GUNTHER AVENUE, FROM STREET BARTOW AVENUE TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done on block segment given
|
2024-07-20
|
No data
|
ROCKAWAY BOULEVARD, FROM STREET 112 STREET TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to latest permit number Q042023265A34 on file.
|
2024-02-21
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit on file. Completed tangent ramps in the NW2 corner found not to be ADA compliant. Previously Measured & collected in Prism on 3/30/23. Excessive right flare Ave M. The flares slopes not in previous H-1011
|
2023-12-23
|
No data
|
EAST GUN HILL ROAD, FROM STREET ALLERTON AVENUE TO STREET NEW ENGLAND THRWY NB EXIT 10
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance
|
2023-10-11
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W repaired, joints sealed.
|
2023-08-10
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No skid steer on site at this time
|
2023-07-29
|
No data
|
2 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags installed on side entrance of Lowe’s opposite 97 10th street.
|
2023-07-29
|
No data
|
12 STREET, FROM STREET 2 AVENUE TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work performed at this location. (New sidewalk flags where installed on side entrance of Lowe’s opposite 97 10th street.)
|
2023-03-30
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Exp permit on file. Completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism on 3/30/23. Excessive right flare Ave M
|
2023-03-29
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Previously measured & collected in Prism on 7/28/21. Newer permit B042021214A23 on file
|
2022-12-31
|
No data
|
FOREST AVENUE, FROM STREET MAPLE PARKWAY TO STREET VAN PELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w restored
|
2022-11-19
|
No data
|
10 STREET, FROM STREET 2 AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not started
|
2022-11-06
|
No data
|
FOREST AVENUE, FROM STREET MAPLE PARKWAY TO STREET VAN PELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed restored, - k
|
2022-10-30
|
No data
|
EAST 13 STREET, FROM STREET AVENUE R TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags in compliance.
|
2022-10-06
|
No data
|
EAST 13 STREET, FROM STREET AVENUE R TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No equipment - skid steer at location now
|
2022-09-10
|
No data
|
10 AVENUE, FROM STREET 152 STREET TO STREET 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored in complience
|
2022-09-04
|
No data
|
EAST 13 STREET, FROM STREET AVENUE R TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done on s/w
|
2022-08-07
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2022-08-07
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance with updated permit. X042022152A00
|
2022-08-03
|
No data
|
EAST 13 STREET, FROM STREET AVENUE R TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No recent sidewalk done at this location
|
2022-06-23
|
No data
|
FOREST AVENUE, FROM STREET MAPLE PARKWAY TO STREET VAN PELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-06-21
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SW1 corner found to be non ADA compliant. Measured and collected on Prism on 9/14/21.
|
2022-05-03
|
No data
|
FOREST AVENUE, FROM STREET MAPLE PARKWAY TO STREET VAN PELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit on file S042022122A00
|
2022-04-26
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repair sidewalk with active permit. # X042022094A00
|
2022-04-26
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repair sidewalk with active permit on file. #X042022094A00
|
2022-04-08
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quad are accessible and functional but not Ada compliant. Previously measured and collected in Prism on 7/28/21.
|
2022-03-23
|
No data
|
62 DRIVE, FROM STREET JUNCTION BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No pedestrian ramp work observed within the NE3 corner at this time of inspection. Permit expired.
|
2022-01-17
|
No data
|
GETZ AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET GURLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2022-01-16
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cub is ok
|
2022-01-10
|
No data
|
GETZ AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET GURLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags are ok
|
2021-12-15
|
No data
|
EAST 66 STREET, FROM STREET AVENUE M TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags in compliance
|
2021-11-23
|
No data
|
JUNCTION BOULEVARD, FROM STREET 62 DRIVE TO STREET HORACE HARDING EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIRED PERM SIDEWALK
|
2021-11-23
|
No data
|
62 DRIVE, FROM STREET 97 STREET TO STREET JUNCTION BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK IN COMPLIANCE
|
2021-10-21
|
No data
|
WEST 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED: spoke to contractor to remind him to maintain stips.
|
2021-10-21
|
No data
|
WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED: spoke to contractor to remind him to maintain stips.
|
2021-10-21
|
No data
|
6 AVENUE, FROM STREET WEST 20 STREET TO STREET WEST 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED: spoke to contractor, ensured that 8' was being maintained on the sidewalk for pedestrians. Also reminded contractor not to start work until 0900.
|
2021-09-22
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags.
|
2021-09-22
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
All issues has been resolved. Newly completed tangent ramps in the NW2 corner quad are accessible and functional but not Ada compliant. Previously measured and collected in Prism on 7/28/21. Newer permit B042021214A23 on file
|
2021-09-14
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed offset ramp, non ADA compliant. Ramp is functional and accessible. Measured and collected today on 9/14/2021. No further action is required.
|
2021-08-28
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-08-28
|
No data
|
GETZ AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET GURLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk acceptable.
|
2021-08-27
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 7/28/21.
|
2021-08-22
|
No data
|
WOODHAVEN BOULEVARD, FROM STREET 73 AVENUE TO STREET 74 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several flags repaired,expansion joints sealed.
|
2021-08-13
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
All issues has been resolved. Newly completed tangent ramps in the NW2 corner quad are accessible and functional but not Ada compliant. Previously measured and collected in Prism on 7/28/21.
|
2021-08-09
|
No data
|
10 AVENUE, FROM STREET 152 STREET TO STREET 154 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container not visible
|
2021-08-04
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2021-07-28
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quad are accessible and functional but not Ada compliant. Measured and collected in Prism on 7/28/21.
|
2021-07-22
|
No data
|
10 AVENUE, FROM STREET 152 STREET TO STREET 154 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Skid Steer not visible
|
2021-07-16
|
No data
|
62 DRIVE, FROM STREET JUNCTION BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expired permit on file. No ped ramp work started at this time. Old existing ramps within the NE3 corner quadrant are functional and accessible. We’ll measure and reinspect when ramps are completed.
|
2021-07-13
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done. Permit expired
|
2021-07-12
|
No data
|
JUNCTION BOULEVARD, FROM STREET 62 DRIVE TO STREET HORACE HARDING EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No bobcat on site at this time of inspection.
|
2021-07-12
|
No data
|
62 DRIVE, FROM STREET 97 STREET TO STREET JUNCTION BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No bobcat on site at this time of inspection.
|
2021-07-06
|
No data
|
62 DRIVE, FROM STREET JUNCTION BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No ped ramp work started at this time. Old existing ramps are functional and accessible. We’ll measure and reinspect when ramps are completed.
|
2021-06-29
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk by home depot
|
2021-06-28
|
No data
|
AVENUE M, FROM STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedramp work started. 2265 is the party city building. Location is back of building. Active permit on file
|
2021-06-17
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
checking .. container on site a this time of inspection , in compliance
|
2021-06-13
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk work is done between to home depot gardening and bus stop.
|
2021-06-13
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk work is in compliance
|
2021-05-11
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Flags in difference area on the sidewalk on brush avenue.
|
2021-05-11
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Flags in certain area on brush avenue. Active permit on file.
|
2021-04-09
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bobcat
|
2021-04-09
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bobcat on site
|
2021-03-26
|
No data
|
NORTHERN BOULEVARD, FROM STREET 50 STREET TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
several new flags sidewalk repaired
|
2021-03-10
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W
|
2021-02-09
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no bob cat on location at this time.
|
2021-02-09
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no bob cat on location at this time.
|
2021-02-03
|
No data
|
BRUSH AVENUE, FROM STREET CBE NB EXIT 6 A TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no bob cat on location at this time.
|
2021-02-03
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CBE NB EXIT 6 A TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no bob cat on location at this time.
|
2021-01-07
|
No data
|
COURT SQUARE, FROM STREET DEAD END TO STREET THOMSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored expansion joints sealed
|
2020-12-16
|
No data
|
THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET COURT SQUARE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly repair sidewalk flags and expansion joints sealed.
|
2020-11-18
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed
|
2020-11-14
|
No data
|
GETZ AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET GURLEY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints are sealed
|
2020-10-16
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed apex ramp. Ramp is functional and accessible with major ponding. Collected not yet measured, will measure at a later date due to heavy rain. Collected only, no action taken at this time.
|
2020-10-01
|
No data
|
137 AVENUE, FROM STREET BELKNAP STREET TO STREET EASTGATE PLAZA
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found
|
2020-09-13
|
No data
|
MILL ROAD, FROM STREET NEW DORP LANE TO STREET WINDMILL COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-09-13
|
No data
|
NEW DORP LANE, FROM STREET HYLAN BOULEVARD TO STREET MILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-09-03
|
No data
|
GETZ AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET GURLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed.
|
2020-09-03
|
No data
|
GURLEY AVENUE, FROM STREET ELTINGVILLE BOULEVARD TO STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2020-09-03
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed.
|
2020-08-26
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit on file S042020021A08
|
2020-08-19
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2020-08-15
|
No data
|
EAST 66 STREET, FROM STREET AVENUE M TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed by Ralph on PC Richardson side
|
2020-08-09
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2020-07-24
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK OBSERVED. SW1 corner old existing apex ramp, non ADA compliant. Ramp is functional & accessible. Work not started, active permit. No action taken.
|
2020-05-27
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw acceptable
|
2020-04-15
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2020-03-11
|
No data
|
HORACE HARDING EXPRESSWAY, FROM STREET LIE WESTBOUND ENTRANCE 254 ST TO STREET NASSAU BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several flags repaired,expansion joints sealed.
|
2020-03-10
|
No data
|
FRANCIS LEWIS BOULEVARD, FROM STREET 34 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w - expansion joints sealed.
|
2020-02-26
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk.
|
2020-02-23
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-02-08
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2019-12-24
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS IN BACK OF (CHASE BANK) OK ON YUKON AVENUE
|
2019-11-17
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS IN BACK OF (CHASE BANK) OK ON YUKON AVENUE
|
2019-11-16
|
No data
|
RICHMOND AVENUE, FROM STREET DRUMGOOLE ROAD EAST TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced in kind/sealed along stores
|
2019-11-13
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2019-10-31
|
No data
|
MILL ROAD, FROM STREET NEW DORP LANE TO STREET WINDMILL COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-10-29
|
No data
|
NEW DORP LANE, FROM STREET HYLAN BOULEVARD TO STREET MILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-10-21
|
No data
|
GURLEY AVENUE, FROM STREET ELTINGVILLE BOULEVARD TO STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
hold re-inspection s/w sealed
|
2019-10-19
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/W SEALED
|
2019-10-16
|
No data
|
WEST 127 STREET, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
patchwork on s/w.
|
2019-10-04
|
No data
|
GURLEY AVENUE, FROM STREET ELTINGVILLE BOULEVARD TO STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please remove plastic caps and seal expansion joints.
|
2019-09-10
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee has sealed expansion joints on the sidewalk
|
2019-08-22
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO C.A.R. #20196510316 ISSUED ON 7/18/2019. RESPONDENT HAS FAILED TO SEAL EXPANSION JOINTS ON SIDEWALK.
|
2019-08-21
|
No data
|
NORTHERN BOULEVARD, FROM STREET 50 STREET TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR SIDEWALK-CREW ON SITE . CONCRETE POUR. STIPS IN COMPLIANCE. 5 FT CLEARANCE.
|
2019-07-18
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE REMOVE PLASTIC AND SEAL EXPANSION JOINTS ON THE SIDEWALK.(LOCATION YUKON AVE BEHIND OLD NAVY, CHASE BANK, ETC. (SHOPPING PLAZA)
|
2019-07-13
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2019-07-09
|
No data
|
GURLEY AVENUE, FROM STREET ELTINGVILLE BOULEVARD TO STREET GETZ AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No visible bobcat on location at this time.
|
2019-06-12
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags acceptable.
|
2019-05-23
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2019-05-16
|
No data
|
FRANCIS LEWIS BOULEVARD, FROM STREET 34 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored. Expansion joints sealed
|
2019-04-30
|
No data
|
RICHMOND AVENUE, FROM STREET DRUMGOOLE ROAD EAST TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-04-17
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS IN BACK OF (CHASE BANK) OK ON YUKON AVENUE
|
2019-03-23
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No visible compressor on location at this time.
|
2019-02-07
|
No data
|
EAST 14 STREET, FROM STREET AVENUE P TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags installed, all expansion joints sealed. In front of corner property 1401 Kings Highway.
|
2019-01-17
|
No data
|
WEST 127 STREET, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2018-12-29
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 127 STREET TO STREET WEST 128 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON RESEARCH I FOUND THAT ON GOOGLE MAPS PICTS SHOW SIDEWALK FLAGS THAT WERE SHAVED DOWN- IFO 340 AKA 311 WEST 127TH MORE THAT 10 SIDEWALK FLAGS REPAIRED 100 FT NORTH OF WEST 127TH
|
2018-12-26
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 127 STREET TO STREET WEST 128 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk clear
|
2018-12-07
|
No data
|
HORACE HARDING EXPRESSWAY, FROM STREET LIE WESTBOUND ENTRANCE 254 ST TO STREET NASSAU BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w replaced
|
2018-12-05
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed behind chase bank
|
2018-12-04
|
No data
|
WEST 127 STREET, FROM STREET 8 AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW has been repaired , flushed and sealed IFO 311.
|
2018-09-29
|
No data
|
168 STREET, FROM STREET 93 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- REPAIR SIDEWALK
|
2018-09-05
|
No data
|
YUKON AVENUE, FROM STREET FOREST HILL ROAD TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MAYNE CREW ON SITE, INSTALLING NEW S/WALK. ALL STIPS IN COMPLIANCE AT THIS TIME. SPOKE WITH FOREMAN, ALEX ON SITE. 2873
|
2018-06-15
|
No data
|
ARTHUR KILL ROAD, FROM STREET GETZ AVENUE TO STREET RICHMOND AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent replaced the Sidewalk and Driveway apron entering shopping center without a permit for segment. S042018164A12 used for ID while working on Richmond Av side of shopping center 3247 Richmond Av.
|
2018-06-15
|
No data
|
RICHMOND AVENUE, FROM STREET DRUMGOOLE ROAD EAST TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew onsite sawcutting Sidewalk IFO pool store
|
2018-06-14
|
No data
|
RICHMOND AVENUE, FROM STREET DRUMGOOLE ROAD EAST TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work was found, address is the shopping center. Checked the surrounding area. Traffic was bumper to bumper- have to go back to investigate Arthur Kill Rd concrete job
|
2018-04-14
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No recent work found at PC Richard &Sons
|
2018-03-07
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO BOBCAT ON STREET
|
2018-02-17
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found at PC Richard and son property
|
2018-01-11
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE
|
2017-12-30
|
No data
|
RALPH AVENUE, FROM STREET AVENUE M TO STREET EAST 66 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
None seen in use but possibly stored in parking lot
|
2017-06-28
|
No data
|
76 STREET, FROM STREET 16 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is up to grade
|
2016-12-18
|
No data
|
76 STREET, FROM STREET 16 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed in compliance.
|