Name: | AKELA CONTRACTING LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 27 Apr 2009 (16 years ago) |
Entity Number: | 3803322 |
County: | Westchester |
Place of Formation: | New York |
Activity Description: | Akela typically performs work related to utilities. We install water mains and associated appurtances such as fire hydrants, gate valves, and services to buildings. We also install both sanitary and storm sewers and variety of structures that feed into the sewers such as building' house connections, catch basins, and manholes. We perform all concrete and waterproofing work required to build underground structures such as value boxes, chambers, and sewer manholes. We will relocate, offset, remove and/or install new conduits and ducts for Con Ed, Verizon, and Cable Vision in order to install out utilities. Depending on client, we will perform excavation required to install the above utility work as well as all restoration of roadways, curbs, and sidewalks disturbed by the required excavation. |
Address: | 113 EDISON AVENUE, MOUNT VERNON, NY, United States, 10550 |
Address ZIP Code: | 10550 |
Contact Details
Phone +1 718-328-4900
Website https://www.akelacontracting.com
Unique Entity ID | Expiration Date | Physical Address | Mailing Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
LMKXP3886GV4 | 2023-08-01 | 113 EDISON AVE, MOUNT VERNON, NY, 10550, 5005, USA | 113 EDISON AVE, MOUNT VERNON, NY, 10550, 5005, USA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
URL | www.akelacontracting.com |
Congressional District | 16 |
State/Country of Incorporation | NY, USA |
Activation Date | 2022-08-12 |
Initial Registration Date | 2022-07-29 |
Entity Start Date | 2009-04-30 |
Fiscal Year End Close Date | Dec 31 |
Service Classifications
NAICS Codes | 221310, 237110, 237310, 237990, 238220, 238910, 238990 |
Points of Contacts
Electronic Business | |
---|---|
Title | PRIMARY POC |
Name | KARINE WILLIAMS |
Role | PRESIDENT |
Address | 113 EDISON AVENUE, MT VERNON, NY, 10583, USA |
Title | ALTERNATE POC |
Name | DEXTER HOLGUIN |
Role | OFFICE ENGINEER |
Address | 113 EDISON AVENUE, MT VERNON, NY, 10550, USA |
Government Business | |
---|---|
Title | PRIMARY POC |
Name | KARINE WILLIAMS |
Role | PRESIDENT |
Address | 113 EDISON AVENUE, MT VERNON, NY, 10550, USA |
Title | ALTERNATE POC |
Name | KARINE WILLIAMS |
Role | PRESIDENT |
Address | 113 EDISON AVENUE, MT VERNON, NY, 10550, USA |
Past Performance | |
---|---|
Title | PRIMARY POC |
Name | KARINE WILLIAMS |
Role | PRESIDENT |
Address | 113 EDISON AVENUE, MT VERNON, NY, 10550, USA |
Title | ALTERNATE POC |
Name | DEXTER HOLGUIN |
Role | OFFICE ENGINEER |
Address | 113 EDISON AVENUE, MT VERNON, NY, 10550, USA |
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
AKELA CONTRACTING LLC 401(K) PLAN | 2023 | 320282524 | 2024-05-07 | AKELA CONTRACTING LLC | 21 | |||||||||||||||||||||
|
Role | Plan administrator |
Date | 2024-05-07 |
Name of individual signing | KARINE WILLIAMS |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2017-01-01 |
Business code | 238220 |
Sponsor’s telephone number | 7183284900 |
Plan sponsor’s address | 113 EDISON AVENUE, MT. VERNON, NY, 10550 |
Signature of
Role | Plan administrator |
Date | 2023-06-06 |
Name of individual signing | KARINE WILLIAMS |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2017-01-01 |
Business code | 238220 |
Sponsor’s telephone number | 7183284900 |
Plan sponsor’s address | 113 EDISON AVENUE, MT. VERNON, NY, 10550 |
Signature of
Role | Plan administrator |
Date | 2022-05-24 |
Name of individual signing | KARINE WILLIAMS |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2017-01-01 |
Business code | 238220 |
Sponsor’s telephone number | 7183284900 |
Plan sponsor’s address | 113 EDISON AVENUE, MT. VERNON, NY, 10550 |
Signature of
Role | Plan administrator |
Date | 2021-03-17 |
Name of individual signing | KARINE WILLIAMS |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2017-01-01 |
Business code | 238220 |
Sponsor’s telephone number | 7183284900 |
Plan sponsor’s address | 732 GARRISON AVENUE, BRONX, NY, 10474 |
Signature of
Role | Plan administrator |
Date | 2020-03-24 |
Name of individual signing | KARINE WILLIAMS |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2017-01-01 |
Business code | 238220 |
Sponsor’s telephone number | 7183284900 |
Plan sponsor’s address | 732 GARRISON AVENUE, BRONX, NY, 10474 |
Signature of
Role | Plan administrator |
Date | 2019-05-06 |
Name of individual signing | KARINE WILLIAMS |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2017-01-01 |
Business code | 238220 |
Sponsor’s telephone number | 7183284900 |
Plan sponsor’s address | 732 GARRISON AVENUE, BRONX, NY, 10474 |
Signature of
Role | Plan administrator |
Date | 2018-07-17 |
Name of individual signing | KARINE WILLIAMS |
Name | Role | Address |
---|---|---|
AKELA CONTRACTING LLC | DOS Process Agent | 113 EDISON AVENUE, MOUNT VERNON, NY, United States, 10550 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
M022024297A55 | 2024-10-23 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q042024292A28 | 2024-10-18 | 2024-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q012024292D21 | 2024-10-18 | 2024-11-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012024292D20 | 2024-10-18 | 2024-11-24 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
B012024292E67 | 2024-10-18 | 2024-11-15 | C.A.R. RESTORATION | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
Q042024292A26 | 2024-10-18 | 2024-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q042024292A27 | 2024-10-18 | 2024-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q012024292D22 | 2024-10-18 | 2024-11-24 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
M002024292A44 | 2024-10-18 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M022024281B24 | 2024-10-07 | 2024-11-02 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012024271B12 | 2024-09-27 | 2024-11-02 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q042024267A22 | 2024-09-23 | 2024-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q042024267A24 | 2024-09-23 | 2024-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q042024267A23 | 2024-09-23 | 2024-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q012024267B72 | 2024-09-23 | 2024-10-25 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q012024267B73 | 2024-09-23 | 2024-10-25 | RESET, REPAIR OR REPLACE CURB | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012024267B74 | 2024-09-23 | 2024-10-25 | RESET, REPAIR OR REPLACE CURB | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
M012024242A13 | 2024-08-29 | 2024-10-03 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q022024235B08 | 2024-08-22 | 2024-11-27 | PLACE MATERIAL ON STREET | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q022024235B10 | 2024-08-22 | 2024-11-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q022024235B11 | 2024-08-22 | 2024-11-27 | PLACE MATERIAL ON STREET | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q022024235B12 | 2024-08-22 | 2024-11-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q022024235B13 | 2024-08-22 | 2024-11-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q042024235A53 | 2024-08-22 | 2024-09-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q042024235A52 | 2024-08-22 | 2024-09-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q042024235A51 | 2024-08-22 | 2024-09-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012024235D05 | 2024-08-22 | 2024-09-26 | RESET, REPAIR OR REPLACE CURB | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q012024235D04 | 2024-08-22 | 2024-09-26 | RESET, REPAIR OR REPLACE CURB | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012024235D03 | 2024-08-22 | 2024-09-26 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
M022024235D87 | 2024-08-22 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | BATTERY PLACE, MANHATTAN, FROM STREET 1 PLACE TO STREET BEND |
Q022024235B09 | 2024-08-22 | 2024-11-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
M012024222A96 | 2024-08-09 | 2024-09-03 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012024222A95 | 2024-08-09 | 2024-09-03 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q042024221A09 | 2024-08-08 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q042024221A08 | 2024-08-08 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q042024221A07 | 2024-08-08 | 2024-08-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012024220A56 | 2024-08-07 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q022024220A07 | 2024-08-07 | 2024-08-30 | PLACE MATERIAL ON STREET | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q022024220A08 | 2024-08-07 | 2024-08-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q022024220A09 | 2024-08-07 | 2024-08-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q022024220A10 | 2024-08-07 | 2024-08-30 | PLACE MATERIAL ON STREET | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q022024220A11 | 2024-08-07 | 2024-08-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q022024220A12 | 2024-08-07 | 2024-08-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q012024220A58 | 2024-08-07 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET |
Q012024220A57 | 2024-08-07 | 2024-08-27 | RESET, REPAIR OR REPLACE CURB | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
M012024213B73 | 2024-07-31 | 2024-09-01 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022024213A17 | 2024-07-31 | 2024-08-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BATTERY PLACE, MANHATTAN, FROM STREET 1 PLACE TO STREET BEND |
M022024169B80 | 2024-06-17 | 2024-06-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPRING STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 6 AVENUE |
M022024169B79 | 2024-06-17 | 2024-06-28 | OCCUPANCY OF ROADWAY AS STIPULATED | SPRING STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 6 AVENUE |
X042024114A00 | 2024-04-23 | 2024-04-26 | REPAIR SIDEWALK | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
Q022024085C94 | 2024-03-25 | 2024-04-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q022024085C92 | 2024-03-25 | 2024-04-23 | PLACE MATERIAL ON STREET | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q022024085C95 | 2024-03-25 | 2024-04-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
Q022024085C93 | 2024-03-25 | 2024-04-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD |
X042024010A15 | 2024-01-10 | 2024-02-02 | REPAIR SIDEWALK | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
X022024010A84 | 2024-01-10 | 2024-02-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
X012023340A57 | 2023-12-06 | 2023-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
X012023289B36 | 2023-10-16 | 2023-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X012023289B37 | 2023-10-16 | 2023-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | THIERIOT AVENUE, BRONX, FROM STREET WATSON AVENUE |
X012023289B34 | 2023-10-16 | 2023-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WATSON AVENUE, BRONX, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE |
X012023289B35 | 2023-10-16 | 2023-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | DEAD END, BRONX, FROM STREET THIERIOT AVENUE |
X042023284A16 | 2023-10-11 | 2023-11-08 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | THIERIOT AVENUE, BRONX, FROM STREET WATSON AVENUE |
X042023284A15 | 2023-10-11 | 2023-11-08 | REPLACE SIDEWALK | WATSON AVENUE, BRONX, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE |
X022023283A26 | 2023-10-10 | 2023-11-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X042023283A53 | 2023-10-10 | 2023-11-06 | REPLACE SIDEWALK | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X022023283A25 | 2023-10-10 | 2023-11-06 | PLACE MATERIAL ON STREET | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
M012023271C09 | 2023-09-28 | 2023-10-21 | TEST PITS, CORES OR BORING - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X042023251A94 | 2023-09-08 | 2023-10-07 | REPLACE SIDEWALK | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X022023251A35 | 2023-09-08 | 2023-10-07 | PLACE MATERIAL ON STREET | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X022023251A36 | 2023-09-08 | 2023-10-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X042023250A09 | 2023-09-07 | 2023-09-27 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | THIERIOT AVENUE, BRONX, FROM STREET WATSON AVENUE |
M012023233B18 | 2023-08-21 | 2023-09-21 | TEST PITS, CORES OR BORING - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023233B17 | 2023-08-21 | 2023-09-28 | TEST PITS, CORES OR BORING | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023233B21 | 2023-08-21 | 2023-11-14 | PLACE MATERIAL ON STREET | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023233B22 | 2023-08-21 | 2023-11-20 | PLACE MATERIAL ON STREET | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023233B19 | 2023-08-21 | 2023-09-28 | TEST PITS, CORES OR BORING | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023233B24 | 2023-08-21 | 2023-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023233B25 | 2023-08-21 | 2023-11-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023233B26 | 2023-08-21 | 2023-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023233B27 | 2023-08-21 | 2023-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023233B23 | 2023-08-21 | 2023-11-14 | PLACE MATERIAL ON STREET | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
X012023230A15 | 2023-08-18 | 2023-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
X022023208A11 | 2023-07-27 | 2023-09-30 | PLACE MATERIAL ON STREET | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
M012023206B33 | 2023-07-25 | 2023-08-29 | TEST PITS, CORES OR BORING | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023206D17 | 2023-07-25 | 2023-08-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023206D16 | 2023-07-25 | 2023-08-29 | PLACE MATERIAL ON STREET | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023206D18 | 2023-07-25 | 2023-08-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012023206B32 | 2023-07-25 | 2023-08-29 | TEST PITS, CORES OR BORING | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
X012023205B72 | 2023-07-24 | 2023-08-09 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
M022023205C56 | 2023-07-24 | 2023-08-22 | PLACE MATERIAL ON STREET | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023205C57 | 2023-07-24 | 2023-08-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023205B07 | 2023-07-24 | 2023-08-22 | TEST PITS, CORES OR BORING - PROTECTED | VANDAM STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
X042023180A10 | 2023-06-29 | 2023-07-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET WEST 195 STREET |
X042023180A09 | 2023-06-29 | 2023-07-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | JEROME AVENUE, BRONX, FROM STREET WEST 195 STREET |
X022023180A88 | 2023-06-29 | 2023-07-28 | PLACE MATERIAL ON STREET | JEROME AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET |
M012023156A78 | 2023-06-05 | 2023-07-30 | TEST PITS, CORES OR BORING | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023156A77 | 2023-06-05 | 2023-07-30 | TEST PITS, CORES OR BORING | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012023145B95 | 2023-05-25 | 2023-06-30 | TEST PITS, CORES OR BORING | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M012023145B94 | 2023-05-25 | 2023-06-30 | TEST PITS, CORES OR BORING | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023145E92 | 2023-05-25 | 2023-08-24 | PLACE MATERIAL ON STREET | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023145E93 | 2023-05-25 | 2023-08-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023144A05 | 2023-05-24 | 2023-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023144A04 | 2023-05-24 | 2023-05-26 | PLACE MATERIAL ON STREET | HUDSON STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
X022023144A05 | 2023-05-24 | 2023-06-15 | PLACE MATERIAL ON STREET | THIERIOT AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
X042023144A03 | 2023-05-24 | 2023-06-17 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | THIERIOT AVENUE, BRONX, FROM STREET WATSON AVENUE |
X042023144A04 | 2023-05-24 | 2023-06-15 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | THIERIOT AVENUE, BRONX, FROM STREET WATSON AVENUE |
M022023117B59 | 2023-04-27 | 2023-07-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 58 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET SUTTON PLACE |
M022023117B58 | 2023-04-27 | 2023-07-26 | PLACE MATERIAL ON STREET | EAST 58 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET SUTTON PLACE |
M012023116B43 | 2023-04-26 | 2023-05-31 | TEST PITS, CORES OR BORING | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023116B71 | 2023-04-26 | 2023-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023116B69 | 2023-04-26 | 2023-07-30 | PLACE MATERIAL ON STREET | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023116B70 | 2023-04-26 | 2023-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012023116B42 | 2023-04-26 | 2023-05-31 | TEST PITS, CORES OR BORING | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023110B00 | 2023-04-20 | 2023-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012023110B32 | 2023-04-20 | 2023-05-01 | TEST PITS, CORES OR BORING | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M012023110B33 | 2023-04-20 | 2023-05-01 | TEST PITS, CORES OR BORING | SPRING STREET, MANHATTAN, FROM STREET HUDSON STREET TO STREET VARICK STREET |
M022023110A99 | 2023-04-20 | 2023-05-01 | PLACE MATERIAL ON STREET | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
M022023110B01 | 2023-04-20 | 2023-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VARICK STREET, MANHATTAN, FROM STREET SPRING STREET TO STREET VANDAM STREET |
Q022023094D04 | 2023-04-04 | 2023-05-01 | PLACE MATERIAL ON STREET | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q012023094D05 | 2023-04-04 | 2023-05-01 | OPEN SIDEWALK TO INSTALL FOUNDATION | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
Q022023094D05 | 2023-04-04 | 2023-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET |
M012023088A58 | 2023-03-29 | 2023-04-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 58 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET SUTTON PLACE |
M022023088A49 | 2023-03-29 | 2023-04-27 | PLACE MATERIAL ON STREET | EAST 58 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET SUTTON PLACE |
M022023088A50 | 2023-03-29 | 2023-04-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 58 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET SUTTON PLACE |
M042023088A00 | 2023-03-29 | 2023-04-27 | REPAIR SIDEWALK | EAST 58 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET SUTTON PLACE |
B012023039B70 | 2023-02-08 | 2023-03-18 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012023039B71 | 2023-02-08 | 2023-03-18 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012023039B69 | 2023-02-08 | 2023-03-18 | MAJOR INSTALLATIONS - WATER | WEST 23 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012023018B80 | 2023-01-18 | 2023-02-16 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012023018B78 | 2023-01-18 | 2023-02-16 | MAJOR INSTALLATIONS - WATER | WEST 23 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012023018B79 | 2023-01-18 | 2023-02-16 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022340B95 | 2022-12-06 | 2023-03-17 | PLACE MATERIAL ON STREET | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022340B38 | 2022-12-06 | 2023-01-11 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022022340B98 | 2022-12-06 | 2023-03-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022340B97 | 2022-12-06 | 2023-03-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022340B96 | 2022-12-06 | 2023-03-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022340B36 | 2022-12-06 | 2023-01-11 | MAJOR INSTALLATIONS - WATER | WEST 23 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022340B37 | 2022-12-06 | 2023-01-11 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022313A15 | 2022-11-09 | 2022-12-12 | MAJOR INSTALLATIONS - WATER | WEST 23 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022313A16 | 2022-11-09 | 2022-12-12 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022313A17 | 2022-11-09 | 2022-12-12 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022299A60 | 2022-10-26 | 2022-11-12 | MAJOR INSTALLATIONS - WATER | WEST 23 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022287A76 | 2022-10-14 | 2022-11-12 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022287A77 | 2022-10-14 | 2022-11-12 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022287A75 | 2022-10-14 | 2022-11-12 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B042022272A27 | 2022-09-29 | 2022-10-27 | REPAIR SIDEWALK | COLUMBIA STREET, BROOKLYN, FROM STREET COLUMBIA STREET ESPLANADE TO STREET BEND |
B042022272A25 | 2022-09-29 | 2022-10-27 | REPAIR SIDEWALK | HALLECK STREET, BROOKLYN, FROM STREET BEARD STREET TO STREET COLUMBIA STREET |
B042022272A26 | 2022-09-29 | 2022-10-27 | REPAIR SIDEWALK | COLUMBIA STREET, BROOKLYN, FROM STREET HALLECK STREET TO STREET SIGOURNEY STREET |
B012022270C61 | 2022-09-27 | 2022-10-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022270C62 | 2022-09-27 | 2022-10-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022022262E16 | 2022-09-19 | 2022-12-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022262E17 | 2022-09-19 | 2022-12-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022262E18 | 2022-09-19 | 2022-12-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022262D97 | 2022-09-19 | 2022-10-18 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022262E15 | 2022-09-19 | 2022-12-17 | PLACE MATERIAL ON STREET | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022022237B46 | 2022-08-25 | 2022-11-26 | PLACE MATERIAL ON STREET | COLUMBIA STREET, BROOKLYN, FROM STREET HALLECK STREET TO STREET SIGOURNEY STREET |
B042022237A29 | 2022-08-25 | 2022-09-27 | REPAIR SIDEWALK | COLUMBIA STREET, BROOKLYN, FROM STREET COLUMBIA STREET ESPLANADE TO STREET BEND |
B042022237A28 | 2022-08-25 | 2022-09-27 | REPAIR SIDEWALK | COLUMBIA STREET, BROOKLYN, FROM STREET HALLECK STREET TO STREET SIGOURNEY STREET |
B042022237A27 | 2022-08-25 | 2022-09-27 | REPAIR SIDEWALK | HALLECK STREET, BROOKLYN, FROM STREET BEARD STREET TO STREET COLUMBIA STREET |
B022022237B49 | 2022-08-25 | 2022-11-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COLUMBIA STREET, BROOKLYN, FROM STREET COLUMBIA STREET ESPLANADE TO STREET BEND |
B022022237B48 | 2022-08-25 | 2022-11-26 | PLACE MATERIAL ON STREET | COLUMBIA STREET, BROOKLYN, FROM STREET COLUMBIA STREET ESPLANADE TO STREET BEND |
B022022237B47 | 2022-08-25 | 2022-11-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COLUMBIA STREET, BROOKLYN, FROM STREET HALLECK STREET TO STREET SIGOURNEY STREET |
B022022237B45 | 2022-08-25 | 2022-11-26 | PLACE MATERIAL ON STREET | HALLECK STREET, BROOKLYN, FROM STREET BEARD STREET TO STREET COLUMBIA STREET |
B012022237A94 | 2022-08-25 | 2022-09-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022237A95 | 2022-08-25 | 2022-09-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022202B45 | 2022-07-21 | 2022-08-29 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022202B46 | 2022-07-21 | 2022-08-29 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022168B62 | 2022-06-17 | 2022-07-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022168B61 | 2022-06-17 | 2022-07-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022147A04 | 2022-05-27 | 2022-06-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022147A05 | 2022-05-27 | 2022-06-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022117A87 | 2022-04-27 | 2022-05-31 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022117A88 | 2022-04-27 | 2022-05-31 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012022098A06 | 2022-04-08 | 2022-05-01 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022098A07 | 2022-04-08 | 2022-05-01 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022022066B65 | 2022-03-07 | 2022-04-30 | PLACE MATERIAL ON STREET | VAN SINDEREN AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022022066B66 | 2022-03-07 | 2022-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VAN SINDEREN AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022022066B67 | 2022-03-07 | 2022-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VAN SINDEREN AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012022066B58 | 2022-03-07 | 2022-04-06 | MAJOR INSTALLATIONS - SEWER | LIVONIA AVENUE, BROOKLYN, FROM STREET VAN SINDEREN AVENUE |
B012022053B56 | 2022-02-22 | 2022-03-25 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012022053B57 | 2022-02-22 | 2022-03-25 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022053B58 | 2022-02-22 | 2022-03-25 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 24 STREET |
B012022053B59 | 2022-02-22 | 2022-03-25 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
X012022047A70 | 2022-02-16 | 2022-03-20 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X012022047A69 | 2022-02-16 | 2022-03-20 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012022047A71 | 2022-02-16 | 2022-03-20 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
B012022024A75 | 2022-01-24 | 2022-02-27 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 24 STREET |
B012022024A73 | 2022-01-24 | 2022-02-27 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012022024A74 | 2022-01-24 | 2022-02-27 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012022024A76 | 2022-01-24 | 2022-02-27 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
X012022013A41 | 2022-01-13 | 2022-02-18 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012022013A40 | 2022-01-13 | 2022-02-18 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X012022013A39 | 2022-01-13 | 2022-02-18 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
B022021356A85 | 2021-12-22 | 2022-03-25 | PLACE MATERIAL ON STREET | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022021356A84 | 2021-12-22 | 2022-03-25 | PLACE MATERIAL ON STREET | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022021356A86 | 2021-12-22 | 2022-03-25 | TEMPORARY PEDESTRIAN WALK | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022021356A87 | 2021-12-22 | 2022-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022021356A88 | 2021-12-22 | 2022-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022021356A89 | 2021-12-22 | 2022-03-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022021356A90 | 2021-12-22 | 2022-03-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B022021356A91 | 2021-12-22 | 2022-03-25 | TEMPORARY PEDESTRIAN WALK | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022021356A92 | 2021-12-22 | 2022-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022021356A93 | 2021-12-22 | 2022-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022021356A94 | 2021-12-22 | 2022-03-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B022021356A95 | 2021-12-22 | 2022-03-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012021356A36 | 2021-12-22 | 2022-01-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012021356A37 | 2021-12-22 | 2022-01-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021356A38 | 2021-12-22 | 2022-01-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 24 STREET |
B012021356A39 | 2021-12-22 | 2022-01-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
X022021354B84 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X022021354B85 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X022021354B78 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X022021354B79 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X022021354B80 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X012021354A31 | 2021-12-20 | 2022-01-19 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012021354A32 | 2021-12-20 | 2022-03-31 | NYC PARKS - RECONSTRUCTION CONTRACT | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012021354A33 | 2021-12-20 | 2022-01-19 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X012021354A34 | 2021-12-20 | 2022-03-31 | NYC PARKS - RECONSTRUCTION CONTRACT | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X012021354A35 | 2021-12-20 | 2022-01-19 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012021354A36 | 2021-12-20 | 2022-03-31 | NYC PARKS - RECONSTRUCTION CONTRACT | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X022021354B81 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X022021354B82 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X022021354B83 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X022021354B77 | 2021-12-20 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
M012021347A53 | 2021-12-13 | 2022-01-02 | MAJOR INSTALLATIONS - WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021347A54 | 2021-12-13 | 2022-01-02 | REPAIR WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021347A58 | 2021-12-13 | 2022-03-01 | CONTRACT ROADWAY PAVING-PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021347A57 | 2021-12-13 | 2022-01-02 | REPAIR WATER - PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021347A56 | 2021-12-13 | 2022-01-02 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021347A55 | 2021-12-13 | 2021-12-31 | CONTRACT ROADWAY PAVING | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A05 | 2021-11-24 | 2022-03-01 | PLACE MATERIAL ON STREET | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A11 | 2021-11-24 | 2022-03-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A10 | 2021-11-24 | 2022-03-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A09 | 2021-11-24 | 2022-03-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A08 | 2021-11-24 | 2022-03-01 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A07 | 2021-11-24 | 2022-03-01 | TEMPORARY PEDESTRIAN WALK | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021328A06 | 2021-11-24 | 2022-03-01 | CROSSING SIDEWALK | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
X022021321A23 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X022021321A25 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X022021321A29 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X022021321A28 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X022021321A27 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012021321A40 | 2021-11-17 | 2021-12-31 | NYC PARKS - RECONSTRUCTION CONTRACT | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X022021321A26 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X012021321A44 | 2021-11-17 | 2021-12-31 | NYC PARKS - RECONSTRUCTION CONTRACT | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012021321A42 | 2021-11-17 | 2021-12-31 | NYC PARKS - RECONSTRUCTION CONTRACT | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X022021321A24 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
X022021321A21 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X022021321A22 | 2021-11-17 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
B012021280A78 | 2021-10-07 | 2021-10-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012021280A76 | 2021-10-07 | 2021-10-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021280A75 | 2021-10-07 | 2021-10-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
M022021273E42 | 2021-09-30 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021273E41 | 2021-09-30 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021273E40 | 2021-09-30 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021273E39 | 2021-09-30 | 2021-12-31 | CROSSING SIDEWALK | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021273E38 | 2021-09-30 | 2021-12-31 | PLACE MATERIAL ON STREET | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021273B58 | 2021-09-30 | 2021-11-01 | REPAIR WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021273B57 | 2021-09-30 | 2021-11-01 | MAJOR INSTALLATIONS - WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021273E44 | 2021-09-30 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M022021273E43 | 2021-09-30 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012021266A89 | 2021-09-23 | 2021-10-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021266A88 | 2021-09-23 | 2021-10-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012021266A90 | 2021-09-23 | 2021-10-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
M012021260A78 | 2021-09-17 | 2021-10-02 | REPAIR WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021260A81 | 2021-09-17 | 2021-10-02 | REPAIR WATER - PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021260A80 | 2021-09-17 | 2021-10-02 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021260A79 | 2021-09-17 | 2021-10-02 | CONTRACT ROADWAY PAVING | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021260A77 | 2021-09-17 | 2021-10-02 | MAJOR INSTALLATIONS - WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
X012021258A23 | 2021-09-15 | 2021-10-21 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012021258A21 | 2021-09-15 | 2021-10-21 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012021258A22 | 2021-09-15 | 2021-10-21 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
M012021253A33 | 2021-09-10 | 2021-10-02 | REPAIR WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021253A36 | 2021-09-10 | 2021-10-02 | CONTRACT ROADWAY PAVING | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021253A32 | 2021-09-10 | 2021-10-02 | MAJOR INSTALLATIONS - WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021252A06 | 2021-09-09 | 2021-12-01 | CONTRACT ROADWAY PAVING-PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021252A05 | 2021-09-09 | 2021-10-02 | REPAIR WATER - PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012021252A04 | 2021-09-09 | 2021-10-02 | MAJOR INSTALLATIONS - WATER-PROTECTED | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
X012021251A98 | 2021-09-08 | 2021-09-30 | FINAL RESTORATION ONLY - PROTECTED | EAST 183 STREET, BRONX, FROM STREET RYER AVENUE TO STREET VALENTINE AVENUE |
B012021237A61 | 2021-08-25 | 2021-09-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012021237A63 | 2021-08-25 | 2021-09-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012021237A62 | 2021-08-25 | 2021-09-30 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
X012021235A39 | 2021-08-23 | 2021-09-21 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET THWAITES PLACE TO STREET WARING AVENUE |
X012021235A43 | 2021-08-23 | 2021-09-21 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET MACE AVENUE TO STREET WARING AVENUE |
X012021235A41 | 2021-08-23 | 2021-09-21 | REPAIR WATER | BRONX PARK EAST, BRONX, FROM STREET WARING AVENUE |
B012021214A10 | 2021-08-02 | 2021-08-31 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012021211A47 | 2021-07-30 | 2021-08-31 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021211A48 | 2021-07-30 | 2021-08-31 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012021180B85 | 2021-06-29 | 2021-07-28 | TRIBUTARY INSTALL - STEAM - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET |
B012021159B02 | 2021-06-08 | 2021-07-02 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021159B03 | 2021-06-08 | 2021-07-02 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012021158D57 | 2021-06-07 | 2021-07-02 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012021158D56 | 2021-06-07 | 2021-07-02 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021154A47 | 2021-06-03 | 2021-07-02 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012021154A48 | 2021-06-03 | 2021-07-02 | TRIBUTARY INSTALL - STEAM - PROTECTED | WEST 24 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
Q012021144A47 | 2021-05-24 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q042021133A28 | 2021-05-13 | 2021-06-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042021133A27 | 2021-05-13 | 2021-06-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012021118B21 | 2021-04-28 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012021118A52 | 2021-04-28 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q042021112A23 | 2021-04-22 | 2021-05-21 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042021112A11 | 2021-04-22 | 2021-05-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012021112A19 | 2021-04-22 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012021112A20 | 2021-04-22 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q012021111B64 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012021111B69 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012021111B70 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012021111B83 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012021111B84 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012021111B85 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012021111B86 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012021111B87 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MURDOCK AVENUE, QUEENS, FROM STREET 175 STREET TO STREET LINDEN BOULEVARD |
Q012021111B88 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012021111B89 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012021111B90 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012021111B91 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012021111B92 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q012021111B93 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012021111B94 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012021111B95 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012021111B96 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012021111B97 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012021111B98 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012021111B68 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q042021111A29 | 2021-04-21 | 2021-05-27 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q012021111B56 | 2021-04-21 | 2021-06-21 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012021089C77 | 2021-03-30 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q042021088A11 | 2021-03-29 | 2021-04-27 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q012021088C57 | 2021-03-29 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MURDOCK AVENUE, QUEENS, FROM STREET 175 STREET TO STREET LINDEN BOULEVARD |
Q012021088A32 | 2021-03-29 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012021088A31 | 2021-03-29 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012021077A82 | 2021-03-18 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012021075B40 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012021075B41 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012021075B43 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012021075B45 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012021075B49 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012021075B52 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012021075B54 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012021075B56 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012021075B57 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q012021075B58 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012021075B60 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012021075B61 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012021075B63 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012021075B64 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012021075B66 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012021075B67 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012021075B68 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012021075B69 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012021075B99 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012021075C00 | 2021-03-16 | 2021-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020346D03 | 2020-12-11 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020346C41 | 2020-12-11 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020343A21 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012020343A24 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020343A26 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020343A18 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012020343A20 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012020343A23 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020343A03 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012020343A13 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020343A02 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012020343A05 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012020343A28 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012020343A29 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012020343A66 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020343A07 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012020343A67 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020343A27 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012020343A11 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012020343A14 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012020343A16 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012020343A17 | 2020-12-08 | 2021-03-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q042020318A03 | 2020-11-13 | 2021-01-10 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020318A02 | 2020-11-13 | 2021-01-10 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020314A20 | 2020-11-09 | 2020-12-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020307A53 | 2020-11-02 | 2020-11-30 | FINAL RESTORATION ONLY | 44 DRIVE, QUEENS, FROM STREET 23 STREET TO STREET HUNTER STREET |
Q012020307A54 | 2020-11-02 | 2020-11-30 | FINAL RESTORATION ONLY | 23 STREET, QUEENS, FROM STREET 44 DRIVE TO STREET 44 ROAD |
Q012020307A52 | 2020-11-02 | 2020-11-30 | FINAL RESTORATION ONLY - PROTECTED | 23 STREET, QUEENS, FROM STREET 44 DRIVE |
Q012020297A03 | 2020-10-23 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q042020294A00 | 2020-10-20 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020294A01 | 2020-10-20 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q012020290C15 | 2020-10-16 | 2020-11-23 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012020290C14 | 2020-10-16 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020290A76 | 2020-10-16 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020288B03 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q042020288A41 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A42 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020288A43 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A44 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A45 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020288A46 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A47 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A51 | 2020-10-14 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A52 | 2020-10-14 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020288A55 | 2020-10-14 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020288A56 | 2020-10-14 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A57 | 2020-10-14 | 2020-12-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020288A58 | 2020-10-14 | 2020-11-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020288B16 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012020288B15 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012020288B14 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012020288B13 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020288B11 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020288B10 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020288B08 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012020288B07 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012020288B05 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020288B04 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012020288B02 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012020288B00 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012020288A99 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012020288A97 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012020288A96 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012020288A69 | 2020-10-14 | 2020-11-23 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020288B31 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020288B29 | 2020-10-14 | 2020-12-31 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q012020288B28 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012020288B17 | 2020-10-14 | 2020-12-31 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020273B97 | 2020-09-29 | 2020-10-05 | FINAL RESTORATION ONLY | 217 STREET, QUEENS, FROM STREET 75 AVENUE TO STREET 77 AVENUE |
Q042020223A09 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020223A07 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020223A11 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q042020223A06 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020223A05 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020223A04 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020223A03 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020223A08 | 2020-08-10 | 2020-09-19 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q012020216C44 | 2020-08-03 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020216C42 | 2020-08-03 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020216C43 | 2020-08-03 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET NATIONAL STREET |
Q012020213A01 | 2020-07-31 | 2020-08-07 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012020213A44 | 2020-07-31 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020206B91 | 2020-07-24 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020206B92 | 2020-07-24 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 103 STREET TO STREET ROOSEVELT AVENUE |
Q012020204A12 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 40 ROAD TO STREET 41 AVENUE |
Q012020204A03 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET NATIONAL STREET |
Q012020204A04 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET NATIONAL STREET |
Q012020204A05 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012020204A06 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012020204A64 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020204A07 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020204A09 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020204A10 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020204A11 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012020204A13 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020204A45 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012020204A46 | 2020-07-22 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 18 AVENUE |
Q012020204A65 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012020204A66 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012020204A69 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012020204A70 | 2020-07-22 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 23 AVENUE, QUEENS, FROM STREET 212 STREET TO STREET BEND |
Q012020204A79 | 2020-07-22 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 16 AVENUE, QUEENS, FROM STREET 212 STREET TO STREET BELL BOULEVARD |
Q012020204A80 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020204A81 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012020204A82 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012020204A83 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012020204A84 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012020204A85 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012020204A86 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012020204A87 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012020204A88 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012020204A89 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020204A90 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012020204A91 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020204A92 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020204B07 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NATIONAL STREET |
Q012020204B08 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 39 AVENUE |
Q012020204B15 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020204B16 | 2020-07-22 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q042020204A24 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020204A25 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020204A26 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020204A27 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020204A32 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020204A33 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020204A35 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020204A63 | 2020-07-22 | 2020-08-20 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020203D09 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012020203B93 | 2020-07-21 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q012020203B94 | 2020-07-21 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 102 STREET |
Q012020203B95 | 2020-07-21 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 102 STREET |
Q012020203B96 | 2020-07-21 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 42 AVENUE |
Q012020203B97 | 2020-07-21 | 2020-10-27 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012020203C83 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 99 STREET TO STREET BEND |
Q012020203C84 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q012020203C86 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012020203D07 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020203D08 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 100 STREET TO STREET 102 STREET |
Q012020203D40 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020203B50 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NYCTA SUBWAY |
Q012020203B51 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q012020203D41 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020203D42 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020203C85 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012020203B52 | 2020-07-21 | 2020-10-27 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020183B03 | 2020-07-01 | 2020-10-16 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020182A74 | 2020-06-30 | 2020-10-16 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012020181B02 | 2020-06-29 | 2020-10-16 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q042020133A05 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020133A02 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020133A06 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020133A03 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020133A07 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020133A04 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020133A08 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020133A09 | 2020-05-12 | 2020-06-25 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020118B47 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012020118B45 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012020118B44 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012020118B43 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012020118B42 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012020118B28 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020118B27 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q012020118B26 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020118B25 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020118B24 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NYCTA SUBWAY |
Q012020118B75 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012020118B74 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012020118B73 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020118B68 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012020118B67 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020118B56 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012020118B51 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012020118B49 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020118B48 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012020118B46 | 2020-04-27 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q042020115A02 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020115A01 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020115A00 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020115A04 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020115A03 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020115A05 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020115A39 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020115A65 | 2020-04-24 | 2020-05-26 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020107B28 | 2020-04-16 | 2020-07-18 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012020107B40 | 2020-04-16 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020107B38 | 2020-04-16 | 2020-07-18 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020107A35 | 2020-04-16 | 2020-07-18 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012020107B39 | 2020-04-16 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 103 STREET TO STREET ROOSEVELT AVENUE |
Q012020106A20 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 23 AVENUE, QUEENS, FROM STREET 212 STREET TO STREET BEND |
Q012020106A74 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012020106A73 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012020106A72 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q012020106A71 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 99 STREET TO STREET BEND |
Q012020106A69 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020106A68 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET NATIONAL STREET |
Q012020106A67 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012020106A66 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 100 STREET TO STREET 102 STREET |
Q012020106A65 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020106A64 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q012020106A63 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020106A62 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020106A61 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NYCTA SUBWAY |
Q012020106A60 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012020106A59 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012020106A58 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET NATIONAL STREET |
Q012020106A57 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET NATIONAL STREET |
Q012020106A56 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012020106A55 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 40 ROAD TO STREET 41 AVENUE |
Q012020106A54 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020106A53 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020106A52 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020106A51 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012020106A50 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 42 AVENUE |
Q012020106A48 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 102 STREET |
Q012020106A46 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 102 STREET |
Q012020106A44 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q012020106A42 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020106A02 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020106A03 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012020106A04 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012020106A06 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012020106A08 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q012020106A09 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 18 AVENUE |
Q012020106A11 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012020106A12 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 212 STREET, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020106A13 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 16 AVENUE, QUEENS, FROM STREET 212 STREET TO STREET BELL BOULEVARD |
Q012020106A14 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020106A15 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012020106A16 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 18 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET 212 STREET |
Q012020106A17 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012020106A18 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020106A19 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012020106A21 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020106A23 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012020106A24 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012020106A26 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020106A27 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020106A28 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 23 AVENUE, QUEENS, FROM STREET 215 STREET TO STREET BELL BOULEVARD |
Q012020106A29 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020106A30 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012020106A31 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012020106A32 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q012020106A33 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020106A34 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NATIONAL STREET |
Q012020106A35 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 39 AVENUE |
Q012020106A37 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020106A40 | 2020-04-15 | 2020-07-29 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020106A41 | 2020-04-15 | 2020-07-29 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | NATIONAL STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020091C83 | 2020-03-31 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020091C87 | 2020-03-31 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020091C86 | 2020-03-31 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020071C51 | 2020-03-11 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020070A17 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NYCTA SUBWAY |
Q012020070A16 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020070A15 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 100 STREET TO STREET 102 STREET |
Q012020070A14 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012020070A13 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET |
Q042020070A00 | 2020-03-10 | 2020-04-09 | PED RAMP MODIFY/INSTALL GOVERNMENT | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020070A05 | 2020-03-10 | 2020-04-09 | PED RAMP MODIFY/INSTALL GOVERNMENT | 103 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020070A01 | 2020-03-10 | 2020-04-09 | PED RAMP MODIFY/INSTALL GOVERNMENT | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020070A32 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020070A31 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020070A30 | 2020-03-10 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET NATIONAL STREET |
Q012020069B54 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 40 ROAD TO STREET 41 AVENUE |
Q042020069A06 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020069A07 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020069A08 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020069A09 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020069A10 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020069A11 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020069A12 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020069A15 | 2020-03-09 | 2020-04-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020069B53 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020069B52 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012020069B33 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET NATIONAL STREET |
Q012020069B32 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET NATIONAL STREET |
Q012020069B31 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020069B30 | 2020-03-09 | 2020-04-30 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012020062A75 | 2020-03-02 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012020059D19 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NATIONAL STREET |
Q012020059D20 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 39 AVENUE |
Q012020059D21 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020059D22 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q012020059D23 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012020059D24 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 99 STREET TO STREET BEND |
Q012020059D26 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012020059D25 | 2020-02-28 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q012020056A95 | 2020-02-25 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012020056B00 | 2020-02-25 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET NATIONAL STREET |
Q012020056A98 | 2020-02-25 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q012020056A97 | 2020-02-25 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 100 STREET TO STREET 102 STREET |
Q012020056A99 | 2020-02-25 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020052C14 | 2020-02-21 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MURDOCK AVENUE |
Q042020052A16 | 2020-02-21 | 2020-03-24 | PED RAMP MODIFY/INSTALL GOVERNMENT | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q042020052A22 | 2020-02-21 | 2020-03-24 | PED RAMP MODIFY/INSTALL GOVERNMENT | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020052C12 | 2020-02-21 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET MERRICK BOULEVARD |
Q012020052C13 | 2020-02-21 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 173 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020052C22 | 2020-02-21 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET LINDEN BOULEVARD |
Q012020052C23 | 2020-02-21 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET MURDOCK AVENUE |
Q012020051A44 | 2020-02-20 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 212 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET BEND |
Q012020051A51 | 2020-02-20 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 23 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET BEND |
Q012020051A56 | 2020-02-20 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 18 AVENUE TO STREET 23 AVENUE |
Q012020051A57 | 2020-02-20 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET BEND |
Q012020051A58 | 2020-02-20 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | BELL BOULEVARD, QUEENS, FROM STREET 24 AVENUE TO STREET BEND |
Q042020051B10 | 2020-02-20 | 2020-03-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020051B05 | 2020-02-20 | 2020-03-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020051B08 | 2020-02-20 | 2020-03-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020051B09 | 2020-02-20 | 2020-03-24 | PED RAMP MODIFY/INSTALL GOVERNMENT | 18 AVENUE, QUEENS, FROM STREET 212 STREET |
Q042020051B06 | 2020-02-20 | 2020-03-13 | PED RAMP MODIFY/INSTALL GOVERNMENT | 23 AVENUE, QUEENS, FROM STREET BELL BOULEVARD |
Q042020051B07 | 2020-02-20 | 2020-03-24 | PED RAMP MODIFY/INSTALL GOVERNMENT | 16 AVENUE, QUEENS, FROM STREET 212 STREET |
Q012020049B84 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD |
Q012020049B86 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET 173 STREET |
Q012020049B87 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 173 STREET TO STREET MURDOCK AVENUE |
Q012020049B88 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET MURDOCK AVENUE |
Q012020049B89 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 174 STREET TO STREET 175 STREET |
Q012020049B90 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE |
Q012020049B91 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MERRICK BOULEVARD, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020049B92 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 174 STREET, QUEENS, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD |
Q012020049B93 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | MARNE PLACE, QUEENS, FROM STREET 113 AVENUE TO STREET MURDOCK AVENUE |
Q012020049B85 | 2020-02-18 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | LINDEN BOULEVARD, QUEENS, FROM STREET 172 STREET TO STREET MERRICK BOULEVARD |
Q042020043A03 | 2020-02-12 | 2020-03-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 103 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020043A01 | 2020-02-12 | 2020-03-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020043A02 | 2020-02-12 | 2020-03-10 | PED RAMP MODIFY/INSTALL GOVERNMENT | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020042A04 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020042A13 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020042A12 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | NATIONAL STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020042A11 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q042020042A10 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 41 AVENUE, QUEENS, FROM STREET NATIONAL STREET |
Q042020042A09 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020042A08 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020042A07 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020042A06 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q042020042A05 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020042A02 | 2020-02-11 | 2020-03-12 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020041A22 | 2020-02-10 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NYCTA SUBWAY |
Q012020041A20 | 2020-02-10 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012020041C16 | 2020-02-10 | 2020-05-01 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020038B60 | 2020-02-07 | 2020-04-19 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020038B63 | 2020-02-07 | 2020-04-19 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012020030B51 | 2020-01-30 | 2020-04-19 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012020030B53 | 2020-01-30 | 2020-04-19 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012020028B48 | 2020-01-28 | 2020-04-19 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012020027B00 | 2020-01-27 | 2020-02-21 | REPAIR WATER | 37 AVENUE, QUEENS, FROM STREET 43 STREET TO STREET 48 STREET |
Q042020027A27 | 2020-01-27 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020027A28 | 2020-01-27 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042020027A25 | 2020-01-27 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020021D85 | 2020-01-21 | 2020-04-19 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | ROOSEVELT AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q042020015A12 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 41 AVENUE, QUEENS, FROM STREET NATIONAL STREET |
Q042020015A14 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020015A15 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020015A16 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q042020015A17 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q042020015A18 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q042020015A25 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | NATIONAL STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020015B10 | 2020-01-15 | 2020-04-11 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q012020015B14 | 2020-01-15 | 2020-04-11 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012020015B13 | 2020-01-15 | 2020-04-11 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q042020015A13 | 2020-01-15 | 2020-02-11 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET NATIONAL STREET |
Q012019351E07 | 2019-12-17 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET NATIONAL STREET |
Q012019351E06 | 2019-12-17 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
Q012019351E03 | 2019-12-17 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q042019346A20 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A04 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 97 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A03 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 97 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A06 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 97 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A11 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 95 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A12 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 95 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A13 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 95 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A14 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A15 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A16 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 105 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A17 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 105 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A18 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 105 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A19 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 101 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A05 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 97 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A21 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 102 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A22 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A23 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 104 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A24 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A25 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A26 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A27 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A28 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 98 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A29 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 98 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019346A30 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 98 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012019346A74 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012019346A73 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012019346A72 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET BEND TO STREET NATIONAL STREET |
Q012019346A71 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 99 STREET TO STREET BEND |
Q012019346A70 | 2019-12-12 | 2020-03-04 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 41 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012019346A69 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET TO STREET NATIONAL STREET |
Q012019346A68 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 100 STREET TO STREET 102 STREET |
Q012019346A67 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012019346A65 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 104 STREET |
Q012019346A64 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET NYCTA SUBWAY TO STREET ROOSEVELT AVENUE |
Q012019346A63 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NYCTA SUBWAY |
Q012019346A62 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 39 AVENUE |
Q012019346A61 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET NATIONAL STREET |
Q012019346A60 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012019346A59 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012019346A58 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET NATIONAL STREET |
Q012019346A57 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET NATIONAL STREET |
Q012019346A56 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 102 STREET |
Q012019346A55 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 102 STREET, QUEENS, FROM STREET 40 ROAD TO STREET 41 AVENUE |
Q012019346A54 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 42 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012019346A53 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 103 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 42 AVENUE |
Q012019346A52 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 41 AVENUE, QUEENS, FROM STREET 103 STREET |
Q012019346A66 | 2019-12-12 | 2020-03-04 | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION | 104 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET 41 AVENUE |
Q042019346A10 | 2019-12-12 | 2019-12-31 | PED RAMP MODIFY/INSTALL GOVERNMENT | 95 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q042019345A08 | 2019-12-11 | 2019-12-18 | PED RAMP MODIFY/INSTALL GOVERNMENT | BRITTON AVENUE, QUEENS, FROM STREET BROADWAY |
Q042019345A07 | 2019-12-11 | 2019-12-18 | PED RAMP MODIFY/INSTALL GOVERNMENT | BRITTON AVENUE, QUEENS, FROM STREET BROADWAY |
Q012019324B11 | 2019-11-20 | 2019-12-19 | FINAL RESTORATION ONLY | 132 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET SOUTH CONDUIT AVENUE |
Q012019319A80 | 2019-11-15 | 2019-11-30 | PRIVATE SEWER - PROTECTED | 132 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 150 AVENUE |
Q012019316C18 | 2019-11-12 | 2019-12-14 | FINAL RESTORATION ONLY | 149 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 150 AVENUE |
Q012019316C19 | 2019-11-12 | 2019-12-14 | FINAL RESTORATION ONLY | 150 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 149 AVENUE |
Q012019277D49 | 2019-10-04 | 2019-11-02 | PRIVATE SEWER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 150 AVENUE |
Q012019277D53 | 2019-10-04 | 2019-11-02 | PRIVATE SEWER - PROTECTED | 150 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 149 AVENUE |
Q012019277D52 | 2019-10-04 | 2019-11-02 | PRIVATE SEWER - PROTECTED | 132 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 150 AVENUE |
Q012019277D51 | 2019-10-04 | 2019-11-02 | PRIVATE SEWER - PROTECTED | 132 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET SOUTH CONDUIT AVENUE |
Q012019277D50 | 2019-10-04 | 2019-11-02 | PRIVATE SEWER | 132 STREET, QUEENS, FROM STREET SOUTH CONDUIT AVENUE |
Q012019277D48 | 2019-10-04 | 2019-11-02 | PRIVATE SEWER - PROTECTED | 132 STREET, QUEENS, FROM STREET 149 AVENUE |
Q012019268C33 | 2019-09-25 | 2019-10-23 | PRIVATE SEWER | 149 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 150 AVENUE |
Q012019268C34 | 2019-09-25 | 2019-10-23 | PRIVATE SEWER | 149 AVENUE, QUEENS, FROM STREET 150 AVENUE |
Q012019242E62 | 2019-08-30 | 2019-10-03 | PRIVATE SEWER | 132 STREET, QUEENS, FROM STREET SOUTH CONDUIT AVENUE |
Q012019214A04 | 2019-08-02 | 2019-09-03 | PRIVATE SEWER | 132 STREET, QUEENS, FROM STREET SOUTH CONDUIT AVENUE |
Q012019189B49 | 2019-07-08 | 2019-08-04 | PRIVATE SEWER | 132 STREET, QUEENS, FROM STREET SOUTH CONDUIT AVENUE |
Q012019176D15 | 2019-06-25 | 2019-07-05 | PRIVATE SEWER - PROTECTED | 150 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 149 AVENUE |
Q012019176G48 | 2019-06-25 | 2019-07-05 | PRIVATE SEWER | 132 STREET, QUEENS, FROM STREET SOUTH CONDUIT AVENUE |
Q012019176B59 | 2019-06-25 | 2019-07-05 | PRIVATE SEWER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 132 STREET TO STREET 150 AVENUE |
Q012019175E37 | 2019-06-24 | 2019-07-19 | PRIVATE SEWER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 150 AVENUE |
Q012019175E36 | 2019-06-24 | 2019-07-19 | PRIVATE SEWER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 150 AVENUE |
Q012019165D06 | 2019-06-14 | 2019-07-05 | PRIVATE SEWER - PROTECTED | 132 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET SOUTH CONDUIT AVENUE |
Q012019165D07 | 2019-06-14 | 2019-07-05 | PRIVATE SEWER - PROTECTED | 132 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 150 AVENUE |
B012019151B98 | 2019-05-31 | 2019-06-28 | FINAL RESTORATION ONLY | BRIGHTON 14 STREET, BROOKLYN, FROM STREET BRIGHTON BEACH AVENUE |
B012019151B97 | 2019-05-31 | 2019-06-28 | FINAL RESTORATION ONLY | BRIGHTON 14 STREET, BROOKLYN, FROM STREET BRIGHTON BEACH AVENUE TO STREET OCEAN VIEW AVENUE |
M012019142A44 | 2019-05-22 | 2019-06-19 | REPAIR WATER | PIKE SLIP, MANHATTAN, FROM STREET MANHATTAN BRIDGE |
M012019142A42 | 2019-05-22 | 2019-06-19 | REPAIR WATER | CHERRY STREET, MANHATTAN, FROM STREET PIKE SLIP |
M012019142A43 | 2019-05-22 | 2019-06-19 | REPAIR WATER | PIKE SLIP, MANHATTAN, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE |
M012019141B88 | 2019-05-21 | 2019-06-19 | REPAIR WATER | CHERRY STREET, MANHATTAN, FROM STREET PIKE SLIP |
M012019141B89 | 2019-05-21 | 2019-06-19 | REPAIR WATER | PIKE SLIP, MANHATTAN, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE |
M012019141B90 | 2019-05-21 | 2019-06-19 | REPAIR WATER | PIKE SLIP, MANHATTAN, FROM STREET MANHATTAN BRIDGE |
M012019122A72 | 2019-05-02 | 2019-05-31 | REPAIR WATER - PROTECTED | 10 AVENUE, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
M012019122A71 | 2019-05-02 | 2019-05-31 | REPAIR WATER | HUDSON BOULEVARD EAST, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
M012019108A90 | 2019-04-18 | 2019-05-01 | REPAIR WATER | HUDSON BOULEVARD EAST, MANHATTAN, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET |
M012019059B19 | 2019-02-28 | 2019-03-28 | FINAL RESTORATION ONLY - PROTECTED | WEST 34 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD |
M012018346A45 | 2018-12-12 | 2019-02-02 | DEP CONTRACTOR MAJOR INSTALLATION WATER | WEST 155 STREET, MANHATTAN, FROM STREET HARLEM RIVER DRIVE TO STREET MACOMBS DAM BRIDGE |
Q012018121B53 | 2018-05-01 | 2018-06-03 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012018120D16 | 2018-04-30 | 2018-06-16 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | ROOSEVELT AVENUE, QUEENS, FROM STREET 72 STREET TO STREET 73 STREET |
Q012018051B19 | 2018-02-20 | 2018-05-01 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012018046A81 | 2018-02-15 | 2018-05-01 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | ROOSEVELT AVENUE, QUEENS, FROM STREET 72 STREET TO STREET 73 STREET |
Q012017348E22 | 2017-12-14 | 2018-03-15 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | ROOSEVELT AVENUE, QUEENS, FROM STREET 72 STREET TO STREET 73 STREET |
Q012017341C78 | 2017-12-07 | 2018-03-17 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012017332E28 | 2017-11-28 | 2017-12-22 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012017312F89 | 2017-11-08 | 2017-12-08 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012017240B52 | 2017-08-28 | 2017-11-25 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Q012017152A92 | 2017-06-01 | 2017-09-01 | DDC CONTRACTOR MAJOR RECONSTRUCTION-PROT | 96 STREET, QUEENS, FROM STREET JAMAICA AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2021-04-12 | 2024-01-26 | Address | 113 EDISON AVENUE, MOUNT VERNON, NY, 10550, USA (Type of address: Service of Process) |
2009-04-27 | 2021-04-12 | Address | 42 SCARSDALE AVENUE, SCARSDALE, NY, 10583, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240126002077 | 2024-01-26 | BIENNIAL STATEMENT | 2024-01-26 |
210412060399 | 2021-04-12 | BIENNIAL STATEMENT | 2021-04-01 |
190403060782 | 2019-04-03 | BIENNIAL STATEMENT | 2019-04-01 |
170406007192 | 2017-04-06 | BIENNIAL STATEMENT | 2017-04-01 |
150406006434 | 2015-04-06 | BIENNIAL STATEMENT | 2015-04-01 |
130405006175 | 2013-04-05 | BIENNIAL STATEMENT | 2013-04-01 |
110418002141 | 2011-04-18 | BIENNIAL STATEMENT | 2011-04-01 |
090427000639 | 2009-04-27 | ARTICLES OF ORGANIZATION | 2009-04-27 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-28 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDE WALK HAS BEEN REPAIRED AND RESTORATION IN THE CROSS WALK HAS BEEN FINALIZED |
2024-10-16 | No data | 168 STREET, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2024-10-16 | No data | 168 STREET, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer active permit on file. Q012024267B72. |
2024-10-15 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on permit. |
2024-10-15 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Curb open awaiting concrete pour. |
2024-10-15 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on permit. |
2024-10-08 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR closed. 0211 permit number #M022024281B24 to satisfy CAR. |
2024-10-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair CAR #20237740147 issued 3/19/2023. Respondent failed to permanently restore a cut, in the roadway, within the required time. Permit expired on 3/18/2023. Cited permit used for ID. |
2024-09-29 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pl mat on the roadway. Respondent in-compliance. |
2024-09-29 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Timber Barricade on the roadway. |
2024-09-23 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR # 20237790387 which was issued on 6/22/2023 without the noted permit listed as required. |
2024-09-05 | No data | SPRING STREET, FROM STREET HUDSON STREET TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On the side of 310 Hudson st Building Work found resurfaced. Permit expired. |
2024-09-03 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 206 ( Oppo. 209 - within Eastbound Bus / South parking lanes ), Wearing course paved for 1 of 2 cuts ( 2nd cut IFO 209 "NYPL" to North Curb w/ later Permit# M012024242A13 ). Cut: 15'7"Lx7'3"Wx3"D. Crew on site at depart. On site 10:25am - 1:56pm. |
2024-08-27 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection found respondent working within the bus lane of the roadway within stipulations |
2024-08-26 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/26/23 |
2024-08-25 | No data | EAST 58 STREET, FROM STREET 1 AVENUE TO STREET SUTTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire sidewalk replaced; joints sealed. |
2024-08-04 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags restored to grade, nearest 168 St. |
2024-07-13 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20237740147 issued 3/19/2023. Respondent failed to permanently restore a cut, in the roadway, within the required time. Permit expired on 3/18/2023. Cited permit used for ID |
2024-06-24 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR # 20237790387 which was issued on 6/22/2023 without the noted permit listed as required. |
2024-06-22 | No data | THIERIOT AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2024-05-30 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 7/24/23. |
2024-05-25 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20237740147 issued 3/19/2023. Respondent failed to permanently restore a cut, in the roadway, within the required time. Permit expired on 3/18/2023. Cited permit used for ID. |
2024-05-14 | No data | THIERIOT AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Black plastic needs to be removed & expansion joint needs to be sealed |
2024-05-05 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced new building |
2024-05-05 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2024-05-05 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No water cut in segment |
2024-04-13 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20237740147 issued 3/19/2023. Respondent failed to permanently restore a cut, in the roadway, within the required time. Permit expired on 3/18/2023. Cited permit used for ID. |
2024-04-01 | No data | JEROME AVENUE, FROM STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Measured and collected in Prism on 9/12/23. |
2024-03-26 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR # 20237790387 which was issued on 6/22/2023 without the noted permit listed as required. |
2024-02-23 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for the above respondent repaired the condition on CAR # 20237790387 which was issued on 6/22/2023 without the noted permit listed as required. |
2024-02-20 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/26/23 ( Vertical barrier) . |
2024-01-20 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | opp of 154, perm water restoration in d/l is ok |
2024-01-11 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work on sidewalk in compliance |
2024-01-10 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work observed |
2024-01-09 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp of building #154 W. 77th Street, please reseal edges of your permanent water restoration where needed, located in the roadway. |
2024-01-07 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to the respondent for repairing the condition on CAR #20237790387 which was issued on 6/22/2023 without the noted permit listed as required. |
2023-12-15 | No data | EAST 58 STREET, FROM STREET 1 AVENUE TO STREET SUTTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street recently paved. |
2023-12-08 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No new ped ramp work started at time of inspection |
2023-11-26 | No data | WATSON AVENUE, FROM STREET TAYLOR AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Building repave in compliane |
2023-11-26 | No data | DEAD END, FROM STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Building regraded in compliance |
2023-11-26 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Building, resufuraced in compliance |
2023-11-19 | No data | THIERIOT AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2+5 |
2023-11-10 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20237740147 issued 3/19/2023. Respondent failed to permanently restore a cut, in the roadway, within the required time. Permit expired on 3/18/2023. Cited permit used for ID. |
2023-10-23 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started at time of inspection |
2023-10-21 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work done in the SW1 corner quadrant, permit expired. Newer permit #X042023284A16 on file. |
2023-10-21 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the SW1 corner quadrant, unable to measure due to behind barriers with gates on top. Will come back at a later time. |
2023-10-12 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee removed white caps and properly isolated |
2023-10-01 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp over due for final. Failed to respond to CAR. D4F issued. |
2023-09-25 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR #20237790387 which was issued on 6/23/2023 without the noted permit listed as required. |
2023-09-20 | No data | THIERIOT AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk and curb behind construction fence at new building m |
2023-09-16 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Portion of street joints resealed on DEP |
2023-09-14 | No data | JEROME AVENUE, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2023-09-12 | No data | JEROME AVENUE, FROM STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. No ped ramp work started in the NE3 corner quadrant. Corner quadrant is behind BPP construction |
2023-09-09 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the SW1 corner quadrant, permit still active. |
2023-08-29 | No data | JEROME AVENUE, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done updated permit on file X012023230A15 |
2023-08-21 | No data | EAST 183 STREET, FROM STREET RYER AVENUE TO STREET VALENTINE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done in parking lane |
2023-08-12 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary restoration cut in the roadway. Respondent failed to respond to CAR #20237740147 issued 3/19/2023 for condition. Cited permit used for ID |
2023-08-09 | No data | JEROME AVENUE, FROM STREET EAST 196 STREET TO STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2023-08-05 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire wearing course street joints cracked up and needs to be resealed. |
2023-07-30 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition(s) on CAR #20237790387, (CAR date 6/22/2023) without the noted permit listed as required. |
2023-07-26 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/26/23 ( Vertical barrier) . |
2023-07-24 | No data | THIERIOT AVENUE, FROM STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NW2 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/24/23( roadway gutter flow slopes) tif on location. |
2023-07-11 | No data | JEROME AVENUE, FROM STREET WEST 195 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. No new ped ramp work started in the NW corner quadrant at time of inspection. |
2023-07-08 | No data | EAST 58 STREET, FROM STREET 1 AVENUE TO STREET SUTTON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | no jersey barriers found |
2023-07-02 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | OVER DUE FOR FINAL SIDE WALK AND ROADWAY |
2023-06-24 | No data | MERRICK BOULEVARD, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk trench found adjacent west bound traffic lane. |
2023-06-22 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPP # 154 a repair water restoration in the roadway, is missing the white “BUMP” Pavement marking, that was paved over by your final restoration. |
2023-06-20 | No data | EAST 58 STREET, FROM STREET 1 AVENUE TO STREET SUTTON PLACE | No data | Street Construction Inspections: Active | Department of Transportation | jersey barriers found on roadway |
2023-06-15 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #160 “PS087M SCHOOL” (3) SIDEWALK FLAGS (1) SURROUNDING WATER VALVE FREE OF DEFECTS ; RESTORATION BEHIND CHAIN LINK FENCE IN PARKING & TRAVEL LANE FLUSHED AND SEALED |
2023-05-22 | No data | MERRICK BOULEVARD, FROM STREET LINDEN BOULEVARD TO STREET SAYRES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two large potholes in the bus lane 2’X2’3”X2” and 1’1”X6”X2” with broken asphalt opposite 114-62 Merrick Boulevard westbound. |
2023-05-10 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary restoration cut in the roadway. Respondent failed to respond to CAR #20237740147 issued 3/19/2023 for condition. Cited permit used for ID |
2023-04-24 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration under contract #GR1508591 |
2023-04-24 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration under contract #GR1508591 |
2023-03-25 | No data | WEST 23 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2023-03-19 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please fully restore sidewalk flag, current patchwork at this time. |
2023-03-19 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Please restore temporary restoration in the driving lane/crosswalk. Permit expired 3/18/23. |
2023-03-18 | No data | HALLECK STREET, FROM STREET BEARD STREET TO STREET COLUMBIA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plastic was removed and expansion joints were sealed. Condition corrected, pass. |
2023-03-08 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the driving lane. New permit on file B012023039B70. |
2023-03-08 | No data | WEST 23 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the parking lane in compliance new permit on file B012023039B69. |
2023-02-28 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plates removed. New permit on file under B012023039B70. |
2023-02-28 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plates removed. New permit on file under B012023039B71. Temporary restoration in the driving/parking lane. |
2023-02-21 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the roadway in compliance. New permit on file B012023039B70. |
2023-02-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration in the roadway in compliance. New permit on file B012023039B71. |
2023-02-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration in the roadway. |
2023-02-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway 5 feet from crosswalk. New permit on file B012023039B70. |
2023-01-24 | No data | COLUMBIA STREET, FROM STREET COLUMBIA STREET ESPLANADE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repaired, in front of 640 Columbia Street. |
2023-01-24 | No data | COLUMBIA STREET, FROM STREET HALLECK STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repaired, in front of 640 Columbia Street. |
2023-01-22 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No need for D1B/D1J inspection contract # GR1508591 on file. |
2023-01-22 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No need for D1B/D1J inspection contract # GR1508591 on file. |
2023-01-20 | No data | WEST 23 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2023-01-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed two pinned and ramped steel plates in the roadway. Respondent failed to obtain a valid DOT permit before making use of of the roadway. Respondent ID by above permit expired 1/11/23 and “Akela” written on steel plates. |
2023-01-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found at this time. |
2022-12-20 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration between the parking lane and driving lane ok in compliance. 160ft from Neptune avenue in front of Building Operation. |
2022-12-20 | No data | WEST 23 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration Across the Roadway in the parking lane and driving lane ok in compliance. Sidewalk ok in front of 2824 West 23 Street. |
2022-11-22 | No data | HALLECK STREET, FROM STREET BEARD STREET TO STREET COLUMBIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove white plastic and seal all expansion joints in between sidewalk flags and at the curb.At Halleck Street between Beard Street and Columbia Street. AKA 640 Columbia Street. |
2022-11-10 | No data | 197 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Verified. I observed the above respondent with multiple barrels labeled "AKELA" and barricades stored in the roadway and grass area of the sidewalk. Tied to complaint (SR Number: 311-12408055) |
2022-11-07 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk occupancy at this time |
2022-11-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill from 9:10AM to 10:10am. One Restoration between the parking lane and the driving lane in front of 2879 West 24 Street. L9FT W 5FT 8INCHES D 4FT 9INCHES. |
2022-11-03 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/18/22. |
2022-11-01 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated Restoration between the parking lane and the driving lane. In Front of 2328 West 24 Street. |
2022-10-29 | No data | 197 STREET, FROM STREET 116 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. I observed the above respondent with multiple barrels, wood forms, barricades, excavated concrete material and backfill material stored in parking lane. |
2022-10-26 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is Plated between the parking lane and driving lane. Plated sidewalk restoration. Permit has been updated permit number B01202287A75. |
2022-10-25 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No inspection need contract # on file |
2022-10-25 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No inspection need contract # on file |
2022-10-21 | No data | 116 ROAD, FROM STREET 196 STREET TO STREET 196 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. I observed the above respondent with multiple barrels labeled "AKELA" stored in the parking lane of the roadway. The respondent failed to obtain an active DOT permit, to store construction equipment in the roadway. |
2022-10-17 | No data | 23 AVENUE, FROM STREET 211 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 9' 6" x 12' temporary/concrete area down 3" to 4" around catch basin in the parking lane overdue for final adjacent to 211-36. |
2022-10-05 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2022-10-05 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Material is stored on the roadway |
2022-09-28 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not Done |
2022-09-07 | No data | COLUMBIA STREET, FROM STREET COLUMBIA STREET ESPLANADE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Barriers placed on street. |
2022-09-07 | No data | COLUMBIA STREET, FROM STREET HALLECK STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe not on site. |
2022-09-07 | No data | HALLECK STREET, FROM STREET BEARD STREET TO STREET COLUMBIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers and fence placed on street. |
2022-08-02 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2022-07-25 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to permit expiration. NOV issued. |
2022-07-25 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to permit expiration. NOV issued. |
2022-07-16 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates in parking lane near mermaid ave. |
2022-07-11 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in parking and driving lane near mermaid ave. |
2022-06-15 | No data | LINDEN BOULEVARD, FROM STREET 174 STREET TO STREET 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2022-06-15 | No data | 174 STREET, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2022-06-07 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER PERM i/f/o 2270 |
2022-06-07 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Trench in the intersection with updated permit. X012022047A70. |
2022-06-07 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2022-05-20 | No data | LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not done ... |
2022-05-18 | No data | BRIGHTON 14 STREET, FROM STREET BRIGHTON BEACH AVENUE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on the s/w or r/w |
2022-05-18 | No data | BRIGHTON 14 STREET, FROM STREET BRIGHTON BEACH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete restoration in intersection |
2022-05-03 | No data | PIKE SLIP, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #250 2019 trench around WSNY box to Hydrant on Sidewalk is in compliance. |
2022-05-03 | No data | CHERRY STREET, FROM STREET PIKE SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (2) Hydrants replaced and installed and in compliance. |
2022-05-03 | No data | PIKE SLIP, FROM STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #250 water restoration in the sidewalk due to fire hydrant installation is in compliance. |
2022-04-26 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b violation in intersection |
2022-04-26 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b violation in parking lane |
2022-04-26 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b violation in parking lane |
2022-04-26 | No data | MERMAID AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b violation in crosswalk |
2022-04-16 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer and white lane markings have been restored. |
2022-04-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation near Mermaid Ave. NOV issued on most recent permit. |
2022-04-01 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a plated street opening in a protected roadway. Respondent Failed to obtain a valid DOT street opening permit. Previous permit B012022053B57 expired 3/25/2022. Name “AKELA” on steel pate used for ID. |
2022-04-01 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a plated street opening in a protected roadway. Respondent Failed to obtain a valid DOT street opening permit. Previous permit B012022053B58 expired 3/25/2022. Name “AKELA” on steel pate used for ID. |
2022-04-01 | No data | MERMAID AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a plated street opening in a protected roadway. Respondent Failed to obtain a valid DOT street opening permit. Previous permit B012022053B56 expired 3/25/2022. Name “AKELA” on steel pate used for ID. |
2022-04-01 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a plated street opening in a protected roadway. Respondent Failed to obtain a valid DOT street opening permit. Previous permit B012022053B59 expired 3/25/2022. Name “AKELA” on steel pate used for ID. |
2022-03-31 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp trench restoration in sidewalk near Mermaid Ave. Plated excavation in roadway near Mermaid Ave. Duplicate. |
2022-03-31 | No data | MERMAID AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated restoration in intersection. Active permit on file. |
2022-03-31 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated street opening in intersection. Duplicate. |
2022-03-27 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration perm flush w/color code and bike lane restored. |
2022-03-21 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated street opening in roadway near Mermaid Ave. Active permit #B012022053B57 on file. Duplicate permit. |
2022-03-21 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated street opening in intersection. |
2022-03-21 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated street opening in intersection. Active permit #B012022053B58 on file. Duplicate permit. |
2022-03-21 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp trench restoration in sidewalk near Mermaid Ave. Plated excavation in roadway near Mermaid Ave. |
2022-03-21 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp trench restoration in sidewalk near Mermaid Ave. Active permit B012022053B59 on file. Duplicate permit. |
2022-03-18 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | P - REPAIR WATER |
2022-03-17 | No data | WEST 23 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent with two steel plated openings in roadway. Respondent failed to obtain a valid DOT street opening permit. Name “AKELA” on steel plates used for ID. |
2022-02-20 | No data | HUDSON BOULEVARD EAST, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Hydrant within building operation. |
2022-02-06 | No data | WEST 34 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area in compliance. |
2022-02-05 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-02-05 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on the sidewalk at City Park |
2022-02-05 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2022-02-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp trench restoration in sidewalk near Mermaid Ave. Active permit B012022024A76 on file. |
2022-02-04 | No data | MERMAID AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway at W 24th St. Active permit B012022024A73 on file. |
2022-02-04 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in intersection. Active permit B012022024A75 on file. |
2022-01-18 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut plated on sidewalk at Waring Avenue, WEST SIDE. |
2022-01-18 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut plated on the sidewalk, west side |
2022-01-18 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work started behind property line, at the city park |
2022-01-15 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in the DL. |
2022-01-14 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White lane makings need to be installed around permanent restoration for water IFO 345 |
2022-01-13 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Rwy not re-paved at segment. Bike lane is clear. |
2022-01-06 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Timber barricades are in compliance at time of inspection |
2022-01-04 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe in compliance at time of inspection |
2022-01-04 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe in compliance at time of inspection |
2021-12-30 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe observed on the work site at time of inspection |
2021-12-23 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Construction site |
2021-12-08 | No data | 41 AVENUE, FROM STREET 103 STREET TO STREET 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION-SEGMENT IN COMPLAINCE |
2021-12-01 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012021328A18 Valid permit on file plates raise plow signs posted |
2021-12-01 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Timber barriers |
2021-12-01 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Port o san stored |
2021-11-27 | No data | 168 STREET, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Active | Department of Transportation | No material stored |
2021-11-27 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No material stored |
2021-11-18 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No evidence of work done. |
2021-11-18 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate marked with permittee name in front of address. |
2021-11-09 | No data | 93 AVENUE, FROM STREET 168 PLACE TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Materials Visible On Site At Time Of Inspection |
2021-11-03 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Barriers on site |
2021-11-03 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No roadway repaving yet, ongoing work for school PS 87, sidewalk shed over clear walkway. |
2021-11-03 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No roadway paving yet. Ongoing work for school PS 87, sidewalk shed up, walkway clear. |
2021-11-03 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J Project-D1B issued |
2021-11-02 | No data | MERMAID AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/30/2021. Respondent failed to obtain a confirmation number |
2021-11-02 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/30/2021. Respondent failed to obtain a confirmation number |
2021-11-02 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/30/2021. Respondent failed to obtain a confirmation number |
2021-11-02 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | N.a at time |
2021-11-02 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | N.a at time |
2021-11-01 | No data | PIKE SLIP, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration in the sidewalk is in compliance due to fire hydrant installation |
2021-11-01 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No port o san |
2021-11-01 | No data | CHERRY STREET, FROM STREET PIKE SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration in the sidewalk is in compliance |
2021-11-01 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No backhoe stored |
2021-11-01 | No data | PIKE SLIP, FROM STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration in the sidewalk is in compliance due to fire hydrant installation |
2021-10-29 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/31/2021. Respondent failed to obtain a confirmation number |
2021-10-28 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/30/2021. Respondent failed to obtain a confirmation number |
2021-10-22 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Timber barriers |
2021-10-05 | No data | BRONX PARK EAST, FROM STREET MACE AVENUE TO STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-10-05 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates on the sidewalk. |
2021-09-30 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No material on street |
2021-09-30 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No material on street |
2021-09-28 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates in the sidewalk. |
2021-09-28 | No data | BRONX PARK EAST, FROM STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe is behind property line. |
2021-09-09 | No data | BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Behind property line. |
2021-09-07 | No data | EAST 229 STREET, FROM STREET GRACE AVENUE TO STREET SCHIEFFELIN PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | New sidewalk and portion of roadway paved as per BPP and JOINT meeting with HIQA also RRM. |
2021-09-07 | No data | 16 AVENUE, FROM STREET 212 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Roadway restored perm. |
2021-08-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [7/2/2021]. |
2021-08-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway near mermaid avenue and cones and other material stored in the parking lane |
2021-08-04 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has material stored on the roadway. Respondent has failed to comply with OCMC stipulation# 066 which states material shall not be placed within 15 feet of a fire hydrant. Material has been placed 6feet away |
2021-08-04 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the intersection |
2021-08-03 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2021-07-30 | No data | MERMAID AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [7/28/2021]. |
2021-07-29 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary relocation of hydrant is within an active B.O inside fence area. |
2021-07-22 | No data | 16 AVENUE, FROM STREET 212 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed that the respondent failed to permanently restore temporary gas cuts in the roadway, i/f/o 163-38 16 avenue, within the required time. Above permit expired on 8/7/2020. Permit used for ID. |
2021-07-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 plated roadway excavations near Mermaid Ave with the parking lane barricaded |
2021-07-17 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway and material stored in the parking lane |
2021-07-08 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway |
2021-07-08 | No data | MERMAID AVENUE, FROM STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found in the intersection |
2021-07-08 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway and sidewalk/ material stored on the roadway and ped walkway |
2021-06-29 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated roadway excavations near Mermaid Ave with the parking lane barricaded. |
2021-06-29 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 plated roadway excavations near Mermaid Ave with the parking lane barricaded. |
2021-06-23 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The crew on site working with the excavation open. |
2021-06-23 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The crew on site working atoi |
2021-06-20 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway excavation plated near the Mermaid Avenue crosswalk with barrels in the parking lane and orange metal barriers on the sidewalk on West 24th Street AKA 2327 Mermaid Ave. Approximately 150 into the segment |
2021-06-20 | No data | WEST 24 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway excavation plated near Mermaid Avenue crosswalk with barrels in the parking lane on West 24th Street AKA 2328 Mermaid Ave. |
2021-06-14 | No data | MURDOCK AVENUE, FROM STREET 175 STREET TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No roadway occupancy at this time. |
2021-05-18 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2021-05-14 | No data | MERRICK BOULEVARD, FROM STREET 115 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | NOT VERIFIED- D.D.C. CONTRACTOR MAJOR RECONSTRUCTION- NO CONCRETE BARRIER FOUND. FOUND 3 ORANGE CONES ON CONCRETE ROADWAY DIVIDER. NO CREW ON SITE. PERMIT ACTIVE WITH NO CONSTRUCTION IN PROGRESS. CONES NOT AFFECTING TRAFFIC. |
2021-05-06 | No data | EAST 229 STREET, FROM STREET GRACE AVENUE TO STREET SCHIEFFELIN PLACE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | illegal use / open of street and or sidewalk without a permit. Upon inspection at site found sidewalk and roadway excavated. Permit number X022020199A25 is used for ID only. |
2021-05-04 | No data | LINDEN BOULEVARD, FROM STREET 173 STREET TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk work at median / material |
2021-04-30 | No data | ROOSEVELT AVENUE, FROM STREET 104 STREET TO STREET 108 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | partially closing of street(140' x 7') with timber columns, orange barrels, wooden planks cobble stones and steel curbs without a permit. Permit number Q012020290C15 is used for ID only. |
2021-04-28 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway has been resurfaced. |
2021-04-23 | No data | LINDEN BOULEVARD, FROM STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified permit remains active DDC site. crash bollards for pedestrian center island. |
2021-04-10 | No data | LINDEN BOULEVARD, FROM STREET 170 STREET TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | NOT VERIFIED- D.D.C. CONTRACTOR MAJOR RECONSTRUCTION-MATERIALS AND BARRIERS STORED IN PARKING LANE. CURB WORK BEING DONE. ROADWAY IS CLEAR AND IN COMPLIANCE. IF ISSUE STILL EXSIT PLEASE GIVE SPECIFIC INFOMATION WITH ANOTHER COMPLIANT. |
2021-03-31 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 417- 425 Permanent repair water restoration adjacent to a fire hydrant within the roadway is in compliance. |
2021-03-24 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPP #430 sidewalk flag around Hydrant in compliance. |
2021-03-16 | No data | PIKE SLIP, FROM STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has installed two fire hydrants on the Northside of Pike Slip between Cherry Street and South Street. They did the installation for 250 South Street on the side of Pike Slip. |
2021-03-16 | No data | 16 AVENUE, FROM STREET 212 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Equipment & materials stored in the parking lane in front of 212-07. Stip #204 allows storage of equipment at this time. Valid permit on file. |
2021-03-16 | No data | CHERRY STREET, FROM STREET PIKE SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has installed two fire hydrants on the Northside of Pike Slip between Cherry Street and South Street. They did the installation for 250 South Street on the side of Pike Slip. |
2021-02-28 | No data | PIKE SLIP, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has restored the sidewalk pavement around the fire hydrant. |
2021-02-17 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2021-01-17 | No data | HUDSON BOULEVARD EAST, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2021-01-10 | No data | WEST 35 STREET, FROM STREET 10 AVENUE TO STREET HUDSON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-11-29 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO respondent has failed to replace granular tan paint to the pedestrian plaza, after a CAR #20184520259 was issued on 7/24/2020 |
2020-10-29 | No data | 212 STREET, FROM STREET 16 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint verified there is materials and an active work site at this time. It is occupying parking however there is an active permit on file. The permit is valid until 12/31/20. DDC work site no action taken. |
2020-09-30 | No data | 16 AVENUE, FROM STREET 212 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to make temporary sewer trench permanent during the required time of their permit which expired on 8/7/2020. Respondent was ID by previous permit on file. |
2020-09-30 | No data | 173 STREET, FROM STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Portion of trench not sealed / no CAR as per DBC |
2020-09-30 | No data | LINDEN BOULEVARD, FROM STREET 173 STREET TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Portion of trench not sealed / no CAR as per DBC |
2020-09-30 | No data | 16 AVENUE, FROM STREET 212 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | (condition verified) storage of material and equipment was observed in the parking lanes |
2020-09-15 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration must restore the granular tan paint to the pedestrian plaza. In front of 1780. |
2020-08-12 | No data | EAST 229 STREET, FROM STREET GRACE AVENUE TO STREET SCHIEFFELIN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Material on the roadway adjacent to curb |
2020-08-01 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to restaurant seating in r/w. |
2020-07-31 | No data | SCHIEFFELIN PLACE, FROM STREET EAST 225 STREET TO STREET EAST 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No crossing sidewalk |
2020-07-28 | No data | EAST 229 STREET, FROM STREET GRACE AVENUE TO STREET SCHIEFFELIN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Barrel possibly behind fence |
2020-07-06 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-06-26 | No data | 102 STREET, FROM STREET NATIONAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DDC CONTRACTOR MAJOR RECONSTRUCTION-CREW ON SITE WORKING ON THE SEGMENT AND ADJACENT INTERSECTIONS . ACTIVE PERMIT ON FILE. |
2020-06-26 | No data | 102 STREET, FROM STREET 41 AVENUE TO STREET NATIONAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | DDC CONTRACTOR MAJOR RECONSTRUCTION-CREW ON SITE WORKING ON THE SEGMENT AND ADJACENT INTERSECTIONS |
2020-06-26 | No data | 102 STREET, FROM STREET NATIONAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | DDC CONTRACTOR MAJOR RECONSTRUCTION-CREW ON WORKING ON ADJACENT SEGMENTS AND INTERSECTION |
2020-06-26 | No data | 102 STREET, FROM STREET 42 AVENUE TO STREET NATIONAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | D.D.C. CONTRACTOR MAJOR RECONSTRUCTION- CREW ON SITE WORKING ON SEGMENT. STREET WAS TEMPORARY CLOSED . OPEN AFTER CONVERSATION WITH FOREMAN. |
2020-06-22 | No data | 5 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-06-19 | No data | NATIONAL STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon returning to re-inspect the DDC site at National St bet 41 ave and Roosevelt ave , I observed some of the conduits on site were stored a little over 5’ in height. Foreman Grazitiano have them lower the conduits and restore fencing. |
2020-06-06 | No data | SCHIEFFELIN PLACE, FROM STREET EAST 225 STREET TO STREET EAST 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Equipment behind fence |
2020-06-03 | No data | LINDEN BOULEVARD, FROM STREET 174 STREET TO STREET MURDOCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp area |
2020-05-15 | No data | NATIONAL STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed the respondent storing electric conduit at a height over 5' in the parking lane in front 40-12 on National Street which is blocking the view of vehicular traffic and pedestrian. |
2020-04-23 | No data | EAST 229 STREET, FROM STREET GRACE AVENUE TO STREET SCHIEFFELIN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | r/w not occupied |
2020-04-23 | No data | SCHIEFFELIN PLACE, FROM STREET EAST 225 STREET TO STREET EAST 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2020-04-18 | No data | EAST 229 STREET, FROM STREET GRACE AVENUE TO STREET SCHIEFFELIN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Material behind fence |
2020-03-28 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm electric conduit restoration flush to grade in the roadway of the driving lane in front of building #515 in compliance |
2020-03-24 | No data | 37 AVENUE, FROM STREET 43 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut on P/D/L opposite 46-02 |
2020-01-30 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway. |
2020-01-16 | No data | PIKE SLIP, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration leading to hydrant closer to south street is in compliance |
2020-01-11 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-10-18 | No data | 132 STREET, FROM STREET 149 AVENUE TO STREET 150 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Disregard, issued in error. |
2019-10-15 | No data | 132 STREET, FROM STREET 149 AVENUE TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Trench across the r/w, no permit. |
2019-10-10 | No data | 132 STREET, FROM STREET 149 AVENUE TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 15'09"x 6'10" 132 St bet 149 Ave and 150 AveTrench across r/w partially completed. |
2019-09-23 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sidewalk restoration around fire hydrant is in compliance |
2019-09-22 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #515 |
2019-09-17 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm electric restoration flushed to grade in the roadway of the driving lane in front of building #515 |
2019-08-27 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Roadway/driving lane with minor defects. However no action taken at this time. |
2019-08-26 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b project pass |
2019-08-20 | No data | 149 AVENUE, FROM STREET 132 STREET TO STREET 150 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Nica condition made safe. Steel plate pinned and ramped over catch basin |
2019-08-20 | No data | 149 AVENUE, FROM STREET 132 STREET TO STREET 150 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Catch basins steel plated on both sides of s/w. Drums on s/w. NICA to be re-issued. |
2019-08-19 | No data | 149 AVENUE, FROM STREET 132 STREET TO STREET 150 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk and Surrounding area of catch basin sunken ( 1st. sunken 5" & 2nd sunken 11"). |
2019-08-14 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b project pass |
2019-08-07 | No data | CHERRY STREET, FROM STREET PIKE SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Hydrants all replaced and installed behind building operation. |
2019-08-07 | No data | PIKE SLIP, FROM STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Hydrants have been installed area is still under major building operation. |
2019-07-11 | No data | SOUTH STREET, FROM STREET RUTGERS SLIP TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2016 Water cuts in roadway sidewalk is blocked off because of active building operations. |
2019-07-03 | No data | 149 AVENUE, FROM STREET 132 STREET TO STREET 150 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Catch basin - no compaction test needed. |
2019-07-03 | No data | 149 AVENUE, FROM STREET 134 STREET TO STREET 150 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed - 86'x2'8" trench.Arrived at 10:12 am,scheduled for 10:00 am,actual start 10:35 am,leaving at 12:05 pm. |
2019-07-03 | No data | 149 AVENUE, FROM STREET 150 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed - 16'x2'8" trench (continued work to the segment).Arrived at 10:12 am,scheduled for 10:00 am,actual start 10:35 am. |
2019-07-03 | No data | 150 AVENUE, FROM STREET 132 STREET TO STREET 149 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Catch basin - no compaction test needed. |
2019-07-02 | No data | PIKE SLIP, FROM STREET CHERRY STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to South St ( I/F/O 250 South St - aka One Manhattan Square ), perm 2019 trench around WSNY box to Hydrant on Sidewalk. |
2019-06-27 | No data | 132 STREET, FROM STREET 149 AVENUE TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress,crew on site. |
2019-06-27 | No data | 132 STREET, FROM STREET 149 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress,crew on site. |
2019-06-27 | No data | 132 STREET, FROM STREET 149 AVENUE TO STREET 150 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress,crew on site - spoke to Amir. |
2019-05-22 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water cut that is flushed to grade in the driving lane which is located opposite of building 408. |
2019-04-15 | No data | 10 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Backhoe on site.(Insp.#746) |
2019-04-07 | No data | MADISON STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BARRELS REMOVED |
2019-03-28 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench crossing driving lane of roadway at this time. |
2018-11-29 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Barricades and barrels removed |
2018-11-18 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/6/2018. |
2018-10-25 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | c-a-r issued and all barricades was removed so this is clear |
2018-10-15 | No data | MADISON STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | barrels left on location are marked "AKELA" This is your company please have them removed |
2018-10-12 | No data | 102 STREET, FROM STREET 86 ROAD TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ped ramps completed on the N/W and N/E corner quadrants of 102 street and Jamaica Ave |
2018-10-10 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ACTIVE B.O -REFER TO CAR#20185810179Sewer cut IFO 1780 Broadway Not restore with required granular asphalt (beige) surface for plaza. Incorrect color code ID marking (2017) installed on cut. |
2018-10-01 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | there are three AKELA orange barrels that still remain on the s/w, remove at once |
2018-09-26 | No data | MADISON STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 3 construction barrels left on sidewalk in front of 21 Madison street |
2018-09-20 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Sloan Kettering perm restoration flushed to grade in the parking lane. |
2018-09-07 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w trench behind barricades ok |
2018-09-04 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | REMOVE ALL BARRICADES AND BARRELS FROM SIDEWALK |
2018-08-31 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WEARING COURSE BEING RESCHEDULED DUE TO CONTRACTOR NOT BEING READY TO PROCEED |
2018-08-30 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 27ft by 11ft down 7in |
2018-08-28 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 20ft by 11ft down 7ft |
2018-08-22 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 7/19/2018. Respondent failed to obtain a c |
2018-08-06 | No data | EAST 67 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Sidewalk Flags around a hydrant have been restored, active permit maintained on file.... (M012018199A60) |
2018-08-01 | No data | 120 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | all construction material has been removed |
2018-07-29 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area remains in compliance. |
2018-07-24 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ACTIVE B.O -REFER TO CAR#20185810179Sewer cut IFO 1780 Broadway Not restore with required granular asphalt (beige) surface for plaza. Incorrect color code ID marking (2017) installed on cut. |
2018-07-24 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE B.O -REFER TO CAR#20185810179Sewer cut IFO 1780 Broadway Not restore with required granular asphalt (beige) surface for plaza. Incorrect color code ID marking (2017) installed on cut. |
2018-07-09 | No data | JAMAICA AVENUE, FROM STREET 104 STREET TO STREET 105 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Barrel on sidewalk severing no purpose. 204 stipulation on permit |
2018-07-03 | No data | JAMAICA AVENUE, FROM STREET 104 STREET TO STREET 105 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Barrel on sidewalk severing no purpose. 204 stipulation on permit |
2018-06-25 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THIS IS BEING CLOSED AS PER THE CONVERSATION WITH THE PERMITTEE & GARY. PRO. THAT WAS DENIED WILL BE PAID. |
2018-06-23 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pin holes filled & sealed. Active BO concrete barriers covering portion of restoration.. CAR needs to be re-issued once job is complete. |
2018-06-12 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | CAR PREVIOUSLY ISSUED, MATERIALS REMOVED |
2018-06-05 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | protest reviewed & denied, as of 6-05-18, NYCTA barriers still remain on sidewalk serving no purpose. no active work in progress. permit expired on 6-03-18. remove all material off s/w. |
2018-05-21 | No data | BROADWAY, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Arrow Board Visible On Site At Time Of Inspection |
2018-05-20 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | reject NOV stipulation 204 attached. |
2018-05-18 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent storing an electronic traffic sign and barriers on the roadway without an active storage permit on file. Respondent identified by electronic sign marked AKELA. The permit attached for ID purposes only |
2018-05-17 | No data | 73 STREET, FROM STREET 37 AVENUE TO STREET 37 ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Roadway towards Broadway milled and section of sidewalk reconstructed. R/w clear for traffic. Walkway provided on in curb area |
2018-05-15 | No data | 73 STREET, FROM STREET 37 AVENUE TO STREET 37 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Approx 100' or r/w towards Broadway milled and section of s/w reconstructed. R/w clear for traffic. Walkway provided on s/w |
2018-05-14 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NOV ISSUED |
2018-05-14 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Electronic traffic and barriers stored on site serving no purpose. In front of 105-03 Jamaica ave |
2018-05-10 | No data | 120 STREET, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plates and barrels left on site at the side of 120-03 Jamaica ave (on 120 st) Identified by barrel labeled AKELA |
2018-05-09 | No data | 120 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Major reconstruction, steel plates stored in parking lane |
2018-05-01 | No data | 42 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | barricades and equipment stored in the p/l of the roadway. Stip #204 allows the storage of materials and equipment. Area in compliance |
2018-04-23 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway resurfaced. cut/trench no longer exist. |
2018-04-19 | No data | BROADWAY, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | One new ramp installed at S/W/C / Lighting covered |
2018-04-17 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Traffic directional equipment on site. Contractor has valid permit , 204 stipulation for storage of equipment until 6/7/18 |
2018-04-03 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut IFO 1780 Broadway Not restore with required granular asphalt (beige) surface for plaza. Also, Incorrect color code ID marking (2017) installed on cut. Please restore area in kind and install correct 2018 ID tag. |
2018-04-02 | No data | 105 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Not on site today. |
2018-03-31 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1042A restoration requirements & pinholes. Located @ 1010 Park Ave |
2018-03-31 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Project-Color code applied however CAR will be re-issued for 1042A, pinholes & scarring. |
2018-03-15 | No data | 120 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate reset & additional ramping material applied. |
2018-03-15 | No data | 47 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration to grade in the p/d/l, two s/w flags restored in kind located on 47 Ave |
2018-03-14 | No data | 120 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 of 2 Steel plate marked âAKELAâ shifted 3â from its position, bouncing 1â as traffic travels over them |
2018-03-12 | No data | 120 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 steel plates marked Akela 11 in the intersection of 120 street & Jamaica avenue, properly pinned, ramped & wedged with no sound observed. Also there is a raise plow sign posted |
2018-03-08 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site repairing curbs. Barricades and fences blocking cuts |
2018-03-02 | No data | 42 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | permittee is within compliance |
2018-03-02 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Use of the street without a permit - excavator machine with commercial lisence plate barricaded on west parking lane. NOV issued. |
2018-03-02 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired and area within pedestrian walkway remains plated. However, permit application 2018022600096950 on file - submitted status makes is acceptable. |
2018-03-01 | No data | BROADWAY, FROM STREET 37 ROAD TO STREET 72 STREET | No data | Street Construction Inspections: Active | Department of Transportation | multiple wooden barricades on site active permit on file. |
2018-03-01 | No data | 73 STREET, FROM STREET 37 AVENUE TO STREET 37 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | multiple wooden barricades active permit on file. |
2018-02-26 | No data | 126 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk |
2018-02-23 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/t/p/o the respondent has pieces of asphalt ,concrete ,construction materials and garbage obstructing gutters/sidewalk. |
2018-02-21 | No data | 5 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CONCRETE BASE PASS.17âL X 7â11âW X 9â 2âD.AR- 9:05AM DP- 1:35PM |
2018-02-18 | No data | ROOSEVELT AVENUE, FROM STREET 72 STREET TO STREET 73 STREET | No data | Street Construction Inspections: Active | Department of Transportation | respondent with multiple wooden timbers stored surrounding in the parking lane.Respondent failed to provide adequate space for water runoff.No one on site at time of inspection.Respondent ID by permit on file for use of street. |
2018-02-18 | No data | BROADWAY, FROM STREET 37 ROAD TO STREET 72 STREET | No data | Street Construction Inspections: Active | Department of Transportation | material onsite active permit on file. |
2018-02-15 | No data | 5 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed the above respondent failed to post raise plow sign and the plate not flush with surrounding roadway as per the winter moratorium, the plate marked Akela i/f/o 515 5 street. |
2018-02-14 | No data | BROADWAY, FROM STREET WEST 57 STREET TO STREET WEST 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water - sewer repairs IFO 1780 Broadway acceptable. There is an excavated area within pedestrian walkway plated ("Akela" marked). No sign posted & plates not countersunk since it's located within plaza area. |
2018-02-08 | No data | BROADWAY, FROM STREET 37 ROAD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with multiple steel plates marked Akela pinned and ramped on the roadway.Respondent failed to countersink plates flush with roadway as per winter moratorium that began on 12-1-17 and ends on 4-30-2018 |
2018-01-19 | No data | 42 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A.T.P.O. I observed the above respondent open the street without DOT permit at this time.Permit #Q012017341B29 presented to me is for work on Broadway bet. 41 St. & 42 St. and # Q012017341C46 is for the intersection 42 St. & Broadway. |
2018-01-19 | No data | BROADWAY, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - crew on site.Flag man on both sides - spoke to Graciano to separate the two lanes for trafick with cones.OCMC stip sheet presented. |
2018-01-19 | No data | 42 STREET, FROM STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No work on the intersection at this time.Contractor working on the segment 42 st bet. Broadway & 34 av - no permit found for this site.Spoke to Graciano and Amir to obtain the permit - NOV issued. |
2018-01-16 | No data | JAMAICA AVENUE, FROM STREET 124 STREET TO STREET 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Ped ramps installed / electric under construction / equipment stored |
2018-01-16 | No data | 102 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Equipment on segment / permit in question / went over violations with Supervisor |
2018-01-11 | No data | BROADWAY, FROM STREET 37 ROAD TO STREET 72 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no equipment placed at this time |
2018-01-11 | No data | 72 STREET, FROM STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | no equipment placed at this time . |
2018-01-10 | No data | BRITTON AVENUE, FROM STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | no equipment at this time |
2018-01-10 | No data | 37 ROAD, FROM STREET 73 STREET TO STREET 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | place equipment Purpose: DDC HWPLZ014Q - Reconstruction Complex Pedestrian Ramps, sewer, water & utilities - Staging area in borough of Queens NY |
2018-01-10 | No data | BROADWAY, FROM STREET BRITTON AVENUE TO STREET VIETOR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no equipment at this time |
2017-12-22 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent with construction conduit water repair materials stored on the street without a DOT permit. Respondent failed to have a storage of equipment permit on file. |
2017-12-19 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please resealed 2 perm water cut in roadway ifo 261. |
2017-12-15 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUMBERS CUT IN THE PARKING LANE AND DRIVING LANE IS IN COMPLIANCE |
2017-11-28 | No data | 98 STREET, FROM STREET 89 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Zone in Compliance |
2017-10-27 | No data | JAMAICA AVENUE, FROM STREET 124 STREET TO STREET 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Previous condition corrected / contractor working |
2017-10-24 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Conduits delivered by CE to DDC project |
2017-10-24 | No data | JAMAICA AVENUE, FROM STREET 124 STREET TO STREET 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Some material stored past 8' / no drainage / Met with Contract supervisor to go over violations. |
2017-10-21 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O The above respondent failed to apply color code marker to their completed water restoration identifying permittee as required. Respondent was notified via CAR #20174600016 dated 6/4/17. (A.k.a 1010 park avenue) |
2017-10-20 | No data | JAMAICA AVENUE, FROM STREET 101 STREET TO STREET 102 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work Zone in Compliance Flagmen Posted |
2017-10-19 | No data | 211 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building pavement over water restoration |
2017-10-19 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building pavement over water restoration in the roadway |
2017-10-18 | No data | 96 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site work is in progress |
2017-10-10 | No data | JAMAICA AVENUE, FROM STREET 124 STREET TO STREET 125 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | S/W and cl excavation to install catch basin and re- rout water line i/f/o 124-20. |
2017-10-03 | No data | 102 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Respondent in-compliance according to Stipulation Sheet QEC-15-502. |
2017-09-26 | No data | 102 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Zone in Compliance Flagmen Posted DDC Rep on site |
2017-09-17 | No data | 42 STREET, FROM STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | no arrowboard, van & box trk, flatbed trl. at site |
2017-09-17 | No data | BROADWAY, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no arrowboard, van & box trk, flatbed trl. at site |
2017-08-31 | No data | JAMAICA AVENUE, FROM STREET 95 STREET TO STREET 96 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Several steel plates marked Akela serving no purpose. (1) stored i/f/o T_Mobile store on Jamaica Avenue between 95 street & 96 street (2) i/f/o Deli in the parking lane and on the sidewalk under the subway stair case on 95 street between Jamaica ave |
2017-08-25 | No data | 102 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Zone in Compliance DDC Contractor |
2017-08-22 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut located within BO barricade |
2017-08-22 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the parking lane |
2017-08-20 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/24/17. |
2017-08-11 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color not applied. |
2017-08-11 | No data | 37 ROAD, FROM STREET 73 STREET TO STREET 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway completely closed / awaiting contract to be e-mailed. Unable to bring up permits or contract in city streets |
2017-08-10 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | C/l closed, partial s/w closure. |
2017-08-04 | No data | JAMAICA AVENUE, FROM STREET 102 STREET TO STREET 104 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor not on site/ Material barricaded. Verified with Parking administration in regard to authorized parking. |
2017-08-04 | No data | JAMAICA AVENUE, FROM STREET 105 STREET TO STREET 106 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor not on site/ Material barricaded. Verified with Parking administration in regard to authorized parking. |
2017-08-04 | No data | 120 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work in progress / (Material stored as per stip sheet ) |
2017-08-04 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2017-07-24 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water" restoration flush to grade in the parking lane and no defect found to three newly sidewalk flags surrounding a water valve cover. |
2017-07-07 | No data | 126 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | As per stipulation sheet material is allowed to be stored. |
2017-07-06 | No data | 120 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work in progress / Contacted contractor (no crew out today) |
2017-07-06 | No data | 126 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Material stored without a storage of material permit for the on street of 126 st / Notified permittee to apply for additional permit. |
2017-07-06 | No data | JAMAICA AVENUE, FROM STREET 124 STREET TO STREET 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work in progress / Contacted contractor (no crew out today) |
2017-07-06 | No data | JAMAICA AVENUE, FROM STREET 120 STREET TO STREET LEFFERTS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work in progress / Contacted contractor (no crew out today) |
2017-07-05 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2017-06-26 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut behind fence |
2017-06-16 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 20ft 3ft down 3ft 6in |
2017-06-12 | No data | 211 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO - unable to see. |
2017-06-09 | No data | BROADWAY, FROM STREET BRITTON AVENUE TO STREET VIETOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In-Compliance. No equipment stored at this time of inspection |
2017-06-07 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MATERIAL ON STREET behind barricades |
2017-06-07 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | trench 35 ft 4 ft down 3 ft 6in |
2017-06-06 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL IS GOING TO BE RESCHEDULED |
2017-06-04 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm. restoration in driving lane is missing color code marker |
2017-06-03 | No data | BRITTON AVENUE, FROM STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | In-Compliance. No equipment placed at worksite at this time of inspection |
2017-05-23 | No data | 6 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | temporary ped walk ok |
2017-05-18 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see work parked car |
2017-05-13 | No data | 42 STREET, FROM STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | no equipment at this time |
2017-05-13 | No data | BROADWAY, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no equipment at this time |
2017-05-06 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | P/w occupied - active BO. |
2017-04-15 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pinhole are fill in with fine asphalt concrete mix. |
2017-04-14 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt ramping removed. |
2017-02-28 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REMOVE THE ASPHALT RAMPING THAT LEFT BEHIND SURROUNDING YOUR WATER CUT |
2017-02-01 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO INSPECT DUE TO PARKED TRUCK |
2017-02-01 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIRS ARE IN COMPLIANCE |
2017-01-03 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | crew is mucing pou the hole.Twster is on site. Crew iswaiting for the solluable fill, to fill under the utility ducts. 1253 slurry mix arrived. sidewalk was back filled with clean fill. Cut back was done. |
2016-12-27 | No data | EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR WATER: Work In progress. |
2016-12-03 | No data | 211 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate restoration due to building operation. barriers in roadway |
2016-11-28 | No data | MILL ROAD, FROM STREET CARMELLA COURT TO STREET FOX BEACH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Still slightly sunken. Houses demolished. Check next inspection. |
2016-11-28 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | took action on latest permit |
2016-11-13 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Road was resurfaced |
2016-11-11 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no eq. Backhoe a/t/o insp. |
2016-10-14 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no eq. Backhoe a/t/o insp. |
2016-10-13 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Backhoe on site at this time of inspection.(634) |
2016-10-05 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see restoration within work zone. |
2016-10-02 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate cut due to ongoing construction. |
2016-09-30 | No data | 132 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS RESTORED IN KIND. EXPANSION JOINTS SEALED |
2016-09-27 | No data | 46 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced, Now work on s/w. |
2016-09-16 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer trench in the driving lane is sunken 2 inches. |
2016-09-15 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Back hoe on site, in compliance. |
2016-09-14 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to do full inspection due to Active BO i/F/o 701 |
2016-09-12 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plates secured to roadway with no movement. crew on site. no action taken |
2016-09-01 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BF reschedule due to no show from DEP |
2016-09-01 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | respondent failed to comply with stipulation #072,which states work Monday-Friday 7am- 4pm. Respondent was actively working with a backhoe lifting debris bags on truck. Graciano the foreman on site was warned on 8/25/16 of stip hrs |
2016-08-27 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work this permit. |
2016-08-25 | No data | EAST 85 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | water cut in P/L foreman Graciano on site.. explained his stips about not working until 9am |
2016-08-23 | No data | 126 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2016-08-16 | No data | 47 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to construction fence along the p/l. |
2016-08-02 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 Steel Plates Secured to the Roadway Parking/Driving Lane within the CNY Workzone I/F/O 701 7th Avenue |
2016-07-24 | No data | 126 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2016-07-17 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plates Secured to Roadway within building Operation barricades and in driving Lane. I/F/O 701 7th avneue |
2016-07-15 | No data | 7 AVENUE, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO BACKHOE AT THIS TIME |
2016-07-10 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates have been Removed now 2 Permanent Restoration reside within CNY Building Operation Barricades, Restorations are Flush to Grade. AKA 701 7th Avenue |
2016-07-05 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel Plates in the Roadway and an Opening on the Sidewalkm Permit expired. AKA 701 7th Avenue |
2016-06-19 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel Plates in the Roadway and an Opening on the Sidewalkm Permit expired. AKA 701 7th Avenue |
2016-06-12 | No data | WEST 47 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel Plates in the Roadway and an Opening on the Sidewalkm Permit expired. AKA 701 7th Avenue |
2016-05-21 | No data | 211 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/l |
2016-04-19 | No data | MILL ROAD, FROM STREET CARMELLA COURT TO STREET FOX BEACH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration opp address # 609/611 is slightly sunken. Check next inspection. |
2016-04-14 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING RESTORED. CONDITION CORRECTED. |
2016-04-05 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SOUTH STREET BEING MILLED FOR RESURFACING |
2016-02-24 | No data | KENT AVENUE, FROM STREET NORTH 11 STREET TO STREET NORTH 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | backhoe not stored in the roadway |
2016-02-16 | No data | ALBERT ROAD, FROM STREET 99 PLACE TO STREET HURON STREET | No data | Street Construction Inspections: Active | Department of Transportation | no backhoe found outside of fence |
2016-02-13 | No data | KENT AVENUE, FROM STREET NORTH 11 STREET TO STREET NORTH 12 STREET | No data | Street Construction Inspections: Active | Department of Transportation | fence.. |
2016-01-22 | No data | 132 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restored sidewalk flags in the middle of the segment |
2016-01-08 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking/driving lane. |
2015-11-24 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | C.A.R Condition corrected. Yellow lane markings restored. |
2015-11-15 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/t/p/o i observed the above respondent failed to restore solid yellow lines lane marking at center of roadway upon completion of sewer restoration as required. CAR 20155810607 was issued on 7/29/15, no action taken. Condition remains. |
2015-11-14 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I Observed the above respondent fail to replace solid white lane markings on bike lane , after completion of a perm water cut . A CAR #20156160241) was issued on 10/13/15. |
2015-11-09 | No data | 211 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/l |
2015-10-16 | No data | 46 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done, permit expired |
2015-10-13 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (1) Please restore while lane markings along with bike lane markings. (2) Seal all pin holes left in the roadway. |
2015-10-12 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to restore yellow middle lane markings to separate north and south bound lanes. Respondent was notified by C.A.R #20155810607 to correct condition on 7/29/15. Condition remains uncorrected. |
2015-09-25 | No data | 126 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i found no work that was done sidewalk and roadway was check could be under a parked car. |
2015-09-13 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET DOMINICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench acceptable |
2015-07-29 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, 2015 finalized sewer restoration. However, yellow lane markings at center line not installed. Please correct. |
2015-07-18 | No data | 47 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut sealed |
2015-07-02 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/t/p/o I observed the above respondent having a sewer excavation covered w/ steel plates on r/w & wood on s/w without a valid NYC DOT permit on file as required. Confirmed Sewer job with BO foreman. Above permit used for identification purposes |
2015-06-25 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TIME OF INSPECTION 7X4 PERM RESTORATION IN ROADWAY |
2015-06-10 | No data | MILL ROAD, FROM STREET CARMELLA COURT TO STREET FOX BEACH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed |
2015-05-20 | No data | 47 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restored sewer/water work in r/w has not been sealed |
2015-04-29 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Active | Department of Transportation | swk open to ped traffic and in compliance |
2015-03-28 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Active | Department of Transportation | roadway in compliance |
2015-03-13 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Active | Department of Transportation | r/w clear |
2015-03-10 | No data | 126 STREET, FROM STREET 82 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - crew on site,spoke to Juan |
2015-02-26 | No data | SOUTH STREET, FROM STREET PIKE SLIP TO STREET RUTGERS SLIP | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, no sewer cut or trench found at location. Sidewalk opened. no work started. |
2015-01-17 | No data | MILL ROAD, FROM STREET CARMELLA COURT TO STREET FOX BEACH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe, truck & compressor behind property line |
2015-01-13 | No data | MILL ROAD, FROM STREET CARMELLA COURT TO STREET FOX BEACH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Gramercy (Subcontractor) Crew onsite excavating roadway to shut off water and sewer using Excavator (Permit on file for use of Equipment ) |
2015-01-10 | No data | MILL ROAD, FROM STREET CARMELLA COURT TO STREET FOX BEACH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway clear at this time |
2015-01-02 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rwy resurfaced |
2014-09-17 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2014-06-27 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm, rwy |
2014-03-15 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut r/w |
2013-11-19 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w cut okay. |
2013-05-25 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration |
2013-04-19 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut approx 100ft from Bay St |
2012-07-19 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2012-06-01 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please apply green color code to roadway restoration to identify permittee |
2012-04-24 | No data | WILLOW AVENUE, FROM STREET BAY STREET TO STREET LANGERE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
No related officers
113 EDISON AVENUE, MOUNT VERNON, NY, United States, 10550
BROTHERS CEMENT TILE CORP. MOUNT VERNON RECYCLING CORP. ROSSINI EQUIPMENT CORP. ROSSINI CONTRACTING CORP.Date of last update: 11 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated