2024-05-11
|
No data
|
PRESCOTT AVENUE, FROM STREET KRUSER STREET TO STREET NORTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD A CONSTRUCTION DEBRIS CONTAINER ON ROADWAY- AT 2:11 PM ON 5/11/2024-WITHOUT A VALID DOT PERMIT TO DO SO. CONSTRUCTION EQUIPMENT ON STREET. NO PERMIT. NYC DEPT. OF BUILDINGS PERMIT#S00788047-l1-GC EXPIRES 5/19/24
|
2023-11-27
|
No data
|
65 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb installed in front of 48-31
|
2023-09-06
|
No data
|
43 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED ABOVE RESPONDENT HAS CONSTRUCTION EQUIPMENT “BARRIERS” ON ROADWAY)-NO PERMIT. Respondent ID BY DOB PERMIT #321186426-01-EQ-FN
|
2023-03-12
|
No data
|
HAIGHT STREET, FROM STREET 41 AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed as per inspector Wanda Manning.
|
2021-12-30
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Improper street protection under container on roadway
|
2021-12-20
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction Container is placed on the Roadway
|
2021-12-14
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction Container is Placed on the roadway
|
2021-12-10
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction Container is Placed on the Roadway
|
2021-12-02
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction Container is placed on the Roadway
|
2021-11-24
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction Container is Placed on the Roadway
|
2021-10-26
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk is occupied
|
2021-10-21
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
construction container stored on the roadway
|
2021-09-23
|
No data
|
HAIGHT STREET, FROM STREET 41 AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb reveal installed in front of building #41-31 HAIGHT STREET in compliance
|
2021-09-09
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plastic jersey barriers stored on the roadway.
|
2021-06-20
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the MAN-LIFT/equipment stored in the roadway. Nov issued
|
2021-06-18
|
No data
|
HAIGHT STREET, FROM STREET 41 AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Not verified. Contractor is working at 41-31 and has valid permit. Permit also allow for full sidewalk closure if less than 5 feet.
|
2021-06-08
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the MAN-LIFT/equipment stored in the sidewalk. Nov issued
|
2021-06-08
|
No data
|
HAIGHT STREET, FROM STREET 41 AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
on 6/4/21 96' x 20'5" milled, 3" depth and 27" curb to curb
|
2021-06-07
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2021-06-04
|
No data
|
HAIGHT STREET, FROM STREET 41 AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
• Curb to Curb width – 27’• Milled area – 65’ x 20’5”• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no
|
2021-05-13
|
No data
|
OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the MAN-LIFT/equipment stored in the roadway. Nov issued
|
2021-03-25
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the several jersey barriers/equipment stored in the sidewalk adjacent to the building operation. Nov issued
|
2021-03-22
|
No data
|
65 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The below BPP is completed and acceptable.Curb to Curb width – 29'0" ,Milled area – 19'0" ,Depth of milled area – 3" ,½ +5’ milled- Yes.
|
2021-03-10
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the several jersey barriers/equipment stored in the sidewalk adjacent to the building operation. Nov issued
|
2021-02-26
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the several jersey barriers/equipment stored in the sidewalk adjacent to the building operation. Nov issued
|
2021-02-19
|
No data
|
BAY RIDGE PARKWAY, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent FORTUNA CONSTRUCTION LLC failed to obtain a DOT permit on file for the storage of the several jersey barriers/equipment stored in the sidewalk adjacent to the building operation. Nov issued
|
2021-01-28
|
No data
|
56 AVENUE, FROM STREET 92 STREET TO STREET JUSTICE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The below BPP is acceptable. Curb to Curb width – 28' 0" , Milled area – 20' 1", Depth of milled area – 3", ½ +5’ milled - Yes.
|
2020-06-19
|
No data
|
74 STREET, FROM STREET 41 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-NO NEW WORK FOUND I/F/O BUILDING OPERATION
|
2020-04-10
|
No data
|
74 STREET, FROM STREET 41 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temp walkway in place.
|
2020-02-19
|
No data
|
12 AVENUE, FROM STREET 150 STREET TO STREET CLINTONVILLE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work done, permit still active.
|
2020-02-18
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp construction signs posted
|
2020-01-15
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
2 " NO PARKING ANYTIME / temporary construction regulation" signs posted on sidewalk shed fence without a permit. Permit number B022019130B70 is used for ID only.
|
2019-10-23
|
No data
|
124 STREET, FROM STREET 18 AVENUE TO STREET 20 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent fully closed the sidewalk on a construction site with a construction vehicle while loading without a DOT building operation permit at this time.DOB permit # 421715362-01-NB used to identify the contractor.
|
2019-09-24
|
No data
|
64 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary Construction Signs posted.
|
2019-09-20
|
No data
|
51 AVENUE, FROM STREET 94 STREET TO STREET JUNCTION BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to call the NYC DOT HIQA borough office within 4 hours prior to work being done. A violation of stipulation 1/2+5” of above DOT permit used for I.D.
|
2019-08-24
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Roadway is open and accessible. Free and clear of all equipment.
|
2019-06-01
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No signs posted permit expired
|
2019-06-01
|
No data
|
60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Occupying rdwy wo permit
|
2019-05-30
|
No data
|
64 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No signs posted at time of inspection
|
2019-05-16
|
No data
|
7 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container stored against the curb, not affecting the bike lane.
|