2023-10-05
|
No data
|
41 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no pedestrian walk found
|
2023-10-01
|
No data
|
VARICK STREET, FROM STREET CANAL STREET TO STREET LAIGHT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2023-06-30
|
No data
|
VAN CORTLANDT AVENUE EAST, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET MOSHOLU PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2023-06-23
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Permittee obtained permit #M012023173B54 for RPO to cover restoration in the intersection. NOV re-inspection passed.
|
2023-06-21
|
No data
|
CENTRE STREET, FROM STREET HOGAN PLACE TO STREET WORTH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent did not do the work, and the permit has expired.
|
2023-05-18
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
NOV issued for Use/opening of protected street without DOT permit.
|
2023-05-14
|
No data
|
VARICK STREET, FROM STREET LAIGHT STREET TO STREET HOLLAND TUNNEL EXIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance.
|
2023-05-03
|
No data
|
LENOX AVENUE, FROM STREET WEST 132 STREET TO STREET WEST 133 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No drill rig on location at this time.
|
2023-04-29
|
No data
|
LENOX AVENUE, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
okay
|
2023-04-20
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2023-04-13
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Respondent had a permanent restoration on the roadway in the intersection without a valid DOT permit. ID by Permit M012023026A92 that permits street opening in the segment of Lenox Ave of West 133rd Street - West 134th Street.
|
2023-03-24
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent has one lane heading south bound for traffic. As per MEC-21-022 the contractors are supposed to maintain 2 11 foot travel lanes for southbound traffic at all times.
|
2023-03-14
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barricades on median of roadway in compliance
|
2023-03-13
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
okay
|
2023-03-01
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No drill rigg stored
|
2023-03-01
|
No data
|
LENOX AVENUE, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No skid steer stored
|
2023-03-01
|
No data
|
LENOX AVENUE, FROM STREET WEST 129 STREET TO STREET WEST 130 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway clear
|
2023-03-01
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2023-03-01
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
NOV Permanent restoration in the roadway without a NYC DOT permit on file to open the Street at the location. Respondent was identified by permit #M012023026A92 which allows a street opening for Lenox Ave between W 133 St & W 134 St only.
|
2023-03-01
|
No data
|
LENOX AVENUE, FROM STREET WEST 132 STREET TO STREET WEST 133 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No drll rigg stored
|
2023-02-28
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
okay
|
2023-02-27
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
plates removed; perm restoration at crosswalk
|
2023-02-27
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
steel plates removed; perm restoration in r/w
|
2023-02-22
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
no noise coming from area; plates pinned and ramped.
|
2023-02-22
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2023-02-16
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w occ.
|
2023-02-13
|
No data
|
SPENCER PLACE, FROM STREET FULTON STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found
|
2023-02-08
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers stored on roadway
|
2023-02-08
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2023-02-03
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
okay
|
2023-02-02
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2023-01-31
|
No data
|
SPENCER PLACE, FROM STREET FULTON STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found
|
2023-01-26
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2023-01-19
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w open to traffic
|
2023-01-12
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site working
|
2023-01-11
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2023-01-06
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
URTS” Marked steel plates pinned and ramped onto the Roadway. Respondent failed to countersink the steel plates flush with the Roadway during winter moratorium period started 12/1/2022. No request was made not to countersink Plates for this location.
|
2023-01-06
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
The above respondent has 4 steel plates pinned, ramped & secured to the roadway marked "URTS" without a DOT permit on file. ID by segment permit #M012022350A21 used for id only.
|
2023-01-05
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
The above respondent has the roadway excavatedin the center of the intersection. The above respondent does not have and Valid DOT permits for the intersection. ID by permit number M012022350A19 for id use only.
|
2023-01-04
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
The above respondent has the full length of the intersection closed off with RMSK marked barriers and chains while working in the center of the roadway. The above respondent does not have any valid DOT permits on file for the interseciton.
|
2023-01-03
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
steel plates using protected r/w w/o a permit.
|
2023-01-03
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers stored on location
|
2023-01-03
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No excavator stored
|
2023-01-02
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New permits on file
|
2022-12-31
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
URTS” Marked steel plates pinned and ramped onto the Roadway. Respondent failed to countersink the steel plates flush with the Roadway during winter moratorium period started 12/1/2022. No request was made not to countersink Plates for this location.
|
2022-12-31
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades in compliance
|
2022-12-20
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-11-30
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Spoke with foreman Carlos. He is aware of loose steel plates and will make sure to further secure plates to the roadway at the end of the day.
|
2022-11-22
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-11-07
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-10-28
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No barricades visible
|
2022-10-28
|
No data
|
LENOX AVENUE, FROM STREET WEST 133 STREET TO STREET WEST 134 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started
|
2022-10-24
|
No data
|
LENOX AVENUE, FROM STREET WEST 134 STREET TO STREET WEST 135 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-10-17
|
No data
|
LENOX AVENUE, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
excavator not visible
|
2022-10-17
|
No data
|
LENOX AVENUE, FROM STREET WEST 129 STREET TO STREET WEST 130 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w not occupied
|
2022-10-17
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material r/w
|
2022-10-17
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
excavator not visible
|
2022-09-29
|
No data
|
BROAD STREET, FROM STREET EXCHANGE PLACE TO STREET NASSAU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work appears to have been done under this permit. Permit expired.
|
2022-09-22
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-09-22
|
No data
|
LENOX AVENUE, FROM STREET WEST 131 STREET TO STREET WEST 132 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent obstructing roadway with a port o san without a valid DOT permit on file. Permit M022022262A09 used to id no valid permit issued for a port o san.
|
2022-07-14
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-05-02
|
No data
|
LENOX AVENUE, FROM STREET WEST 130 STREET TO STREET WEST 131 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades on roadway incompliance.
|
2022-02-27
|
No data
|
VARICK STREET, FROM STREET LAIGHT STREET TO STREET HOLLAND TUNNEL EXIT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work at this location not started at the time of my inspection.
|
2021-12-14
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this time.
|
2021-12-11
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Swk still occupied. No obstruction to both conventional bike lanes.
|
2021-12-05
|
No data
|
VARICK STREET, FROM STREET LAIGHT STREET TO STREET HOLLAND TUNNEL EXIT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Acceptable
|
2021-12-02
|
No data
|
VARICK STREET, FROM STREET LAIGHT STREET TO STREET HOLLAND TUNNEL EXIT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ATPO respondent a container stored on the roadway with no protection under the steel wheels , respondent has been ID by barriers around the container marked RMS
|
2021-09-22
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
MTA work not started, both conventional bike lanes are up & running
|
2021-09-14
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Partial sidewalk excavation behind construction fence by the park. Sidewalk open, bike lane and traffic lanes clear.
|
2021-09-08
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 175 STREET TO STREET EAST 175 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
pass
|
2021-09-02
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 175 STREET TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ATPO permittee didn’t comply with Bike MPT, violating Bike02 stipulation. Signs SC-145 & SC-152 should be 50’ ahead of bike lane impaction. SC-151 & SC-152 should be at front of impaction. Identified by permit and permittee name on barrels and truck.
|
2021-08-26
|
No data
|
VARICK STREET, FROM STREET LAIGHT STREET TO STREET HOLLAND TUNNEL EXIT
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Contractor is in compliance no action has been taken
|
2021-08-13
|
No data
|
BROAD STREET, FROM STREET EXCHANGE PLACE TO STREET NASSAU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work conducted under this permit. Permit expired.
|
2021-08-11
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MTA work not started, both conventional bike lanes are up & running
|
2021-07-26
|
No data
|
PATCHEN AVENUE, FROM STREET FULTON STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
now perm ...
|
2021-07-25
|
No data
|
PATCHEN AVENUE, FROM STREET FULTON STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, perm .... s/b driving lane ..
|
2021-06-12
|
No data
|
CENTRE STREET, FROM STREET HOGAN PLACE TO STREET WORTH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MTA contractor working on vaults on west swk, not performed yet. Bike lane is up & running
|
2021-06-03
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Porto has been placed down at construction site in front of 50 Nevins.
|
2021-06-02
|
No data
|
VARICK STREET, FROM STREET BEACH STREET TO STREET LAIGHT STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
having 21 - PLASTIC BARRIERS occupying 38'x6.5' area of sidewalk adjacent to curb, without securing a NYC DOT permit to maintain PLASTIC BARRIERS use of street.
|
2021-06-02
|
No data
|
VARICK STREET, FROM STREET CANAL STREET TO STREET LAIGHT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no OCCUPANCY OF ROADWAY
|
2021-05-26
|
No data
|
CENTRE STREET, FROM STREET HOGAN PLACE TO STREET WORTH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started.
|
2021-05-17
|
No data
|
VARICK STREET, FROM STREET CANAL STREET TO STREET LAIGHT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No rapid transit work found at this time on this segment. Permit remains active.
|
2021-05-06
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work for transit not obstructing or impacting conventional bike lane
|
2021-04-30
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started around south curb line of Schermerhorn st. Conventional is up & running
|
2021-04-17
|
No data
|
PATCHEN AVENUE, FROM STREET FULTON STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ROADWAY MARKINGS HAVE BEEN ADDED
|
2021-04-13
|
No data
|
BROAD STREET, FROM STREET EXCHANGE PLACE TO STREET NASSAU STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The respondent did not start the work.
|
2021-04-02
|
No data
|
BROAD STREET, FROM STREET EXCHANGE PLACE TO STREET NASSAU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ARTS-DOT-496937-R7H1- At time of inspection I spoke to Carlos ( Foreman) on site. He explained to me that they do arrive at 0700, they may setup the tools but don't do any work until 0900 as stated on the noise mitigation stips.
|
2021-02-22
|
No data
|
CENTRE STREET, FROM STREET HOGAN PLACE TO STREET WORTH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The respondent did not start the work.
|
2021-02-17
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 175 STREET TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material barricaded in compliance
|
2021-02-10
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WOOD COVERED SIDEWALK BEHIND BARRICADES ON SIDEWALK-NP
|
2021-02-10
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
WOOD COVERED SIDEWALK BEHIND BARRICADES ON SIDEWALK
|
2021-02-08
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no Backhoe
|
2021-01-14
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 175 STREET TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Working with expired permit / NOV issued
|
2021-01-14
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 175 STREET TO STREET EAST 175 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No valid permit / NOV issued
|
2020-12-20
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
WOOD COVERED SWK IN PARKS DEPT-NP
|
2020-12-05
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BARRICADES ON STREET BY PARK DEPT
|
2020-11-23
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO BACKHOE
|
2020-10-29
|
No data
|
PATCHEN AVENUE, FROM STREET FULTON STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO COMPRESSOR ON THE ROADWAY
|
2020-07-29
|
No data
|
VAN CORTLANDT AVENUE EAST, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET MOSHOLU PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
On site working on the driving lane, s/w grass area.
|
2020-07-23
|
No data
|
PATCHEN AVENUE, FROM STREET FULTON STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TRANSIT
|
2020-07-23
|
No data
|
PATCHEN AVENUE, FROM STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TRANSIT
|
2020-07-22
|
No data
|
PATCHEN AVENUE, FROM STREET FULTON STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TRANSIT
|
2020-07-21
|
No data
|
SPENCER PLACE, FROM STREET FULTON STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CLOSE TO FULTON ST AND SPENCER PL IS SIDEWALK GRATING WITH AN ATTACHED DOOR. OPPOSITE "FUEL JUICE"
|
2020-07-21
|
No data
|
FULTON STREET, FROM STREET BEDFORD AVENUE TO STREET SPENCER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w ok
|
2020-07-21
|
No data
|
FULTON STREET, FROM STREET SPENCER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s\w ok 1183
|
2020-04-20
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
JOINTS SEAL
|
2020-03-17
|
No data
|
EAST 161 STREET, FROM STREET BEND TO STREET MACOMBS DAM BRIDGE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started no staging area
|
2020-01-01
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE SEAL EXPANSION JOINTS IN NEW SIDEWALK FLAGS- OPPOSITE 333 SCHERMERHORN STREET BETWEEN NEVINS STREET & 3 AVENUE(AT PARKS DEPT. GATE).
|
2019-11-05
|
No data
|
SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN TRENCH BEHIND FENCE BY PARK - MTA SUB-CONTRACTOR
|
2019-10-31
|
No data
|
MC DONALD AVENUE, FROM STREET 18 AVENUE TO STREET AVENUE F
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades
|
2019-10-09
|
No data
|
PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Materials not found to be on roadway at this time
|
2019-10-04
|
No data
|
MC DONALD AVENUE, FROM STREET 18 AVENUE TO STREET AVENUE F
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Area in the parking lane near 18th Ave.
|
2019-09-24
|
No data
|
MC DONALD AVENUE, FROM STREET 65 STREET TO STREET AVENUE O
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk
|
2019-08-17
|
No data
|
SPENCER PLACE, FROM STREET FULTON STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY MATERIAL STORED IN THE PARKING LANE
|
2018-11-23
|
No data
|
MC DONALD AVENUE, FROM STREET 18 AVENUE TO STREET AVENUE F
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No material observed on the street at the construction site, at the time of inspection.
|
2018-05-19
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp walk way in compliance
|
2018-03-25
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active MTA site s/w closed
|
2018-01-10
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ped walk in parking lane
|
2018-01-05
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active site at train yard
|
2017-12-23
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ped walk in parking lane, timber barricades used
|
2017-11-21
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
active work site
|
2017-11-21
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit for Rapid transit construction
|
2017-08-13
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK
|
2017-07-13
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
2017-06-21
|
No data
|
FURMAN AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades in roadway.
|
2017-03-19
|
No data
|
PINE STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced, sidewalk acceptable as per MTA structure alterations on street segment & drawing on permit application 2016122800426083 sketch.
|
2016-12-13
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Timber Barricade
|
2016-12-02
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractor is in compliance with stips
|
2016-11-29
|
No data
|
PINE STREET, FROM STREET NASSAU STREET TO STREET WILLIAM STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
s/w closed w/o permit
|
2016-11-14
|
No data
|
PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK Acceptable
|
2016-11-04
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Generator not on site at this time.
|
2016-11-03
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No compressor on site at this time.
|
2016-10-18
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
40' by 40' backfillcutback at later date
|
2016-10-05
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractor is in compliance with stips
|
2016-06-02
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-06-01
|
No data
|
EAST 149 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-05-04
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractor is in compliance with all stips
|
2016-04-26
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
roadway is in compliance with all stips
|
2016-04-22
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-04-12
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2016-04-12
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTRACTOR IN COMPLIANCE WITH STIPS
|
2016-04-12
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-03-23
|
No data
|
EAST 149 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Duplicate confirmation times, Arrived-0333 Cut#1) 19'x11'x1', PAVER)RMSK-Mr.John, R/W)Reconst., Existing)8"Conc./4"W/C, Epoxy Used, Cut Plated, Depart-0500
|
2016-03-18
|
No data
|
EAST 149 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
B/F NOT YET COMPLETED HAD TO BE RELIEVED BY A. DOWLING. INTERSECTION CUT #1 20'X10'X9' WD=134.3 DD=125.6 MDD 129.4 AM=6.9 1ST COMPACTION TEST 96.1 - PASS. ARRIVED 1930 HRS DEPARTING 0140 HRS
|
2016-03-04
|
No data
|
EAST 149 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-02-26
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-02-24
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Backhoe on site.
|
2016-02-23
|
No data
|
LENOX AVENUE, FROM STREET WEST 146 STREET TO STREET WEST 147 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway is open to pedestrians at this time.
|
2016-02-22
|
No data
|
EAST 149 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Not started
|
2016-02-07
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
timber barricades on sidewalk
|
2016-02-06
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
WORK IN PROGRESS, NO ONE ON SITE
|
2016-01-19
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
compressor removed
|
2016-01-19
|
No data
|
EAST 149 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2015-12-02
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
generator removed
|
2015-11-24
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
BASE PASS LL-14 SAW CUT WAS DONE ON BASE TRENCH
|
2015-11-09
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
trench cut pass sand cone test
|
2015-10-22
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
(BEFORE BASE WAS DONE CONCRETE WAS ON ONE SIDE AND BINDER WAS ON THE OTHER) DUE TO THE GAS LINE BEING EXPOSED ON THE EAST SIDE OF THE TRENCH,BASE AND WEARING COURSE WAS REMOVED SO DIRT CAN BE COMPACTED...23' X 4'
|
2015-10-14
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
compressor
|
2015-02-03
|
No data
|
EAST 149 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2015-01-26
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2015-01-26
|
No data
|
EAST 149 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2015-01-26
|
No data
|
EAST 146 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started
|
2015-01-06
|
No data
|
WALTON AVENUE, FROM STREET EAST 146 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2015-01-06
|
No data
|
EAST 146 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2014-02-28
|
No data
|
10 AVENUE, FROM STREET NYCTA SUBWAY TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RPO Permit.
|
2013-09-10
|
No data
|
BROADWAY, FROM STREET WEST 110 STREET TO STREET WEST 109 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no activity at this time both sides of roadway & sidewalk ,not enough info on specific location walking & observing area
|
2013-06-26
|
No data
|
LIVONIA AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-26
|
No data
|
LIVONIA AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-26
|
No data
|
LIVONIA AVENUE, FROM STREET POWELL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-04-27
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
incompliance
|
2012-12-26
|
No data
|
CENTRAL PARK WEST, FROM STREET WEST 95 STREET TO STREET WEST 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-12-19
|
No data
|
CENTRAL PARK WEST, FROM STREET WEST 95 STREET TO STREET WEST 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-11-27
|
No data
|
CENTRAL PARK WEST, FROM STREET WEST 95 STREET TO STREET WEST 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-11-20
|
No data
|
CENTRAL PARK WEST, FROM STREET WEST 95 STREET TO STREET WEST 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-10-27
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no pedestrian walk/no activity (3961 MTA Building )
|
2012-10-26
|
No data
|
CENTRAL PARK WEST, FROM STREET WEST 95 STREET TO STREET WEST 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-10-19
|
No data
|
CENTRAL PARK WEST, FROM STREET WEST 95 STREET TO STREET WEST 96 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no Compressor
|
2012-07-05
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active
|
2012-06-28
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-06-24
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-06-04
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-05-14
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-05-01
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-03-29
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-02-01
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-01-31
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-01-30
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-01-12
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-12-27
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-08-27
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
place equipment, barriers with a fence on top.
|
2011-07-25
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-07-16
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-06-17
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-05-13
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-05-04
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-28
|
No data
|
LIVONIA AVENUE, FROM STREET POWELL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-28
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-19
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-13
|
No data
|
10 AVENUE, FROM STREET WEST 211 STREET TO STREET WEST 212 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-11-27
|
No data
|
LIVONIA AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-11-27
|
No data
|
LIVONIA AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|