M022023289C52
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023289C50
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023289C53
|
2023-10-16
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023289C51
|
2023-10-16
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023289C74
|
2023-10-16
|
2023-12-31
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023289C55
|
2023-10-16
|
2023-12-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023289C54
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M002023285A19
|
2023-10-12
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M002023285A18
|
2023-10-12
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022023179C54
|
2023-06-28
|
2023-09-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023179C52
|
2023-06-28
|
2023-09-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023179C58
|
2023-06-28
|
2023-09-27
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023179C57
|
2023-06-28
|
2023-09-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023179C56
|
2023-06-28
|
2023-09-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023179C55
|
2023-06-28
|
2023-09-27
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023179C53
|
2023-06-28
|
2023-09-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A60
|
2023-03-21
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A59
|
2023-03-21
|
2023-06-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A58
|
2023-03-21
|
2023-06-29
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A57
|
2023-03-21
|
2023-06-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A56
|
2023-03-21
|
2023-06-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A55
|
2023-03-21
|
2023-06-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022023080A54
|
2023-03-21
|
2023-06-29
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C61
|
2022-12-27
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C60
|
2022-12-27
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C85
|
2022-12-27
|
2023-03-31
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C65
|
2022-12-27
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C64
|
2022-12-27
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C63
|
2022-12-27
|
2023-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022361C62
|
2022-12-27
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C55
|
2022-12-19
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C53
|
2022-12-19
|
2022-12-31
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C59
|
2022-12-19
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C58
|
2022-12-19
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C57
|
2022-12-19
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C56
|
2022-12-19
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022353C54
|
2022-12-19
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M002022263A03
|
2022-09-20
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022022263E57
|
2022-09-20
|
2022-12-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022263E62
|
2022-09-20
|
2022-12-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022263E61
|
2022-09-20
|
2022-12-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022263E60
|
2022-09-20
|
2022-12-19
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022263E59
|
2022-09-20
|
2022-12-19
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022263E56
|
2022-09-20
|
2022-12-19
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022263E58
|
2022-09-20
|
2022-12-19
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022241B89
|
2022-08-29
|
2022-10-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022241B87
|
2022-08-29
|
2022-10-06
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022241B88
|
2022-08-29
|
2022-10-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022238A06
|
2022-08-26
|
2022-10-06
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022209A62
|
2022-07-28
|
2022-09-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022209A63
|
2022-07-28
|
2022-09-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022209A64
|
2022-07-28
|
2022-09-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022203A19
|
2022-07-22
|
2022-09-02
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022181E61
|
2022-06-30
|
2022-08-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022181E63
|
2022-06-30
|
2022-08-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022181E62
|
2022-06-30
|
2022-08-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022180A11
|
2022-06-29
|
2022-08-04
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F82
|
2022-06-24
|
2022-09-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F79
|
2022-06-24
|
2022-09-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F75
|
2022-06-24
|
2022-09-20
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F74
|
2022-06-24
|
2022-09-20
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F76
|
2022-06-24
|
2022-09-20
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F78
|
2022-06-24
|
2022-09-20
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F80
|
2022-06-24
|
2022-09-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F77
|
2022-06-24
|
2022-09-20
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022175F81
|
2022-06-24
|
2022-09-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022151D00
|
2022-05-31
|
2022-07-07
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022151D01
|
2022-05-31
|
2022-07-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022151D02
|
2022-05-31
|
2022-07-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022145A00
|
2022-05-25
|
2022-07-07
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A89
|
2022-05-10
|
2022-06-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A92
|
2022-05-10
|
2022-06-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A91
|
2022-05-10
|
2022-06-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A90
|
2022-05-10
|
2022-05-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A88
|
2022-05-10
|
2022-06-23
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A87
|
2022-05-10
|
2022-06-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A86
|
2022-05-10
|
2022-06-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A85
|
2022-05-10
|
2022-06-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022130A84
|
2022-05-10
|
2022-06-23
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022119A05
|
2022-04-29
|
2022-06-02
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022116C49
|
2022-04-26
|
2022-06-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022116C50
|
2022-04-26
|
2022-06-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022116C48
|
2022-04-26
|
2022-06-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022115A02
|
2022-04-25
|
2022-06-02
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022081D54
|
2022-03-22
|
2022-04-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022081D55
|
2022-03-22
|
2022-04-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022081D56
|
2022-03-22
|
2022-04-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022080A00
|
2022-03-21
|
2022-04-28
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022066B79
|
2022-03-07
|
2022-03-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022066B80
|
2022-03-07
|
2022-03-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022066B78
|
2022-03-07
|
2022-03-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B83
|
2022-02-22
|
2022-05-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B76
|
2022-02-22
|
2022-05-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B75
|
2022-02-22
|
2022-05-14
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B77
|
2022-02-22
|
2022-05-14
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152022053A02
|
2022-02-22
|
2022-03-28
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B78
|
2022-02-22
|
2022-05-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B79
|
2022-02-22
|
2022-05-14
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B80
|
2022-02-22
|
2022-05-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B81
|
2022-02-22
|
2022-05-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022022053B82
|
2022-02-22
|
2022-05-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M152021316A01
|
2021-11-12
|
2021-12-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C83
|
2021-11-08
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C91
|
2021-11-08
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C90
|
2021-11-08
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C89
|
2021-11-08
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C88
|
2021-11-08
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C87
|
2021-11-08
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C86
|
2021-11-08
|
2021-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C85
|
2021-11-08
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C84
|
2021-11-08
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C82
|
2021-11-08
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M022021312C81
|
2021-11-08
|
2021-12-31
|
CROSSING SIDEWALK
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|
M012021041B02
|
2021-02-10
|
2021-03-09
|
INSTALL FENCE
|
MOTT STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET HESTER STREET
|