2024-05-28
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP perm to grade I/F/O 27-14 39th Avenue
|
2024-05-25
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY HAS BEEN RESURFACED
|
2024-02-02
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2023-07-09
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2023-06-27
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE WS DONE UNDER THIS PERMIT
|
2023-03-19
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway.
|
2022-12-21
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2022-10-12
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple sidewalk flags restored expansion joints sealed in front of 27-14.
|
2022-07-27
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED
|
2022-07-08
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2022-07-07
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2022-06-11
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2022-05-04
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2022-04-07
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ,,....
|
2022-02-25
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ... installed
|
2022-02-18
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, walk , restored .... east side of street ...
|
2022-02-02
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street paved . after bpp..
|
2022-01-28
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
bpp..fully paved ....
|
2022-01-26
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - - Roadway 29ft...Milled W20ft…Milled L68ft…Milled D3f.
|
2022-01-23
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, new walk
|
2022-01-12
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ....
|
2022-01-05
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ... west side of street ....
|
2022-01-04
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, bpp ... complete
|
2021-11-19
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Constr signs
|
2021-08-21
|
No data
|
23 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w - expansion joints sealed.
|
2021-08-19
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved st at this time in compliance 1/2 +5
|
2021-08-18
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel face curb installed , in compliance
|
2021-08-07
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE ST 1/2 + 5 IN COMPLIANCE
|
2021-08-07
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Complaint verified: i/f/o 27-14 there is a refuse container stored within the parking lane. Permittee Charan Electrical has proper permits to store container on roadway. Container is in compliance with stipulations at time of inspection.
|
2021-07-16
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed(monolithic)
|
2021-06-27
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, full paving ...,BPP.. n/b ..
|
2021-06-23
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving work started at this time of inspection.
|
2021-06-21
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ......
|
2021-06-16
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observe the above respondent with on lane closed of the roadway for vehicular traffic. Respondent failed to comply with DOT permit stipulation 027, stating to have 2 lanes for traffic, 1 lane in each direction.
|
2021-06-16
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site paving RW
|
2021-06-09
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ... new building ...
|
2021-06-08
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new walk ..
|
2021-05-23
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started yet ...
|
2021-05-23
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, walk completed ...walk fully open to traffic ..
|
2021-05-23
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass...
|
2021-05-21
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Condition not verified. No blocked construction observed. Container in r/w
|
2021-05-21
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp sign posted
|
2021-05-19
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started .. yet ....
|
2021-05-18
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving work done at the time of inspection.
|
2021-05-18
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving work done at the time of inspection.
|
2021-05-17
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, crew on location ......west side of street ..
|
2021-05-14
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, no container at this time .....
|
2021-05-05
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupancy of roadway in use at this time.
|
2021-04-30
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary pedestrian walk i/f/o 99 Thatford Avenue
|
2021-04-27
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temporary construction sign posted at the time of inspection
|
2021-03-24
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no TEMPORARY PEDESTRIAN WALK, s/w open
|
2021-03-05
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Temp no parking signs posted on the south side adjacent to worksite allowed at this time of inspection. Permit Q022021012A37 is active until 4/6/2021
|
2021-02-25
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk in-compliance.
|
2021-01-24
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
VERIFIED- CONTRUCTION BARRIERS ON ROADWAY IN COMPLIANCE. STORED I/F/O BUILDING OPERATION (Permit No: 421723638-01-NB)
|
2021-01-24
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN SIDEWALK TO INSTALL FOUNDATION IN COMPLIANCE
|
2021-01-11
|
No data
|
23 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed expansion joints sealed i/f/o 37-11 23st
|
2020-12-09
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is free from obstructions.
|
2020-11-18
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no temporary pedestrian walkway provided at this time with up to date permit in progress.
|
2020-10-29
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CONCRETE PUMP ON THE ROADWAY
|
2020-09-18
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN SIDEWALK TO INSTALL FOUNDATION-CREW ON SITE WORKING BEHIND FENCED AREA.
|
2020-09-10
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Maintained Fence. CREW ON SITE WAS BLOCKING THE ROADWAY . ROADWAY OPEN AFTER CONVERSATION WITH SUPERVISOR ON SITE.
|
2020-09-05
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2020-07-10
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk and curb installed ifo property #120
|
2020-07-07
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2020-07-06
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CROSSING SIDEWALK, acceptable
|
2020-01-25
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk open for pedestrian
|
2019-12-17
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO TEMPORARY PEDESTRIAN WALKWAY IN THE ROADWAY
|
2019-11-25
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS HAVE BEEN SEALED
|
2019-11-18
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BASE PASSED REQUIRED CUT BACKS DONE EPOXY APPLIED CONCRETE CURING
|
2019-11-15
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOV’s issued for this defect. Permittee placed on hold.
|
2019-11-01
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
new sidewalk they installed with the plastic covers over the expansion joints and fail to seal the joints along the sidewalk and curb line. they was notified on 9/25/19 C.A.R# 20196620263 AND FAIL TO MAKE THE REPAIRS NEEDED.
|
2019-09-25
|
No data
|
OSBORN STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS HAVE PLASTIC NOT REMOVED AND NOT SEALED
|
2019-06-25
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk observed
|
2019-06-04
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
A/T/P/O I observed the above respondent posted temporary construction “NO PARKING” signs at an active building operation without any valid DOT permits on file allowing to do so. NYC DOB Permit Number (320625383-01-NB) used to ID.
|
2019-05-16
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk observed at this time.
|
2018-05-02
|
No data
|
39 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
A/T/P/O, I observed the respondent maintain an illegal construction fence on the sidewalk with no permit. Construction fence extends more than three feet onto the sidewalk. Respondent was identify by DO B permit #
|
2017-10-04
|
No data
|
40 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w replaced
|
2017-04-03
|
No data
|
40 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
flags replaced
|
2017-03-23
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
signs
|
2016-11-29
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed temporary "NO PARKING" signs posted without a valid DOT permit to do so. DOB permit (320625383-EQ-FN) used for ID.
|
2016-11-23
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed temporary "NO PARKING" signs posted without a valid DOT permit to do so. DOB permit (320625383-EQ-FN) used for ID.
|
2016-11-15
|
No data
|
THATFORD AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed temporary "NO PARKING" signs posted without a valid DOT permit to do so. DOB permit (320625383-EQ-FN) used for ID.
|
2016-09-30
|
No data
|
40 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored, expansion joints sealed.
|