B022024255A46
|
2024-09-11
|
2024-10-03
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024255A52
|
2024-09-11
|
2024-10-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024255A48
|
2024-09-11
|
2024-10-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024255A47
|
2024-09-11
|
2024-10-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024255A45
|
2024-09-11
|
2024-10-03
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024255A51
|
2024-09-11
|
2024-10-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024255A50
|
2024-09-11
|
2024-10-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024255A49
|
2024-09-11
|
2024-10-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024254A92
|
2024-09-10
|
2024-10-03
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024254A91
|
2024-09-10
|
2024-10-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024254A93
|
2024-09-10
|
2024-10-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
Q022024152A55
|
2024-05-31
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024152A54
|
2024-05-31
|
2024-08-01
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022024152B70
|
2024-05-31
|
2024-09-16
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024152B68
|
2024-05-31
|
2024-09-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024152B67
|
2024-05-31
|
2024-09-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024152B65
|
2024-05-31
|
2024-09-16
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024152B64
|
2024-05-31
|
2024-09-16
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024152B63
|
2024-05-31
|
2024-09-16
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024152B66
|
2024-05-31
|
2024-09-16
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
Q022024152A59
|
2024-05-31
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024152A58
|
2024-05-31
|
2024-08-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024152A57
|
2024-05-31
|
2024-08-01
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024152A56
|
2024-05-31
|
2024-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022024152B73
|
2024-05-31
|
2024-09-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024152B72
|
2024-05-31
|
2024-09-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024152B71
|
2024-05-31
|
2024-09-16
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024152B69
|
2024-05-31
|
2024-09-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
Q022024082A27
|
2024-03-22
|
2024-06-18
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024082A28
|
2024-03-22
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024082A23
|
2024-03-22
|
2024-06-18
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024082A24
|
2024-03-22
|
2024-06-18
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024082A25
|
2024-03-22
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022024082A26
|
2024-03-22
|
2024-06-18
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022024081C42
|
2024-03-21
|
2024-06-18
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024081C34
|
2024-03-21
|
2024-06-18
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C35
|
2024-03-21
|
2024-06-18
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C36
|
2024-03-21
|
2024-06-18
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C37
|
2024-03-21
|
2024-06-18
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C38
|
2024-03-21
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C39
|
2024-03-21
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C40
|
2024-03-21
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024081C44
|
2024-03-21
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024081C43
|
2024-03-21
|
2024-06-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024081C41
|
2024-03-21
|
2024-06-18
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024074A34
|
2024-03-14
|
2024-03-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024074A37
|
2024-03-14
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024074A36
|
2024-03-14
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024074A35
|
2024-03-14
|
2024-03-19
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024074A33
|
2024-03-14
|
2024-03-19
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022024074A31
|
2024-03-14
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022024074A32
|
2024-03-14
|
2024-03-19
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
Q022023360B53
|
2023-12-26
|
2024-03-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023360B54
|
2023-12-26
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023360B55
|
2023-12-26
|
2024-03-19
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023360B56
|
2023-12-26
|
2024-03-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023360B57
|
2023-12-26
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023360B52
|
2023-12-26
|
2024-03-19
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022023355A29
|
2023-12-21
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023355A10
|
2023-12-21
|
2024-03-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023355A11
|
2023-12-21
|
2024-03-19
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023355A12
|
2023-12-21
|
2024-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023355A13
|
2023-12-21
|
2024-03-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023355A23
|
2023-12-21
|
2024-03-13
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023355A24
|
2023-12-21
|
2024-03-13
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023355A25
|
2023-12-21
|
2024-03-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023355A26
|
2023-12-21
|
2024-03-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023355A27
|
2023-12-21
|
2024-03-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023355A28
|
2023-12-21
|
2024-03-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B82
|
2023-10-23
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B92
|
2023-10-23
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023296B91
|
2023-10-23
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023296B90
|
2023-10-23
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023296B89
|
2023-10-23
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023296B88
|
2023-10-23
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B87
|
2023-10-23
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B86
|
2023-10-23
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B85
|
2023-10-23
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B84
|
2023-10-23
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023296B83
|
2023-10-23
|
2023-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
Q022023292A09
|
2023-10-19
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023292A07
|
2023-10-19
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023292A05
|
2023-10-19
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023292A06
|
2023-10-19
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023292A04
|
2023-10-19
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023292A08
|
2023-10-19
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023255B20
|
2023-09-12
|
2023-11-01
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023255B24
|
2023-09-12
|
2023-11-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023255B23
|
2023-09-12
|
2023-11-01
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023255B22
|
2023-09-12
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023255B21
|
2023-09-12
|
2023-11-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023255B25
|
2023-09-12
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022023221A02
|
2023-08-09
|
2023-11-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023221A03
|
2023-08-09
|
2023-11-01
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023221A04
|
2023-08-09
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023221A05
|
2023-08-09
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023220A90
|
2023-08-08
|
2023-11-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023220A93
|
2023-08-08
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023220A92
|
2023-08-08
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023220A91
|
2023-08-08
|
2023-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023220A89
|
2023-08-08
|
2023-11-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023220A88
|
2023-08-08
|
2023-11-01
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023220A87
|
2023-08-08
|
2023-11-01
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
Q022023172B76
|
2023-06-21
|
2023-09-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023172B75
|
2023-06-21
|
2023-09-22
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023172B80
|
2023-06-21
|
2023-09-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023172B79
|
2023-06-21
|
2023-09-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023172B78
|
2023-06-21
|
2023-09-22
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023172B77
|
2023-06-21
|
2023-09-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022023128A18
|
2023-05-08
|
2023-08-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A17
|
2023-05-08
|
2023-08-07
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A20
|
2023-05-08
|
2023-08-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A16
|
2023-05-08
|
2023-08-07
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A19
|
2023-05-08
|
2023-08-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A10
|
2023-05-08
|
2023-08-07
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023128A15
|
2023-05-08
|
2023-08-07
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A14
|
2023-05-08
|
2023-08-07
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023128A13
|
2023-05-08
|
2023-08-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023128A12
|
2023-05-08
|
2023-08-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023128A11
|
2023-05-08
|
2023-08-07
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
Q022023086A60
|
2023-03-27
|
2023-06-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023086A55
|
2023-03-27
|
2023-06-24
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023086A56
|
2023-03-27
|
2023-06-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023086A57
|
2023-03-27
|
2023-06-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023086A58
|
2023-03-27
|
2023-06-24
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023086A59
|
2023-03-27
|
2023-06-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
B022023044B01
|
2023-02-13
|
2023-05-09
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B06
|
2023-02-13
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B05
|
2023-02-13
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B04
|
2023-02-13
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B03
|
2023-02-13
|
2023-05-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B02
|
2023-02-13
|
2023-05-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B00
|
2023-02-13
|
2023-05-09
|
PLACE MATERIAL ON STREET
|
ROCKAWAY PARKWAY, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RUTLAND ROAD
|
B022023044B16
|
2023-02-13
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023044B15
|
2023-02-13
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023044B14
|
2023-02-13
|
2023-05-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
B022023044B13
|
2023-02-13
|
2023-05-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 96 STREET, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET RUTLAND ROAD
|
Q022023030B25
|
2023-01-30
|
2023-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023030B24
|
2023-01-30
|
2023-03-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023030B23
|
2023-01-30
|
2023-03-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023030B22
|
2023-01-30
|
2023-03-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023030B21
|
2023-01-30
|
2023-03-19
|
PLACE MATERIAL ON STREET
|
142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|
Q022023030B20
|
2023-01-30
|
2023-03-19
|
PLACE MATERIAL ON STREET
|
143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD
|