Name: | GALAXY G.C. GROUP LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 03 Jun 2008 (16 years ago) |
Entity Number: | 3679373 |
County: | Bronx |
Place of Formation: | New York |
Address: | 3152 ALBANY CRESCENT, BRONX, NY, United States, 10463 |
Address ZIP Code: | 10463 |
Contact Details
Phone +1 718-617-0264
Name | Role | Address |
---|---|---|
THE LLC | DOS Process Agent | 3152 ALBANY CRESCENT, BRONX, NY, United States, 10463 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
X022024243A29 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A23 | 2024-08-30 | 2024-11-30 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A34 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A22 | 2024-08-30 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A21 | 2024-08-30 | 2024-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A20 | 2024-08-30 | 2024-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A26 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A27 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A19 | 2024-08-30 | 2024-11-30 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A18 | 2024-08-30 | 2024-11-30 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A28 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A35 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A25 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A24 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A33 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A32 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A31 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024243A30 | 2024-08-30 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022024240A46 | 2024-08-27 | 2024-11-30 | PLACE MATERIAL ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A85 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A47 | 2024-08-27 | 2024-11-30 | CROSSING SIDEWALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A45 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ROCKAWAY AVENUE |
B022024240A44 | 2024-08-27 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ROCKAWAY AVENUE |
B022024240A61 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A63 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A62 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A84 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A83 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A82 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A81 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A80 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A79 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A78 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A77 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A76 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A75 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A74 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A73 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A72 | 2024-08-27 | 2024-11-30 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A71 | 2024-08-27 | 2024-11-30 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A70 | 2024-08-27 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A69 | 2024-08-27 | 2024-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A68 | 2024-08-27 | 2024-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A67 | 2024-08-27 | 2024-11-30 | TEMPORARY PEDESTRIAN WALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A66 | 2024-08-27 | 2024-11-30 | CROSSING SIDEWALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A65 | 2024-08-27 | 2024-11-30 | PLACE MATERIAL ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024240A64 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A60 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A59 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A58 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A57 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A56 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A55 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A54 | 2024-08-27 | 2024-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A53 | 2024-08-27 | 2024-11-30 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A52 | 2024-08-27 | 2024-11-30 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A51 | 2024-08-27 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A50 | 2024-08-27 | 2024-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A49 | 2024-08-27 | 2024-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024240A48 | 2024-08-27 | 2024-11-30 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024212A23 | 2024-07-30 | 2024-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ROCKAWAY AVENUE |
B022024212A24 | 2024-07-30 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ROCKAWAY AVENUE |
B012024212A06 | 2024-07-30 | 2024-08-27 | INSTALL FENCE | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ROCKAWAY AVENUE |
X042024183A00 | 2024-07-01 | 2024-07-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024183A09 | 2024-07-01 | 2024-07-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024183A10 | 2024-07-01 | 2024-07-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024180A82 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A89 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A88 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A87 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A86 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A85 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A84 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A83 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A81 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A80 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A79 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A78 | 2024-06-28 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A77 | 2024-06-28 | 2024-09-01 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A76 | 2024-06-28 | 2024-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A75 | 2024-06-28 | 2024-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A74 | 2024-06-28 | 2024-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A73 | 2024-06-28 | 2024-09-01 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024180A72 | 2024-06-28 | 2024-09-01 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022024177A62 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A69 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A68 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A67 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A66 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A65 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A73 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A72 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A71 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A43 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A42 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A47 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A48 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A46 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A45 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A39 | 2024-06-25 | 2024-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A40 | 2024-06-25 | 2024-09-01 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A44 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A49 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A41 | 2024-06-25 | 2024-09-01 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A50 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A51 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A52 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A53 | 2024-06-25 | 2024-09-01 | PLACE MATERIAL ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A54 | 2024-06-25 | 2024-09-01 | CROSSING SIDEWALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A55 | 2024-06-25 | 2024-09-01 | TEMPORARY PEDESTRIAN WALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A56 | 2024-06-25 | 2024-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A33 | 2024-06-25 | 2024-09-01 | PLACE MATERIAL ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A64 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A57 | 2024-06-25 | 2024-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A58 | 2024-06-25 | 2024-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A59 | 2024-06-25 | 2024-09-01 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A60 | 2024-06-25 | 2024-09-01 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A61 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A70 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A63 | 2024-06-25 | 2024-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A38 | 2024-06-25 | 2024-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A37 | 2024-06-25 | 2024-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024177A36 | 2024-06-25 | 2024-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A34 | 2024-06-25 | 2024-09-01 | CROSSING SIDEWALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024177A35 | 2024-06-25 | 2024-09-01 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
X012024122A12 | 2024-05-01 | 2024-05-30 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024122A13 | 2024-05-01 | 2024-05-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X042024122A01 | 2024-05-01 | 2024-05-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024082B09 | 2024-03-22 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024082B10 | 2024-03-22 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024082B08 | 2024-03-22 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024082B07 | 2024-03-22 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024082B06 | 2024-03-22 | 2024-06-30 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024082A22 | 2024-03-22 | 2024-04-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024082A21 | 2024-03-22 | 2024-04-19 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024081A98 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024081A44 | 2024-03-21 | 2024-04-30 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A93 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A94 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A95 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A96 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A97 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024081A45 | 2024-03-21 | 2024-04-30 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A82 | 2024-03-21 | 2024-06-20 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A83 | 2024-03-21 | 2024-06-20 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A84 | 2024-03-21 | 2024-06-20 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A85 | 2024-03-21 | 2024-06-28 | TEMPORARY PEDESTRIAN WALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A86 | 2024-03-21 | 2024-06-20 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A87 | 2024-03-21 | 2024-06-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X042024081A02 | 2024-03-21 | 2024-04-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A88 | 2024-03-21 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
B022024081D02 | 2024-03-21 | 2024-03-29 | CROSSING SIDEWALK | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022024081D03 | 2024-03-21 | 2024-03-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022024081D04 | 2024-03-21 | 2024-03-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022024081D05 | 2024-03-21 | 2024-03-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022024081A89 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A90 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A91 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024081A92 | 2024-03-21 | 2024-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022024078A07 | 2024-03-18 | 2024-04-01 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024078A08 | 2024-03-18 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024078A09 | 2024-03-18 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024078A10 | 2024-03-18 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024078A11 | 2024-03-18 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022024078B86 | 2024-03-18 | 2024-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022024075A64 | 2024-03-15 | 2024-06-28 | CROSSING SIDEWALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
X022024075B16 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B15 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B14 | 2024-03-15 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B13 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B12 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B11 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B10 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B09 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B08 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B07 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B06 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B05 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B04 | 2024-03-15 | 2024-06-28 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B03 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B02 | 2024-03-15 | 2024-06-28 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B01 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075B00 | 2024-03-15 | 2024-06-28 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022024075A99 | 2024-03-15 | 2024-06-28 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022024075A54 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A55 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A44 | 2024-03-15 | 2024-06-28 | PLACE MATERIAL ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A45 | 2024-03-15 | 2024-06-28 | CROSSING SIDEWALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A46 | 2024-03-15 | 2024-06-28 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A47 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A48 | 2024-03-15 | 2024-06-28 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A49 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A50 | 2024-03-15 | 2024-06-28 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A51 | 2024-03-15 | 2024-06-28 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A52 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A53 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A56 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A57 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A58 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A59 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A60 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A61 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A62 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022024075A63 | 2024-03-15 | 2024-06-28 | PLACE MATERIAL ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A65 | 2024-03-15 | 2024-06-28 | TEMPORARY PEDESTRIAN WALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A66 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A67 | 2024-03-15 | 2024-06-28 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A68 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A69 | 2024-03-15 | 2024-06-28 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A70 | 2024-03-15 | 2024-06-28 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A71 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A72 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A73 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A74 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A75 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A76 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A77 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A78 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A79 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A80 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A81 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A82 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075A83 | 2024-03-15 | 2024-06-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022024075B07 | 2024-03-15 | 2024-06-28 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B152024074A08 | 2024-03-14 | 2024-06-30 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
X012024074C07 | 2024-03-14 | 2024-04-01 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X042024065A01 | 2024-03-05 | 2024-03-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024065A28 | 2024-03-05 | 2024-03-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012024065A27 | 2024-03-05 | 2024-03-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B43 | 2023-12-22 | 2024-03-22 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B49 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B48 | 2023-12-22 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B47 | 2023-12-22 | 2024-03-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B46 | 2023-12-22 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B45 | 2023-12-22 | 2024-03-30 | TEMPORARY PEDESTRIAN WALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B44 | 2023-12-22 | 2024-03-22 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B42 | 2023-12-22 | 2024-03-22 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B50 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B51 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B52 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B54 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B53 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B55 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B56 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B57 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023356B58 | 2023-12-22 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
B022023355B83 | 2023-12-21 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B84 | 2023-12-21 | 2024-03-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B85 | 2023-12-21 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B86 | 2023-12-21 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B87 | 2023-12-21 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B88 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B89 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B90 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B91 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B92 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B93 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B94 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B95 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B96 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B97 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B98 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B99 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355C00 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B60 | 2023-12-21 | 2024-03-30 | PLACE MATERIAL ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B61 | 2023-12-21 | 2024-03-30 | CROSSING SIDEWALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B62 | 2023-12-21 | 2024-03-30 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B63 | 2023-12-21 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B64 | 2023-12-21 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B65 | 2023-12-21 | 2024-03-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B66 | 2023-12-21 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B67 | 2023-12-21 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B68 | 2023-12-21 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B69 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B70 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B71 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B72 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B73 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B74 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B75 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B76 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B77 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B78 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B79 | 2023-12-21 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023355B80 | 2023-12-21 | 2024-03-30 | PLACE MATERIAL ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B81 | 2023-12-21 | 2024-03-30 | CROSSING SIDEWALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023355B82 | 2023-12-21 | 2024-03-30 | TEMPORARY PEDESTRIAN WALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
X022023354A39 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A42 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A40 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A25 | 2023-12-20 | 2024-03-30 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A26 | 2023-12-20 | 2024-03-30 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A41 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A27 | 2023-12-20 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A28 | 2023-12-20 | 2024-03-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A29 | 2023-12-20 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A30 | 2023-12-20 | 2024-03-30 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A31 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A32 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A33 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A34 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A35 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A36 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A37 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023354A38 | 2023-12-20 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X012023334A17 | 2023-11-30 | 2024-02-23 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023331B18 | 2023-11-27 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B32 | 2023-11-27 | 2023-12-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023331B31 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B22 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B21 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B20 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B19 | 2023-11-27 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B34 | 2023-11-27 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023331B17 | 2023-11-27 | 2023-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B16 | 2023-11-27 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B15 | 2023-11-27 | 2023-12-31 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B14 | 2023-11-27 | 2023-12-31 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B30 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B29 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B28 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B27 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B26 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B25 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B24 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023331B33 | 2023-11-27 | 2023-12-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023331B36 | 2023-11-27 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023331B35 | 2023-11-27 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023331B23 | 2023-11-27 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
B022023299A45 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A44 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A43 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A42 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A41 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A40 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A39 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A38 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A37 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A36 | 2023-10-26 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A35 | 2023-10-26 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A32 | 2023-10-26 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A34 | 2023-10-26 | 2023-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A33 | 2023-10-26 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A31 | 2023-10-26 | 2023-12-31 | CROSSING SIDEWALK | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A30 | 2023-10-26 | 2023-12-31 | PLACE MATERIAL ON STREET | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299D53 | 2023-10-26 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023299A48 | 2023-10-26 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A47 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023299A46 | 2023-10-26 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BROADWAY, BROOKLYN, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE |
B022023298A25 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A16 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A17 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A18 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A19 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A20 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A21 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A22 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A23 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023298A24 | 2023-10-25 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B152023298A10 | 2023-10-25 | 2023-12-31 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A30 | 2023-10-20 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A24 | 2023-10-20 | 2023-12-31 | PLACE MATERIAL ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A33 | 2023-10-20 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A25 | 2023-10-20 | 2023-12-31 | CROSSING SIDEWALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A34 | 2023-10-20 | 2023-12-31 | TEMP. CONST. SIGNS/MARKINGS | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A26 | 2023-10-20 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A27 | 2023-10-20 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A28 | 2023-10-20 | 2023-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A29 | 2023-10-20 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A31 | 2023-10-20 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B022023293A32 | 2023-10-20 | 2023-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B002023289A01 | 2023-10-16 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X022023268B10 | 2023-09-25 | 2023-12-23 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B09 | 2023-09-25 | 2023-12-23 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B16 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B21 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B20 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B19 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B11 | 2023-09-25 | 2023-12-23 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B12 | 2023-09-25 | 2023-12-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B18 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B13 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B14 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B22 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B15 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023268B17 | 2023-09-25 | 2023-12-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X042023258A47 | 2023-09-15 | 2023-10-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023258A51 | 2023-09-15 | 2023-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023258A50 | 2023-09-15 | 2023-11-25 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023258A49 | 2023-09-15 | 2023-11-25 | TEMPORARY PEDESTRIAN WALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012023258B12 | 2023-09-15 | 2023-10-11 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023258B13 | 2023-09-15 | 2023-10-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023258B14 | 2023-09-15 | 2023-11-25 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023240A64 | 2023-08-28 | 2023-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A63 | 2023-08-28 | 2023-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A62 | 2023-08-28 | 2023-11-30 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A61 | 2023-08-28 | 2023-11-30 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A54 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A53 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A52 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A51 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A50 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A49 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A48 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A47 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A46 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A45 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A44 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A43 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A42 | 2023-08-28 | 2023-11-30 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A41 | 2023-08-28 | 2023-11-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A40 | 2023-08-28 | 2023-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A39 | 2023-08-28 | 2023-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A38 | 2023-08-28 | 2023-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A37 | 2023-08-28 | 2023-11-24 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A36 | 2023-08-28 | 2023-11-30 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A35 | 2023-08-28 | 2023-11-30 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A34 | 2023-08-28 | 2023-11-30 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A97 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A78 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X012023240A96 | 2023-08-28 | 2023-09-25 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023240A97 | 2023-08-28 | 2023-09-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A95 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A94 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A93 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A92 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A91 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A90 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A89 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A88 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A87 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A86 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A85 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A84 | 2023-08-28 | 2023-11-30 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A83 | 2023-08-28 | 2023-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A82 | 2023-08-28 | 2023-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A81 | 2023-08-28 | 2023-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A80 | 2023-08-28 | 2023-11-30 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A79 | 2023-08-28 | 2023-11-30 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A77 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A76 | 2023-08-28 | 2023-11-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A75 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A74 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A73 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A72 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A71 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A70 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A69 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A68 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A67 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A66 | 2023-08-28 | 2023-11-30 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023240A65 | 2023-08-28 | 2023-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X042023240A08 | 2023-08-28 | 2023-09-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023240A96 | 2023-08-28 | 2023-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023209A85 | 2023-07-28 | 2023-08-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X042023209A01 | 2023-07-28 | 2023-08-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023209A50 | 2023-07-28 | 2023-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023209A49 | 2023-07-28 | 2023-08-26 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023209A84 | 2023-07-28 | 2023-08-26 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023187A30 | 2023-07-06 | 2023-08-03 | OPEN PROTECTED SIDEWALK FOR FOUNDATION | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023186A59 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A58 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A57 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A56 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A55 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A54 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A53 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A52 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A51 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A50 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A48 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A47 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A38 | 2023-07-05 | 2023-08-03 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023186A49 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A39 | 2023-07-05 | 2023-08-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023186A40 | 2023-07-05 | 2023-08-03 | TEMPORARY PEDESTRIAN WALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023186A41 | 2023-07-05 | 2023-09-01 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A42 | 2023-07-05 | 2023-09-01 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A43 | 2023-07-05 | 2023-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A44 | 2023-07-05 | 2023-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A45 | 2023-07-05 | 2023-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A46 | 2023-07-05 | 2023-09-01 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A78 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A77 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A76 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A75 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A74 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A73 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A72 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A71 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A70 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A69 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A68 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A67 | 2023-07-05 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A65 | 2023-07-05 | 2023-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A66 | 2023-07-05 | 2023-09-01 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A64 | 2023-07-05 | 2023-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A63 | 2023-07-05 | 2023-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A62 | 2023-07-05 | 2023-09-01 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A61 | 2023-07-05 | 2023-09-01 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023186A60 | 2023-07-05 | 2023-09-01 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023177A41 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A24 | 2023-06-26 | 2023-09-01 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A25 | 2023-06-26 | 2023-09-01 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A26 | 2023-06-26 | 2023-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A27 | 2023-06-26 | 2023-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A28 | 2023-06-26 | 2023-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A29 | 2023-06-26 | 2023-09-01 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A30 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A31 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A32 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A33 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A34 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A35 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A36 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A37 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A38 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A39 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023177A40 | 2023-06-26 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023172B68 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B67 | 2023-06-21 | 2023-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B66 | 2023-06-21 | 2023-09-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B65 | 2023-06-21 | 2023-09-01 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B74 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B73 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B72 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B71 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B77 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B70 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B69 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B64 | 2023-06-21 | 2023-09-01 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B76 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023172B75 | 2023-06-21 | 2023-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X012023164A75 | 2023-06-13 | 2023-07-13 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X042023164A10 | 2023-06-13 | 2023-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023164A73 | 2023-06-13 | 2023-07-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023164A72 | 2023-06-13 | 2023-07-13 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023164A76 | 2023-06-13 | 2023-07-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X042023089A10 | 2023-03-30 | 2023-04-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X042023089A09 | 2023-03-30 | 2023-04-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023089A49 | 2023-03-30 | 2023-04-26 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023089A50 | 2023-03-30 | 2023-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023089A51 | 2023-03-30 | 2023-04-26 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023089A52 | 2023-03-30 | 2023-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023089B50 | 2023-03-30 | 2023-04-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023089B49 | 2023-03-30 | 2023-04-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023089B48 | 2023-03-30 | 2023-04-26 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023089B47 | 2023-03-30 | 2023-04-26 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B90 | 2023-03-29 | 2023-06-29 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B91 | 2023-03-29 | 2023-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B92 | 2023-03-29 | 2023-06-29 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B93 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B94 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B95 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B66 | 2023-03-29 | 2023-06-29 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B70 | 2023-03-29 | 2023-06-29 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B69 | 2023-03-29 | 2023-06-29 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088C04 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088C03 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088C02 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088C01 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088C00 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B99 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B98 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B97 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B96 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B68 | 2023-03-29 | 2023-06-29 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B67 | 2023-03-29 | 2023-06-29 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B71 | 2023-03-29 | 2023-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B72 | 2023-03-29 | 2023-06-29 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B73 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B74 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B75 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B76 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B77 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B78 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B79 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B80 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B81 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B82 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B83 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B84 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B85 | 2023-03-29 | 2023-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B86 | 2023-03-29 | 2023-06-29 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B87 | 2023-03-29 | 2023-06-29 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B88 | 2023-03-29 | 2023-06-29 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023088B89 | 2023-03-29 | 2023-06-29 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023086A12 | 2023-03-27 | 2023-06-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A26 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A25 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A24 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A23 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A22 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A21 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A20 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A19 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A18 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A17 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A16 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A15 | 2023-03-27 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A14 | 2023-03-27 | 2023-06-30 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A13 | 2023-03-27 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A09 | 2023-03-27 | 2023-06-30 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A10 | 2023-03-27 | 2023-06-30 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023086A11 | 2023-03-27 | 2023-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023081A56 | 2023-03-22 | 2023-06-13 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A63 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A62 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A61 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A60 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A59 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A58 | 2023-03-22 | 2023-06-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A57 | 2023-03-22 | 2023-06-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A67 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A55 | 2023-03-22 | 2023-06-13 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A68 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A66 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A65 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023081A64 | 2023-03-22 | 2023-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022023048A00 | 2023-02-17 | 2023-03-24 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X042023048A01 | 2023-02-17 | 2023-03-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023048A01 | 2023-02-17 | 2023-03-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X042023048A00 | 2023-02-17 | 2023-03-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023048A11 | 2023-02-17 | 2023-03-24 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023048A09 | 2023-02-17 | 2023-03-24 | RESET, REPAIR OR REPLACE CURB | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023048A10 | 2023-02-17 | 2023-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X012023048A12 | 2023-02-17 | 2023-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023047A45 | 2023-02-16 | 2023-03-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023047A44 | 2023-02-16 | 2023-03-24 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M022023031B82 | 2023-01-31 | 2023-04-01 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
X012023031A40 | 2023-01-31 | 2023-02-22 | INSTALL FENCE | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
M022023031B91 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B90 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B89 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B88 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B87 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B86 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B85 | 2023-01-31 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B84 | 2023-01-31 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B83 | 2023-01-31 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B81 | 2023-01-31 | 2023-04-01 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022023031B19 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B18 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B17 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B16 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B15 | 2023-01-31 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B14 | 2023-01-31 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B13 | 2023-01-31 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B12 | 2023-01-31 | 2023-04-01 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022023031B11 | 2023-01-31 | 2023-04-01 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
X022023031A25 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A24 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A23 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A22 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A21 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A20 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A19 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A18 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A17 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A16 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A15 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A14 | 2023-01-31 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A13 | 2023-01-31 | 2023-04-01 | TEMP. CONST. SIGNS/MARKINGS | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A12 | 2023-01-31 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A11 | 2023-01-31 | 2023-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A10 | 2023-01-31 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A09 | 2023-01-31 | 2023-04-01 | CROSSING SIDEWALK | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023031A08 | 2023-01-31 | 2023-04-01 | PLACE MATERIAL ON STREET | COMMONWEALTH AVENUE, BRONX, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET |
X022023003A08 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A19 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A18 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A17 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A16 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A15 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A14 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A13 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A12 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A11 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A10 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A09 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A02 | 2023-01-03 | 2023-03-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A01 | 2023-01-03 | 2023-03-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A00 | 2023-01-03 | 2023-03-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A05 | 2023-01-03 | 2023-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A04 | 2023-01-03 | 2023-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A03 | 2023-01-03 | 2023-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A06 | 2023-01-03 | 2023-03-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022023003A07 | 2023-01-03 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A33 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A20 | 2022-12-30 | 2023-03-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A19 | 2022-12-30 | 2023-03-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A36 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A35 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A34 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A21 | 2022-12-30 | 2023-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A32 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A31 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A30 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A29 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A18 | 2022-12-30 | 2023-03-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A25 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A26 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A27 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A28 | 2022-12-30 | 2023-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A24 | 2022-12-30 | 2023-03-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A23 | 2022-12-30 | 2023-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022364A22 | 2022-12-30 | 2023-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022349A81 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A76 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A72 | 2022-12-15 | 2023-03-15 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A73 | 2022-12-15 | 2023-03-15 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A74 | 2022-12-15 | 2023-03-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A75 | 2022-12-15 | 2023-03-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A77 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A83 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A82 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A85 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A78 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A79 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A80 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022349A84 | 2022-12-15 | 2023-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B04 | 2022-11-28 | 2022-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
M022022332B56 | 2022-11-28 | 2022-12-31 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B57 | 2022-11-28 | 2022-12-31 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B58 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B59 | 2022-11-28 | 2022-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B60 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B61 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B62 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B63 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B64 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022332B70 | 2022-11-28 | 2022-12-31 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B71 | 2022-11-28 | 2022-12-31 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B72 | 2022-11-28 | 2022-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B73 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B74 | 2022-11-28 | 2022-12-31 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B75 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B76 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B77 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B78 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B79 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022332B80 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
X022022332A81 | 2022-11-28 | 2022-12-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A82 | 2022-11-28 | 2022-12-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A83 | 2022-11-28 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A84 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A85 | 2022-11-28 | 2022-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A86 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A87 | 2022-11-28 | 2022-12-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A88 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A89 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A90 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A91 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A92 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A93 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A94 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A95 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A96 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A97 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A98 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332A99 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B00 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B01 | 2022-11-28 | 2022-12-15 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B02 | 2022-11-28 | 2022-12-15 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B03 | 2022-11-28 | 2022-12-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B05 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B06 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B07 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B08 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B09 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B10 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B11 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B12 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B13 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B14 | 2022-11-28 | 2022-12-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022332B15 | 2022-11-28 | 2022-12-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B16 | 2022-11-28 | 2022-12-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B17 | 2022-11-28 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B18 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B19 | 2022-11-28 | 2022-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B20 | 2022-11-28 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B21 | 2022-11-28 | 2022-12-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B22 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B23 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B24 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B25 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B26 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B27 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B28 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B29 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B30 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B31 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B32 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022332B33 | 2022-11-28 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022258A01 | 2022-09-15 | 2022-12-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022258A00 | 2022-09-15 | 2022-12-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A61 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A60 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A59 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A58 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A57 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A63 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A55 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A54 | 2022-08-31 | 2022-11-30 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A52 | 2022-08-31 | 2022-11-30 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A53 | 2022-08-31 | 2022-11-30 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A56 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022243A62 | 2022-08-31 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
M022022242B03 | 2022-08-30 | 2022-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B01 | 2022-08-30 | 2022-11-30 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242A84 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A83 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A82 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A81 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A80 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A79 | 2022-08-30 | 2022-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A78 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A77 | 2022-08-30 | 2022-11-30 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022242A76 | 2022-08-30 | 2022-11-30 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M012022242A25 | 2022-08-30 | 2022-10-01 | CONDUIT CONSTRUCTION AND FRANCHISE | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
X022022242A23 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A24 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A25 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A26 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A27 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A28 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A29 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A30 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A31 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A32 | 2022-08-30 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A33 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A34 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A84 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A76 | 2022-08-30 | 2022-11-30 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A77 | 2022-08-30 | 2022-11-30 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A78 | 2022-08-30 | 2022-11-30 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A79 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A80 | 2022-08-30 | 2022-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A81 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A82 | 2022-08-30 | 2022-11-30 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A83 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A85 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A86 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A87 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A88 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A89 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A90 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A91 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A92 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A93 | 2022-08-30 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A94 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A95 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A96 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M022022242B11 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B09 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B10 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B08 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B07 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B06 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B05 | 2022-08-30 | 2022-11-30 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B04 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022242B02 | 2022-08-30 | 2022-11-30 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
X022022242A15 | 2022-08-30 | 2022-11-30 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A16 | 2022-08-30 | 2022-11-30 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A17 | 2022-08-30 | 2022-11-30 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A18 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A19 | 2022-08-30 | 2022-11-30 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A20 | 2022-08-30 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A21 | 2022-08-30 | 2022-11-30 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022242A22 | 2022-08-30 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A69 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A85 | 2022-08-17 | 2022-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A86 | 2022-08-17 | 2022-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A87 | 2022-08-17 | 2022-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A88 | 2022-08-17 | 2022-09-01 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A89 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A90 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A91 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A92 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A93 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A94 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A95 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A96 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A97 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A98 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A99 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229B00 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229B01 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229B02 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A83 | 2022-08-17 | 2022-09-01 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A68 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A67 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A66 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A65 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A64 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A63 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A62 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A84 | 2022-08-17 | 2022-09-01 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A61 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A60 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A57 | 2022-08-17 | 2022-09-01 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A58 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A59 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A51 | 2022-08-17 | 2022-09-01 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A52 | 2022-08-17 | 2022-09-01 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A53 | 2022-08-17 | 2022-09-01 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A54 | 2022-08-17 | 2022-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A55 | 2022-08-17 | 2022-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A56 | 2022-08-17 | 2022-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A82 | 2022-08-17 | 2022-09-01 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022229A70 | 2022-08-17 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M012022227A90 | 2022-08-15 | 2022-09-01 | CONDUIT CONSTRUCTION AND FRANCHISE | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
X022022207A66 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A71 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A67 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A65 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A64 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A63 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A62 | 2022-07-26 | 2022-09-01 | TEMP. CONST. SIGNS/MARKINGS | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A61 | 2022-07-26 | 2022-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A60 | 2022-07-26 | 2022-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A59 | 2022-07-26 | 2022-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A56 | 2022-07-26 | 2022-09-01 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A58 | 2022-07-26 | 2022-09-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A57 | 2022-07-26 | 2022-09-01 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A69 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A70 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022207A68 | 2022-07-26 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
M022022188A70 | 2022-07-07 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C57 | 2022-06-15 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C56 | 2022-06-15 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C55 | 2022-06-15 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C54 | 2022-06-15 | 2022-09-01 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C53 | 2022-06-15 | 2022-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C52 | 2022-06-15 | 2022-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C51 | 2022-06-15 | 2022-09-01 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C50 | 2022-06-15 | 2022-09-01 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C58 | 2022-06-15 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022166C59 | 2022-06-15 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
X022022164A46 | 2022-06-13 | 2022-09-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022164A45 | 2022-06-13 | 2022-09-01 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022164A44 | 2022-06-13 | 2022-09-01 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
M022022164B17 | 2022-06-13 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B15 | 2022-06-13 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B16 | 2022-06-13 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
X022022164A50 | 2022-06-13 | 2022-08-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022164A49 | 2022-06-13 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022164A48 | 2022-06-13 | 2022-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
M022022164B09 | 2022-06-13 | 2022-09-01 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B10 | 2022-06-13 | 2022-09-01 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B11 | 2022-06-13 | 2022-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B12 | 2022-06-13 | 2022-09-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B13 | 2022-06-13 | 2022-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022164B14 | 2022-06-13 | 2022-09-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
X022022164A47 | 2022-06-13 | 2022-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022139B05 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B03 | 2022-05-19 | 2022-08-12 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B02 | 2022-05-19 | 2022-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B01 | 2022-05-19 | 2022-08-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B00 | 2022-05-19 | 2022-08-12 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139A99 | 2022-05-19 | 2022-08-12 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139A98 | 2022-05-19 | 2022-08-12 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139A97 | 2022-05-19 | 2022-08-12 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B06 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B07 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B08 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B09 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B10 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B11 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B12 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B13 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B14 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B15 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B16 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B17 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022139B04 | 2022-05-19 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A79 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A80 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A81 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A84 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A85 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A86 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A87 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A82 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A83 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A76 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A68 | 2022-05-18 | 2022-08-12 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A69 | 2022-05-18 | 2022-08-12 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A70 | 2022-05-18 | 2022-08-12 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A71 | 2022-05-18 | 2022-08-12 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A72 | 2022-05-18 | 2022-08-12 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A73 | 2022-05-18 | 2022-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A74 | 2022-05-18 | 2022-08-12 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A75 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A77 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022138A78 | 2022-05-18 | 2022-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
B022022137A17 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012022137A36 | 2022-05-17 | 2022-06-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012022137A35 | 2022-05-17 | 2022-06-17 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022137A28 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A27 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A26 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A25 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A24 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A23 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A22 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A21 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A20 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A19 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A18 | 2022-05-17 | 2022-08-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A16 | 2022-05-17 | 2022-08-13 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A15 | 2022-05-17 | 2022-08-13 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A14 | 2022-05-17 | 2022-08-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A13 | 2022-05-17 | 2022-08-13 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A12 | 2022-05-17 | 2022-08-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A11 | 2022-05-17 | 2022-08-13 | CROSSING SIDEWALK | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A10 | 2022-05-17 | 2022-08-13 | PLACE MATERIAL ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022137A09 | 2022-05-17 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022137A08 | 2022-05-17 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022022130A17 | 2022-05-10 | 2022-07-18 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A18 | 2022-05-10 | 2022-07-18 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A19 | 2022-05-10 | 2022-07-18 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A20 | 2022-05-10 | 2022-07-18 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A21 | 2022-05-10 | 2022-07-18 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A22 | 2022-05-10 | 2022-07-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A23 | 2022-05-10 | 2022-07-18 | TEMP. CONST. SIGNS/MARKINGS | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A24 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A25 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A26 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A27 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A28 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A29 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A30 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A31 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022130A32 | 2022-05-10 | 2022-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B23 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B24 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B25 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B26 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B27 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B29 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080A00 | 2022-03-21 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B09 | 2022-03-21 | 2022-05-14 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B10 | 2022-03-21 | 2022-05-14 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B11 | 2022-03-21 | 2022-05-14 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B12 | 2022-03-21 | 2022-05-14 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B13 | 2022-03-21 | 2022-05-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B14 | 2022-03-21 | 2022-05-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B15 | 2022-03-21 | 2022-05-14 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B16 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B17 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B18 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B19 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B20 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B21 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B22 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M022022080C38 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C39 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C40 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C41 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C42 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C43 | 2022-03-21 | 2022-06-29 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C44 | 2022-03-21 | 2022-06-29 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C45 | 2022-03-21 | 2022-06-29 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C46 | 2022-03-21 | 2022-06-29 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C47 | 2022-03-21 | 2022-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C48 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C49 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C50 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022022080C51 | 2022-03-21 | 2022-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
X022022080B55 | 2022-03-21 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B54 | 2022-03-21 | 2022-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B53 | 2022-03-21 | 2022-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B52 | 2022-03-21 | 2022-06-30 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B51 | 2022-03-21 | 2022-06-30 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B50 | 2022-03-21 | 2022-06-30 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022080B49 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B48 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B47 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B46 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B45 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B44 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B43 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B42 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B41 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B40 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B39 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B38 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B37 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B36 | 2022-03-21 | 2022-05-14 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B35 | 2022-03-21 | 2022-05-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B34 | 2022-03-21 | 2022-05-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B33 | 2022-03-21 | 2022-05-14 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B32 | 2022-03-21 | 2022-05-14 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B31 | 2022-03-21 | 2022-05-14 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B30 | 2022-03-21 | 2022-05-14 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022022080B28 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
B022022080A43 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022080A44 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022080A45 | 2022-03-21 | 2022-05-14 | PLACE MATERIAL ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A46 | 2022-03-21 | 2022-05-14 | CROSSING SIDEWALK | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A47 | 2022-03-21 | 2022-05-14 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A48 | 2022-03-21 | 2022-05-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A49 | 2022-03-21 | 2022-05-14 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A50 | 2022-03-21 | 2022-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A51 | 2022-03-21 | 2022-05-14 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A52 | 2022-03-21 | 2022-05-14 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A53 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A54 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A55 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A56 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A57 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A58 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A59 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A60 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A61 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A62 | 2022-03-21 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A63 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A64 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022080A65 | 2022-03-21 | 2022-05-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022080C35 | 2022-03-21 | 2022-06-29 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C33 | 2022-03-21 | 2022-06-29 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C34 | 2022-03-21 | 2022-06-29 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C36 | 2022-03-21 | 2022-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022022080C37 | 2022-03-21 | 2022-06-29 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
B042022075A71 | 2022-03-16 | 2022-04-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022075B75 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B76 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B77 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B78 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B79 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022075C92 | 2022-03-16 | 2022-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B042022075A70 | 2022-03-16 | 2022-04-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022075C89 | 2022-03-16 | 2022-04-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022075C90 | 2022-03-16 | 2022-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022022075A76 | 2022-03-16 | 2022-03-16 | TEMPORARY PEDESTRIAN WALK | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022022075A77 | 2022-03-16 | 2022-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022022075A78 | 2022-03-16 | 2022-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
B012022075C91 | 2022-03-16 | 2022-04-14 | RESET, REPAIR OR REPLACE CURB | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X022022075A79 | 2022-03-16 | 2022-03-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
B022022075B62 | 2022-03-16 | 2022-06-13 | PLACE MATERIAL ON STREET | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B63 | 2022-03-16 | 2022-06-13 | CROSSING SIDEWALK | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B64 | 2022-03-16 | 2022-06-13 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B65 | 2022-03-16 | 2022-06-13 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B66 | 2022-03-16 | 2022-06-13 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B67 | 2022-03-16 | 2022-06-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B68 | 2022-03-16 | 2022-06-13 | TEMP. CONST. SIGNS/MARKINGS | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B69 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B70 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B71 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B72 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B73 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022075B74 | 2022-03-16 | 2022-06-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022022052A01 | 2022-02-21 | 2022-04-01 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022052A02 | 2022-02-21 | 2022-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022052A04 | 2022-02-21 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022052A05 | 2022-02-21 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022052A06 | 2022-02-21 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022052A03 | 2022-02-21 | 2022-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022022052A00 | 2022-02-21 | 2022-04-01 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
B012022038B12 | 2022-02-07 | 2022-03-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022038A96 | 2022-02-07 | 2022-03-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012022038B13 | 2022-02-07 | 2022-03-08 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B042022038A05 | 2022-02-07 | 2022-03-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B042022038A06 | 2022-02-07 | 2022-03-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012022038A95 | 2022-02-07 | 2022-03-08 | RESET, REPAIR OR REPLACE CURB | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B55 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B042022004A02 | 2022-01-04 | 2022-02-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B042022004A01 | 2022-01-04 | 2022-02-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022004B60 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B59 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B58 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B57 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B56 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B54 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B53 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B52 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B51 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B50 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B49 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B48 | 2022-01-04 | 2022-04-01 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B47 | 2022-01-04 | 2022-04-01 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B46 | 2022-01-04 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B45 | 2022-01-04 | 2022-04-01 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B61 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B44 | 2022-01-04 | 2022-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B43 | 2022-01-04 | 2022-04-01 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B42 | 2022-01-04 | 2022-04-01 | CROSSING SIDEWALK | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B41 | 2022-01-04 | 2022-04-01 | PLACE MATERIAL ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022004B40 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022022004B39 | 2022-01-04 | 2022-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022004A13 | 2022-01-04 | 2022-02-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022004A14 | 2022-01-04 | 2022-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012022004A15 | 2022-01-04 | 2022-02-02 | RESET, REPAIR OR REPLACE CURB | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012022004A16 | 2022-01-04 | 2022-02-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X022021355A19 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A12 | 2021-12-21 | 2022-03-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A13 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A51 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A50 | 2021-12-21 | 2022-03-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A49 | 2021-12-21 | 2022-03-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A23 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
B022021355A20 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A21 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A22 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A23 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A24 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A25 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A26 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A27 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A28 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A29 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022021355A48 | 2021-12-21 | 2022-03-15 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A46 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A45 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A44 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A43 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A42 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A41 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A25 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A26 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A24 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A52 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A40 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A39 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A38 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A37 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A36 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A35 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A34 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A33 | 2021-12-21 | 2022-03-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A32 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A31 | 2021-12-21 | 2022-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A22 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A47 | 2021-12-21 | 2022-03-15 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A30 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A29 | 2021-12-21 | 2022-03-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A28 | 2021-12-21 | 2022-03-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A27 | 2021-12-21 | 2022-03-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A21 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A20 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A11 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A18 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A17 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A16 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A15 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A14 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A01 | 2021-12-21 | 2022-03-31 | TEMPORARY PEDESTRIAN WALK | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021355A02 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021355A03 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021355A04 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021355A05 | 2021-12-21 | 2022-03-15 | OCCUPANCY OF ROADWAY AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021355A06 | 2021-12-21 | 2022-03-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A07 | 2021-12-21 | 2022-03-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A08 | 2021-12-21 | 2022-03-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A09 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021355A10 | 2021-12-21 | 2022-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
B022021355A13 | 2021-12-21 | 2022-03-15 | CROSSING SIDEWALK | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A12 | 2021-12-21 | 2022-03-15 | PLACE MATERIAL ON STREET | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A14 | 2021-12-21 | 2022-03-15 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A15 | 2021-12-21 | 2022-03-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A16 | 2021-12-21 | 2022-03-15 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A17 | 2021-12-21 | 2022-03-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
M022021355A85 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A84 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A83 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A82 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A81 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A80 | 2021-12-21 | 2022-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A79 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A78 | 2021-12-21 | 2022-03-31 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A77 | 2021-12-21 | 2022-03-31 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021355A76 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A75 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A74 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A73 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A72 | 2021-12-21 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A71 | 2021-12-21 | 2022-03-31 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A70 | 2021-12-21 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A69 | 2021-12-21 | 2022-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A67 | 2021-12-21 | 2022-03-31 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021355A68 | 2021-12-21 | 2022-03-31 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
B022021355A18 | 2021-12-21 | 2022-03-15 | TEMP. CONST. SIGNS/MARKINGS | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021355A19 | 2021-12-21 | 2022-03-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022021340A11 | 2021-12-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021340A09 | 2021-12-06 | 2021-12-31 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021340A07 | 2021-12-06 | 2021-12-31 | PLACE MATERIAL ON STREET | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021340A08 | 2021-12-06 | 2021-12-31 | CROSSING SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021340A10 | 2021-12-06 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X022021340A12 | 2021-12-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
B022021336A69 | 2021-12-02 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021336A68 | 2021-12-02 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021336A67 | 2021-12-02 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B022021336A66 | 2021-12-02 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
X022021333A33 | 2021-11-29 | 2021-12-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A34 | 2021-11-29 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A35 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A36 | 2021-11-29 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A37 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A38 | 2021-11-29 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A39 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A40 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A41 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A42 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A43 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A44 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A45 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A46 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A47 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A48 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A49 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A50 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A51 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A81 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A82 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A83 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A84 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A85 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A86 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A87 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A88 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A76 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A89 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A52 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A71 | 2021-11-29 | 2021-12-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A72 | 2021-11-29 | 2021-12-31 | CROSSING SIDEWALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A73 | 2021-11-29 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A74 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A90 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A75 | 2021-11-29 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A77 | 2021-11-29 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A78 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A79 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A80 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
X022021333A28 | 2021-11-29 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021333A29 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021333A30 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021333A31 | 2021-11-29 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
X022021333A32 | 2021-11-29 | 2021-12-31 | PLACE MATERIAL ON STREET | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
B012021326A05 | 2021-11-22 | 2021-12-21 | RESET, REPAIR OR REPLACE CURB | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B042021326A01 | 2021-11-22 | 2021-12-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B042021326A00 | 2021-11-22 | 2021-12-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012021326A03 | 2021-11-22 | 2021-12-21 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012021326A04 | 2021-11-22 | 2021-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012021326A06 | 2021-11-22 | 2021-12-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B73 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B72 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B71 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B70 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B69 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B68 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B67 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B66 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B65 | 2021-11-18 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B64 | 2021-11-18 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B63 | 2021-11-18 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B62 | 2021-11-18 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B61 | 2021-11-18 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B60 | 2021-11-18 | 2021-12-31 | PLACE CONSTRUCTION OFFICE TRAILER ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B59 | 2021-11-18 | 2021-12-31 | CROSSING SIDEWALK | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B58 | 2021-11-18 | 2021-12-31 | PLACE MATERIAL ON STREET | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B74 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B75 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022021322B76 | 2021-11-18 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 51 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
X022021313A28 | 2021-11-09 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VILLA AVENUE, BRONX, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET |
M022021299A89 | 2021-10-26 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A90 | 2021-10-26 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A88 | 2021-10-26 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A87 | 2021-10-26 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A86 | 2021-10-26 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A85 | 2021-10-26 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A84 | 2021-10-26 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A83 | 2021-10-26 | 2021-12-31 | CROSSING SIDEWALK | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M022021299A82 | 2021-10-26 | 2021-12-31 | PLACE MATERIAL ON STREET | WEST 158 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE |
M042021293A21 | 2021-10-20 | 2021-11-18 | REPLACE SIDEWALK | WEST 161 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022021279B19 | 2021-10-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B20 | 2021-10-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B21 | 2021-10-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B12 | 2021-10-06 | 2021-12-31 | PLACE MATERIAL ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B13 | 2021-10-06 | 2021-12-31 | CROSSING SIDEWALK | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B14 | 2021-10-06 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B15 | 2021-10-06 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B16 | 2021-10-06 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B17 | 2021-10-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
M022021279B18 | 2021-10-06 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT WASHINGTON AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 160 STREET |
B042021264A19 | 2021-09-21 | 2021-10-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY |
X042021182A07 | 2021-07-01 | 2021-07-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021182A34 | 2021-07-01 | 2021-07-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X012021182A35 | 2021-07-01 | 2021-07-30 | RESET, REPAIR OR REPLACE CURB | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021182A36 | 2021-07-01 | 2021-07-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X042021182A06 | 2021-07-01 | 2021-07-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X012021182A33 | 2021-07-01 | 2021-07-30 | RESET, REPAIR OR REPLACE CURB | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
B012021137B61 | 2021-05-17 | 2021-06-14 | RESET, REPAIR OR REPLACE CURB | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
B012021137B62 | 2021-05-17 | 2021-06-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
B042021135A01 | 2021-05-15 | 2021-06-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
B042021135A00 | 2021-05-15 | 2021-06-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EASTERN PARKWAY, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
X042021133A00 | 2021-05-13 | 2021-06-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X042021133A01 | 2021-05-13 | 2021-06-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021133A08 | 2021-05-13 | 2021-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021133A07 | 2021-05-13 | 2021-06-10 | RESET, REPAIR OR REPLACE CURB | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021133A06 | 2021-05-13 | 2021-06-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X012021133A05 | 2021-05-13 | 2021-06-10 | RESET, REPAIR OR REPLACE CURB | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X042021117A04 | 2021-04-27 | 2021-05-26 | REPAIR SIDEWALK | BEDFORD PARK BOULEVARD, BRONX, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE |
B042021106A25 | 2021-04-16 | 2021-05-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EASTERN PARKWAY, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET |
B042021106A26 | 2021-04-16 | 2021-05-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
B012021106C33 | 2021-04-16 | 2021-05-15 | RESET, REPAIR OR REPLACE CURB | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
B012021106C34 | 2021-04-16 | 2021-05-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | ATLANTIC AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE |
X042021092A05 | 2021-04-02 | 2021-04-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021092A46 | 2021-04-02 | 2021-04-30 | RESET, REPAIR OR REPLACE CURB | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X012021092A45 | 2021-04-02 | 2021-04-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X012021092A44 | 2021-04-02 | 2021-04-30 | RESET, REPAIR OR REPLACE CURB | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X012021092A47 | 2021-04-02 | 2021-04-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 198 STREET, BRONX, FROM STREET MARION AVENUE TO STREET POND PLACE |
X042021092A04 | 2021-04-02 | 2021-04-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARION AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE |
X012021085A11 | 2021-03-26 | 2021-05-01 | RESET, REPAIR OR REPLACE CURB | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021085A10 | 2021-03-26 | 2021-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021085A09 | 2021-03-26 | 2021-05-01 | RESET, REPAIR OR REPLACE CURB | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X042021085A03 | 2021-03-26 | 2021-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X042021085A02 | 2021-03-26 | 2021-04-23 | REPAIR SIDEWALK | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
X042021085A05 | 2021-03-26 | 2021-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X042021085A04 | 2021-03-26 | 2021-05-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021085A13 | 2021-03-26 | 2021-05-01 | RESET, REPAIR OR REPLACE CURB | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X012021085A14 | 2021-03-26 | 2021-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X012021085A12 | 2021-03-26 | 2021-05-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X042021074A03 | 2021-03-15 | 2021-04-01 | REPAIR SIDEWALK | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X042021069A13 | 2021-03-10 | 2021-04-01 | REPAIR SIDEWALK | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021065A00 | 2021-03-06 | 2021-04-01 | RESET, REPAIR OR REPLACE CURB | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X042021065A02 | 2021-03-06 | 2021-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X042021065A01 | 2021-03-06 | 2021-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X042021065A00 | 2021-03-06 | 2021-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021065A05 | 2021-03-06 | 2021-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X012021065A01 | 2021-03-06 | 2021-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021065A02 | 2021-03-06 | 2021-04-01 | RESET, REPAIR OR REPLACE CURB | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021065A03 | 2021-03-06 | 2021-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021065A04 | 2021-03-06 | 2021-04-01 | RESET, REPAIR OR REPLACE CURB | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X042021039A05 | 2021-02-08 | 2021-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X042021039A04 | 2021-02-08 | 2021-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021039A95 | 2021-02-08 | 2021-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X012021039A94 | 2021-02-08 | 2021-03-11 | RESET, REPAIR OR REPLACE CURB | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X012021039A93 | 2021-02-08 | 2021-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021039A91 | 2021-02-08 | 2021-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021039A92 | 2021-02-08 | 2021-03-11 | RESET, REPAIR OR REPLACE CURB | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021039A90 | 2021-02-08 | 2021-03-11 | RESET, REPAIR OR REPLACE CURB | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X042021039A06 | 2021-02-08 | 2021-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X012021013B11 | 2021-01-13 | 2021-02-09 | RESET, REPAIR OR REPLACE CURB | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X042021013A07 | 2021-01-13 | 2021-02-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
X042021013A06 | 2021-01-13 | 2021-02-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021013B08 | 2021-01-13 | 2021-02-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021013B07 | 2021-01-13 | 2021-02-09 | RESET, REPAIR OR REPLACE CURB | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X042021013A05 | 2021-01-13 | 2021-02-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MANIDA STREET, BRONX, FROM STREET BEND TO STREET SPOFFORD AVENUE |
X012021013B09 | 2021-01-13 | 2021-02-09 | RESET, REPAIR OR REPLACE CURB | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021013B10 | 2021-01-13 | 2021-02-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | SPOFFORD AVENUE, BRONX, FROM STREET COSTER STREET TO STREET MANIDA STREET |
X012021013B12 | 2021-01-13 | 2021-02-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | COSTER STREET, BRONX, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE |
B012020324A33 | 2020-11-19 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | STANLEY AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B012020324A26 | 2020-11-19 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WORTMAN AVENUE, BROOKLYN, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE |
B012020324A25 | 2020-11-19 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VAN SICLEN AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012020324A24 | 2020-11-19 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | STANLEY AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B012020324A36 | 2020-11-19 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | SCHENCK AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012020324A27 | 2020-11-19 | 2020-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | SCHENCK AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B012020276C96 | 2020-10-02 | 2020-11-02 | OPEN SIDEWALK TO INSTALL FOUNDATION | 4 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
B012020248A97 | 2020-09-04 | 2020-10-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | STANLEY AVENUE, BROOKLYN, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE |
B012020248A96 | 2020-09-04 | 2020-10-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | SCHENCK AVENUE, BROOKLYN, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE |
B042020163A08 | 2020-06-11 | 2020-07-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HEGEMAN AVENUE, BROOKLYN, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD |
X012019137A91 | 2019-05-17 | 2019-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEBSTER AVENUE, BRONX, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET |
X012019137A92 | 2019-05-17 | 2019-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 204 STREET, BRONX, FROM STREET WEBSTER AVENUE TO STREET PEDESTRIAN OVERPASS |
X012019037A80 | 2019-02-06 | 2019-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEBSTER AVENUE, BRONX, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET |
X012019037A82 | 2019-02-06 | 2019-03-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 204 STREET, BRONX, FROM STREET WEBSTER AVENUE TO STREET PEDESTRIAN OVERPASS |
X012019037A79 | 2019-02-06 | 2019-03-07 | RESET, REPAIR OR REPLACE CURB | WEBSTER AVENUE, BRONX, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET |
X012019037A81 | 2019-02-06 | 2019-03-07 | RESET, REPAIR OR REPLACE CURB | EAST 204 STREET, BRONX, FROM STREET WEBSTER AVENUE TO STREET PEDESTRIAN OVERPASS |
Start date | End date | Type | Value |
---|---|---|---|
2021-06-16 | 2024-01-18 | Address | 3152 ALBANY CRESCENT, BRONX, NY, 10463, USA (Type of address: Service of Process) |
2012-11-28 | 2021-06-16 | Address | 525 LONGFELLOW AVENUE, BRONX, NY, 10474, USA (Type of address: Service of Process) |
2008-06-03 | 2012-11-28 | Address | 33 BONNIE BRIAR LANE, LARCHMONT, NY, 10538, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240118003977 | 2024-01-18 | BIENNIAL STATEMENT | 2024-01-18 |
210616000426 | 2021-06-16 | CERTIFICATE OF AMENDMENT | 2021-06-16 |
200608060367 | 2020-06-08 | BIENNIAL STATEMENT | 2020-06-01 |
180604008460 | 2018-06-04 | BIENNIAL STATEMENT | 2018-06-01 |
160608006215 | 2016-06-08 | BIENNIAL STATEMENT | 2016-06-01 |
140610006459 | 2014-06-10 | BIENNIAL STATEMENT | 2014-06-01 |
121128006108 | 2012-11-28 | BIENNIAL STATEMENT | 2012-06-01 |
100707002529 | 2010-07-07 | BIENNIAL STATEMENT | 2010-06-01 |
080912000786 | 2008-09-12 | CERTIFICATE OF PUBLICATION | 2008-09-12 |
080603000251 | 2008-06-03 | ARTICLES OF ORGANIZATION | 2008-06-03 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-25 | No data | COMMONWEALTH AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence behind property in compliance |
2024-10-25 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | please notify Permittee:50951 - GALAXY G.C. GROUP LLC to remove barriers from roadway parking lane adjacent to bike lane and sidewalk serving no purpose. Ifo 5108 4th avenue |
2024-10-17 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2024-10-08 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Green construction fence installed for construction site 1542 |
2024-09-18 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2024-07-31 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SW1 corner found not to be ADA compliant. Measured & collected in Prism on 2/22/23. Expansion joints has been installed. |
2024-06-17 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway not on site at this time. |
2024-06-13 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Concrete Pump on site at this time. |
2024-05-30 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No construction trailer on site at this time. |
2024-05-22 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | five-digit ID number in the front and back |
2024-05-21 | No data | BROADWAY, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ID 50951 placed on the sign |
2024-04-30 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway at this time, permit still active. |
2024-04-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has crossing s/w. |
2024-04-03 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit for barricades |
2024-04-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No material on site. |
2024-03-07 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has JLG LIFT machine, Yodocks, gated fence blocking the sidewalk. Was ID by DOT expired 11/30/23 permit. No one on site working. |
2024-02-26 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is open |
2024-02-12 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of roadway found newly repaved for new building |
2024-02-03 | No data | BROADWAY, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed a “No Parking Anytime” sign posted without any ID information. Respondent failed to affix their 5 digit ID number in lower corner right/left (front or back) of the sign using a waterproof label or sticker. DOB permit# 321589125-01-NB |
2024-01-16 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is in compliance at this time. |
2024-01-08 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant are non ada compliant, the ramps are functional and accessible. Measured and collected in prism on 2/22/23. Expansion joints has been installed. |
2024-01-04 | No data | BROADWAY, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed a “No Parking Anytime” sign posted without any ID information. Respondent failed to affix 5-digit to temporary construction signage. Respondent ID by cited permit. |
2024-01-04 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed a “No Parking/Standing Anytime” sign posted without any ID information. Respondent failed to affix 5-digit to temporary construction signage. Respondent ID by cited permit. |
2023-12-18 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is clear at this time in compliance at this time . |
2023-12-11 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 5ft pedestrian walkway on sidewalk in compliance has scaffolding |
2023-11-21 | No data | COMMONWEALTH AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Port-o-San behind fence |
2023-11-18 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-11-18 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2023-11-09 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2023-10-27 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New s/w curb |
2023-10-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has s/w open for ped |
2023-10-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete s/w |
2023-10-11 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Bronx ) office within four hours prior to paving. As per stipulation 1/2+ 5. And roadway was paved, |
2023-10-10 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Port-o-San 1 |
2023-10-06 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/t/p/o I observed the above respondent failed to comply with the conditions and agreement of this permit by violating stipulation BIKE01 THE PERMITTEE MUST CREATE A TEMPORARY BIKEWAY AROUND THE WORK ZONE DELINEATED BY CONES OR SIMILAR VERTICAL |
2023-09-26 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk open |
2023-09-21 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/t/p/o I observed the above respondent with a construction container in the roadway without a valid dot permit on file, was id by dob permit x00569062-l1-fn |
2023-09-07 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/t/p/o I observed the respondent occupying the roadway with jersey barriers without a valid dot permit, therefore a summons has been issued for use of the roadway without a valid dot permit. Was id by expired permit permit expired 8/3/23 |
2023-09-05 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. |
2023-09-02 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2023-08-31 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced refer to Permit# M152022097A54 for paving information. |
2023-07-28 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No crosswalk activity at time of inspection |
2023-07-21 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open excavation sidewalk updated permit on file |
2023-06-29 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of r.w paved in compliance |
2023-06-28 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-06-24 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has active permit. Has open excavation to install s/w curb. |
2023-06-24 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has signs posted. |
2023-06-20 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass in compliance |
2023-06-19 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work lift at this time |
2023-06-12 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in place |
2023-06-12 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-06-10 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2023-06-09 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started |
2023-06-09 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass no materials on the street |
2023-05-27 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | resealed |
2023-05-25 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence removed |
2023-05-25 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fence removed |
2023-05-25 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fence removed |
2023-05-18 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New s/w curb I/F/O 3069. |
2023-04-29 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe behind fence |
2023-04-26 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2023-04-17 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plastic barricades in use maintaining bike lane in the parking lane. |
2023-04-07 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. Permittee failed to seal and install expansion joints in the SE4 corner.Measured and collected in Prism on 9/24/21. |
2023-04-05 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IN THE DRIVING LANE. |
2023-03-10 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No lull in use. |
2023-02-25 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Manlift behind fence |
2023-02-25 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Vehicles parked at location of restoration |
2023-02-24 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit for bob cat behind fence |
2023-02-23 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit for Material in the street |
2023-02-19 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parkng lane IFO COMMUNITY CENTER |
2023-02-18 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No BPP observed at this time. |
2023-02-16 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No forklift stored |
2023-02-14 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No port o san stored |
2023-01-31 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2023-01-06 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Signs posted correctly ifo and opp location, Which span adjacent to opp property. |
2022-12-15 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee Galaxy G.C Group permit type placed jersey barriers on the street as stipulated. At the time of my post audit inspection is in compliance with the DOT rules and regulations. |
2022-11-28 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. Permittee failed to seal and install expansion joints in the SE4 corner.M&C in Prism on 9/24/21. |
2022-10-25 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | manlift not visible |
2022-10-08 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and sidewalk in compliance |
2022-10-08 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb and sidewallk in compliance |
2022-10-06 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2022-10-04 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee Galaxy G C Group LLC permit type to occupancy of roadway as stipulated currently in compliance with the DOT rules and regulation . |
2022-10-04 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/0/O I discovered the above respondent failure to provide street protection under construction container in the parking lane. The street shall be shielded by wooden planking, skids or other protective covering min 1.1/2” approved for the roadway |
2022-10-03 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee permit type place equipment is for a concrete pump Security guard booth behind a green plywood fence currently in compliance with the DOT rules and regulation . |
2022-10-02 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 9/24/21. |
2022-10-02 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb in compliance |
2022-10-01 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and sidewalk in compliance |
2022-09-27 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | container not visible |
2022-09-19 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No plastic barriers on site. 2-way protected bike lane is clear. |
2022-09-14 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No boom truck on site |
2022-09-13 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Place equipment other than crane or shov |
2022-09-06 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit for materials on street. |
2022-09-02 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crossing not observed |
2022-08-11 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | material behind fence |
2022-08-01 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK NOT DONE |
2022-07-25 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 9/24/21. |
2022-07-23 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2022-07-23 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Material behind fence |
2022-06-29 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | manlift not visible |
2022-06-28 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO container stored |
2022-06-12 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and crtbin compiance |
2022-06-12 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and curb in compliance |
2022-06-05 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of the sidewalk |
2022-06-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Place open construction debris container on street |
2022-05-27 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 9/24/21. |
2022-05-20 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No generator |
2022-05-20 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No port o san found |
2022-05-20 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No manlift |
2022-05-19 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence on sidewalk in compliance |
2022-05-16 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence is in compliance at this time. |
2022-05-08 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass |
2022-05-07 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No boom stored |
2022-05-02 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb and sidewalk flags have been installed in front of 5108. |
2022-04-28 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed in compliance |
2022-04-15 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 9/24/21. |
2022-04-14 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No backhoe on location |
2022-04-14 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2022-04-07 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk clear |
2022-04-05 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No material on the street |
2022-04-04 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M022022080C33 on file |
2022-04-03 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP not done |
2022-03-18 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed in compliance |
2022-03-18 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb/expansion joints installed, no sealer applied. |
2022-03-16 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to Silver foreman on site has barricades on the parking lanes on a 1 way street. Email complaint. |
2022-02-26 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No KNUCKLE BOOM |
2022-02-24 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Full swk restoration for newly constructed building. Only missing sealer for expansion joints throughout swk. Protected bikeway is clear. |
2022-02-10 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site restoring swk for new building. Metal fence occupying full swk, asked foreman to remove all machinery from bike lane. |
2022-02-04 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe not present at time of inspection. |
2022-02-02 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has jersey barricades in the p/l. |
2022-01-31 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB |
2022-01-26 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new sidewalk flags have been installed at this time. |
2022-01-20 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence Is in compliance at this time. |
2022-01-11 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB |
2022-01-11 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has 6' walkway on the s/w |
2022-01-11 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT |
2022-01-05 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No material on the roadway at this time |
2022-01-05 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Port-O-San not on site |
2021-12-29 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Lift in parking lane at 4th Ave. |
2021-12-27 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2021-12-27 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Manlift on location |
2021-12-21 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2021-12-21 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection, active work being done in area. |
2021-12-16 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | okay |
2021-12-11 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | not currently on site. |
2021-12-07 | No data | FT WASHINGTON AVENUE, FROM STREET BEND TO STREET WEST 160 STREET | No data | Street Construction Inspections: Active | Department of Transportation | okay |
2021-11-29 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, new curb .. Install .. |
2021-11-22 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Material stored behind fence |
2021-11-21 | No data | WEST 161 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2021-11-13 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No compressor observed at the construction site, at the time of inspection |
2021-11-12 | No data | WEST 158 STREET, FROM STREET BROADWAY TO STREET EDWARD M MORGAN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | not currently on site. |
2021-11-12 | No data | BEDFORD PARK BOULEVARD, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the sidewalk i/f/o 33 Bedford Park Boulevard |
2021-11-10 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Excavator observed on the street, at the time of inspection i/f/o 3069 Villa Avenue |
2021-11-09 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, new curb ..,install |
2021-11-07 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit B042021264A19 obtained. |
2021-10-25 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner found non to be ADA compliant, Ramps are functional and accessible. Previously measured & collected in Prism on 9/24/21. |
2021-10-21 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2021-10-01 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Knuckle boom/No equipment knuckle boom on site |
2021-09-28 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2021-09-28 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete pump not visible |
2021-09-24 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Ramps are functional and accessible. Measured & collected in Prism on 9/24/21. |
2021-09-21 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2021-09-17 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | boom truck not visible |
2021-09-13 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 on file for the new completed tangent ramps on the Se4 corner. We’ll measure and collect at a later date. |
2021-09-05 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk i/f/o new building |
2021-08-28 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 'ROADWAY RESURFACED IN FRONT OF THE COMMUNITY CENTER |
2021-08-27 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE |
2021-08-27 | No data | STANLEY AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2021-08-27 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3FT PAVEMENT DONE ONLY |
2021-08-13 | No data | BEDFORD PARK BOULEVARD, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at this time |
2021-08-13 | No data | BEDFORD PARK BOULEVARD, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | barriers on site in compliance |
2021-08-07 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building, curb and sidewalk in compliance |
2021-08-07 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building, curb and sidewalk in compliance |
2021-08-07 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building, curb and sidewalk in compliance |
2021-07-31 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work almost completed |
2021-07-30 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work almost completed |
2021-07-30 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | work almost complete |
2021-07-29 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | work almost completed, Fence not on location |
2021-07-28 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, acceptable |
2021-07-17 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset |
2021-07-06 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New s/w, curbs. |
2021-07-06 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012021182A35 |
2021-07-06 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | New s/w curb |
2021-07-06 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | New s/w |
2021-06-25 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Knuckle Boom visible at the construction site, at the time of inspection i/f/o 3069 Villa Avenue |
2021-06-17 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed on active BO. |
2021-06-17 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | fence s/w |
2021-06-17 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2021-06-14 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Maintain fence on the sidewalk. |
2021-06-14 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP work started |
2021-06-14 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP work started |
2021-06-14 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-06-14 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No activity is observed at sidewalk crossing, at the time of inspection |
2021-06-12 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No material observed on the street i/f/o 3054 Villa Avenue |
2021-06-11 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No activity observed at sidewalk crossing, at the time of inspection i/f/o 2885 Marion Avenue |
2021-06-11 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the street i/f/o 3054 Villa Avenue |
2021-06-10 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers on the street i/f/o 3054 Villa Avenue |
2021-06-10 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-06-10 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-06-08 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | JERSEY BARRIERS STORED ON THE SIDE WALK |
2021-06-04 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No material observed on the street |
2021-06-04 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No material observed at the construction site, at the time of inspection |
2021-06-03 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-06-03 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE NEW PERMIT ON FILE |
2021-06-03 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | chain link fence s/w |
2021-06-02 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2021-05-30 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TIMBER BARRICADE ON THE ROADWAY |
2021-05-29 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Installation of Temp Construction Signs Posted in Compliance |
2021-05-29 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Storage of Backhoe found at Work Site |
2021-05-29 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | JERSEY BARRIERS ON THE ROADWAY |
2021-05-28 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new curb ....s/s .. |
2021-05-27 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied at time |
2021-05-15 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway at time of inspection. |
2021-05-15 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway at time of inspection |
2021-05-11 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp signs acceptable |
2021-05-10 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work completed at location |
2021-05-10 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crossing s.w acceptable |
2021-05-10 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | work complete at location |
2021-05-08 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCTION CONTAINER ON THE ROADWAY |
2021-05-08 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | concrete pump not on site |
2021-05-07 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work at location |
2021-05-03 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. signed waiver form provided in supporting documents. |
2021-04-30 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-04-30 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-04-14 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #879 VAN SICLEN AVENUE |
2021-04-14 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please restore/repair the 2’ 8” WIDTH of the roadway to the minimum requirement of 30‘ in front of building #271 WORTMAN AVENUE (as per the BPP 1/2 +5 restoration entire WIDTH of the roadway curb to curb 50’), in a timely fashion. CAR issued |
2021-04-13 | No data | STANLEY AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of building #654-664 STANLEY AVENUE |
2021-04-11 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED |
2021-04-11 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO EXCAVATOR ON THE ROADWAY |
2021-04-07 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe |
2021-04-07 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY |
2021-04-01 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed |
2021-04-01 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-04-01 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-04-01 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2021-03-25 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO visible excavator on location |
2021-03-24 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2021-03-24 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2021-03-15 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is occupied. |
2021-03-11 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | parking lane resurfaced in front of the community center |
2021-03-09 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence is maintained |
2021-03-09 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence is maintained. |
2021-03-05 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk is occupied |
2021-03-02 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk is occupied |
2021-03-02 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Construction office trailer is stored on the roadway. |
2021-02-24 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is occupied. |
2021-02-22 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Equipment placed on the street |
2021-02-21 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Galaxy G C Group LLC permit X042021013A07 has expired permit and have a updated permit # X042021039A06. |
2021-02-21 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Project Lead Address 700 Manida Street No work done due to snow/ice to reset, repair or replace curb |
2021-02-21 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The security guard on the site not willing to move the orange water/sand fillable jersey barrier - 32” H x 72” L x 24” W, in order to MAINTAIN A 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY/ WHEELCHAIR IN THE ROADWAY. |
2021-02-17 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Construction Container is stored on the roadway |
2021-02-17 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fence is maintained |
2021-02-10 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs are posted |
2021-02-09 | No data | BEDFORD PARK BOULEVARD, FROM STREET GRAND CONCOURSE TO STREET VILLA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2021-02-09 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site |
2021-02-08 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway is occupied |
2021-02-06 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | MR - BXEC 18-261 FULL SIDEWALK CLOSURE. CONTRACTORS MAY OCCUPY 8 X 250 ONLY OF ROADWAY SPACE. |
2021-02-06 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Boom Truck |
2021-02-05 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | PEDESTRIAN WALK |
2021-02-05 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file |
2021-02-03 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2021-01-26 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permit Active |
2021-01-24 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved .... |
2021-01-11 | No data | STANLEY AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not done |
2021-01-05 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not done |
2020-12-12 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO BACKHOE ON SITE |
2020-12-06 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | not started .... |
2020-12-05 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | FENCE INSTALLED |
2020-12-04 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY HAS FINISHED BEINGM PAVED 100FT BY 2FT 5IN |
2020-12-04 | No data | STANLEY AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | UPON INSPECTION ROADWAY IS MILLED {L}176FT X {W}2FT 5IN BECAUSE OF VARIANCE WITH A DEPTH OF 3 INCHES |
2020-12-03 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway - 50Width of roadway after mil - 2'6"Length of the roadway - 255'Depth of roadway - 3Paver is unable to completely mil the road. The paver stated that he will be back tomorrow to tow vehicles. |
2020-12-03 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway - 52'Width of roadway after mil - 16'Length of the roadway - 142'Depth of roadway - 2.5" |
2020-11-30 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete pump |
2020-11-23 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no bob cat |
2020-11-20 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp signs posted |
2020-11-01 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No material on street |
2020-10-30 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | backhoe behind fence |
2020-10-30 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | MATERIAL ON STREET |
2020-10-30 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2020-10-30 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence maintained |
2020-10-29 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TIMBER BARRICADES ON THE ROADWAY |
2020-10-29 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate on Sidewalk |
2020-10-28 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has maintained fence |
2020-10-28 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Has crossing sidewalk |
2020-10-28 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs are posted |
2020-10-26 | No data | VILLA AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | container behind fence |
2020-10-24 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No Port-o-San on site. |
2020-10-11 | No data | STANLEY AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work found under this expired permit |
2020-10-11 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work found under this expired permit |
2020-10-11 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work found under this expired permit |
2020-10-11 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work found under this expired permit |
2020-10-07 | No data | VAN SICLEN AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway. |
2020-10-07 | No data | WORTMAN AVENUE, FROM STREET SCHENCK AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway. |
2020-10-07 | No data | SCHENCK AVENUE, FROM STREET STANLEY AVENUE TO STREET WORTMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway. |
2020-10-07 | No data | STANLEY AVENUE, FROM STREET HENDRIX STREET TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started on roadway. |
2020-10-02 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plastic jersey barricades in roadway |
2020-10-02 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | timber barricades not used |
2020-10-01 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in place. |
2020-09-29 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No Port-o-San on site. |
2020-09-10 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO EXCAVATOR ON THE ROADWAY |
2020-09-01 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plastic Barricades |
2020-08-16 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TIMBER BARRICADES ON THE ROADWAY |
2020-08-13 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE INSTALLED |
2020-08-07 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO COMPRESSOR ON THE ROADWAY |
2020-08-06 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TIMBER BARRICADES ON THE ROADWAY |
2020-08-04 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TIMBER BARRICADES ON THE ROADWAY |
2020-08-03 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP. CONST. SIGNS/MARKINGS |
2020-07-24 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Jersey Barriers in place |
2020-07-10 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TIMBER BARRICADES ON THE ROADWAY |
2020-07-09 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMP. CONST. SIGNS/MARKINGS |
2020-07-09 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Jersey Barriers in place |
2020-07-02 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-24 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Jersey Barriers in place |
2020-06-12 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Fork lift on location |
2020-06-11 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2020-06-11 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No crossing sidewalk work at this time. |
2020-06-10 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No visible excavator on location |
2020-06-09 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2020-06-08 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK, acceptable |
2020-06-02 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon my inspection and determination currently site Plastic Barrier 26 are in compliance with DOT rules and regulations |
2020-05-21 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2020-05-21 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass |
2020-05-21 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | In compliance |
2020-04-07 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | material acceptable |
2020-04-03 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of r.w acceptable |
2020-04-02 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material in parking lane |
2020-03-17 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Material is placed behind the fence i/f/o 1860 Eastern Parkway |
2020-03-17 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | concrete jersey barriers on the street AKA 1860 Eastern Parkway |
2020-03-17 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe |
2020-03-17 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - PLACE MATERIAL ON STREET |
2020-03-13 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on the roadway |
2020-03-04 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | port-o-san on the property line |
2020-02-26 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Fence maintained |
2020-02-26 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Yellow Forklift stored on the street in front of building operation, without a NYCDOT storage of equipment permit on file for a Forklift. Respondent was ID by their Department of building permit #321184302-01-NB Expires 05/12/2020. |
2020-02-25 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Materials on street behind barriers. |
2020-02-16 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey Barrier |
2020-02-13 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I discovered the above respondent with the use of the parking lane, without a valid DOT permit. Respondent has 4 plastic water filled barricades in the parking lane. Above permit No # X012019009A16 expires 4/07/2019 used to identify for I.D. |
2020-02-11 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on the roadway |
2020-02-11 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV |
2020-01-31 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence on the sidewalk |
2020-01-27 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | HAD CREW MOVE BARRICADES TO OPEN RWY |
2020-01-25 | No data | 4 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2020-01-11 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Lift on site |
2020-01-11 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no office trailer on the roadway |
2020-01-10 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk crossing ... |
2020-01-10 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Boom Truck on site |
2020-01-10 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | construction signs posted |
2020-01-09 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Materials on street behind fence |
2020-01-07 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no backhoe on site |
2019-12-30 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | NO BACK HOE ON THE ROADWAY |
2019-12-19 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container on roadway. |
2019-12-19 | No data | WATKINS STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No construction container in front of property #647 permit valid. |
2019-11-24 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plastic jersey barriers on street |
2019-11-24 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | port o san behind fence |
2019-10-31 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate on Sidewalk |
2019-10-10 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe |
2019-10-03 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plastic jersey barriers in roadway |
2019-10-03 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | timber barricades removed |
2019-08-31 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Fence on the sidewalk |
2019-08-27 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Materials on street |
2019-07-15 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Signs posted |
2019-06-07 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Materials placed on street |
2019-06-05 | No data | EAST 204 STREET, FROM STREET WEBSTER AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | on E.204 street, paving in progress of roadway milled 1/2 + 5' |
2019-06-05 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway milled 35' WEC IFO 3100 Webster Avenue awaiting top upon arrival |
2019-04-20 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO BOOM TRUCK AT TIME OF INSPECTION |
2019-04-04 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is occupied with fence AKA 1860 Eastern parkway |
2019-04-04 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | No timber barricades observed on the street i/f/o 1860 Eastern Parkway |
2019-04-01 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK |
2019-03-31 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | maintain fence on sidewalk |
2019-03-31 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | maintain fence on sidewalk |
2019-03-28 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | MATERIAL ON STREET |
2019-03-24 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2019-03-22 | No data | ATLANTIC AVENUE, FROM STREET EASTERN PARKWAY TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate on Sidewalk |
2019-03-11 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2019-03-11 | No data | EAST 204 STREET, FROM STREET WEBSTER AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2019-02-26 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING SIDEWALK |
2019-02-23 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Excavator |
2019-02-22 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIGNS POSTED |
2019-02-18 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb and sidewalk in compliance |
2019-02-11 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | temp cost sn ofcc |
2019-02-11 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | maintain fence on sidewalk |
2019-02-11 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crossing sidewalk in use |
2019-02-05 | No data | 51 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | GENERATOR BEHIND THE FENCE |
2019-01-28 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crossing sidewalk in compliance |
2019-01-15 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No backhoe at time of inspection |
2019-01-14 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO MATERIAL ON STREET |
2019-01-14 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO CONCRETE PUMP AT TIME OF INSPECTION |
2019-01-14 | No data | COSTER STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crossing sidewalk in compliance |
2018-12-21 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plastic jersey barriers in portion of roadway at this time. |
2018-12-02 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Fence maintained |
2018-12-02 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Full sidewalk closure with fence maintained |
2018-12-02 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No crossing sidewalk at this time |
2018-11-18 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No crossing sidewalk at this time |
2018-11-18 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Fence maintained |
2018-11-18 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Temp construction signs posted |
2018-11-06 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material on street at this time. |
2018-11-06 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | no forklift on site at this time. |
2018-10-29 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied |
2018-10-15 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired |
2018-10-01 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Fence on sidewalk in-compliance |
2018-09-30 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Port-o-san behind fence |
2018-09-28 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | one bobcat on r/w |
2018-09-25 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | NO MATERIAL |
2018-09-25 | No data | EASTERN PARKWAY, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence erected |
2018-09-18 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No container on site at this time. |
2018-09-13 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs/markings posted |
2018-08-25 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat on site |
2018-08-20 | No data | MANIDA STREET, FROM STREET BEND TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp parking signs posted at this time; site in compliance. |
2018-08-20 | No data | SPOFFORD AVENUE, FROM STREET COSTER STREET TO STREET MANIDA STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temporary parking signs posted at location during this time; site in compliance. |
2018-08-17 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | temporary construction signs posted at this time; site in compliance. |
2018-08-17 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | temporary construction signs posted at this time; site in compliance. |
2018-08-17 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no Signs on location at this time. |
2018-08-05 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | TEMP. CONST. SIGNS/MARKINGS POSTED |
2018-08-01 | No data | WEBSTER AVENUE, FROM STREET EAST 203 STREET TO STREET EAST 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has new sidewalk curb. |
2018-08-01 | No data | MARION AVENUE, FROM STREET EAST 198 STREET TO STREET OLIVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plywood fence on sidewalk |
2018-08-01 | No data | MARION AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Active | Department of Transportation | active permit for crossing sidewalk |
2018-08-01 | No data | EAST 198 STREET, FROM STREET MARION AVENUE TO STREET POND PLACE | No data | Street Construction Inspections: Active | Department of Transportation | portion of sidewalk occupied with fence |
2018-08-01 | No data | EAST 204 STREET, FROM STREET WEBSTER AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk. |
2018-07-15 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | TEMP. CONST. SIGNS/MARKINGS POSTED |
2018-06-20 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | TEMP. CONST. SIGNS/MARKINGS POSTED |
2018-05-09 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Temporary construction signs posted |
2018-04-20 | No data | HEGEMAN AVENUE, FROM STREET NEW LOTS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No Port-o-San observed at this time |
THE LLC
HITTERZZ, LLC PLJ PROPERTIES, LLC 7119 20TH AVE. LLC THE TALLY-HO INN, LLC HAGOP TANKIAN LLC NEXIS REALTY GROUP, LLC KILBORN LLC BKN PROPERTIES, LLC COTTON TEES, LLC PLAYDATE 4 YOU LLC3152 ALBANY CRESCENT, BRONX, NY, United States, 10463
10 NATHAN DAVIS LLC 1117 HOE LLC 1230 ASSOCIATES LLC 13 SOUTH 6TH ST LLC 13 SOUTH SIXTH LLC 1347/49 CWEALTH LLC 140 EDGECOMBE LLC 1422 ASSOCIATES LLC 1422 NELSON AVENUE CORP. 151 BRUCKNER LLCDate of last update: 09 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated