2021-11-05
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CONCRETE WAS REMOVED
|
2021-08-26
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failure to restore street in kind.
|
2021-06-05
|
No data
|
CRYSTAL AVENUE, FROM STREET CASWELL AVENUE TO STREET DORA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2021-05-19
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failure to restore street in kind (non-historic district)
|
2021-04-06
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failure to restore street in kind (non-historic district)
|
2020-11-30
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failed to restore parking lane
|
2020-08-26
|
No data
|
CRYSTAL AVENUE, FROM STREET CASWELL AVENUE TO STREET DORA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curby ok.
|
2020-08-25
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please remove concrete overspill in roadway and restore in kind for a.k.a 148 Geldner Ave
|
2020-08-25
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
drop curb ok.
|
2020-03-04
|
No data
|
SYDNEY PLACE, FROM STREET FOXHOLM STREET TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2019-10-27
|
No data
|
EGBERT AVENUE, FROM STREET GREENLEAF AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rwy paved
|
2019-08-07
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-07-11
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2019-06-15
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2019-06-15
|
No data
|
SYDNEY PLACE, FROM STREET FOXHOLM STREET TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2019-05-30
|
No data
|
BEACON AVENUE, FROM STREET ALTAMONT STREET TO STREET BOYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2019-04-11
|
No data
|
EGBERT AVENUE, FROM STREET GREENLEAF AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2019-04-10
|
No data
|
MERRILL AVENUE, FROM STREET DANNY COURT TO STREET HILLMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2019-03-03
|
No data
|
ZOE STREET, FROM STREET DONGAN HILLS AVENUE TO STREET NAUGHTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2018-10-31
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2018-10-31
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2018-08-17
|
No data
|
EGBERT AVENUE, FROM STREET GREENLEAF AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
"Driveway curb/sidewalk repair."
|
2018-06-10
|
No data
|
BEACON AVENUE, FROM STREET ALTAMONT STREET TO STREET BOYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2018-04-03
|
No data
|
CRYSTAL AVENUE, FROM STREET CASWELL AVENUE TO STREET DORA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cp: "Repaired/restored curb at active B.O. site"
|
2018-02-03
|
No data
|
MERRILL AVENUE, FROM STREET DANNY COURT TO STREET HILLMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the above respondent excavated the sidewalk without a permit..Respondent has a permit to replace sidewalk not to excavate three feet down for electrical duct installation..A street opening permit is required for this type of work.
|
2017-12-02
|
No data
|
ZOE STREET, FROM STREET DONGAN HILLS AVENUE TO STREET NAUGHTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2017-10-26
|
No data
|
EGBERT AVENUE, FROM STREET GREENLEAF AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repaired curb/sidewalk.
|
2017-10-24
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok.
|
2017-10-24
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Drop curb was ok.
|
2017-10-08
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2017-10-08
|
No data
|
SYDNEY PLACE, FROM STREET FOXHOLM STREET TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2017-10-08
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2017-07-04
|
No data
|
SYDNEY PLACE, FROM STREET FOXHOLM STREET TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
sw ok
|
2017-04-06
|
No data
|
SYDNEY PLACE, FROM STREET FOXHOLM STREET TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS FOR S/WALK FLAGS & AT D/WAY APRON ARE NOT SEALED. PLEASE SEAL THE EXPANSION JOINTS.
|
2017-04-04
|
No data
|
EMERSON COURT, FROM STREET BEND TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Score line in drop curb was sealed howver there was no evidence of an installed expansion joint. Photos taken and sent as per SI Base/DBC.
|
2017-04-04
|
No data
|
ALPINE COURT, FROM STREET BROOKSIDE AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Score line in drop curb was sealed. No evidence of expansion joint installed. Photos taken as per SI Base/DBC
|
2017-01-21
|
No data
|
EMERSON COURT, FROM STREET BEND TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk installed
|
2016-12-07
|
No data
|
VEDDER AVENUE, FROM STREET BEND TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repair.
|
2016-10-30
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2016-08-23
|
No data
|
SYDNEY PLACE, FROM STREET FOXHOLM STREET TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done. B/O in progress.
|
2016-06-05
|
No data
|
ALPINE COURT, FROM STREET BROOKSIDE AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints have not been installed along the drop curb
|
2016-06-04
|
No data
|
ALPINE COURT, FROM STREET BROOKSIDE AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints still not installed along drop curb / NOV issued / permittee placed on hold
|
2016-06-02
|
No data
|
EMERSON COURT, FROM STREET BEND TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
both conditions remain
|
2016-06-01
|
No data
|
PROSPECT AVENUE, FROM STREET CLYDE PLACE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w to grade
|
2016-05-22
|
No data
|
KINGSLEY AVENUE, FROM STREET JEWETT AVENUE TO STREET NEW YORK PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2016-05-15
|
No data
|
VEDDER AVENUE, FROM STREET BEND TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2016-05-01
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB
|
2016-04-28
|
No data
|
ALPINE COURT, FROM STREET BROOKSIDE AVENUE TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Kindly place expansion joint in driveway curb at apron; Restore hot asphalt along driveway curb.Unable to load photo(s).
|
2016-04-23
|
No data
|
EMERSON COURT, FROM STREET BEND TO STREET SPRING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
install expansion joints along the curb and remove excess concrete from roadway and restore with asphalt
|
2016-03-20
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-12-20
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-11-08
|
No data
|
VEDDER AVENUE, FROM STREET BEND TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-10-16
|
No data
|
MARGARETTA COURT, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w repair
|
2015-09-10
|
No data
|
PROSPECT AVENUE, FROM STREET CLYDE PLACE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w to grade
|
2015-08-30
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-08-22
|
No data
|
TWOMBLY AVENUE, FROM STREET HOPKINS AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2015-06-29
|
No data
|
KINGSLEY AVENUE, FROM STREET JEWETT AVENUE TO STREET NEW YORK PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit no existing conditions at time of inspection
|
2015-05-07
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-05-05
|
No data
|
BIONIA AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-05-03
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-03-29
|
No data
|
MARGARETTA COURT, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2015-03-28
|
No data
|
VEDDER AVENUE, FROM STREET BEND TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-09-22
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repair
|
2014-09-17
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed, joints sealed.
|
2014-09-05
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-08-24
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2014-08-23
|
No data
|
TWOMBLY AVENUE, FROM STREET HOPKINS AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2014-08-15
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-08-09
|
No data
|
BIONIA AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2014-07-08
|
No data
|
VEDDER AVENUE, FROM STREET BEND TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaired curb
|
2014-06-11
|
No data
|
MARGARETTA COURT, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-03-09
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-03-02
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in.
|
2014-01-20
|
No data
|
TWOMBLY AVENUE, FROM STREET HOPKINS AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB REPLACED EXPANSION JOINTS SEALED.
|
2014-01-19
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok sw sealed
|
2014-01-15
|
No data
|
BIONIA AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2013-11-16
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
driveway apron and other flags replaced
|
2013-08-23
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-08-07
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk replaced
|
2013-08-06
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2013-06-02
|
No data
|
BIONIA AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2013-05-11
|
No data
|
BRYSON AVENUE, FROM STREET AUBURN AVENUE TO STREET CASWELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk Active Permit
|
2013-04-28
|
No data
|
TWOMBLY AVENUE, FROM STREET HOPKINS AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-04-26
|
No data
|
CLIFTON AVENUE, FROM STREET FOX HILL TERRACE TO STREET VAUGHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced
|
2013-04-09
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started
|
2012-10-28
|
No data
|
ARDSLEY STREET, FROM STREET MC KINLEY AVENUE TO STREET MOORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2012-10-15
|
No data
|
CLIFTON AVENUE, FROM STREET FOX HILL TERRACE TO STREET VAUGHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2012-10-04
|
No data
|
HAMDEN AVENUE, FROM STREET HUSSON STREET TO STREET SOUTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/W along curb to grade with crushed stones. Check for sealed exp. joints in curb on post audit.
|
2012-07-05
|
No data
|
BIONIA AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition resolved with builders pave
|
2012-05-12
|
No data
|
BIONIA AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-03-03
|
No data
|
MC KINLEY AVENUE, FROM STREET CENTER STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-09-22
|
No data
|
MC KINLEY AVENUE, FROM STREET CENTER STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-09-22
|
No data
|
CENTER STREET, FROM STREET MC KINLEY AVENUE TO STREET MOORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|