M042024320A02
|
2024-11-15
|
2024-12-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
M012024320A50
|
2024-11-15
|
2024-12-13
|
RESET, REPAIR OR REPLACE CURB
|
WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
M042024319A03
|
2024-11-14
|
2024-12-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
Q012024319B28
|
2024-11-14
|
2024-12-14
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
M042024319A04
|
2024-11-14
|
2024-12-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
Q012024318E15
|
2024-11-13
|
2024-12-13
|
RESET, REPAIR OR REPLACE CURB
|
23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE
|
Q012024318E14
|
2024-11-13
|
2024-12-21
|
RESET, REPAIR OR REPLACE CURB
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
Q012024318E13
|
2024-11-13
|
2024-12-13
|
RESET, REPAIR OR REPLACE CURB
|
23 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 44 ROAD
|
Q042024318B06
|
2024-11-13
|
2024-12-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE
|
Q042024318B04
|
2024-11-13
|
2024-12-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
23 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 44 ROAD
|
Q042024318B05
|
2024-11-13
|
2024-12-21
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
M042024317A09
|
2024-11-12
|
2024-12-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
M042024317A08
|
2024-11-12
|
2024-12-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
M002024316A05
|
2024-11-11
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
Q002024316A13
|
2024-11-11
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M002024316A04
|
2024-11-11
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M042024309A08
|
2024-11-04
|
2024-12-06
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET
|
M042024309A07
|
2024-11-04
|
2024-12-06
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET
|
M012024309A70
|
2024-11-04
|
2024-12-03
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
M042024309A09
|
2024-11-04
|
2024-12-06
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET
|
M042024309A06
|
2024-11-04
|
2024-12-03
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
M002024309A17
|
2024-11-04
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M002024306A25
|
2024-11-01
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022024303B76
|
2024-10-29
|
2024-11-29
|
TEMPORARY PEDESTRIAN WALK
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B042024303A28
|
2024-10-29
|
2024-11-23
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET
|
B042024303A27
|
2024-10-29
|
2024-11-23
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET
|
B042024303A26
|
2024-10-29
|
2024-11-29
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET
|
B042024303A24
|
2024-10-29
|
2024-11-29
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B042024303A23
|
2024-10-29
|
2024-11-29
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B012024303B25
|
2024-10-29
|
2024-11-29
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B012024303B26
|
2024-10-29
|
2024-11-29
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B012024303B34
|
2024-10-29
|
2024-11-29
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B012024303B35
|
2024-10-29
|
2024-11-29
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B022024303B69
|
2024-10-29
|
2024-11-29
|
TEMPORARY PEDESTRIAN WALK
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B022024303B77
|
2024-10-29
|
2024-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B022024303B70
|
2024-10-29
|
2024-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B042024299A34
|
2024-10-25
|
2024-11-21
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
HURON STREET, BROOKLYN, FROM STREET WEST STREET
|
B012024299A37
|
2024-10-25
|
2024-11-23
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
SACKETT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B042024299A01
|
2024-10-25
|
2024-11-23
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
SACKETT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B042024299A35
|
2024-10-25
|
2024-11-20
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
HURON STREET, BROOKLYN, FROM STREET WEST STREET
|
M042024292A14
|
2024-10-18
|
2024-11-16
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
M012024292B41
|
2024-10-18
|
2024-11-16
|
RESET, REPAIR OR REPLACE CURB
|
WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
M012024291A44
|
2024-10-17
|
2024-11-14
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
Q012024291B97
|
2024-10-17
|
2024-11-23
|
RESET, REPAIR OR REPLACE CURB
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
Q042024291A69
|
2024-10-17
|
2024-11-23
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
M042024289A05
|
2024-10-15
|
2024-11-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
M042024289A04
|
2024-10-15
|
2024-11-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
M042024282A35
|
2024-10-08
|
2024-11-06
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET
|
M042024282A33
|
2024-10-08
|
2024-11-06
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET
|
M012024282B07
|
2024-10-08
|
2024-11-03
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M012024282B08
|
2024-10-08
|
2024-11-03
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M042024282A34
|
2024-10-08
|
2024-11-06
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 41 STREET
|
Q042024278A99
|
2024-10-04
|
2024-11-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE
|
Q012024278B95
|
2024-10-04
|
2024-11-13
|
RESET, REPAIR OR REPLACE CURB
|
23 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 AVENUE
|
Q012024278B94
|
2024-10-04
|
2024-11-13
|
RESET, REPAIR OR REPLACE CURB
|
23 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 44 ROAD
|
Q042024278A98
|
2024-10-04
|
2024-11-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
23 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 44 ROAD
|
M012024277A94
|
2024-10-03
|
2024-11-03
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
M042024277A40
|
2024-10-03
|
2024-11-03
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
M042024277A75
|
2024-10-03
|
2024-11-10
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
M042024277A76
|
2024-10-03
|
2024-11-10
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
B012024274C03
|
2024-09-30
|
2024-10-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B012024274C05
|
2024-09-30
|
2024-10-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B022024274C30
|
2024-09-30
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B022024274C31
|
2024-09-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B022024274C32
|
2024-09-30
|
2024-10-30
|
TEMPORARY PEDESTRIAN WALK
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B022024274C33
|
2024-09-30
|
2024-10-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B042024274A16
|
2024-09-30
|
2024-10-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B042024274A17
|
2024-09-30
|
2024-10-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B042024274A18
|
2024-09-30
|
2024-10-30
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET
|
B042024274A20
|
2024-09-30
|
2024-10-24
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET
|
B042024274A19
|
2024-09-30
|
2024-10-24
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET
|
B012024274C02
|
2024-09-30
|
2024-10-30
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE
|
B012024274C04
|
2024-09-30
|
2024-10-30
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET
|
B012024270B65
|
2024-09-26
|
2024-10-24
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
SACKETT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B042024270A39
|
2024-09-26
|
2024-10-24
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
SACKETT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
Q012024269E38
|
2024-09-25
|
2024-10-24
|
RESET, REPAIR OR REPLACE CURB
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
Q042024269B35
|
2024-09-25
|
2024-10-24
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
24 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 44 ROAD
|
M022024261C70
|
2024-09-17
|
2024-10-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M022024261C69
|
2024-09-17
|
2024-10-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022024261C68
|
2024-09-17
|
2024-10-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022024261C67
|
2024-09-17
|
2024-10-18
|
TEMPORARY PEDESTRIAN WALK
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M012024261C37
|
2024-09-17
|
2024-10-18
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M012024261B19
|
2024-09-17
|
2024-10-16
|
RESET, REPAIR OR REPLACE CURB
|
WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT
|
M042024261A38
|
2024-09-17
|
2024-10-17
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M042024261A39
|
2024-09-17
|
2024-10-17
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M042024261A37
|
2024-09-17
|
2024-10-17
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M042024261A36
|
2024-09-17
|
2024-10-18
|
REPLACE SIDEWALK
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M042024261A19
|
2024-09-17
|
2024-10-16
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT
|
M042024257A16
|
2024-09-13
|
2024-10-12
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
M042024257A15
|
2024-09-13
|
2024-10-12
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
M042024257A17
|
2024-09-13
|
2024-10-12
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
3 AVENUE, MANHATTAN, FROM STREET EAST 20 STREET
|
M042024256A07
|
2024-09-12
|
2024-10-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
M042024256A06
|
2024-09-12
|
2024-10-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
M042024256A08
|
2024-09-12
|
2024-10-11
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET
|
M012024250A78
|
2024-09-06
|
2024-10-04
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
M042024250A08
|
2024-09-06
|
2024-10-04
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
10 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET
|
M042024234A19
|
2024-08-21
|
2024-09-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 19 STREET TO STREET EAST 20 STREET
|
M012024234B28
|
2024-08-21
|
2024-09-26
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
3 AVENUE, MANHATTAN, FROM STREET EAST 19 STREET TO STREET EAST 20 STREET
|
M042024233A11
|
2024-08-20
|
2024-09-18
|
REPLACE SIDEWALK
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022024233B18
|
2024-08-20
|
2024-09-18
|
TEMPORARY PEDESTRIAN WALK
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022024233B20
|
2024-08-20
|
2024-09-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M012024233A17
|
2024-08-20
|
2024-09-18
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022024233B19
|
2024-08-20
|
2024-09-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M042024232A22
|
2024-08-19
|
2024-09-17
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M042024232A21
|
2024-08-19
|
2024-09-17
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M042024232A20
|
2024-08-19
|
2024-09-17
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M022024232D57
|
2024-08-19
|
2024-09-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHARLES STREET, MANHATTAN, FROM STREET HUDSON STREET
|
M042024185A23
|
2024-07-03
|
2024-08-06
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 20 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
M012024185B92
|
2024-07-03
|
2024-08-06
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
EAST 20 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
B012024180D34
|
2024-06-28
|
2024-07-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST STREET, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
B012024178B10
|
2024-06-26
|
2024-07-24
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
HURON STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET
|
M012024114C33
|
2024-04-23
|
2024-05-21
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M012024114C35
|
2024-04-23
|
2024-05-21
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M012024114C34
|
2024-04-23
|
2024-05-21
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M042024096A09
|
2024-04-05
|
2024-05-11
|
REPLACE SIDEWALK
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M022024096B44
|
2024-04-05
|
2024-05-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M022024096B43
|
2024-04-05
|
2024-05-11
|
TEMPORARY PEDESTRIAN WALK
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M022024096B45
|
2024-04-05
|
2024-05-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M012024096B20
|
2024-04-05
|
2024-05-11
|
RESET, REPAIR OR REPLACE CURB
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M012024073A35
|
2024-03-13
|
2024-04-11
|
RESET, REPAIR OR REPLACE CURB
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M012024073A33
|
2024-03-13
|
2024-04-11
|
RESET, REPAIR OR REPLACE CURB
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M012024073A34
|
2024-03-13
|
2024-04-11
|
RESET, REPAIR OR REPLACE CURB
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A45
|
2024-03-13
|
2024-04-11
|
TEMPORARY PEDESTRIAN WALK
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A46
|
2024-03-13
|
2024-04-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A47
|
2024-03-13
|
2024-04-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A48
|
2024-03-13
|
2024-04-11
|
TEMPORARY PEDESTRIAN WALK
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A49
|
2024-03-13
|
2024-04-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A50
|
2024-03-13
|
2024-04-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M022024073A51
|
2024-03-13
|
2024-04-11
|
TEMPORARY PEDESTRIAN WALK
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M022024073A52
|
2024-03-13
|
2024-04-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M022024073A53
|
2024-03-13
|
2024-04-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
M042024073A00
|
2024-03-13
|
2024-04-11
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M042024073A01
|
2024-03-13
|
2024-04-11
|
REPLACE SIDEWALK
|
BARROW STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET
|
M042024073A02
|
2024-03-13
|
2024-04-11
|
REPLACE SIDEWALK
|
JOE DIMAGGIO HIGHWAY, MANHATTAN, FROM STREET BARROW STREET TO STREET MORTON STREET
|
B012024065C25
|
2024-03-05
|
2024-04-01
|
RESET, REPAIR OR REPLACE CURB
|
WEST STREET, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
B022024065B32
|
2024-03-05
|
2024-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HURON STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET
|
B042024065B00
|
2024-03-05
|
2024-04-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST STREET, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
B042024065A99
|
2024-03-05
|
2024-04-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
HURON STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET
|
B022024065B33
|
2024-03-05
|
2024-04-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST STREET, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
B012024065C24
|
2024-03-05
|
2024-04-01
|
RESET, REPAIR OR REPLACE CURB
|
HURON STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET
|
M042023313A21
|
2023-11-09
|
2023-11-10
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 39 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M042023313A22
|
2023-11-09
|
2023-11-10
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
M022023306B25
|
2023-11-02
|
2023-12-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M022023306B22
|
2023-11-02
|
2023-12-01
|
TEMPORARY PEDESTRIAN WALK
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M022023306B23
|
2023-11-02
|
2023-12-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M022023306B24
|
2023-11-02
|
2023-12-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M012023306A75
|
2023-11-02
|
2023-12-01
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M042023306A04
|
2023-11-02
|
2023-12-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
CHRISTOPHER STREET, MANHATTAN, FROM STREET WASHINGTON STREET TO STREET WEEHAWKEN STREET
|
M022023297E40
|
2023-10-24
|
2023-11-22
|
CROSSING SIDEWALK
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M012023297C23
|
2023-10-24
|
2023-11-22
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M042023297A17
|
2023-10-24
|
2023-11-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022023297E44
|
2023-10-24
|
2023-11-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022023297E43
|
2023-10-24
|
2023-11-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022023297E42
|
2023-10-24
|
2023-11-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M022023297E41
|
2023-10-24
|
2023-11-22
|
TEMPORARY PEDESTRIAN WALK
|
HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET
|
M012023279B50
|
2023-10-06
|
2023-11-09
|
RESET, REPAIR OR REPLACE CURB
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023279C15
|
2023-10-06
|
2023-11-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023279C16
|
2023-10-06
|
2023-11-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023279C17
|
2023-10-06
|
2023-11-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023279C13
|
2023-10-06
|
2023-11-09
|
CROSSING SIDEWALK
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023279C14
|
2023-10-06
|
2023-11-09
|
TEMPORARY PEDESTRIAN WALK
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M042023279A21
|
2023-10-06
|
2023-11-09
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M042023268A01
|
2023-09-25
|
2023-10-24
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
RECTOR STREET, MANHATTAN, FROM STREET TRINITY PLACE
|
M012023262B12
|
2023-09-19
|
2023-10-18
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M012023262B11
|
2023-09-19
|
2023-10-18
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M012023255A45
|
2023-09-12
|
2023-09-27
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M012023254C30
|
2023-09-11
|
2023-10-05
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET
|
M012023254C31
|
2023-09-11
|
2023-10-05
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
M022023250B53
|
2023-09-07
|
2023-10-10
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023250B52
|
2023-09-07
|
2023-10-10
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023250B51
|
2023-09-07
|
2023-10-10
|
CROSSING SIDEWALK
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M042023250A14
|
2023-09-07
|
2023-10-10
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023250B55
|
2023-09-07
|
2023-10-10
|
TEMPORARY PEDESTRIAN WALK
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M012023250A67
|
2023-09-07
|
2023-10-10
|
RESET, REPAIR OR REPLACE CURB
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M022023250B54
|
2023-09-07
|
2023-10-10
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET
|
M012023243A76
|
2023-08-31
|
2023-09-28
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M012023242A97
|
2023-08-30
|
2023-09-28
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M012023241B02
|
2023-08-29
|
2023-09-27
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
EAST 83 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
X012023240B24
|
2023-08-28
|
2023-09-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BOSTON ROAD, BRONX, FROM STREET EAST 169 STREET TO STREET UNION AVENUE
|
M012023229A59
|
2023-08-17
|
2023-09-12
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M012023229A58
|
2023-08-17
|
2023-09-12
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M012023212B22
|
2023-07-31
|
2023-08-29
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
RECTOR STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET TRINITY PLACE
|
M012023212B21
|
2023-07-31
|
2023-08-29
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
TRINITY PLACE, MANHATTAN, FROM STREET EXCHANGE ALLEY TO STREET RECTOR STREET
|
M022023208C48
|
2023-07-27
|
2023-08-24
|
CROSSING SIDEWALK
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M022023208C49
|
2023-07-27
|
2023-08-24
|
TEMPORARY PEDESTRIAN WALK
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M022023208C50
|
2023-07-27
|
2023-08-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M022023208C51
|
2023-07-27
|
2023-08-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M022023208C52
|
2023-07-27
|
2023-08-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M042023208A54
|
2023-07-27
|
2023-08-24
|
REPLACE SIDEWALK
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M042023208A59
|
2023-07-27
|
2023-08-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M012023208B78
|
2023-07-27
|
2023-08-30
|
RESET, REPAIR OR REPLACE CURB
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M012023208B76
|
2023-07-27
|
2023-08-24
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
SUFFOLK STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M012023187B38
|
2023-07-06
|
2023-07-31
|
RESET, REPAIR OR REPLACE CURB
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M042023184A14
|
2023-07-03
|
2023-07-31
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
B022023181A15
|
2023-06-30
|
2023-07-29
|
CROSSING SIDEWALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022023181A16
|
2023-06-30
|
2023-07-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022023181A17
|
2023-06-30
|
2023-07-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B042023181A06
|
2023-06-30
|
2023-07-29
|
REPAIR SIDEWALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022023181A18
|
2023-06-30
|
2023-07-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
M012023164A77
|
2023-06-13
|
2023-07-16
|
C.A.R. RESTORATION - PROTECTED
|
BOWERY, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M012023152A22
|
2023-06-01
|
2023-07-01
|
RESET, REPAIR OR REPLACE CURB
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M042023152A01
|
2023-06-01
|
2023-07-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
X022023143A55
|
2023-05-23
|
2023-06-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CLINTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET JEFFERSON PLACE
|
X022023143A54
|
2023-05-23
|
2023-06-21
|
CROSSING SIDEWALK
|
CLINTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET JEFFERSON PLACE
|
X012023143A90
|
2023-05-23
|
2023-06-21
|
RESET, REPAIR OR REPLACE CURB
|
BOSTON ROAD, BRONX, FROM STREET EAST 169 STREET TO STREET UNION AVENUE
|
X012023143A28
|
2023-05-23
|
2023-06-21
|
RESET, REPAIR OR REPLACE CURB
|
CLINTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET JEFFERSON PLACE
|
X042023143A08
|
2023-05-23
|
2023-06-21
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
CLINTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET JEFFERSON PLACE
|
X042023143A14
|
2023-05-23
|
2023-06-21
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BOSTON ROAD, BRONX, FROM STREET EAST 169 STREET TO STREET UNION AVENUE
|
X022023143A63
|
2023-05-23
|
2023-06-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BOSTON ROAD, BRONX, FROM STREET EAST 169 STREET TO STREET UNION AVENUE
|
X022023143A62
|
2023-05-23
|
2023-06-21
|
CROSSING SIDEWALK
|
BOSTON ROAD, BRONX, FROM STREET EAST 169 STREET TO STREET UNION AVENUE
|
M042023118A04
|
2023-04-28
|
2023-06-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M012023118B07
|
2023-04-28
|
2023-06-01
|
RESET, REPAIR OR REPLACE CURB
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M042023100A01
|
2023-04-10
|
2023-05-02
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M012023100A57
|
2023-04-10
|
2023-05-06
|
RESET, REPAIR OR REPLACE CURB
|
3 AVENUE, MANHATTAN, FROM STREET EAST 82 STREET TO STREET EAST 83 STREET
|
M042023047A01
|
2023-02-16
|
2023-03-18
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
RECTOR STREET, MANHATTAN, FROM STREET TRINITY PLACE
|
M042023047A02
|
2023-02-16
|
2023-03-18
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
RECTOR STREET, MANHATTAN, FROM STREET TRINITY PLACE
|
M042023047A03
|
2023-02-16
|
2023-03-18
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
RECTOR STREET, MANHATTAN, FROM STREET TRINITY PLACE
|
M022023019B39
|
2023-01-19
|
2023-02-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
RECTOR STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET TRINITY PLACE
|
M012023019A82
|
2023-01-19
|
2023-02-22
|
RESET, REPAIR OR REPLACE CURB
|
TRINITY PLACE, MANHATTAN, FROM STREET EXCHANGE ALLEY TO STREET RECTOR STREET
|
M012023019A85
|
2023-01-19
|
2023-02-22
|
RESET, REPAIR OR REPLACE CURB
|
RECTOR STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET TRINITY PLACE
|
M022023019B36
|
2023-01-19
|
2023-02-22
|
CROSSING SIDEWALK
|
TRINITY PLACE, MANHATTAN, FROM STREET EXCHANGE ALLEY TO STREET RECTOR STREET
|
M022023019B37
|
2023-01-19
|
2023-02-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
TRINITY PLACE, MANHATTAN, FROM STREET EXCHANGE ALLEY TO STREET RECTOR STREET
|
M042023019A11
|
2023-01-19
|
2023-02-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
TRINITY PLACE, MANHATTAN, FROM STREET EXCHANGE ALLEY TO STREET RECTOR STREET
|
M042023019A13
|
2023-01-19
|
2023-02-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
RECTOR STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET TRINITY PLACE
|
M022023019B38
|
2023-01-19
|
2023-02-22
|
CROSSING SIDEWALK
|
RECTOR STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET TRINITY PLACE
|
M042023009A06
|
2023-01-09
|
2023-02-07
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
8 AVENUE, MANHATTAN, FROM STREET WEST 155 STREET
|
M042023009A05
|
2023-01-09
|
2023-02-07
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
8 AVENUE, MANHATTAN, FROM STREET WEST 155 STREET
|
M042023009A04
|
2023-01-09
|
2023-02-07
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
8 AVENUE, MANHATTAN, FROM STREET WEST 155 STREET
|
M022023006D65
|
2023-01-06
|
2023-02-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M042023006A05
|
2023-01-06
|
2023-02-08
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M042023006A06
|
2023-01-06
|
2023-02-08
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022023006D68
|
2023-01-06
|
2023-02-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022023006D67
|
2023-01-06
|
2023-02-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022023006D66
|
2023-01-06
|
2023-02-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022023006D64
|
2023-01-06
|
2023-02-02
|
CROSSING SIDEWALK
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022023006D63
|
2023-01-06
|
2023-02-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022023006D62
|
2023-01-06
|
2023-02-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022023006D61
|
2023-01-06
|
2023-02-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M012023006B39
|
2023-01-06
|
2023-02-09
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M012023006B38
|
2023-01-06
|
2023-02-08
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022023006D60
|
2023-01-06
|
2023-02-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022023006D59
|
2023-01-06
|
2023-02-02
|
TEMPORARY PEDESTRIAN WALK
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022023006D58
|
2023-01-06
|
2023-02-02
|
CROSSING SIDEWALK
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C19
|
2022-12-20
|
2022-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M042022354A13
|
2022-12-20
|
2022-12-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C15
|
2022-12-20
|
2022-12-26
|
CROSSING SIDEWALK
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022022354C14
|
2022-12-20
|
2022-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M042022354A14
|
2022-12-20
|
2022-12-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022022354C16
|
2022-12-20
|
2022-12-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022022354C17
|
2022-12-20
|
2022-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M022022354C12
|
2022-12-20
|
2022-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C11
|
2022-12-20
|
2022-12-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C10
|
2022-12-20
|
2022-12-26
|
TEMPORARY PEDESTRIAN WALK
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C09
|
2022-12-20
|
2022-12-26
|
CROSSING SIDEWALK
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C13
|
2022-12-20
|
2022-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
8 AVENUE, MANHATTAN, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
M022022354C18
|
2022-12-20
|
2022-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 155 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET HARLEM RIVER DRIVE
|
M042022305A21
|
2022-11-01
|
2022-11-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 78 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M012022305B46
|
2022-11-01
|
2022-11-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST END AVENUE, MANHATTAN, FROM STREET WEST 77 STREET TO STREET WEST 78 STREET
|
M012022305B45
|
2022-11-01
|
2022-11-30
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST 78 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M012022305B44
|
2022-11-01
|
2022-11-30
|
RESET, REPAIR OR REPLACE CURB
|
WEST 78 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
B012022305A93
|
2022-11-01
|
2022-12-06
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
M022022305D10
|
2022-11-01
|
2022-11-30
|
CROSSING SIDEWALK
|
WEST 78 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M022022305D11
|
2022-11-01
|
2022-11-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST 78 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M022022290D01
|
2022-10-17
|
2022-11-16
|
CROSSING SIDEWALK
|
WEST END AVENUE, MANHATTAN, FROM STREET WEST 77 STREET TO STREET WEST 78 STREET
|
M022022290D02
|
2022-10-17
|
2022-11-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST END AVENUE, MANHATTAN, FROM STREET WEST 77 STREET TO STREET WEST 78 STREET
|
M012022290B48
|
2022-10-17
|
2022-11-16
|
RESET, REPAIR OR REPLACE CURB
|
WEST END AVENUE, MANHATTAN, FROM STREET WEST 77 STREET TO STREET WEST 78 STREET
|
M042022290A12
|
2022-10-17
|
2022-11-16
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST END AVENUE, MANHATTAN, FROM STREET WEST 77 STREET TO STREET WEST 78 STREET
|
B022022287B40
|
2022-10-14
|
2022-11-18
|
TEMPORARY PEDESTRIAN WALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B012022287A99
|
2022-10-14
|
2022-11-18
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022287B39
|
2022-10-14
|
2022-11-18
|
CROSSING SIDEWALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B042022287A14
|
2022-10-14
|
2022-11-18
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022287B42
|
2022-10-14
|
2022-11-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022287B41
|
2022-10-14
|
2022-11-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B042022285A05
|
2022-10-12
|
2022-10-19
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B012022285A60
|
2022-10-12
|
2022-10-19
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022285A29
|
2022-10-12
|
2022-10-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022285A28
|
2022-10-12
|
2022-10-19
|
CROSSING SIDEWALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
M012022269B22
|
2022-09-26
|
2022-10-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
BOWERY, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M012022269B23
|
2022-09-26
|
2022-10-22
|
RESET, REPAIR OR REPLACE CURB
|
BROOME STREET, MANHATTAN, FROM STREET BEND TO STREET CHRYSTIE STREET
|
M012022269B24
|
2022-09-26
|
2022-10-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BROOME STREET, MANHATTAN, FROM STREET BEND TO STREET CHRYSTIE STREET
|
M042022269A07
|
2022-09-26
|
2022-10-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BOWERY, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
M042022269A08
|
2022-09-26
|
2022-10-22
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BROOME STREET, MANHATTAN, FROM STREET BEND TO STREET CHRYSTIE STREET
|
M012022269B21
|
2022-09-26
|
2022-10-22
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BOWERY, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET
|
B042022264A07
|
2022-09-21
|
2022-10-19
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B012022264B03
|
2022-09-21
|
2022-10-19
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022264B69
|
2022-09-21
|
2022-10-19
|
CROSSING SIDEWALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022264B70
|
2022-09-21
|
2022-10-19
|
TEMPORARY PEDESTRIAN WALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022264B71
|
2022-09-21
|
2022-10-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
B022022264B72
|
2022-09-21
|
2022-10-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
Q042022262A32
|
2022-09-19
|
2022-10-18
|
REPAIR SIDEWALK
|
QUEENS PLAZA NORTH, QUEENS, FROM STREET 27 STREET TO STREET 28 STREET
|
Q042022262A33
|
2022-09-19
|
2022-10-18
|
REPAIR SIDEWALK
|
28 STREET, QUEENS, FROM STREET 42 ROAD TO STREET QUEENS PLAZA
|
M022022244C51
|
2022-09-01
|
2022-09-27
|
TEMPORARY PEDESTRIAN WALK
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET
|
M042022244A09
|
2022-09-01
|
2022-09-27
|
REPAIR SIDEWALK
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET
|
M022022244C52
|
2022-09-01
|
2022-09-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET
|
M022022244C53
|
2022-09-01
|
2022-09-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET
|
B012022237A55
|
2022-08-25
|
2022-09-23
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022231C05
|
2022-08-19
|
2022-09-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B012022231B25
|
2022-08-19
|
2022-09-17
|
RESET, REPAIR OR REPLACE CURB
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022231C03
|
2022-08-19
|
2022-09-17
|
CROSSING SIDEWALK
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022231C06
|
2022-08-19
|
2022-09-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022231C04
|
2022-08-19
|
2022-09-17
|
TEMPORARY PEDESTRIAN WALK
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B042022231A17
|
2022-08-19
|
2022-09-17
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
M012022223A46
|
2022-08-11
|
2022-09-09
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M012022217A97
|
2022-08-05
|
2022-09-03
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
B022022203A81
|
2022-07-22
|
2022-08-18
|
TEMPORARY PEDESTRIAN WALK
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B012022203B09
|
2022-07-22
|
2022-08-18
|
RESET, REPAIR OR REPLACE CURB
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022203A82
|
2022-07-22
|
2022-08-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022203A80
|
2022-07-22
|
2022-08-18
|
CROSSING SIDEWALK
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B022022203A83
|
2022-07-22
|
2022-08-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
B042022203A05
|
2022-07-22
|
2022-08-18
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
M012022180A91
|
2022-06-29
|
2022-07-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M042022178A05
|
2022-06-27
|
2022-07-23
|
REPAIR SIDEWALK
|
EAST 96 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
M012022116A76
|
2022-04-26
|
2022-05-18
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
3 AVENUE, MANHATTAN, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
M022022110C44
|
2022-04-20
|
2022-05-17
|
TEMPORARY PEDESTRIAN WALK
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M042022110A11
|
2022-04-20
|
2022-05-17
|
REPAIR SIDEWALK
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M022022110C45
|
2022-04-20
|
2022-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M022022110C46
|
2022-04-20
|
2022-05-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
Q042022108A23
|
2022-04-18
|
2022-05-17
|
REPAIR SIDEWALK
|
169 STREET, QUEENS, FROM STREET CROCHERON AVENUE TO STREET DEPOT ROAD
|
Q012022108B84
|
2022-04-18
|
2022-05-17
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
44 DRIVE, QUEENS, FROM STREET 21 STREET TO STREET 23 STREET
|
M022022038B89
|
2022-02-07
|
2022-03-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M012022038B26
|
2022-02-07
|
2022-03-02
|
RESET, REPAIR OR REPLACE CURB
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M042022038A12
|
2022-02-07
|
2022-03-02
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MADISON AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
Q012022004C39
|
2022-01-04
|
2022-01-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
JACKSON AVENUE, QUEENS, FROM STREET PEARSON STREET
|
Q042021335A56
|
2021-12-01
|
2021-12-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
Q042021322A04
|
2021-11-18
|
2021-11-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
PEARSON STREET, QUEENS, FROM STREET DEAD END TO STREET JACKSON AVENUE
|
Q042021322A03
|
2021-11-18
|
2021-11-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
JACKSON AVENUE, QUEENS, FROM STREET 23 STREET TO STREET PEARSON STREET
|
M042021281A04
|
2021-10-08
|
2021-11-11
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M012021281A33
|
2021-10-08
|
2021-11-11
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M012021281A32
|
2021-10-08
|
2021-11-11
|
RESET, REPAIR OR REPLACE CURB
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M012021274C04
|
2021-10-01
|
2021-10-29
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021258B03
|
2021-09-15
|
2021-10-12
|
RESET, REPAIR OR REPLACE CURB
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M012021258B04
|
2021-09-15
|
2021-10-12
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M042021258A18
|
2021-09-15
|
2021-10-12
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST HOUSTON STREET, MANHATTAN, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
M012021239A94
|
2021-08-27
|
2021-09-25
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT
|
M042021224A02
|
2021-08-12
|
2021-09-10
|
REPLACE SIDEWALK
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021215A90
|
2021-08-03
|
2021-09-03
|
RESET, REPAIR OR REPLACE CURB
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021210A20
|
2021-07-29
|
2021-08-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT
|
M042021210A01
|
2021-07-29
|
2021-08-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
M042021210A02
|
2021-07-29
|
2021-08-26
|
REPAIR SIDEWALK
|
WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
M042021210A03
|
2021-07-29
|
2021-08-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT
|
M012021210A18
|
2021-07-29
|
2021-08-26
|
RESET, REPAIR OR REPLACE CURB
|
WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT
|
M012021195A14
|
2021-07-14
|
2021-08-04
|
VAULT CONSTRUCTION OR ALTERATION
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021195A15
|
2021-07-14
|
2021-08-04
|
RESET, REPAIR OR REPLACE CURB
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021181A93
|
2021-06-30
|
2021-08-04
|
RESET, REPAIR OR REPLACE CURB
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021181A92
|
2021-06-30
|
2021-08-04
|
VAULT CONSTRUCTION OR ALTERATION
|
EAST 89 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
M012021167A28
|
2021-06-16
|
2021-07-15
|
RESET, REPAIR OR REPLACE CURB
|
3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET
|
M042021167A03
|
2021-06-16
|
2021-07-15
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET
|
M042021036A15
|
2021-02-05
|
2021-03-06
|
REPAIR SIDEWALK
|
JOHN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET NASSAU STREET
|
M042021008A01
|
2021-01-08
|
2021-02-04
|
REPAIR SIDEWALK
|
JOHN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET NASSAU STREET
|
M042020343A21
|
2020-12-08
|
2021-01-07
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 61 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
M042020314A06
|
2020-11-09
|
2020-12-08
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 61 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
B012020162A97
|
2020-06-10
|
2020-07-08
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET NEWTON STREET
|
Q012020150D01
|
2020-05-29
|
2020-06-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
82 STREET, QUEENS, FROM STREET ITHACA STREET TO STREET ROOSEVELT AVENUE
|
Q012020150D03
|
2020-05-29
|
2020-06-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BAXTER AVENUE, QUEENS, FROM STREET HAMPTON STREET TO STREET ITHACA STREET
|
Q012020150D02
|
2020-05-29
|
2020-06-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
ITHACA STREET, QUEENS, FROM STREET 82 STREET TO STREET BAXTER AVENUE
|
B012020149C26
|
2020-05-28
|
2020-06-27
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET NEWTON STREET
|
B012020149C25
|
2020-05-28
|
2020-06-27
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
ECKFORD STREET, BROOKLYN, FROM STREET ENGERT AVENUE TO STREET MANHATTAN AVENUE
|
Q012020148A73
|
2020-05-27
|
2020-06-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
ITHACA STREET, QUEENS, FROM STREET 82 STREET TO STREET BAXTER AVENUE
|
Q012020148A74
|
2020-05-27
|
2020-06-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BAXTER AVENUE, QUEENS, FROM STREET HAMPTON STREET TO STREET ITHACA STREET
|
Q012020148A72
|
2020-05-27
|
2020-06-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
82 STREET, QUEENS, FROM STREET ITHACA STREET TO STREET ROOSEVELT AVENUE
|
Q012020101B13
|
2020-04-10
|
2020-05-14
|
RESET, REPAIR OR REPLACE CURB
|
82 STREET, QUEENS, FROM STREET ITHACA STREET TO STREET ROOSEVELT AVENUE
|
Q012020101B15
|
2020-04-10
|
2020-05-14
|
RESET, REPAIR OR REPLACE CURB
|
BAXTER AVENUE, QUEENS, FROM STREET HAMPTON STREET TO STREET ITHACA STREET
|
Q012020101B14
|
2020-04-10
|
2020-05-14
|
RESET, REPAIR OR REPLACE CURB
|
ITHACA STREET, QUEENS, FROM STREET 82 STREET TO STREET BAXTER AVENUE
|
B012020086B59
|
2020-03-26
|
2020-04-10
|
RESET, REPAIR OR REPLACE CURB
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET NEWTON STREET
|
B012020086B58
|
2020-03-26
|
2020-04-10
|
RESET, REPAIR OR REPLACE CURB
|
ECKFORD STREET, BROOKLYN, FROM STREET ENGERT AVENUE TO STREET MANHATTAN AVENUE
|
Q012020076A40
|
2020-03-16
|
2020-04-14
|
RESET, REPAIR OR REPLACE CURB
|
ITHACA STREET, QUEENS, FROM STREET 82 STREET TO STREET BAXTER AVENUE
|
Q012020076A39
|
2020-03-16
|
2020-04-14
|
RESET, REPAIR OR REPLACE CURB
|
82 STREET, QUEENS, FROM STREET ITHACA STREET TO STREET ROOSEVELT AVENUE
|
Q012020076A41
|
2020-03-16
|
2020-04-14
|
RESET, REPAIR OR REPLACE CURB
|
BAXTER AVENUE, QUEENS, FROM STREET HAMPTON STREET TO STREET ITHACA STREET
|
B012020072C34
|
2020-03-12
|
2020-04-10
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
NEWTON STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
B012020072C30
|
2020-03-12
|
2020-04-10
|
RESET, REPAIR OR REPLACE CURB
|
ECKFORD STREET, BROOKLYN, FROM STREET ENGERT AVENUE TO STREET MANHATTAN AVENUE
|
B012020072C31
|
2020-03-12
|
2020-04-10
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
ECKFORD STREET, BROOKLYN, FROM STREET ENGERT AVENUE TO STREET MANHATTAN AVENUE
|
B012020072C32
|
2020-03-12
|
2020-04-10
|
RESET, REPAIR OR REPLACE CURB
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET NEWTON STREET
|
B012020072C33
|
2020-03-12
|
2020-04-10
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET NEWTON STREET
|
M012019204B32
|
2019-07-23
|
2019-08-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BROADWAY, MANHATTAN, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
M012019204B33
|
2019-07-23
|
2019-08-22
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST 81 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M012019151B55
|
2019-05-31
|
2019-07-02
|
RESET, REPAIR OR REPLACE CURB
|
BROADWAY, MANHATTAN, FROM STREET WEST 80 STREET TO STREET WEST 81 STREET
|
B012019095H95
|
2019-04-05
|
2019-04-21
|
RESET, REPAIR OR REPLACE CURB
|
GRAND STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
Q012019043D43
|
2019-02-12
|
2019-02-27
|
RESET, REPAIR OR REPLACE CURB
|
NORTHERN BOULEVARD, QUEENS, FROM STREET NYCTA SUBWAY TO STREET BEND
|
Q012019043D44
|
2019-02-12
|
2019-02-27
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
NORTHERN BOULEVARD, QUEENS, FROM STREET NYCTA SUBWAY TO STREET BEND
|
M012019036B37
|
2019-02-05
|
2019-02-19
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST 81 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M012019036B36
|
2019-02-05
|
2019-02-19
|
RESET, REPAIR OR REPLACE CURB
|
WEST 81 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M012019032A45
|
2019-02-01
|
2019-02-05
|
RESET, REPAIR OR REPLACE CURB
|
WEST 81 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
M012019032A46
|
2019-02-01
|
2019-02-05
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WEST 81 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
Q012019008C39
|
2019-01-08
|
2019-02-01
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
30 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE
|
Q012018352D86
|
2018-12-18
|
2018-12-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
30 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE
|