD
|
Q012020009B47
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020009B42
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 107 STREET
|
Q012020009B44
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET
|
Q012020009B45
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 AVENUE, QUEENS, FROM STREET 107 STREET TO STREET 108 STREET
|
Q012020009B46
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD
|
Q012020009B56
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020009B53
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE
|
Q012020009B52
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
106 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
Q012020009B51
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET LIBERTY AVENUE
|
Q012020009B50
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
101 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD
|
Q012020009B41
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
107 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE
|
Q012020009B49
|
2020-01-09
|
2020-03-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
103 STREET, QUEENS, FROM STREET LIBERTY AVENUE TO STREET ROCKAWAY BOULEVARD
|
X042020008A18
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020008A14
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A15
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A16
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A17
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A19
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020008A20
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020008A21
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020008A22
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A23
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A24
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042020008A25
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042020008A26
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020008A27
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020008A29
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020008A30
|
2020-01-08
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020007A04
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BEND, BRONX, FROM STREET EAST 222 STREET
|
X042020007A22
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020007A21
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042020007A19
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A18
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X042020007A17
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020007A16
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020007A15
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X042020007A14
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042020007A13
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042020007A11
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A10
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A09
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A06
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A07
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A08
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A05
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A00
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020007A12
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042020007A01
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020007A02
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042020007A03
|
2020-01-07
|
2020-02-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
Q012020006B51
|
2020-01-06
|
2020-02-07
|
TEST PITS, CORES OR BORING
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
X012019365A27
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET RANDALL AVENUE
|
Q012019365A56
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019365A55
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019365A52
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019365A51
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019365A50
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019365A49
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019365A48
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019365A59
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019365A61
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019365A62
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019365A63
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019365A74
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
X012019365A18
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PENNYFIELD AVENUE
|
X012019365A19
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE
|
X012019365A20
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MEAGHER AVENUE TO STREET MILES AVENUE
|
X012019365A21
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE TO STREET PENNYFIELD AVENUE
|
X012019365A22
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X012019365A23
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PENNYFIELD AVENUE TO STREET WISSMAN AVENUE
|
X012019365A25
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET SCHLEY AVENUE
|
X012019365A26
|
2019-12-31
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
Q012019365A57
|
2019-12-31
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
X012019364A87
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
Q012019364B73
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019364B72
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019364B71
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012019364B70
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012019364B69
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012019364B78
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019364B77
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019364C72
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019364C71
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019364C70
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019364C69
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE
|
Q012019364C68
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET
|
Q012019364C67
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019364C66
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019364C65
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019364C64
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019364C63
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019364C62
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE
|
Q012019364C61
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019364C60
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019364C59
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019364C58
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019364C57
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019364C56
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019364C55
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019364C54
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019364C53
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
160 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019364C52
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019364C51
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019364C50
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019364C48
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019364C47
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019364C46
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019364C44
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019364C42
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019364C41
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019364C40
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019364C39
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019364C38
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019364C37
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019364C36
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019364C35
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019364C34
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019364C32
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019364C31
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019364C30
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019364C29
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019364C28
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019364C27
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019364C26
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019364C24
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019364C23
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019364C22
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019364C21
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012019364C20
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019364C33
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019364B81
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019364B80
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019364B79
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019364B76
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012019364B75
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
X012019364A79
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET REYNOLDS AVENUE
|
X012019364A80
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE TO STREET REYNOLDS AVENUE
|
X012019364A81
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE TO STREET WISSMAN AVENUE
|
X012019364A82
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET WISSMAN AVENUE
|
X012019364A83
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MEAGHER AVENUE TO STREET WEIR CREEK PARK BOUNDARY
|
X012019364A85
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE TO STREET WEIR CREEK PARK BOUNDARY
|
X012019364A86
|
2019-12-30
|
2020-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET ELLSWORTH AVENUE
|
Q012019364B74
|
2019-12-30
|
2020-03-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
B012019354B93
|
2019-12-20
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HALSEY STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
B012019353C18
|
2019-12-19
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
STANHOPE STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE
|
B012019353C17
|
2019-12-19
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
DE SALES PLACE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET DEAD END
|
X012019352A37
|
2019-12-18
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X012019352A56
|
2019-12-18
|
2020-03-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X042019351A53
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A42
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST TREMONT AVENUE
|
X042019351A41
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019351A40
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019351A54
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A39
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST 177 STREET
|
X042019351A38
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST 177 STREET
|
X042019351A37
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019351A21
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042019351A36
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WILDER AVENUE
|
X042019351A35
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019351A34
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019351A33
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019351A32
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019351A31
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019351A30
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019351A29
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEREID AVENUE, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019351A28
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019351A27
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019351A26
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019351A25
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019351A24
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019351A23
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019351A16
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042019351A15
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019351A14
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019351A13
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019351A12
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019351A11
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019351A10
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019351A09
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019351A08
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019351A07
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019351A06
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019351A05
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019351A04
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019351A03
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019351A20
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019351A02
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019351A01
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019351A19
|
2019-12-17
|
2020-01-11
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019351A18
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019351A17
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042019351A46
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET HOLLYWOOD AVENUE
|
X042019351A47
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET KEARNEY AVENUE
|
X042019351A48
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019351A49
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019351A50
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019351A51
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019351A52
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A65
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A64
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A63
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A22
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET OSMAN PLACE
|
X042019351A44
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019351A43
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019351A62
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A45
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAWTON AVENUE, BRONX, FROM STREET PENNYFIELD AVENUE
|
X042019351A61
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A59
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A60
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A58
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A57
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A56
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019351A55
|
2019-12-17
|
2020-01-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019345A10
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019345A09
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019345A03
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A04
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A05
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A06
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019345A07
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019345A08
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019345A40
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BEND, BRONX, FROM STREET EAST 222 STREET
|
X042019345A39
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042019345A38
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042019345A37
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A36
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X042019345A35
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X042019345A34
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A33
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A32
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A31
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A30
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A29
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A28
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A27
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A26
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A25
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A24
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A23
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A22
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019345A21
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019345A20
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019345A19
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019345A18
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019345A17
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019345A16
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019345A15
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019345A14
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019345A13
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019345A12
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019345A11
|
2019-12-11
|
2020-01-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
Q012019343B54
|
2019-12-09
|
2020-01-08
|
TEST PITS, CORES OR BORING
|
107 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
M012019340A43
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET BEND
|
M012019340A44
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
PETER MINUIT PLACE, MANHATTAN, FROM STREET BEND TO STREET STATE STREET
|
M012019340A45
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
M012019340A46
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET FDR DRIVE SB EXIT 1 TO STREET BROAD STREET
|
M012019340A47
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET OLD SLIP TO STREET OLD SLIP
|
M012019340A48
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP
|
M012019340A49
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET WALL STREET
|
M012019340A51
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET PINE STREET TO STREET WALL STREET
|
M012019340A50
|
2019-12-06
|
2020-03-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
SOUTH STREET, MANHATTAN, FROM STREET WALL STREET TO STREET WALL STREET
|
B012019337A96
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET FRANK COURT
|
B012019337A74
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT TO STREET BODY OF WATER
|
B012019337A75
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MADOC AVENUE, BROOKLYN, FROM STREET POST COURT
|
B012019337A76
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012019337A77
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE TO STREET SEBA AVENUE
|
B012019337A78
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ABBEY COURT, BROOKLYN, FROM STREET LOIS AVENUE
|
B012019337A82
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET CYRUS AVENUE TO STREET SEBA AVENUE
|
B012019337A83
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EATON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012019337A84
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET CANTON COURT TO STREET DARE COURT
|
B012019337A85
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012019337A86
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012019337A87
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SEBA AVENUE, BROOKLYN, FROM STREET GAIN COURT TO STREET HYMEN COURT
|
B012019337A88
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GAIN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012019337A89
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HYMEN COURT, BROOKLYN, FROM STREET SEBA AVENUE
|
B012019337A90
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NOEL AVENUE, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012019337A91
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012019337A92
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET NOEL AVENUE
|
B012019337A93
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
DARE COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE
|
B012019337A94
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET DARE COURT
|
B012019337A95
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT TO STREET FRANK COURT
|
B012019337B07
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT
|
B012019337B04
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT
|
B012019337B05
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET HYMEN COURT TO STREET IVAN COURT
|
B012019337B03
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET IVAN COURT
|
B012019337B02
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT
|
B012019337A99
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BEACON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012019337A98
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CANTON COURT, BROOKLYN, FROM STREET CYRUS AVENUE
|
B012019337A97
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET EATON COURT
|
B012019337B00
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CYRUS AVENUE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012019337B01
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET JUST COURT TO STREET BODY OF WATER
|
B012019337B06
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET EATON COURT
|
B012019337B11
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT
|
B012019337B10
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET BEACON COURT TO STREET CANTON COURT
|
B012019337B09
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET CANTON COURT
|
B012019337B08
|
2019-12-03
|
2019-12-20
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BARTLETT PLACE, BROOKLYN, FROM STREET DARE COURT TO STREET EATON COURT
|
X012019318A67
|
2019-11-14
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X042019312A35
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A31
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019312A30
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019312A29
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019312A28
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019312A27
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019312A26
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019312A25
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A24
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A23
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A22
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A21
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A20
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A19
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019312A18
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A17
|
2019-11-08
|
2019-11-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A16
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A41
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019312A40
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019312A39
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019312A38
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019312A37
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A36
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A34
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019312A33
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019312A32
|
2019-11-08
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
M012019311A49
|
2019-11-07
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
WEST 14 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019311A50
|
2019-11-07
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
M012019310A97
|
2019-11-06
|
2019-11-14
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
WEST 14 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M012019310A98
|
2019-11-06
|
2019-11-14
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
X042019308A16
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042019308A18
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BEND, BRONX, FROM STREET EAST 222 STREET
|
X042019308A17
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042019308A15
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019308A10
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019308A11
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019308A12
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019308A13
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019308A14
|
2019-11-04
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019305A06
|
2019-11-01
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X042019305A07
|
2019-11-01
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X042019305A05
|
2019-11-01
|
2019-12-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019304A91
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAWTON AVENUE, BRONX, FROM STREET PENNYFIELD AVENUE
|
X042019304A03
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A04
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A05
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A06
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A07
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A08
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A09
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A10
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A11
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A12
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A13
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A14
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304A15
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A16
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A17
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIEMANN AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019304A18
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIEMANN AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019304A19
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELANOY AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A20
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELANOY AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A21
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019304A22
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A23
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A24
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A25
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A26
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A27
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019304A28
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
STILLWELL AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A29
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A30
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A31
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A32
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304A33
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019304A34
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019304A35
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019304A36
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CLAREMONT PARKWAY, BRONX, FROM STREET FULTON AVENUE
|
X042019304A37
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019304A38
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019304A39
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ESPLANADE, BRONX, FROM STREET LURTING AVENUE
|
X042019304A40
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042019304A41
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ESPLANADE, BRONX, FROM STREET LURTING AVENUE
|
X042019304A42
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042019304A43
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET LYDIG AVENUE
|
X042019304A44
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET OSMAN PLACE
|
X042019304A45
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET LYDIG AVENUE
|
X042019304A46
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET LYDIG AVENUE
|
X042019304A47
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A48
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019304A49
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019304A50
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019304A51
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019304A52
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET PIERCE AVENUE
|
X042019304A53
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET SACKETT AVENUE
|
X042019304A54
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A55
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A56
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAIGHT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A57
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAIGHT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A58
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAIGHT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A59
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A60
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A61
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A62
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LYDIG AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A63
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LYDIG AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A64
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NARRAGANSETT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A65
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NARRAGANSETT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A66
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NARRAGANSETT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019304A67
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET TENBROECK AVENUE
|
X042019304A68
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET TENBROECK AVENUE
|
X042019304A69
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042019304A70
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042019304A71
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042019304A72
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019304A73
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019304A74
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019304A75
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019304A76
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A77
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A78
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A79
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST TREMONT AVENUE
|
X042019304A80
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAWTHORNE STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A81
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019304A82
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019304A83
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A84
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A85
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A86
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019304A87
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019304A88
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEWPORT AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304A89
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019304A90
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEWPORT AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304A92
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET HOLLYWOOD AVENUE
|
X042019304A93
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304A94
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304A95
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304A96
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304A97
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET KEARNEY AVENUE
|
X042019304A98
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
VAN NEST AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019304A99
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
VAN NEST AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019304B00
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019304B01
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TOMLINSON AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B02
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019304B03
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019304B04
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B05
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B06
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B07
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B08
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B09
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B10
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B11
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B12
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B13
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B14
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B15
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B16
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B17
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 237 STREET
|
X042019304B18
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B19
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B20
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042019304B21
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B22
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B23
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B24
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B25
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B26
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B27
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019304B28
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019304B29
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B30
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B31
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B32
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019304B33
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019304B34
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019304B35
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019304B36
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042019304B37
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042019304B38
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 236 STREET
|
X042019304B39
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B40
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B41
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B42
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B43
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B44
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B45
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B46
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B47
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B48
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B49
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B50
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019304B51
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019304B52
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEREID AVENUE, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B53
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019304B54
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019304B55
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019304B56
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019304B57
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019304B58
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019304B59
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019304B60
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B61
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019304B62
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B63
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019304B64
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B65
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019304B66
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WILDER AVENUE
|
X042019304B68
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET REVERE AVENUE
|
X042019304B69
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET REVERE AVENUE
|
X042019304B70
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304B71
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019304B72
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B73
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B74
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B75
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B76
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019304B77
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019304B78
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019304B79
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019304B80
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET RHINELANDER AVENUE
|
X042019304B81
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET RHINELANDER AVENUE
|
X042019304B82
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET RHINELANDER AVENUE
|
X042019304B83
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304B84
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304B85
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019304B86
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019304B87
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019304B88
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019304B89
|
2019-10-31
|
2019-12-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
Q012019298C07
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019298B76
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019298B77
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019298B78
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019298B79
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019298B80
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019298B81
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019298B82
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019298B83
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019298B84
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019298B85
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019298B86
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019298B87
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019298B88
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019298B89
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019298B90
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019298B91
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019298B92
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019298B75
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019298C08
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019298C10
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019298A56
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012019298A58
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019298A59
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019298A60
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019298A61
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019298A62
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012019298A76
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019298B53
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019298B54
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019298B55
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019298B57
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019298B58
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019298B59
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019298B60
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019298B62
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019298B63
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019298B64
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019298B65
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019298B66
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019298B67
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019298B71
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019298B72
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019298B73
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019298A46
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019298A49
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012019298A50
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012019298A51
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012019298C13
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019298C14
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019298A52
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019298A53
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
B012019298C90
|
2019-10-25
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HALSEY STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
X012019298B23
|
2019-10-25
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
Q012019298A54
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
Q012019298A55
|
2019-10-25
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
Q012019297B94
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019297B95
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019297B96
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019297B97
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019297B98
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019297B99
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019297C00
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019297C01
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019297C02
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE
|
Q012019297C03
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019297C04
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019297B60
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019297B59
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019297B58
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
160 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019297B57
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019297B93
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE
|
B012019297A91
|
2019-10-24
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
STANHOPE STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE
|
B012019297B27
|
2019-10-24
|
2019-12-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
DE SALES PLACE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET DEAD END
|
Q012019297B65
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019297B64
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019297B63
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE
|
Q012019297B62
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET
|
Q012019297B61
|
2019-10-24
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
X042019296A44
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042019296A42
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A41
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A40
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A39
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A38
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A37
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET MATILDA AVENUE
|
X042019296A36
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A35
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A34
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 237 STREET
|
X042019296A32
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A31
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A30
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A29
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019296A28
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019296A27
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BYRON AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019296A26
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019296A33
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 239 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A25
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X042019296A24
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A23
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A22
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A21
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A12
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A11
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A10
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A09
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET OSMAN PLACE
|
X042019296A08
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042019296A07
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET EAST 241 STREET
|
X042019296A20
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 236 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A19
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CARPENTER AVENUE, BRONX, FROM STREET EAST 236 STREET
|
X042019296A18
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019296A17
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019296A16
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019296A15
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FURMAN AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019296A14
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X042019296A13
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X012019296D66
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET REYNOLDS AVENUE
|
X012019296D67
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE TO STREET REYNOLDS AVENUE
|
X012019296D68
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE
|
X012019296D69
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE TO STREET WISSMAN AVENUE
|
X012019296D70
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET WISSMAN AVENUE
|
X012019296D71
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PENNYFIELD AVENUE
|
X012019296D72
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MEAGHER AVENUE TO STREET MILES AVENUE
|
X012019296D73
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MEAGHER AVENUE TO STREET WEIR CREEK PARK BOUNDARY
|
X012019296D75
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE TO STREET WEIR CREEK PARK BOUNDARY
|
X012019296D76
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
X012019296D77
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET ELLSWORTH AVENUE
|
X012019296D78
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
X012019296D79
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET RANDALL AVENUE
|
X012019296D80
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X012019296D81
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET SCHLEY AVENUE
|
X012019296D83
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE TO STREET PENNYFIELD AVENUE
|
X012019296D84
|
2019-10-23
|
2019-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PENNYFIELD AVENUE TO STREET WISSMAN AVENUE
|
X042019296A59
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WILDER AVENUE
|
X042019296A58
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A57
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PENFIELD STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A56
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019296A55
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MURDOCK AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019296A54
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019296A53
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BARNES AVENUE, BRONX, FROM STREET PENFIELD STREET
|
X042019296A52
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEREID AVENUE, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A51
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 241 STREET, BRONX, FROM STREET RICHARDSON AVENUE
|
X042019296A50
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A49
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A48
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019296A47
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A46
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 240 STREET, BRONX, FROM STREET FURMAN AVENUE
|
X042019296A45
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BULLARD AVENUE, BRONX, FROM STREET EAST 240 STREET
|
X042019296A43
|
2019-10-23
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 237 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X042019294A37
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019294A26
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LYDIG AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A25
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LYDIG AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A24
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A23
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A22
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A21
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAIGHT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A20
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAIGHT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A19
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAIGHT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A18
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A17
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A16
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET SACKETT AVENUE
|
X042019294A15
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET PIERCE AVENUE
|
X042019294A14
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019294A13
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019294A12
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019294A11
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X042019294A10
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A09
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET LYDIG AVENUE
|
X042019294A08
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET LYDIG AVENUE
|
X042019294A07
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET LYDIG AVENUE
|
X042019294A06
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ESPLANADE, BRONX, FROM STREET LURTING AVENUE
|
X042019294A05
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ESPLANADE, BRONX, FROM STREET LURTING AVENUE
|
X042019294A41
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET RHINELANDER AVENUE
|
X042019294A40
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET RHINELANDER AVENUE
|
X042019294A39
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET RHINELANDER AVENUE
|
X042019294A38
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019294A36
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019294A35
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019294A34
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042019294A33
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042019294A32
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET WILLIAMSBRIDGE ROAD
|
X042019294A31
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET TENBROECK AVENUE
|
X042019294A30
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEILL AVENUE, BRONX, FROM STREET TENBROECK AVENUE
|
X042019294A29
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NARRAGANSETT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A28
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NARRAGANSETT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019294A27
|
2019-10-21
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NARRAGANSETT AVENUE, BRONX, FROM STREET NEILL AVENUE
|
X042019288A96
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019288A01
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A02
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A03
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A04
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A05
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A06
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A07
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A08
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A09
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A10
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A11
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A12
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A13
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A14
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIEMANN AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019288A15
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIEMANN AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019288A16
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELANOY AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A17
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELANOY AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A18
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019288A19
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A20
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A21
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A22
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A23
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A24
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019288A25
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019288A26
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
STILLWELL AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A27
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019288A28
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CLAREMONT PARKWAY, BRONX, FROM STREET FULTON AVENUE
|
X042019288A29
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A30
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A31
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A32
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A33
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019288A34
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019288A35
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019288A36
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019288A37
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019288A39
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A40
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A41
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A42
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST TREMONT AVENUE
|
X042019288A43
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAWTHORNE STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A44
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019288A45
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019288A46
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A47
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A48
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A49
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019288A50
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019288A51
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEWPORT AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A52
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019288A53
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEWPORT AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A54
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAWTON AVENUE, BRONX, FROM STREET PENNYFIELD AVENUE
|
X042019288A55
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET HOLLYWOOD AVENUE
|
X042019288A56
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A57
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A58
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A59
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A60
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET KEARNEY AVENUE
|
X042019288A61
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
VAN NEST AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019288A62
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
VAN NEST AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019288A63
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019288A64
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TOMLINSON AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A65
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A66
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A67
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A68
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A69
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A70
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A71
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A72
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A73
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A74
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A75
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A76
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A77
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A78
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET REVERE AVENUE
|
X042019288A79
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET REVERE AVENUE
|
X042019288A80
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A81
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A82
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A83
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A84
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019288A85
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A86
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A00
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019288A87
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019288A88
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019288A89
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019288A90
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A91
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A92
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019288A93
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019288A94
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019288A95
|
2019-10-15
|
2019-11-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019277A18
|
2019-10-04
|
2019-11-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042019277A21
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIFFANY STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A22
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FOX STREET, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A04
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A05
|
2019-10-04
|
2019-11-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A06
|
2019-10-04
|
2019-11-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A07
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A08
|
2019-10-04
|
2019-11-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A09
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A10
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A11
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A12
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019277A13
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X042019277A14
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X042019277A15
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET RIVER AVENUE
|
X042019277A16
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019277A17
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DYRE AVENUE, BRONX, FROM STREET LIGHT STREET
|
X042019277A19
|
2019-10-04
|
2019-11-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A20
|
2019-10-04
|
2019-11-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A23
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A24
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A25
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TAN PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X042019277A26
|
2019-10-04
|
2019-11-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BEND, BRONX, FROM STREET EAST 222 STREET
|
X042019276A00
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019276A25
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET EAST 208 STREET TO STREET EAST GUN HILL ROAD
|
X042019276A21
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019276A20
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019276A19
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019276A18
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019276A17
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019276A16
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019276A15
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019276A14
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019276A13
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019276A12
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019276A11
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019276A10
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019276A09
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019276A08
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET EAST 208 STREET TO STREET EAST GUN HILL ROAD
|
X042019276A24
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019276A23
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019276A22
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019276A01
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019276A02
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019276A03
|
2019-10-03
|
2019-11-04
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X012019270A80
|
2019-09-27
|
2019-11-14
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X042019266A41
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET EAST 208 STREET TO STREET EAST GUN HILL ROAD
|
X042019266A20
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET EAST 208 STREET TO STREET EAST GUN HILL ROAD
|
X042019266A21
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019266A22
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019266A23
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019266A24
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET VAN CORTLANDT AVENUE EAST
|
X042019266A25
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019266A26
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019266A27
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
JEROME AVENUE, BRONX, FROM STREET WEST MOSHOLU PARKWAY SOUTH
|
X042019266A28
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019266A29
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019266A30
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY SOUTH, BRONX, FROM STREET JEROME AVENUE
|
X042019266A31
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019266A32
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019266A33
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET JEROME AVENUE
|
X042019266A34
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019266A37
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019266A38
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 212 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019266A39
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019266A40
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 213 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019266A35
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
X042019266A36
|
2019-09-23
|
2019-10-05
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 208 STREET, BRONX, FROM STREET JEROME AVENUE
|
Q012019262B31
|
2019-09-19
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019262B33
|
2019-09-19
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA NORTH, QUEENS, FROM STREET 28 STREET TO STREET BEND
|
Q012019262B32
|
2019-09-19
|
2019-09-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NORTHERN BOULEVARD, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
X012019261A63
|
2019-09-18
|
2019-09-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X042019259A09
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A10
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEWPORT AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A11
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
NEWPORT AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A12
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A41
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET REVERE AVENUE
|
X042019259A42
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET REVERE AVENUE
|
X042019259A43
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DEWEY AVENUE, BRONX, FROM STREET EAST TREMONT AVENUE
|
X042019259A44
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019259A45
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE
|
X042019259A46
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019259A47
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 177 STREET, BRONX, FROM STREET SAMPSON AVENUE
|
X042019259A48
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LAWTON AVENUE, BRONX, FROM STREET PENNYFIELD AVENUE
|
X042019259A49
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET HOLLYWOOD AVENUE
|
X042019259A50
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET KEARNEY AVENUE
|
X042019259A51
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019259A52
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET LOGAN AVENUE
|
X042019259A53
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019259A54
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE
|
X042019259A55
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A56
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A57
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A58
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
STILLWELL AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A59
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A60
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A61
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A62
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
WARING AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A80
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A81
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A82
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A83
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A84
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019259A85
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019259A87
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIEMANN AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019259A88
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TIEMANN AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019259A89
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELANOY AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A90
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
DELANOY AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A91
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A92
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WICKHAM AVENUE
|
X042019259A93
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A94
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A95
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A96
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GUNTHER AVENUE, BRONX, FROM STREET MACE AVENUE
|
X042019259A97
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019259A98
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 171 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019259A99
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
CLAREMONT PARKWAY, BRONX, FROM STREET FULTON AVENUE
|
X042019259B00
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019259B01
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET FULTON AVENUE
|
X042019259A86
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET TIEMANN AVENUE
|
X042019259A21
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
VAN NEST AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019259A22
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TOMLINSON AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A23
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A24
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A19
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A18
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A17
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A16
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HERING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A15
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A14
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A13
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
TENBROECK AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A25
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
PAULDING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A26
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A27
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
RADCLIFF AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A28
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A20
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
VAN NEST AVENUE, BRONX, FROM STREET YATES AVENUE
|
X042019259A29
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HONE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A30
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
COLDEN AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A31
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A32
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A33
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LURTING AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A34
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A35
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A36
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
BRONXDALE AVENUE, BRONX, FROM STREET VAN NEST AVENUE
|
X042019259A63
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019259A64
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019259A65
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019259A66
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
ASTOR AVENUE, BRONX, FROM STREET LODOVICK AVENUE
|
X042019259A67
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
LODOVICK AVENUE, BRONX, FROM STREET WARING AVENUE
|
X042019259A68
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A69
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A70
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A71
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 172 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A72
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A73
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A74
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A75
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 174 STREET, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A76
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A77
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A78
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A79
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
GLEASON AVENUE, BRONX, FROM STREET ST LAWRENCE AVENUE
|
X042019259A02
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A03
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A04
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
FIELDING STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A05
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
HAWTHORNE STREET, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A06
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A07
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X042019259A08
|
2019-09-16
|
2019-10-12
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
MACE AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X012019256B13
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MEAGHER AVENUE TO STREET WEIR CREEK PARK BOUNDARY
|
X012019256B31
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SCHLEY AVENUE, BRONX, FROM STREET ELLSWORTH AVENUE TO STREET THROGS NECK EXPRESSWAY
|
X012019256B28
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MEAGHER AVENUE TO STREET MILES AVENUE
|
X012019256B27
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET MILES AVENUE TO STREET PENNYFIELD AVENUE
|
X012019256B26
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MILES AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET PENNYFIELD AVENUE
|
X012019256B25
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PENNYFIELD AVENUE TO STREET WISSMAN AVENUE
|
X012019256B24
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WISSMAN AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET PRENTISS AVENUE
|
X012019256B23
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PRENTISS AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET WISSMAN AVENUE
|
X012019256B22
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SCHLEY AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET VINCENT AVENUE
|
X012019256B21
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RANDALL AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET VINCENT AVENUE
|
X012019256B20
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE TO STREET WISSMAN AVENUE
|
X012019256B19
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET PRENTISS AVENUE TO STREET REYNOLDS AVENUE
|
X012019256B18
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
REYNOLDS AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET WISSMAN AVENUE
|
X012019256B17
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WISSMAN AVENUE, BRONX, FROM STREET PRENTISS AVENUE TO STREET REYNOLDS AVENUE
|
X012019256B16
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PENNYFIELD AVENUE, BRONX, FROM STREET THROGS NECK EXPRESSWAY TO STREET MILES AVENUE
|
X012019256B15
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MILES AVENUE, BRONX, FROM STREET PENNYFIELD AVENUE TO STREET PRENTISS AVENUE
|
X012019256B14
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PRENTISS AVENUE, BRONX, FROM STREET BEND TO STREET WISSMAN AVENUE
|
X012019256B12
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET SCHLEY AVENUE TO STREET WEIR CREEK PARK BOUNDARY
|
X012019256B11
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
THROGS NECK EXPRESSWAY, BRONX, FROM STREET DEAD END TO STREET SCHLEY AVENUE
|
X012019256B10
|
2019-09-13
|
2019-12-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELLSWORTH AVENUE, BRONX, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
Q012019248A99
|
2019-09-05
|
2019-10-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NORTHERN BOULEVARD, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019248A53
|
2019-09-05
|
2019-10-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA NORTH, QUEENS, FROM STREET 28 STREET TO STREET BEND
|
Q012019248A98
|
2019-09-05
|
2019-10-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019235A17
|
2019-08-23
|
2019-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019235C06
|
2019-08-23
|
2019-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA NORTH, QUEENS, FROM STREET 28 STREET TO STREET BEND
|
Q012019235A18
|
2019-08-23
|
2019-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA NORTH, QUEENS, FROM STREET 28 STREET TO STREET BEND
|
Q012019235A19
|
2019-08-23
|
2019-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
NORTHERN BOULEVARD, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
Q012019235C05
|
2019-08-23
|
2019-08-30
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
QUEENS PLAZA, QUEENS, FROM STREET BEND TO STREET JACKSON AVENUE
|
X012019234A99
|
2019-08-22
|
2019-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET EASTCHESTER ROAD
|
X012019234B05
|
2019-08-22
|
2019-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X012019234A43
|
2019-08-22
|
2019-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X012019234A98
|
2019-08-22
|
2019-11-14
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET DEWITT PLACE
|
X012019226B17
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET WOODHULL AVENUE
|
X012019226B10
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 243 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X012019226B04
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
KNAPP STREET, BRONX, FROM STREET EAST GUN HILL ROAD TO STREET FENTON AVENUE
|
X012019226B11
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BULLARD AVENUE, BRONX, FROM STREET EAST 239 STREET
|
X012019226B12
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CARPENTER AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X012019226B13
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MATILDA AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X012019226B14
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET DEWITT PLACE
|
X012019226B27
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 242 STREET, BRONX, FROM STREET WHITE PLAINS ROAD
|
X012019226B15
|
2019-08-14
|
2019-11-10
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ARNOW AVENUE, BRONX, FROM STREET EASTCHESTER ROAD
|
X012019224A47
|
2019-08-12
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019213B09
|
2019-08-01
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X012019213B24
|
2019-08-01
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 202 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
X012019212A55
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET WARD AVENUE
|
X012019212B16
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BUSSING AVENUE, BRONX, FROM STREET ELY AVENUE
|
X012019212A57
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019212A56
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET NYCTA SUBWAY TO STREET WATSON AVENUE
|
X012019212A54
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET NYCTA SUBWAY
|
X012019212A53
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019212A52
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET COLGATE AVENUE
|
X012019212A51
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET NYCTA SUBWAY
|
X012019212A17
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X012019212A16
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET CROSS BRONX EXPRESSWAY
|
X012019212A14
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
TIFFANY STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019212A13
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019212A09
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019212A50
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019212A49
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019212A48
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE
|
X012019212A47
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY
|
X012019212A45
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019212A44
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 138 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
X012019212A43
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY
|
X012019212A42
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019212A39
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 183 STREET, BRONX, FROM STREET PARK AVENUE
|
X012019212A38
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 168 STREET, BRONX, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
X012019212A37
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 183 STREET, BRONX, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
X012019212A36
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
X012019212A35
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET
|
X012019212A34
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X012019212A33
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X012019212A32
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRUNER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 222 STREET
|
X012019212A31
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RIVER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 164 STREET
|
X012019212A30
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET
|
X012019212A29
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 164 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET NYCTA SUBWAY
|
X012019212A28
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X012019212A27
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NYCTA SUBWAY, BRONX, FROM STREET TAN PLACE
|
X012019212A26
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET TOWNSEND AVENUE
|
X012019212A25
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
TAN PLACE, BRONX, FROM STREET EAST TREMONT AVENUE TO STREET WESTCHESTER AVENUE
|
X012019212A24
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JEROME AVENUE, BRONX, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET
|
X012019212A23
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WATERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY
|
X012019212A20
|
2019-07-31
|
2019-10-05
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RIVER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET JEROME AVENUE
|
B012019212E02
|
2019-07-31
|
2019-10-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HALSEY STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
B012019212E01
|
2019-07-31
|
2019-10-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
DE SALES PLACE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET DEAD END
|
B012019212E03
|
2019-07-31
|
2019-10-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
STANHOPE STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE
|
Q012019212A86
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019212A85
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019212A84
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019212A83
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE
|
Q012019212A82
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET
|
Q012019212A80
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019212A79
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019212A78
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019212A77
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019212A76
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE
|
Q012019212A75
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019212A74
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019212A73
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019212A72
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019212A71
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019212A70
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019212A69
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019212A68
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019212A67
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
160 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019212A66
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019212A65
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019212A81
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
X012019212B18
|
2019-07-31
|
2019-10-30
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELY AVENUE, BRONX, FROM STREET NEREID AVENUE
|
Q012019211A75
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019211A62
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019211A63
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019211A64
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019211A65
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019211A66
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019211A67
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019211A68
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019211A69
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019211A78
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019211A79
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012019211B19
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019211B18
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019211A80
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019211B17
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019211B16
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019211B15
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019211B14
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019211B13
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019211B12
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012019211B11
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019211A98
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019211A92
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
X012019211A88
|
2019-07-30
|
2019-10-27
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
Q012019211A91
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012019211A90
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
Q012019211A89
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
Q012019211A88
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019211A87
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019211A86
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019211A85
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019211A72
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019211A73
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019211A74
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019211A59
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019211A84
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019211A83
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019211A82
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019211A81
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012019211C06
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
Q012019211C01
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019211C00
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET
|
Q012019211B99
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019211B33
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019211B32
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019211B31
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012019211B30
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019211B29
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019211B28
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019211B27
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019211B26
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019211B25
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019211B24
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019211B23
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019211B22
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019211B21
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019211B20
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019211A70
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019211A71
|
2019-07-30
|
2019-10-29
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
M012019207B43
|
2019-07-26
|
2019-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, MANHATTAN, FROM STREET WEST 126 STREET
|
M012019207B42
|
2019-07-26
|
2019-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, MANHATTAN, FROM STREET WEST 129 STREET TO STREET WEST 130 STREET
|
M012019207B41
|
2019-07-26
|
2019-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 129 STREET
|
M012019207B37
|
2019-07-26
|
2019-08-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
BROADWAY, MANHATTAN, FROM STREET LA SALLE STREET TO STREET TIEMANN PLACE
|
Q012019206B38
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012019206B31
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B30
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012019206B29
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
Q012019206B28
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
X012019206B19
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE
|
X012019206B18
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY
|
X012019206B16
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019206B15
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 138 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
X012019206B14
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY
|
X012019206B13
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019206B21
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019206B11
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
TIFFANY STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019206B10
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019206B08
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
Q012019206B24
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019206B23
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B22
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019206B15
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019206B16
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B17
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019206B21
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019206B18
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019206B19
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019206B20
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019206B27
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019206B26
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012019206B25
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019206B67
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B66
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019206B65
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019206B64
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B63
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019206B62
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019206B61
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019206B58
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019206B57
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019206B54
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019206B53
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019206B52
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B51
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B50
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019206B49
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B48
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019206B47
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019206B46
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019206B45
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019206B44
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019206B43
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019206B42
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019206B41
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019206B40
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
X012019206B20
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019206B28
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019206B27
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET NYCTA SUBWAY TO STREET WATSON AVENUE
|
X012019206B26
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET WARD AVENUE
|
X012019206B25
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET NYCTA SUBWAY
|
X012019206B24
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019206B23
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET COLGATE AVENUE
|
X012019206B22
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET NYCTA SUBWAY
|
Q012019206B39
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019206B37
|
2019-07-25
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019205A38
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019205A30
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET
|
Q012019205A32
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019205A33
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019205A34
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019205A35
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019205A36
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019205A37
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019205A39
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012019205A40
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019205A41
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019205A42
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019205A43
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019205A49
|
2019-07-24
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
X012019203A30
|
2019-07-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 183 STREET, BRONX, FROM STREET PARK AVENUE
|
X012019191A89
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET TOWNSEND AVENUE
|
X012019191A90
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE
|
X012019191A99
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 183 STREET, BRONX, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
X012019191A94
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET
|
X012019191A93
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X012019191A92
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RIVER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 164 STREET
|
X012019191A91
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 164 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET NYCTA SUBWAY
|
X012019191A88
|
2019-07-10
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JEROME AVENUE, BRONX, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET
|
X012019171A49
|
2019-06-20
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ELY AVENUE, BRONX, FROM STREET NEREID AVENUE
|
X012019171A47
|
2019-06-20
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BUSSING AVENUE, BRONX, FROM STREET ELY AVENUE
|
Q012019169C94
|
2019-06-18
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019169C92
|
2019-06-18
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019169C91
|
2019-06-18
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE
|
Q012019169C90
|
2019-06-18
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019169C89
|
2019-06-18
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019169C93
|
2019-06-18
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019168E09
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019168E15
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019168E41
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019168E42
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019168E43
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019168E44
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019168E45
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019168E46
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019168E47
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET
|
Q012019168E40
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
160 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019168E39
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019168E16
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019168E14
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019168E13
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE
|
Q012019168E12
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019168E11
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE
|
Q012019168E07
|
2019-06-17
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 161 AVENUE
|
X012019162A62
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X012019162A61
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRUNER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 222 STREET
|
X012019162A60
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET
|
X012019162A58
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
TAN PLACE, BRONX, FROM STREET EAST TREMONT AVENUE TO STREET WESTCHESTER AVENUE
|
X012019162A63
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
X012019162A64
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 168 STREET, BRONX, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
X012019162A59
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
NYCTA SUBWAY, BRONX, FROM STREET TAN PLACE
|
X012019162A54
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET CROSS BRONX EXPRESSWAY
|
X012019162A55
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X012019162A56
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RIVER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET JEROME AVENUE
|
X012019162A57
|
2019-06-11
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WATERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY
|
B012019142B08
|
2019-05-22
|
2019-06-30
|
RESET, REPAIR OR REPLACE CURB
|
LAFAYETTE AVENUE, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
B012019142B09
|
2019-05-22
|
2019-06-30
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
LAFAYETTE AVENUE, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
Q012019142D46
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
97 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019142D47
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 162 AVENUE
|
Q012019142D48
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
96 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019142D49
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
160 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019142D50
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019142D84
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET BODY OF WATER
|
Q012019142D85
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
161 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019142D95
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE TO STREET 162 AVENUE
|
Q012019142D96
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE TO STREET 161 AVENUE
|
Q012019142D97
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 161 AVENUE
|
Q012019142B32
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 97 STREET TO STREET 98 STREET
|
Q012019142C34
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 160 AVENUE
|
Q012019142D45
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET
|
Q012019142D58
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
162 AVENUE, QUEENS, FROM STREET 95 STREET TO STREET 96 STREET
|
Q012019142D57
|
2019-05-22
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
95 STREET, QUEENS, FROM STREET 162 AVENUE
|
X012019128A87
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LAYTON AVENUE, BRONX, FROM STREET STADIUM AVENUE
|
X012019128A94
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HERING AVENUE, BRONX, FROM STREET MACE AVENUE
|
X012019128A91
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HAIGHT AVENUE, BRONX, FROM STREET SACKETT AVENUE
|
X012019128A88
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HAIGHT AVENUE, BRONX, FROM STREET MORRIS PARK AVENUE
|
X012019128B00
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
SACKETT AVENUE, BRONX, FROM STREET TOMLINSON AVENUE
|
X012019128A99
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
MORRIS PARK AVENUE, BRONX, FROM STREET TOMLINSON AVENUE
|
X012019128A98
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RHINELANDER AVENUE, BRONX, FROM STREET TOMLINSON AVENUE
|
X012019128A95
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HERING AVENUE, BRONX, FROM STREET WARING AVENUE
|
X012019128A96
|
2019-05-08
|
2019-08-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LYDIG AVENUE, BRONX, FROM STREET TOMLINSON AVENUE
|
B012019127D72
|
2019-05-07
|
2019-06-05
|
RESET, REPAIR OR REPLACE CURB
|
LAFAYETTE AVENUE, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
B012019127D73
|
2019-05-07
|
2019-06-05
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
LAFAYETTE AVENUE, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
B012019123B94
|
2019-05-03
|
2019-07-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
HALSEY STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
X012019121B34
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CASTLE HILL AVENUE, BRONX, FROM STREET SEWARD AVENUE
|
B012019121C64
|
2019-05-01
|
2019-07-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
STANHOPE STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE
|
X012019121A73
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019121A80
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY
|
X012019121A81
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE
|
X012019121A82
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019121A83
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019121A84
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET NYCTA SUBWAY
|
X012019121A85
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET COLGATE AVENUE
|
X012019121A86
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019121A87
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET NYCTA SUBWAY
|
X012019121A89
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET NYCTA SUBWAY TO STREET WATSON AVENUE
|
X012019121A90
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
B012019121C63
|
2019-05-01
|
2019-07-28
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
DE SALES PLACE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET DEAD END
|
X012019121A88
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET WARD AVENUE
|
X012019121A71
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019121A74
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
TIFFANY STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019121A76
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY
|
X012019121A77
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 138 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
X012019121A78
|
2019-05-01
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019119B22
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FTELEY AVENUE, BRONX, FROM STREET WATSON AVENUE
|
X012019119B23
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FTELEY AVENUE, BRONX, FROM STREET GLEASON AVENUE
|
Q012019119D88
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
Q012019119D82
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019119D81
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019119D80
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET
|
X012019119B25
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
METCALF AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019119B27
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET FTELEY AVENUE
|
X012019119B30
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET FTELEY AVENUE
|
X012019119B74
|
2019-04-29
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019119B75
|
2019-04-29
|
2019-07-24
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
Q012019116A68
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019116B19
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019116B18
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019116B17
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012019116B16
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019116B15
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019116B14
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019116B13
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019116B12
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019116B11
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019116B10
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019116B09
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019116B06
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019116B05
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019116B04
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019116B03
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019116B02
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019116B01
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019116B00
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019116A99
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019116A98
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019116A97
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019116A96
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019116A95
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019116A94
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019116A93
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019116A92
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019116A91
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019116A90
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019116A89
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019116A88
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019116A87
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019116A86
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019116A85
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019116A84
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019116A83
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019116A80
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019116A79
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019116A73
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019116A72
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012019116A71
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
Q012019116A70
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
Q012019116A69
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019116A67
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019116A66
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019116A65
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019116A64
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019116A62
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012019116A61
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019116A59
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012019116A58
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019116A57
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012019116A56
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019116A63
|
2019-04-26
|
2019-07-25
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
X012019115A61
|
2019-04-25
|
2019-07-25
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
Q012019109A74
|
2019-04-19
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
Q012019109A66
|
2019-04-19
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET
|
Q012019109A67
|
2019-04-19
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019109A68
|
2019-04-19
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
X012019105A40
|
2019-04-15
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET FTELEY AVENUE
|
X012019105A41
|
2019-04-15
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FTELEY AVENUE, BRONX, FROM STREET GLEASON AVENUE
|
X012019105A42
|
2019-04-15
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FTELEY AVENUE, BRONX, FROM STREET WATSON AVENUE
|
X012019105A43
|
2019-04-15
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
METCALF AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019102B59
|
2019-04-12
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CROSS BRONX EXPRESSWAY, BRONX, FROM STREET FTELEY AVENUE
|
X012019088A42
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019088A43
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET BEND TO STREET NYCTA SUBWAY
|
X012019088A44
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET ROGERS PLACE
|
X012019088A45
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019088A46
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ROGERS PLACE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019088A41
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FOX STREET, BRONX, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY
|
X012019088A40
|
2019-03-29
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
TIFFANY STREET, BRONX, FROM STREET EAST 163 STREET TO STREET NYCTA SUBWAY
|
X012019087A62
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET COLGATE AVENUE
|
X012019087A67
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019087A65
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WESTCHESTER AVENUE, BRONX, FROM STREET BOYNTON AVENUE TO STREET WARD AVENUE
|
X012019087A61
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET BRONX RIVER AVENUE TO STREET NYCTA SUBWAY
|
X012019087A64
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET NYCTA SUBWAY
|
X012019087A66
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
WARD AVENUE, BRONX, FROM STREET NYCTA SUBWAY TO STREET WATSON AVENUE
|
X012019087A63
|
2019-03-28
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
COLGATE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019085A78
|
2019-03-26
|
2019-04-26
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
Q012019084A87
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019084B32
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019084B31
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019084B30
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019084B29
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019084B28
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019084B25
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019084B24
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019084B23
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B22
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B21
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019084B20
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B19
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019084B18
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019084B17
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B16
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019084B15
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019084B14
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019084B13
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019084B12
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019084B11
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019084B10
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B09
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019084B08
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B07
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019084B06
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019084B05
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019084B04
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019084B03
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019084B02
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019084A99
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019084A98
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019084A92
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019084A91
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019084A90
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019084A89
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019084A88
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019084A86
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019084A85
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019084A84
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019084B38
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019084B37
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019084B36
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
Q012019084B35
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019084B34
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019084B33
|
2019-03-25
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019081A49
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
111 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019081A48
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A42
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE
|
Q012019081A56
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019081A50
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
111 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019081A57
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019081A58
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A59
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A60
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019081A61
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A62
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019081A63
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019081A41
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
208 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BARDWELL AVENUE
|
Q012019081A40
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
208 STREET, QUEENS, FROM STREET BARDWELL AVENUE TO STREET HOLLIS AVENUE
|
Q012019081A39
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
111 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A38
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A37
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 208 STREET
|
Q012019081A36
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019081A55
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
208 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019081A35
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A47
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019081A46
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019081A51
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
111 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET COLFAX STREET
|
Q012019081A52
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE
|
Q012019081A53
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE
|
Q012019081A45
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019081A44
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019081A43
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE
|
Q012019081A65
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019081A64
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 111 ROAD
|
Q012019081B78
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019081A34
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 205 STREET
|
Q012019081A33
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET
|
Q012019081A32
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 204 STREET
|
Q012019081A31
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019081A30
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 ROAD, QUEENS, FROM STREET 205 STREET
|
Q012019081B77
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET COLFAX STREET
|
Q012019081A54
|
2019-03-22
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
207 STREET, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019081B76
|
2019-03-22
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
111 AVENUE, QUEENS, FROM STREET 207 STREET
|
Q012019080B88
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 PLACE, QUEENS, FROM STREET HOLLIS AVENUE
|
Q012019080C02
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 207 STREET TO STREET 208 STREET
|
Q012019080C01
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019080C00
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 112 ROAD
|
Q012019080B99
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
111 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019080B98
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
112 AVENUE, QUEENS, FROM STREET 203 STREET TO STREET 204 STREET
|
Q012019080B97
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
204 STREET, QUEENS, FROM STREET 112 AVENUE TO STREET 113 AVENUE
|
Q012019080B96
|
2019-03-21
|
2019-04-26
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
208 STREET, QUEENS, FROM STREET HOLLIS AVENUE TO STREET HOLLIS AVENUE
|
Q012019080B95
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET 205 STREET TO STREET FRANCIS LEWIS BOULEVARD
|
Q012019080B94
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019080B93
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019080B92
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
205 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE
|
Q012019080B91
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 111 AVENUE TO STREET BRINKERHOFF AVENUE
|
Q012019080B90
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BRINKERHOFF AVENUE, QUEENS, FROM STREET FRANCIS LEWIS BOULEVARD
|
Q012019080B89
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE
|
Q012019080B87
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
HOLLIS AVENUE, QUEENS, FROM STREET 208 STREET TO STREET BEND
|
X012019080A25
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019080A26
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019080A27
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019080A28
|
2019-03-21
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 138 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
Q012019073A55
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 91 ROAD TO STREET 92 AVENUE
|
Q012019073A61
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET WINCHESTER BOULEVARD
|
Q012019073A62
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 90 AVENUE TO STREET 91 ROAD
|
Q012019073A57
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE
|
Q012019073A58
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019073A59
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
91 ROAD, QUEENS, FROM STREET 221 PLACE TO STREET 221 STREET
|
Q012019073A60
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
221 PLACE, QUEENS, FROM STREET 92 AVENUE TO STREET WINCHESTER BOULEVARD
|
Q012019073A56
|
2019-03-14
|
2019-04-26
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
92 AVENUE, QUEENS, FROM STREET 221 PLACE
|
Q012019072A44
|
2019-03-13
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
X012019056B30
|
2019-02-25
|
2019-04-01
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
Q012019053C04
|
2019-02-22
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019035A52
|
2019-02-04
|
2019-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT
|
149 AVENUE, QUEENS, FROM STREET SPRINGFIELD LANE
|
Q012019032C88
|
2019-02-01
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
Q012019030A32
|
2019-01-30
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 164 PLACE TO STREET 164 STREET
|
Q012019030A31
|
2019-01-30
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CENTRL PARKWAY, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET
|
X012019029A06
|
2019-01-29
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
UNION AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019029A38
|
2019-01-29
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 138 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
X012019028B31
|
2019-01-28
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
CAULDWELL AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019028B32
|
2019-01-28
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAGLE AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
X012019028B30
|
2019-01-28
|
2019-04-01
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
ST ANNS AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE
|
Q012018362C20
|
2018-12-28
|
2019-04-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
164 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET UNION TURNPIKE
|
Q012018362C26
|
2018-12-28
|
2019-04-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
164 STREET, QUEENS, FROM STREET 82 ROAD TO STREET GRAND CENTRL PARKWAY
|
Q012018362C24
|
2018-12-28
|
2019-04-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
164 STREET, QUEENS, FROM STREET 82 ROAD TO STREET GOETHALS AVENUE
|
Q012018362C23
|
2018-12-28
|
2019-04-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
164 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET GOETHALS AVENUE
|
Q012018362C22
|
2018-12-28
|
2019-04-01
|
DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT
|
164 STREET, QUEENS, FROM STREET GOETHALS AVENUE
|
Q012018351F28
|
2018-12-17
|
2019-01-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GOETHALS AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET
|
X012018346A22
|
2018-12-12
|
2019-03-11
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
GRAND CONCOURSE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
X012018319A23
|
2018-11-15
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BUSSING AVENUE, BRONX, FROM STREET ELY AVENUE
|
X012018303A57
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X012018303A56
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 202 STREET, BRONX, FROM STREET GRAND CONCOURSE
|
X012018303A28
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JEROME AVENUE, BRONX, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET
|
X012018303A29
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 172 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET TOWNSEND AVENUE
|
X012018303A31
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 164 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET NYCTA SUBWAY
|
X012018303A32
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
RIVER AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 164 STREET
|
X012018303A33
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 164 STREET, BRONX, FROM STREET RIVER AVENUE
|
X012018303A34
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 184 STREET
|
X012018303A35
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 183 STREET, BRONX, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
X012018303A36
|
2018-10-30
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET
|
X012018299A50
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BOSTON ROAD, BRONX, FROM STREET CROSS BRONX EXPRESSWAY
|
X012018299A51
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 193 STREET, BRONX, FROM STREET JEROME AVENUE
|
X012018299A43
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET
|
X012018299A44
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
PARK AVENUE, BRONX, FROM STREET EAST 141 STREET TO STREET EAST 144 STREET
|
X012018299A45
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
EAST 144 STREET, BRONX, FROM STREET PARK AVENUE
|
X012018299A46
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE TO STREET WEST 177 STREET
|
X012018299A47
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE
|
X012018299A49
|
2018-10-26
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
BOSTON ROAD, BRONX, FROM STREET BRYANT AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
X012018276A95
|
2018-10-03
|
2018-12-31
|
D.D.C. CONTRACTOR MAJOR RECONSTRUCTION
|
LIGHT STREET, BRONX, FROM STREET DYRE AVENUE TO STREET ROMBOUTS AVENUE
|
B012018206C16
|
2018-07-25
|
2018-10-20
|
RAPID TRANSIT CONSTRUCT/ ALTERATION-PROT
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET GREENPOINT AVENUE TO STREET KENT STREET
|
X012018141A59
|
2018-05-21
|
2018-07-31
|
NYC PARKS - RECONSTRUCTION CONTRACT-PROT
|
EAST 140 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
X012018009A94
|
2018-01-09
|
2018-04-01
|
NYC PARKS - RECONSTRUCTION CONTRACT-PROT
|
EAST 140 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
X012017297A66
|
2017-10-24
|
2017-12-31
|
NYC PARKS - RECONSTRUCTION CONTRACT-PROT
|
EAST 140 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|