2023-05-10
|
No data
|
43 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway in compliance at this time.
|
2023-01-11
|
No data
|
BEDFORD AVENUE, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2022-09-14
|
No data
|
LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 204 Linden Boulevard
|
2022-07-24
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET IFO PROPERTY #41.
|
2022-06-21
|
No data
|
AVENUE P, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed - in compliance
|
2022-04-17
|
No data
|
60 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2022-04-14
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Active gas construction within corner. Passing out permit
|
2022-03-30
|
No data
|
23 STREET, FROM STREET 33 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed adjacent to property AKA # 21-34 BROADWAY in compliance
|
2022-03-07
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb OK seal
|
2022-02-26
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reset curb
|
2022-02-17
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb OK
|
2022-02-08
|
No data
|
49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance.
|
2022-01-22
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb reset
|
2022-01-19
|
No data
|
NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found to be in compliance
|
2022-01-15
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed IFO #19
|
2022-01-03
|
No data
|
ST MARKS AVENUE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2021-12-30
|
No data
|
MILTON STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb still in compliance
|
2021-12-30
|
No data
|
GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2021-12-26
|
No data
|
ASCAN AVENUE, FROM STREET AUSTIN STREET TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed adjacent to property AKA #73-20 AUSTIN STREET in compliance
|
2021-12-19
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2021-12-01
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found to be in compliance
|
2021-12-01
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found in compliance
|
2021-11-05
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner are accessible and functional but not Ada compliant. Previously measured and collected on 7/31/19.
|
2021-11-04
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset IFO property #307.
|
2021-10-27
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb installed
|
2021-10-26
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW STEEL FACE CURB INSTALLED
|
2021-10-06
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2021-09-22
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner are accessible and functional but not Ada compliant. Previously measured and collected on 7/31/19.
|
2021-09-11
|
No data
|
EAST 3 STREET, FROM STREET LAWRENCE AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-08-31
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection paved, in compliance
|
2021-08-29
|
No data
|
45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 BPP in Compliance
|
2021-08-29
|
No data
|
EAST 3 STREET, FROM STREET LAWRENCE AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 BPP in Compliance
|
2021-08-29
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed on roadway in front of 92 Emerson place
|
2021-08-29
|
No data
|
52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 BPP in Compliance
|
2021-08-29
|
No data
|
WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 BPP in Compliance
|
2021-08-28
|
No data
|
NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found to be in compliance
|
2021-08-19
|
No data
|
NORTH 12 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP repaved roadway is in good condition, for corner building property at Berry St.
|
2021-08-19
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection repaved as per BPP.
|
2021-08-19
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway repaved as per BPP, the whole block.
|
2021-08-19
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection repaved as per BPP for 25 Kent. Completed by different contractor.
|
2021-08-19
|
No data
|
NORTH 12 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP roadway repaved in intersection for building with public seating, ok.
|
2021-08-19
|
No data
|
BERRY STREET, FROM STREET NORTH 11 STREET TO STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP roadway repaving in good condition for corner building property at N 12 St.
|
2021-08-19
|
No data
|
BERRY STREET, FROM STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP roadway repaved- ok.
|
2021-08-15
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner are accessible and functional but not Ada compliant. Previously measured and collected on 7/31/19.
|
2021-08-13
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW STEEL FACED CURB INSTALLED I/F/O PROPERTY #189.
|
2021-08-10
|
No data
|
EVERGREEN AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved. Bike lanes installed. In compliance
|
2021-08-04
|
No data
|
MENAHAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW resurfaced by BPP, in compliance
|
2021-07-30
|
No data
|
AINSLIE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work observed
|
2021-07-30
|
No data
|
KEAP STREET, FROM STREET AINSLIE STREET TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb on metropolitan, in compliance
|
2021-07-30
|
No data
|
METROPOLITAN AVENUE, FROM STREET MEEKER AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed, in compliance
|
2021-07-25
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 765-755 Bedford avenue
|
2021-07-07
|
No data
|
SOUTH 3 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK RESURFACED BY NATIONAL WORK
|
2021-07-06
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is in compliance
|
2021-06-29
|
No data
|
MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-06-20
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired
|
2021-06-15
|
No data
|
WEST STREET, FROM STREET GREENPOINT AVENUE TO STREET MILTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED I/F/O #80 WEST STREET.
|
2021-06-15
|
No data
|
MILTON STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED ON THE SIDE OF PROPERTY #80 WEST STREET.
|
2021-06-08
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
2nd N.O.V issued for cracked concrete in quadrant. Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected updated on 5/4/2020.
|
2021-05-30
|
No data
|
BRIGHTON 2 LANE, FROM STREET BRIGHTON 2 PATH TO STREET BRIGHTON 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Length of the milled roadway property line to property line:90’Width of the entire roadway curb to curb:22’Width of the milled roadway:17’
|
2021-05-25
|
No data
|
SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb work in compliance
|
2021-05-24
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired in front of 1460 fulton street
|
2021-05-24
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2021-05-19
|
No data
|
GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel faced curb installed.
|
2021-05-13
|
No data
|
UNIVERSITY PLACE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O Building #34 steel face curb installed and roadway resurfaced as per BPP.
|
2021-05-09
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2021-05-04
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed in front of #410
|
2021-04-30
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected updated on 5/4/2020.
|
2021-04-28
|
No data
|
CYPRESS AVENUE, FROM STREET EAST 141 STREET TO STREET ST MARYS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reset replace curb
|
2021-04-17
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2021-04-16
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is a corner property both sides are within compliance.
|
2021-04-03
|
No data
|
BEDFORD AVENUE, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB OK
|
2021-03-31
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found to be in compliance
|
2021-03-27
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2021-03-27
|
No data
|
UNIVERSITY PLACE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Reset, repair steel face curb with expansion joints sealed between the curb and sidewalk is acceptable.
|
2021-03-27
|
No data
|
21 STREET, FROM STREET 47 ROAD TO STREET 49 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed expansion joints sealed
|
2021-03-25
|
No data
|
HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY FOUND RESURFACED BY DOT IN HOUSE
|
2021-03-23
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2021-03-21
|
No data
|
DAHILL ROAD, FROM STREET 16 AVENUE TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #437 DAHILL ROAD in compliance
|
2021-03-16
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2021-03-11
|
No data
|
KINGSLAND AVENUE, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2021-03-09
|
No data
|
49 AVENUE, FROM STREET 11 PLACE TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb installed expansion joints sealed at 11-39 49ave
|
2021-03-01
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is in compliance.
|
2021-02-24
|
No data
|
AVENUE N, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags in compliance
|
2021-02-22
|
No data
|
NORTH 7 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE PERMIT EXPIRED
|
2021-02-22
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
newer permit in progress and awaiting payment permits will be issued to APM SERVICES GROUP CORP
|
2021-01-30
|
No data
|
DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration is found to be in compliance
|
2021-01-28
|
No data
|
36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed expansion joints sealed
|
2021-01-28
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2021-01-28
|
No data
|
36 STREET, FROM STREET 37 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed for 37-16 36st
|
2021-01-27
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant are found to be ADA compliant. Ramps are functional and accessible, Previously measured and collected on 1/9/20.
|
2021-01-16
|
No data
|
EVERGREEN AVENUE, FROM STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced for new building plus 5 added
|
2021-01-16
|
No data
|
EVERGREEN AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced for new building plus 5 added
|
2021-01-13
|
No data
|
45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2021-01-11
|
No data
|
58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway found resurfaced
|
2021-01-10
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed
|
2021-01-10
|
No data
|
KENT AVENUE, FROM STREET NORTH 8 STREET TO STREET NORTH 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done
|
2021-01-10
|
No data
|
49 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2021-01-10
|
No data
|
49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2021-01-10
|
No data
|
47 STREET, FROM STREET 19 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2021-01-09
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
half plus 5 feet.
|
2021-01-06
|
No data
|
MENAHAN STREET, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #411 MENAHAN STREET in compliance
|
2021-01-06
|
No data
|
13 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rw ok
|
2021-01-06
|
No data
|
21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1\2 +5ok
|
2021-01-05
|
No data
|
EAST 3 STREET, FROM STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2021-01-05
|
No data
|
WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-01-05
|
No data
|
EAST 3 STREET, FROM STREET LAWRENCE AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed in compliance
|
2021-01-05
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-12-16
|
No data
|
LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved, in compliance
|
2020-12-15
|
No data
|
EAST 27 STREET, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is in compliance
|
2020-12-12
|
No data
|
PROSPECT PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Concrete) found to be in compliance
|
2020-12-09
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant was found to be non ada compliant, however ramps are functional and accessible. Previously measured on 8-22-19.
|
2020-12-06
|
No data
|
EVERGREEN AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of building #253 EVERGREEN AVENUE in compliance
|
2020-11-29
|
No data
|
GATES AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed adjacent to building AKA 1052 BUSHWICK AVENUE in compliance
|
2020-11-27
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection paved.
|
2020-11-27
|
No data
|
HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Area sunken on sewer line, more than one sunken areas on sewer line. DEP issue.
|
2020-11-18
|
No data
|
MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway flush and sealed ifo Beyond Market
|
2020-11-17
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
C.A.R issued for cracked concrete in quadrant. Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected updated on 5/4/2020.
|
2020-11-17
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved, in compliance
|
2020-11-17
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection paved, in compliance
|
2020-11-17
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Conditions remain the same, Area around street light poles was sealed. Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected updated on 5/4/2020.
|
2020-11-16
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street paved, in compliance
|
2020-11-16
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Area around street light post was sealed.
|
2020-11-13
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Area around street light post was sealed.
|
2020-11-13
|
No data
|
47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored expansion joints sealed
|
2020-11-10
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Area around street light poles was sealed
|
2020-11-10
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2020-11-06
|
No data
|
AVENUE N, FROM STREET EAST 55 STREET TO STREET EAST 56 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2020-11-06
|
No data
|
12 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2020-11-06
|
No data
|
12 AVENUE, FROM STREET 37 STREET TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2020-11-05
|
No data
|
6 AVENUE, FROM STREET 21 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rw paved 1\2+5
|
2020-11-05
|
No data
|
EAST 56 STREET, FROM STREET AVENUE N TO STREET MILL LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w is paved
|
2020-11-04
|
No data
|
47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset
|
2020-11-01
|
No data
|
EAST 56 STREET, FROM STREET AVENUE N TO STREET MILL LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2020-11-01
|
No data
|
AVENUE N, FROM STREET EAST 56 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done in intersection
|
2020-11-01
|
No data
|
LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2020-10-31
|
No data
|
LEE AVENUE, FROM STREET ROSS STREET TO STREET WILSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2020-10-31
|
No data
|
AVENUE P, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2020-10-30
|
No data
|
DAHILL ROAD, FROM STREET 16 AVENUE TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
the roadway was resurfaced
|
2020-10-23
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-10-22
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving in compliance.
|
2020-10-21
|
No data
|
MESEROLE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving in compliance.
|
2020-10-21
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2020-10-10
|
No data
|
PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work observed on corner property
|
2020-10-08
|
No data
|
BUSHWICK AVENUE, FROM STREET GATES AVENUE TO STREET PALMETTO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed
|
2020-10-08
|
No data
|
GRAHAM AVENUE, FROM STREET MESEROLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving ok.
|
2020-10-07
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent has obtained permit #B042019308A44. N.O.V issued for Conditions remaining the same to resolve excessive curb reveal issues. Completed tangent ramps in the NW2 corner are functional and accessible but not Ada compliant.
|
2020-10-05
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected updated on 5/4/2020.
|
2020-10-03
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired, in compliance
|
2020-10-01
|
No data
|
CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2020-10-01
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET TO STREET PILLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2020-09-29
|
No data
|
88 AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is ok steel face
|
2020-09-26
|
No data
|
EVERGREEN AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved by b.p.p
|
2020-09-24
|
No data
|
HARMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved roadway
|
2020-09-23
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found to be in compliance
|
2020-09-22
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CREW ON SITE ROADWAY CURB TO CURB IS 34FT. MILLED ROADWAY IS 22FT 5IN AND DEPTH OF 3 INCHES ACHIEVED
|
2020-09-21
|
No data
|
SHEEPSHEAD BAY ROAD, FROM STREET WEST 6 STREET TO STREET WEST 8 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-09-19
|
No data
|
AVENUE N, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2020-09-19
|
No data
|
AVENUE N, FROM STREET EAST 27 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2020-09-18
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2020-09-18
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE L TO STREET AVENUE M
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2020-09-18
|
No data
|
EAST 19 STREET, FROM STREET AVENUE O TO STREET AVENUE P
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2020-09-15
|
No data
|
EAST 32 STREET, FROM STREET AVENUE L TO STREET AVENUE M
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved
|
2020-09-15
|
No data
|
WEST 8 STREET, FROM STREET NYCTA SUBWAY TO STREET SHEEPSHEAD BAY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance.
|
2020-09-15
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
INTERSECTION PAVED
|
2020-09-14
|
No data
|
PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2020-09-14
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Isolated issued resolved & ramps restored. Completed tangent ramps on NW2 corner quadrant is accessible and functional , Non Ada compliant. Missing elements, Previously measured and collected on 7-26-19.
|
2020-09-13
|
No data
|
LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #888 in compliance
|
2020-09-13
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Length of the milled roadway property line to property line:428’Width of the entire roadway curb to curb:30’Width of the milled roadway:20’
|
2020-09-13
|
No data
|
WEST STREET, FROM STREET GREENPOINT AVENUE TO STREET MILTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed adjacent to property AKA #50 GREENPOINT AVENUE in compliance
|
2020-09-13
|
No data
|
MILTON STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done at time of inspection AKA 50 GREENPOINT AVENUE
|
2020-09-10
|
No data
|
RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving in compliance.
|
2020-09-08
|
No data
|
UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving in compliance.
|
2020-09-06
|
No data
|
WEST 6 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-09-05
|
No data
|
BAY 43 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-09-02
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET KANE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY HAS BEEN PAVED BY BPP
|
2020-09-01
|
No data
|
CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved by b.p.p
|
2020-09-01
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are functional and accessible, however, Non Ada compliant. Previously measured and collected on 7/26/19. NOV #0702170545 has been issued.
|
2020-09-01
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESURFACED BY B.P.P
|
2020-08-31
|
No data
|
6 AVENUE, FROM STREET 20 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
in compliance
|
2020-08-31
|
No data
|
4 AVENUE, FROM STREET 1 STREET TO STREET GARFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rw paved
|
2020-08-29
|
No data
|
PULASKI STREET, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5 in compliance
|
2020-08-24
|
No data
|
HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Edging of building paving is sunken about 2 inches below grade of roadway. On side closer to Meserole.
|
2020-08-21
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED
|
2020-08-15
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb pass
|
2020-08-14
|
No data
|
EASTERN PARKWAY, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found to be in compliance
|
2020-08-08
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found in compliance
|
2020-08-02
|
No data
|
AVENUE P, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway (BBP), sealed and flush
|
2020-08-02
|
No data
|
AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW CORNER BUILDING
|
2020-08-01
|
No data
|
NORTH 9 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING
|
2020-08-01
|
No data
|
KENT AVENUE, FROM STREET NORTH 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE
|
2020-07-30
|
No data
|
SUMPTER STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaved roadway for new building half + 5
|
2020-07-30
|
No data
|
SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaved roadway for new building half + 5
|
2020-07-29
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK OBSERVED.
|
2020-07-28
|
No data
|
BRIGHTON 3 STREET, FROM STREET BRIGHTON 2 LANE TO STREET BRIGHTON 3 LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved. BPP.
|
2020-07-28
|
No data
|
BRIGHTON 2 LANE, FROM STREET BRIGHTON 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP.
|
2020-07-25
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ONE HALF OF ROADWAY, PLUS FIVE FT HAS BEEN RESTORED.
|
2020-07-25
|
No data
|
SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ONE HALF OF ROADWAY, PLUS 5FT HAS BEEN RESTORED.
|
2020-07-24
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant are found to be ADA compliant. Ramps are functional and accessible, Previously measured and collected on 1/9/20. No further action is required.
|
2020-07-24
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb
|
2020-07-23
|
No data
|
LAFAYETTE AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAVED ROADWAY FOR NEW BUILDING HALF + 5 WAS DONE
|
2020-07-23
|
No data
|
SHELL ROAD, FROM STREET BEND TO STREET SHORE PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-07-22
|
No data
|
61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm restoration in 1/2+5 width of roadway.
|
2020-07-22
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway has repaved and + 5 added
|
2020-07-22
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway has repaved and + 5 added
|
2020-07-18
|
No data
|
EAST 19 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property# 323 in compliance
|
2020-07-17
|
No data
|
FREEMAN STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb intact, no defects at this time.
|
2020-07-16
|
No data
|
MENAHAN STREET, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved by b.p.p
|
2020-07-16
|
No data
|
GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced. BPP not visible.
|
2020-07-16
|
No data
|
LAWN COURT, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2020-07-16
|
No data
|
TROUTMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVED ROADWAY BY B.P.P
|
2020-07-15
|
No data
|
BRIGHTON 1 STREET, FROM STREET BRIGHTON 2 LANE TO STREET NEPTUNE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved. BPP.
|
2020-07-15
|
No data
|
EVERGREEN AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved roadway by b.p.p
|
2020-07-15
|
No data
|
HARMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVED BY B.P.P
|
2020-07-15
|
No data
|
EVERGREEN AVENUE, FROM STREET HARMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVED BY B.P.P
|
2020-07-15
|
No data
|
BUSHWICK AVENUE, FROM STREET HARMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVED BY B.P.P
|
2020-07-15
|
No data
|
BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVED BY B.P.
|
2020-07-15
|
No data
|
BRIGHTON 5 STREET, FROM STREET BRIGHTON 4 LANE TO STREET OCEAN VIEW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved. BPP.
|
2020-07-15
|
No data
|
GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire segment repaved, sidewalk flush and sealed.
|
2020-07-14
|
No data
|
HARRISON AVENUE, FROM STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Paving in compliance.
|
2020-07-14
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving ok.
|
2020-07-14
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving ok.
|
2020-07-14
|
No data
|
LINCOLN PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found to be in compliance
|
2020-07-14
|
No data
|
UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2020-07-13
|
No data
|
BUSHWICK AVENUE, FROM STREET SUYDAM STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved by b.p.p
|
2020-07-13
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D.O.T resurfaced the roadway in 2019
|
2020-07-13
|
No data
|
ATLANTIC AVENUE, FROM STREET MONACO PLACE TO STREET PLEASANT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED
|
2020-07-13
|
No data
|
KANE PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2020-07-13
|
No data
|
FULTON STREET, FROM STREET DOWNING STREET TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R\W PAVED 1\2 +5
|
2020-07-12
|
No data
|
GATES AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVED BY B.P.P
|
2020-07-12
|
No data
|
EAST 19 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & resurfaced restored in-kind in compliance
|
2020-07-12
|
No data
|
EAST 7 STREET, FROM STREET CORTELYOU ROAD TO STREET DITMAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & resurfaced restored in-kind BPP 1/2+5 course 40‘ x 20‘ in front of property#592 in compliance
|
2020-07-12
|
No data
|
BUSHWICK AVENUE, FROM STREET GATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY RESURFACED BY B.P.P
|
2020-07-12
|
No data
|
BUSHWICK AVENUE, FROM STREET GATES AVENUE TO STREET PALMETTO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAVED BY B.P.P
|
2020-07-11
|
No data
|
BATH AVENUE, FROM STREET 26 AVENUE TO STREET BAY 43 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-07-11
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB
|
2020-07-11
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVING DONE. 1 HALF PLUS 5FT.
|
2020-07-11
|
No data
|
BATH AVENUE, FROM STREET BAY 43 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-07-10
|
No data
|
60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Sidewalk flags and curb installed. Perm restoration in 1/2 + 5 width of roadway.
|
2020-07-10
|
No data
|
WEST 122 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been repaved since 2018 but new restorations are now in location IFO 215
|
2020-07-10
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w paved
|
2020-07-10
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w paved
|
2020-07-09
|
No data
|
CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVING DONE. HALF PLUS 5FT.
|
2020-07-09
|
No data
|
MAPLE STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK COMPLETED ON ROADWAY
|
2020-07-09
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration is found to be in compliance
|
2020-07-09
|
No data
|
WEST 24 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 560 ( closer to 11 Ave ), roadway paved perm / flush to South Curb. Newer perm 2019 Con Ed trench over top of old work.
|
2020-07-08
|
No data
|
DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work observed
|
2020-07-08
|
No data
|
MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK COMPLETED ON ROADWAY IN FRONT OF 502-504 MAPLE STREET
|
2020-07-08
|
No data
|
60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. New sidewalk flags and curb installed. Perm restoration in 1/2 + 5 width of roadway.
|
2020-07-07
|
No data
|
NASSAU STREET, FROM STREET BRIDGE STREET TO STREET DUFFIELD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK AT NEW BUILDING
|
2020-07-07
|
No data
|
60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm restoration in more than half width of roadway.
|
2020-07-07
|
No data
|
AVENUE D, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET ON NORTH WEST SIDE OF BLOCK
|
2020-07-07
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESURFACED BY B.P.P
|
2020-07-07
|
No data
|
BRIDGE STREET, FROM STREET NASSAU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING
|
2020-07-07
|
No data
|
BRIDGE STREET, FROM STREET RAMP TO STREET CONCORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING
|
2020-07-06
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
resurfaced intersection
|
2020-07-06
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2020-07-04
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE IN INTERSECTION OF RWY
|
2020-07-04
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5, in compliance
|
2020-07-04
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK AT NEW BUILDING
|
2020-07-04
|
No data
|
JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET CURB
|
2020-07-04
|
No data
|
HAVEMEYER STREET, FROM STREET GRAND STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT 108 HAVEMEYER ST
|
2020-07-04
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed, in compliance
|
2020-07-04
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING
|
2020-07-04
|
No data
|
EAST 19 STREET, FROM STREET CHURCH AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & resurfaced restored in-kind BPP 1/2+5 course 64‘ x 18‘ in front of building #15 in compliance
|
2020-07-04
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE INTERSECTION OF RWY
|
2020-07-03
|
No data
|
EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & resurfaced restored in-kind BPP 1/2+5 course in front of property #1082 in compliance
|
2020-07-02
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5, in compliance
|
2020-07-02
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5. In compliance
|
2020-07-02
|
No data
|
HUMBOLDT STREET, FROM STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Paving in compliance.
|
2020-07-02
|
No data
|
HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving in compliance.
|
2020-07-02
|
No data
|
COLUMBUS PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY NOW PAVED BY BPP
|
2020-07-02
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5, in compliance
|
2020-07-02
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w paved be building pavers
|
2020-07-02
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w paved be building pavers
|
2020-07-02
|
No data
|
LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK OBSERVED.
|
2020-07-01
|
No data
|
LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed on roadway
|
2020-07-01
|
No data
|
EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire segment repaved.
|
2020-07-01
|
No data
|
BEDFORD AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w pave by building pavers
|
2020-07-01
|
No data
|
BERGEN STREET, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut ok r\w
|
2020-07-01
|
No data
|
LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed
|
2020-07-01
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5, in compliance
|
2020-06-30
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance
|
2020-06-30
|
No data
|
SOUTH 5 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2020-06-30
|
No data
|
BEDFORD AVENUE, FROM STREET CLIFTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK OBSERVED.
|
2020-06-30
|
No data
|
FREEMAN STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire segment repaved.
|
2020-06-29
|
No data
|
FROST STREET, FROM STREET MANHATTAN AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-06-29
|
No data
|
EAST 32 STREET, FROM STREET AVENUE L TO STREET AVENUE M
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & resurfaced restored in-kind in prestigious condition in compliance
|
2020-06-29
|
No data
|
EAST 27 STREET, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & resurfaced restored in-kind BPP 1/2+5 course 30’ x 20’ in front of property AKA 2701 AVENUE N IN COMPLIANCE
|
2020-06-29
|
No data
|
FROST STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-06-28
|
No data
|
AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-06-28
|
No data
|
RODNEY STREET, FROM STREET BQE EASTBOUND EXIT 32 TO STREET AINSLIE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-06-28
|
No data
|
HOPE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed ifo #123
|
2020-06-28
|
No data
|
DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-06-28
|
No data
|
PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed in front of 640 parksideavenue
|
2020-06-28
|
No data
|
KINGSLAND AVENUE, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush and sealed.
|
2020-06-27
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street paved, in compliance
|
2020-06-27
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced for new building
|
2020-06-27
|
No data
|
BATH AVENUE, FROM STREET 26 AVENUE TO STREET BAY 43 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway BPP 1/2 plus 5 feet.
|
2020-06-27
|
No data
|
ROCKAWAY AVENUE, FROM STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced + 5 for new building
|
2020-06-27
|
No data
|
ROCKAWAY AVENUE, FROM STREET MAC DOUGAL STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced + 5 for new building
|
2020-06-26
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced for new building
|
2020-06-26
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET TO STREET PILLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway have been resurfaced
|
2020-06-26
|
No data
|
ST JOHNS PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been resurfaced
|
2020-06-25
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY WAS REPAVED IN FRONT OF 189
|
2020-06-25
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w ok
|
2020-06-25
|
No data
|
UNION STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w paved
|
2020-06-24
|
No data
|
PROSPECT PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1\2 +5 PAVED
|
2020-06-24
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1\2 +5 paved
|
2020-06-23
|
No data
|
MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new building roadway repaved
|
2020-06-23
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW resurfaced
|
2020-06-23
|
No data
|
LINCOLN PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done
|
2020-06-23
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner quadrant found to be non ADA compliant , ramps are functional and accessible. Previously measured on 5/10/2019 collector updated on 8/17/2019.
|
2020-06-23
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1\2+5 PAVED
|
2020-06-23
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1\2+5 PAVED
|
2020-06-23
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R\W PAVED 1\2 +5
|
2020-06-23
|
No data
|
BEDFORD AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVING WAS DONE.
|
2020-06-23
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street paved, in compliance
|
2020-06-22
|
No data
|
EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire segment repaved.
|
2020-06-22
|
No data
|
BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been repaved
|
2020-06-22
|
No data
|
STILLWELL AVENUE, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced
|
2020-06-20
|
No data
|
KANE PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK FOUND PERMIT EXPIRED
|
2020-06-20
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed.
|
2020-06-16
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2020-06-15
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2020-06-14
|
No data
|
FULTON STREET, FROM STREET DOWNING STREET TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2020-06-14
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2020-06-14
|
No data
|
CYPRESS AVENUE, FROM STREET EAST 141 STREET TO STREET ST MARYS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel faced curb installed
|
2020-06-13
|
No data
|
DAHILL ROAD, FROM STREET 16 AVENUE TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-06-13
|
No data
|
MILTON STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel curb intact, no defects.
|
2020-06-13
|
No data
|
GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel curb intact, no defects.
|
2020-06-12
|
No data
|
AVENUE P, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2020-06-11
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb work in compliance
|
2020-06-05
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2020-06-05
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new steel face curb installed
|
2020-06-04
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Conditions previously reported. Conditions remain the same.
|
2020-06-03
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance.
|
2020-06-03
|
No data
|
52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-06-03
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-06-02
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2020-06-01
|
No data
|
41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2020-05-31
|
No data
|
EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel faced curb installed
|
2020-05-30
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Concrete) found to be in compliance
|
2020-05-30
|
No data
|
SOUTH 2 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Concrete) found to be in compliance
|
2020-05-28
|
No data
|
COLUMBUS PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new walk ... n/w/c ....
|
2020-05-26
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET KANE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, sidewalk ...
|
2020-05-04
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected updated on 5/4/2020.
|
2020-05-04
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found not to be Ada compliant however, Ramps are accessible and functional. Previously measured and collected on 7/31/19. Will issue 2nd C.A.R crack concrete damages on ramp running slopes and isolation.
|
2020-05-03
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival at time of inspection respondent AIRSIDE PAVEMENT MARKING INC. has restored all bicycle lane markers in the roadway of the intersection over BPP 1/2+5 course in compliance.
|
2020-05-03
|
No data
|
NORTH 12 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival at time of inspection respondent AIRSIDE PAVEMENT MARKING INC. has restored all bicycle lane markers in the roadway of the intersection over re-paved BPP 1/2+5 course in compliance
|
2020-05-03
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival at time of inspection respondent AIRSIDE PAVEMENT MARKING INC.has restored all bicycle lane markers in the roadway over re-paved BPP 1/2+5 course adjacent to building AKA #25 KENT AVENUE IN COMPLIANCE
|
2020-04-24
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plastic was removed for DWS and expansion joint were sealed around light post as well as sidewalk. No further action taken at this time.
|
2020-03-28
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #51 in compliance
|
2020-03-23
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ramps are accessible and functional.
|
2020-03-20
|
No data
|
BUSHWICK AVENUE, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2020-03-19
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2020-03-19
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb found to be in compliance
|
2020-03-18
|
No data
|
25 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored
|
2020-03-17
|
No data
|
BROADWAY, FROM STREET 23 STREET TO STREET 25 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2020-03-11
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2020-03-11
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED
|
2020-03-06
|
No data
|
WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found Curb replaced / reset . ( Inspector H. Salovic )
|
2020-03-02
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2020-02-29
|
No data
|
UNIVERSITY PLACE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O aka 34 East 13th St on University Pl ( West Side ), steel face curb installed and roadway resurfaced as per BPP.
|
2020-02-23
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm gas cut found in bike lane in front of 382 wallabout
|
2020-02-17
|
No data
|
BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|
2020-02-14
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2020-02-12
|
No data
|
BRIDGE STREET, FROM STREET RAMP TO STREET CONCORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and curb repaired
|
2020-02-12
|
No data
|
NASSAU STREET, FROM STREET BRIDGE STREET TO STREET DUFFIELD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and curb repaired
|
2020-02-08
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb okay
|
2020-01-10
|
No data
|
44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-01-09
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEC newly completed tangent ramps found to be ADA compliant. Ramps are functional and accessible. Measured and collected on 1/9/20. No further action is required.
|
2020-01-07
|
No data
|
BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2019-12-31
|
No data
|
WEST 122 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and curb in compliance.
|
2019-12-31
|
No data
|
ST MARKS AVENUE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
permit is active for sidewalk and curb barricade off on the sidewalk
|
2019-12-29
|
No data
|
WINTHROP STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk repaired; sealer installed. Sealed and flush.
|
2019-12-29
|
No data
|
WINTHROP STREET, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire roadway resurfaced; cut no longer visible.
|
2019-12-28
|
No data
|
16 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2019-12-28
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found to be in compliance
|
2019-12-25
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of building #19 KENT AVENUE in compliance.
|
2019-12-22
|
No data
|
FREEMAN STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #152 in compliance
|
2019-12-22
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed
|
2019-12-21
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #4 in compliance
|
2019-12-03
|
No data
|
NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half roadway plus 5 done.
|
2019-11-30
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #420-426 TOMPKINS AVENUE in compliance
|
2019-11-30
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #410-420 in compliance
|
2019-11-30
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of building #410-420 Lexington Avenue in compliance
|
2019-11-23
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass
|
2019-11-20
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #158 in compliance
|
2019-11-20
|
No data
|
DECATUR STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Concrete) found to be in compliance
|
2019-11-20
|
No data
|
SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk and curb installed in front of 88 south 6 street
|
2019-11-20
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #847 in compliance
|
2019-11-10
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, paving completed ... ..new building ...
|
2019-11-09
|
No data
|
NORTH 12 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE WHITE BIKE LANE MARKINGS OVER ROADWAY RE-PAVE AT INTERSECTION OF WYTHE AVENUE & NORTH 12 STREET.
|
2019-11-09
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE WHITE CROSSWALK LANE MARKINGS(NORTH OF NORTH 12 ST) & RESTORE WHITE BIKE LANE MARKINGS OVER NEW PERMANENT RE-PAVE ROADWAY, AT WYTHE AVENUE BETWEEN NORTH 12 STREET & NORTH 13 STREET.
|
2019-11-09
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE WHITE BIKE LANE MARKINGS OVER ROADWAY RE-PAVE AT INTERSECTION OF WYTHE AVENUE & NORTH 13 STREET.
|
2019-11-03
|
No data
|
LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sealer installed in expansion joint. In-compliance.
|
2019-11-03
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #1460 in compliance
|
2019-11-03
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #1409 in compliance
|
2019-11-02
|
No data
|
52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Joints sealed
|
2019-10-27
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #873 in compliance
|
2019-10-27
|
No data
|
DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #800 in compliance
|
2019-10-26
|
No data
|
FULTON STREET, FROM STREET DOWNING STREET TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of building #1008 in compliance
|
2019-10-25
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel faced) found to be in compliance
|
2019-10-24
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #1148 in compliance
|
2019-10-23
|
No data
|
NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2019-10-23
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #564 in compliance
|
2019-10-23
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #1068 in compliance
|
2019-10-23
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #1092 in compliance
|
2019-10-23
|
No data
|
PROSPECT PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #633 in compliance
|
2019-10-23
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #562 in compliance
|
2019-10-22
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner found not to be Ada compliant, Ramps are accessible, functional measured and collected on 7/31/19.
|
2019-10-20
|
No data
|
MILTON STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2019-10-19
|
No data
|
GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2019-10-14
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
HALF PLUS FIVE 5 FEEY RWY RESURFACING OK
|
2019-10-11
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Tangent ramps in the SE4 corner quadrant are functional and accessible. Non Ada compliant. Measured and collected on 7/26/19
|
2019-10-10
|
No data
|
16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #98 in compliance
|
2019-10-08
|
No data
|
7 AVENUE, FROM STREET WEST 126 STREET TO STREET WEST 127 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb okay.
|
2019-10-05
|
No data
|
NORTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bike lane markings restored.
|
2019-10-05
|
No data
|
BEDFORD AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
All lane marking (solid white, bike lane, crosswalk) is restored.
|
2019-10-05
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Solid white lane marking in roadway is restored
|
2019-10-04
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramp on the NW2 corner quadrant is accessible and functional. Measured on 1-10-19 and updated collector on 10/4/2019.
|
2019-10-03
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please disregard the last 2 previous inspections. This permit is being used for the newly completed tangent ramps in the Ne3 corner, front of 1535 Bedford Ave. Ramps are accessible, functional and collected on 10/3/19. We’ll measure at a later date.
|
2019-10-02
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp, new building ....
|
2019-10-01
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE F TO STREET DITMAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2019-09-29
|
No data
|
WALTON STREET, FROM STREET MARCY AVENUE TO STREET WALLABOUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk replaced in front of 18 Wallabout steet
|
2019-09-28
|
No data
|
NORTH 5 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk repaired.
|
2019-09-25
|
No data
|
LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed a sidewalk installment with no sealer in the expansion joints.
|
2019-09-25
|
No data
|
ST MARKS AVENUE, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed
|
2019-09-22
|
No data
|
BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb
|
2019-09-22
|
No data
|
48 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints needs to be sealed
|
2019-09-22
|
No data
|
52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal all expansion joints at both property lines and at the curb.
|
2019-09-20
|
No data
|
88 AVENUE, FROM STREET 153 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired. No work observed at this time.
|
2019-09-20
|
No data
|
EAST 104 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done but an area within curb and new sidewalk was left temp with concrete expose but no way to Link condition to anyone at this time, area is about 7x6 area
|
2019-09-18
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit status denied on NYC night streets under further investigation in front of building #51
|
2019-09-17
|
No data
|
88 AVENUE, FROM STREET 153 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started. Grey existing ped ramps
|
2019-09-16
|
No data
|
NORTH 12 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED 21 FT X 21 FT OF RWY 30 FEET DOWN 2-3 INCHES DUE TO COBBLESTONE.
|
2019-09-16
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BRUNO ON SITE FOR BPP- ARRIVE 940 AM ROADWAY MILLED ENTIRE SEGMENT 21 FEET MILLED ON ROADWAY 30 FEET WIDE
|
2019-09-16
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BRUNO ON SITE FOR BPP- ARRIVE 940 AM ROADWAY MILLED 15 FEET OF SEGMENT OFF WYTHE AVENUE-MILLED 23 FEET MILLED ON ROADWAY 30 FEET WIDE DOWN 2-3 INCHES DUE TO COBBLESTONE UNDER WEARING COURSE.
|
2019-09-16
|
No data
|
61 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP street pave work
|
2019-09-16
|
No data
|
ROGERS AVENUE, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP street pave work started
|
2019-09-16
|
No data
|
LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP street pave work started
|
2019-09-16
|
No data
|
23 STREET, FROM STREET 33 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Worked was completed on 8/29/19 under expired permit Q012019210B66
|
2019-09-16
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED 23 FT X 23 FT OF RWY 30 FEET DOWN 2-3 INCHES DUE TO COBBLESTONE.
|
2019-09-13
|
No data
|
LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb
|
2019-09-13
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
work must be completed, airside is still the last permittee of record
|
2019-09-13
|
No data
|
4 AVENUE, FROM STREET 1 STREET TO STREET GARFIELD PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full width of the roadway - 39 Feet 7 inches Width of milled roadway half plus 5 - 24 Feet Length of milled roadway half plus 5 - 121 Feet 4 inchesDepth of milled roadway - 3 inches
|
2019-09-11
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
PED RAMP WORK
|
2019-09-09
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Valid permit on file for paving.
|
2019-09-06
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Incomplete tangent ramp on the SE4 corner quadrant is accessible and functional, however ramps are non ADA compliant. Measured and collected on 7-26-19. (This is the 2nd CAR)
|
2019-09-06
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Incomplete tangent ramp on the SE4 corner quadrant is accessible and functional, however ramps are non ADA compliant. Measured and collected on 7-26-19. (This is the 2nd CAR)
|
2019-09-06
|
No data
|
NORTH 5 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk in compliance
|
2019-09-05
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed tangent ramp on the SW1 corner quadrant is accessible and functional. Measured on 8-22-19 and updated collector on 9-4-19.
|
2019-09-04
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed tangent ramps in the NW2 corner quad street light post has been corrected no further action required at time of inspection ramps are non ADA compliant however ramps are functional and accessible.
|
2019-09-04
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed tangent ramp on the SW1 corner quadrant is accessible and functional. Refer to permit # Q012019217B48 on file.
|
2019-09-03
|
No data
|
LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction container stored in the roadway of the parking lane in front of property #888
|
2019-09-01
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved half plus 5 feet. lane marking restored.
|
2019-09-01
|
No data
|
BEDFORD AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restore ALL lane markings ( solid white, bike lane, crosswalk).
|
2019-09-01
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restore solid white lane marking on roadway.
|
2019-09-01
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w was milled & active permit on file
|
2019-09-01
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w milled but not paved yet
|
2019-08-30
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent failed to notice nyc dot hiqa brough office within 4 hour prey to paving. As per stipulation 1/2 + 5.
|
2019-08-30
|
No data
|
LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp, performed ... all street lane markings restored as well ....
|
2019-08-29
|
No data
|
23 STREET, FROM STREET 33 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed the respondent milling and paving the roadway with an expired permit . This permit expired 8/26/19 .
|
2019-08-28
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work observed at this time.
|
2019-08-28
|
No data
|
LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No bpp Street pavement has started
|
2019-08-27
|
No data
|
LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
HALF PLUS 5 FEET DONE PROPERLY
|
2019-08-23
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2019-08-22
|
No data
|
NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb.
|
2019-08-22
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved half plus 5 feet on roadway
|
2019-08-22
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Ramps are functional and accessible. Non Ada compliant. Measured and collected on 8/22/19. Ramp running slope exceeds Ada measurements, DWS plastic cover needs to be removed
|
2019-08-21
|
No data
|
23 STREET, FROM STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly installed tangent ramps in the SW1 corner quadrant are functional and accessible. Unable to measure due active construction within corner
|
2019-08-21
|
No data
|
88 AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent stored a chain-linked fence across the sidewalk and along the roadway without pulling a Fence permit to do so. Respondent was identified by active permits # Q022019205B98 and Q042019205A20 for doing work at location.
|
2019-08-21
|
No data
|
153 STREET, FROM STREET 88 AVENUE TO STREET 89 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent stored a chain-linked fence across the sidewalk and along the roadway without pulling a Fence permit to do so. Respondent was identified by active permit#s Q022019205C04 and Q042019205A21 for doing work at location.
|
2019-08-20
|
No data
|
AVENUE P, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Brand new curb reveal installed in front of property #3614 in compliance.
|
2019-08-20
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO CONTAINER ON STREET
|
2019-08-20
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
half plus 5 feet finalized
|
2019-08-20
|
No data
|
WEST 6 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Width 34 ft & Length 39 ft 7 inches & Depth 2.5 inches
|
2019-08-20
|
No data
|
BEDFORD AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 24 feet x (W) 38 feet x (D) 3 inches..length of roadway curb to curb 55 feet.
|
2019-08-20
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 130 feet x (W) 22 feet x (D) 3 inches.. width of roadway 34 feet.
|
2019-08-20
|
No data
|
BEDFORD AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 97 feet x (W) 32 feet x (D) 3 inches.. curb to curb width 52 feet.
|
2019-08-20
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass,mall paved ..
|
2019-08-19
|
No data
|
PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New Curb installed.
|
2019-08-17
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains the same ,Respondent completed work on repairing the sidewalk with their sidewalk repair permit B042018052A02. Respondent was notified on 5/15/19 C.A.R #20195730221,Upon reinspection no ped ramp permit on file, no action taken.
|
2019-08-17
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant found to be non ADA compliant , ramps are functional and accessible. Measured on 5/10/2019 collector updated on 8/17/2019. C.A.R#20196900133 issued on 8/14/2019. Condition remains the same.
|
2019-08-16
|
No data
|
36 STREET, FROM STREET FT HAMILTON PARKWAY TO STREET MINNA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of the roadway is 29 feet and 6inches. 20 feet width of the roadway is milled. Property length milled is 79feet and 8inches. Depth of roadway milled down 2.5 inches.Email sent 3:29pm,8/16/19. Inspection did not record.
|
2019-08-15
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
half plus 5 okay r/w milled 3 inches
|
2019-08-14
|
No data
|
NORTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
FAILURE TO RESTORE BIKE LANE MARKINGS
|
2019-08-14
|
No data
|
DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP street pave work started
|
2019-08-14
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent completed work on repairing the sidewalk with their sidewalk repair permit B042018052A02.Respondent was notified on 5/15/19 C.A.R 20195730221,Upon reinspection no ped ramp permit on file
|
2019-08-14
|
No data
|
WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2019-08-14
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps found not to be Ada compliant; Ramps are accessible, functional, measured and collected on 1/10/19.
|
2019-08-14
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant found to be non ADA compliant , ramps are functional, accessible. Measured and collected on 5/10/2019.
|
2019-08-14
|
No data
|
HUMBOLDT STREET, FROM STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INTERSECTION IS MILLED 25FT X 22FT WITH A DEPTH OF 3 INCHES
|
2019-08-14
|
No data
|
MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY IS MILLED 145FT X 25FT WITH A DEPTH OF 3INCHES
|
2019-08-14
|
No data
|
HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY IS CURRENTLY MILLED 125FT X 22FT WITH A DEPTH OF 3INCHES
|
2019-08-11
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work started
|
2019-08-09
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the intersection size is 45 ft x 45 ft they have milled 29 ft x 29 ft down 3 inches as required.
|
2019-08-09
|
No data
|
AVENUE D, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway width is 42 ft they have milled 27 ft x 123 ft down 3 inches the required 1/2 + 5 ft have been milled.
|
2019-08-09
|
No data
|
NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the roadway is milled width of r/w is 43 ft they have milled 27 ft x 68.9 ft down 3 inches the required 1/2 + 5 ft is done
|
2019-08-08
|
No data
|
LINCOLN PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved half plus 5 feet
|
2019-08-07
|
No data
|
HOPE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
LENGTH OF ROADWAY CURB TO CURB IS 30FT MILLED ROADWAY IS 20FT 2INCHES LENGTH OF ROADWAY THAT IS MILLED IS 215FT WITH A DEPTH OF 3 INCHES
|
2019-08-07
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Valid permit B012019197C26; roadway milled
|
2019-08-07
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INTERSECTION IS MILLED 20FT X 25FT WITH A DEPTH OF 3 INCHES
|
2019-08-07
|
No data
|
RODNEY STREET, FROM STREET BQE EASTBOUND EXIT 32 TO STREET AINSLIE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 30FT MILLED ROADWAY IS 20FT WITH A DEPTH OF 3 INCHES LENGTH OF MILLED ROADWAY IS 120FT 8INCHES
|
2019-08-07
|
No data
|
153 STREET, FROM STREET 88 AVENUE TO STREET 89 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk Occupied At Time Of Inspection
|
2019-08-06
|
No data
|
153 STREET, FROM STREET 88 AVENUE TO STREET 89 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Ped Walkway On Site At Time Of Inspection
|
2019-08-06
|
No data
|
SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW BUILDING NEW CURB OK
|
2019-08-06
|
No data
|
88 AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Ped Walkway On Site At Time Of Inspection
|
2019-08-05
|
No data
|
NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the width of the r/w is 33.9 ft they have milled 51.3 x 22.9 ft that is down 4 inch waiting for asphalt.
|
2019-08-05
|
No data
|
56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The roadway measures 30 feet from curb to curb. The contractor on site milled 20 feet of the roadway, adjacent to the property. However, they only milled the roadway to a depth of 2 ¾ inches due to them reaching the concrete base. Pass.
|
2019-08-05
|
No data
|
88 AVENUE, FROM STREET 150 STREET TO STREET 153 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Occupied At Time Of Inspection
|
2019-08-03
|
No data
|
BROADWAY, FROM STREET 21 STREET TO STREET 23 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONSTRUCT NEW SIDEWALK- A 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN ROADWAY. NO CREW ON SITE. SIDEWALK FULLY CLOSED.
|
2019-08-03
|
No data
|
23 STREET, FROM STREET 33 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN CONSTRUCTION DEBRIS CONTAINER ON THE STREET
|
2019-08-02
|
No data
|
BROADWAY, FROM STREET 21 STREET TO STREET 23 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container not visible
|
2019-08-02
|
No data
|
23 STREET, FROM STREET 33 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ped /walk not visible
|
2019-08-02
|
No data
|
LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP measurementsFull width of r/w- 59’4’’r/w cut- 34’4’’length of r/w cut- 56’depth cut- 3’’
|
2019-08-02
|
No data
|
EAST 3 STREET, FROM STREET LAWRENCE AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street is 27ft cutback 19ft by 126 ft down 3in
|
2019-08-02
|
No data
|
WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
19ft by 110ft down 3in
|
2019-08-01
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly installed ramps within the NW2 is non Ada compliant,however, ramp is functional and accessible. Measured and collected on 3/18/2019. Must isolate street light pole.
|
2019-08-01
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to active permit #B042019205A39
|
2019-07-31
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset in compliance.
|
2019-07-31
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street paved hallf plus 5 feet.
|
2019-07-31
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk installed and sealed.
|
2019-07-31
|
No data
|
AVENUE D, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner found not to be Ada compliant, Ramps are accessible, functional measured and collected on 7/31/19.
|
2019-07-31
|
No data
|
NORTH 12 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Milled roadway at time of inspection actual paving work did not start.
|
2019-07-31
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMITTEE FAILED TO COMPLY WITH STIPULATION 1/2+5 WHICH STATES. THE PERMITTEE IS REQUIRED TO CALL THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING.
|
2019-07-26
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Incomplete tangent ramp on NW2 corner quadrant is accessible and functional. Non Ada compliant. Missing elements. Measured and collected on 7-26-19.
|
2019-07-26
|
No data
|
BAY 43 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent failed to notify NYC DOT HIQA borough office within 4 hours prior to 4 hours prior to paving. As per stipulation 1/2 + 5.
|
2019-07-26
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Incomplete tangent ramp on the SE4 corner quadrant is accessible and functional, however ramps are non Ada compliant. Measured and collected on 7-26-19.
|
2019-07-26
|
No data
|
BATH AVENUE, FROM STREET 26 AVENUE TO STREET BAY 43 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent failed to notify NYC DOT HIQA borough office within 4 hours prior to 4 hours prior to paving. As per stipulation 1/2 + 5.
|
2019-07-25
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ..
|
2019-07-25
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramp on SW1 corner quadrant is accessible and functional, however ramps are non Ada compliant. Measured and collected on 7-25-19. Active permit # B042019176A11 on file. Expansion joints need to be installed on ramp 2.
|
2019-07-25
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to permit # B012019199C26
|
2019-07-25
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Incomplete tangent ramp on SW1 corner quadrant is accessible and functional. Ramps are non Ada compliant. Measured and collected on 7-25-19. Some elements need to be restored, joints need to be sealed, light pole need to be isolated. Street is milled
|
2019-07-24
|
No data
|
LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2019-07-24
|
No data
|
KINGSLAND AVENUE, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, bpp, preformed .. 25x22x33'' milled out report sent ...crew lift on site awaiting asphlt ...all lane markings to be restored ...
|
2019-07-24
|
No data
|
DEVOE STREET, FROM STREET CATHERINE STREET TO STREET OLIVE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 30FT MILLED ROADWAY IS 20FT. CONTRACTOR STILL HAS ABOUT 9 INCHES OF ROADWAY TO MILL TO SQUARE OFF CUT. LENGTH OF CUT IS 24FT 10IN DEPTH OF 3INCHES
|
2019-07-24
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb ..
|
2019-07-24
|
No data
|
DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY IS PAVED HALF+5 CURB TO CURB LENGTH IS 30FT PAVED ROADWAY FROM CURB IS 20FT. LENGTH OF PAVED ROADWAY IS 22FT 10IN
|
2019-07-23
|
No data
|
KINGSLAND AVENUE, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTRACTOR CALLED FOR BPP AT 10AM NO CREW HAS SHOWED UP FOR WORK. RESPONDENT WILL NEED TO CALL BACK FOR ANOTHER INSPECTION
|
2019-07-21
|
No data
|
GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paving due to BPP ....all lane markings restored as welll ...
|
2019-07-19
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb .. nistall ..n/e/c
|
2019-07-19
|
No data
|
BAINBRIDGE STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2019-07-19
|
No data
|
COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP paved street , work not started.
|
2019-07-19
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN TO BASE 2 1/2 INCHES -HALF PLUS 5 FEET
|
2019-07-19
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN TO BASE 2 1/2 INCHES -HALF PLUS 5 FEET
|
2019-07-19
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN TO BASE 3 INCHES -HALF PLUS 5 FEET
|
2019-07-19
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN TO BASE 3 INCHES -HALF PLUS 5 FEET
|
2019-07-19
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN TO BASE & COBBLESTONE BASE 2 1/2 INCHES -HALF PLUS 5 FEET
|
2019-07-19
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN TO BASE 2 1/2 INCHES -HALF PLUS 5 FEET
|
2019-07-19
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY PARTIALLY MILLED -CONTAINED DEBRIS IN CONTAINER ON RWY
|
2019-07-18
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp paved street, roadway in process of being milled at time of inspection.
|
2019-07-18
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp pavement street , roadway in the process of being milled at time of inspection.
|
2019-07-18
|
No data
|
WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp paved street, roadway in process of being milled at time of inspection.
|
2019-07-18
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp paved street, roadway in process of being milled at time of inspection.
|
2019-07-18
|
No data
|
KENT AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp paved street, roadway in process of being milled at time of inspection.
|
2019-07-16
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 33 feet x (W) 28 x (D) 3 inches... total width of roadway 34 feet.
|
2019-07-16
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 192 feet x (W) 33 x (D) 3''.. total width of roadway 54 feet.
|
2019-07-16
|
No data
|
LINCOLN PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 133 feet x (W) 23 feet x (D) 3''.. total width of roadway 34 feet.
|
2019-07-16
|
No data
|
EASTERN PARKWAY, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 178 feet x (W) 17 feet x (D) 3''.. total width of roadway 24 feet.
|
2019-07-16
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 33 feet x (W) 26 feet x (D) 3 inches .. total width of roadway 30 feet.
|
2019-07-13
|
No data
|
38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb
|
2019-07-11
|
No data
|
BERGEN STREET, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SIDEWALK FLAGS INSTALLED IN FRONT FRONT 916
|
2019-07-10
|
No data
|
KINGSLAND AVENUE, FROM STREET FROST STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pave street work not started.
|
2019-07-09
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramp on the NW2 corner quadrant is accessible and functional. Measured on 1-10-19 and updated collector on 7-9-19.
|
2019-07-09
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramp on the NW2 corner quadrant is accessible and functional. Measured on 5-10-19 and updated collector on 7-9-19.
|
2019-07-08
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramp on NE3 corner quadrant is accessible and functional, however ramps are non Ada compliant. Measured and collected on 7-8-19.
|
2019-07-02
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway milled half plus 5 at this time awaiting pavement.
|
2019-07-02
|
No data
|
EASTERN PARKWAY, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway milled at this time.
|
2019-07-02
|
No data
|
LINCOLN PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway milled half plus 5 at this time awaiting pavement.
|
2019-07-02
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway milled half plus 5 at this time awaiting pavement.
|
2019-07-01
|
No data
|
GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, all bpp as well as markings.. installed ...
|
2019-07-01
|
No data
|
NORTH 1 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2019-07-01
|
No data
|
PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r\w mill 20ft by 80ft down 3in
|
2019-06-30
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved half plus 5
|
2019-06-28
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MILLING OF ROADWAY HAVING HIM CALL FOR APPOINTMENT
|
2019-06-28
|
No data
|
PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
having full width of sidewalk excavated & closed to pedestrian use without providing a MINIMUM 5 FOOT CLEAR SIDEWALK as required by stipulation ID:013 of their permit to CONSTRUCT NEW SIDEWALK pavement.
|
2019-06-28
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RESPONDENT HAS MILLED ABOUT 315FT OF ROADWAY FROM CORNER TO CORNER TOTAL LENGTH IS 405FT. CURB TO CURB 30FT RESPONDENT DID MILL 20FT FROM CURB
|
2019-06-26
|
No data
|
EMERSON PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New curb installed. Expansions joints not sealed
|
2019-06-26
|
No data
|
60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
yellow lane markings ok
|
2019-06-24
|
No data
|
NORTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT HAS FAILED TO RESTORE WHITE LANE MARKINGS FOR BIKE LANE. RESPONDENT WAS NOTIFIED ON CAR#20194510452 ON 5/1/2019 AND FAILED TO TAKE ACTION TO CORRECT DEFECT.
|
2019-06-20
|
No data
|
EAST 3 STREET, FROM STREET LAWRENCE AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk including curb, all sealed and flush
|
2019-06-18
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE.
|
2019-06-18
|
No data
|
EASTERN PARKWAY, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK STARTED.
|
2019-06-18
|
No data
|
45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY IS MILLED MEASUREMENTS ARE LENGTH 82FT WIDTH FROM CURB TO CURB IS 30FT HALF OF THAT IS 15FT ADD 5FT IS 20FT DEPTH 3INCHES
|
2019-06-17
|
No data
|
52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Width from Curb to Curb 30’Property Length 46’BPP Size.Length: 46’4”.Width: 20’.Depth: 3.5”
|
2019-06-17
|
No data
|
EAST 19 STREET, FROM STREET CHURCH AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
64ft by 18ft down 3iin
|
2019-06-12
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY RESURFACED OK
|
2019-06-12
|
No data
|
BAY 43 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY IS MILLED CORNER PROPERTY MEASUREMENT ON BAY 43STREET SIDE LENGTH IS 151FT CURBTO CURB WAS 32FT HALF OF THAT IS 16FT ADD 5FT IS 21FT DEPTH IS 3INCHES ON BATH AVE SIDE LENGTH WAS 105FT CURB TO CURB WAS 42FT HALF IS 21FT ADD 5FT 26FT DEPTH
|
2019-06-11
|
No data
|
BERRY STREET, FROM STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE HALF PLUS 5 FEET -OK
|
2019-06-11
|
No data
|
NORTH 12 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE HALF PLUS 5 FEET -OK
|
2019-06-11
|
No data
|
BERRY STREET, FROM STREET NORTH 11 STREET TO STREET NORTH 12 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE HALF PLUS 5 FEET -OK
|
2019-06-05
|
No data
|
CYPRESS AVENUE, FROM STREET EAST 141 STREET TO STREET ST MARYS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel faced curb
|
2019-06-01
|
No data
|
BEDFORD AVENUE, FROM STREET EASTERN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed ramps within the NW2 is non Ada compliant,however, ramp is functional and accessible. Measured and collected on 3/18/2019.
|
2019-05-28
|
No data
|
EAST 19 STREET, FROM STREET CHURCH AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started
|
2019-05-28
|
No data
|
EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB
|
2019-05-24
|
No data
|
NORTH 12 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP;The contractor milled 150’ x 20’ in front of 150 North 12th with a depth of 3”. Roadway width from curb to curb is 30’.
|
2019-05-21
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK INSTALLED
|
2019-05-21
|
No data
|
36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2019-05-19
|
No data
|
NORTH 13 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed.
|
2019-05-18
|
No data
|
25 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2019-05-17
|
No data
|
ST MARKS AVENUE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
B012019112C53 active permit on file
|
2019-05-16
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2019-05-15
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file for the newly completed tangent ramps in the NE3 corner quadrant, ramps are functional,accessible. Will Measured and collected at a later date. C.a.r blitz.
|
2019-05-15
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Responded still failed to obtain a 410 permit, will pass this one out and re-issue c.a.r.
|
2019-05-14
|
No data
|
BRIGHTON 2 LANE, FROM STREET BRIGHTON 2 PATH TO STREET BRIGHTON 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2+5 area of roadway milled, down 3” in compliance and waiting for top.
|
2019-05-14
|
No data
|
BRIGHTON 3 STREET, FROM STREET BRIGHTON 2 LANE TO STREET BRIGHTON 3 LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2+5 area of roadway milled, down 3” in compliance and waiting for top.
|
2019-05-14
|
No data
|
BRIGHTON 2 LANE, FROM STREET BRIGHTON 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2+5 area of roadway milled, down 3” in compliance and waiting for top.
|
2019-05-13
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2019-05-13
|
No data
|
CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2019-05-11
|
No data
|
BROADWAY, FROM STREET 23 STREET TO STREET 25 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2019-05-10
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET
|
2019-05-10
|
No data
|
MESEROLE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO CALL THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. A VIOLATION OF STIPULATION 1/2+5' OF ABOVE DOT PERMIT USED FOR ID.
|
2019-05-10
|
No data
|
GRAHAM AVENUE, FROM STREET MESEROLE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO CALL THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. A VIOLATION OF STIPULATION 1/2+5' OF ABOVE DOT PERMIT WHICH WAS USED FOR ID.
|
2019-05-10
|
No data
|
GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO CALL THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. A VIOLATION OF STIPULATION 1/2+5' OF ABOVE DOT PERMIT WHICH WAS USED FOR ID.
|
2019-05-10
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant were found to be non ADA compliant ,however, ramps are functional and accessible. Measured and collected on 5/10/2019. Inspector 690, 693
|
2019-05-09
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Tangent ramps located in the SE4 corner quadrant are behind active BO fence. Will return after construction is completed to measure and collect. Inspectors 687, 692
|
2019-05-08
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED
|
2019-05-08
|
No data
|
WEST 122 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed on sidewalk.
|
2019-05-08
|
No data
|
HALSEY STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INTERSECTION IS BEING MILLED AT THIS TIME DEPTH OF 3 INCHES ACHIEVED
|
2019-05-08
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 34FT MILLED ROADWAY IS 22FT. LENGTH OF MILLED ROADWAY IS 123FT
|
2019-05-07
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED
|
2019-05-06
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Duplicate- Tangent ramps located in the SE4 corner quadrant are behind active BO fence. Will return after construction is completed to measure and collect. Inspectors 687, 692. Refer to active permit #B042019123A52
|
2019-05-06
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Duplicate-Tangent ramps located in the NW2 corner quadrant are behind active BO fence. Will return after construction is completed to measure and collect. Inspectors 687, 692. Refer to active permit #B042019123A55
|
2019-05-06
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE L TO STREET AVENUE M
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The roadway measures 70 feet 6inches from curb to curb. The contractor milled 40 feet 6 inches with a depth of 3 inches of the roadway, adjacent to the property. In compliance with the BPP required measurements (1/2 + 5), pass.
|
2019-05-05
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2019-05-05
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED
|
2019-05-04
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2019-05-04
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
s/w joints sealed.
|
2019-05-03
|
No data
|
UNIVERSITY PLACE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At the time of inspection, I found a steel face curb installed.
|
2019-05-03
|
No data
|
38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(BPP Inspection) Roadway from curb to curb measures 30 feet. The contractor milled 20 feet with a depth of 3 inches. In compliance with the BPP required measurements.
|
2019-05-03
|
No data
|
36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2019-05-03
|
No data
|
36 STREET, FROM STREET 37 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2019-05-03
|
No data
|
35 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2019-05-01
|
No data
|
NORTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please restore white bike lane markings over new permanent restoration in the roadway (half plus 5 ft roadway resurfacing), in front of 88 North 5 Street between Berry Street & Wythe Avenue.
|
2019-05-01
|
No data
|
AVENUE P, FROM STREET EAST 36 STREET TO STREET EAST 37 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent/respondent's subcontractor actively working on site at 4:07PM, past their stipulated work hours. Failed to comply with stipulation 072, Work 9AM-4PM, MONDAY TO FRIDAY. Permit, B012019121B07 exp. 5/30/2019, used for ID.
|
2019-04-26
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 was obtained; however DWS and blue tape were removed and replaced. New C.A.R will be issued.
|
2019-04-26
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps found not to be Ada compliant; however ramps are accessible, functional, measured and collected on 1/10/19
|
2019-04-25
|
No data
|
EVERGREEN AVENUE, FROM STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w has been milled and paved half plus 5. has white lane markings in compliance
|
2019-04-25
|
No data
|
MENAHAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w has been milled and paved half plus 5. has white lane markings in compliance
|
2019-04-21
|
No data
|
BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED
|
2019-04-18
|
No data
|
51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street pavement is in compliance
|
2019-04-18
|
No data
|
60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to restore in kind all roadway pavement markings. Restore double solid yellow lane markings, on the roadway. In front of 1527 60 Street. Notified prior by car #20186780434 dated 12/16/2018
|
2019-04-16
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO CURB WORK DONE
|
2019-04-15
|
No data
|
MENAHAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO PROPERLY PROTECT DEP GREEN INFRASTRUCTURE WITH PLASTIC TARPS TO PREVENT DEBRIS AND EXCESSIVE DUST FROM SETTLING INTO THE ENGINEERED SOIL AND OBSTRUCTING INFILTRATION AND HARMING
|
2019-04-12
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Corner is non ADA compliant. Will be measured and collected at a later date
|
2019-04-11
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2019-04-11
|
No data
|
NEVINS STREET, FROM STREET FLATBUSH AVENUE TO STREET LIVINGSTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE- MAJOR BUILDING OPERATION FENCE OVER SWK
|
2019-04-10
|
No data
|
SHELL ROAD, FROM STREET BEND TO STREET SHORE PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY IS MILLED LENGTH 123FT WIDTH 21FT MEASURED CURB TO CURB 32FT HALF OF THAT IS 16FT ADD 5FT IS 21FT DEPTH IS 2INCHES
|
2019-04-10
|
No data
|
EVERGREEN AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MILLING ROADWAY - HAD CONTRACTOR OPEN ONE LANE-HE STATED CALL DOT FOR 12 PM INSPECTION CLOSED RWY DUE TO BRITTLE ASPHALT -DEBRIS FROM MILLER ON ROADWAY
|
2019-04-10
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2019-04-07
|
No data
|
MILTON STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed.
|
2019-04-06
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass..
|
2019-04-05
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed
|
2019-04-03
|
No data
|
NORTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY RESURFACED MISSING BIKE LANE MARKINGS
|
2019-04-02
|
No data
|
EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site. Milling in compliance. Approved for paving.
|
2019-03-30
|
No data
|
MANHATTAN AVENUE, FROM STREET EAGLE STREET TO STREET FREEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed.
|
2019-03-29
|
No data
|
GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed.
|
2019-03-29
|
No data
|
LORIMER STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The contractor milled 151’-5” x 23’-3” in front of 848 Lorimer St with a depth of 3”. Roadway width from curb to curb is 36’-6”.
|
2019-03-27
|
No data
|
CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W REPAIRED
|
2019-03-25
|
No data
|
KENT AVENUE, FROM STREET NORTH 13 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No ped ramp work started. Active BO in SE4 corner quadrant.
|
2019-03-25
|
No data
|
NORTH 13 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No ped ramp work started. Active BO in SW1 corner quadrant.
|
2019-03-25
|
No data
|
SUMPTER STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
all milling , as well as...clean up preformed ..25'x22'x3" no white lines or bike lines to be restored ...none was removed..
|
2019-03-25
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced
|
2019-03-25
|
No data
|
GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
AIRSIDE MILLED RWY DOWN 3 INCHES AT 163
|
2019-03-25
|
No data
|
NORTH 5 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MILLING ROADWAY AT 88 -CALLED OFFICE
|
2019-03-21
|
No data
|
GREENPOINT AVENUE, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done, permit expired. Contractor did not do any ped ramp work in corner quadrant
|
2019-03-21
|
No data
|
MILTON STREET, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done in corner quadrant. Ramps are functional and accessible, however non ADA compliant. Measured and collected on 3/21/2019
|
2019-03-19
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
JERSEY BARRIERS PLACED ON ROADWAY FOR PEDESTRIANS TO WALK WITH A CLEAR 5FT WALK WAY. SPOKE WITH CONTRACTOR ABOUT MAINTAINING THE WALK WAY UPON BUILDING OPERATION IS COMPLETE
|
2019-03-19
|
No data
|
HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT POURING CONCRETE FOR NEW SIDE WALK WITH OUT A 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY.RESPONDENT HAS FAILED TO ADHERE TO TERMS AND CONDITIONS OF STIPULATION 014 OF THE ABOVE DOT PERMIT.
|
2019-03-15
|
No data
|
BUFFALO AVENUE, FROM STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done, permit expired.
|
2019-03-12
|
No data
|
NORTH 7 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: The contractor milled 76’-10” x 20’ in front of 71 North 7 St with a depth of 3”. Roadway width from curb to curb is 30’.
|
2019-03-04
|
No data
|
NORTH 7 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new swk installed but not sealed
|
2019-03-04
|
No data
|
TOMPKINS AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT EXCAVATING SIDE WALK WITH OUT MAINTAINING A CLEAR 5 FOOT PEDESTRIAN WALK WAY IN THE ROADWAY.RESPONDENT HAS FAILED TO ADHERE TO TERMS AND CONDITIONS OF STIPULATION 014 OF THE ABOVE DOT PERMIT
|
2019-02-26
|
No data
|
SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT IN VIOLATION OF OCMC STIP ID#083 WORKING PASSED THEIR TIME WITH IS 9AM TO 2PM MONDAY TO FRIDAY PERMITTEE STILL WORKING DOING MILLING.
|
2019-02-26
|
No data
|
ROCKAWAY AVENUE, FROM STREET MAC DOUGAL STREET TO STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT IN VIOLATION OF OCMC STIP ID#083 WORKING PASSED THEIR TIME WITH IS 9AM TO 2PM MONDAY TO FRIDAY PERMITTEE STILL WORKING DOING MILLING.
|
2019-02-26
|
No data
|
ROCKAWAY AVENUE, FROM STREET SUMPTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT IN VIOLATION OF OCMC STIP ID#083 WORKING PASSED THEIR TIME WITH IS 9AM TO 2PM MONDAY TO FRIDAY PERMITTEE STILL WORKING DOING MILLING.
|
2019-02-25
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No repair sidewalk work started at this time.
|
2019-02-25
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway clear and opened to vehicular traffic at this time.
|
2019-02-25
|
No data
|
EAST 77 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Portion of parking lane in roadway occupied with jersey barriers at this time opp of #100.
|
2019-02-25
|
No data
|
NORTH 7 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Valid permit#B042019043A24; Constructing new sidewalk
|
2019-02-25
|
No data
|
RODNEY STREET, FROM STREET AINSLIE STREET TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Valid permit#B012019043F69; Roadway being milled.
|
2019-02-21
|
No data
|
AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w has been milled half plus 5 down 3 inches okay
|
2019-02-19
|
No data
|
RODNEY STREET, FROM STREET AINSLIE STREET TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w milled half plus 5
|
2019-02-15
|
No data
|
EAST 77 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Miscellaneous sidewalk flags repaired with sidewalk expansion joints applied, recessed and sealed. for #100 E 77 St; work done on the side of building on Park Avenue.
|
2019-02-15
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Miscellaneous sidewalk flags repaired with sidewalk expansion joints applied, recessed and sealed.
|
2019-02-13
|
No data
|
JEWEL AVENUE, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced
|
2019-02-13
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk flags restored curbside opp of #110; expansion joints are not sealed at this time.
|
2019-02-13
|
No data
|
150 STREET, FROM STREET 70 ROAD TO STREET JEWEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sections of sidewalk replaced
|
2019-02-13
|
No data
|
70 ROAD, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
section of sidewalk replaced
|
2019-02-11
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OK
|
2019-02-10
|
No data
|
LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved.
|
2019-02-07
|
No data
|
49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
11:00-11:45 Roadway with 29'6" milled already over half plus 5'. permittee is milling entire width of roadway due to long water cut in front of address.
|
2019-02-07
|
No data
|
BUFFALO AVENUE, FROM STREET PROSPECT PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started on NW2 corner quadrant. Ramps are non ADA compliant however, ramps are accessible and functional. Collected on 2/7/2019.
|
2019-02-05
|
No data
|
60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR PREVIOUSLY ISSUED AT LOCATION FOR LANE MARKINGS
|
2019-01-29
|
No data
|
60 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of block is 44’5”Width milled and is down 3 inches is 27’10”Location has been milled properly ½ plus 5 feet.
|
2019-01-29
|
No data
|
24 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work was not done due to shape of building being an L shape intersection does not need to be repaved
|
2019-01-29
|
No data
|
MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET AVENUE M
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of block is 57’5”Width milled and is down 3 inches is 37’2”Location has been milled properly ½ plus 5 feet.
|
2019-01-28
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OK
|
2019-01-28
|
No data
|
SOUTH 2 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OPP 83
|
2019-01-23
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RWY RESURFACED-OK
|
2019-01-23
|
No data
|
KENT AVENUE, FROM STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
INTERSECTION RE-SURFACED
|
2019-01-21
|
No data
|
DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved half plus 5
|
2019-01-16
|
No data
|
JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new walk ...new building ....
|
2019-01-14
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB EXPANSION JOINT NOT SEALED
|
2019-01-10
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Completed tangent ramp on Nw2 corner quadrant is accessible and functional. Non ADA compliant. Measured and collected on 1-10-19.
|
2019-01-09
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb.
|
2018-12-29
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w joints need to be sealed.
|
2018-12-29
|
No data
|
EAST 77 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2018-12-28
|
No data
|
SOUTH 5 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street paved.
|
2018-12-27
|
No data
|
MC DONALD AVENUE, FROM STREET 47 STREET TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was done IFO a corner property. As per Mr. Ta, the contractor had to mill 1/2 + 5 at 47 St between Mc Donald Ave & Parkville Ave (in compliance) but at Mc Donald Ave between 47 Street and Elmwood Ave just half of the roadway (also in compliance).
|
2018-12-26
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done.
|
2018-12-24
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street paved half plus 5 feet.
|
2018-12-21
|
No data
|
BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
blocking the gutter
|
2018-12-21
|
No data
|
KANE PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass,
|
2018-12-17
|
No data
|
HAVEMEYER STREET, FROM STREET GRAND STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb.
|
2018-12-16
|
No data
|
60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Restore double solid yellow lane markings, on the roadway.In front of 1527 60 Street between 15 Avenue and LIRR BAY RIDGE DIV.
|
2018-12-13
|
No data
|
37 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, the roadway was milled and partly paved already. The roadway measures 30 feet from curb to curb. The crew on site milled 20 feet adjacent to the property with a depth of 3 inches, in compliance with the BPP measurements.
|
2018-12-13
|
No data
|
13 AVENUE, FROM STREET 37 STREET TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, the roadway was already paved by the contractor. The roadway measures 44ft. 3in. from curb to curb, crew on site had already paved 27 feet 10 inches (in compliance with BPP ½ + 5). In front of corner property 1276 37 Street.
|
2018-12-12
|
No data
|
MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: The contractor milled 51’-4" x 20’-4” in front of 502A-504 Maple St with a depth of 3”. Roadway width from curb to curb is 30’-4”.
|
2018-12-12
|
No data
|
MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-12-09
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK OBSERVED
|
2018-12-06
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 83 feet x (W) 23 feet x (D) 4'' street milled for paving.
|
2018-12-06
|
No data
|
HAVEMEYER STREET, FROM STREET GRAND STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(l) 123 FEET X (w) 20 FEET X (d) 4 FEET OF STREET MILLED FOR PAVEMENT .
|
2018-12-05
|
No data
|
LAFAYETTE AVENUE, FROM STREET GRAND AVENUE TO STREET ST JAMES PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway was milled 204’ x 25’ x 2 ½’’
|
2018-12-05
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway clear
|
2018-12-03
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is in compliance
|
2018-11-28
|
No data
|
DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane markings have been placed
|
2018-11-19
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED DOWN 3 INCHES BEFORE RESURFACING. IN-COMPLIANCE
|
2018-11-12
|
No data
|
GRAND STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new curb installed.
|
2018-11-11
|
No data
|
EAST 77 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2018-11-11
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2018-11-11
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2018-11-08
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street paved half plus 5 feet.
|
2018-10-31
|
No data
|
21 STREET, FROM STREET 47 ROAD TO STREET 49 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2018-10-31
|
No data
|
49 AVENUE, FROM STREET 11 PLACE TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2018-10-31
|
No data
|
STORY AVENUE, FROM STREET BOYNTON AVENUE TO STREET MORRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored.
|
2018-10-26
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP The contractor milled 73.1’ x 26.1 down in front of Fulton St. Roadway width from curb to curb is 42.1
|
2018-10-25
|
No data
|
UNIVERSITY PLACE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm reset, repair, or replace CURB acceptable
|
2018-10-22
|
No data
|
DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/W currently being milled 3” and half plus 5. In compliance
|
2018-10-22
|
No data
|
EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel faced curb installed
|
2018-10-20
|
No data
|
41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Curb in Compliance
|
2018-10-19
|
No data
|
WEST 24 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Arrive-0135, I/F/O 560 West24St., MrSam-(AIRSIDE-Supv), CUT SIZE AFTER C/B #1)50'x22'x3", Builders pave completed. Depart-0510
|
2018-10-18
|
No data
|
LAFAYETTE AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new curb .....
|
2018-10-17
|
No data
|
EAST 19 STREET, FROM STREET AVENUE O TO STREET AVENUE P
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Entire 35ft of roadway in front of 1543 has been milled down 3 inches. Paving will be done. Will reinspect.
|
2018-10-15
|
No data
|
EAST 56 STREET, FROM STREET AVENUE N TO STREET MILL LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MILLED ROADWAY 44FT FROM CURB TO CURB HALF OF WHICH IS 22FT ADD 5FT IS 27FT FOR PAVING DEPTH IS DOWN 3INCHES
|
2018-10-10
|
No data
|
AVENUE N, FROM STREET EAST 55 STREET TO STREET EAST 56 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MONITORED CREW PAVING THE ROADWAY FROM 1245PM TO 345PM 44FT OF ROADWAY FROM CURB TO CURB HALF OF THAT IS 22FT ADD 5FT OF ROADWAY IS 27FT TO PAVE
|
2018-10-09
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(L) 185 FEET X (w) 30 FEET X (d) 3''..WILL MONITORE SITE STREET IS EXTREMELY BUSY SEGMENT.
|
2018-10-06
|
No data
|
DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
at this time roadway was paved half plus 5 but is missing bike lane markings
|
2018-10-04
|
No data
|
60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The roadway, from curb to curb, measures 42 Feet 10 inches. The contractor milled 27 feet 4 inches adjacent to the property and a width of 40 feet 7 inches. The required BPP measurements are ½ + 5, which would be 26 feet 5 inches.
|
2018-10-04
|
No data
|
22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site with the roadway already milled. The roadway from curb to curb measures 29 feet 9 inches. The milled roadway adjacent to 271A 22 Street, measures 20 Feet 9 inches with a width of 17 feet 11 inches. In compliance with the BPP 1/2 + 5.
|
2018-10-03
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET TO STREET PILLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2018-09-26
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/W OPEN TO TRAFFIC
|
2018-09-20
|
No data
|
51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains the same, will re-issue CAR.
|
2018-09-20
|
No data
|
51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Builder's Pavement Plan 1/2 + 5 foot restoration, has the incorrect slope causing water to sit against the curb (Ponding Condition), on the roadway. (As per Mr. Hock)In front of 1455 51 Street between 14 Avenue and 15 Avenue.
|
2018-09-18
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags okay
|
2018-09-16
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to pave roadway half plus 5 feet as per section rule 34 RCNY 2-09 (H)(2). Respondent was notified to make correction via (CAR #20185270365) on 4/4/18 and failed to do so.
|
2018-09-15
|
No data
|
EAST 77 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PEDESTRIAN RAMP QUADRANT HAS NOT BEEN RESTORED AS PER STANDARD SPECIFICATIONS H-1011.
|
2018-09-15
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work done.
|
2018-09-15
|
No data
|
PARK AVENUE, FROM STREET EAST 76 STREET TO STREET EAST 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full width of the roadway is open to pedestrians.
|
2018-09-15
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work done
|
2018-09-14
|
No data
|
21 STREET, FROM STREET 47 ROAD TO STREET 49 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian walk observed at the time of inspection
|
2018-09-11
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK STARTED
|
2018-09-10
|
No data
|
EAST 77 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w open to traffic.
|
2018-09-09
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w open to traffic.
|
2018-09-09
|
No data
|
AVENUE N, FROM STREET EAST 55 STREET TO STREET EAST 56 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary pedestrian walk in roadway
|
2018-09-08
|
No data
|
FULTON STREET, FROM STREET CLASSON AVENUE TO STREET CLAVER PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started yet.
|
2018-09-07
|
No data
|
AVENUE N, FROM STREET EAST 55 STREET TO STREET EAST 56 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF THE SIDEWALK
|
2018-09-07
|
No data
|
DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Half +5 done, roadway milled 3 inches
|
2018-09-07
|
No data
|
EAST 56 STREET, FROM STREET AVENUE N TO STREET MILL LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLACE EQUIPMENT JERSEY BARRIER IN THE ROADWAY
|
2018-09-07
|
No data
|
60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No roadway occupancy at this time
|
2018-09-06
|
No data
|
AVENUE N, FROM STREET EAST 55 STREET TO STREET EAST 56 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SIDEWALK
|
2018-09-06
|
No data
|
60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Jersey Barrier on site
|
2018-09-06
|
No data
|
EAST 56 STREET, FROM STREET AVENUE N TO STREET MILL LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED THE RESPONDENT STORING A CONSTRUCTION CONTAINER ON THE ROADWAY ON THE SIDE OF 5518 AVE N WITHOUT A PERMIT FROM D.O.T TO DO SO. THE RESPONDENT WAS ID BY PERMIT B022018239B69 THAT WAS ISSUED FOR A BOBCAT ONLY AND VALID TILL 9-16-18
|
2018-09-05
|
No data
|
CYPRESS AVENUE, FROM STREET EAST 141 STREET TO STREET ST MARYS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel faced curb installed
|
2018-09-03
|
No data
|
SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SIDEWALK INSTALLED, BUT NOT SEALED
|
2018-09-01
|
No data
|
WINTHROP STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-09-01
|
No data
|
WINTHROP STREET, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-08-30
|
No data
|
18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway measures 49ft. 5in. from curb to curb. Contractor milled 29ft. 10in. adjacent to the property and a width of 125ft. 10in. In compliance with the BPP measurement requirements. Contractor is on site.
|
2018-08-30
|
No data
|
STILLWELL AVENUE, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
a/t/p/o i observed the above respondent failed to comply with stip 071 of permit B012018239B39 respondent had a crew working after the hours allowed by permit B012018239B39. crew was on roadway milling roadway. permit B012018239B39 used as id
|
2018-08-30
|
No data
|
BUSHWICK AVENUE, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED
|
2018-08-28
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
100 feet x 20 feet milled down 2'' for pave street.
|
2018-08-27
|
No data
|
6 AVENUE, FROM STREET 20 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew working on site. Roadway measures 42 feet from curb to curb, contractor milled 27 feet adjacent to the property by 165 feet wide.
|
2018-08-26
|
No data
|
JOHNSON AVENUE, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags in compliance
|
2018-08-25
|
No data
|
6 AVENUE, FROM STREET 20 STREET TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
STIP 078 VIOLATED
|
2018-08-24
|
No data
|
BERGEN STREET, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Pedestrians walkway in place at this time
|
2018-08-18
|
No data
|
CYPRESS AVENUE, FROM STREET EAST 141 STREET TO STREET ST MARYS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian walk in the roadway full sidewalk open to pedestrian
|
2018-08-18
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE F TO STREET DITMAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK INSTALLED
|
2018-08-17
|
No data
|
BERGEN STREET, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 34FT MILLED ROADWAY IS 22FT 8IN DEPTH OF 3INCHES ACHIEVED
|
2018-08-14
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE ROADWAY CURB TO CURB IS 34FT. MILLED ROADWAY IS 22FT 5IN AND DEPTH OF 3 INCHES ACHIEVED
|
2018-08-14
|
No data
|
ST JOHNS PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW IS ON SITE ROADWAY CURB TO CURB IS 33FT 5IN MILLED ROADWAY IS 22FT 5IN DEPTH IS 3 INCHES
|
2018-08-08
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
area has been milled half +5 down 3"
|
2018-08-07
|
No data
|
BERGEN STREET, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE DIIGING UP EXISTING SIDE WALK. FOR NEW INSTALLATION OF SIDE WALK
|
2018-08-06
|
No data
|
GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags in compliance
|
2018-08-06
|
No data
|
SOUTH 3 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee is not going to pave the roadway today. Permittee is the process of just milling the roadway for tomorrow
|
2018-08-06
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee is not going to pave the roadway today. Permittee is the process of just milling the roadway for tomorrow
|
2018-08-06
|
No data
|
ROEBLING STREET, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee is not going to pave the roadway today. Permittee is the process of just milling the roadway for tomorrow
|
2018-08-04
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINT SEALED
|
2018-08-03
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Equipment Type: Jersey Barrier /barriers on roadway
|
2018-08-02
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO POST ADVANCE NOTIFICATIONS OF SIDEWALK CLOSURES AS DESCRIBED IN PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. FAILED TO ADHERE TO TERMS AND CONDITIONS OF STIPULATION 038
|
2018-08-02
|
No data
|
BERRY STREET, FROM STREET NORTH 10 STREET TO STREET NORTH 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
neew sidewalk flags in compliance
|
2018-08-02
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO PROPERLY RAMP THE CURB LEADING TO WALKWAY IN ROADWAY LEADING TO SIDEWALK(MUST BE RAMPED AT BOTH ENDS);FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION 014 OF DOT
|
2018-07-31
|
No data
|
NORTH 10 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags in compliance
|
2018-07-31
|
No data
|
WEST STREET, FROM STREET GREEN STREET TO STREET HURON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags in compliance
|
2018-07-29
|
No data
|
LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-07-28
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO POST ADVANCE NOTIFICATIONS OF SIDEWALK CLOSURES AS DESCRIBED IN PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. FAILED TO ADHERE TO TERMS AND CONDITIONS OF S
|
2018-07-26
|
No data
|
SOUTH 2 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb work done
|
2018-07-26
|
No data
|
52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags ok, expansion joints sealed. In front of 1536 52 Street.
|
2018-07-26
|
No data
|
JEWEL AVENUE, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w - expansion joints sealed.
|
2018-07-26
|
No data
|
150 STREET, FROM STREET 70 ROAD TO STREET JEWEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several flags repaired,expansion joints sealed.
|
2018-07-26
|
No data
|
SOUTH 3 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb work in progress
|
2018-07-26
|
No data
|
70 ROAD, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several flags repaired,expansion joints sealed.
|
2018-07-25
|
No data
|
NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags in compliance
|
2018-07-24
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-07-23
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-07-23
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
crew on site currently replacing entire sidewalk. barriers on both ends okay
|
2018-07-21
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW CURB INSTALLED AND EXPANSION JOINT ON SIDEWALK NOT SEALED.
|
2018-07-21
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
NOV ISSUED FOR NOT HAVING PROPER SIGNAGE
|
2018-07-21
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb re-placed
|
2018-07-20
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
half plus 5 feet done
|
2018-07-19
|
No data
|
SPENCER STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT HAD FAILED TO RAMP THE PEDESTRIAN WALKWAY AT ENTRY. A VIOLATION TO THE TERMS & CONDITIONS OF STIPULATION 014 OF PERMIT# B022018045A04 WHICH WAS USED FOR ID.
|
2018-07-18
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags are in compliance
|
2018-07-16
|
No data
|
51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Builder's Pavement Plan 1/2 + 5 foot restoration, has the incorrect slope causing water to sit against the curb (Ponding Condition), on the roadway.In front of 1455 51 Street between 14 Avenue and 15 Avenue
|
2018-07-12
|
No data
|
49 AVENUE, FROM STREET 11 PLACE TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent with 3 temporary construction signs posted on fence without a permit on file. Permit number Q022018179E93 is being used to ID
|
2018-07-12
|
No data
|
49 AVENUE, FROM STREET 11 PLACE TO STREET 21 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plastic barriers stored
|
2018-07-11
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONCRETE POURED FOR NEW CURB. CONCRETE DRYING AT TIME OF INSPECTION
|
2018-07-09
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers currently on site
|
2018-07-09
|
No data
|
43 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in front of 1673 paved (BPP 1/2 + 5). Roadway measures 30 feet from curb to curb. Contractor paved 20 feet.
|
2018-07-08
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2018-07-08
|
No data
|
BEDFORD AVENUE, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2018-06-28
|
No data
|
EAST 27 STREET, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced and repaired.
|
2018-06-25
|
No data
|
LENOX ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPPThe contractor milled 100’ x 22.6 down in front of 271 – 275 Lenox Road. Roadway width from curb to curb is 34.8
|
2018-06-21
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to pave roadway half plus 5 feet as per section rule 34 RCNY 2-09 (H)(2). Respondent was notified to make correction via (CAR #20185270365) on 4/4/18 and failed to do so.
|
2018-06-20
|
No data
|
SOUTH 2 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site r/w being paved half +5 okay
|
2018-06-19
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CURB TO CURB LENGTH IS 34FT MILLED ROADWAY IS 22FT. 8FTX 8FT SECTION ISNT MILLED DUE TO MACHINE BREAK DOWN. NEW EQUIPMENT SHOULD ARRIVE IS THE NEXT 45 MINS STATED BY CONTRACTOR
|
2018-06-16
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE S TO STREET AVENUE T
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Contractor has restored white lane markings to roadway, in compliance
|
2018-06-14
|
No data
|
LAWRENCE AVENUE, FROM STREET 47 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/W milled. Airside crew on site. Depth 3", 1/2 +5 in accordance with Roadway rules.
|
2018-06-12
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINT IN NEW STEEL FACED CURB NOT SEALED
|
2018-06-10
|
No data
|
36 STREET, FROM STREET 37 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb replaced.
|
2018-06-10
|
No data
|
36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb replaced.
|
2018-06-09
|
No data
|
16 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk installed, expansion joints sealed
|
2018-06-06
|
No data
|
UNION AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
35'x30' foot section of roadway milled and being repaved by respondent. 2 two traffic maintained by flagmen
|
2018-06-05
|
No data
|
BEDFORD AVENUE, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP -62’ x 27’ x 3” down
|
2018-06-04
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS SEALED
|
2018-06-03
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2018-06-02
|
No data
|
SULLIVAN PLACE, FROM STREET BEDFORD AVENUE TO STREET MC KEEVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2018-05-30
|
No data
|
AVENUE N, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK WAS DONE ON SIDWALK NEW CURB WAS INSTALLED
|
2018-05-30
|
No data
|
WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pedestrian walk not set up
|
2018-05-30
|
No data
|
PACIFIC STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No temporary pedestrian walkway on location at this time
|
2018-05-30
|
No data
|
SOUTH 2 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no bobcat stored
|
2018-05-25
|
No data
|
NORTHERN BOULEVARD, FROM STREET 36 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent paved area of the intersection without a DOT permit.Permit # Q012018135C87 for Northern Blvd. between 36 St. & 38 Ave. and permit # Q012018130A68 for 36 St. between Northern Blvd. & 37 Ave. not covered intersection.
|
2018-05-25
|
No data
|
36 STREET, FROM STREET 37 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent paved the street.They failed to comply with stipulation 1/2+5' from the above permit to call NYC DOT HIQA Borough office 4 hours before the paving.Contractor called on 5/24/18 @ 1:00 pm,permit allow work till 4 pm.
|
2018-05-25
|
No data
|
NORTHERN BOULEVARD, FROM STREET 36 STREET TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent paved the street.They failed to comply with stipulation 1/2+5' from the above permit to call NYC DOT HIQA Borough office 4 hours before the paving.Contractor called on 5/24/18 @ 1:00 pm,permit allow work till 3 pm.
|
2018-05-24
|
No data
|
UNION AVENUE, FROM STREET WALLABOUT STREET TO STREET WALTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2018-05-20
|
No data
|
EVERGREEN AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New curb in compliance. Bike lane uneffected.
|
2018-05-15
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
445' x 24' of the street is milled at this time in front of job site... parking is open for teachers at this time.
|
2018-05-15
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
a/t/p/o i observed the respondent in violation of STIP-074 of their permit that states work SATURDAY 8am-6pm & SUNDAY 9am-6pm. Respondent was on the roadway milling & paving on a tuesday they shouldn't have been on the roadway working.
|
2018-05-14
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
445' x 24' of the street is milled at this time in front of job site.
|
2018-05-11
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PED. WALKWAY CLEAR
|
2018-05-10
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No roadway occupancy at this time.
|
2018-05-10
|
No data
|
GATES AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel-faced curb in compliance.
|
2018-05-09
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No jersey barriers on location at this time.
|
2018-05-08
|
No data
|
DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
21ft by 21ft down 3in for paving
|
2018-05-06
|
No data
|
BUSHWICK AVENUE, FROM STREET GATES AVENUE TO STREET PALMETTO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance.
|
2018-05-03
|
No data
|
CAFFREY AVENUE, FROM STREET BEACH 17 STREET TO STREET NEW HAVEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W flags repaired, joints sealed.
|
2018-05-01
|
No data
|
47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed, plastic tape over seal, in compliance
|
2018-05-01
|
No data
|
PROSPECT PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No roadway occupancy at this time.
|
2018-05-01
|
No data
|
47 ROAD, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed in kind, plastic tape over seal. in compliance
|
2018-04-29
|
No data
|
DECATUR STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2018-04-28
|
No data
|
WEST 122 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced.
|
2018-04-26
|
No data
|
47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no barriers stored
|
2018-04-26
|
No data
|
PROSPECT PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO TEMPORARY PEDESTRIAN WALK
|
2018-04-26
|
No data
|
47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent with 2 temporary construction signs posted on sidewalk without a permit. Permit Q022018018A17 is being used to ID. Permit expired on 4/17/18
|
2018-04-25
|
No data
|
WEST 122 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway being occupied
|
2018-04-24
|
No data
|
EAST 76 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
104'.5" x 20'.2" x 3" paved n 2 sections sealed. FYI NO tac glue was placed to bond new wearing course down to concrete.
|
2018-04-24
|
No data
|
DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PEDESTRIAN WALK
|
2018-04-21
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags sealed and in compliance
|
2018-04-20
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal all expansion joints installed on the sidewalk. F/O 1460 FULTON ST. *Previous CAR #20184510222 closed.
|
2018-04-20
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR will be reissued. *Previous CAR closed.
|
2018-04-17
|
No data
|
36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barriers along sidewalk
|
2018-04-16
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass/ new walk ..ok ..
|
2018-04-16
|
No data
|
NORTHERN BOULEVARD, FROM STREET 36 STREET TO STREET 37 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO TEMP PED WALK
|
2018-04-15
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET TO STREET PILLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb
|
2018-04-13
|
No data
|
NORTHERN BOULEVARD, FROM STREET 36 STREET TO STREET 37 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-Temporary pedestrian walkway in compliance.
|
2018-04-13
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new sidewalk flags in front of 562
|
2018-04-13
|
No data
|
WEST 122 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
total width of rdwy is 34' 22' was paved1/2 + 5 was doneroadway in compliance
|
2018-04-12
|
No data
|
36 STREET, FROM STREET 37 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plastic barriers on location along curb
|
2018-04-11
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb partially done
|
2018-04-10
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed.
|
2018-04-10
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
HALF +5 OKAY MILLED DOWN 3 INCHS OKAY
|
2018-04-07
|
No data
|
DAHILL ROAD, FROM STREET 16 AVENUE TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flags, expansion joints not sealed. Permit still active, exp. 4/19/2018
|
2018-04-06
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk installed.
|
2018-04-05
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temporary pedestrian walk observed i/f/o 1148 Pacific street
|
2018-04-04
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to adhere to OCMC stipulation 1/2+5'. Only 20' width of the roadway was paved on a 40'+ roadway. F/O 1120 BUSHWICK.
|
2018-04-04
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failed to adhere to OCMC stipulation 1/2+5'. Only 20' width of the roadway was paved on a 40'+ roadway. F/O 1120 BUSHWICK.
|
2018-04-04
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work in progress.
|
2018-04-02
|
No data
|
FULTON STREET, FROM STREET DOWNING STREET TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian walk observed i/f/o 1008 Fulton street
|
2018-04-01
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk Currently not active
|
2018-03-31
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE S TO STREET AVENUE T
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration of LANE markings needed, white lane makers missing from restoration
|
2018-03-29
|
No data
|
36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP r/w measurments are correctfull r/w measures 29'6"BPP measures 20' down 3"
|
2018-03-28
|
No data
|
16 AVENUE, FROM STREET DAHILL ROAD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT MILLING THE ROADWAY IN THE INTERSECTION WITH OUT A VALID DOT PERMIT TO DO SO. PERMITTEE ONLY HAS ACTIVE/VALID PERMIT FOR BLOCK SEGMENT. ACTIVE PERMIT FOR BLOCK SEGMENT B012018080B18 HAS BEEN USED FOR ID.
|
2018-03-28
|
No data
|
DAHILL ROAD, FROM STREET 16 AVENUE TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadwayis 48âRoadway that is already milled and where mark outs are to be milled goes until the width of 29â6âRoadway where it has already been milled is down 3 and a half inches I/F/O address 437 Dahill Rd.
|
2018-03-23
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane marking restored.
|
2018-03-23
|
No data
|
EAST 19 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee on site milling roadway, down 3 inches.
|
2018-03-21
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temp. walkway currently on location.
|
2018-03-20
|
No data
|
CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New curb in compliance. Permit still active.
|
2018-03-17
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb okay
|
2018-03-17
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temp. walkway currently at this location.
|
2018-03-17
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags ok
|
2018-03-15
|
No data
|
FULTON STREET, FROM STREET DOWNING STREET TO STREET IRVING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb has been reset
|
2018-03-15
|
No data
|
MONROE STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, meet standard ,spec
|
2018-03-15
|
No data
|
MENAHAN STREET, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb. Joints sealed.
|
2018-03-14
|
No data
|
AVENUE N, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MILLING IN PROCESS. WIDTH OF ROADWAY IS 32'. MARKED OUT AND IS CURRENTLY MILLING 21' OF ROADWAY. 3 INCHES DOWN.
|
2018-03-14
|
No data
|
AVENUE N, FROM STREET EAST 27 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
intersection has been started 3/4 of intersection milled. total should be 23' by 20' milled.
|
2018-03-14
|
No data
|
EAST 27 STREET, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY HAS BEEN MILLED HALF+5 FEET. WIDTH OF ROADWAY IS 30' AND 20' HAS BEEN MILLED.
|
2018-03-12
|
No data
|
EAST 19 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb work done
|
2018-03-12
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS SEALED AND IN COMPLIANCE
|
2018-03-07
|
No data
|
47 AVENUE, FROM STREET 11 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to comply to 014-OCMC of their permit stipulation by not providing a ramp entry to the sidewalk for handicapped accessibility on both sides of the building operation in front of 10-18 47 Ave.
|
2018-03-07
|
No data
|
36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb ok
|
2018-03-07
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb ok
|
2018-03-05
|
No data
|
BROADWAY, FROM STREET 23 STREET TO STREET 25 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W
|
2018-03-05
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET TO STREET PILLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2+5' of the roadway is not milled. Will call back for an inspection. *AWAITING 10AM START TIME.
|
2018-03-05
|
No data
|
CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway is milled 3â down (½+5â) and ready to be paved. *awaiting 9am start time.
|
2018-03-05
|
No data
|
BUSHWICK AVENUE, FROM STREET CHAUNCEY STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Failed to obtain a NYCDOT permit to mill the intersection for a Builders Pavement Plan (BPP) roadway paving. Permitee Information/Telephone number, (718) 388-5800, displayed on vehicles were used to ID.
|
2018-03-02
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk Currently not Active
|
2018-02-28
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is in compliance
|
2018-02-25
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass...#77 ..walk
|
2018-02-24
|
No data
|
18 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVEMENT PLAN OK 1/2 ROADWAY +5' ...ROADWAY 50 FEET WIDE 30 FEET OF IT HAS BEEN REPAVED.
|
2018-02-22
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk and curb is in compliance
|
2018-02-22
|
No data
|
FROST STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work is complete. 1/2 + 5' in compliance.
|
2018-02-13
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE S TO STREET AVENUE T
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor on site roadway milled and waiting for black top.
|
2018-02-11
|
No data
|
FULTON STREET, FROM STREET KINGSTON AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE SEAL EXPANSION JOINTS IN NEW SIDEWALK FLAGS , IN FRONT OF 1460 FULTON STREET BETWEEN TOMPKINS AVENUE & KINGSTON AVENUE.
|
2018-02-10
|
No data
|
PACIFIC STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2018-02-10
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Steel Face Curb in Compliance
|
2018-02-09
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB OK
|
2018-02-08
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF ROADWAY WITH BARRIERS
|
2018-02-08
|
No data
|
35 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE CURB-
|
2018-02-08
|
No data
|
36 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE CURB
|
2018-02-08
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED
|
2018-02-07
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temp. walkway on site
|
2018-02-05
|
No data
|
EAST 7 STREET, FROM STREET CORTELYOU ROAD TO STREET DITMAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT VIOLATED STIPULATION 083 WHICH STATES WORK 9AM TO 2PM MONDAY TO FRIDAY PERMITTEE WAS WORKING AT 302PM PAVING THE ROADWAY
|
2018-02-03
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Steel Face Curb in Compliance
|
2018-02-03
|
No data
|
16 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Steel Face Curb in Compliance
|
2018-02-03
|
No data
|
EAST 100 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb has not been replaced at time of inspection.
|
2018-01-31
|
No data
|
MENAHAN STREET, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failed to comply with OCMC stipulation ID 014. Respondent failed to maintain a temporary five foot pedestrian walkway in the roadway as stipulated. NYCDOT permit B042018030A00 was used to ID.
|
2018-01-28
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Pedestrian Walkway in Compliance
|
2018-01-28
|
No data
|
28 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2018-01-27
|
No data
|
BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
another permittee with a more recent date & permittee on file done work
|
2018-01-25
|
No data
|
EAST 32 STREET, FROM STREET AVENUE L TO STREET AVENUE M
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site. Roadway milled 1/2 plus 5ft., down 3 inches. Preparing to pave. Advised to ramp roadway for vehicles passing.
|
2018-01-24
|
No data
|
HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ONSITE MILLING THE ROADWAY 1/2 PLUS 5 FOOT RESTORATION
|
2018-01-22
|
No data
|
LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street restoration missing white lane markings located in front of 743
|
2018-01-19
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED OK
|
2018-01-18
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2018-01-17
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2018-01-16
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS SEALED AND IN COMPLIANCE
|
2018-01-03
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I OBSERVED THE ABOVE RESPONDENT EXCAVATED 50 FEET OF THE SIDEWALK WITHOUT A VALID PERMIT TO DO SO. DOT PERMIT#B042017354A33 EXP 12/31/2017 USED FOR ID.
|
2017-12-28
|
No data
|
42 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
HALF THE ROADWAY PLUS 5 FEET HAVE BEEN REPAVED
|
2017-12-28
|
No data
|
7 AVENUE, FROM STREET WEST 126 STREET TO STREET WEST 127 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curk ok; no defects
|
2017-12-27
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance.
|
2017-12-26
|
No data
|
46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
ROADWAY RE-SURFACED
|
2017-12-23
|
No data
|
EAST 19 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No bobcat on site.
|
2017-12-22
|
No data
|
GREENE AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass..street ....fully paved by nycdot ...summer of 2017...
|
2017-12-22
|
No data
|
PENN STREET, FROM STREET BROADWAY TO STREET HARRISON AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
ATPO I OBSERVED THE ABOVE RESPONDENT HAS A CONSTRUCTION CONTAINER STORED ON THE ROADWAY WITHOUT A VALID PERMIT TO DO SO. I SPOKE WITH THE FORMAN WHO CONFIRMED THAT IT WAS THEIR CONTAINER. 78584-MK LICENSE PLATE USED FOR ID.
|
2017-12-19
|
No data
|
WEST 238 STREET, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Monitored BPP paving I/F/O 640 for new residential building , 1/2+5 rule was done, Site was left clean and work was done in compliance to stipulations.
|
2017-12-19
|
No data
|
LEE AVENUE, FROM STREET ROSS STREET TO STREET WILSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w has been milled and repaved as per BPP
|
2017-12-15
|
No data
|
AUSTIN STREET, FROM STREET 73 ROAD TO STREET ASCAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
not done
|
2017-12-15
|
No data
|
18 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site milling in front of above address. 1/2+5 marked out. 3 inches down by curb at time of inspection. Will reinspect.
|
2017-12-13
|
No data
|
41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No visible bobcat on location at this time.
|
2017-12-13
|
No data
|
BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to adhere to OCMC stipulation 1/2+5'. Only 20' width of the roadway was paved on a 40'+ roadway. F/O 1120 BUSHWICK. **UNABLE TO SPRAY DUE TO HEAVY TRAFFIC.
|
2017-12-12
|
No data
|
41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No visible Temporary pedestrian walkway on location at this time.
|
2017-12-10
|
No data
|
AVENUE A, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple flags restored. Exansion joints sealed.
|
2017-12-08
|
No data
|
ASCAN AVENUE, FROM STREET AUSTIN STREET TO STREET LONG ISLAND RAILROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2017-12-06
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey barriers are placed in roadway
|
2017-12-06
|
No data
|
EAST 2 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway is marked out crew is on site had to do inspection from Base.
|
2017-12-06
|
No data
|
EAST 2 STREET, FROM STREET FT HAMILTON PARKWAY TO STREET GREENWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway is marked out crew is on site stips are in compliance crew is currently milling the road.
|
2017-12-06
|
No data
|
FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway is marked out crew is on site had to do inspection from Base.
|
2017-12-04
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barricades are ok
|
2017-12-03
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS SEALED
|
2017-12-02
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk Currently not Active
|
2017-12-02
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS SEALED
|
2017-11-30
|
No data
|
COLUMBUS PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2017-11-30
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET KANE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2017-11-30
|
No data
|
KANE PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2017-11-29
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
STREET PAVED.. NOW FLUSH TO GRADE..
|
2017-11-27
|
No data
|
BRIDGE STREET, FROM STREET RAMP TO STREET CONCORD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/t/p/o I observed the above respondent failed to mark the outer surface of plastic barriers on roadway with reflective markings capable or producing a warning glow when struck by vehicles headlights
|
2017-11-27
|
No data
|
NASSAU STREET, FROM STREET BRIDGE STREET TO STREET DUFFIELD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/t/p/o I observed the above respondent failed to mark the outer surface of plastic barriers on roadway with reflective markings capable of producing a warning glow when struck by vehicles headlights
|
2017-11-25
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
R\W PAVED AND LANE MARKINGS OK
|
2017-11-22
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
street paved at this time by business operation for BPP plan.
|
2017-11-22
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street milled out fall 2017
|
2017-11-20
|
No data
|
UNION STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
ROADWAY RESURFACED OK AT 701 UNION ST
|
2017-11-18
|
No data
|
DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS IN NEWLY INSTALLED SIDEWALK HAS BEEN SEALED
|
2017-11-18
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the paving of only 15 feet of the roadway after the completion of the building operation. This is a violation of Stipulation 1/2+5' of the above DOT permit. Permit used to ID.
|
2017-11-17
|
No data
|
TERRACE PLACE, FROM STREET 20 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway width from curb to curb: 43 feet.Area being paved off the curb 26 feet 7 inches. The Contractor did 2 inches extra.Property length 79 feet.Depth: 3.5â.Total BPP: 79âL x 26â7âW x 3.5âD.
|
2017-11-16
|
No data
|
EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-11-16
|
No data
|
BRUCKNER BOULEVARD, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2017-11-15
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is in compliance
|
2017-11-15
|
No data
|
41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Builders Pave.Roadway Width 31â From Curb to Curb.BPP 43âL X 20â6âW X 4âD.
|
2017-11-14
|
No data
|
UNION STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
3" SCRAPED OFF THE TOP OF THE ROADWAY IN FRONT OF 701
|
2017-11-13
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the paving of only 15 feet of the roadway after the completion of the building operation. This is a violation of Stipulation 1/2+5' of the above DOT permit. Permit used to ID.
|
2017-11-13
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SIDEWALK. NOT SEALED.
|
2017-11-12
|
No data
|
70 ROAD, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
at this time, work not done, permit Expired.
|
2017-11-09
|
No data
|
BRIDGE STREET, FROM STREET NASSAU STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee also did this side also well and is in compliance 30âx29âx3ââ (pictures attached)
|
2017-11-09
|
No data
|
NASSAU STREET, FROM STREET BRIDGE STREET TO STREET DUFFIELD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee also did this side also well and is in compliance 47âx29âx3ââ (pictures attached)
|
2017-11-09
|
No data
|
BRIDGE STREET, FROM STREET RAMP TO STREET CONCORD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
permittee in compliance 70'x27'6''x3 1/2''
|
2017-11-08
|
No data
|
150 STREET, FROM STREET 70 ROAD TO STREET JEWEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repair sidewalk, expansion joints sealed.
|
2017-11-08
|
No data
|
JEWEL AVENUE, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repair sidewalk, expansion joints sealed.
|
2017-11-08
|
No data
|
EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site waiting for asphalt to pave street.
|
2017-11-08
|
No data
|
BRUCKNER BOULEVARD, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2 of rd'way milled will call for other 1/2 later on in the day.
|
2017-11-03
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey barriers placed in roadway
|
2017-11-02
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BOBCAT NOT ON SITE
|
2017-11-02
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED AND SEALED
|
2017-11-02
|
No data
|
28 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
-No visible bobcat on location at this time.
|
2017-11-01
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is in compliance
|
2017-11-01
|
No data
|
AUSTIN STREET, FROM STREET 73 ROAD TO STREET ASCAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a wheel barrel with cement dry in it left on the sidewalk. The location is Burns Ave. between Bye St. & Ascan Ave on the sidewalk of the train line at this time. Photos attached.
|
2017-10-31
|
No data
|
SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new sidewalk being installed at this time.
|
2017-10-30
|
No data
|
NORTH 10 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w in compliance
|
2017-10-27
|
No data
|
EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
bpp conducted and paved at this time
|
2017-10-27
|
No data
|
BAINBRIDGE STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2017-10-26
|
No data
|
EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed a 40ft x 8ft area of the milled roadway, occupied with machines stored by the above respondent, while the site is unattended. This is a violation of Stipulation 078 of the above DOT permit. Permit used to ID.
|
2017-10-26
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Jersey barriers placed in roadway
|
2017-10-25
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
PLEASE SEAL EXPANSION JOINTS IN NEWLY INSTALLED CURB, AT 123 CLARA ST BETWEEN 36 ST & CHESTER AVE
|
2017-10-25
|
No data
|
COLUMBUS PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street milled down 3''.. in progress of being paved.
|
2017-10-25
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET KANE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street milled 3'' for paving.. in progress.
|
2017-10-24
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO BOBCAT ON SITE AT TIME OF INSPECTION
|
2017-10-23
|
No data
|
FROST STREET, FROM STREET MANHATTAN AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew is on site milling roadway. 26âX20â(1/5+5) area of the roadway is milled at a depth of 2â. *Advised crew to maintain one 11â lane for traffic.
|
2017-10-23
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE ROADWAY MILLED HALF + 5 AND HAS DEPTH AT 3IN
|
2017-10-20
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced
|
2017-10-19
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway paved half plus 5 feet.
|
2017-10-19
|
No data
|
16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW STEEL FACED CURB INSTALLED IN GOOD CONDITION
|
2017-10-19
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
NEW SIDEWALK INSTALLED, SIDEWALK COMPLETELY OPEN AT TIME OF INSPECTION
|
2017-10-19
|
No data
|
LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET LAMONT COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SIDEWALK, NO EXPANSION JOINTS PROPERLY INSTALLED, NOT SEALED AND NO 5 FT BY 5 FT FLAGS- PERMIT STILL ACTIVE
|
2017-10-18
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site. 60'x20' area of roadway milled to a depth of 2.5"-3". Spoke to Sam,Airside, to pave half and half to maintain traffic.
|
2017-10-18
|
No data
|
MADISON STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance
|
2017-10-17
|
No data
|
52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2017-10-16
|
No data
|
NASSAU STREET, FROM STREET BRIDGE STREET TO STREET DUFFIELD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb not sealed
|
2017-10-16
|
No data
|
60 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2017-10-16
|
No data
|
AUSTIN STREET, FROM STREET 73 ROAD TO STREET ASCAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No signs of work done at this time.
|
2017-10-12
|
No data
|
150 STREET, FROM STREET 70 ROAD TO STREET JEWEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done refer to latest permit # Q042017275A37.
|
2017-10-12
|
No data
|
JEWEL AVENUE, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work observed.
|
2017-10-12
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
metal faced curb ok
|
2017-10-11
|
No data
|
CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk is in compliance
|
2017-10-10
|
No data
|
70 ROAD, FROM STREET 147 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several flags replace. I/F/O 147-37
|
2017-10-10
|
No data
|
SUYDAM STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paced. 1/2+5'
|
2017-10-10
|
No data
|
BUSHWICK AVENUE, FROM STREET SUYDAM STREET TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2017-10-08
|
No data
|
DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints missing sealer in front of 699 dekalb
|
2017-10-07
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb. Joints sealed.
|
2017-10-07
|
No data
|
16 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
NEW SIDEWALK OK- NOT SEALED
|
2017-10-06
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk is in compliance
|
2017-10-03
|
No data
|
WEST 44 STREET, FROM STREET 7 AVENUE TO STREET SHUBERT ALLEY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
UNABLE TO FULLY INSPECT DUE TO CARPETING ON THE S/W
|
2017-10-02
|
No data
|
WYCKOFF AVENUE, FROM STREET CORNELIA STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2017-10-02
|
No data
|
BEDFORD AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At this time crew is on site milling the roadway 1/2 +5 with a Depth of 3". Permittee is following stips, work site is safe and in compliance.
|
2017-10-01
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
atpo i observed the above respondent had an active construction site working time 7 am to 6 pm monday through friday time stipulations as per dot permit respondent working on sunday in non compliance of ocmc 019 of dot permit
|
2017-10-01
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, street paved due to c of o ...
|
2017-09-26
|
No data
|
BRIDGE STREET, FROM STREET RAMP TO STREET CONCORD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new sidewalk installed. exp joints need to be sealed.
|
2017-09-26
|
No data
|
NASSAU STREET, FROM STREET BRIDGE STREET TO STREET DUFFIELD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new sidewalk needs to be sealed.
|
2017-09-23
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to maintain a pedestrian walkway in the roadway while having the sidewalk fully closed. Permit used to ID.
|
2017-09-23
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL CRUB RESET
|
2017-09-22
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE BIKE LANE MARKINGS OVER PERMANENT RESTORATION (1/2 ROADWAY PLUS 5) AT 564 ST JOHNS PLACE BETWEEN NYCTA SUBWAY & CLASSON AVE.
|
2017-09-22
|
No data
|
FREEMAN STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2017-09-21
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades/jersey barriers placed in r/w
|
2017-09-16
|
No data
|
CORNELIA STREET, FROM STREET CORNELIA STREET TO STREET CYPRESS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed
|
2017-09-16
|
No data
|
BEVERLY ROAD, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paving finalized ifo 1608.
|
2017-09-16
|
No data
|
PUTNAM AVENUE, FROM STREET PUTNAM AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed tape
|
2017-09-15
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE HAS SCRAPED OFF 22FT X 268FT DOWN 3INCHES OF THE ROADWAY AND LAYING DOWN ASPHALT AS REQUIRED OF BPP. IN COMPLIANCE WITH STIPS I/F/O 564
|
2017-09-13
|
No data
|
PUTNAM AVENUE, FROM STREET PUTNAM AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
start 11:30 115.6 x 20.6 x .3 builder paved
|
2017-09-13
|
No data
|
CORNELIA STREET, FROM STREET CORNELIA STREET TO STREET CYPRESS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
start 8:11 124.4 x 20.2 x .3 builder pave
|
2017-09-13
|
No data
|
WYCKOFF AVENUE, FROM STREET CORNELIA STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
start 8:11 -11:30 126.0 x 20.2 x .3 street paved
|
2017-09-08
|
No data
|
RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CHECKED LOCATION NO WORK HAS BEEN DONE OR MARK OUTS
|
2017-09-07
|
No data
|
36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
20 ft on either side of the building milled
|
2017-09-05
|
No data
|
DECATUR STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2017-09-03
|
No data
|
73 ROAD, FROM STREET AUSTIN STREET TO STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired expansion joints sealed
|
2017-08-28
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is in compliance
|
2017-08-28
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to mill and pave 1/2+5' of roadway. Only 15' width of roadway was paved, as opposed, to the required 20' on a 30' roadway. F/O 4 N HENRY ST
|
2017-08-27
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO SUCH ADDRESS AT 546, WORK DONE AT 564 NOV'S/SUMMONS ISSUED
|
2017-08-27
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Curb in Compliance
|
2017-08-23
|
No data
|
BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
roadway paved..
|
2017-08-19
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and curb is in compliance
|
2017-08-18
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BARRIERS WITH NO LIGHTS
|
2017-08-06
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Joints sealed.
|
2017-07-27
|
No data
|
36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk cut
|
2017-07-25
|
No data
|
WALTON STREET, FROM STREET MARCY AVENUE TO STREET WALLABOUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2017-07-25
|
No data
|
WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk ifo 514 free of defect
|
2017-07-20
|
No data
|
WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved IFO 409
|
2017-07-17
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SIDEWALK INSTALLED HAS EXPANSION SEAL AROUND JOINTS IN GOOD CONDITION
|
2017-07-15
|
No data
|
14 AVENUE, FROM STREET 44 STREET TO STREET 45 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2017-07-11
|
No data
|
CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk construction crew on site
|
2017-07-09
|
No data
|
NORTH 1 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed
|
2017-06-27
|
No data
|
9 AVENUE, FROM STREET WEST 52 STREET TO STREET WEST 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I FOUND THE RESPONDENT REPAIRING THE SIDEWALK AND CLOSING OFF THE FULL WIDTH OF THE SIDEWALK WITH ORANGE CAUTION TAPE AND CONSTRUCTION HORSES. PERMITTEE FAILED TO MAINTAIN A 5' CLEAR SIDEWALK AS PER STIPULATION 013.
|
2017-06-27
|
No data
|
NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced and half the r/w was repaired
|
2017-06-26
|
No data
|
WEST 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I FOUND THE RESPONDENT WITH THE FULL WIDTH OF THE SIDEWALK BROKEN OUT. PERMITTEE FAILED TO MAINTAIN A 5 FOOT WALKWAY ON THE SIDEWALK AS STIPULATED BY STIPULATION 013 ON THE PERMIT. AKA 798 9 AVE. I SPOKE TO FOREMAN ON SITE.
|
2017-06-26
|
No data
|
WEST 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I FOUND THE RESPONDENT PLACED A CONSTRUCTION CONTAINER ON THE ROADWAY IN CONJUNCTION WITH REPAIRING THE SIDEWALK; WITHOUT A PERMIT TO DO SO. I IDENTIFIED BY PERMIT M042017172A04. I SPOKE TO FOREMAN ON SITE.
|
2017-06-26
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SIDEWALK INSTALLED HAS EXPANSION SEAL AROUND JOINTS , ALSO NEW CURB INSTALLED IN FRONT OF 1409
|
2017-06-25
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Currently Accessible
|
2017-06-23
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joint on sidewalk needs to be sealed.
|
2017-06-21
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB AND SIDEWALK INSTALLED OK
|
2017-06-19
|
No data
|
DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY RESURFACED IN FRONT OF ADDRESS BY BUILDINGS PAVERS
|
2017-06-16
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary pedestrian walk in r/w
|
2017-06-15
|
No data
|
GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STREET HAS BEEN REPAVED
|
2017-05-31
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w paved in compliance
|
2017-05-31
|
No data
|
47 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway has been paved in front of the above address . new building
|
2017-05-31
|
No data
|
44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work on sidewalk
|
2017-05-30
|
No data
|
7 AVENUE, FROM STREET WEST 126 STREET TO STREET WEST 127 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Tape has been removed.
|
2017-05-28
|
No data
|
SCHOLES STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RWY RESURFACED
|
2017-05-28
|
No data
|
SCHOLES STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RWY RESURFACED
|
2017-05-27
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Currently Accessible.
|
2017-05-24
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2017-05-22
|
No data
|
MADISON STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb. Joint sealed.
|
2017-05-19
|
No data
|
WALTON STREET, FROM STREET MARCY AVENUE TO STREET WALLABOUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk good.
|
2017-05-15
|
No data
|
MANHATTAN AVENUE, FROM STREET MESEROLE STREET TO STREET SCHOLES STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site paving roadway.. half plus 5 feet.
|
2017-05-14
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 60 STREET TO STREET 61 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
no code for this defect.
|
2017-05-13
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
WK SEALED
|
2017-05-04
|
No data
|
STERLING STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A 8' x 3' area down 3" sunken in the driving lane i/f/o 329 Sterling Street between Nostrand Avenue & New York avenue
|
2017-05-03
|
No data
|
FULTON STREET, FROM STREET BROOKLYN AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SIDEWALK AND CURB HAS BE RESET
|
2017-05-03
|
No data
|
BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
another permittee with a more recent permit on file done work
|
2017-05-02
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk Crossing Currently not Active.
|
2017-05-02
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk installed exp joints not sealed.
|
2017-05-02
|
No data
|
LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new sidewalk installed
|
2017-04-30
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 60 STREET TO STREET 61 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
failed CAR re-inspection.
|
2017-04-29
|
No data
|
16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb
|
2017-04-24
|
No data
|
TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TALKED TO GENERAL CONTRACTOR OF BUILDING OPERATION AND FOREMAN OF SWK CREW-NOTIFIED OF NOV
|
2017-04-23
|
No data
|
NORTH 1 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINTS AT CURB AS PER CAR#20175270127 ISSUED ON 3/5/17.
|
2017-04-22
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence on s/w
|
2017-04-19
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary pedestrian walk in r/w
|
2017-04-13
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk
|
2017-04-11
|
No data
|
SULLIVAN PLACE, FROM STREET BEDFORD AVENUE TO STREET MC KEEVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2017-04-09
|
No data
|
BAYARD STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RWY RESURFACED OK
|
2017-04-09
|
No data
|
NORTH HENRY STREET, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
curb replaced
|
2017-04-08
|
No data
|
VANDERBILT AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
BIKE LANE MARKING RESTORED
|
2017-04-08
|
No data
|
LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joiunts installed on steel faced curb
|
2017-04-05
|
No data
|
SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk good.
|
2017-04-02
|
No data
|
GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2017-04-02
|
No data
|
WYCKOFF STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rwy resurfaced
|
2017-04-01
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2017-03-25
|
No data
|
25 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed
|
2017-03-25
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE F TO STREET DITMAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk installed.
|
2017-03-25
|
No data
|
EAST 2 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street paved.
|
2017-03-22
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 60 STREET TO STREET 61 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
THE PERMITTEE IS RESPONSIBLE FOR MILLING AND PAVING 1/2 + 5 FEET OF THE ROADWAY TO A DEPTH OF 3 INCHES AS A MINIMUM RESTORATION REQUIREMENT. THIS IS A TWO WAY STREET AND PERMITTEE ONLY CAME OUT 8FEET 1INCH
|
2017-03-21
|
No data
|
25 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
removing sidewalk at this time.
|
2017-03-21
|
No data
|
SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb.
|
2017-03-18
|
No data
|
BROADWAY, FROM STREET 23 STREET TO STREET 25 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
unable to inspect due to snow
|
2017-03-15
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material is placed in roadway
|
2017-03-12
|
No data
|
7 AVENUE, FROM STREET WEST 126 STREET TO STREET WEST 127 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Blue tape on expansion joints need to be removed.
|
2017-03-11
|
No data
|
OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full curb to curb restoration done.
|
2017-03-06
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2017-03-05
|
No data
|
NORTH 1 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS ON SIDEWALK NOT SEALED AT THIS TIME.
|
2017-03-04
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no Concrete Pump at location
|
2017-03-02
|
No data
|
7 AVENUE, FROM STREET WEST 126 STREET TO STREET WEST 127 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O the respondent's subcontractor(Able Pavement Marking) is milling the roadway without a valid permit. No permit found on DASH, therefore NOV was issued for use/opening the roadway without a permit. Spoke to Ms. Ditty via phone.
|
2017-03-02
|
No data
|
WEST 127 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O the respondent's sub-contractor, Able Pavement Marking, is milling the roadway without a valid permit. No permit found on DASH, therefore NOV was issued as per section of law. Spoke to Ms. Ditty via phone.
|
2017-02-27
|
No data
|
BAINBRIDGE STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, street paving curb to curb ....due to c of o ...new building ..
|
2017-02-27
|
No data
|
PARK PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
22' width of roadway paved.
|
2017-02-26
|
No data
|
SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STREET PAVE SUNKEN DUE TO DEP DEPRESSION
|
2017-02-25
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS RESET AND REPLACE
|
2017-02-21
|
No data
|
GREENE AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, street ....paving due to c of o ....
|
2017-02-16
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewal good.
|
2017-02-16
|
No data
|
WALTON STREET, FROM STREET HARRISON AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done yet
|
2017-02-16
|
No data
|
UNION AVENUE, FROM STREET WALLABOUT STREET TO STREET WALTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no sidewalk work at this time.
|
2017-02-14
|
No data
|
OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work observed.
|
2017-02-09
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Currently not Active.
|
2017-02-08
|
No data
|
LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb open joints no expansion joints as per DOT Standard Specifications H1010 must install and seal expansion joints at start and end of project also at open joints between steel pieces
|
2017-02-07
|
No data
|
MARCY AVENUE, FROM STREET LORIMER STREET TO STREET MIDDLETON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK GOOD
|
2017-02-07
|
No data
|
BAINBRIDGE STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass... buiders pavement .....ok ...new building ..
|
2017-02-06
|
No data
|
16 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB ok
|
2017-02-03
|
No data
|
NORTH 1 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2017-02-03
|
No data
|
EAST 3 STREET, FROM STREET AVENUE A TO STREET AVENUE B
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass s/w
|
2017-02-03
|
No data
|
AVENUE A, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass s/w
|
2017-01-30
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk work ok
|
2017-01-29
|
No data
|
GRAHAM AVENUE, FROM STREET BROOME STREET TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Paved roadway New car will be issued on new permit Missing footage on real paving
|
2017-01-28
|
No data
|
LAWRENCE AVENUE, FROM STREET EAST 3 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str.. 1/2 +5' paved...BPP
|
2017-01-26
|
No data
|
LEXINGTON AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
streetpaved ...due to c of o ....new building constructtion .,...
|
2017-01-26
|
No data
|
WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
bpp done in compliance 1/2 +5'
|
2017-01-26
|
No data
|
SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb.
|
2017-01-25
|
No data
|
25 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2017-01-21
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE W TO STREET AVENUE X
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str 1/2 + 5'.... BPP
|
2017-01-19
|
No data
|
20 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street paved.
|
2017-01-11
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Maintain fence on sidewalk
|
2017-01-11
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
To place materials in roadway
|
2017-01-10
|
No data
|
50 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk
|
2017-01-10
|
No data
|
14 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk
|
2017-01-06
|
No data
|
MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved ...for c of o ....
|
2017-01-04
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ON STOP
|
2017-01-04
|
No data
|
WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no defect to sidewalk
|
2017-01-03
|
No data
|
MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rwy properly resurfaced
|
2017-01-03
|
No data
|
DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
properly resurfaced but no markings yet
|
2017-01-02
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent fail to seal sidewalk expansion joints. permittee was previously notified on 11/12/16 by CAR #20165270578 and condition remains.
|
2016-12-30
|
No data
|
PALMETTO STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W IN COMPLIANCE
|
2016-12-30
|
No data
|
CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is ok
|
2016-12-21
|
No data
|
LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
less than 15 construction of curb at same time full closure signs to use other side
|
2016-12-20
|
No data
|
CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
re-paved rwy
|
2016-12-15
|
No data
|
2 AVENUE, FROM STREET EAST 78 STREET TO STREET EAST 79 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Repair sidewalk i/f/o CAPITAL ONE BANK in compliance, no defects.
|
2016-12-15
|
No data
|
LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
was on site earlier Nov issued doing s/w no permit this work was not done expired permit
|
2016-12-15
|
No data
|
GREENE AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, street ....paving due to c of o ....
|
2016-12-08
|
No data
|
EAST 161 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
2016-12-05
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2016-12-05
|
No data
|
VANDERBILT AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please restore bike lane markings over new roadway resurfacing/restoration, in front of 531 Vanderbilt Ave between Atlantic Ave and Fulton St.
|
2016-11-30
|
No data
|
WALTON STREET, FROM STREET HARRISON AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2016-11-30
|
No data
|
MIDDLETON STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags in compliance
|
2016-11-30
|
No data
|
HARRISON AVENUE, FROM STREET WALLABOUT STREET TO STREET WALTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2016-11-30
|
No data
|
UNION AVENUE, FROM STREET WALLABOUT STREET TO STREET WALTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w done
|
2016-11-29
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence is ok
|
2016-11-28
|
No data
|
MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass...c of o ...for new building ...
|
2016-11-28
|
No data
|
GRAHAM AVENUE, FROM STREET BROOME STREET TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed piece of wood in other car at this time
|
2016-11-27
|
No data
|
GRAHAM AVENUE, FROM STREET BROOME STREET TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed respondent or subcontractor failed to restore entire pavement Between Street opening and curb previous notification by car # 20160920450 no repairs made no application on file for paving
|
2016-11-27
|
No data
|
NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed ok
|
2016-11-23
|
No data
|
THROOP AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new swk flags by Kosciusko St on WCL
|
2016-11-14
|
No data
|
61 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done
|
2016-11-12
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints on sidewalk not sealed.
|
2016-11-09
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-11-04
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
To repave street in front of new building
|
2016-10-28
|
No data
|
WINTHROP STREET, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET CURB
|
2016-10-26
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work Site.
|
2016-10-20
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing Sidewalk Currently not Active.
|
2016-10-16
|
No data
|
NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK GOOD
|
2016-10-15
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed at this time.
|
2016-10-13
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work site.
|
2016-10-12
|
No data
|
GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk.
|
2016-10-10
|
No data
|
KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk installed.
|
2016-10-09
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-10-09
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-10-06
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET
|
2016-10-06
|
No data
|
DRIGGS AVENUE, FROM STREET GRAHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work no t done new active permit work in progress
|
2016-10-06
|
No data
|
DRIGGS AVENUE, FROM STREET ECKFORD STREET TO STREET GRAHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new permit active working on s/w first
|
2016-10-05
|
No data
|
MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paving for ...new building ....
|
2016-10-04
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work site.
|
2016-10-03
|
No data
|
NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints on sidewalk not sealed.
|
2016-10-03
|
No data
|
GRAHAM AVENUE, FROM STREET BROOME STREET TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must remove 2 ' x 4' pieces of wood from embedded in to concrete sidewalk decrease all expansion joints & seal them
|
2016-10-01
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barricades on r/w
|
2016-10-01
|
No data
|
48 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2016-09-30
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-09-28
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades are in compliance.
|
2016-09-25
|
No data
|
SULLIVAN PLACE, FROM STREET BEDFORD AVENUE TO STREET MC KEEVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2016-09-22
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway Currently Acessible.
|
2016-09-21
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work site.
|
2016-09-19
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-09-19
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material visible at site.
|
2016-09-17
|
No data
|
61 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w in compliance
|
2016-09-14
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 60 STREET TO STREET 61 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
bobcat stored in the roadway without a permit. permit number B042016252A15 is used for ID only
|
2016-09-14
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
failed to comply with stipulation 013 of their permit by failing to maintain minimum 5'ft clear pedestrian walk. upon inspection at site found full width of sidewalk closed with barriers & chainlink fence.
|
2016-09-13
|
No data
|
61 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
failed to comply with stipulation OCMC12 of their permit by having 15'5" width sidewalk closed with plastic barriers after working hrs. RESPONDENT MUST MAINTAIN MINIMUM 5 FT CLEAR SIDEWALK AFTER WORKING HRS FOR PEDESTRIANS.
|
2016-09-11
|
No data
|
KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SIDEWALK FLAGS INSTALLED. NOT SEALED.
|
2016-09-11
|
No data
|
OCEAN PARKWAY, FROM STREET NEPTUNE AVENUE TO STREET OCEAN VIEW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pave str BPP
|
2016-09-06
|
No data
|
THROOP AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
excavated swk , crew on site
|
2016-09-06
|
No data
|
PACIFIC STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r\w mill for pave
|
2016-09-06
|
No data
|
EAST 3 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED - NEW BUILDING
|
2016-09-01
|
No data
|
JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w in compliance opp 114
|
2016-08-21
|
No data
|
HAWTHORNE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS RESET AND REPLACE
|
2016-08-20
|
No data
|
WINTHROP STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET AND REPLACE
|
2016-08-20
|
No data
|
LINCOLN ROAD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET AND REPLACE
|
2016-08-05
|
No data
|
LAFAYETTE AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved.
|
2016-07-31
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2016-07-31
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w repaved
|
2016-07-30
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not on site
|
2016-07-30
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
n/a
|
2016-07-29
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
on site
|
2016-07-25
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work site.
|
2016-07-19
|
No data
|
BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK RESTORED
|
2016-07-10
|
No data
|
EAST 3 STREET, FROM STREET CATON AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2016-07-03
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk Currently Accessible.
|
2016-07-01
|
No data
|
47 STREET, FROM STREET 31 AVENUE TO STREET NEWTOWN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb not replace
|
2016-06-28
|
No data
|
ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved.
|
2016-06-28
|
No data
|
MANHATTAN AVENUE, FROM STREET EAGLE STREET TO STREET FREEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2016-06-26
|
No data
|
38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2016-06-23
|
No data
|
EAST 3 STREET, FROM STREET AVENUE A TO STREET AVENUE B
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2016-06-19
|
No data
|
LAFAYETTE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w paved.
|
2016-06-15
|
No data
|
MESEROLE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Barricade removed.
|
2016-06-14
|
No data
|
GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w
|
2016-06-13
|
No data
|
MESEROLE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ATPO I observed the above respondent failed to remove barriers and drum from sidewalk as per CAR#20166100069
|
2016-05-28
|
No data
|
DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
area around tree ok
|
2016-05-27
|
No data
|
AVENUE A, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Ongoing sidewalk repairs on 1'x5' sidewalk flags at bus stop acceptable. Bike lane reopened. IFO aka 151 E. 3 st.
|
2016-05-27
|
No data
|
AVENUE A, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent having an ongoing curb replacement without a valid NYC DOT permit (type 0118) on file as required. Sidewalk repair permit M042016144A27 used to identify respondent. Nov issued.
|
2016-05-24
|
No data
|
EAST 164 STREET, FROM STREET BOSTON ROAD TO STREET CAULDWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition corrected
|
2016-05-24
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work site.
|
2016-05-18
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rwy resurfaced
|
2016-05-16
|
No data
|
LAFAYETTE AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, street paving for c ofo ..
|
2016-05-12
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 94 STREET TO STREET WEST 95 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
failed " To Maintain a minimum 5ft Clear pedestrian walk on sidewalk." Upon Inspection contractor had a FULL sidewalk closure forcing pedestrians into a NON- authorized walkway.
|
2016-05-08
|
No data
|
53 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS SEALED.
|
2016-05-07
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
detecable warning applied
|
2016-05-03
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-05-03
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-04-28
|
No data
|
MESEROLE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Sidewalk work is completed but there are 2 wooden barriers and a drum on the sidewalk serving no purpose. Please notify proper party.
|
2016-04-22
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Storage of Materials found @ work Site.
|
2016-04-20
|
No data
|
GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved..3 feet out.
|
2016-04-12
|
No data
|
DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Please reset all cobblestones around tree pits and remove excess concrete poured onto side of the tree.
|
2016-04-12
|
No data
|
DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to seal expansion joints. CAR was issued 1/22/2016. (CAR #20166180022)
|
2016-04-06
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
a\t\p\o\ i observed the above respondent failure to install detectable warning pads on the corner pacific and hoyt sr car issued on 12\12\2015 car 20151670811
|
2016-04-06
|
No data
|
MESEROLE STREET, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
repair sidewalk work in progress
|
2016-04-03
|
No data
|
EAST 164 STREET, FROM STREET BOSTON ROAD TO STREET CAULDWELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to seal expansion joints on the sidewalk as per subsection. CAR # 20154110595 was issued but has yet to be corrected
|
2016-03-20
|
No data
|
53 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
exp joints missing sealer
|
2016-03-04
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-03-04
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk open and accessible as stipulated.
|
2016-03-02
|
No data
|
MYRTLE AVENUE, FROM STREET STANHOPE STREET TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paving r/w crew on site
|
2016-02-27
|
No data
|
EAST 3 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str under BPP
|
2016-02-27
|
No data
|
EAST 3 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pave str under BPP
|
2016-02-20
|
No data
|
FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved.
|
2016-02-18
|
No data
|
WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Paving 1/2 + 5 not sealed on edges permit active
|
2016-02-16
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades okay.
|
2016-02-16
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway open and accessible as stipulated.
|
2016-02-16
|
No data
|
MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paving .....due to c of o .....s/s of street ....
|
2016-02-16
|
No data
|
KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STREET PAVED.
|
2016-02-16
|
No data
|
KENT AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
STREET PAVED AND LANE MARKING RESTORED.
|
2016-02-06
|
No data
|
53 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
nwd
|
2016-02-05
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No existing conditions at the time of insp
|
2016-02-05
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material at site.
|
2016-02-03
|
No data
|
DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags replaced.
|
2016-01-28
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
ATPO I observed the above respondent have a fence closing off a portion of the sidewalk without a valid DOT permit. DOT permit B022015331A24 expired on 12/31/2015 and was used for identification.
|
2016-01-22
|
No data
|
DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk flags replaced at corner property of 155. Please seal sidewalk expansions joints at the Dean St. side entrance.
|
2016-01-18
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the above respondent have a fence closing off the sidewalk without a valid DOT permit. The above referenced permit expired on 12/31/2015 and was used for identification.
|
2016-01-13
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the above respondent have its barricades placed on the roadway without a valid DOT permit. The above referenced permit expired on 12/31/2015 and was used for identification.
|
2016-01-09
|
No data
|
PACIFIC STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S\W OK JOINTS SEAL
|
2016-01-06
|
No data
|
EAST 163 STREET, FROM STREET EAGLE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2016-01-05
|
No data
|
NORTH 8 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Spoke to contractor to maintain 1 11 foot lane for traffic.
|
2015-12-30
|
No data
|
EAST 164 STREET, FROM STREET BOSTON ROAD TO STREET CAULDWELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2015-12-29
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no existing conditions at this time of insp
|
2015-12-29
|
No data
|
DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
no one working on site pass
|
2015-12-28
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing sidewalk not active at time of inspection.
|
2015-12-24
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary pedestrian walkway is in compliance.
|
2015-12-23
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No existing conditions at the time of insp.
|
2015-12-16
|
No data
|
MARCY AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING TEMPORARY RESTORATION NOT FLUSH WITH SURROUNDING AREA AS PER DOT WINTER MORATORIUM POLICY. RESTORATION LEFT DOWN 2'' CAUSING CARS TO JOLT.
|
2015-12-12
|
No data
|
MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new walk ....ok
|
2015-12-12
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
fail to install detectable warning peds
|
2015-12-12
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
joints seal
|
2015-12-10
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
5 foot sidewalk open and accessible. 8 foot portion of the roadway occupied as stipulated. Bus stop relocated to 15 Avenue as per posted MTA signs and as per the Super of the construction site.
|
2015-12-09
|
No data
|
16 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk closed. Temp pedestrian walkway in place. Super instructed to ramp by curb.
|
2015-12-08
|
No data
|
MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street paving ....s/s of street ....not started yet ...
|
2015-12-08
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
5 foot sidewalk open and accessible. 8 foot portion of the roadway occupied as stipulated. Bus stop relocated to 15 Avenue as per posted MTA signs and as per the Super of the construction site.
|
2015-12-03
|
No data
|
86 STREET, FROM STREET 16 AVENUE TO STREET BAY 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor on site installing fence
|
2015-11-22
|
No data
|
12 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK INSTALLED JOINTS COVERED WITH TAPE
|
2015-11-22
|
No data
|
36 STREET, FROM STREET 12 AVENUE TO STREET TEHAMA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2015-11-06
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
expansion joints not sealed
|
2015-10-21
|
No data
|
SULLIVAN PLACE, FROM STREET BEDFORD AVENUE TO STREET MC KEEVER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 in the Roadway Installed ( Building Pavement)
|
2015-10-20
|
No data
|
PACIFIC STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk open. Permit still active.
|
2015-10-20
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
D30 Atpo I observed the above respondent failed to properly sign directing pedestrians to opposite sidewalk at the corner of Dean st and Hoyt st(causing pedestrians to walk in roadway in bike lane)
|
2015-10-19
|
No data
|
PACIFIC STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O i observed that the respondent violated stip # 019 of permit by working at 8:15 pm. Above permit allows to work from 7:00 am - 6:00 pm. The foreman, IAN said he didn't know they cant work at this time.
|
2015-10-19
|
No data
|
HOYT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O i observed that the respondent violated stip # 019 of permit by working at 8:00 pm. Above permit allows to work from 7:00 am - 6:00 pm.
|
2015-09-27
|
No data
|
PARK PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pave str BPP
|
2014-10-12
|
No data
|
MARENGO STREET, FROM STREET KENO AVENUE TO STREET MC LAUGHLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-08-14
|
No data
|
107 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2014-03-19
|
No data
|
MARENGO STREET, FROM STREET KENO AVENUE TO STREET MC LAUGHLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cobblestone curb
|
2014-03-14
|
No data
|
BEACH 21 STREET, FROM STREET DEAD END TO STREET ELK DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2014-03-05
|
No data
|
WOLCOTT STREET, FROM STREET DWIGHT STREET TO STREET RICHARDS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s\w ok
|
2013-11-05
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
b02.2013 030050 107 081 container 1/19/13.
|
2013-09-01
|
No data
|
47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB
|
2013-07-31
|
No data
|
38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass
|
2013-07-24
|
No data
|
107 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb
|
2013-07-13
|
No data
|
PENN STREET, FROM STREET WILLIAMSBURG ST EAST TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint, 2 violations previously issued
|
2013-07-08
|
No data
|
HART STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FENCE
|
2013-07-05
|
No data
|
WYTHE AVENUE, FROM STREET PENN STREET TO STREET RUTLEDGE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Man Lift on site.
|
2013-07-05
|
No data
|
RUTLEDGE STREET, FROM STREET CLASSON AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Man Lift on site
|
2013-07-05
|
No data
|
PENN STREET, FROM STREET WILLIAMSBURG ST EAST TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Man Lift in parking lane ok
|
2013-07-02
|
No data
|
52 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence
|
2013-06-28
|
No data
|
LEONARD STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-27
|
No data
|
THROOP AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave st.
|
2013-06-26
|
No data
|
MESEROLE STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-26
|
No data
|
38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk open and accessible in compliance with permit stips.
|
2013-06-26
|
No data
|
LEONARD STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-24
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-06-22
|
No data
|
MESEROLE STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-20
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-06-16
|
No data
|
38 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence in compliance.
|
2013-06-14
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FENCE.
|
2013-06-13
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occ s/w stip
|
2013-06-11
|
No data
|
MARCY AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-06-07
|
No data
|
WALWORTH STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
placed on hold for expansion joint policy
|
2013-06-05
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no flag person while overlifting with boom truck
|
2013-05-29
|
No data
|
WALWORTH STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
joints not sealed- take picture for NOV
|
2013-05-28
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-05-27
|
No data
|
MARENGO STREET, FROM STREET KENO AVENUE TO STREET MC LAUGHLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb done with cobble stones
|
2013-05-19
|
No data
|
WALWORTH STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
JOINTS NOT SEALED. NOV ISSUED THRU S/W PERMIT ALREADY TODAY.
|
2013-05-16
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-05-07
|
No data
|
PENN STREET, FROM STREET WILLIAMSBURG ST EAST TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No data
|
2013-04-29
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no safety devices around bricks in roadway
|
2013-04-23
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container no pre....
|
2013-04-23
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-04-14
|
No data
|
BRIGHTON 6 STREET, FROM STREET BRIGHTON BEACH AVENUE TO STREET OCEAN VIEW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-04-11
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-04-04
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Maint fence Expired 3/21/13
|
2013-03-07
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no protection under bricks
|
2013-03-04
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-03-04
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk in violation bike sign
|
2013-03-04
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-03-01
|
No data
|
52 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-03-01
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-02-26
|
No data
|
WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container
|
2013-02-25
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-02-25
|
No data
|
52 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-02-21
|
No data
|
WALWORTH STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joint on sidewalk not sealed.
|
2013-02-18
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container
|
2013-02-18
|
No data
|
52 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence
|
2013-02-12
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-02-12
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-01-31
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
container in roadway updated permit b012013030023
|
2013-01-07
|
No data
|
PENN STREET, FROM STREET WILLIAMSBURG ST EAST TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition still exist expansion joints not sealed
|
2012-12-31
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
occupancy of the sidewalk
|
2012-12-12
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-12-11
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No equipment stored in the roadway.
|
2012-12-06
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-12-04
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-11-27
|
No data
|
MESEROLE STREET, FROM STREET LORIMER STREET TO STREET SOUTH 4 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
No data
|
2012-11-27
|
No data
|
3 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-11-16
|
No data
|
DIVISION AVENUE, FROM STREET BEDFORD AVENUE TO STREET BEDFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-11-07
|
No data
|
MARCY AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started.
|
2012-10-26
|
No data
|
PENN STREET, FROM STREET WILLIAMSBURG ST EAST TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints placed
|
2012-10-13
|
No data
|
BEACH 21 STREET, FROM STREET DEAD END TO STREET ELK DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw fail molothic pour
|
2012-09-13
|
No data
|
BROADWAY, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved curblane
|
2012-08-22
|
No data
|
PENN STREET, FROM STREET WILLIAMSBURG ST EAST TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
All expansion joints need shaving & sealed. 1 expansion joint missing at the end.
|
2012-05-01
|
No data
|
BRIGHTON 6 STREET, FROM STREET BRIGHTON BEACH AVENUE TO STREET OCEAN VIEW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-05-01
|
No data
|
OCEAN VIEW AVENUE, FROM STREET BRIGHTON 6 STREET TO STREET BRIGHTON 7 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2012-03-20
|
No data
|
AVENUE I, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB
|
2011-12-21
|
No data
|
12 AVENUE, FROM STREET 46 STREET TO STREET 47 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-12-21
|
No data
|
47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-12-10
|
No data
|
1 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-11-29
|
No data
|
1 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|