Name: | ROCK E SMALL PLUMBING & HEATING INC |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 04 Apr 2005 (20 years ago) |
Entity Number: | 3186389 |
County: | Bronx |
Place of Formation: | New York |
Principal Address: | 152-32B ROCKAWAY BLVD, JAMAICA, NY, United States, 11434 |
Principal Address ZIP Code: | 11434 |
Address: | 152-32B ROCKAWAY BLVD., JAMAICA, NY, United States, 11434 |
Address ZIP Code: | 11434 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
ERROL SMALL | Chief Executive Officer | 152-32B ROCKAWAY BLVD, JAMAICA, NY, United States, 11434 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 152-32B ROCKAWAY BLVD., JAMAICA, NY, United States, 11434 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
X012024313B44 | 2024-11-08 | 2024-12-10 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE |
B012024313B42 | 2024-11-08 | 2024-12-08 | REPAIR WATER - SEWER | MADISON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012024311B46 | 2024-11-06 | 2024-11-20 | C.A.R. RESTORATION | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q012024311D39 | 2024-11-06 | 2024-11-20 | REPAIR WATER | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q012024311D38 | 2024-11-06 | 2024-12-05 | REPAIR WATER - SEWER - PROTECTED | BEACH 4 STREET, QUEENS, FROM STREET DEAD END TO STREET SEAGIRT AVENUE |
Q012024311D37 | 2024-11-06 | 2024-12-05 | C.A.R. RESTORATION | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
X012024309A59 | 2024-11-04 | 2024-11-18 | REPAIR WATER - SEWER - PROTECTED | EAST 177 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE |
Q002024309A01 | 2024-11-04 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012024309A90 | 2024-11-04 | 2024-12-03 | C.A.R. RESTORATION | CLIFTON PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012024309A91 | 2024-11-04 | 2024-11-26 | REPAIR WATER - SEWER - PROTECTED | STERLING PLACE, BROOKLYN, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE |
Q012024309B77 | 2024-11-04 | 2024-11-30 | REPAIR WATER | HIGHLAND AVENUE, QUEENS, FROM STREET BEND TO STREET PARSONS BOULEVARD |
Q012024309B36 | 2024-11-04 | 2024-11-19 | C.A.R. RESTORATION - PROTECTED | 166 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012024309A42 | 2024-11-04 | 2024-12-01 | REPAIR SEWER - PROTECTED | JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE |
Q012024309A40 | 2024-11-04 | 2024-12-02 | REPAIR WATER - SEWER | 36 AVENUE, QUEENS, FROM STREET 200 STREET TO STREET 201 STREET |
B012024309A44 | 2024-11-04 | 2024-12-01 | REPAIR WATER - SEWER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET ASHFORD STREET TO STREET WARWICK STREET |
B012024306B30 | 2024-11-01 | 2024-12-01 | REPAIR WATER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012024306A15 | 2024-11-01 | 2024-11-03 | REPAIR WATER - PROTECTED | SEIGEL STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012024304B47 | 2024-10-30 | 2024-11-29 | REPAIR WATER | 57 ROAD, QUEENS, FROM STREET 84 STREET TO STREET 85 STREET |
Q002024304A07 | 2024-10-30 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012024304A39 | 2024-10-30 | 2024-11-13 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024304A66 | 2024-10-30 | 2024-11-28 | REPAIR WATER - SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024299A78 | 2024-10-25 | 2024-11-21 | REPAIR WATER | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
X012024299B04 | 2024-10-25 | 2024-11-06 | REPAIR WATER - PROTECTED | EAST 137 STREET, BRONX, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE |
Q012024299A96 | 2024-10-25 | 2024-11-23 | REPAIR WATER - SEWER - PROTECTED | 32 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q012024299A34 | 2024-10-25 | 2024-11-23 | REPAIR WATER - SEWER | MURRAY STREET, QUEENS, FROM STREET 25 AVENUE TO STREET 25 DRIVE |
B012024299B50 | 2024-10-25 | 2024-11-21 | REPAIR WATER - SEWER | DUMONT AVENUE, BROOKLYN, FROM STREET JEROME STREET TO STREET WARWICK STREET |
Q012024298B78 | 2024-10-24 | 2024-11-22 | REPAIR WATER - SEWER - PROTECTED | TUDOR ROAD, QUEENS, FROM STREET EDGERTON ROAD TO STREET TRYON PLACE |
X012024297A19 | 2024-10-23 | 2024-11-21 | REPAIR WATER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
B012024296C70 | 2024-10-22 | 2024-11-06 | C.A.R. RESTORATION | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q012024296D09 | 2024-10-22 | 2024-11-16 | C.A.R. RESTORATION | 112 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 221 STREET |
Q012024296D04 | 2024-10-22 | 2024-11-01 | REPAIR SEWER - PROTECTED | JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE |
Q012024296C36 | 2024-10-22 | 2024-11-02 | REPAIR WATER - SEWER | 36 AVENUE, QUEENS, FROM STREET 200 STREET TO STREET 201 STREET |
Q012024296C32 | 2024-10-22 | 2024-10-31 | REPAIR WATER - SEWER - PROTECTED | 224 STREET, QUEENS, FROM STREET 147 AVENUE TO STREET DEAD END |
Q012024291A80 | 2024-10-22 | 2024-11-15 | REPAIR WATER | 85 STREET, QUEENS, FROM STREET 95 AVENUE TO STREET 97 AVENUE |
X012024296A96 | 2024-10-22 | 2024-11-05 | C.A.R. RESTORATION | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
B012024296C61 | 2024-10-22 | 2024-11-01 | REPAIR WATER - SEWER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET ASHFORD STREET TO STREET WARWICK STREET |
Q012024296D10 | 2024-10-22 | 2024-11-05 | C.A.R. RESTORATION - PROTECTED | 166 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012024295D20 | 2024-10-21 | 2024-11-01 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
X012024295B06 | 2024-10-21 | 2024-10-31 | REPAIR WATER - SEWER - PROTECTED | EAST 177 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE |
B012024292E76 | 2024-10-18 | 2024-11-07 | REPAIR WATER | HOPKINS STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012024292E77 | 2024-10-18 | 2024-11-10 | REPAIR WATER - PROTECTED | PARK PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
Q012024292D26 | 2024-10-18 | 2024-11-16 | REPAIR WATER | 167 STREET, QUEENS, FROM STREET 145 DRIVE TO STREET 145 ROAD |
B042024292A29 | 2024-10-18 | 2024-11-16 | REPAIR SIDEWALK | DE KALB AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q002024291A00 | 2024-10-17 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012024291A79 | 2024-10-17 | 2024-10-19 | REPAIR WATER | 145 DRIVE, QUEENS, FROM STREET 167 STREET TO STREET DEAD END |
Q012024291A21 | 2024-10-17 | 2024-11-14 | REPAIR WATER | 145 DRIVE, QUEENS, FROM STREET 167 STREET TO STREET DEAD END |
Q012024289B93 | 2024-10-15 | 2024-10-25 | REPAIR WATER - SEWER | 53 AVENUE, QUEENS, FROM STREET 230 STREET TO STREET HORATIO PARKWAY |
Q012024282A25 | 2024-10-10 | 2024-11-06 | REPAIR WATER | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q012024282A38 | 2024-10-08 | 2024-11-06 | REPAIR SEWER - PROTECTED | 32 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
B012024282C55 | 2024-10-08 | 2024-11-07 | REPAIR WATER | HOPKINS STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012024282C54 | 2024-10-08 | 2024-11-07 | REPAIR WATER - PROTECTED | PARK AVENUE, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET TOMPKINS AVENUE |
Q012024278B61 | 2024-10-04 | 2024-11-02 | REPAIR WATER - PROTECTED | 38 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD |
Q042024277A42 | 2024-10-03 | 2024-10-31 | REPAIR SIDEWALK | 163 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
B012024277A40 | 2024-10-03 | 2024-10-30 | C.A.R. RESTORATION - PROTECTED | STANLEY AVENUE, BROOKLYN, FROM STREET AMBER STREET TO STREET EMERALD STREET |
B012024277A82 | 2024-10-03 | 2024-10-18 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012024277B21 | 2024-10-03 | 2024-10-30 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012024276B90 | 2024-10-02 | 2024-10-31 | REPAIR WATER | CLIFTON PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
Q002024275A02 | 2024-10-01 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012024275E17 | 2024-10-01 | 2024-10-24 | REPAIR WATER - SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024275F64 | 2024-10-01 | 2024-10-30 | REPAIR WATER - SEWER | 57 ROAD, QUEENS, FROM STREET 84 STREET TO STREET 85 STREET |
B012024275B88 | 2024-10-01 | 2024-10-24 | REPAIR WATER - SEWER | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024271A49 | 2024-09-27 | 2024-10-11 | REPAIR WATER - SEWER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
X012024270A15 | 2024-09-26 | 2024-10-19 | REPAIR WATER - SEWER - PROTECTED | EAST 177 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE |
Q012024267A24 | 2024-09-24 | 2024-10-22 | REPAIR WATER | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
X012024268A65 | 2024-09-24 | 2024-10-19 | REPAIR WATER - SEWER - PROTECTED | EAST 177 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE |
X012024268A64 | 2024-09-24 | 2024-10-23 | REPAIR WATER - PROTECTED | EAST 137 STREET, BRONX, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE |
Q012024267A90 | 2024-09-23 | 2024-10-17 | REPAIR WATER - SEWER - PROTECTED | 224 STREET, QUEENS, FROM STREET 147 AVENUE TO STREET DEAD END |
B012024267A72 | 2024-09-23 | 2024-10-22 | REPAIR WATER | ST JOHNS PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B012024264B61 | 2024-09-20 | 2024-10-22 | REPAIR WATER - SEWER | NORTH 4 STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
Q012024264B60 | 2024-09-20 | 2024-10-19 | REPAIR WATER - SEWER | 36 AVENUE, QUEENS, FROM STREET 200 STREET TO STREET 201 STREET |
Q012024264B75 | 2024-09-20 | 2024-10-19 | REPAIR WATER - SEWER | 221 STREET, QUEENS, FROM STREET 142 ROAD TO STREET EDGEWOOD AVENUE |
B012024263C27 | 2024-09-19 | 2024-10-18 | REPAIR WATER - SEWER | DUMONT AVENUE, BROOKLYN, FROM STREET JEROME STREET TO STREET WARWICK STREET |
B012024263C24 | 2024-09-19 | 2024-10-16 | REPAIR WATER - PROTECTED | PARK PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012024263C25 | 2024-09-19 | 2024-09-23 | REPAIR SEWER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET ASHFORD STREET TO STREET WARWICK STREET |
Q012024263A60 | 2024-09-19 | 2024-10-18 | REPAIR WATER - SEWER - PROTECTED | JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE |
B012024263C28 | 2024-09-19 | 2024-10-17 | REPAIR WATER | MADISON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012024263C26 | 2024-09-19 | 2024-10-18 | REPAIR WATER - SEWER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET ASHFORD STREET TO STREET WARWICK STREET |
Q012024263B73 | 2024-09-19 | 2024-10-18 | REPAIR WATER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012024262B57 | 2024-09-18 | 2024-10-02 | C.A.R. RESTORATION - PROTECTED | STANLEY AVENUE, BROOKLYN, FROM STREET AMBER STREET TO STREET EMERALD STREET |
Q012024262D22 | 2024-09-18 | 2024-10-18 | REPAIR SEWER - PROTECTED | JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE |
B012024262B48 | 2024-09-18 | 2024-10-18 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
Q012024243A89 | 2024-08-30 | 2024-09-13 | REPAIR WATER - SEWER | 124 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE |
B012024242B28 | 2024-08-29 | 2024-09-28 | REPAIR WATER - SEWER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012024242B71 | 2024-08-29 | 2024-09-21 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
Q012024241D55 | 2024-08-28 | 2024-09-27 | REPAIR WATER | 146 STREET, QUEENS, FROM STREET 119 AVENUE TO STREET 120 AVENUE |
B012024239A17 | 2024-08-27 | 2024-09-24 | REPAIR WATER | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012024239A18 | 2024-08-26 | 2024-08-28 | REPAIR WATER | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
Q012024239B90 | 2024-08-26 | 2024-09-07 | REPAIR WATER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 113 DRIVE TO STREET 114 AVENUE |
Q012024236B26 | 2024-08-23 | 2024-09-25 | REPAIR WATER - SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X002024236A00 | 2024-08-23 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q042024236A35 | 2024-08-23 | 2024-09-24 | REPAIR SIDEWALK | 111 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE |
Q012024236A70 | 2024-08-23 | 2024-09-22 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
B012024236A79 | 2024-08-23 | 2024-09-06 | REPAIR SEWER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET ASHFORD STREET TO STREET WARWICK STREET |
B012024235B67 | 2024-08-22 | 2024-09-20 | REPAIR WATER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X012024235A71 | 2024-08-22 | 2024-09-06 | REPAIR WATER - SEWER - PROTECTED | UNDERCLIFF AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X012024235A70 | 2024-08-22 | 2024-09-05 | REPAIR WATER - SEWER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
Q012024235C45 | 2024-08-22 | 2024-09-03 | REPAIR WATER - SEWER | HOLLY AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
Q012024234A37 | 2024-08-21 | 2024-09-04 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X012024234B07 | 2024-08-21 | 2024-09-19 | REPAIR WATER | WHEELER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE |
Q012024233B33 | 2024-08-20 | 2024-09-19 | REPAIR WATER - SEWER | 57 ROAD, QUEENS, FROM STREET 84 STREET TO STREET 85 STREET |
B012024233A44 | 2024-08-20 | 2024-09-18 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024228A42 | 2024-08-15 | 2024-08-29 | C.A.R. RESTORATION - PROTECTED | STANLEY AVENUE, BROOKLYN, FROM STREET AMBER STREET TO STREET EMERALD STREET |
B012024228A36 | 2024-08-15 | 2024-08-26 | REPAIR WATER - SEWER | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q012024228A21 | 2024-08-15 | 2024-08-29 | REPAIR WATER - SEWER | 124 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE |
Q042024227A28 | 2024-08-14 | 2024-09-12 | REPAIR SIDEWALK | 163 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
Q012024222A58 | 2024-08-09 | 2024-08-23 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
Q012024222A71 | 2024-08-09 | 2024-09-10 | REPAIR SEWER - PROTECTED | JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE |
Q012024221A93 | 2024-08-08 | 2024-08-22 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
X012024220A44 | 2024-08-07 | 2024-08-22 | REPAIR WATER - SEWER - PROTECTED | UNDERCLIFF AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
Q012024220B92 | 2024-08-07 | 2024-09-06 | REPAIR SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X012024220B06 | 2024-08-07 | 2024-09-05 | REPAIR WATER | FTELEY AVENUE, BRONX, FROM STREET BANYER PLACE TO STREET CLASON POINT LANE NORTH |
Q012024219B45 | 2024-08-06 | 2024-08-20 | REPAIR WATER - SEWER | HOLLY AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012024215B83 | 2024-08-02 | 2024-08-28 | REPAIR WATER | DE KALB AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012024214A31 | 2024-08-01 | 2024-08-09 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
B012024212A73 | 2024-07-30 | 2024-08-23 | REPAIR SEWER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET ASHFORD STREET TO STREET WARWICK STREET |
X012024212A21 | 2024-07-30 | 2024-08-22 | REPAIR WATER - SEWER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
Q012024212B06 | 2024-07-30 | 2024-08-28 | REPAIR WATER | 205 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET 90 AVENUE |
Q042024212A16 | 2024-07-30 | 2024-08-25 | REPAIR SIDEWALK | 111 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE |
Q012024208B71 | 2024-07-26 | 2024-08-24 | REPAIR WATER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 113 DRIVE TO STREET 114 AVENUE |
Q012024207C77 | 2024-07-25 | 2024-08-21 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012024206A22 | 2024-07-25 | 2024-08-22 | REPAIR WATER | VARICK STREET, BROOKLYN, FROM STREET MEEKER AVENUE TO STREET NASSAU AVENUE |
B012024205A45 | 2024-07-23 | 2024-08-13 | REPAIR WATER - SEWER | SEIGEL STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012024205C03 | 2024-07-23 | 2024-08-07 | REPAIR SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012024200D25 | 2024-07-18 | 2024-08-15 | C.A.R. RESTORATION - PROTECTED | STANLEY AVENUE, BROOKLYN, FROM STREET AMBER STREET TO STREET EMERALD STREET |
Q012024199A94 | 2024-07-17 | 2024-08-15 | REPAIR WATER - SEWER | 124 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE |
B012024198A60 | 2024-07-16 | 2024-07-30 | REPAIR WATER | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012024198A57 | 2024-07-16 | 2024-08-14 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 25 STREET TO STREET 26 STREET |
X012024193A40 | 2024-07-11 | 2024-08-08 | REPAIR WATER - SEWER - PROTECTED | UNDERCLIFF AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
Q012024192B33 | 2024-07-10 | 2024-08-08 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
Q012024188A00 | 2024-07-09 | 2024-08-04 | REPAIR WATER - PROTECTED | 203 STREET, QUEENS, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD |
X012024191A70 | 2024-07-09 | 2024-07-23 | REPAIR WATER - SEWER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
Q012024190B89 | 2024-07-08 | 2024-08-06 | REPAIR WATER - SEWER | HOLLY AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012024184F28 | 2024-07-02 | 2024-08-01 | REPAIR WATER - SEWER | AUTUMN AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
B012024184F27 | 2024-07-02 | 2024-07-30 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
Q012024184F11 | 2024-07-02 | 2024-08-01 | REPAIR WATER | 37 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012024183D26 | 2024-07-01 | 2024-07-30 | REPAIR WATER - PROTECTED | DITMARS BOULEVARD, QUEENS, FROM STREET 35 STREET TO STREET 36 STREET |
Q042024183A45 | 2024-07-01 | 2024-07-26 | REPAIR SIDEWALK | 111 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE |
B012024180B23 | 2024-06-28 | 2024-07-16 | REPAIR WATER | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
Q012024180B75 | 2024-06-28 | 2024-07-06 | REPAIR WATER - SEWER | 19 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024180B04 | 2024-06-28 | 2024-07-25 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
Q002024179A01 | 2024-06-27 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q002024179A00 | 2024-06-27 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012024178A18 | 2024-06-26 | 2024-07-24 | REPAIR SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X012024178A18 | 2024-06-26 | 2024-07-09 | REPAIR WATER - SEWER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
Q012024173B96 | 2024-06-25 | 2024-07-20 | REPAIR WATER | 136 ROAD, QUEENS, FROM STREET 244 STREET TO STREET HOOK CREEK BOULEVARD |
Q012024176G68 | 2024-06-24 | 2024-07-23 | REPAIR WATER - PROTECTED | 197 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET 116 AVENUE |
Q012024167A08 | 2024-06-24 | 2024-07-14 | REPAIR WATER - PROTECTED | 120 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 STREET |
Q012024173B88 | 2024-06-21 | 2024-07-06 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
Q012024173A52 | 2024-06-21 | 2024-07-10 | REPAIR WATER - SEWER | 53 AVENUE, QUEENS, FROM STREET 228 STREET TO STREET 229 STREET |
B012024173E28 | 2024-06-21 | 2024-07-05 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 25 STREET TO STREET 26 STREET |
B012024166A86 | 2024-06-14 | 2024-06-29 | REPAIR WATER | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012024166A85 | 2024-06-14 | 2024-06-30 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
X012024165A39 | 2024-06-13 | 2024-07-13 | REPAIR WATER | VAN NEST AVENUE, BRONX, FROM STREET FILLMORE STREET TO STREET GARFIELD STREET |
Q012024164A65 | 2024-06-12 | 2024-06-26 | RESTORATION RE-DIG | 38 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
Q012024160A00 | 2024-06-12 | 2024-07-07 | REPAIR WATER | 203 STREET, QUEENS, FROM STREET 100 AVENUE TO STREET 104 AVENUE |
X012024164B07 | 2024-06-12 | 2024-06-27 | REPAIR WATER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
B012024159A32 | 2024-06-10 | 2024-07-06 | REPAIR WATER - PROTECTED | STANLEY AVENUE, BROOKLYN, FROM STREET AMBER STREET TO STREET EMERALD STREET |
Q012024162C56 | 2024-06-10 | 2024-06-25 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
B012024157A48 | 2024-06-10 | 2024-07-04 | REPAIR WATER - PROTECTED | WARWICK STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
X012024162B21 | 2024-06-10 | 2024-06-25 | REPAIR WATER - SEWER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
Q002024159A00 | 2024-06-07 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012024158A40 | 2024-06-06 | 2024-07-05 | REPAIR WATER - SEWER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET REVERE PLACE |
Q012024158C29 | 2024-06-06 | 2024-06-18 | REPAIR WATER - SEWER | 38 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
B012024155B16 | 2024-06-03 | 2024-06-21 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 25 STREET TO STREET 26 STREET |
Q012024155C48 | 2024-06-03 | 2024-06-13 | REPAIR SEWER | ROOSEVELT AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET PEDESTRIAN WAY |
B012024152C98 | 2024-05-31 | 2024-06-16 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
Q012024151A03 | 2024-05-30 | 2024-06-15 | REPAIR WATER - PROTECTED | NASHVILLE BOULEVARD, QUEENS, FROM STREET 120 AVENUE TO STREET 121 AVENUE |
Q012024150B84 | 2024-05-29 | 2024-06-27 | REPAIR WATER | ASH AVENUE, QUEENS, FROM STREET 149 PLACE TO STREET MURRAY STREET |
Q012024145E05 | 2024-05-29 | 2024-06-22 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
B012024149C05 | 2024-05-28 | 2024-06-11 | REPAIR WATER - SEWER | BUSHWICK AVENUE, BROOKLYN, FROM STREET ARION PLACE TO STREET MELROSE STREET |
X012024145A48 | 2024-05-24 | 2024-06-07 | REPAIR WATER - SEWER | QUINCY AVENUE, BRONX, FROM STREET DEWEY AVENUE TO STREET SAMPSON AVENUE |
Q012024145D42 | 2024-05-24 | 2024-06-08 | REPAIR WATER - SEWER - PROTECTED | 32 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q012024145D13 | 2024-05-24 | 2024-06-22 | REPAIR WATER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
Q012024144A77 | 2024-05-23 | 2024-06-22 | REPAIR WATER - SEWER | 19 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024142B12 | 2024-05-21 | 2024-06-20 | REPAIR WATER | UNION HALL STREET, QUEENS, FROM STREET 108 AVENUE TO STREET 109 AVENUE |
Q012024142B20 | 2024-05-21 | 2024-06-19 | REPAIR WATER - SEWER | 14 AVENUE, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET |
Q012024142B19 | 2024-05-21 | 2024-06-08 | REPAIR WATER - SEWER | 42 AVENUE, QUEENS, FROM STREET 189 STREET TO STREET 190 STREET |
Q012024142B21 | 2024-05-21 | 2024-06-04 | REPAIR WATER - SEWER | 38 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
B012024141A32 | 2024-05-20 | 2024-06-15 | REPAIR WATER | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
Q012024138A68 | 2024-05-17 | 2024-05-18 | REPAIR WATER - SEWER | HAWTHORNE AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012024138C62 | 2024-05-17 | 2024-06-01 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 25 STREET TO STREET 26 STREET |
B012024138B71 | 2024-05-17 | 2024-06-02 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
Q012024138B22 | 2024-05-17 | 2024-06-17 | REPAIR WATER - SEWER | HAWTHORNE AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
Q002024138A00 | 2024-05-17 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012024137C65 | 2024-05-16 | 2024-05-30 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
Q042024137A63 | 2024-05-16 | 2024-06-14 | REPAIR SIDEWALK | 111 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE |
Q012024136A82 | 2024-05-15 | 2024-05-30 | REPAIR WATER - PROTECTED | NASHVILLE BOULEVARD, QUEENS, FROM STREET 120 AVENUE TO STREET 121 AVENUE |
X012024136A26 | 2024-05-15 | 2024-06-13 | REPAIR WATER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
Q012024135A10 | 2024-05-14 | 2024-06-11 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
B012024134B24 | 2024-05-13 | 2024-06-11 | REPAIR WATER - SEWER | EAST 55 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET MILL LANE |
X012024134A85 | 2024-05-13 | 2024-06-11 | REPAIR WATER - SEWER | BLONDELL AVENUE, BRONX, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE |
Q012024130B49 | 2024-05-09 | 2024-05-23 | REPAIR WATER - SEWER | 42 AVENUE, QUEENS, FROM STREET 189 STREET TO STREET 190 STREET |
Q012024130B50 | 2024-05-09 | 2024-05-25 | REPAIR WATER - SEWER | MOTT AVENUE, QUEENS, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET |
B002024130A00 | 2024-05-09 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012024130B63 | 2024-05-09 | 2024-06-07 | REPAIR WATER | LESLIE ROAD, QUEENS, FROM STREET 178 STREET TO STREET IRWIN PLACE |
B012024128A40 | 2024-05-07 | 2024-06-05 | REPAIR SEWER | 56 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q012024127A81 | 2024-05-06 | 2024-05-20 | REPAIR WATER - SEWER | 14 AVENUE, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET |
B012024124A26 | 2024-05-03 | 2024-06-01 | REPAIR WATER | EAST 99 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET TRUCKELMANS LANE |
B012024123B01 | 2024-05-02 | 2024-05-30 | REPAIR WATER | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q012024122A11 | 2024-05-02 | 2024-05-30 | REPAIR WATER | 221 STREET, QUEENS, FROM STREET 108 AVENUE TO STREET DEAD END |
Q012024121A23 | 2024-04-30 | 2024-05-14 | REPAIR SEWER | ROOSEVELT AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET PEDESTRIAN WAY |
Q012024117A14 | 2024-04-29 | 2024-05-25 | REPAIR WATER | 37 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET |
B012024110A43 | 2024-04-26 | 2024-05-18 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 25 STREET TO STREET 26 STREET |
B012024117C36 | 2024-04-26 | 2024-05-28 | REPAIR WATER - SEWER | BUSHWICK AVENUE, BROOKLYN, FROM STREET ARION PLACE TO STREET MELROSE STREET |
Q012024117B68 | 2024-04-26 | 2024-05-25 | REPAIR WATER - SEWER - PROTECTED | 32 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
X012024114A59 | 2024-04-23 | 2024-05-24 | REPAIR WATER - SEWER | QUINCY AVENUE, BRONX, FROM STREET DEWEY AVENUE TO STREET SAMPSON AVENUE |
B012024113A28 | 2024-04-22 | 2024-05-19 | REPAIR WATER | BUSHWICK AVENUE, BROOKLYN, FROM STREET ARION PLACE TO STREET MELROSE STREET |
Q012024110A94 | 2024-04-19 | 2024-05-18 | REPAIR WATER | 117 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD |
Q012024110B03 | 2024-04-19 | 2024-05-21 | REPAIR WATER - SEWER | 38 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
Q012024108A45 | 2024-04-18 | 2024-05-16 | REPAIR WATER - PROTECTED | NASHVILLE BOULEVARD, QUEENS, FROM STREET 120 AVENUE TO STREET 121 AVENUE |
B012024108A44 | 2024-04-17 | 2024-05-19 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
B012024108B09 | 2024-04-17 | 2024-05-16 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
Q012024103B08 | 2024-04-12 | 2024-05-11 | REPAIR WATER - SEWER | MOTT AVENUE, QUEENS, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET |
Q012024103B13 | 2024-04-12 | 2024-05-12 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
Q012024102C26 | 2024-04-11 | 2024-05-11 | REPAIR WATER - SEWER | 210 STREET, QUEENS, FROM STREET 104 AVENUE TO STREET 109 AVENUE |
Q012024101A63 | 2024-04-10 | 2024-05-09 | REPAIR WATER - SEWER | 42 AVENUE, QUEENS, FROM STREET 189 STREET TO STREET 190 STREET |
X012024099A35 | 2024-04-08 | 2024-04-20 | REPAIR WATER - SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
Q012024096B06 | 2024-04-05 | 2024-05-06 | REPAIR WATER - SEWER | 14 AVENUE, QUEENS, FROM STREET 159 STREET TO STREET 160 STREET |
Q012024096B07 | 2024-04-05 | 2024-05-04 | REPAIR WATER - SEWER | HAWTHORNE AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
Q012024096B09 | 2024-04-05 | 2024-04-30 | REPAIR SEWER | ROOSEVELT AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET PEDESTRIAN WAY |
Q012024089A85 | 2024-03-29 | 2024-04-09 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
Q012024089A83 | 2024-03-29 | 2024-04-27 | C.A.R. RESTORATION - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
B012024086B86 | 2024-03-26 | 2024-04-19 | REPAIR WATER | BUSHWICK AVENUE, BROOKLYN, FROM STREET ARION PLACE TO STREET MELROSE STREET |
X012024086B24 | 2024-03-26 | 2024-04-24 | REPAIR WATER - SEWER | QUINCY AVENUE, BRONX, FROM STREET DEWEY AVENUE TO STREET SAMPSON AVENUE |
Q012024086D81 | 2024-03-26 | 2024-04-24 | REPAIR SEWER | MOTT AVENUE, QUEENS, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET |
Q012024079A31 | 2024-03-22 | 2024-04-17 | REPAIR SEWER | 121 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET HAWTREE CREEK ROAD |
B012024081A61 | 2024-03-21 | 2024-04-19 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012024080B46 | 2024-03-20 | 2024-04-19 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
Q012024074B94 | 2024-03-14 | 2024-04-12 | REPAIR WATER - SEWER | 143 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD |
B012024073A39 | 2024-03-13 | 2024-04-11 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
X012024073A25 | 2024-03-13 | 2024-04-06 | REPAIR WATER - SEWER - PROTECTED | DEWEY AVENUE, BRONX, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE |
Q012024072B19 | 2024-03-12 | 2024-04-12 | REPAIR WATER - SEWER | 197 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
Q012024072B18 | 2024-03-12 | 2024-04-11 | C.A.R. RESTORATION | ASH AVENUE, QUEENS, FROM STREET 149 PLACE TO STREET MURRAY STREET |
Q012024068B09 | 2024-03-08 | 2024-04-07 | REPAIR WATER - SEWER | 112 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 221 STREET |
Q012024067B49 | 2024-03-07 | 2024-04-04 | REPAIR WATER - PROTECTED | MARSDEN STREET, QUEENS, FROM STREET 118 AVENUE TO STREET SMITH STREET |
Q012024067B47 | 2024-03-07 | 2024-04-04 | REPAIR WATER - SEWER - PROTECTED | 222 STREET, QUEENS, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD |
B012024061A18 | 2024-03-06 | 2024-03-30 | REPAIR WATER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET STUART STREET |
Q012024062A01 | 2024-03-05 | 2024-03-31 | REPAIR WATER - PROTECTED | 50 AVENUE, QUEENS, FROM STREET 91 PLACE TO STREET 91 STREET |
Q012024062A02 | 2024-03-04 | 2024-03-31 | REPAIR WATER | HOOK CREEK BOULEVARD, QUEENS, FROM STREET CANEY LANE TO STREET CANEY LANE |
X012024060A99 | 2024-02-29 | 2024-03-30 | REPAIR WATER - SEWER | RYER AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE |
B012024059B73 | 2024-02-28 | 2024-03-28 | REPAIR WATER - SEWER | POWERS STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012024057B26 | 2024-02-26 | 2024-03-24 | REPAIR WATER - SEWER - PROTECTED | CLEVELAND STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012024054B75 | 2024-02-23 | 2024-03-12 | REPAIR WATER - SEWER - PROTECTED | ALABAMA AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY |
B012024054B74 | 2024-02-23 | 2024-03-11 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
Q012024052A96 | 2024-02-21 | 2024-03-21 | REPAIR WATER - SEWER | 93 AVENUE, QUEENS, FROM STREET ATARI LANE TO STREET 173 STREET |
X012024051A85 | 2024-02-20 | 2024-03-14 | REPAIR WATER - SEWER | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
B012024051A94 | 2024-02-20 | 2024-03-19 | REPAIR WATER | BUSHWICK AVENUE, BROOKLYN, FROM STREET ARION PLACE TO STREET MELROSE STREET |
X012024051B11 | 2024-02-20 | 2024-03-20 | REPAIR WATER - SEWER | BEECH TERRACE, BRONX, FROM STREET BEEKMAN AVENUE TO STREET DEAD END |
X012024045A39 | 2024-02-14 | 2024-03-14 | REPAIR WATER - SEWER | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
Q012024043B37 | 2024-02-12 | 2024-03-13 | REPAIR WATER - SEWER | 197 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 91 AVENUE |
B012024043B04 | 2024-02-12 | 2024-03-12 | REPAIR WATER - SEWER - PROTECTED | BROADWAY, BROOKLYN, FROM STREET MELROSE STREET TO STREET STOCKTON STREET |
Q012024043B76 | 2024-02-12 | 2024-02-27 | REPAIR SEWER - PROTECTED | THEBES AVENUE, QUEENS, FROM STREET MARATHON PARKWAY TO STREET ZION STREET |
Q012024043B75 | 2024-02-12 | 2024-03-13 | REPAIR WATER - PROTECTED | THEBES AVENUE, QUEENS, FROM STREET MARATHON PARKWAY TO STREET ZION STREET |
Q012024043A79 | 2024-02-12 | 2024-03-12 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET |
B012024041A08 | 2024-02-10 | 2024-02-23 | REPAIR WATER - SEWER - PROTECTED | CLEVELAND STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
Q012024040C59 | 2024-02-09 | 2024-02-23 | REPAIR WATER - SEWER | ASH AVENUE, QUEENS, FROM STREET 149 PLACE TO STREET MURRAY STREET |
Q012024038A78 | 2024-02-07 | 2024-03-07 | REPAIR WATER - SEWER | 112 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 221 STREET |
X012024037A72 | 2024-02-06 | 2024-03-06 | REPAIR WATER - SEWER - PROTECTED | DEWEY AVENUE, BRONX, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE |
B012024037B26 | 2024-02-06 | 2024-02-10 | REPAIR WATER - SEWER - PROTECTED | BROADWAY, BROOKLYN, FROM STREET MELROSE STREET TO STREET STOCKTON STREET |
Q042024032A09 | 2024-02-01 | 2024-03-01 | REPAIR SIDEWALK | 196 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE |
Q012024032B18 | 2024-02-01 | 2024-03-01 | C.A.R. RESTORATION | 196 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE |
Q012024032B65 | 2024-02-01 | 2024-03-05 | REPAIR WATER - SEWER - PROTECTED | 203 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET 53 AVENUE |
Q012024026A39 | 2024-01-26 | 2024-02-22 | REPAIR WATER - SEWER - PROTECTED | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 148 STREET |
B012024026B06 | 2024-01-26 | 2024-02-24 | REPAIR WATER - SEWER | POWERS STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012024025B93 | 2024-01-25 | 2024-02-09 | REPAIR WATER - PROTECTED | METROPOLITAN AVENUE, QUEENS, FROM STREET 64 STREET TO STREET 65 STREET |
B012024024B58 | 2024-01-24 | 2024-02-22 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
Q012024016A30 | 2024-01-23 | 2024-02-14 | REPAIR WATER - PROTECTED | 142 STREET, QUEENS, FROM STREET 131 AVENUE TO STREET 135 AVENUE |
Q012024019C25 | 2024-01-19 | 2024-01-26 | REPAIR WATER - PROTECTED | METROPOLITAN AVENUE, QUEENS, FROM STREET 64 STREET TO STREET 65 STREET |
Q012024016A74 | 2024-01-16 | 2024-02-13 | REPAIR SEWER - PROTECTED | THEBES AVENUE, QUEENS, FROM STREET MARATHON PARKWAY TO STREET ZION STREET |
Q012024016A33 | 2024-01-16 | 2024-02-14 | REPAIR WATER | 65 STREET, QUEENS, FROM STREET 68 AVENUE TO STREET CATALPA AVENUE |
B012024012B31 | 2024-01-12 | 2024-02-09 | REPAIR WATER - SEWER | GRAHAM AVENUE, BROOKLYN, FROM STREET GRAND STREET TO STREET POWERS STREET |
Q012024011A86 | 2024-01-11 | 2024-02-09 | REPAIR WATER - SEWER | 93 AVENUE, QUEENS, FROM STREET ATARI LANE TO STREET 173 STREET |
Q012024006A00 | 2024-01-11 | 2024-02-04 | REPAIR WATER | 133 AVENUE, QUEENS, FROM STREET 225 STREET TO STREET DUBONS LANE |
Q012024011A76 | 2024-01-11 | 2024-02-09 | REPAIR WATER - SEWER | ASH AVENUE, QUEENS, FROM STREET 149 PLACE TO STREET MURRAY STREET |
B012024011C24 | 2024-01-11 | 2024-01-26 | REPAIR WATER - SEWER - PROTECTED | BROADWAY, BROOKLYN, FROM STREET MELROSE STREET TO STREET STOCKTON STREET |
B012024011B91 | 2024-01-11 | 2024-02-09 | REPAIR WATER - SEWER - PROTECTED | CLEVELAND STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012024004A85 | 2024-01-04 | 2024-01-08 | REPAIR WATER - SEWER - PROTECTED | CLEVELAND STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
M012023361A90 | 2023-12-27 | 2024-01-08 | REPAIR WATER - PROTECTED | MT MORRIS PARK WEST, MANHATTAN, FROM STREET WEST 123 STREET TO STREET WEST 124 STREET |
Q012023360A87 | 2023-12-26 | 2024-01-08 | REPAIR WATER - PROTECTED | MERRICK BOULEVARD, QUEENS, FROM STREET 227 STREET TO STREET 228 STREET |
B012023355C42 | 2023-12-21 | 2024-01-08 | REPAIR WATER | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
Q012023354B72 | 2023-12-20 | 2024-01-08 | REPAIR WATER - SEWER | 93 AVENUE, QUEENS, FROM STREET ATARI LANE TO STREET 173 STREET |
Q012023353B56 | 2023-12-19 | 2024-01-08 | REPAIR WATER - SEWER - PROTECTED | 143 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET 116 AVENUE |
Q012023353B38 | 2023-12-19 | 2024-01-08 | REPAIR WATER - PROTECTED | 107 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
Q012023349A70 | 2023-12-15 | 2023-12-20 | REPAIR WATER - PROTECTED | METROPOLITAN AVENUE, QUEENS, FROM STREET 64 STREET TO STREET 65 STREET |
Q002023349A02 | 2023-12-15 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023349A72 | 2023-12-15 | 2024-01-08 | REPAIR SEWER - PROTECTED | THEBES AVENUE, QUEENS, FROM STREET MARATHON PARKWAY TO STREET ZION STREET |
Q012023343A03 | 2023-12-11 | 2023-12-31 | REPAIR WATER | NASHVILLE BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET 212 STREET |
Q012023341A06 | 2023-12-07 | 2023-12-31 | REPAIR SEWER - PROTECTED | 208 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET BARDWELL AVENUE |
Q012023340B09 | 2023-12-06 | 2023-12-31 | REPAIR WATER - PROTECTED | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
Q012023338A13 | 2023-12-04 | 2023-12-31 | REPAIR WATER - SEWER | 166 STREET, QUEENS, FROM STREET 120 AVENUE TO STREET SMITH STREET |
B012023338B01 | 2023-12-04 | 2023-12-31 | REPAIR WATER - SEWER | MONTAUK AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
Q012023335A28 | 2023-12-01 | 2023-12-30 | REPAIR SEWER - PROTECTED | 96 PLACE, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET PITKIN AVENUE |
M012023333A75 | 2023-11-29 | 2023-12-27 | REPAIR WATER - PROTECTED | MT MORRIS PARK WEST, MANHATTAN, FROM STREET WEST 123 STREET TO STREET WEST 124 STREET |
Q012023332A95 | 2023-11-28 | 2023-12-27 | REPAIR SEWER | 126 AVENUE, QUEENS, FROM STREET 174 PLACE TO STREET 176 STREET |
B012023331B01 | 2023-11-27 | 2023-12-23 | REPAIR WATER - PROTECTED | BAY PARKWAY, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
Q002023331A08 | 2023-11-27 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B002023331A07 | 2023-11-27 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023331A50 | 2023-11-27 | 2023-12-23 | REPAIR WATER - SEWER - PROTECTED | 215 PLACE, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q012023328A37 | 2023-11-24 | 2023-12-21 | REPAIR WATER - SEWER | 74 STREET, QUEENS, FROM STREET BEND TO STREET HORACE HARDING EXPRESSWAY |
Q012023328A07 | 2023-11-24 | 2023-12-23 | REPAIR WATER | 217 PLACE, QUEENS, FROM STREET 102 AVENUE TO STREET 103 AVENUE |
B002023328A01 | 2023-11-24 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023325B32 | 2023-11-21 | 2023-12-20 | REPAIR WATER | 217 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET 115 ROAD |
Q012023325A64 | 2023-11-21 | 2023-12-12 | REPAIR WATER - PROTECTED | 107 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
Q012023321B00 | 2023-11-17 | 2023-12-14 | REPAIR SEWER - PROTECTED | 216 STREET, QUEENS, FROM STREET 40 AVENUE TO STREET 41 AVENUE |
Q012023314A17 | 2023-11-15 | 2023-12-09 | REPAIR SEWER | 123 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE |
Q012023319A05 | 2023-11-15 | 2023-12-13 | REPAIR SEWER | 123 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE |
Q012023319B45 | 2023-11-15 | 2023-12-14 | REPAIR WATER - SEWER | PARK LANE SOUTH, QUEENS, FROM STREET 112 STREET TO STREET LONG ISLAND RAILROAD |
B012023311A12 | 2023-11-07 | 2023-12-05 | REPAIR WATER - PROTECTED | STRAUSS STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
X012023305B22 | 2023-11-01 | 2023-11-29 | C.A.R. RESTORATION | BAILEY AVENUE, BRONX, FROM STREET BEND TO STREET CHARLES HALLEY PLACE |
Q012023304B61 | 2023-11-01 | 2023-11-29 | REPAIR WATER - PROTECTED | NASHVILLE BOULEVARD, QUEENS, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD |
B012023305A53 | 2023-11-01 | 2023-11-29 | REPAIR WATER - PROTECTED | JEROME STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
X022023305A41 | 2023-11-01 | 2023-11-29 | OCCUPANCY OF ROADWAY AS STIPULATED | BAILEY AVENUE, BRONX, FROM STREET BEND TO STREET CHARLES HALLEY PLACE |
Q012023303D11 | 2023-10-30 | 2023-11-13 | CORE RE-DIG | LINDEN BOULEVARD, QUEENS, FROM STREET 230 STREET TO STREET 231 STREET |
B012023303A51 | 2023-10-30 | 2023-11-07 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q012023300B20 | 2023-10-27 | 2023-11-18 | REPAIR WATER - SEWER - PROTECTED | UNION STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q012023298B52 | 2023-10-25 | 2023-11-24 | REPAIR WATER - PROTECTED | 197 STREET, QUEENS, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD |
Q012023296A71 | 2023-10-23 | 2023-11-21 | REPAIR SEWER | 52 AVENUE, QUEENS, FROM STREET DEAD END TO STREET HASPEL STREET |
B012023292B03 | 2023-10-19 | 2023-11-17 | REPAIR WATER - SEWER | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
Q012023286A41 | 2023-10-17 | 2023-11-11 | REPAIR WATER - PROTECTED | 107 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
Q012023286B57 | 2023-10-13 | 2023-11-14 | REPAIR WATER - SEWER - PROTECTED | 215 PLACE, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q012023286A98 | 2023-10-13 | 2023-11-11 | REPAIR WATER - SEWER | 36 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q012023285D12 | 2023-10-12 | 2023-11-11 | REPAIR WATER - PROTECTED | 103 AVENUE, QUEENS, FROM STREET 120 STREET TO STREET 121 STREET |
B012023277A64 | 2023-10-04 | 2023-10-11 | REPAIR WATER | LEGION STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012023277A67 | 2023-10-04 | 2023-10-31 | C.A.R. RESTORATION | 84 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET |
B012023277A87 | 2023-10-04 | 2023-11-02 | REPAIR WATER - PROTECTED | STRAUSS STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
Q012023274A03 | 2023-10-03 | 2023-10-30 | REPAIR WATER | 204 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET 94 AVENUE |
Q012023273A04 | 2023-10-02 | 2023-10-29 | REPAIR WATER | 168 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET 116 AVENUE |
Q012023272A44 | 2023-09-29 | 2023-10-28 | REPAIR WATER - SEWER | 163 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
B012023268E58 | 2023-09-25 | 2023-10-19 | REPAIR WATER | HUMBOLDT STREET, BROOKLYN, FROM STREET MOULTRIE STREET TO STREET NASSAU AVENUE |
X012023264A42 | 2023-09-21 | 2023-10-20 | REPAIR WATER | ST LAWRENCE AVENUE, BRONX, FROM STREET RANDALL AVENUE TO STREET SEWARD AVENUE |
B012023264C15 | 2023-09-21 | 2023-10-10 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q042023263A15 | 2023-09-20 | 2023-10-19 | REPAIR SIDEWALK | BEACH 35 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE |
Q012023237A44 | 2023-09-19 | 2023-09-23 | REPAIR WATER | 135 AVENUE, QUEENS, FROM STREET 151 PLACE TO STREET CRANSTON STREET |
Q012023262A34 | 2023-09-19 | 2023-10-18 | REPAIR WATER - SEWER - PROTECTED | UNION STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
M012023257B52 | 2023-09-14 | 2023-10-13 | C.A.R. RESTORATION - PROTECTED | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
Q012023255B43 | 2023-09-12 | 2023-09-26 | REPAIR WATER - SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023254A47 | 2023-09-11 | 2023-10-10 | REPAIR WATER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 94 STREET TO STREET 95 STREET |
B012023251B07 | 2023-09-08 | 2023-10-04 | C.A.R. RESTORATION | GLENWOOD ROAD, BROOKLYN, FROM STREET CORBIN COURT TO STREET EAST 12 STREET |
Q012023251B37 | 2023-09-08 | 2023-10-10 | REPAIR WATER - SEWER | 65 AVENUE, QUEENS, FROM STREET 169 STREET TO STREET 170 STREET |
Q012023251B49 | 2023-09-08 | 2023-10-06 | C.A.R. RESTORATION | 189 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD |
B012023249B07 | 2023-09-06 | 2023-10-05 | REPAIR WATER - SEWER | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
Q012023249A76 | 2023-09-06 | 2023-10-04 | C.A.R. RESTORATION | 90 AVENUE, QUEENS, FROM STREET 74 PLACE TO STREET 75 STREET |
Q042023248A00 | 2023-09-05 | 2023-09-30 | REPAIR SIDEWALK | 111 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE |
B012023244A35 | 2023-09-01 | 2023-09-29 | REPAIR WATER - SEWER - PROTECTED | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012023243A79 | 2023-08-31 | 2023-09-29 | REPAIR WATER | 18 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023241C79 | 2023-08-29 | 2023-09-26 | REPAIR WATER - PROTECTED | WYTHE AVENUE, BROOKLYN, FROM STREET SOUTH 1 STREET TO STREET SOUTH 2 STREET |
B012023230B76 | 2023-08-18 | 2023-09-15 | REPAIR WATER | LIBERTY AVENUE, BROOKLYN, FROM STREET AUTUMN AVENUE TO STREET HEMLOCK STREET |
Q012023229B92 | 2023-08-17 | 2023-09-15 | REPAIR WATER - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
Q012023229B93 | 2023-08-17 | 2023-09-07 | C.A.R. RESTORATION | KEW FOREST LANE, QUEENS, FROM STREET 77 AVENUE TO STREET 77 ROAD |
Q012023226A19 | 2023-08-16 | 2023-09-12 | REPAIR WATER | 224 STREET, QUEENS, FROM STREET 141 ROAD TO STREET LONG ISLAND RAILROAD |
Q012023228A48 | 2023-08-16 | 2023-09-14 | C.A.R. RESTORATION - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
Q012023226A55 | 2023-08-14 | 2023-09-12 | REPAIR WATER - SEWER - PROTECTED | 166 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012023222B59 | 2023-08-10 | 2023-09-08 | REPAIR WATER - SEWER | 118 AVENUE, QUEENS, FROM STREET 189 STREET TO STREET FARMERS BOULEVARD |
B012023221A42 | 2023-08-09 | 2023-09-05 | REPAIR WATER - SEWER | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
X012023221A74 | 2023-08-09 | 2023-09-05 | REPAIR WATER - SEWER - PROTECTED | EAST 203 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE |
Q012023219A55 | 2023-08-07 | 2023-08-15 | C.A.R. RESTORATION - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
Q022023219A31 | 2023-08-07 | 2023-08-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 194 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023219B19 | 2023-08-07 | 2023-08-22 | C.A.R. RESTORATION - PROTECTED | 162 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE |
Q012023219A59 | 2023-08-07 | 2023-08-29 | C.A.R. RESTORATION | 108 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012023219A56 | 2023-08-07 | 2023-08-29 | C.A.R. RESTORATION - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q012023212C88 | 2023-07-31 | 2023-08-22 | REPAIR WATER - PROTECTED | CORP KENNEDY STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 28 ROAD |
Q012023212A98 | 2023-07-31 | 2023-08-22 | REPAIR SEWER - PROTECTED | 28 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET CORP KENNEDY STREET |
X012023212A65 | 2023-07-31 | 2023-08-29 | REPAIR WATER | BOLTON AVENUE, BRONX, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE |
B012023208A62 | 2023-07-27 | 2023-08-23 | C.A.R. RESTORATION | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
Q012023206A79 | 2023-07-27 | 2023-08-23 | REPAIR WATER | 202 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
Q012023205A35 | 2023-07-25 | 2023-08-22 | REPAIR WATER | 137 ROAD, QUEENS, FROM STREET 244 STREET TO STREET 246 STREET |
Q012023205B01 | 2023-07-24 | 2023-08-17 | REPAIR WATER | 84 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET |
X012023205B70 | 2023-07-24 | 2023-08-22 | REPAIR WATER - SEWER | PERRY AVENUE, BRONX, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH |
Q012023202C40 | 2023-07-21 | 2023-08-12 | C.A.R. RESTORATION | 158 STREET, QUEENS, FROM STREET 132 AVENUE TO STREET 134 AVENUE |
B012023202B10 | 2023-07-21 | 2023-08-17 | REPAIR WATER | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012023202C42 | 2023-07-21 | 2023-07-28 | C.A.R. RESTORATION | 108 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012023199A34 | 2023-07-18 | 2023-08-15 | REPAIR WATER | PALO ALTO AVENUE, QUEENS, FROM STREET 87 ROAD TO STREET HAYWOOD ROAD |
Q012023199A36 | 2023-07-18 | 2023-08-15 | REPAIR WATER - SEWER | OCEANIA STREET, QUEENS, FROM STREET 50 AVENUE TO STREET 53 AVENUE |
Q012023195C31 | 2023-07-14 | 2023-08-09 | C.A.R. RESTORATION | 90 AVENUE, QUEENS, FROM STREET 74 PLACE TO STREET 75 STREET |
Q012023195C28 | 2023-07-14 | 2023-07-18 | REPAIR WATER | 84 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET |
Q012023195C30 | 2023-07-14 | 2023-08-10 | C.A.R. RESTORATION | 189 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD |
X012023192B12 | 2023-07-11 | 2023-08-09 | REPAIR WATER - SEWER - PROTECTED | FAILE STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
Q012023191A05 | 2023-07-11 | 2023-08-08 | REPAIR WATER - PROTECTED | 166 STREET, QUEENS, FROM STREET 29 AVENUE TO STREET 32 AVENUE |
B012023191B04 | 2023-07-10 | 2023-07-22 | C.A.R. RESTORATION | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012023191A99 | 2023-07-10 | 2023-08-04 | C.A.R. RESTORATION | AVENUE K, BROOKLYN, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET |
Q012023188C02 | 2023-07-07 | 2023-08-05 | C.A.R. RESTORATION | KEW FOREST LANE, QUEENS, FROM STREET 77 AVENUE TO STREET 77 ROAD |
B012023186C06 | 2023-07-05 | 2023-07-29 | C.A.R. RESTORATION | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
Q012023184B14 | 2023-07-03 | 2023-08-01 | C.A.R. RESTORATION - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
B012023184E17 | 2023-07-03 | 2023-07-17 | REPAIR WATER | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012023184B04 | 2023-07-03 | 2023-08-01 | REPAIR WATER - PROTECTED | 62 STREET, QUEENS, FROM STREET 53 DRIVE TO STREET 61 STREET |
Q012023180A50 | 2023-06-29 | 2023-07-13 | RESTORATION RE-DIG - PROTECTED | BELL BOULEVARD, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q012023177D29 | 2023-06-26 | 2023-07-25 | C.A.R. RESTORATION - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q012023174D29 | 2023-06-23 | 2023-07-22 | C.A.R. RESTORATION | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012023173A44 | 2023-06-22 | 2023-07-21 | REPAIR SEWER | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
X012023173A11 | 2023-06-22 | 2023-07-20 | C.A.R. RESTORATION | PROSPECT AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET MACY PLACE |
Q012023171D52 | 2023-06-20 | 2023-07-18 | C.A.R. RESTORATION | BEACH 69 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET GOUVERNEUR AVENUE |
X012023167A57 | 2023-06-16 | 2023-07-14 | REPAIR WATER - SEWER | BAILEY AVENUE, BRONX, FROM STREET BEND TO STREET CHARLES HALLEY PLACE |
Q012023166B49 | 2023-06-15 | 2023-06-30 | REPAIR WATER - SEWER | JAMAICA AVENUE, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
B012023166B77 | 2023-06-15 | 2023-07-14 | REPAIR WATER - PROTECTED | HULL STREET, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD |
Q012023166B37 | 2023-06-15 | 2023-07-01 | C.A.R. RESTORATION - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
Q012023165D10 | 2023-06-14 | 2023-07-14 | C.A.R. RESTORATION | 108 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
B012023160A78 | 2023-06-09 | 2023-07-08 | C.A.R. RESTORATION | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012023160A87 | 2023-06-09 | 2023-07-11 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE |
B012023157C54 | 2023-06-06 | 2023-07-05 | C.A.R. RESTORATION | GLENWOOD ROAD, BROOKLYN, FROM STREET CORBIN COURT TO STREET EAST 12 STREET |
Q012023157B07 | 2023-06-06 | 2023-06-19 | REPAIR WATER - SEWER | 46 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY |
B012023157A96 | 2023-06-06 | 2023-06-18 | C.A.R. RESTORATION - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012023156C93 | 2023-06-05 | 2023-07-04 | C.A.R. RESTORATION | 90 AVENUE, QUEENS, FROM STREET 247 STREET TO STREET BEND |
Q012023156C97 | 2023-06-05 | 2023-07-04 | REPAIR WATER | 84 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 164 STREET |
B012023153A16 | 2023-06-02 | 2023-06-30 | C.A.R. RESTORATION | GLENMORE AVENUE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET |
Q012023153C54 | 2023-06-02 | 2023-07-01 | C.A.R. RESTORATION | MOTT AVENUE, QUEENS, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET |
B012023153A15 | 2023-06-02 | 2023-06-30 | C.A.R. RESTORATION | GLENMORE AVENUE, BROOKLYN, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE |
Q012023152C53 | 2023-06-01 | 2023-06-30 | C.A.R. RESTORATION | FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 135 AVENUE TO STREET 137 AVENUE |
B012023152C17 | 2023-06-01 | 2023-07-03 | REPAIR WATER | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012023151A15 | 2023-06-01 | 2023-06-29 | REPAIR WATER | 232 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 137 AVENUE |
B012023150D31 | 2023-05-30 | 2023-06-28 | C.A.R. RESTORATION | GLENMORE AVENUE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET |
B012023150A27 | 2023-05-30 | 2023-06-26 | C.A.R. RESTORATION - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET STERLING PLACE |
B012023150C99 | 2023-05-30 | 2023-06-28 | C.A.R. RESTORATION - PROTECTED | COLEMAN STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
X012023146B93 | 2023-05-26 | 2023-06-24 | C.A.R. RESTORATION | NEWBOLD AVENUE, BRONX, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE |
M012023143A83 | 2023-05-23 | 2023-06-21 | C.A.R. RESTORATION - PROTECTED | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
Q012023143B27 | 2023-05-23 | 2023-06-06 | REPAIR WATER - SEWER | 46 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY |
Q012023143B26 | 2023-05-23 | 2023-06-20 | REPAIR WATER - PROTECTED | 162 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE |
B012023139B14 | 2023-05-19 | 2023-06-03 | C.A.R. RESTORATION - PROTECTED | ATKINS AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
Q012023139C87 | 2023-05-19 | 2023-06-17 | C.A.R. RESTORATION - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
Q012023139C17 | 2023-05-19 | 2023-06-03 | C.A.R. RESTORATION | 14 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 30 ROAD |
Q012023139C14 | 2023-05-19 | 2023-06-16 | C.A.R. RESTORATION | 129 STREET, QUEENS, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE |
Q012023139C88 | 2023-05-19 | 2023-06-20 | REPAIR SEWER | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
B012023139B67 | 2023-05-19 | 2023-06-03 | REPAIR WATER | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q042023138A48 | 2023-05-18 | 2023-06-16 | REPAIR SIDEWALK | 161 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
Q012023137B08 | 2023-05-17 | 2023-05-30 | REPAIR WATER - PROTECTED | 215 PLACE, QUEENS, FROM STREET 93 AVENUE TO STREET 94 ROAD |
Q012023136A37 | 2023-05-16 | 2023-06-16 | REPAIR WATER - SEWER | JAMAICA AVENUE, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
B012023132B99 | 2023-05-12 | 2023-05-27 | C.A.R. RESTORATION - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET STERLING PLACE |
Q012023132C84 | 2023-05-12 | 2023-05-29 | REPAIR WATER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 230 STREET TO STREET 231 STREET |
Q042023129A27 | 2023-05-09 | 2023-06-07 | REPAIR SIDEWALK | 131 STREET, QUEENS, FROM STREET 131 AVENUE TO STREET 133 AVENUE |
Q012023129B06 | 2023-05-09 | 2023-05-24 | REPAIR WATER - SEWER - PROTECTED | HAWTREE STREET, QUEENS, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE |
Q012023128A76 | 2023-05-08 | 2023-06-06 | REPAIR WATER - SEWER - PROTECTED | 124 STREET, QUEENS, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE |
M012023125A34 | 2023-05-05 | 2023-05-20 | C.A.R. RESTORATION | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012023125A45 | 2023-05-05 | 2023-06-04 | C.A.R. RESTORATION - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012023125A55 | 2023-05-05 | 2023-06-06 | REPAIR WATER | MERRICK BOULEVARD, QUEENS, FROM STREET 129 AVENUE TO STREET EVELETH ROAD |
Q012023124A23 | 2023-05-05 | 2023-06-02 | REPAIR WATER | 209 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET BEND |
Q012023118C39 | 2023-04-28 | 2023-05-25 | REPAIR SEWER | 165 STREET, QUEENS, FROM STREET 120 AVENUE TO STREET SMITH STREET |
X012023118A57 | 2023-04-28 | 2023-05-30 | REPAIR WATER | OLMSTEAD AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE |
X012023118A58 | 2023-04-28 | 2023-05-30 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE |
Q012023118C80 | 2023-04-28 | 2023-05-27 | REPAIR WATER - SEWER - PROTECTED | HAWTREE STREET, QUEENS, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE |
Q012023117A74 | 2023-04-27 | 2023-05-12 | REPAIR WATER - PROTECTED | 193 STREET, QUEENS, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD |
Q012023116A55 | 2023-04-26 | 2023-05-15 | REPAIR WATER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 230 STREET TO STREET 231 STREET |
Q012023112A02 | 2023-04-25 | 2023-05-21 | REPAIR WATER - PROTECTED | 162 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE |
B012023112A01 | 2023-04-25 | 2023-05-21 | REPAIR WATER | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012023114B55 | 2023-04-24 | 2023-05-23 | C.A.R. RESTORATION | MOTT AVENUE, QUEENS, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET |
B012023111B30 | 2023-04-21 | 2023-05-05 | C.A.R. RESTORATION - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012023111B28 | 2023-04-21 | 2023-05-20 | C.A.R. RESTORATION | 14 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 30 ROAD |
B012023111A67 | 2023-04-21 | 2023-05-20 | C.A.R. RESTORATION - PROTECTED | ATKINS AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
Q012023110B93 | 2023-04-20 | 2023-05-23 | REPAIR WATER - SEWER | 46 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY |
Q012023110C38 | 2023-04-20 | 2023-05-20 | REPAIR WATER | 232 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD |
Q012023108C01 | 2023-04-18 | 2023-05-02 | REPAIR WATER - SEWER | CLAUDE AVENUE, QUEENS, FROM STREET BEND TO STREET GUY R BREWER BOULEVARD |
B012023107A44 | 2023-04-17 | 2023-05-13 | C.A.R. RESTORATION - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET STERLING PLACE |
Q012023107C02 | 2023-04-17 | 2023-05-16 | REPAIR WATER - PROTECTED | 215 PLACE, QUEENS, FROM STREET 93 AVENUE TO STREET 94 ROAD |
M012023104A52 | 2023-04-14 | 2023-05-06 | C.A.R. RESTORATION | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q012023101A14 | 2023-04-14 | 2023-05-10 | REPAIR WATER | 264 STREET, QUEENS, FROM STREET BOROUGH BOUNDARY TO STREET 85 AVENUE |
Q012023101B63 | 2023-04-11 | 2023-05-10 | REPAIR WATER - SEWER - PROTECTED | HAWTREE STREET, QUEENS, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE |
X012023101A56 | 2023-04-11 | 2023-05-16 | REPAIR WATER - SEWER | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
Q012023097C43 | 2023-04-07 | 2023-05-09 | REPAIR WATER - SEWER | 252 STREET, QUEENS, FROM STREET 63 AVENUE TO STREET CULLMAN AVENUE |
Q012023097B30 | 2023-04-07 | 2023-05-09 | REPAIR WATER - PROTECTED | 142 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET 116 AVENUE |
B012023096A80 | 2023-04-06 | 2023-04-30 | REPAIR SEWER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE |
Q012023090B95 | 2023-03-31 | 2023-04-30 | REPAIR WATER - SEWER - PROTECTED | 124 STREET, QUEENS, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE |
Q012023089B40 | 2023-03-31 | 2023-04-28 | REPAIR WATER - PROTECTED | 193 STREET, QUEENS, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD |
X012023086A35 | 2023-03-28 | 2023-04-25 | REPAIR SEWER - PROTECTED | FAILE STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
Q012023083C82 | 2023-03-24 | 2023-04-22 | REPAIR WATER - PROTECTED | 111 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE |
B012023083C96 | 2023-03-24 | 2023-04-25 | REPAIR WATER - SEWER | PATCHEN AVENUE, BROOKLYN, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET |
Q012023081A09 | 2023-03-24 | 2023-03-24 | REPAIR WATER - PROTECTED | BELKNAP STREET, QUEENS, FROM STREET 137 AVENUE TO STREET BENNETT STREET |
Q012023082F12 | 2023-03-23 | 2023-04-21 | C.A.R. RESTORATION - PROTECTED | BELL BOULEVARD, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
B012023081A96 | 2023-03-22 | 2023-04-21 | C.A.R. RESTORATION - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012023081F99 | 2023-03-22 | 2023-04-20 | REPAIR WATER - SEWER - PROTECTED | FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD |
Q012023080B71 | 2023-03-21 | 2023-04-19 | REPAIR WATER - SEWER - PROTECTED | 146 STREET, QUEENS, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE |
Q012023076A14 | 2023-03-20 | 2023-04-15 | REPAIR WATER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 230 STREET TO STREET 231 STREET |
B012023079H38 | 2023-03-20 | 2023-04-20 | REPAIR WATER | 16 AVENUE, BROOKLYN, FROM STREET 66 STREET TO STREET 67 STREET |
Q012023079E39 | 2023-03-20 | 2023-04-14 | REPAIR WATER - SEWER - PROTECTED | HAWTREE STREET, QUEENS, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE |
Q012023079D65 | 2023-03-20 | 2023-04-19 | REPAIR WATER - SEWER | 122 AVENUE, QUEENS, FROM STREET 161 PLACE TO STREET LONG STREET |
Q012023079D63 | 2023-03-20 | 2023-04-18 | REPAIR WATER - SEWER | CLAUDE AVENUE, QUEENS, FROM STREET BEND TO STREET GUY R BREWER BOULEVARD |
Q012023066A73 | 2023-03-07 | 2023-04-05 | REPAIR WATER | 148 ROAD, QUEENS, FROM STREET 241 STREET TO STREET BROOKVILLE BOULEVARD |
Q012023062A09 | 2023-03-06 | 2023-04-01 | REPAIR WATER - PROTECTED | 112 STREET, QUEENS, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE |
Q012023065A31 | 2023-03-06 | 2023-04-04 | REPAIR WATER - PROTECTED | 97 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 81 STREET |
Q012023061A95 | 2023-03-02 | 2023-03-30 | REPAIR WATER - SEWER | 226 STREET, QUEENS, FROM STREET 139 AVENUE TO STREET 141 AVENUE |
B012023061A63 | 2023-03-02 | 2023-03-31 | REPAIR SEWER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE |
Q012023061B08 | 2023-03-02 | 2023-04-01 | REPAIR WATER - SEWER | SMITH STREET, QUEENS, FROM STREET 120 AVENUE TO STREET BEND |
Q012023058A02 | 2023-03-02 | 2023-03-03 | REPAIR WATER - PROTECTED | 200 STREET, QUEENS, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD |
Q012023041A05 | 2023-02-13 | 2023-03-11 | REPAIR WATER | 90 AVENUE, QUEENS, FROM STREET 247 STREET TO STREET BEND |
B012023044B01 | 2023-02-13 | 2023-03-15 | REPAIR WATER - SEWER - PROTECTED | 26 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012023040A76 | 2023-02-09 | 2023-03-11 | REPAIR WATER | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
Q012023040B83 | 2023-02-09 | 2023-03-11 | REPAIR SEWER | 29 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
B012023040A06 | 2023-02-09 | 2023-03-10 | REPAIR WATER | BELMONT AVENUE, BROOKLYN, FROM STREET LOGAN STREET TO STREET MILFORD STREET |
Q012023039A55 | 2023-02-08 | 2023-03-09 | REPAIR WATER | 101 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 37 AVENUE |
Q012023039A07 | 2023-02-08 | 2023-03-09 | REPAIR WATER - PROTECTED | 25 AVENUE, QUEENS, FROM STREET 157 STREET TO STREET 160 STREET |
Q012023037A07 | 2023-02-06 | 2023-03-08 | REPAIR WATER | 107 AVENUE, QUEENS, FROM STREET 169 STREET TO STREET MERRICK BOULEVARD |
B012023034A79 | 2023-02-03 | 2023-03-04 | REPAIR WATER - PROTECTED | ESSEX STREET, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
X012023032A81 | 2023-02-01 | 2023-03-03 | REPAIR WATER - SEWER | PROSPECT AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET MACY PLACE |
Q012023031D39 | 2023-01-31 | 2023-03-02 | REPAIR WATER - SEWER | 194 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023031C21 | 2023-01-31 | 2023-03-01 | REPAIR WATER - PROTECTED | 97 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 25 AVENUE |
X012023030A19 | 2023-01-30 | 2023-02-28 | REPAIR WATER - SEWER | HUSSON AVENUE, BRONX, FROM STREET DEAD END TO STREET GILDERSLEEVE AVENUE |
Q012023026A11 | 2023-01-30 | 2023-02-24 | REPAIR WATER - PROTECTED | 205 PLACE, QUEENS, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE |
B012023019B87 | 2023-01-19 | 2023-02-18 | REPAIR WATER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q012023019B45 | 2023-01-19 | 2023-02-15 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012023019B10 | 2023-01-19 | 2023-02-17 | REPAIR WATER - SEWER | ROBINSON STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q012023018A10 | 2023-01-18 | 2023-02-16 | REPAIR SEWER | 77 ROAD, QUEENS, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD |
Q012022363A18 | 2023-01-04 | 2023-01-08 | REPAIR WATER | BEACH 65 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET THURSBY AVENUE |
Q012023004B48 | 2023-01-04 | 2023-01-08 | REPAIR WATER - SEWER - PROTECTED | 162 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE |
B012022323A00 | 2023-01-03 | 2022-11-22 | REPAIR WATER | STILLWELL AVENUE, BROOKLYN, FROM STREET 25 AVENUE TO STREET 83 STREET |
Q012023003B45 | 2023-01-03 | 2023-01-08 | REPAIR WATER - PROTECTED | 95 AVENUE, QUEENS, FROM STREET 113 STREET TO STREET 114 STREET |
Q012023003A94 | 2023-01-03 | 2023-01-08 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
X002022363A00 | 2022-12-29 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012022352A00 | 2022-12-20 | 2022-12-31 | REPAIR WATER - PROTECTED | ESSEX STREET, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
Q012022349A96 | 2022-12-15 | 2022-12-31 | REPAIR WATER - SEWER - PROTECTED | 162 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE |
Q012022349B21 | 2022-12-15 | 2022-12-31 | REPAIR WATER | 114 ROAD, QUEENS, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD |
Q012022348B88 | 2022-12-14 | 2022-12-31 | REPAIR WATER - PROTECTED | 135 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 133 STREET |
X012022347A49 | 2022-12-13 | 2022-12-31 | REPAIR SEWER | EAST 219 STREET, BRONX, FROM STREET BEND TO STREET OAKLEY STREET |
Q012022341A13 | 2022-12-09 | 2022-12-31 | REPAIR WATER | 156 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
Q012022341A26 | 2022-12-07 | 2022-12-31 | REPAIR WATER | 121 STREET, QUEENS, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE |
Q002022339A03 | 2022-12-05 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012022336A46 | 2022-12-02 | 2022-12-30 | REPAIR WATER - SEWER - PROTECTED | 134 AVENUE, QUEENS, FROM STREET 157 STREET TO STREET 158 STREET |
B012022334A23 | 2022-11-30 | 2022-12-29 | REPAIR WATER | PACIFIC STREET, BROOKLYN, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE |
B012022332B39 | 2022-11-28 | 2022-12-27 | REPAIR WATER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
Q012022322C77 | 2022-11-18 | 2022-12-17 | REPAIR WATER - SEWER | 122 PLACE, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
Q012022322C76 | 2022-11-18 | 2022-12-20 | REPAIR WATER - PROTECTED | BORDEN AVENUE, QUEENS, FROM STREET 34 STREET TO STREET 35 STREET |
Q012022313E24 | 2022-11-09 | 2022-12-08 | REPAIR SEWER - PROTECTED | 164 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET POWER ROAD |
Q012022313E13 | 2022-11-09 | 2022-12-08 | REPAIR WATER | 158 STREET, QUEENS, FROM STREET 132 AVENUE TO STREET 134 AVENUE |
M012022305A78 | 2022-11-01 | 2022-11-14 | REPAIR WATER | WEST 59 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012022304C36 | 2022-10-31 | 2022-11-29 | REPAIR WATER - SEWER | 113 AVENUE, QUEENS, FROM STREET 221 STREET TO STREET 223 STREET |
B012022301B87 | 2022-10-28 | 2022-12-03 | REPAIR WATER - SEWER - PROTECTED | COLEMAN STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
Q012022299B72 | 2022-10-26 | 2022-11-15 | REPAIR WATER - SEWER | 196 STREET, QUEENS, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE |
Q012022298A96 | 2022-10-25 | 2022-11-23 | REPAIR WATER - SEWER | JUNIPER AVENUE, QUEENS, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD |
B012022293A17 | 2022-10-20 | 2022-11-16 | REPAIR WATER | EAST 51 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
Q012022286A20 | 2022-10-13 | 2022-10-28 | REPAIR WATER - PROTECTED | BORDEN AVENUE, QUEENS, FROM STREET 34 STREET TO STREET 35 STREET |
X012022286A26 | 2022-10-13 | 2022-11-15 | REPAIR WATER | NEWBOLD AVENUE, BRONX, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE |
Q012022281A06 | 2022-10-12 | 2022-11-06 | REPAIR SEWER - PROTECTED | FOCH BOULEVARD, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q012022284C91 | 2022-10-11 | 2022-11-09 | REPAIR WATER - SEWER - PROTECTED | HAWTREE STREET, QUEENS, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE |
Q012022276A51 | 2022-10-10 | 2022-11-01 | REPAIR WATER | 111 ROAD, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
B012022279A12 | 2022-10-06 | 2022-11-02 | REPAIR WATER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012022278B05 | 2022-10-05 | 2022-11-03 | REPAIR WATER - SEWER - PROTECTED | COLEMAN STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
M012022278B21 | 2022-10-05 | 2022-10-19 | REPAIR WATER - PROTECTED | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
B012022276A58 | 2022-10-03 | 2022-10-22 | REPAIR WATER - PROTECTED | ATKINS AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
Q012022270A84 | 2022-09-27 | 2022-10-26 | REPAIR WATER | 171 STREET, QUEENS, FROM STREET 103 ROAD TO STREET 104 AVENUE |
Q012022270A75 | 2022-09-27 | 2022-10-21 | REPAIR WATER - SEWER | BELL BOULEVARD, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
B012022270A48 | 2022-09-27 | 2022-10-25 | REPAIR WATER - SEWER | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
Q012022266A39 | 2022-09-23 | 2022-10-22 | REPAIR WATER | 142 PLACE, QUEENS, FROM STREET 120 AVENUE TO STREET 123 AVENUE |
Q002022264A00 | 2022-09-21 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012022264A19 | 2022-09-21 | 2022-10-20 | REPAIR WATER | BEACH 44 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET REINHART ROAD |
Q012022264D40 | 2022-09-21 | 2022-09-21 | REPAIR WATER - SEWER | 164 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET BODY OF WATER |
M012022256B45 | 2022-09-13 | 2022-10-05 | REPAIR WATER - PROTECTED | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
Q012022256B36 | 2022-09-13 | 2022-10-05 | REPAIR WATER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 220 STREET TO STREET 221 STREET |
Q012022255B29 | 2022-09-12 | 2022-09-27 | RESTORATION RE-DIG | 164 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET BODY OF WATER |
Q012022249G14 | 2022-09-06 | 2022-10-05 | REPAIR WATER - SEWER - PROTECTED | LIBERTY AVENUE, QUEENS, FROM STREET 130 STREET TO STREET 131 STREET |
Q012022245A67 | 2022-09-02 | 2022-10-01 | REPAIR WATER | 14 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 30 ROAD |
X012022245A45 | 2022-09-02 | 2022-10-01 | REPAIR SEWER | NEWBOLD AVENUE, BRONX, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE |
Q002022244A02 | 2022-09-01 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012022188C15 | 2022-07-07 | 2022-08-05 | REPAIR SEWER - PROTECTED | LIBERTY AVENUE, QUEENS, FROM STREET 130 STREET TO STREET 131 STREET |
Q012022186B50 | 2022-07-05 | 2022-07-22 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 15 DRIVE TO STREET 15 ROAD |
Q012022182D22 | 2022-07-01 | 2022-07-31 | REPAIR WATER - PROTECTED | CLINTONVILLE STREET, QUEENS, FROM STREET CROSS ISLAND PARKWAY TO STREET LOCKE AVENUE |
Q012022181C43 | 2022-06-30 | 2022-07-29 | REPAIR WATER - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
B012022180B36 | 2022-06-29 | 2022-07-28 | REPAIR SEWER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
X012022168A15 | 2022-06-17 | 2022-07-20 | REPAIR WATER | WEST 174 STREET, BRONX, FROM STREET MACOMBS ROAD TO STREET NELSON AVENUE |
X012022168A17 | 2022-06-17 | 2022-07-20 | REPAIR WATER - SEWER - PROTECTED | PROSPECT AVENUE, BRONX, FROM STREET EAST 156 STREET TO STREET MACY PLACE |
B012022168A67 | 2022-06-17 | 2022-06-28 | REPAIR SEWER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012022167B16 | 2022-06-16 | 2022-07-14 | REPAIR WATER - PROTECTED | 101 AVENUE, QUEENS, FROM STREET 133 STREET TO STREET 134 STREET |
Q012022167A46 | 2022-06-16 | 2022-06-25 | REPAIR WATER | WOODHULL AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q012022152B50 | 2022-06-01 | 2022-06-30 | REPAIR SEWER | 154 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET 33 AVENUE |
B012022143C48 | 2022-05-23 | 2022-06-22 | REPAIR WATER | GLENMORE AVENUE, BROOKLYN, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE |
Q012022137B74 | 2022-05-17 | 2022-06-16 | REPAIR WATER - PROTECTED | 229 STREET, QUEENS, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD |
Q012022133B81 | 2022-05-13 | 2022-06-11 | REPAIR SEWER | 220 STREET, QUEENS, FROM STREET 133 ROAD TO STREET MERRICK BOULEVARD |
Q012022133B83 | 2022-05-13 | 2022-06-09 | REPAIR SEWER - PROTECTED | LIBERTY AVENUE, QUEENS, FROM STREET 130 STREET TO STREET 131 STREET |
Q012022132C83 | 2022-05-12 | 2022-05-31 | REPAIR WATER - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
B012022123A67 | 2022-05-03 | 2022-06-01 | REPAIR SEWER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012022123A66 | 2022-05-03 | 2022-05-31 | REPAIR WATER - SEWER | GLENMORE AVENUE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET |
Q012022115B98 | 2022-04-25 | 2022-05-19 | REPAIR WATER | 90 AVENUE, QUEENS, FROM STREET 74 PLACE TO STREET 75 STREET |
Q002022112A00 | 2022-04-22 | No data | MISCELLANEOUS - MINOR SALES | No data |
X012022104A08 | 2022-04-18 | 2022-05-13 | REPAIR WATER - PROTECTED | MATILDA AVENUE, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
Q012022108B77 | 2022-04-18 | 2022-05-13 | REPAIR SEWER - PROTECTED | 192 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE |
Q012022105A25 | 2022-04-15 | 2022-04-15 | REPAIR SEWER - PROTECTED | 90 AVENUE, QUEENS, FROM STREET 192 STREET TO STREET 193 STREET |
B012022102A28 | 2022-04-12 | 2022-05-10 | REPAIR WATER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012022097B83 | 2022-04-07 | 2022-05-06 | REPAIR WATER - SEWER | 85 ROAD, QUEENS, FROM STREET BEND TO STREET MC LAUGHLIN AVENUE |
Q012022097F57 | 2022-04-07 | 2022-05-07 | REPAIR WATER - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
X012022094A66 | 2022-04-04 | 2022-05-03 | REPAIR WATER - SEWER - PROTECTED | KINGSLAND AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE |
B012022091B45 | 2022-04-01 | 2022-05-05 | REPAIR WATER | AVENUE K, BROOKLYN, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET |
Q012022087C17 | 2022-03-28 | 2022-04-26 | REPAIR WATER - SEWER - PROTECTED | MOTT AVENUE, QUEENS, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET |
Q012022084G12 | 2022-03-25 | 2022-04-22 | REPAIR WATER | 113 AVENUE, QUEENS, FROM STREET 219 STREET TO STREET 221 STREET |
Q012022084G96 | 2022-03-25 | 2022-04-22 | REPAIR SEWER - PROTECTED | 90 AVENUE, QUEENS, FROM STREET 192 STREET TO STREET 193 STREET |
Q012022084G11 | 2022-03-25 | 2022-04-23 | REPAIR WATER - PROTECTED | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
Q012022083A68 | 2022-03-24 | 2022-04-22 | REPAIR SEWER | 14 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 30 ROAD |
B012022081C44 | 2022-03-22 | 2022-04-12 | REPAIR WATER | WASHINGTON AVENUE, BROOKLYN, FROM STREET EMPIRE BOULEVARD TO STREET FRANKLIN AVENUE |
Q012022077D35 | 2022-03-18 | 2022-04-16 | REPAIR WATER | 228 STREET, QUEENS, FROM STREET 130 AVENUE TO STREET 131 AVENUE |
Q012022070B23 | 2022-03-11 | 2022-04-09 | REPAIR SEWER - PROTECTED | 162 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
B012022070C41 | 2022-03-11 | 2022-04-09 | REPAIR WATER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012022047A18 | 2022-03-07 | 2022-03-17 | REPAIR WATER | 228 STREET, QUEENS, FROM STREET 130 AVENUE TO STREET 131 AVENUE |
X012022063A33 | 2022-03-04 | 2022-03-31 | REPAIR SEWER | WILDER AVENUE, BRONX, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE |
B012022063A51 | 2022-03-04 | 2022-03-31 | REPAIR SEWER | DREW STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
B012022060B28 | 2022-03-01 | 2022-03-30 | REPAIR WATER - SEWER | GLENMORE AVENUE, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET |
B012022042A57 | 2022-02-24 | 2022-02-16 | REPAIR WATER | EMPIRE BOULEVARD, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET WASHINGTON AVENUE |
M012022054A91 | 2022-02-23 | 2022-03-19 | REPAIR WATER | WEST 59 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012022052A01 | 2022-02-21 | 2022-03-20 | REPAIR WATER - SEWER | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET DEAD END |
B012022049A62 | 2022-02-18 | 2022-02-28 | REPAIR WATER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012022046B39 | 2022-02-16 | 2022-03-16 | REPAIR WATER | WASHINGTON AVENUE, BROOKLYN, FROM STREET EMPIRE BOULEVARD TO STREET FRANKLIN AVENUE |
Q012022045A43 | 2022-02-14 | 2022-02-22 | REPAIR WATER - SEWER | 126 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
B012022021A49 | 2022-02-11 | 2022-02-03 | REPAIR WATER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET STERLING PLACE |
Q012022035A75 | 2022-02-04 | 2022-03-05 | REPAIR WATER | 175 STREET, QUEENS, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE |
Q002022032A01 | 2022-02-01 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012022032A89 | 2022-02-01 | 2022-03-02 | REPAIR WATER - SEWER | SHERIDAN AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
Q012022031B62 | 2022-01-31 | 2022-03-01 | REPAIR WATER | ROCKAWAY BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET INWOOD STREET |
Q012022026A90 | 2022-01-26 | 2022-02-24 | REPAIR WATER | 140 AVENUE, QUEENS, FROM STREET SOUTHGATE STREET TO STREET THURSTON STREET |
Q012022019B94 | 2022-01-19 | 2022-02-17 | REPAIR WATER - SEWER | 125 AVENUE, QUEENS, FROM STREET MERRICK BOULEVARD TO STREET MERRILL STREET |
Q012022018C00 | 2022-01-18 | 2022-02-11 | REPAIR WATER - PROTECTED | 124 STREET, QUEENS, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE |
Q012022018B99 | 2022-01-18 | 2022-02-12 | REPAIR WATER - SEWER | 77 ROAD, QUEENS, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD |
Q012021364A55 | 2021-12-30 | 2022-01-08 | REPAIR WATER | 126 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
Q012021364A56 | 2021-12-30 | 2022-01-08 | REPAIR WATER - PROTECTED | 124 STREET, QUEENS, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE |
Q012021362C38 | 2021-12-28 | 2022-01-08 | REPAIR WATER - SEWER | 77 ROAD, QUEENS, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD |
B012021355A63 | 2021-12-21 | 2022-01-08 | REPAIR SEWER | HOYT STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET |
Q012021354B53 | 2021-12-20 | 2022-01-08 | REPAIR WATER - SEWER | 116 AVENUE, QUEENS, FROM STREET 200 STREET TO STREET 201 STREET |
B012021354A98 | 2021-12-20 | 2022-01-08 | REPAIR WATER | PARKSIDE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE |
Q012021351A42 | 2021-12-17 | 2022-01-08 | REPAIR SEWER | 14 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 30 ROAD |
Q012021351B70 | 2021-12-17 | 2022-01-08 | REPAIR WATER | ROCKAWAY BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET INWOOD STREET |
Q012021350B00 | 2021-12-16 | 2021-12-31 | REPAIR WATER - PROTECTED | 124 STREET, QUEENS, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE |
Q012021349A96 | 2021-12-15 | 2021-12-31 | REPAIR WATER - PROTECTED | BEACH 35 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE |
Q012021348B07 | 2021-12-14 | 2021-12-31 | REPAIR WATER | 126 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
Q012021337C83 | 2021-12-03 | 2021-12-31 | REPAIR SEWER | FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 135 AVENUE TO STREET 137 AVENUE |
Q012021337A19 | 2021-12-03 | 2021-12-30 | REPAIR WATER - PROTECTED | CHANNING ROAD, QUEENS, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET |
B012021333B39 | 2021-11-29 | 2021-12-30 | REPAIR WATER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012021312A90 | 2021-11-08 | 2021-12-07 | REPAIR SEWER - PROTECTED | HAWTREE STREET, QUEENS, FROM STREET 99 PLACE TO STREET COHANCY STREET |
Q012021300C38 | 2021-10-27 | 2021-11-27 | REPAIR WATER - PROTECTED | 129 STREET, QUEENS, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE |
B012021295A58 | 2021-10-22 | 2021-11-14 | REPAIR WATER - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
Q012021281B48 | 2021-10-08 | 2021-11-11 | REPAIR SEWER - PROTECTED | 85 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 37 AVENUE |
Q012021274B33 | 2021-10-01 | 2021-11-06 | REPAIR SEWER | FRANCIS LEWIS BOULEVARD, QUEENS, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD |
Q012021273B63 | 2021-09-30 | 2021-10-30 | REPAIR SEWER | ROCKAWAY BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET INWOOD STREET |
X012021263A59 | 2021-09-20 | 2021-10-20 | REPAIR WATER - SEWER | YOUNG AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET EAST GUN HILL ROAD |
X012021260A24 | 2021-09-17 | 2021-10-19 | REPAIR WATER - SEWER | HOLLYWOOD AVENUE, BRONX, FROM STREET BAISLEY AVENUE TO STREET WATERBURY AVENUE |
X012021253B12 | 2021-09-10 | 2021-09-27 | REPAIR WATER - SEWER | ECHO PLACE, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
X012021251C89 | 2021-09-08 | 2021-10-07 | REPAIR WATER | LACOMBE AVENUE, BRONX, FROM STREET COMMONWEALTH AVENUE TO STREET ST LAWRENCE AVENUE |
Q012020356A45 | 2020-12-21 | 2020-12-31 | RESTORATION RE-DIG - PROTECTED | MC BRIDE STREET, QUEENS, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE |
B012020353A27 | 2020-12-18 | 2020-12-31 | FINAL RESTORATION ONLY | EAST 11 STREET, BROOKLYN, FROM STREET GILMORE COURT TO STREET SHORE PARKWAY |
B012020351B29 | 2020-12-16 | 2020-12-31 | REPAIR WATER - PROTECTED | EAST 48 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012020351B30 | 2020-12-16 | 2020-12-31 | FINAL RESTORATION ONLY | JACKSON STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD |
Q012020350A27 | 2020-12-15 | 2020-12-31 | FINAL RESTORATION ONLY | 119 ROAD, QUEENS, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD |
B012020349B31 | 2020-12-14 | 2020-12-31 | FINAL RESTORATION ONLY - PROTECTED | HIMROD STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE |
B012020345B51 | 2020-12-10 | 2020-12-24 | REPAIR WATER - SEWER | AVENUE J, BROOKLYN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
B012020343F04 | 2020-12-08 | 2020-12-31 | FINAL RESTORATION ONLY | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012020341A00 | 2020-12-08 | 2020-12-31 | REPAIR WATER - PROTECTED | BAY 43 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE |
B012020338B12 | 2020-12-03 | 2020-12-31 | FINAL RESTORATION ONLY - PROTECTED | 6 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X012020337C23 | 2020-12-02 | 2020-12-31 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
B012020336A24 | 2020-12-01 | 2020-12-31 | REPAIR SEWER - PROTECTED | WILLMOHR STREET, BROOKLYN, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY |
Q012020335A71 | 2020-11-30 | 2020-12-29 | FINAL RESTORATION ONLY - PROTECTED | MC BRIDE STREET, QUEENS, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE |
Q012020335A84 | 2020-11-30 | 2020-12-29 | FINAL RESTORATION ONLY | 224 STREET, QUEENS, FROM STREET 147 AVENUE TO STREET DEAD END |
B012020335A88 | 2020-11-30 | 2020-12-30 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE |
B012020330C29 | 2020-11-25 | 2020-12-29 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
Q012020330B13 | 2020-11-25 | 2020-12-24 | REPAIR WATER - SEWER | 134 AVENUE, QUEENS, FROM STREET 155 STREET TO STREET 156 STREET |
B012020329B39 | 2020-11-24 | 2020-12-23 | FINAL RESTORATION ONLY | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
Q012020328B48 | 2020-11-23 | 2020-12-23 | REPAIR WATER | WOODHULL AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
X012020325A55 | 2020-11-20 | 2020-11-29 | REPAIR SEWER - PROTECTED | EAST 179 STREET, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
B012020324C30 | 2020-11-19 | 2020-11-27 | REPAIR WATER - SEWER | NOSTRAND AVENUE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B012020323A92 | 2020-11-18 | 2020-12-18 | REPAIR WATER - SEWER | EAST 11 STREET, BROOKLYN, FROM STREET GILMORE COURT TO STREET SHORE PARKWAY |
B012020322B46 | 2020-11-17 | 2020-12-17 | FINAL RESTORATION ONLY | JACKSON STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD |
B012020322B58 | 2020-11-17 | 2020-12-17 | REPAIR SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012020322B45 | 2020-11-17 | 2020-12-17 | REPAIR WATER - PROTECTED | EAST 48 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012020318A40 | 2020-11-13 | 2020-12-12 | FINAL RESTORATION ONLY - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE |
B012020318A42 | 2020-11-13 | 2020-12-12 | FINAL RESTORATION ONLY - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
B012020317A06 | 2020-11-12 | 2020-12-10 | REPAIR WATER - SEWER | AVENUE J, BROOKLYN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
B012020312A02 | 2020-11-11 | 2020-12-06 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET HALSEY STREET TO STREET HALSEY STREET |
Q012020316A04 | 2020-11-11 | 2020-12-09 | REPAIR WATER | 158 STREET, QUEENS, FROM STREET 134 AVENUE TO STREET 137 AVENUE |
B012020316A15 | 2020-11-11 | 2020-12-07 | REPAIR WATER - SEWER - PROTECTED | HIMROD STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE |
B012020316A05 | 2020-11-11 | 2020-12-10 | REPAIR WATER - SEWER | AVENUE J, BROOKLYN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET |
B012020314B36 | 2020-11-09 | 2020-12-08 | FINAL RESTORATION ONLY | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012020311C13 | 2020-11-06 | 2020-11-21 | REPAIR WATER | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020311C12 | 2020-11-06 | 2020-11-21 | REPAIR WATER - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
B012020311B98 | 2020-11-06 | 2020-11-08 | FINAL RESTORATION ONLY | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012020311A08 | 2020-11-06 | 2020-12-02 | FINAL RESTORATION ONLY - PROTECTED | 6 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012020305A10 | 2020-11-06 | 2020-11-23 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE |
B012020305A03 | 2020-11-06 | 2020-11-29 | REPAIR WATER - PROTECTED | BUFFALO AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE |
Q012020310A13 | 2020-11-05 | 2020-12-03 | REPAIR WATER | 176 STREET, QUEENS, FROM STREET 130 AVENUE TO STREET 132 AVENUE |
Q012020309D85 | 2020-11-04 | 2020-11-23 | REPAIR WATER - SEWER - PROTECTED | MC BRIDE STREET, QUEENS, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE |
Q012020304A54 | 2020-10-30 | 2020-11-14 | REPAIR WATER - SEWER | 119 ROAD, QUEENS, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD |
B012020304C10 | 2020-10-30 | 2020-11-14 | REPAIR WATER - PROTECTED | BERGEN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
B012020303A85 | 2020-10-29 | 2020-11-23 | REPAIR SEWER | BROADWAY, BROOKLYN, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE |
Q012020297B30 | 2020-10-23 | 2020-11-07 | REPAIR WATER | 51 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET SKILLMAN AVENUE |
B012020297D78 | 2020-10-23 | 2020-11-06 | REPAIR SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
Q012020292A00 | 2020-10-20 | 2020-11-16 | REPAIR SEWER | 189 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET 46 ROAD |
B012020290B28 | 2020-10-16 | 2020-11-17 | REPAIR WATER - SEWER | JACKSON STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD |
B012020290B66 | 2020-10-16 | 2020-10-30 | REPAIR WATER - PROTECTED | BERGEN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012020289B50 | 2020-10-15 | 2020-11-14 | REPAIR SEWER - PROTECTED | 119 AVENUE, QUEENS, FROM STREET 218 STREET TO STREET FRANCIS LEWIS BOULEVARD |
B012020288A81 | 2020-10-14 | 2020-11-07 | REPAIR WATER - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
B012020288B42 | 2020-10-14 | 2020-11-12 | REPAIR WATER - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
B012020282B41 | 2020-10-08 | 2020-11-07 | REPAIR WATER | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020282D00 | 2020-10-08 | 2020-11-08 | FINAL RESTORATION ONLY | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012020282B88 | 2020-10-08 | 2020-11-11 | REPAIR WATER - SEWER - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE |
B012020282B42 | 2020-10-08 | 2020-11-07 | REPAIR WATER - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
Q012020281A10 | 2020-10-07 | 2020-11-05 | REPAIR SEWER | 115 ROAD, QUEENS, FROM STREET 157 STREET TO STREET 158 STREET |
Q012020280C39 | 2020-10-06 | 2020-11-04 | REPAIR WATER - SEWER - PROTECTED | MC BRIDE STREET, QUEENS, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE |
Q012020280B16 | 2020-10-06 | 2020-10-31 | REPAIR WATER - SEWER | 119 ROAD, QUEENS, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD |
Q012020275C46 | 2020-10-01 | 2020-10-30 | REPAIR WATER - PROTECTED | SUTPHIN BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET ARLINGTON TERRACE |
B012020274B91 | 2020-09-30 | 2020-10-30 | REPAIR WATER - SEWER - PROTECTED | LOTT AVENUE, BROOKLYN, FROM STREET AMBOY STREET TO STREET HOPKINSON AVENUE |
B012020269C31 | 2020-09-25 | 2020-10-25 | FINAL RESTORATION ONLY | MAC DOUGAL STREET, BROOKLYN, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE |
Q012020269A76 | 2020-09-25 | 2020-10-24 | REPAIR WATER | 51 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET SKILLMAN AVENUE |
Q012020267A27 | 2020-09-23 | 2020-10-22 | REPAIR WATER | 157 STREET, QUEENS, FROM STREET 134 AVENUE TO STREET 137 AVENUE |
B012020267A15 | 2020-09-23 | 2020-10-24 | REPAIR WATER | EAST 86 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET SEAVIEW AVENUE |
B012020267B49 | 2020-09-23 | 2020-10-23 | REPAIR SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
Q012020267A37 | 2020-09-23 | 2020-10-23 | REPAIR SEWER - PROTECTED | MC BRIDE STREET, QUEENS, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE |
B012020265B70 | 2020-09-21 | 2020-10-16 | REPAIR WATER - PROTECTED | BERGEN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
X012020260A69 | 2020-09-16 | 2020-10-16 | REPAIR SEWER | MICKLE AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE |
X012020256A00 | 2020-09-15 | 2020-10-11 | REPAIR WATER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET |
S012020259D85 | 2020-09-15 | 2020-10-11 | FINAL RESTORATION ONLY | LOCKMAN AVENUE, STATEN ISLAND, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE |
B012020255C36 | 2020-09-14 | 2020-10-10 | REPAIR WATER | EAST 52 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012020252A75 | 2020-09-14 | 2020-09-15 | REPAIR WATER | CLARKSON AVENUE, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020255A37 | 2020-09-11 | 2020-10-13 | REPAIR WATER - PROTECTED | WYTHE AVENUE, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
Q012020254C43 | 2020-09-10 | 2020-09-28 | RESTORATION RE-DIG | BAISLEY BOULEVARD, QUEENS, FROM STREET 161 STREET TO STREET LONG STREET |
Q012020254A17 | 2020-09-10 | 2020-10-09 | REPAIR WATER | 170 STREET, QUEENS, FROM STREET 120 AVENUE TO STREET MARSDEN STREET |
B012020253B34 | 2020-09-10 | 2020-10-08 | REPAIR WATER - PROTECTED | 16 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B012020248B50 | 2020-09-08 | 2020-10-03 | REPAIR WATER - PROTECTED | EAST 82 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012020248B31 | 2020-09-04 | 2020-10-09 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
Q012020248A92 | 2020-09-04 | 2020-10-06 | REPAIR WATER - SEWER | 119 ROAD, QUEENS, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD |
S012020240A25 | 2020-08-27 | 2020-09-08 | REPAIR WATER | LOCKMAN AVENUE, STATEN ISLAND, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE |
B012020240B50 | 2020-08-27 | 2020-09-25 | REPAIR SEWER | MAC DOUGAL STREET, BROOKLYN, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE |
Q012020239B76 | 2020-08-26 | 2020-09-19 | FINAL RESTORATION ONLY | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 135 AVENUE TO STREET 136 AVENUE |
B012020239B53 | 2020-08-26 | 2020-09-09 | REPAIR WATER - SEWER | EAST 51 STREET, BROOKLYN, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET |
B012020239B44 | 2020-08-26 | 2020-09-25 | FINAL RESTORATION ONLY | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q012020239B67 | 2020-08-26 | 2020-09-06 | REPAIR WATER - SEWER | 119 ROAD, QUEENS, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD |
Q012020239B78 | 2020-08-26 | 2020-09-19 | FINAL RESTORATION ONLY | WOODHULL AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
X012020238A42 | 2020-08-25 | 2020-09-23 | REPAIR WATER - SEWER - PROTECTED | EAST 178 STREET, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
X012020233A52 | 2020-08-20 | 2020-09-19 | REPAIR WATER - SEWER | EAST 182 STREET, BRONX, FROM STREET MAPES AVENUE TO STREET PROSPECT AVENUE |
Q012020226B93 | 2020-08-13 | 2020-08-28 | REPAIR SEWER - PROTECTED | GIPSON STREET, QUEENS, FROM STREET CORNAGA AVENUE TO STREET HEALY AVENUE |
B012020226B83 | 2020-08-13 | 2020-09-15 | REPAIR WATER | EAST 99 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B012020224A77 | 2020-08-11 | 2020-09-09 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012020223A50 | 2020-08-11 | 2020-09-08 | REPAIR WATER | GLENWOOD ROAD, BROOKLYN, FROM STREET CORBIN COURT TO STREET EAST 12 STREET |
B012020219B78 | 2020-08-06 | 2020-09-05 | REPAIR WATER | MACON STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
Q012020218B08 | 2020-08-05 | 2020-08-30 | REPAIR WATER | 162 STREET, QUEENS, FROM STREET 75 ROAD TO STREET 76 AVENUE |
Q012020218B09 | 2020-08-05 | 2020-09-08 | REPAIR SEWER | 142 STREET, QUEENS, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE |
Q012020211B00 | 2020-07-29 | 2020-08-11 | REPAIR SEWER | WOODHULL AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
B012020206A28 | 2020-07-24 | 2020-08-26 | REPAIR WATER - SEWER | EAST 51 STREET, BROOKLYN, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET |
Q012020199A80 | 2020-07-17 | 2020-08-18 | REPAIR SEWER | HEALY AVENUE, QUEENS, FROM STREET DICKENS STREET TO STREET GIPSON STREET |
B012020198A96 | 2020-07-16 | 2020-08-19 | REPAIR WATER - SEWER | MAC DOUGAL STREET, BROOKLYN, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE |
Q012020195C10 | 2020-07-13 | 2020-08-13 | REPAIR WATER - SEWER | 119 ROAD, QUEENS, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD |
B012020192A78 | 2020-07-10 | 2020-08-11 | REPAIR WATER - SEWER | TOMPKINS AVENUE, BROOKLYN, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE |
S012020192A12 | 2020-07-10 | 2020-08-11 | REPAIR WATER | LOCKMAN AVENUE, STATEN ISLAND, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE |
B012020192A79 | 2020-07-10 | 2020-08-11 | REPAIR WATER | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020190A25 | 2020-07-08 | 2020-08-06 | REPAIR SEWER | NEW JERSEY AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
Q012020182C60 | 2020-06-30 | 2020-07-30 | REPAIR SEWER - PROTECTED | GIPSON STREET, QUEENS, FROM STREET CORNAGA AVENUE TO STREET HEALY AVENUE |
Q012020174B95 | 2020-06-22 | 2020-07-23 | REPAIR WATER - SEWER | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 135 AVENUE TO STREET 136 AVENUE |
Q012020169A39 | 2020-06-17 | 2020-07-15 | REPAIR SEWER | WOODHULL AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q012020168B69 | 2020-06-16 | 2020-06-21 | REPAIR WATER | 162 STREET, QUEENS, FROM STREET 75 ROAD TO STREET 76 AVENUE |
B012020167B08 | 2020-06-15 | 2020-07-14 | REPAIR SEWER | EAST 59 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
X012020164A90 | 2020-06-12 | 2020-07-14 | REPAIR SEWER - PROTECTED | EAST 178 STREET, BRONX, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE |
Q012020160A08 | 2020-06-10 | 2020-07-07 | REPAIR WATER | 147 AVENUE, QUEENS, FROM STREET 225 STREET TO STREET 226 STREET |
Q012020160E58 | 2020-06-08 | 2020-07-07 | REPAIR WATER - SEWER - PROTECTED | 106 AVENUE, QUEENS, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET |
Q012020156C62 | 2020-06-04 | 2020-07-07 | REPAIR WATER | 147 STREET, QUEENS, FROM STREET 119 AVENUE TO STREET 120 AVENUE |
Q012020154B18 | 2020-06-02 | 2020-07-03 | REPAIR WATER | 135 PLACE, QUEENS, FROM STREET 131 AVENUE TO STREET 133 AVENUE |
B012020150A10 | 2020-05-29 | 2020-06-27 | REPAIR WATER - PROTECTED | EAST 37 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
Q012020150C33 | 2020-05-29 | 2020-06-30 | REPAIR WATER | ATLANTIC AVENUE, QUEENS, FROM STREET 107 STREET TO STREET 108 STREET |
Q012020150C08 | 2020-05-29 | 2020-06-27 | REPAIR WATER | 130 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET INWOOD STREET |
X012020149B86 | 2020-05-28 | 2020-06-30 | REPAIR SEWER | CYPRESS AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 136 STREET |
X012020148A11 | 2020-05-27 | 2020-06-25 | REPAIR WATER | BUSSING AVENUE, BRONX, FROM STREET HILL AVENUE TO STREET MONTICELLO AVENUE |
B012020143B62 | 2020-05-22 | 2020-06-24 | REPAIR SEWER | EAST 59 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012020139C66 | 2020-05-18 | 2020-06-19 | REPAIR WATER | EAST 72 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
Q012020135B28 | 2020-05-14 | 2020-06-16 | REPAIR WATER | 162 STREET, QUEENS, FROM STREET 75 ROAD TO STREET 76 AVENUE |
Q012020135B25 | 2020-05-14 | 2020-06-16 | REPAIR WATER - PROTECTED | LIBERTY AVENUE, QUEENS, FROM STREET 130 STREET TO STREET 131 STREET |
X012020132A05 | 2020-05-11 | 2020-06-09 | REPAIR WATER | TENBROECK AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
Q012020126A65 | 2020-05-05 | 2020-06-04 | REPAIR WATER - PROTECTED | GUY R BREWER BOULEVARD, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
Q012020076A63 | 2020-03-16 | 2020-04-16 | REPAIR WATER | 97 AVENUE, QUEENS, FROM STREET 75 STREET TO STREET 76 STREET |
Q012020076B24 | 2020-03-16 | 2020-04-16 | REPAIR WATER - PROTECTED | LIBERTY AVENUE, QUEENS, FROM STREET 130 STREET TO STREET 131 STREET |
X012020073B49 | 2020-03-13 | 2020-04-10 | REPAIR WATER | LIGHT STREET, BRONX, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE |
Q012020073A50 | 2020-03-13 | 2020-04-14 | REPAIR WATER | 88 ROAD, QUEENS, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY |
Q012020071B26 | 2020-03-11 | 2020-04-09 | FINAL RESTORATION ONLY | 145 DRIVE, QUEENS, FROM STREET 177 PLACE TO STREET 177 STREET |
Q012020070E14 | 2020-03-10 | 2020-04-09 | REPAIR WATER - SEWER - PROTECTED | 106 AVENUE, QUEENS, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET |
B012020066D30 | 2020-03-06 | 2020-04-04 | REPAIR WATER - PROTECTED | SCHAEFER STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
M012020065B60 | 2020-03-05 | 2020-04-04 | REPAIR WATER | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012020065D55 | 2020-03-05 | 2020-04-04 | FINAL RESTORATION ONLY | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
B012020064B46 | 2020-03-04 | 2020-04-03 | FINAL RESTORATION ONLY | 82 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
B012020064B43 | 2020-03-04 | 2020-04-03 | FINAL RESTORATION ONLY - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
B012020064B47 | 2020-03-04 | 2020-04-03 | FINAL RESTORATION ONLY - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012020064B50 | 2020-03-04 | 2020-03-31 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012020064C40 | 2020-03-04 | 2020-04-03 | FINAL RESTORATION ONLY | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
Q012020062B16 | 2020-03-02 | 2020-04-03 | REPAIR SEWER | WOODHULL AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
X012020059C51 | 2020-02-28 | 2020-03-28 | FINAL RESTORATION ONLY | TENBROECK AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
M012020052B32 | 2020-02-21 | 2020-03-24 | REPAIR WATER - PROTECTED | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
B012020052B27 | 2020-02-21 | 2020-03-24 | REPAIR SEWER - PROTECTED | SHEFFIELD AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012020052B85 | 2020-02-21 | 2020-03-25 | REPAIR WATER | 54 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012020049A57 | 2020-02-19 | 2020-03-18 | REPAIR WATER | WILDER AVENUE, BRONX, FROM STREET BUSSING AVENUE TO STREET EDENWALD AVENUE |
B012020050A98 | 2020-02-19 | 2020-03-18 | REPAIR WATER - PROTECTED | EAST 54 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD |
X012020044A46 | 2020-02-13 | 2020-03-13 | REPAIR WATER | LIGHT STREET, BRONX, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE |
Q012020041B40 | 2020-02-10 | 2020-03-10 | REPAIR WATER - SEWER - PROTECTED | 106 AVENUE, QUEENS, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET |
M012020037A20 | 2020-02-06 | 2020-03-05 | REPAIR WATER | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q012019361A23 | 2020-02-06 | 2020-01-25 | REPAIR WATER | MERRICK BOULEVARD, QUEENS, FROM STREET 219 STREET TO STREET 220 STREET |
B012020037A72 | 2020-02-06 | 2020-03-06 | REPAIR SEWER - PROTECTED | HALSEY STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012020036B41 | 2020-02-05 | 2020-03-06 | REPAIR WATER - PROTECTED | SCHAEFER STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012020036B38 | 2020-02-05 | 2020-03-05 | FINAL RESTORATION ONLY | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
B012020036B36 | 2020-02-05 | 2020-03-04 | FINAL RESTORATION ONLY | POWERS STREET, BROOKLYN, FROM STREET BEND TO STREET CATHERINE STREET |
B012020035B16 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY | 82 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
Q012020035C45 | 2020-02-04 | 2020-03-05 | REPAIR WATER - SEWER | 145 DRIVE, QUEENS, FROM STREET 177 PLACE TO STREET 177 STREET |
Q012020035C62 | 2020-02-04 | 2020-03-04 | REPAIR WATER - SEWER | 155 STREET, QUEENS, FROM STREET 121 AVENUE TO STREET 122 AVENUE |
B012020035B24 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY | DEVOE STREET, BROOKLYN, FROM STREET CATHERINE STREET TO STREET OLIVE STREET |
B012020035B23 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012020035B19 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012020035B18 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012020035B17 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
B012020035B14 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY - PROTECTED | 15 AVENUE, BROOKLYN, FROM STREET 42 STREET TO STREET 43 STREET |
B012020035B13 | 2020-02-04 | 2020-03-04 | FINAL RESTORATION ONLY - PROTECTED | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B012020035B11 | 2020-02-04 | 2020-03-04 | REPAIR WATER | CHAUNCEY STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
X012020035A78 | 2020-02-04 | 2020-02-23 | REPAIR WATER | TENBROECK AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
X012020020A02 | 2020-01-23 | 2020-02-04 | REPAIR WATER | TURNBULL AVENUE, BRONX, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE |
B012020021C13 | 2020-01-21 | 2020-02-04 | REPAIR SEWER | EAST 21 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012020015B02 | 2020-01-17 | 2020-02-04 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE |
M012020017A29 | 2020-01-17 | 2020-02-03 | REPAIR WATER | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012020011A04 | 2020-01-14 | 2020-02-04 | REPAIR WATER - PROTECTED | CHESTER STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET |
B012020009A09 | 2020-01-13 | 2020-02-04 | REPAIR WATER | SNEDIKER AVENUE, BROOKLYN, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE |
B012020013C32 | 2020-01-13 | 2020-02-04 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012020009C40 | 2020-01-09 | 2020-02-04 | REPAIR WATER - SEWER | 145 DRIVE, QUEENS, FROM STREET 177 PLACE TO STREET 177 STREET |
Q012020008E84 | 2020-01-08 | 2020-02-04 | REPAIR SEWER | 73 AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET |
M012020008B15 | 2020-01-08 | 2020-02-03 | REPAIR WATER | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
X012020007B27 | 2020-01-07 | 2020-01-31 | REPAIR WATER | TENBROECK AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B012020006A87 | 2020-01-06 | 2020-02-01 | REPAIR WATER | POWERS STREET, BROOKLYN, FROM STREET BEND TO STREET CATHERINE STREET |
B012020003B34 | 2020-01-03 | 2020-02-01 | REPAIR WATER - PROTECTED | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
X012019365A10 | 2019-12-31 | 2019-12-31 | REPAIR WATER | TENBROECK AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B012019361A99 | 2019-12-27 | 2020-01-25 | REPAIR WATER - SEWER - PROTECTED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012019360A38 | 2019-12-26 | 2019-12-31 | REPAIR WATER | POWERS STREET, BROOKLYN, FROM STREET BEND TO STREET CATHERINE STREET |
Q012019357A36 | 2019-12-23 | 2019-12-31 | REPAIR WATER - SEWER | 155 STREET, QUEENS, FROM STREET 121 AVENUE TO STREET 122 AVENUE |
Q012019352C03 | 2019-12-18 | 2019-12-31 | REPAIR WATER - SEWER | BAISLEY BOULEVARD, QUEENS, FROM STREET 161 STREET TO STREET LONG STREET |
B012019352D17 | 2019-12-18 | 2019-12-31 | REPAIR WATER | AVENUE J, BROOKLYN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
Q012019352C01 | 2019-12-18 | 2019-12-31 | REPAIR WATER - PROTECTED | 106 AVENUE, QUEENS, FROM STREET INWOOD STREET TO STREET PRINCETON STREET |
Q012019350A13 | 2019-12-16 | 2019-12-31 | REPAIR WATER | DUNBAR STREET, QUEENS, FROM STREET MOTT AVENUE TO STREET PLUNKETT AVENUE |
Q012019350A12 | 2019-12-16 | 2019-12-31 | REPAIR WATER | BEACH 26 STREET, QUEENS, FROM STREET DEAD END TO STREET SEAGIRT AVENUE |
Q012019346B18 | 2019-12-12 | 2019-12-31 | REPAIR WATER | LIBERTY AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
B012019343C01 | 2019-12-09 | 2019-12-31 | REPAIR WATER - PROTECTED | 15 AVENUE, BROOKLYN, FROM STREET 42 STREET TO STREET 43 STREET |
Q012019340A95 | 2019-12-06 | 2019-12-31 | FINAL RESTORATION ONLY - PROTECTED | 165 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
Q012019340C21 | 2019-12-06 | 2019-12-31 | FINAL RESTORATION ONLY | 143 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD |
B012019340A74 | 2019-12-06 | 2019-12-31 | FINAL RESTORATION ONLY | HERBERT STREET, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET |
B012019340A66 | 2019-12-06 | 2019-12-31 | FINAL RESTORATION ONLY | STOCKHOLM STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
Q012019340C20 | 2019-12-06 | 2019-12-31 | FINAL RESTORATION ONLY | 120 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
M012019340A07 | 2019-12-06 | 2019-12-31 | REPAIR WATER - PROTECTED | ADRIAN AVENUE, MANHATTAN, FROM STREET TERRACE VIEW AVENUE TO STREET WEST 227 STREET |
B012019338B44 | 2019-12-04 | 2019-12-28 | REPAIR WATER | DEVOE STREET, BROOKLYN, FROM STREET CATHERINE STREET TO STREET OLIVE STREET |
Q012019337C46 | 2019-12-03 | 2019-12-31 | FINAL RESTORATION ONLY | 109 ROAD, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
Q012019337C49 | 2019-12-03 | 2019-12-31 | FINAL RESTORATION ONLY | 112 ROAD, QUEENS, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD |
Q012019337C11 | 2019-12-03 | 2019-12-31 | REPAIR WATER - SEWER | 224 STREET, QUEENS, FROM STREET 147 AVENUE TO STREET DEAD END |
B012019337D03 | 2019-12-03 | 2019-12-27 | REPAIR WATER - PROTECTED | RIDGEWOOD AVENUE, BROOKLYN, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET |
B012019337D05 | 2019-12-03 | 2019-12-30 | FINAL RESTORATION ONLY - PROTECTED | TAPSCOTT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
Q012019336B88 | 2019-12-02 | 2019-12-18 | REPAIR WATER - SEWER | BAISLEY BOULEVARD, QUEENS, FROM STREET 161 STREET TO STREET LONG STREET |
B012019331C38 | 2019-11-27 | 2019-12-28 | REPAIR WATER | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012019331C40 | 2019-11-27 | 2019-12-27 | FINAL RESTORATION ONLY - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
X012019331A88 | 2019-11-27 | 2019-12-20 | FINAL RESTORATION ONLY | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
Q012019330B60 | 2019-11-26 | 2019-12-26 | REPAIR WATER - SEWER - PROTECTED | 106 AVENUE, QUEENS, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET |
B012019329B93 | 2019-11-25 | 2019-11-30 | REPAIR WATER - PROTECTED | TAPSCOTT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012019326A62 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019326A61 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
X012019326B49 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY | EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST |
M012019326A20 | 2019-11-22 | 2019-12-20 | REPAIR WATER | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012019326B99 | 2019-11-22 | 2019-12-20 | FINAL RESTORATION ONLY - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
B012019326A68 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019326A66 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY | ROCKAWAY AVENUE, BROOKLYN, FROM STREET AMES LANE TO STREET EAST 98 STREET |
B012019326A65 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
B012019326A64 | 2019-11-22 | 2019-12-21 | FINAL RESTORATION ONLY - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019325B60 | 2019-11-21 | 2019-12-20 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019325C28 | 2019-11-21 | 2019-11-27 | REPAIR WATER - SEWER - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
B012019325C40 | 2019-11-21 | 2019-12-20 | FINAL RESTORATION ONLY | 82 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
Q012019324B36 | 2019-11-20 | 2019-12-20 | REPAIR WATER | HEMPSTEAD AVENUE, QUEENS, FROM STREET 220 STREET TO STREET 220 STREET |
Q012019324B29 | 2019-11-20 | 2019-12-20 | REPAIR WATER | HEMPSTEAD AVENUE, QUEENS, FROM STREET 220 STREET TO STREET 220 STREET |
B012019324C62 | 2019-11-20 | 2019-12-19 | REPAIR WATER | AVENUE J, BROOKLYN, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET |
B012019324C83 | 2019-11-20 | 2019-12-05 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET |
B012019324C88 | 2019-11-20 | 2019-12-17 | REPAIR WATER - SEWER - PROTECTED | AINSLIE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
M012019313A05 | 2019-11-12 | 2019-12-08 | REPAIR WATER - PROTECTED | ADRIAN AVENUE, MANHATTAN, FROM STREET TERRACE VIEW AVENUE TO STREET WEST 227 STREET |
Q012019303D88 | 2019-10-30 | 2019-11-19 | REPAIR WATER - SEWER | 109 ROAD, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
Q012019303C76 | 2019-10-30 | 2019-11-29 | REPAIR WATER - PROTECTED | 108 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
B012019303D70 | 2019-10-30 | 2019-11-24 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET |
B012019303B81 | 2019-10-30 | 2019-11-18 | REPAIR WATER - SEWER - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
B012019303C15 | 2019-10-30 | 2019-12-04 | REPAIR WATER | DEVOE STREET, BROOKLYN, FROM STREET CATHERINE STREET TO STREET OLIVE STREET |
B012019303B82 | 2019-10-30 | 2019-11-29 | REPAIR WATER | CORNELIA STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q012019298D65 | 2019-10-25 | 2019-11-23 | REPAIR WATER - SEWER | BAISLEY BOULEVARD, QUEENS, FROM STREET 161 STREET TO STREET LONG STREET |
B012019291C14 | 2019-10-18 | 2019-11-22 | REPAIR WATER - SEWER | HERBERT STREET, BROOKLYN, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET |
Q012019291B02 | 2019-10-18 | 2019-11-16 | REPAIR WATER | 143 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD |
Q012019290A57 | 2019-10-17 | 2019-11-13 | REPAIR WATER | LIBERTY AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
Q012019289C18 | 2019-10-16 | 2019-11-13 | REPAIR WATER | 73 AVENUE, QUEENS, FROM STREET 162 STREET TO STREET 164 STREET |
Q012019288B73 | 2019-10-15 | 2019-11-13 | REPAIR WATER | 120 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
X012019282B12 | 2019-10-09 | 2019-10-19 | REPAIR WATER - SEWER - PROTECTED | TIEMANN AVENUE, BRONX, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE |
B012019282B19 | 2019-10-09 | 2019-11-08 | REPAIR WATER - PROTECTED | RIDGEWOOD AVENUE, BROOKLYN, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET |
M012019280B73 | 2019-10-07 | 2019-11-05 | REPAIR WATER | EAST 116 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
Q012019280A50 | 2019-10-07 | 2019-11-05 | REPAIR WATER - SEWER | 112 ROAD, QUEENS, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD |
Q012019277A36 | 2019-10-04 | 2019-11-02 | REPAIR WATER - SEWER | UNION HALL STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
B012019276B46 | 2019-10-03 | 2019-10-23 | REPAIR WATER - SEWER | 82 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
B012019276B49 | 2019-10-03 | 2019-10-23 | REPAIR WATER - SEWER - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
M012019276A46 | 2019-10-03 | 2019-11-01 | FINAL RESTORATION ONLY - PROTECTED | WEST 10 STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET |
Q012019273B38 | 2019-09-30 | 2019-10-05 | REPAIR WATER - SEWER | 112 ROAD, QUEENS, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD |
X012019273A74 | 2019-09-30 | 2019-10-08 | REPAIR WATER - SEWER - PROTECTED | TIEMANN AVENUE, BRONX, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE |
B012019273C47 | 2019-09-30 | 2019-10-24 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET |
Q012019273B35 | 2019-09-30 | 2019-10-29 | REPAIR WATER - SEWER | 109 ROAD, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
B012019273C45 | 2019-09-30 | 2019-10-29 | REPAIR WATER - SEWER | UTICA AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
Q012019246C89 | 2019-09-03 | 2019-10-02 | REPAIR WATER - SEWER | UNION HALL STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
B012019239B61 | 2019-08-27 | 2019-09-25 | REPAIR WATER | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
Q012019239B04 | 2019-08-27 | 2019-09-27 | REPAIR WATER - SEWER | 109 ROAD, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
X012019238B88 | 2019-08-26 | 2019-09-24 | FINAL RESTORATION ONLY | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B012019238B73 | 2019-08-26 | 2019-09-24 | REPAIR WATER - SEWER | UTICA AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012019238F29 | 2019-08-26 | 2019-09-21 | REPAIR WATER - PROTECTED | TAPSCOTT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012019238F30 | 2019-08-26 | 2019-09-24 | FINAL RESTORATION ONLY - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
Q012019235C15 | 2019-08-23 | 2019-09-21 | FINAL RESTORATION ONLY | 77 AVENUE, QUEENS, FROM STREET 138 STREET TO STREET 141 STREET |
B012019235E09 | 2019-08-23 | 2019-09-16 | REPAIR WATER - SEWER - PROTECTED | COLONIAL ROAD, BROOKLYN, FROM STREET 81 STREET TO STREET 82 STREET |
B012019235E10 | 2019-08-23 | 2019-09-16 | REPAIR WATER - SEWER | 82 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
B012019235E11 | 2019-08-23 | 2019-09-24 | FINAL RESTORATION ONLY | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019233C57 | 2019-08-21 | 2019-09-15 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019233C54 | 2019-08-21 | 2019-09-19 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
M012019232B50 | 2019-08-20 | 2019-09-18 | FINAL RESTORATION ONLY - PROTECTED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET |
B012019232D22 | 2019-08-20 | 2019-09-18 | REPAIR SEWER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET AMES LANE TO STREET EAST 98 STREET |
B012019232D23 | 2019-08-20 | 2019-09-19 | FINAL RESTORATION ONLY - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
Q012019231C25 | 2019-08-19 | 2019-09-13 | FINAL RESTORATION ONLY | 45 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
X012019228D89 | 2019-08-16 | 2019-09-17 | FINAL RESTORATION ONLY - PROTECTED | BONNER PLACE, BRONX, FROM STREET DEAD END TO STREET MORRIS AVENUE |
B012019228B93 | 2019-08-16 | 2019-09-17 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
X012019228D88 | 2019-08-16 | 2019-09-18 | REPAIR WATER - PROTECTED | GRANT AVENUE, BRONX, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET |
B012019228B92 | 2019-08-16 | 2019-09-13 | FINAL RESTORATION ONLY | 5 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
B012019225C11 | 2019-08-15 | 2019-09-11 | REPAIR SEWER | RICHARDSON STREET, BROOKLYN, FROM STREET MONITOR STREET TO STREET NORTH HENRY STREET |
B012019227A05 | 2019-08-15 | 2019-09-12 | REPAIR WATER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
M012019227A73 | 2019-08-15 | 2019-09-13 | REPAIR WATER - SEWER - PROTECTED | WEST 90 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
X012019226B51 | 2019-08-14 | 2019-09-10 | REPAIR WATER - PROTECTED | THROOP AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B012019226A58 | 2019-08-14 | 2019-09-11 | FINAL RESTORATION ONLY | POWELL STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET |
B012019224C20 | 2019-08-12 | 2019-09-11 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019224B61 | 2019-08-12 | 2019-09-10 | REPAIR WATER - PROTECTED | MYRTLE AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE |
B012019224C29 | 2019-08-12 | 2019-09-04 | REPAIR WATER - SEWER | STOCKHOLM STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012019224C28 | 2019-08-12 | 2019-09-11 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
Q012019221D21 | 2019-08-09 | 2019-09-05 | REPAIR WATER - SEWER | 112 ROAD, QUEENS, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD |
B012019220B69 | 2019-08-08 | 2019-09-10 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET |
Q012019218A72 | 2019-08-06 | 2019-09-03 | REPAIR WATER | LIBERTY AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
Q012019213B96 | 2019-08-02 | 2019-08-30 | REPAIR WATER | 131 STREET, QUEENS, FROM STREET 131 AVENUE TO STREET 133 AVENUE |
B012019207C93 | 2019-07-26 | 2019-08-25 | FINAL RESTORATION ONLY - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
X012019207A66 | 2019-07-26 | 2019-08-25 | REPAIR SEWER | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B012019205C47 | 2019-07-24 | 2019-08-25 | FINAL RESTORATION ONLY | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019205C41 | 2019-07-24 | 2019-08-24 | FINAL RESTORATION ONLY | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012019205C45 | 2019-07-24 | 2019-08-25 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019205C48 | 2019-07-24 | 2019-08-28 | REPAIR WATER - PROTECTED | IRVING AVENUE, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
B012019205C49 | 2019-07-24 | 2019-08-22 | REPAIR WATER - PROTECTED | TAPSCOTT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012019204E75 | 2019-07-23 | 2019-08-22 | REPAIR WATER - SEWER | 82 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
Q012019204C95 | 2019-07-23 | 2019-08-22 | FINAL RESTORATION ONLY | 77 AVENUE, QUEENS, FROM STREET 138 STREET TO STREET 141 STREET |
B012019204F40 | 2019-07-23 | 2019-08-20 | FINAL RESTORATION ONLY - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B012019203H94 | 2019-07-22 | 2019-08-20 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
X012019200B58 | 2019-07-19 | 2019-08-18 | FINAL RESTORATION ONLY - PROTECTED | BONNER PLACE, BRONX, FROM STREET DEAD END TO STREET MORRIS AVENUE |
B012019200F00 | 2019-07-19 | 2019-08-18 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
B012019200F01 | 2019-07-19 | 2019-08-18 | REPAIR SEWER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET AMES LANE TO STREET EAST 98 STREET |
B012019200F03 | 2019-07-19 | 2019-08-19 | FINAL RESTORATION ONLY - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
Q012019199C67 | 2019-07-18 | 2019-08-14 | REPAIR WATER - SEWER - PROTECTED | 165 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
B012019197C76 | 2019-07-16 | 2019-08-15 | FINAL RESTORATION ONLY - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
M012019196A68 | 2019-07-15 | 2019-08-13 | REPAIR WATER - PROTECTED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET |
B012019193G28 | 2019-07-12 | 2019-07-22 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019193F08 | 2019-07-12 | 2019-08-13 | REPAIR WATER - SEWER | STOCKHOLM STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012019193G29 | 2019-07-12 | 2019-08-13 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019193G32 | 2019-07-12 | 2019-08-10 | FINAL RESTORATION ONLY | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
B012019193G33 | 2019-07-12 | 2019-08-12 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019193G34 | 2019-07-12 | 2019-08-12 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
Q012019193A79 | 2019-07-12 | 2019-08-10 | REPAIR WATER | 111 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
B012019192C73 | 2019-07-11 | 2019-08-08 | FINAL RESTORATION ONLY | 5 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
Q012019190A39 | 2019-07-09 | 2019-08-07 | REPAIR WATER | 45 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q012019159A02 | 2019-07-08 | 2019-07-07 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 52 COURT TO STREET 53 AVENUE |
B012019189B48 | 2019-07-08 | 2019-08-08 | REPAIR WATER | POWELL STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET |
Q012019183C98 | 2019-07-02 | 2019-08-01 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 52 COURT TO STREET 53 AVENUE |
Q012019183C96 | 2019-07-02 | 2019-07-23 | REPAIR WATER | 77 AVENUE, QUEENS, FROM STREET 138 STREET TO STREET 141 STREET |
B012019183D32 | 2019-07-02 | 2019-07-31 | FINAL RESTORATION ONLY | EAST 15 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
B012019182C20 | 2019-07-01 | 2019-07-25 | FINAL RESTORATION ONLY | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012019182A74 | 2019-07-01 | 2019-07-30 | REPAIR WATER - SEWER - PROTECTED | NEWELL STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE |
Q012019179A08 | 2019-06-28 | 2019-07-27 | REPAIR WATER - SEWER - PROTECTED | 150 AVENUE, QUEENS, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD |
Q012019177F14 | 2019-06-26 | 2019-07-26 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
B012019177B75 | 2019-06-26 | 2019-07-26 | FINAL RESTORATION ONLY - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
B012019177B76 | 2019-06-26 | 2019-07-26 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019177C42 | 2019-06-26 | 2019-07-26 | FINAL RESTORATION ONLY | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
X012019177A52 | 2019-06-26 | 2019-07-26 | REPAIR SEWER | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B012019176D68 | 2019-06-25 | 2019-07-24 | FINAL RESTORATION ONLY - PROTECTED | GRAFTON STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012019173A00 | 2019-06-25 | 2019-07-21 | REPAIR SEWER - PROTECTED | EAST 34 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
B012019175C85 | 2019-06-24 | 2019-07-20 | REPAIR WATER - SEWER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
X012019175B66 | 2019-06-24 | 2019-07-19 | FINAL RESTORATION ONLY - PROTECTED | BONNER PLACE, BRONX, FROM STREET DEAD END TO STREET MORRIS AVENUE |
B012019175C86 | 2019-06-24 | 2019-07-21 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012019171C59 | 2019-06-20 | 2019-07-23 | REPAIR WATER - PROTECTED | TAPSCOTT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012019171C62 | 2019-06-20 | 2019-07-19 | REPAIR SEWER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET AMES LANE TO STREET EAST 98 STREET |
B012019171C60 | 2019-06-20 | 2019-07-21 | FINAL RESTORATION ONLY - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B012019171C61 | 2019-06-20 | 2019-07-19 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
M012019169B98 | 2019-06-18 | 2019-07-15 | REPAIR WATER - SEWER - PROTECTED | WEST 90 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
Q012019168A98 | 2019-06-17 | 2019-07-17 | REPAIR WATER - SEWER - PROTECTED | 165 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET SOUTH ROAD |
Q012019163F50 | 2019-06-17 | 2019-07-11 | REPAIR WATER | 111 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 109 AVENUE |
B012019165D04 | 2019-06-14 | 2019-07-16 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012019165D03 | 2019-06-14 | 2019-07-10 | REPAIR WATER | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
Q012019165C62 | 2019-06-14 | 2019-07-16 | REPAIR WATER - PROTECTED | DITMARS BOULEVARD, QUEENS, FROM STREET 33 STREET TO STREET 35 STREET |
B012019165F81 | 2019-06-14 | 2019-07-16 | REPAIR WATER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012019164A39 | 2019-06-13 | 2019-07-09 | REPAIR WATER | POWELL STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET |
B012019164E67 | 2019-06-13 | 2019-07-14 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019164E70 | 2019-06-13 | 2019-07-13 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012019164E68 | 2019-06-13 | 2019-07-13 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019164A41 | 2019-06-13 | 2019-07-09 | FINAL RESTORATION ONLY | 5 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
B012019164E64 | 2019-06-13 | 2019-07-13 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
M012019161C15 | 2019-06-10 | 2019-07-11 | REPAIR WATER - PROTECTED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET |
Q012019156C13 | 2019-06-05 | 2019-07-04 | REPAIR WATER | 148 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012019154E22 | 2019-06-05 | 2019-07-02 | REPAIR SEWER | 74 STREET, QUEENS, FROM STREET 52 COURT TO STREET 53 AVENUE |
B012019156B33 | 2019-06-05 | 2019-06-30 | REPAIR WATER - SEWER - PROTECTED | NEWELL STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE |
Q012019154E15 | 2019-06-03 | 2019-06-26 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
B012019154D14 | 2019-06-03 | 2019-06-26 | FINAL RESTORATION ONLY - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
Q012019149C49 | 2019-05-29 | 2019-06-27 | REPAIR WATER - SEWER - PROTECTED | 150 AVENUE, QUEENS, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD |
Q012019149B51 | 2019-05-29 | 2019-06-28 | REPAIR WATER | 77 AVENUE, QUEENS, FROM STREET 138 STREET TO STREET 141 STREET |
B012019148C87 | 2019-05-28 | 2019-06-25 | FINAL RESTORATION ONLY | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019143A00 | 2019-05-28 | 2019-06-21 | REPAIR WATER | WALLACE AVENUE, BRONX, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE |
B012019144C96 | 2019-05-24 | 2019-06-23 | REPAIR WATER - PROTECTED | TAPSCOTT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE |
B012019144C95 | 2019-05-24 | 2019-06-26 | REPAIR WATER | MAPLE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019144C97 | 2019-05-24 | 2019-06-24 | REPAIR WATER - PROTECTED | GRAFTON STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012019144C98 | 2019-05-24 | 2019-06-26 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019144D68 | 2019-05-24 | 2019-06-21 | FINAL RESTORATION ONLY - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B012019142B68 | 2019-05-22 | 2019-06-19 | REPAIR SEWER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET AMES LANE TO STREET EAST 98 STREET |
B012019142B67 | 2019-05-22 | 2019-06-18 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012019142B60 | 2019-05-22 | 2019-06-19 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
B012019142B57 | 2019-05-22 | 2019-06-21 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012019142B56 | 2019-05-22 | 2019-06-16 | REPAIR WATER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
X012019142B36 | 2019-05-22 | 2019-06-21 | REPAIR WATER - PROTECTED | THROOP AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
X012019142B42 | 2019-05-22 | 2019-06-19 | FINAL RESTORATION ONLY - PROTECTED | BONNER PLACE, BRONX, FROM STREET DEAD END TO STREET MORRIS AVENUE |
M012019142C12 | 2019-05-22 | 2019-06-18 | REPAIR WATER - SEWER - PROTECTED | WEST 90 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
Q012019142D43 | 2019-05-22 | 2019-06-19 | FINAL RESTORATION ONLY - PROTECTED | 138 STREET, QUEENS, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE |
B012019142C12 | 2019-05-22 | 2019-06-16 | REPAIR WATER | JEFFERSON AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012019141C11 | 2019-05-21 | 2019-06-20 | REPAIR WATER - SEWER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
Q012019136A66 | 2019-05-20 | 2019-06-14 | REPAIR WATER | 145 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
X012019136A78 | 2019-05-16 | 2019-06-12 | FINAL RESTORATION ONLY | BOSTON ROAD, BRONX, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE |
B012019135D81 | 2019-05-15 | 2019-06-13 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019135D70 | 2019-05-15 | 2019-06-13 | REPAIR WATER | IRVING AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B012019135D66 | 2019-05-15 | 2019-06-14 | FINAL RESTORATION ONLY | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012019135D65 | 2019-05-15 | 2019-06-14 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019134E30 | 2019-05-14 | 2019-06-15 | REPAIR WATER | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
B012019134E27 | 2019-05-14 | 2019-06-13 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012019134E29 | 2019-05-14 | 2019-06-13 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019130D04 | 2019-05-10 | 2019-06-09 | FINAL RESTORATION ONLY | 5 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
X012019130B33 | 2019-05-10 | 2019-06-09 | FINAL RESTORATION ONLY | EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST |
X012019130B11 | 2019-05-10 | 2019-05-22 | REPAIR WATER - PROTECTED | THROOP AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B012019129A15 | 2019-05-09 | 2019-06-06 | FINAL RESTORATION ONLY | WEST 6 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012019128B32 | 2019-05-08 | 2019-05-31 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012019123D25 | 2019-05-03 | 2019-06-04 | REPAIR WATER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 98 STREET TO STREET POWER ROAD |
B012019121C08 | 2019-05-01 | 2019-05-15 | REPAIR WATER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012019121A61 | 2019-05-01 | 2019-05-16 | REPAIR WATER | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
Q012019121B05 | 2019-05-01 | 2019-05-31 | REPAIR WATER - PROTECTED | 163 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012019121C02 | 2019-05-01 | 2019-05-15 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012019121C03 | 2019-05-01 | 2019-05-20 | REPAIR WATER - PROTECTED | 138 STREET, QUEENS, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE |
B012019121C03 | 2019-05-01 | 2019-05-15 | FINAL RESTORATION ONLY | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012019121C05 | 2019-05-01 | 2019-05-15 | FINAL RESTORATION ONLY - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE |
B012019120E89 | 2019-04-30 | 2019-05-14 | REPAIR WATER | IRVING AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B012019120E87 | 2019-04-30 | 2019-05-14 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019120E86 | 2019-04-30 | 2019-05-14 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
Q012019120E04 | 2019-04-30 | 2019-05-14 | FINAL RESTORATION ONLY - PROTECTED | ABERDEEN ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET |
Q012019120C98 | 2019-04-30 | 2019-05-29 | REPAIR WATER - PROTECTED | 109 AVENUE, QUEENS, FROM STREET 204 STREET TO STREET 205 STREET |
B012019120E85 | 2019-04-30 | 2019-05-14 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019115F09 | 2019-04-25 | 2019-05-26 | REPAIR SEWER | POWELL STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET |
X012019115B18 | 2019-04-25 | 2019-05-10 | REPAIR WATER - PROTECTED | THROOP AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
B012019115F12 | 2019-04-25 | 2019-05-27 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019115F11 | 2019-04-25 | 2019-05-26 | FINAL RESTORATION ONLY | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019114A30 | 2019-04-24 | 2019-05-13 | REPAIR WATER | BOSTON ROAD, BRONX, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE |
B012019113C68 | 2019-04-23 | 2019-05-22 | REPAIR WATER - SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET |
B012019110A01 | 2019-04-23 | 2019-05-19 | REPAIR SEWER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET AMES LANE TO STREET EAST 98 STREET |
B012019112D59 | 2019-04-22 | 2019-05-22 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012019112C45 | 2019-04-22 | 2019-05-21 | REPAIR WATER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012019108A79 | 2019-04-18 | 2019-05-20 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
Q012019108B01 | 2019-04-18 | 2019-05-02 | REPAIR WATER - PROTECTED | 138 STREET, QUEENS, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE |
Q012019108A84 | 2019-04-18 | 2019-05-17 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
X012019108A08 | 2019-04-18 | 2019-05-06 | REPAIR WATER - PROTECTED | EAST 215 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
B012019106F80 | 2019-04-18 | 2019-05-15 | REPAIR WATER | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET |
B012019108A86 | 2019-04-18 | 2019-05-18 | FINAL RESTORATION ONLY | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012019108B13 | 2019-04-18 | 2019-05-20 | REPAIR WATER - SEWER - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
B012019108C06 | 2019-04-18 | 2019-05-19 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012019107D68 | 2019-04-17 | 2019-05-16 | FINAL RESTORATION ONLY | 51 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012019102A11 | 2019-04-15 | 2019-05-11 | REPAIR WATER - PROTECTED | 167 STREET, QUEENS, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD |
X012019101A56 | 2019-04-11 | 2019-05-10 | FINAL RESTORATION ONLY | EAST MOSHOLU PARKWAY NORTH, BRONX, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST |
B012019101B19 | 2019-04-11 | 2019-05-10 | FINAL RESTORATION ONLY | 5 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
Q012019100A16 | 2019-04-10 | 2019-05-08 | REPAIR WATER | 155 STREET, QUEENS, FROM STREET 119 ROAD TO STREET 120 AVENUE |
B012019098A05 | 2019-04-08 | 2019-05-04 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
X012019095A77 | 2019-04-05 | 2019-04-18 | REPAIR WATER - PROTECTED | BONNER PLACE, BRONX, FROM STREET DEAD END TO STREET MORRIS AVENUE |
Q012019095A17 | 2019-04-05 | 2019-04-18 | REPAIR WATER - SEWER - PROTECTED | 209 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET 94 AVENUE |
B012019095H94 | 2019-04-05 | 2019-05-06 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012019092A50 | 2019-04-05 | 2019-05-01 | REPAIR WATER | 112 ROAD, QUEENS, FROM STREET 227 STREET TO STREET CROSS ISLAND PARKWAY |
B012019093F75 | 2019-04-03 | 2019-05-02 | REPAIR WATER | MYRTLE AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE |
B012019092B16 | 2019-04-02 | 2019-05-01 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012019092F88 | 2019-04-02 | 2019-05-01 | REPAIR WATER - PROTECTED | 163 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012019092B23 | 2019-04-02 | 2019-05-01 | REPAIR WATER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012019091E40 | 2019-04-01 | 2019-04-30 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019091E43 | 2019-04-01 | 2019-04-30 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012019091E45 | 2019-04-01 | 2019-04-30 | REPAIR WATER | IRVING AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B012019091E46 | 2019-04-01 | 2019-05-01 | FINAL RESTORATION ONLY | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012019091E48 | 2019-04-01 | 2019-05-01 | FINAL RESTORATION ONLY - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE |
B012019091F59 | 2019-04-01 | 2019-04-25 | REPAIR WATER - PROTECTED | GRAFTON STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012019091C52 | 2019-04-01 | 2019-04-17 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
Q012019091D39 | 2019-04-01 | 2019-04-30 | FINAL RESTORATION ONLY - PROTECTED | ABERDEEN ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET |
B012019091E37 | 2019-04-01 | 2019-04-30 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019088A82 | 2019-03-29 | 2019-04-26 | REPAIR SEWER | POWELL STREET, BROOKLYN, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET |
B012019087D28 | 2019-03-28 | 2019-04-27 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019087D29 | 2019-03-28 | 2019-04-26 | FINAL RESTORATION ONLY | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012019087G55 | 2019-03-28 | 2019-04-10 | REPAIR WATER | 227 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
B012019087D16 | 2019-03-28 | 2019-04-26 | FINAL RESTORATION ONLY | HOWARD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
X012019086B42 | 2019-03-27 | 2019-04-26 | REPAIR WATER - PROTECTED | THROOP AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE |
Q012019084E54 | 2019-03-25 | 2019-04-23 | FINAL RESTORATION ONLY - PROTECTED | 101 AVENUE, QUEENS, FROM STREET 110 STREET TO STREET 110 STREET |
Q012019081B87 | 2019-03-22 | 2019-04-20 | REPAIR WATER | ATLANTIC AVENUE, QUEENS, FROM STREET 107 STREET TO STREET 108 STREET |
B012019081E14 | 2019-03-22 | 2019-04-20 | FINAL RESTORATION ONLY | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
B012019081E15 | 2019-03-22 | 2019-04-22 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
Q012019081B79 | 2019-03-22 | 2019-04-20 | REPAIR WATER - PROTECTED | 134 STREET, QUEENS, FROM STREET 131 AVENUE TO STREET 133 AVENUE |
Q012019079A20 | 2019-03-21 | 2019-04-18 | REPAIR WATER - PROTECTED | 138 STREET, QUEENS, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE |
B012019080C82 | 2019-03-21 | 2019-04-20 | REPAIR WATER - SEWER - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
B012019079B72 | 2019-03-20 | 2019-04-19 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012019079B71 | 2019-03-20 | 2019-04-18 | FINAL RESTORATION ONLY | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
X012019079B58 | 2019-03-20 | 2019-04-19 | REPAIR WATER - PROTECTED | EAST 215 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
B012019078B29 | 2019-03-19 | 2019-04-16 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012019078C25 | 2019-03-19 | 2019-04-05 | REPAIR WATER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
Q012019077A16 | 2019-03-18 | 2019-04-13 | REPAIR WATER | BEACH 86 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY |
B012019077F60 | 2019-03-18 | 2019-04-16 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
Q012019074C08 | 2019-03-15 | 2019-03-29 | REPAIR WATER - PROTECTED | ABERDEEN ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET |
X012019072A01 | 2019-03-14 | 2019-04-11 | REPAIR WATER | BOSTON ROAD, BRONX, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE |
Q012019072C38 | 2019-03-13 | 2019-04-12 | REPAIR SEWER | 94 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET 209 STREET |
Q012019072C39 | 2019-03-13 | 2019-04-12 | REPAIR WATER - PROTECTED | WATSON PLACE, QUEENS, FROM STREET DEAD END TO STREET POLHEMAS AVENUE |
Q012019068A05 | 2019-03-12 | 2019-04-07 | REPAIR WATER | MURDOCK AVENUE, QUEENS, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD |
B012019070E13 | 2019-03-11 | 2019-04-06 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012019067A14 | 2019-03-11 | 2019-04-06 | REPAIR WATER | ARLINGTON TERRACE, QUEENS, FROM STREET INWOOD STREET TO STREET LIVERPOOL STREET |
B012019067D66 | 2019-03-08 | 2019-03-21 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012019067D77 | 2019-03-08 | 2019-03-23 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012019067D68 | 2019-03-08 | 2019-03-21 | REPAIR WATER | HOWARD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012019067D67 | 2019-03-08 | 2019-03-21 | REPAIR WATER | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
B012019066C68 | 2019-03-07 | 2019-03-21 | REPAIR WATER - SEWER - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
X012019066A58 | 2019-03-07 | 2019-03-20 | REPAIR WATER - PROTECTED | EAST 215 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
Q012019065D52 | 2019-03-06 | 2019-04-04 | REPAIR WATER - SEWER - PROTECTED | 209 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET 94 AVENUE |
B012019065F19 | 2019-03-06 | 2019-04-03 | REPAIR WATER | IRVING AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B012019065F23 | 2019-03-06 | 2019-03-31 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
X012019064B13 | 2019-03-05 | 2019-04-04 | REPAIR WATER - PROTECTED | BONNER PLACE, BRONX, FROM STREET DEAD END TO STREET MORRIS AVENUE |
B012019060B80 | 2019-03-01 | 2019-03-31 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012019060B81 | 2019-03-01 | 2019-03-31 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019060C29 | 2019-03-01 | 2019-03-15 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012019060C39 | 2019-03-01 | 2019-04-01 | FINAL RESTORATION ONLY - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE |
B012019060C40 | 2019-03-01 | 2019-04-01 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019060C42 | 2019-03-01 | 2019-03-15 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012019060C44 | 2019-03-01 | 2019-04-01 | FINAL RESTORATION ONLY | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
Q012019060B01 | 2019-03-01 | 2019-04-01 | REPAIR WATER - PROTECTED | 163 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012019060A98 | 2019-03-01 | 2019-04-02 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
Q012019059C68 | 2019-02-28 | 2019-03-30 | REPAIR WATER | FOCH BOULEVARD, QUEENS, FROM STREET 171 STREET TO STREET MERRICK BOULEVARD |
B012019058C88 | 2019-02-27 | 2019-03-27 | FINAL RESTORATION ONLY | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012019058C91 | 2019-02-27 | 2019-03-28 | FINAL RESTORATION ONLY | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019058D30 | 2019-02-27 | 2019-03-30 | REPAIR WATER - PROTECTED | GRAFTON STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012019057A21 | 2019-02-26 | 2019-03-27 | REPAIR WATER | 227 STREET, QUEENS, FROM STREET 107 AVENUE TO STREET 108 AVENUE |
B012019037C15 | 2019-02-22 | 2019-03-07 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
Q012019052B57 | 2019-02-21 | 2019-03-22 | REPAIR WATER | ATLANTIC AVENUE, QUEENS, FROM STREET 107 STREET TO STREET 108 STREET |
Q012019046A60 | 2019-02-19 | 2019-03-16 | REPAIR WATER | SUNBURY ROAD, QUEENS, FROM STREET 120 AVENUE TO STREET IRWIN PLACE |
B012019046C21 | 2019-02-15 | 2019-03-19 | REPAIR WATER - SEWER | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
Q012019044A19 | 2019-02-13 | 2019-03-08 | REPAIR WATER | 145 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012019044D89 | 2019-02-13 | 2019-03-15 | REPAIR WATER - PROTECTED | ABERDEEN ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET |
B012019039C07 | 2019-02-08 | 2019-03-09 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
Q012019039A24 | 2019-02-08 | 2019-02-21 | RESTORATION RE-DIG | UTOPIA PARKWAY, QUEENS, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD |
B012019037B89 | 2019-02-06 | 2019-03-07 | REPAIR WATER | EAST 51 STREET, BROOKLYN, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET |
B012019037D55 | 2019-02-06 | 2019-03-07 | REPAIR WATER | HOWARD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012019037D54 | 2019-02-06 | 2019-03-07 | REPAIR WATER - SEWER - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
Q012019035F63 | 2019-02-04 | 2019-03-03 | REPAIR WATER - SEWER | UTOPIA PARKWAY, QUEENS, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD |
Q012019035F64 | 2019-02-04 | 2019-03-06 | REPAIR WATER - SEWER | INWOOD STREET, QUEENS, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE |
X012019035B47 | 2019-02-04 | 2019-03-06 | REPAIR WATER - PROTECTED | EAST 215 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
Q012019032D78 | 2019-02-01 | 2019-03-02 | REPAIR WATER - PROTECTED | 163 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012019032C52 | 2019-02-01 | 2019-03-04 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019032D18 | 2019-02-01 | 2019-03-02 | FINAL RESTORATION ONLY - PROTECTED | 6 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012019032D60 | 2019-02-01 | 2019-03-04 | REPAIR WATER | IRVING AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B012019032D61 | 2019-02-01 | 2019-03-06 | FINAL RESTORATION ONLY | EAST 15 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
Q012019032D79 | 2019-02-01 | 2019-03-03 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
B012019032D62 | 2019-02-01 | 2019-03-02 | FINAL RESTORATION ONLY - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE |
B012019032D66 | 2019-02-01 | 2019-03-02 | FINAL RESTORATION ONLY | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012019032D65 | 2019-02-01 | 2019-03-02 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012019032D64 | 2019-02-01 | 2019-03-02 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019031C30 | 2019-01-31 | 2019-03-01 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012019031C29 | 2019-01-31 | 2019-03-01 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012019031C31 | 2019-01-31 | 2019-03-01 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012019030G84 | 2019-01-30 | 2019-02-28 | REPAIR WATER - PROTECTED | GRAFTON STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012019030A33 | 2019-01-30 | 2019-02-28 | REPAIR WATER | FOCH BOULEVARD, QUEENS, FROM STREET 171 STREET TO STREET MERRICK BOULEVARD |
B012019029A19 | 2019-01-29 | 2019-02-25 | REPAIR WATER | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012019028A03 | 2019-01-28 | 2019-02-04 | REPAIR WATER | HOWARD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
Q012019028B89 | 2019-01-28 | 2019-02-27 | REPAIR WATER - SEWER | QUEENS BOULEVARD, QUEENS, FROM STREET 45 AVENUE TO STREET 70 STREET |
Q012019028A72 | 2019-01-28 | 2019-02-26 | REPAIR WATER - SEWER - PROTECTED | HURON STREET, QUEENS, FROM STREET ALBERT ROAD TO STREET ECKFORD AVENUE |
Q012019028A11 | 2019-01-28 | 2019-02-26 | REPAIR WATER - SEWER - PROTECTED | HURON STREET, QUEENS, FROM STREET ALBERT ROAD TO STREET ECKFORD AVENUE |
B012019025C31 | 2019-01-25 | 2019-02-26 | REPAIR WATER | KRIER PLACE, BROOKLYN, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE |
B012019024A12 | 2019-01-24 | 2019-02-04 | REPAIR WATER - SEWER - PROTECTED | EAST 55 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD |
B012019017E48 | 2019-01-17 | 2019-02-02 | REPAIR WATER | IRVING AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
Q012019011B60 | 2019-01-11 | 2019-02-04 | REPAIR WATER - SEWER | INWOOD STREET, QUEENS, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE |
B012019011D01 | 2019-01-11 | 2019-02-04 | FINAL RESTORATION ONLY | EAST 15 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
B012019004A83 | 2019-01-04 | 2019-01-13 | REPAIR WATER - SEWER | EAST 15 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
Q012019004B19 | 2019-01-04 | 2019-02-04 | REPAIR WATER - SEWER | UTOPIA PARKWAY, QUEENS, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD |
Q012019003B10 | 2019-01-03 | 2019-02-01 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
B012018362A09 | 2019-01-02 | 2019-01-26 | REPAIR WATER | DE GRAW STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012018365C94 | 2018-12-31 | 2019-01-29 | REPAIR WATER - PROTECTED | GRAFTON STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012018365F60 | 2018-12-31 | 2019-01-30 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012018365F59 | 2018-12-31 | 2019-01-30 | REPAIR WATER - SEWER | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012018365F57 | 2018-12-31 | 2019-01-30 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012018365C97 | 2018-12-31 | 2019-01-30 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012018365C96 | 2018-12-31 | 2019-01-30 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012018362B28 | 2018-12-28 | 2019-01-28 | REPAIR WATER - PROTECTED | TROUTMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q012018358A29 | 2018-12-27 | 2019-01-22 | REPAIR WATER | 134 AVENUE, QUEENS, FROM STREET DEAD END TO STREET FARMERS BOULEVARD |
Q012018355E88 | 2018-12-21 | 2018-12-31 | FINAL RESTORATION ONLY - PROTECTED | 79 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE |
B012018355E39 | 2018-12-21 | 2018-12-31 | FINAL RESTORATION ONLY - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE |
Q012018353B63 | 2018-12-19 | 2018-12-31 | REPAIR WATER - PROTECTED | 163 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012018352B57 | 2018-12-18 | 2018-12-31 | REPAIR WATER | 144 AVENUE, QUEENS, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD |
Q012018351A02 | 2018-12-17 | 2018-12-31 | FINAL RESTORATION ONLY | 91 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET 32 AVENUE |
B012018351A09 | 2018-12-17 | 2018-12-31 | REPAIR WATER - SEWER | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012018346C21 | 2018-12-12 | 2018-12-31 | REPAIR WATER - SEWER | EAST 15 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
B012018346A94 | 2018-12-12 | 2018-12-31 | FINAL RESTORATION ONLY | PACIFIC STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012018346A85 | 2018-12-12 | 2018-12-31 | REPAIR WATER | MADISON STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
Q012018346D76 | 2018-12-12 | 2018-12-31 | FINAL RESTORATION ONLY | BEACH 19 STREET, QUEENS, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET |
B012018344D02 | 2018-12-10 | 2018-12-25 | REPAIR WATER - PROTECTED | EAST 43 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012018344C21 | 2018-12-10 | 2018-12-31 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012018344D59 | 2018-12-10 | 2018-12-31 | FINAL RESTORATION ONLY - PROTECTED | HEWES STREET, BROOKLYN, FROM STREET BROADWAY TO STREET SOUTH 5 STREET |
B012018344D58 | 2018-12-10 | 2018-12-31 | FINAL RESTORATION ONLY | DECATUR STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE |
B012018344D57 | 2018-12-10 | 2018-12-31 | FINAL RESTORATION ONLY | ROSS STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012018339A46 | 2018-12-05 | 2018-12-31 | REPAIR SEWER - PROTECTED | 6 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012018337C83 | 2018-12-03 | 2018-12-31 | FINAL RESTORATION ONLY | SARATOGA AVENUE, BROOKLYN, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE |
B012018337C66 | 2018-12-03 | 2018-12-31 | REPAIR WATER - SEWER - PROTECTED | SHEFFIELD AVENUE, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B012018337C84 | 2018-12-03 | 2018-12-31 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018334C44 | 2018-11-30 | 2018-12-31 | FINAL RESTORATION ONLY | HANCOCK STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012018334C48 | 2018-11-30 | 2018-12-31 | REPAIR WATER | WAKEMAN PLACE, BROOKLYN, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE |
B012018320B38 | 2018-11-16 | 2018-12-01 | REPAIR WATER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012018313A90 | 2018-11-09 | 2018-12-11 | REPAIR WATER - PROTECTED | EAST 43 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
Q012018312D04 | 2018-11-08 | 2018-12-03 | REPAIR WATER - SEWER - PROTECTED | 126 STREET, QUEENS, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012018309D57 | 2018-11-05 | 2018-12-04 | FINAL RESTORATION ONLY - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018286A01 | 2018-10-22 | 2018-11-11 | REPAIR WATER - PROTECTED | EAST 43 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012018291B39 | 2018-10-18 | 2018-11-04 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018291C11 | 2018-10-18 | 2018-11-17 | REPAIR WATER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012018284C93 | 2018-10-11 | 2018-11-11 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018270A96 | 2018-09-27 | 2018-10-21 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018254C95 | 2018-09-11 | 2018-10-12 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
Q012018254C36 | 2018-09-11 | 2018-09-26 | REPAIR WATER - PROTECTED | SUTPHIN BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET 109 AVENUE |
B012018254C96 | 2018-09-11 | 2018-10-11 | FINAL RESTORATION ONLY - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018240C96 | 2018-08-28 | 2018-09-26 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018233C80 | 2018-08-21 | 2018-09-15 | REPAIR WATER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD |
Q012018226B77 | 2018-08-17 | 2018-09-12 | REPAIR WATER - PROTECTED | SUTPHIN BOULEVARD, QUEENS, FROM STREET 109 AVENUE TO STREET 109 AVENUE |
B012018225C51 | 2018-08-13 | 2018-09-11 | FINAL RESTORATION ONLY - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018225C58 | 2018-08-13 | 2018-09-12 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018194C84 | 2018-07-13 | 2018-08-13 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018194A38 | 2018-07-13 | 2018-08-11 | FINAL RESTORATION ONLY - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018194B32 | 2018-07-13 | 2018-08-10 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD |
Q012018193D33 | 2018-07-12 | 2018-08-10 | REPAIR WATER - SEWER - PROTECTED | 129 STREET, QUEENS, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE |
B012018166B28 | 2018-06-15 | 2018-07-14 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018155C51 | 2018-06-04 | 2018-07-04 | FINAL RESTORATION ONLY - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012018150F69 | 2018-05-30 | 2018-06-28 | FINAL RESTORATION ONLY - PROTECTED | 53 AVENUE, QUEENS, FROM STREET 197 STREET TO STREET 198 STREET |
B012018141E23 | 2018-05-21 | 2018-06-17 | FINAL RESTORATION ONLY - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012018134C99 | 2018-05-14 | 2018-06-09 | FINAL RESTORATION ONLY - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018124C51 | 2018-05-04 | 2018-06-04 | FINAL RESTORATION ONLY - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018124C40 | 2018-05-04 | 2018-05-18 | FINAL RESTORATION ONLY - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
Q012018120A94 | 2018-04-30 | 2018-05-29 | REPAIR SEWER - PROTECTED | 53 AVENUE, QUEENS, FROM STREET 197 STREET TO STREET 198 STREET |
Q012018110F97 | 2018-04-20 | 2018-05-21 | REPAIR WATER - PROTECTED | 202 STREET, QUEENS, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE |
Q012018102B07 | 2018-04-12 | 2018-05-12 | FINAL RESTORATION ONLY - PROTECTED | 174 STREET, QUEENS, FROM STREET 134 ROAD TO STREET 137 AVENUE |
B012018101B87 | 2018-04-11 | 2018-05-10 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018096A11 | 2018-04-06 | 2018-05-05 | FINAL RESTORATION ONLY - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
Q012018096B21 | 2018-04-06 | 2018-04-21 | REPAIR WATER - PROTECTED | 202 STREET, QUEENS, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE |
B012018095C61 | 2018-04-05 | 2018-05-05 | REPAIR WATER - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012018089B93 | 2018-03-30 | 2018-04-28 | REPAIR WATER - PROTECTED | SUTPHIN BOULEVARD, QUEENS, FROM STREET 111 ROAD TO STREET 112 AVENUE |
Q012018086D66 | 2018-03-27 | 2018-04-26 | REPAIR SEWER - PROTECTED | 53 AVENUE, QUEENS, FROM STREET 197 STREET TO STREET 198 STREET |
B012018086E68 | 2018-03-27 | 2018-04-10 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
Q012018068A10 | 2018-03-13 | 2018-04-07 | REPAIR WATER - PROTECTED | 202 STREET, QUEENS, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE |
Q012018072E80 | 2018-03-13 | 2018-03-27 | REPAIR SEWER - PROTECTED | 53 AVENUE, QUEENS, FROM STREET 197 STREET TO STREET 198 STREET |
B012018072G77 | 2018-03-13 | 2018-04-05 | REPAIR WATER - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012018065D23 | 2018-03-06 | 2018-04-05 | REPAIR WATER - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012018065D38 | 2018-03-06 | 2018-03-26 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE |
B012018054C59 | 2018-02-23 | 2018-03-27 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
B012018047E09 | 2018-02-16 | 2018-03-13 | REPAIR WATER - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012018043E18 | 2018-02-12 | 2018-03-13 | REPAIR SEWER - PROTECTED | 53 AVENUE, QUEENS, FROM STREET 197 STREET TO STREET 198 STREET |
B012018033A34 | 2018-02-02 | 2018-03-06 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE |
B012018033B67 | 2018-02-02 | 2018-03-06 | REPAIR WATER - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012018009C91 | 2018-01-09 | 2018-02-04 | REPAIR WATER - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012017363G48 | 2017-12-29 | 2018-01-08 | REPAIR WATER - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
Q012017345C89 | 2017-12-11 | 2017-12-31 | FINAL RESTORATION ONLY - PROTECTED | 128 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
B012017334B06 | 2017-11-30 | 2017-12-30 | REPAIR WATER - PROTECTED | SACKETT STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
Q012017326A16 | 2017-11-22 | 2017-12-08 | REPAIR WATER - SEWER - PROTECTED | 128 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
B012017324A96 | 2017-11-20 | 2017-12-01 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE |
Q012017321C44 | 2017-11-17 | 2017-12-19 | REPAIR WATER - PROTECTED | 21 STREET, QUEENS, FROM STREET 44 DRIVE TO STREET 44 ROAD |
B012017317C77 | 2017-11-13 | 2017-11-15 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE |
B012017300B37 | 2017-10-27 | 2017-11-10 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
Q012017298D70 | 2017-10-25 | 2017-11-24 | REPAIR WATER - SEWER - PROTECTED | 128 STREET, QUEENS, FROM STREET 135 AVENUE TO STREET 149 AVENUE |
B012017271B69 | 2017-09-28 | 2017-10-27 | REPAIR WATER - PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE |
Q012017219A39 | 2017-08-07 | 2017-09-05 | REPAIR SEWER - PROTECTED | 142 STREET, QUEENS, FROM STREET 109 AVENUE TO STREET GLASSBORO AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2024-09-06 | 2024-09-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-26 | 2024-09-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-07-02 | 2024-08-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-07 | 2024-07-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-04 | 2024-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-04 | 2024-06-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-09 | 2024-06-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-15 | 2024-05-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-03 | 2024-02-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-17 | 2024-01-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-23 | 2023-11-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-19 | 2023-10-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-14 | 2023-10-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-02 | 2023-08-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-18 | 2023-08-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-10 | 2023-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-10 | 2023-07-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-16 | 2023-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-08 | 2023-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-08 | 2023-06-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-07 | 2023-06-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-30 | 2023-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-18 | 2023-05-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-18 | 2023-05-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-08 | 2023-05-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-08 | 2023-05-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-24 | 2023-05-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-24 | 2023-04-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-19 | 2023-04-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-29 | 2023-01-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-28 | 2022-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-28 | 2022-10-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-26 | 2022-10-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-26 | 2022-10-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-25 | 2022-10-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-25 | 2022-10-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-24 | 2022-10-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-24 | 2022-10-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-21 | 2022-10-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-21 | 2022-10-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-07 | 2022-10-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-27 | 2022-10-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-19 | 2022-09-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-19 | 2022-09-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-16 | 2022-09-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-16 | 2022-09-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-08 | 2022-09-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-07 | 2022-09-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-31 | 2022-09-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-31 | 2022-08-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-30 | 2022-08-31 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-30 | 2022-08-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-29 | 2022-08-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-29 | 2022-08-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-23 | 2022-08-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-10 | 2022-08-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-10 | 2022-08-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-09 | 2022-08-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-09 | 2022-08-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-08 | 2022-08-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-08 | 2022-08-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-05 | 2022-08-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-05 | 2022-08-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-15 | 2022-08-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2022-07-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-13 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-13 | 2022-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-17 | 2022-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-17 | 2022-05-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-12 | 2022-05-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-12 | 2022-05-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-26 | 2022-05-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-26 | 2022-04-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-25 | 2022-04-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-25 | 2022-04-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-22 | 2022-04-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-22 | 2022-04-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-21 | 2022-04-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-21 | 2022-04-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-20 | 2022-04-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-20 | 2022-04-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-19 | 2022-04-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-19 | 2022-04-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-15 | 2022-04-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-25 | 2022-03-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-25 | 2022-04-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-24 | 2022-03-25 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-23 | 2022-03-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-23 | 2022-03-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-16 | 2022-03-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-16 | 2022-03-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-01 | 2022-03-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-03-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-24 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-24 | 2022-02-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-11 | 2022-02-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-11 | 2022-02-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-08 | 2022-02-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-08 | 2022-02-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-07 | 2022-02-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-07 | 2022-02-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-01-13 | 2022-02-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-01-03 | 2022-01-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-12-29 | 2022-01-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-12-09 | 2021-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-12-07 | 2021-12-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-30 | 2021-12-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-30 | 2021-11-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-29 | 2021-11-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-29 | 2021-11-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-23 | 2021-11-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-20 | 2021-11-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-16 | 2021-11-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-16 | 2021-11-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-15 | 2021-11-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-15 | 2021-11-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-15 | 2021-11-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-02 | 2021-10-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-01 | 2021-10-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-01 | 2021-10-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-29 | 2021-10-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-27 | 2021-09-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-23 | 2021-09-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-23 | 2021-09-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-21 | 2021-09-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-21 | 2021-09-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-20 | 2021-09-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-20 | 2021-09-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-16 | 2021-09-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-07 | 2021-09-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-08-17 | 2021-09-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-28 | 2021-08-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-28 | 2021-07-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-27 | 2021-07-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-27 | 2021-07-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-23 | 2021-07-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-23 | 2021-07-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-21 | 2021-07-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-21 | 2021-07-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-16 | 2021-07-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-16 | 2021-07-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-13 | 2021-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-13 | 2021-07-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-12 | 2021-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2005-04-04 | 2015-12-30 | Address | 764 BRADY AVENUE, BRONX, NY, 10462, USA (Type of address: Service of Process) |
2005-04-04 | 2021-07-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
170413006087 | 2017-04-13 | BIENNIAL STATEMENT | 2017-04-01 |
170123002007 | 2017-01-23 | BIENNIAL STATEMENT | 2015-04-01 |
151230000304 | 2015-12-30 | CERTIFICATE OF CHANGE | 2015-12-30 |
131021000110 | 2013-10-21 | ANNULMENT OF DISSOLUTION | 2013-10-21 |
DP-2119311 | 2012-01-25 | DISSOLUTION BY PROCLAMATION | 2012-01-25 |
050404000634 | 2005-04-04 | CERTIFICATE OF INCORPORATION | 2005-04-04 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-31 | No data | 74 STREET, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plates found in compliance, permit status is active in the system |
2024-10-31 | No data | 97 AVENUE, FROM STREET 80 STREET TO STREET 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut to grade. |
2024-10-30 | No data | MURRAY STREET, FROM STREET 25 AVENUE TO STREET 25 DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site, open excavation in parking/driving lane |
2024-10-30 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-10-30 | No data | SAYRES AVENUE, FROM STREET 175 PLACE TO STREET 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced. |
2024-10-29 | No data | DREW STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags in compliance |
2024-10-29 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-10-29 | No data | 32 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed in driving and parking lanes.WD = 121.5DD = 111.8MD = 118.5ACTUAL = 8.7%Compaction Test bottom = 97.2% Compaction Test top = 97.6% |
2024-10-29 | No data | 175 STREET, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Covered by gas work. |
2024-10-28 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO VISIBLE WORK FOUND |
2024-10-28 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to DOT in house paving and milling no work found on the segment. |
2024-10-26 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave |
2024-10-25 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut made permanent |
2024-10-25 | No data | 32 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Not Verified. There is a temp cut on the sidewalk ifo 30-24 (Active B.O.) at time of inspection. Crew on site working at this time. Active permit on file. |
2024-10-24 | No data | DUMONT AVENUE, FROM STREET JEROME STREET TO STREET WARWICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed CONCRETE DEBRIS IN PARKING LANE WITHOUT A VALID DOT PERMIT. |
2024-10-22 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | RESPONDENT FAILED TO HAVE A TESTER ON SITE |
2024-10-20 | No data | STANLEY AVENUE, FROM STREET AMBER STREET TO STREET EMERALD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New permit on file for restoration |
2024-10-20 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has a roadway excavation covered I/F/O 1369. Evidence provided from NYC Street permit management system inculcation of no valid DOT permit. |
2024-10-18 | No data | 74 STREET, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | Plates offer skids resistance however, 1 plate has shifted and NICA will be started . |
2024-10-18 | No data | HOPKINS STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Respondent has an active permit to excavate in front of 179 Hopkins St not 175 Hopkins St. |
2024-10-18 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition came afterwards and redig is being issued. |
2024-10-18 | No data | 74 STREET, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate reset. No spacing in between plates |
2024-10-18 | No data | 74 STREET, FROM STREET 57 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate with Rocke Small plumbing marking is shifted 2” in roadway, |
2024-10-17 | No data | SPRINGFIELD BOULEVARD, FROM STREET 113 DRIVE TO STREET 114 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway and 1 flag on sidewalk. |
2024-10-17 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | N.I.C.A. reinspection passed, sunken restoration/adjacent area brought to grade with temporary asphalt within the driving lane in front of 219-35 112th Avenue. |
2024-10-17 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7'x5' section of permanent restoration + surrounding area sunken 5" within the driving lane in front of 219-35 112th Avenue. |
2024-10-17 | No data | 85 STREET, FROM STREET 95 AVENUE TO STREET 97 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic water service. DEP notice issued to property. One excavation in roadway and sidewalk |
2024-10-17 | No data | BEECH TERRACE, FROM STREET BEEKMAN AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced by BPP |
2024-10-15 | No data | PARK PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L 3FT 6IN W 3FT D 2FT WD 113.4 DD 105.7 MD 109.3 AM 7.3; 96.3% |
2024-10-15 | No data | PARK AVENUE, FROM STREET DELMONICO PLACE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L 6FT W 3FT 6 IN D 3FT WD 120.0. DD 111.1 MD 118.4 AM 8.0; 98.3% |
2024-10-15 | No data | PARK AVENUE, FROM STREET DELMONICO PLACE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the SW/RW |
2024-10-15 | No data | PARK PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the RW |
2024-10-15 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The asphalt is broken out on the permanent restoration in the driving lane and parking lane OPP property #436 Essex Street. Restore in kind. |
2024-10-15 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The color code marker has been installed. |
2024-10-15 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IBM markers added to both restorations in front of 115-45 168 street |
2024-10-14 | No data | DE KALB AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The temporary restoration on the sidewalk IFO property #503 De Kalb Av is overdue for final. B012024215B83 expired 8/28/2024. |
2024-10-14 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench in the r/w.....steel plates & shoring underneath container with an active permit |
2024-10-14 | No data | DE KALB AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed a street plate stored in the parking lane after DOT permit expiration. Permit #B012024215B83 expired 8/28/2024. Respondent failed to remove the street plate after final restoration and prior to DOT permit expiration. Cited permit and ROCK |
2024-10-14 | No data | DE KALB AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The temporary restoration on the sidewalk IFO property #503 De Kalb Av is overdue for final. B012024215B83 expired 8/28/2024. |
2024-10-14 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a permanent restoration sunken more than 2 inches in the parking lane and 1.5 inches in the driving lane. CAR# 20245150106 issued 4/4/24. Respondent failed to make the wearing course flush with the surrounding area. Cite permit used for ID |
2024-10-13 | No data | NASHVILLE BOULEVARD, FROM STREET 120 AVENUE TO STREET 121 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in parking lane at 120-23 nashville boulevard |
2024-10-13 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent failed to restore cut to grade within driving lane at 219-35 112th Avenue after notification was made via C.A.R. 20246200377 on 8/17/24. |
2024-10-08 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates shifts and make noise when car drive over it. Steel plates need to be reset, securely pin and ramp. |
2024-10-08 | No data | 136 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak Contractor currently making Repairs in the Roadway |
2024-10-07 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PATCH WORK ON THE SIDE WALK UNDERNEATH SCAFFOLDING |
2024-10-07 | No data | 36 AVENUE, FROM STREET 200 STREET TO STREET 201 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp cut within the sidewalk. |
2024-10-06 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has a roadway excavation covered I/F/O 1369. Evidence provided from NYC Street permit management system inculcation of no valid DOT permit. |
2024-10-06 | No data | 14 AVENUE, FROM STREET 159 STREET TO STREET 160 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a permanent restoration in the driving lane, with a missing color code. The respondent failed to install missing color code on permanent restoration. |
2024-10-06 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Active permit on file, permanent restoration in the driving lane. Steel plate against the curb is not making any noise currently. |
2024-10-05 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway in compliance |
2024-10-04 | No data | 166 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete on 2 excavations in the roadway . No Base done. Sprayed for cut-backs |
2024-10-03 | No data | HOLLY AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across the roadway, sidewalk flag restored I/F/O 146-15 Holly Avenue. |
2024-10-02 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration made to grade in parking lane and flags on sidewalk restored in kind |
2024-10-02 | No data | EAST 137 STREET, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Crew on site, temp mounded 10’ west of crosswalk belongs to DEPCrew on site working inside excavation adjacent to sunken cut (5.5’ x 3’ temp cut sunken 4.5). NICA remains sunken. |
2024-10-02 | No data | EAST 137 STREET, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 5.5’ x 3’ temp cut sunken 4.5” 3’x3’ temp cut mounded 3” |
2024-09-30 | No data | UNDERCLIFF AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done at time of inspection. |
2024-09-30 | No data | 146 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent cuts restored in kind. |
2024-09-30 | No data | 74 STREET, FROM STREET HORACE HARDING EXPRESSWAY TO STREET 58 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Respondent working on a sewer installation in roadway in front 57-51/53/55 , that’s 30 feet in depth without a valid DOT permit. Respondent previous permit Q012024234A37 expired on 9/4/24 . No new permit on file . Previous permit used for ID |
2024-09-29 | No data | WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in roadway overdue for final, must make cut permanent and restore in kind. I/f/o 939 |
2024-09-29 | No data | 133 AVENUE, FROM STREET 225 STREET TO STREET DUBONS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 long water restorations in front of 225-02 133 avenue, no sidewalk work found |
2024-09-28 | No data | DUMONT AVENUE, FROM STREET JEROME STREET TO STREET WARWICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in the RW, debris on the PL |
2024-09-28 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2024-09-27 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Restoration located within the driving lane IFO property 256 - 10'x3'x5' |
2024-09-27 | No data | FTELEY AVENUE, FROM STREET BANYER PLACE TO STREET CLASON POINT LANE NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp 4’x5’cut in roadway overdue for final, must make cut permanent i/f/o 939 |
2024-09-26 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: LL14 | Department of Transportation | new sewer and water 13'11" x 4'3" x 8' |
2024-09-25 | No data | 74 STREET, FROM STREET BEND TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O#57-53, this condition has been addressed, Plates have been reset. |
2024-09-25 | No data | 74 STREET, FROM STREET BEND TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated cut, water/sewer excavation remains without a valid DOT permit. NOV issued. |
2024-09-25 | No data | 163 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to restore defective sidewalk flags in front of 88-32. Temporary asphalt has been applied on repair water sidewalk flags. Respondent was notified by CAR #20246150370 issued on 8/11/24 |
2024-09-25 | No data | PARK PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 SIDE WALK FLAG IS EXCAVATED WITH CONES PLACED AROUND AND EXCAVATED DEBRIS STORED IN THE PARKING LANE. |
2024-09-25 | No data | MADISON STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | STIP VIOLATION WORKING PAST STIP TIME |
2024-09-25 | No data | 14 AVENUE, FROM STREET 159 STREET TO STREET 160 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent water restoration within the driving lane. The respondent failed to install color code o restoration. The respondent was notified by CAR #20248620213 on 8/20/2024 but condition remain. |
2024-09-25 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to maintain wearing course to be flushed with the surrounding area of repair water restoration. Respondent was notified by CAR #20246150401 issued on 7/11/24. |
2024-09-25 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site filling in excavation in the roadway i/f/o 140. |
2024-09-24 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate found on roadway |
2024-09-24 | No data | EAST 137 STREET, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to comply with the agreement and conditions of this permit by violating stipulation 013,maintain 5ft pedestrian walkway on sidewalk. Therefore a summons has been issued |
2024-09-23 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-09-23 | No data | 65 PLACE, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in sidewalk , one excavation made on sidewalk and one excavation made on roadway , crew on site. |
2024-09-22 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2024-09-22 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Missing color code |
2024-09-21 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a temporary water restoration within the parking lane I/F/O 15-34 150th Street. The respondent failed to permanent restore restoration within the required time. The respondent was notified by CAR #20246200341 |
2024-09-21 | No data | 197 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No repair water & sewer work done in front of 90-03, permit has expired. |
2024-09-20 | No data | FULTON STREET, FROM STREET ASHFORD STREET TO STREET WARWICK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2024-09-20 | No data | FULTON STREET, FROM STREET ASHFORD STREET TO STREET WARWICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Awaiting backfill |
2024-09-19 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two sidewalk flags IFO 255 Hoyt St., is incompliance. |
2024-09-19 | No data | ALABAMA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed from roadway |
2024-09-19 | No data | JUNCTION BOULEVARD, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | contractor reschedule backfill |
2024-09-18 | No data | EAST 99 STREET, FROM STREET AVENUE J TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints found sealed |
2024-09-18 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut remains defective. |
2024-09-18 | No data | 203 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at 116-17 203 street 2 sidewalk flags restored and opposide 1 perm restoration in roadway |
2024-09-17 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due builder's pave I/F/O 45-55 Robinson Street |
2024-09-15 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two permanent roadway restoration in good condition color coded and sealed. Water valve box on sidewalk with new concrete flag flush to grade at time of my inspection. |
2024-09-14 | No data | STANLEY AVENUE, FROM STREET AMBER STREET TO STREET EMERALD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp restoration on roadway overdue for final |
2024-09-13 | No data | HAWTHORNE AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking/driving lane I/F/O 146-41 Hawthorne Avenue |
2024-09-13 | No data | 32 AVENUE, FROM STREET 146 STREET TO STREET 147 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2024-09-12 | No data | 166 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER - CREW ON SITE WORKING IN OPEN EXCAVATION IN ROADWAY. ACTIVE PERMIT ON FILE. |
2024-09-12 | No data | 166 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER - CREW ON SITE WORKING IN OPEN EXCAVATION IN ROADWAY |
2024-09-11 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill incomplete ifo 256 roadway driving lane 10’x3’x6’ BT ONLY 96.9 actual moisture 5.9 backfill compacted to the water line |
2024-09-11 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site open excavation inn the roadway driving lane / parking lane 10’x3’x6’ ifo 256 With 1 open flag |
2024-09-11 | No data | 42 AVENUE, FROM STREET 189 STREET TO STREET 190 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Long water restorations to grade within the driving lane front of 189-08. |
2024-09-08 | No data | DE KALB AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on s/w & perm restoration in the r/w |
2024-09-07 | No data | SPRINGFIELD BOULEVARD, FROM STREET 113 DRIVE TO STREET 114 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of my inspection found one permanent roadway restoration in good condition color coded . |
2024-09-06 | No data | SEIGEL STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration to grade located within the driving lane IFO property 97. |
2024-09-06 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | observed the respondent failed to place its identifying information/color code marker within permanent water restorations in front of 115-45 168 Street. Respondent was notified by CAR #20247840171 on 5/17/2024. |
2024-09-06 | No data | 205 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm repair water restoration in the parking/driving lane in front of 89-12. |
2024-09-05 | No data | 166 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. 2 cuts done in the parking lane in front of and opposite the property. |
2024-09-05 | No data | 19 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk |
2024-09-03 | No data | DITMARS BOULEVARD, FROM STREET 35 STREET TO STREET 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SKT002 - two 8’x6’ plumber permanent restorations, long-water going across roadway, in between parking and driving lanes. SKT002 does not match plumber cut. |
2024-08-27 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 L9.5ft, W5ft, D1ft cut in the driving lane. Cut #2 L6ft, W4ft, D1ft cut in the driving lane. Cut #2 L6ft, W4ft, D1ft cut in the parking lane. |
2024-08-26 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, set-up, ifo #480, water service repair. |
2024-08-24 | No data | FULTON STREET, FROM STREET ASHFORD STREET TO STREET WARWICK STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY NEW PERMIT ON FILE |
2024-08-24 | No data | WILDER AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT Milled roadway |
2024-08-23 | No data | 221 STREET, FROM STREET 108 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within parking lane in front of 108-20 |
2024-08-21 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Two excavations backfill (1) 16'6" x 4' x 10' & (2) 7'5" x 4' x 4'6" passed within the driving lane at 85-20 57th Avenue. |
2024-08-21 | No data | 121 STREET, FROM STREET 115 AVENUE TO STREET HAWTREE CREEK ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway and sidewalk cut |
2024-08-21 | No data | 203 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade within the parking lane opposite 100-15. |
2024-08-20 | No data | 124 STREET, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having 2 steel plates on the roadway that was smooth to the touch. Respondent's plates did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012024228A21. |
2024-08-20 | No data | 14 AVENUE, FROM STREET 159 STREET TO STREET 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color code marker is missing on the permanent restoration opposite the building operation of 159-16 14 Ave. |
2024-08-17 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4' x 3' area of permanent 2024 sewer restoration is sunken by 2.5" in roadway. |
2024-08-11 | No data | 163 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary restoration, adjacent to water valve labeled "JWS" along the sidewalk. The respondent failed to permanently restore cut within the required time. |
2024-08-10 | No data | AUTUMN AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on the RW/SW, in compliance |
2024-08-10 | No data | ALABAMA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED REMOVED PLATING FROM THE ROADWAY |
2024-08-10 | No data | 197 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent roadway restoration in good condition color coded and sealed. |
2024-08-10 | No data | ALABAMA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO MARKINGS TO IDENTIFY PERMITTEE |
2024-08-10 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Paving markers placed in roadway. |
2024-08-06 | No data | 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, running across the roadway, in front of 526 56 Street. |
2024-08-04 | No data | HOLLY AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA passed.Plate was put back in place and ramped. |
2024-08-03 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT RESTORED IN THE BUS LANE .. IN COMPLAIANCE WITH CAR ISSUED |
2024-08-03 | No data | HOLLY AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | N.I.C.A. reinspection failed; steel plate remains shifted exposing a 2'8"x6'0" opening down 3" within the driving lane in front of 146-15 Holly Avenue. |
2024-08-03 | No data | HOLLY AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate shifted in roadway. |
2024-08-03 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a 7' x 6' temporary restoration across the parking lane over sewer restoration. There is also a 2' diameter, down 2", circular depression in the southbound driving lane over restoration. |
2024-08-03 | No data | 232 STREET, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of my inspection found roadway paved . |
2024-08-02 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Base completed opposite 85-07A. Cut 1: (sewer) 17' 3" x 5' x 9", cut 2: (water) 7' x 4' x 8". |
2024-08-01 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill opposite 85-07A complete. Cut 1: (sewer) 16' 10" x 4' x 8', cut 2: (water) 6' 11" x 3' 10" x 3' 6". Water was found in both excavations due to Con Edison hardware and was removed. A field meeting & dye test is advised should the cut sink. |
2024-07-31 | No data | VAN NEST AVENUE, FROM STREET FILLMORE STREET TO STREET GARFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER SERVICE |
2024-07-29 | No data | UNDERCLIFF AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | E form attached. 11x4x5 |
2024-07-28 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to place its identifying information/color code marker within permanent water restorations in front of 115-45 168 Street. Respondent was notified by CAR #20247840171 on 5/17/2024 to put information but did not. |
2024-07-27 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAS FAILED TO INSTALL A IBM COLOR MARKER WITHIN THEIR PERMANENT RESTORATION ACROSS THE ROADWAY. RESPONDENT WAS NOTIFIED ON CORRECTIVE ACTION |
2024-07-27 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Full flag restored. |
2024-07-25 | No data | UNDERCLIFF AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER -crew is on site |
2024-07-25 | No data | UNDERCLIFF AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Under to complete due to materials |
2024-07-24 | No data | VARICK STREET, FROM STREET MEEKER AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Basement. Contractor currently making Repairs in the Roadway. Property owner on site |
2024-07-24 | No data | 166 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. Two cuts. (10'3" x 4' x 9' & 5'3" x 4' x 3') |
2024-07-23 | No data | NASHVILLE BOULEVARD, FROM STREET 120 AVENUE TO STREET 121 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM CUT IN THE DRIVING LANE IN GOOD CONDITION OPPOSITE 120-20 AND IN THE GRASS AREA |
2024-07-21 | No data | EAST 99 STREET, FROM STREET AVENUE J TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to seal expansion joint along curbline. |
2024-07-20 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wood forms has been removed. |
2024-07-20 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition is corrected color code IBM marker installed to perm cut ifo 1175 |
2024-07-19 | No data | 203 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut found opposite and 2 flags in front of 116-17 203 Street |
2024-07-18 | No data | JAMAICA AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent rstorations to grade within the parking lane in front 172-12 & 172-10. |
2024-07-18 | No data | 143 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway builder pave |
2024-07-17 | No data | 32 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Previous Confirmation Number: Q202414524 (5/24/2024 8:52:34 AM)-PERM RESTORATION ROADWAY |
2024-07-16 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The above respondent failed to pin and ramped steel plates as per subsection 2-11(e) (10ii).sufficiently ramped, covering all edges of the steel plates to provide smooth riding and safe condition. |
2024-07-16 | No data | 117 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut and sidewalk cuts perm. |
2024-07-16 | No data | 120 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number. |
2024-07-15 | No data | STANLEY AVENUE, FROM STREET AMBER STREET TO STREET EMERALD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/6/24. |
2024-07-15 | No data | 171 STREET, FROM STREET 103 ROAD TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the driving lane in front of 103-33. |
2024-07-15 | No data | 107 AVENUE, FROM STREET 169 STREET TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water restorations to grade within the driving lane front of 107-17. |
2024-07-15 | No data | JAMAICA AVENUE, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number. |
2024-07-14 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | INSTALL NEW WATER AND SEWER SERVICE |
2024-07-13 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR has been found resurfaced by BPP under permit M012024169A47. Last CAR Re inspection was on 6/2/24. BPP was completed at a later date & the permit expired on 6/27/24. |
2024-07-11 | No data | NOSTRAND AVENUE, FROM STREET AVENUE P TO STREET STUART STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Asphalt in permanent restoration cracked and broken in roadway. Request to restore in kind. |
2024-07-11 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 71-39, There is asphalt that is broken out on perm cut on the wearing course in the driving lane. Also, There is excess asphalt that needs to be cleaned up in the area. |
2024-07-11 | No data | WARWICK STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2024-07-10 | No data | DITMARS BOULEVARD, FROM STREET 35 STREET TO STREET 36 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 Out Of 2 Steel Plates Marked "Rock E Small Plumbing" Has Shifted 8" Exposing Concrete Base Excavation In Driving Lane I/F/O 35-06 Ditmars Blvd |
2024-07-10 | No data | DITMARS BOULEVARD, FROM STREET 35 STREET TO STREET 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA Pass. Rock E Small marked long water cut, two (2) steel plates were reset, pinned, and ramped. In the parking and driving lane ifo & opposite 3506 Ditmars Blvd. |
2024-07-09 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-07-07 | No data | 166 STREET, FROM STREET 120 AVENUE TO STREET SMITH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR: Re-inspection passed. RAISE PLOW sign removed. |
2024-07-07 | No data | QUINCY AVENUE, FROM STREET DEWEY AVENUE TO STREET SAMPSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INSTALL NEW WATER AND SEWER SERVICE |
2024-07-06 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | COLOR CODE MARKER ADDED |
2024-07-06 | No data | 203 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in grass area/hit during tree install under permit Q012024159B29 by GRIFFIN'S LANDSCAPING CORP. , one excavation made on roadway and one excavation made in grass area at time of inspection. |
2024-07-05 | No data | CLAUDE AVENUE, FROM STREET BEND TO STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade in the parking lane, opp 160-39. |
2024-07-05 | No data | DITMARS BOULEVARD, FROM STREET 35 STREET TO STREET 36 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Two Cuts 6'6" x 4' x 3'6" & 7'4" x 3' x 3' backfill passed across the roadway I/F/O 35-06 Ditmars Blvd |
2024-07-04 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-07-02 | No data | ALABAMA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE STORED IN THE PARKING LANE |
2024-07-02 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2024-06-29 | No data | QUINCY AVENUE, FROM STREET DEWEY AVENUE TO STREET SAMPSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm in roadway, I/F/O 455 |
2024-06-29 | No data | UNION HALL STREET, FROM STREET 108 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restoration flushed to grade in the parking lane. |
2024-06-28 | No data | DEAN STREET, FROM STREET ALBANY AVENUE TO STREET REVERE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival open excavation in the roadway driving/parking lane 14’x4’x7’ ifo 1469. |
2024-06-28 | No data | 163 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 88-29, There is a temporary restoration, adjacent to water valve labeled "JWS" that is overdue for final restoration, along the sidewalk. Finalize sidewalk. |
2024-06-28 | No data | DEAN STREET, FROM STREET ALBANY AVENUE TO STREET REVERE PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Ifo 1469 backfill pass in compliance in roadway driving dimensions 17’x4’x7’ moisture 7.5 BT. 96.3 TT. 97.0 departing backfill 12:26 |
2024-06-25 | No data | 197 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. (cut1 5' x 4' x 2') (cut2 3'5'' x 3'5'' x 2'8'' within the parking lane in front of 115-23. |
2024-06-24 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-06-24 | No data | WARWICK STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L2ft10in W3ft5in D3ft8in - - BACKFILL BASED ON WATER REPAIR FOR #727. TEMPORARY RESTORATION IN PARKING LANE AND SIDEWALK. CUTBACKS MADE. |
2024-06-23 | No data | 205 PLACE, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Long water cuts to grade within the parking lane front of 109-29. |
2024-06-23 | No data | EAST 55 STREET, FROM STREET AVENUE O TO STREET MILL LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in parking lane sealed and |
2024-06-23 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition previously reported. NOV issued on 6/19/24 condition remains. |
2024-06-22 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a broken patched sidewalk flag, adjacent to restored concrete flag, along the sidewalk. The respondent failed to fully replace defective flag, along the sidewalk. |
2024-06-22 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE BUS LANE WITHIN THE REQUIRED TIME TO DO SO , CAR # 20226610148 ISSUED ON 8/22/2022 |
2024-06-22 | No data | HAZEN STREET, FROM STREET 71 STREET TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water cuts across roadway (driving lanes) with 2023 color codes. Water valve sidewalk flag adjacent to curb restored in kind. |
2024-06-22 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration missing Color code marker in the driving lane. |
2024-06-22 | No data | 136 ROAD, FROM STREET 244 STREET TO STREET HOOK CREEK BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway in compliance |
2024-06-21 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated valid permit Q012024162C56 On file. |
2024-06-21 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent plumber restorations in parking lanes, also plated excavation in roadway. Permit is still valid. 100’ from railroad. |
2024-06-20 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent air compressors stored in the parking lane without a DOT permit. NYC Streets permit management system show no current DOT permit above location (I.D. By DOT permit # X022024162B21 |
2024-06-19 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO INSTALL IBM MARKER |
2024-06-19 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with two permanent restorations in the driving lane. The respondent failed to apply color code identifying DOT permittee on two permanent cuts in the roadway. |
2024-06-18 | No data | 97 STREET, FROM STREET 24 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 24-16 to grade in the parking lane. |
2024-06-18 | No data | 106 AVENUE, FROM STREET 177 STREET TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water valve installed within sidewalk grass area in front of 177-27. BPP paving done. |
2024-06-17 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane new flag ifo 1175 missing color code marker |
2024-06-17 | No data | EAST 99 STREET, FROM STREET AVENUE J TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sealer missing in sidewalk along curb |
2024-06-16 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent air compressors stored in the parking lane without a DOT permit. NYC Streets permit management system show no current DOT permit above location (I.D. By DOT permit # X022024162B21 |
2024-06-15 | No data | 120 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in roadway , one excavation made on roadway /one excavation made in grass area at time of inspection, 3 day notice issued from DEP. |
2024-06-14 | No data | DEAN STREET, FROM STREET ALBANY AVENUE TO STREET REVERE PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Wood siding and cones stored in the parking lane in compliance |
2024-06-13 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed Respondent failed to remove Wood Forms upon expiration of permit, Respondent failed to respond to CAR#20245400059, issued on 3/18/2024. Respondent was Identified through above permit. |
2024-06-13 | No data | 38 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | On site for redig. Redig pass. Foreman Clifton. Backfilled compacted subgrade blend looks good. No timber shoring, no debris found. 10” concrete base was re-dug, and restored. Roadway at new curb was left undisturbed to not risk damage. 16’x9’6” P/L |
2024-06-13 | No data | LESLIE ROAD, FROM STREET 178 STREET TO STREET IRWIN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER CUT IN THE P/L |
2024-06-12 | No data | MT MORRIS PARK WEST, FROM STREET WEST 123 STREET TO STREET WEST 124 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found plumbers cut resealed. |
2024-06-11 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I discovered the above respondent’s air compressors stored in the parking lane without a DOT permit. NYC Streets permit management system show no current DOT permit above location (I.D. By DOT permit # X022024162B21 |
2024-06-11 | No data | MERRICK BOULEVARD, FROM STREET 227 STREET TO STREET 228 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM CUT IN THE ROADWAY |
2024-06-11 | No data | 222 STREET, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM CUT IN THE PARKING LANE CLOSE TO MERRICK BLVD |
2024-06-10 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew working on site |
2024-06-09 | No data | 196 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags replaced. |
2024-06-09 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water |
2024-06-08 | No data | 203 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing leaking water service. One excavation in roadway opposite property. One excavation in grassy area in front of property |
2024-06-08 | No data | COHANCY STREET, FROM STREET HAWTREE STREET TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR: Re-inspection passed. Edges has been resealed on permanent restoration. |
2024-06-07 | No data | PONTON AVENUE, FROM STREET BLONDELL AVENUE TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Flagger posted at corner directing traffic down incorrect rw, Nov issued |
2024-06-07 | No data | STANLEY AVENUE, FROM STREET AMBER STREET TO STREET EMERALD STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, parked, setting-up to excavate, ifo #1395, water leak repair. |
2024-06-07 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway closed NOV issued |
2024-06-06 | No data | 224 STREET, FROM STREET 141 ROAD TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one roadway cut and in the grass area at 141-34 224 street |
2024-06-06 | No data | 38 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to updated permit Q012024142B21. Updated permit is being out on redig. I observed timber shoring / wooden planks within concrete base. Supervisors have been notified via email and phone conversation. |
2024-06-05 | No data | WARWICK STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy, ifo #585, water leak repair. |
2024-06-03 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: all cuts flush |
2024-06-02 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The respondent’s debris construction material stores against the curb is obstructing the gutter. I identified them by there DOT permit # X022024123A85 |
2024-06-02 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to install ID marker as required on water restoration IFO 147 East 26 Street. DB5 summons issued. No permit required. |
2024-06-02 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NO COLOR CODE MARKER |
2024-06-01 | No data | EAST 219 STREET, FROM STREET BEND TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2024-06-01 | No data | ALABAMA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE. STEEL PLATE STORED. NEW PERMIT ON FILE |
2024-05-31 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color code marker missing from cut ifo 1175 |
2024-05-29 | No data | JAMAICA AVENUE, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | cut 1 3'10'x3'8"x1'9" 96.7 compaction. Cut 2 4'3"x3'4"x2'9" 97.2 compaction. |
2024-05-28 | No data | EAST 55 STREET, FROM STREET AVENUE O TO STREET MILL LANE | No data | Street Construction Inspections: Active | Department of Transportation | Perm in roadway parking lane. No IBM tag installed as of yet. Permit still active. |
2024-05-28 | No data | MONTAUK AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2024-05-28 | No data | QUINCY AVENUE, FROM STREET DEWEY AVENUE TO STREET SAMPSON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp trench in the r/w 10'x6'x2'' sunken I/F/O 455 Quincy Ave. |
2024-05-27 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-05-25 | No data | 196 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut covered by BBP. |
2024-05-24 | No data | 32 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill has to be re-scheduled due to no one onsite after 30 minute grace period. |
2024-05-24 | No data | JAMAICA AVENUE, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on location working within stipulations. |
2024-05-24 | No data | 166 STREET, FROM STREET 120 AVENUE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove RAISE PLOW sign posted on pole in front of 119-43 166 Street |
2024-05-24 | No data | 232 STREET, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade, d/l - p/l. Perm s/w to grade, grace area. |
2024-05-24 | No data | JAMAICA AVENUE, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak. Excavations in roadway and sidewalk. |
2024-05-23 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench to grade within the driving lane front of 219-37. |
2024-05-23 | No data | 32 STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Parking Lane 5’10”x3’6”x2’6” water service. Foreman Emilio. Wet 123.9 dry 115.2 max 121.1 moisture 7.5% Blend JumpingJack SandCone. Mobile Testing John. TopTest - 96.2. I/F/O building operation. Base to follow. Cutbacks monitored. |
2024-05-22 | No data | 166 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway cuts restored to grade in the parking in front of and opposite 29-11 166 St. |
2024-05-22 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 85-20 completed and acceptable. Cut 1 IFO (sewer) 15' 8" x 4' 4" x 8', cut 2 OPP (water) 11' 10" x 6' 8" x 2'. Note: water was found inside excavation due to water buildup from a Con Edison S-box 12" away. Con Edison notified. |
2024-05-22 | No data | BLONDELL AVENUE, FROM STREET PONTON AVENUE TO STREET ROBERTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER crew is on site |
2024-05-22 | No data | THEBES AVENUE, FROM STREET MARATHON PARKWAY TO STREET ZION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER - PERM RESTORATION ROADWAY |
2024-05-21 | No data | BUSHWICK AVENUE, FROM STREET ARION PLACE TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open excavation in the driving lane. Active work installing Suring. |
2024-05-17 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm to grade water cuts across roadway. |
2024-05-17 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk restored two temp restorations in roadway need more asphalt had contractor of BO call permittee to infom them |
2024-05-17 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored two temp restorations in roadway need more asphalt had contractor of BO call permittee to infom them |
2024-05-17 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water restorations missing IBM color code markings within the parking lane front of 115-45 168 St. |
2024-05-16 | No data | 38 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | RockESmall plumber excavation in sidewalk and roadway ifo active b.o. Spoke to crew on site regarding plates not fully covering excavation, timber shoring covering & protecting cut in sidewalk. They said DEP inspection today. Will return. |
2024-05-16 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trenches to grade across the roadway in front of 219-35. |
2024-05-15 | No data | MARSDEN STREET, FROM STREET 118 AVENUE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the driving lane in front of 117-72. |
2024-05-14 | No data | 117 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent has a temporary restoration not flush with the surrounding area. The concrete base cut is below grade 2". No curing stipulation attached to permit. I ID by listed permit. |
2024-05-14 | No data | 137 ROAD, FROM STREET 244 STREET TO STREET 246 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w cut to grade, s/w grass area to grade. |
2024-05-14 | No data | 122 AVENUE, FROM STREET 161 PLACE TO STREET LONG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade in the parking lane in front of 161-11. |
2024-05-13 | No data | 217 STREET, FROM STREET 115 AVENUE TO STREET 115 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER CUT IN THE P/L IN GOOD CONDITION |
2024-05-11 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to permit # (Q012023083C82). |
2024-05-11 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a broken patched sidewalk flag, adjacent to restored concrete flag, along the sidewalk. The respondent failed to fully replace defective flag, along the sidewalk. |
2024-05-10 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO, CAR # 20226610148 ISSUED ON 2/21/21 |
2024-05-09 | No data | 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has closed off the entire roadway to traffic, with orange cones. Failed to comply with stipulation 023, Maintain one 11 foot lane for traffic. Cited permit used for ID. |
2024-05-09 | No data | THEBES AVENUE, FROM STREET MARATHON PARKWAY TO STREET ZION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER - PERM RESTORATION ROADWAY. ASPHALT STARTING TO BREAK UP. |
2024-05-07 | No data | 156 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the parking lane in front of 107-25. |
2024-05-07 | No data | NASHVILLE BOULEVARD, FROM STREET 115 AVENUE TO STREET 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut on the roadway |
2024-05-07 | No data | NASHVILLE BOULEVARD, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM CUT IN THE P/L |
2024-05-07 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Counter sunk plates in the roadway ifo 1175 Fulton st new permit on file |
2024-05-05 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO INSTALL IBM MARKER |
2024-05-04 | No data | COHANCY STREET, FROM STREET HAWTREE STREET TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to reseal permanent water restoration on roadway. |
2024-05-03 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATIONS NO VALID PERMIT |
2024-05-03 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW PERMIT B012024043B04 OBTAINED FOR PERMANENT RESTORATION |
2024-05-03 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permit B012024054B74 was taken out i/f/o 1644 |
2024-05-03 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | D01/D02 assignment. NOV reinspection pass. Expired permit Q012024043A79 On file. |
2024-05-03 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW PERMIT TAKEN OUT. STEEL PLATED EXCAVATIONS REMAIN NOV BEING ISSUED UNDER LATEST PERMIT |
2024-05-01 | No data | 221 STREET, FROM STREET 108 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak. Excavation in sidewalk and roadway. |
2024-05-01 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 85-20 completed and acceptable. Cut 1 IFO (sewer) 15' x 5' 1" x 9', cut 2 OPP (water) 5' 8" x 5' 7" x 2' 4". Base cutback applied however not broken out. |
2024-04-29 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L16.4 W4.5 D9.6, 1 cut out of 3 ,backfill passed |
2024-04-27 | No data | MT MORRIS PARK WEST, FROM STREET WEST 123 STREET TO STREET WEST 124 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT not resealed. |
2024-04-27 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-04-27 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER - PERM RESTORATION TO-GRADE |
2024-04-26 | No data | 37 AVENUE, FROM STREET 108 STREET TO STREET 109 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak in basement. Excavations in roadway and sidewalk. |
2024-04-25 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed Respondent failed to remove Wood Forms upon expiration of permit, Respondent failed to respond to CAR#20245400059, issued on 3/18/2024. Respondent was Identified through above permit. |
2024-04-25 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill re-scheduled due to water in the excavation. |
2024-04-25 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO APPLY THE COLOR CODE WITH IBM TAG # TO IDENTIFY THE RESPONDENT, CAR # 20247740010 ISSUED ON 1/4/24, ABOVE PERMIT # EXPIRED ON 11/29/23 |
2024-04-24 | No data | 38 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Plated Excavation In Driving/Parking Lane |
2024-04-20 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut below grade. |
2024-04-19 | No data | 3 AVENUE, FROM STREET 25 STREET TO STREET 26 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy opp of #770, water leak repair. |
2024-04-18 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration, in the roadway with a missing color code. The respondent failed to apply color code identifying DOT permittee in the roadway. The respondent was notified via CAR # 20245180068 on 2/24/2024 but has yet to be corrected. |
2024-04-17 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a permanent restoration, repair water - sewer backfilled on a protected street but failed to obtain a confirmation number. Permit #B012024043B04 expired on 3/12/2024. |
2024-04-17 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. No confirmation number, permit expired. Plumber not on site. Plumber cuts remain steel plated. There are two separate cuts going across driving lanes, 100’ apart. I/F/O the active building operation. Updated permits on file. |
2024-04-17 | No data | NASHVILLE BOULEVARD, FROM STREET 120 AVENUE TO STREET 121 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak. Excavations in roadway. |
2024-04-17 | No data | DEWEY AVENUE, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT HAS A PERMANENT RESTORATION,WATER/SEWER REPAIR BACKFILLED ON A PROTECTIVE STREET BUT FAILED TO OBTAIN A CONFIRMATION NUMBER AT LEAST TWO HOURS PRIOR TO THE COMMENCEMENT OF THE BACKFILL. PERMIT# X012024037A72 EXPIRE |
2024-04-16 | No data | HOOK CREEK BOULEVARD, FROM STREET CANEY LANE TO STREET CANEY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER. Permanent plumbers cut within the parking lane flushed and sealed IFO 250-20 |
2024-04-16 | No data | ALABAMA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/11/2024. |
2024-04-16 | No data | DEWEY AVENUE, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT HAS A PERMANENT RESTORATION,REPAIR /SEWER BACKFILLED ON A PROTECTIVE STREET BUT FAILED TO OBTAIN A CONFIRMATION NUMBER AT LEAST TWO HOURS PRIOR TO THE COMMENCEMENT OF THE BACKFILL. PERMIT# X012024037A72 EXPIRED |
2024-04-14 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, repair water backfilled on a protected street but failed to obtain a confirmation number. Permit # B012024004A85 expired 1/8/24 |
2024-04-14 | No data | 196 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent has failed to restore area around restoration that sunken 2’’ in the driving lane. Also, there is temporary asphalt in the sidewalk that’s overdue for final restoration. |
2024-04-12 | No data | 197 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. |
2024-04-12 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway in compliance |
2024-04-12 | No data | 197 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit number Q012024072B19. |
2024-04-08 | No data | 197 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | coring passed |
2024-04-07 | No data | MONTAUK AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut covered by BPP |
2024-04-06 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a broken patched sidewalk flag, adjacent to restored concrete flag, along the sidewalk. The respondent failed to fully replace defective flag, along the sidewalk. |
2024-04-06 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to permit # (Q012023083C82). |
2024-04-05 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having 3 steel plates on the roadway that was smooth to the touch. Respondent's plates did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012024089A85 |
2024-04-04 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l sunken down approx 2-2.6 inches in the parking lane , also cut is missing its color code with IBM tag # too identify the respondent |
2024-04-02 | No data | 208 STREET, FROM STREET 111 AVENUE TO STREET BARDWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm repair sewer restoration in the driving lane in front of 110-42. |
2024-04-01 | No data | HOOK CREEK BOULEVARD, FROM STREET CANEY LANE TO STREET CANEY LANE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER. Permanent plumbers cut within the parking lane flushed and sealed IFO 250-20 |
2024-03-31 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair done in the roadway to the parking lane |
2024-03-30 | No data | MATILDA AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-03-30 | No data | 208 STREET, FROM STREET 111 AVENUE TO STREET BARDWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm repair sewer restoration in the driving lane in front of 110-42. |
2024-03-29 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O#85-12, Temporary 9'X7' restoration is down 3" in Driving Lane. This condition has not been addressed, Condition remains. |
2024-03-29 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Several water plated cuts ifo and opposite address in driving lanes. Foreman Emilio and crew on site currently excavating. Spoke with crew and Mr.Small via phone speaker making them aware of protected street status. Prior permit status is delinquent. |
2024-03-28 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Temporary 9'x7' restoration sunken 3" within the driving lane in front of 85-12 57th Avenue. |
2024-03-28 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration not flush with the roadway. |
2024-03-28 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2024-03-28 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent found maintaining 2 plated excavations within the driving lane in front of 85-12/85-20 57th Avenue without a valid NYCDOT permit on file to do so. |
2024-03-27 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-03-25 | No data | DEWEY AVENUE, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee Rock E Small Plumbing & Heating Inc is currently on site working I/F/O 2808 purpose Install New Water and service |
2024-03-25 | No data | 143 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a plated excavation in the roadway and failed to place Raise Plow Sign within five feet of plate. As required during the winter moratorium period 12/1/23 - 3/31/24. Respondent ID by permit |
2024-03-25 | No data | DEWEY AVENUE, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permittee Rock E Small Plumbing & Heating Inc is currently on site working I/F/O 2808 purpose Install New Water and service |
2024-03-25 | No data | 142 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement restoration overlapping plumber's roadway repair. |
2024-03-25 | No data | DEWEY AVENUE, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Pass back |
2024-03-25 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Summons previously issued on 3/23/24 for failing to post signs |
2024-03-24 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Broken out asphalt has been made flush |
2024-03-24 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a plated counter sunken excavation on the roadway. The respondent has failed to post “Steel Plates Ahead” or “Raise Plow” sign. Permit#B012024081A61. Use for I.D. |
2024-03-24 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation on the roadway valid permit on file |
2024-03-23 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The asphalt is broken around the steel plate in the driving lane. |
2024-03-23 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration made perm in the roadway |
2024-03-22 | No data | BOLTON AVENUE, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in compliance |
2024-03-22 | No data | 143 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | I observed respondent failed to countersink the steel plate as required during the winter moratorium effective from 12/1/23-3/31/24. Steel plate used found above roadway grade. Respondent ID by permit. |
2024-03-22 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate, marked "Rock E Small", Countersunk FLUSH with Roadway, pass |
2024-03-22 | No data | BEACH 69 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET GOUVERNEUR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway cut |
2024-03-22 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O#1644, There is a Steel Plate marked "Rock E Small", that has adjacent to it a Breakout in the Roadway, 7"X5"X12" down, making for a Potentially Hazardous condition to Vehicular Traffic. Condition remains |
2024-03-22 | No data | 121 STREET, FROM STREET 115 AVENUE TO STREET HAWTREE CREEK ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site working in roadway and sidewalk. |
2024-03-22 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2024-03-22 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations to grade within the parking/driving lane |
2024-03-21 | No data | 175 STREET, FROM STREET 109 AVENUE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway & Sidewalk in compliance. |
2024-03-21 | No data | DEWEY AVENUE, FROM STREET QUINCY AVENUE TO STREET SWINTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the respondent failed to comply with the agreement and conditions of this permit by violating stipulation 078 FULL WIDTH OF ROADWAY, INCLUDING PARKING LANES, SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. |
2024-03-20 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file steel plated excavation okay |
2024-03-20 | No data | 121 STREET, FROM STREET 115 AVENUE TO STREET HAWTREE CREEK ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | one temporary cut on sidewalk at time of inspection |
2024-03-20 | No data | 166 STREET, FROM STREET 120 AVENUE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 Permanent plumber cut in the parking lane flushed and sealed. Also I observed that a BPP was conducted at this location, trench is to grade |
2024-03-20 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations to grade in the driving lane in front of 71-37. |
2024-03-19 | No data | BEACH 44 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET REINHART ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no address found on segment or work visible |
2024-03-19 | No data | BEECH TERRACE, FROM STREET BEEKMAN AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Complaint | Department of Transportation | NOV for stip 027 for maintain lane for traffic. |
2024-03-18 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove wood forms between sidewalk and grass area |
2024-03-18 | No data | MARSDEN STREET, FROM STREET 118 AVENUE TO STREET SMITH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill Pass cut sizes: 4' x 3' x 20'', 3' x3' x 20'', 3' x 2'9'' x 24''. |
2024-03-16 | No data | BUSHWICK AVENUE, FROM STREET ARION PLACE TO STREET MELROSE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | temp cut on the SW flushed to grade, in compliance at time of inspection |
2024-03-15 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed wooden timber in the tree pit adjacent to restored sidewalk flags. Respondent failed to remove timber from tree pit upon expiration of permit. C.A.R #20247740010 issued 1/4/24. Respondent ID by cited permit. |
2024-03-15 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in rw and Swk no permit |
2024-03-13 | No data | ASH AVENUE, FROM STREET 149 PLACE TO STREET MURRAY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 10' x 5' temporary sewer restoration within the driving lane I/F/O 149-41 remains sunken 3". |
2024-03-12 | No data | ASH AVENUE, FROM STREET 149 PLACE TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a 10' x 5'5" temporary sewer restoration is sunken 3" within the driving lane & temporary restoration on the sidewalk is sunken 3" causing a trip hazard I/F/O 149-41 Ash Avenue. |
2024-03-12 | No data | 65 AVENUE, FROM STREET 169 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench to grade within the driving lane, sidewalk flags restored in front of 169-07 |
2024-03-12 | No data | ASH AVENUE, FROM STREET 149 PLACE TO STREET MURRAY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a 10' x 5'5" temporary sewer restoration below grade 2" or more within the driving lane I/F/O 149-41 Ash Avenue. The respondent was issued a NICA CAR #20246270069 on 3/12/2024 but condition remains. |
2024-03-12 | No data | 222 STREET, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (3' x 3' x 2'2") |
2024-03-11 | No data | 208 STREET, FROM STREET 111 AVENUE TO STREET BARDWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway. Slight asphalt broken out at this time. Not enough for CAR at this time. S/w in compliance. |
2024-03-09 | No data | 123 STREET, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut to grade and sidewalk flag. |
2024-03-09 | No data | 103 AVENUE, FROM STREET 120 STREET TO STREET 121 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in roadway long water. 1 sidewalk flag. |
2024-03-08 | No data | NOSTRAND AVENUE, FROM STREET AVENUE P TO STREET STUART STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L3’4 W3’0 D4’6Compaction 96.8 |
2024-03-07 | No data | 50 AVENUE, FROM STREET 91 PLACE TO STREET 91 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL COMPLETED 4' X 4' |
2024-03-07 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2024-03-06 | No data | HUSSON AVENUE, FROM STREET DEAD END TO STREET GILDERSLEEVE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance |
2024-03-04 | No data | 217 PLACE, FROM STREET 102 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in the parking & driving lane. S/w restored in kind. |
2024-03-02 | No data | 50 AVENUE, FROM STREET 91 PLACE TO STREET 91 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in sidewalk,(visibly confirmed) one excavation made on roadway and one excavation made on sidewalk , crew on site |
2024-03-02 | No data | HOOK CREEK BOULEVARD, FROM STREET CANEY LANE TO STREET CANEY LANE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in grass area,3 day notice issued,one excavation made on roadway and one excavation made in grass area , crew on site. |
2024-03-01 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. (cut1 19' x 4' x 10'5'')(cut2 4' x 3' x 3') within the driving lane in front of 50-09. |
2024-03-01 | No data | NOSTRAND AVENUE, FROM STREET AVENUE P TO STREET STUART STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water service leak contractor currently working in the sidewalk & roadway. Three day notice is issued property owner on our site. |
2024-03-01 | No data | GLENMORE AVENUE, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway curb to curb |
2024-02-29 | No data | 57 AVENUE, FROM STREET LONG ISLAND RAILROAD TO STREET VAN HORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR WATER - SEWER - CREW ON SITE WORKING IN OPEN EXCAVATION IN THE ROADWAY. 2 FLAGGERS DIRECTING TRAFFIC DUE 2 LANES NOT ABLE TO USED IN BOTH WAYS DUE TO LOCATION OF THE CUT. SPOKE WITH SUPERVISOR ABOUT STIP. |
2024-02-28 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2024-02-26 | No data | 142 STREET, FROM STREET 131 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water, perm roadway cuts in d/p/l restore to grade. |
2024-02-26 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Countersunk steel plates in the roadway in compliance. Permit issued 1/26/24 under B012024026B06. |
2024-02-26 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed a countersunk plated excavation in the roadway without an active permit on file. Respondent failed to maintain a valid DOT while making use of the roadway. Respondent ID by cited permit expired 2/24/24. |
2024-02-25 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration |
2024-02-24 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color Code Marker is missing from your permanent Restoration in the Roadway. |
2024-02-23 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in roadway two cuts in roadway |
2024-02-23 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a plated excavation on the roadway without a valid DOT permit on file. Respondent identified by Small Plumbing marking on plate and permit#B012024024B58 exp 2/22/24. |
2024-02-23 | No data | 143 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUG WATER AND SEWER SERVICE, perm r/w rest. flush to grade opp. 115-21. |
2024-02-23 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with a plated excavation in the roadway and failed to place Raise Plow Sign within five feet of plate. As required during the winter moratorium period 12/1/23 - 3/31/24. Respondent ID by permit. |
2024-02-23 | No data | 203 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Not verified however I observed the respondent failed to post sidewalk closed signs at work zone and both intersections. Signs directing pedestrian to use opposite sidewalk. The sidewalk is less than 15 feet. I ID by listed permit. |
2024-02-21 | No data | 126 AVENUE, FROM STREET 174 PLACE TO STREET 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the parking lane flushed and sealed IFO 174-06 |
2024-02-21 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in the r/w, water cut around water valve incompliance. |
2024-02-20 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Base restoration in compliance |
2024-02-20 | No data | 112 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O#219-35 112 Avenue, there are (2)Steel Plates Countersunk, that are Noisy when rolled on by Vehicular Traffic. Condition will be referred to NYC DEP. Inspection was Initiated by COMPLAINT SR#311-17675523 |
2024-02-15 | No data | MT MORRIS PARK WEST, FROM STREET WEST 123 STREET TO STREET WEST 124 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal cut. |
2024-02-15 | No data | THEBES AVENUE, FROM STREET MARATHON PARKWAY TO STREET ZION STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4’x3’10”x4’ backfill completed |
2024-02-14 | No data | BEACH 65 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET THURSBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent long water cuts sidewalk restored |
2024-02-09 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - OPEN CONCRETE BASE EXCAVATION IN PARKING LANE AGAINST THE CURB. AREA BARRICADED WITH 4 CONES. NO CREW ON SITE. |
2024-02-09 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NO COLOR CODE MARKER AND WOOD NOT REMOVED FROM TREE PIT / SIDE WALK |
2024-02-08 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 146 STREET TO STREET 148 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. (Cut1 8' x 6' x 9'8'')(Cut2 4' x 4' x 4') within the parking/driving lane in front of 146-15 cuts left plated. |
2024-02-07 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 2 CUTS .. 1 SEWER 1 WATER .. SEWER CUT : (L) 14 FT (W) 5 FT (D) 10 FT .. WATER CUT : (L) 6 FT (W) 4 FT (D) 3FT ..ACTUAL START TIME 11:27 AM .. COMPACTION: (1 SEWER) 96.8% 96.5% (2 WATER) 96.4% |
2024-02-04 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW FLAG INSTALLED |
2024-02-04 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-02-04 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA failed Temp cut is sunken in the roadway IFO #917. Sunken area is down 10 inches. |
2024-02-04 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent failed to post “Steel Plates Ahead” or “Raise Plow” sign, during the winter moratorium which begins on 12/1/2023- 3/31/2024. Permit# B012024011C24 was used for ID. |
2024-02-03 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary restoration cut in the roadway sunken 12 inches. Respondent failed to respond to CAR #20247400028 issued at 0916 for condition. Cited permit used for ID |
2024-02-03 | No data | BROADWAY, FROM STREET MELROSE STREET TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a steel plate on the roadway counter sunken covering an excavation in the roadway with an expired permit. Respondent failed to apply for a permit in order to do so. Cited permit expired 1/26/2024 used for ID |
2024-02-02 | No data | 216 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-02-02 | No data | 121 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPP. 116-51 Repair water, perm r/w cut flush to grade in DP/L. |
2024-02-01 | No data | 36 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in roadway |
2024-01-31 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by BPP. |
2024-01-30 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A TEMPORARY CUT IN THE DRIVING LANE DOWN APPROX 2-2.6 INCHES NOT FLUSH WITH THE SURROUNDING AREA DURING THE WINTER POLICY MONTHS WHICH BEGINS 12/1/23 AND ENDS 3/31/24 ,ABOVE PERMIT # USED FOR I.D |
2024-01-29 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to DOT-in-house paving no work found on the segment. |
2024-01-29 | No data | 196 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 109-57, The area around perm cut in the parking/driving lane, is sunken 2" in localized area's of the roadway. Restore cut with surrounding area. |
2024-01-27 | No data | 26 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 213 26 Street. |
2024-01-26 | No data | GRAHAM AVENUE, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working on powers |
2024-01-26 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site with open excavation |
2024-01-25 | No data | GRAHAM AVENUE, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed Respondent Failed to Post “Steel Plates Ahead” or “Raise Plow” sign for Steel Plates, as required during "WINTER MORITORIUM" from 12/1/2023 to 3/31/2024. Respondent was Identified through above Active Permit. |
2024-01-25 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed Respondent with a PLATED excavation, without a Valid DOT permit on File. Respondent was Identified through markings "ROCK E SMALL" on Steel Plate. |
2024-01-24 | No data | 232 STREET, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER Cut flushed and sealed |
2024-01-23 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 14 FT (W) 6 FT (D) 13 FT .. ACTUAL START TIME 11:50 AM .. COMPACTION: 97.8% 96.6% |
2024-01-23 | No data | 142 STREET, FROM STREET 131 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL 14 Backfill Pass roadway cut sizes: 4' x 3'6'' x 2' and 4'6'' x 3' x 2'. |
2024-01-22 | No data | 215 PLACE, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file Q012023331A50 |
2024-01-19 | No data | BAY PARKWAY, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration opposite 8629 and new sidewalk flag installed ifo 8629 bay pkwy. |
2024-01-19 | No data | THEBES AVENUE, FROM STREET MARATHON PARKWAY TO STREET ZION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, (Sewer) on a protected street but failed to obtain a confirmation number. Permit # ( Q012023349A72) expired 1/8/24. |
2024-01-19 | No data | 107 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, (Water) backfilled on a protected street but failed to obtain a confirmation number. Permit # (Q012023353B38) expired 1/8/24. |
2024-01-19 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/5/23 |
2024-01-19 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Backfilled plumber cut in parking lane, overdue for final. Will issue CAR. Also, delinquent confirmation NOV issued. |
2024-01-18 | No data | UNION STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration going across roadway ifo b.o. delinquent confirmation NOV issued. |
2024-01-16 | No data | 65 STREET, FROM STREET 68 AVENUE TO STREET CATALPA AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently Making Repairs in the Roadway 3 Day Dep Notice Issued. Property Owner on site |
2024-01-16 | No data | 65 STREET, FROM STREET 68 AVENUE TO STREET CATALPA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER-CREW ON SITE WORKING IN OPEN EXCAVATIONS IN ROADWAY AND SIDEWALK. |
2024-01-16 | No data | 142 STREET, FROM STREET 131 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently Making Repairs in the Roadway & Sidewalk 3 Day Dep Notice Issued. Property Owner on site. |
2024-01-11 | No data | 28 AVENUE, FROM STREET 208 STREET TO STREET CORP KENNEDY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-01-11 | No data | MONTAUK AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT IN THE DRIVING LANE IS NOT ROLLED CORRECTLY, AND THE COLOR CODE WITH IBM TAG # IS MISSING , RE- ROLL CUT IN THE DRIVING LANE AND APPLY THE COLOR CODE WITH IBM TAG # |
2024-01-11 | No data | CORP KENNEDY STREET, FROM STREET 28 AVENUE TO STREET 28 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-01-09 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restorations partially cover due to builder's pave I/F/O 43-11/13 163rd Street. |
2024-01-06 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2024-01-06 | No data | 133 AVENUE, FROM STREET 225 STREET TO STREET DUBONS LANE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing water service leak. Crew excavating roadway at this time |
2024-01-05 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Repair permit number Q012023277A67 obtained. |
2024-01-04 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration sealed and in compliance |
2024-01-03 | No data | 96 PLACE, FROM STREET LINDEN BOULEVARD TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut to grade. 96-30 LINDEN BOULEVARD, QUEENS, NY, 11417 |
2024-01-02 | No data | MT MORRIS PARK WEST, FROM STREET WEST 123 STREET TO STREET WEST 124 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill. Backfill pass & complete. 13'4"x4'3"x2'8" Arrival: 12PM Departure: 1:35PM |
2023-12-31 | No data | WEST 174 STREET, FROM STREET MACOMBS ROAD TO STREET NELSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No plumber’s work found done |
2023-12-31 | No data | 134 AVENUE, FROM STREET 157 STREET TO STREET 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer trench maintain to grade in D/L. |
2023-12-29 | No data | MERRICK BOULEVARD, FROM STREET 227 STREET TO STREET 228 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | LL 14 Backfill restoration Pass. Roadway cuts:5'7'' x 3'3''x 3'4''. |
2023-12-29 | No data | BRUCKNER BOULEVARD, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2023-12-29 | No data | OLMSTEAD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2023-12-29 | No data | THEBES AVENUE, FROM STREET MARATHON PARKWAY TO STREET ZION STREET | No data | Street Construction Inspections: Active | Department of Transportation | No raised plow signs posted. |
2023-12-28 | No data | 52 AVENUE, FROM STREET DEAD END TO STREET HASPEL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking/driving lane, sidewalk flags restored expansion joints sealed I/F/O 84-05 52nd Avenue |
2023-12-28 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work out done |
2023-12-27 | No data | 202 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm repair water restoration in the parking lane opposite 88-27. |
2023-12-27 | No data | 143 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (3'8" x 3'6" x 2'). |
2023-12-26 | No data | 32 AVENUE, FROM STREET 146 STREET TO STREET 147 PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed 8'2" x 6'2"and 10' x 4' |
2023-12-23 | No data | 148 ROAD, FROM STREET 241 STREET TO STREET BROOKVILLE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration in good condition color coded and sealed at time of my inspection. |
2023-12-22 | No data | 122 PLACE, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial perm trench in opposite roadway at time of inspection. |
2023-12-20 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | P/L storage when site was unattended. |
2023-12-20 | No data | LINDEN BOULEVARD, FROM STREET 94 STREET TO STREET 95 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two restorations long water |
2023-12-18 | No data | DREW STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2023-12-17 | No data | 62 STREET, FROM STREET 53 DRIVE TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent maintaining a steel plated excavation on protected street within the parking lane opposite of 53-81 62 Street without a valid DOT permit on file to do so. ID by permit Q012023184B04 expired 8/1/2023. |
2023-12-16 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 2 sidewalk flags restored at time of inspection. |
2023-12-16 | No data | 107 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a counter-sunken plated excavation, in the roadway at this time. The respondent failed to obtain an active DOT permit to use/open the roadway. Permit used for ID only. |
2023-12-15 | No data | METROPOLITAN AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Rock E Small Plumbing obtained a repair water permit (permit number: Q012023349A70). No NOV issued. |
2023-12-15 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water cut across the parking lane. |
2023-12-15 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA passed, 4’ x 2’ area of sidewalk is no longer sunken 2” in front of 93-60. Condition has been temporarily fixed & no longer poses a tripping hazard to pedestrians and has been made safe. |
2023-12-15 | No data | 96 PLACE, FROM STREET LINDEN BOULEVARD TO STREET PITKIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill for the corner property of 93-30 Linden blvd completed and acceptable across the roadway. 10' 9" x 4' x 10' 3". |
2023-12-15 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4’ x 2’ area of sidewalk is sunken 2” in front of 93-60. Condition poses a tripping hazard to pedestrians and needs to be completely fixed. |
2023-12-14 | No data | 123 STREET, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking/driving lane. Slight asphalt broken out on perm cut. S/w restored in kind. Will not issue a CAR at this time. |
2023-12-13 | No data | 205 PLACE, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cuts to grade. |
2023-12-13 | No data | OCEANIA STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration going across roadway. I/F/O 5021. |
2023-12-12 | No data | ATKINS AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-12-12 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 161-07 to grade in the parking lane. |
2023-12-12 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary water restoration in the driving lane adjacent to water valve cover in the sidewalk area in front of 93-60. Condition is now overdue final at this time permit expired 10/30/23. |
2023-12-09 | No data | NASHVILLE BOULEVARD, FROM STREET 115 AVENUE TO STREET 212 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak. Contractor Currently Making Repairs in the Roadway. 3 Day Dep Notice Issued |
2023-12-07 | No data | 208 STREET, FROM STREET 111 AVENUE TO STREET BARDWELL AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Repairing damaged domestic sanitary sewer. Crew excavating in grassy area behind property line at this time |
2023-12-07 | No data | 46 AVENUE, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restorations driving lane opposite 20416 - 20420. Portions of cuts were resurfaced by BPP. |
2023-12-07 | No data | 163 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 88-29 to grade in the driving lane. |
2023-12-06 | No data | BAY PARKWAY, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill reschedule |
2023-12-05 | No data | 107 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with a plated excavation, that was smooth to the touch, in the driving lane. Respondent's plates did not have skid resistance greater than or equal to the adjacent roadway surface. Permit used for ID purposes only. |
2023-12-05 | No data | 107 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent with a plated excavation, in the roadway. The respondent failed to countersink steel plates, flushed with the roadway, during the Winter Moratorium. |
2023-12-03 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-12-03 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-12-02 | No data | 96 PLACE, FROM STREET LINDEN BOULEVARD TO STREET PITKIN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic sanitary sewer collapsed in roadway ,one excavation made on roadway at time of inspection/one excavation made on sidewalk at time of inspection. |
2023-12-02 | No data | CHESTER STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in Rodeway parking lane partially covered by car one sidewalk flag against property, line in compliance IFO 543 |
2023-11-30 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-11-30 | No data | 216 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Sewer cut D/L Rock-Dale. Mobile-John. 8x4x8 Wet 124.8 Dry 116.1 Max 121.4 Moisture 7.5 BottomTest 96.8 TopTest 96.6 Blend JumpingJack SandCone. Existing binder base will replaced with concrete. Cut also in S/W and behind property. |
2023-11-30 | No data | WILDER AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-11-29 | No data | EAST 179 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-11-28 | No data | 215 PLACE, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | this is a correction12' x 7'’ sewer base cut and 17' x 6' driving lane opposite 35-23. |
2023-11-28 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on sight upon arrival open excavation in the roadway and open sidewalk ifo property 513 measuring 13’x6’x3’ |
2023-11-28 | No data | 101 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-11-28 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass in compliance ifo 511 dimensions 13’x6’x3’ total compaction (97.2) |
2023-11-28 | No data | 215 PLACE, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12' x 7'’ sewer base cut driving lane opposite 35-23. |
2023-11-27 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2023 permanent restoration in the roadway. |
2023-11-24 | No data | BAY 43 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2023-11-24 | No data | 18 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway parking lane. |
2023-11-24 | No data | 217 PLACE, FROM STREET 102 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak. Excavation in roadway and sidewalk. |
2023-11-23 | No data | 158 STREET, FROM STREET 134 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the p/l, partially covered by BBP pavement. opp. 134-21 |
2023-11-23 | No data | HUMBOLDT STREET, FROM STREET MOULTRIE STREET TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-11-21 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer, cut, extending across the roadway, into construction site wall to sealed in compliance |
2023-11-20 | No data | 176 STREET, FROM STREET 130 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 130-27 permanent long water cut restoration to grade in the roadway. |
2023-11-20 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Plated Excavation In Driving/Parking Lane |
2023-11-20 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site open excavation in the roadway parking lane mid segment IFO 2050. |
2023-11-19 | No data | ST LAWRENCE AVENUE, FROM STREET RANDALL AVENUE TO STREET SEWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water. Bad sidewalk flag |
2023-11-19 | No data | 118 AVENUE, FROM STREET 189 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway and s/ w flags restore to grade. |
2023-11-19 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIRED PERM SIDEWALK FLAG |
2023-11-18 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a temporary restoration in the roadway overdue for final restoration. Respondent failed to finalize temporary restoration in the required time. CAR 20226610148 issued 8/22/22. Respondent ID by cited permit. |
2023-11-18 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This trench is under a Re-dig. |
2023-11-17 | No data | KINGSLAND AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut going across roadway in compliance |
2023-11-14 | No data | 215 PLACE, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10’x5’x10’ sewer cut driving lane opposite 35-23. Rock Emilio, Mobile John, SandCone JumpingJack CleanFill Wet128.1 Dry120.2 Max125.4 Moisture 6.6% BottomTest96.0 TopTest96.5. Base not yet scheduled base not monitored at this time. I/F/O 3520-26. |
2023-11-12 | No data | JEROME STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in parking lane okay |
2023-11-10 | No data | 123 STREET, FROM STREET 107 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic sanitary sewer backing up into property/clogged , one excavation made on roadway and one excavation made on sidewalk. |
2023-11-09 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway leading to parking lane |
2023-11-07 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two temp cuts in Rodeway opposite one another in front of 2050 new permit on file. |
2023-11-06 | No data | 88 AVENUE, FROM STREET 80 STREET TO STREET 85 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent roadway trenches restored to grade going across the roadway in front of 8031 88 Ave. |
2023-11-05 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated shifted exposing excavation below. Plates must be reset and properly ramped. Located at 394 mother Gaston Blvd |
2023-11-05 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates have been reset |
2023-11-03 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation extending across the roadway ifo 397 for construction site opposite New permit on file |
2023-11-03 | No data | 107 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (5' x 4' x 2'). |
2023-11-02 | No data | 36 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber crew on site. One lane maintained for two way traffic. Flaggers on site. |
2023-11-02 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving lane okay |
2023-11-02 | No data | NASHVILLE BOULEVARD, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 117-24 completed and acceptable in the driving lane. 3' 3" x 2' 10" x 2' 10". |
2023-11-02 | No data | 226 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement, plumber's roadway restoration not visible. |
2023-11-01 | No data | LINDEN BOULEVARD, FROM STREET 230 STREET TO STREET 231 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Wearing course portion complete in the driving lane. 16' 6" x 9' 5" |
2023-11-01 | No data | 197 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill has been Rr-e-scheduled for 2:30 pm |
2023-10-31 | No data | LINDEN BOULEVARD, FROM STREET 230 STREET TO STREET 231 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Base portion complete. Concrete was existing in the excation. Only 3' 10" x 2' out of 14' 8" x 6' 5" needed to be dug out to the dirt. |
2023-10-31 | No data | NASHVILLE BOULEVARD, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic water service leaking in roadway. One excavation in parking lane at this time |
2023-10-30 | No data | WYTHE AVENUE, FROM STREET SOUTH 1 STREET TO STREET SOUTH 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut in the roadway |
2023-10-28 | No data | LIBERTY AVENUE, FROM STREET AUTUMN AVENUE TO STREET HEMLOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-10-26 | No data | EAST 219 STREET, FROM STREET BEND TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done |
2023-10-25 | No data | BORDEN AVENUE, FROM STREET 34 STREET TO STREET 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the driving lane I/F/O 34-10 Borden Avenue |
2023-10-24 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to new builders pave |
2023-10-24 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 temp restorations in roadway opposite one another ifo 2050 active permit. In compliance |
2023-10-24 | No data | LEGION STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Dirt filled excavation ifo property 271 park in lane |
2023-10-23 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in parking lane in compliance. Debris barricaded in parking lane opposite address |
2023-10-22 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2023-10-19 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT IS CURRENTLY MILLED BY BPP |
2023-10-19 | No data | EAST 203 STREET, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued for failure to obtain a confirmation number prior to expiration of DOT street opening permit |
2023-10-19 | No data | 126 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced. BPP paved over previous cuts in the roadway at this time. |
2023-10-18 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew awaiting backfill |
2023-10-18 | No data | STRAUSS STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2023-10-17 | No data | 36 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STIP VIOLATION #35 |
2023-10-16 | No data | 62 STREET, FROM STREET 53 DRIVE TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two plumber permanent restorations in parking lanes I/F/O 53-81. Delinquent confirmation, D1J NOV issued. Backfilled on protected street without obtaining confirmation number. |
2023-10-15 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration resealed |
2023-10-14 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway restoration found to be permanently restored and in compliance at this time (B012023251B07) |
2023-10-13 | No data | 107 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in sidewalk , one excavation made on sidewalk and one excavation made on roadway at time of inspection,(confirmed with home owner)crew on site to repair. |
2023-10-12 | No data | PERRY AVENUE, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut was resurfaced. |
2023-10-11 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavations in roadway no permit ifo construction site |
2023-10-08 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a patched sidewalk flag, adjacent to restored concrete flag, along the sidewalk. The respondent failed to fully replace defective flag, along the sidewalk. |
2023-10-08 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to permit # (Q012023083C82). |
2023-10-07 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Reissue due to several defects in restoration. |
2023-10-07 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a temporary restoration in the roadway overdue for final restoration. Respondent failed to finalize temporary restoration in the required time. CAR 20226610148 issued 8/22/22. Respondent ID by cited permit. |
2023-10-07 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found sidewalk flags restored and sealed in kind with 0135P - C.A.R. RESTORATION - PROTECTED permit # M012023257B52 on file for COMPLETE RESTORATION ONLY. |
2023-10-07 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire Plumber 30' x 9' wearing course needs to do over, various areas sunken 2" below, also missing color code and Yellow lane markings. |
2023-10-06 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit number Q012023205B01. |
2023-10-06 | No data | 119 AVENUE, FROM STREET 218 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer trench in front of 218-06 Flush to grade across the roadway |
2023-10-03 | No data | 252 STREET, FROM STREET 63 AVENUE TO STREET CULLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm repair water sewer restoration in the parking & driving lane in front of 63-41. |
2023-10-02 | No data | EAST 51 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance opp 360 |
2023-10-02 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified In compliance, there is active permits on file work site is in compliance with active traffic lanes and flaggers installed for direction. |
2023-10-01 | No data | 194 STREET, FROM STREET 42 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bottom portion of “STOP” lane markings restored. Occ. Of Roadway permit# Q022023219A31 pulled. |
2023-10-01 | No data | 204 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Repairing domestic water service leak. One excavation in roadway at this time |
2023-10-01 | No data | 90 AVENUE, FROM STREET 74 PLACE TO STREET 75 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR: Re-inspection passed. Permanent restoration to grade within the parking/driving lane in front of 74-32. Completed on permit #Q012023249A76 |
2023-09-30 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Unable to locate cut due to BPP paving was done in front of 77-21 Kew Forest Ln. Permittee did obtain a 0135- CAR restoration permit #Q012023229B93 |
2023-09-30 | No data | 168 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic water service leak. One excavation in grassy area at this time |
2023-09-28 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed. Permit Q012023219A59 obtained on 8/7/23 after issuance of C.A.R. 20226710680 on 8/22/22. |
2023-09-28 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent repaired the condition on CAR# 20231700175 issued on 7/13/23 without the noted permit listed as required. |
2023-09-27 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition repaired with CAR Restoration permit#Q012023219A56. |
2023-09-27 | No data | 97 STREET, FROM STREET 24 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-09-24 | No data | 215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EPAIR WATER - PERM RESTORATION ROADWAY |
2023-09-22 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-09-19 | No data | 65 AVENUE, FROM STREET 169 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on the sidewalk and roadway at this time. |
2023-09-17 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp. restoration on roadway made perm to grade. C.A.R. Restoration permit# Q012023228A48 pulled to do work. |
2023-09-17 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent repaired the condition(s) on CAR #20236710252 issued on 6/9/23 without the noted permit listed as required. No 0211 occupancy of roadway permit was obtained for lane marker restoration at 31-75 Steinway St. |
2023-09-16 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR repaired under permit number Q012023251B49. |
2023-09-16 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA CAR passed.Cave-in in grass area of sidewalk was filled with asphalt. |
2023-09-15 | No data | WYTHE AVENUE, FROM STREET SOUTH 1 STREET TO STREET SOUTH 2 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the RW |
2023-09-15 | No data | WYTHE AVENUE, FROM STREET SOUTH 1 STREET TO STREET SOUTH 2 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts #1 L 7ft W 3ft 6in D 3ft #2 L 7ft W 3ft 6in D 3ft. WD 115.2 DD 106.0 MD 113.9 AM 8.7 #1 97.5% #2 97.7 |
2023-09-15 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a 8" x 8" down 6" cave-in in grass area of sidewalk adjacent to walking path that was restored with asphalt. |
2023-09-15 | No data | 85 ROAD, FROM STREET BEND TO STREET MC LAUGHLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the parking & driving lane in front of 193-37. |
2023-09-15 | No data | PALO ALTO AVENUE, FROM STREET 87 ROAD TO STREET HAYWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water restorations in front of and opposite in the parking & driving lane in front of of 188-20. Multiple water sidewalk flags restored and installed with water valve cover in front of 188-20. |
2023-09-13 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 71-37 completed and acceptable. Cut 1: IFO 12' 3" x 4' x 10', cut 2: OPP 5' 1" x 4' x 2' 4". |
2023-09-13 | No data | LINDEN BOULEVARD, FROM STREET 94 STREET TO STREET 95 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. Two cuts. (4' x 4' x 3'4", 4'6" x 4'6" x 2'6") |
2023-09-11 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-09-10 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wood forms has been removed from sidewalk. |
2023-09-10 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-09-10 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to make permanent/final, a temporary water restoration on the roadway. Respondent was notified by CAR #20227490241 on 09/01/22. Permit# Q012020292A00 for work was used to identify respondent. |
2023-09-09 | No data | 150 AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sidewalk flags restored in kind in front of 11917 150 Ave. No work found on roadway due to BPP done on location. |
2023-09-08 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 different blend #1 WD 12.4 DD 114.4 MD 118.2 AM 9.7% #2 WD 116.4 DD 106.9 MD 113.6 AM 8.9% L 14ft W 3ft 6in D 9ft |
2023-09-08 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Base in front of 71-39 completed and acceptable. Cut 1 IFO (sewer) 14' x 6' 2" x 8", cut 2 OPP (water) 7' 5" x 6' 1" x 7". unable to monitor pouring of concrete however witnessed cutback. |
2023-09-08 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open trench going from the RW to PL |
2023-09-07 | No data | BOLTON AVENUE, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber’s permanent restoration in parking lane and sidewalk flag I/F/O 420. |
2023-09-06 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2023-09-05 | No data | 166 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 71-39 completed and acceptable. Cut 1 IFO (sewer) 11' x 4' x 9' 4", cut 2 OPP (water) 5' 5" x 3' 11" x 2' 3". |
2023-09-03 | No data | 88 ROAD, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Edges resealed around permanent restorations in front of 244-60. |
2023-09-02 | No data | COLLEGE POINT BOULEVARD, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate removed. Perm to grade restoration at location. |
2023-09-02 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has failed to permanently restore temporary area in restoration as per CAR#20236480179 issued7/29/23. Permit#B012020223A50 exp9/8/2020. Use for I.D. |
2023-09-01 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Stip 78 violation |
2023-08-31 | No data | PERRY AVENUE, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance |
2023-08-30 | No data | 125 AVENUE, FROM STREET MERRICK BOULEVARD TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm water/sewer trench the d/l |
2023-08-30 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags is patched and cracked, no expansion joints. Restore full flags with sealed expansion joints IFO 91-37. |
2023-08-30 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection maintained to grade. |
2023-08-29 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp patch on perm cut overdue for final , must restore entire cut in kind. No patch work must take out new permit for restoration only |
2023-08-29 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2023-08-26 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in parking lane in compliance. Debris barricaded in parking lane opposite address |
2023-08-26 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR repaired under permit number Q012023219B19. |
2023-08-26 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2023-08-26 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in roadway opposite one another Ifo property 312 need resealing |
2023-08-26 | No data | 194 STREET, FROM STREET 42 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent has a permanent water restoration in the roadway partially over stop sign markings. The respondent failed to restored white paint in kind over the stop sign markings. CAR# 20238580001 was issued on 7/18/23. |
2023-08-23 | No data | 194 STREET, FROM STREET 42 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | r/w not occupied |
2023-08-23 | No data | MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WITH 2 STEEL PLATED EXCAVATIONS IN THE ROADWAY BOTH SIDES OF THE STREET. INFORMED FOREMAN WHEN SEWER IS BEING DONE FULL EXCAVATION TO THE CURB MUST BE DONE COMPLETELY DOWN TO SEWER PIPE |
2023-08-23 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. 4'-2'' x 4'-2'' x 3' within the parking lane in front of 12-18 (Binder Base) |
2023-08-20 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent has a temporary patch over its restoration on the roadway. Respondent was notified by CAR# 20227490241 on 09/01/22. Permit# Q012020292A00 for initial work at location was used to identify respondent. |
2023-08-19 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #147 the respondent failed to maintain their final wearing course. Final restoration has pitted. CAR re-inspection failed, NOV issued. |
2023-08-19 | No data | 215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | this CAR is incorrect, will reissue |
2023-08-19 | No data | 215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in front of 93-43 215 Place restoration is temporary asphalt to grade overdue for final |
2023-08-19 | No data | 90 AVENUE, FROM STREET 74 PLACE TO STREET 75 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restorations overdue for final. |
2023-08-19 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# 20231700175 issued on 7/13/23 without the noted permit listed as required. |
2023-08-17 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the r/w p/l ifo 1218 |
2023-08-16 | No data | HURON STREET, FROM STREET ALBERT ROAD TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w resurfaced, new s/w. |
2023-08-16 | No data | BELKNAP STREET, FROM STREET 137 AVENUE TO STREET BENNETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in parking lane flush with surrounding area |
2023-08-15 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit #B012023191A99 exp. 8/4/2023, acquired to repair CAR. |
2023-08-15 | No data | 158 STREET, FROM STREET 132 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit type obtained 135. Permit #Q012023202C40. |
2023-08-15 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit type 135 issued. Q012023174D29. |
2023-08-15 | No data | BEACH 44 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET REINHART ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP over cut |
2023-08-15 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit #B012023160A87 exp. 7/11/2023, acquired to complete work. |
2023-08-14 | No data | 224 STREET, FROM STREET 141 ROAD TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently making Repairs in the Roadway & Sidewalk. Property owner on site |
2023-08-12 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has a permanent sewer restoration in the roadway sunken 1" to 2" below grade. The respondent failed to restore area flush with the surrounding grade. CAR# 20236000090 was issued on 7/2/23. |
2023-08-11 | No data | LINDEN BOULEVARD, FROM STREET 230 STREET TO STREET 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PERM RESTORATION IN DRIVING LANE BACKFILL MATERIALS NOT IN COMPLIANCE. SPRAY "R" FOR RE-DIG |
2023-08-10 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration in the parking lane in front of 161-07, permit is still active at this time. |
2023-08-09 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition remains the same CAR for scoring to be applied to sidewalk flags to be issued. |
2023-08-09 | No data | BOLTON AVENUE, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work started long water restoration in the roadway. |
2023-08-09 | No data | 16 AVENUE, FROM STREET 66 STREET TO STREET 67 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 6628 16 Avenue. |
2023-08-09 | No data | PACIFIC STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is flush to grade |
2023-08-05 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent failed to restore lane marking over permanent water restoration within the parking/driving lane after notification was made via C.A.R.# 20236710252 on 6/9/23. Condition remains. |
2023-08-04 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Wood forms not removed in sidewalk. |
2023-08-03 | No data | CORP KENNEDY STREET, FROM STREET 28 AVENUE TO STREET 28 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. 4' x 3'10'' x 3'6'' within the driving lane in front of 28-02 |
2023-08-03 | No data | 28 AVENUE, FROM STREET 208 STREET TO STREET CORP KENNEDY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Re-scheduled due to tester not available. |
2023-08-02 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. |
2023-08-02 | No data | PERRY AVENUE, FROM STREET EAST 201 STREET TO STREET EAST MOSHOLU PARKWAY SOUTH | No data | Street Construction Inspections: Active | Department of Transportation | Work started , DEP on site inspecting plumbers work…. |
2023-07-30 | No data | PATCHEN AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-29 | No data | 88 ROAD, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to seal wearing course. |
2023-07-29 | No data | 215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER |
2023-07-29 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration needs to be permanently restored on the roadway ifo 1117 Glenwood Road |
2023-07-29 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut re-sealed in the bike lane portion of the roadway. Area in compliance. |
2023-07-29 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway has been made flush with surrounding areas |
2023-07-29 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR conditions repaired under permit number Q012023082F12. |
2023-07-28 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Perm trench 16'x6' with 2 depression 4'x6'x3'' in the driving lane, 2'x4'x4'' in the p/l, next to the s/w curb. I/F/O 3854 Bailey Ave. Need to repair ASAP. Also restore the Wearing Course completely no path asphalt. |
2023-07-28 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA was temp patch and going to be cored. |
2023-07-27 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in the roadway |
2023-07-26 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-26 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2023-07-26 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | inspecting this location for DIJ or D1B but there is a confirmation# Q202311734 (4/27/2023 11:02:32 AM) |
2023-07-25 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a permanent water restoration backfilled on a protected street however failed to obtain a confirmation number. Permit expired 6/20/23. |
2023-07-25 | No data | 202 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Water service was leaking in roadway. Homeowner on site. One excavation in roadway opposite address |
2023-07-24 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Rock E small Plumbing & Heating Inc Block 02766 / Lot: 0016 Water relay 2 inches copper domestic water service from the existing tap. Two (2) permanent restoration long water cut and new sidewalk flag in place I/F/O # 641 |
2023-07-24 | No data | 137 ROAD, FROM STREET 244 STREET TO STREET 246 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic water service was leaking in grassy area. One excavation in roadway at this time |
2023-07-24 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #470 |
2023-07-24 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill |
2023-07-23 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent repaired the condition on CAR #20226710680 issued on 8/22/2022 however failed to obtain the noted permit listed as required. |
2023-07-23 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-23 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on the sidewalk/roadway is flush to grade |
2023-07-22 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area resurfaced by BPP restoration. |
2023-07-22 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to issued NOV due to vehicle parked over restoration. |
2023-07-22 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 22-78 to grade in the parking lane. |
2023-07-22 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR condition repaired under permit number Q012023153C54. |
2023-07-22 | No data | BEACH 69 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET GOUVERNEUR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations in front of 420 to grade across the roadway. |
2023-07-22 | No data | BEACH 69 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET GOUVERNEUR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR condition repaired under permit number Q012023171D52. |
2023-07-22 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found sidewalk flags restored and sealed and kind with final restoration permit # M012023143A83 on file . |
2023-07-20 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file Q012023143B26 |
2023-07-20 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts to grade, perm concrete s/w. |
2023-07-18 | No data | 194 STREET, FROM STREET 42 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 42-06, There is a permanent trench, adjacent to faded lane markings labeled “STOP” that needs to be restored. |
2023-07-16 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber’s cut made permanent in bike lane, lane markings restored |
2023-07-16 | No data | LINDEN BOULEVARD, FROM STREET 230 STREET TO STREET 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY AND SIDEWALK. |
2023-07-16 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber’s cut made permanent in bike lane, lane markings restored |
2023-07-15 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2023-07-15 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to seal cut in the roadway ifo property 312 |
2023-07-13 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Re dig wearing course completed. in front of 28-55 15' x 8'2'' x 2'' and 28-45 12' x 5'2'' x 2'' within the driving lane color code installed. |
2023-07-13 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7' X 5' X 3'' Temp roadway restoration is below grade in the driving and parking lane. |
2023-07-13 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed temp roadway cut is made safe. |
2023-07-13 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking/driving lane in front of 35-64 85th Street |
2023-07-12 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Re-Dig Backfill completed 8' x 4'2'' x 11'6'' and Base 10' x 5'2'' x 1'3'' within the driving lane in front of 28-45 . |
2023-07-12 | No data | EAST 11 STREET, FROM STREET GILMORE COURT TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration overlapped by builder pavement |
2023-07-12 | No data | 84 AVENUE, FROM STREET 161 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7’x5’ x 3’’ temp roadway cut is below grade in the driving and parking lane, condition needs repair. Please notify ROCK E SMALL PLUMBING & HEATING INC with valid DOT permit# Q012023156C97 Expired on 7/4/20 |
2023-07-11 | No data | 166 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass cuts size= (1) 4'9'' x 3'2'' down 3'4'', (2) 4' x 3'5'' down 3'4'' |
2023-07-10 | No data | 166 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak in roadway. Crew on site making repairs. Excavations in roadway. |
2023-07-10 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | RE-DIG: 13'5''x 5'2" x 12'' concrete base completed in front of 28-55. |
2023-07-09 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary restoration, in the driving lane of the roadway. The respondent failed to permanently restore cut within the required time. The respondent was notified via CAR# (20227490241) on 9/1/22. |
2023-07-09 | No data | 90 AVENUE, FROM STREET 74 PLACE TO STREET 75 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to make permanent/final, three temporary restorations on the roadway. Respondent was notified by CAR #20236200152 on 04/30/23 to make work final but, failed to do so. Permit# Q012022115B98 for work expired on 05/19/22. |
2023-07-09 | No data | 90 AVENUE, FROM STREET 247 STREET TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new permit issued Q012023156C93 bpp done |
2023-07-09 | No data | 90 AVENUE, FROM STREET 247 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w flag bpp done to rd/w |
2023-07-08 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | RE-DIG:6' x 4'4" down 11'6" backfill for re-dig, across the northbound parking lane I/F/O house# 28-45, complete and acceptable.Base and wearing courses will be performed at at later date.Restoration was plated. |
2023-07-07 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has obtain permit type 0401 permit #Q042023138A48 for - Repair sidewalk. |
2023-07-07 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has obtain permit type 0135 permit #Q012023139C14 for C.A.R. Restoration. |
2023-07-07 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has obtain permit type 0135 permit #Q012023152C53for C.A.R. Restoration. |
2023-07-07 | No data | COLLEGE POINT BOULEVARD, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied. |
2023-07-07 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This permit was obtained to satisfy CAR#20238320028. Overdue for final repair work was done. Plumbers Permanent restoration in the parking lane. |
2023-07-07 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit #X012023146B93 on file for CAR repair work which was done. |
2023-07-07 | No data | 158 STREET, FROM STREET 132 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent repaired the condition on CAR #20224580047 issued on 12/17/2022 without the noted permit listed as required. |
2023-07-07 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has obtain permit type 0401 permit #Q042023129A27 for Repair Sidewalk. |
2023-07-06 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2023-07-06 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has acquired a permit to repair the CAR. Permit #B012023186C06 exp. 7/29/2023. |
2023-07-06 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has acquired a permit to repair the CAR. Permit #B012023150C99 exp. 6/28/2023. |
2023-07-06 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued in office. |
2023-07-06 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued in office. |
2023-07-06 | No data | 97 AVENUE, FROM STREET 80 STREET TO STREET 81 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w cut to grade. Perm concrete s/w. |
2023-07-05 | No data | MERRICK BOULEVARD, FROM STREET 129 AVENUE TO STREET EVELETH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER WORK DONE ON THE R/W P/L |
2023-07-05 | No data | 215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in the parking lane not sealed, loose aggregates not rolled adequately. Cut needs to be sealed and rolled newly apply asphalt flushed. IFO 93-43 |
2023-07-05 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the driving lane. Active permit on file B012023184E17. |
2023-07-04 | No data | SMITH STREET, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM RESTORATION ON ROADWAY CURB TO CURB. |
2023-07-04 | No data | 165 STREET, FROM STREET 120 AVENUE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-PERM RESTORATION ROADWAY |
2023-07-02 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two perm restorations in the driving lane IFO property #700. Work done on 0135 permit #B012023157A96. |
2023-07-02 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a perm cut in front of 71-21 that is down 1+ inches and could develop into a hazardous condition. Restore entire cut to grade. |
2023-07-02 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT IS NOW OUT OF GUARANTEE NO FURTHER ACTION NEEDED |
2023-07-01 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THE WORD STOP HAS BEEN ADDED OVER PERMANENT RESTORATION IN THE ROADWAY |
2023-07-01 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed. Permanent restoration to grade in P/D lane with multiple sidewalk flags restored in front of 30-18 14th Street. Permit Q012023139C17 obtained 5/19/23 for C.A.R. restoration after issuance of C.A.R. 20225460346 on 10/17/22. |
2023-06-30 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR re-inspection passed. The condition was repaired and permit was obtained. |
2023-06-29 | No data | 90 AVENUE, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut covered by BPP. |
2023-06-28 | No data | JUNIPER AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to multiple cars in the parking lane |
2023-06-26 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition previously reported |
2023-06-24 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Small T-shaped plumbers cut in bicycle lane overdue for final restoration, CAR restoration permit on file, work not yet started. I/F/O # 781 Prospect Av. |
2023-06-24 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR pass as per conversation with Staff Kelvin Ramirez wood form inside tree pit acceptable. |
2023-06-24 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Small T-shaped plumbers cut in bicycle lane overdue for final restoration, CAR work not yet started. I/F/O # 781 Prospect Av. |
2023-06-23 | No data | COLLEGE POINT BOULEVARD, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with a plated excavation labeled "ROCK E SMALL PLUMBING" in the driving lane of the roadway. The respondent failed to obtain an active DOT permit to use/open the roadway. |
2023-06-23 | No data | COLLEGE POINT BOULEVARD, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. In front of 23-06, There is a plated excavation labeled "ROCK E SMALL PLUMBING" that is loose and noisy in the driving lane of the roadway. Fix hardware. |
2023-06-22 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition previously reported |
2023-06-21 | No data | BAILEY AVENUE, FROM STREET BEND TO STREET CHARLES HALLEY PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Active permit and flagman on site as sidewalk is being excavated. |
2023-06-21 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 4ft 4in x 2ft 9in x 3ft = 97.4%5ft 6in x 5ft x 3ft= 97.2%W: 118.2, DD:108.7, MD: 115.7, AM:8.7% |
2023-06-21 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-06-17 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition(s) on CAR #20237720222, (5/13/2023) without the noted permit listed as required. |
2023-06-17 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR #20237770065 on 3/16/23 without the noted permit listed as required. |
2023-06-16 | No data | MACON STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-06-14 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut in the p/l |
2023-06-14 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-06-14 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Note: There are two 4' x 4' areas sunken in the driving lane at 28-45 and 28-55 |
2023-06-11 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wearing course is pitting and not a smooth surface as required.of asphalt grade. Must re-apply. |
2023-06-11 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D4F issued to respondent for failing to permanently restore cut |
2023-06-11 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration within parking lane asphalt sealer edges not seal also install color code marker and Install white lane marker. |
2023-06-10 | No data | 88 ROAD, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to maintain wearing course. |
2023-06-10 | No data | GLENMORE AVENUE, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATIONS HAVE BEEN COMBINED AND ENLARGE. CAR RESTORATION PERMIT B012023153A15 WAS TAKEN OUT TO CORRECT DEFECTS |
2023-06-10 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY MARKINGS RESTORED |
2023-06-10 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has expired unable to see work due to ongoing construction in the roadway at this time. |
2023-06-10 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been re-sealed at time of inspection. |
2023-06-10 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut in the roadway at time of inspection. Active permit on file. |
2023-06-10 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2023-06-09 | No data | 122 AVENUE, FROM STREET 161 PLACE TO STREET LONG STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent roadway cut to grade steel plate remove |
2023-06-09 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore parking/driving white lane marker divider over permanent cut. |
2023-06-09 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration needs to be reseal. |
2023-06-09 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 4’x4’ area of roadway sunken 2” below grade and starting to crack in localized area |
2023-06-09 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4’x4’ area of roadway sunken 2” below grade and starting to crack in localized area |
2023-06-08 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to seal cut in the roadway ifo property 312 |
2023-06-08 | No data | BEACH 69 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET GOUVERNEUR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temp cuts in the roadway are overdue for final restoration IFO 420. Above permit expired on 12/25/21 |
2023-06-07 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site 1 open excavation in roadway parking lane ifo 700 grand st. Preparing backfill |
2023-06-07 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASS CUTBACKS DONE DIMENSIONS 4’6”x3’x4’ replaced base scheduled for later date |
2023-06-06 | No data | OLMSTEAD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut made permanent in the roadway |
2023-06-06 | No data | 25 AVENUE, FROM STREET 157 STREET TO STREET 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-06-05 | No data | FOCH BOULEVARD, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment resurfaced |
2023-06-05 | No data | 142 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Sidewalk flags restored to grade, water valve in grass area to grade and permanent cut in the parking lane is sealed. However the sealant is in a thin layer, not addressed at this time. |
2023-06-04 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION RE QUEST # 20236610034. RESPONDENT FAILED TO REPAIR A PERMANENT RESTORATION DOWN 2 INCHES ON R OADWAY. EXPIRED DOT PERMIT #B012020223A50 EXP (9/8/2020) WAS USED FOR ID. |
2023-06-03 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway excavation found to be permanently restored, in compliance (B012023150A27) |
2023-06-03 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2023-06-03 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to restore defects to cut in roadway ifo property 312 |
2023-06-02 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass dimensions 4’x8’x4’ temp asphalt applied to cut in compliance |
2023-06-02 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site digging trench 4’x8’ ifo property 697 |
2023-06-01 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the d/l in compliance. |
2023-06-01 | No data | CLINTONVILLE STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET LOCKE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway and sidewalk flag restored |
2023-06-01 | No data | BRUCKNER BOULEVARD, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut made permanent |
2023-05-31 | No data | 232 STREET, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking out of sidewalk (confirmed with home owner)one excavation made on sidewalk ,one excavation made on roadway , crew on site to repair. |
2023-05-30 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-05-30 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 6' 7" Width 4' Depth 3' 5" First Lift 97.4 Second Lift 96.9. I left at 1:25 |
2023-05-30 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the d/l opposite residence 1173. |
2023-05-29 | No data | MAC DOUGAL STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-05-27 | No data | HUSSON AVENUE, FROM STREET DEAD END TO STREET GILDERSLEEVE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-05-26 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore "STOP" lane marking in the driving lane ifo 963 glenmore ave |
2023-05-26 | No data | 264 STREET, FROM STREET BOROUGH BOUNDARY TO STREET 85 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water cut to grade |
2023-05-26 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EDGES NOT SEALED |
2023-05-25 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | : A/T/P/O I observed the above respondent repaired the condition on CAR #20238320028, 1/17/23 without the noted permit listed as required. Permit #X012022286A26 |
2023-05-25 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued in office. |
2023-05-25 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued in office. |
2023-05-25 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition after CAR #20227480273 was issued on 8/27/2022 without the noted permit listed as required. |
2023-05-25 | No data | ATKINS AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration was permanently finalized. Permit #B012023111A67 exp. 5/20/2023, acquired to repair the CAR. |
2023-05-24 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut in the p/l |
2023-05-24 | No data | 90 AVENUE, FROM STREET 247 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3' x3' temporary water cut overdue for final restoration in the parking lane |
2023-05-24 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent repaired sunken permanent restoration for water repair, without obtaining proper permit to repair condition reported on CAR # 20227380527 on 8/26/22. |
2023-05-24 | No data | 146 STREET, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench driving and parking lanes is sealed and flushed to existing roadway. IFO 12814 active work site. |
2023-05-24 | No data | 90 AVENUE, FROM STREET 74 PLACE TO STREET 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR# 20236200152 issued on 04/30/23 to make three temp. restorations on roadway final. |
2023-05-22 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE ON 5' 6'' X4' X3' 6'' & 3' 7'' X 3' 3'' X 3' 6'' EXCAVATIONS ON THE ROADWAY I/F/O 149-45 HAWTREE STREET. |
2023-05-21 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration in parking/driving lanes with white lane markings missing on both sides of restoration, also found temporary asphalt within 3 sidewalk flags around water valve box being overdue for final restoration |
2023-05-20 | No data | OLMSTEAD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Cut plated in the roadway |
2023-05-20 | No data | BRUCKNER BOULEVARD, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Cut plated in the roadway |
2023-05-19 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (4' x 3' x 2'8") |
2023-05-18 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 4’x4’ area of roadway sunken 2” below grade in localized area |
2023-05-16 | No data | MERRICK BOULEVARD, FROM STREET 129 AVENUE TO STREET EVELETH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER-CREW ON SITE WORKING IN 2 OPEN EXCAVATIONS ON THE ROADWAY. |
2023-05-15 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plywood needs to be removed from curb & from between sidewalk flag & tree pit |
2023-05-15 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plywood needs to be removed from curb & from between sidewalk flag & tree pit |
2023-05-13 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags have been sealed |
2023-05-13 | No data | JEFFERSON AVENUE, FROM STREET CLAVER PLACE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #17. |
2023-05-12 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Back fill Pass Restoration Pass: cut sizes 4'3'' x 4'2'' x 2'6'' , 4' x 4' x 2'6''. |
2023-05-11 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New permanent restoration has been built over old cut. |
2023-05-09 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore temporary water cut in the roadway within the required time. The condition remains despite prior notice in CAR # 20225460010 issued on 1/24/22. Permit used for ID |
2023-05-09 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR # 20225460292, issued on 9/8/22 without the noted permit listed as required. |
2023-05-09 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR # 20223950008, issued on 9/16/22 without the noted permit listed as required. |
2023-05-09 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR # 20227480310, issued on 9/9/22 without the noted permit listed as required. |
2023-05-09 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed 4'6 x 3' |
2023-05-08 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill incomplete, Inspector Jarrel Mack to complete backfill. |
2023-05-06 | No data | DREW STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2023-05-06 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED TEMPORARY RESTOATIONS ON THE ROADWAY OVERDUE FOR FINAL. CAR# 20227720383 ISSUED 8/24/2022. RESPONDENT FAILED TO PERMANENTLY RESTORE THE ROADWAY WITHIN THE REQUIRED TIME. CITED PERMIT USED FOR ID. |
2023-05-05 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut was made final in sidewalk but not in roadway. Will reissue overdue for final for roadway only to keep NOVs consistent with CAR. |
2023-05-05 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers cut temporary restoration in roadway bicycle lane is overdue for final permanent restoration. Please make final permanent restoration. I/F/O #781 |
2023-05-05 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued in office. |
2023-05-04 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 3421 Glenwood road |
2023-05-04 | No data | 209 STREET, FROM STREET 115 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Temporary restoration in roadway flush with surrounding area |
2023-05-02 | No data | 200 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut in parking lane |
2023-05-01 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w, in compliance. |
2023-04-30 | No data | 90 AVENUE, FROM STREET 74 PLACE TO STREET 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has a temporary restoration along the driving lane that is not flush with the adjacent roadway surfaces. Restoration was sunken by 2". Permit# Q012022115B98 which expired in 05/18/22 for work at location was used to identify respondent. |
2023-04-30 | No data | AMELIA ROAD, FROM STREET 172 STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-SEGMENT RESURFACED. SIDEWALK IN COMPLIANCE. |
2023-04-27 | No data | LINDEN BOULEVARD, FROM STREET 230 STREET TO STREET 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent gas restoration, backfilled on a protected street but failed to obtain a confirmation number. Permit #Q012023076A14 expired 4/15/23 |
2023-04-27 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 15'x6'x11' |
2023-04-26 | No data | EAST 52 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway driving lane and sidewalk flag restored in driveway IFO 1082 |
2023-04-25 | No data | 142 STREET, FROM STREET 115 AVENUE TO STREET 116 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE ON 5' X 3' 6'' X 4' EXCAVATION IN THE PARKING LANE I/F/O 115-30 142 STREET |
2023-04-22 | No data | GLENMORE AVENUE, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROPER CUT BACKS NOT DONE |
2023-04-22 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Sidewalk Currently Being Pumped out. Contractor making Repairs in the Sidewalk & Roadway |
2023-04-22 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active permit# Q012023090B95 pulled for work. Plated excavation across the parking and driving lane. |
2023-04-22 | No data | 77 ROAD, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER PERM TO GRADE CUT IN THE D/L |
2023-04-22 | No data | 95 AVENUE, FROM STREET 113 STREET TO STREET 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has two permanent water restorations, backfilled on a protected street but failed to obtain a confirmation number. Permit #Q012023003B45 expired 1/8/23. |
2023-04-22 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Roadway Dep Shut Off Water after 3 Day Dep Notice was Issued |
2023-04-22 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/14/23. |
2023-04-20 | No data | 264 STREET, FROM STREET BOROUGH BOUNDARY TO STREET 85 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | VERIFIED - 3 TEMP RESTORATIONS IN THE ROADWAY AND 1 IN PARKING LANE I/F/O ADDRESS MENTIONED. RESTORATIONS ARE TO-GRADE WITH ACTIVE PERMIT ON FILE. SITE IN COMPLIANCE.NO CREW ON SITE. |
2023-04-20 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Street closure granted op#79 til 4:30 in compliance narrow street cut in the roadway I/f/o 1309 |
2023-04-19 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. re-inspection failed as respondent failed to restore a temporary water restoration on the sidewalk in front of 30-18 14th Street after notification was made via C.A.R. 20225460346 on 10/17/22. Condition remains. |
2023-04-19 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT PERM IN THE PARKING LANE IN COMPLIANCE WITH CAR ISSUED |
2023-04-19 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of segment found resurfaced by sewer trench (jr cruz) , perm cut opp location in compliance |
2023-04-18 | No data | 215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - BACKFILL COMPLETE ON 4' 6'' X 3' 3'' X 3' 7'' EXCAVATION ON THE ROADWAY 93-43 215 PLACE |
2023-04-16 | No data | 134 AVENUE, FROM STREET 157 STREET TO STREET 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2023-04-16 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR was issued on latest permit |
2023-04-15 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are two permanent water trenches that are sunken 1"-2" within a localized area of both trenches, across the roadway. Also, saw cut lines are exposed and need to be resealed around trench. I/f/o 11-27 |
2023-04-15 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a 4'10" x 3'3" temporary restoration within the parking lane this is overdue for final restoration. Cited permit expired on 04/26/2022. I/f/o 22-78 |
2023-04-15 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EDGES NOT SEALED |
2023-04-14 | No data | 46 AVENUE, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent with permanent asphalt cut in roadway and a concrete cut on the sidewalk around water valve without a DOT permit. Respondent ID by denied application number 2022120500817690 on NYC STREETS. Also paving marker. |
2023-04-14 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut down 2 inches in rw |
2023-04-13 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2023-04-12 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent tight 2 permanent cuts in the roadway needing to be resealed. Respondent failed to respond to previous CAR issued 9/5/2022 for condition, permit #b012019338B44 expired 12/28/2019 used for ID |
2023-04-12 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration was resealed. |
2023-04-11 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found respondenrt failed to permanently restore a temporary water restoration on the sidewalk. CAR #20226040264 was issued on 10/27/2022 prior to NOV being written. |
2023-04-11 | No data | 264 STREET, FROM STREET BOROUGH BOUNDARY TO STREET 85 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Repairing domestic water service leaking in roadway. One excavation in roadway at this time |
2023-04-10 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition(s) on CAR #20225150313, (12/12/2022) without the noted permit listed as required. |
2023-04-10 | No data | 146 STREET, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 20'9" x 6' x 6' 4" backfill and cut back where undermining |
2023-04-09 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut roadway is flush to grade |
2023-04-09 | No data | 111 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-2 PERM RESTORATIONS ROADWAY |
2023-04-08 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags at location restored in kind. |
2023-04-08 | No data | GIPSON STREET, FROM STREET CORNAGA AVENUE TO STREET HEALY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the parking lane 10-95 |
2023-04-08 | No data | LINDEN BOULEVARD, FROM STREET 220 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water two perm cuts to grade across the roadway sidewalk flags restored 220-12 Linden Blvd |
2023-04-08 | No data | 112 STREET, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk has new concrete flag and roadway has a new permanent restoration . |
2023-04-07 | No data | 162 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration resurfaced by BPP. |
2023-04-07 | No data | 158 STREET, FROM STREET 132 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain proper permits to repair the conditions reported on a CAR. |
2023-04-07 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumbers permanent restoration in the parking lane, work done to resolve CAR without an updated NYCDOT permit as required. |
2023-04-06 | No data | 122 AVENUE, FROM STREET 161 PLACE TO STREET LONG STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012023079D65. |
2023-04-06 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | L shape trench acceptable. |
2023-04-06 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/ L IN COMPLIANCE |
2023-04-05 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY MARKINGS NOT RESTORED |
2023-04-05 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain proper permits to repair the conditions reported on a CAR. |
2023-04-05 | No data | 122 AVENUE, FROM STREET 161 PLACE TO STREET LONG STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O#161-11 (1) of (2)Steel Plates marked "ROCK E SMALL PLUMBING", is Noisy when Rolled on by Vehicular Traffic. Condition Previously Reported, CAR#20235710028 was issued on 4/3/2023. |
2023-04-05 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to obtain a proper permit to repair conditions reported on a CAR. (CAR #20227390242) was issued on 10/30/2022. Respondent ID by permit on file. |
2023-04-05 | No data | ATKINS AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION FINALIZED WITHOUT PROPER PERMIT |
2023-04-04 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in the bus lane |
2023-04-04 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent repair water restoration in front of 40-18 108 st. Respondent failed to restore the white lane markings over the permanent water cut , after CAR #20226710680 was issued on 8/22/2022 to address the condition. |
2023-04-04 | No data | 122 AVENUE, FROM STREET 161 PLACE TO STREET LONG STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012023079D65. |
2023-04-04 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | BASE COMPLETED THE TWO 4' X 4' CUTS WERE LESS THAN 1' BETWEEN THEM SO THEY WERE MADE ONE CUT- 13' X 6'4' X 4' |
2023-04-04 | No data | PATCHEN AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit check, Crew on site, excavated parking lane, water & sewer repair. Active. |
2023-04-04 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for Wearing course not flush with surrounding area. |
2023-04-04 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified however crew onsite working where the defect is located at 133-17 Francis Lewis Blvd. Permittee is following there stipulations at this time roadway in-compliance. |
2023-04-04 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration overdue for final within the driving lane in front of 46-04 189th Street. |
2023-04-03 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary cut within bus pad overdue for final |
2023-04-03 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 133 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | base has to be rescheduled |
2023-04-03 | No data | 122 AVENUE, FROM STREET 161 PLACE TO STREET LONG STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | At My Time Of Arrival I Observed 1 Out Of 2 Steel Plates Marked "Rock E Small" Making Noise When Driven Over By Heavy Vehicular Traffic In Driving Lane I/F/O 161-11 122nd Ave |
2023-04-01 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO MAINTAIN PROPER PERMIT TYPE 0135 FOR SIDEWALK REPAIR AFTER BEING ISSUED A CAR ON 2/6/23. Was issued by expired permit |
2023-04-01 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in parking lane under parked car at this time |
2023-04-01 | No data | MATILDA AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber cut made permanent |
2023-04-01 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk flags , must be restored in kind, expansion joints must be sealed. Curb line is not installed properly. Must restored i/f/o 779/781 remove plywood from curb line and installed curb |
2023-04-01 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permament sewer restoration needs to be resealed. |
2023-03-31 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR#20227410162 issued on 5/15/2022, without the noted permit listed as required. |
2023-03-31 | No data | 229 STREET, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water two perm cuts to grade across the roadway in front of 117-35 229th Street |
2023-03-29 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restorations sealed |
2023-03-29 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2023-03-29 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew is working on location |
2023-03-28 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-03-28 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS CURRENTLY MILLED ROADWAY RESURFACED |
2023-03-27 | No data | 111 STREET, FROM STREET 91 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. 5'3'' x 4'4'' x 3'7'' within the parking lane in front of 91-37. |
2023-03-27 | No data | 29 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in front of 160-17 to grade in the roadway. |
2023-03-27 | No data | 112 STREET, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (5’6” x 4’8” x 2’6”) |
2023-03-27 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Sewer backup confirmed. Homeowner unable to use plumbing services. Contractor working in excavation on sidewalk at time of inspection. Changing service to sewer. |
2023-03-24 | No data | 46 AVENUE, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permanent sewer restoration across roadway, sidewalk flag restored around water valve without a DOT permit |
2023-03-24 | No data | 146 STREET, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2023-03-22 | No data | BELKNAP STREET, FROM STREET 137 AVENUE TO STREET BENNETT STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Permanent cut in parking lane flush with surrounding area |
2023-03-21 | No data | TURNBULL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumbers long water cut actual dimensions 45”x40” in D/L I/F/O # 2080 now out of guarantee Cannot reissue CAR in DASH. W/C cutbacks not made. Original CAR has incorrect measurements. Plumbers work to grade flush with R/W. Can’t reissue DASH guarantee |
2023-03-19 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags restored in kind. Roadway was recently resurfaced. |
2023-03-18 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | RESTORATION IS FINAL ACK FILL COMPLETED UNDER B012023034A79 |
2023-03-18 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20226480223 issued on 9/11/2022. Respondent failed to seal expansion joints in sidewalk flags and at the curb. Cited permit used for ID. |
2023-03-17 | No data | GLENMORE AVENUE, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROPER CUT BACKS NOT DONE |
2023-03-17 | No data | LINDEN BOULEVARD, FROM STREET 230 STREET TO STREET 231 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic water service was leaking in roadway. Two long water cuts in roadway at this time |
2023-03-16 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restorations not properly rolled. |
2023-03-15 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-03-15 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY AND 2 SIDE WALK FLAGS INSTALLED |
2023-03-15 | No data | QUINCY STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade |
2023-03-13 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in parking lane vehicle park |
2023-03-12 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent maintaining a permanent roadway restoration in the bike lane with edges and sealer cracking. Respondent was notified Via CAR# 20226710735 ON 8/25/2022 to repair condition and did not. |
2023-03-09 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 20’ x 5’x 3’Temp in tree pit sunken 2’ and partial sunken 3’ must make condition safe I/f/o 779 |
2023-03-09 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp asphalt applied & leveled off. |
2023-03-08 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20236780016 issued on 1/4/2023. Respondent failed to reseal a permanent restoration, in the roadway. Cited permit used for ID. |
2023-03-08 | No data | 134 AVENUE, FROM STREET 155 STREET TO STREET 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced. |
2023-03-08 | No data | 97 AVENUE, FROM STREET 80 STREET TO STREET 81 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4.0 X 3.8 X 4.0 BACKFILL |
2023-03-08 | No data | HOLLYWOOD AVENUE, FROM STREET BAISLEY AVENUE TO STREET WATERBURY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Edges of plumbers permanent restoration were resealed. |
2023-03-08 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBERVED THE ABOVE RESPONDENT FAIL TO PROPERLY SEAL AND MAINTAIN PERMANANT CUT IN THE PARKING LANE, CAR # 20237410012 ISSUED ON 1/9/23,ABOVE PERMIT # USED FOR I.D |
2023-03-06 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent tight 2 permanent cuts in the roadway needing to be resealed. Respondent failed to respond to previous CAR issued 9/5/2022 for condition, permit #b012019338B44 expired 12/28/2019 used for ID |
2023-03-06 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate removed from the street |
2023-03-06 | No data | 157 STREET, FROM STREET 134 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut to grade small hair line cracks 10%. |
2023-03-05 | No data | 88 ROAD, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a permanent water restoration, that has edge cracking on the seal. The respondent failed to properly seal & maintain the wearing course. The respondent was notified via CAR# (20226200479) on 10/29/22. |
2023-03-03 | No data | 112 STREET, FROM STREET 95 AVENUE TO STREET ATLANTIC AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic water service leaking in roadway. One excavation in roadway opposite property. One excavation in sidewalk in front of property |
2023-03-02 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO OBTAIN CORRECT PERMIT NOV ISSUED |
2023-03-02 | No data | 200 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (8' x 4' x 3') |
2023-03-01 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO OBTAIN CORRECT PERMIT NOV ISSUED |
2023-03-01 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED OBTAIN CORRECT PERMIT NOV ISSUED |
2023-03-01 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV ISSUED IN OFFICE. |
2023-02-28 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reseal perm restoration in bike lane. |
2023-02-28 | No data | 29 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permanent restoration to grade within the parking/driving lane in front of 160-17. |
2023-02-28 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to obtain a proper permit to repair conditions reported on a CAR. (CAR ##20227440243) was issued on 9/15/2022. Respondent ID by permit on file. |
2023-02-27 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | STEEL PLATES HAVE BEEN REMOVED AND NEW PERMIT ON FILE TO FINALIZE WORK |
2023-02-27 | No data | 200 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Temporary restoration in roadway flush with surrounding area. |
2023-02-27 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade driving lane |
2023-02-24 | No data | 26 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site actively working, shifted plate complaint not verified. |
2023-02-22 | No data | 46 AVENUE, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Permanent sewer restoration across roadway, sidewalk flag restored around water valve without a DOT permit |
2023-02-20 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED STEEL PLATES ON THE ROADWAT WITHOUT RAISE PLOW SIGNS POSTED DURING THE WINTER MORATORIUM. RESPONDENT FAILED TO POST RAISE PLOW SIGNS WHILE HAVING STEEL PLATES ON THE ROADWAY DURING THE WINTER MORATORIUM. CITED PERMIT ON FILE FOR ID. |
2023-02-18 | No data | 154 STREET, FROM STREET 32 AVENUE TO STREET 33 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2023-02-18 | No data | 29 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to cease work on the roadway at 4pm. |
2023-02-13 | No data | 25 AVENUE, FROM STREET 157 STREET TO STREET 160 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed: Start: 1115 End 13:05 Cut Size #1: 7'6" x 4'9" x3' Cut#2: 4'4" x 3'9" x 2'10" |
2023-02-13 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - CUT #1 - W6ft 3in 4ft W4ft 5in D8ft 3in - - CUT #2 3ft 2in W3ft 5in D4ft - - TWO TEMPS IFO & OPP 436 |
2023-02-13 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No signs posted for plate. Space available on trees, light poles and u-channel rails. D70 issued. Spoke with G.C during backfill and he complied but never posted sign. |
2023-02-12 | No data | 113 AVENUE, FROM STREET 221 STREET TO STREET 223 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER -ACTIVE GAS WORK I/F/O ADDRESS CITED. |
2023-02-10 | No data | 90 AVENUE, FROM STREET 247 STREET TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Basement Contractor currently making Repairs in the Roadway. Property Owner on site |
2023-02-10 | No data | 25 AVENUE, FROM STREET 157 STREET TO STREET 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backfill debris obstructing gutter, no one on site temporary to grade cut within driving lane |
2023-02-09 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving lane . |
2023-02-09 | No data | 25 AVENUE, FROM STREET 157 STREET TO STREET 160 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill has been rescheduled due to damaging a gas line in front of 157-11 upon excavating material. |
2023-02-09 | No data | 46 AVENUE, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Temporary cut on roadway and sidewalk without a DOT permit |
2023-02-09 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Basement went inside to verify.Contractor currently in the Process of Excavating the Roadway to make Repairs. Building Super on site. |
2023-02-08 | No data | 25 AVENUE, FROM STREET 157 STREET TO STREET 160 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic water service leaking in basement of property. One excavation in roadway opposite address. |
2023-02-07 | No data | EAST 219 STREET, FROM STREET BEND TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done and sidewalk |
2023-02-06 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on sidewalk and roadway overdue for final. Must be restored in kind also expansion joints must be sealed I/f/o 781 |
2023-02-06 | No data | PROSPECT AVENUE, FROM STREET EAST 156 STREET TO STREET MACY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COMPLY WITH STOP 016 WHILE HAVING A PARTIAL SIDEWALK CLOSURE. RESPONDENT MUST HAVE OPEN SIDEWALK FOR PEDESTRIANS WAS ID BY PERMIT |
2023-02-05 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and In compliance |
2023-02-03 | No data | 228 STREET, FROM STREET 130 AVENUE TO STREET 131 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking lane opposite 130-45 228th Street |
2023-02-03 | No data | 77 ROAD, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SEWER PERM TO GRADE CUT IN THE D/L |
2023-02-02 | No data | 97 STREET, FROM STREET 24 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. Cut size: 5'0" x 3'0" x 4'0" in the parking lane i/f/o 24-16 97th Street. |
2023-02-02 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXCAVATION NO PERMIT |
2023-02-02 | No data | HAZEN STREET, FROM STREET 71 STREET TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway cut maintain to grade in d/l. |
2023-01-31 | No data | SNEDIKER AVENUE, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance in d/l |
2023-01-29 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-01-28 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut has 6”x6” area down 2” in driving lane at 1117 glenwood road |
2023-01-27 | No data | 205 PLACE, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE ON 2 EXCAVATIONS IN THE ROADWAY , BINDER BASE AFTER. |
2023-01-26 | No data | 164 AVENUE, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/8/22. |
2023-01-26 | No data | 135 AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent water restoration, backfilled on a protected street but failed to obtain a confirmation number. Permit #Q012022348B88 expired 12/31/22. |
2023-01-26 | No data | QUINCY STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived: 11:30 Departure: 12:30 Cut1: L4ftxW4ftxD2ft8in 1st lift: 96.6%Cut2: L4ft5inxW4ftxD2ft8in 1st lift: 96.8% |
2023-01-26 | No data | 205 PLACE, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Spoke to homeowner. Water service was leaking in roadway. DEP shut off water. Two excavations in roadway. (Long water) |
2023-01-24 | No data | BORDEN AVENUE, FROM STREET 34 STREET TO STREET 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit delinquent |
2023-01-23 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit number Q012023019B45. |
2023-01-23 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration in front of 15-46 to grade across the roadway. |
2023-01-22 | No data | PACIFIC STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM WATER CUTS FOUND ON ROADWAY ON FRONT 1807 PACIFIC STREET, WATER VALVE INSTALLED ON SIDEWALK |
2023-01-21 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/31/22. |
2023-01-21 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass due to continuity with permit B012022301B87 |
2023-01-21 | No data | ATKINS AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, repair water backfilled on a protected street but failed to obtain a confirmation number. Permit #B012022276A58 expired 10/22/22. |
2023-01-19 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit delinquent |
2023-01-17 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration in driving lane. Cut with temporary asphalt adjacent to plumbers permanent restoration belongs to DEP. |
2023-01-11 | No data | HOLLYWOOD AVENUE, FROM STREET BAISLEY AVENUE TO STREET WATERBURY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The restoration L 15’ X 9’ X D- zero sealant need to be re-sealed at the edges of the wearing course.Must be properly maintained throughout the life of the guarantee period 1/08/23. In accordance with the section 34RCNY2-11(e) (12) (viii) |
2023-01-09 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Request to reseal permanent restoration in roadway. Sealer worn out. |
2023-01-07 | No data | GLENMORE AVENUE, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PROPER CUT BACKS NOT DONE |
2023-01-06 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Base completed 24' x 6'4'' x 12'' across the roadway. |
2023-01-05 | No data | 162 STREET, FROM STREET 35 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed 24' x 5' x 12' trench across the roadway in front of 35-35. |
2023-01-04 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, needs to be resealed.At 6 Street between 3 Avenue and 4 Avenue. AKA 399 3 Avenue. |
2023-01-03 | No data | STILLWELL AVENUE, FROM STREET 25 AVENUE TO STREET 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent Emergency |
2023-01-02 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in DL, In compliance |
2023-01-02 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROAWAY IN FRONT OF 251 WINTHROP STREET |
2022-12-31 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane okay |
2022-12-28 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV repaired the condition on CAR #20225460292 issued on 9/8/2022 without the noted permit listed as required. |
2022-12-27 | No data | STILLWELL AVENUE, FROM STREET 25 AVENUE TO STREET 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent Emergency |
2022-12-27 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued in office |
2022-12-25 | No data | EAST 21 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT paved the segment |
2022-12-19 | No data | ESSEX STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Rwy plated, s/w temp. |
2022-12-19 | No data | 220 STREET, FROM STREET 133 ROAD TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-PERM RESTORATION. ASPHALT STARTING TO BREAK AWAY . |
2022-12-19 | No data | STILLWELL AVENUE, FROM STREET 25 AVENUE TO STREET 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent Emergency |
2022-12-17 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-12-17 | No data | 158 STREET, FROM STREET 132 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THERE IS A TEMP WATER CUT IN THE PARKING LANE IN FRONT OF 132-04 158 STREET THAT IS OVER DUE FOR FINAL PERMIT EXPIRED 12/8/2022 |
2022-12-14 | No data | WILLOUGHBY AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #260 |
2022-12-12 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 TEMP CUTS OVERDUE FOR FINAL ON THE SIDEWALK AND THE PARKING LANE'S , RESTORE CUTS IN THE P/L AND S/W |
2022-12-12 | No data | STILLWELL AVENUE, FROM STREET 25 AVENUE TO STREET 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent Emergency |
2022-12-08 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition made safe with Black Top. |
2022-12-08 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags restored , Roadway resurfaced |
2022-12-08 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found asphalt broken out and down 1” below the surface on an area within a temporary restoration on the sidewalk that is creating a trip hazard for pedestrians. |
2022-12-07 | No data | 156 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Domestic Water service leaking in grassy area. Crew preparing to excavate |
2022-12-07 | No data | HEMPSTEAD AVENUE, FROM STREET 220 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the parking lane I/f/o 220-05 |
2022-12-06 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration within permanent cut restore as per 1042D specifications Note#10: Square out, mill and pave. |
2022-12-06 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wrong defect code used, will re-issue according to 1042 specs. |
2022-12-05 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass perm ...... |
2022-12-01 | No data | 162 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp roadway trench overdue for final restoration and sunken 2'' in localized area. |
2022-11-30 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to obtain a proper permit to repair conditions reported on a CAR. (CAR ##20227440243) was issued on 9/15/2022. Respondent ID by permit on file |
2022-11-30 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with permanent restorations not properly sealed in roadway. Respondent failed to seal and maintain wearing course. CAR #20227690218 was issued on 9/15/2022. Permit #B012019338B44 used for ID. |
2022-11-29 | No data | EAST 51 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w sealed and in compliance |
2022-11-28 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR #20227480310, (9/9/22) without the noted permit listed as required. |
2022-11-28 | No data | BORDEN AVENUE, FROM STREET 34 STREET TO STREET 35 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cuts size 8'x8'x4' & 5'x3'5''x4' |
2022-11-28 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to permanently restore roadway within the required time. (Temp cut in the bus lane & p/l) |
2022-11-28 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition(s) on CAR #20223950008, (9/16/22) without the noted permit listed as required. |
2022-11-28 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with permanent restorations not properly sealed in roadway. Respondent failed to seal and maintain wearing course. CAR #20227690218 was issued on 9/15/2022. Permit #B012019338B44 used for ID. |
2022-11-27 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed Respondent failed to comply with terms & conditions of DOT permits.Violation of stip:020 which states:Contractor may contain a maximum of 25 linear ft during non-work hours for storage of excavated material.Occupied 19 linear ft with wood |
2022-11-26 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to seal expansion joints in sidewalk flags, NOV was issued due to failed CAR. The roadway was paved by DOT, roadway restoration was found resurfaced. |
2022-11-25 | No data | 113 AVENUE, FROM STREET 221 STREET TO STREET 223 STREET | No data | Street Construction Inspections: Active | Department of Transportation | two long water temp restorations within the d/l and p/l, slightly below grade, not within scope of action. 221-24 |
2022-11-22 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in roadway is overdue for final restoration IFO 86-11 |
2022-11-22 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag restored without proper permit |
2022-11-21 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 STEEL PLATES FOUND ON ROADWAY |
2022-11-20 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a temporary cut 8'x4' within a bus pad section 20'x11' that is overdue for final restoration. Permanently restore entire section of bus pad. |
2022-11-20 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-11-20 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-11-19 | No data | STILLWELL AVENUE, FROM STREET 25 AVENUE TO STREET 83 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Sidewalk & Roadway Currently being Pumped out. Property Owner on site |
2022-11-18 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 9ft 4in by 4ft down 4ft \4ft by4ft down 4ft |
2022-11-18 | No data | MATILDA AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed temporary water repair restorations overdue for final in the roadway. CAR CAR 20227750147 was issued 7/29/2022. Respondent failed to permanently restore cuts within required time. I.D by expired permit X012022104A08. |
2022-11-17 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in bus lane |
2022-11-17 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut made perm while permit was active. It was a NICA. |
2022-11-17 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | bkfill not completed / 4 ft remaining from pipe to base to bkfill bottom test 97.0% ,will resume tomorrow due to time stipulation is up @ 2 pm ..11 ft x 4 ft down 8.6 ft ..actual start time 11:29 am, compaction 97.0% |
2022-11-16 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD TWO TEMPORARY RESTORATIONS ON THE ROADWAY IFO PROPERTY #700 OVERDUE FOR FINAL. CAR#20227720383 ISSUED 8/24/2022. RESPONDENT FAILED TO PERMANENTLY RESTORE THE ROADWAY WITHIN THE REQUIRED TIME. ID BY PERMIT # |
2022-11-16 | No data | TURNBULL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a 3.5''x 4'' of the 2 perm cuts on the roadway that did not conform with standard detail specification H 1042-D Note # 6 cut back. |
2022-11-16 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 6'x4' asphalt patch over perm cut sunken 2'' IFO 77-21. Area needs to be permanently restored. |
2022-11-14 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-11-13 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR acknowledged. Sealer installed around permanent restoration. In compliance. |
2022-11-13 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation (plumber) in compliance |
2022-11-12 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUTIS FINAL BUT PROPER PERMIT NOT TAKEN OUT |
2022-11-12 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code applied to permanent restoration, DEP 3' x 3' temp cut adjacent to plumber restoration |
2022-11-12 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILURE TO RESTORE WHITE MARKINGS ON THE ROADWAY |
2022-11-11 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DOT paved the segment |
2022-11-10 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation on the r/w also temp cut on the s/w under valid permit # B012022301B87 exp 12/3/22 |
2022-11-10 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The CAR Re-inspection passed because the respondent has an active permit:M012022305A78 on file and they're currently excavating a portion of the roadway. |
2022-11-10 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The crew is on site with partial roadway excavation that extends from under the bridge into the north curb lane. |
2022-11-10 | No data | COLEMAN STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in r/w , temp cut on s/w to grade ... permit valid |
2022-11-10 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for wearing course not flush with surrounding area. |
2022-11-06 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate found on roadway in front of 251 Winthrop street, new permit on file B012022290A96 |
2022-11-04 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumbers restoration in the parking lane. |
2022-11-04 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration remains in acceptable condition |
2022-11-01 | No data | 112 ROAD, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2022-11-01 | No data | ATKINS AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL CUT IN THE PARKING LANE AND 2 SIDE WALK FLAGS INSTALLED |
2022-10-30 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 permanent roadway restorations needs to be resealed. |
2022-10-30 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMIT EXPIRED ON 10/25/2022 |
2022-10-30 | No data | DUNBAR STREET, FROM STREET MOTT AVENUE TO STREET PLUNKETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced. No old cuts on the roadway at this time. |
2022-10-29 | No data | 88 ROAD, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to reseal permanent 2020 water restoration in the driving lane. |
2022-10-29 | No data | 54 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2022-10-28 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Base completed in front of 149-53, 5' 2" x 3' 6" x 9" , 149-57: 4' 11" x 3' 7" x 11". Two cuts opposite addresses remain to be cutback and based. |
2022-10-27 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. cut 1: 3' 10" x 2' 10" x 2' 10". cut 2: 6' 6" x 3' 8" x 1' 3", cut 3: 4' 2" x 2' 6" x 2' 10", cut 4: 5' 11" x 4' 2" x 1' 11". |
2022-10-27 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The temporary repair water cut on the sidewalk is overdue for final, and the restoration within the roadway is unraveling ½’’. The final wearing course surface must be smooth without any defects as per 34 RCNY 2-11(e)(12)(xiii). |
2022-10-27 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent removed their steel plates and made the restoration perm to grade within the parking/driving lane. |
2022-10-25 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber work stated in roadway and sidewalk |
2022-10-23 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rwy paved, s/w restored |
2022-10-22 | No data | 97 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2022-10-22 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD UNSEALED PERMANENT RESTORATIONS IN THE DRIVING LANE. CAR#20227690218 ISSUED 12/28/2019. RESPONDENT FAILED TO SEAL & MAINTAIN THE WEARING COURSE. ID BY PERMIT #B012019338B44 EXP 12/28/2022. |
2022-10-21 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in p/l on opp side |
2022-10-21 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET COHANCY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IBM color code marker installed on the permanent water restoration, also poor house keeping condition is restored i/f/o 15018. |
2022-10-21 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving lane, in compliance |
2022-10-21 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-10-20 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on roadway is flush to grade |
2022-10-20 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary cuts within sidewalk around water valve overdue for final |
2022-10-20 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent with a permanent water restoration in the bike lane with seals broken along the edges of cut. Respondent failed to properly seal and maintain the wearing course after CAR#20226710735 was issued on 8/25/2022. |
2022-10-19 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to restore the white lane marker over the permanent water cut after CAR # 20226710680 was issued on 8/22/2022. Respondent also failed to install the IBM color code marker and seal the edges of the cut. |
2022-10-19 | No data | FOCH BOULEVARD, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 167-03 completed and acceptable in the parking lane. 7' 5" x 6' 2" x 6'. |
2022-10-19 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to seal expansion joints in sidewalk flags, NOV was issued due to failed CAR. The roadway was paved by DOT, roadway restoration was found resurfaced. |
2022-10-18 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .. |
2022-10-17 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY MILLED |
2022-10-17 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on the sidewalk and 5'x3' in the roadway are overdue for final restoration IFO 30-18. Above permit expired on 10/1/22. |
2022-10-15 | No data | KINGSLAND AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Double yellow lane marking have been restored. |
2022-10-14 | No data | FOCH BOULEVARD, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival I witnessed site was in compliance. Pipe placed for debris stored in parking for water flow. I noticed the contractor placed another contractor signage on site. Please contact them to remove sign and put proper signage. |
2022-10-14 | No data | MATILDA AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observe a water repair cut overdue for final restoration. CAR 20227750147 was issued 7/29/2022. Respondent failed to permanently restore cut within required time. I.D by expired permit X012022104A08. |
2022-10-13 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration overdue for final within the driving lane in front of 46-04 189th Street. |
2022-10-13 | No data | FOCH BOULEVARD, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to provide adequate protection to persons and property. There is a 20'x4' high un-covered pile of sand. There a sharp pieces of excavated concrete and asphalt, And wood not fully protected. I ID by cited permit. |
2022-10-12 | No data | FOCH BOULEVARD, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to comply with the terms and condition of the DOT rules Occupy 25 linear feet for excavated materials. Site unattended. The site has 70 linear feet occupied. I ID by cited permit. Another contractor sign on site. |
2022-10-12 | No data | COHANCY STREET, FROM STREET HAWTREE STREET TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade in the driving lane. |
2022-10-11 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the respondent failed to adhere to stip # 071 of their permit by working at 5:20 PM. Above permit allows for work 10 AM- 4PM, Monday To Friday. Permit used for ID. |
2022-10-11 | No data | BELL BOULEVARD, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Contractor was observed working at 5:20 PM in violation of stip which allows work between 10 am - 4 pm. Plated excavation in r/w. R/w and s/w clear at this time. |
2022-10-09 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent had an unseal permanent restoration on the roadway. CAR #20227390197 issued 9/4/2022. Respondent failed to properly seal and maintain the wearing course. ID by permit #B012019227A05 expired 9/12/2019. |
2022-10-08 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a permanent sewer restoration, that is mounded 1" in the roadway. The respondent failed to flush the wearing course with surrounding area. The respondent was notified via CAR# (20227480273) on 8/27/22. |
2022-10-08 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been finalized but correct permit was not taken out |
2022-10-08 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD TWO TEMPORARY RESTORATIONS ON THE ROADWAY IFO PROPERTY #700 OVERDUE FOR FINAL. CAR#20227720383 ISSUED 8/24/2022. RESPONDENT FAILED TO PERMANENTLY RESTORE THE ROADWAY WITHIN THE REQUIRED TIME. PERMIT #B012021295A58 |
2022-10-08 | No data | FOCH BOULEVARD, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic sanitary sewer backing up into property. One excavation in grassy area behind property line. Crew saw cutting roadway at this time |
2022-10-08 | No data | WOODHULL AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2022-10-08 | No data | 82 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for paved |
2022-10-07 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-10-07 | No data | MERRICK BOULEVARD, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RESTORATIONS ROADWAY. 1 PERM SIDEWALK FLAG AROUND WATER VALVE |
2022-10-07 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I found a portion of the sidewalk temp/plated and the driving/parking lane plated. |
2022-10-07 | No data | LACOMBE AVENUE, FROM STREET COMMONWEALTH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1763 work not found work not done |
2022-10-06 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary water restoration, in the roadway. The respondent failed to permanently restore cuts within the required time. The respondent was notified via CAR# (20225460010) on 1/24/22. |
2022-10-06 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | The backfill is rescheduled for a later time because the contractor need to remove the 2' void. |
2022-10-04 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for wearing course not flush with surrounding area. |
2022-10-03 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The Cut remains overdue for final restoration. |
2022-10-03 | No data | 111 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Roadway water was shut off by DEP after 3 Day notice was issued. Property Owner on Site |
2022-10-02 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #167. |
2022-10-02 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in p/l |
2022-10-02 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in bus lane |
2022-10-01 | No data | WEST 182 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 564 west 182 st restoration on roadway non defective |
2022-09-28 | No data | 113 AVENUE, FROM STREET 219 STREET TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2022-09-26 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass,,perm ...cut water relay ... |
2022-09-26 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary 3” in diameter color code missing adjacent to plumbers temp cut in the roadway |
2022-09-26 | No data | EMPIRE BOULEVARD, FROM STREET NYCTA SUBWAY TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed on roadway |
2022-09-26 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition Previously Reported, I/F/O#147, there are (3) Steel Plates, that are Loose and Noisy. CAR#20226540099, was issued on 9/20/2022 |
2022-09-24 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED |
2022-09-24 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavated concrete & asphalt materials stored in the grass area at this time. There is a 4' x 4' mounded 2" temporary restoration in the roadway at this time. A open CAR is on this permit for mounded conditions in grass area & roadway. |
2022-09-23 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 4'x4' temp cut in the roadway mounded 2'' and on the sidewalk (grass area) 4'' IFO 120-17 |
2022-09-23 | No data | LINDEN BOULEVARD, FROM STREET 220 STREET TO STREET 221 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable in front of 220-12. Two cuts.Cut 1 IFO: 4' x 3' 10" x 2' 4" , Cut 2 OPP: 8' 6" x 3' x 1' 8". |
2022-09-22 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New car to be issued |
2022-09-22 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in bus lane overdue for final. |
2022-09-22 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New car to be issued |
2022-09-22 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway missing white “stop” markings. |
2022-09-21 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area was made permanent |
2022-09-20 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O#147, There is (1)Steel Plate that is Loose and Noisy. |
2022-09-20 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | Wearing course passed and completed in front of 102-31. 21’3” x 9’ x 3” permanent trench is flushed to grade and color coded, across the roadway at this time. |
2022-09-19 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | Good Afternoon,Update, one out of two trenches have been completed to grade with final wearing course 19’x 12’ x 2’’ in front of 102-33, spoke to foreman MR. Dale he will Re-scheduled the next trench for Tuesday 9/19/22. |
2022-09-16 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Temp patch restoration on the sidewalk is overdue final and was never completed under permit# Q012019213B96 and is still not completed. Replace full flag then install expansion joint, recess 1/2" then seal. |
2022-09-16 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | Backfill & Base passed and completed. Backfill = (11' x 7'4" x 8') (4'6" x 4' x 1'8") (9' x 7' x 7') (4' x 4' x 1'). Base = (12' x 8'4" x 12") (5'6" x 5' x 12") (10' x 8' x 12") (5' x 5' x 12"). All restorations fully backfilled & binder based. |
2022-09-16 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Defect still remains on the sidewalk temp patch overdue final while permit# Q012019213B96 went out of guarantee 8/30/22. New CAR# 20223950008 issued to replace full sidewalk flag. |
2022-09-16 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water trench flush to grade within d/l. (CAR CLEAN UP PROJECT) |
2022-09-15 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in p/l on opp side |
2022-09-15 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | A 10’ x 7’6” x 7’ plated excavation has been made in front of 102-33 at time of inspection. Active permit on file. Will start the backfilling process for sewer in the morning 9/16/22. Will update permit once completed. |
2022-09-15 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in roadway is overdue for final restoration IFO 86-11 |
2022-09-15 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reseal perm restorations in roadway. |
2022-09-15 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains. Cut in roadway overdue for final. New CAR issued. |
2022-09-15 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in p/l on opp side |
2022-09-14 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | Backfill Re-scheduled. 2 backfilled cuts completed (11’ x 7’4” x 8’ & 4’6” x 4’ x 1’8”). Rock E Smalls Plumbing needs to complete other trench in front of 102-33. Base Re-scheduled. Rock E Smalls Plumbing completed one restoration on the sewer. |
2022-09-14 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w sealed and in compliance |
2022-09-13 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains. 6'x4' asphalt patch over perm cut. New CAR issued. |
2022-09-13 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'x4' asphalt patch over perm cut sunken 2'' IFO 77-21. Area needs to be permanently restored. |
2022-09-13 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | Backfill Re-Dig Rescheduled. The permittee “ROCK E SMALL PLUMBING & HEATING INC” did not have fresh new material for the start of the re-dig process and will re-schedule at a later date for two trenches ifo 102-31 & 102-33. Active permit on file. |
2022-09-13 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2022-09-13 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New CAR to be issued |
2022-09-13 | No data | 101 AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water restoration flush to grade within the parking , driving lane.(CAR CLEAN UP PROJECT) 133-04 |
2022-09-11 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 281 MAPLE STREET |
2022-09-11 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints need to be sealed ifo 255 Hoyt st |
2022-09-11 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sw flags installed |
2022-09-10 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary water restoration within the sidewalk, overdue for final restoration. CAR will be re-issued (CAR CLEAN UP PROJECT) |
2022-09-10 | No data | DREW STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW flags installed, in compliance |
2022-09-10 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane okay |
2022-09-10 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE, NEW FLAG IFO PROPERTY #171. |
2022-09-10 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Temporary water restoration within the sidewalk, overdue for final restoration. Cited permit expired 8/30/19. Prior CAR#: 20214620153 never addressed. I/f/o 131-43 |
2022-09-09 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER -BASE COMPLETE ON 2 EXCAVATIONS ON THE ROADWAY 130-10 LIBERTY AVENUE. |
2022-09-09 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary water restoration within the parking lane, is overdue for final restoration. Cited permit expired 11/27/21. I/f/o 118-68. |
2022-09-09 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary water restoration within the parking lane, is overdue for final restoration. Cited permit expired 11/27/21. CAR to be re-issued (CAR CLEAN UP PROJECT) I/f/o 118-68. |
2022-09-09 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Defective CAR issued. |
2022-09-08 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - BACKFILL COMPLETE ON 2 EXCAVATIONS ON THE ROADWAY. NO TEMPORARY DEPTH. PLATED AFTER . |
2022-09-08 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 permanent roadway restorations in compliance. |
2022-09-08 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on sidewalk is overdue for final restoration IFO 88-12 |
2022-09-08 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All cuts except the one on the sidewalk restored perm. New CAR issued. |
2022-09-08 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plated excavation within parking/driving lane, Active permit Q012022245A67 on file |
2022-09-08 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-09-08 | No data | KINGSLAND AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observe permanent restoration in the roadway with missing double yellow lane markings. CAR 20224820497 was issued 8/2/2022. Respondent failed to restore in kind pavement markings within required time. I.D by permit X012022094A66. |
2022-09-08 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET DEAD END | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with two permanent trenches in the driving lane of the roadway at this time. The respondent failed to obtain an active DOT permit to use/open the roadway on a protected street. |
2022-09-08 | No data | 45 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration within parking / driving lane opposite 160-10 flushed to grade. (C.A.R. clean up). |
2022-09-07 | No data | 82 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2022-09-07 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-09-07 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane in front of 223 East 43 street |
2022-09-06 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET DEAD END | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with two permanent trenches in the driving lane of the roadway at this time. The respondent failed to obtain an active DOT permit to use/open the roadway on a protected street. |
2022-09-06 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... water relay .. |
2022-09-04 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re-seal cut |
2022-09-04 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | please re-seal permanent water cut |
2022-09-03 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water restoration flush to grade within the d/l, not sealed, however CAR will be passed out. I/f/o 114-30 (CAR CLEAN UP PROJECT) |
2022-09-03 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Edge cracking within permanent restoration found at 100% in the driving lane in front of 69-38 138th Street. Surrounding saw cuts exposed. Reseal entire restoration. |
2022-09-03 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET DEAD END | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with two permanent trenches in the driving lane of the roadway at this time. The respondent failed to obtain an active DOT permit to use/open the roadway on a protected street. |
2022-09-03 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Edge cracking within permanent water restoration remains at 100% exposing saw cuts surrounding restoration within the driving lane in front of 69-38 138th Street. New C.A.R. to be issued. |
2022-09-02 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET COHANCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Missing IBM color code marker on permanent cut on driving lane. |
2022-09-02 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET COHANCY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Missing IBM color code marker on permanent cut on driving lane. New CAR to be issued |
2022-09-02 | No data | MATILDA AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber temp cuts overdue for final restoration. |
2022-09-01 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration within the driving lane remains overdue for final in front of 46-04 189th Street. New C.A.R. to be issued. |
2022-09-01 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET DEAD END | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. I observed the above respondent with a plated excavation labeled "ROCK E SMALLS PLUMBING" with multiple temporary restorations in the driving lane. The respondent failed to obtain an active DOT permit to use/open the roadway. |
2022-09-01 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. Duplicate. |
2022-09-01 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration overdue for final within the driving lane in front of 46-04 189th Street. |
2022-09-01 | No data | 164 AVENUE, FROM STREET 104 STREET TO STREET DEAD END | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Ifo 102-33, There are two temporary restorations, that are sunken 1"-2" in the driving lane of the roadway. Also, Finalize three temporary restorations in the driving lane of the roadway ifo 102-31 & 102-33. |
2022-09-01 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Multiple Perm water restorations within the driving, slightly high-low condition, not within scope of immediate action. CAR will be closed out (CAR CLEAN UP PROJECT) |
2022-08-31 | No data | BUSSING AVENUE, FROM STREET HILL AVENUE TO STREET MONTICELLO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber cut in the roadway |
2022-08-30 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags on segment in compliance |
2022-08-30 | No data | 51 STREET, FROM STREET 39 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway milled |
2022-08-30 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w being worked on under DDC contract |
2022-08-27 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Width of permanent water restoration within the driving lane is 4'. improper cut back. Also, cut is mounded 1-1/2". CAR to be re-issued (CAR CLEAN UP PROJECT) 135-56 |
2022-08-27 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water restoration, flush to grade and sealed within d/l, 131-45 (CAR CLEAN UP PROJECT) |
2022-08-27 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Width of permanent water restoration within the driving lane is 4'. need to comply with NYC DOT standard detail drawings H-1042D, Note #6. Also, restoration is mounded 1". I/f/o 135-56 |
2022-08-26 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water restoration currently still slightly sunken down 2” in the roadway of the driving lane opposite from property #116 EAST 116 STREET, CORRECTIVE ACTION REQUEST being re-issued condition remains |
2022-08-26 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | North side under the West side highway Bridge, your temporary Restoration in the Roadway leading to the Curb is overdue for final and sunken 2” below grade. Also Restoration on the Sidewalk is overdue for final. |
2022-08-26 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR project, no repairs made for overdue for final Restoration in the Roadway and Sidewalk and sunken Street Cut in the Roadway. CAR will be reissued for defect stated. |
2022-08-26 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT IN THE PARKING LANE OVERDUE FOR FINAL RESTORATION , RESTORE CUT |
2022-08-26 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT IN THE PARKING LANE IFO LOCATION OVERDUE FOR FINAL .. (CAR CLEAN UP) A NEW CAR WILL BE ISSUED |
2022-08-26 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration Sunkenplease restore/repair permanent water restoration to grade sunken down 2” in the roadway of the driving lane opposite from property #116 EAST 116 STREET, in a timely fashion. CAR issued |
2022-08-25 | No data | 227 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water restoration within the driving lane, slight edge cracking, not within scope of immediate action (CAR CLEANUP PROJECT) i/f/o 107-16 |
2022-08-25 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt sealer edges cracked on permanent water cut within bike lane. Re-seal cut. |
2022-08-25 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked on permanent water cut within bike lane. Re-seal cut. |
2022-08-25 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm curb to curb restoration in roadway. Duplicate. |
2022-08-24 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. New sidewalk at location. Roadway was resurfaced after work was done. |
2022-08-24 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW CAR ISSUED. |
2022-08-24 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE TWO TEMPORARY RESTORATIONS ON THE ROADWAY IFO & OPP PROPERTY #700 GRAND STREET IS OVERDUE FOR FINAL. |
2022-08-23 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New car to be issued |
2022-08-22 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration sealed. |
2022-08-22 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New CAR TO BE ISSUED |
2022-08-22 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1. Permanent water cut within parking lane asphalt sealer edges not sealed.2. Install color code marker.3. Install white lane marker/divider. |
2022-08-22 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1. Permanent water cut within parking lane asphalt sealer edges not sealed.2. Install color code marker.3. Install white lane marker/divider. |
2022-08-22 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT ON ROADWAY. AT BUS STOP OVERDUE FOR FINAL NEAR 798 ROGERS |
2022-08-22 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut on r.w new car to be issued |
2022-08-22 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in roadway is overdue for final located in driving/parking lane at 409 Parkside |
2022-08-21 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #246 There are two Sidewalk flags with expansion joints at the curb line that are not sealed expansion joints needs to be properly sealed. |
2022-08-20 | No data | 126 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a perm water & sewer cut in the roadway |
2022-08-20 | No data | EAST 72 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT FOUND RESURFACED IN THE D/L BY NGRID |
2022-08-19 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l in compliance |
2022-08-19 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Original permit, repair water, B012018101B86 , is out of the guarantee period, 4-5-2022. Final restoration permit used for C.A.R . |
2022-08-18 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut pass |
2022-08-18 | No data | UNION HALL STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder paved over cuts |
2022-08-17 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please restore 3 cuts |
2022-08-17 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | i observed ,the above respondent failed to restore white lane markings, after sewer install, i issued an nov, after respondent was contacted to do so on 07/06/2022 via c-a-r 2021660116. |
2022-08-17 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration in the roadway. Respondent failed to permanently restore cut within required time. Permit expired on 12/30/2020. Cited permit used for ID. CAR 20216780394 was issued. |
2022-08-17 | No data | 60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Q012020224C27 31639 - BLATT PLUMBING INC. taken out 8/11/20 for this location. NOV issued to plumber 8/17/22 |
2022-08-16 | No data | 109 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder paved over cut |
2022-08-16 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER - PERM RESTORATION RESEALED |
2022-08-14 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2022-08-14 | No data | 45 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent restoration in driving/parking lane opposite 160-10 45 Avenue between 160 and 161 Streets and failed to properly seal restoration as notified by C.A.R. #20227840024 issued on 02/23/2022. |
2022-08-13 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a temporary water restoration that is overdue for final restoration within the parking lane i/f/o 1218 Channing Road. Respondent failed to finalize the restoration within the required time. 12-18 |
2022-08-13 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The water cut is sealed . Rd/w perm cut |
2022-08-12 | No data | 116 AVENUE, FROM STREET 200 STREET TO STREET 201 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CORING DONE EXISTING 2 1/2" W/C & 5 1/2" BINDER RESTORATION 2" W/C & 10 1/2" BINDER PERM CUT |
2022-08-12 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary sidewalk and grass area sunk 4-5 inches in front of building operation . Permanent sewer cut in driving and parking lane |
2022-08-12 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition made safe. Crew on site made grass area on sidewalk flush. Crew waiting on asphalt to place along sidewalk. |
2022-08-12 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint verified:Temporary sidewalk and grass area sunk 4-5 inches in front of building operation . Permanent sewer cut in driving and parking lane. Condition remains. NICA# 20221100237 issued this morning. NICA to be reinspected at 14:52 Hrs. |
2022-08-11 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to restore wearing course flush with surrounding area on a 11'x4' permanent restoration sunken 1'' in the roadway. The condition remains despite prior notice in CAR # 20220320279 issued on 4/22/22 |
2022-08-10 | No data | SAYRES AVENUE, FROM STREET 175 PLACE TO STREET 175 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut on s/w restored perm. |
2022-08-08 | No data | 227 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to reseal the wearing course edges around a permanent cut in the roadway as required. The condition remains despite prior notice in CAR # 20214620215 issued on 12/8/21. |
2022-08-07 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with temporary restoration in roadway parking lane; failed to restore within required time. Failure to respond to CAR 20227410162. Permit expired 5/5/2022 and used for I.D. |
2022-08-06 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut in the driving lane in compliance |
2022-08-06 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PROPERLY SEAL AND MAINTAIN THE WEARING COURSE ON CUTS , CAR # 20225150086 ISSUED 5/5/22, ABOVE PERMIT # USED TO I.D RESPONDENT |
2022-08-06 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration made flush |
2022-08-06 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failure to seal expansion joints |
2022-08-04 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEAL IS OK |
2022-08-04 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-08-03 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded ifo 2315 |
2022-08-03 | No data | 150 STREET, FROM STREET 15 DRIVE TO STREET 15 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/p/l. |
2022-08-03 | No data | 115 ROAD, FROM STREET 157 STREET TO STREET 158 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cuts in r/w resealed |
2022-08-02 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but, failed to obtain a confirmation number prior to the expiration of such permit as required. Permit # Q012022133B83 expired on 06/09/22. |
2022-08-02 | No data | KINGSLAND AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Double Yellow lane markings needs to be installed on plumber restoration. |
2022-08-02 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two plated excavations across roadway at location. Excavated materials stored in the parking lane. |
2022-08-02 | No data | 101 AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit # Q012022167B16 expired on 07/14/22. |
2022-07-31 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | please reseal perm water cut within parking lane |
2022-07-31 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | please re-seal and add ibm color code |
2022-07-31 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush to grade |
2022-07-30 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain confirmation number two hrs prior to backfill. |
2022-07-29 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway restoration needs to be resealed, this is a New Construction B/O a BPP should be done within the near future. |
2022-07-29 | No data | MATILDA AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration. |
2022-07-27 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over due to bpp ... |
2022-07-25 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, (REPAIR WATER) backfilled on a protected street but failed to obtain a confirmation number. Permit # (B012022102A28)expired 5/10/2022. |
2022-07-24 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-07-24 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONFIRMATION RECEIVED 6/29/2022. B012022180B36 |
2022-07-23 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but, failed to obtain a confirmation number prior to the expiration of such permit as required. Permit # Q012022108B77 expired on 05/13/22. |
2022-07-23 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush |
2022-07-23 | No data | 90 AVENUE, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit # Q012022105A25 expired 04/15/22. |
2022-07-22 | No data | 116 DRIVE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION STILL THE SAME BOTH CUTS ARE FLUSH WITH SURROUNDING AREA INSPECTION PASS DUE TO THE TIMING AND PERMIT IS OUT OF GUARANTEE |
2022-07-22 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. AKA 45 Irving Ave. |
2022-07-21 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having a steel plate on the sidewalk that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent sidewalk surface. I ID by permit Q012022188C15. |
2022-07-20 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-07-20 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area cleaned up. |
2022-07-19 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to permanently restore roadway within the required time. Respondent ID by permit on file. |
2022-07-19 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OVER DUE FOR FINAL |
2022-07-19 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove pile of excavated materials dirt from roadway. |
2022-07-19 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to permanently restore roadway within the required time. Respondent ID by permit on file. |
2022-07-18 | No data | SNEDIKER AVENUE, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L IN COMPLIANCE |
2022-07-17 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This NICA has passed.Additional steel plates were securely placed and ramped over excavation. |
2022-07-17 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate covering sewer excavation in the eastbound driving lane, in front of building# 130-10 130th Street, is shifted by 10" exposing opened excavation and creating a traffic hazard to motorists. |
2022-07-13 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY RESTORATION WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT #B012020335A88 EXP 12/30/2020 WAS USED FOR ID. RESPONDENT WAS NOTIFIED VIA |
2022-07-12 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Re-scheduled. Backfill will take place another time & date. Adjacent to 14' x 9' x 11' open excavation, the permittee needs to cut out defective area, and any voids. Saw cut markings made at this time and will follow up at a later date. |
2022-07-12 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with a plated long water excavation labeled "ROCK E SMALL PLUMBING" in the driving lane. The respondent failed to obtain an active DOT repair water permit, to use the roadway. |
2022-07-11 | No data | CLINTONVILLE STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET LOCKE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. 1st Cut: 14’x4’2”x4’ 2nd Cut: 7”11”x4’2”x1’10”. Both cuts will be restored as one as per Foreman (Clifton). |
2022-07-11 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to reseal cut in roadway |
2022-07-11 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to re-seal around a permanent roadway restoration in front of 4110 5th Avenue a CAR #20224890068 was issued on 2/16/22. The respondent was identified by DOT permit # B012019192C73 |
2022-07-11 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Temp asphalt cut in sidewalk by curb, and steel plated cut in parking lane, #31-75. |
2022-07-10 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | please restore 2 cuts on sidewalk and in bus lane, also please restore bus lane paint |
2022-07-09 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to reseal its two permanent water cuts on the roadway. Respondent was notified by CAR# 20217840183 on the 12/07/21. Permit# Q012019121C03 for work done at location and color code markers were used to identify respondent. |
2022-07-08 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD TWO TEMPORARY RESTORATIONS ON THE ROADWAY OVERDUE FOR FINAL. CAR#20216620266 ISSUED 6/2/2022. RESPONDENT FAILED TO PERMANENTLY RESTORE THE CUTS WITHIN THE REQUIRED TIME. ID BY PERMIT #B012021295A58 EXPIRED 11/14. |
2022-07-08 | No data | 155 STREET, FROM STREET 119 ROAD TO STREET 120 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut edges resealed in r/w |
2022-07-08 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent has a permanent water cut sunken 2 inches in the roadway. CAR 20216390529 was issued on 10-14-21 |
2022-07-07 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area around shifted steel plate in the roadway has been patched and ramp with temporary asphalt. Area made safe at this time. |
2022-07-07 | No data | CLINTONVILLE STREET, FROM STREET CROSS ISLAND PARKWAY TO STREET LOCKE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent with a temporary restoration in front of 1567 Clintonville Street that is mounded and sunken in various area and not flush to grade with surrounding area. Respondent identified by cited active permit #Q012022182D22. |
2022-07-06 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | espondent failed to make permanent, a temporary water restoration on the roadway, prior to the expiration of its permit. Respondent was notified by CAR# 20226050030 on 05/03/2022. Expired permit# Q012022018C00 was used to ID respondent. |
2022-07-06 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a steel plate over a open excavation in the roadway (DRIVING LANE) HEAVY TRAFFIC THAT IS SHIFTED 1FT |
2022-07-06 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane (STOP) marking, not restored, after water relay .... |
2022-07-05 | No data | 112 ROAD, FROM STREET 227 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | R/w resurfaced |
2022-07-03 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to make permanent, a temporary water cut on the sidewalk prior to the expiration of its permit. Respondent was notified by CAR# 20227380030 on 01/05/22 to make restoration permanent/final but, failed to do so. |
2022-07-03 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on roadway overdue for final plus water valve raised 1'' causing trip hazard |
2022-07-02 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer work in the roadway |
2022-07-02 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut in the roadway |
2022-07-02 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On site, Just filled out Re-Dig Form for location of 130-10, There was a 9' x 2' down 3' cave-in condition, to where has now been made safe and has a closed NICA. Re-Dig has been sent out and will be monitored at a later time & date. |
2022-07-02 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area was repaired and made safe |
2022-07-01 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 130-10 Liberty Avenue 9’x 2’ cave in remains sunken 3’ in the roadway |
2022-07-01 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Verified. In front of 130-10, There is a 9' x 2' down 3' cave-in condition in the roadway, adjacent to steel plate in line with "Rock E Smalls Plumbing" hardware on the sidewalk. Tied in with complaint 311-10860013 |
2022-07-01 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2022-06-30 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 13ft x 4ft x 8ft 8in = 98.5%, 97.3% |
2022-06-29 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent sewer restoration with insufficient cut back, additional 6'' cut back is required as per Standard Detail Drawing H 1042D note #6 in front of 135-56. |
2022-06-29 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed respondent failed to reseal two permanent restoration cuts in the bike lane in front of 31-17 and 31-11. Respondent was notified via car # 20217760117 on 10/7/21 and condition remains the same |
2022-06-29 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE RESPONDENT IS WORKING IN AN OPEN EXCAVATION WITH EXPIRED DOT PERMIT ON FILE. PERMIT EXPIRED ON 5/31/2022 AND BEING USED TO ID RESPONDENT. |
2022-06-28 | No data | 82 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permit was pulled for the wrong segment. |
2022-06-27 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut now perm .... |
2022-06-27 | No data | 45 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent restoration in driving/parking lane opposite 160-10 45 Avenue between 160 and 161 Streets and failed to properly seal restoration as notified by C.A.R. #20227840024 issued on 02/23/2022. Cited permit |
2022-06-27 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration overdue for final. Failed to respond to CAR. NOV issued. |
2022-06-26 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to reseal perm cut in r/w |
2022-06-24 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to seal expansion joints on the sidewalk (CAR #20226780029) issued 1\26\2022 I'd by permit |
2022-06-23 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew now on location for paving ... |
2022-06-21 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2022-06-21 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-06-21 | No data | SHERIDAN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATION, after sewer and water relay ..install |
2022-06-21 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2022-06-21 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm to grade cuts in both parking lanes on speed bump. |
2022-06-21 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-06-18 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done in the roadway |
2022-06-15 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012022133B83. |
2022-06-15 | No data | WEST 59 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration 2” below grade along roadwaySidewalk & roadway are overdue for final restoration (expired 3/29/2022) |
2022-06-15 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PROPERLY SEAL AND MAINTAIN THE WEARING COURSE ON CUT , CAR # 20225150086 ISSUED 5/5/22, ABOVE PERMIT # USED TO I.D RESPONDENT |
2022-06-14 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2022-06-14 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i observed a plated street opening by the above respondent, with further investigation found the respondent not to have maintained active permit for this plated opening, i issued an nov under permit b012022123A66, exp 5/31/022. |
2022-06-14 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the parking & driving lane is missing IBM color code marker. Also restore parking lane markings and seal off the restoration along the edges of cut in front of 40-18 108th Street. ID by permit # on file. |
2022-06-14 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found/identifiable. Roadway was recently resurfaced by DOT. New sidewalk at location (new building). |
2022-06-13 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O, I observed the respondent with a 7'x5' temporary roadway restoration within a permanent roadway cut overdue for final. Respondent failed to permanently restore cut within required time. CAR# 20227381685 issued to respondent . |
2022-06-10 | No data | 140 AVENUE, FROM STREET SOUTHGATE STREET TO STREET THURSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STREET WAS RESURFACED |
2022-06-09 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OVER DUE FOR FINAL CUT IN THE PARKING LANE |
2022-06-07 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts on speed bump on roadway in front 138-19. |
2022-06-07 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active - plated excavation across sidewalk. Plated excavation across the eastbound parking and driving lanes. Excavated materials stored in the eastbound parking lane. |
2022-06-05 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please make temp water cut permanent and restore bus lane paint |
2022-06-05 | No data | 14 AVENUE, FROM STREET 155 STREET TO STREET 156 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary cut permanently restored. |
2022-06-04 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp cut in parking lane overdue for final |
2022-06-02 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD TWO TEMPORARY CUTS IN THE ROADWAY OVERDUE FOR FINAL. RESPONDENT FAILED TO PERMANENTLY RESTORE THE CUTS WITHIN THE REQUIRED TIME. CAR#20216620266 IISSUED 12/4/2021. ID BY PERMIT #B012021295A58 EXPIRED 11/14/2021. |
2022-06-02 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Site has been taken over by "THE BROOKLYN UNION GAS COMPANY D/B/A NATIONAL GRID NY" under expired permit # (Q012022117A93). Will issue CAR to gas permit for having temporary restoration along the sidewalk. |
2022-06-01 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 8120 Colonial Rd in need of reseal, this is a new building opp a BPP will follow. |
2022-06-01 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT IN BUS LANE OVERDUE FOR FINAL |
2022-06-01 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT OVERDUE FOR FINAL |
2022-05-29 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR issued on most recent permit B012019233C54 |
2022-05-29 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, paved over due to bbp... |
2022-05-29 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut needs to be re-sealed and IBM code needs to be added to cut |
2022-05-28 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to re-seal around a permanent roadway restoration in front of 4110 5th Avenue a CAR #20224890068 was issued on 2/16/22. The respondent was identified by DOT permit # B012019192C73. |
2022-05-28 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade |
2022-05-27 | No data | 77 ROAD, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restorations coved by New Building BPP repaving of roadway at location. |
2022-05-27 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration in the r/w sealed |
2022-05-26 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent has a permanent water cut sunken 2 inches in the roadway. CAR 20216390529 was issued on 10-14-21 |
2022-05-25 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two permanent restorations in the driving lane seals broken along edges of cuts, restorations needs to be reseal. |
2022-05-25 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2022-05-25 | No data | 51 STREET, FROM STREET 39 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary water restoration in the parking / driving lane over due for final in front of 39-22 51st |
2022-05-24 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20226780068 issued on 2/19/2022. Respondent failed to properly reseal a permanent restoration in the roadway. Cited permit used for ID. |
2022-05-24 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on roadway and the sidewalk. |
2022-05-24 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Four sidewalk flags restored in kind (joints sealed). Roadway recently resurfaced/repaved by DOT. |
2022-05-24 | No data | WILDER AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber fully restored wearing course |
2022-05-24 | No data | GLENMORE AVENUE, FROM STREET LINCOLN AVENUE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with 2 open excavation in the RW |
2022-05-24 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driivng lane has work sealer , re seal cut in the driving lane |
2022-05-23 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Coring |
2022-05-20 | No data | 229 STREET, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed, (cut1 4' x 3'10'' x 3'3'' ( cut2 4' x 3'10'' x 3'8'') in the parking lane in front of 117-35. binder base. |
2022-05-20 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE OPP LOCATION |
2022-05-19 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. 9’x4’x2’5” |
2022-05-19 | No data | NORTHERN BOULEVARD, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced at the time of inspection. |
2022-05-18 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR ISSUED 5/18/2022 |
2022-05-18 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR ISSUED 5/18/2022 |
2022-05-18 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR RE-ISSUED ON 5/18/2022 |
2022-05-18 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR RE-ISSUED ON 5/18/2022 |
2022-05-17 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to maintain sealer, nov issued |
2022-05-16 | No data | 112 ROAD, FROM STREET 227 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed that the respondent failed to reseal cracked the edges of permanent restorations in the roadway as required. The condition remains despite prior notice in CAR # 20214620213 issued on 12/8/2021. |
2022-05-16 | No data | EAST 52 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAG INSTALLED |
2022-05-15 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to make permanent, a temporary water cut on the sidewalk prior to the expiration of its permit. Respondent was notified by CAR# 20227380030 on 01/05/22. Permit# Q012021326A63 was used to ID respondent. |
2022-05-15 | No data | UTICA AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-05-15 | No data | AVENUE K, FROM STREET EAST 35 STREET TO STREET EAST 36 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Request to make temporary restoration permanent. Temp overdue for final IFO 3503. |
2022-05-15 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags around water valve. |
2022-05-13 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt restoration overdue for final on the sidewalk. |
2022-05-13 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent sewer restoration with insufficient cut back, additional 6'' cut back is required as per Standard Detail Drawing H 1042D note #6 in front of 135-36. |
2022-05-13 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration overdue for final. |
2022-05-13 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration is sunken 1 to 2 inches below grade. |
2022-05-12 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l p/l in compliance |
2022-05-11 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration seals broken along the edges of cut in front of 131-45. |
2022-05-10 | No data | 82 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New roadway restoration in need of reseal this is a new construction a BPP will be done. |
2022-05-09 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to permanently restore a repair water in roadway within required time permit allows. |
2022-05-09 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file |
2022-05-07 | No data | LOCKMAN AVENUE, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2022-05-05 | No data | GLENMORE AVENUE, FROM STREET CHESTNUT STREET TO STREET CRYSTAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | water relay , crew on location ... |
2022-05-05 | No data | 116 AVENUE, FROM STREET 200 STREET TO STREET 201 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration to grade in the parking lane in front of 200-01 |
2022-05-05 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PORTION OF THE SEGMENT FOUND RESURFACED DUE TOO NEW BUILDING BPP |
2022-05-05 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS IN THE PARKING LANE HAS WORN SEALER , RE SEAL CUTS IN THE PARKING LANE |
2022-05-04 | No data | STEINWAY STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway extending into the parking lane in front of property #31-75 STEINWAY STREET & steel plate street opening ramped in the sidewalk |
2022-05-03 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OVER DUE FOR FINAL CUT IN THE PARKING LANE |
2022-05-03 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2022-05-03 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk restored in compliance with car issued |
2022-05-03 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT OVERDUE FOR FINAL |
2022-05-03 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a temporary water restoration backfill on a protected street but failed to obtain a confirmation number, permit # Q012022018C00 expired on 2/11/2022. |
2022-05-03 | No data | KINGSLAND AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut temp to grade in the roadway |
2022-05-02 | No data | 162 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with 2 plated excavations (Plate marked Rock E Small Plumbing) on a protected street in front of 57-11 162 Street without a valid DOT permit. Previous permit #Q012022070B23 expired 4/9/2022 and used for identification. |
2022-05-02 | No data | 162 STREET, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration. |
2022-05-01 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore/repair the temporary restoration after being notified via CORRECTIVE ACTION REQUEST #20216710592. Nov D4F issued overdue for final (special 135 project) |
2022-05-01 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent failed to obtain a confirmation number prior to their expired permit on a protected street. Respondent was ID by permit on file. |
2022-05-01 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 402 HANCOCK STREET |
2022-04-30 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2022-04-30 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The restoration was not made final |
2022-04-30 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD 2 TEMPORARY RESTORATIONS ON THE SIDEWALK & A TEMPOPRARY RESTORATION IN THE DRIVING LANE.RESPONDENT FAILED TO PERMANENTLY RESTORE THE CUTS WITHIN THE REQUIRED TIME. C.A.R.#20227720054 ISSUED 3/24/2022. ID BY PERMIT |
2022-04-30 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | espondent failed to reseal its two permanent water cuts on the roadway. Respondent was notified by CAR# 20217840183 on the 12/07/21. Permit# Q012019121C03 for work done at location and color code markers were used to identify respondent. |
2022-04-30 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOT A WATER CUT |
2022-04-30 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET COHANCY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent's permanent roadway restoration without a color code marker applied & or maintained on the restoration upon Re-inspecting C.A.R # 20226710012. Respondent failed to make needed correction as noted in the C.A.R. |
2022-04-29 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair temporary sewer restoration condition remains in front of property #30-18 14 STREET & restore double yellow divide roadway pavement lane markings in kind over restoration. CAR |
2022-04-29 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP WATER CUCT ON SIDEWALK AND PARKING LANE IN FRONT OF 507 QUINCY STREET |
2022-04-29 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ACTIVE PERMIT ON FILE B012022102A28, TEMP WATER CUT FOUND ON SIDEWALK AND PARKING LANE IN FRONT OF 507 QUINCY STREET |
2022-04-29 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed that the respondent failed to seal / re-seal tth wearing course at one permanent restoration as required. This condition remains despite prior notice in CAR #20217840114 issued 10/25/21 |
2022-04-29 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE RESTORATION WITHIN REQUIRED TIME, (CAR #20225850033) WAS ISSUED ON 4/12/22 |
2022-04-29 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt gas restoration to grade on the sidewalk i/f/o 145-52. Active permit #Q01202217A93 on file. |
2022-04-28 | No data | 246 PLACE, FROM STREET 60 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway not fully visible due to parked cars |
2022-04-28 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp work was done. |
2022-04-28 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4'x3' section of sewer trench sunken 2-3" in driving lane, Location will need have an joint inspection will National Grid. |
2022-04-28 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area of roadway made safe with temp mack. |
2022-04-27 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. (2 temp cut on s/w & 1 cut in d/l) |
2022-04-26 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2022-04-23 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on r/w |
2022-04-22 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 cut in roadway 11'x3'9" sunken 1" the 9'9"x4'9" both cuts edges are cracked. 1 cut asphalt is pitted and cracking. |
2022-04-22 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass and re-issue cuts now sunken. |
2022-04-21 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent had a permanent restoration on the roadway without a color code marker installed. Permittee failed to install a color coding marker at the end of the restoration. CAR#20214310277 was issued on 11/3/2021. |
2022-04-20 | No data | 60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Respondent maintaining a temporary sewer restoration within the driving lane & sidewalk opposite 246-08 60th Avenue without a valid DOT permit on file. |
2022-04-20 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the PL extending into RW, flushed to grade |
2022-04-19 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP WATER CUT FOUND ON ROADWAY AND SIDEWALK IN FRONT OF 507 QUINCY STREET |
2022-04-19 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR re-inspection failed NOV issued |
2022-04-18 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | inspect and in compliance |
2022-04-17 | No data | 228 STREET, FROM STREET 130 AVENUE TO STREET 131 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPP. 13045 one perm roadway cut in p/l restore to grade. |
2022-04-16 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The restoration was not resealed |
2022-04-14 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found in compliance |
2022-04-14 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm inroadwyay parking lane sealed and flush. |
2022-04-13 | No data | 134 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent long water cuts to grade in the parking / driving lane in front of 131-13 134st |
2022-04-13 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer work not visible due to builder's pave at 135-44 128st |
2022-04-12 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | temp cut overdue in the roadway |
2022-04-11 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent fail to seal expansion joints on the sidewalk (CAR #20226780029) issued 1\26\2022 I'd by permit |
2022-04-11 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to restore lane markings for bike lane CAR #20226780029) issued 1\26\2022 I'd by permit |
2022-04-11 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO the respondent has a permanent water cut sunken 2 inches in the roadway. CAR 20216390529 was issued on 10-14-21 |
2022-04-10 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway |
2022-04-09 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please reseal roadway cuts marked 19, seal broken out and missing through out cuts. |
2022-04-09 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #020, restore all travel lanes to all vehicles during non-work hours allowed 25’ to store fill/excavated material. Nov issued |
2022-04-09 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to properly seal and maintain the wearing course |
2022-04-09 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent had a permanent restoration not properly sealed IFO property #1409. Respondent failed to properly maintain the wearing course. CAR #20214310263 was issued 10/18/2021. ID by permit on file. |
2022-04-08 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PASS |
2022-04-07 | No data | WILDER AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken out 1-2 " in entire plumber restoration. Entire wearing course needs to be restored in the roadway |
2022-04-07 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20226780068 issued on 2/19/2022. Respondent failed to properly reseal a permanent restoration in the roadway. Cited permit used for ID. |
2022-04-02 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was milled on permit # B152019319A73 |
2022-04-01 | No data | 112 ROAD, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm to grade cuts in the driving lane |
2022-04-01 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal street cut |
2022-03-31 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q012022031B62. |
2022-03-31 | No data | MOTT AVENUE, FROM STREET GIPSON STREET TO STREET MC BRIDE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass start time=11:10, end time=12:00. Cut dimensions= 4'10'' x 3'3'' down 2'9'' |
2022-03-30 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2022-03-30 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2022-03-29 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade IFO #80 |
2022-03-29 | No data | 14 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to countersink the steel plates flush with the roadway as per the 2021 WINTER MORATORIUM POLICY starts 12-1-2021 TO 3-31-2022 ends. Nov issued |
2022-03-29 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified I observed an 12'6"x6'7" sewer cut is sunken 4-5" in the driving lane. Also place on re-dig of backfill. |
2022-03-29 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sewer cut made safe with temp mack. Still on re-dig. |
2022-03-28 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass...water relay ... |
2022-03-28 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, perm ... |
2022-03-28 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street fully paved by nycdot ... |
2022-03-28 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane, new flag IFO property #1409. |
2022-03-23 | No data | 45 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking/driving lane |
2022-03-22 | No data | 147 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the grass area of sidewalk. |
2022-03-22 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found at the time of inspection. |
2022-03-19 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temporary restoration on the sidewalk flushed with surrounding area IFO active building operation |
2022-03-17 | No data | 130 AVENUE, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush to grade in the driving lane i/f/o 145-42. |
2022-03-16 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work not done |
2022-03-16 | No data | RICHARDSON STREET, FROM STREET MONITOR STREET TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Segment repaved, sidewalk flags flush and sealed |
2022-03-15 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2022-03-14 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in p/l |
2022-03-14 | No data | WILDER AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plumber work started . plumber getting ready to leave site |
2022-03-14 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2022-03-14 | No data | RUTLAND ROAD, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .. water relay .. |
2022-03-09 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations & s/w flags acceptable. |
2022-03-08 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 104-74 & 104-76, there are two permanent water restoration (one trench & the other regular cut) in the driving lane with separation cracks along the edges of cut. |
2022-03-07 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane. |
2022-03-06 | No data | HOLLYWOOD AVENUE, FROM STREET BAISLEY AVENUE TO STREET WATERBURY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS PERM TO GRADE R/W TWO NEW FLAG ON SW |
2022-03-04 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane sealed and in compliance |
2022-03-04 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane IFO property #1409. |
2022-03-02 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm , sewer relay ..... |
2022-03-02 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file q012018150f69 |
2022-03-01 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Request to restore ramp around steel plat in sidewalk IFO 507. Ramp worn out possible trip hazard. |
2022-02-28 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW PERMIT ON FILE B012022049A62 |
2022-02-28 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Plates removed from the roadway |
2022-02-27 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | countersunk plate on r.w and plated s.w |
2022-02-26 | No data | 111 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced since permit |
2022-02-26 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cur OK parking lane |
2022-02-24 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2022-02-24 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition of broken seal around the edges of cut remains the same, refer to CAR #20217840050 for the most recent inspection. |
2022-02-23 | No data | 45 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the driving/parking lane sealer worn off exposing sawcut edges and needs to be reseal opposite 160-10 45 Avenue. |
2022-02-19 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent asphalt restoration in roadway, Restoration needs to be re-sealed |
2022-02-19 | No data | FARRAGUT ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2022-02-19 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 330 Myrtle Avenue. |
2022-02-18 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-02-18 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a perm cut in the p/l. |
2022-02-17 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-02-16 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-02-16 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass sewr .. |
2022-02-16 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 4110 5th Ave going to the NYC Bike Rack needs to be resealed |
2022-02-16 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2022-02-16 | No data | 228 STREET, FROM STREET 130 AVENUE TO STREET 131 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed the above respondent with a steel plate pinned and ramped on the roadway. Respondent failed to to countersink plate flush with roadway as per winter moratorium that began on 12-1-21 and ends on 3-31-22. |
2022-02-16 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-02-15 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, paved .... |
2022-02-15 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 2/12/2022 Inspection Result: PassInspection Remarks: rwy plated..Inspected by gabe garcia..Location incorrect on first permit B012022042a57 |
2022-02-15 | No data | 77 ROAD, FROM STREET 160 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk plated excavation with expired permit |
2022-02-15 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by DEP cut. Work no longer visible. |
2022-02-12 | No data | EMPIRE BOULEVARD, FROM STREET NYCTA SUBWAY TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | rwy plated |
2022-02-10 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt restoration in roadway, Temporary Restoration Overdue for FINAL RESTORATION |
2022-02-10 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified: There is no cave-in i/f/o 86-11. However two steel plates marked "ROCK E SMALL PLUMBING," overlapped and 1" below grade within the roadway, driving lane. Also, plates not skid resistant and no signs posted for plow.i/f/o 86-11 |
2022-02-10 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | two steel plates marked "ROCK E SMALL PLUMBING," within the roadway during the winter moratorium, Respondent failed to post signs at the site indicating "Steel Plates Ahead" or "Raise Plow" on both sides of the street. |
2022-02-09 | No data | 125 AVENUE, FROM STREET MERRICK BOULEVARD TO STREET MERRILL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time the crew is on site making safe a failed temporary roadway trench in the driving and parking lane; roadway repair is incomplete the crew is waiting for the truck to bring new material to complete the work. The area need to be re-inspecte |
2022-02-09 | No data | 125 AVENUE, FROM STREET MERRICK BOULEVARD TO STREET MERRILL STREET | No data | Street Construction Inspections: Active | Department of Transportation | 26'x6'x4" temporary sewer cut sunken 3-4" in the driving lane. |
2022-02-08 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration is still on sidewalk. |
2022-02-08 | No data | BOSTON ROAD, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | seems work done in the parking lane |
2022-02-07 | No data | SAYRES AVENUE, FROM STREET 175 PLACE TO STREET 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary water cut sunken 4" no parking allowed on street. NICA issued |
2022-02-07 | No data | SAYRES AVENUE, FROM STREET 175 PLACE TO STREET 175 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition made safe. Asphalt applied flush over sunken cut. |
2022-02-07 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut flush with surrounding area. Car parked over section of cut. |
2022-02-03 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent with an excavation with an area 5”7” x 1’8” x 4’ that is not fully plated in the driving lane in front of 80-11/13 124 Street as per subsection. |
2022-02-01 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving lane with some seal missing. |
2022-01-26 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restore white lane markings over a permanent restoration, in the parking/driving lane.- Seal expansion joints in new sidewalk flags.In front of 255 Hoyt Street between Degraw Street and Douglass Street. |
2022-01-26 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plate was removed from the roadway and the cut was finalized. Pass. |
2022-01-25 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water cut flush to grade in the parking & driving lanes in front of 138-19. |
2022-01-25 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition was corrected |
2022-01-24 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition made safe. Asphalt applied flush over sunken cut |
2022-01-24 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, perm .. |
2022-01-24 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND REPAVED |
2022-01-24 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a permanent restoration, backfilled on water repair on protected street but failed to obtain a confirmation number at least two hours prior to the start of the backfill. Permit #Q012021337A19 expired 12/30/21. |
2022-01-24 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk cut mounded 2-3" also large pile of unprotected debris. |
2022-01-24 | No data | BEACH 35 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition remains. Contractor removed the unprotect debris in the roadway but the sidewalk cut is still mounded. |
2022-01-23 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. (2 temp cut in the r/w) |
2022-01-23 | No data | QUINCY STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. |
2022-01-22 | No data | 126 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#Q012021364A55 |
2022-01-22 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET COHANCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut on driving lane, sidewalk flag restored, Permit for sidewalk work only, NOV to follow |
2022-01-22 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration across roadway |
2022-01-22 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #145-52, TEMP WATER Repair on Roadway, Sidewalk are Overdue for Final Restoration, |
2022-01-21 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a permanent restoration, Water repair backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the start of the backfill. Permit #Q012021364A56 expired1/8/22. |
2022-01-21 | No data | NOSTRAND AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed the respondent in the process of performing non-emergency work, thus, connecting water tap into a vacant property. No one lives on property . No signs of a water leak |
2022-01-21 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush to grade in the driving lane in front of 138-19. |
2022-01-20 | No data | 129 STREET, FROM STREET CEDRIC ROAD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a permanent restoration, water repair backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the start of the backfill. Permit # Q012021300C38 expired 11/27/21. |
2022-01-18 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade IFO #156 |
2022-01-18 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway down 8 1/2’ on a protected street. Nov issued |
2022-01-16 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Perm cuts in roadway parking lane ifo 1367 sealed and flush. |
2022-01-15 | No data | 116 AVENUE, FROM STREET 200 STREET TO STREET 201 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair temporary water-sewer restoration in the roadway extending into the parking lane condition remains in front of property #200-01 116 AVENUE(special 135 project). CAR issued |
2022-01-14 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now perm .... |
2022-01-14 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm water restorations flush to grade in the roadway of both parking lanes in front of property #88-12 & 88-14 161 STREET & temp water restoration in the sidewalk condition remains debris removed |
2022-01-12 | No data | 148 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2022-01-12 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway trench restore to grade in d/pl. |
2022-01-12 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 135 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 11'x4' perm roadway restoration with insufficient cut back ;additional 6'' cut back is required as per Standard Detail Drawing H 1042D note6 ; also cut is mounded 1''-1 1/2''. |
2022-01-11 | No data | 126 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-01-10 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP conducted in front of 188 Pulaski street |
2022-01-09 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway down 8 1/2’ on a protected street. Nov issued |
2022-01-08 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post a “RAISE PLOW” sign ahead as per the 2021 WINTER MORATORIUM POLICY starts 12-1-2021 TO 3-31-2022 ends. Nov issued |
2022-01-08 | No data | 116 AVENUE, FROM STREET 200 STREET TO STREET 201 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp water-sewer restoration in the roadway extending into the parking lane in front of property #200-01 116 AVENUE |
2022-01-07 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to installed a raise plow for steel plates in the roadway. Respondent failed to adhere to the rules of the winter moratorium. Respondent id’d by steel plates and permit on file B012021355A63. |
2022-01-05 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair 5 temporary water restorations in the roadway/sidewalk condition remains in front of property #88-12 & 88-14 161 STREET(special 135 project) in a timely fashion. CAR issued |
2022-01-04 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2022-01-04 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... |
2022-01-04 | No data | 14 AVENUE, FROM STREET 155 STREET TO STREET 156 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt water restoration in the parking lane in front of 155-15 14 Avenue is overdue for final. |
2022-01-04 | No data | 106 AVENUE, FROM STREET 177 STREET TO STREET 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent failed to maintain the temporary restoration in the roadway flushed with the surrounding area. The temporary water cut is below grade 2-3" I ID by the permit#Q012021287D98. |
2022-01-04 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN THE ROADWAY (LONG WATER) AND 1 SIDE WALK FLAG INSTALLED |
2022-01-03 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is parking lane is flush to grade IFO #158 |
2022-01-01 | No data | 116 AVENUE, FROM STREET 200 STREET TO STREET 201 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to countersink the steel plates flush with the roadway as per the 2021 WINTER MORATORIUM POLICY starts 12-1-2021 TO 3-31-2022 ends. Nov issued |
2021-12-31 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2021-12-30 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done in the roadway |
2021-12-30 | No data | 111 AVENUE, FROM STREET 145 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | - Steel Plate(s) Serving no Purposeplease remove unpinned & ramp steel plate (engraved markings ROCK E SMALLS PLUMBING) occupying the roadway of the parking lane severing no purpose in front of property #145-16 111 AVENUE, in a timely fashion. CAR |
2021-12-30 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane opposite from property #114-79 145 STREET in compliance |
2021-12-30 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L IN COMPLIANCE |
2021-12-29 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-12-29 | No data | PARKSIDE AVENUE, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & temp cut in p/l with active permit |
2021-12-28 | No data | HOLLYWOOD AVENUE, FROM STREET BAISLEY AVENUE TO STREET WATERBURY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2021-12-28 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2021-12-28 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-12-27 | No data | EAST 86 STREET, FROM STREET AVENUE N TO STREET SEAVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street repaved .... |
2021-12-27 | No data | BERGEN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw cut ok |
2021-12-26 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible due to BPP. |
2021-12-25 | No data | 109 AVENUE, FROM STREET 204 STREET TO STREET 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2021-12-24 | No data | HOYT STREET, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent Failure to countersink plates over excavation during the winter moratorium months dated 12/1/21 to 3/31/22. id by permit no one working on site |
2021-12-24 | No data | 124 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post a “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY starts 12-1-2021 TO 3-31-2022 ends. Nov issued |
2021-12-22 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | new (CAR #20215850089) is issued temp in parking lane |
2021-12-22 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp in the parking lane overdue for final permit expire 12/31/2018 |
2021-12-22 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/l |
2021-12-21 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | not verified. steel construction plates removed concrete cured crew on site |
2021-12-20 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r.w has been resurfaced |
2021-12-19 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration, in the parking lane, is overdue for final restoration. Permit expired on 12/30/2020.Opposite 315 East 4 Street between Albemrle Road and Church Avenue. |
2021-12-19 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Restoration, in the parking lane, was not finalized. An overdue for final CAR will be issued. |
2021-12-18 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration in the bus lane opposite 794 Rogers Ave is overdue for final & permit expired on 10/9/2020 |
2021-12-18 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration in the parking lane ifo 203 E 51 St is overdue for final |
2021-12-18 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Duplicate |
2021-12-18 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CAR will be issued |
2021-12-18 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration on the sidewalk ifo property 8712 Ave J is overdue for final.Permanent restoration on the roadway at 8712 Ave J needs to be resealed |
2021-12-18 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp restoration found on the sidewalk |
2021-12-18 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration in roadway - |
2021-12-17 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2021-12-17 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the respondent with 2 steel plates on the roadway not recessed. Respondent failed to countersink plates flush with roadway as required during the Winter Moratorium which commenced on December 1, 2021 and ending on March 31, 2022. |
2021-12-16 | No data | HAZEN STREET, FROM STREET 71 STREET TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. Two Cuts. (6' x 3'6" x 3'6" & 7' x 5' x 3') |
2021-12-16 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 temp water restorations in the roadway of both parking lanes in front of property #88-12 & 88-14 161 STREET & temp water restoration in the sidewalk |
2021-12-16 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w & s/w |
2021-12-16 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2021-12-15 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | temporary roadway cut in driving lane |
2021-12-14 | No data | NEW YORK AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced |
2021-12-14 | No data | HAZEN STREET, FROM STREET 71 STREET TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plated Long Water Excavations In Driving Lane |
2021-12-14 | No data | HAZEN STREET, FROM STREET 71 STREET TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 1 Out Of 2 Steel Plates Marked "Rock E. Small Plumbing" Has Shifted 3' Exposing Excavation In Driving Lane I/F/O 21-40 Hazen St. Emailed Complaint From Central. |
2021-12-13 | No data | SNEDIKER AVENUE, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... |
2021-12-10 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition remains the same temporary cut overdue for final. CAR will be issued due to special 135 project |
2021-12-10 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in the p/l CAR on file on a more recent permit |
2021-12-10 | No data | HAWTREE STREET, FROM STREET 99 PLACE TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 22'x4'x6' |
2021-12-10 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary cut on driving lane overdue for final in front of 46-04. |
2021-12-08 | No data | 227 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration needs to be re-sealed in roadway |
2021-12-08 | No data | 112 ROAD, FROM STREET 227 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration needs to be re-sealed in roadway |
2021-12-08 | No data | MURDOCK AVENUE, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration made to grade |
2021-12-07 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration sealer has worn off exposing the sawcut edges and needs to be resealed in the driving/parking lane opposite 69-09 138 Street. |
2021-12-06 | No data | ATLANTIC AVENUE, FROM STREET 107 STREET TO STREET 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm concrete s/w. Perm gas trench, p/l. |
2021-12-04 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL CUTS ON THE ROADWAY AND SIDE WALK |
2021-12-04 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp down 2.5 inches in driving parking lane. CAR to be issued. Does not meet NICA criteria |
2021-12-03 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done in the roadway |
2021-12-03 | No data | CHANNING ROAD, FROM STREET BEACH 12 STREET TO STREET NEILSON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No water going into home. Spoke to homeowner. Crew excavating roadway at this time |
2021-12-03 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the driving lane is 2.5in under grade. Opposite property #700 Grand Street |
2021-12-02 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2021-12-02 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration is overdue for final |
2021-11-29 | No data | 130 AVENUE, FROM STREET 145 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water / Perm restoration roadway |
2021-11-27 | No data | BEACH 69 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET GOUVERNEUR AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water service leaking in basement. Crew excavating roadway at this time |
2021-11-27 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2021-11-27 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 concrete base restorations fully cured in the roadway of both parking lanes in front of property #88-12 & 88-14 161 STREET & temp water restoration in the sidewalk |
2021-11-26 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival ROCK E SMALLS has restored/repaired temporary water-sewer restoration to grade with temporary asphalt flush with surrounding areas in the roadway of the driving lane in front of property #77-21 KEW FOREST LANE in compliance. NICA closed |
2021-11-26 | No data | KEW FOREST LANE, FROM STREET 77 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair temporary water-sewer restoration in the roadway of the driving lane condition remains in front of property #77-21 KEW FOREST LANE(special 135 project). CAR issued |
2021-11-24 | No data | YOUNG AVENUE, FROM STREET ADEE AVENUE TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2021-11-23 | No data | 45 STREET, FROM STREET 50 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #50-72 45 STREET in compliance |
2021-11-20 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water/perm restoration parking lane |
2021-11-19 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Localized areas of permanent water restoration has separation cracks. In the driving lane in front of 186-28 Aberdeen Street . |
2021-11-17 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition remains the same temporary cut overdue for final. CAR will be issued due to special 135 project |
2021-11-17 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration on sidewalk overdue for finial |
2021-11-16 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done in the roadway |
2021-11-16 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2021-11-15 | No data | ROCKAWAY BOULEVARD, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration made to grade in parking lane |
2021-11-14 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration in the roadway. Respondent failed to permanently restore cut within required time. Permit expired on 12/30/2020. Cited permit used for ID. |
2021-11-14 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration was temporarily restored to grade. Condition corrected, pass. |
2021-11-13 | No data | QUEENS BOULEVARD, FROM STREET 45 AVENUE TO STREET 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #69-29 QUEENS BOULEVARD |
2021-11-13 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has a permanent trench on the roadway that needs to be resealed. Respondent has failed to answer CAR#20216480148 issued 10/12/2021 to seal |
2021-11-13 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp water cut in the roadway that is over due for final they fail to permanently restore their cut within the required time their permit expired 12/31/2018 used for ID only |
2021-11-12 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O, I observed the respondent with a 7'x5' temporary roadway cut in the driving lane overdue for final restoration. Respondent failed to permanently restore cut within required time. Above permit# was used for ID. |
2021-11-12 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill it pass compaction at 96.6%. |
2021-11-12 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint verified- At time of inspection roadway cave-in was made safe; at this time there is a 7'x 5' temp roadway restoration flush to grade. |
2021-11-11 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent water restoration within the driving lane. Respondent has failed to properly maintain the sealant applied to the wearing course within the restoration's guarantee period. |
2021-11-11 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk temped, roadway plated and secured.Opposit 230 D/L temped (old service plug. south curb lane excavated material stored |
2021-11-11 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp cut in bus lane |
2021-11-11 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO, ABOVE PERMIT # EXPIRED ON 3/21/19, ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2021-11-10 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2021-11-10 | No data | ARLINGTON TERRACE, FROM STREET INWOOD STREET TO STREET LIVERPOOL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 4x4 perm Restoration needs to be re-sealed in roadway |
2021-11-10 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two temp restorations on the sidewalk. Two temp restorations in the driving lane IFO & opposite property #700. |
2021-11-09 | No data | EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway closed off at the crosswalk of 2nd avenue with orange and white cones while working on water restoration in front of 230. As per stip (023) they are supposed to maintain a 1-11 foot lane for traffic. ID by cited permit. |
2021-11-07 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible due to BPP. |
2021-11-07 | No data | 21 STREET, FROM STREET 44 DRIVE TO STREET 44 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #44-45 21 STREET |
2021-11-06 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cuts in the roadway |
2021-11-05 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO, ABOVE PERMIT # EXPIRED ON 12/21/19 , ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2021-11-05 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane in compliance |
2021-11-04 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2021-11-04 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete includes sidewalk and roadway restorations 35-64 85 street corner property west side11'3" x 4'2" x 10'12" |
2021-11-03 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration Missing Color Code, (2)- Restoration needs to be re-sealed |
2021-11-03 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2021-11-03 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is 2 perm water cuts in the parking lane in front of and opposite 305 that is missing a pavement marker |
2021-11-01 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed |
2021-10-31 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration in the parking lane. The respondent has failed to permanently restore cut within required time. |
2021-10-30 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PASS |
2021-10-29 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp water cut in the parking lane in front 2317 pacific st that is over due for final they fail to permanently restore their cut in the required time, their last permit on file expired on 12/31/2020 used for ID |
2021-10-29 | No data | 85 STREET, FROM STREET 35 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled - crew did not show up to do backfill. |
2021-10-28 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-10-28 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp cut in bus lane |
2021-10-28 | No data | 161 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROCK E SMALLS crew on site currently performing work/excavating in the roadway of both parking lanes in front of property #88-12 - 88-14 161. STREET in a efficient manner in compliance |
2021-10-28 | No data | 158 STREET, FROM STREET 134 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the p/l, partially covered by BBP pavement. opp. 134-21 |
2021-10-27 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time roadway repair is being done by the contractor to make the area safe. |
2021-10-27 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw resurfaced |
2021-10-26 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent Plumber's cut in the roadway remains sunken 3 inches below roadway surface.NICA re-inspection failed. |
2021-10-26 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. In front of 46-04, There is a 5' x 4' portion of temporary restoration, inside of a permanent restoration, that is sunken 3" in localized area's of the cut. Restore roadway with surrounding area immediately. |
2021-10-26 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no recent work found done on the segment ifo location |
2021-10-25 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken and missing seal around permanent water restoration in the driving lane in front of 186-28. |
2021-10-22 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair work done in the parking lane |
2021-10-21 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | There is 2 perm water cut in the roadway at this time |
2021-10-21 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp water cut in the roadway that is over due for final they fail to permanently restore their cut within the required time to do so.the last permit on file expired 3/2/2019 used for id |
2021-10-21 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. |
2021-10-21 | No data | MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled down for paving. |
2021-10-21 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in the parking lane |
2021-10-19 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY WAS RESURFACED IN 2019 SIDEWALK CUT IS GOOD |
2021-10-19 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water / sewer work was done on the sidewalk sidewalk have been reconstructed |
2021-10-19 | No data | BEACH 86 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2021-10-06 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-10-06 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-10-06 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Waters cuts in the roadway is flush with the surrounding area |
2021-10-05 | No data | ECHO PLACE, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway completely milled and re paved |
2021-10-01 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, street cuts .. new permit for sidewalk... |
2021-10-01 | No data | LIGHT STREET, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT paved roadway |
2021-09-30 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent with a temporary water-sewer restoration in the roadway overdue for final. Respondent failed to permanently restore the temporary restoration within the required time. Permit # B012018344C21 expired on 12-31-2018 |
2021-09-30 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | restoration made perm in the parking lane |
2021-09-29 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. |
2021-09-29 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Contractor found to be actively working in this area of roadway at this time. (B012021242B74) |
2021-09-29 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in compliance |
2021-09-26 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway found resurfaced. |
2021-09-25 | No data | WHITE PLAINS ROAD, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2021-09-23 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-09-21 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O Building #111, is missing color code IBM for identification (Year and Permittee), has been installed also the wearing course of irregular restoration as per per H-1042A specs. Had been squared off. |
2021-09-19 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEAL OK |
2021-09-19 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondents failure to apply the correct color code with the correct year on the roadway in front of 744 Bedford avenue. CAR 20217390034 issued on 7/11/2021. Permit and IBM code used for ID Permit expired 8/19/2019 |
2021-09-18 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-09-16 | No data | JEROME STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMIT IS OUT OF GUARANTEE |
2021-09-16 | No data | WILLMOHR STREET, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of the segment found resurfaced due to new building bpp |
2021-09-14 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one repair water cut in p/l needs to be resealed |
2021-09-13 | No data | 142 STREET, FROM STREET 109 AVENUE TO STREET LAKEWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2021-09-13 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Full flag restored I/F/O property #1270. |
2021-09-13 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2021-09-13 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET ARLINGTON TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut to grade in the parking lane, i/f/o 108-53. |
2021-09-12 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints sealed |
2021-09-11 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts on r/w |
2021-09-11 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 SIDEWALK FLAGS HaVE BEEN RESTORED IFO #39. |
2021-09-09 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm in rw acceptable |
2021-09-07 | No data | 143 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade in the parking /driving lanes i/f/o 111-30 |
2021-09-07 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Temporary plumber cut on street overdue for final restoration. Previous permit B012019067D67 to repair water expired 3/21/2019. Expired permit use for Id |
2021-09-07 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE RESTORATION WITHIN REQUIRED TIME, LAST PERMIT B012019032D65 ON FILE EXPIRED 3/2/2019 PERMITTEE ID BE PERMIT |
2021-09-07 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2021-09-07 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code marker was installed. |
2021-09-05 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION (OVER CITY WATER MAIN) DOWN 1 3/4 INCHES IN ROADWAY- OPPOSITE 315 EAST 4 STREET BETWEEN CHURCH AVENUE & ALBEMARLE ROAD. PLEASE RESTORE ROADWAY TO GRADE. |
2021-09-05 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-09-05 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION (OVER CITY WATER MAIN)WITHIN RQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2021-09-04 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY WATER RESTORATION ON (ROADWAY AND SIDE WALK) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012020305A03 EXP 11/29/2020 WAS USED FOR ID. |
2021-09-03 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2021-09-02 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp cut on sidewalk overdue for final |
2021-09-01 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition verified. 3'X2' area of perm cut collapsed down 12''. Nica was issued. Area now temp to grade. Re-dig issued |
2021-09-01 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind. |
2021-08-31 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-08-31 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pave covering work |
2021-08-31 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition verified. 3'x2' area perm cut in the roadway collapsed down 12'' IFO 46-04. Re-dig will be issued. |
2021-08-31 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition not corrected - found permanent restoration cave -in 3' x 2' with 12" down at driving lane of roadway creating dangerous condition to motorists. |
2021-08-30 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the RW flushed to grade, in compliance |
2021-08-27 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-08-26 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced at this time. |
2021-08-25 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2021-08-25 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate cut due to Builders paver. |
2021-08-24 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut |
2021-08-24 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-08-20 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-08-20 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restorations in roadway - 1 straddling driving and parking lane by 2nd tree from Irving Ave, the other by the street light pole. |
2021-08-20 | No data | FARRAGUT ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012019279A01) |
2021-08-20 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP for #223 covering old perm cut. (Red brick building near Stanhope St). |
2021-08-19 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration resealed |
2021-08-19 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the PL extending into RW, flushed to grade |
2021-08-18 | No data | CHESTER STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the parking lane |
2021-08-18 | No data | CROWN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-08-17 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the 4 temporary water restorations in the roadway/sidewalk within the required time. Nov D4F issued overdue for final |
2021-08-17 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2021-08-16 | No data | ALBERT ROAD, FROM STREET 99 PLACE TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible, roadway resurfaced. |
2021-08-16 | No data | HURON STREET, FROM STREET ALBERT ROAD TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible, roadway resurfaced. |
2021-08-13 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration overlapping parking, biking, and driving lane. Lane markings have been restored. |
2021-08-13 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations in parking lanes on both sides of street, and newish sidewalk around water valve and in front of 470. |
2021-08-13 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l and d/l in compliance |
2021-08-12 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in compliance |
2021-08-12 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-08-11 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l. |
2021-08-11 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seal around permanent water restoration in the parking lane, in front of 114-30. Edges need to be reseal. |
2021-08-11 | No data | BRADFORD STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 3 TEMP WATER CUTS IN THE ROADWAY IN FRONT OF & OPPOSITE OF 696 BRADFORD ST ON A PROTECTED STREET WITHOUT A PERMIT FROM D.O.T TO DO SO. THEY WAS ID BY THE CREW ON SITE AND WORK TRUCK AT THE LOCATION. |
2021-08-11 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration on street - in compliance |
2021-08-10 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-08-10 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the 4 temporary water restorations in the roadway/sidewalk within the required time. Nov D4F issued overdue for final |
2021-08-09 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition not verified. No cave-in observed, rather a 3'x2' area of perm cut sunken 2'' IFO 46-04 |
2021-08-07 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT OPP LOCATION IN P/L IN COMPLIANCE |
2021-08-07 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway in good condition at time of my inspection. |
2021-08-05 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found repaved |
2021-08-05 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found milled and sw flag installed with hardware |
2021-08-05 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-08-05 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reseal both permanent plumbing restorations in the roadway in front of property #402. |
2021-08-03 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l in compliance |
2021-08-03 | No data | 147 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the s/w grass area and inside the property lane. |
2021-07-31 | No data | EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-07-29 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-07-27 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r.w acceptable |
2021-07-26 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, full panel replacement ... |
2021-07-26 | No data | WEST 182 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | water cuts have been resealed |
2021-07-25 | No data | EAST 182 STREET, FROM STREET MAPES AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut for new building in compliance |
2021-07-24 | No data | RUTLAND ROAD, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-07-24 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F previously issued overdue for final |
2021-07-24 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2021-07-23 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk and roadway is in compliance. |
2021-07-22 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 water valves installed on sidewalk in front of new building, corner of 329 gates avenue |
2021-07-22 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-07-22 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has a temp cut in the driving lane overdue for final, permit expired on 11/15/2018. Was I.D by permit. |
2021-07-20 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber cut under parked car |
2021-07-19 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk is in compliance. |
2021-07-18 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk in front of 326 Clifton place |
2021-07-17 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the opposite sidewalk |
2021-07-16 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to make permanent, a temporary water cut on the sidewalk, within the required time. Respondent Repair Water permit# Q012019213B96 for work at location expired on 08/30/19. |
2021-07-16 | No data | 39 AVENUE, FROM STREET 30 STREET TO STREET 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut on parking lane(vehicles parked) |
2021-07-16 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2021-07-16 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | defect remains re-issue. |
2021-07-15 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts found on roadway |
2021-07-15 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PATCH WORK ON SIDEWALK WITH 2 WATER HARDWARES INSIDE. RESTORE 2 SEPERATE FLAGS ON THE SIDEWALK IFO 39. |
2021-07-15 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been sealed |
2021-07-15 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-07-14 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The bike lane has been restored I/F/O property #437. |
2021-07-13 | No data | 115 ROAD, FROM STREET 157 STREET TO STREET 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water sewer restoration in front of 157-18 to grade in the roadway. |
2021-07-11 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please replace IBM color code with correct year of completed water restoration cut in front of 744 Bedford avenue. IBM color code year should say 2019 , - Restoration Missing Color Code |
2021-07-11 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR ISSUED ON OTHER PERMIT:B012019200F03 |
2021-07-10 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed |
2021-07-10 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I Found The above Respondent has failed to conform to the applicable Standard Detail Drawing H-1042 note 3 on a protected street. Respondent has an irregular shaped Permanent Restoration. CAR issued 20206460051 on 4/25/2020. |
2021-07-10 | No data | JEROME STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINT NOT SEALED AROUND WATER CAP COVER |
2021-07-09 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts on roadway in compliance. |
2021-07-08 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code marker missing. |
2021-07-08 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-07-08 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found in the parking lane cave-in 1'x 1'depth 1'3"align with 2 permanent long water restoration. Condition not corrected ,Contractor to be notified |
2021-07-08 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance . |
2021-07-07 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PATCH WORK IS NOT ALLOWED.INSTALL FULL FLAG I/F/O PROPERTY #307. |
2021-07-07 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #439 EAST 48 STREET & 2 sidewalk flags installed with water valve expansion joints sealed in between curb in compliance |
2021-07-07 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install full size flag 5ft x 5ft in front of property #1270. |
2021-07-07 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Complaint | Department of Transportation | 1'x1' cave in down 1' in the parking lane of 1367 east 99th street. |
2021-07-07 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition remains the same. 1'x1' cave in down 1' in the parking lane of 1367 east 99th street. |
2021-07-06 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration acceptable |
2021-07-06 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced. |
2021-07-06 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway |
2021-07-06 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced |
2021-07-06 | No data | ALSTYNE AVENUE, FROM STREET BEND TO STREET JUNCTION BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2021-07-05 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - new gas work on top loc. area d/l,s/w flag concrete to grade. |
2021-07-02 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | RESPONDENT FAILED TO PERMANENTLY RESTORE CUT WITHIN REQUIRED TIME. TEMPORARY CUT IN THE ROADWAY IS OVERDUE FOR FINAL. PERMIT #B012020297D78 EXPIRED 1/6/2020 AND IS USED TO IDENTIFY THE ABOVE RESPONDENT. |
2021-07-01 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water-sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2021-07-01 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut is sealed |
2021-06-29 | No data | BEVERLY ROAD, FROM STREET EAST 59 STREET TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in the RW flushed to grade |
2021-06-28 | No data | WILDER AVENUE, FROM STREET BUSSING AVENUE TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway newly paved |
2021-06-27 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway cut in p/l has been sealed. |
2021-06-24 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane in compliance. |
2021-06-24 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the RW flushed to grade, in compliance |
2021-06-23 | No data | EAST 72 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in roadway parking lane sealed and flush. |
2021-06-23 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in the parking lane and sidewalk flag restored. |
2021-06-22 | No data | EAST 52 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Per, cut in the RW flushed with surrounding area, in compliance |
2021-06-20 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two water restorations made perm to grade in the driving lane at 206-09 |
2021-06-18 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cuts in compliance. |
2021-06-18 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking lane IFO active BO. |
2021-06-16 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observe the above respondent with a temporary restoration cut in the roadway with an expired permit. Respondent failed to permanently restore cut within required time. Permit #b012019067D67 expired 3/21/2019 used for ID |
2021-06-16 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Above respondent has a temporary water repair restoration in sidewalk in front of address #8712. Respondent failed to permanently restore restoration within required time; permit expired 12/31/2019 and used for I.D. |
2021-06-16 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | 3 OVER DUE FINAL CUTS IN THE ROADWAY AND 1 ON THE SIDE WALK |
2021-06-14 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK FLAGS REPAIRED |
2021-06-13 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible due to BPP. |
2021-06-13 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued due to failure of restoring bus lane in kind |
2021-06-13 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV ISSUED ON NEWER PERMIT:B012020343F04 |
2021-06-13 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced |
2021-06-10 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY 80 FEET SOUTH OF LEE AVE ON WCL AKA 156 LEE AVE |
2021-06-10 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane |
2021-06-08 | No data | 176 STREET, FROM STREET 130 AVENUE TO STREET 132 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 130-27 permanent long water cut restoration to grade in the roadway. |
2021-06-07 | No data | 119 AVENUE, FROM STREET 218 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer trench in front of 218-06 Flush to grade across the roadway. |
2021-06-05 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The roadway restorations were not resealed |
2021-06-05 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESPONDENT FAILED TO PERMANENTLY RESTORE CUT WITHIN REQUIRED TIME. TEMPORARY CUT IN DRIVING LANE (PATCH WORK) IS OVERDUE FOR FINAL. ABOVE PERMIT EXPIRED ON 10/23/2020 AND IS USED TO IDENTIFY THE ABOVE RESPONDENT. |
2021-06-04 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by New Building BPP paving. Roadway at location flush to grade. |
2021-06-03 | No data | EAST 86 STREET, FROM STREET AVENUE N TO STREET SEAVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A 5' X 4' CAVE IN ADJACENT TO PERM CUT DOWN APPROX 1 FT , ALSO PERM CUT IS SUNKEN AND DOWN APPROX 5-6 INCHES NOT FLUSH |
2021-06-03 | No data | EAST 86 STREET, FROM STREET AVENUE N TO STREET SEAVIEW AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cave in repaired at this time in compliance wit h NICA issued |
2021-06-03 | No data | TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is flush to grade |
2021-06-01 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sealer not installed in sidewalk. CAR on most recent permit B012018233C81 issued. |
2021-06-01 | No data | EAST 86 STREET, FROM STREET AVENUE N TO STREET SEAVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway long water. Sealed and flush |
2021-06-01 | No data | 42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seal around permanent cut. Sidewalk concrete restoration not meeting DOT standard, brush left deep grooves in the concrete, missing expansion joint, restoration not finished. Re-apply concrete. |
2021-05-31 | No data | EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2021-05-28 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts on roadway. Swk in compliance. |
2021-05-26 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the bike lane ifo 162-25 opposite 162-28, perm restoration worn out and needs to be resealed. |
2021-05-26 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-05-26 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | ROADWAY RESURFACED BY NYC DOT |
2021-05-25 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | swk flags have been restored and in compliance |
2021-05-25 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE A TEMPORARY LONG WATER REPAIR WATER RESTORATION IN ROADWAY WITHIN THE REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012020248B31 EXPIRED 10/9/20 WAS USED FOR ID. |
2021-05-24 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2021-05-22 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a permanent restoration on the roadway not being sealed along the edges as per CAR #20201380056 Issued 3/6/2020. |
2021-05-22 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PERM CUT IN P/L. |
2021-05-22 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 954, perm 2018 trench from Driving / Bike lane to East curb. Lane markings / green paint restored in kind. Work within 3 sidewalk flags in compliance. Expansion joints sealed at this time. |
2021-05-20 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AREA RESURFACED BY BPP FOR #977. |
2021-05-20 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced in the r/w |
2021-05-19 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & PERM RESTORATIONS IN RWY |
2021-05-19 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | TEMPORARY CONCRETE FLAGS AT ALTERATION BUILDING |
2021-05-19 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | new swk flag at 233- no work done at 231- 3 permittee's work in temp restoration in swk - Con Edison, Rock E Small & Ngrid-NP#B012021132B34 |
2021-05-19 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Roadway paved & resurfaced restored in kind overlapped by National Grid major installation |
2021-05-19 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp cut in the r/w opp 315 |
2021-05-18 | No data | JEROME STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut on the sidewalk around a water valve cover the expansion joint that was installed was not sealed they was notified by C.A.R# 20217400005 |
2021-05-18 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2021-05-18 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by DOT in 2019. |
2021-05-17 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane and on the sidewalk is in compliance |
2021-05-17 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color coding marker not installed |
2021-05-17 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | H-1042 |
2021-05-17 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER-TEMPRORAY RESTORATION RESTORED. PERM TO GRADE. |
2021-05-17 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore parking lane markings with final restoration. Respondent was notified to make correction via (CAR #20207381349) on 12/5/2020 and failed to do so. |
2021-05-17 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts perm.... |
2021-05-16 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Permanent cuts in the roadway. |
2021-05-16 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2021-05-15 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent had 2018 color code marker still applied to cut. respondent failed to apply correct 2019 color code marker after being previously notified by CAR #20204511050 on 10/30/2020. |
2021-05-15 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to remove marked "Rock Small Plumbing" steel plate in the parking lane as per (CAR #20217380326) issued on 4/1/2021. Respondent ID by permit on file. |
2021-05-15 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut out of guarantee |
2021-05-14 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane in compliance. |
2021-05-12 | No data | 170 STREET, FROM STREET 120 AVENUE TO STREET MARSDEN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk cut make perm. |
2021-05-12 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane, sealed and flush |
2021-05-11 | No data | LINWOOD STREET, FROM STREET JAMAICA AVENUE TO STREET RIDGEWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY |
2021-05-10 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to maintain seal of perm restoration |
2021-05-10 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-05-09 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work covered by bpp |
2021-05-08 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY LONG WATER REPAIR WATER RESTORATION IN ROADWAY WITHIN THE REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2021-05-08 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SWK RESTORED POORLY - NOV & CAR WILL BE ISSUED |
2021-05-08 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN & ACROSS ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2021-05-08 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD INSTALLED A NEW SIDEWALK FLAG IN CITY PROPERTY(AFTER RECEIVING CAR#20217440001 1/6/21)-WITHOUT A VALID DOT PERMIT TO DO SO. SIDEWALK RESTORATION WORK-NO PERMIT. |
2021-05-08 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV & CAR ISSUED |
2021-05-08 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV TO BE WRITTEN ON RIGHT NOT FINAL RESTORATION PERMIT- BECAUSE ITS A WORK NOT STARTED |
2021-05-06 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent restoration resealed |
2021-05-05 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cuts to grade p/d/l - parked cars on top p/l at this time,active BO. |
2021-05-05 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway parking lane,. |
2021-05-04 | No data | WEST 182 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street opening joints around 2 permanent water cut restorations need to be re-sealed located I/F/O 564. |
2021-05-04 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by DOT in 2019. |
2021-05-04 | No data | EAST 179 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has perm trench in the r/w |
2021-05-04 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway/swk ok. |
2021-05-02 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway parking lane. |
2021-05-02 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW PERM RESTORATION IN RWY |
2021-05-01 | No data | EAST 179 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has a perm trench in the d/l,p/l. |
2021-05-01 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk flags restored |
2021-04-30 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observe the above respondent with a temporary restoration cut in the roadway with an expired permit. Respondent failed to permanently restore cut within required time. Permit #b012019067D67 expired 3/21/2019 used for ID |
2021-04-29 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cut in the RW flushed to grade, in compliance |
2021-04-28 | No data | MERRICK BOULEVARD, FROM STREET 226 STREET TO STREET 227 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM ROADWAY. RESURFACED. |
2021-04-27 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by b.p.p |
2021-04-27 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL WATER CUT ON THE SIDE WALK AND ROADWAY CUTS |
2021-04-27 | No data | LANDER STREET, FROM STREET 84 ROAD TO STREET HOOVER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, work is obstructed by BPP. no longer visible |
2021-04-25 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l. |
2021-04-23 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, / water street cut for this location has been paved over, however water line leaking within the building, pvt unauthorized plb found to be making repairs, they was instructed to backfill hole on the west side sidewalk .building supv informed. |
2021-04-21 | No data | FLUSHING AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | complete roadway was repaved |
2021-04-21 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | covered by 1/2+5' BPP |
2021-04-20 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk and in the parking lane is in compliance. |
2021-04-19 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench is perm to grade. |
2021-04-18 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restorations in need to be reseal a CAR will be issued on a newer permit |
2021-04-18 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate still serving no purpose i/f/o 309 |
2021-04-18 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-04-17 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER - SEWER- "STOP" LANE MARKINGS RESTORED TO ROADWAY |
2021-04-17 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed a temporary water restoration on the sidewalk. respondent failed to permaently restore its restoration within the required time. Cited permit expired 12/31/2019 and was used with water valve in temp cut as ID. |
2021-04-17 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk remain temp. NOV to be issued as a post audit. |
2021-04-16 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurface 3/21/19 by DOT. |
2021-04-14 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag in compliance. |
2021-04-13 | No data | BERGEN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates has been removed |
2021-04-12 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane |
2021-04-10 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has two permanent water restorations on the roadway with multiple cracks at above address. The respondent failed to provide smooth riding surface free of defects in the completed wearing course. |
2021-04-09 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color coding marker not installed |
2021-04-08 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut sealed at this time. |
2021-04-07 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates removed. |
2021-04-07 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore parking lane markings with final restoration. Respondent was notified to make correction via (CAR #20207381349) on 12/5/2020 and failed to do so. |
2021-04-07 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | H-1042 note 3 violation |
2021-04-06 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Perm cuts in roadway parking lane ifo 1367 sealed and flush. |
2021-04-06 | No data | JEROME STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WATER CUT ON THE SIDEWALK EXPANSION JOINTS WASN'T SEALED THEY WAS NOTIFIED BY C.A.R# 20217400005 THEY FAIL TO MAKE THE REPAIRS NEEDED |
2021-04-06 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to reseal perm restoration after car was issued |
2021-04-05 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed to properly seal final roadway restoration at seams. Corrective action request issued 3.6.20-CAR #20201380056 |
2021-04-05 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut needs to be re-sealed |
2021-04-03 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE I/F/O HOUSE #233. |
2021-04-03 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by b.p.p |
2021-04-03 | No data | 78 AVENUE, FROM STREET 60 LANE TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by new building repaving on roadway and new sidewalk. |
2021-04-03 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut in the parking lane |
2021-04-03 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Trench must be Resealed |
2021-04-03 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the bike lane |
2021-04-03 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION ON THE SIDEWALK I/F/O HOUSE #233 OVERDUE FOR FINAL. |
2021-04-02 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts remain temporary. NOV to be issued. |
2021-04-02 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new sidewalk installed |
2021-04-02 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to make permanent, a temporary water cut on the sidewalk, within the required time. Respondent Repair Water permit# Q012019213B96 for work at location expired on 08/30/19. |
2021-04-02 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT WAS MADE PERM BY NGRID |
2021-04-01 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TWO TEMPORARY RESTORATIONS PASSED. CONDITION NOT CORRECTED. SUMMONS TO BE ISSUED. |
2021-04-01 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk overdue for final |
2021-04-01 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Concrete flush, crew onsite paving flags |
2021-04-01 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water restoration in the roadway within the required. Nov D4F issued overdue for final |
2021-04-01 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp water restoration in the roadway of the parking lane opposite from property #315 EAST 4 STREET, Nov D4F currently being issued overdue for final |
2021-04-01 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas cut on the sidewalk is in compliance |
2021-04-01 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration found in the parking lane |
2021-04-01 | No data | EAST 11 STREET, FROM STREET GILMORE COURT TO STREET SHORE PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | work done on s/w & perm trench in the r/w |
2021-04-01 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT IN THE ROADWAY |
2021-04-01 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT FAILED TO PERMANENTLY RESTORE CUT WITHIN REQUIRED TIME. TEMPORARY CUT OPPOSITE 794, IN BUS LANE. ABOVE PERMIT #B012020248B31 IS USED TO ID THE ABOVE RESPONDENT. |
2021-04-01 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked on permanent water cut on driving lane in front of 4220. Asphalt cracking on wearing course of permanent water cut on driving lane in front of 4220. |
2021-03-31 | No data | ALSTYNE AVENUE, FROM STREET BEND TO STREET JUNCTION BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Covered by BPP |
2021-03-31 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2021-03-31 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | atpo i observed Binder base or temporary restoration not flush with surrounding area down 3 inches in the roadway. Respondent was issued N.I.C.A #20216610022 3:56 PM and failed to make changes |
2021-03-30 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temporary restoration has multiple areas sized 3"x3" down 3 inches in driving lane. areas of temp restoration is still down causing dangerous condition for vehicles in the roadway insufficient amount of temp asphalt has been placed at area |
2021-03-30 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2021-03-30 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary restoration has multiple areas sized 3"x3" down 3 inches in driving lane. located at 3421 Glenwood road |
2021-03-30 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP |
2021-03-30 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | temporary cut in driving lane at 3421 glenwood road is overdue for final restoration. |
2021-03-29 | No data | 103 AVENUE, FROM STREET 221 STREET TO STREET 223 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2021-03-27 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across the roadway at 21-45 44dr |
2021-03-27 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fine cracks developing in street joint |
2021-03-26 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is flush to grade. |
2021-03-25 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair in the parking lane also two sidewalk flags restore/repaired with expansion joints sealed. |
2021-03-25 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain conformation number |
2021-03-23 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are 2 permanent Long Water cuts in the roadway that is missing seal around entire cuts. Re-seal both cuts entirely. |
2021-03-23 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the above respondent has a permanent restoration,(type of work) backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit #b012020339A45expired 12/31/2020. |
2021-03-23 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and resurfaced |
2021-03-23 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple flags in sidewalk restored sealed and flush. |
2021-03-22 | No data | SNEDIKER AVENUE, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane in compliance |
2021-03-20 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fully paved |
2021-03-20 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water restorations flush to grade in the roadway extending into both parking lanes in front of property #4219 15 AVENUE in compliance |
2021-03-20 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CHECKING ..DOUBLE YELLOW LINE FADED BUT PAINTED , IN COMPLIANCE |
2021-03-18 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2021-03-17 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts in the p/l need to be resealed in the p/l , also a temp cut on the sidewalk around the water valve overdue (winter policy ) |
2021-03-17 | No data | BAY 43 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to backfill. NOV issued. |
2021-03-17 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway in compliance |
2021-03-17 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway in front of the church needs the street opening joints resealed |
2021-03-16 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 11/29/2020. |
2021-03-15 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass , perm ... |
2021-03-15 | No data | EAST 179 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain confirmation # prior to the expiration of permit for sewer work on protected street. |
2021-03-13 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts on rw |
2021-03-13 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration |
2021-03-12 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in compliance. |
2021-03-12 | No data | WILLMOHR STREET, FROM STREET EAST 98 STREET TO STREET ROCKAWAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a confirmation number at least 2 hours prior to the commencement of the backfill. Nov issued |
2021-03-11 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2021-03-09 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags restored in kind sealed and flush. |
2021-03-09 | No data | EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut possibly covered by BPP |
2021-03-09 | No data | NOSTRAND AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED OVER. IFO 1503. NO WORK OBSERVED IN THE ROADWAY. |
2021-03-07 | No data | 147 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the s/w grass area and inside the property lane. |
2021-03-02 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk |
2021-03-01 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERMANENT RESTORATIONS IN RWY NEW SWK FLAG |
2021-02-26 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY 80 FEET SOUTH OF LEE AVE ON WCL |
2021-02-25 | No data | EAST 11 STREET, FROM STREET GILMORE COURT TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on s/w i/f/o 2672 |
2021-02-25 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2021-02-25 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done for new building |
2021-02-25 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED BY BPP |
2021-02-24 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L IN COMPLIANCE |
2021-02-21 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair temporary water-sewer restoration in the roadway of the driving lane/bus lane opposite from building# 794 ROGERS AVENUE , in a timely fashion. CAR issued overdue for final |
2021-02-17 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut from curb to curb flushed to grade, in compliance |
2021-02-17 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found due to snow |
2021-02-15 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair temporary water restoration in the roadway of the parking lane opposite from property #315 EAST 4 STREET & remove unpinned steel plate severing no purpose IFO#309. CAR issued |
2021-01-31 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway in front of 8658 16 Avenue was paved by BPP, found resurfaced. |
2021-01-31 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FINAL RESTORATION -PERM ROADWAY. NO RESTORATIONS FOUND. |
2021-01-30 | No data | CYPRESS AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not found |
2021-01-30 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving lane. |
2021-01-30 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway was resurfaced |
2021-01-29 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving lane. |
2021-01-29 | No data | BOSTON ROAD, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to Hardware materials and parked cars, unable to locate cut |
2021-01-27 | No data | EAST 52 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l as well as on the sidewalk in compliance ifo location |
2021-01-26 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2021. Nov issued |
2021-01-26 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2021-01-25 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the street opening’s counter sunken in the roadway on a protected street. Nov issued |
2021-01-24 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over ...BPP WORK |
2021-01-23 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L |
2021-01-22 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, section of street now 55.. |
2021-01-21 | No data | CLARKSON AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered |
2021-01-21 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY WAS RESURFACED IN 2019 |
2021-01-21 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced |
2021-01-19 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2021-01-19 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2021. Nov issued |
2021-01-18 | No data | 94 AVENUE, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration in parking |
2021-01-17 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012018257B11 on file. |
2021-01-16 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-01-15 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the street opening’s counter sunken in the roadway on a protected street. Nov issued |
2021-01-13 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumb cut in compliance |
2021-01-13 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent water restorations within the driving lane missing over 50% of seal around perimeter of restoration. Stress cracks present within asphalt of both restorations, needs to be repaved. i/f/o 206-07 & 206-09 |
2021-01-13 | No data | CROWN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE. NEW SIDE WALK INSTALLED ON THE NORTH SIDE OF THE BLOCK. |
2021-01-12 | No data | JEROME STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued for expansion joints not sealed, permit expired 8/31/2018 |
2021-01-12 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY 80 FEET SOUTH OF LEE AVE ON WCL |
2021-01-12 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and resurfaced |
2021-01-11 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2021. Nov issued |
2021-01-11 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway. Ok. |
2021-01-10 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #437 IRVING AVENUE & temp sewer restoration in the sidewalk currently now remains no longer backfill material |
2021-01-10 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of both parking lanes in front of property #464 IRVING AVENUE in compliance ( plates & debris removed at this current time) |
2021-01-09 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cuts in roadway to grade |
2021-01-08 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the street opening’s counter sunken in the roadway on a protected street. Nov issued |
2021-01-07 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED. SIDEWALK FLAG. |
2021-01-06 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-01-06 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT OK IN THE PARKING LANE. |
2021-01-06 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-01-06 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on s/w & remove steel plate from p/l |
2021-01-06 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to install temporary pavement asphalt immediately after the completion of the backfill flush with the surrounding areas in the sidewalk. Nov issued |
2021-01-05 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Steel Plate(s) Serving no PurposePlease remove 3 unpinned & ramp steel plate (engraved markings ROCK E SMALL PLUMBING) occupying the roadway on HIMROD STREET severing no purpose adjacent to building AKA 1399 MYRTLE AVENUE. CAR issued |
2021-01-04 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the excavated sewer street opening down 3” on a protected street. Nov issued |
2020-12-19 | No data | EAST 48 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration on the sidewalk. Valid permit on file |
2020-12-18 | No data | EAST 11 STREET, FROM STREET GILMORE COURT TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed countersunk steel plates over excavation in roadway. Respondent failed to post ''Steel Plates Ahead" or "Raise Plow Sign '' as required in the Winter Moratorium Policy which begins 12/1/2020 and ends 3/31/2021 |
2020-12-18 | No data | 134 AVENUE, FROM STREET 155 STREET TO STREET 156 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Snow on location can't see if work was done. |
2020-12-16 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2020-12-15 | No data | 170 STREET, FROM STREET 120 AVENUE TO STREET MARSDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag overdue for final. |
2020-12-14 | No data | EAST 4 STREET, FROM STREET ALBEMARLE ROAD TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no raise plow sign |
2020-12-14 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post raise plow sign & countersink the street opening’s flush with the roadway as per the 2020 WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2020. Nov issued |
2020-12-13 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to countersink the street opening flush with the roadway & post “RAISE PLOW” ahead as per the WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2021. Nov issued |
2020-12-12 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post raise plow sign & countersink the street opening’s flush with the roadway as per the 2020 WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2021. Nov issued |
2020-12-12 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to remove all debris from the roadway prior to the expiration date of the DOT permit as per 34 RCNY section 2-11 (C) (3). Nov issued |
2020-12-12 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening's ramped & pinned in the roadway of both parking lanes in front of property #392 |
2020-12-11 | No data | EAST 179 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet: 127.2 Lift 1. 97.0Dry: 115.8 Lift 2.96.8Max: 119.5Moisture: 9.9 |
2020-12-10 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA PASSED. All six temp cuts are flushed to grade at time of inspection. In compliance. |
2020-12-10 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT MADE FLUSH TO GRADE. |
2020-12-10 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATION ON THE SIDEWALK OVERDUE FOR FINAL IN FRONT OF HOUSE #149. |
2020-12-09 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #023, maintain one 11 FOOT lane for all ongoing vehicular traffic. Nov issued |
2020-12-09 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the 3 steel plate street opening's down 1’ in the roadway on a protected street. Nov issued |
2020-12-09 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Replaced the lane marking in the roadway. The STOP wording in roadway. The OP needs replacing. |
2020-12-09 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with 1 of 6 temporary water restorations, that is sunken 2"-3" in localized area of the driving lane of the roadway. The respondent failed to flush temporary restoration with the surrounding area. |
2020-12-08 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 temporary asphalt sewer cuts in the driving lane i/f/o 147-34 224 street. (1) 15' x 5' sunken 3" & (2) 14' x 4' sunken 2" below roadway surface. A message was left at 23:51 Hours on 12/7/20 ( condition remains the same) |
2020-12-08 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA FAILED. There is 1 of 6 of temporary cuts, that remains sunken 2"-3" in the driving lane of the roadway. The restoration needs to be flushed with the surrounding area for vehicular traffic at this time. |
2020-12-08 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING 2 TEMPORARY CUTS ON THE ROADWAY IN THE DRIVING LANE DOWN APPROX 2-3 INCHES NOT FLUSH WITH THE SURROUNDING AREA , AS PER DOT WINTER MORATORIUM , ALL CUTS MUST BE FLUSH TO GRADE |
2020-12-07 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1 Sewer cut sunken 3" was partially slope & 1 sewer cut sunken 2" in the driving lane in the same condition. |
2020-12-07 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 Sewer cut sunken 3" 1 sewer cut sunken 2" in the driving lane. |
2020-12-06 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152020227A16-r/w resurfaced |
2020-12-06 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to countersink the street opening flush with the roadway & post “RAISE PLOW” ahead as per the WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2021. Nov issued |
2020-12-06 | No data | BAY 43 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken water service. Heavy leak in roadway. One excavation in roadway opposite address. One excavation in sidewalk ifo property |
2020-12-06 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored. |
2020-12-05 | No data | BERGEN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEWER PERMIT ON FILE |
2020-12-05 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - Restoration of BIKE LANE markings neededPlease restore/repair white divided bicycle lane marker over the permanent water restoration in the roadway in front of property #437 IRVING AVENUE, in a timely fashion. CAR issued |
2020-12-05 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to remove all debris from the roadway prior to the expiration date of the DOT permit as per 34 RCNY section 2-11 (C) (3). Nov issued |
2020-12-05 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA Failed. Ifo 11-30, There are 2 temp cuts 5' x 2' x 3" & 4' x 2' x 3" that remains sunken in the parking/driving lane at this time. |
2020-12-04 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt cracked in localized area within permanent water restoration, located within the driving lane i/f/o 86-01 on Hillside ave. |
2020-12-03 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION IN SIDEWALK-OVERDUE FOR FINAL (ALTERATION BUILDING OPERATION) AT 157 WYTHE AVENUE BETWEEN NORTH 6 STREET & NORTH 7 STREET. PLEASE RESTORE SIDEWALK FLAG. |
2020-12-03 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. Ifo 11-30, There are 4 of 6 temporary cuts, that are sunken 2"-3" in localized area's of the driving lane. Restore roadway with surrounding area immediately. Re-digg submitted prior to this NICA. |
2020-12-02 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post raise plow sign & countersink the street opening’s flush with the roadway as per the 2020 WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2020. Nov issued |
2020-12-02 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone restoration is acceptable. |
2020-12-02 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONPlease restore/repair the 2 temporary water restorations in the roadway of both parking lanes in front of building #74 BLEECKER STREET, in a timely fashion. CAR issued |
2020-12-02 | No data | JEFFERSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #1336 JEFFERSON AVENUE |
2020-12-02 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONPlease restore/repair the temporary water restoration in the roadway of the parking lane in front of property #309 WEIRFIELD STREET, in a timely fashion. CAR issued |
2020-12-02 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to post raise plow sign & countersink the street opening’s flush with the roadway as per the 2020 WINTER MORATORIUM POLICY 12-1-2020 TO 3-31-2020. Nov issued |
2020-12-02 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts to grade in the p/d/l at 21-36 44th Dr |
2020-12-02 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Temporary Restoration Overdue for FINAL RESTORATION/ after sewer relay .... |
2020-12-01 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w and 2 long water restorations to grade |
2020-12-01 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP |
2020-11-29 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane ifo supermarket on Lee Ave |
2020-11-29 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Upon arrival ROCK E SMALL PLUMBING currently has 2 temp water restorations in the roadway of both parking lanes in front of property #74 , Nov D4F being issued overdue for on previous permit expired #B012017363G47 never issue on final restoration |
2020-11-29 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival ROCK E SMALL PLUMBING currently has 2 temp water restorations in the roadway of both parking lanes in front of property #74 , Nov D4F being issued overdue for on previous permit expired #B012017363G47 never issue on final restoration |
2020-11-29 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 steel plate street openings ramped & pinned in the roadway of the driving lane in front of building #233 JACKSON STREET, valid dot permit on file #B012020322B46 |
2020-11-29 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street openings ramped & pinned in the roadway of the driving lane in front of building #233 JACKSON STREET |
2020-11-29 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the wooden cover street opening in the sidewalk down 4”. Nov issued |
2020-11-28 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESPONDENTS 6 TEMPORARY CUTS SUNKEN 2 - 5 IN THE DRIVING AND PARKING LANE WITH 3 OF THE 6 CUTS EXPOSING THE BACKFILL FAILING TO HAVE INSTALLED TEMPORARY PAVEMENT OF ACCEPTABLE ASPHALT MIXTURE NOT LESS THAN 4" AFTER COMPACTION. NO ONE ON SITE. |
2020-11-28 | No data | EAST 86 STREET, FROM STREET AVENUE N TO STREET SEAVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LONG WATER CUT |
2020-11-28 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt has been applied to restorations in roadway |
2020-11-28 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street openings ramped & pinned in the roadway of the driving lane & temp water restoration sunken down 2” opposite from property #207 AKA #1399 MYRTLE AVENUE & temp water restoration in the sidewalk under scaffold |
2020-11-28 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012019226B51 |
2020-11-28 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water restoration in the roadway within the required time. No D4F issued overdue for final |
2020-11-27 | No data | 224 STREET, FROM STREET 147 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent failed to maintain the wearing course with surrounding area The 2 sewer cuts and the two water cuts are below grade 2-3". I ID the cuts by the permit #Q012019337C11. |
2020-11-27 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the respondents failure to permanently restore a temporary cut in the roadway within required time prior to the permit expiration date on 11/15/2018 |
2020-11-26 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate has been removed. |
2020-11-25 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #112, maintain one 11 FOOT lane for all ongoing vehicular traffic on a one-way street. Nov issued |
2020-11-25 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway cut restored to grade and sealed |
2020-11-25 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-22’Width of the cut-3’Depth of the cut-4’ 5”W.D-123.3D.D-115.9M.D.D-120A.M-8.4%1st lift-96.3%last lift-97.5% |
2020-11-24 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #OCMC12, post signs meeting NYCDOT specs at the work-zone & at both intersections redirecting all pedestrians. Nov issued |
2020-11-24 | No data | EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced ifo location due to new building bpp |
2020-11-24 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING DEBRIS/ CONSTRUCTION MATERIALS IN THE PARKING LANE UP AGAINST THE CURB OBSTRUCTING THE GUTTERS, ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2020-11-23 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | i OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 8/6/2020. |
2020-11-23 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the above Respondent fail to conform to the applicable Standard Detail Drawing #H-1042 on a protected street. The Respondent permanent restoration shape is Ireggular in shape. Respondent was notified by CAR 20206460051 on 4/25/20 |
2020-11-22 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 cuts rd/w plus s/w temp was an E # |
2020-11-22 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of both parking lanes in front of property #470 & temp water restoration in the sidewalk under scaffold |
2020-11-22 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm water restorations flush to grade in the roadway of both parking lanes in front of property #470 & temp water restoration in the sidewalk under scaffold |
2020-11-21 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-11-21 | No data | LOCKMAN AVENUE, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration to grade |
2020-11-20 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE ACTIVELY WORKING. |
2020-11-19 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED. 1 SIDEWALK FLAG. |
2020-11-18 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut ok. |
2020-11-18 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp water cut found on roadway |
2020-11-16 | No data | EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED DUE TO NEW BUILDING BPP |
2020-11-15 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW PERM RESTORATION WITH NEW PERMIT#B012020311A08 EXP 12/2/20 |
2020-11-15 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP, roadway and sidewalk. |
2020-11-14 | No data | AVENUE J, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the roadway. |
2020-11-14 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a broken seal around permanent trench, due to the wear and tare from vehicular traffic. The respondent failed to properly re-seal and maintain the wearing course. |
2020-11-13 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to obtain a valid DOT permit on file for the wooden cover street opening in the sidewalk down 4”. Nov issued |
2020-11-13 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2020-11-12 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO INSPECT PARKING LANE, ROADWAY. SIDEWALK FULL OF LEAVES. ROADWAY APPEARS TO HAVE BEEN REPAVED. |
2020-11-09 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the driving lane in front of building #1189 |
2020-11-09 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent trench joints sealed. |
2020-11-07 | No data | BROADWAY, FROM STREET HALSEY STREET TO STREET HALSEY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 2 TEMP CUTS ON S/W AND RD/W IN BUS STOP AT THE CORNER OF BROADWAY |
2020-11-07 | No data | 109 AVENUE, FROM STREET 204 STREET TO STREET 205 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration resealed |
2020-11-06 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-6’ 4”/cut2-6’Width of the cut-4’/cut2-4’Depth of the cut-4’/cut2-5’W.D-116.4D.D-107.5M.D.D-114.8A.M-8.2%1st lift-97.5%/cut2-97.6%last lift-97.6%/cut2-97.7% |
2020-11-06 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #023, maintain one 11 FOOT lane for all ongoing vehicular traffic. Nov issued Foreman on site has informed me they have authorization! |
2020-11-06 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-16’Width of the cut-5’Depth of the cut-2’W.D-118.2D.D-109.2M.D.D-114A.M-8.2%1st lift-97.4% |
2020-11-05 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a permanent restoration on the roadway not being sealed along the edges as per CAR #20201380056 Issued 3/6/2020. |
2020-11-05 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurface. |
2020-11-04 | No data | LOTT AVENUE, FROM STREET AMBOY STREET TO STREET HOPKINSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | National Grid Working over cut. |
2020-11-01 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Please install temporary pavement asphalt flush with the surrounding areas in the sewer restoration in the sidewalk in front of property #437 IRVING AVENUE , in a timely fashion. CAR issued |
2020-11-01 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival ROCK E SMALL PLUMBING has restored/repaired the temporary sewer restoration to grade with backfill material in the sidewalk flush with the surrounding areas in front of property #437 IRVING AVENUE, in a timely fashion. NICA closed |
2020-11-01 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed the above respondent with barricaded dirt debris stored on the roadway obstructing the water run off.Respondent failed to provide adequate space for water run off. No crew on site at time of inspection. |
2020-10-31 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2020-10-31 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on rw |
2020-10-31 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - Temporary Restoration SunkenPlease restore/repair the temporary sewer restoration to grade in the sidewalk sunken down 1’ in front of property #437 IRVING AVENUE, in a timely fashion. NICA issued (safety cone placed prior to departure) |
2020-10-31 | No data | BUFFALO AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken water service. Leaking in basement. Owner issued 3 day notice. One excavation in roadway and sidewalk at this time |
2020-10-30 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20204510529-FAILED TO PROPERLY SEALED COMPLETED EDGES OF THE CUTS OF WEARING COURSE |
2020-10-30 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE REMOVE 2018 ROCK E SMALL PLUMBING & HEATING INC COLOR CODE & INSTALL PROPER 2019 COLOR CODE IN PERMANENT RESTORATION-IN FRONT OF 744 BEDFORD AVENUE BETWEEN FLUSHING AVENUE & PARK AVENUE. |
2020-10-30 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone restoration is acceptable. |
2020-10-30 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-10-29 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #1189 |
2020-10-29 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued |
2020-10-28 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, perm cut to grade in the roadway, 2 sidewalk flags restored. |
2020-10-28 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane, sealed and flush |
2020-10-28 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN RWY TEMP RESTORATION IN SWK & WOOD COVERED SIDEWALK |
2020-10-27 | No data | 119 AVENUE, FROM STREET 218 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill has been completed , 18'' cut hasn't done yet. |
2020-10-27 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway in compliance. |
2020-10-27 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Large perm restoration flush in the roadway IFO 116. |
2020-10-26 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #BIKE02, create a temporary bike-way around the work-zone delineated by cones or similar vertical traffic devices. Nov issued |
2020-10-24 | No data | 75 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts sealed at this time. |
2020-10-24 | No data | JACKSON STREET, FROM STREET KINGSLAND AVENUE TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to maintain a clear water flow passage for the gutter line in the roadway adjacent to the NORTH EAST curb-line. Nov issued |
2020-10-24 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO PERMANENTLY RESTORE A SHORT REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012020150A10 EXPIRED 6/27/20 WAS USED FOR ID. |
2020-10-23 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | roadway was closed opp# 93 was notified backfill completed on 2 cuts in the roadway the sewer cut was left down 1 ft need 1 more left there was not enough material no cutbacks made no base restored cut was plated |
2020-10-23 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM WATER CUT ON THE SIDEWALK |
2020-10-23 | No data | EAST 178 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | full street closure |
2020-10-22 | No data | MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the roadway |
2020-10-20 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATE WAS REMOVED |
2020-10-19 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the parking lane in front of property #437 |
2020-10-19 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut and debris in the roadway |
2020-10-18 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway |
2020-10-18 | No data | 189 STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Sewer backing up. One excavation in roadway at this time |
2020-10-17 | No data | TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed |
2020-10-17 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway trench in compliance |
2020-10-15 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | i observed 2 excavations measuring at 4.8 x 4.2 and 4.10 x 3 back filled and passed with compaction of 97.0 and 97.4 |
2020-10-15 | No data | 162 STREET, FROM STREET 75 ROAD TO STREET 76 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Dual restorations within the parking / driving lane ifo 75-34 found flushed to grade. |
2020-10-14 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2020-10-14 | No data | MAC DOUGAL STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway |
2020-10-14 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | TEMP CUT OVERDUE , NGRID WENT INSIDE OF CUT WHILE OVERDUE , NGRID IS RESPONSIBLE , |
2020-10-13 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I SPOKE WITH THE FOREMAN WORKING ON THE NEXT SEGMENT THAT A ADDITIONAL PERMIT NEEDS TO BE PULLED CAN NOT WORK 2 DIFFERENT LOCATIONS WITH 1 PERMIT AND SPOKE TO OWNER ON THE PHONE. THAT SAID HE WILL GET ANOTHER PERMIT TODAY |
2020-10-13 | No data | IRVING AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WITH A OPEN EXCAVATION IN THE PARKING LANE |
2020-10-13 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | AS I GOT A BETTER LOOK AT THE MATERIAL IT IS PERMANENT ASPHALT USE FOR THE WEARING COURSE |
2020-10-12 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r.w and s/w in compliance |
2020-10-12 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV WRITTEN |
2020-10-12 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2020-10-09 | No data | CARROLL STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2020-10-09 | No data | MC BRIDE STREET, FROM STREET HOLLYWOOD COURT TO STREET MOTT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. 9'6" x 4'6" x 6' & 4'6" x 4' x 1' |
2020-10-08 | No data | LOTT AVENUE, FROM STREET AMBOY STREET TO STREET HOPKINSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Notes: start 9:42am Length 16FT 7IN Width 4FT 6IN DEPTH 10FT 9IN (shoring removed) WET 120.1 DRY 113.6 MAX 119.9 MOIST 7.5 1st test 97.1 2nd test 98.2 LAB MOBILE TESTING TESTER AMANDA DEVICE SANDCONE |
2020-10-08 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prior permit new active permit Q012019346B18 |
2020-10-08 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored in kind |
2020-10-07 | No data | 76 STREET, FROM STREET 95 AVENUE TO STREET 97 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk replaced in kind |
2020-10-06 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 binder water cuts in the roadway that is over due for final they fail to permanently their cut within the required time their permit expired 2/4/2018 used for ID |
2020-10-06 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET ARLINGTON TERRACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill restoration is completed. |
2020-10-05 | No data | 145 DRIVE, FROM STREET 177 PLACE TO STREET 177 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm sewer restorations flush to grade in the roadway of both parking lanes in front of property #177-08 - 177-10 in compliance |
2020-10-05 | No data | 157 STREET, FROM STREET 134 AVENUE TO STREET 137 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #134-40 in compliance |
2020-10-04 | No data | 170 STREET, FROM STREET 140 AVENUE TO STREET 143 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #140-23 in compliance |
2020-10-04 | No data | BAISLEY BOULEVARD, FROM STREET 161 STREET TO STREET LONG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer-water restorations flush to grade in the roadway of the driving lane opposite from property #161-26 - 161-30 in compliance |
2020-10-04 | No data | 174 STREET, FROM STREET 134 ROAD TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2020-10-02 | No data | 45 AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION OK IN D/L OPP 160-10. SIDEWALK FLAG IFO 160-10. |
2020-10-02 | No data | 119 ROAD, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 steel plate street openings ramped & pinned in the roadway extending into the parking lane in front of property #161-24, valid dot permit on file #Q012020248A92 |
2020-10-02 | No data | 119 ROAD, FROM STREET LONG STREET TO STREET GUY R BREWER BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plate street openings ramped & pinned in the roadway extending into the parking lane in front of property #161-24 |
2020-10-02 | No data | MIDLAND AVENUE, FROM STREET FREEBORN STREET TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut acceptable |
2020-09-30 | No data | EAST 99 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restoration found in the roadway in front of 1367. |
2020-09-30 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2020-09-30 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in compliance |
2020-09-30 | No data | WOODHULL AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary sewer restoration in the roadway within the required time. Nov D4F issued overdue for final |
2020-09-29 | No data | GIPSON STREET, FROM STREET CORNAGA AVENUE TO STREET HEALY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the p/l, i/f/o 1095 |
2020-09-29 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a permanent restoration with green plastic color code not being properly sealed as per CAR #20201380056 issued 3/6/2020. |
2020-09-29 | No data | HEALY AVENUE, FROM STREET DICKENS STREET TO STREET GIPSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the p/l flush to grade, i/f/o 23-11 |
2020-09-26 | No data | BEACH 26 STREET, FROM STREET DEAD END TO STREET SEAGIRT AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | s/w flag replaced and sealed i/f/o 168 |
2020-09-26 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20204510529-FAILED TO SEAL JOINT EDGES OF PERMANENT RESTORATION IN ROADWAY-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2020-09-26 | No data | FLUSHING AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY RESURFACED BY DDC JLJ |
2020-09-25 | No data | HALSEY STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2020-09-25 | No data | 51 STREET, FROM STREET 39 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site excavating sidewalk - repairing water leak on service i/f/o 3922 |
2020-09-25 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent ROCK E SMALL PLUMBING & HEATING INC has complied with H-1041 restored permanent water restoration as one within 10’ in the roadway of the parking lane in front of #283 in compliance |
2020-09-24 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving, parking lanes I/F/O 2315 Tiemann Ave |
2020-09-24 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-09-24 | No data | NEW YORK AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY REPAVED IN FRONT OF NEW BUILDING |
2020-09-24 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-09-23 | No data | CLARKSON AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2020-09-23 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2020-09-22 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 11:10am to 11:55am one cut in the parking lane length 5ft width 5ft depth 3ft 5inches. |
2020-09-22 | No data | MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, sewer repair, no cause for action. |
2020-09-21 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut1-7’ 3”/cut2-3’ 8”/cut3-8’ 3”Width of the cut1-3’ 8”/cut2-3’ 6”/cut3-4’ 2”Depth of the cut1-4’ 5”/cut2-3’ 7”/cut3-3’ 6”W.D-125.4D.D-115.6M.D.D-119.5A.M-8.5%1st lift cut1-97.4%/cut2-97.%/cut3-97.2%last lift cut1-97.6% |
2020-09-21 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 8/6/2020 |
2020-09-21 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING failed to comply with terms & conditions of stipulation #BIKE02, create a temporary bike-way around the work-zone delineated by cones or similar vertical traffic devices. Nov issued no bike gear |
2020-09-21 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut in the parking lane and sidewalk have been made perm. |
2020-09-21 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | 2 sidewalk flags restored and sealed ifo 134-03 Liberty Avenue. |
2020-09-20 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO The Respondent failing to install the color code marker. The Respondent was notified by CAR 20206460060 issued on 8-9-2020. |
2020-09-20 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please reseal roadway cut , seal broken out and cracking throughout cut. |
2020-09-19 | No data | MACON STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2020-09-18 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | fully paved |
2020-09-18 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM WATER RESTORATIONS ACROSS THE ROADWAY IFO PROPERTY # 542 |
2020-09-17 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING failed to comply with terms & conditions of stipulation #BIKE02, create a temporary bike-way around the work-zone delineated by cones or similar vertical traffic devices. Nov issued no bike gear |
2020-09-16 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temporary restoration in rwy 15 NOV written 9/5/20 |
2020-09-16 | No data | WYTHE AVENUE, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the bicycle lane opposite from property #157 with minor debris occupying the roadway of the parking lane |
2020-09-15 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Restoration restored, in compliance |
2020-09-15 | No data | BAISLEY BOULEVARD, FROM STREET 161 STREET TO STREET LONG STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backfill completed. I have monitored one cut at this time. 4' x 3' x 3'6". Compaction result = 97.2%.Base completed. I have monitored one cut at this time. 4' x 3' x 12". Binder base was used and cut backs were made before i arrived. |
2020-09-14 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work is in progress crew is on site repair water |
2020-09-13 | No data | EAST 52 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | The above respondent failed to install temporary pavement upon completion of backfill. Respondent left sidewalk backfill only . |
2020-09-12 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to correct sewer restoration defect after (CAR #20196630413) was issued on 11/14/2019 to resealed the crack edges on the wearing course of the trench. |
2020-09-12 | No data | WHITE PLAINS ROAD, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water / fire line leaking (visibly confirmed) ,one excavation made on roadway and 2 excavations made on sidewalk at time of inspection. |
2020-09-12 | No data | TOMPKINS AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN ROADWAY IN BOTH PK LANE & NEW SWK AT NEW BUILDINGS |
2020-09-11 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent ROCK E SMALSS PLUMBING & HEATING failed to obtain a DOT permit on file for the storage of the steel plate after being notified via CORRECTIVE ACTION REQUEST #20207380597. Nov issued |
2020-09-11 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: Active | Department of Transportation | NICA issued to have sunken temp restoration to grade. |
2020-09-11 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: LL14 | Department of Transportation | NOTES: START 11:14am LENGTH 3ft x4inWIDTH 3ft x 8in DEPTH 4ft x 6in WET 111.3 DRY 104.6 108.6 MOIST 6.4 LAB MOBILE TESTING TESTER JOE DEVICE SANDCONE COMPACTION DEVICE JUMPING JACK TEST 97.6 |
2020-09-11 | No data | MORNINGSTAR ROAD, FROM STREET DAVID PLACE TO STREET WALKER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway and sidewalk area brought to grade with dirt and asphalt respectively |
2020-09-10 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found resurfaced. No old cuts on the roadway at time of inspection. In compliance. |
2020-09-09 | No data | 16 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Cut behind property & parking lane, debris barricaded. |
2020-09-09 | No data | COHANCY STREET, FROM STREET HAWTREE STREET TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill dimensions: 7'0" x 3'9" x 2'3" within the driving lane ifo 150-54. |
2020-09-08 | No data | CLARKSON AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating s/w & rwy, water leak repair, 3day, Confirmed. |
2020-09-08 | No data | 109 AVENUE, FROM STREET 204 STREET TO STREET 205 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed, perm water restoration within the p/l, missing more than 50% of seal around perimeter of restoration. Patch work is still present on sidewalk, NOV issued for seal. i/f/o 204-11 |
2020-09-06 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Seal is adequate at Building operation pending a BPP. |
2020-09-06 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored. |
2020-09-05 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of building #794 & temp sewer restoration in the roadway of the bus lane opposite from building |
2020-09-05 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Active | Department of Transportation | Temp Water Cut at Opp 1173 in the Roadway in Compliance |
2020-09-05 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2020-09-05 | No data | 88 ROAD, FROM STREET 247 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cuts in roadway to grade |
2020-09-04 | No data | EAST 82 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: E-Number | Department of Transportation | No work Started within the 2 Hour Grace Period. Will Follow up at Location |
2020-09-04 | No data | LOCKMAN AVENUE, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The condition was brought to grade with temp asphalt |
2020-09-04 | No data | LINWOOD STREET, FROM STREET JAMAICA AVENUE TO STREET RIDGEWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the driving lane. |
2020-09-04 | No data | LOCKMAN AVENUE, FROM STREET LOCKMAN PLACE TO STREET RICHMOND TERRACE | No data | Street Construction Inspections: Active | Department of Transportation | NICA issued for sunken restoration |
2020-09-03 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has back filled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the back fill. Permit expired 6/16/20. i/f/o 130-24 |
2020-09-03 | No data | MAC DOUGAL STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012020240B50 active permit plated excavation in the parking lane |
2020-09-03 | No data | 106 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/7/20. |
2020-09-02 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 8/6/2020 |
2020-09-02 | No data | EAST 182 STREET, FROM STREET MAPES AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site, flag man posted to direct traffic. The area is in compliance, no action to be taken. |
2020-09-02 | No data | EAST 178 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/14/2020. Respondent failed to obtain a confirmation number |
2020-09-01 | No data | MACON STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN LONG WATER STREET OPENING & SHORT WATER PK LANE STEEL PLATED |
2020-09-01 | No data | MAC DOUGAL STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW DOING BACKFILL ON LONG WATER STREET -OPENING EXPLAINED TO CREW TO TAKE OUT 113 OR 115 TYPE PERMIT-SEWER PLATED TO MIDDLE OF STREET AT BUILDING OPERATION- HAD 2 PERMITS AT LOCATION |
2020-09-01 | No data | MAC DOUGAL STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW DOING BACKFILL ON LONG WATER STREET -OPENING EXPLAINED TO CREW TO TAKE OUT 113 OR 115 TYPE PERMIT-SEWER PLATED TO MIDDLE OF STREET AT BUILDING OPERATION- HAD 2 PERMITS AT LOCATION |
2020-08-30 | No data | 45 STREET, FROM STREET 50 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut in the parking lane & two sidewalk flags restore with expansion joint seal in compliance. |
2020-08-29 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS OBSERVED. VERIZON TRENCH IFO 644. IN PARKING LANE. |
2020-08-29 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #1117 in compliance (lane markers restored in -kind) |
2020-08-29 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration in good condition color coded and sealed. |
2020-08-29 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE. |
2020-08-28 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water restoration in the roadway within the required time prior to being notified via CORRECTIVE ACTION REQUEST #20207380857. Nov D4F issued |
2020-08-28 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROCK E SMALL PLUMBING & HEATING currently has a temporary water restoration in the roadway of the parking lane in front of property#1301, Nov D4 F being issued overdue for final (steel plate removed from occupying the roadway) |
2020-08-26 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012020132A05. Perm trench in the driving lane, parking lane, water cap is on the grass area. |
2020-08-26 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-08-26 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #033, maintain 2-11 FOOT lanes,1-11 FOOT lane in each direction to all ongoing vehicular traffic. Nov issued |
2020-08-25 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary water cut in the roadway sunken 3 inches below roadway level. Failure to make area flush with surrounding roadway surface after NICA #20207381009 was issued on 8/24/2020. At 5:30pm detailed voicemail left on emgergency # 917- 418-4879. |
2020-08-25 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012020226A39 |
2020-08-24 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration in the roadway remains sunken, No NOV issued at this time. Permittee to be notified again. |
2020-08-24 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | - In Driving Lane - Temporary Restoration SunkenPlease restore/repair the temporary water restoration to grade sunken down 3” in the roadway of the driving lane in front of property #1117, in a timely fashion. NICA issued |
2020-08-24 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #013, maintain minimum 5 clear sidewalk passage to all ongoing pedestrians. Nov issued |
2020-08-22 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Cut in Compliance |
2020-08-21 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2020-08-21 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the respondent with 2 binder water cuts that is in temp form over due for final in front of 74 bleecker st there last permit on file expired 2/4/18 |
2020-08-19 | No data | BAISLEY BOULEVARD, FROM STREET 161 STREET TO STREET LONG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Joint inspection with Greg and Mr. Smalls for the protest. |
2020-08-19 | No data | SPRINGFIELD BOULEVARD, FROM STREET 135 AVENUE TO STREET 136 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has a plated sewer excavation across the roadway without maintaining an active permit to do so. Respondent was identified by their name on plates and expired permit# Q012020174B95 for location which expired on 07/23/20. |
2020-08-18 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O, I observed the respondent failed to Re-seal one permanent roadway trench in the driving lane. Respondent was notified by CAR# 20196200031 ON 4/3019 to repair condition and did not. |
2020-08-18 | No data | BAISLEY BOULEVARD, FROM STREET 161 STREET TO STREET LONG STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp asphalt applied to sunken areas |
2020-08-18 | No data | TURNBULL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration in compliance |
2020-08-18 | No data | BAISLEY BOULEVARD, FROM STREET 161 STREET TO STREET LONG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 161-26 19'x8'3" cut sunken 3-4" IFO 161-30 15'8"x8'2". The cuts are sunken also the roadway adjacent to the cuts are sinking in localized areas. Place on Re-Dig. |
2020-08-17 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the roadway |
2020-08-17 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #071, WORK 10 AM - 4 PM, MONDAY TO FRIDAY. Nov issued |
2020-08-14 | No data | 8 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-08-14 | No data | 162 STREET, FROM STREET 75 ROAD TO STREET 76 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA FAILED. Cold patch applied to partial portion of temp cut. 6' x 4' portion of temp cut still sunken 2"-3". The permittee needs to add more temp asphalt to temporary restoration at this time |
2020-08-14 | No data | 162 STREET, FROM STREET 75 ROAD TO STREET 76 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp sewer cut sunken 2-3" ”. Also the have unprotected debris barricades required, The gutter is obstructed, The plate is not skid resistant. The site is messy. |
2020-08-14 | No data | GIPSON STREET, FROM STREET CORNAGA AVENUE TO STREET HEALY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 6'2" x 4' x 1'8" i/f/o 10-95 p/lper supervisor on site, Cliffton, work was performed on s/w and roadway was mistakenly excavated. pipe in r/w was never exposed or worked on. 1'8" of fill was dug out. same amount put back in. |
2020-08-14 | No data | SNEDIKER AVENUE, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2020-08-13 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to comply with terms & conditions of stipulation #078, FULL width of the roadway including the parking lane shall be open when the site is unattended. Nov issued |
2020-08-13 | No data | 155 STREET, FROM STREET 121 AVENUE TO STREET 122 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut is covered by builders paving |
2020-08-12 | No data | ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to provide flag personnel on site to direct all ongoing vehicular traffic. Nov issued |
2020-08-12 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to install and seal sidewalk expansion joints as per subsection. Respondent notified of this oversight in CAR 20203690026 but failed to install/seal expansion joints in sidewalk. |
2020-08-12 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to seal and maintain the wearing course. Respondent notified of the oversight in CAR 20201380056 but failed to seal the restoration of the wearing course. |
2020-08-12 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2020-08-11 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w cut ok |
2020-08-11 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP WATER CUT IN THE PARKING LANE |
2020-08-10 | No data | GLENWOOD ROAD, FROM STREET CORBIN COURT TO STREET EAST 12 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy in the Roadway & Behind Property in the Grass Area. 3 Day Dep Notice Issued |
2020-08-09 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to the Respondent failing to conform to the applicable Standard Detail Drawing #H-1042 on a protected street. The Respondent permanent restoration shape is Ireggular in shape. Respondent was notified by CAR 20206460051 on 4/25/2020. |
2020-08-09 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to the Respondent failing to install color code markers to 3 Permanent restoration at the end of the restoration. The Respondent was notified by CAR 20206460060 issued on 5/2/2020. |
2020-08-08 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced, new flags on SW, in compliance |
2020-08-08 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | rw pave by building pavers |
2020-08-07 | No data | FLUSHING AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT FAILED TO APPLY COLOR CODE IDENTIFYING DOT PERMITTEE. CAR #20205250119 WAS ISSUED ON 7/1/2020. ABOVE PERMIT #B012020015B02 IS USED TO IDENTIFY THE RESPONDENT. |
2020-08-07 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2020-08-05 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate was removed from the roadway. Condition corrected. |
2020-08-05 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate |
2020-08-05 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DOUBLE YELLOW LANE MARKINGS RESTORED |
2020-08-05 | No data | EAST 72 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 steel plate was removed from p/l |
2020-08-04 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | sewer repair ... now temped to grade ... |
2020-08-04 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW found resurfaced, new flag installed IFO property |
2020-08-04 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT FAILED TO SEAL AND MAINTAIN THE WEARING COURSE. STREET OPENING JOINTS NOT SEALED AS REQUESTED. CAR#20204510529 WAS ISSUED. |
2020-08-02 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance 25 feet west of entrance of IFO 304 |
2020-08-02 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 8120 Colonial Road. |
2020-07-31 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued to most recent permit on file to install color code and restore as per 1042 spec for irregular restoration. |
2020-07-30 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-07-29 | No data | EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts flush and sealed |
2020-07-28 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT TEMP WATER CUT IN THE PARKING LANE THAT WAS BACKFILL MATERIAL ONLY (DIRTY) THEY FAIL TO INSTALL A TEMP ASPHALT AS THE WEARING COURSE AFTER THE COMPLETION OF THEIR BACKFILL AS REQUIRED |
2020-07-27 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-07-27 | No data | EAST 59 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway sealed and flush |
2020-07-26 | No data | CYPRESS AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-25 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in the r/w |
2020-07-25 | No data | ALBERT ROAD, FROM STREET 99 PLACE TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved at time of my inspection . |
2020-07-25 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration needs to be resealed |
2020-07-25 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK OBSERVED IN THE ROADWAY. ONE HALF PLUS 5FT OF PAVING DONE IN FRONT OF NEW BUILDING. |
2020-07-24 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT ON THE ROADWAY IN THE PARKING LANE IFO PROPERTY #144 |
2020-07-23 | No data | SACKMAN STREET, FROM STREET SOMERS STREET TO STREET TRUXTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2020-07-23 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued to permit M012019169B98 for color code marker. |
2020-07-22 | No data | BUSSING AVENUE, FROM STREET HILL AVENUE TO STREET MONTICELLO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the roadway flush and sealed adjacent to driveway 2103 |
2020-07-22 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE NO LONGER VISIBLE ROADWAY HAS BEEN RESURFACED IFO PROPERTY # 255 ( new building ) |
2020-07-22 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY |
2020-07-17 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in RW |
2020-07-17 | No data | 135 PLACE, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway. |
2020-07-17 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site with a open excavation in the parking lane |
2020-07-14 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-07-11 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK flag restored around water valve, roadway cuts covered by new gas main trench |
2020-07-11 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking / Bike lanes, unable to fully view parking lane due to Roadway seating area set up. |
2020-07-10 | No data | NEW JERSEY AVENUE, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | sewer , repair crew on site ...... |
2020-07-07 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new sewer/sprinkler relay .... new building .... |
2020-07-07 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2020-07-06 | No data | EAST 178 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Active | Department of Transportation | I observed that the above despondent failed to comply with terms and conditions of DOT permit by closing the street. Stipulation#23 Maintain 1-11 FT lane for traffic. |
2020-07-03 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the parking lane in front of property #1301, D-02 shall be issued at a later date as per mayor & commissioner executive order |
2020-07-02 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance |
2020-07-01 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY 80 FEET SOUTH OF LEE AVE ON WCL |
2020-07-01 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to pterodactyl inspect due to 2019 con Edison restoration |
2020-07-01 | No data | FLUSHING AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COLOR CODE MISSING IDENTIFYING PERMITTEE. |
2020-07-01 | No data | CHESTER STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk & roadway new flag installed and perm water cut in the p/l ifo property #543 |
2020-06-30 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway in front of 2416 and 2418. |
2020-06-30 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 134-03, Remove all plastic capping, & recess and re-seal all expansion joints as per subsection, on two restored concrete flags at this time. |
2020-06-30 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Ifo 134-03, Remove all plastic capping, & recess and re-seal all expansion joints as per subsection, on two restored concrete flags at this time. |
2020-06-30 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE PARKING LANE |
2020-06-30 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-06-30 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED 1/2 PLUS 5FT. HARDWARE ON SIDEWALK |
2020-06-29 | No data | EAST 72 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w i/f/o 1203 |
2020-06-29 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2020-06-29 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced ...... |
2020-06-28 | No data | INWOOD STREET, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012019035F64 on file. |
2020-06-28 | No data | 130 AVENUE, FROM STREET 146 STREET TO STREET INWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent to grade cut in the driving lane. |
2020-06-28 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1042-D specs. |
2020-06-28 | No data | LIBERTY AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with two temporary water restoration's, along the sidewalk. The respondent failed to permanently restore cuts within the required time. Permit expired on 12/31/2019. |
2020-06-27 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by permanent gas restoration |
2020-06-26 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in PL. in compliance |
2020-06-25 | No data | 35 AVENUE, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder paved over cut |
2020-06-24 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is good |
2020-06-24 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-06-24 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking and sidewalk, in front of 152 Wakeman Place. |
2020-06-24 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in PL/ new SW flags, in compliance |
2020-06-23 | No data | TURNBULL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent's with two permanent restorations on the roadway that did not conform with standard detail specification H 1042-D Note # 6 cut back. |
2020-06-23 | No data | 95 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012017341A37 on file. |
2020-06-23 | No data | SUNBURY ROAD, FROM STREET 120 AVENUE TO STREET IRWIN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm to grade |
2020-06-22 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2020-06-21 | No data | CHURCH AVENUE, FROM STREET EAST 42 STREET TO STREET EAST 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY |
2020-06-20 | No data | 120 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to cars parked in p/l at time of inspection. |
2020-06-20 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / Bike lanes. |
2020-06-17 | No data | 134 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade long cuts in the driving & parking lane. |
2020-06-17 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration reaching curb in compliance |
2020-06-17 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by B.P.P |
2020-06-16 | No data | WOODHULL AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint verified there is a hole in the street One steel plates covering a sewer excavation collapsing into to hole. The plate is about 9" in the hole. The location needs larger plate. Also the permit is expired. NICA issued. |
2020-06-16 | No data | WOODHULL AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent having 2 steel plate on the roadway that was smooth to the touch. Respondent's plates did not have skid resistance greater than or equal to the adjacent roadway surface as required. I ID by permit #Q012020062B16. |
2020-06-16 | No data | WOODHULL AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor made area temporary safe with an extra steel plate. |
2020-06-15 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the p/l |
2020-06-14 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-06-14 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on r.w |
2020-06-12 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway cut and sidewalk made perm. |
2020-06-11 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area is under an active DDC site. M012020135A31. |
2020-06-11 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway perm to grade |
2020-06-11 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY BPP |
2020-06-11 | No data | BEACH 26 STREET, FROM STREET DEAD END TO STREET SEAGIRT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm to grade cuts on roadway, temp SWK flag ,NOV to be issued on post audit |
2020-06-11 | No data | BEACH 26 STREET, FROM STREET DEAD END TO STREET SEAGIRT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary cut on SWK overdue for final |
2020-06-11 | No data | 97 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent roadway and sidewalk cuts to grade |
2020-06-11 | No data | WILLOUGHBY AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway is being resurfaced |
2020-06-11 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut in the roadway |
2020-06-10 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent ROCK E SMALL PLUMBING & HEATING INC currently has a temporary water restoration in the roadway extending into the parking lane 75 FEET FROM CORNER OF 3 AVENUE AKA 339 3 AVENUE, NOV D4F being issued |
2020-06-10 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water Restoration flush and Sealed in the roadway. |
2020-06-10 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK FLAG RESTORE WITHOUT A VALID DOT PERMIT |
2020-06-10 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL WATER CUTS IN THE ROADWAY |
2020-06-10 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2020-06-10 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING & HEATING INC failed to permanently restore the temporary water restoration in the roadway within the required time. Nov issued overdue for final |
2020-06-10 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 WATER CUTS ARE OVER DUE FOR FINAL NOV WILL BE ISSUED UNDER POST AUDIT |
2020-06-10 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration flush and sealed. |
2020-06-09 | No data | NORTHERN BOULEVARD, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade p/d/l |
2020-06-09 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the rd/w, curb to curb. Sidewalk flush and sealed |
2020-06-08 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in d/l is in compliance; s/w ok |
2020-06-08 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSION JOINT IN NEW REPAIR WATER SIDEWALK FLAG & PLEASE RESTORE DOUBLE YELLOW LANE MARKING DIVIDER OVER PERMANENT RESTORATION IN CENTER OF ROADWAY, IN FRONT OF 226 LIVINGSTON STREET BETWEEN ELM PLACE & HOYT STREET. |
2020-06-08 | No data | 147 AVENUE, FROM STREET 225 STREET TO STREET 226 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken domestic water service. Leaking by curb |
2020-06-07 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT ON ROADWAY |
2020-06-07 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-06 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #456 in compliance |
2020-06-06 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the bicycle lane in front of property #177 in compliance |
2020-06-04 | No data | EAST 72 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Active | Department of Transportation | checking ... crew on site all in complaince ,was advised to post a flag man |
2020-06-04 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2020-06-04 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL JOINTS/EDGES OF NEW PERMANENT RESTORATION ACROSS ROADWAY, IN FRONT OF 744 BEDFORD AVENUE BETWEEN FLUSHING AVENUE & PARK AVENUE. |
2020-06-04 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-02 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: LL14 | Department of Transportation | #1) 7ft, 10 inches x 5ft, 0 inches, down 4 1/2ft. 96.5% 96/9% WET 123.3 DRY 114.9 MAX 121.7 MOISTURE 7.3% CLEANFILL #2) 4ft, 8 inches x 4ft, down 3ft, 2 inches. 96.8% & 97.2% WET 123.0 DRY 114.4 MAX 116.5 MOISTURE 7.5% SAND |
2020-06-02 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane; sealed and flush |
2020-06-01 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-01 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration - in compliance |
2020-05-31 | No data | 150 AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012019179A08 on file. |
2020-05-29 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Active | Department of Transportation | Broken Domestic Water Service Leak in the Roadway. 3 Day Dep Notice Issued. |
2020-05-29 | No data | EAST 37 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: E-Number | Department of Transportation | No Work Started within the 2 Hour Grace Period. Will Return Later to Check Status. |
2020-05-28 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2020-05-24 | No data | 54 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #622 & 2 sidewalk flags installed in compliance |
2020-05-22 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA PASSED. There is a 3'6" x 3'3" temp restoration inside permanent water trench that was made to make area safe at time of inspection. |
2020-05-22 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 151-68, There is a 3'6" x 3'3" temp restoration inside permanent water trench, that is overdue for final restoration after completion of NICA condition. Finalize restoration. |
2020-05-22 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint Verified. 151-68, There is a 9" x 5" down 8" cave-in condition inside permanent water trench in the driving lane. Also, the asphalt is broken out and cracking around defective condition. Restore roadway immediately. |
2020-05-21 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired. Refer to permit #M012018113B56 on file. |
2020-05-21 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BPP 1/2+5 in compliance |
2020-05-19 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #555-557 in compliance |
2020-05-19 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2020-05-16 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY |
2020-05-15 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... water relay .... |
2020-05-10 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temporary restoration on sidewalk in compliance at time of inspection ,steel plate on roadway |
2020-05-08 | No data | BAY 14 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | seal ok |
2020-05-08 | No data | WILLOUGHBY AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration overdue for final |
2020-05-07 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut resealed. |
2020-05-06 | No data | DUNBAR STREET, FROM STREET MOTT AVENUE TO STREET PLUNKETT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two temp cuts made perm. |
2020-05-06 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A PERMANENT RESTORATION IN THE ROADWAY ON A PROTECTED STREET BUT FAILED TO OBTAIN A CONFIRMATION NUMBER AT LEAST 2 HOURS PRIOR TO THE COMMENCEMENT OF THE BACK-FILL AS REQUIRED PERMIT B012020052 B27 EXPIRED 3/24/2020 |
2020-05-06 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
2020-05-01 | No data | 106 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pile of back fill material stored on the street without proper protection |
2020-05-01 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATION DOWN 2 INCHES IN D/L OVERDUE FOR FINAL AND MAKE FLUSH TO GRADE |
2020-05-01 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION HAS NOT BEEN REPAIRED, TEMP RESTORATION DOWN 2 INCHES ON RW PERMIT EXPIRED, CAR TO BE ISSUE |
2020-05-01 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | In compliance |
2020-05-01 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION HAS BEEN REPAIRED, PERM WATER CUT IN THE PARKING LANE IFO 223 |
2020-05-01 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the parking lane in front of building #283 & 1 brand new sidewalk flag installed with water valve in compliance |
2020-04-30 | No data | 106 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department |
2020-04-29 | No data | LIBERTY AVENUE, FROM STREET 130 STREET TO STREET 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department . |
2020-04-28 | No data | WEST 182 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J |
2020-04-28 | No data | LIGHT STREET, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site, performing cut backs, getting ready to pave. Mayor Order, extents permit. |
2020-04-28 | No data | EAST 21 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code installed |
2020-04-27 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong photo attached to CAR, no defect as such found on segment or ifo mentioned in CAR issued |
2020-04-27 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates have been removed and the restoration has been finalized |
2020-04-26 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1 restoration final the balance of the roadway was resurfaced |
2020-04-26 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT HAVE BEEN MADE PERM TO GRADE |
2020-04-25 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut located in the roadway IFO Building #111, is missing color code IBM for identification (Year and Permittee), also fails wearing course is irregular and needs to be squared off as per 1042 specs |
2020-04-25 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm sewer restoration resealed |
2020-04-25 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Car to be reissued. Condition remains the same. |
2020-04-24 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate needs to be removed |
2020-04-24 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate needs to be removed |
2020-04-22 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent failed to properly seal and maintain the wearing course. Respondent failed to reseal perm sewer cut across roadway. CAR 20196200031 issued on 4/30/2019. condition remains the same |
2020-04-21 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut prem ok |
2020-04-20 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected |
2020-04-20 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSION JOINT IN NEW REPAIR WATER SIDEWALK FLAG & PLEASE RESTORE DOUBLE YELLOW LANE MARKING DIVIDER OVER PERMANENT RESTORATION IN CENTER OF ROADWAY, IN FRONT OF 226 LIVINGSTON STREET BETWEEN ELM PLACE & HOYT STREET. |
2020-04-20 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW CAR ISSUED |
2020-04-17 | No data | 97 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 water temporary cuts on roadway over due for final. |
2020-04-15 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut overdue for final. New CAR issued due to the emergency shut down. |
2020-04-15 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway cut remains overdue passing due to emergency shut down. |
2020-04-15 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT ON THE SIDEWALK HAVE BEEN MADE PERM |
2020-04-15 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration flush and sealed nearly curb to curb. |
2020-04-14 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue |
2020-04-14 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Will re-issue |
2020-04-14 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp cut on the sidewalk is overdue for final |
2020-04-14 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue. |
2020-04-14 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Will re-issue |
2020-04-14 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on the sidewalk is overdue for final |
2020-04-13 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY-OVERDUE FOR FINAL, AT 6 STREET BETWEEN 3 AVENUE & 4 AVENUE "AKA" 399 3 AVENUE. PLEASE PERMANENTLY RESTORE ROADWAY. |
2020-04-13 | No data | 97 AVENUE, FROM STREET 75 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temporary cut on roadway in compliance at time of inspection. |
2020-04-12 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm water cut found on roadway |
2020-04-10 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut opposite property in PL, in compliance |
2020-04-09 | No data | HEMPSTEAD AVENUE, FROM STREET 220 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to conduct proper inspection due to parked vehicle over cut. |
2020-04-08 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been resurfaced |
2020-04-08 | No data | 227 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade with some seal missing in the driving lane. No CAR issued at this time. |
2020-04-07 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent ROCK E SMALL PLUMBING & HEATING INC has restored now permanent water restoration flush to grade in the roadway extending into the parking lane 45 FEET FROM CORNER OF 3 AVENUE AKA PROPERTY #399 in complian |
2020-04-06 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This is not a gas cut, CAR should of never be approved. This is a plumber trench, CAR will be reissued, with current issues. |
2020-04-06 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut ;and seal the sidewalk expansion joints.Your patch work is unacceptable, full flag restoration is required. |
2020-04-05 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERMANENT RESTORATION IN ROADWAY & NEW SIDEWALK FLAGS |
2020-04-05 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration made flush |
2020-04-05 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMANENT RESTORATION IN ROADWAY & NEW SIDEWALK FLAGS(ALL FOUR TEMP RESTORATIONS RESTORED IN RWY 3 WERE DEP'S) WITH NEW PERMIT#B012020065D55 EXP 4/4/20 |
2020-04-05 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 TEMP CUTS IN THE ROADWAY OVER DUE FOR FINAL. NEW CAR BEING ISSUED |
2020-04-05 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 OVER DUE FOR FINAL TEMP CUTS IN THE ROADWAY |
2020-04-05 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration made flush |
2020-04-04 | No data | FOCH BOULEVARD, FROM STREET 171 STREET TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2020-04-04 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut perm |
2020-04-04 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. Will issue a new CAR. |
2020-04-04 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 172-22, There are two temporary water cuts that are over due for final restoration. Also, The two temp cuts have asphalt broken and cracked out in localized area's. In addition, two temp cuts are sunken 1" in the roadway. Finalize cuts. |
2020-04-02 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber cut in compliance |
2020-04-02 | No data | BEACH 26 STREET, FROM STREET DEAD END TO STREET SEAGIRT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Four temp r/w cuts and s/w overdue for perm restoration. |
2020-03-26 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-26 | No data | 109 AVENUE, FROM STREET 204 STREET TO STREET 205 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in roadway missing seal, and sidewalk flag is partially restored(patch work). Reseal all cut joints and fully restore sidewalk flag in kind. |
2020-03-24 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Covered by BPP |
2020-03-24 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut perm |
2020-03-20 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | THERE IS A BACKFILL TEMPORARY RESTORATION IN RWY WITH (WRONG TYPE 135 PERMIT)# B012020059D44 EXP 3/28/20 ON FILE |
2020-03-20 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | WORK NOT STARTED THERE IS A BACKFILL TEMPORARY RESTORATION IN RWY WITH (WRONG TYPE 135 PERMIT)# B012020059D44 EXP 3/28/20 ON FILE |
2020-03-19 | No data | CHURCH AVENUE, FROM STREET EAST 42 STREET TO STREET EAST 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is in compliance |
2020-03-19 | No data | LIGHT STREET, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber temp cuts to grade, 4 cones place on 1 cut. in compliance |
2020-03-19 | No data | LIGHT STREET, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two water cuts ( one temporary asphalt, the other debris mounted), on the roadway, sunken 2 to 7 inches. |
2020-03-18 | No data | 112 ROAD, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cut on parking/ driving lane. the in driving lane sunken 1/2 ". No action has been taken at this time. |
2020-03-18 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane / ifo blink gym |
2020-03-17 | No data | LIBERTY AVENUE, FROM STREET 114 STREET TO STREET 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At this time perm r/w and s/w cuts are maintained to grade. |
2020-03-17 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-03-16 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK & RWY RESURFACED NEW BUILDING |
2020-03-14 | No data | 106 AVENUE, FROM STREET INWOOD STREET TO STREET PRINCETON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut on r/w |
2020-03-14 | No data | 106 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | wk done in r/w |
2020-03-13 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, prem ... water svc ... relay .. |
2020-03-13 | No data | EAST 21 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install IBM color code identifying permittee. |
2020-03-12 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steen plate not fastened |
2020-03-10 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-09 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK RESURFACED |
2020-03-09 | No data | 212 PLACE, FROM STREET 90 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RESTORATION ON THE ROADWAY |
2020-03-09 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on roadway past BPP. In compliance. |
2020-03-09 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk plate not flushed |
2020-03-08 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut at 50 in d/l |
2020-03-06 | No data | MILLER AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY PARTIALLY COVERED BY GAS TRENCH |
2020-03-06 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-03-06 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Restoration needs to be Sealed |
2020-03-05 | No data | EAST 54 STREET, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}5FT X {W}3FT 5IN X {D}3FT 6IN TEST 97.6 97.2 CUT 2 {L}7FT 4IN {W}4FT 4IN X {D}3FT TEST 97.5 NO BASE SAW CUT BACKS WERE DONE CUT WAS REPLATED |
2020-03-05 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seal around perm trench. S/O 202 B30 St |
2020-03-05 | No data | EAST 54 STREET, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATIONS IN THE ROADWAY LONG WATER CUT. CREW ON SITE SETTING UP FOR BACK FILL |
2020-03-04 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUTS ARE PERM .. LONG WATER CUT |
2020-03-03 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to parked vehicles, unable to conduct proper inspection. |
2020-03-03 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp asphalt for ramping has been re installed. |
2020-03-03 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Ramping for steel plate |
2020-03-02 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-03-02 | No data | 167 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection, crew onsite, condition has been addressed and rendered safe. |
2020-03-02 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At 194 Ainslie St., •10'X11' Temporary restored cut in roadway |
2020-03-01 | No data | 167 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 9'3" x 8' permanent restoration with localized area adjacent to cut, down 3" posing a trip hazard in opposite side (i//f/o 116-22) of address provided. Restore roadway flush to grade and render safe. |
2020-02-28 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At 194 Ainslie St.,•10'X11' Temporary restored cut in roadway overdue for final during 2019-2020 Winter Moratorium. |
2020-02-28 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012018142D00) |
2020-02-28 | No data | LIGHT STREET, FROM STREET HARPER AVENUE TO STREET SECOR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site working in excavation.Site in compliance |
2020-02-27 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | having a 10'x11' cut in roadway, where 10'x5' area of cut was left with back fill material only. Respondent failed to install 4" of acceptable asphalt paving mixture for temporary pavement on full 10' x 11' cut after back fill phase. |
2020-02-26 | No data | SHEFFIELD AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CLOSED SIDE WALK CLOSED STIP 013 VIOLATION |
2020-02-25 | No data | DITMAS AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Keyspan's trench covering Plumbers cut in the roadway. Plumbers cut not observed. |
2020-02-24 | No data | BAY 14 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, needs to be resealed.In front of 200 Bay 14 Street between Bath Avenue and Cropsey Avenue. |
2020-02-24 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PERMIT TYPE 135# B012020035B17 EXPIRES 3/4/20- TEMP RESTORATION ON COLONIAL ROAD(WATER) & TEMP SWK & TEMP RWY & PLATED ON 82 STREET (SEWER) |
2020-02-24 | No data | 82 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration not located on 82 st. Temp water restoration in parking lane in front of 8120 Colonial Rd with new active permit on file. |
2020-02-24 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLEASE UNPINNED & UNRAMPED ROCK E SMALL PLUMBING&HEATING INC STEEL PLATE ON ROADWAY, AT 82 STREET BETWEEN COLONIAL ROAD & NARROWS AVENUE "AKA" 8120 COLONIAL ROAD. |
2020-02-23 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street joint sealer is broken along the plumber cuts in driving lane in front of 2316 - 2318 East 15 Street - Re-apply sealer |
2020-02-21 | No data | 82 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp water restoration located in parking lane of 8120 Colonial rd. Active permit on file. |
2020-02-21 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Four sidewalk flags restored in kind (joints sealed). Roadway recently resurfaced/repaved by DOT. |
2020-02-21 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two temp r/w cuts overdue for perm. |
2020-02-19 | No data | WILDER AVENUE, FROM STREET BUSSING AVENUE TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | The respondent has fail to begin emergency work withing 2 hours after authorization. No street or sidewalk opening found at this location, as a result this summon was issued. |
2020-02-19 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DDC reconstruction |
2020-02-19 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMITTEE FAILED TO PERMANENTLY RESTORE TWO (2) TEMPORARY CUTS ON THE ROADWAY IN THE DRIVING AND PARKING LANE CONDITION IS OVERDUE FOR FINAL. PERMIT# B012018034A00 EXP. 3/4/18 RESTORE ROADWAY IN KIND AT 709 HENDRIX ST. BTW NEW LOTS AVE & HEGEMAN AV |
2020-02-18 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm ... |
2020-02-17 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-17 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A PLATED EXCAVATIONS ON THE ROADWAY IN THE PARKING LANES WITHOUT A VALID DOT PERMIT TO DO SO , ABOVE PERMIT # EXPIRED ON 12/31/19 |
2020-02-17 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV CODE D02 WAS WRITTEN ON NEWER PERMIT ON 2/17/20 |
2020-02-17 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR HAD A STEEL PLATED STREET OPENING DOWN 1 FOOT IN A PROTECTED ROADWAY(BACKFILL ONLY-NO BASE WORK DONE)-WITHOUT A VALID DOT PERMIT TO DO SO. PLATED STREET OPENING PROTECTED ROADWAY-NO PERMIT. |
2020-02-17 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER & SEWER RESTORATION DOWN 2 1/2 INCHES IN CENTER OF ROADWAY& OVERDUE FOR FINAL, IN FRONT OF 165 STOCKHOLM STREET BETWEEN WILSON AVENUE & KNICKERBOCKER AVENUE. PLEASE PERMANENTLY RESTORE ROADWAY. |
2020-02-17 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED BACKFILL RESTORATION DOWN 1 FOOT IN RWY-NO CONCRETE BASE IN STREET OPENING |
2020-02-16 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK OVERDUE FOR FINAL PLUS CUT IN PARKING NEED TO BE SEALED |
2020-02-15 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed above respondent to maintain a steel plated excavation 12 inches deep on roadway with an expired DOT permit.The above permit expired on 2/04/20,no active permit found at this time."Rock e small" sign on plates used to identify contractor. |
2020-02-15 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY RESTORATION IN ROADWAY DOWN 3 1/2 INCHES, IN FRONT OF 223 CENTRAL AVENUE BETWEEN STANHOPE STREET & HIMROD STREET. PLEASE RESTORE TO GRADE. |
2020-02-15 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PASS. There is cold patch that was applied to the corners of steel plates at time of inspection. This creates a ramping material for vehicular traffic at this time. |
2020-02-15 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate on r/w not countersink,raised 2.5 inches above grade on driving lane pose a dangerous condition to the vehicular traffic at this time.FYI - permit expired,no active permit found - NOV's issued.RockESmall signs on the plates. |
2020-02-15 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2020-02-14 | No data | HALSEY STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back-fill completed 12 inch cutback wasn't made no base restored cut left plated i sprayed for the cutback |
2020-02-14 | No data | SCHAEFER STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 6ft 5in x 4ft 2in x 11incement barrel mixer was used |
2020-02-13 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file:B012020036B38 |
2020-02-13 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATIONS IN SWK & ROADWAY- DIRT RWY IN PK LANE- NO BASE ON PROTECTED STREET-NO BASE CALLED IN- ONLY APPLIED FOR FINAL RESTORATION IN NYC STREETS |
2020-02-13 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-02-12 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Stip violation |
2020-02-11 | No data | HEMPSTEAD AVENUE, FROM STREET 217 LANE TO STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut with missing seal and broken and missing asphalt. Reseal cut joints and restore cracked/missing asphalt. Unable to spray cut due to heavy traffic. |
2020-02-11 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts in the roadway |
2020-02-10 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced by nycdot |
2020-02-10 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Full width of the roadway is open to traffic at end of permittee work day |
2020-02-10 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012018235A31) |
2020-02-09 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 temp cuts on r/w. |
2020-02-08 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A PLATED EXCAVATIONS ON THE ROADWAY IN THE PARKING LANES WITHOUT A VALID DOT PERMIT TO DO SO , ABOVE PERMIT # EXPIRED ON 12/31/19 |
2020-02-08 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate with Rock E Small markings, failed to countersink, N O V issued on 2.7.2020 |
2020-02-07 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit X012020035A78 |
2020-02-07 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The respondent failed to countersink “ ROCK E SMALL PLUMBING & HEATING INC” marked steel plates in roadway as per the 2019-2020 winter moratorium |
2020-02-06 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane/ bus lane |
2020-02-06 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, install water .... long water .....sprinkler |
2020-02-06 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-02-05 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates not counter sunken |
2020-02-05 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Use of street without permit |
2020-02-05 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed respondent identified by NYC DOT permit having a pile of debris stored in the roadway while site un-attended. Above permit used as identification expired on 1/25/2020 and debris remains onsite. |
2020-02-05 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | new permit on file:B012020036B38.New permit expires 03/05/2020 |
2020-02-05 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | HALF PLUS 5 FEET ROADWAY & SIDEWALK RESURFACED WITH VALID DOT PERMIT |
2020-02-03 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway is resurfaced |
2020-02-01 | No data | CARROLL STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #130 in compliance |
2020-02-01 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012018142D00) |
2020-02-01 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | condition previously reported |
2020-02-01 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A PLATED EXCAVATION ON THE ROADWAY IN THE PARKING LANES WITHOUT A VALID DOT PERMIT TO DO SO , ABOVE PERMIT # EXPIRED ON 12/31/19 |
2020-02-01 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT IN THE PARKING LANE OVERDUE FOR FINAL |
2020-02-01 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the roadway flush and sealed |
2020-01-31 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, resurfaced due to c of o...east bound |
2020-01-30 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass... |
2020-01-30 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE RESPONDENT FAILED TO PLACE PINS ON THEIR SEWER STEEL PLATES ON THE ROADWAY PREVENTING MOVEMENT. |
2020-01-30 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I OBSERVED THE RESPONDENT HAS FAILED TO COUNTERSINK THEIR STEEL PLATE IN THE DRIVING LANE I/F/O 162-12 73 AVENUE. PLATES ON THE ROADWAY NOT FLUSH WITH THE ROADWAY. RESPONDENT IDENTIFY THROUGH NAME ON PLATES. |
2020-01-29 | No data | BOSTON ROAD, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate cut due to vehicles parked |
2020-01-29 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-01-28 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | CAR already issued for cut in parking lane. |
2020-01-28 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts found on roadway |
2020-01-28 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the driving lane flush and sealed |
2020-01-27 | No data | 108 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number. |
2020-01-27 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At 52 HerbertSt., 2- cuts made into one perm |
2020-01-26 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | At 52 Herbert St.,•4.5'x12' Cut with binder only, in parking lane, 1"-2" under grade with surrounding pavement.•4'x6' & 4.5'x12' Cuts with binder only, overdue for final restoration during 2019-2020 Winter Moratorium. |
2020-01-26 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | having unattended 4'x6' cut temporary restored with binder in roadway, 3" under grade with surrounding pavement, after being notified by NICA CAR #20204960026 of condition at 1:22pm on 1/26/20, and condition remains. |
2020-01-26 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-01-25 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV#0702176458 WAS WRITTEN 10/13 FOR FINAL RESTORATION WORK NO PERMIT |
2020-01-25 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | SIDEWALK RESTORED- TEMP RESTORATION IN RWY; CAR #20204510076 WAS ISSUED 1/24/20 |
2020-01-25 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PASS. Perm trench across the roadway at time of inspection. |
2020-01-25 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Cuts perm to grade at time of inspection, in compliance. |
2020-01-25 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV# 0702261048 WAS WRITTEN FOR PERFORMING FINAL RESTORATION WITHOUT A VALID DOT PERMIT |
2020-01-24 | No data | 148 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Roadway has been resurfaced. |
2020-01-24 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION DOWN 2 AND A HALF INCH IN ROADWAY IN FRONT OF 330 MYRTLE AVE BETWEEN CARLTON AVE AND CARLTON AVE. PLEASE RESTORE ROADWAY TO GRADE. |
2020-01-24 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work that was done no longer visible. Roadway found resurfaced ifo property #643 - 647 |
2020-01-23 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NEW FLAG, BASE RESTORATION IN RWY NOT RECT OR SQUARE- POSSIBLE 1042 CAR |
2020-01-23 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Stip violation |
2020-01-23 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [11/18/2019]. |
2020-01-23 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION IN ROADWAY-OVERDUE FOR FINAL, IN FRONT OF 402 HANCOCK STREET BETWEEN THROOP AVENUE & MARCUS GARVEY BLVD . PLEASE PERMANENTLY RESTORE SHORT WATER TEMPORARY RESTORATION IN ROADWAY. |
2020-01-23 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A PLATED EXCAVATION ON THE ROADWAY IN THE PARKING LANES WITHOUT A VALID DOT PERMIT TO DO SO , ABOVE PERMIT # EXPIRED ON 12/31/19 |
2020-01-22 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade |
2020-01-22 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 5ft 6in (W): 5ft (D): 4ft - 97.4%; 97.3%Located in P/L IFO 411A.Cutbacks to be made.Arrival: 10:00AMDeparture: 12:10PM |
2020-01-22 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO 116, there are four 'ROCK E SMALL PLUMBING' marked steel plates in the driving lane, that are loose and VERY noisy. Also, two steel plates are shifted (2'x7") gap; that goes down up to 3'. Plates are overlapped. As per Karen Johnson - no connecti |
2020-01-22 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates has been cautioned off with tape and cones area has been made safe for vehicles driving in area |
2020-01-21 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates need to be reset and fasten |
2020-01-21 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-01-21 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut located in the roadway IFO Building #111, is missing color code IBM for identification (Year and Permittee), also fails wearing course is irregular and needs to be squared off as per 1042 specs |
2020-01-21 | No data | TURNBULL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | s fail to post their permittee information sign or information sign was found missing, at this water service operation. No permit number, name, telephone, dates information sign found in or around this site, and as a result, this summons was issued. |
2020-01-20 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VIOLATION D1B / TEMP RESTORATION IN THE ROADWAY AND TEMP SIDE WALK NEW PERMIT ON FILE |
2020-01-18 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent (ROCK E SMALL PLUMBING) with 2 counter sunken steel plate street openings in the roadway. Respondent failed to post steel plates ahead or raise plow sign as per 2019 winter moratorium policy. |
2020-01-16 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-119.4, Dry-Den-113.4, Max. Dry-Den-119.0, Act. Moist-5.3, Material- Clean fill, Test-Sand cone, Lab- Exclusive Testing Labs, Lab tech- Eon, Compaction results- (98.3, 98.8) |
2020-01-16 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A PLATED EXCAVATION ON THE ROADWAY IN THE PARKING LANES WITHOUT A VALID DOT PERMIT TO DO SO , ABOVE PERMIT # EXPIRED ON 12/31/19 |
2020-01-15 | No data | SACKMAN STREET, FROM STREET SOMERS STREET TO STREET TRUXTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk |
2020-01-15 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-01-15 | No data | FLUSHING AVENUE, FROM STREET WASHINGTON AVENUE TO STREET WAVERLY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Leak in the Sidewalk Water Coming Up. 3 Day Dep Notice Issued. |
2020-01-13 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site to reset shifted plates. In compliance. |
2020-01-13 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-124.8, Dry-Den-112.6, Max. Dry-Den-116.2, Act. Moist-10.9, Material- Clean fill (Blend), Test- Sand cone, Lab -Mobil Testing Labs, Lab tech- Mike, Compaction Results-(97.2, 96.9) (Note: WiFi connection was lost, LL14 start time was 11:19am) |
2020-01-13 | No data | CHESTER STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMP TO GRADE CUT ON THE SIDE WALK AND CREW WORKING WORKING IN OPEN EXCAVATION IN THE PARKING LANE |
2020-01-13 | No data | CHESTER STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}3FT X {W}2FT 6IN X {D}2FT 5IN TEST 95.6. BASE SAW CUT BACKS ARE BEING DONE ARRIVED 1245 FINISHED 150. STAYING FOR BASE |
2020-01-13 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A PLATED EXCAVATION ON THE ROADWAY IN THE PARKING LANES WITHOUT A VALID DOT PERMIT TO DO SO , ABOVE PERMIT # EXPIRED ON 12/31/19 |
2020-01-12 | No data | 77 AVENUE, FROM STREET 138 STREET TO STREET 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flushed to grade in the roadway extending into the parking lanes in front of property #138-19 in compliance |
2020-01-12 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | In front of 116 E116st there is a steel plate shifted 6 inches in the driving lane. |
2020-01-11 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in the parking lane overdue for final |
2020-01-11 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut IFO 1227. CAR will be issued to latest permit |
2020-01-11 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flushed to grade in the roadway extending into the parking lanes in front of building #69-09 & 1 sidewalk flag installed with water valve in compliance |
2020-01-11 | No data | CHESTER STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking out of sidewalk,short water ,one excavation made on the sidewalk and roadway at time of inspection. |
2020-01-10 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed |
2020-01-10 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-01-09 | No data | SNEDIKER AVENUE, FROM STREET DE WITT AVENUE TO STREET STANLEY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Basement Property Owner on Site |
2020-01-09 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cut overdue for final |
2020-01-09 | No data | 78 AVENUE, FROM STREET 60 LANE TO STREET 60 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | sidewalk flags restored and roadway cut paved |
2020-01-07 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway ok. |
2020-01-07 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 312 Devoe St.•5'x8' & 2.5'x8' Binder cut 2" |
2020-01-07 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | having 5'x8' & 2.5'x8' temporary restored cuts in roadway, both 2" undergrade with surrounding pavement. Respondent failed to install 4" temporary pavement after back fill phase. |
2020-01-07 | No data | UNION HALL STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2019 work found, permit expired. |
2020-01-07 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " STEEL PLATES AHEAD" OR "RAISE PLOW" SIGNS , ALSO FAIL TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/19 AND ENDS ON 3/31/2020 |
2020-01-06 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp s/w and r/w made perm. |
2020-01-06 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seal around perm cut.Cut opp to 708 not cutback. |
2020-01-06 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 312 Devoe St.•5'x8' & 2.5'x8' Binder cut 3" |
2020-01-06 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | having unattended 5'x8' & 2.5'x8' temporary restored cuts in ropadway sunken 3" under grade with surrounding pavement, after being notified by NICA CAR #20204960005 of condition at 3:02pm on 1/6/20, and condition remains. |
2020-01-05 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #250 |
2020-01-05 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid dot permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2020-01-05 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 255 union avenue |
2020-01-05 | No data | MESEROLE STREET, FROM STREET BUSHWICK PLACE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2020-01-04 | No data | POWERS STREET, FROM STREET BEND TO STREET CATHERINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #283 |
2020-01-04 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to comply with the terms and conditions of stipulation #020, restore all travel lanes to all ongoing vehicular traffic during non-work hours. Nov issued |
2020-01-04 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 131-45, There is a 1" mound on perm water cut in the parking/driving lane. Restore roadway with surrounding area. |
2020-01-04 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PASS. Perm cut in the p/l at time of inspection, in compliance. |
2020-01-04 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 TEMP CUTS ON R/W OVERDUE FOR FINAL. |
2020-01-03 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid DOT permit on file for the 2 steel plate street openings counter sunken in the roadway on a protected street. Nov issued |
2020-01-03 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp water cut sunken 2" on parking/driving laneTemp water cut overdue for final restoration |
2020-01-03 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp cut on parking/drive lane overdue for final restoration, Car to be issued as per winter moratorium, Temp cut 2" below grade NOV to be issued |
2020-01-02 | No data | TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent activity working in an open excavation on the sidewalk without a valid DOT permit on file IFO 2910. Permit used for ID expired on 12/31/19. |
2020-01-02 | No data | 131 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts to grade in the d/p/l. |
2020-01-02 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV Re-inspection: FAILED, condition remains, will issue CAR to latest permit for overdue for final, during 2019-2020 winter moratorium. |
2020-01-02 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two temporary water restorations, within opposite side of parking lanes, overdue for final restoration. Permittee notified by means of NOV #0702217845, Permit ended 12/31/18, condition remains in temporary state. |
2020-01-02 | No data | DUNBAR STREET, FROM STREET MOTT AVENUE TO STREET PLUNKETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7' x 4' and 5' 3' temporary roadway cuts are overdue for final restoration; as per the winter moratorium which begins December 1st, 2019 and ends March 31st , 2020. |
2020-01-02 | No data | 111 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in parking / driving lane opposite 107-23 flushed to grade |
2020-01-02 | No data | DUNBAR STREET, FROM STREET MOTT AVENUE TO STREET PLUNKETT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 7' X 4' X 2'' and 5' x 3' x 4'' Temporary roadway cuts are sunken in the driving and parking lane needs repair. |
2020-01-02 | No data | DUNBAR STREET, FROM STREET MOTT AVENUE TO STREET PLUNKETT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time two temp roadway cuts maintain to grade. |
2020-01-01 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY-OVERDUE FOR FINAL, AT 6 STREET BETWEEN 3 AVENUE & 4 AVENUE "AKA" 399 3 AVENUE. PLEASE RESTORE ROADWAY. |
2020-01-01 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (P/L) found to be in compliance |
2020-01-01 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSION JOINT IN NEW REPAIR WATER SIDEWALK FLAG & PLEASE RESTORE DOUBLE YELLOW LANE MARKING DIVIDER OVER PERMANENT RESTORATION IN CENTER OF ROADWAY, IN FRONT OF 226 LIVINGSTON STREET BETWEEN ELM PLACE & HOYT STREET. |
2020-01-01 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid dot permit on file for the steel plate street openings ramped & pinned in the roadway. Nov issued |
2019-12-30 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm is for work under M012017223D00. |
2019-12-29 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid dot permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2019-12-29 | No data | 143 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/p/l. |
2019-12-28 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to comply with the terms and conditions of stipulation #020, restore all travel lanes to all ongoing vehicular traffic during non-work hours. Nov issued |
2019-12-28 | No data | MERRICK BOULEVARD, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 Cuts , 1 temp cut on the sidewalk , 1 temp cut in the driving lane and last temp cut located on the opposite median in the driving lane |
2019-12-28 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL failed to post steel plates ahead or raise plow sign as per the 2019 winter moratorium policy. Nov issued |
2019-12-27 | No data | RIDGEWOOD AVENUE, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation on the PL |
2019-12-27 | No data | RIDGEWOOD AVENUE, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Temp cut in PL. length 5f 6in, width 3ft 9in, depth 3ft. WD 114.9 DD 104.6 MD 107.3 AM 9.9. 1 lift 95.7%. IFO 464 |
2019-12-27 | No data | UNION HALL STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts overdue |
2019-12-27 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid dot permit on file for performing work in the roadway for the installation of new sewer & water services. Nov issued foreman has informed me he is not concerned with DOT permits |
2019-12-27 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Active | Department of Transportation | cuts not flushed |
2019-12-27 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two (2) water perm water restorations in the roadway with visible cracks. |
2019-12-27 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid DOT permit on file for the 2 steel plate street openings counter sunken in the roadway on a protected street. Nov issued |
2019-12-25 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in the parking lane |
2019-12-24 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp water cut on sidewalk and 2 plated excavation in the roadway opposite each other ifo property #8712. NOV TO BE ISSUED TO NEWEST PERMIT (B012019352D17) ON FILE FOR FAILURE TO COUNTER-SINK STEEL PLATES DURING THE WINTER MOARTORIUM PERIOD. |
2019-12-24 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued on permit M012019227A73 |
2019-12-24 | No data | AVENUE J, FROM STREET EAST 87 STREET TO STREET EAST 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO POST RAISE PLOW SIGNS & FAILED TO COUNTER SINK TWO (2) STEEL PLATES DURING THE WINTER MORATORIUM MONTHS WHICH BEGAN ON 12-1-19 AND ENDS ON 3-31-20 ABOVE PERMIT# B012019352D17 USED FOR ID. |
2019-12-24 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to post steel plates ahead or raise plow sign & countersink steel plate street openings flush with the roadway as per the 2019 winter moratorium policy. Nov issued |
2019-12-24 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced. No defects to report |
2019-12-23 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration however unable to view work properly due to parked cars. |
2019-12-23 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:55A End: 12:15PCUT#1: L: 5FT. 9IN. W: 4FT. 2IN. D: 3FT. 4IN. (96.2%)CUT#2: L: 3FT. 3IN. W: 3FT. 0IN. D: 3FT. 0IN. (95.6%)CUT#3: L: 10FT. W: 2FT. 3IN. D:3FT. 2IN. (95.5%)WD: 136.5 DD: 122.9 MD: 123.0 MST: 11.1% |
2019-12-23 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by half plus five. Cut no longer visible. |
2019-12-22 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BBP 1/2+5 |
2019-12-21 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to obtain a valid dot permit on file for the steel plate street opening counter sunken in the roadway on a protected street. Nov issued |
2019-12-21 | No data | 109 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | one temp cut on r/w |
2019-12-21 | No data | FARRAGUT ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced roadway, 1/2 plus 5ft ifo new residential building. |
2019-12-21 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | FINAL RESTORATION -PERM ROADWAY |
2019-12-20 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | having a non-countersunk steel plate without any steel plate warning signs posted, covering excavation in roadway. Respondent failed to post steel plate warning sign & countersink steel plate flush roadway during 2019/2020 Winter Moratorium. |
2019-12-20 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL failed to post steel plates ahead or raise plow sign as per the 2019 winter moratorium policy. Nov issued |
2019-12-20 | No data | DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp water restoration in the roadway & steel plate street opening counter sunken in the extending into the parking lane opposite from property #312 |
2019-12-19 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition remains, new CAR issued |
2019-12-19 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration in the parking lane is overdue for final restoration. |
2019-12-18 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp still in sidewalk; summons to be issued on recent expired permit. |
2019-12-18 | No data | ALSTYNE AVENUE, FROM STREET BEND TO STREET JUNCTION BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Area p/d/l paved to grade by the builder(BPP). |
2019-12-18 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CONDITION WAS RECTIFIED TEMPORARY RESTORATION IN THE PARKING LANE WAS MADE PERMANENT. |
2019-12-18 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary sewer excavation in sidewalk over due for final; failure to permanently restore cut before winter moratorium period and or before expiration of permit 12/25/2018 |
2019-12-17 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent ROCK E SMALL PLUMBING failed to post steel plates ahead or raise plow sign as per 2019 winter moratorium policy. Nov issued |
2019-12-16 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | The respondent with a water and sewer cut on the street has permanently restore cuts. . |
2019-12-16 | No data | AINSLIE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | D30 ISSUED ON 12/16/2019. Respondent failed to comply with OCMC 020 stipulation |
2019-12-16 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | cut covered by new building construction. |
2019-12-15 | No data | HINCKLEY PLACE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-14 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-12 | No data | 15 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site working with a flag man posted, traffic moving. |
2019-12-12 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | r\w paved |
2019-12-11 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | pass |
2019-12-11 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp gas asphalt cut is overdue for final |
2019-12-11 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CONCRETE BASED RESTORATION NOT FINALIZED. {OVER DUE FOR FINAL} CAR ISSUED |
2019-12-11 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CUTS IN THE PARKING LANE STILL TEMP NEW FINAL RESTORATION PERMIT B012019337D05 ON FILE |
2019-12-11 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | TEMP CUT IN THE PARKING LANE FINAL RESTORATION PERMIT B012019326B99 ON FILE |
2019-12-11 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUT IN THE PARKING LANE NOT SQUARED OFF |
2019-12-10 | No data | HEMLOCK STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | there is still a binder water cut in the parking lane in front of 271 hemlock street that is over due for final. C.A.R will be reissued. |
2019-12-09 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is 2 water cuts in the parking lane in front of 709 that is over due for final |
2019-12-09 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | there is still 2 water cuts in the roadway over due for final C.A.R was reissued |
2019-12-07 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW SWK FLAG TEMP RESTORATION IN RWY WITH NEW PERMIT#B012019326A61 EXP 12/21/19 TYPE 135 |
2019-12-07 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp work done on the sidewalk overdue |
2019-12-07 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp on the sidewalk overdue |
2019-12-07 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PERM RESTORATION IN PK LANE OF ROADWAY |
2019-12-07 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | 2 TEMP RESTORATIONS IN RWY- NEW PERMIT #B012019325B60 EXP 12/20/19 TYPE135 |
2019-12-07 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | now fully paved ...... |
2019-12-06 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plated shifted back into position & additional ramping material applied around steel plates |
2019-12-06 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Plates in roadway shifted and deflecting as car drive over. Ifo 116 east 116th street |
2019-12-06 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-05 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CAR TO BE WRITTEN |
2019-12-05 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR HAD NEW PERMANENT 4 FEET X 4 FEET REPAIR WATER RESTORATION IN ROADWAY(AFTER RECEIVING NO#0702232310 ON 11/16/19)-WITHOUT A VALID DOT PERMIT TO DO SO.FINAL RESTORATION WORK-NO PERMIT. |
2019-12-05 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Water valve in s/w & s/w in compliance. |
2019-12-04 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm water cut in the roadway in front of #8913 |
2019-12-04 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CAR# 20194510950 WAS WRITTEN 12/2/19 |
2019-12-04 | No data | 29 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | car parked at location ,unable to see if work was done at site |
2019-12-04 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Sidewalk restored in kind in front of 246. |
2019-12-04 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV WAS WRITTEN FOR RESTORATION OF RWY & SWK WITHOUT A PERMIT |
2019-12-03 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Roadway re-surfaced . |
2019-12-03 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut ok. |
2019-12-02 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION IN ROADWAY-OVERDUE FOR FINAL AT 330 MYRTLE AVENUE BETWEEN CARLTON AVENUE & CARLTON AVENUE. |
2019-12-02 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE BASED RESTORATION NOT FINALIZED. {OVER DUE FOR FINAL} |
2019-12-02 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO TEMP TO GRADE CUTS IN THE ROADWAY NEW PERMIT SUBMITTED IN NYC STREETS. |
2019-12-02 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on opp side of roadway. |
2019-11-30 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED |
2019-11-30 | No data | 109 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp rd/w work in front of a build operation |
2019-11-30 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #782 |
2019-11-30 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE RESTORATION ON THE SIDEWALK WITHIN REQUIRED TIME, LAST PERMIT ON FILE #B012018309C76 EXPIRED 12/7/2018 |
2019-11-29 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #171 |
2019-11-29 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE 2 TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-11-29 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp water restoration in the roadway of the driving lane in front of property #117 |
2019-11-29 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp water restoration in the roadway of the driving lane in front of property #117. Valid final restoration permit obtain on file #B012019326A61 expires 12-29-2019 CAR will be immediately issued if not flushed within required time |
2019-11-27 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working back filling a open excavation, the roadway is currently milled. |
2019-11-27 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Double yellow lane markings restored |
2019-11-27 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | S/w replaced |
2019-11-26 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated recent permit on file |
2019-11-26 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed on roadway |
2019-11-25 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED CUT 1 {L}3FT X {W}3FT X {D}3FT TEST 97.6 97.7 CUT 2 {L}5FT X {W}3FT 2IN {D}3FT TEST 95.1 95.4 |
2019-11-25 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The respondent was found working actively on site in roadway. Upon inspection contractor failed to display the required signs at work site indicating work start, work end dates, along with Permittee name and type of work being performed. |
2019-11-25 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 OPEN EXCAVATIONS IN THE ROADWAY/PARKING LANE CREW ON SITE AWAITING BACK FILL |
2019-11-25 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O/ I oberseved the above respondent had failed to reseal wearing course restoration. After CAR# 20196630413 was issued on 11/14/19. |
2019-11-24 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV WAS WRITTEN FOR RESTORATION OF RWY & SWK WITHOUT A PERMIT |
2019-11-24 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #45 |
2019-11-23 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the respondent failed to permanently restore roadway excavation within required time. Street cut left with temporary asphalt down 2 inches awaiting final restoration. Permit expired 9/24/2019 |
2019-11-23 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV for overdue for final will be issued |
2019-11-21 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition remains. Summons will be issued. |
2019-11-21 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary restoration in roadway not permanently restored within the required time. Permit expired 11/22/2018. |
2019-11-21 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Valid permit; 020 stip - storage of material. |
2019-11-21 | No data | HERBERT STREET, FROM STREET BQE EB EXIT 33 TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/ respondent's sub-contractor had debris, rocks, broken asphalt & concrete obstructing gutter. Permittee identified by DOT permit#B012019291C14 Exp.11/22/19 |
2019-11-21 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | perm restoration in r/w & s/w flag restored |
2019-11-21 | No data | CROWN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2019-11-20 | No data | RIDGEWOOD AVENUE, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a plated water cut in the parking lane in front of 464 ridgewood ave that is over due for final. they fail to permanently restore their cut within the required time. their permit expired on 11/8/19 |
2019-11-19 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAG HAS BEEN FULLY REPLACED AND TEMPORARY RESTORATION IN THE PARKING LANE HAS BEEN MADE PERMANENT. |
2019-11-19 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed that the above respondent failed to permanently restore temporary asphalt gas cut within required time. Notified via CAR#20191380210 on 9/4/2019 |
2019-11-17 | No data | UTICA AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE FOR NEW BUILDING |
2019-11-17 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent has a temporary gas excavation in sidewalk over due for final; failure to permanently restore cut within required time. Permit expired 12-11-19 and used for I.D. |
2019-11-16 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #325 Gates Avenue |
2019-11-16 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-11-15 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Roadway cut has been restored permanently. |
2019-11-14 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV D4F WAS WRITTEN 11/11/19 |
2019-11-14 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #399 3 Avenue in compliance |
2019-11-14 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One trench in the driving lane having 50%+ edge cracking at this time needs to be resealed |
2019-11-14 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR failed 3 or more times. Permittee placed on hold until work is completed. |
2019-11-13 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | OVER DUE WATER CUT IN THE ROADWAY |
2019-11-13 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | OVER DUE FOR FINAL WATER CUT IN THE ROADWAY |
2019-11-13 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been sealed on rw |
2019-11-13 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a temp cut in the driving lane overdue for final I/F/O 2104 Ryer Ave. |
2019-11-13 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Has updated permit Re-issued. NOV permit # X012018290A63 expired on 11/15/18. |
2019-11-13 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O, I observed the respondent failed to properly Re-seal and maintain the wearing course on a permanent roadway cut. Respondent was notified prior by Car # 20191260272 on 8/7/19 to repair condition and did not. |
2019-11-13 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Sidewalk restored in kind. |
2019-11-12 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CONCRETE BASED RESTORATION NOT FINALIZED |
2019-11-12 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | nov pending |
2019-11-12 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | nov pending .... |
2019-11-12 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Trench has been patched and is perm to grade. |
2019-11-12 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Cut remains temp. NOV was isssued on 11/10/19. |
2019-11-12 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Patch work not restored on sidewalk flag. |
2019-11-12 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV WAS WRITTEN D4F ON 11/12/19 |
2019-11-11 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY&SIDEWALK WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012019239B61 |
2019-11-11 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #4110 in compliance |
2019-11-10 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO PERMANENTLY RESTORE A TEMPORARY LONG WATER REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-11-10 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE 2 TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-11-10 | No data | CROWN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2019-11-10 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-09 | No data | ADRIAN AVENUE, FROM STREET TERRACE VIEW AVENUE TO STREET WEST 227 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in Basement went in to Verify. |
2019-11-08 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [08/22/2019] |
2019-11-08 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 3 temp cuts down 1 1\2 in |
2019-11-07 | No data | 112 ROAD, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Ifo 217-13, There is still half of sunken cut that has not been made safe at this time. Permittee needs to apply more asphalt to sunken condition. |
2019-11-06 | No data | 112 ROAD, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | F/O 217-13 one temporary water cut 7' by 5' down 3" also 217-15 one sewer cut 12' by 5' down 3" and 217-19 & 21 One temporary sewer cut 12' by 5' down 3' in d/l not flush. |
2019-11-06 | No data | 112 ROAD, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | nica re-inspection failed - It just an attempted to bring to grade temp /restoration... still 7' x 7' area below grade at driving lane |
2019-11-04 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench has been patched in parking lane. Restoration color coded. In compliance. |
2019-11-04 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD SAW CUT ROADWAY 10 FEET BY 5 FEET TO PERFORM"FINAL RESTORATION" REPAIR WATER IN PROTECTED STREET(ROADWAY) |
2019-11-04 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT |
2019-11-03 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BBP 1/2+5 |
2019-11-03 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-02 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration has been resealed |
2019-11-02 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent with temp water restoration in the roadway over due for final. Nov issued |
2019-11-02 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Full flag replacement was not done. |
2019-10-31 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours to the commencement of the backfill. Permit expired 9/10/19. Respondent failed to obtain a confirmation number from the department. |
2019-10-30 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-10-29 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to restore in kind all roadway pavement markings, and any parking or regulatory signs or supports. |
2019-10-27 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed with water valve in front of property #455 in compliance |
2019-10-26 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATION AT BUILDING OPERATION - RWY RE-PAVE NEW PERMIT #B012019270B72 EXP 10/29/19 |
2019-10-26 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the Respondent had a Temporary Domestic Water & Sewer Plug ( Cut) on a Protected Street without a Valid Permit. Cited Permit Expired on 10/23/19. After Research no Active Permit was Found in the System. |
2019-10-26 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane has an 09 IBM tag. No new work observed. New building operation. |
2019-10-25 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to comply with H-1042D spec |
2019-10-24 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE 2 TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-10-24 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cut in the parking lane |
2019-10-23 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O i observed that the respondent failed to permanently restore two temporary water cuts in the roadway within the required time. Above permit expired on 12/31/2018 |
2019-10-23 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY&SIDEWALK WITHIN REQUIRED TIME |
2019-10-22 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must restore Double yellow lane markings that are missing IFO 2315. |
2019-10-21 | No data | WEST 33 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active Construction site unable to view work with No work found on the North side of the Street. |
2019-10-20 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV WAS WRITTEN FOR RESTORATION OF RWY & SWK WITHOUT A PERMIT |
2019-10-18 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i observed, two temporary water install cuts ,belonging to the above respondent, found cuts long overdue for final paving, found permit b012019205c48 to have exp since 8/28/19.i suued an nov |
2019-10-18 | No data | 134 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Two perm r/w cuts to grade. |
2019-10-17 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed that the above respondent failed to permanently restore temporary asphalt gas cut within required time. Notified via CAR#20191380210 on 9/4/2019 |
2019-10-17 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | a concrete base cut in the roadway that was over due for final. they fail to permanently restore their cut within their required time. their permit expired on 7/24/19 used for ID only |
2019-10-17 | No data | 73 AVENUE, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Not started, no crew on site, bike lane clear |
2019-10-17 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | s/w & r/w restored |
2019-10-17 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE 2 TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-10-16 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition remains, nov will be issued |
2019-10-16 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary restoration in roadway not permanently restored within the required time. Permit expired 11/22/2018. |
2019-10-16 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | a/t/p/o i observed the respondent with a temp water cut in the parking lane under a car that was over due for final. they fail to permanently restore their cut within the required time. their permit expired 9/24/19 |
2019-10-15 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED RESPONDENT STILL HAS FAILED TO FULLY REPLACE DEFECTIVE SIDEWALK FLAG |
2019-10-14 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE WATER CUT IN THE ROADWAY |
2019-10-13 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR HAD PERFORMED "FINAL RESTORATION"WORK-WITHOUT A VALID DOT PERMIT TO DO SO. |
2019-10-13 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | 2 PERMANENT RESTORATIONS IN RWY NEW SWK FLAG DONE WITHOUT NEW PERMIT-NOV WRITTEN |
2019-10-13 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS IN ROADWAY&SIDEWALK WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-10-12 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | B012019266B74 VALID PERMIT FOR REPAIR GAS. EXPIRES 10/24 |
2019-10-12 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the parking/driving lane, updated permit X012019282B12 on file (active) |
2019-10-12 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3 FOOT X 3FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/2018 WAS USED FOR I.D. |
2019-10-12 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-10-12 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY TRENCH ON ROADWAY IN REQUIRED TIME. ABOVE PERMIT EXPIRED ON 3/2/19 USED FOR I.D |
2019-10-12 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Respondeent failed to permanently restore cut within required time. Temporary cut on sidewalk leading to a permanent restoration in the parking lane. Above permit expired on 12/11/18 is used to ID the above respondent. |
2019-10-12 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD FAILED TO PERMANENTLY RESTORE 7 FEET BY 3 FEET OF TEMPORARY REPAIR WATER-SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME. PERMIT EXPIRED ON 7/20/19. |
2019-10-11 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | steel plates removed out of the street, cut temp |
2019-10-10 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp cut repaired |
2019-10-09 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cut down 4in on the driving lane |
2019-10-09 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent with excavated material on the street obstructing gutters no water runoff id by permit |
2019-10-09 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION IN RWY 15 NOV'S WRITTEN |
2019-10-08 | No data | SUTTER AVENUE, FROM STREET HINSDALE STREET TO STREET WILLIAMS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by a new gas cut in the roadway |
2019-10-05 | No data | DITMARS BOULEVARD, FROM STREET 33 STREET TO STREET 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway/sidewalk flag restored around water valve |
2019-10-05 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench resealed |
2019-10-02 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #456 |
2019-10-02 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #555-557 |
2019-10-02 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the bike lane in front of property #177 |
2019-10-01 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS ACROSS THE ROADWAY IN FRONT OF CHURCH |
2019-09-30 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV will be issued under permit M012017223D00. |
2019-09-30 | No data | 8 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-30 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-09-30 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | called rocky's office permit on "Ready for Payment" in NYC STREETS- explained if cannot do work from 2017-take out occupy roadway permit to close off portion of roadway to complete work |
2019-09-30 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2019-09-28 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-09-28 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in s/w & r/w |
2019-09-28 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Lane marking and sealer in perm restoration in compliance at this time in front of church. |
2019-09-28 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | non protected street restoration restored to grade |
2019-09-28 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL WATER CUT IN THE ROADWAY |
2019-09-28 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the bike lane in front of property #391 |
2019-09-26 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COLOR CODE HAS BEEN INSTALLED |
2019-09-26 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found due to DDC work in the same location. |
2019-09-26 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | duplicate |
2019-09-25 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | TEMP RESTORATION IN ROADWAY & WOOD COVERED STREET OPENING IN SIDEWALK- WITH PERMIT#B012019239B61 EXP 9/25/19. |
2019-09-25 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE BASED RESTORATION NOT FINALIZED |
2019-09-25 | No data | 148 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Four temp cuts o/due for perm. |
2019-09-25 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | wrong permit for nov- temp restoration in rwy |
2019-09-25 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PLUMBER WAITING FOR BUILDING TO RE-PAVE ROADWAY, BUT NO VALID PERMIT ON FILE TO PAVE ROADWAY & FIRST NOV WRITTEN BY INSPECTOR BRUNO#451 NOV#0701788506 ISSUED ON 12/8/18. |
2019-09-24 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR failed 3 or more times. Permittee placed on hold until work is completed. |
2019-09-24 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | all cut backs were made |
2019-09-24 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival 2 temp water restorations over due for final. Nov issued |
2019-09-24 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR failed 3 or more times. Permittee placed on hold until work is completed. |
2019-09-21 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY TRENCH ON ROADWAY IN REQUIRED TIME. ABOVE PERMIT EXPIRED ON 3/2/19 USED FOR I.D |
2019-09-21 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3 FOOT X 3FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/2018 WAS USED FOR I.D. |
2019-09-21 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has a temp cut overdue for final in the parking lane I/F/O 177 EAST MOSHOLU PARKWAY NORTH. Permit expired on 11/22/18. |
2019-09-20 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for use/opening of protected street without DOT permit. |
2019-09-20 | No data | COLONIAL ROAD, FROM STREET 81 STREET TO STREET 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK |
2019-09-19 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent with temp water restoration in the roadway over due for final. Nov issued |
2019-09-19 | No data | RICHARDSON STREET, FROM STREET MONITOR STREET TO STREET NORTH HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway/sidewalk flags. |
2019-09-19 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp water restoration on the sidewalk & in the parking lane in front of property #1409 |
2019-09-17 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2019-09-16 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | UPON DOING A CAR REINSPECTION CAR NUMBER 20196780231 ISSUED ON 6/20/2019 I OBSERVED RESPONDENT STILL HAS FAILED TO FULLY REPLACE DEFECTIVE SIDEWALK FLAG. |
2019-09-16 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20193720163 issued on 6/28/2019. Respondent failed to properly seal a permanent restoration on the roadway. Cited permit used for ID. |
2019-09-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3 steel plates removed from roadway |
2019-09-14 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORED TEMP TO GRADE IN RWY AT 330 MYRTLE AVE |
2019-09-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE 7 FEET BY 3 FEET OF TEMPORARY REPAIR WATER-SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-09-14 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL ROADWAY RESTORATION (CAR #20196760141) WAS ISSUED 8/2/19 |
2019-09-14 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #431 |
2019-09-14 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAIL TO APPLY COLOR CODE INTO 2 RESTORATION IN THE PARKING LANE . (CAR #20194580110) WAS ISSUED 4/14/19 |
2019-09-13 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WHITE LANE MARKINGS MISSING AND EDGES OF PERM RESTORATION STILL NEEDS TO BE SEALED |
2019-09-13 | No data | DREW STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the roadway |
2019-09-12 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent failed to obtain a valid DOT permit on file for the plated street opening on a protected street. Nov issued |
2019-09-12 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TRENCH WORK DONE IN THE ROADWAY |
2019-09-09 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three steel plates on R/W ; sidewalk barricaded for protection of pedestrians. Active permit on file. M012019227A73 |
2019-09-08 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-06 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | overdue for final cut (roughly 80' from 3 ave) |
2019-09-05 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONCRETE BASE RESTORATIONS ON THE ROADWAY CURED AND NOT PLATED VIOLATION DQ9 |
2019-09-05 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE BASED RESTORATION IS CURED BUT NOT PLATED IN THE ROADWAY. NEW PERMIT ON FILE SUMMONS ISSUED TO LATEST PERMIT |
2019-09-04 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | - In Driving Lane - Temporary Restoration Missing Color Code and Sunken 3" |
2019-09-04 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-09-03 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | As per policy, limit NOV’s issued for this defect. Permittee placed on hold. |
2019-09-03 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | atpo respondent had stored a large pile of debris on the roadway obstructing the gutter no gutter run had been provided at the time of inspection no crew on site |
2019-09-03 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts on r/w |
2019-09-03 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm cuts on r/w |
2019-09-01 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permanent plumber cuts in roadway - in compliance |
2019-09-01 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Subsequent summons issued on 5/31/2019. |
2019-09-01 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavated material stored. |
2019-08-31 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has a temp cut in the parking lane overdue for final. As per C.A.R # 20186490258 issued on 12/23/18. |
2019-08-29 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary restoration on the roadway not permanently restored within the required time. Permit expired 10/16/2018. |
2019-08-29 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-29 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated street opening in the roadway in front of property #644 |
2019-08-29 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Stip 016 violated |
2019-08-29 | No data | GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - PROTECTED |
2019-08-29 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Summons issued |
2019-08-28 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut in p/l and s/w. |
2019-08-28 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in p/l and s/w.. valid permit in dash |
2019-08-28 | No data | KRIER PLACE, FROM STREET EAST 92 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm water cut found in driving lane |
2019-08-28 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-28 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN PK LANE 23 FINAL RESTORATION PERMIT |
2019-08-28 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN RWY & WOOD COVERED SWK- PERMIT TAKEN OUT AFTER 2 NOV'S |
2019-08-28 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber excavating to do sewer installation, spoke to foreman Errol jr, in regards to work zone signs |
2019-08-28 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration on the roadway. Respondent failed to permanently restore cut within required time, permit expired on 12/31/2018. Cited permit used for ID. |
2019-08-27 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | concrete base restoration 13' X 9' x 3" at driving lane of roadway, respondent in violation of section/ rule 34 RCNY 2-11(11)(ii). Concrete base shall be properly plated except where other stipulations have been granted in writing by OCMC |
2019-08-27 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | There is a 2' x 1'3" area in the grass that collapsed with 2'6" depth adjacent to curb line and needs immediate assistance. Plumber's work was in done in the parking lane |
2019-08-27 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition made safe |
2019-08-27 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-08-27 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | failed to comply with stipulation 078 of their permit by failing to open full width of roadway when site is unattended. Upon inspection at site found mound clean -fill stored on parking lane of roadway. |
2019-08-26 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 Excavations, A.K.A 45 Irving Ave/Building operation, 1 Excavation 3'6''L X 3'1''L 20Feet from the fire hydrant, 2 Excavation 5'4''L X 3'10'' in front of Street light pole, and 3 Excavation is located 10Feet from tree, next to property 349. |
2019-08-26 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp water cut on the sidewalk that was over due for final. their permit expired on 12/11/18 used for ID |
2019-08-24 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-24 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #545 |
2019-08-24 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A OPEN BACKFILL RESTORATION IN SIDEWALK&FAILED TO UPON COMPLETION OF BACKFILL TO INSTALL A TEMPORARY PAVEMENT FLUSH WITH SURROUNDING AREA. |
2019-08-23 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #1251 |
2019-08-23 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-21 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-21 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Excavated material stored; valid permit |
2019-08-19 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 14 feet x (W) 4 feet 6 inches x (D) 6 feet.. compaction of 98.1 and 97.2%.. monitored from 9:45-11:50am. |
2019-08-19 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill PassL-14' W-4'2" D-7'6"2 lifts; IFO St Gregory Park on South side of segment. |
2019-08-19 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-18 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair CAR #20186510404. Respondent has 2 permanent restorations on the roadway that measure 4 feet in width and failed to comply with the Standard Detail Drawing # H-1042D note 6. Cited permit used for ID. |
2019-08-18 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-18 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20194890255 issued on 6/29/2019. Respondent failed to properly and completely seal a permanent restoration on the roadway. Cited permit used for ID. |
2019-08-17 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete base cut on r/w |
2019-08-16 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill for re-scheduled due material being late |
2019-08-15 | No data | 134 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | One of two cuts overdue for perm. |
2019-08-15 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 temp cuts on roadway..valid permit in nyc streets. |
2019-08-15 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2019-08-15 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT ON SIDEWALK AND ROADWAY IN REQUIRED TIME. PERMIT NUMBER B012018227A29 EXPIRED ON 8/24/18 USED FOR I.D. |
2019-08-15 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | : I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [5/20/2019]. |
2019-08-15 | No data | 148 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Four temp r/w cuts overdue for perm. Two s/w temp cuts to grade (BO). |
2019-08-14 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber doing sewer and water installation, warns plumber of men at work signs needed at site. |
2019-08-14 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES REMOVED PERM TRENCH IN THE ROADWAY OVER LAPPED BY NEW TEMPORARY GAS TRENCH |
2019-08-14 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 11 1/2' x 3.9' x 7.6' and 9.9' x 4.9' x 8.3' |
2019-08-14 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit B012019108B13 expired 5/20/19. |
2019-08-14 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A COVERED REPAIR WATER STREET OPENING DOWN 3 FEET IN SIDEWALK-WITHOUT A VALID DOT PERMIT TO DO SO. SIDEWALK STREET OPENING-NO PERMIT. |
2019-08-13 | No data | 165 STREET, FROM STREET 107 AVENUE TO STREET SOUTH ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two temp restorations flush to grade with two plated excavations on roadway properly pinned and ramp. Active permit on file Q012019199C67 |
2019-08-12 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED R.W IN P/L AND TEMP CUT ON SIDEWALK |
2019-08-12 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber steel plates shifted 3-4 inches off sewer and water excavation, 1 steel plate raise 7" above grade. |
2019-08-12 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection, Rock E. Small field workers, reset the steel plates and securing pinned and ramp steel plates. |
2019-08-11 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20196780231 issued on 6/20/2019. Respondent failed to fully replace a defective sidewalk flag. Cited expired permit used for ID. |
2019-08-11 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to properly seal and maintain the wearing course. Sealer is broken around plumber cut in roadway. Notified prior by car #20193720163 dated 6/28/2019 |
2019-08-10 | No data | TIEMANN AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer and water excavation in the roadway, without a valid dot permit on protected street, Rock E small steel plates covering excavation. |
2019-08-10 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent cut in the roadway and failed to restore the roadway lane markings. they was notified of this condition on 3-26-19 C.A.R# 20194430082 . |
2019-08-10 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO INSTALL COLOR CODE MARKER THAT IDENTIFIES PERMITTEE WAS NOTIFIED ON CAR #20194580110. EXPIRED PERMIT B012019037D55 EXPIRED 3/7/2019 WAS USED FOR I.D |
2019-08-10 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Active repair sidewalk permit M042019221A03 on file with full sidewalk excavated at this time. |
2019-08-09 | No data | MYRTLE AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working with excavation. travel lanes maintained. |
2019-08-07 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION DOWN 2-3 INCHES IN ROADWAY, IN FRONT OF 330 MYRTLE AVENUE BETWEEN CARLTON AVENUE & CARLTON AVENUE. PLEASE RESTORE TO GRADE. |
2019-08-06 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I observed the respondents failure to provide adequate protection at work site by placing a single cone on undermine of roadway and sidewalk entering active driveway. |
2019-08-06 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3 FOOT X 3FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/2018 WAS USED FOR ID |
2019-08-06 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber temp sunken area of cuts to grade. Nica condition corrected |
2019-08-04 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLEASE REMOVE 3 UNPINNED & UNRAMPED ROCK E SMALL STEEL PLATES ON ROADWAY, IN FRONT OF 744 BEDFORD AVENUE BETWEEN FLUSHING AVENUE & PARK AVENUE. |
2019-08-04 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A OPEN BACKFILL DIRT RESTORATION IN THE SIDEWALK & FAILED TO UPON COMPLETION OF BACKFILL TO INSTALL A TEMPORARY PAVEMENT FLUSH WITH SURROUNDING AREA. |
2019-08-04 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plate removed |
2019-08-03 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Era has been made flush and secure. |
2019-08-03 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | nov written |
2019-08-03 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-08-03 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION 40 FT SOUTH OF LEE AVE ON ECL |
2019-08-03 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATION IN ROADWAY WITHIN REQUIRED TIME. EXPIRED DOT PERMIT# B012018339A46 EXP 12/31/18 WAS USED FOR ID. |
2019-08-03 | No data | IRVING AVENUE, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway; excavated material stored. |
2019-08-02 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | There is a 2’x8” area of temporary asphalt sunken 1’between the curb and sidewalk causing a hazardous tripping condition. |
2019-08-02 | No data | 135 AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W resurfaced. |
2019-08-02 | No data | 38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations in the roadway of the driving lane in front of property #1325 |
2019-08-02 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seal around perm cuts, cracked asphalt. |
2019-08-02 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reseal restoration in roadway. |
2019-08-01 | No data | POPLAR AVENUE, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - active BO. |
2019-07-30 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has a temp cut in the parking lane overdue for final. As per C.A.R # 20186490258 issued on 12/23/18. |
2019-07-29 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6'x6'x3'6", 3'x3'x4'4" site plated. Markouts sprayed for cutbacks. |
2019-07-29 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate on site, area is secure. No action taken. |
2019-07-29 | No data | WALLACE AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2019-07-29 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 PERM RESTORATIONS IN BACKFILL DIRT RESTORATION IN SWK, TEMP RESTORATION IN RWY |
2019-07-29 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable it locate restoration due to active BO |
2019-07-28 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavated material stored. Protected with cones. |
2019-07-28 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I discovered the above respondent failed to provide proper drainage at work site.There a large pile of excavated material obstructing the gutter. This preventing flow of accumulating water between the curb and gutter, the site is unattended. |
2019-07-27 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site. No ons |
2019-07-27 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | B012019197C76 new permit on file |
2019-07-27 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor on site. See permit X012019200B58 |
2019-07-27 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 temp cuts in p/l. |
2019-07-26 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag with water valve. |
2019-07-26 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate over excavation secured at this time not lose nor noisy |
2019-07-26 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade ,d/l. S/W dirt area. |
2019-07-25 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced by BPP |
2019-07-25 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES BASE RESTORATIONS IN ROADWAY- BACKFILL RESTORATION IN SIDEWALK & PK LANE AT 744 |
2019-07-25 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A OPEN BACKFILL DIRT RESTORATION IN THE SIDEWALK |
2019-07-25 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I discovered the above respondent, failed to display required I.D. signs at work site. No A-frame barricades,material shall have printed thereon the 1) Name of the permittee(2) Phone # (3) address (4) type of work scheduled completion date'. |
2019-07-24 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-07-24 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to fully restore sidewalk flag after a water repair. Sidewalk flag is partially restored patch work done. s/w is now asphalt |
2019-07-24 | No data | TAPSCOTT STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2019-07-23 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed respondent failed to properly seal and maintain the wearing course. Respondent failed to reseal perm sewer cut across roadway. CAR 20196200031 issued on 4/30/2019. |
2019-07-23 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | overdue for final |
2019-07-22 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk made temp safe with asphalt |
2019-07-21 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-07-21 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon my inspection of 291 Bonner Place: Morris Ave/ Dead End I issued a N.I.C.A to CONSOLIDATED EDISON for a collapsed sidewalk flag L 5' x W 5' X D 4". Work done under permit No X012019142B42 |
2019-07-21 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to permanently restore their asphalt restoration containing a gas valve box in a full flag concrete restoration in time. The permit currently expired on 6/19/2019. Permittee was notified by CAR # 20192380132. |
2019-07-20 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a temp cut 3'x5' in the parking lane, temp asphalt on concrete sidewalk overdue for final permit expired on 11/22/18. |
2019-07-20 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Cuts not visible - area p/d/l paved to grade by the builder. |
2019-07-19 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, long trench in front of building 255, paving permit on file. |
2019-07-19 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavated material stored. |
2019-07-19 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cuts permanently restored |
2019-07-19 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cuts permanently restored |
2019-07-19 | No data | 134 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Two temp cuts overdue for perm. |
2019-07-18 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV ISSUED ON PERMIT #B012018339A46 |
2019-07-18 | No data | RUTLAND ROAD, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt over sunken area, flushed to grade. |
2019-07-17 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time , i observed an 11' x 5 ' perm roadway cut restore to grade in d/l. |
2019-07-17 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATION IN ROADWAY WITHIN REQUIRED TIME. EXPIRED DOT PERMIT# B012018339A46 EXP 12/31/18 WAS USED FOR ID. |
2019-07-17 | No data | RUTLAND ROAD, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbing permanent restoration cut down 12 inches in the roadway opposite of house number 1000. |
2019-07-17 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 PLATED EXCAVATIONS IN THE ROADWAY NEW PERMIT ON FILE CUTS ARE CLOSER TO IRVING |
2019-07-17 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 PLATED EXCAVATIONS IN THE ROADWAY ODD SIDE OF THE STREET CLOSER TO IRVING AVENUE |
2019-07-16 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp repair water restoration on sidewalk; over due for final. |
2019-07-16 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration on the roadway. Respondent failed to permanently restore within required time, permit expired on 12/31/2018. Cited permit used for ID. |
2019-07-13 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3 FOOT X 3FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/2018 WAS USED FOR ID |
2019-07-13 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A OPEN BACKFILL RESTORATION DOWN 6 INCHES IN ROADWAY&FAILED TO UPON COMPLETION OF BACKFILL TO INSTALL A TEMPORARY PAVEMENT FLUSH WITH SURROUNDING AREA. |
2019-07-13 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV WRITTEN |
2019-07-13 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-07-12 | No data | 148 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O i observed that the respondent failed to permanently restore 4 temporary water cuts (2 in the roadway and 2 on the sidewalk) within the required time. Above permit expired on 7/4/19. Permit used for ID |
2019-07-12 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT WITH A TEMP WATER CUT ON THE SIDEWALK THAT WAS OVER DUE FOR FINAL. THEY FAIL TO PERMANENTLY RESTORE THEIR CUT WITHIN THE REQUIRED TIME THEIR PERMIT EXPIRED 12/11/18 USED FOR ID ONLY |
2019-07-12 | No data | MANHATTAN AVENUE, FROM STREET WEST 104 STREET TO STREET WEST 105 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started for #111 at this time. |
2019-07-12 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES HAVE BEEN REMOVED CONCRETE BASED TRENCH IN THE ROADWAY |
2019-07-11 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 3ft 8in x 3ft 8in x 3ft 6ft x 4ft x 2ft 8in Pass: 96.6% 96.8% |
2019-07-11 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent failed to permanently restore cut within required time. Concrete base cut exposed in parking lane overdue for final restoration. Previous permit B012019004A83 to work at location expired 1/13/2019.Expired permit use for Id |
2019-07-11 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-07-10 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY AND SWK AT 744 |
2019-07-10 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ARRIVED AT 12 PM;BACKFILL A PASS-(L)9 FT X (W) 7 FT 6 IN X (D) 5 FT-TESTS 98.2 + 96.9; WD 117.6, DD 110.5, MD 114, AM 6.4- NO BASE OR SAW CUT CUTBACK WORK DONE AND LEFT AT 145 PM |
2019-07-10 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 temporary cuts on r/w and temp sidewalk cut. |
2019-07-09 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One cut plumber is completely restored , the other cut is restored in the driving lane; however, portion of the plumber is not restored, apparently a car was parked at location - Valid permit B012019183D32 expiration 7/31/2019 - on file |
2019-07-09 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | One cut plumber is completely restored , the other cut is restored in the driving lane; however, portion of the plumber is not restored, apparently a car was parked at location - Permit is still valid |
2019-07-09 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY PLATES ARE NOT LOOSE AND NOSY UPON INSPECTION. SR#311-00012830 |
2019-07-08 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 of 2 unmarked steel plates in the roadway is loose and noisy. |
2019-07-05 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by National Grid restoration. |
2019-07-05 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-07-03 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to permanently restore cut within required time |
2019-07-03 | No data | 150 AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O i observed that the respondent failed to install pavement flush with surrounding area on a 30'x4' concrete binder base only sewer trench across the roadway down 2'' as required. Site is unattended. Permit used for ID |
2019-07-03 | No data | 98 AVENUE, FROM STREET 218 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work visible in sidewalk or roadway |
2019-07-03 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Under section 34RCNY202( c)(2) the crew is working without permit at the work site. All permittee must post signs at 100 foot intervals along the excavation. |
2019-07-02 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION SWK AND RWY |
2019-07-02 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY REPAIR WATER RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). |
2019-07-01 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Concrete base cuts exposed in driving lane are overdue for final restoration. Previous permit B012019004A83 to work at location expired 1/13/2019. |
2019-07-01 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO SEWER CUTS IN THE DRIVING LANE PARTIALLY COVERED BY TEMPORARY TRENCH BY BROOKLYN UNION GAS |
2019-07-01 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CREW ON SITE ATTENDING TO COLLAPSED AREA ADJACENT TO PLATED EXCAVATION |
2019-07-01 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel Plates Shifted 3" Exposing Excavation In The Driving Lane I/F/O 43 Newel St. This Is Tied To A Compliant Given By Emergency Response Operator#57 Roadway also has deep cracks within work area. |
2019-07-01 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm . |
2019-06-30 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Concrete base cuts still exposed in driving lane are overdue for final restoration. Previous permit B012019004A83 to work at location expired 1/13/2019. |
2019-06-29 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp in s/w & steel plate in r/w. new permit on file |
2019-06-29 | No data | JEFFERSON AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag with water valve. |
2019-06-29 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESTORATION NEEDS TO BE RESEALED |
2019-06-29 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY RESTORATION NEEDS TO BE RESEALED |
2019-06-28 | No data | 150 AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 30'x 6'7" and 7' depth. working in parking/driving lane. 3 lift 2 test. excavation plated. full width of roadway open for traffic. |
2019-06-28 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sealer is broken around plumber cut in roadway - Reapply sealer |
2019-06-28 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Concrete base cuts in roadway overdue for final restoration. Previous permit B012019004A83 to work at location expired 1/13/2019. Expired permit use for Id |
2019-06-27 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT FLUSH NOT MOUNDED OR WARRANTS A CAR |
2019-06-27 | No data | 94 AVENUE, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | roadway repaved by builder . |
2019-06-27 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION WAS RECTIFIED TWO TEMPORARY RESTORATIONS WAS MADE PERMANENT AND FLUSH WITH AREA |
2019-06-27 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | fail to comply with standard spec H-1042D note #3. The Respondents irregular shaped perm restoration water cut needs to be square or rectangular as required. The Respondent was notified by CAR 20183690123 issued on 4/20/18. |
2019-06-27 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway. |
2019-06-27 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED CAR RE-INSPECTION. |
2019-06-27 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | backfill completed upon arrival.came to relieve another inspector |
2019-06-26 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | a/t/p/o i observed the respondent with a permanent cut in the roadway & fail to restore the roadway markings. they was notified of this condition on 3-26-19 C.A.R# 20194430082 WAS ISSUED & THEY FAIL TO MAKE THE REPAIRS NEEDED. |
2019-06-26 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now perm .... |
2019-06-25 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New permit on file |
2019-06-25 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway lane marking applied |
2019-06-24 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO INSTALL COLOR CODE MARKER THAT IDENTIFIES PERMITTEE WAS NOTIFIED ON CAR #20194580110. EXPIRED PERMIT B012019037D55 EXPIRED 3/7/2019 WAS USED FOR I.D |
2019-06-24 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass ... |
2019-06-24 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving an emergency permit number.. |
2019-06-23 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-06-22 | No data | EAST 34 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic sanitary sewer broken in property, (confirmed with home owner),one excavation made on sidewalk at time of inspection. |
2019-06-21 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NEW PERMIT SUBMITTED IN NYC STREETS |
2019-06-20 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration on the roadway. Respondent failed to permanently restore within required time, by expiration of DOT permit. Expired permit, #B012018334C48 exp. 12/31/2018. |
2019-06-20 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work unacceptable, must restore a full sidewalk flag.In front of 152 Wakeman Place between Bergen Place and Sedgwick Place. |
2019-06-20 | No data | CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w restored |
2019-06-20 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN STREET OPENING- DEP ON SITE DOING INSPECTION OF TAP |
2019-06-20 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY AND SIDE WALK |
2019-06-20 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT |
2019-06-19 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Temporary plumber cuts in roadway overdue for final restoration. Previous permit B012019004A83 to work at location expired 1/13/2019. Expired permit use for Id |
2019-06-19 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed temporary restoration not flush with surrounding area. Concrete base is down 2 inches in driving lane. Previous permit B012019004A83 to work at location expired 1/13/2019. Expired permit use for Id |
2019-06-19 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt place on top to make area safe and and backfill only cuts has been cold patched |
2019-06-18 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Violation: I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3 FOOT X 3FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/2018 |
2019-06-18 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp mounded 3in on the sidewalk. its a trip condition. their 4 cut that was left in backfill only. |
2019-06-18 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the respondents failure to permanently restore temporary cuts on sidewalk and roadway within required time prior to permit expiration date on 11/22/2018 |
2019-06-18 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | condition passed out |
2019-06-16 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | nov for overdue for final cut was issued under permit#B012018339A46 |
2019-06-16 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | found all paving completed ... |
2019-06-15 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | respondent failed to permanently restore 2 temporary repair water restorations in the roadway within the required time permit allows. |
2019-06-15 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | condition remain the same there will be a N.O.V issued from a post audit inspection. |
2019-06-15 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the respondent with a temp water cut on the sidewalk that was over due for final. they fail to permanently restore they cut within their required time to do so. their permit expired 12/11/18 |
2019-06-14 | No data | 111 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp and plated excavation in r/w |
2019-06-13 | No data | 111 STREET, FROM STREET 107 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 2 excavations r/w 1 s/w |
2019-06-12 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 321 ROADWAY & SWK RESURFACED AT NEW BUILDING |
2019-06-12 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in roadway ok. |
2019-06-11 | No data | 45 AVENUE, FROM STREET 70 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade cut in r/w |
2019-06-11 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary restoration on the roadway not permanently restored within the required time. Permit expired 10/16/2018. |
2019-06-09 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm .... sewer connection .. |
2019-06-09 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, now perm ... |
2019-06-08 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondents permanent restoration on the roadway did not conform with Standard Detail Drawing 1042 D, Note #6. |
2019-06-08 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | A/T/P/O I observed the Respondent Performing Non Emergency Work. Therefore, Work Crew was Repairing an Domestic Sanitary Sewer.Respondent Currently has a Regular Permit # Q01-2019-154-E22 Which is Valid Until 7/2/19. |
2019-06-08 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Crew Currently Repair a Domestic Sanitary Sewer (Summons was Issued for Non Emergency Work) |
2019-06-08 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration is in compliance |
2019-06-08 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT# B012018339A46 EXP 12/31/18 WAS USED FOR ID. |
2019-06-07 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE AGAINST THE CURB. NO CREW ON SITE. NO UNSAFE CONDITIONS FOUND. |
2019-06-06 | No data | 134 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 4/20/2019. |
2019-06-06 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/0 291 Sidewalk restoration not in kind. Full flag restoration needed |
2019-06-06 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM ROADWAY AND PERM/TEMP RESTORATION ON THE SIDEWALK I/F/O BUILDING OPERATION- REPAIR WATER - SEWER |
2019-06-06 | No data | BOSTON ROAD, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | materials place over cut, unable to see it clearly |
2019-06-06 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in roadway, updated permit # X012019142B36 on file |
2019-06-06 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 temporary restorations on roadway to grade |
2019-06-05 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced with work completed during 10/2018 to 12/2018. |
2019-06-05 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | final restoration is in compliance |
2019-06-04 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2019-06-04 | No data | 74 STREET, FROM STREET 52 COURT TO STREET 53 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | WORK IN PROGRESS 10'EXCAVATION ON SIDEWALK/SHORING IN PLACE |
2019-06-03 | No data | 103 STREET, FROM STREET 37 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sunken work found |
2019-06-02 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK RESTORED |
2019-06-02 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cuts in roadway to grade |
2019-06-02 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents failure to permanently restore temporary cuts on sidewalk and roadway within required time prior to permit expiration date on 11/22/2018. Respondent notified of oversight in CAR 20186490258 |
2019-06-01 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 perm cuts missing ibm color code tag. |
2019-06-01 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts missing ibm color code tag. |
2019-06-01 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2019-05-31 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | nov to be issued for temporary overdue cut. |
2019-05-31 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAVING TEMPORARY ROADWAY WITHOUT DOT PERMIT ON PROTECTED STREET. PERMIT WAS DENIED. |
2019-05-31 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY TRENCH ON ROADWAY IN REQUIRED TIME. ABOVE PERMIT EXPIRED ON 3/2/19 USED FOR I.D |
2019-05-30 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cobblestone restoration in curb lane acceptable ifo active B.O |
2019-05-29 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT) EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/18 WAS USED FOR ID. |
2019-05-29 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated p/l cut and also temp cut in front of 50. |
2019-05-28 | No data | WEST 90 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site working at time of inspection , foreman is Erol. Site is in compliance . |
2019-05-27 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT# B012018339A46 EXP 12/31/18 WAS USED FOR ID. |
2019-05-25 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 20 TH FINAL RESTORATION PERMIT SINCE 2017-TEMP RESTORATION IN RWY |
2019-05-25 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-05-24 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012019135D70 |
2019-05-24 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012019135D81 |
2019-05-22 | No data | FOCH BOULEVARD, FROM STREET 171 STREET TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut p/l |
2019-05-17 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION IN RWY ON NCL LANE BY CITI-BIKE OPP 10 |
2019-05-17 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | long water steel plate & temp restoration short water at 50 |
2019-05-16 | No data | FARRAGUT ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill re-scheduled due to lab technician not arriving on site within the 30 minute grace period. |
2019-05-16 | No data | 155 STREET, FROM STREET 119 ROAD TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w p/l |
2019-05-15 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area has been filled with temp |
2019-05-15 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2019-05-15 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp restoration down 3 inches in driving lane located at 46 Melrose street |
2019-05-15 | No data | NORTHERN BOULEVARD, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 19'x4'2"x4' 4'x3'3'4" |
2019-05-15 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 temp cuts on r/w. |
2019-05-14 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in dirt area on sidewalk, also within property line, DEP cut in the roadway with orange color markout |
2019-05-14 | No data | NORTHERN BOULEVARD, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - crew on site - spoke to Shana. |
2019-05-12 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - 2 PERM RESTORATIONS ON THE ROADWAY. DEBRIS STORED IN THE PARKING LANE |
2019-05-11 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut covered by bpp |
2019-05-09 | No data | 75 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked on long water cuts |
2019-05-09 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION RWY & SWK |
2019-05-09 | No data | MYRTLE AVENUE, FROM STREET CARLTON AVENUE TO STREET CARLTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATION RWY & SWK |
2019-05-09 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in r/w new permits on file, gas trench runs through cut |
2019-05-09 | No data | CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w restored |
2019-05-08 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 19TH FINAL RESTORATION PERMIT FOR TEMP RESTORATION IN RWY |
2019-05-08 | No data | 129 STREET, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, BPP overlapping most of plumber's cut, a small portion still visible. |
2019-05-08 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in d/p/l. |
2019-05-08 | No data | FARRAGUT ROAD, FROM STREET EAST 34 STREET TO STREET EAST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew actively working on site. New Permit Number: B012019113C68 |
2019-05-07 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | FAILED TO COMPLY WITH THE TERMS AND CONDITIONS OF DOT PERMIT THAT STIPULATES RESPONDENT MUST RESTORE ALL TRAVEL LANES TO TRAFFIC AFTER WORKING HOURS. DEBRIS IS STORED ON THE RW 13' FROM CURB. 8' OCCUPANCY OF THE RW ALLOWED. STIP (020) VIOLATED. |
2019-05-06 | No data | 86 STREET, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2019-05-05 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED BY PERM GAS RESTORATION |
2019-05-04 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR SEWER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018313A7 |
2019-05-04 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PLEASE REMOVE UNPINNED & UNRAMPED ROCK E SMALL STEEL PLATE ON ROADWAY(IN FRONT OF HYDRANT)- ON SACKETT STREET BETWEEN HOYT STREET & BOND STREET. |
2019-05-04 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w and s/w under new construction |
2019-05-04 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE REMOVE UNPINNED & UNRAMPED ROCK E SMALL STEEL PLATE ON ROADWAY(IN FRONT OF HYDRANT)- ON SACKETT STREET BETWEEN HOYT STREET & BOND STREET. |
2019-05-03 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the d/l |
2019-05-03 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-05-03 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observed the respondents failure to permanently restore temporary cut in roadway within required time prior to permit expiration date on 10/16/2018 |
2019-05-02 | No data | ATLANTIC AVENUE, FROM STREET 107 STREET TO STREET 108 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway in compliance at time of inspection. |
2019-05-02 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2019-05-02 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced roadway repaved. insp 745 |
2019-05-01 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-05-01 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-SIDEWALK IN COMPLIANCE I/F/O ACTIVE BUILDING OPERATION |
2019-04-30 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | To reseal water cut across roadway. |
2019-04-29 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O 2021 West 6St., • 6'x8' area of 6'x14.5' Temp cut sunken 4.5" in driving lane causing hazardous condition to bicyclists & motorists. |
2019-04-29 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN PK LANE |
2019-04-29 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition was rectified temp cut in driving lane made safe |
2019-04-26 | No data | WEST 6 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor on site, work site found to be in compliance (Active permit B012019098A05) |
2019-04-26 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012019108C06 ACTIVE PERMIT ON FILE NO WORK DONE |
2019-04-26 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | LONG WATER CUT ONE IS PLATED AND THE OTHER IS TO GRADE WORK IS STILL IN PROGRESS AND NOT COMPLETED . THEY ASKED FOR AN EXTENSION AND THEY GOT IT |
2019-04-26 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2019-04-25 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored around water valve flush and in compliance. |
2019-04-25 | No data | BEACH 86 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2019-04-25 | No data | 144 AVENUE, FROM STREET 170 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to make permanent, two temporary long water cuts across the roadway within the required time. Respondent's Repair Water permit# Q012018352B57 for location expired on 12/31/18. |
2019-04-25 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-04-24 | No data | 209 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | almost curb to curb sewer water repairs. |
2019-04-24 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison paved over plumber restoration in the roadway and sidewalk, dep temp cut on opposite side. |
2019-04-24 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass stip repaved |
2019-04-24 | No data | MAIN STREET, FROM STREET GRAVETT ROAD TO STREET MELBOURNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 sewer cuts plus s/w sealed |
2019-04-23 | No data | MILLER AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l |
2019-04-22 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Complaint | Department of Transportation | I OBSERVED RESPONDENT FAILED TO PERMANENTLY RESTORE CUTS WITHIN REQUIRED TIME PERMIT EXPIRED ON 1/13/2019 ID PERMITTEE BY EXPIRED PERMIT |
2019-04-21 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP TO GRADE CUT IN THE PARKING LANE NEW PERMIT ON FILE |
2019-04-20 | No data | 145 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade opposite parking lane. |
2019-04-20 | No data | 116 AVENUE, FROM STREET 144 STREET TO STREET 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration in good condition at time of my inspection. |
2019-04-20 | No data | EAST 51 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a temp cut in the parking lane ,active final restoration permit on file |
2019-04-20 | No data | ROCKAWAY AVENUE, FROM STREET AMES LANE TO STREET EAST 98 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Sanitary Sewer Backing up into Property. Building Owner on Site |
2019-04-20 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration in good condition color coded and sealed. |
2019-04-19 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A temporary water restoration sunken 3 1/2 inches in the parking lane i/f/o 58 Lee Avenue on Ross Street |
2019-04-19 | No data | EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber on site, to reseal street joints properly |
2019-04-18 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison paved over plumber restoration. |
2019-04-18 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | E-MAIL SENT SECOND DAY BY INSPECTOR #451 |
2019-04-18 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO PRIORITY CORRECTIVE ACTION REQUEST#20194510423-HAD OPEN BACKFILL RESTORATION DOWN 4 INCHES-FAILED TO UPON COMPLETION OF BACKFILL TO INSTALL A TEMPORARY PAVEMENT FLUSH |
2019-04-17 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut is plated and secured at this time of inepction |
2019-04-17 | No data | RUTLAND ROAD, FROM STREET EAST 93 STREET TO STREET EAST 94 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed a Rock E Small Plumbing & Heating crew on site working to repair, a broken pipe i/f/o 1000 Rutland Road |
2019-04-17 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp restoration flush on roadway at this time. |
2019-04-17 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY TRENCH ON ROADWAY IN REQUIRED TIME. ABOVE PERMIT EXPIRED ON 3/2/19 USED FOR I.D |
2019-04-17 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CENTRAL/EMERGENCY RESPONSE NO RESPONSE BY PHONE, INSP#451 SENT E-MAIL AT 6:55 PM |
2019-04-17 | No data | 39 AVENUE, FROM STREET 30 STREET TO STREET 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l |
2019-04-17 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | a 7' x 4' area of a plated excavation in the roadway has collasped and exposing the excavation that is down approx more than 4-5 ft thats plated , make area safe , |
2019-04-17 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A TMEP CUT IN THE PARKIG LANE UNDER A VLAID PERMIT ON FILE |
2019-04-17 | No data | 94 AVENUE, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition correct |
2019-04-16 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent failed to permanently restore a street cut within the required time of the above DOT permit (exp. 12/11/18). Permit used to ID. |
2019-04-16 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Still remains overdue. NOV to be issued on post audit. |
2019-04-14 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THERE IS 2 PERM WATER CUTS IN THE ROADWAY THAT IS MISS COLOR CODE MARKER WITH IBM NUMBER IN FRONT OF 305 |
2019-04-14 | No data | 94 AVENUE, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 15' x 10' temporary restoration down approx. 3'' |
2019-04-14 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed one of two perm long water restorations measuring 45" in width. Respondent failed to make proper cut backs to restoration as per Standard restoration drawing H-1042D note #6 as requested via CAR#20183690219 issued 7/22/2018 |
2019-04-14 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THERE IS 2 PERM WATER CUTS IN THE ROADWAY THAT IS MISS COLOR CODE MARKER WITH IBM NUMBER IN FRONT OF 305 |
2019-04-14 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on r/w and swk ok |
2019-04-14 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY IS MILLED |
2019-04-13 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut |
2019-04-13 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PROVIDE ADEQUATE PROTECTION AT WORK SITE. RESPONDENT FAILED TO PROVIDE PROTECTIVE MEASURES SUCH AS BARRICADES IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT, SO AS TO PREVENT DANGER TO PE |
2019-04-12 | No data | 167 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway & Sidewalk. 3 Day Dep Notice Issued |
2019-04-11 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY TRENCH ON ROADWAY IN REQUIRED TIME. ABOVE PERMIT EXPIRED ON 3/2/19 USED FOR I.D |
2019-04-11 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | countersunk plates in r/w new permits on file |
2019-04-11 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAVING TEMPORARY ROADWAY AND SIDEWALK RESTORATION WITHOUT DOT PERMIT ON PROTECTED STREET. PERMIT WAS DENIED. |
2019-04-11 | No data | IRVING AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp restoration in parking lane okay, new permits on file |
2019-04-08 | No data | EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts made perm in the roadway |
2019-04-08 | No data | 45 AVENUE, FROM STREET 70 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2019-04-07 | No data | 171 STREET, FROM STREET 140 AVENUE TO STREET 143 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | one permanent roadway restoration in parking lane found flush to grade(leveled). |
2019-04-06 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING CONSTRUCTION MATERIAL( BACKFILL MATERIAL)ON THE STREET UP AGAINST THE CURB IN THE PARKING LANE OBSTRUCTING THE GUTTERS WHEN RAIN OR WATER FALLS , ABOVE PERMIT NUMBER USED TO IDENTIFY THE RESPONDENT |
2019-04-06 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed respondent failed to make wearing course flush with surrounding area. Restoration mounded 1/2 to 1 inch in front of house #647. CAR#20184580041 was previously issued. |
2019-04-06 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION STILL REMAINS NO SEALER ON THE JOINTS , NOV WILL BE ISSUED UNDER PERMIT |
2019-04-06 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk |
2019-04-06 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A//T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A TEMPORARY RESTORATIONS IN SIDEWALK & ROADWAY AND FAILED TO PERMANENTLY RESTORE TEMPORARY RESTORATIONS WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERM |
2019-04-06 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP RESTORATIONS RWY & SWK-NOV D4F WRITTEN |
2019-04-06 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PROPERLY SEAL AND MAINTAIN THE WEARING COURSE ON CUT IN THE DRIVNG LANE |
2019-04-06 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT OPPOSITE #10 IS STILL OVER DUE FOR FINAL SUMMONS WILL BE ISSUED UNDER POST AUDIT AS PER POLICY |
2019-04-06 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3 FOOT X 3FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018320B38 EXP 12/1/2018 WAS USED FOR ID. |
2019-04-05 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut p/l. 4 1/2ft x 4 1/2ft, down 3 1/2ft. Blend. Wet 123.9 Dry 116.5 Max 120.0 Moisture 6.4% 97.3% |
2019-04-05 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to Respondent for failing to comply with standard spec H-1042D note #3. The Respondents irregular shaped perm restoration water cut needs to be square or rectangular as required. The Respondent was notified by CAR 20183690. |
2019-04-05 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration remains overdue for final however per HIQA Policy this CAR is being closed and a summons will be issued separately to the permit via a Post Audit Inspection-temp to-grade restoration . |
2019-04-05 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY RESTORATION ON ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT #B012018344D59 EXP 12/31/2018 WAS USED FOR ID. |
2019-04-05 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | overdue for final |
2019-04-05 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE RESPONDENT FAILED PERMANENTLY RESTORE THEIR TEMPORARY RESTORATION ON THE ROADWAY I/F/O 5-11 126 STREET WITHIN THE REQUIRED TIME GIVEN . PERMIT EXPIRED ON 12/24/2018. (CAR #20196190075) WAS ISSUED ON 2/28/2019 TO REPAIR CONDITION. |
2019-04-04 | No data | BONNER PLACE, FROM STREET DEAD END TO STREET MORRIS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 6' by 4' backfillno cutback was done today |
2019-04-04 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the Respondent had a perm trench mounded 2 in cut must be flush with surrounding area bike lane and driving lane (CAR #20191670051 issued 2\5\2019 |
2019-04-04 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT PERM CUT THAT WAS MADE WITHIN A PARKING LANE LINE NEAR THE CORNER AND FAIL TO RESTORE THE WHITE LINE. THEY WAS NOTIFIED BY C.A.R# 20185150132 AND FAIL TO MAKE THE REPAIRS NEEDED. |
2019-04-04 | No data | THROOP AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled due to no proper equipment for void removals. |
2019-04-04 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE CONCRETE BASE CUT ON ROADWAY IN REQUIRED TIME. ABOVE PERMIT EXPIRED ON 12/10/18 USED FOR I.D. |
2019-04-04 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration in the roadway, slightly sunken |
2019-04-04 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2019-04-03 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVERDUE FOR FINAL |
2019-04-03 | No data | HURON STREET, FROM STREET ALBERT ROAD TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance at time of inspection. |
2019-04-03 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 177, I observed the respondents failure to restore temporary cuts on sidewalk and roadway within required time prior to permit expiration on 11/22/2018. Respondent notified of this oversight in CAR 20186490258 but failed to make the repairs. |
2019-04-03 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THE WINTER MORATORIUM IS OVER THE CUT IS STILL OVERDUE FOR FINAL, A NOV WILL BE ISSUED THE REGULAR WAY. |
2019-04-03 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED RESPOND TO CORRECTIVE ACTION REQUEST #20186450033. FAILED TO PROPERLY SEAL EDGES OF CUT. A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. EXPIRED DOT PERMIT #B012017279A94 EXP 12/31/2015 WAS USED FOR ID |
2019-04-03 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on r/w & parking lane |
2019-04-03 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee has active permit on file for location |
2019-04-03 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area restored to grade. |
2019-04-02 | No data | 112 ROAD, FROM STREET 227 STREET TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in roadway, 3day notice issued from DEP , 3 excavations made on roadway at time of inspection. |
2019-04-01 | No data | POWELL STREET, FROM STREET LOTT AVENUE TO STREET NEWPORT STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site at this time |
2019-04-01 | No data | QUEENS BOULEVARD, FROM STREET 45 AVENUE TO STREET 70 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2019-04-01 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR HAD FAILED TO RESPOND TO PRIORITY CORRECTIVE ACTION REQUEST#20194510365-FAILED TO RESTORE A TEMPORARY RESTORATION IN SIDEWALK DOWN 2 INCHES TO GRADE (ALL TEMPORARY RESTORATION MUST BE GRADE |
2019-04-01 | No data | 209 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in roadway sidewalk temp. to grade |
2019-03-31 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATION IN SIDEWALK-OVERDUE FOR FINAL-IN FRONT OF 404 GRAND STREET BETWEEN RODNEY STREET & KEAP STREET. PLEASE RESTORE SIDEWALK. |
2019-03-30 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on sidewalk, new building swk to be done over during BPP |
2019-03-29 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY SEWER RESTORATION IN ROADWAY-OVERDUE FOR FINAL-AT 6 STREET BETWEEN 3 AVENUE & 4 AVENUE "AKA" 399 3 AVENUE. PLEASE RESTORE ROADWAY. |
2019-03-29 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORED ROADWAY TO GRADE |
2019-03-28 | No data | BOSTON ROAD, FROM STREET REEDS MILL LANE TO STREET ROMBOUTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-03-27 | No data | INWOOD STREET, FROM STREET 130 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 17'X 8' PERM CUT ,REPAIR WATER - SEWER |
2019-03-27 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts in the parking lane overdue for final |
2019-03-27 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two short water cuts remain in acceptable condition. |
2019-03-26 | No data | WATSON PLACE, FROM STREET DEAD END TO STREET POLHEMAS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable4'7" x 3'7" s/w restoration found I/F/O 107-21 |
2019-03-26 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROLLED AND SEAL , REPLACE ALL LINE MARKING . |
2019-03-26 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway ifo active B.O. at time of inspection. |
2019-03-24 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH ROADWAY DURING THE WINTER MORATORIUM PERIOD THAT COMMENCED ON DECEMBER 1, 2018 AND ENDS ON MARCH 31, 2019. A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2019-03-20 | No data | 138 STREET, FROM STREET 68 DRIVE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway Spoke with Property Manager Camille. |
2019-03-20 | No data | 111 AVENUE, FROM STREET 223 STREET TO STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2019-03-18 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Contractor ran out of material on second cut, driver went to get more material to complete backfill. 3'8" still remains to be completed. |
2019-03-18 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to countersink steel plates in the roadway as required during the Winter Moratorium in effect from December 1, 2018-March31, 2019. Respondent identified by markings on steel plates and inspector onsite. |
2019-03-13 | No data | BOSTON ROAD, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway cut to repair water leak to water service water visibly on roadway and within cut |
2019-03-09 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two long water cuts perm to grade on the roadway |
2019-03-09 | No data | 209 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with a plated excavation labeled " Rock E Small Plumbing" in the roadway. The permittee failed to comply with stip #038 to meet the standard specs and requirements of the MUTCD signage during the Winter Moratorium |
2019-03-09 | No data | MURDOCK AVENUE, FROM STREET 219 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | temporary cut on roadway and sidewalk in compliance at time of inspection. |
2019-03-08 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O, I observed the respondent had three steel plates in the roadway and failed to countersunk the plates ; and failed to post raise plow sign at the work site as per the winter moratorium. |
2019-03-08 | No data | ARLINGTON TERRACE, FROM STREET INWOOD STREET TO STREET LIVERPOOL STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway Being Pumped out. 3 Day Dep Notice Issued. Property Owner on Site |
2019-03-07 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST "STEEL PLATES AHEAD" OR "RAISE PLOW" SIGN AS PER DOT WINTER MORATORIUM WHICH BEGINS ON 12/1/18 AND ENDS ON 3/31/19 |
2019-03-07 | No data | 209 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent plated excavation 3 steel plates on the roadway .Respondent fail to post" Steel Plates Ahead " or "Raise Plow sign" as per Winter Moratorium policy. |
2019-03-07 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A NOV WAS ISSUED DUE TO NO RAISE PLOW SIGNS POSTED FOR PLATES UNDER VALID PERMIT ON FILE |
2019-03-06 | No data | LEXINGTON AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is good ifo 1704 |
2019-03-06 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT IN THE ROADWAY NEW PERMIT ON FILE |
2019-03-06 | No data | 209 STREET, FROM STREET 93 AVENUE TO STREET 94 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent excavating the roadway of a protected street without an active DOT permit for this work . Respondent identified by crew on site working. |
2019-03-04 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, crew onsite, work in progress. |
2019-03-03 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent with a long water cut across roadway failed to acquire a valid DOT permit. |
2019-03-02 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts made Temp to grade cuts on R/W |
2019-03-01 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY SEWER RESTORATION DOWN 1 1/2 INCHES IN ROADWAY AT 6 STREET BETWEEN 3 AVE & 4 AVE "AKA" 399 3 AVENUE. PLEASE RESTORE ROADWAY TO GRADE. |
2019-02-28 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary water cut Overdue for Final restoration in the driving lane in front of 5-11 126 St |
2019-02-28 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (8' X 3') cut in the driving lane down 3" with another (10' X 3') cut in the driving/parking lane down 3" |
2019-02-27 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 excavation have asphalt broken out and is down 2in |
2019-02-26 | No data | 227 STREET, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in the Roadway & Sidewalk. 3 Day Dep Notice Issued. |
2019-02-25 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A 10 FEET BY 5 FEET PERMANENT REPAIR WATER RESTORATION IN A PROTECTED STREET(ROADWAY & TEMPORARY RESTORATION IN SIDEWALK)-WITHOUT A VALID DOT PERMIT TO DO SO.PERMITTEE'S |
2019-02-25 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PLUMBER RESTORED ILLEGAL WORK - REPAIR WATER-TEMPORARY RESTORATION IN SIDEWALK & PERMANENT RESTORATION IN ROADWAY TO GRADE WITH TEMPORARY ASPHALT. |
2019-02-24 | No data | ABERDEEN ROAD, FROM STREET CHEVY CHASE STREET TO STREET HADDON STREET | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, no work visible. |
2019-02-21 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp work done in the parking lane |
2019-02-21 | No data | HOWARD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012019037D55 active permit on file temp work done in the parking lane |
2019-02-20 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN OPEN EXCAVATION IN THE ROADWAY |
2019-02-17 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary cut on the sidewalk not flush with the surrounding area down 1’’-2’’ |
2019-02-17 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition was made safe |
2019-02-16 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 TEMP CUTS ON R/W |
2019-02-15 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MARKOUTS MADE WORK NOT STARTED |
2019-02-15 | No data | SUNBURY ROAD, FROM STREET 120 AVENUE TO STREET IRWIN PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak at the Curb Valve. 3 Day Dep Notice Issued |
2019-02-15 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration okay in d/l. |
2019-02-14 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Wearing course complete and acceptable. |
2019-02-14 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2019-02-14 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - In Parking Lane - In Parking LaneRemove Debris Left at Worksite or re barricade ... |
2019-02-13 | No data | NEW LOTS AVENUE, FROM STREET VERMONT STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Specific Location: 686 and 690 Vermont Street do not match with the given location of the permit. location of permit is incorrect. no work done |
2019-02-13 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water and sewer cut mounded 1/2 inch not flush and need to be re-sealed in some areas |
2019-02-09 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY & SIDEWALK OVERDUE FOR FINAL |
2019-02-06 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration, in the parking/driving lane, overdue for final.In front of 1409 Fulton Street between Brooklyn Avenue and Marcy Avenue. |
2019-02-06 | No data | HANCOCK STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notice confirmed, p/l OP IFO being excavated |
2019-02-05 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench is mounded 2 in cut must be flush with surrounding area bike lane and driving lane |
2019-02-04 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-02-03 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent obtained a street opening permit on a protected st. but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/24/2018. Respondent failed to obtain a confirmation number from the dept. |
2019-02-02 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | re-scheduled due permittee did not come. |
2019-02-01 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE |
2019-01-31 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-30 | No data | FOCH BOULEVARD, FROM STREET 171 STREET TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leak in roadway on 3/4 lead line in roadway (visibly confirmed)to be restored with 1'' copper,one excavation made on roadway at time of inspection. |
2019-01-29 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-28 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on roadway is overdue for final restoration |
2019-01-28 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-28 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the dept. |
2019-01-28 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a temporary restoration in the driving lane down 2 inches, not flush with the surrounding area. Permit, #B012018365F58 exp. 1/30/2019, used for ID. |
2019-01-26 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT'RESPONDENT'S SUB-CONTRACTORS HAD A STEEL PLATED REPAIR SEWER DOWN 5 FEET IN SIDEWALK-WITHOUT A VALID DOT PERMIT TO DO SO. STEEL PLATED SEWER STREET OPENING-NO PERMIT. EXPIRED DOT PERMIT#B012018339A46 |
2019-01-26 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A 10 FEET BY 5 FEET PERMANENT REPAIR WATER RESTORATION IN A PROTECTED STREET(ROADWAY & TEMPORARY RESTORATION IN SIDEWALK)-WITHOUT A VALID DOT PERMIT TO DO SO.PERMITTEE'S COLOR CODE |
2019-01-25 | No data | EAST 55 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE AT THIS TIME OF INSPECTION |
2019-01-25 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp. cut 5 inches below grade,contractor on site at this time. |
2019-01-25 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut flush in the roadway. |
2019-01-24 | No data | SUTTER AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts opp 953/955 d/l ok. |
2019-01-23 | No data | VAN SICLEN AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts in the roadway |
2019-01-23 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work starts |
2019-01-22 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition corrected - temp. cut to grade p/d/l,contractor working on s/w - spoke to Eroll on site. |
2019-01-21 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Temp. cut p/d/l 8 inches below grade visible - more on one side (iced area at this time).Area on the sidewalk 4 inches below grade create trip hazard for the pedestrians - wood plate out of place and not acceptable to used.Review for re-dig. |
2019-01-18 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED SHIFTED OFF SEWER BACKFILL RESTORATION IN ROADWAY, PLEASE RE-SET STEEL PLATE, AT 6 STREET BETWEEN 3 AVENUE & 4 AVENUE "AKA" 399 3 AVENUE. (CODE D4E & D05). |
2019-01-18 | No data | UTOPIA PARKWAY, FROM STREET 45 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | temp rd/w |
2019-01-17 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO POST A RAISE PLOW SIGNS & COUNTER SINK A PLATED ROADWAY EXCAVATION DURING THE WINTER MORATORIUM MONTHS DATED FROM 12/1/17 TO 4/30/18. THE PERMITTEE WAS IDENTIFIED BY PERMIT # B012018365F59 EXP |
2019-01-17 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV ISSUED TO NEWER PERMIT B012018365F59 |
2019-01-17 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary cut in bus pad overdue for final. |
2019-01-16 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk ok. |
2019-01-15 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2019-01-14 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permits issued nov issued on new permit |
2019-01-14 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to comply with terms and conditions of D.O.T permit stip # 112 which states to maintain 1-11 foot lane on one-way street . Above permittee has a full closure with an open sewer excavation . |
2019-01-13 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATIONS IN ROADWAY & SIDEWALK-OVERDUE FOR FINAL AT 226 LIVINGSTON STREET BETWEEN ELM PLACE & HOYT STREET. |
2019-01-12 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEWER PERMIT ON FILE |
2019-01-12 | No data | SOUTH ROAD, FROM STREET LIVERPOOL STREET TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found re-surfaced |
2019-01-09 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration on sidewalk overdue for final restoration. |
2019-01-08 | No data | EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway/sidewalk cut to repair water leak to water service dep three day as well as ten day notice on file |
2019-01-08 | No data | SEAGIRT AVENUE, FROM STREET BEACH 3 STREET TO STREET BEACH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D D C contractor paved over cut. |
2019-01-08 | No data | MERRICK BOULEVARD, FROM STREET 226 STREET TO STREET 227 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm cuts to grade |
2019-01-08 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | a steel plate in the roadway over excavation that wasn't counter sunk or a raise plow sign posted as required by the winter policy that is in effect from 12-1-18 to 3-1-19 steel was sitting on top of the roadway surface ramped. |
2019-01-07 | No data | UNION HALL STREET, FROM STREET 108 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work no longer visible due reconstruction work |
2019-01-07 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | Failure to Countersink Plates flush with roadway |
2019-01-05 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | Failure to Countersink Plates flush with roadway |
2019-01-05 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUTS IN THE ROADWAY {LONG WATER} |
2019-01-04 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Use/opening of protected street without DOT permit |
2019-01-04 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE REMOVE UNPINNED & UNRAMPED ROCK E SMALL STEEL PLATE ON ROADWAY(IN FRONT OF HYDRANT)- ON SACKETT STREET BETWEEN HOYT STREET & BOND STREET. |
2019-01-02 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | condition corrected . Roadway condition brought to grade prior to this `inspection |
2018-12-31 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a perm water cut in the roadway that needs the street opening joint to be sealed |
2018-12-30 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | NO RAISE PLOW SIGN |
2018-12-28 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | NO RAISE PLOW SIGN |
2018-12-28 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | roadway condition brought to grade prior to this inspection . |
2018-12-28 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway /sidewalk cut to repair water leak to water service |
2018-12-28 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2018-12-27 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in the roadway street opening joints haven't been sealed |
2018-12-26 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | Failure to Countersink Plates flush with roadway |
2018-12-25 | No data | 134 AVENUE, FROM STREET DEAD END TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp cut in the driving lane |
2018-12-24 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Active | Department of Transportation | at this time work not started permit is still active. |
2018-12-23 | No data | EAST MOSHOLU PARKWAY NORTH, FROM STREET EAST 206 STREET TO STREET VAN CORTLANDT AVENUE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp plumbers cut on the sidewalk and in the parking lane over due for final I/F/O 177, permit expired on 11/22/18. |
2018-12-22 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | NO RAISE PLOW SIGN |
2018-12-22 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA Condition made safe |
2018-12-21 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | portion of sewer cut across sidewalk sunken 3 '' |
2018-12-20 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected sewer cut and surrounding roadway brought to grade |
2018-12-20 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to countersink steel plate with the surrounding roadway. All steel plates need to be flushed during the Winter Moratorium period that is commenced on December 1, 2018 and ends on March 31, 2019. |
2018-12-20 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR & NOV issued to most recent permit on file Q012018351A02 |
2018-12-20 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp made safe. |
2018-12-20 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cuts in roadway. New active final restoration Permit Number: B012018334C44. |
2018-12-19 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | observed that the respondent failed to install temporary asphalt over entire repair . A large portion of the repair restoration was left back fill to grade with no temporary asphalt installed . Condition remains despite notice in NICA dated 12/17/18 |
2018-12-19 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass1 Cut size:3 Feet 9 inches by 3 Feet 2 inches Down 3 Feet 5 inches lift – 97.3%; 97.9WD – 124.2; DD – 114.3; Max D – 119.0 , AM – 8.7%AR: 11:30AM; DP: 1:05PM |
2018-12-18 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1042(A)-6 CORRECT CUT BACKS WEREN'T MADE ON LONG WATER RESTORATION 6" BASE CUT BACKS AND 12" WEARING COURSE CUT BACKS. 1042(A)-9 AFTER CORRECT CUT BACKS ARE TO BE MADE RESTORATION WILL HAVE TO BE COMBINED INTO 1 PERMANENT TRENCH. |
2018-12-18 | No data | CROWN STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS IN ROADWAY IN DRIVING LANE FINAL RESTORATION |
2018-12-18 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Roadway collapsing around sewer cut , temp asphalt pulled / washed out of cut, cut down 6'' |
2018-12-18 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut ok. |
2018-12-17 | No data | 45 STREET, FROM STREET 50 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 5' x 3' x 3.7' |
2018-12-15 | No data | MARION STREET, FROM STREET BEND TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass , ....new svc ..... |
2018-12-15 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A 10 FEET BY 5 FEET PERMANENT REPAIR WATER RESTORATION IN A PROTECTED STREET(ROADWAY & TEMPORARY RESTORATION IN SIDEWALK)-WITHOUT A VALID DOT PERMIT TO DO SO.PERMITTE |
2018-12-15 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | perm cut broken out with temp work is not flush with surrounding area down 2 inchs please make final restoration in front of 2083 |
2018-12-14 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt water cut in the roadway with localized area sunken 3 inches. NICA #20186150261 was issued on 12/14/2018 and permittee was notified by email ROCKESMALLPLUMBING@YAHOO.COM at 1700 hours and condition remains the same |
2018-12-14 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICA issued to most recent permit Q012018325E48 |
2018-12-14 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | unable to fully inspect temp cut in p/l due to cars, valid permit on file |
2018-12-14 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COVERED BY HALF +5 |
2018-12-13 | No data | 101 AVENUE, FROM STREET 110 STREET TO STREET 110 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | TEMP CUTS IN DL & PL WATER BF TAMPED TESTED & REPLATED COUNTER SUNK |
2018-12-13 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE REPSONDENT HAVING A CONCRETE BASE CUT DOWN 2 INCHES NOT FLUSH WITH THE SURROUNDING AREA,ALL CUTS MUST BE FLUSH AS PER DOT WINTER MORATORIUM ,ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT , WINTER POLICY |
2018-12-11 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp asphalt has worn out. Cut is overdue for final restoration. Must restore permanently. |
2018-12-09 | No data | EAST 15 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | NO RAISE PLOW SIGN |
2018-12-09 | No data | 45 STREET, FROM STREET 50 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012018320B53 on file. |
2018-12-09 | No data | 45 STREET, FROM STREET 50 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Temporary to grade cut in the parking lane. |
2018-12-09 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WORK DONE IN THE WORK |
2018-12-08 | No data | 146 STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 3520 perm /rest x r/w s/w temp /rest BO |
2018-12-08 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD OCCUPIED 50 FEET BY 5 FEET OF ROADWAY AT UNATTENDED WORKSITE WITH EXCAVATION MATERIAL FAILED TO ADHERE TO TERMS & CONDITIONS OF STIPULATION 078 OF ABOVE DOT PERMIT WAS USED FOR ID. |
2018-12-08 | No data | 3 AVENUE, FROM STREET 3 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A 10 FEET BY 5 FEET PERMANENT REPAIR WATER RESTORATION IN A PROTECTED STREET(ROADWAY & TEMPORARY RESTORATION IN SIDEWALK)-WITHOUT A VALID DOT PERMIT TO DO |
2018-12-07 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATIONS IN ROADWAY & SIDEWALK- OVERDUE FOR FINAL, AT 226 LIVINGSTON STREET BETWEEN ELM PLACE & HOYT STREET. |
2018-12-06 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}10FT 2IN X {W}4FT 2IN X {D}8FT 10IN TEST 97.4 98.2 ARRIVED 1230 LEFT 410 |
2018-12-06 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION ON THE ROADWAY AND SIDE WALK 70FT FROM 3 AVENUE |
2018-12-04 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE REPSONDENT HAVING A CONCRETE BASE CUT DOWN 2 INCHES NOT FLUSH WITH THE SURROUNDING AREA,ALL CUTS MUST BE FLUSH AS PER DOT WINTER MORATORIUM ,ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2018-12-04 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i observed the above respondent doing sewer work within keyspan's excavation without a valid permit on file to do so. permit on file expired on 11/13/18. expired permit# used to I.D contractor |
2018-12-01 | No data | EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temporary water cuts on the roadway overdue for final during the 2018-19 winter moratorium. |
2018-11-30 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | work being done for AKA 45 Irving, water being shut off due to contractor breaking service inside to building to be demoed, water leaking onto sidewalk which could leak to icy hazard to pedestrians |
2018-11-29 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATIONS HAVE BEEN MADE PERMANENT AND FLUSH TO GRADE |
2018-11-29 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 TEMP WATER CUTS IN THE ROADWAY |
2018-11-28 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the Respondent failed to permanently restore the roadway and sidewalk after a water repair within the required time permit allows. Attached permit expired 11/24/2018. |
2018-11-28 | No data | 171 STREET, FROM STREET 140 AVENUE TO STREET 143 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration approx. 2'' above grade |
2018-11-28 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DOT permit for any changes to,or installation of, temporary roadway pavement markings and temporary construction,parking or regulatory signs and supports,respondent fail to restore white lane roadway lane markings car # 20185150132 issued on 8/10/18 |
2018-11-28 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent/respondents sub-contractor failed to respond to corrective action request CAR Details (CAR #20186450033). Failure to properly seal and maintain the wearing course. |
2018-11-28 | No data | DITMAS AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 9 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | National Grid's IBM tag inserted, identifying permittee. |
2018-11-27 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT SEWER CUT IN THE ROADWAY THAT WAS LEFT WITH A TEMPORARY WEARING COURSE THAT HAVE WORN AWAY CUT IS DOWN 2" CONCRETE BASE EXPOSED CUT NOT FLUSH WITH SURROUNDING ROADWAY. |
2018-11-27 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINT SEALED |
2018-11-27 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATIONS IN ROADWAY & SIDEWALK WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012018227A29 EXP |
2018-11-24 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Green Paint for the Bike lane restored on perm Trench. |
2018-11-24 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway cut to repair water leak to water service |
2018-11-23 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY RESTORATION DOWN 1 AND A HALF INCHES BELOW GRADE OF SURROUNDING ROADWAY IN FRONT OF 730 51ST STREET. |
2018-11-23 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY PLATES ARE SECURED AND NOT MAKING ANY NOISE |
2018-11-23 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [9/14/18]. |
2018-11-21 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plate on roadway makinh minimal noise and also not shifted. |
2018-11-21 | No data | 97 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp on s/w and r/w new permit on file Q012018313A16 |
2018-11-20 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plate has been reset |
2018-11-19 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 temp cuts in the driving lane waiting top valid permit on file |
2018-11-19 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in roadway is shifted exposing excavation down 1' in driving lane in front of 402 hancock street |
2018-11-19 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in the roadway waiting top under a valid permit on file |
2018-11-18 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plates in r/w okay, no action needed at this time |
2018-11-18 | No data | 231 STREET, FROM STREET 131 AVENUE TO STREET 133 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O, I observed a 9' x 4' temporary roadway cut overdue for final restoration,. Respondent failed to permanently restore cut within required time. Above permit # was obtain to repair sewer which Expired on 10/16/18.. |
2018-11-17 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to plate concrete base excavation in the driving lane . Permit used for I.D. purpose only . |
2018-11-16 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & SIDEWALK- OK |
2018-11-16 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plate not shifted on roadway at this time. plate is pinned and ramped. |
2018-11-15 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
2018-11-15 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | PLATED ROADWAY AT THIS TIME. PLATES NOT SHIFTED AND MAKING MINIMal noise |
2018-11-15 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION HAS BEEN ADDRESSED ASPHALT NO LONGER CRACKED/BROKEN OUT. LANE MARKINGS HAVE BEEN APPLIED |
2018-11-14 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/10/2018. |
2018-11-14 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 2 CUTS...CUT#1 (L) 13 FT (W) 4FT (D) 8FT ...CUT#2 (L) 5.6 FT (W) 5.2 FT (D) 4FT ..ACTUAL START TIME 12:30 PM ..COMPACTION: (1) 97.1% / 97.6% (2) 97.3% / 97.7% |
2018-11-14 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/11/2018. |
2018-11-14 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/17/2018. |
2018-11-13 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to make proper cut backs to one of two long water cuts in parking lane of roadway. |
2018-11-12 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate good on roadway in good standing and not shifted as complaint says, |
2018-11-10 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the area within a permanent sewer restoration not flush with the surrounding area,Permanent cut sunken 2" below grade. CAR # 20184820443 issued 8/14/2018 but has yet to be corrected. |
2018-11-10 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE A TEMPORARY RESTORATIONS IN ROADWAY & SIDEWALK WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT |
2018-11-09 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | stip violation #020 |
2018-11-09 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE PREPARING TO SHORE UP EXCAVATION IN THE ROADWAY. TO PREVENT PLATES FROM MOVING |
2018-11-09 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | STEEL PLATES BEING RESET BY CONTACTOR |
2018-11-08 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | MONITORED BACKFILL FROM 11:12AM TO 1225PM TWO CUTS IN THE PARKING LANE CUT 1LENGTH 4FT WIDTH 3FT DEPTH 3FT 9INCHES CUT 2 LENGTH 3FT WIDTH 3FT DEPTH 3FT 7INCHES SPRAYED CUTBACKS |
2018-11-08 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut in sidewalk and roadway |
2018-11-08 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 24ft 5in x 4ft 1in x 7ft Pass: 96.1% and 96.5% |
2018-11-06 | No data | HEMLOCK STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT IN THE DRIVING LANE WITHIN THE REQUIRED TIME TO DO SO , ABOVE PERMIT # EXPIRED ON 1/8/18 |
2018-11-05 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting both lanes closed due to safety condition |
2018-11-05 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced |
2018-11-05 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The respondent failed to plate the sewer excavations in the driving lane. The cuts were concrete only below grade 2-3". |
2018-11-05 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on location re-setting steel plates |
2018-11-04 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench is in compliance |
2018-11-04 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w is sealed and in compliance |
2018-11-03 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV ISSUED |
2018-11-02 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site working in excavation. spoke with supervisor about making sure plates are secure when they leave the work site. will return at a later date to re-inspect |
2018-11-02 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | water restoration flush to grade in the d/l |
2018-11-01 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT WITH 2 TEMPORARY RESTORATIONS ON THE ROADWAY AND FAILED TO PERMANENTLY RESTORE WITHIN REQUIRED TIME (BY EXPIRATION OF DOT PERMIT). EXPIRED PERMIT B012018255D24 EXPIRED 10/11/2018 USED FOR ID. |
2018-10-31 | No data | HURON STREET, FROM STREET ALBERT ROAD TO STREET ECKFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to new reconstructed road project |
2018-10-31 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER CUT IN THE ROADWAY |
2018-10-30 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Made safe with temporary asphalt. |
2018-10-30 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | trench in driving lane below grade 3" 15'x3' |
2018-10-29 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT WITH 2 TEMPORARY RESTORATIONS ON THE ROADWAY AND FAILED TO PERMANENTLY RESTORE WITHIN REQUIRED TIME (BY EXPIRATION OF DOT PERMIT). EXPIRED PERMIT B012018255D24 EXPIRED 10/11/2018 USED FOR ID. |
2018-10-28 | No data | 146 STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 3520 perm /rest x r/w s/w temp /rest BO |
2018-10-28 | No data | 195 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut r/w |
2018-10-27 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w at time of inspection, valid permit on file |
2018-10-25 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN OPEN TRENCH ON THE SIDE OF 399 3 AVE ON NCL |
2018-10-24 | No data | ALBERT ROAD, FROM STREET 99 PLACE TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-10-24 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the respondent with a temp sewer cut in the roadway the temp asphalt worn away exposing the concrete base. their temporary restoration wasn't flush with the surrounding roadway area down 2 inches. |
2018-10-23 | No data | 163 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation on the roadway. Active permit Q012018291C33 on file |
2018-10-23 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERMANENT RESTORATION ON ROADWAY IN PARKING/DRIVING LANE. ASPHALT IS BROKEN AND CRACKED LANE MARKINGS NEED TO BE APPLIED PERMITTEE HAS BEEN TAKING OUT PERMITS FOR LOCATION SINCE OCTOBER OF 2017. |
2018-10-22 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - PROTECTED LL14 BACKFILL RE-SCHEDULED |
2018-10-22 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT WITH 2 TEMPORARY RESTORATIONS ON THE ROADWAY AND FAILED TO PERMANENTLY RESTORE WITHIN REQUIRED TIME (BY EXPIRATION OF DOT PERMIT). EXPIRED PERMIT B012018255D24 EXPIRED 10/11/2018 USED FOR ID. |
2018-10-20 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water Service Repair was Resurfaced by National Grid |
2018-10-20 | No data | ALSTYNE AVENUE, FROM STREET BEND TO STREET JUNCTION BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/o 94-47/49 two temp. cuts to grade on r/w and on s/w - no active permit found at this time. On the s/w is O'k - active BO;NOV issued for the r/w under the newest permit. |
2018-10-20 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the about respondent failed to plate concrete base excavation in driving lane . Above permit used for I.D purpose. |
2018-10-19 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | spoke with supervisor, backfill will be re-scheduled for a later date |
2018-10-19 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp long water cut okay, steel plate is pinned and ramped |
2018-10-19 | No data | MONROE STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | spoke with supervisor, backfill will be re-scheduled for a later date |
2018-10-18 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(8’)W(4’)D(4’)TEST#1=96.6TEST#2=97.2CUT#1=L(5’)W(4’)D(3’)TEST#1=96.3Backfill pass |
2018-10-18 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2018-10-18 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Permit Number: B012018275E25. |
2018-10-16 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill re-scheduled due to contractor not doing a full trench from the roadway to the sidewalk. Excavation was 1 foot and 18 inches from the curb. |
2018-10-16 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration on roadway and sidewalk |
2018-10-16 | No data | AUGUSTINA AVENUE, FROM STREET NAMEOKE AVENUE TO STREET WHEATLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration p/l |
2018-10-15 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cuts temp to grade sidewalk and roadway |
2018-10-15 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2018-10-14 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp trench in roadway. NewPermit Number: B012018263A76. |
2018-10-13 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Active | Department of Transportation | swk restore |
2018-10-13 | No data | EAST 43 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway cut to repair water leak to water service |
2018-10-09 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates was reset |
2018-10-07 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent/respondents sub-contractor failed to respond to corrective action request CAR Details (CAR #20186450033) Failure to properly seal and maintain the wearing course expired D.O.T permit B012017279A94 USED FOR ID |
2018-10-07 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | H-1042D failure |
2018-10-07 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 out of 2 steel plates shifted 4'' exposing excavation that is down 6' |
2018-10-07 | No data | 146 STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 3520 perm /rest x r/w s/w temp /rest BO |
2018-10-06 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealed perm cut |
2018-10-04 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition was filled in and made flush with sidewalk |
2018-10-03 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working in the roadway |
2018-10-03 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary cut on the sidewalk sunken 2 ½’’ |
2018-10-03 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates were reset & ramp |
2018-10-03 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERMIT IS STILL ACTIVE FOR SITE. FINAL RESTORATION NEEDED DUE TO WERING COURSE. PERMIT EXPIRES THE MIDDLE OF OCTOBER. |
2018-10-03 | No data | WAKEMAN PLACE, FROM STREET BERGEN PLACE TO STREET SEDGWICK PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | leak on basement confirmed with home owner, p/l & s/w excavated |
2018-10-03 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The respondent failed to comply with the terms and conditions of the DOT permit. Stipulation # 112 in violation. The respondent failed to provide 2-11 ft lanes on the two way street. The company was working on a sewer at time of inspection. |
2018-10-02 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 out of 2 steel plates shifted 6'' exposing excavation that is down 5' |
2018-10-01 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restore |
2018-10-01 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane in compliance |
2018-09-30 | No data | BIRDSALL AVENUE, FROM STREET BEACH CHANNEL DRIVE TO STREET REDFERN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration p/d/l |
2018-09-28 | No data | 155 STREET, FROM STREET 122 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection crew working at site |
2018-09-27 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w at time of inspection, valid permit on file |
2018-09-25 | No data | 86 STREET, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | WORK WAS ALSO DONE ON THE SIDEWALK 2 CUTS THAT ARE FINAL |
2018-09-22 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary 15' x 5' plumber's cut in the roadway that's overdue for final restoration. Respondent failed to permanently restore cut within the required time. Above permit #B012018233C81 expired on 9/20/2018 was used for ID purpose. |
2018-09-21 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 407, roadway resurfaced and sidewalk area acceptable. |
2018-09-20 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2018-09-20 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE 2 TEMPORARY CUTS IN THE DRIVING LANE WITH IN THE REQUIRED TIME TO DO SO , ABOVE PERMIT # EXPIRED ON 5/5/18 |
2018-09-20 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | NOV issued due to failing to secure steel plates |
2018-09-20 | No data | 126 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates across roadway need to be secured to roadway |
2018-09-19 | No data | SHEFFIELD AVENUE, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 2 CUTS ..CUT #1 (L) 12 FT (W) 4FT (D) 8FT ...CUT #2 (L) 5FT (W) 4FT (D) 3FT ...COMPACTION: (1) 97.6% / 96.9% (2) 97.2% |
2018-09-18 | No data | 134 STREET, FROM STREET 109 AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2018-09-17 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 TEMPORARY RESTORATIONS ON ROADWAY. (LONG WATER CUT) |
2018-09-17 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway cut mounded 2-21/2" in driving lane. |
2018-09-17 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FULL SIDEWALK FLAG NEEDED PATCH WORK NOT ACCEPTABLE |
2018-09-17 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FULL SIDEWALK FLAG NEEDED PATCH WORK NOT ACCEPTABLE |
2018-09-16 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed. In compliance. |
2018-09-15 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | r\w paved |
2018-09-14 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to make proper cut backs to one of two long water cuts in parking lane of roadway. |
2018-09-12 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT IN THE PARKING NEW PERMIT ON FILE |
2018-09-12 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVE THE ABOVE RESPONDENT HAS 2 TEMPORARY RESTORATIONS ON THE ROADWAY AND FAILED TO PERMANENTLY RESTORE WITHIN REQUIRED TIME. (BY EXPIRATION OF DOT PERMIT). EXPIRED PERMIT B012018213A12 EXPIRED 8/30/2018 USED FOR ID. |
2018-09-11 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on swk ok |
2018-09-09 | No data | MERRICK BOULEVARD, FROM STREET 226 STREET TO STREET 227 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cuts in roadway to grade |
2018-09-08 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR(HALLEN)HAD A OPEN DIRT BACKFILL RESTORATION IN SIDEWALK;FAILED TO UPON COMPLETION OF BACKFILL TO INSTALL A TEMPORARY PAVEMENT FLUSH WITH SURROUNDING AREA. DOT PERMIT# |
2018-09-07 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | white travel lane markings and green bike lane paint to be restored on perm restoration |
2018-09-07 | No data | 51 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAS 2 TEMPORARY RESTORATIONS ON THE ROADWAY AND FAILED TO PERMANENTLY RESTORE WITHIN REQUIRED TIME. (BY EXPIRATION OF DOT PERMIT). EXPIRED PERMIT B012018213A12 EXPIRED 8/30/2018 USED FOR ID. |
2018-09-06 | No data | NEW YORK AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | work crew on site restoration beinging sawcut for nyc paving |
2018-09-06 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The respondent failed to plate concrete only excavations in the driving lane. 4 cuts are below grade 2" |
2018-09-05 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp. restoration active permit on file |
2018-09-03 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas cut in compliance |
2018-09-03 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration remains in a temporary state. Passed as per Queens DBC. Violation will be issued. |
2018-09-02 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated cuts on r/w. |
2018-09-02 | No data | GLENWOOD ROAD, FROM STREET EAST 89 STREET TO STREET REMSEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the roadway. Active permit on file. |
2018-09-01 | No data | DITMAS AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Missing IBM color code tag identifying permittee. |
2018-08-31 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 4 temp. to grade cuts observed in the r/w |
2018-08-31 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | MULTIPLE TEMP CUTS ON R./W |
2018-08-30 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent with two temporary water restoration that is overdue for final restoration, respondent was notify by CAR #20186230226 on 5/16/2018, condition remains. |
2018-08-29 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CLOSE CAR, ISSUE NOV & ANOTHER CAR |
2018-08-29 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/6/2018. Respondent failed to obtain a confi |
2018-08-29 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE 2 TEMPORARY CUTS IN THE DRIVING LANE WITH IN THE REQUIRED TIME TO DO SO , ABOVE PERMIT # EXPIRED ON 5/5/18 |
2018-08-29 | No data | NEW YORK AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass:1 Cut size:17 Feet by 11 Feet Down 10 Feet lift – 96.3%; 97.7 WD – 120.9; DD – 113.6; Max D – 117.0 , AM – 6.4%AR: 10:30AM; DP: 1:25PM |
2018-08-29 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD RESTORED 2- 4 FEET BY 4 FEET SIDEWALK FLAGS TO REPAIR A CORRECTIVE ACTION REQUEST#20184510705-WITHOUT A VALID DOT PERMIT TO DO SO(RESTORE SIDEWALK FLAGS).SIDEWALK |
2018-08-28 | No data | HANCOCK STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW EXCAVATING ROADWAY IN DRIVING LANE |
2018-08-28 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to make two temporary water cuts permanent after being notify CAR #20186230226 on 5/16/2018, condition remains |
2018-08-27 | No data | CLOVERDALE BOULEVARD, FROM STREET 56 AVENUE TO STREET 57 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm trench to grade. |
2018-08-27 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water restoration in p/l & d/l |
2018-08-27 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street milled waiting to be resurfaced. |
2018-08-26 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts patch |
2018-08-24 | No data | RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut |
2018-08-24 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT CUT ACROSS ROADWAY NEEDS TO BE RESEALED |
2018-08-24 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/9/2018. Respondent failed to obtain a confi |
2018-08-23 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1j |
2018-08-23 | No data | 78 AVENUE, FROM STREET 60 LANE TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J Issued. Permit expired 7/6/2018. Respondent failed to obtain a confirmation number from the department. |
2018-08-23 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed on arrival. |
2018-08-22 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1j |
2018-08-20 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | ifo 954 2 ave b/t E 51 st & E 50 st found 4 steel plates marked Ruggiero : 2 steel plates countersink 1".5 below grade and not resting properly in the grove at driving lane, also at parking 2 steel plates overlapped and shifting . |
2018-08-20 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate reset pinned and ramped to the Roadway. |
2018-08-20 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed and in compliance. Cut#1: 4'x4'x4' Cut#2: 4'x3'6"x2'x8". Two sidewalk flags have been temp to grade. Sprayed for cutbacks. |
2018-08-18 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew Onsite at this Time, New Active Permit On File |
2018-08-18 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO RESEAL CUT ON THE STREET CAR #20186600085 ISSUED ON 6\29\2018 |
2018-08-18 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE 2 TEMPORARY 3 FOOT X 3 FOOT RESTORATIONS ON (SIDE WALK) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#(B012017314A05) EXP 12/9/2017 WAS USED FOR ID. |
2018-08-16 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates are reset |
2018-08-16 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary restoration in roadway newer permit on file B012018226C51 |
2018-08-16 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | temporary restoration in roadway |
2018-08-15 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates shifted back into postion. |
2018-08-15 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | one steel plate in the parking lane shifted 3 inches and second steel plate in the driving lane shifted 17 inches |
2018-08-15 | No data | MESEROLE STREET, FROM STREET BUSHWICK PLACE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp swk trench. Located IFO BO. Roadway was repaved by DOT. |
2018-08-14 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in the driving lane shifted 10 inches . exposing excavation, steel plates to be reset |
2018-08-14 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates were reset |
2018-08-14 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Plumber permanent restoration sunken 1-2 inches below grade,also restoration joint needs to be resealed. |
2018-08-14 | No data | SUTPHIN BOULEVARD, FROM STREET 109 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk 3 Day Dep Notice Issued |
2018-08-12 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway |
2018-08-12 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONCRETE BASE CUT ON R.W, |
2018-08-12 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2018-08-10 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut flushed to grade |
2018-08-10 | No data | 142 STREET, FROM STREET 109 AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not found |
2018-08-10 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO RESTORE IN KIND ALL ROADWAY MARKINGS, CAR #20185150132 ISSUED ON 3/23/18 |
2018-08-10 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 24, active B/O at this time and unable to view work performed. Cobble Stone roadway observed is flush within B/O barricades. |
2018-08-09 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has since been resurfaced 10/2017. |
2018-08-09 | No data | 42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK-FILL WILL BE RESCHEDULED DUE TO NO BACK-FILL MATERIALS AND NO TESTER ON SITE. |
2018-08-08 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint between s/w and curb recessed and sealed |
2018-08-07 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site working in the parking lane I.F.O 954 |
2018-08-06 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Sewer repair work plated across roadway. |
2018-08-06 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer repair work plated across roadway. |
2018-08-05 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway cut restored to grade. |
2018-08-04 | No data | 42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | excavated material stored in parking lane active permit on file. |
2018-08-03 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | FINAL RESTORATION PERMIT HAS BEEN TAKEN OUT TO MILL AND REPAVE PERMANENT TRENCH RESTORATION THAT IS BROKEN AND CRACKED IN THE PARKING/DRIVING LANE. |
2018-08-03 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent with a irregular shape restoration for water that is unacceptable , must be square or rectangular in shape. As per 1042D Note # 3. A CAR was issued on 4/20/18, CAR # 20183690123. |
2018-08-03 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | i observed the above respondent obstructing the gutter with dirt & debris at work site. permit# used to I.D contractor |
2018-08-03 | No data | 78 AVENUE, FROM STREET 60 LANE TO STREET 60 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | The above respondent had a temporary plumber's restoration cut in the street overdue for final. |
2018-08-03 | No data | CHURCH AVENUE, FROM STREET EAST 42 STREET TO STREET EAST 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration curb-curb in roadway. |
2018-08-03 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates have been reset |
2018-08-02 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt adjacent to plate remains broken and cracked sunken 2-4 inches in the roadway and Temporary restoration on sidewalk sunken 2-3 inches not flush with surrounding area. Opposite 345 Hewes St |
2018-08-02 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working on sidealk IFO 956 |
2018-08-01 | No data | HEWES STREET, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate in the roadway is shifted 4 inches exposing excavation and there is also broken and cracked asphalt adjacent to plate sunken 2-3 inches. There is also a Temporary restoration on the sidewalk not flush sunken 2-3 inches. Opp 345 Hewes St |
2018-08-01 | No data | 2 AVENUE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Sewer relay work ongoing (sidewalk/roadway), crew on location. |
2018-08-01 | No data | 78 AVENUE, FROM STREET 60 LANE TO STREET 60 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | start 10:15 9.0 x 6.0 x 9.5 back fill |
2018-08-01 | No data | CARROLL STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w ative b.o |
2018-08-01 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane okay |
2018-07-30 | No data | NEW YORK AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | INCOMPLETE BACKFILL – Major voids on both sides of the trench after removal of shoring. Crew on site did not have machinery to do cutback and cut out voids. 18 Feet by 3 Feet 10 inches Down 10 Feet; Backfill to 5ft only. |
2018-07-30 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm 3 cuts |
2018-07-29 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/respondent's sub-contractor with three (3) concrete base restoration not flush with surrounding area. In front of 1014 & 1016 Carroll Street. The surrounding area must be made and kept flush;restoration down 2 inches. |
2018-07-29 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in parking lane |
2018-07-27 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | start 12:30 3.10 x 3.11 x 4.0, 3.10 x 3.10 x 3.0 |
2018-07-26 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2018-07-26 | No data | 129 STREET, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptablefound at 130-33 2 restorations (long water) 3'6" x 3'3" and 5'1" x 3'10" I/F/O BO |
2018-07-25 | No data | ALSTYNE AVENUE, FROM STREET BEND TO STREET JUNCTION BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 1 open and 1 plated roadway excavation in parking and driving lane |
2018-07-24 | No data | 146 STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench across r/w |
2018-07-23 | No data | ALBERT ROAD, FROM STREET 99 PLACE TO STREET NORTH CONDUIT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permit check found shoring backfill in hole. |
2018-07-22 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | P/L PERM |
2018-07-22 | No data | HOWE AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | your final water restoration, in the parking lane measure less than 4ft in length. Proper cut back were not done. |
2018-07-21 | No data | 76 STREET, FROM STREET 95 AVENUE TO STREET 97 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance at time of inspection. (parking lane not visible due to cars on roadway) location in compliance. |
2018-07-21 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT failed to seal street joints on a trench CAR #20181670277) issued on 4\5\2018 |
2018-07-21 | No data | 174 STREET, FROM STREET 134 ROAD TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2018-07-21 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut into 2341 |
2018-07-20 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE ON R/W S/W |
2018-07-19 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a temporary water and sewer cut on the street overdue for final. Respondent failed to permanently restore cuts within required time. Permit expired on 5/24/2018 and used for ID only. |
2018-07-19 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cuts in the r/w. NOV issued to permit#Q012018094B51. Active permit also on file. |
2018-07-18 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate on D/L pinned and ramped with temp asphalt |
2018-07-17 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | ifo 138 -12 northern blvd b/t Union st & Bowne st- found one steel plate shifted marked BUG/tried to smooth out mark) at driving lane of roadway. |
2018-07-17 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | FINAL RESTORATION PERMIT HAS BEEN TAKEN OUT TO MILL AND REPAVE PERMANENT TRENCH RESTORATION THAT IS BROKEN AND CRACKED IN THE PARKING/DRIVING LANE. |
2018-07-16 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM SIDE WALK FLAG AROUND WATER CAP COVER. TRENCH IN THE ROADAY WAITING TO BE REPAVED AND RESEALED |
2018-07-16 | No data | NEW YORK AVENUE, FROM STREET MIDWOOD STREET TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working |
2018-07-14 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION REMAINS THE SAME ,NOV ISSUED |
2018-07-14 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE 2 CUTS IN THE PARKING LANE WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 5/5/18, ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2018-07-12 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent maintaining temporary water cuts across the roadway. respondent failed to permanently restore their cuts within required time. permit expired on 5/4/2018. The respondent was previously notified by CAR #20186230226 |
2018-07-11 | No data | 196 STREET, FROM STREET 120 AVENUE TO STREET 122 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts made final. |
2018-07-10 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION STILL OVERDUE. VIOLATION WILL BE ISSUED. |
2018-07-10 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE RESPONDENT FAILED TO PERMANENTLY RESTORE THEIR TWO TEMPORARY RESTORATIONS ON THE ROADWAY I/F/O 62-96 FOREST AVENUE WITHIN THE REQUIRED TIME GIVEN. PERMIT LISTED EXPIRED ON 6/27/2018. NO ACTIVE PERMIT ON FILE. |
2018-07-09 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE 2 TEMPORARY 3 FOOT X 3 FOOT RESTORATIONS ON (SIDE WALK) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#(B012017314A05) EXP 12/9/2017 WAS USED FOR ID. |
2018-07-08 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent/respondent's sub-contractor with three (3) concrete base restoration not flush with surrounding area. In front of 1014-1016 Carroll Street. The surrounding area must be made and kept flush;restoration down 1.5". |
2018-07-08 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm. cuts p/d/l to be resealed loc. areas,restore full s/w flag - patchwork not acceptable. |
2018-07-07 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut in r/w, swk flags are sealed and in compliance |
2018-07-06 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BPP [Permit#B012018170B62] was done at location covering restoration. |
2018-07-06 | No data | MERRICK BOULEVARD, FROM STREET 226 STREET TO STREET 227 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two days of receiving an emergency permit number. |
2018-07-05 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent maintaining 3 temporary water cuts across the roadway in front of 2609 Seagirt Avenue. The respondent failed to permanently restore their cuts within the required time. The above permit expired on 6/28/2018. |
2018-07-05 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Restoration Missing Color Code - Temporary Restoration Overdue for FINAL RESTORATION AFTER NICA REPAIRS |
2018-07-05 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | - In Driving Lane - Restoration Missing Color Code - Temporary Restoration Overdue for FINAL RESTORATION AFTER NICA REPAIRS |
2018-07-03 | No data | 174 STREET, FROM STREET 134 ROAD TO STREET 137 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2018-07-03 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same, NOV will be issued to updated permit. |
2018-07-03 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The above respondent has failed to permanently restore their temporary asphalt water restoration within the required time. Permit expired 11/28/17. |
2018-07-02 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Materials not properly barricaded |
2018-07-02 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete base cut and also temp cut on rw |
2018-07-02 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete base cut on r.w. valid permit in dash. |
2018-07-02 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 4' X 3'6'' BINDER RESTORATION DOWN 3''- 4'' IN THE DRIVING LANE I/F/O 62-96 FOREST AVENUE |
2018-07-02 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE RESPONDENT FAILED TO PERMANENTLY RESTORE THEIR (2) BINDER (TEMP) WATER RESTORATIONS IN THE DRIVING LANE WITHIN THE REQUIRED TIME GIVEN. PERMIT EXPIRED ON 6/27/2018. NO ACTIVE PERMIT ON FILE. |
2018-07-02 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 3 Plates in the roadway loose and noisy as cars drive over. |
2018-07-01 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I Found two temporary restoration in the driving lane overdue for final , respondent permit expired 6/30/18 and condition still exist. |
2018-06-30 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm trench on r.w |
2018-06-29 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL 5FT X 10FT PERM RESTORATION CUT ON THE ROADWAY IN FRONT OF 177 |
2018-06-27 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/respondent's sub-contractor with three (3) concrete base restoration not flush with surrounding area. In front of 1014 & 1016 Carroll Street. The surrounding area must be made and kept flush;restoration down 2 inches. |
2018-06-26 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. |
2018-06-26 | No data | MIDLAND AVENUE, FROM STREET FREEBORN STREET TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration to grade in r/w |
2018-06-25 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CHECKING....plated excavation in the driving lane |
2018-06-25 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUTS ON R//W |
2018-06-23 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two temporary restoration flushed to grade in the roadway. |
2018-06-23 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TRENCH COVERED BY NEW BUILDING HALF +5 |
2018-06-23 | No data | SEAGIRT AVENUE, FROM STREET BEACH 26 STREET TO STREET BEACH 26 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit on file Q012018150F66 |
2018-06-22 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete base cut on r/w and temp cut. |
2018-06-22 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | temporary restoration on roadway in the driving lane to grade in front of 977 |
2018-06-22 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temporary restoration was restored to grade newer permit on file# B012018151C33 |
2018-06-21 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench sealed and in compliance |
2018-06-20 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete cut and temporary cut on r/w. |
2018-06-20 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for Final water cut on the Sidewalk, I/F/O 246 |
2018-06-20 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Duplicate, summons will be issued under permit #(M012017223D00) |
2018-06-20 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | concrete restorations down 1" waiting for top |
2018-06-20 | No data | 35 AVENUE, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | permit within compliance, no block sidewalk or street |
2018-06-20 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | mate safe |
2018-06-20 | No data | MERRICK BOULEVARD, FROM STREET 226 STREET TO STREET 227 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak Coming up from the Sidewalk. 3 Day Dep Notice Issued. Church Rep on Site. Leak Perhaps due to Electrolysis Instructed Site Foreman to Enclose Copper Pipe with an PVC Pipe. |
2018-06-19 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT failed to seal street joints on a trench CAR #20181670277) issued on 4\5\2018 |
2018-06-19 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut 5in by 5in cave in down 1ft |
2018-06-18 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate in driving lane is set and ramped. Area now safe. Crew on site making repairs in excavation. In compliance. |
2018-06-18 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED BY NEW BUILDING HALF +5 |
2018-06-18 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At 81 - 83 STOCKHOLM ST., 2 of 2 steel plates at excavation very loose & noisy when rolled upon. |
2018-06-18 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | At 81 - 83 STOCKHOLM ST., -1 of 2 unsecured plates at excavation bouncing 2" in air when rolled upon. -1 of 2 inadequate 5' wide plate at 4'8" wide excavation & also bounces 2" in air when rolled upon.-Adjacent walls collapsing at plated excavation |
2018-06-15 | No data | 21 AVENUE, FROM STREET 154 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut in r/w |
2018-06-15 | No data | 21 AVENUE, FROM STREET 154 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in r/w. Active permit in file |
2018-06-14 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent with a irrregular shape restoration for water that is unacceptable. As per 1042D Note # 3. A CAR was issued on 4/20/18, CAR # 20183690123. |
2018-06-14 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-06-13 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cuts on r/w. |
2018-06-12 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | atpo i observed the above respondent had placed wood boards over an open roadway cut failing to provide adequate protection at worksite id by permit on file |
2018-06-11 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore their sidewalk flags with in the required time. Repondent was notified on 12/1/17 via CAR# 20175010152 about condition. |
2018-06-10 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer - in compliance |
2018-06-10 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/respondent's sub-contractor with two(2) concrete base restoration not flush with surrounding area. In front of 1014 & 1016 Carroll Street. The surrounding area must be made and kept flush;restoration down 2 inches. |
2018-06-08 | No data | 116 DRIVE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | When more than one roadway opening is made against a single permit and openings are less than three feet apart after the required cutbacks, the existing wearing course between such openings shall be restored integrally Standard Detail Draw #H-1042. |
2018-06-08 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Permanent water/sewer restoration across roadway flush to grade,plated excavation in P/L pinned and ramped |
2018-06-08 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY RESTORATION ON SIDEWALK WITHIN REQUIRED TIME. EXPIRED DOT PERMIT #B012018071A56 EXP 4/10/2018 WAS USED FOR ID. |
2018-06-08 | No data | LANDER STREET, FROM STREET 84 ROAD TO STREET HOOVER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in progress - steel plated p/d/l,contractor has an active permit at this time. |
2018-06-08 | No data | LANDER STREET, FROM STREET 84 ROAD TO STREET HOOVER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - steel plated p/d/l. |
2018-06-08 | No data | SARATOGA AVENUE, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | atpo i observed the above respondent had left various roadway restorations in a temporary state ( backfill only down three inches not flushed with roadway surface id by permit number on file |
2018-06-07 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to make roadway restoration flush with the surrounding area. Roadway down 1". Respondent failed to apply temporary asphalt to restoration upon completion of backfill. |
2018-06-07 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt added to restoration making it flush with surrounding area. |
2018-06-07 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE 2 TEMPORARY 3 FOOT X 3 FOOT RESTORATIONS ON (SIDE WALK) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#(B012017314A05) EXP 12/9/2017 WAS USED FOR ID. |
2018-06-07 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to make roadway restoration flush with the surrounding area. Roadway down 3". Respondent failed to apply |
2018-06-06 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete and temp cut on r/w existing after street paved during BPP. |
2018-06-05 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to seal expansion joints as per subsection along the sidewalk. The respondent was notified via CAR# 20186150099 on 5/2/18 to correct the condition but failed to do so. |
2018-06-05 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut covered by bpp |
2018-06-03 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration not completed at curb line |
2018-06-02 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION IN THE ROADWAY COVERED BY BUILDERS PAVERS |
2018-06-02 | No data | CARROLL STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD 2 STEEL PLATES OVER OPEN EXCAVATION DOWN 3FT 8IN 1 PLATE NOT PAIN ALL RAMPED ID BY STEEL PLATE AND THE ABOVE PERMIT B012018137A41 |
2018-06-01 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file Q012018150F72 |
2018-05-31 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT WITH a temp cut on the STEEL PLATE ON THE STREET NOT PINNED OR RAMPED.id by the above permit B012018127E91 |
2018-05-30 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER & SEWER PLATED EXCAVATION IN THE ROADWAY AND IN COMPLIANCE .TEMP SIDEWALK FLAG. BIO SWALES OPP. ADDRESS IN COMPLIANCE AND AWAY FROM CONSTRUCTION ON ROADWAY DIVIDER. NO CREW ON SITE. |
2018-05-29 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cuts on r/w..new permit on file |
2018-05-29 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cuts on r/w. |
2018-05-29 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to maintain one 11-foot lane for traffic. This is a violation of Stipulation 023 of the above DOT permit. Permit used to ID. |
2018-05-27 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | potholes filled in |
2018-05-27 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w s/w |
2018-05-26 | No data | CLOVERDALE BOULEVARD, FROM STREET 56 AVENUE TO STREET 57 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 8'x4' area of perm restoration sunken 21/2'' IFO 56-33 |
2018-05-24 | No data | 103 AVENUE, FROM STREET 221 STREET TO STREET 223 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy in the Roadway. 3 Day Dep Notice Issued |
2018-05-24 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY |
2018-05-24 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 TEMPORARY SIDEWALK RESTORATIONS -OVERDUE FOR FINAL- IN FRONT 455 PROSPECT PLACE BETWEEN CLASSON AVENUE & GRAND AVENUE. |
2018-05-23 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on r.w. |
2018-05-23 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDE WALK FLAGS INSTALLED AROUND WATER CAP COVER ROADWAY RESURFACED BY BUILDERS PAVERS |
2018-05-23 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete and acceptable. |
2018-05-22 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | last week there was a water leak i spoke to the restaurant owner that confirm d.e.p respondent and plumber was hired to make repairs there is a temp water cut in the roadway. |
2018-05-21 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | SEWER & WATER CUT COMBO PL & DL BF TAMPED TESTED MARKOUT FOR CUTBACK |
2018-05-20 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not effecting the bike lane |
2018-05-18 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 24 ( active B/O ), unable to view work at this time on cobble stone roadway. |
2018-05-18 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO POST ADVANCE WARNING SIGNS PRIOR AND ALSO AT WORK ZONE AFFECTING THE BIKE LANE. SIGNS SHALL BE POSTED IN ACCORDANCE WITH FEDERAL M.U.T.C.D. MANUAL. LANE A VIOLATION OF STIP BIKE 02 OF ABOVE DOT |
2018-05-17 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates not secured shifted 3 inches |
2018-05-17 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2018-05-17 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012018134A28 |
2018-05-17 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to use skid resistant plating and/or decking on roadway |
2018-05-17 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp long water cuts in the parking lane to grade overdue for final (extended winter policy) |
2018-05-16 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no bike lane on segment |
2018-05-16 | No data | BEACH 19 STREET, FROM STREET CRAWFORD COURT TO STREET EVERDELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temps cuts in the roadway and on the sidewalk, overdue for final restoration. |
2018-05-16 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | no workat this time |
2018-05-16 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plate in the roadway with no skid resistant |
2018-05-16 | No data | GRAND STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2018-05-15 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10ft 4ft down 5ft |
2018-05-15 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CAR HAS BEEN ISSUED 5 MONTHS AGO, PERMITTEE KEEPS TAKING NEW PERMITS OUT FOR FINAL RESTORATION, BUT HAS NOT STARTED THE WORK TO REPAVE |
2018-05-14 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2018-05-14 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10ft 4ft down 11ft backfill only 6ft |
2018-05-11 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cut with area broken out & down 2'' |
2018-05-11 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on roadway with newer permit (B012018121B39) on file |
2018-05-10 | No data | DYRE AVENUE, FROM STREET BOSTON ROAD TO STREET CONNER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street has been resurfaced. |
2018-05-09 | No data | 21 AVENUE, FROM STREET 154 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in r/w |
2018-05-09 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-05-09 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Cobble stones restoration on sewer installation acceptable. No defects. |
2018-05-08 | No data | OCEAN PARKWAY, FROM STREET BRIGHTON BEACH AVENUE TO STREET SEA BREEZE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2018-05-08 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working in front of location to repair a LEAK ON STREET.. |
2018-05-05 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated plus 2 temp cut up to grade |
2018-05-03 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. permit expired 3/6/2018. Respondent failed to obtain a confirmation number |
2018-05-03 | No data | LINWOOD STREET, FROM STREET JAMAICA AVENUE TO STREET RIDGEWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CHECKING......TEMP CUT IN THE DRIVING LANE AND IN THE PARKING LANE TO GRADE |
2018-05-03 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | onsite working at open exc. in p&d/l |
2018-05-02 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On the side of 44-45, Recess and seal all expansion joints as per subsection along the s/w. |
2018-05-02 | No data | WEST 81 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Above permit expired found active final restoration permit M012018110C34 on file |
2018-04-30 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp trench on roadway overdue for final. |
2018-04-29 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL |
2018-04-28 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Monitored cobblestone restoration from 10:00am until 5:15pm |
2018-04-28 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT RD/W -S/W |
2018-04-27 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete base set on sewer installation cut and ready for cobble stones restoration. Refer to active permit M012018113B56. Acceptable for now. |
2018-04-27 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Concrete base set on sewer installation cut and ready for cobble stones restoration - schedule for tomorrow. |
2018-04-27 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts on r.w..new valid permit on deck. |
2018-04-27 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp trench and concrete cut; |
2018-04-27 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two water restorations flushed to grade. |
2018-04-27 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | As per project the location will be reinspected. |
2018-04-26 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | a-1245pmcut- 7'x3'7''x3' test-96.9 & 98.2patrickjumping jackexclusive testingwatsonsand conew-119.1d-109.6md-116am-8.7% |
2018-04-26 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | a-10:05amcut-5'x4'7''x4' test-96.5% & 98%patrickjumping jackexlcusive testing watsonsand conew-119.1d-109.6md-116am-8.7% |
2018-04-26 | No data | CLEVELAND STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PROPERLY FASTEN A STEEL PLATE IN THE DRIVING LANE, ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2018-04-25 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opp 138-12 permanen cut flush to grade |
2018-04-25 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavation of sewer work plated and countersunken |
2018-04-25 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two temp. cuts to grade d/l - permit active at this time. |
2018-04-23 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 1 CUT IN THE PARKING LANE (L) 14FT 3IN (W) 7FT 10IN (D) 4FT WET DENSITY-131.7DRY DENSITY-121.2MAX DRY DENSITY-124.5ACTUAL MOISTURE-8.7 LAST LIFT-97.2 |
2018-04-23 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PROPERLY PLACE STEEL PLATE. PLATE IS NOT EXTENDED 12 INCHES OVER STEEL PLATED EXCAVATION DOWN 2 FEET IN THE ROADWAY. DOT PERMIT B012018095C78 EXPIRES 5/1/2018 USED FOR ID. |
2018-04-23 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ASPHALT ADDED AROUND EDGES OF PLATE |
2018-04-21 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit B012018096A11 |
2018-04-20 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PROPERLY PLACE STEEL PLATE. PLATE IS NOT EXTENDED 12 INCHES OVER STEEL PLATED EXCAVATION DOWN 2 FEEFT IN THE ROADWAY. DOT PERMIT B012018095C78 EXPIRES 5/1/2018 USED FOR ID. |
2018-04-20 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your T-shape/irregular shape trench is unacceptable. Your are required to make rectangle or square in shape. Proper cut back were believed to not been done, due to different final measurements,( 3'4", 3'7", 5'7"in width). |
2018-04-20 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill in complete due to stips 10/3 one lift |
2018-04-19 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATED NOT PROPERLY PLACED EXPOSING EXCAVATION |
2018-04-18 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PROPERLY PLACE STEEL PLATE. PLATE IS NOT EXTENDED 12 INCHES OVER STEEL PLATED EXCAVATION DOWN 1FT 8 INCHES IN THE ROADWAY. DOT PERMIT B012018095C78 EXPIRES 5/1/2018 USED FOR ID. |
2018-04-18 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Shifted steel plate in the driving-lane. OPPOSITE 1014-1016 CARROLL ST. |
2018-04-17 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on roadway and sidewalk is overdue for final restoration |
2018-04-17 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 TEMPORARY SIDEWALK RESTORATIONS -OVERDUE FOR FINAL- IN FRONT 455 PROSPECT PLACE BETWEEN CLASSON AVENUE & GRAND AVENUE.(CAR #20184510379) 3\17\2018 |
2018-04-17 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in r/w new permits on file |
2018-04-17 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new car issued |
2018-04-17 | No data | SACKETT STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL RESCHEDULED DUE TO CONTRACTOR NOT BEING ON SITE AND HAVING FINAL RESTORATION PERMIT FOR BACK FILL WHICH IS THE WRONG KIND OF PERMIT |
2018-04-17 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with full closure of the sidewalk to pedestrian walk. Failed to adhere to terms & conditions of stipulation 013. Permittee I.D. by DOT permit #B012018094A93 exp. 5/3/18 |
2018-04-17 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cuts in compliance at time of inspection,slight cracking in seal. |
2018-04-16 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut is good. |
2018-04-16 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut in P/L,D/L flush to grade |
2018-04-16 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates countersunk in roadway |
2018-04-16 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated ..street cut .e/b ...new sewer......being installed for new building... |
2018-04-15 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | excavation barricaded within center island /with active permit Q012018103A06 |
2018-04-15 | No data | ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway |
2018-04-15 | No data | 53 AVENUE, FROM STREET 197 STREET TO STREET 198 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK FOUND OR DONE I/F/O BUILDING OPERATION |
2018-04-12 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR REISSUED |
2018-04-12 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress. Excavated material in compliance. |
2018-04-12 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 SIDEWALK FLAGS ARE TEMPORARILY RESTORED AND ARE OVERDUE FOR FINAL RESTORATION |
2018-04-11 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sunken cut in p/l |
2018-04-09 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut is in compliance |
2018-04-09 | No data | MAC DONOUGH STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PROVIDE ADEQUATE PROTECTION AT WORK SITE. RESPONDENT FAILED TO PROPERLY BARRICADE ALL 4 SIDES OF EXCAVATION MATERIAL, POSING A HAZARD TO PEDESTRIANS & VEHICLES. DOT PERMIT #B012018095C61 USED FOR ID. |
2018-04-09 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to comply with stip 112 which failed to maintain one 11' lane open, full roadway closed to traffic at time of inspection. |
2018-04-09 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Shallow service at location. Sewer pipe encased in concrete on cobblestone roadway.Section of excavation adjacent to pipe restored 1 lift 1 test |
2018-04-08 | No data | 116 DRIVE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cuts less than 3ft apart. 2'5" make wearing coures into one cut. |
2018-04-08 | No data | 116 DRIVE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway cuts less than 3ft apart. 2'5" make wearing coures into one cut. |
2018-04-07 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts re-sealed |
2018-04-06 | No data | SUTPHIN BOULEVARD, FROM STREET 111 ROAD TO STREET 112 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Two cuts -one in Driving Lane- 3'8"x 3'6" D-3'. Parking Lane:3'10"x3'0 D-3'2 Backfill Completed and acceptable. Sprayed for cutbacks. |
2018-04-06 | No data | 222 STREET, FROM STREET 145 AVENUE TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway cut in d/l restored to grade. |
2018-04-06 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS A STEEL PLATED EXCAVATION IN THE ROADWAY. RESPONDENTS PLATE IS NOT PROPERLY PLACED OVER EXCAVATION 6 INCHES OF EXCAVATION IS EXPOSED {NOT COVERED BY PLATE}.PERMIT B012018095C78 EXP 5/1/2018 USED FOR ID. |
2018-04-06 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress |
2018-04-05 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3' 7"x3' 4"x3' 7" cut, backfill completed |
2018-04-05 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cuts was resealed. |
2018-04-05 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW CARISSUED |
2018-04-05 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal trench on the roadway and restore lane markings CAR #20171670507) ISSUED 11\24\2017 |
2018-04-05 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The Concrete Base Course restoration, left 3" down in the driving lane i/f/o 1016-1018 the condition was repaired |
2018-04-05 | No data | SUTPHIN BOULEVARD, FROM STREET 111 ROAD TO STREET 112 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O The respondent failed to mainain temporary water restoration flushed with surrounding roadway. The temporary cut remains sunken 2-3" NICA was issued 4/4/18 the condition remains. |
2018-04-05 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition was corrected with temp mac |
2018-04-05 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sewer installation ongoing - shallow sewer pipe on sidewalk. roadawy area plated behind fence. Acceptable. |
2018-04-04 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 temp cuts |
2018-04-04 | No data | SUTPHIN BOULEVARD, FROM STREET 111 ROAD TO STREET 112 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut sunken 3-4" most of cut is backfill only. |
2018-04-04 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 12'x5'6'' temporary binder base only cut left down 3'' on the roadway. |
2018-04-04 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/t/p/o I observed the above respondent failed to make temporary concrete base flush with surrounding area of roadway. |
2018-04-04 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/t//p/o I observed the above respondent failed to post raise plow signs as per winter moratorium policy. |
2018-04-03 | No data | 196 STREET, FROM STREET 120 AVENUE TO STREET 122 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition remain's the same, new CAR issued |
2018-04-03 | No data | 196 STREET, FROM STREET 120 AVENUE TO STREET 122 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three temp cuts across the roadway over due for final |
2018-04-03 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent left a temporary concrete base water restoration i/f/o 10-14 - 10-16 Carroll Street down 3" in the driving lane not plated causing a dangerous condition for the motorists |
2018-04-03 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERMITTEE HAS PERM RESTORATION IN NEED OF REPAVING, BUT KEEPS TAKING OUT FINAL RESTORATION PERMIT. |
2018-04-03 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates removed. |
2018-04-02 | No data | FOREST AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Long water - f/o and opp. temp. cuts to grade,permit active at this time. |
2018-04-02 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp trench and plated r/w cut. |
2018-04-02 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK HAS NOT STARTED YET, BUT PERMITTEE HAS AN ACTIVE FINAL RESTORATION PERMIT TO DO THE WORK IN FRONT OF 4110 5TH AVE. WILL RE-INSPECT AFTER PERMIT EXPIRES TO SEE IF WORK IS DONE AND PERMITTEE HAS RE-PAVED RESTORATION. PERMIT EXPIRES AFTER TODAY. |
2018-03-31 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent restoration in good condition color coded and sealed sidewalk still in temporary condition |
2018-03-30 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please fully replace two concrete sidewalk flags that are overdue for final during the winter moratorium. |
2018-03-30 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please fully replace two concrete sidewalk flags that are overdue for final during the winter moratorium. |
2018-03-30 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT DID NOT PROPERLY FASTEN STEEL PLATE ON THE ROADWAY:FAILED TO PROPERLY FASTEN PLATING AND DECKING. DOT PERMIT#B012018086E68 EXP 4/10/2018 USED FOR ID. |
2018-03-29 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates countersunk in roadway |
2018-03-28 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersink in driving/parking lane in compliance at this time. |
2018-03-27 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESTORATION NEEDS TO BE RESEALED |
2018-03-27 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | WORK HAS NOT STARTED YET, BUT PERMITTEE HAS AN ACTIVE FINAL RESTORATION PERMIT TO DO THE WORK IN FRONT OF 4110 5TH AVENUE. WILL RE-INSPECT AFTER PERMIT EXPIRES TO SEE IF WORK IS DONE AND PERMITTEE HAS RE-PAVED RESTORATION. PERMIT EXPIRES 4/2/2018 |
2018-03-27 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION MADE FINAL |
2018-03-25 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM TRENCH ON R/W |
2018-03-24 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | one temp cut on r/w |
2018-03-24 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR opened for this location CAR #20186550124 |
2018-03-24 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plate has been reset |
2018-03-23 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR CLEAN UP PROJECT |
2018-03-23 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new car issued |
2018-03-23 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE THE LANE MARKINGS IN THE DRIVING LANE ALSO SEAL SAW CUTS IN THE ROADWAY MADE AROUND CUT |
2018-03-23 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates removed from roadway. temp cuts on roadway and new valid permit on file. |
2018-03-22 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent had shifted steel plates pinned and ramped in the roadway. Respondent failed to countersink steel plates flush with the roadway during the winter no raise ploe sign moratorium,12/1/17-4/30/18.id by permit |
2018-03-21 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | respondent with a counter sunken steel plate on the roadway without a raise plow sign on site. permittee failed to post signs during the winter moratorium months (12/1/17 - 4/31/18). permit# used to I.D contractor |
2018-03-20 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMPORARY RESTORATION RESTORED TO GRADE |
2018-03-19 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REREAD |
2018-03-19 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY RESTORATION IN ROADWAY DOWN 4 INCHES, PLEASE RESTORE TO GRADE; IN FRONT 4110 BETWEEN 41ST AND 42ND STREET |
2018-03-18 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition repaired and filled with temp-mac |
2018-03-18 | No data | LINDEN BOULEVARD, FROM STREET 224 STREET TO STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2018-03-18 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with 2 areas within a temporary cut on the roadway down 3''. permittee failed to maintain temporary cut flush with roadway. permit# used to I.D contractor |
2018-03-18 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 areas (3âx2â & 2âx2â) within a sewer cut down 3ââ in the driving lane |
2018-03-17 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 TEMPORARY SIDEWALK RESTORATIONS -OVERDUE FOR FINAL- IN FRONT 455 PROSPECT PLACE BETWEEN CLASSON AVENUE & GRAND AVENUE. |
2018-03-17 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | missing bike lane marking and needs to reseal street joints |
2018-03-17 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued under newer permit, temp cuts on r/w |
2018-03-17 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD OCCUPIED 12 FEET BY 5 FEET OF ROADWAY AT UNATTENDED WORKSITE WITH EXCAVATION DEBRIS AND BARRIERS AT UNATTENDED WORKSITE;FAILED TO ADHERE TO TERMS &CONDITIONS OF STIPULATION 078 OF DOT PERM |
2018-03-16 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to maintained an active permit on file as required for ongoing sewer installation work. NOV issued. |
2018-03-15 | No data | BRISTOL STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2018-03-14 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no evidence of work at current location |
2018-03-13 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2018-03-12 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk cuts made safe. |
2018-03-11 | No data | 90 STREET, FROM STREET 86 ROAD TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cuts s/w replace |
2018-03-10 | No data | 255 STREET, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET HOOK CREEK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench cut in driving lavn. |
2018-03-10 | No data | 41 AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave roadway perm i/f/o 136-36 |
2018-03-10 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found |
2018-03-09 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | At this time, permittee is on site working with an emergeccy permit to stop the water leak in the roadway and the sidewalk. No action warrants at this time. Area will be re-inspected upon request. |
2018-03-09 | No data | 202 STREET, FROM STREET 109 AVENUE TO STREET HOLLIS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; water leak on 3/4" service at the curb---owner provided 3 day notice--contractor is currently backfilling hole in r/w and temping with temp asphalt until addtonal permit is acquired in order to do a DOT supervised backfill |
2018-03-09 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, excavation in driving lane, in compliance |
2018-03-08 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade in the d/l opposit of 138-12 |
2018-03-08 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O The respondent failed to maintain temporary water cuts on the sidewalk with surounding area. 2 cuts remain sunken 2" A NICA was issued on 3/5/18 condition remains. |
2018-03-08 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Excavation covered and made safe. |
2018-03-08 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 cuts on sidewalk remain 2" 3rd inspection. |
2018-03-08 | No data | 222 STREET, FROM STREET 145 AVENUE TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time, crew is on site making the area safe. |
2018-03-08 | No data | QUEENS BOULEVARD, FROM STREET 51 AVENUE TO STREET DONGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance at time of inspection. |
2018-03-07 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3 cuts remain sunken 2" on sidewalk only one repaired. |
2018-03-07 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to post a raise plow sign, after covering a water/sewer restoration i/f/o 1014-1016 Carrol Street as per winter motoratorium |
2018-03-07 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 steel plate without any markings is completely removed exposing the entire excavation, this is causing a dangerous condition for both motorists and pedestrians |
2018-03-07 | No data | 222 STREET, FROM STREET 145 AVENUE TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 6' x 3' temp roadway cut sunken 3'' in driving lane in localized area. Condition needs repair. |
2018-03-07 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O The respondent failed to maintain temporary water cuts on the sidewalk with surounding area. 2 cuts remain sunken 2" A NICA was issued on 3/5/18 condition remains. |
2018-03-06 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | large sewer cut restored to grade |
2018-03-05 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O The respondent failed to maintain temporary water cuts on the sidewalk with surounding area. The cuts are sunken 3-5" A NICA was issued on 3/5/18 condition remains. |
2018-03-05 | No data | PACIFIC STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, p/l |
2018-03-05 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 4 temps on sidewalk remain sunken nov issued. |
2018-03-04 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | another permit on file.NICA issued. |
2018-03-04 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | AT/P/O I observed the respondent with a temporary sewer trench in the roadway below grade 3 inches. The respondent was notify by (CAR #20181100055) to correct condition on 3/2/2018, condition remain |
2018-03-02 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/t/p/o the respondent temporary sewer cut down 3 inches in driving lane. The respondent temporary pavement not flush with surrounding area. |
2018-03-02 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/t/p/o the respondent has a concrete sewer excavation in the driving lane down 3 inches without adequate protection at work site. |
2018-03-01 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plates on swk okay |
2018-03-01 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seals around 2 perm r/w cut, asphalt cracked. |
2018-02-28 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED DEBRIS, CONSTRUCTION MATERIAL BELONGING TO THE ABOVE RESPONDENT OBSTRUCTING ROADWAY GUTTERS. SITE UN-ATTENDED |
2018-02-27 | No data | 75 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in compliance at time of inspection (slight cracking in seal) |
2018-02-27 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | ASPHALT BROKEN OUT OF TEMPORARY TRENCH ON ROADWAY DOWN 2''. |
2018-02-27 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING NO RAISE PLOW SIGN WHILE HAVING STEEL PLATES DURING WINTER MORATORIUM POLICY MONTHS FROM 12/1/17- 4/30/18. |
2018-02-27 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Made temporary safe |
2018-02-26 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cuts needs re-sealing. |
2018-02-26 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | 7'x3' temporary restoration is sunken 5" inches in driving lane |
2018-02-24 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER REPAIRS AND RESTORATION IS IN COMPLIANCE |
2018-02-23 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT STORED EXCAVATION MATERIAL ON THE SIDEWALK WITHOUT A PERMIT ON FILE |
2018-02-22 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED DEBRIS, CONSTRUCTION MATERIAL BELONGING TO THE ABOVE RESPONDENT OBSTRUCTING ROADWAY GUTTERS. SITE UN-ATTENDED. |
2018-02-21 | No data | MIDLAND AVENUE, FROM STREET FREEBORN STREET TO STREET OLYMPIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O# 562 (1) SIDEWALK FLAG REPLACED SURROUNDING WATER CAP, NO R/W CUTS OBSERVED FOR THIS CONTRACTOR. |
2018-02-21 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to provide adequate protection at the work site. The contractor failed to barricade all 4 sides of the excavated material stored in the parking lane i/f/o1460 Fulton Street |
2018-02-21 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration to grade |
2018-02-21 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp asphalt on sidewalk flags overdue for final ifo 246.CAR issued due to winter moratorium. |
2018-02-20 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Section of temp cut sunken 5" in the driving lane on Hillside Ave. |
2018-02-17 | No data | 174 STREET, FROM STREET 134 ROAD TO STREET 137 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, Water service leaking in the basement of property, Excavation in the grass area and roadway |
2018-02-16 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Time of inspection at 44 drive between 21st and 23 street there is a 4âx5â temp to grade sunken 5ââ on sidewalk that needs to be made flush , Also 4â x 2 ½â cut on sidewalk where half of the wood plywood has broken and fallen down into cut 1â ,e |
2018-02-16 | No data | 44 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 temp s/w cuts to grade, area is in compliance |
2018-02-15 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 304 NO DEFECTS |
2018-02-14 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary restoration made safe |
2018-02-14 | No data | HILLSIDE AVENUE, FROM STREET 235 COURT TO STREET RANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | 7'x3' temporary cut sunken 5" inches in driving lane |
2018-02-14 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | lane marking missing for crosswalk ,also apply or re seal cut ,sealer worn |
2018-02-12 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/ T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTER SINK STEEL PLATES FLUSH WITH THE ROADWAY. DURING THE WINTER MORATORIUM PERIOD. WHICH BEGINS ON 12/1/2017 AND ENDS ON 4/30/2018. AT A UNATTENDED WORK SITE. PERMIT B012018033A55 EXP 3/6/2018 |
2018-02-12 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATIONS IN BOTH PARKING LANES. NEW PERMIT ON FILE |
2018-02-11 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates needs more ramping to make smoother transition for vehicles. |
2018-02-11 | No data | SACKMAN STREET, FROM STREET SOMERS STREET TO STREET TRUXTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2018-02-10 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration in roadway |
2018-02-09 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary cut, 7'x6.5' in size, sunken 1.5-2". As required rule, temporary restoration must be flush with the surrounding pavement until the wearing course is installed. ***WATER-MAIN ON THE OPPOSITE SIDE |
2018-02-09 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in r/w and swk , new permit on file |
2018-02-09 | No data | GREEN STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent fail to provide adequate protection around material (debris) by not barricading off all 4 sides to prevent danger to persons and or property. permit# used to I.D contractor |
2018-02-08 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway in compliance |
2018-02-08 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | respondent fail to post raise plow sign while having 1 counter sunken & 1 none counter sunken steel plates on roadway during the winter moratorium months 12/1/17- 4/30/18.permit# used to I .D contractor |
2018-02-06 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY. NOV ISSUED TO LATEST PERMIT FOR NOT COUNTER SINKING PLATE |
2018-02-06 | No data | CARROLL STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/ T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTER SINK STEEL PLATE FLUSH WITH THE ROADWAY. DURING THE WINTER MORATORIUM PERIOD. WHICH BEGINS ON 12/1/2017 AND ENDS ON 4/30/2018. AT A UNATTENDED WORK SITE. PERMIT B012018033A55 EXP 3/6/2018 |
2018-02-06 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 30 feet x (W) 4 feet x (D) 9 feet... compaction of 97.4 and 96.1%.. monitored from 10:48am-3:30pm. base to be done at later time. |
2018-02-03 | No data | HENDRIX STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found in front of 709 hendix st crew on site excavating open roadway and sidewalk cut to repair water leak to water service dep notice on file no water to property |
2018-02-02 | No data | MARCY AVENUE, FROM STREET GATES AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working in water cut in parking lane |
2018-02-01 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway at this time. |
2018-02-01 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sewer installation ongoing. Area within work zone plated. Acceptable. |
2018-01-30 | No data | SUTTER AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2018-01-27 | No data | 196 STREET, FROM STREET 120 AVENUE TO STREET 122 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-01-27 | No data | 230 STREET, FROM STREET 146 AVENUE TO STREET 147 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration |
2018-01-27 | No data | 95 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cuts to grade across the roadway(sidewalk flag missing expansion joint, building operation in progress). |
2018-01-27 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair cuts(2) on cobble stones roadway in compliance. Final restoration performed with permit M012016320A41 & monitored by me on 11/20/16. |
2018-01-27 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 TEMPORARY SIDEWALK RESTORATIONS -OVERDUE FOR FINAL- IN FRONT 455 PROSPECT PLACE BETWEEN CLASSON AVENUE & GRAND AVENUE. |
2018-01-26 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 246 Temp asphalt overdue for final on sidewalk. CAR issued due to winter moratorium. please replace full width of sidewalk flag |
2018-01-25 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking lane trench. *CAR issued to latest permit (B012017243B53) |
2018-01-25 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in parking lane. Newer permit on file. |
2018-01-24 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates was reset in compliance |
2018-01-24 | No data | 135 AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench to grade across the roadway. |
2018-01-24 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with 1 out of 2 steel plates smooth to the touch offering no skid resistance equal to or greater than the existing roadway surface. DOT permit# use for ID |
2018-01-23 | No data | 170 STREET, FROM STREET 140 AVENUE TO STREET 143 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2018-01-23 | No data | 116 DRIVE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cuts less than 3ft apart. 2'5" make wearing coures into one cut. |
2018-01-23 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WEARING COURSE IS BROKEN OUT & DOWN 1". DOUBLE YELLOW LANE MARKING NEEDS TO BE RESTORED. |
2018-01-23 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent fail to post raise plow sign while having 1 counter sunken & 1 none counter sunken steel plates on roadway during the winter moratorium months 12/1/17- 4/30/18.permit# used to I .D contractor |
2018-01-21 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated street opening in compliance |
2018-01-20 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}12FT X {W]4FT X {D}10FT 4IN TEST 97.5 RESPONDENT ONLY WENT UP 3FT WITH BACK FILL. NEEDS TO INSTALL WATER SERVICE. UNDERMINNING OBSERVED RESPONDENT IS CUTTING OUT 2FT OF UNDERMINNING. |
2018-01-20 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATIONS IN THE ROADWAY. NEW PERMIT ON FILE |
2018-01-19 | No data | CLOVERDALE BOULEVARD, FROM STREET 56 AVENUE TO STREET 57 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade trench across Northbound driving and parking lanes. One sidewalk flags left in temp condition. Active B/O at location. |
2018-01-18 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER TRENCH IN ROADWAY IS IN COMPLIANCE |
2018-01-17 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp parking-lane cut (7'x6'). Opposite 74 BLEECKER. **Valid permit on file (B012018009C16). |
2018-01-17 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp parking-lane cut (7'x6'). Opposite 74 BLEECKER |
2018-01-16 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plate countersink not loose or noisy |
2018-01-16 | No data | 145 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade opposite parking lane. |
2018-01-15 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERMANENT RESTORATION IN ROADWAY, TEMPORARY SIDEWALK FLAGS |
2018-01-13 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER TRENCH ON R/W AND S/W IS IN COMPLIANCE |
2018-01-12 | No data | LONG STREET, FROM STREET 119 AVENUE TO STREET 119 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The respondent failed to comply with the terms and conditions of the DOT permit. Contractor may contain maximum of 25 linear feet for excavated materials during non working hours. The respondent conatained at least 50ft. |
2018-01-11 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Failed to post âSteel Plates Aheadâ or âRaise Plowâ signs during the WINTER MORATORIUM, which commenced on 12/1/2017 and ends on 3/31/2018. Countersunken plated excavation found on the roadway. |
2018-01-10 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee on site working at this time. told them to correct nica upon departure |
2018-01-10 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | I found a 5â4ââ x 2â8ââarea sunken down 3ââ adjacent to steel plates on the roadway. All plates not skid resistant , & no raise plow at location |
2018-01-09 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee on site correcting condition |
2018-01-09 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Active | Department of Transportation | I found a 5â4ââ x 2â8ââarea sunken down 6ââ adjacent to steel plates on the roadway. All plates not skid resistant , & no raise plow at location |
2018-01-08 | No data | LONG STREET, FROM STREET 119 AVENUE TO STREET 119 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | snow covering location |
2018-01-07 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut covered by BPP |
2018-01-03 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR HAS BEEN PREVIOUSLY ISSUED ABOUT HAVING TO REPAVE RESTORATION |
2018-01-02 | No data | 44 AVENUE, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer cuts need to be resealed |
2018-01-02 | No data | 116 AVENUE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work on permit |
2018-01-02 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plates countersunk |
2018-01-01 | No data | LONG STREET, FROM STREET 119 AVENUE TO STREET 119 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | The respondent failed to countersink plates flush with surrounding roadway. The winter moratorium began on 12/1/17 until 3/31/18. |
2017-12-30 | No data | 76 STREET, FROM STREET 95 AVENUE TO STREET 97 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started at time of inspection, valid permit on file |
2017-12-29 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking/driving lane. |
2017-12-29 | No data | 111 AVENUE, FROM STREET 223 STREET TO STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2017-12-28 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 out of 2 counter sunken steel plates on the roadway loose & noisy |
2017-12-27 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 Out Of 2 Steel Plates Countersunken Very Loose & Noisy In Driving Lane I/F/O 977 Manhattan Ave |
2017-12-27 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent fail to post "raise plow" signs while having steel plates on the roadway during the winter moratorium months (12/1/17-3/31/18) . permit# used to I.D contractor |
2017-12-26 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE BIKE LANE MARKINGS OVER NEW PERMANENT RESTORATION IN ROADWAY-IN FRONT OF 391 14 STREET BETWEEN 7 AVE & 8 AVE. |
2017-12-26 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plated countersunk in roadway. In- compliance with valid DOT permit till 1/8/18. |
2017-12-24 | No data | DYRE AVENUE, FROM STREET BOSTON ROAD TO STREET CONNER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street re-surfaced |
2017-12-24 | No data | LEXINGTON AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on the roadway is in compliance. Sidewalk flags in compliance. |
2017-12-23 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate countersink |
2017-12-23 | No data | VAN WYCK EXPRESSWAY, FROM STREET VWE SB ENTRANCE ROCKAWAY BLVD TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking lane. |
2017-12-23 | No data | CRANSTON STREET, FROM STREET 133 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l |
2017-12-21 | No data | 76 STREET, FROM STREET 95 AVENUE TO STREET 97 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk. Property Owner on Site |
2017-12-21 | No data | MARCY AVENUE, FROM STREET BROADWAY TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w was found resurfaced by d.o.t |
2017-12-20 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane okay |
2017-12-20 | No data | MAIN STREET, FROM STREET GRAVETT ROAD TO STREET MELBOURNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway and sidewalk cuts restored to grade. |
2017-12-19 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate covering sewer excavation. Holiday embargo in effect. Work ongoing behind BO fenced area. Acceptable. for now. |
2017-12-19 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate covering sewer excavation acceptable. Holiday embargo in effect. |
2017-12-18 | No data | 8 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pave cut |
2017-12-18 | No data | 8 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut r\w ok |
2017-12-15 | No data | CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across r/w |
2017-12-14 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plated countersunk in roadway. In- compliance with valid DOT permit till 12/19/17. |
2017-12-14 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/T/P/O I observed the above respondent fail to post "raise plow" signs while having steel plates on the roadway during the winter moratorium months (12/1/17-3/31/18) . permit# used to I.D contractor |
2017-12-12 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/T/P/O I observed the above respondent fail to post "raise plow" signs while having steel plates on the roadway during the winter moratorium months (12/1/17-3/31/18) . permit# used to I.D contractor |
2017-12-12 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length- 5 Feet 9 Inches Width- 4 Feet 5 Inches Depth- 5 Feet 9 Inches |
2017-12-10 | No data | 21 STREET, FROM STREET 44 DRIVE TO STREET 44 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2017-12-09 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated countersink |
2017-12-09 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A OPEN BASE RESTORATION DOWN 2 INCHES IN ROADWAY(MUST BE FLUSH AT ALL TIMES-STEEL PLATED OR TEMPORARY ASPHALT)-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. EXPIR |
2017-12-09 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | car issued on a different permit B012017312B15 for the lane marking |
2017-12-08 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut ok |
2017-12-08 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the roadway. ( INSP.#673 ) |
2017-12-08 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm color coded |
2017-12-08 | No data | DECATUR STREET, FROM STREET ALBANY AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working i/f/o location to repair a leak in street.. |
2017-12-07 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY AND PLATE COUNTER SUNK |
2017-12-04 | No data | 128 STREET, FROM STREET 135 AVENUE TO STREET 149 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill reschedule for 12 noon. |
2017-12-03 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-12-03 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo i observed the above respondent had left in front of 71 dahlgren pl a roadway restoration in a concrete base state down two inches not flush with roadway surface id by permit number on file |
2017-12-01 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION IN THE ROADWAY |
2017-12-01 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESURFACE NEW PERMANENT RESTORATION ACROSS ROADWAY (COLD ROLLED) WEARING COURSE BREAKING UP DOWN 1-2 INCHES AND RESTORE ALL LANE MARKINGS (WHITE & DOUBLE YELLOW), AT 4110 5 AVE BETWEEN 41 STREET & 42 STREET. |
2017-12-01 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | over due temp on sidewalk- please make permanent on Concrete sidewalk. iofo 322 |
2017-12-01 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 9ft x 4ft x 4ft 8inPass: 97.3%, 97.8% |
2017-11-30 | No data | FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site open cut in driving lane , in compliance |
2017-11-29 | No data | 116 AVENUE, FROM STREET 144 STREET TO STREET 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three permanent cuts to grade in parking/driving lanes. |
2017-11-28 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS A TEMPORARY RESTORATION ON THE SIDEWALK AND FAILED TO PERMANENTLY RESTORE RESTORATION BY THE EXPIRATION OF PERMIT B012017320B47 EXPIRED 11/18/2017. THE ABOVE DOT PERMIT HAS BEEN USED FOR ID. |
2017-11-27 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut is in compliance |
2017-11-25 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION CUTS ON THE ROADWAY IN THE DRIVING LANE I/F/O 321 |
2017-11-25 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple permanent cuts to grade(cars parked in parking lanes). |
2017-11-25 | No data | BOSTON ROAD, FROM STREET REEDS MILL LANE TO STREET ROMBOUTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is good |
2017-11-24 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BUS PAD REPAIRED IN KIND |
2017-11-24 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal trench on the roadway and restore lane markings |
2017-11-22 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | In compliance |
2017-11-22 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-11-22 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut across r/w |
2017-11-22 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file, permit number B012017321B37 |
2017-11-21 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT WITH A STEEL PLATED EXCAVATION THAT IS DOWN 3 FEET 4 INCHES ON THE SIDEWALK AND DOES NOT HAVE A VALID/ACTIVE DOT PERMIT ON FILE TO DO SO. EXPIRED PERMIT B |
2017-11-16 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison paved over plumber restoration |
2017-11-16 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is resurfaced. |
2017-11-16 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD 3 TEMPORARY BINDER REPAIR WATER RESTORATIONS DOWN 2 1/2 INCHES IN ROADWAY- A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. DOT PERMIT#B012017312B15 EXP 11/14/17 WAS USED FOR ID. |
2017-11-15 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanet long water cuts to grade in parking/driving lane. |
2017-11-15 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to perform required base and/or wearing course cutbacks. Permanent trench found on the roadway (parking-lane) with 50â width. All final trench restorations should be a minimum of 54âx54". Standard Drawing H-1042D. |
2017-11-14 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE RESTORATION ON THE SIDEWALK WITHIN REQUIRED TIME, LAST PERMIT ON FILE B012017300B37 AND WORK EXPIRED 11/10/2017 |
2017-11-14 | No data | GRAND AVENUE, FROM STREET SEABURY STREET TO STREET VAN LOON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO i observed the above respondent maintaining a temporary sidewalk flag around a water valve. The respondent failed to permanently restore it's flag within the required time. The above permit expired on 8/17/2017 |
2017-11-14 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to keep an active permit for ongoing sewer work for 24 Leonard st. |
2017-11-14 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway |
2017-11-10 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; water leak on 1.5" service for building--excavation on sidewalk |
2017-11-10 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut to grade and sealed |
2017-11-10 | No data | UNION STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD 3 TEMPORARY BINDER REPAIR WATER RESTORATIONS DOWN 2 1/2 INCHES IN ROADWAY- A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. DOT PERMIT#B012017312B15 EXP 11/14/17 |
2017-11-08 | No data | 8 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut on the roadway is down 2 inches in the parking lane |
2017-11-08 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | both cuts joined at this time in compliance with CAR issued |
2017-11-08 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Wooden protection has collapsed inside excavation on roadway condition is creating a hazardous condition. Permittee failed to properly barricade work |
2017-11-08 | No data | ROSS STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition is found in the parking-lane. Jersey barriers and cones are found around the perimeter of the excavation. |
2017-11-08 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DOUBLE YELLOW LINES RESTORED OVER RESTORATION |
2017-11-08 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the respondent failed to comply with terms and conditions of DOT permit. Violation of stip Id:013 which states:MAINTAIN A MINIMUM 5 FOOT CLEAR PEDESTRIAN WALK ON THE SIDEWALK. Contractor has closed entire sidewalk. No walkway provided |
2017-11-06 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway ok. |
2017-11-06 | No data | CHURCH AVENUE, FROM STREET EAST 42 STREET TO STREET EAST 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired 9/14/2017. Respondent failed to obtain a confirmation number from the department. |
2017-11-03 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L |
2017-11-03 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent cut flush to grade |
2017-11-01 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L |
2017-10-31 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT FAILED TO PROPERLY PLACE AND RAMP PLATING AND DECKING ON THE ROADWAY. DOT PERMIT#B012017300B33 EXP 11/11/2017. USED FOR ID. |
2017-10-30 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to reset 1 of 2 steel plates shifted 7" exposing the excavation marked adam in the driving lane opposite 4110 5 avenue. A voice message was left on the Permittee contact number at 05:15 am on 10/30/17 |
2017-10-30 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 of 2 steel plates marked "adams" shifted off pin and ramping 7"exposing depth 4'7"presenting a unsafe condition for motorist "opp"4110.Contractor to be notified |
2017-10-28 | No data | DAHLGREN PLACE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O Iobserved the above respondent in front of 73 dahlgren pl had placed materials on the roadway obstructing the gutter no gutter run off was provided at the time |
2017-10-28 | No data | AUGUSTINA AVENUE, FROM STREET NAMEOKE AVENUE TO STREET WHEATLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in parking lane flush to grade,color coded and sealed |
2017-10-28 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench completed rectangular in shaped. |
2017-10-27 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT USING A STEEL PLATE ON THE ROADWAY TO ACTIVELY COVER AN OPEN EXCAVATION DOWN 5 FEET 4 AND WAS NOT PROPERLY FASTENED TO ROADWAY. ACTIVE PERMIT B012017300B33 USED FOR ID. |
2017-10-26 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | New sewer work ongoing on cobble stones roadway within occupancy of roadway for BO. Area excavated and covered with wood plywood & barricaded. permit #3. |
2017-10-26 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on roadway and sidewalk acceptable |
2017-10-26 | No data | LEONARD STREET, FROM STREET HUDSON STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sewer work ongoing on cobble stones roadway within occupancy of roadway for BO. Area excavated and covered with wood plywood & barricaded. Refer to active permit M012017292A23. First permit. |
2017-10-26 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp to grade! |
2017-10-25 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. *NOV was previously issued. |
2017-10-25 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Yellow lines restored to permanent restoration |
2017-10-24 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to make a permanent trench (wearing course), which is down 1" in the bike-lane, flush with the surrounding area. On 10/24/17, 8:07am, respondent was notififed was condition and failed to take any corrective action. |
2017-10-24 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench sunken 1" in localized areas, specifically in the bike-lane. I/F/O 305 CORNELIA ST |
2017-10-22 | No data | BELMONT AVENUE, FROM STREET AUTUMN AVENUE TO STREET HEMLOCK STREET | No data | Street Construction Inspections: Active | Department of Transportation | backfill material and cones stored in the roadway failed to adhere to stipulation 078 of their DOT issued permit which requires full width of the roadway to be opened to traffic when site is unattended. Site unattended at time of inspection.. |
2017-10-21 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to restored 2 sidewalks at pedestrian safety island within required time. permit number Q012016322A02 expired 12/1/2016 |
2017-10-21 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS RWY AND TEMP SWK BUT WRONG CROSS STREETS SHOULD BETWEEN MARCY AVE AND NOSTRAND AVE |
2017-10-20 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in roadway parking lane & driving lane |
2017-10-20 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving/parking lane. Fail to perform required cutbacks. Unable to properly photograph due to double parked car. Will re-inspect. |
2017-10-20 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 FELIX marked steel plates have been removed from bus lane, CAR corrected, sidewalk still remains in temp scaffolding present |
2017-10-17 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVTION ON THE ROADWAY IN THE PARKING LANE I/F/O 391, NEW ACTIVE PERMIT ON FILE |
2017-10-17 | No data | 135 AVENUE, FROM STREET 151 PLACE TO STREET CRANSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2017-10-15 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway and sidewalk cuts are to grade. |
2017-10-13 | No data | 5 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATED ROADWAY EXCAVATION |
2017-10-10 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 4 FOOT X 4 FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT# B012017138B30 EXP 6/15/2017 WAS USED FOR |
2017-10-10 | No data | BELMONT AVENUE, FROM STREET CRESCENT STREET TO STREET PINE STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane with debris in the parking lane |
2017-10-07 | No data | HINCKLEY PLACE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration d/l. Temp restoration on s/w ifo new building opearation. |
2017-10-05 | No data | FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â PassCut #1: (L): 3ft (W): 3ft (D): 2ft â 96.7%Cut #2: (L): 5ft (W): 3ft 6in (D): 5ft â 96.2%; 95.2%Located in P/L IFO 1409.Cutbacks marked.Arrival: 12:15PMDeparture: 2:00PM |
2017-10-05 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2017-10-05 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L |
2017-10-04 | No data | CHURCH AVENUE, FROM STREET EAST 42 STREET TO STREET EAST 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH CURB TO CURB FLUSH TO GRADE. SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2017-10-02 | No data | LIBERTY AVENUE, FROM STREET 114 STREET TO STREET 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut plus s/w full restoration |
2017-09-28 | No data | HINCKLEY PLACE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench d/l. Temporary restoration on s/w in front of active building operation. |
2017-09-27 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IS IN COMPLIANCE |
2017-09-25 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cuts |
2017-09-25 | No data | VARET STREET, FROM STREET BOGART STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent with steel plates on the roadway that failed to display the name of the owner/permittee. Names should be welded, stamped, or painted on all plates to identify the owner as per required rule (34RCNY 2-11 (e)10)(viii). |
2017-09-24 | No data | FOSTER AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber restoration in d/l |
2017-09-23 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut made final |
2017-09-23 | No data | SEAGIRT AVENUE, FROM STREET BEACH 3 STREET TO STREET BEACH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no water restoration found. Permanent CAC DEP trench along segment |
2017-09-22 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway and sidewalk to grade |
2017-09-21 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two steel plates removed from roadway. Sidewalk still in temp condition. |
2017-09-21 | No data | SUTTER AVENUE, FROM STREET HINSDALE STREET TO STREET WILLIAMS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced |
2017-09-20 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l |
2017-09-16 | No data | OCEAN PARKWAY, FROM STREET BRIGHTON BEACH AVENUE TO STREET SEA BREEZE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ...aka 120 Brighton Beach Avenue |
2017-09-14 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two steel plates in the bus lane. Temp cut across sidewalk. NOV & CAR issued recently. |
2017-09-12 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed permanently restore temporary water cut on sidewalk within required time. Permit M012017223D00 expired on 9/9/2017. |
2017-09-12 | No data | 212 PLACE, FROM STREET 90 AVENUE TO STREET 91 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w 1 flag in s/w restored |
2017-09-11 | No data | MILLER AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2017-09-09 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-09-09 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanet cut in roadway flush to grade |
2017-09-07 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp roadway sidewalk - M012017243A08 valid permit on file |
2017-09-06 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm to grade trench across roadway. Temp trench across sidewalk. |
2017-09-06 | No data | DITMAS AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration d/l |
2017-09-05 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2017-09-04 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY PARTIALLY COVERED BY NATIONAL GRID RESTORATION |
2017-09-03 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to restore lane markings. Failed to restore double lane markings in roadway. Notified prior by car #20164510955 dated 11/29/2016 |
2017-09-02 | No data | 98 AVENUE, FROM STREET 218 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restorations |
2017-08-30 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cut on r/w |
2017-08-30 | No data | MANHATTAN AVENUE, FROM STREET HURON STREET TO STREET INDIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file B012017230C63cut on r/w plated off |
2017-08-28 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED A TEMPORARY CUT IN THE PARKING LANE 4 X 4 IN SIZE. RESPONDENTâS PERMIT FOR THIS WORK EXPIRED ON 12/20/2017 DURING THE WINTER MORATORIUM PERIOD THAT COMMENCED ON DECEMBER 1, 2016 AND ENDED ON APRIL 1, 2017. RESPONDENT FAILED TO |
2017-08-28 | No data | CHURCH AVENUE, FROM STREET EAST 42 STREET TO STREET EAST 43 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | STEEL PLATED EXCAVATIONS IN ROADWAY. CREW ON SITE, PLATES FLUSH WITH SURROUNDING AREA. NO DEFLECTION SEEN |
2017-08-28 | No data | 44 AVENUE, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | #1 Backfill completed and acceptable. #2 backfill scheduled for 08/28/2017. |
2017-08-27 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | multiple permanent plumbers cut in roadway and temporary sidewalk cuts. Active B/O |
2017-08-26 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent failed to make repairs to two cuts 3' apart from each other. Permittee violated DOT Standard Specification 2-11(E)(12)(V) drawing H-1042A (9) which states cuts less than 10' apart must be made one continuous trench. |
2017-08-24 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit: B012017229B68 |
2017-08-24 | No data | WEIRFIELD STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut in parking lane. Located IFO BO. |
2017-08-23 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water cuts |
2017-08-22 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition remains same. |
2017-08-22 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects |
2017-08-22 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Trench is irregular and needs to be properly squared off as per Standard Detail Figure H-1042A note #3... "all Trench restorations must be square or rectangular in shape" I/F/O 423 |
2017-08-19 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RW RESTORATIOB |
2017-08-18 | No data | 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent had the street closed in violation of stipulation 023 maintain one 11ft lane of traffic,street closed off with orange plastic barrels . |
2017-08-18 | No data | 118 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp roadway to grade parking driving lane |
2017-08-18 | No data | 118 STREET, FROM STREET 111 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | temp cut to grade |
2017-08-18 | No data | LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Respondent having a plated excavation in the parking lane without a valid NYC DOT permit on file. Permit B012017138B30, which expired on 6/15/2017, was used to ID. |
2017-08-16 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two plated excavations across roadway. Temp. restoration across sidewalk. Active Repair Water permit# M012017223D00 exists for work. |
2017-08-16 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two plated excavations across roadway. Temp. restoration across sidewalk. |
2017-08-15 | No data | 142 STREET, FROM STREET 109 AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | contractor working in grass area in open excavation and inside property line |
2017-08-14 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to install yellow lane markings on permanent water cut in the roadway. Respondent was notified via CAR# 20176530082 on 3/11/17. |
2017-08-12 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO COMPLY WITH DOT STANDARD SPECIFICATIONS, RESPONDENT IS IN VIOLATION OF HAVING 2 STREET OPENING THAT IS LESS THAN 3 FT APART AFTER THE REQUIRED CUT BACKS ,AS PER SUB SECTION 2-11(E)(12)(IV) |
2017-08-12 | No data | DREW STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT IN THE DRIVING LANE |
2017-08-05 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restroation flushed in the parking & driving lane, S/w flushed expansion joints sealed (south curb) |
2017-08-05 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plumber cut temp to grade, overdue for final restoration in the roadway. |
2017-07-28 | No data | WEST 154 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, No water to the building, Excavation behind the property and on the sidewalk ( Insurance ). |
2017-07-26 | No data | 245 STREET, FROM STREET 134 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable contractor worked under obstructions 1 concrete pad 4'6'' x 4'6''across width and wter main 5' off corb 4' deep |
2017-07-24 | No data | BEDELL STREET, FROM STREET 115 ROAD TO STREET 116 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street reconstructed |
2017-07-21 | No data | 41 AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut is being covered by consolidated edison work in the driving lane. |
2017-07-21 | No data | HINCKLEY PLACE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO, I observed above respondent failed to permanently restore cut within required time. Above permit expired on 7/15/17. 2 inch wearing course not restored. |
2017-07-20 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut in compliance. |
2017-07-20 | No data | 41 AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in driving lane. |
2017-07-19 | No data | GRAND AVENUE, FROM STREET SEABURY STREET TO STREET VAN LOON STREET | No data | Street Construction Inspections: Active | Department of Transportation | workers on site valid permit on file location in compliance. |
2017-07-18 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable sewer and water restorations separate and work on s/wfound at 36-61water restoration 4'x3'11"sewer restoration 14'5"x4'5" |
2017-07-17 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk has been restored, 4 Steel Plates remain secured to the Roadway |
2017-07-17 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | due to broken pipe must reschedule |
2017-07-16 | No data | POPLAR AVENUE, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut d/l |
2017-07-16 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed sewer restoration with asphalt on concrete pad . Respondent failed to restore concrete pad in kind with diagram 1042B requirements. Notified prior by car# 20164510955 dated 11-29-2016 |
2017-07-12 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 Steel Plates Secured to the Roadway and a Temporary Trench on the Sidewalk, I/F/O 423 |
2017-07-12 | No data | HEMPSTEAD AVENUE, FROM STREET 217 LANE TO STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk passed |
2017-07-12 | No data | GUY R BREWER BOULEVARD, FROM STREET 107 AVENUE TO STREET 108 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water, perm roadway and sidewalk cuts are to grade. |
2017-07-10 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PER CUT IN ROADWAY , LOCALIZED AREA 2' X 1' SUNKEN 3'' , 3' X 1 1/2' SUNKEN 4'' IN THE MIDDLE OF STREET. NEED TO BE FLUSH WITH ROADWAY |
2017-07-09 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to make repairs to multiple cuts 3' apart from each other. permittee Violated of DOT standard Specification 2-11(E)(12)(V) drawing H-1042A (9) which states cuts less than 10' apart must be made 1 continuous trench . |
2017-07-03 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench to grade opposite driving lanes. |
2017-07-02 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 Steel Plates secured to the Roadway one of which is marked "R" and 1 plate on the Sidewalk I/F/O 423 |
2017-07-01 | No data | 36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued to respondent for construction debris obstructing gutter in roadway. No one on site. |
2017-06-29 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade |
2017-06-29 | No data | 45 AVENUE, FROM STREET 70 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration is perm to grade |
2017-06-28 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut to grade |
2017-06-28 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway cut has been sealed. |
2017-06-27 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED BY BUILDERS PAVERS |
2017-06-24 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for the work. |
2017-06-24 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Site safely operated; Constance Small on location. Stip 074 in effect. |
2017-06-23 | No data | QUEENS BOULEVARD, FROM STREET 51 AVENUE TO STREET DONGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk temp to grade around water hardware |
2017-06-22 | No data | UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | PLATED ROADWAY AT THIS TIME.. INSTALLING NEW WATER SERVICE. NO CAVE IN VISIBLE. |
2017-06-21 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to restore wearing course flush with surrounding area. The condition remains despite prior notice in CAR #20165380169 issued 11/26/16. |
2017-06-21 | No data | SOUTH ROAD, FROM STREET LIVERPOOL STREET TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builders pave |
2017-06-20 | No data | LEXINGTON AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | both condition were corrected. |
2017-06-16 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Defect on the sidewalk has been made safe by applying cold patch temporary restoration on the sidewalk. |
2017-06-14 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to provide adequate protection by not addressing a 3'X2' Cave-in, I/F/O 411 9th Avenue |
2017-06-14 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W |
2017-06-14 | No data | MILLER AVENUE, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING CONSTRUCTION DEBRIS IN THE PARKING LANE OBSTRUCTING A FIRE HYDRANT ON THE SIDEWALK ,ABOVE PERMIT # USED TO IDENTIFY THE ABOVE RESPONDENT |
2017-06-14 | No data | 255 STREET, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET HOOK CREEK BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; water leak on service--owner confirmed |
2017-06-13 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial Sidewalk Collapse I/F/O 411 9th Avenue, a 3' X 2' area of Sidewalk has collapsed and is down 2 1/2 Feet. This condition needs to be made Flush with the surrounding Roadway ASAP. |
2017-06-13 | No data | WEST 10 STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-06-12 | No data | BEVERLY ROAD, FROM STREET EAST 59 STREET TO STREET RALPH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Start time 1025 end time 1115 size 4' x 3' x 4' compaction 97.3% pass Sand blend |
2017-06-11 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent has permanent restorations with wearing course not flush with surrounding roadway sunken 2" previously notified by car #20170920267 none of the repairs were made from CAR |
2017-06-06 | No data | 75 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two long water cuts perm to grade. One s/w flag restored in kind |
2017-06-04 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp asphalt patched concrete pad sewer restoration. Respondent failed to restore concrete pad in kind with diagram 1042B requirements. CAR 20164510955 issued on 11-29-16, respondent failed to comply with full panel replacement. |
2017-06-03 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO COMPLY WITH DOT STANDARD SPECIFICATIONS,RESPONDENT IS VIOLATION OF SECTION 2-11(E)(12)(I) WEARING COURSE MATERIAL SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND STANDARD DETAIL DRAWINGS 1042A |
2017-06-03 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2017-06-02 | No data | 145 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2017-05-31 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to install yellow lane markings on permanent water cut in the roadway. Respondent was notified via CAR# 20176530082 on 3/11/17 and failed to do so. |
2017-05-30 | No data | 45 AVENUE, FROM STREET 70 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed Respondent has a concrete based restoration in the roadway that is down 2 (two) inches. Respondent failed to maintain/install temporary asphalt compacted flush with the surrounding area. |
2017-05-29 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water Cuts was Resurfaced & No work found on the Existing Sidewalk. |
2017-05-28 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS RWY AND TEMP SWK BUT WRONG CROSS STREETS SHOULD BETWEEN MARCY AVE AND NOSTRAND AVE |
2017-05-25 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two long water cuts perm to grade in the r/w. One s/w flag restored in kind |
2017-05-25 | No data | 38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-21 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed temporary water cut in roadway. Respondentâs permit for this work expired on 12/29/16 during the Winter Moratorium period that commenced on 12/1/16 and ended on 4/1/ 17. Respondent failed to permanently restore cut by April 1, 2017 |
2017-05-20 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR SEWER: crew is on site working on the s/w. |
2017-05-20 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm. cuts to grade p/d/l;temp. asphalt cuts to grade on s/w - active BO. |
2017-05-18 | No data | BAY 14 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work is in progress - ask foreman to flag person |
2017-05-16 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work is on going. Active permit M012017109A78 on file for final restoration. At time of inspection temp asphalt found in two sidewalk flags and on the roadway I/F/O 322 |
2017-05-14 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION RWY AND TEMP SWK BUT WRONG CROSS STREETS SHOULD BETWEEN MARCY AVE AND NOSTRAND AVE |
2017-05-13 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2017-05-12 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water two perm cuts to grade in the p/d/l |
2017-05-11 | No data | 98 AVENUE, FROM STREET 218 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found several temp cuts not sure if there this companies. |
2017-05-09 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | three perm cuts to grade on the r/w |
2017-05-09 | No data | 135 AVENUE, FROM STREET 132 STREET TO STREET 133 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade across the r/w |
2017-05-07 | No data | DITMAS AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 9 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Temp Excavation flushed on the sidewalk and roadway |
2017-05-06 | No data | DITMAS AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 9 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew arrived on site while i was on location. Property ower on site break inside basement |
2017-05-06 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations in roadway. |
2017-05-03 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR SEWER |
2017-05-02 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restorations in concrete Bus stop Not restored in Kind , large permanent restoration sunken 2" in center 3" against Bus pad, cracked and broken asphalt in all cuts cover for water hardware missing on sidewalk |
2017-05-01 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts needs to be sealed plus connected into 1 less then 10 feet apart. |
2017-04-23 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | seal loose and cracking please reseal cut in front of 12014. |
2017-04-23 | No data | MAIN STREET, FROM STREET GRAVETT ROAD TO STREET MELBOURNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two permanent restoration in need of sealing |
2017-04-23 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway in compliance at time of inspection sidewalk flags restored location in compliance. |
2017-04-22 | No data | 29 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | no crew on site at this time---owner showed me 3 day notice and running water at curb is visible--no excavation yet at this time |
2017-04-22 | No data | 29 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site |
2017-04-22 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO COMPLY WITH DOT STANDARD SPECIFICATIONS BY HAVING 2 PATCHED CUTS IN THE BUS PAD RESPONDENT FAIL TO COMPLY WITH DOT DIAGRAM 1042-B,CAR #20164510955 ISSUED ON 11/29/16 |
2017-04-22 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joint resealed, Expansion joint sealed between curb and sidewalk flag |
2017-04-22 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONNECT CUTS TO MAKE ONE CUT IN THE PARKING LANE ,CUTS ARE LESS THAN 10 FT APART, AS PER DOT SPECIFICATION 1042 A |
2017-04-22 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONNECT CUTS TO MAKE ONE CUT IN THE PARKING LANE ,CUTS ARE LESS THAN 10 FT APART, AS PER DOT SPECIFICATION 1042 A |
2017-04-20 | No data | WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012014225A35) |
2017-04-19 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | cut1: 25' x 4' x 4' 3" lift1: 96.4 lift2: 97.6cut2: 25' x 9' 2" x 4' 7" lift1: 99.2 lift2: 98.1wet: 124.2 dry: 115.5 max:123.5 act: 7.5 from 10:30 to 2:20 |
2017-04-19 | No data | BOSTON ROAD, FROM STREET REEDS MILL LANE TO STREET ROMBOUTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Four perm water cuts in the driving lane |
2017-04-17 | No data | SUTTER AVENUE, FROM STREET HINSDALE STREET TO STREET WILLIAMS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE 3 TEMPORARY CUTS IN THE DRIVING AND PARKING LANE WITHIN THE REQUIRED TIME TO SO SO,ABOVE PERMIT #EXPIRED ON 3/13/17,ABOVE PERMIT USED TO IDENTIFY THE RESPONDENT |
2017-04-15 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison paved over plumber restoration |
2017-04-11 | No data | 91 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | a/t/p/o i observed the above respondent had performed work on the street long water cut,saw cut with patch temporary grade and one temporary to grade down 2'' with out a dot permit on site or on file .permit number Q012017011A02 expired 2-7-17 |
2017-04-10 | No data | LEXINGTON AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to restore lane markings to their permanent water restoration. Respondent notified via CAR #20175650030 on 2/1/17. |
2017-04-09 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts restored flush to grade. |
2017-04-08 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore wearing course flush with surrounding area. CAR #20165380169 issued 11/26/16. Wearing course remains broken/cracked. |
2017-04-03 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable started 12:05 completed 3:35 p.m. contractor left cleaning site and plating cut . |
2017-04-02 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | steel plates pinned and ramped on sidewalk and two steel plates on roadway location in compliance valid permit on file. |
2017-03-31 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-03-31 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | address is at next block segment. perm long water cut ok |
2017-03-31 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut opposite address in parking lane |
2017-03-29 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm 9X5 cut in the parking lane. |
2017-03-27 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD A TEMPORARY RESTORATION IN ROADWAY DOWN 2 INCHES(MUST BE FLUSH AT ALL TIMES)- A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. DOT PERMIT#B012017072B10 EXP 4/12/17 WAS USED FOR ID. |
2017-03-26 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | steel plate countersunk at time of inspection in driving/ parking lane location in compliance at time of inspection steel plate pinned and ramped on sidewalk in compliance. |
2017-03-25 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut |
2017-03-25 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-03-24 | No data | 103 STREET, FROM STREET 37 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade driving lane |
2017-03-23 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012017075B33 on file |
2017-03-22 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | two temp cuts to grade in the p/d/l |
2017-03-22 | No data | UNION HALL STREET, FROM STREET 108 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance at time of inspection slight cracking in seal no action taken at this time. |
2017-03-15 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates no "raise plow" sign / NOV issued |
2017-03-13 | No data | AUGUSTINA AVENUE, FROM STREET NAMEOKE AVENUE TO STREET WHEATLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2017-03-12 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-03-12 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | excavated debris and wooden timbers stored in the parking lane.Respondent failed to comply with Stipulation 78 FULL WIDTH OF ROADWAY, INCLUDING PARKING LANES, SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. identified by permit on file. |
2017-03-11 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a trench in the roadway in which the respondent failed to restore lane markings. The respondent was notified to make correction via CAR #20164510955 on 11/29/2016 and failed to do so. |
2017-03-11 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 temp cuts in r/w. |
2017-03-11 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore double yellow lane markings line. |
2017-03-09 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | workers onsite at time of inspection valid permit on file location in compliance at time of inspection. |
2017-03-09 | No data | 156 STREET, FROM STREET 111 AVENUE TO STREET 113 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | workers on site location in compliance at time of inspection. |
2017-03-08 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD FAILED TO COUNTERSINK LONG WATER STEEL PLATED STREET OPENING FLUSH WITH ROADWAY DURING WINTER MORATORIUM- A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. DOT PERMIT#B012017059C02 EXP 3/13/17 USED FO |
2017-03-05 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed two temporary restorations in the parking lane that have sunken down about 4 inches below grade. Respondent was notified to make correction via CAR #20166370156 on 12/20/16 and failed to do so. |
2017-03-05 | No data | SUTPHIN BOULEVARD, FROM STREET 113 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with Stipulation 78 FULL WIDTH OF ROADWAY, INCLUDING PARKING LANES, SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. Respondent identified by permit on file. No one on site at time of inspection |
2017-03-04 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | con ed work over plumber restoration |
2017-03-03 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane ok |
2017-03-02 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | covered by builder pavers plan |
2017-03-01 | No data | 116 AVENUE, FROM STREET 144 STREET TO STREET 145 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in d/l overlapped by BPP. |
2017-02-27 | No data | DREW STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp trench in roadway must be restored permanently. |
2017-02-26 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal your sewer trench as needed.Cut and seal your sidewalk expansion joints. |
2017-02-24 | No data | OCEAN PARKWAY, FROM STREET BRIGHTON BEACH AVENUE TO STREET SEA BREEZE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONTRACTER HAS PULLED A NEW PERMIT FOR THIS LOCATION B012017045B72 |
2017-02-24 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored BF from 1025-1243, BF acceptable |
2017-02-23 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES (L) 14.6 FT (W) 4FT (D) 4.6 FT ...ACTUAL START TIME 12:40 PM COMPACTION: 96.8%/97.2% |
2017-02-21 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a steel plated excavation and failed to countersink plate during Winter Moratorium Policy. ID by DOT permit# B012017044A31. |
2017-02-21 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012017048A24 on file. |
2017-02-21 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | two temp cuts to grade in the p/d/l |
2017-02-21 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration flushed |
2017-02-21 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | work is in progress and is within their stipulations |
2017-02-21 | No data | FOSTER AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-02-19 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING TEMPORARY AND CONCRETE BASE CUTS SUNKEN 2'' IN ROADWAY NOT FLUSH WITH SURROUNDING AREA. |
2017-02-18 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration remain in compliance |
2017-02-18 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO LONG WATER CUTS TO GRADE IN THE R/W |
2017-02-18 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress valid permits |
2017-02-17 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in parking/driving lane ok |
2017-02-17 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 14.6 FT (W) 4.9 FT (D) 8 FT ....ACTUAL START TIME 11:24 AM ..COMPACTION: 96.8%/96.2% , ONLY 4 FT WAS BKFILLED ,PERMITTEE WILL CALL IN FOR ANOTHER CONFIRMATION# TO COMPLETE THE OTHER 4 FT ALSO TO INSTALL THE WATER SERVICE |
2017-02-16 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY AND TEMP SWK AT 76 |
2017-02-14 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Active | Department of Transportation | wrk in progress |
2017-02-07 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | two temp cuts to grade in the p/d/l |
2017-02-04 | No data | CRANSTON STREET, FROM STREET 133 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade another cut next to it car on top. |
2017-02-03 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Re-Inspection for Insp / temp cuts in roadway and sidewalk |
2017-02-02 | No data | EAST 158 STREET, FROM STREET GERARD AVENUE TO STREET RIVER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street to be resurfaced |
2017-02-01 | No data | LEXINGTON AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/f/o building #1704 permanent water cut is missing a color code marker. Reapply white lane markings |
2017-01-31 | No data | SEAGIRT AVENUE, FROM STREET BEACH 29 STREET TO STREET BEACH 30 STREET | No data | Street Construction Inspections: Active | Department of Transportation | permit check contractor working in compliance |
2017-01-31 | No data | 48 AVENUE, FROM STREET 206 STREET TO STREET 207 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. flag men posted |
2017-01-30 | No data | 116 DRIVE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 temp restorations in roadway |
2017-01-29 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSUNK STEEL PLATES FLUSH WITH THE ROADWAY DURING WINTER MORATORIUM POLICY. |
2017-01-29 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to restore lane markings. Failed to restore double lane markings in roadway. Notified prior by car #20164510955 dated 11/29/2016 |
2017-01-28 | No data | 116 AVENUE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | no work done |
2017-01-28 | No data | LINDEN BOULEVARD, FROM STREET 224 STREET TO STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I DID OBSERVE THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE A BINDER BASED 6'X4' WATER CUT WITHIN THE REQUIRED TIME. PERMIT EXPIRED ON 3/19/16 BUT RESTORATION IS OVERDUE FOR FINAL RESTORATION |
2017-01-27 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking lane. |
2017-01-26 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SEWER - PROTECTED CREW ON SITE |
2017-01-24 | No data | MARION STREET, FROM STREET BEND TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...09 ....sprinkler installed |
2017-01-23 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the respondent having a steel plate countersunk in roadway that is smooth to the touch offering no resistance. |
2017-01-21 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/t/p/o i observed the above respondent failed to counter sink steel plate or post raise plow signs as per DOT's winter moratorium policy |
2017-01-20 | No data | RIVER AVENUE, FROM STREET EAST 157 STREET TO STREET EAST 158 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with steel plates in roadway but failed to post raise plow signs during winter moratorium. |
2017-01-20 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and acceptable. |
2017-01-18 | No data | OCEAN PARKWAY, FROM STREET BRIGHTON BEACH AVENUE TO STREET SEA BREEZE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Construction materials/equipment stored on street w/o permit |
2017-01-18 | No data | OCEAN PARKWAY, FROM STREET BRIGHTON BEACH AVENUE TO STREET SEA BREEZE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt restoration in concrete sidewalk, Temporary Restoration Overdue for FINAL RESTORATION |
2017-01-18 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench is now perm,in compliance with NICA |
2017-01-18 | No data | 257 STREET, FROM STREET 87 AVENUE TO STREET 87 ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; water leak on service--owner has 3 day notice on site--s/w in dirt area only excavation at this time |
2017-01-17 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A CONCRETE BASE TRENCH NOT FLUSH WITH THE SURROUNDING AREA IN THE DRIVING LANE AS PER DOT WINTER MORATORIUM,ABOVE PERMIT USED TO IDENTIFY THE ABOVE RESPONDENT NICA ISSUED ON 1/13/17 @1:17 pm, NO ATTEMPT TO CORRECT CONDITION |
2017-01-16 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT HAVING A CONCRETE BASE TRENCH NOT FLUSH WITH THE SURROUNDING AREA IN THE DRIVING LANE AS PER DOT WINTER MORATORIUM,ABOVE PERMIT USED TO IDENTIFY THE ABOVE RESPONDENT NICA ISSUED ON 1/13/17 @1:17 pm, NO ATTEMPT TO CORRECT CONDITION |
2017-01-14 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-01-14 | No data | 111 AVENUE, FROM STREET 223 STREET TO STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restorantion |
2017-01-13 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING A CONCRETE BASE TRENCH NOT FLUSH WITH THE SURROUNDING AREA IN THE DRIVING LANE AS PER DOT WINTER MORATORIUM,ABOVE PERMIT USED TO IDENTIFY THE ABOVE RESPONDENT |
2017-01-10 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to countersink their steel plate during the winter moratorium. Steel plate not flush with surrounding roadway and no raise plow signs posted. |
2017-01-10 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate secured to roadway. However NOV will be given for not countersinking plate during winter moratorium |
2017-01-09 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | permittee has debris left in the parking lane at this time,also shoring that is in front of the building operations drive way ,not obstructing others residents sidewalk or driveway at this time |
2017-01-07 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate shifted 10" in driving lane exposing 4' excavation below. IFO 322raise plow must be posted |
2017-01-05 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut is in compliance. |
2016-12-31 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber temp cut in the roadway overdue for final restoration |
2016-12-31 | No data | 133 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent cuts sunken 1'' in the driving & parking lane. Please make flush with roadway. Valid permit on file at time of inspection. |
2016-12-29 | No data | 90 STREET, FROM STREET 86 ROAD TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk. Building Super on Site. |
2016-12-28 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site.. cleaning up roadway open |
2016-12-27 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " RAISE PLOW" SIGNS ALSO FAIL TO COUNTERSINK STEEL PLATES IN THE DRIVING LANE FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM ,ABOVE PERMIT USED TO IDENTIFY THE RESPONDENT |
2016-12-26 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | an open excavation with wooden shoring at pedestrian safety island without permit. permit number Q012016322A02 exp. 12/1/16 is used for ID only |
2016-12-23 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | having 1 of 2 non-counter sunken steel plates at excavation in roadway without any "Raise Plow" signs posted. Respondent failed to countersink both steel plates & post "Raise Plow" signs during 2016/2017 Winter Moratorium. |
2016-12-21 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable started 11:00 a.m. completed 1:07 p.m. |
2016-12-21 | No data | SUTTER AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cuts in r/w. |
2016-12-21 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST " RAISE PLOW" SIGNS ALSO FAIL TO COUNTERSINK STEEL PLATES IN THE DRIVING LANE FLUSH WITH THE ROADWAY AS PER DOT WINTER MORATORIUM ,ABOVE PERMIT USED TO IDENTIFY THE RESPONDENT |
2016-12-20 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed that the respondent failed to countersink steel plates flush to roadway and post raise plow signs as required by winter moretorium policy. |
2016-12-20 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two temporary cuts in the parking lane sunken down 3 inches. Please restore to grade. |
2016-12-20 | No data | VAN SICLEN AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts. |
2016-12-20 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PLATE RESET TO COVER EXCAVATION NOV ISSUED PLATES NOT COUNTERSUNK / NO RAISE PLOW SIGN AND NO SKID RESISTANCE |
2016-12-19 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass,long water to be installed ....crew now on location ... |
2016-12-19 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | close DEP |
2016-12-17 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO POST A RAISE PLOW SIGN WHERE THEY HAD A STEEL PLATE IN THE ROADWAY OVER A OPEN EXCAVATION THERE WAS A COMPLAINT FROM (NYPD) OF A SHIFTED PLATE AT THIS LOCATION PLATE WAS MARKED (RD) WAS ON WATER LINE. |
2016-12-16 | No data | HERKIMER STREET, FROM STREET LOUIS PLACE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2016-12-15 | No data | WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Water Cut in the Parking Lane 3 Feet Below Grade Filled with Water. Thus, Temporary Asphalt must be Install to make Surrounding Area Flush to Grade. |
2016-12-14 | No data | CORNELIA STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW WILL BE WORKING ON THE SIDEWALK AND PROVIDE A TEMP PED WALK WAY, FULL SIDEWALK POURED CREW WILL REMAIN ON SITE TILL S/W IS CURED AND ROADWAY (CONCRETE BASE) WILL RE INSPECT AFTER 5 PM |
2016-12-06 | No data | BELMONT AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | MONITORED BACKFILL FROM 1005AM TO 1245PM ONE RESTORATION IN D/L LENGTH 6FT WIDTH 6FT DEPTH 9FT SPRAYED CUTBACKS |
2016-12-04 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2016-12-02 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts. 6 1/2 x 3 1/6, down 3ft, 96.9% & 4ft x 3 1/2ft, down 4 1/2ft 97.2%. Arrival 10:26am to 12:05pm |
2016-12-01 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem trench on r/w and temp sidewalk flag around water valve - active b/o |
2016-12-01 | No data | QUEENS BOULEVARD, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk perm / active BO |
2016-11-30 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2016-11-29 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore double yellow lane markings and restore concrete bus pad (asphalt unacceptable), in front of 9029 Flatlands Ave. |
2016-11-29 | No data | QUEENS BOULEVARD, FROM STREET 51 AVENUE TO STREET DONGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2016-11-29 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk temp to grade |
2016-11-28 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 114 STREET TO STREET BEACH 115 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | SIDEWALK EXCAVATION PLATED WITH WHAT LOOKS LIKE PLYWOOD. EXCAVATION NEEDS TO BE BACKFILLED WITH TEMP ASPHALT INSTALLED TO GRADE . OR PLATED WITH ACCEPTABLE STEEL PLATE WITH PROPER ASPHALT RAMPING INSTALLED |
2016-11-28 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in d/l to grade |
2016-11-27 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number. |
2016-11-26 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt inside perm restoration cracked and broken out.Street opening joints needs to be re-sealed |
2016-11-24 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bike lane marking restored |
2016-11-23 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the roaday |
2016-11-22 | No data | 98 AVENUE, FROM STREET 218 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. |
2016-11-22 | No data | 98 AVENUE, FROM STREET 218 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 5 water cuts were made 3 in the p/l opposite address 1 in the d/l. and one in the p/l ifo address. |
2016-11-20 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored cobble stones replacement as per stip #105 from 10:30-1:10 PM. Two roadway cuts (1: 3'9"x4'9" & 2: 3'4"x4'6") IFO 3 Mercer st. Restoration in compliance. |
2016-11-19 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | monitored base restoration from 1000-1150..permittee was not able to lay cobblestone due to concrete base not being poured prior |
2016-11-19 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates removed |
2016-11-18 | No data | 230 STREET, FROM STREET 146 AVENUE TO STREET 147 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut to grade. |
2016-11-17 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site setting up to restore sidewalk flags first. Roadway still plated & temp to grade. Explained procedure on cobblestones. Photos taken. Active permit M012016320A41 on file. |
2016-11-17 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site setting up to restore sidewalk flags first. Roadway still plated & temp to grade. Explained procedure on cobblestones. Photos taken. |
2016-11-14 | No data | 98 AVENUE, FROM STREET 218 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; water leak on 3/4" copper service is visible--no 3 day notice on site |
2016-11-13 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R.W |
2016-11-10 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo i observed the above respondent had left a roadway restoration in a temporary state failing to permanently restore the cut within required timeid by expired permit on file permit expired 8-30-16 |
2016-11-10 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defect to restoration on s/w and r/w located on west 176 street side |
2016-11-10 | No data | 38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-11-07 | No data | BRISTOL STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w. New swk flag. |
2016-11-06 | No data | VAN WYCK EXPRESSWAY, FROM STREET VWE SB ENTRANCE ROCKAWAY BLVD TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking lane. Two sidewalk flags restored, expansion joints sealed. |
2016-11-06 | No data | BERGEN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in r/w |
2016-11-06 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed the respondent failed to properly secure steel plate as per subsection 34RCNY 2-11(e)(10). |
2016-11-06 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | site plated nov issued on active permit Q012016285A03 |
2016-11-03 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across roadway in westbound lane of Northern Blvd. Open excavation in median strip with shoring and protective fencing. Active permit #Q012016285A03 expires 11/10/2016. |
2016-11-03 | No data | 75 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in d/l p/l to grade / sidewalk perm |
2016-11-02 | No data | WEST 33 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | No work observed as of right now, |
2016-11-01 | No data | 145 STREET, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent failed to permanently restore cut within required time. Respondent has two temporary cuts in the roadway. Permit expired 9/29/16. No new permit on file. |
2016-11-01 | No data | 145 STREET, FROM STREET 116 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade across the roadway. |
2016-10-30 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | out of busines |
2016-10-26 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates over excavation in r/w |
2016-10-24 | No data | BAINBRIDGE STREET, FROM STREET DEAD END TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts 09 .... |
2016-10-24 | No data | CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Long water, tunneled, two cuts join by a trench (paving only). Temp sidewalk. |
2016-10-21 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair on cobblestones roadway in progress. Roadway plated & sidewalk covered with plywood, cones & caution tape. 5' sidewalk clearance maintained. |
2016-10-20 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in p/d/l |
2016-10-19 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site--excavation on sidewalk and in roadway doing installs |
2016-10-19 | No data | 142 PLACE, FROM STREET 120 AVENUE TO STREET 123 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | street opening without a permit |
2016-10-18 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 13x4 excavation back filed |
2016-10-18 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DEP work in roadway at time of inspection. |
2016-10-15 | No data | WEST 33 STREET, FROM STREET 9 AVENUE TO STREET LINCOLN TNNL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this location. |
2016-10-15 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate has been removed. Restoration beneath parked vehicle appears sunken and will be re-inspected when fully visible. |
2016-10-15 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | arrived 22:45 departed 02:50 32 x 4 excavation, was back filled partially and plated 21 feet completed and plated |
2016-10-14 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | fou condition resolvednd debris removed from job site |
2016-10-12 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway are in compliance |
2016-10-06 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking lane. |
2016-10-06 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w . r/w resurfaced by Con Edison |
2016-10-05 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass,...09 //... |
2016-10-05 | No data | 9 AVENUE, FROM STREET WEST 33 STREET TO STREET WEST 34 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | found Rock E small pl & htg crew at site , I spoke Andre forman at site in regard to noise they will keep noise to lowest |
2016-10-04 | No data | 38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE 2 PLUGS5FT9IN X 3FT2IN X 3FT8IN3FT9IN X 3FT3IN X 4FT0INWD:132.3; DD:120.4; MDD:123.5; MST:9.5 - CUT #1 a) 96.2, b) 96.0 - CUT #2 a) 96.2, b) 96.7START 1:18 END 2:54 |
2016-10-03 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore bike lane marking in front of 45 willoughby avenue |
2016-10-02 | No data | NEW LOTS AVENUE, FROM STREET VERMONT STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench IFO 690 Vermont. |
2016-10-01 | No data | DAVIDSON AVENUE, FROM STREET WEST 192 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored, street resurfaced |
2016-09-30 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut. 6ft x 4ft, down 3 1/2 ft. 97.1% p/l Arrival 9:50 to 11:20am |
2016-09-28 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | 6FT 3IN X 4FT 3IN SUNKEN DOWN 3IN |
2016-09-28 | No data | CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection crew working at site , excavation in r/w |
2016-09-25 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut on sidewalk in complaince |
2016-09-19 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut |
2016-09-15 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work started 9/14/15 new permit on file M012016258B23. roadway & sidewalk excavated. |
2016-09-15 | No data | SEAGIRT AVENUE, FROM STREET BEACH 3 STREET TO STREET BEACH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5X4 PERM CUT IN R/W |
2016-09-14 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in opposite parking/driving lane. |
2016-09-12 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work still not started. |
2016-09-08 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active building opration |
2016-09-08 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane in compliance |
2016-09-07 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file M012016237A37 |
2016-09-07 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on the sidewalk is in compliance |
2016-09-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 temp cut on the sidewalk and in the roadway |
2016-09-02 | No data | MERCER STREET, FROM STREET CANAL STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started on water repair. |
2016-08-31 | No data | 45 AVENUE, FROM STREET 70 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2016-08-31 | No data | SOUTH ROAD, FROM STREET LIVERPOOL STREET TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 water cuts to grade |
2016-08-28 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration p/l flush with surrounding area. SR# 1297173678. |
2016-08-28 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-08-25 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2016-08-19 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site during time of inspection. spoke to foreman and let him know that he need a flag person at all times |
2016-08-11 | No data | WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut is in compliance |
2016-08-09 | No data | NORTHERN BOULEVARD, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Work opp. 138-12 (WB Northern blvd ) at this time,crew on site,work in compliance with the stipulations of the permit at this time - two lane for traffic maintained WB at this time. |
2016-08-08 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-08-08 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cuts been temp to grade on the sidewalk, also spoke to COSMO in regards to color code needs to applied on 2 cuts in the roadway |
2016-08-07 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut resurfaced by Nat Grid. Pass. |
2016-08-06 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the above respondent fail to remove its steel plate from the roadway. CAR 20165410526 was issued to respondent to correct said condition. |
2016-08-06 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane marking applied and steel plates removed. |
2016-08-05 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 open pk lane trenches-2 opp 350-crew on site |
2016-08-05 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | bruno and trainees arrive at 1030am, backfill a pass on 3 pk lane trenches&swk trench (L)4ft,3ft,3ft5in X (W)3ft,4ft8in,3ft X (D)3ft5in,3ft7in,4ft, tests97.6,97.2&96.6&97.1, no cutbacks or base done, left temp to grade, left at 1215pm |
2016-08-03 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plumber on site working |
2016-07-30 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT IS SEALED IN COMPLIANCE WITH CAR |
2016-07-29 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill passed 2 cuts - cut 1 3'by 4.1 down 3.1 test 1 - 97.4 test 2 - 97.3 cut 2 3.6 by 4' down 2.3 test 1 97.6 |
2016-07-28 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated in the roadway and sidewalk |
2016-07-27 | No data | GILMORE COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | remove debris from center of roadway |
2016-07-27 | No data | BOSTON ROAD, FROM STREET REEDS MILL LANE TO STREET ROMBOUTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-07-26 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated in p/l and on s/w |
2016-07-25 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in front of building operation is acceptable. |
2016-07-24 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a cut in the roadway with wearing course not flush with the surrounding area. Cut is down 2 inches below grade in multiple locations. Respondent was notified on 8/11/2015 via CAR# 20153940400 to make corrections and failed to do so |
2016-07-23 | No data | ATLANTIC AVENUE, FROM STREET 80 STREET TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2016-07-22 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Lane marking installed on restorations. |
2016-07-22 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plumbing work in progress. spoke to cosmo |
2016-07-21 | No data | KEAP STREET, FROM STREET BEDFORD AVENUE TO STREET WILLIAMSBURG ST WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-07-20 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w re surfaced |
2016-07-20 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A.T.P.O. I Observed the above respondent using the roadway with stored stacked steel pates located in parking lane with no valid NYC DOT permit to do so. |
2016-07-20 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two steel plates stored stacked in parking lane serving no purpose. |
2016-07-18 | No data | FOSTER AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in dl |
2016-07-16 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-07-15 | No data | WHITE PLAINS ROAD, FROM STREET EAST 221 STREET TO STREET EAST 222 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress, i spoke to MR SMALL in regards to signs needed to be posted on the sidewalk and 5'ped walk need to maintain on the sidewalk after shoring installed. contractor has a temp ped walk in the roadway |
2016-07-14 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench over cut |
2016-07-11 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING ON SWK. |
2016-07-11 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT IS NOW PERMANENT |
2016-07-06 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable. |
2016-07-06 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION ON THE SIDEWALK SUNKEN 1 INCH POTENTIAL TRIP HAZARD TO PEDESTRIANS. |
2016-07-06 | No data | 103 STREET, FROM STREET 37 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | water work contractor comply with my request to take permits for location |
2016-07-06 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in p/l |
2016-07-06 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm water cut acceptable. |
2016-07-06 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP RESTORATION ON SWK FLUSH TO GRADE. |
2016-07-05 | No data | 103 STREET, FROM STREET 37 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 37-60 103 Street water work |
2016-07-04 | No data | UNION HALL STREET, FROM STREET 108 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut flush to grade,color code and seal.. |
2016-07-02 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rdwy & s/w acceptable |
2016-07-01 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | restoration has been made final, but awaiting color code. permit still in active status so no action taken |
2016-07-01 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file, restoration made final new permit M012016167A24 |
2016-07-01 | No data | 116 AVENUE, FROM STREET 144 STREET TO STREET 145 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in r/w..valid permit |
2016-06-28 | No data | 87 ROAD, FROM STREET 162 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed temporary asphalt cut over water lane on sidewalk.Above respondent failed to permanently restore the cut within required time - above DOT permit expired on 6/2/16. |
2016-06-28 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration. Plate remains. |
2016-06-27 | No data | 111 AVENUE, FROM STREET 223 STREET TO STREET 225 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane in compliance |
2016-06-27 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A TEMPORARY CUT ON THE SIDEWALK WITH IN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 4/5/2016,ABOVE PERMIT # USED FOR I.D PURPOSES |
2016-06-26 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT HAS BEEN RESEALED IN ROADWAY AT TIME OF INSPECTION |
2016-06-24 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | I spoke with joe harris and his boss faxed over their permit because i could not find it in dash. They are in compliance at time of inspection. |
2016-06-23 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2016-06-23 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steal plates have been removed. |
2016-06-20 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A CUT ON THE SIDEWALK WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 4/5/2016 ,ABOVE PERMIT USED FOR I.D PURPOSES |
2016-06-18 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm long water cuts to grade in the roadway |
2016-06-17 | No data | MAIN STREET, FROM STREET GRAVETT ROAD TO STREET MELBOURNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site preparing for work - 10 am stip. |
2016-06-17 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Opposite 1136 83 Street remove a steel plate not fastened to the roadway and serving no purpose by a permanent restoration. |
2016-06-16 | No data | SUTTER AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-06-15 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A CUT ON THE SIDEWALK WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 4/5/2016 ,ABOVE PERMIT USED FOR I.D PURPOSES |
2016-06-14 | No data | BOSTON ROAD, FROM STREET REEDS MILL LANE TO STREET ROMBOUTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts made final |
2016-06-14 | No data | DYRE AVENUE, FROM STREET BOSTON ROAD TO STREET CONNER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut made final |
2016-06-12 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to make the wearing course flush on a roadway restoration with the surrounding area .Roadway cut is down 2" below grade in various locations. Respondent was notified on 8/11/2015 Via CAR to make corrections and failed to do so |
2016-06-11 | No data | 120 AVENUE, FROM STREET 153 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm in roadway to grade |
2016-06-11 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed. |
2016-06-06 | No data | VAN SICLEN AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts pl/dl |
2016-06-05 | No data | EAST 158 STREET, FROM STREET GERARD AVENUE TO STREET RIVER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | all work behind fence |
2016-06-01 | No data | MARION STREET, FROM STREET BEND TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cuts new water sprinkler installed .... |
2016-05-28 | No data | 128 STREET, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm. long water cuts. One is missing a color code. No action taken. |
2016-05-27 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE3FT7IN X 3FT5IN X 3FT10INSTART 10:49 END 11:41 |
2016-05-26 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2016-05-25 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no evidence of recent work on site |
2016-05-25 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating parking lane. |
2016-05-24 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm long water cuts to grade in roadway |
2016-05-24 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2016-05-23 | No data | 81 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated and barricaded in parking lane. |
2016-05-23 | No data | 12 AVENUE, FROM STREET 80 STREET TO STREET 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit taken in error. Actual permit supposed to be on 81 Street between 11 Ave and 12 Ave aka 8020 12 Ave. Permit for 81 Street will be secured today for work on 81 Street. |
2016-05-23 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed above respondent did not restore opening wearing Course flush with surrounding area sunken 2 1/2" inches after previous notification by car # 20160920033 no repairs made at this time |
2016-05-22 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent failed to make the wearing course flush on a roadway restoration with the surrounding area .Roadway cut is down 2" below grade in various locations. Respondent was notified on 8/11/2015 Via CAR to make corrections and failed to do so . |
2016-05-22 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT IN ROADWAY |
2016-05-19 | No data | BAINBRIDGE STREET, FROM STREET DEAD END TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass long water ....09.. |
2016-05-18 | No data | QUEENS BOULEVARD, FROM STREET 51 AVENUE TO STREET DONGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk at B.O temp. to grade |
2016-05-15 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Temporary cut on concrete bus pad overdue for final restoration.Previous permit B012016075A66 to install water/sewer expired4/14/2016Expired permit used for Id |
2016-05-15 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w. |
2016-05-13 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts in roadway to grade |
2016-05-12 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut is in compliance. |
2016-05-11 | No data | MARION STREET, FROM STREET BEND TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new svc .....water svc .... |
2016-05-09 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut flush to grade.. |
2016-05-05 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1) Install missing lane markings2)remove steel plates serving no purpose in parking lane I/F/O building # 498. (WORK COMPLETED) |
2016-05-05 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area has been made safe plates re adjusted |
2016-05-04 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | a.t.p.o. the above respondent has failed to properly secure steel plates, plates have shifted out of place. notice of immediate action was issued 5.13.16 nica/CAR #20164560134 |
2016-05-04 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts re-sealed |
2016-05-03 | No data | CRANSTON STREET, FROM STREET 133 AVENUE TO STREET 134 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | A 3'X2' RESTORATION IN THE PARKING LANE WAS LEFT IN BACKFILL MATERIAL. RESTORATION SHOULD HAVE BEEN LEFT FLUSH IN TEMPORARY PAVEMENT AND IS IN VIOLATION--SERVING HOUSE 151-54 133 AVENUE AS STATED ON PERMIT |
2016-05-03 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICA HAS BEEN ISSUED FOR SHIFTED PLATED USING UPDATED PERMIT |
2016-05-03 | No data | WEST 176 STREET, FROM STREET BEND TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | steel plates have shifted out of place exposing excavation, steel plates need to be well adjusted and secured well pinned. in front of vapor lounge & restaurant |
2016-05-01 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2016-04-23 | No data | AUGUSTINA AVENUE, FROM STREET NAMEOKE AVENUE TO STREET WHEATLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade restoration in p/l |
2016-04-22 | No data | BRISTOL STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS |
2016-04-22 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in roadway needs to be reasealed at this time |
2016-04-20 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VOIDED PERMIT |
2016-04-19 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE CUTS IN THE PARKING LANE AND THE SIDEWALK WITHIN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 4/5/16,ABOVE PERMIT # USED FOR I.D PURPOSES |
2016-04-17 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Temporary cut on concrete bus pad overdue for final restoration.Previous permit B012016075A66 to install water/sewer expired4/14/2016Expired permit used for Id |
2016-04-16 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found later 2013 water cut IFO premise with ID 22396 tag belonging to permit M012013252081. |
2016-04-15 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Loose and noisy steel plate along roadway |
2016-04-15 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4 cuts on the sidewalk temp to grade, 3 cuts in roadway platted. |
2016-04-12 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A 8'x7' PERM CUT IN PARKING/DRIVING LANE NEEDS TO BE RESEALED IN FRONT OF 194-01 LINDEN BLVD |
2016-04-06 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to make the wearing course flush on a roadway restoration with the surrounding area .Roadway cut is down 2" below grade in various locations. Respondent was notified on 8/11/2015 Via CAR to make corrections and failed to do so . |
2016-04-06 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed. |
2016-04-05 | No data | BRISTOL STREET, FROM STREET NEWPORT STREET TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut 3.4 by 3.6 down 4.6 - 1 test 97 .2 |
2016-04-04 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed above respondent performed no repairs after previous notification by CAR # 20160920033 Conditions remain |
2016-04-04 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in roadway |
2016-04-03 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm water cut to grade |
2016-04-02 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2016-03-31 | No data | DYRE AVENUE, FROM STREET BOSTON ROAD TO STREET CONNER STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 cuts, 1 cut slightly sunken. car issued on previously permit |
2016-03-31 | No data | DYRE AVENUE, FROM STREET BOSTON ROAD TO STREET CONNER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 cuts in r/w a more recent permit on file |
2016-03-29 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done no defect |
2016-03-28 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2016-03-27 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work ok |
2016-03-26 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-03-26 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut flush to grade |
2016-03-23 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | active worksite crew on site foreman advised me dirt on sidewalk will be removed within the hour |
2016-03-23 | No data | NEW LOTS AVENUE, FROM STREET VERMONT STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in driving lane corner property cross street should be new jersey ave and Vermont st |
2016-03-23 | No data | NEW LOTS AVENUE, FROM STREET VERMONT STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file Plated excavation in driving lane corner property , cross street should be new jersey ave and Vermont st |
2016-03-23 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2016-03-23 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts |
2016-03-22 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2016-03-22 | No data | JEFFERSON AVENUE, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2016-03-20 | No data | 230 STREET, FROM STREET 146 AVENUE TO STREET 147 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2016-03-20 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp st |
2016-03-20 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the respondent failed to comply with the terms and conditions of DOT permits. Violation of stip Id:013 which states: MAINTAIN MINIMUM 5 FOOT CLEAR SIDEWALK. Observed full sidewalk closing |
2016-03-20 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sealer fading away,please re-seal. |
2016-03-19 | No data | LINDEN BOULEVARD, FROM STREET 224 STREET TO STREET 225 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in Basement, Property Owner on Site. |
2016-03-19 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Active | Department of Transportation | having two steel plated cuts in the roadway without any raised plow signs posted. Respondent failed to post raise plow signs during the 2015/'16 winter moratorium |
2016-03-18 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-03-17 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2016-03-16 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2016-03-16 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site actively working , warning was issued to foreman chavon to maintain three 11 foot lane for traffic. |
2016-03-12 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | work done |
2016-03-10 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | In-compliance "Rock E small plumbing & heating INC" onsite resetting their Two Steel plate in the roadway spoke to foreman chavon at the time of inspection. No action taken at this time. |
2016-03-08 | No data | WEST END AVENUE, FROM STREET WEST 83 STREET TO STREET WEST 84 STREET | No data | Street Construction Inspections: Active | Department of Transportation | respondent failed to comply with the Terms & condition of DOT Permit stipulation 087 which states work 9AM - 3PM Monday through Friday. Respondent onsite working @ 5:09pm in an 9' x 5' opened excavation down 5' below roadway surface. |
2016-03-08 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut made final |
2016-03-06 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut paved over by DEP sewer contractor |
2016-03-03 | No data | LEXINGTON AVENUE, FROM STREET EAST 106 STREET TO STREET EAST 107 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 test 96.8 97.6 6ft x 3ft.7 x 3ft.7 |
2016-03-02 | No data | DYRE AVENUE, FROM STREET BOSTON ROAD TO STREET CONNER STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 temp cuts on sidewalk, 2 temp cut in the roadway opposite site |
2016-03-02 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to foreman COSMO. in regards to flag man on site and maintaining 2 lanes |
2016-02-28 | No data | EAST 15 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts |
2016-02-26 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress on the sidewalk and roadway |
2016-02-25 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut broken out and crack,needs to be re-paved |
2016-02-23 | No data | MARTENSE COURT, FROM STREET DEAD END TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PARKING LANE |
2016-02-23 | No data | LACONIA AVENUE, FROM STREET EAST 216 STREET TO STREET OAKLEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IN PROGRESS ON THE SIDEWALK. plumber on site |
2016-02-23 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Streets was re paved no cut or trenches found on roadway. |
2016-02-21 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm excavation |
2016-02-12 | No data | NEWBOLD AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working in s/w and r/w to repair a low pressure service. |
2016-02-06 | No data | MARTENSE COURT, FROM STREET DEAD END TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-01-29 | No data | WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect due to snow on the roadway |
2016-01-21 | No data | BERGEN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-01-19 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite # 2 WYCOFF Avenue temporary repair temp High 2" was not made final also entire permanent restoration is below grade 2 1/2" in driving lane please make all necessary repairs |
2016-01-18 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-01-17 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was repaved no cuts found. |
2016-01-13 | No data | WEST 48 STREET, FROM STREET AMTRAK RR TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w found resurfaced |
2016-01-11 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2015-12-27 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | must measure from cut not seal |
2015-12-12 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a portion of a permanent roadway restoration sunken 1'-2'. The respondent failed to restore the restoration to be flush with the surrounding area as requested in CAR #20150720143 dated 9-19-15 |
2015-12-10 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2015-12-08 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | ATPO I Observed the above respondent with plated ongoing water repair work on sidewalk and roadway without a valid DOT permit on file. ID by above permit # M012015300A37 that expired on 11/27/15. |
2015-12-06 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS FAILED TO MAKE PAVEMENT SURFACE FLUSH WITH THE SURROUND AREA. PERMANENT CUT DOWN MORE THAN 2" AND NEED'S TO BE RE-SEALED. CAR#20153940400 & PERMITTEE HAS NOT YET COMPLIED. |
2015-12-05 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade restoration in r/w |
2015-12-04 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut on r/w |
2015-12-04 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut in r/w |
2015-12-04 | No data | SUTPHIN BOULEVARD, FROM STREET 118 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration and 2 s/w flags |
2015-12-03 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE OF THE ROADWAY AND NEW SIDEWALK FLAGS REPLACED AT 1120. |
2015-11-23 | No data | AUTUMN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2015-11-18 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2015-11-16 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway. |
2015-11-15 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT TO GRADE |
2015-11-14 | No data | 128 STREET, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUT TO GRADE |
2015-11-13 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in roadway |
2015-11-13 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm parking lane |
2015-11-12 | No data | EAST 15 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cut p/l, d/l s/w ok |
2015-11-11 | No data | BAINBRIDGE STREET, FROM STREET DEAD END TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS I/F/O 55 & 58 |
2015-11-11 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THAT THE ABOVE RESPONDENT FAILED TO APPLY COLOR CODE TO IDENTIFY PERMITTEE C A R # 20156050021 WAS ISSUED ON 10-11-2015 RESPONDENT FAILED TO COMPLY WITH RULES AND REGULATION OF THE D.O.T. |
2015-11-10 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm under major installation restoration and parked car . |
2015-11-10 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perrm r/w cut is to grade in d/l. |
2015-11-09 | No data | RUSSELL STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts one in each p/l 1 s/w all ok |
2015-11-09 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...09 ... |
2015-11-07 | No data | EAST 40 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PARKING LANE |
2015-11-07 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer installed |
2015-11-05 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade restoration in r/w |
2015-10-31 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR re-inspection passed. Permanent cut was resealed. |
2015-10-27 | No data | VERONICA PLACE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2015-10-27 | No data | EAST 137 STREET, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2015-10-21 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | atpo i observed the above respondent has wearing course not flushed with the surrounding area. as per CAR #20150720143 issue on 9-19-15. permanent cut is sunken 2'' |
2015-10-16 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PARKING LANE |
2015-10-16 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway at time of inspection. |
2015-10-12 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | a/t/p/o i found the above respondent having wearing course (perm sunken down 2inches)not flush with surrounding area .respondent failed to make corrected after being notified by CAR 201539404400 8/14 15 |
2015-10-11 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut must go back to the curb because its less than 1' away & IBM mark needed to identify work done |
2015-10-11 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | in compliance |
2015-10-11 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut must go back to the curb because its less than 1' away & IBM mark needed to identify work done |
2015-10-09 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2015-10-09 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration flush and sealed |
2015-10-07 | No data | 120 AVENUE, FROM STREET 153 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2015-10-04 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade restoration in r/w |
2015-10-03 | No data | QUEENS BOULEVARD, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary restoration covered with plywood. The respondent failed to permanently restore the restoration within the required time. The attached permit expired 4-18-14 |
2015-09-29 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DEP took over this cut |
2015-09-27 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w.. |
2015-09-19 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of perm cut sunken 1"-2" |
2015-09-05 | No data | 53 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in p/l d/l to grade |
2015-09-05 | No data | 55 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in d/l to grade |
2015-09-01 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w cuts are to grade in d/p/l. |
2015-08-31 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut needs IBM marker |
2015-08-29 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent fail to seal street opening joints |
2015-08-28 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut along the roadway |
2015-08-22 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed |
2015-08-14 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in roadway |
2015-08-11 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sunken down 2inches |
2015-07-30 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut on r/w |
2015-07-27 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut has been paved over |
2015-07-26 | No data | 224 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration re-sealed |
2015-07-18 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut acceptable |
2015-07-16 | No data | MARTENSE COURT, FROM STREET DEAD END TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane |
2015-07-11 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed Respondent failed to reseal a permanent restoration with edge cracking of the liquid seal in the roadway. Respondent was notified prior by CAR number 20154690074 on 01/29/15 and failed to correct the condition. |
2015-07-11 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent with a permanent water cut in the roadway that was not resealed as per C.A.R. #20155280149 issued 1/21/15. |
2015-07-09 | No data | SIMPSON STREET, FROM STREET FREEMAN STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | block milled |
2015-06-28 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations sealed |
2015-06-26 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS. EXPANSION JOINTS ADDED AND SEALER APPLIED. |
2015-06-21 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2015-06-21 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm rw sewer |
2015-06-20 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2015-06-08 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 perm cuts reseald |
2015-06-07 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent with a permanent water cut in the roadway that was not resealed as per C.A.R. #20155280149 |
2015-06-06 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | a/t/p/o - i observed respondent failed to reseal permanent cut edges on the roadway to prevent water seepage in the pavement as per CAR number 20154690074 as required |
2015-06-05 | No data | CROSS BAY BOULEVARD, FROM STREET 164 AVENUE TO STREET 165 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | flag restored in kind |
2015-06-05 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | all cuts resealed |
2015-05-30 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER / SEWER CUT IN THE ROADWAY |
2015-05-29 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm o grade restoration in r/w |
2015-05-23 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STREET BEING PAVED |
2015-05-21 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved over. |
2015-05-21 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | workdone |
2015-05-21 | No data | AUTUMN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2015-05-15 | No data | WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and roadway are in compliance. |
2015-05-09 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS ROADWAY |
2015-05-09 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm |
2015-05-09 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut acceptable |
2015-05-09 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2015-05-08 | No data | DAVIDSON AVENUE, FROM STREET WEST 192 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored, street resurfaced |
2015-05-08 | No data | 224 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 13'x5' perm cut broken & cracked at edges |
2015-05-06 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced after street paved during BPP |
2015-05-02 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration color coded and sealed |
2015-05-02 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration covered by D.E.P Sewer restoration |
2015-05-01 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut on r/w |
2015-05-01 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 r/w cuts |
2015-04-30 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut driving lane. |
2015-04-29 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane |
2015-04-28 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut in r/w |
2015-04-27 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued prior on this permit |
2015-04-27 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICA already issued on this permit |
2015-04-23 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2cuts on ok r\w |
2015-04-22 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass..cuts 09 |
2015-04-18 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm cuts, 7'x4', 6'x4, 5'6x3, 4'x2'6, broken & cracked at edges in traffic lane on both sides of roadway |
2015-04-17 | No data | 74 AVENUE, FROM STREET 62 STREET TO STREET 64 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced roadway |
2015-04-16 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rwy and swk resurfaced |
2015-04-16 | No data | WYTHE AVENUE, FROM STREET NORTH 11 STREET TO STREET NORTH 12 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 2 openings of street/sidewalk w/o permit |
2015-04-16 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2015-04-15 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in roadway |
2015-04-15 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5'9x4', 3'6x3' perm restorations broken & cracked at edges |
2015-04-12 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane |
2015-04-12 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | all cuts resurfaced when street paved.. |
2015-04-11 | No data | CROSS BAY BOULEVARD, FROM STREET 164 AVENUE TO STREET 165 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags patched / need full flag restoration |
2015-04-11 | No data | 128 STREET, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work is on 128 st two street opening permanent color coded and sealed |
2015-04-08 | No data | WEST 48 STREET, FROM STREET AMTRAK RR TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2015-04-06 | No data | SUTPHIN BOULEVARD, FROM STREET 118 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration and 2 s/w flags |
2015-04-05 | No data | RUSSELL STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R/W |
2015-03-30 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...ok ...cuts flush |
2015-03-30 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM LONG WATER CUTS IN P/D/L |
2015-03-26 | No data | BERGEN AVENUE, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2015-03-25 | No data | EAST 40 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2015-03-25 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVED OVER.. |
2015-03-24 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rroadway cut |
2015-03-24 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r.w,, |
2015-03-23 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN P/D/L |
2015-03-23 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut acceptable |
2015-03-21 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2015-03-20 | No data | RUSSELL STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm 1 s/w ok for now no car at this time |
2015-03-14 | No data | SOUTH ROAD, FROM STREET 148 STREET TO STREET 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in p/l d/l to grade |
2015-01-29 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut p/d/l, edges cracking need to reseal |
2015-01-29 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR project / condition not corrected |
2015-01-26 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...cut as well as s/w 09 |
2015-01-21 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade in r/w |
2015-01-21 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut have some areas that need to be resealed. |
2015-01-21 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water cut have some areas that need to be resealed. |
2015-01-17 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut adj to water cut |
2015-01-15 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN P/L |
2015-01-13 | No data | 109 AVENUE, FROM STREET 84 STREET TO STREET 86 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color coded |
2015-01-12 | No data | BERGEN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2015-01-10 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut p/l |
2015-01-10 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect. snow |
2015-01-08 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2015-01-07 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | APPLY SEALER AT CURB(condition repaired) |
2015-01-05 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Re-inspection passed. Color code markers was installed to 2 permanent "Water" cuts in the roadway. Permittee only has 2 cuts in the roadway. |
2015-01-02 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new color code |
2015-01-02 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2014-12-13 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restorations |
2014-12-12 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane |
2014-12-07 | No data | SIMPSON STREET, FROM STREET FREEMAN STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut OK |
2014-11-28 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | portion of roadway perm sunken 2'' |
2014-11-27 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/l to grade |
2014-11-27 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts to grade |
2014-11-26 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 restorations |
2014-11-25 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2014-11-24 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET 196 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts to grade |
2014-11-22 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patch work on the sidewalk , all sidewalk flags must be restored with a full 5 X 5 flag restoration . |
2014-11-22 | No data | 108 STREET, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm rest s/w |
2014-11-22 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration re-sealed. sunken cut is an out of guarantee restoration. |
2014-11-22 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work on the sidewalk , all sidewalk flags must be restored with a full 5 X 5 flag restoration . |
2014-11-22 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration missing seal |
2014-11-18 | No data | BAINBRIDGE STREET, FROM STREET DEAD END TO STREET LEWIS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service ,Leak in Basement Property Owner on Site. |
2014-11-17 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave street |
2014-11-15 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | maspeth DDC major reconstruction work in progress |
2014-11-15 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | water cuts was re-sealed in roadway |
2014-11-13 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in d/l |
2014-11-11 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to install a color coding marker to a final restoration. CAR#20144550379 was issued on 4-6-14 to correct this condition. |
2014-11-11 | No data | HART STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced... |
2014-11-09 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D D C contractor paved over cut. |
2014-11-08 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to seal expansion joints as per subsection |
2014-11-08 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Install color code identifying permittee |
2014-11-08 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install color code identifying permittee |
2014-11-08 | No data | 109 AVENUE, FROM STREET 84 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in d/p/l missing color code. |
2014-11-08 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work ok |
2014-10-31 | No data | QUEENS BOULEVARD, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at time of inspection cut was temp to grade on s/w |
2014-10-25 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new residendal house has 4 new permanent plumber cuts flush to grade |
2014-10-25 | No data | TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET OAKLAND PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Entire sidewalk is in bad condition. |
2014-10-24 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut needs to be re-sealed |
2014-10-24 | No data | JEFFERSON AVENUE, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS ROADWAY. ENTIRE SIDEWALK NEWLY REPAIRED. |
2014-10-23 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w cut |
2014-10-19 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6" in diameter localized area sunken 2" |
2014-10-16 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal expansion joints |
2014-10-10 | No data | EAST 137 STREET, FROM STREET BRUCKNER EXPRESSWAY TO STREET WILLOW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts are ok |
2014-10-08 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a perm 11x10ft cut in the roadway that needs the street opening joints re-sealed |
2014-10-07 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install single white lane markings. Insert color code identifying permittee. 1 cut missing ID |
2014-10-05 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway cut is to grade in d/l. |
2014-10-04 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street opening joints sealed |
2014-10-02 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to resealed 6'x4' perm cut in roadway |
2014-10-02 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | stop sign restored |
2014-09-30 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm sunken 2 inches localized area opp 123-07 |
2014-09-30 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut resealed |
2014-09-29 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to install a color coding marker on two 2012 Short water restorations found on the roadway. CAR#20144550379 was issued on 4-6-14 to correct this condition. |
2014-09-28 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work under keyspan cut |
2014-09-26 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re-inspect location flag on sidewalk finally concreted |
2014-09-22 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water two perm r/w cuts to grade in d/p/l. |
2014-09-19 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2014-09-19 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor on location making repairs permit has less than 30 days of gurantee |
2014-09-18 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk cut overdue for final |
2014-09-17 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | APPLY SEALER AT CURB |
2014-09-17 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water to grade |
2014-09-16 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2014-09-11 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts to grade long water |
2014-09-08 | No data | RUSSELL STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/s/wok 2 perm cuts losing seal localized area no car at this time ok |
2014-09-01 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D E P contractor paved over cut; new sewer trench in d/l. |
2014-09-01 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l in compliance. |
2014-08-30 | No data | 74 AVENUE, FROM STREET 62 STREET TO STREET 64 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk flags in good condition one perm cut in roadway in good condition . |
2014-08-28 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDANT FAILED TO RE-SEAL THE STREET OPENING JOINTS ON 3 PERMANENT RESTORATIONS IN THE ROADWAY. RESPONDANT WAS NOTIFIED BY CAR#20141530165 ON THE DATE OF 7/19/14 CONDITION REMAINS THE SAME |
2014-08-27 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to seal street opening joints. Unable to attach photo. |
2014-08-27 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to plug & seal spike holes |
2014-08-24 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W |
2014-08-22 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts to grade |
2014-08-22 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2014-08-17 | No data | 118 AVENUE, FROM STREET 168 STREET TO STREET 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURFACED BY A NEWER CUT |
2014-08-17 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench |
2014-08-17 | No data | CLASSON AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench new swk flags |
2014-08-16 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore "STOP' lane marking in roadway plus seal cut in roadway.. |
2014-08-16 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w |
2014-08-15 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7x7 portion of cut needs to be re-sealed. |
2014-08-14 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5x3 & 6x5 side by side needs to be one cut sunken 3" 20x7 cut & 15x4 cut needs re-sealing edge cracks. |
2014-08-14 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2014-08-09 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2prm cuts p/l |
2014-08-09 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 7 perm trenches at 1 lex |
2014-08-09 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7 perm trenches |
2014-08-08 | No data | EAST 40 STREET, FROM STREET CHURCH AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perms cut, p/l, d/l, s/w |
2014-08-07 | No data | 120 AVENUE, FROM STREET 153 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repaired long water two perm roadway cuts are to grade in d/p/l. |
2014-08-05 | No data | 81 STREET, FROM STREET 37 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration is still perm to grade |
2014-08-04 | No data | 12 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2014-07-31 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2014-07-30 | No data | TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET OAKLAND PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to fully replace defective s/w flag |
2014-07-28 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm roadway cuts are to grade in d/p/l. |
2014-07-28 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway cut to grade in d/p/l. |
2014-07-27 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration has no sealant |
2014-07-26 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2014-07-26 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut made flush wit surrounding area in r/w.. |
2014-07-20 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'x4.5' perm. cut to be resealed,broken edges,asphalt broken loc. areas,spike holes around the cut not plugged and sealed. |
2014-07-20 | No data | RALPH AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay at this time. |
2014-07-19 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in rdw |
2014-07-19 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Parking Lane - Area Identified through Permit number on file3 perm cuts, 3'x2', 4'x4', 6'x4' in rdw broken & cracked at edges, also asphalt broken adjacent to the 4'x4' restoration down 3" in rdway |
2014-07-19 | No data | SUTPHIN BOULEVARD, FROM STREET 118 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in rdw |
2014-07-16 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-07-16 | No data | AUTUMN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w |
2014-07-14 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced |
2014-07-13 | No data | EAST 116 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2014-07-12 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cuts in r/w.... |
2014-07-10 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm trenches and temp trenches and steel plated base trench |
2014-07-10 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, water cut in compliance. no defects. |
2014-07-08 | No data | BERGEN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2014-07-08 | No data | RUSSELL STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed equipment stored on street in the parking lane consisting of a steel plate , road cut final sidewalk temp, permit above expired 3/30/14 no active permit on file. violation D09 issued above permit for ID purpose only. |
2014-07-08 | No data | 77 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/l, one s/w flag restored |
2014-07-07 | No data | DAVIDSON AVENUE, FROM STREET WEST 192 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-07-06 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Action to Be Taken Conditions Remains. ( Firm Currently Out Of Business) |
2014-07-02 | No data | WEST 48 STREET, FROM STREET AMTRAK RR TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2014-06-30 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM AND TEMP CUTS IN R/W..WATER INSTALLATION FOR NEW BUILDING 6 CUTS IN R/W.. |
2014-06-29 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut made final up to grade ok s/w ok |
2014-06-29 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade restoration in p/l |
2014-06-28 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK JOINT SEALED |
2014-06-28 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to install install color coding marker upon completion of restorations cuts on roadway, restore 1 of 2 double yellow lines ,partial perm rest cuts broken out |
2014-06-28 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut in r/w.. |
2014-06-27 | No data | SUTTER AVENUE, FROM STREET 133 STREET TO STREET 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in p/l |
2014-06-25 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d/l 2 perm cuts |
2014-06-25 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal street opening joints around 2 cuts. |
2014-06-21 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates removed |
2014-06-21 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new restoration.. perm cut flush. |
2014-06-19 | No data | EAST 105 STREET, FROM STREET AVENUE N TO STREET FLATLANDS 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway is resurfaced |
2014-06-14 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | out of business |
2014-06-12 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | nica re-inspection passes , plates were removed , one cut was made final and the other cut is half temp mac and based with the edges ramped no action taken |
2014-06-11 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway needs to be sealed |
2014-06-11 | No data | WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-06-11 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | FAILURE TO PLATE CONCRETE BASE |
2014-06-10 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoraration poorly restored, localized areas broken out & sunken, Wearing course Redig will be requested if not properly restored asap. |
2014-06-10 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 3 LOOSE & NOISY STEEL PLATES |
2014-06-10 | No data | RUSSELL STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I Observed a sidewalk restoration still temporary overdue for final . The two road cuts are permanent at this time , Permit expired 3/30/14 . violation D4F issued. |
2014-06-09 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w trench is to grade in d/l. |
2014-06-07 | No data | 224 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade in r/w |
2014-06-06 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | backfill 3x3 down 4 inches d/l |
2014-06-05 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR closed at this time,permittee require to REdig restoration. |
2014-06-05 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w by tree(2) cuts |
2014-06-04 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | rw |
2014-06-03 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill a pass on a 15 ft L x 5 ft W x 12 ft D trench with a 96.5 + 96.1 tests waiting for concrete delivery for base |
2014-05-31 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2014-05-31 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to permanently restore cut within required time |
2014-05-31 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cut |
2014-05-31 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed. Color code tag inserted. |
2014-05-31 | No data | TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET OAKLAND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork on sidewalk. Restore full flag. Reseal street opening joints around perm cut in d/l |
2014-05-30 | No data | VERONICA PLACE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts ok p/l, s/w |
2014-05-29 | No data | SIMPSON STREET, FROM STREET FREEMAN STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-05-28 | No data | 55 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/d/l |
2014-05-28 | No data | 53 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/d/l to grade |
2014-05-27 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-05-23 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FAILED TO OBTAIN A CONFIRMATION NUMBER FROM D.O.T |
2014-05-23 | No data | KEAP STREET, FROM STREET BEDFORD AVENUE TO STREET WILLIAMSBURG ST WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT. |
2014-05-22 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 5/22/2014 1:56:40 PM; Conf# B201414214 Arrival time: 9:54am, Departure time 1:57pm. 16ft, 6 inhes x 4ft, down 12ft. |
2014-05-20 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent cut 10'x10 lost seal and cracks previous car issued approved 4/9/14 no repairs made .violation D5A issued |
2014-05-19 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | open c-a-r for this location...to repair sewer cut ...in the e/b driving lane ... |
2014-05-19 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plated open excavation no temporary color code car issued approved 4/11/14 . violation D5C issued due to still no color code applied. |
2014-05-19 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER WORK NOT STARTED |
2014-05-18 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to install color code marker on 3 permanent 4' X 4' water cuts in the roadway upon completion of restoration. |
2014-05-18 | No data | 108 STREET, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2014-05-18 | No data | EAST 15 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3 cuts reseal vehicle drove over when hot left tire marks and removed some small area of seal and color code of one ok at this time seems will come out seal and color code again soon. |
2014-05-17 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | - Sidewalk expansion joints need to be sealedPERM REST MADE TO-GRADE. NOW HAS A 3'' CAVE-IN HOLE DOWN 7'' IN DRIVING LANE. NICA WILL BE ISSUED. |
2014-05-17 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Inside perm cut( 10'x6') , 6'x4'x2" sunken & cut must be reseal. |
2014-05-17 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealedPERM REST MADE TO-GRADE. NOW HAS A 3'' CAVE-IN HOLE DOWN 7'' IN DRIVING LANE. NICA WILL BE ISSUED. |
2014-05-15 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 5/15/2014 1:46:53 PM; Conf# B201413512 backfill cancelled |
2014-05-15 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 2 of 2 countersunk plates collapsing into exc., 1.5’x19.5’ base area adj. to plate collapsed, depth currently 6” (Spoke to Errol Smalls at 6:33am on 5/15/14,issued 2 hour notice, he said he is sending a crew right away.) |
2014-05-14 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 5/14/2014 10:44:03 AM; Conf# B201413402 backfill a pass on 19 ft x 5 ft by 11 ft down |
2014-05-13 | No data | HUBBARD PLACE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealer was apply to expansion joints |
2014-05-13 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-05-10 | No data | MARTENSE COURT, FROM STREET DEAD END TO STREET MARTENSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | couldnt locate cut |
2014-05-10 | No data | DAVIDSON AVENUE, FROM STREET WEST 192 STREET TO STREET WEST KINGSBRIDGE ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | no work started yet will try and reinspect |
2014-05-10 | No data | CORONA AVENUE, FROM STREET 90 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | plate shifted in d/l not countersunk with r/w |
2014-05-09 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in rdw |
2014-05-08 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade p/d/l |
2014-05-07 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 5/7/2014 3:03:34 PM; Conf# B201412707 3rd attempt to enter start 11:25 AM end 2:41 PM size 13'x4'x9' specification 1042A on permit contractor was advised and Marking done 6" base 12" w/c must be all existing material. |
2014-05-06 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut sealed |
2014-05-05 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WOW! two cuts on opposite sides of the r/w are perm to grade with color cod added!!!! |
2014-05-05 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm r/w cut has been sealed. |
2014-05-05 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-05-04 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated rwy and 4 trenches |
2014-05-03 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | EXCAVATION IN R/W.. |
2014-05-03 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2014-05-02 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATIONS ROADWAY SEALED |
2014-04-30 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane |
2014-04-29 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | plumber working on sewer excavation in roadway at time of inspection. |
2014-04-29 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 4/29/2014 2:04:59 PM; Conf# B201411905 backfill a pass 11 ft x 4 ft x15f ft trench |
2014-04-29 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2014-04-29 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore around water service lid (missing in side walk ) |
2014-04-29 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two long water cuts in p/l |
2014-04-27 | No data | MEXICO STREET, FROM STREET SUFFOLK DRIVE TO STREET TIOGA DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2014-04-26 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in r/w.. |
2014-04-25 | No data | EAST 16 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2014-04-24 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints on s/w at curb missing sealer |
2014-04-23 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICA made safe contractor on site making cuts perm |
2014-04-22 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut temp below grade 2-3" |
2014-04-22 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in p/l missing color code (spray paint) |
2014-04-21 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-04-14 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | maintained a plated excavation in roadway permit expired 7-23-13 |
2014-04-13 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm restoration in good condition color coded and sealed |
2014-04-13 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET 196 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade cuts in r/w |
2014-04-12 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2014-04-12 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut to grade |
2014-04-11 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | no color code around countersunk steel plates in roadway.. |
2014-04-10 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 long steel plated street opening and temp swk trenches |
2014-04-10 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 4/10/2014 2:51:06 PM; Conf# B201410004 backfill pass , cut backs done on 19 ft x 11 ft trench |
2014-04-09 | No data | WASHINGTON AVENUE, FROM STREET LEFFERTS AVENUE TO STREET STERLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 4/9/2014 2:46:42 PM; Conf# B201409911 Backfill from 12:48 to 2:25pm. 1 cut plated in p/l. 7ft x 3 1/2ft x 4 1/2 ft. |
2014-04-09 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WEARING COURSE BREAKING OUT PLUS RESEAL ENTIRE CUT IN ROADWAY.. |
2014-04-08 | No data | QUEENS BOULEVARD, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site cut on sidewalk near fence |
2014-04-08 | No data | QUEENS BOULEVARD, FROM STREET 74 STREET TO STREET 76 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site working with a valid permit cut on sidewalk will be surfaced by a newer permit |
2014-04-06 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color code need to be applied to 3 perm 4' X 4' water cuts |
2014-04-06 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm to grade cuts in r/w |
2014-04-05 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane |
2014-04-04 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | WORKERS ON SITE PLATED REPAIR WATER AND SEWERS FOR NEW BUILDINGS.. |
2014-04-04 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3x2 temp cut sunken 3" no color code |
2014-04-01 | No data | BROADWAY, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts |
2014-04-01 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-31 | No data | SIDNEY PLACE, FROM STREET LIVINGSTON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench and new swk flag |
2014-03-31 | No data | SOUTH ROAD, FROM STREET 148 STREET TO STREET 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2014-03-26 | No data | 224 STREET, FROM STREET 144 AVENUE TO STREET 145 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp to grade still winter months |
2014-03-25 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | area adjacent to plumbers cut in the p/l depressed down approx 2.6 inches in the r/w |
2014-03-21 | No data | EAST 15 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-21 | No data | MARTENSE COURT, FROM STREET DEAD END TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut to grade |
2014-03-15 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ok |
2014-03-14 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade in p/d/l |
2014-03-13 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New NIca issued for Backfill only and sunken on sidewalk not acceptable must place temporary asphalt or finish the sidewalk. |
2014-03-13 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm to grade |
2014-03-13 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in p/d/l |
2014-03-12 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 3/12/2014 10:19:00 AM; Conf# Q201407102 2- 3'x2.5" water cut in p/d/l backfill complete |
2014-03-12 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Open excavation r/w and on s/w. Crew on site. Work in progress. Traffic passing thru and flagman on site. |
2014-03-11 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Wearing Course is not acceptable for both permanent restorations , request you do the wearing course again on Both cuts flush with roadway area. Include the DEP restoration it is within your area to restore. You must Backfill and redu sidewalk. |
2014-03-09 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-03-09 | No data | LEXINGTON AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | INSTALLING WATER AND SEWERS FOR NEW BUILDING CONNECTION.. |
2014-03-07 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut missing color code/Called to verify they are currently in bussiness |
2014-03-05 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by a newer permit |
2014-02-27 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4'x3' perm cut p/l opp. address |
2014-02-27 | No data | ATLANTIC AVENUE, FROM STREET 80 STREET TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in roadway and sidewalk |
2014-02-26 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | nov no confirmation |
2014-02-26 | No data | 197 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway excavation not countersunk to roadway , no raise plow signs posted . plates in parking and driving lane . |
2014-02-24 | No data | KEAP STREET, FROM STREET BEDFORD AVENUE TO STREET WILLIAMSBURG ST WEST | No data | Street Construction Inspections: LL14 | Department of Transportation | Inspection Started at: 2/24/2014 3:25:32 PM; Conf# B201405517 BKFILL NOTES: (L) 4.5 FT (W) 2.8 FT (D) 3.8 FT.....ACTUAL START TIME 3:27 PM |
2014-02-19 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opposite #2 Wykoff avenue side of the Hydrant permanent restoration is mounded 2" causing vehicular jolts also has 2 type B potholes and 1 type c pot hole seems restoration was not rolled properly , call must be made to repair cut. |
2014-02-18 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATION - In Driving Lane - In Parking Lane - permit expired 7-23-13 |
2014-02-17 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not done ; permit is still valid. |
2014-02-16 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | unable to locate work due to snow and ice on the r/w & s/w |
2014-02-06 | No data | 228 STREET, FROM STREET 139 AVENUE TO STREET 141 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | unable to locate work due snow on r/w |
2014-02-01 | No data | 12 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut to grade in p/l under parked car |
2014-02-01 | No data | CROSS BAY BOULEVARD, FROM STREET 164 AVENUE TO STREET 165 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restored in kind |
2014-01-30 | No data | VERONICA PLACE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water in p/l in compliance |
2014-01-21 | No data | 28 STREET, FROM STREET ASTORIA BOULEVARD TO STREET NEWTOWN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | worked not visible |
2014-01-20 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates in driving lanes two way traffic open excavations only one sign for one lane .violation D70 |
2014-01-20 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Remove plate Left at Worksite |
2014-01-13 | No data | WYCKOFF AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | D.E.P 10 day notice . |
2014-01-13 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/o and opp. 100-21 two temp. cuts to grade missing color code,overdue for final. |
2014-01-11 | No data | RALPH AVENUE, FROM STREET EAST 80 STREET TO STREET EAST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in parking lane |
2014-01-10 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2014-01-09 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2014-01-06 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | two perm cuts and sidewalk |
2014-01-02 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 binder base flush cuts are overdue for final. |
2014-01-01 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts re-sealed |
2014-01-01 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut re-sealed |
2013-12-28 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut sealed |
2013-12-28 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cuts sealed |
2013-12-26 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restorations have asphalt broken and cracked along edges , must reseal both restorations to avoid further deteri0ration of roadway |
2013-12-25 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | rw coreccted |
2013-12-23 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-12-22 | No data | 81 STREET, FROM STREET 37 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in good condition. |
2013-12-21 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | did not apply color code |
2013-12-21 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Two perm cuts in d/l & p/l to grade |
2013-12-18 | No data | JEFFERSON AVENUE, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | LL-14 b/f 2 cuts long water tunnel fee paid in street 0ne cut on s/w ok |
2013-12-17 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NICA inspection pass |
2013-12-16 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in good condition. |
2013-12-16 | No data | 197 STREET, FROM STREET 100 AVENUE TO STREET 104 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 4'x3' temp cuts mounded in rdw & s/w |
2013-12-13 | No data | PLEASANT AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor onsite working at time of inspection foreman is Andrea |
2013-12-07 | No data | HUBBARD PLACE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint missing sealer on s/w |
2013-12-07 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color coded |
2013-12-07 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced |
2013-12-05 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut & Sidewalk Flag in good condition. However, Missing IBM Tag/Color Code. |
2013-12-04 | No data | 224 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-11-25 | No data | CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BKFILL NOTES: 2 CUTS .... CUT #1 (L) 3 FT (W) 3 FT (D) 4.6 FT .....CUT#2 (L)4.9 FT (W) 2.9FT (D) 1FT ....ACTUAL START TIME 11:22 AM |
2013-11-21 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Less than 1' between two perm cuts/Edges cracking need to be re-sealed |
2013-11-21 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICA REINSP. PASS! PLATE REMOVED |
2013-11-21 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut I/F/O address partially missing seal |
2013-11-19 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backfill complete4ft0in x 3ft0in x 5ft10in4ft0in x3ft5in x 2ft0in10:53 - 12:15 |
2013-11-16 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2013-11-11 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut sealed |
2013-11-11 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT ON S/W.. |
2013-11-10 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel Plated Excavation on the Roadway/Active Permit in System. |
2013-11-10 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 3'x3' perm long water cuts in p/d/l need to be re-sealed localized |
2013-11-10 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plated Excavation on the Roadway. |
2013-11-09 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-11-06 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-11-05 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | c/c missing on 2 cuts without ibm tag# |
2013-11-05 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings replade resolved |
2013-11-04 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber out of business & joints sealed. |
2013-11-04 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'X4' perm cut p/d/l & 3' 6'' X 3' perm cut d/l sunken 1'' along edges of cuts. Need to be made flush with surrounding pavement. |
2013-11-04 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 6'X4' perm cut p/d/l & 3' 6'' X 3' perm cut d/l sunken 1'' along edges of cuts. Need to be made flush with surrounding pavement. |
2013-11-04 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | arrival 12:28 Back fill completed and acceptable 4:007.9 by 5.9 down 4.78.2 by 4.1 down 4.7 3.7 by 3.6 down 3.0 |
2013-11-01 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMITTEE UNLAWFULLY USED THE STREET TO PLACE A STEEL PLATE ON THE ROADWAY THAT WAS SERVING NO PURPOSE. MUST REMOVE BY 11/4/13 BY 12:30PM |
2013-10-29 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERMITTEE UNLAWFULLY USED THE STREET TO PLACE A STEEL PLATE ON THE ROADWAY THAT WAS SERVING NO PURPOSE. |
2013-10-28 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | FINAL RESTORATION ONLY/ CREW ON SITE WORKING |
2013-10-26 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURVEY DONE ON STREET CUTS. |
2013-10-26 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURVEY DONE ON STREET CUTS. |
2013-10-26 | No data | EAST 116 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURVEY ON STREET CUTS. |
2013-10-26 | No data | EAST 59 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURVEY DONE ON STREET CUTS. |
2013-10-26 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURVEY ON STREET CUTS. |
2013-10-26 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-10-26 | No data | WEST 48 STREET, FROM STREET AMTRAK RR TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SURVEY DONE ON STREET CUTS. |
2013-10-25 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-10-25 | No data | AUTUMN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w |
2013-10-24 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cuts to grade p/d/l |
2013-10-22 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | upon nica reinsp steel plates still on street r/w in front of 263 notified permittee on 10/18 |
2013-10-21 | No data | EAST 105 STREET, FROM STREET AVENUE N TO STREET FLATLANDS 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts never sealed color code says 2011 was done in 2013 never finalised |
2013-10-20 | No data | EAST 15 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in r/w - no color code - will investigate to see if company is still in business - will issue car next time |
2013-10-20 | No data | VAN WYCK EXPRESSWAY, FROM STREET VWE SB ENTRANCE LIBERTY AVE TO STREET 107 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut & Sidewalk Flags in good condition. |
2013-10-19 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in parking lane |
2013-10-16 | No data | 108 STREET, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w perm |
2013-10-12 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found two steel plates 24hrs |
2013-10-10 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-10-10 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-10-03 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | p/l |
2013-10-01 | No data | HUBBARD PLACE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXPANSION JOINTS ON THE S/W AT THE CURB MISSING SEALER |
2013-09-28 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor is out of Business |
2013-09-27 | No data | MEXICO STREET, FROM STREET SUFFOLK DRIVE TO STREET TIOGA DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaired long water two perm r/w cuts in d/l are to grade. |
2013-09-26 | No data | EAST 16 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in Parking Lane |
2013-09-26 | No data | SOUTH ROAD, FROM STREET 148 STREET TO STREET 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut |
2013-09-21 | No data | EAST 59 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-09-20 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-09-19 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/d 12" from the curb, s/w flag expansion joints not sealed flag against curb broken no car company no longer in bussines as per Spiegel. |
2013-09-19 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OUT OF BUSINESS |
2013-09-14 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FINAL RESTORATION DONE-ONE PERM CUT IN P/L |
2013-09-13 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints at the curb needs to be sealed. |
2013-09-09 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok |
2013-09-05 | No data | STERLING STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two permanent restorations in the parking lane missing color codes ibm tags |
2013-08-31 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Excavation on The Roadway Steel Plated. However, Contractor Currently out of Business. |
2013-08-30 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Conditions remain. Plumber out of business. |
2013-08-29 | No data | WEST 48 STREET, FROM STREET AMTRAK RR TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in roadway |
2013-08-27 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 cuts in the r/w sunken 2" |
2013-08-25 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permitte out of business |
2013-08-25 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITEE OUT OF BUSINESS |
2013-08-25 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bike lane markings restored. |
2013-08-23 | No data | 125 AVENUE, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Work found on existing Roadway/Sidewalk. |
2013-08-23 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Cut in good condition. |
2013-08-23 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done permitee out of business |
2013-08-21 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w |
2013-08-21 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i/f/o 265 bowery there is a 4x4 water cut that needs to be resealed. |
2013-08-18 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failong to replace lane marking |
2013-08-18 | No data | BERGEN AVENUE, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | resolved |
2013-08-18 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber out of business. |
2013-08-17 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | out of business refer to RRM |
2013-08-15 | No data | 128 STREET, FROM STREET 133 AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2013-08-14 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-08-10 | No data | MADISON STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITEE OUT OF BUSINESS.. |
2013-08-10 | No data | CLASSON AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITEE OUT OF BUSINESS... |
2013-08-07 | No data | 120 AVENUE, FROM STREET 153 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm long water cuts in p/l and d/l |
2013-08-05 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | No data |
2013-08-04 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts |
2013-08-04 | No data | HART STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | out of business |
2013-08-04 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OUT OF BUSINESS |
2013-08-03 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3 temp trenches plumber out of business |
2013-08-03 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street plated |
2013-08-03 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | water and sewer |
2013-07-28 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway & Sidewalk flag overdue for final.However, Contractor out of business. |
2013-07-27 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-07-26 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut overdue |
2013-07-25 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to Errol the supervisor advising to remove all concrete stored on roadway and clean site at the end of the day reinspect at the end of day |
2013-07-25 | No data | 55 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 temp cut in driving lane overdue for final restoration. |
2013-07-23 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 14 X 7 Perm. cut in the roadway. |
2013-07-22 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Active | Department of Transportation | out of service |
2013-07-22 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D01 steel plated street opening no permit |
2013-07-20 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code applied |
2013-07-20 | No data | 55 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-20 | No data | 53 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-19 | No data | 53 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-18 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit out of service |
2013-07-18 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | back filled under permit # q012013141179 |
2013-07-18 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit is out of service |
2013-07-18 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | install water to BO steel plated temp swk flag |
2013-07-17 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | out of service |
2013-07-16 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITTEE OUT OF BUSINESS |
2013-07-16 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITTEE OUT OF BUSINESS |
2013-07-16 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITTEE OUT OF BUSINESS |
2013-07-16 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITTEE OUT OF BUSINESS |
2013-07-16 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMITTEE OUT OF BUSINESS |
2013-07-16 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK ACCEPTABLE PERMITTEE OUT OF BUSINESS |
2013-07-15 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMP CUT OVERDUE FOR FINAL RESTORATION-ON GOING CONDITION/MULTIPLE NOV'S ISSUED AND CUT WAS MADE FLUSH BY RRM |
2013-07-15 | No data | 109 AVENUE, FROM STREET 84 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS OK |
2013-07-15 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT OVERDUE FOR FINAL RESTORATION-ON GOING CONDITION/MULTIPLE NOV'S ISSUED AND CUT WAS MADE FLUSH BY RRM |
2013-07-15 | No data | TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET OAKLAND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok in driving lane |
2013-07-14 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | resolved |
2013-07-14 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | resealed |
2013-07-14 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration Sunken 2cuts 1 4a4 sunken 1 1/2" 1 3x3 cut sunken 2", not flush with surrounding area |
2013-07-14 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TWO perm r/w cuts 3'x3' & 3'x4' roadway cuts needs e-sealing. |
2013-07-13 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restore white lane marking in roadway.. |
2013-07-13 | No data | CROSS BAY BOULEVARD, FROM STREET 164 AVENUE TO STREET 165 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | S/W FLAGS OK |
2013-07-13 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal expansion joint on the sidewalk |
2013-07-13 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong permit being used ! New Car reissued |
2013-07-13 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts sealed |
2013-07-13 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore white lane marking in roadway.. |
2013-07-12 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration i/f/o 8892 must be restored in accordance with sketch 1 as stipulated in permit. Expansion joints not installed. Single sidewalk flag not restored in kind with existing pattern. Two flags are required to be in kind. |
2013-07-11 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temp sidewalk and roadway cut overdue for final restoration |
2013-07-09 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 5x4 area sunken 3' to 4 '' in the middle of roadway ,which is extending from PLATED EXCAVATION IN ROADWAY, SUNKEN AREA NEED TO BE MADE FLUSH W/R |
2013-07-09 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut is still overdue for final ongoing issue. |
2013-07-07 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm r/w cut has been sealed. |
2013-07-06 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | INTERMITENT YELLOW LINES-NO CAUSE FOR CAR |
2013-07-06 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restore bike lane markings |
2013-07-06 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore bike lane markings |
2013-07-05 | No data | 74 AVENUE, FROM STREET 62 STREET TO STREET 64 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-04 | No data | BERGEN AVENUE, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway restoration not sealed |
2013-07-04 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | exp joint on s/w sealed.. |
2013-07-04 | No data | CLASSON AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to sea expansion joint on s/w |
2013-07-04 | No data | MADISON STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO SEAL EXP JOINT ON S/W |
2013-07-02 | No data | VAN LOON STREET, FROM STREET 51 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-02 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-07-02 | No data | SUTPHIN BOULEVARD, FROM STREET 118 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-07-01 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Permanent roadway restoration in need of reseal. Replace lane markings. Thank you. |
2013-06-29 | No data | VAN LOON STREET, FROM STREET 51 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in good condition. |
2013-06-29 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | only sidewalk work found roadway cut gas only unless newer work covered r/w cut. |
2013-06-29 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Restorations overdue for final. |
2013-06-28 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | need to restore yellow lane marking |
2013-06-28 | No data | EAST 15 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-24 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Portion of temp cut sunken 2 inches i/f/o 3912. All three temp restorations missing green spray paint color code. Restorations 1 day from overdue NOV. |
2013-06-20 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut p/d/l |
2013-06-19 | No data | 5 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-06-19 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | having a 3'x3' area of temporary cut in the roadway left with back fill material only. |
2013-06-19 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to use skid resistant plating and/or decking on roadway |
2013-06-18 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2013-06-18 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in r/w. valid permit on file. |
2013-06-16 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut resurfaced by gas restoration |
2013-06-16 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk new flags |
2013-06-16 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-06-15 | No data | EAST 116 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed |
2013-06-13 | No data | BOWERY, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 cut north and southbound |
2013-06-10 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | conditons reported. |
2013-06-08 | No data | 55 AVENUE, FROM STREET 90 STREET TO STREET 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Temp. cuts (4'-1/2" & 3' - 8" & 4'-1/2" X 4'-1/2") Sidewalk flag with temp. mac - down 3 to 5" - undermined. |
2013-06-06 | No data | MIDWOOD STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-05 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit check crew on site working ; repairing sewer. |
2013-06-05 | No data | MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-05 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | C.A.R. already issued for inspection on 06/01/2013. |
2013-06-05 | No data | 224 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm r/w cut has been sealed. |
2013-06-04 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 10'x35' temp r/w cut is made safe. |
2013-06-03 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | two perm cuts needs to be resealed |
2013-06-03 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pick up insp. 10'x35' temp r/w trench is sunken 2 1/2'' to 3'' in d/p/l. |
2013-06-01 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | exp joint not sealed. |
2013-06-01 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street opening joint around perm cut d/l resealed |
2013-06-01 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT SUNKEN 21/2" ASPHALT BROKEN OUT ALSO NO COLOR CODE |
2013-06-01 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 4'X3' TEMP CUT OVERDUE FOR FINAL RESTORATION |
2013-06-01 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to apply color code & seal expansion joints.Issued D69-NOV#182510837 |
2013-06-01 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT SUNKEN 21/2" ASPHALT BROKEN OUT ALSO NO COLOR CODE |
2013-06-01 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 binder flush cuts are overdue for final. |
2013-05-31 | No data | WEST 48 STREET, FROM STREET AMTRAK RR TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site actively working , in compliance with permit |
2013-05-31 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | backfill completed and acceptablepermittee did not have eng clean fill to do second plated excavation,they will reschedule.arrival time 1:00DEPARTURE TIME 4:205/30/13 |
2013-05-31 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition corrected now (2) perm cuts |
2013-05-29 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6' X 5' & 7' X 4' perm cuts in d/l cracking @ edges need to be resealed. |
2013-05-29 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 of two temp cuts missing color code around it. |
2013-05-29 | No data | 109 AVENUE, FROM STREET 118 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DUPLICATE PERMIT ON FILE |
2013-05-28 | No data | BERGEN AVENUE, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is not sealed |
2013-05-27 | No data | 118 AVENUE, FROM STREET 168 STREET TO STREET 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w cut to grade in p/l. |
2013-05-27 | No data | 74 AVENUE, FROM STREET 62 STREET TO STREET 64 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired during holiday weekend. will reinspect on Wednesday |
2013-05-24 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-05-24 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water perm restoration in p/l in compliance. |
2013-05-23 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection work in progress check permit flag man on site. |
2013-05-22 | No data | EAST 38 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate in p/l serving no purpose |
2013-05-20 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failed to Display required I D SIGNS AT work site. |
2013-05-20 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 temp cuts in r/w |
2013-05-18 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This permit was entered in error. Please cancell. |
2013-05-18 | No data | 120 AVENUE, FROM STREET 153 STREET TO STREET SUTPHIN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | repair domestic water line 3 day #185575242 ;2 open pk lane trenches and 2 open in grass area |
2013-05-18 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts perm |
2013-05-17 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BKFILL NOTES: 2CUTS .....CUT#1 (L) 5.11 FT (W) 3.9 FT (D) 3.6 FT ...CUT#2 (L) 7FT (W) 3FT (D) 3FT ..ACTUAL START TIME IS 11:45 AM |
2013-05-17 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BKFILL NOTES: (L) 3.5 FT (W) 3.4 FT (D) 3.6 FT .... ACTUAL START TIME 2:40PM |
2013-05-15 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION STILL REMAINS BIKE LANE MARKINGS NOT RESTORED |
2013-05-14 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-05-13 | No data | MADISON STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO SEAL EXP JOINT ON S/W |
2013-05-13 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to seal joint on s/w |
2013-05-11 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated open excavation |
2013-05-11 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm trench sealed |
2013-05-11 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to restore double yellow pavement lane marking over perm cut |
2013-05-11 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cracking edges of 3'x3' perm resealed |
2013-05-11 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut made into a large 18x8 cut perm to grade and sealed. |
2013-05-08 | No data | 74 AVENUE, FROM STREET 62 STREET TO STREET 64 PLACE | No data | Street Construction Inspections: Active | Department of Transportation | s/w restored , temp cut in d/l |
2013-05-08 | No data | 12 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No work started o existing Roadway/Sidewalk |
2013-05-07 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-05-07 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint missing at curb line |
2013-05-06 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-05-06 | No data | LINDEN BOULEVARD, FROM STREET 194 STREET TO STREET 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection ,work in progress. |
2013-05-05 | No data | 118 AVENUE, FROM STREET 168 STREET TO STREET 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-05-05 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway temp cuts flush to grade , valid permit on file, B012013109068, exp 5/20/2013 |
2013-05-05 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 16'X6' PERM CUT IN P/L & D/L WITH BROKEN SEAL / RH |
2013-05-04 | No data | CLASSON AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D4F unfinished trench overdue for final |
2013-05-04 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4x3 cut sunken 1-11/2 needs sealing & 3x3 cut needs re-sealing. |
2013-05-04 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 cuts sunken 2" no repairs made |
2013-05-04 | No data | HERKIMER STREET, FROM STREET DEWEY PLACE TO STREET HOWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-05-04 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 4x3 cut sunken 1-11/2 needs sealing & 3x3 cut needs re-sealing. |
2013-05-03 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 plate (no markings) is too small for the excavation. so excavation is exposed to by 1' 1/2'' |
2013-05-03 | No data | CROSS BAY BOULEVARD, FROM STREET 164 AVENUE TO STREET 165 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to fully replace defective sidewalk flags |
2013-05-02 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-05-02 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | nov was already issued for same condition under another permit(b012012326085) no seal joints |
2013-05-02 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 perm cuts needs the street opening joints to be re-sealed |
2013-05-02 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate in d/l loose & noisy |
2013-05-02 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 5-BORE HOLES LEFT IN ROADWAY |
2013-05-01 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT OVERDUE FOR FINAL |
2013-05-01 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 STEEL PLATES LOOSE & NOISY IN THE R/W |
2013-04-28 | No data | 36 AVENUE, FROM STREET 217 STREET TO STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water-sewer cut paved over by builders paving |
2013-04-27 | No data | EAST 116 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm "11" color coded water cut need to be resealed in the driving lane. |
2013-04-27 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-04-23 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut extending from parking lane into driving lane |
2013-04-23 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 CUTS NOT RESTORE OVER DUE |
2013-04-22 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm s/w flags |
2013-04-22 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/t/p/o I observed that one 3'x4' temp sidewalk cut is long overdue for final restoration. Respondent failed to permanently restored cut within required time; above permit # expired on 10/04/12. |
2013-04-22 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-04-21 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET 196 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-04-21 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM 4'X3' LONG WATER CUTS IN P/L & D/L WITH SEAL BROKEN / RH |
2013-04-20 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street opening joints cracked. Needs to be filled and re sealed In Driving Lane |
2013-04-19 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-04-18 | No data | WASHINGTON AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | (NICA reinspection on sidewalk unsafe condition) |
2013-04-17 | No data | VAN WYCK EXPRESSWAY, FROM STREET VWE SB ENTRANCE LIBERTY AVE TO STREET 107 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2013-04-16 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cuts d/l |
2013-04-16 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water perm restoration in p/l in compliance. |
2013-04-16 | No data | SUTPHIN BOULEVARD, FROM STREET LAKEWOOD AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress excavated r/w cut in p/l |
2013-04-15 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated |
2013-04-15 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated |
2013-04-13 | No data | 172 STREET, FROM STREET 103 ROAD TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced street paved new building |
2013-04-13 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cuts in roadway. valid permit on file. |
2013-04-13 | No data | 224 STREET, FROM STREET 119 AVENUE TO STREET 120 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-04-12 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration sunken 2 1/2 inches in driving/parking lane |
2013-04-10 | No data | SIMPSON STREET, FROM STREET FREEMAN STREET TO STREET HOME STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-04-09 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | TEMP CUT IN ROADWAY IS SUNKEN 1 -1 1/2, RESTORE CUT TO GRADE |
2013-04-06 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4X3 TEMP RESTORATION CUT NOT FINALIZED DURING WATER MORATORIUM |
2013-04-03 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-04-03 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR ISSUED ALREADY FOR DEFECTS |
2013-04-02 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in r/w p/l d/l |
2013-04-02 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Paving Inspections | Department of Transportation | No data |
2013-04-02 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | over due cuts nov |
2013-04-01 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS R/W AND S/W JOINTS NEED SEALING.CHANGE COLOR I.D. TO PROPER ''2013" MARKER |
2013-03-31 | No data | SUTPHIN BOULEVARD, FROM STREET 109 DRIVE TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | double yellow line needs to be restored |
2013-03-31 | No data | WEST 12 STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-03-29 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-03-29 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | there is a perm water / sewer cut in the roadway permittee made saw cuts in the roadway and did not excavate ere entire cut seal the cuts or cut area out and joint it to there perm cut |
2013-03-29 | No data | LIVERPOOL STREET, FROM STREET FERNDALE AVENUE TO STREET GLASSBORO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | edge cracking at street opening joints. restoration needs to be re-sealed |
2013-03-27 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street opening joints on 2 perm water cuts in the roadway in front of 172-10 140 ave needs to be re-sealed |
2013-03-27 | No data | MERRILL STREET, FROM STREET AMELIA ROAD TO STREET BROCHER ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | temp cut in roadway sunken 3 inches cut is over due called into base |
2013-03-27 | No data | SUTPHIN BOULEVARD, FROM STREET 118 AVENUE TO STREET FOCH BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site. work site in compliance. |
2013-03-26 | No data | 108 STREET, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7x5 perm |
2013-03-26 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-03-25 | No data | MADISON STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts in roadway needs to be sealed and color code applied. plus seal expansion joint on sidewalk. |
2013-03-24 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 binder flush cuts is missing a color code in the parking & driving lane & expansion joints on the sidewalk needs to be sealed. |
2013-03-24 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts are binder base flush, overdue for final. |
2013-03-23 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3x6 cut sunken 2" 3x2 cut needs re-sealing |
2013-03-23 | No data | MEXICO STREET, FROM STREET SUFFOLK DRIVE TO STREET TIOGA DRIVE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2013-03-23 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | - Restoration Sunken 2cuts 1 4a4 sunken11/2" 1 3x3 cut sunken 2" |
2013-03-23 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration Sunken 2cuts 1 4a4 sunken11/2" 1 3x3 cut sunken 2" |
2013-03-23 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3x6 cut sunken 2" 3x2 cut needs re-sealing |
2013-03-23 | No data | HULL STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | no color code around 2 temp cuts in roadway plus apply more temp mac 1 cut sloping. |
2013-03-22 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration Breaking up - Restoration Missing Color Code |
2013-03-20 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | crew actively working , all in compliance at this time |
2013-03-18 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-03-16 | No data | CLASSON AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONCRETE CUT OVERDUE FOR FINAL PLUS SEAL EXPANSION JOINT ON SIDEWALK. |
2013-03-15 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut sunken 3" in d/l |
2013-03-15 | No data | 19 AVENUE, FROM STREET 19 LANE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Failed to apply 4 inches of temporary asphalt -backfill material exposed |
2013-03-13 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp s/w flag and dirt to grade r/w cut 4x3 |
2013-03-12 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | over due cuts |
2013-03-12 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | two temp cuts sunken 2'' |
2013-03-09 | No data | VERONA PLACE, FROM STREET FULTON STREET TO STREET MACON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2013-03-09 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-03-07 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no call for backfill |
2013-03-07 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-03-07 | No data | 133 STREET, FROM STREET ROCKAWAY BOULEVARD TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2013-03-06 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w perm |
2013-03-05 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on existing Roadway/Sidewalk |
2013-03-05 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | on site actively working , in compliance at this time |
2013-03-04 | No data | 111 STREET, FROM STREET 48 AVENUE TO STREET 49 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no call for backfill on protected street |
2013-03-02 | No data | AUTUMN AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2013-03-02 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal s/w joints. cut on Johnson ave, house is a corner property. |
2013-02-26 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm restorations needs to be resealed |
2013-02-26 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 75% of the cut was excavated by DEP and is now sunken down 5" in the parking and partial of the driving lane. |
2013-02-25 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | nov already issued |
2013-02-24 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate pin/ramped in p/l d/l |
2013-02-22 | No data | FRANKLIN AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE IN R/W |
2013-02-20 | No data | LACOMBE AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration needs to be re-sealed |
2013-02-20 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 s/w 5'x5' concrete expansion joint not sealed. |
2013-02-20 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition was rectified steel plate was removed |
2013-02-20 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp overdue for final |
2013-02-17 | No data | 125 AVENUE, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-02-14 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joint on sidewalk not sealed. |
2013-02-14 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 cuts over due to be be made final |
2013-02-13 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-02-12 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-02-10 | No data | 211 STREET, FROM STREET 115 AVENUE TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Not started R/W covered w/snow can not inspect |
2013-02-05 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-02-01 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 cuts |
2013-02-01 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut was taken over by Con-Edison,and or on sidewalk |
2013-02-01 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-31 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-01-31 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color code need to be applied to 3 perm water cuts. In the parking/driving lane. |
2013-01-31 | No data | EAST 105 STREET, FROM STREET AVENUE N TO STREET FLATLANDS 9 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-25 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings missing |
2013-01-21 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-21 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2013-01-20 | No data | 197 STREET, FROM STREET BRINKERHOFF AVENUE TO STREET 111 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-01-19 | No data | SOUTH ROAD, FROM STREET 148 STREET TO STREET 153 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade in r/w |
2013-01-17 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut in p/l still temp to grade |
2013-01-17 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-16 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No data |
2013-01-14 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | new sewer being installed ...../permit active.... |
2013-01-12 | No data | 113 AVENUE, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-01-10 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-01-10 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | conditions were pick up and nov's was written twice for over due and open cuts expire permit. |
2013-01-10 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patchwork sidewalk flag not acceptable. Full flag must be restored in kind. Expansion joints must be installed and sealed in accordance with DOT specs. Roadway restorations were resealed. |
2013-01-10 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork sidewalk flag not acceptable. Full flag must be restored in kind. Expansion joints must be installed and sealed in accordance with DOT specs. Roadway restorations were resealed. |
2013-01-07 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-07 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No data |
2013-01-05 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in d/l |
2013-01-04 | No data | CROSS BAY BOULEVARD, FROM STREET 164 AVENUE TO STREET 165 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restored s/w flags fully |
2013-01-03 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-03 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-01-03 | No data | ELY AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2013-01-02 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-01-02 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to seal perm street cut in the driving lane / parking lane |
2012-12-28 | No data | 109 AVENUE, FROM STREET 84 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | make to grade |
2012-12-28 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut 3'6"x 2'6"and 3'6"x4'6" did not cut back proper to dot requirements |
2012-12-27 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | PLATES NOT SKID RESISTANT |
2012-12-26 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut is temp to grade |
2012-12-22 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-17 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut overdue for final, NICA continued |
2012-12-14 | No data | SEWARD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | open cut in r/way expired permit |
2012-12-14 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut overdue for final |
2012-12-13 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber 4ft x 4ft cut sunken 4 to 5 inches below grade.also cut overdue for final. |
2012-12-12 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ~4'x3' cut backfill only, NICA issued |
2012-12-12 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-09 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two temp roadway restorations overdue for final restoration. |
2012-12-09 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-09 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-07 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2012-12-06 | No data | NOSTRAND AVENUE, FROM STREET EMPIRE BOULEVARD TO STREET SULLIVAN PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2012-12-02 | No data | 115 AVENUE, FROM STREET 146 STREET TO STREET 147 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-01 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temp cuts in r/w |
2012-11-29 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-11-27 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two temp cuts |
2012-11-25 | No data | BAISLEY BOULEVARD, FROM STREET 120 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-11-25 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water 2 temp rw cuts ok. Spray color code faded. |
2012-11-24 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-11-12 | No data | SIDNEY PLACE, FROM STREET LIVINGSTON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-11-12 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2012-11-07 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-10-28 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | r/ resurfaced ....summer of 2012 .... |
2012-10-26 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-10-26 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate removed. |
2012-10-24 | No data | WILSON AVENUE, FROM STREET COOPER STREET TO STREET DECATUR STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp roadway restoration overdue for final restoration. |
2012-10-21 | No data | AVENUE R, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | New Permit held for external review. |
2012-10-17 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | entire cut in the parking and driving lane is missing seal |
2012-10-17 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | APPLY COLOR CODE WITH IMB # |
2012-10-15 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-10-14 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/P WATER PERM R/W CUTS TO GRADE. |
2012-10-10 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-10-07 | No data | CLARKSON AVENUE, FROM STREET EAST 95 STREET TO STREET EAST 96 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-10-06 | No data | CLASSON AVENUE, FROM STREET FULTON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | r/w |
2012-10-06 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED CUT R/W. TEMP S/W FLAGS. DEBRIS STORED P/L WITH PVC PIPE UNDER FOR WATER FLOW. |
2012-10-04 | No data | 97 AVENUE, FROM STREET SUTPHIN BOULEVARD TO STREET WALTHAM STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | temp cut in p/l not sunken |
2012-10-03 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings missing |
2012-10-02 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temporary restoration ok parking lane |
2012-10-02 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1.Permanent Restorations (2) not rolled properly. 2. Bike Lane Markers not restored. 3. S/W Hardware below grade trip hazard. |
2012-09-30 | No data | STAGG STREET, FROM STREET BOGART STREET TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm roadway restorations must be sealed. Expansion joints must be installed at curb. |
2012-09-28 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plate removed. Overdue condition on sidewalk at active Building op so no action taken. CAR issued on renewed permit. |
2012-09-27 | No data | EAST 16 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code inserted |
2012-09-26 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two tewmp cuts in r/ |
2012-09-24 | No data | 81 STREET, FROM STREET 37 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-09-21 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut 3'6"x 2'6"and 3'6"x4'6" did not cut back proper to dot requirements |
2012-09-21 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut 3'6"x 2'6"and 3'6"x4'6" did not cut back proper to dot requirements |
2012-09-20 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Active | Department of Transportation | nica re inspection s/w has black top contractor on site |
2012-09-19 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk cut needs more black top and plates need resetting. |
2012-09-15 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-09-13 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SQUARE OFF PERM CUT AND APPLY SEALER |
2012-09-13 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-09-12 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Active | Department of Transportation | wk in progress |
2012-09-10 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-09-09 | No data | 56 ROAD, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated |
2012-09-09 | No data | 118 AVENUE, FROM STREET 168 STREET TO STREET 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp to grade |
2012-09-08 | No data | GLENMORE AVENUE, FROM STREET LOGAN STREET TO STREET MILFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-09-06 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate serving no purpose in parking lane must be removed. Restoration paved and flush to grade to cure NICA and answer complaint. |
2012-09-05 | No data | HUBBARD PLACE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work started in r/w at time of inspection |
2012-09-05 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated |
2012-09-04 | No data | ELY AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-08-29 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-08-23 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failed to pin or ramp steel plate in roadway. NICA issued on 8/22/12. |
2012-08-22 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate over excavation not pinned or ramped. |
2012-08-17 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-08-14 | No data | 109 AVENUE, FROM STREET 118 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/p water two r/w cuts in p/l. |
2012-08-13 | No data | 118 AVENUE, FROM STREET 168 STREET TO STREET 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut overdue for final-temp to grade |
2012-08-13 | No data | WASHINGTON AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | inspection passed |
2012-07-30 | No data | 36 AVENUE, FROM STREET 217 STREET TO STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water-sewer cut covered by builders paving |
2012-07-29 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk area temped to grade and in compliance |
2012-07-28 | No data | GREEN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUTS IN R/W |
2012-07-27 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | NICA re inspection. Permitte on site to place steel plate over sw excavation. Will reinspect to assure properly installed. |
2012-07-26 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | water repair excavation in roadway |
2012-07-25 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work in progress. plates pinned and ramped |
2012-07-24 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temp asphalt applied to back fill to grade restoration. |
2012-07-23 | No data | 114 ROAD, FROM STREET 194 STREET TO STREET FARMERS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-07-15 | No data | WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to place a temporary ( green paint) or permanent colored marker code around or adjacent to 5 steel plates located in the driving lane. |
2012-07-13 | No data | EVERGREEN AVENUE, FROM STREET MELROSE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Repair water/sewer active site. Signs posted rw open and accessible. |
2012-07-11 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp "Water" cut is overdue for final. |
2012-07-05 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET 196 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | thereare2permwater cuts in roadway |
2012-07-03 | No data | 153 STREET, FROM STREET 123 AVENUE TO STREET 124 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | IN COMPLIANCE WITH STIP. #020 OF THIS PERMIT |
2012-06-28 | No data | EAST 16 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2012-06-26 | No data | VAN WYCK EXPRESSWAY, FROM STREET VWE SB ENTRANCE LIBERTY AVE TO STREET 107 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | CREW ON SITE RESTORING 2 CUTS IN R/W & 2 FLAGS ON S/W NO PERMIT. EXP 6/25/12 |
2012-06-20 | No data | SOUTH ROAD, FROM STREET 148 STREET TO STREET 153 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-06-19 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration recently paved not sealed. |
2012-06-19 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT IN PERMANENT STATE |
2012-06-19 | No data | EDGECOMBE AVENUE, FROM STREET WEST 137 STREET TO STREET WEST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | overdue for final |
2012-06-18 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | p/m r/w cut is color coded. |
2012-06-16 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 8" PILE OF ASPHALT IN GRASS AREA NOT REMOVED |
2012-06-16 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cuts have been finalized and color coded |
2012-06-14 | No data | 108 STREET, FROM STREET 42 AVENUE TO STREET 43 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-06-13 | No data | VAN WYCK EXPRESSWAY, FROM STREET VWE SB ENTRANCE LIBERTY AVE TO STREET 107 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-06-13 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavations without a valid DOT permit. |
2012-05-29 | No data | EAST 116 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-05-16 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOT CORRECTED-PERMITTEE OUT OF BUSINESS ACCORDING TO LIST DATED 6/6/11 |
2012-05-12 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-05-09 | No data | EAST 16 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | overdue for final and no color code |
2012-05-02 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2012-04-11 | No data | 114 DRIVE, FROM STREET 194 STREET TO STREET 196 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 4'X3' TEMP CUTS IN THE R/W OVERDUE FOR FINAL |
2012-04-04 | No data | EAST 16 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | apply color code to temp cut. |
2012-03-30 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-03-25 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2012-03-25 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in p/d/l |
2012-03-20 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED R/W EXCAVATIONS. WORKING ON BUILDING FOR ROCK E SMALL |
2012-03-15 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 plated r/w excavations with expired permit |
2012-03-04 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-03-01 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate removed - cut temp. |
2012-02-29 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-02-28 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | PLATES NOT PINNED AND RAMPED. NICA WAS ISSUED |
2012-02-28 | No data | 179 STREET, FROM STREET BEND TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | 8" HIGH, 4X2 PILE OF ASPAHLT LEFT IN GRASS AREA OF S/W SERVING NO PURPOSE |
2012-02-24 | No data | NORTHERN BOULEVARD, FROM STREET POWER ROAD TO STREET 100 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | MATERIAL STORED IN BUS STOP |
2012-02-23 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO COLOR CODE ON R/W |
2012-02-21 | No data | 145 DRIVE, FROM STREET 178 PLACE TO STREET 179 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | BF ONLY |
2012-02-08 | No data | 109 AVENUE, FROM STREET 118 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 107-72 lefferts on 109 ave 2 binder base cuts overdue p/l and patchwork on sidewalk |
2012-01-27 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | binder base cut overdue for final restoration in p/l and no color code |
2012-01-12 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to restore bike lane |
2011-12-28 | No data | 140 AVENUE, FROM STREET 172 STREET TO STREET 173 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ON BACKFILL, 2'8"X2'4" & 2'8"X2'6" TEMP CUTS TO GRADE MISSING COLOR CODE |
2011-12-08 | No data | EAST 59 STREET, FROM STREET MADISON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2011-12-06 | No data | EAST 94 STREET, FROM STREET GLENWOOD ROAD TO STREET SMITHS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2011-11-11 | No data | 210 STREET, FROM STREET 104 AVENUE TO STREET 109 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2011-10-23 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bike lane is missing |
2011-10-18 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION STILL REMAINS C/C WITH I.B.M TAG NOT APPLIED AT TIME OF INSPECTION. |
2011-09-12 | No data | EAST 116 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-08-16 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | one cut binder base overdue for final = one cut perm bike lane missing |
2011-08-15 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | PROPER CUTBACK TO PERM CUT WASNT PERFORMED , CUT SHOULD EXTEND UP TO CURB, AND THE IBM # PAVING MARK |
2011-08-03 | No data | 109 AVENUE, FROM STREET 118 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2011-07-28 | No data | 109 AVENUE, FROM STREET 118 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | No data |
2011-07-28 | No data | 109 AVENUE, FROM STREET 118 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | No data |
2011-07-26 | No data | LOGAN STREET, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-07-14 | No data | LINCOLN ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-06-06 | No data | 173 STREET, FROM STREET 134 ROAD TO STREET 137 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2009-03-27 | No data | 173 STREET, FROM STREET 134 ROAD TO STREET 137 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | permit # qo12009041047..12x6 concrete based cut in d/l is overdue for final. |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-228213 | Office of Administrative Trials and Hearings | Issued | Settled - Pending | 2024-01-02 | 0 | No data | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-227860 | Office of Administrative Trials and Hearings | Issued | Settled - Pending | 2023-10-23 | 0 | No data | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-226533 | Office of Administrative Trials and Hearings | Issued | Settled | 2023-04-24 | 1000 | 2023-09-27 | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-224937 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-09-22 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223954 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-05-05 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223791 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-04-19 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223778 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-04-08 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221731 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-13 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-219844 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-08-01 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
ERROL SMALL
ROCKSMAL CONSTRUCTION, INC.THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.Date of last update: 10 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated