Name: | IPS PLUMBING CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 19 Oct 2012 (12 years ago) |
Entity Number: | 4310608 |
ZIP code: | 11378 |
County: | Queens |
Place of Formation: | New York |
Address: | 6506 GRAND AVENUE, MASPETH, NY, United States, 11378 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
IPS PLUMBING CORP. | DOS Process Agent | 6506 GRAND AVENUE, MASPETH, NY, United States, 11378 |
Name | Role | Address |
---|---|---|
ASDRUBAL AGUIRRE | Chief Executive Officer | 6506 GRAND AVENUE, MASPETH, NY, United States, 11378 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
B002024312A07 | 2024-11-07 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024312A77 | 2024-11-07 | 2024-11-17 | REPAIR WATER - PROTECTED | EAST 23 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024312C33 | 2024-11-07 | 2024-11-14 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
M002024306A04 | 2024-11-01 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B002024298A09 | 2024-10-24 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024293A14 | 2024-10-23 | 2024-10-23 | REPAIR WATER - PROTECTED | LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET |
M012024291A41 | 2024-10-23 | 2024-11-13 | REPAIR WATER - PROTECTED | LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET |
M012024291A40 | 2024-10-17 | 2024-10-19 | REPAIR WATER - SEWER - PROTECTED | LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET |
M012024290A13 | 2024-10-16 | 2024-10-30 | REPAIR SEWER | DYCKMAN STREET, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET POST AVENUE |
M012024290A32 | 2024-10-16 | 2024-10-31 | REPAIR WATER - PROTECTED | EAST 40 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012024290A31 | 2024-10-16 | 2024-11-03 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024290A14 | 2024-10-16 | 2024-11-03 | REPAIR WATER - PROTECTED | EAST 23 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024284A70 | 2024-10-10 | 2024-11-03 | REPAIR SEWER | 12 AVENUE, MANHATTAN, FROM STREET WEST 26 STREET TO STREET WEST 27 STREET |
X012024284A39 | 2024-10-10 | 2024-11-08 | REPAIR WATER - SEWER - PROTECTED | WEST 232 STREET, BRONX, FROM STREET IRWIN AVENUE TO STREET TIBBETT AVENUE |
M012024282A55 | 2024-10-08 | 2024-10-17 | REPAIR WATER - PROTECTED | EAST 40 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012024277A86 | 2024-10-03 | 2024-10-20 | REPAIR SEWER | 12 AVENUE, MANHATTAN, FROM STREET WEST 26 STREET TO STREET WEST 27 STREET |
M012024275A43 | 2024-10-01 | 2024-10-20 | REPAIR SEWER | DYCKMAN STREET, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET POST AVENUE |
M012024270A24 | 2024-09-26 | 2024-10-20 | REPAIR WATER - PROTECTED | EAST 23 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024267B48 | 2024-09-23 | 2024-10-20 | REPAIR SEWER | DYCKMAN STREET, MANHATTAN, FROM STREET NAGLE AVENUE TO STREET POST AVENUE |
M012024267B10 | 2024-09-23 | 2024-10-20 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012024267C66 | 2024-09-23 | 2024-10-15 | REPAIR WATER - SEWER | KINGSLAND AVENUE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET MEEKER AVENUE |
M012024264B79 | 2024-09-20 | 2024-10-20 | REPAIR WATER - PROTECTED | WALL STREET, MANHATTAN, FROM STREET HANOVER STREET TO STREET PEARL STREET |
M012024264A56 | 2024-09-20 | 2024-10-20 | REPAIR WATER | MURRAY STREET, MANHATTAN, FROM STREET CHURCH STREET TO STREET WEST BROADWAY |
X012024263A13 | 2024-09-20 | 2024-10-18 | REPAIR WATER | EAST 172 STREET, BRONX, FROM STREET HARROD AVENUE TO STREET MORRISON AVENUE |
M012024262A25 | 2024-09-18 | 2024-09-20 | REPAIR WATER - PROTECTED | EAST 40 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012024260B30 | 2024-09-16 | 2024-10-09 | REPAIR SEWER | EAST 75 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024254A27 | 2024-09-10 | 2024-09-12 | REPAIR WATER | COURT STREET, BROOKLYN, FROM STREET HUNTINGTON STREET TO STREET NELSON STREET |
M012024254A37 | 2024-09-10 | 2024-09-30 | REPAIR SEWER - PROTECTED | PARK TERRACE EAST, MANHATTAN, FROM STREET DEAD END TO STREET WEST 215 STREET |
B012024251A00 | 2024-09-07 | 2024-10-08 | REPAIR SEWER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M012024240A66 | 2024-08-27 | 2024-09-25 | REPAIR SEWER | EAST 75 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024237A00 | 2024-08-24 | 2024-10-01 | REPAIR WATER - SEWER | KINGSLAND AVENUE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET MEEKER AVENUE |
X012024233A35 | 2024-08-22 | 2024-09-18 | REPAIR WATER | BRUCKNER BOULEVARD, BRONX, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE |
M012024234A45 | 2024-08-21 | 2024-08-23 | REPAIR WATER | EAST 34 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET FDR DRIVE SB ENTRANCE E 34 ST |
M012024233B00 | 2024-08-20 | 2024-09-18 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M012024233A99 | 2024-08-20 | 2024-09-18 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024215B32 | 2024-08-02 | 2024-09-05 | REPAIR SEWER - PROTECTED | PARK TERRACE EAST, MANHATTAN, FROM STREET DEAD END TO STREET WEST 215 STREET |
M012024214B64 | 2024-08-01 | 2024-08-19 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M012024214B63 | 2024-08-01 | 2024-08-19 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
B012024208B72 | 2024-07-26 | 2024-08-24 | REPAIR SEWER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 10 STREET TO STREET SOUTH 11 STREET |
M012024207A61 | 2024-07-25 | 2024-09-03 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024201A11 | 2024-07-24 | 2024-08-17 | REPAIR WATER | EAST 70 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M012024201A10 | 2024-07-19 | 2024-08-05 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M012024201A09 | 2024-07-19 | 2024-08-05 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024191A19 | 2024-07-09 | 2024-07-27 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024191A20 | 2024-07-09 | 2024-07-27 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
B012024179C51 | 2024-06-27 | 2024-07-27 | REPAIR WATER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M012024171A01 | 2024-06-26 | 2024-06-21 | REPAIR WATER | JANE STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B012024172A82 | 2024-06-20 | 2024-07-10 | REPAIR WATER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 10 STREET TO STREET SOUTH 11 STREET |
M012024166A97 | 2024-06-14 | 2024-07-13 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
B012024166B27 | 2024-06-14 | 2024-07-13 | REPAIR WATER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M012024166A96 | 2024-06-14 | 2024-07-13 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
X012024158A82 | 2024-06-06 | 2024-07-10 | REPAIR WATER - SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
B012024150A00 | 2024-05-29 | 2024-06-26 | REPAIR WATER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 10 STREET TO STREET SOUTH 11 STREET |
M012024142A12 | 2024-05-21 | 2024-06-07 | REPAIR SEWER | EAST 75 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024130B25 | 2024-05-09 | 2024-06-08 | REPAIR WATER - SEWER - PROTECTED | PARK TERRACE EAST, MANHATTAN, FROM STREET DEAD END TO STREET WEST 215 STREET |
X012024118A00 | 2024-05-01 | 2024-05-26 | REPAIR WATER | OGDEN AVENUE, BRONX, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET |
B012024122C58 | 2024-05-01 | 2024-05-21 | REPAIR WATER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M012024117A67 | 2024-04-26 | 2024-05-24 | REPAIR SEWER | EAST 75 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012024115A52 | 2024-04-24 | 2024-05-23 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET GERARD AVENUE |
M012024114A72 | 2024-04-23 | 2024-05-24 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024114A70 | 2024-04-23 | 2024-05-21 | REPAIR WATER | WEST 46 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BROADWAY |
M012024114A69 | 2024-04-23 | 2024-05-21 | REPAIR WATER | WEST 45 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET SHUBERT ALLEY |
M012024114A75 | 2024-04-23 | 2024-06-09 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
M012024114A74 | 2024-04-23 | 2024-05-24 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M022024114A17 | 2024-04-23 | 2024-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
M022024114A16 | 2024-04-23 | 2024-06-09 | TEMPORARY PEDESTRIAN WALK | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
X012024114A21 | 2024-04-23 | 2024-05-21 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B012024114B11 | 2024-04-23 | 2024-05-21 | REPAIR WATER - SEWER - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
M012024102A85 | 2024-04-11 | 2024-05-10 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024102A84 | 2024-04-11 | 2024-05-10 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
X012024101A29 | 2024-04-10 | 2024-05-07 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X012024096A24 | 2024-04-09 | 2024-05-04 | REPAIR WATER | HERING AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
B012024096A57 | 2024-04-05 | 2024-05-07 | REPAIR WATER - SEWER - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
M022024095C16 | 2024-04-04 | 2024-05-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
B022024095D15 | 2024-04-04 | 2024-05-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
B022024095D14 | 2024-04-04 | 2024-05-07 | TEMPORARY PEDESTRIAN WALK | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
B012024095E74 | 2024-04-04 | 2024-05-07 | REPAIR WATER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M012024095D47 | 2024-04-04 | 2024-05-10 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
M022024095C15 | 2024-04-04 | 2024-05-10 | TEMPORARY PEDESTRIAN WALK | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
B012024081B76 | 2024-03-28 | 2024-04-06 | REPAIR WATER | STANLEY AVENUE, BROOKLYN, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE |
X012024081A53 | 2024-03-21 | 2024-04-02 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE |
X012024081A55 | 2024-03-21 | 2024-04-02 | REPAIR SEWER | GERARD AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET |
X012024081A54 | 2024-03-21 | 2024-04-02 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET GERARD AVENUE |
M022024079D27 | 2024-03-19 | 2024-04-10 | TEMPORARY PEDESTRIAN WALK | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
M012024079B80 | 2024-03-19 | 2024-04-10 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
M022024079D28 | 2024-03-19 | 2024-04-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
M012024058A17 | 2024-03-18 | 2024-03-27 | REPAIR WATER | EAST 89 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012024052A34 | 2024-02-21 | 2024-03-21 | REPAIR WATER | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012024051B33 | 2024-02-20 | 2024-03-20 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET GERARD AVENUE |
X012024051B32 | 2024-02-20 | 2024-03-20 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE |
M042024045A10 | 2024-02-14 | 2024-03-14 | REPAIR SIDEWALK | GOLD STREET, MANHATTAN, FROM STREET JOHN STREET TO STREET PLATT STREET |
M012024045A44 | 2024-02-14 | 2024-03-10 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024040A83 | 2024-02-09 | 2024-02-16 | REPAIR SEWER - PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012024039A57 | 2024-02-08 | 2024-03-09 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X012024039A56 | 2024-02-08 | 2024-03-09 | REPAIR SEWER | GERARD AVENUE, BRONX, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET |
X012024039A58 | 2024-02-08 | 2024-03-09 | REPAIR SEWER | EAST 146 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
M012024037A51 | 2024-02-06 | 2024-03-22 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
M022024037A74 | 2024-02-06 | 2024-03-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
B012024034A02 | 2024-02-06 | 2024-03-03 | REPAIR WATER - PROTECTED | PARK PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
M022024037A73 | 2024-02-06 | 2024-03-22 | TEMPORARY PEDESTRIAN WALK | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
B012024036A75 | 2024-02-05 | 2024-03-03 | REPAIR WATER - PROTECTED | LINCOLN PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012024032A97 | 2024-02-01 | 2024-02-26 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024032A82 | 2024-02-01 | 2024-02-12 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012024032A83 | 2024-02-01 | 2024-02-16 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M012024032A95 | 2024-02-01 | 2024-03-01 | REPAIR SEWER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 28 STREET |
M022024030C08 | 2024-01-30 | 2024-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
M022024030C07 | 2024-01-30 | 2024-02-21 | TEMPORARY PEDESTRIAN WALK | COLUMBIA STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET DELANCEY STREET |
M012024029B15 | 2024-01-29 | 2024-02-21 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
B012024029C07 | 2024-01-29 | 2024-02-18 | REPAIR SEWER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
B012024026B51 | 2024-01-26 | 2024-02-04 | REPAIR SEWER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M012024023A58 | 2024-01-23 | 2024-02-07 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
M012024019B12 | 2024-01-19 | 2024-02-13 | REPAIR SEWER | EAST 75 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024017C00 | 2024-01-17 | 2024-02-04 | REPAIR SEWER - PROTECTED | KENT AVENUE, BROOKLYN, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET |
M042024016A12 | 2024-01-16 | 2024-02-11 | REPAIR SIDEWALK | GOLD STREET, MANHATTAN, FROM STREET JOHN STREET TO STREET PLATT STREET |
M012024009A30 | 2024-01-16 | 2024-02-07 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | BROOME STREET, MANHATTAN, FROM STREET COLUMBIA STREET |
M012024011A70 | 2024-01-11 | 2024-01-15 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 39 STREET TO STREET EAST 40 STREET |
M022024011B14 | 2024-01-11 | 2024-02-08 | PLACE MATERIAL ON STREET | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022024011B15 | 2024-01-11 | 2024-02-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012024006A00 | 2024-01-09 | 2024-02-04 | REPAIR WATER | CROTONA AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET GROTE STREET |
M012024009A00 | 2024-01-09 | 2024-02-06 | REPAIR SEWER - PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024005C61 | 2024-01-05 | 2024-02-02 | REPAIR WATER - PROTECTED | LINCOLN PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012024005B46 | 2024-01-05 | 2024-01-13 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 39 STREET TO STREET EAST 40 STREET |
M012024003A66 | 2024-01-03 | 2024-02-02 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012024003A86 | 2024-01-03 | 2024-01-23 | REPAIR SEWER - PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M002023362A04 | 2023-12-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012023362B31 | 2023-12-28 | 2024-01-13 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012023349A08 | 2023-12-27 | 2023-12-25 | REPAIR WATER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 39 STREET TO STREET EAST 40 STREET |
M012023356B50 | 2023-12-22 | 2023-12-31 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012023356A56 | 2023-12-22 | 2023-12-31 | REPAIR SEWER - PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M002023352A11 | 2023-12-18 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
Q012023340C08 | 2023-12-06 | 2023-12-31 | REPAIR WATER - PROTECTED | VAN HORN STREET, QUEENS, FROM STREET 52 AVENUE TO STREET GRAND AVENUE |
M012023332A68 | 2023-11-28 | 2023-12-23 | REPAIR SEWER - PROTECTED | EAST 74 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
Q022023331B39 | 2023-11-27 | 2023-12-26 | PLACE MATERIAL ON STREET | 188 STREET, QUEENS, FROM STREET ABERDEEN ROAD TO STREET MIDLAND PARKWAY |
M012023328A46 | 2023-11-24 | 2023-12-06 | REPAIR WATER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q012023324A94 | 2023-11-20 | 2023-12-26 | REPAIR WATER - SEWER | 188 STREET, QUEENS, FROM STREET ABERDEEN ROAD TO STREET MIDLAND PARKWAY |
X012023317A12 | 2023-11-16 | 2023-12-12 | REPAIR WATER | EAST 215 STREET, BRONX, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE |
M012023320A96 | 2023-11-16 | 2023-12-14 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012023318A52 | 2023-11-14 | 2023-11-22 | REPAIR WATER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023317D46 | 2023-11-13 | 2023-12-12 | REPAIR WATER - SEWER | DE WITT AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE |
M002023304A10 | 2023-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023304B84 | 2023-10-31 | 2023-11-30 | REPAIR WATER | CORBIN PLACE, BROOKLYN, FROM STREET BRIGHTON 15 STREET TO STREET BRIGHTON BEACH AVENUE |
Q012023303B74 | 2023-10-30 | 2023-11-23 | REPAIR SEWER | 48 AVENUE, QUEENS, FROM STREET 31 PLACE TO STREET 31 STREET |
Q012023297A73 | 2023-10-24 | 2023-11-23 | REPAIR SEWER | 48 AVENUE, QUEENS, FROM STREET 31 PLACE TO STREET 31 STREET |
B012023290A64 | 2023-10-17 | 2023-11-03 | REPAIR WATER - SEWER | DE WITT AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE |
M012023289B28 | 2023-10-16 | 2023-11-13 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012023284B19 | 2023-10-11 | 2023-11-08 | REPAIR WATER | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
Q012023280A01 | 2023-10-11 | 2023-11-05 | REPAIR WATER - PROTECTED | 216 STREET, QUEENS, FROM STREET 29 AVENUE TO STREET 31 ROAD |
M012023279B63 | 2023-10-06 | 2023-11-04 | REPAIR WATER - PROTECTED | WEST 25 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012023273A03 | 2023-10-03 | 2023-10-29 | REPAIR WATER | JUNCTION BOULEVARD, QUEENS, FROM STREET 62 DRIVE TO STREET QUEENS BOULEVARD |
M012023275B35 | 2023-10-02 | 2023-10-17 | REPAIR SEWER | WEST 142 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE |
B012023270B78 | 2023-09-27 | 2023-10-20 | REPAIR SEWER - PROTECTED | AVENUE D, BROOKLYN, FROM STREET BANK STREET |
M012023269B22 | 2023-09-26 | 2023-10-14 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
B012023265A01 | 2023-09-22 | 2023-10-20 | REPAIR WATER - SEWER | DE WITT AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE |
M012023261B85 | 2023-09-18 | 2023-10-14 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
X012023261A79 | 2023-09-18 | 2023-10-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | CAMPBELL DRIVE, BRONX, FROM STREET BEND TO STREET STADIUM AVENUE |
X012023240A57 | 2023-09-10 | 2023-09-26 | REPAIR WATER | EAST 228 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY |
M012023244A40 | 2023-09-01 | 2023-09-16 | REPAIR WATER | WEST 27 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012023243A75 | 2023-08-31 | 2023-10-03 | REPAIR SEWER | WEST 142 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE |
X012023242B32 | 2023-08-30 | 2023-09-28 | REPAIR WATER | JEROME AVENUE, BRONX, FROM STREET EAST 182 STREET TO STREET WEST 182 STREET |
M012023240A17 | 2023-08-28 | 2023-09-09 | REPAIR WATER | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012023235B18 | 2023-08-23 | 2023-09-20 | REPAIR WATER | DE WITT AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE |
X012023230A10 | 2023-08-18 | 2023-09-16 | RESET, REPAIR OR REPLACE CURB | CAMPBELL DRIVE, BRONX, FROM STREET BEND TO STREET STADIUM AVENUE |
X042023230A03 | 2023-08-18 | 2023-09-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CAMPBELL DRIVE, BRONX, FROM STREET BEND TO STREET STADIUM AVENUE |
X012023230A11 | 2023-08-18 | 2023-09-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | CAMPBELL DRIVE, BRONX, FROM STREET BEND TO STREET STADIUM AVENUE |
M012023229B30 | 2023-08-17 | 2023-09-11 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
X042023220A05 | 2023-08-08 | 2023-09-02 | REPAIR SIDEWALK | PALISADE AVENUE, BRONX, FROM STREET BEND TO STREET BRADLEY TERRACE |
B012023216B95 | 2023-08-04 | 2023-09-07 | REPAIR WATER | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
M012023216B33 | 2023-08-04 | 2023-09-02 | REPAIR WATER | WEST 27 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012023214B67 | 2023-08-02 | 2023-08-28 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012023213A96 | 2023-08-01 | 2023-08-24 | REPAIR WATER | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012023209B72 | 2023-07-28 | 2023-08-26 | REPAIR WATER | WEST 77 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M042023208A36 | 2023-07-27 | 2023-08-25 | REPAIR SIDEWALK | WEST 190 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M042023208A37 | 2023-07-27 | 2023-08-25 | REPAIR SIDEWALK | AUDUBON AVENUE, MANHATTAN, FROM STREET WEST 189 STREET TO STREET WEST 190 STREET |
M012023203A03 | 2023-07-26 | 2023-07-25 | REPAIR WATER | WEST 103 STREET, MANHATTAN, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE |
M012023205A23 | 2023-07-26 | 2023-08-22 | REPAIR WATER | WEST 103 STREET, MANHATTAN, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE |
M012023201C74 | 2023-07-20 | 2023-08-15 | REPAIR WATER | EAST 64 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012023196A09 | 2023-07-15 | 2023-08-01 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012023194A43 | 2023-07-13 | 2023-08-15 | REPAIR SEWER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012023188C55 | 2023-07-07 | 2023-08-05 | REPAIR WATER | EAST 27 STREET, BROOKLYN, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY |
Q012023186D30 | 2023-07-05 | 2023-07-31 | REPAIR WATER | HIGHLAND AVENUE, QUEENS, FROM STREET 165 STREET TO STREET UPLAND PARKWAY |
B012023186A43 | 2023-07-05 | 2023-07-29 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
M012023180A15 | 2023-06-29 | 2023-07-18 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
Q012023172C35 | 2023-06-21 | 2023-07-05 | REPAIR WATER | HIGHLAND AVENUE, QUEENS, FROM STREET 165 STREET TO STREET UPLAND PARKWAY |
B012023170A01 | 2023-06-21 | 2023-07-18 | REPAIR WATER - PROTECTED | 9 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012023169A01 | 2023-06-20 | 2023-07-17 | REPAIR WATER | PARK AVENUE, MANHATTAN, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET |
M012023166A98 | 2023-06-15 | 2023-07-16 | REPAIR SEWER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M042023165A04 | 2023-06-14 | 2023-07-07 | REPAIR SIDEWALK | EAST 14 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012023151B61 | 2023-05-31 | 2023-06-29 | REPAIR WATER - PROTECTED | 118 STREET, QUEENS, FROM STREET 84 AVENUE TO STREET CURZON ROAD |
Q012023145A51 | 2023-05-30 | 2023-05-30 | REPAIR WATER - PROTECTED | 79 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE |
M012023150A70 | 2023-05-30 | 2023-06-18 | REPAIR SEWER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023146A28 | 2023-05-26 | 2023-06-22 | REPAIR SEWER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
Q012023143A19 | 2023-05-23 | 2023-06-21 | REPAIR WATER | HIGHLAND AVENUE, QUEENS, FROM STREET 165 STREET TO STREET UPLAND PARKWAY |
M012023142B74 | 2023-05-22 | 2023-06-23 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
Q012023132D09 | 2023-05-12 | 2023-05-17 | REPAIR WATER - SEWER | SEASIDE AVENUE, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET NYCTA |
Q012023132D10 | 2023-05-12 | 2023-05-31 | REPAIR WATER - SEWER | SEASIDE AVENUE, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET NYCTA |
M012023129C29 | 2023-05-09 | 2023-06-06 | REPAIR SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023129B27 | 2023-05-09 | 2023-06-04 | REPAIR SEWER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023128B74 | 2023-05-08 | 2023-05-28 | REPAIR SEWER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023125A35 | 2023-05-05 | 2023-05-24 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
B012023103B99 | 2023-04-13 | 2023-05-01 | REPAIR WATER - PROTECTED | BROADWAY, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK STREET |
M012023102D51 | 2023-04-12 | 2023-05-11 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q012023101B10 | 2023-04-11 | 2023-05-17 | REPAIR WATER - SEWER | SEASIDE AVENUE, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET NYCTA |
M012023101A75 | 2023-04-11 | 2023-05-10 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
X012023096B28 | 2023-04-06 | 2023-05-04 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023096A54 | 2023-04-06 | 2023-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023096A55 | 2023-04-06 | 2023-05-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023096A56 | 2023-04-06 | 2023-05-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023096A58 | 2023-04-06 | 2023-05-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023096A57 | 2023-04-06 | 2023-05-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023096A53 | 2023-04-06 | 2023-05-11 | PLACE MATERIAL ON STREET | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
M012023093B68 | 2023-04-03 | 2023-04-22 | REPAIR WATER | EAST 91 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012023088B04 | 2023-03-31 | 2023-04-27 | REPAIR WATER - PROTECTED | BENSON AVENUE, BROOKLYN, FROM STREET 24 AVENUE TO STREET BAY 37 STREET |
M012023089B85 | 2023-03-30 | 2023-04-25 | REPAIR WATER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023083C18 | 2023-03-24 | 2023-04-02 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M012023083C14 | 2023-03-24 | 2023-04-20 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012023083C15 | 2023-03-24 | 2023-04-22 | REPAIR WATER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023083C16 | 2023-03-24 | 2023-04-22 | REPAIR WATER | EAST 91 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
Q042023081A01 | 2023-03-22 | 2023-04-20 | REPAIR SIDEWALK | ERICSSON STREET, QUEENS, FROM STREET 29 AVENUE TO STREET 31 AVENUE |
B012023080B79 | 2023-03-21 | 2023-04-19 | REPAIR WATER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012023068A42 | 2023-03-09 | 2023-04-10 | REPAIR WATER - PROTECTED | BROADWAY, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK STREET |
B012023057A00 | 2023-02-26 | 2023-03-31 | REPAIR WATER - SEWER | WITHERS STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
M012023054A00 | 2023-02-23 | 2023-03-19 | REPAIR WATER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X022023054A00 | 2023-02-23 | 2023-04-10 | PLACE MATERIAL ON STREET | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023054A01 | 2023-02-23 | 2023-04-10 | OCCUPANCY OF ROADWAY AS STIPULATED | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023054A02 | 2023-02-23 | 2023-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023054A03 | 2023-02-23 | 2023-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023054A04 | 2023-02-23 | 2023-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023054A05 | 2023-02-23 | 2023-04-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X012023054A00 | 2023-02-23 | 2023-04-04 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
M012023054A01 | 2023-02-23 | 2023-03-19 | REPAIR WATER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023054A02 | 2023-02-23 | 2023-03-18 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012023054A03 | 2023-02-23 | 2023-03-18 | REPAIR WATER | EAST 91 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012023037A30 | 2023-02-06 | 2023-03-05 | REPAIR WATER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023034A67 | 2023-02-03 | 2023-03-04 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012023005A57 | 2023-02-03 | 2023-02-03 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
M012023034A25 | 2023-02-03 | 2023-03-04 | REPAIR WATER | EAST 91 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012023033A63 | 2023-02-02 | 2023-03-05 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023033A44 | 2023-02-02 | 2023-03-05 | PLACE MATERIAL ON STREET | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023033A45 | 2023-02-02 | 2023-03-05 | OCCUPANCY OF ROADWAY AS STIPULATED | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
M012023033A62 | 2023-02-02 | 2023-03-05 | REPAIR WATER - PROTECTED | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X022023033A46 | 2023-02-02 | 2023-03-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023033A49 | 2023-02-02 | 2023-03-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023033A48 | 2023-02-02 | 2023-03-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023033A47 | 2023-02-02 | 2023-03-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
Q012023018A16 | 2023-01-20 | 2023-02-16 | REPAIR WATER | 47 STREET, QUEENS, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD |
M012023011A28 | 2023-01-17 | 2023-02-09 | REPAIR WATER | WATER STREET, MANHATTAN, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP |
M012023007A01 | 2023-01-14 | 2023-02-05 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET |
X022023014A04 | 2023-01-14 | 2023-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023014A00 | 2023-01-14 | 2023-02-03 | PLACE MATERIAL ON STREET | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023014A05 | 2023-01-14 | 2023-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023014A01 | 2023-01-14 | 2023-02-03 | OCCUPANCY OF ROADWAY AS STIPULATED | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X012023014A03 | 2023-01-14 | 2023-02-03 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023014A02 | 2023-01-14 | 2023-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022023014A03 | 2023-01-14 | 2023-02-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X152023012A29 | 2023-01-12 | 2023-03-30 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
M012022354A08 | 2023-01-03 | 2022-12-22 | REPAIR WATER - PROTECTED | CHAMBERS STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M012022352A00 | 2023-01-03 | 2022-12-22 | REPAIR WATER - PROTECTED | CHAMBERS STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
X022022340B46 | 2022-12-06 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022340B44 | 2022-12-06 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022340B43 | 2022-12-06 | 2022-12-31 | PLACE MATERIAL ON STREET | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X012022340B23 | 2022-12-06 | 2022-12-31 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X012022340B24 | 2022-12-06 | 2022-12-31 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022340B48 | 2022-12-06 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022340B47 | 2022-12-06 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022340B45 | 2022-12-06 | 2022-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
M012022339A10 | 2022-12-05 | 2022-12-31 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022333A07 | 2022-12-02 | 2022-12-02 | REPAIR WATER - PROTECTED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022327A99 | 2022-12-01 | 2022-12-22 | REPAIR WATER | NORTH 6 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
X012022319A32 | 2022-11-15 | 2022-12-01 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022306A02 | 2022-11-02 | 2022-12-01 | PLACE MATERIAL ON STREET | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022306A03 | 2022-11-02 | 2022-12-01 | OCCUPANCY OF ROADWAY AS STIPULATED | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022306A04 | 2022-11-02 | 2022-12-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022306A05 | 2022-11-02 | 2022-12-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022306B24 | 2022-11-02 | 2022-12-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X012022306A00 | 2022-11-02 | 2022-12-01 | PRIVATE SEWER | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X022022306B25 | 2022-11-02 | 2022-12-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
X152022305A00 | 2022-11-01 | 2022-12-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | AMETHYST STREET, BRONX, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE |
M012022295A05 | 2022-10-28 | 2022-11-20 | REPAIR WATER | WEST 16 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022299B04 | 2022-10-26 | 2022-12-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022299B03 | 2022-10-26 | 2022-12-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022299A99 | 2022-10-26 | 2022-12-08 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022299B00 | 2022-10-26 | 2022-12-08 | TEMPORARY PEDESTRIAN WALK | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022299B01 | 2022-10-26 | 2022-12-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022299E77 | 2022-10-26 | 2022-11-14 | PLACE MATERIAL ON STREET | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M012022299C00 | 2022-10-26 | 2022-11-14 | REPAIR WATER - PROTECTED | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022299E78 | 2022-10-26 | 2022-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022299E79 | 2022-10-26 | 2022-11-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022299B02 | 2022-10-26 | 2022-12-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022298A35 | 2022-10-25 | 2022-11-22 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022284B17 | 2022-10-11 | 2022-11-08 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022284A60 | 2022-10-11 | 2022-11-08 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022284B30 | 2022-10-11 | 2022-11-01 | REPAIR SEWER - PROTECTED | COLUMBIA HEIGHTS, BROOKLYN, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET |
B012022284B31 | 2022-10-11 | 2022-11-01 | REPAIR WATER - PROTECTED | CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
M022022284B22 | 2022-10-11 | 2022-11-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022284B21 | 2022-10-11 | 2022-11-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022284B20 | 2022-10-11 | 2022-11-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022284B19 | 2022-10-11 | 2022-11-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022284B18 | 2022-10-11 | 2022-11-08 | TEMPORARY PEDESTRIAN WALK | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022273B79 | 2022-09-30 | 2022-10-14 | REPAIR SEWER - PROTECTED | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
B012022259D09 | 2022-09-16 | 2022-10-18 | REPAIR WATER - PROTECTED | CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012022259D10 | 2022-09-16 | 2022-10-18 | REPAIR SEWER - PROTECTED | COLUMBIA HEIGHTS, BROOKLYN, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET |
M022022259E12 | 2022-09-16 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M012022250B44 | 2022-09-07 | 2022-09-30 | REPAIR SEWER - PROTECTED | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022248A23 | 2022-09-05 | 2022-09-30 | PLACE MATERIAL ON STREET | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022248A24 | 2022-09-05 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M012022248A01 | 2022-09-05 | 2022-09-20 | REPAIR WATER | GREENWICH STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012022239A01 | 2022-09-02 | 2022-09-25 | REPAIR WATER - PROTECTED | EAST 9 STREET, MANHATTAN, FROM STREET AVENUE B TO STREET AVENUE C |
M022022244B60 | 2022-09-01 | 2022-09-30 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022244A54 | 2022-09-01 | 2022-09-30 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022244B64 | 2022-09-01 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022244B62 | 2022-09-01 | 2022-09-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022244B63 | 2022-09-01 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022244B61 | 2022-09-01 | 2022-09-30 | TEMPORARY PEDESTRIAN WALK | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022244B65 | 2022-09-01 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012022236A51 | 2022-08-31 | 2022-09-23 | REPAIR WATER | EAST 205 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE |
M012022223A65 | 2022-08-11 | 2022-09-06 | REPAIR WATER | KING STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012022223A66 | 2022-08-11 | 2022-09-06 | REPAIR WATER | GREENWICH STREET, MANHATTAN, FROM STREET CHARLTON STREET TO STREET KING STREET |
M012022212A01 | 2022-08-11 | 2022-08-29 | REPAIR SEWER - PROTECTED | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022223C57 | 2022-08-11 | 2022-09-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022223C56 | 2022-08-11 | 2022-09-10 | PLACE MATERIAL ON STREET | GRAND STREET, MANHATTAN, FROM STREET ESSEX STREET TO STREET NORFOLK STREET |
M022022216C67 | 2022-08-04 | 2022-08-18 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022193B79 | 2022-07-12 | 2022-08-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022193B78 | 2022-07-12 | 2022-08-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022193A74 | 2022-07-12 | 2022-08-18 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022193B06 | 2022-07-12 | 2022-08-02 | REPAIR SEWER - PROTECTED | LIVONIA AVENUE, BROOKLYN, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE |
M022022193B75 | 2022-07-12 | 2022-08-18 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022193B76 | 2022-07-12 | 2022-08-18 | TEMPORARY PEDESTRIAN WALK | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022193B77 | 2022-07-12 | 2022-08-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022193B80 | 2022-07-12 | 2022-08-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012022189B18 | 2022-07-08 | 2022-08-09 | REPAIR WATER | JEROME AVENUE, BRONX, FROM STREET WEST MT EDEN AVENUE |
Q012022164B41 | 2022-06-13 | 2022-07-15 | REPAIR SEWER - PROTECTED | ROCKAWAY BEACH BOULEVARD, QUEENS, FROM STREET BEACH 67 STREET TO STREET BEACH 69 STREET |
B012022161A33 | 2022-06-10 | 2022-07-08 | REPAIR SEWER - PROTECTED | LIVONIA AVENUE, BROOKLYN, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE |
X012022159A00 | 2022-06-08 | 2022-07-06 | REPAIR WATER | JEROME AVENUE, BRONX, FROM STREET WEST MT EDEN AVENUE |
M022022154C15 | 2022-06-03 | 2022-07-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022154B12 | 2022-06-03 | 2022-07-19 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022154B14 | 2022-06-03 | 2022-07-09 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022154C14 | 2022-06-03 | 2022-07-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022154C13 | 2022-06-03 | 2022-07-09 | TEMPORARY PEDESTRIAN WALK | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022154C12 | 2022-06-03 | 2022-07-09 | PLACE MATERIAL ON STREET | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022154C10 | 2022-06-03 | 2022-07-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022154C09 | 2022-06-03 | 2022-07-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022154C08 | 2022-06-03 | 2022-07-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022154C07 | 2022-06-03 | 2022-07-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022154C06 | 2022-06-03 | 2022-07-19 | TEMPORARY PEDESTRIAN WALK | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022154C05 | 2022-06-03 | 2022-07-19 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X042022151A08 | 2022-05-31 | 2022-06-22 | REPAIR SIDEWALK | EAST 236 STREET, BRONX, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE |
M012022147A86 | 2022-05-27 | 2022-06-19 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022147A87 | 2022-05-27 | 2022-06-15 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
Q022022140B70 | 2022-05-20 | 2022-06-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012022140A01 | 2022-05-20 | 2022-06-03 | REPAIR SEWER | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012022140B54 | 2022-05-20 | 2022-06-18 | REPAIR SEWER | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022022140B69 | 2022-05-20 | 2022-06-20 | PLACE MATERIAL ON STREET | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
M012022138B82 | 2022-05-18 | 2022-05-29 | REPAIR SEWER | WORTH STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M022022137A01 | 2022-05-17 | 2022-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022137A00 | 2022-05-17 | 2022-06-09 | PLACE MATERIAL ON STREET | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022132A72 | 2022-05-12 | 2022-06-09 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022132B46 | 2022-05-12 | 2022-06-09 | TEMPORARY PEDESTRIAN WALK | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022132B47 | 2022-05-12 | 2022-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022129A02 | 2022-05-09 | 2022-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
M022022124C89 | 2022-05-04 | 2022-06-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022124C13 | 2022-05-04 | 2022-05-19 | REPAIR SEWER | WORTH STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M022022124C88 | 2022-05-04 | 2022-06-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022124C90 | 2022-05-04 | 2022-06-05 | TEMPORARY PEDESTRIAN WALK | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022124C91 | 2022-05-04 | 2022-06-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022123B27 | 2022-05-03 | 2022-06-01 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
Q022022119A23 | 2022-04-29 | 2022-05-20 | PLACE MATERIAL ON STREET | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022022119A24 | 2022-04-29 | 2022-05-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
M022022119A26 | 2022-04-29 | 2022-06-05 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022119A27 | 2022-04-29 | 2022-06-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022119A36 | 2022-04-29 | 2022-06-05 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022113A03 | 2022-04-28 | 2022-05-22 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012022111B04 | 2022-04-21 | 2022-05-20 | REPAIR SEWER | 255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
M012022105A29 | 2022-04-19 | 2022-05-14 | REPAIR WATER | GROVE STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET WASHINGTON PLACE |
M012022103A12 | 2022-04-19 | 2022-05-12 | REPAIR WATER | GROVE STREET, MANHATTAN, FROM STREET 7 AVENUE SOUTH TO STREET WASHINGTON PLACE |
M012022108A59 | 2022-04-18 | 2022-05-17 | REPAIR WATER - SEWER | EAST 75 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022099A01 | 2022-04-13 | 2022-04-13 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022096A41 | 2022-04-12 | 2022-05-05 | REPAIR SEWER | WORTH STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
Q012022099A06 | 2022-04-09 | 2022-04-24 | REPAIR SEWER - PROTECTED | SENECA AVENUE, QUEENS, FROM STREET CENTRE STREET TO STREET GEORGE STREET |
M012022099A02 | 2022-04-09 | 2022-05-10 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
B012022098A00 | 2022-04-08 | 2022-04-24 | REPAIR WATER - PROTECTED | CLARK STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
M012022092A05 | 2022-04-07 | 2022-05-01 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M022022097B72 | 2022-04-07 | 2022-05-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022097B71 | 2022-04-07 | 2022-05-06 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022097A45 | 2022-04-07 | 2022-05-06 | PLACE MATERIAL ON STREET | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022097A46 | 2022-04-07 | 2022-05-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022097A63 | 2022-04-07 | 2022-05-06 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022095B56 | 2022-04-05 | 2022-04-10 | REPAIR WATER - PROTECTED | CLARK STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
M012022085A05 | 2022-03-30 | 2022-04-10 | REPAIR SEWER | WORTH STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M012022089A98 | 2022-03-30 | 2022-04-10 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022085A04 | 2022-03-26 | 2022-03-28 | REPAIR WATER - PROTECTED | 11 AVENUE, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
Q012022078A02 | 2022-03-24 | 2022-04-10 | REPAIR WATER | BEACH 116 STREET, QUEENS, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD |
Q012022076B75 | 2022-03-17 | 2022-04-10 | REPAIR SEWER - PROTECTED | SENECA AVENUE, QUEENS, FROM STREET CENTRE STREET TO STREET GEORGE STREET |
B012022061B55 | 2022-03-02 | 2022-03-31 | REPAIR WATER - SEWER - PROTECTED | GRAND STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
M022022060D34 | 2022-03-01 | 2022-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022060A30 | 2022-03-01 | 2022-03-17 | REPAIR WATER - PROTECTED | EAST 57 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH |
M012022060B20 | 2022-03-01 | 2022-03-30 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022060B21 | 2022-03-01 | 2022-04-01 | REPAIR WATER | EAST 14 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M022022060D33 | 2022-03-01 | 2022-03-30 | PLACE MATERIAL ON STREET | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
S012022047A51 | 2022-02-16 | 2022-03-17 | REPAIR WATER - PROTECTED | TAFT AVENUE, STATEN ISLAND, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET |
B012021323A07 | 2022-02-08 | 2021-12-18 | REPAIR WATER | FURMAN STREET, BROOKLYN, FROM STREET JORALEMON STREET TO STREET MONTAGUE STREET |
M012022035A32 | 2022-02-08 | 2022-03-03 | REPAIR WATER - PROTECTED | EAST 57 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH |
M012022021A08 | 2022-02-04 | 2022-02-04 | REPAIR WATER - PROTECTED | EAST 57 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH |
M022022034B04 | 2022-02-03 | 2022-02-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022034B03 | 2022-02-03 | 2022-02-25 | PLACE MATERIAL ON STREET | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022032A40 | 2022-02-01 | 2022-02-25 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022032A07 | 2022-02-01 | 2022-03-01 | REPAIR WATER - PROTECTED | 7 AVENUE, MANHATTAN, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET |
M012022028A50 | 2022-01-28 | 2022-02-25 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022025A24 | 2022-01-25 | 2022-02-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022025A25 | 2022-01-25 | 2022-02-27 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022010A43 | 2022-01-25 | 2022-02-08 | REPAIR WATER | 6 AVENUE, MANHATTAN, FROM STREET WEST 42 STREET TO STREET WEST 43 STREET |
M022022025A23 | 2022-01-25 | 2022-02-27 | PLACE MATERIAL ON STREET | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012022018A83 | 2022-01-21 | 2022-02-16 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012022013B03 | 2022-01-13 | 2022-02-02 | REPAIR SEWER | BRIGHTON BEACH AVENUE, BROOKLYN, FROM STREET BRIGHTON 5 STREET TO STREET BRIGHTON 6 STREET |
M012021364A51 | 2022-01-10 | 2022-01-28 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022010A00 | 2022-01-10 | 2022-01-29 | PLACE MATERIAL ON STREET | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M022022010A01 | 2022-01-10 | 2022-01-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
X012021362A60 | 2022-01-03 | 2021-12-31 | REPAIR WATER | BAILEY AVENUE, BRONX, FROM STREET SUMMIT PLACE TO STREET WEST 233 STREET |
B012021357C08 | 2021-12-29 | 2021-12-23 | REPAIR SEWER | BRIGHTON BEACH AVENUE, BROOKLYN, FROM STREET BRIGHTON 5 STREET TO STREET BRIGHTON 6 STREET |
M012021349A08 | 2021-12-23 | 2022-01-13 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021350A11 | 2021-12-16 | 2022-01-04 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
M022021349A01 | 2021-12-15 | 2022-01-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GRAND STREET, MANHATTAN, FROM STREET F D R DRIVE TO STREET MADISON STREET |
M022021349A00 | 2021-12-15 | 2022-01-16 | PLACE MATERIAL ON STREET | GRAND STREET, MANHATTAN, FROM STREET F D R DRIVE TO STREET MADISON STREET |
M022021337B75 | 2021-12-03 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 75 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021335B03 | 2021-12-01 | 2021-12-18 | REPAIR SEWER - PROTECTED | EAST 75 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X042021326A02 | 2021-11-22 | 2021-12-22 | REPAIR SIDEWALK | NETHERLAND AVENUE, BRONX, FROM STREET WEST 230 STREET TO STREET WEST 231 STREET |
M012021316A63 | 2021-11-12 | 2021-12-04 | REPAIR SEWER - PROTECTED | EAST 75 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021311A04 | 2021-11-07 | 2021-11-13 | CONDUIT CONSTRUCTION AND FRANCHISE | GRAND STREET, MANHATTAN, FROM STREET F D R DRIVE TO STREET MADISON STREET |
M012021302A40 | 2021-11-03 | 2021-11-13 | REPAIR WATER - PROTECTED | WEST 26 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X012021298A82 | 2021-10-25 | 2021-11-13 | REPAIR WATER - SEWER - PROTECTED | WESTCHESTER AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE |
B012021294C88 | 2021-10-21 | 2021-11-11 | REPAIR WATER | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B012021294C86 | 2021-10-21 | 2021-11-11 | REPAIR WATER | UNION AVENUE, BROOKLYN, FROM STREET WALLABOUT STREET TO STREET WALTON STREET |
X042021286A07 | 2021-10-13 | 2021-11-04 | REPAIR SIDEWALK | EAST 236 STREET, BRONX, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE |
X012021280A83 | 2021-10-07 | 2021-11-03 | REPAIR WATER - SEWER | PAULDING AVENUE, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
B012021280A73 | 2021-10-07 | 2021-10-26 | REPAIR WATER | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
B012021280A72 | 2021-10-07 | 2021-10-26 | REPAIR WATER | UNION AVENUE, BROOKLYN, FROM STREET WALLABOUT STREET TO STREET WALTON STREET |
M012021279A38 | 2021-10-06 | 2021-11-04 | REPAIR SEWER - PROTECTED | EAST 75 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q012021266A35 | 2021-10-04 | 2021-10-21 | REPAIR WATER | ROOSEVELT AVENUE, QUEENS, FROM STREET 90 STREET TO STREET ELMHURST AVENUE |
M012021274C05 | 2021-10-01 | 2021-10-14 | CONDUIT CONSTRUCTION AND FRANCHISE | GRAND STREET, MANHATTAN, FROM STREET F D R DRIVE TO STREET MADISON STREET |
M012021266A33 | 2021-09-23 | 2021-10-12 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | CLINTON STREET, MANHATTAN, FROM STREET EAST BROADWAY TO STREET GRAND STREET |
B012021266A15 | 2021-09-23 | 2021-10-12 | REPAIR WATER | UNION AVENUE, BROOKLYN, FROM STREET WALLABOUT STREET TO STREET WALTON STREET |
B012021266A14 | 2021-09-23 | 2021-10-12 | REPAIR WATER | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
M012021266A35 | 2021-09-23 | 2021-10-14 | CONDUIT CONSTRUCTION AND FRANCHISE | GRAND STREET, MANHATTAN, FROM STREET F D R DRIVE TO STREET MADISON STREET |
B012021263D57 | 2021-09-20 | 2021-09-30 | REPAIR WATER | UNION AVENUE, BROOKLYN, FROM STREET WALLABOUT STREET TO STREET WALTON STREET |
M012021257B45 | 2021-09-14 | 2021-09-26 | REPAIR SEWER | KING STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
X012021251A73 | 2021-09-08 | 2021-10-06 | REPAIR WATER - SEWER - PROTECTED | WESTCHESTER AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE |
M012021244B05 | 2021-09-01 | 2021-09-30 | CONDUIT CONSTRUCTION AND FRANCHISE | GRAND STREET, MANHATTAN, FROM STREET F D R DRIVE TO STREET MADISON STREET |
M012021243B43 | 2021-08-31 | 2021-09-12 | REPAIR SEWER | KING STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021242C25 | 2021-08-30 | 2021-09-28 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | CLINTON STREET, MANHATTAN, FROM STREET EAST BROADWAY TO STREET GRAND STREET |
M012021239B45 | 2021-08-27 | 2021-09-11 | REPAIR SEWER | CHARLTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021238A44 | 2021-08-26 | 2021-09-24 | REPAIR SEWER - PROTECTED | EAST 75 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012021232B49 | 2021-08-20 | 2021-09-21 | REPAIR WATER | UNION AVENUE, BROOKLYN, FROM STREET WALLABOUT STREET TO STREET WALTON STREET |
M012021231A15 | 2021-08-20 | 2021-09-17 | REPAIR WATER - PROTECTED | WEST 49 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M012021222C14 | 2021-08-10 | 2021-08-31 | REPAIR SEWER | KING STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021214B10 | 2021-08-02 | 2021-08-28 | REPAIR SEWER | CHARLTON STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
M012021203A06 | 2021-07-22 | 2021-08-10 | REPAIR WATER - PROTECTED | WEST 133 STREET, MANHATTAN, FROM STREET 12 AVENUE TO STREET BROADWAY |
M012021203A42 | 2021-07-22 | 2021-08-21 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | CLINTON STREET, MANHATTAN, FROM STREET EAST BROADWAY TO STREET GRAND STREET |
M012021197A11 | 2021-07-21 | 2021-08-14 | REPAIR WATER | EAST 90 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
M012021189A80 | 2021-07-08 | 2021-08-07 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET |
M012021188B26 | 2021-07-07 | 2021-08-04 | REPAIR WATER | EAST 16 STREET, MANHATTAN, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST |
Q042021181A20 | 2021-06-30 | 2021-07-29 | REPAIR SIDEWALK | ERICSSON STREET, QUEENS, FROM STREET 29 AVENUE TO STREET 31 AVENUE |
M012021179C87 | 2021-06-28 | 2021-07-27 | REPAIR WATER - PROTECTED | WEST 133 STREET, MANHATTAN, FROM STREET 12 AVENUE TO STREET BROADWAY |
M012021172A00 | 2021-06-21 | 2021-07-21 | REPAIR WATER | EAST 16 STREET, MANHATTAN, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST |
X042021172A00 | 2021-06-21 | 2021-07-16 | REPAIR SIDEWALK | HATTING PLACE, BRONX, FROM STREET BEND TO STREET CHAFFEE AVENUE |
M012021168A20 | 2021-06-17 | 2021-07-02 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 24 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
Q012021156A02 | 2021-06-15 | 2021-07-04 | REPAIR SEWER | 15 AVENUE, QUEENS, FROM STREET 142 STREET TO STREET 143 STREET |
B012021161A85 | 2021-06-10 | 2021-07-13 | REPAIR SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET |
M012021158A02 | 2021-06-07 | 2021-06-28 | REPAIR WATER - PROTECTED | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET |
B012021145B72 | 2021-05-25 | 2021-06-05 | REPAIR WATER | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
Q012021141A15 | 2021-05-24 | 2021-06-19 | REPAIR WATER | 146 STREET, QUEENS, FROM STREET 123 AVENUE TO STREET ROCKAWAY BOULEVARD |
M012021138A16 | 2021-05-18 | 2021-06-18 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | WEST 24 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
S012021130B63 | 2021-05-18 | 2021-06-08 | REPAIR SEWER | CHESTERTON AVENUE, STATEN ISLAND, FROM STREET GRAYSON STREET TO STREET PENDALE STREET |
B012021130A23 | 2021-05-11 | 2021-06-08 | REPAIR WATER | GATES AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012021120A37 | 2021-05-10 | 2021-05-03 | REPAIR WATER - PROTECTED | LOVE LANE, BROOKLYN, FROM STREET COLLEGE PLACE TO STREET HENRY STREET |
M012021127B28 | 2021-05-07 | 2021-06-08 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | CLINTON STREET, MANHATTAN, FROM STREET EAST BROADWAY TO STREET GRAND STREET |
Q012021120B31 | 2021-04-30 | 2021-06-01 | REPAIR SEWER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
M012021120B26 | 2021-04-30 | 2021-05-31 | REPAIR WATER - PROTECTED | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET |
Q042021110A05 | 2021-04-20 | 2021-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 27 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B012021109C89 | 2021-04-19 | 2021-05-19 | REPAIR WATER | WALTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
X042021106A04 | 2021-04-16 | 2021-05-11 | REPAIR SIDEWALK | EAST 236 STREET, BRONX, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE |
Q012021093A02 | 2021-04-07 | 2021-05-02 | REPAIR WATER | 29 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q012021083D34 | 2021-03-24 | 2021-04-23 | REPAIR WATER | ARCHER AVENUE, QUEENS, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY |
B012021083E39 | 2021-03-24 | 2021-04-22 | REPAIR WATER - SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
M012021066A01 | 2021-03-07 | 2021-04-10 | REPAIR WATER | FULTON STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
Q012021060A68 | 2021-03-01 | 2021-03-26 | REPAIR WATER | 138 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE |
Q012021042B17 | 2021-02-16 | 2021-03-12 | REPAIR WATER | BEECH AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD |
Q012021042B12 | 2021-02-16 | 2021-02-15 | REPAIR WATER | KISSENA BOULEVARD, QUEENS, FROM STREET ASH AVENUE TO STREET BEECH AVENUE |
B012021034A32 | 2021-02-05 | 2021-03-04 | REPAIR WATER - PROTECTED | AVENUE Z, BROOKLYN, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET |
M012021028A17 | 2021-02-01 | 2021-02-01 | REPAIR WATER | EAST 29 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
M012021029A05 | 2021-02-01 | 2021-02-27 | REPAIR WATER | BETHUNE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M012021027A67 | 2021-01-27 | 2021-02-11 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
Q012021026B89 | 2021-01-26 | 2021-02-25 | REPAIR WATER | 138 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE |
M012021026A86 | 2021-01-26 | 2021-02-11 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
X042021017A00 | 2021-01-17 | 2021-02-16 | REPAIR SIDEWALK | HENRY HUDSON PARKWAY, BRONX, FROM STREET WEST 250 STREET TO STREET WEST 252 STREET |
M012021012A24 | 2021-01-12 | 2021-01-25 | REPAIR WATER | EAST 89 STREET, MANHATTAN, FROM STREET EAST END AVENUE TO STREET YORK AVENUE |
M012021005A93 | 2021-01-05 | 2021-02-03 | REPAIR WATER - PROTECTED | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012021004A57 | 2021-01-04 | 2021-01-30 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M012020364A17 | 2020-12-29 | 2021-01-12 | REPAIR WATER | EAST 89 STREET, MANHATTAN, FROM STREET EAST END AVENUE TO STREET YORK AVENUE |
M012020358A25 | 2020-12-29 | 2021-01-21 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET BROADWAY |
M012020345A22 | 2020-12-15 | 2021-01-08 | REPAIR WATER - PROTECTED | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
S012020338A11 | 2020-12-09 | 2020-12-31 | REPAIR SEWER | DONGAN HILLS AVENUE, STATEN ISLAND, FROM STREET HUSSON STREET TO STREET VERA STREET |
B012020343F22 | 2020-12-08 | 2020-12-31 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012020333A01 | 2020-12-07 | 2020-12-27 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M012020335B25 | 2020-11-30 | 2020-12-29 | REPAIR WATER | EAST 89 STREET, MANHATTAN, FROM STREET EAST END AVENUE TO STREET YORK AVENUE |
B012020332A13 | 2020-11-27 | 2020-12-14 | REPAIR WATER - PROTECTED | AVENUE C, BROOKLYN, FROM STREET MC DONALD AVENUE |
X012020325A94 | 2020-11-20 | 2020-12-21 | REPAIR WATER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
Q012020314B32 | 2020-11-18 | 2020-12-08 | REPAIR WATER | PAGE PLACE, QUEENS, FROM STREET GRAND AVENUE TO STREET MASPETH AVENUE |
X012020322A18 | 2020-11-17 | 2020-12-01 | REPAIR WATER - SEWER | CAMPBELL DRIVE, BRONX, FROM STREET BEND TO STREET STADIUM AVENUE |
B012020310B13 | 2020-11-05 | 2020-11-30 | REPAIR WATER - PROTECTED | AVENUE C, BROOKLYN, FROM STREET MC DONALD AVENUE |
B012020310A32 | 2020-11-05 | 2020-11-23 | REPAIR SEWER | BOND STREET, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
B012020308A48 | 2020-11-03 | 2020-11-23 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
X012020295A40 | 2020-10-29 | 2020-11-19 | REPAIR WATER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET |
Q012020303D67 | 2020-10-29 | 2020-11-27 | REPAIR WATER | 138 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE |
Q012020303D66 | 2020-10-29 | 2020-11-27 | REPAIR WATER | ARCHER AVENUE, QUEENS, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY |
M012020297A34 | 2020-10-29 | 2020-11-15 | REPAIR WATER | WEST 78 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012020301B51 | 2020-10-27 | 2020-11-24 | CONDUIT CONSTRUCTION AND FRANCHISE | SAMUEL DICKSTEIN PLAZA, MANHATTAN, FROM STREET EAST BROADWAY TO STREET GRAND STREET |
M012020296A95 | 2020-10-22 | 2020-11-20 | CONDUIT CONSTRUCTION AND FRANCHISE-PROT | CLINTON STREET, MANHATTAN, FROM STREET EAST BROADWAY TO STREET GRAND STREET |
X012020290B25 | 2020-10-16 | 2020-11-17 | REPAIR WATER - SEWER | CAMPBELL DRIVE, BRONX, FROM STREET BEND TO STREET STADIUM AVENUE |
Q012020287E52 | 2020-10-13 | 2020-10-28 | REPAIR WATER | ARCHER AVENUE, QUEENS, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY |
B012020287A82 | 2020-10-13 | 2020-11-03 | REPAIR SEWER | BOND STREET, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
B012020281F05 | 2020-10-13 | 2020-11-05 | REPAIR WATER | EMERALD STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD |
B012020287D20 | 2020-10-13 | 2020-10-29 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012020287E53 | 2020-10-13 | 2020-10-28 | REPAIR WATER | 138 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE |
B012020276C12 | 2020-10-02 | 2020-10-31 | REPAIR SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET FLATBUSH AVENUE |
B012020275A61 | 2020-10-01 | 2020-10-30 | REPAIR WATER - PROTECTED | AVENUE C, BROOKLYN, FROM STREET MC DONALD AVENUE |
M012020273A66 | 2020-09-29 | 2020-10-16 | REPAIR WATER | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012020256A01 | 2020-09-24 | 2020-09-30 | REPAIR WATER - PROTECTED | 1 AVENUE, MANHATTAN, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET |
Q012020266B50 | 2020-09-22 | 2020-10-07 | REPAIR WATER | ARCHER AVENUE, QUEENS, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY |
Q012020266B51 | 2020-09-22 | 2020-10-08 | REPAIR WATER | SANTIAGO STREET, QUEENS, FROM STREET PALO ALTO AVENUE TO STREET RIO DRIVE |
Q012020266B52 | 2020-09-22 | 2020-10-07 | REPAIR WATER | 138 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE |
B012020259D92 | 2020-09-18 | 2020-10-14 | REPAIR WATER - PROTECTED | HIMROD STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012020261C25 | 2020-09-17 | 2020-10-20 | REPAIR WATER | CORNELIA STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012020261B82 | 2020-09-17 | 2020-10-20 | REPAIR SEWER | BOND STREET, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
M012020258A45 | 2020-09-14 | 2020-09-29 | REPAIR WATER | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012020254A40 | 2020-09-10 | 2020-10-15 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M042020252A09 | 2020-09-08 | 2020-10-07 | REPAIR SIDEWALK | WEST 23 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q012020246A00 | 2020-09-02 | 2020-09-24 | REPAIR WATER | SANTIAGO STREET, QUEENS, FROM STREET PALO ALTO AVENUE TO STREET RIO DRIVE |
B012020244B18 | 2020-08-31 | 2020-09-18 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012020244B24 | 2020-08-31 | 2020-09-29 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
M012020230A13 | 2020-08-23 | 2020-09-15 | REPAIR WATER | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q012020227F07 | 2020-08-20 | 2020-09-12 | REPAIR WATER | 137 AVENUE, QUEENS, FROM STREET 156 STREET TO STREET 157 STREET |
Q012020232A11 | 2020-08-19 | 2020-09-23 | REPAIR WATER | 138 STREET, QUEENS, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE |
Q012020232A10 | 2020-08-19 | 2020-09-23 | REPAIR WATER | ARCHER AVENUE, QUEENS, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY |
X012020227A65 | 2020-08-14 | 2020-09-17 | REPAIR WATER | EAST 163 STREET, BRONX, FROM STREET ELTON AVENUE TO STREET 3 AVENUE |
B012020227B92 | 2020-08-14 | 2020-09-04 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012020224A26 | 2020-08-11 | 2020-09-02 | REPAIR SEWER | PALO ALTO AVENUE, QUEENS, FROM STREET HAYWOOD ROAD TO STREET SANTIAGO STREET |
B012020220A68 | 2020-08-07 | 2020-09-04 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012020219A34 | 2020-08-07 | 2020-08-31 | REPAIR WATER | 108 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q012020218C02 | 2020-08-07 | 2020-08-31 | REPAIR WATER | 108 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
B012020217B05 | 2020-08-04 | 2020-09-02 | REPAIR WATER - PROTECTED | BAY 38 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE |
M012020211A45 | 2020-07-29 | 2020-08-27 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
B012020206A00 | 2020-07-24 | 2020-08-27 | REPAIR WATER - PROTECTED | PROSPECT AVENUE, BROOKLYN, FROM STREET 11 AVENUE TO STREET TERRACE PLACE |
Q012020203A55 | 2020-07-21 | 2020-08-19 | REPAIR SEWER | PALO ALTO AVENUE, QUEENS, FROM STREET HAYWOOD ROAD TO STREET SANTIAGO STREET |
B012020202A08 | 2020-07-20 | 2020-08-08 | REPAIR SEWER - PROTECTED | BAY 38 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE |
Q012020197B59 | 2020-07-20 | 2020-08-13 | REPAIR WATER | ASTORIA BOULEVARD, QUEENS, FROM STREET 25 STREET TO STREET 27 STREET |
M012020196B39 | 2020-07-14 | 2020-07-28 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
Q012020183B20 | 2020-07-09 | 2020-07-30 | REPAIR WATER | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q012020181A80 | 2020-07-09 | 2020-07-28 | REPAIR WATER | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
B012020178C51 | 2020-06-26 | 2020-07-25 | REPAIR SEWER - PROTECTED | BAY 38 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE |
Q012020174A24 | 2020-06-26 | 2020-07-21 | REPAIR WATER | 33 STREET, QUEENS, FROM STREET NYCTA SUBWAY |
Q012020170B15 | 2020-06-24 | 2020-07-17 | REPAIR WATER | BELL BOULEVARD, QUEENS, FROM STREET 58 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X012020170A11 | 2020-06-22 | 2020-07-17 | REPAIR WATER - PROTECTED | WEBSTER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
X012020167B29 | 2020-06-22 | 2020-06-19 | REPAIR WATER | OAK POINT AVENUE, BRONX, FROM STREET CRAVEN STREET TO STREET TRUXTON STREET |
M012020169B51 | 2020-06-17 | 2020-07-14 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
X012020167B36 | 2020-06-15 | 2020-07-11 | FINAL RESTORATION ONLY | SEXTON PLACE, BRONX, FROM STREET BEND TO STREET YOUNG AVENUE |
B012020164A00 | 2020-06-12 | 2020-07-11 | REPAIR SEWER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
Q012020160E13 | 2020-06-10 | 2020-07-07 | REPAIR SEWER - PROTECTED | 247 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET DEPEW AVENUE |
S012020141A25 | 2020-05-27 | 2020-06-18 | REPAIR SEWER - PROTECTED | FINGERBOARD ROAD, STATEN ISLAND, FROM STREET BANG TERRACE TO STREET BAY STREET |
X012020144A00 | 2020-05-27 | 2020-06-21 | REPAIR WATER - PROTECTED | LELAND AVENUE, BRONX, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE |
M012020135A87 | 2020-05-14 | 2020-06-14 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
B012020134C13 | 2020-05-13 | 2020-06-11 | REPAIR SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
X012020125B15 | 2020-05-08 | 2020-06-02 | REPAIR WATER - PROTECTED | BOGART AVENUE, BRONX, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE |
B012020118B34 | 2020-04-27 | 2020-05-12 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012020108A48 | 2020-04-17 | 2020-05-15 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
M012020094A05 | 2020-04-09 | 2020-05-02 | REPAIR WATER - PROTECTED | EAST 37 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012020099B35 | 2020-04-08 | 2020-04-20 | REPAIR WATER | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
M012020098B19 | 2020-04-07 | 2020-05-01 | FINAL RESTORATION ONLY - PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012020090D02 | 2020-03-30 | 2020-04-28 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012020090B02 | 2020-03-30 | 2020-04-17 | REPAIR SEWER - PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q012020085C18 | 2020-03-27 | 2020-04-10 | REPAIR WATER | 150 STREET, QUEENS, FROM STREET 8 AVENUE TO STREET 8 ROAD |
M012020087A74 | 2020-03-27 | 2020-04-10 | REPAIR WATER | UNION SQUARE WEST, MANHATTAN, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET |
M012020086B82 | 2020-03-26 | 2020-04-10 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
M012020086B88 | 2020-03-26 | 2020-04-10 | CONDUIT CONSTRUCTION AND FRANCHISE | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
M012020077B55 | 2020-03-25 | 2020-03-18 | REPAIR WATER | UNION SQUARE WEST, MANHATTAN, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET |
S012020069A16 | 2020-03-21 | 2020-03-18 | REPAIR SEWER - PROTECTED | MILL ROAD, STATEN ISLAND, FROM STREET NEW DORP LANE |
M012020078C85 | 2020-03-18 | 2020-03-31 | REPAIR WATER | UNION SQUARE WEST, MANHATTAN, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET |
M012020077B53 | 2020-03-17 | 2020-04-09 | REPAIR WATER | EAST 25 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH |
X012020077B48 | 2020-03-17 | 2020-04-10 | REPAIR WATER - SEWER - PROTECTED | SEWARD AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
M012020077B54 | 2020-03-17 | 2020-04-03 | REPAIR SEWER - PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
S012020072D36 | 2020-03-12 | 2020-04-09 | REPAIR WATER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET METCALFE STREET TO STREET ROFF STREET |
B012020069E21 | 2020-03-09 | 2020-04-03 | REPAIR WATER | CLARK STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
M012020059A20 | 2020-03-05 | 2020-03-28 | REPAIR WATER | WAVERLY PLACE, MANHATTAN, FROM STREET GREENE STREET TO STREET UNIVERSITY PLACE |
B012020062B26 | 2020-03-02 | 2020-03-31 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012020056A07 | 2020-02-27 | 2020-02-26 | REPAIR WATER | ASTORIA BOULEVARD, QUEENS, FROM STREET 23 STREET TO STREET 25 STREET |
Q012020056B35 | 2020-02-27 | 2020-03-25 | REPAIR WATER | ASTORIA BOULEVARD, QUEENS, FROM STREET 23 STREET TO STREET 25 STREET |
B012020049C55 | 2020-02-21 | 2020-03-18 | REPAIR WATER | LAFAYETTE AVENUE, BROOKLYN, FROM STREET ADELPHI STREET TO STREET CLERMONT AVENUE |
B012020044D11 | 2020-02-13 | 2020-03-12 | REPAIR WATER | CLARK STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
M012020041C13 | 2020-02-10 | 2020-03-17 | REPAIR SEWER - PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012020041B76 | 2020-02-10 | 2020-03-11 | REPAIR WATER - SEWER - PROTECTED | SEWARD AVENUE, BRONX, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE |
X012020041B75 | 2020-02-10 | 2020-03-11 | REPAIR WATER - SEWER | BEACH AVENUE, BRONX, FROM STREET SEWARD AVENUE TO STREET SOUNDVIEW AVENUE |
M012020041C12 | 2020-02-10 | 2020-02-26 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET |
M012020035A41 | 2020-02-08 | 2020-03-04 | REPAIR WATER | LAFAYETTE STREET, MANHATTAN, FROM STREET GRAND STREET TO STREET HOWARD STREET |
Q012020038A05 | 2020-02-07 | 2020-03-10 | REPAIR SEWER | 37 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
S012020027A20 | 2020-02-07 | 2020-02-25 | REPAIR WATER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET METCALFE STREET TO STREET ROFF STREET |
M012020036A34 | 2020-02-05 | 2020-02-21 | REPAIR WATER - SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
M012020036A37 | 2020-02-05 | 2020-02-21 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET CHURCH STREET TO STREET WEST BROADWAY |
B012020036C26 | 2020-02-05 | 2020-02-24 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
B012020025A02 | 2020-01-30 | 2020-02-23 | REPAIR WATER | MALCOLM X BOULEVARD, BROOKLYN, FROM STREET HALSEY STREET TO STREET HANCOCK STREET |
M012020024A32 | 2020-01-28 | 2020-02-22 | REPAIR WATER - PROTECTED | LEWIS STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M012020013A25 | 2020-01-16 | 2020-02-11 | REPAIR WATER | EAST 89 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012020015B84 | 2020-01-15 | 2020-02-10 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012020007A42 | 2020-01-13 | 2020-02-05 | REPAIR WATER | EAST 86 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M012020006A14 | 2020-01-09 | 2020-02-04 | REPAIR WATER - PROTECTED | EAST 88 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012020008A14 | 2020-01-08 | 2020-02-07 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET CHURCH STREET TO STREET WEST BROADWAY |
M012020008A23 | 2020-01-08 | 2020-02-07 | REPAIR WATER - SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
B012019363A01 | 2019-12-29 | 2020-01-27 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
B012019350C04 | 2019-12-16 | 2019-12-28 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019350B03 | 2019-12-16 | 2020-01-01 | REPAIR WATER - SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET |
M012019331A42 | 2019-11-27 | 2019-12-18 | REPAIR WATER - SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET |
M012019329A10 | 2019-11-25 | 2019-12-10 | REPAIR SEWER - PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q012019326B17 | 2019-11-22 | 2019-12-17 | REPAIR WATER - PROTECTED | METROPOLITAN AVENUE, QUEENS, FROM STREET METROPOLITAN AVENUE TO STREET WOODWARD AVENUE |
Q012019322D07 | 2019-11-20 | 2019-12-17 | REPAIR WATER - PROTECTED | METROPOLITAN AVENUE, QUEENS, FROM STREET METROPOLITAN AVENUE TO STREET WOODWARD AVENUE |
M012019316A19 | 2019-11-12 | 2019-11-26 | REPAIR SEWER - PROTECTED | EAST 47 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012019310A85 | 2019-11-12 | 2019-12-05 | REPAIR WATER | SEXTON PLACE, BRONX, FROM STREET BEND TO STREET YOUNG AVENUE |
X012019316A30 | 2019-11-12 | 2019-12-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | UNION AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
B012019309A13 | 2019-11-05 | 2019-12-14 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
X012019302A36 | 2019-10-29 | 2019-11-26 | REPAIR WATER - SEWER | BURR AVENUE, BRONX, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY |
B012019294A09 | 2019-10-21 | 2019-11-14 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019290A69 | 2019-10-17 | 2019-11-15 | REPAIR SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET |
X012019268A80 | 2019-09-25 | 2019-10-10 | REPAIR WATER - SEWER - PROTECTED | HOE AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET HOME STREET |
B012019263B10 | 2019-09-20 | 2019-10-23 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
X012019262B31 | 2019-09-19 | 2019-10-22 | REPAIR SEWER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
M012019259B01 | 2019-09-16 | 2019-10-15 | REPAIR WATER | EAST 21 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019253B68 | 2019-09-10 | 2019-10-10 | REPAIR WATER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
X012019252A37 | 2019-09-09 | 2019-09-22 | REPAIR SEWER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
B012019252C01 | 2019-09-09 | 2019-09-23 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
X012019239B52 | 2019-08-27 | 2019-09-26 | REPAIR WATER - SEWER - PROTECTED | HOE AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET HOME STREET |
M012019234B22 | 2019-08-22 | 2019-09-24 | REPAIR WATER - PROTECTED | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012019224A58 | 2019-08-15 | 2019-09-10 | REPAIR WATER | CAMPUS PLACE, BROOKLYN, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET |
Q012019224D79 | 2019-08-12 | 2019-09-10 | REPAIR WATER | 36 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
M012019221A28 | 2019-08-09 | 2019-09-10 | REPAIR WATER | ORCHARD STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
B012019221C15 | 2019-08-09 | 2019-09-09 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012019221B48 | 2019-08-09 | 2019-09-10 | REPAIR SEWER | 37 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
X012019210A46 | 2019-07-29 | 2019-08-27 | REPAIR SEWER | WHITE PLAINS ROAD, BRONX, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD |
M012019206C44 | 2019-07-25 | 2019-08-25 | REPAIR WATER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012019200B67 | 2019-07-19 | 2019-08-20 | REPAIR WATER | ALEXANDER AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET |
M012019192B99 | 2019-07-11 | 2019-07-22 | REPAIR WATER - SEWER | STONE STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET BROADWAY |
B012019192C27 | 2019-07-11 | 2019-08-10 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019179B57 | 2019-07-06 | 2019-07-26 | REPAIR WATER | WEST 25 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012019179B58 | 2019-06-28 | 2019-07-16 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012019175B74 | 2019-06-24 | 2019-07-28 | REPAIR WATER - SEWER | WARREN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
Q012019168A88 | 2019-06-17 | 2019-07-15 | REPAIR SEWER | 34 AVENUE, QUEENS, FROM STREET 36 STREET TO STREET 37 STREET |
B012019164E81 | 2019-06-13 | 2019-07-12 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019164B87 | 2019-06-13 | 2019-07-02 | REPAIR WATER - SEWER | STONE STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET BROADWAY |
M012019154B15 | 2019-06-03 | 2019-07-02 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012019154B17 | 2019-06-03 | 2019-06-19 | REPAIR SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
M012019151D21 | 2019-05-31 | 2019-06-28 | RESET, REPAIR OR REPLACE CURB | WEST 28 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012019151D20 | 2019-05-31 | 2019-06-28 | RESET, REPAIR OR REPLACE CURB | WEST 24 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
B012019148G08 | 2019-05-28 | 2019-06-12 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019141B50 | 2019-05-21 | 2019-06-11 | REPAIR WATER - SEWER | WARREN STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M012019141C31 | 2019-05-21 | 2019-06-18 | REPAIR WATER - SEWER | STONE STREET, MANHATTAN, FROM STREET BROAD STREET TO STREET BROADWAY |
Q012019136B34 | 2019-05-16 | 2019-06-18 | REPAIR WATER - SEWER | 37 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
Q012019136B79 | 2019-05-16 | 2019-06-18 | REPAIR SEWER | 34 AVENUE, QUEENS, FROM STREET 36 STREET TO STREET 37 STREET |
M012019122A01 | 2019-05-02 | 2019-06-02 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012019121A00 | 2019-05-01 | 2019-05-29 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019120A03 | 2019-04-30 | 2019-06-05 | REPAIR SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
M012019116C28 | 2019-04-26 | 2019-05-22 | REPAIR WATER - PROTECTED | LISPENARD STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M012019114B12 | 2019-04-24 | 2019-05-03 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q012019113D13 | 2019-04-23 | 2019-05-22 | REPAIR WATER | 37 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
M012019106B80 | 2019-04-16 | 2019-04-21 | REPAIR WATER - PROTECTED | LISPENARD STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
B012019102F07 | 2019-04-12 | 2019-04-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | WYCKOFF STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
M012019084C75 | 2019-03-25 | 2019-04-21 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012019084A49 | 2019-03-25 | 2019-04-21 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
Q012019073D08 | 2019-03-14 | 2019-04-14 | REPAIR WATER | 37 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
M012019071A41 | 2019-03-12 | 2019-04-11 | REPAIR SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
M012019070A09 | 2019-03-11 | 2019-03-31 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
M012019057A08 | 2019-02-26 | 2019-03-12 | REPAIR SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
M012019057A07 | 2019-02-26 | 2019-03-26 | REPAIR WATER | EAST 48 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012019051F98 | 2019-02-20 | 2019-03-21 | REPAIR WATER - SEWER | SCHERMERHORN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET NEVINS STREET |
M012019047A01 | 2019-02-20 | 2019-03-17 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
Q012019046A57 | 2019-02-15 | 2019-03-15 | REPAIR WATER | 37 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
M012019035A45 | 2019-02-13 | 2019-02-11 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
X012019042B16 | 2019-02-11 | 2019-03-12 | REPAIR WATER - SEWER | CROTONA PARK EAST, BRONX, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD |
M012019041A01 | 2019-02-10 | 2019-02-24 | REPAIR SEWER | ORCHARD STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
X012019036A02 | 2019-02-08 | 2019-03-06 | REPAIR WATER | SOUTHERN BOULEVARD, BRONX, FROM STREET AVENUE ST JOHN TO STREET EAST 149 STREET |
M012019029A34 | 2019-01-29 | 2019-02-26 | REPAIR SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
Q012019023D52 | 2019-01-23 | 2019-02-07 | REPAIR WATER | 207 STREET, QUEENS, FROM STREET 111 AVENUE TO STREET 112 AVENUE |
M012019017A26 | 2019-01-17 | 2019-02-10 | REPAIR SEWER | ORCHARD STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
X012019015A01 | 2019-01-15 | 2019-02-12 | REPAIR SEWER | CROTONA PARK EAST, BRONX, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD |
M012019012A02 | 2019-01-12 | 2019-02-09 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
M012019011A05 | 2019-01-11 | 2019-02-08 | REPAIR WATER - PROTECTED | WEST 19 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012019009A65 | 2019-01-11 | 2019-02-07 | REPAIR WATER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BEND |
B012019008E69 | 2019-01-08 | 2019-01-14 | REPAIR WATER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET |
B012019001A01 | 2019-01-01 | 2019-01-14 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET CHAPEL STREET TO STREET CONCORD STREET |
M012018360B25 | 2018-12-29 | 2018-12-31 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET BEND |
B012018352A72 | 2018-12-26 | 2018-12-31 | REPAIR WATER | JAY STREET, BROOKLYN, FROM STREET CHAPEL STREET TO STREET CONCORD STREET |
Q012018352C77 | 2018-12-18 | 2018-12-31 | REPAIR WATER | 36 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 35 AVENUE |
M012018342A02 | 2018-12-13 | 2018-12-31 | REPAIR WATER - PROTECTED | GREAT JONES STREET, MANHATTAN, FROM STREET BOWERY TO STREET LAFAYETTE STREET |
M012018345A09 | 2018-12-13 | 2018-12-31 | REPAIR WATER - PROTECTED | WEST 26 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012018338A02 | 2018-12-04 | 2018-12-31 | REPAIR WATER - SEWER | CROTONA PARK EAST, BRONX, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD |
M012018305A63 | 2018-11-01 | 2018-11-14 | REPAIR SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012018144A00 | 2018-05-24 | 2018-06-20 | REPAIR WATER | WEST 20 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012017269A51 | 2017-09-29 | 2017-10-25 | REPAIR WATER - PROTECTED | 76 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012017227A19 | 2017-08-21 | 2017-09-13 | REPAIR WATER - PROTECTED | QUEENS BOULEVARD, QUEENS, FROM STREET 67 DRIVE TO STREET 102 STREET |
Start date | End date | Type | Value |
---|---|---|---|
2024-08-07 | 2024-10-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-07 | 2024-08-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-06 | 2024-08-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-06 | 2024-08-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-21 | 2024-08-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-20 | 2024-06-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-08 | 2024-06-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-04-16 | 2024-05-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-01 | 2024-02-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-01 | 2024-04-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-30 | 2024-02-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-24 | 2023-10-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-13 | 2023-07-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-12 | 2023-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-03 | 2023-07-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-24 | 2023-07-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-24 | 2023-04-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-03-30 | 2023-04-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-27 | 2023-02-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-02-27 | 2023-02-27 | Address | 6506 GRAND AVENUE, MASPETH, NY, 11378, USA (Type of address: Chief Executive Officer) |
2023-02-27 | 2023-03-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-12 | 2023-02-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-05 | 2023-01-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-05 | 2023-01-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-04 | 2023-01-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-04 | 2023-01-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-29 | 2023-01-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-29 | 2022-11-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-29 | 2022-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-13 | 2022-11-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-23 | 2022-10-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-23 | 2022-09-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-14 | 2022-09-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-14 | 2022-09-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-11 | 2022-08-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-11 | 2022-09-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-05 | 2022-08-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-02 | 2022-08-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-02 | 2022-08-05 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-15 | 2022-08-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2022-07-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-13 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-04 | 2022-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-01 | 2022-07-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-01 | 2022-07-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-18 | 2022-07-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-16 | 2022-06-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-16 | 2022-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-26 | 2022-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-26 | 2022-04-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-19 | 2022-04-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-19 | 2022-04-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-29 | 2022-04-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-23 | 2022-03-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-16 | 2022-03-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-02 | 2022-03-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-01 | 2022-03-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-01 | 2022-03-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-28 | 2022-03-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-15 | 2022-02-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-12-07 | 2022-02-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-17 | 2021-12-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-16 | 2021-11-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-15 | 2021-11-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-02 | 2021-11-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-08-11 | 2021-11-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-08-10 | 2021-08-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-23 | 2021-08-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-21 | 2021-07-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-12 | 2021-07-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-07 | 2021-07-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2018-10-29 | 2023-02-27 | Address | 6506 GRAND AVENUE, MASPETH, NY, 11378, USA (Type of address: Chief Executive Officer) |
2018-10-29 | 2023-02-27 | Address | 6506 GRAND AVENUE, MASPETH, NY, 11378, USA (Type of address: Service of Process) |
2018-01-22 | 2018-10-29 | Address | 6539 GRAND AVENUE, MASPETH, NY, 11378, USA (Type of address: Chief Executive Officer) |
2018-01-22 | 2018-10-29 | Address | 6539 GRAND AVENUE, MASPETH, NY, 11378, USA (Type of address: Principal Executive Office) |
2018-01-22 | 2018-10-29 | Address | 6539 GRAND AVENUE, MASPETH, NY, 11378, USA (Type of address: Service of Process) |
2012-10-19 | 2018-01-22 | Address | 32-08 38TH AVENUE, 3RD FLOOR, LONG ISLAND CITY, NY, 11101, USA (Type of address: Service of Process) |
2012-10-19 | 2021-07-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
230227003811 | 2023-02-27 | BIENNIAL STATEMENT | 2022-10-01 |
181029006035 | 2018-10-29 | BIENNIAL STATEMENT | 2018-10-01 |
180122002014 | 2018-01-22 | BIENNIAL STATEMENT | 2016-10-01 |
121101000272 | 2012-11-01 | CERTIFICATE OF AMENDMENT | 2012-11-01 |
121019000451 | 2012-10-19 | CERTIFICATE OF INCORPORATION | 2012-10-19 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-31 | No data | 48 AVENUE, FROM STREET 31 PLACE TO STREET 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore lane markings over permanent sewer restoration within the parking/driving lane. |
2024-10-30 | No data | JANE STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #66, found 1 sidewalk flag with patchwork within half flag has been restored partially marked out by green paint Full sidewalk flag must be restored in kind. |
2024-10-29 | No data | MURRAY STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permanent repair water Restoration in the Roadway does not meet the minimum of 54” after all cutbacks are completed. Must restore Roadway as per NYCDOT Standard detail Drawing 1042D note # 6. Restoration measured 35” in width. |
2024-10-25 | No data | EAST 89 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut flushed to grade DL. |
2024-10-25 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber’s work done on sidewalk |
2024-10-24 | No data | WEST 232 STREET, FROM STREET IRWIN AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has open excavation in the driving lane with Yodock. 311 complaint |
2024-10-23 | No data | WEST 232 STREET, FROM STREET IRWIN AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has open excavation with barricades on the driving lane, s/w is plated. Don site safety, flagman on site. No traffic. No action taken Email Complaint. |
2024-10-23 | No data | WALL STREET, FROM STREET HANOVER STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving lane with Sidewalk restored. |
2024-10-22 | No data | 188 STREET, FROM STREET MIDLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp in the NE3 corner quadrant was recently upgraded without a 411 permit. Ramp is functional and accessible. |
2024-10-22 | No data | EAST 40 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done, refer to latest permit on file M012024290A32 |
2024-10-22 | No data | WEST 232 STREET, FROM STREET IRWIN AVENUE TO STREET TIBBETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has steel plates pinned, ramp in the r/w also ramp plate on the s/w I/F/O 306 W 232 St. No one on site working. |
2024-10-20 | No data | LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | The backfill passed. Two cuts were made on the roadway and one on the sidewalk. There is no pipe within the restoration on the east side of the street. As per foreman Benny, they only excavated to the base because DEP let them excavate the wrong area |
2024-10-19 | No data | LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Sprinkler Line Leaking Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued |
2024-10-19 | No data | LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Crew not ready, will be rescheduled for later date. |
2024-10-18 | No data | WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Within Bike Lane buffer zone, Water Repair excavation ( 13'L x 4'W x 4'D ) backfilled. Cpmp: 96.3% & 98.6%. Base being saw cut for concrete to follow at a later time or date. In House crew on site at time of departure: 10:45am. |
2024-10-17 | No data | LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | water leaking out of sprinkler line in roadway , 2 excavations made on roadway at time of inspection, 3 day notice issued from DEP. |
2024-10-16 | No data | WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled due to permittee not being ready at time of inspection |
2024-10-14 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | COLOR CODE OK'D FOR PAINT ON THIS LOCATION ONLY. CAR PASSED. |
2024-10-12 | No data | EAST 40 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Opposite #118 backfill completed within the driving lane. Measurements: L5’ W4’6” D4’ Top Test 97.6 Forman/Beni. Base to follow. |
2024-10-12 | No data | WALL STREET, FROM STREET HANOVER STREET TO STREET PEARL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed Cut #1 L: 7' 11" W: 5' 11"I/F/O #67, Water restoration located in driving lane leading to 1 sidewalk flag cut back made. |
2024-10-11 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cutbacks not done-H-1042A, Note #6 |
2024-10-07 | No data | CAMPBELL DRIVE, FROM STREET BEND TO STREET STADIUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over work |
2024-10-04 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings have been restored. |
2024-10-02 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade extending from the bike lane into the driving lane IFO property 659 |
2024-10-02 | No data | BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway no work done on sidewalk |
2024-09-30 | No data | EAST 34 STREET, FROM STREET 1 AVENUE TO STREET FDR DRIVE SB ENTRANCE E 34 ST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7 flags restored i/f/o #401 surrounding valve. expansion joints present and sealed |
2024-09-29 | No data | 3 AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags are incompliance, IFO property #83. |
2024-09-29 | No data | MADISON AVENUE, FROM STREET EAST 39 STREET TO STREET EAST 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done, refer to latest permit on file M012024011A70 |
2024-09-25 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 PERM CUT |
2024-09-24 | No data | PAULDING AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2024-09-20 | No data | EAST 146 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Catch basin installation at 414 good |
2024-09-20 | No data | EAST 146 STREET, FROM STREET GERARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Catch basin installation at 414 a.k.a. South East curb. Rw and sw good |
2024-09-19 | No data | 255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to BPP paving done in front of 38-06. |
2024-09-19 | No data | EAST 172 STREET, FROM STREET HARROD AVENUE TO STREET MORRISON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing water service leak. DEP notice issued to property crew excavating roadway at this time |
2024-09-18 | No data | EAST 40 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak in roadway. Excavation made in roadway. |
2024-09-14 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code not applied. |
2024-09-10 | No data | COURT STREET, FROM STREET HUNTINGTON STREET TO STREET NELSON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating, ifo #514, water leak repair.. |
2024-09-05 | No data | EAST 74 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012024040A83 |
2024-09-05 | No data | KENT AVENUE, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration to grade located within the bike lane 45' from the crosswalk at South 11 st |
2024-08-21 | No data | EAST 34 STREET, FROM STREET 1 AVENUE TO STREET FDR DRIVE SB ENTRANCE E 34 ST | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in sidewalk ,one excavation made on sidewalk at time of inspection,3 day notice issued from DEP. |
2024-08-20 | No data | BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in basement , one excavation made on roadway at time of inspection, crew on site. |
2024-08-13 | No data | KENT AVENUE, FROM STREET SOUTH 10 STREET TO STREET SOUTH 11 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L12'4'' x W4' x D7'11'' located in the parking lane i/f/o 470 Kent Ave. |
2024-08-10 | No data | KENT AVENUE, FROM STREET SOUTH 10 STREET TO STREET SOUTH 11 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Re-scheduled |
2024-08-03 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | the incorrect 2023 year color code marker within their 2021 year permanent water restoration. Respondent failed to comply with section 2-11(e)(14)(v) of the highway rules. Respondent notified by via CAR #20247450133, issued on 5/6/24 |
2024-07-30 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2024-07-27 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Flags have been resurfaced. |
2024-07-27 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for Failure to comply with all applicable sections of the Highway Rules, the Standard Specifications, Standard Detail Drawings, and all other applicable laws or rules. |
2024-07-24 | No data | 255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-PERM ROADWAY |
2024-07-22 | No data | 188 STREET, FROM STREET MIDLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Flag has been restored within the NE3 corner,DWS color (gray) remains the same. No 411 permit on file, will this one out and issue a new C.A.R. |
2024-07-22 | No data | 188 STREET, FROM STREET ABERDEEN ROAD TO STREET MIDLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition has been resolved within the NE3 corner. |
2024-07-22 | No data | 188 STREET, FROM STREET MIDLAND PARKWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Flag and one flare as been restored within the NE3 corner quadrant with gray DWS mat,is functional and accessible. We’ll re-inspect a later date. |
2024-07-20 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued observed the above respondent has a permanent restoration, backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. |
2024-07-20 | No data | 11 AVENUE, FROM STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. |
2024-07-19 | No data | EAST 70 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic water service leak. Crew excavating roadway at this time |
2024-07-16 | No data | HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restoration in the roadway |
2024-07-16 | No data | BROOME STREET, FROM STREET COLUMBIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. |
2024-07-16 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 5/21/2024. |
2024-07-15 | No data | KENT AVENUE, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 5/21/2024. |
2024-07-14 | No data | VAN DUZER STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMANENT RESTORATION WAS PROPERLY RE-SEALED -OK- NO PERMIT REQUIRED |
2024-07-13 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | In front of #261 11th Avenue, backfill completed in the driving lane: 39' x 3' x 6' 2" |
2024-07-10 | No data | STANLEY AVENUE, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the RW/SW, both in compliance |
2024-07-03 | No data | GOLD STREET, FROM STREET JOHN STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M042024045A10 on file. |
2024-06-27 | No data | 11 AVENUE, FROM STREET WEST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Found respondent actively working within the south west corner of the intersection. Following all stips and found in compliance |
2024-06-27 | No data | 11 AVENUE, FROM STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file, refer to permit #M012024166A97 |
2024-06-23 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to fully replace defective sidewalk flag. |
2024-06-22 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | installed wrong 2023 color code within a 2021 water restoration. 34RCNY2-11(d)(v) Color codes shall include only the permittee's five-digit identification number and the two-digit year, unless other information is approved by the Department. |
2024-06-19 | No data | JANE STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in basement (visibly confirmed )one excavation made on roadway and one excavation made on sidewalk . |
2024-06-19 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cutbacks not done-H-1042A, Note #6 |
2024-06-13 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work for this permit |
2024-06-10 | No data | VAN DUZER STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please re-seal permanent restoration in driving/bike lane in front of 927 Van Duzer Street. |
2024-06-08 | No data | STANLEY AVENUE, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration made perm in the roadway |
2024-05-31 | No data | EAST 228 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2024-05-28 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent steam restoration acceptable |
2024-05-25 | No data | 188 STREET, FROM STREET ABERDEEN ROAD TO STREET MIDLAND PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed, white lane markings restored within crosswalk in front of 82-27 188th Street. |
2024-05-25 | No data | 188 STREET, FROM STREET ABERDEEN ROAD TO STREET MIDLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Monolithic pour of concrete surrounding valves on the sidewalk at 82-27 188th Street. Restored sidewalk flags need to be scored properly. |
2024-05-24 | No data | PARK TERRACE EAST, FROM STREET DEAD END TO STREET WEST 215 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing Course Fail; restoration paved before my arrival. |
2024-05-23 | No data | EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and grass area of the sidewalk |
2024-05-23 | No data | PARK TERRACE EAST, FROM STREET DEAD END TO STREET WEST 215 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed contractor had to keep material covered due to rain delay cut in the Drive/Park lane I/F/O 37 |
2024-05-23 | No data | MADISON AVENUE, FROM STREET EAST 39 STREET TO STREET EAST 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #274 there is a permanent restoration flush to grade extending to the curb. |
2024-05-21 | No data | PARK TERRACE EAST, FROM STREET DEAD END TO STREET WEST 215 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #37 BACKFILL RESCHEDULE WORK NOT FINISHED WITH 30 MIN GRACE PERIOD GIVEN |
2024-05-18 | No data | LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The condition has been corrected. There is no longer steel plates being stored in the Rodeway, parking lane. IF0 construction site 33. |
2024-05-13 | No data | PRESIDENT STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flag on s/w that is flush & sealed, IFO #250. There is a container ifo of that property |
2024-05-13 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Catch basin installed in compliance |
2024-05-13 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done in th intersection |
2024-05-13 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Catch basin installed |
2024-05-09 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 261 ( near W27th St ), four "IPS" marked plates in roadway from NYC Sewer cover to West curb. Spoke with foremen Charly & Benny, they are unable to conduct LL14 due to ongoing connecting Catch Basin work on SW at this time. Re-Scheduled. |
2024-05-09 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your permanent restoration in the driving lane measured in at 37" in width, and should be a minimum of 54". Please restore as per DOT Standard Details Drawing H-1042D, Note #6. |
2024-05-06 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code added to the restoraiton, new CAR will be issued for the incorrect year. |
2024-05-06 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 9 east 75th street your permanent restoration has the wrong color code in place, there is a 2023 color code within a 2021 restoration. |
2024-05-05 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Contractor has rescheduled |
2024-05-04 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong 2023 color code within a repair water restoration. 34RCNY2-11(d)(v)Color codes shall include only the permittee's five-digit identification number and the two-digit year, unless other information is approved by the Department. CAR #20237790567 |
2024-05-02 | No data | EAST 74 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2024-05-02 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving lane. |
2024-05-02 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | X012024081A54 Issued after XNP. |
2024-05-01 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L14ft, W4ft, D3ft cut in the driving lane. Work done on the sidewalk. |
2024-05-01 | No data | STANLEY AVENUE, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in the RW needs to be finalized, permit expired 4/6/2024 |
2024-04-30 | No data | 146 STREET, FROM STREET 123 AVENUE TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w restoration maintain to grade in d/p/l. |
2024-04-27 | No data | OGDEN AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic water service leak. Crew saw cutting roadway at this time |
2024-04-26 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill will be Reschedule. Due to DEP arriving early. |
2024-04-24 | No data | COLUMBIA STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Found sidewalk occupied by wooden planks for REPAIR STEAM LINE LOW PRESSURE with 5’ pedestrian walkway. |
2024-04-23 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2024-04-22 | No data | EAST 146 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration nearest to crosswalk of roadway. |
2024-04-22 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 sidewalk flags restored on the south side of street in the rear of 365 West 25 Street. |
2024-04-22 | No data | EAST 146 STREET, FROM STREET GERARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV for use of street without valid permit on file. |
2024-04-18 | No data | BROOME STREET, FROM STREET COLUMBIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to the respondent for failure to obtain a confirmation # prior to the expiration of the permit. |
2024-04-18 | No data | 188 STREET, FROM STREET MIDLAND PARKWAY | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 411 permit on file. Perm concrete restoration around water valve in the NE corner quadrant. Old existing ramp is accessible and non compliant. We’ll re inspect at later date once work is completed. |
2024-04-17 | No data | 188 STREET, FROM STREET ABERDEEN ROAD TO STREET MIDLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Lane markings need to be restored. |
2024-04-17 | No data | EAST 74 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2024-04-17 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2024-04-16 | No data | KENT AVENUE, FROM STREET DIVISION AVENUE TO STREET SOUTH 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 2/18/2024. |
2024-04-15 | No data | 11 AVENUE, FROM STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to the respondent for failure to obtain a confirmation # prior to the expiration of the permit. |
2024-04-15 | No data | LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 2/2/2024. |
2024-04-15 | No data | WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to the respondent for failure to obtain a confirmation prior to the expiration of the permit. |
2024-04-15 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to the respondent for failure to obtain a confirmation # prior to the expiration of the permit. |
2024-04-11 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | will be reschedule |
2024-04-10 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: New permit#M012023328A46 |
2024-04-10 | No data | PALISADE AVENUE, FROM STREET BEND TO STREET BRADLEY TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New flags in place |
2024-04-07 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2024-04-06 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to fully replace defective sidewalk flag. |
2024-04-05 | No data | HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Basement. Contractor currently making Repairs in the Roadway & Sidewalk. Property owner on site |
2024-04-03 | No data | LINCOLN PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There’s a marked “IPS “ steel plate in the parking lane in front of 33 Lincoln Pl serving no purpose & permit expired on 3/3/2024. |
2024-03-31 | No data | PARK PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated water cut in the roadway |
2024-03-31 | No data | STANLEY AVENUE, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed two pinned and ramped steel plates in the roadway, with no “Raise Plow” signs posted. Respondent failed to post “Raise Plow” in accordance with the winter moratorium from 12/1/23-3/31/24. Respondent ID by cited permit |
2024-03-31 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair work done on the sidewalk |
2024-03-30 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1299 3 ave water restoration in compliance |
2024-03-28 | No data | GATES AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the PL opposite property ifo 1221 |
2024-03-26 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration complete in front of 278. |
2024-03-24 | No data | STANLEY AVENUE, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed two pinned and ramped steel plates in the roadway, with no “Raise Plow” signs posted. Respondent failed to post “Raise Plow” in accordance with the winter moratorium from 12/1/23-3/31/24. Respondent ID by cited permit. |
2024-03-22 | No data | EAST 146 STREET, FROM STREET GERARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I found the respondent with 3 steel plates pinned and ramped on the roadway. Respondent failed to countersink plate flush with roadway during the Winter Moratorium Policy which is in effect from 12/1/2023-3/31/2024. steel plate marked IPC |
2024-03-22 | No data | WEST 25 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a sidewalk flag restored with a water valve cover and a permanent restoration flush to grade in the driving lane. |
2024-03-21 | No data | STANLEY AVENUE, FROM STREET ASHFORD STREET TO STREET SCHENCK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued. Building Superintendent on site |
2024-03-19 | No data | BROOME STREET, FROM STREET COLUMBIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M012024037A51 on file. |
2024-03-17 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured. |
2024-03-12 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2024-03-09 | No data | BROADWAY, FROM STREET ELLERY STREET TO STREET PARK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-03-01 | No data | SEASIDE AVENUE, FROM STREET BEACH CHANNEL DRIVE TO STREET NYCTA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway trench sidewalk restored |
2024-02-29 | No data | EAST 89 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site cuts made final on sidewalk and roadway, street is now open to traffic. Email Sent with photos. |
2024-02-27 | No data | EAST 89 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in basement ,one excavation made on roadway ,3 day notice issued from dep , roadway closed operator 70 contacted. |
2024-02-24 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | incorrect color code applied. |
2024-02-20 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | NOV for working in the intersection without at DOT permit on file. |
2024-02-16 | No data | COLUMBIA STREET, FROM STREET BROOME STREET TO STREET DELANCEY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | NOV issued observed 73’3” (measured) of protective barricades missing from temporary pedestrians walkway on roadway. Respondent failed to provided safety devices (barriers filled with water/sand) for public safety as stipulated. |
2024-02-08 | No data | SEASIDE AVENUE, FROM STREET BEACH CHANNEL DRIVE TO STREET NYCTA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway trench sidewalk restored around water valve |
2024-02-06 | No data | DE WITT AVENUE, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-02-03 | No data | PARK PLACE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water line leaking behind property (visibly confirmed ),one excavation made on roadway and one excavation made on sidewalk at time of inspection, crew on site . |
2024-02-03 | No data | BETHUNE STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Within the driving lane (just short of the crosswalk of West St) there is a permanent restoration flush to grade with a 2021 color code marker applied. (FYI: 5 digit I.d marker belongs to Balkin who re-excavated the cut to install a new water line. |
2024-02-03 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 201 West 77th Street, patchwork is not accepted. All 4 sidewalk flags need to be fully restored in kind. |
2024-02-01 | No data | WEST 27 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water cobblestone restoration near 11th ave remains acceptable at this time.photos on NYCstreet. |
2024-01-25 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit # M012023289B28 expired on 11/13/2023. |
2024-01-25 | No data | EAST 74 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit # M012023356A56 expired on 12/31/2023. |
2024-01-22 | No data | LINDEN BOULEVARD, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on the grassy area of the sidewalk in front of 126-10 Linden Blvd |
2024-01-22 | No data | EAST 16 STREET, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In the Bike lane / Bike station, found a permanent Restoration. |
2024-01-17 | No data | METROPOLITAN AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - NO WORK FOUND . PERM ROADWAY IN COMPLIANCE. |
2024-01-17 | No data | HIGHLAND AVENUE, FROM STREET 165 STREET TO STREET UPLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent water restorations to grade within the driving opposite 165-20. |
2024-01-15 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong 2023 color code within a repair water restoration. 34RCNY2-11(d)(v)Color codes shall include only the permittee's five-digit identification number and the two-digit year, unless other information is approved by the Department. CAR #20237790567 |
2024-01-12 | No data | 216 STREET, FROM STREET 29 AVENUE TO STREET 31 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-01-12 | No data | EAST 74 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | sidewalk fully open to pedestrians. I/F/O 201, 1 steel plate ramped on the sidewalk and steel plates countersunk in the parking/driving lane. |
2024-01-12 | No data | AVENUE D, FROM STREET BANK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumbers restoration sealed in the intersection of Avenue D and Bank Street. |
2024-01-11 | No data | JUNCTION BOULEVARD, FROM STREET 62 DRIVE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER WORK DONE ON THE SIDEWALK |
2024-01-11 | No data | BROOME STREET, FROM STREET COLUMBIA STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Steam leak on main. Excavation in intersection. |
2024-01-11 | No data | 36 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration opposite 22-67. |
2024-01-08 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing course complete at 2:30pm at my arrival I was only able to monitor 1 out of 2 cuts |
2024-01-07 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET GROTE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Work done in sidewalk only. Flag barricaded |
2024-01-05 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled. Crew will not be ready for backfill today. |
2024-01-04 | No data | BANK STREET, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Respondent failed to obtain a permit to excavate the roadway. |
2023-12-31 | No data | PAULDING AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway minor cracks in seal will monitor |
2023-12-31 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent restoration flush to grade in the park/Drive lanes and a sidewalk flag restored in kind around a water valve I/F/O 1611 |
2023-12-30 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #1299 aka 201 East 74 Street (4) IPS marked steel plates in roadway countersunk and in compliance. |
2023-12-26 | No data | EAST 37 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found 2 Sidewalk Flags restored with a permanent Restoration in the driving lane. |
2023-12-25 | No data | CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY NYC DOT-NP#S152023137A12 |
2023-12-23 | No data | WATER STREET, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #10-Perm water cut in the driving/parking lane is flush to grade. |
2023-12-22 | No data | WEST 142 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023275B35 |
2023-12-20 | No data | VAN HORN STREET, FROM STREET 52 AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10’x5’x3’5” backfill completed |
2023-12-16 | No data | JEROME AVENUE, FROM STREET EAST 182 STREET TO STREET WEST 182 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work started on sidewalk behind fence |
2023-12-15 | No data | MADISON AVENUE, FROM STREET EAST 39 STREET TO STREET EAST 40 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking in basement , 3 day notice issued from DEP,one excavation made on roadway at time of inspection. |
2023-12-13 | No data | VAN HORN STREET, FROM STREET 52 AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Re-scheduled for a later date and time due to backfill materials not available. |
2023-12-13 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work found. |
2023-12-11 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET BRIGHTON BEACH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane. |
2023-12-09 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 311, full segment roadway appears resurfaced by DOT ( no permit on Dash ) and unable to locate exact sidewalk work mentioned in previous inspections. |
2023-12-09 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill reschedule as per contractor complications with securely connecting Water/ sewer pipes grace period given. |
2023-11-30 | No data | ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the driving lane of the roadway. |
2023-11-27 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Upon arriving at 10 am, I found that the respondent had already installed the final wearing course without a DOT inspector being present. The wearing was scheduled for 10:30am. The wearing course failed, and it will be submitted for a Re-dig. |
2023-11-25 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO aka 278 8th Ave ( on West 23rd St ), perm restoration in Westbound Driving, Bus and North Parking lanes is flush to grade at this time. Lane markings / Red paint restored in kind. |
2023-11-22 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 36 ( within ongoing B/O ), Water trench ( 14'L x 4'1"W x 4'D ) backfilled in the driving lane. Sidewalk work was also performed but not part of this LL14. Base being saw-cut for concrete to follow. |
2023-11-21 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2023-11-21 | No data | LELAND AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway. |
2023-11-21 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill r/s: contractor stated they meant to call in to DEP not DOT, crew is not ready to perform backfill/base. A new confirmation will be called in at a later date/time. |
2023-11-20 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plates although recessed in the driving lane are making noise when ever trucks drive over them. Condition should be given to DEP for noise complaint |
2023-11-19 | No data | DE WITT AVENUE, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated plumber cuts in roadway |
2023-11-16 | No data | LIVONIA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-11-14 | No data | EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | One perm cut on roadway at time of inspection. |
2023-11-14 | No data | DE WITT AVENUE, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway - in compliance |
2023-11-13 | No data | WEST 77 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair restorations made on road and sidewalk in front of 201. |
2023-11-12 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong 2023 color code installed with,cur within 34RCNY2-11(d)(v)Colorcodes shall include only the permittee's five-digit identification number and the two-digit year, unless other information is approved by the Department. CAR #20237790567 9/7/2023 |
2023-11-10 | No data | VAN DUZER STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rwy to grade restored |
2023-11-08 | No data | DE WITT AVENUE, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed opening of street without DOT permit. Plated plumber cut in roadway pinned and ramp without DOT permit. Previous permit B012023290A64 to work at location expired 11/3/2023. Above expired permit and company name (IPS) use for id |
2023-11-08 | No data | AVENUE D, FROM STREET BANK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to seal plumber restoration at intersection of Avenue D and Bank street |
2023-11-08 | No data | BANK STREET, FROM STREET AVENUE D TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed opening of street without DOT permit. Plumber trench in roadway from crosswalk of Bank street and Avenue D to the building site. Work was done without DOT permit. Respondent is identified by the number 33401 printed on the tag. |
2023-11-07 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WTER RESTORATION IN PARKING / TRAVEL LANE FLUSHED AND SEALED TO GRADE OPEN CAR ISSUED FOR COLOR CODE MARKER. ON MOST RECENT PERMIT M012021335B03 |
2023-11-07 | No data | 3 AVENUE, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced under permit M152023234A56. |
2023-11-07 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Currently, the roadway is milled. |
2023-11-03 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done. |
2023-10-25 | No data | LIVONIA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane sealed and in compliance |
2023-10-20 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code added to perm cut |
2023-10-19 | No data | WEST 25 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO #280 within the parking lane, the wearing course was completed prior to arrival. |
2023-10-19 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. |
2023-10-18 | No data | WEST 25 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent water restoration complete located in front of 280 W 25th street |
2023-10-18 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut. In the roadway is flush to grade |
2023-10-18 | No data | CAMPBELL DRIVE, FROM STREET BEND TO STREET STADIUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Bronx ) office within four hours prior to paving. As per stipulation 1/2+ 5. And roadway was paved, |
2023-10-17 | No data | WEST 25 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 280, water repair cut in south parking / driving lanes ( 6'5"L x 4'W x 1'6"D ) backfilled. Concrete being saw-cut for Base to follow. Sidewalk work around Water valve as well. |
2023-10-16 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONDITION PREVIOUSLY REPORTED OPEN CAR ON PERMIT AT TIME OF INSPECTION CUT FLUSHED AND SEALED BUT MISSING COLOR CODE |
2023-10-13 | No data | PRESIDENT STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint sealed in the curb area |
2023-10-13 | No data | 216 STREET, FROM STREET 29 AVENUE TO STREET 31 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL COMPLETED 5' X 3' |
2023-10-12 | No data | 7 AVENUE, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 727, found a permanent Restoration in the driving lane. |
2023-10-07 | No data | PARK AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Portion of solid white lane marking has been added to Permanent 2023 water restoration in front of #499 |
2023-10-07 | No data | 216 STREET, FROM STREET 29 AVENUE TO STREET 31 ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing domestic water service leaking in basement. Crew excavating roadway in parking lane at this time |
2023-10-06 | No data | DE WITT AVENUE, FROM STREET AVENUE D TO STREET VAN SINDEREN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NWK found at time of inspection. Permit expired on 9/20/2023. New permit B012023265A01 on file. |
2023-10-02 | No data | JUNCTION BOULEVARD, FROM STREET 62 DRIVE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Sidewalk cut barricaded and plated. ( fire sprinkler system) |
2023-10-01 | No data | WEST 190 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found several flags restored in kind I/F/O 550 |
2023-10-01 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2023-09-28 | No data | LOVE LANE, FROM STREET COLLEGE PLACE TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in front of property 37 is in compliance |
2023-09-27 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in front of property 124 is in compliance |
2023-09-26 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WTER RESTORATION IN PARKING / TRAVEL LANE FLUSHED AND SEALED TO GRADE OPEN CAR ISSUED FOR COLOR CODE MARKER. |
2023-09-26 | No data | EAST 29 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The excavation stated by IPS Plumbing Corp, was taken over by DEP after confirming that 3 days' notice was served in error. Special adjudication requested from summon unit. |
2023-09-17 | No data | WEST 190 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found several sidewalk flags and curb restored I/F/O 550 |
2023-09-17 | No data | AUDUBON AVENUE, FROM STREET WEST 189 STREET TO STREET WEST 190 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found several sidewalk flags and curbs restored in kind I/F/O 550 |
2023-09-15 | No data | EAST 29 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued found temporary restoration and driving lane over due for final restoration, Respondent failed to permanently restore cut within required time, CAR #20238380128 issued 8/9/2023 to correct condition. |
2023-09-15 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to install a color coding maker at the end of the restoration. CAR#(20238280298) was issued on 8/4/2023. Permit#B012023170A01 was used for ID. |
2023-09-08 | No data | AVENUE C, FROM STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm rein the intersection |
2023-09-07 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #9 Repair Water Sewer restoration in parking /travel lane is missing 2022 IBM color code marker. For cuts or trenches ten feet (10') or less, colored marker shall be placed in the linear center of the cut. |
2023-09-06 | No data | PRESIDENT STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & cant inspect p/l due to container |
2023-09-06 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O # 9 ACTIVE BUILDING OPERATION WATER & SEWER RESTORATION IN PARKING LANE / TRAVEL LANE FLUSHED AND SEALED CAR ISSUED TO RECENT PRRMIT M012022108A59 |
2023-08-29 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced |
2023-08-29 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance on the sidewalk and roadway ifo 310 |
2023-08-28 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONDUIT CONSTRUCTION AND FRANCHISE |
2023-08-28 | No data | EAST 228 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leak in basement, contractor on site repairing. Shut off water from main and install valve. |
2023-08-23 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONDUIT CONSTRUCTION AND FRANCHISE-: latest permit # M012021061B51 |
2023-08-23 | No data | PARK AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must restore portion of the white lane pavement markings on your permanent Restoration in the Curb lane. |
2023-08-16 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance |
2023-08-14 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - CONDUIT CONSTRUCTION AND FRANCHISE- |
2023-08-13 | No data | KING STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2023-08-13 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled |
2023-08-10 | No data | EAST 27 STREET, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed IFO property |
2023-08-10 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent trench that is flushed to grade across the crosswalk located at Midblock. |
2023-08-09 | No data | EAST 29 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must properly seal street opening joints plus add year 2021 Color code to restoration in front 331. |
2023-08-07 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 NEW SWK FLAGS AT 322 EAST 14 STREET OFF SCL -OK |
2023-08-07 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMANENT RESTORATION IN DRIVING LANE & 2 NEW REPAIR WATER SIDEWALK FLAGS - AT 322 E 14 STREET -OFF SCL -OK-NP#M042023165A04 |
2023-08-06 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERMIT SECURED FOR THIS WORK. |
2023-08-04 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER restoration on roadway bike lane is over due for final permittee has failed to place color code marker over permanent restoration. |
2023-07-30 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts on the sidewalk 1 cut in the driving lane permanent final |
2023-07-30 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found milled and scheduled to be resurfaced |
2023-07-30 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O #129, sidewalk expansion joints around 2 restored sidewalk flags has been recessed and sealed. In compliance. |
2023-07-29 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 6 inch cutbacks we're done 12 inch cutbacks will be done on final restoration .Backfill complete |
2023-07-27 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut in the driving/parking lane restored to grade and permanent sidewalk flags restored in kind. |
2023-07-27 | No data | BROADWAY, FROM STREET ELLERY STREET TO STREET PARK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, REPAIR WATER backfilled on a protected street but failed to obtain a confirmation number. Permit #B012023103B99 expired 5/1/2023. |
2023-07-26 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Coring conducted on cut - passed. Restoration 2 1/2" WC, 12 1/2" CON vs Existing 3 1/4" WC, 9 1/4" CON. - better then in kind. |
2023-07-26 | No data | CORNELIA STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is flush to grade |
2023-07-26 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a Confirmation number prior to the expiration of such permit as required. Permit expired on 5/11/2023. |
2023-07-26 | No data | 3 AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. |
2023-07-26 | No data | BROADWAY, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Five sidewalk flags restored in kind one around a water valve I/F/O 4250 . |
2023-07-25 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent obtained a Street opening permit on a protected Street but failed to obtain a Confirmation number prior to the expiration of such permit as required. Permit expired on 67/16/2023. |
2023-07-25 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent has a permanent repair water Restoration backfilled on a protected Street but failed to obtain a Confirmation number. Permit # M012023101A75 expired on 5/10/2023. |
2023-07-24 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy & ifo #310, water leak repair, basement. |
2023-07-22 | No data | WEST 103 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently Making Repairs in the Sidewalk Around Water Valve. 3 Day Dep Notice Issued. Building Super on Site. |
2023-07-19 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent trench flush to grade mid-block across the roadway/crosswalk with work done on the sidewalk. |
2023-07-19 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In the intersection of Norfolk Street, I found a permanent trench that runs North to South flush to grade in the roadway with work done on the sidewalk. |
2023-07-18 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Inspected for coring |
2023-07-10 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-06-29 | No data | BENSON AVENUE, FROM STREET 24 AVENUE TO STREET BAY 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The parking lane was Found resurfaced by THE BROOKLYN UNION GAS COMPANY D/B/A NATIONAL GRID NY. Permit expired. |
2023-06-29 | No data | WORTH STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable no defects |
2023-06-27 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in parking lane rain water and car parked over it |
2023-06-26 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance, sidewalk in compliance |
2023-06-26 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived 11:00 Departed 1:00. One cut in the parking lane in front of 211 9th Street. 4’7x4’1x2’9. Compaction 97.2% |
2023-06-24 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | crosswalk lane markings restored on plumber restoration |
2023-06-22 | No data | 1 AVENUE, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced by 2022 con Edison gas trench. |
2023-06-21 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to active Permit#M012023166A98. Permit expired. |
2023-06-21 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #278 Perm cut near the corner of 8th ave. In the driving lane is flush to grade. |
2023-06-21 | No data | WEST 11 STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite #255 there is a permanent restoration flush to grade within the parking/driving lane. (2019 color code marker applied |
2023-06-21 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in the bus/driving lane Permit active. |
2023-06-19 | No data | 29 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. re-inspection passed. Permanent water restoration resealed within the driving/bike lane opposite 35-25. |
2023-06-19 | No data | 9 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in roadway in bike lane,one excavation made on roadway at time of inspection , 3 day notice issued from DEP |
2023-06-18 | No data | PARK AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Domestic water leak. Flood in the basement of 499. Opening to be made in roadway and sidewalk. |
2023-06-18 | No data | PARK AVENUE, FROM STREET EAST 58 STREET TO STREET EAST 59 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Flood in the basement of 499. Opening to be made in roadway and sidewalk. |
2023-06-15 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #261 Permanent water cut in the driving/parking lane, currently under B.O. barricades, |
2023-06-15 | No data | ASTORIA BOULEVARD, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2023-06-15 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #129 two sidewalk flags with one surrounding a water valve, has expansion joint at curb line that needs to be properly sealed. |
2023-06-15 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut closer to 12th ave, mid block, is flush to grade. |
2023-06-13 | No data | SENECA AVENUE, FROM STREET CENTRE STREET TO STREET GEORGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2023-06-13 | No data | ROOSEVELT AVENUE, FROM STREET 90 STREET TO STREET ELMHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag restored. |
2023-06-12 | No data | 118 STREET, FROM STREET 84 AVENUE TO STREET CURZON ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill has been rescheduled due to miscommunication on the date. |
2023-06-10 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-06-10 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Construction sign has been removed -expansion joints have been sealed-bus lane has been painted by the city.CAR pass |
2023-06-09 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints has been recessed and sealed in between restored sidewalk flags and curb in front of 29-36. |
2023-06-07 | No data | WEST KINGSBRIDGE ROAD, FROM STREET KINGSBRIDGE TERRACE TO STREET SEDGWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm concrete trench in the d/l. |
2023-06-07 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In the intersection of Norfolk Street, I found a permanent trench flush to grade across the roadway. |
2023-06-07 | No data | WATER STREET, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete in front 10. |
2023-06-06 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found the street resurfaced. |
2023-06-06 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the parking/driving lane in front of 42-21. |
2023-06-03 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found respondent failed to restore two sidewalk flags in kind. Respondent has patchwork on two flags. CAR #20226040291 was issued on 11/10/2022 prior to NOV being written. |
2023-06-01 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced Permit #M152020310A33 |
2023-06-01 | No data | 6 AVENUE, FROM STREET WEST 42 STREET TO STREET WEST 43 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found, possibly in subway station. |
2023-05-25 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak in parking lane in front of property. 3 Day notice issued from DEP. |
2023-05-25 | No data | 79 STREET, FROM STREET 45 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 6'6''x3'x3'6'' |
2023-05-24 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo property 18 |
2023-05-22 | No data | 15 AVENUE, FROM STREET 142 STREET TO STREET 143 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance at this time. |
2023-05-20 | No data | 47 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water perm cut to grade within the driving lane in front of 21-89 47th Street |
2023-05-20 | No data | PAGE PLACE, FROM STREET GRAND AVENUE TO STREET MASPETH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2023-05-17 | No data | EMERALD STREET, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in compliance opposite address |
2023-05-15 | No data | OAK POINT AVENUE, FROM STREET CRAVEN STREET TO STREET TRUXTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-05-14 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced Permit#M152022158A56 |
2023-05-14 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the parking lane is flush to grade, (2) sidewalk flags on the north/south have been restored-in-kind. |
2023-05-14 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #278 Perm water cut is flush to grade. |
2023-05-10 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There’s a pin embedded in the roadway near permanent sewer restoration in front of #1903. |
2023-05-04 | No data | BEACH 116 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w |
2023-05-02 | No data | GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET WASHINGTON PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite #74 (Chase Bank) at the subway station there are multiple sidewalk flag restorations around a NYC Sewer access utility cover. |
2023-04-29 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-04-28 | No data | EAST 91 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection I was unable to find any evidence of work due to an ongoing building op. |
2023-04-27 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-04-26 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plates in parking/ driving in front of BO 261 near crosswalk of W 28th St. |
2023-04-26 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file. M012023101A75. |
2023-04-25 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Red Paint must be restored in kind & BU must be restored also in the bus lane. Also expansion joint must be sealed along curb line & Raise Plow must be removed. Opposite 268. |
2023-04-21 | No data | EAST GUN HILL ROAD, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2023-04-21 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV for the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 4/2/2023. |
2023-04-21 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV for the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 3/19/2023. LL14's under M012023089B85. |
2023-04-21 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV for the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 3/19/2023. LL14's under M012023083C15. |
2023-04-15 | No data | WITHERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway for new building |
2023-04-11 | No data | BEECH AVENUE, FROM STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Resurfaced. |
2023-04-08 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT L 8'6" x W 3' x D 3'6" Backfill completed 6" cutbacks were made backfill left plated for concrete curing |
2023-04-08 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete,6” cutbacks we’re done 12” cutbacks will be done on final restoration |
2023-04-05 | No data | BROADWAY, FROM STREET ELLERY STREET TO STREET PARK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site other open excavation in the PL |
2023-04-05 | No data | BROADWAY, FROM STREET ELLERY STREET TO STREET PARK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L 8ft W 4ft D 5ft WD 120.9 DD 112.4 MD 119.0 AM 7.5 2 lift #1 97.7% #2 96.3% |
2023-04-04 | No data | ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in compliance I/F/O1473 |
2023-04-03 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued to the respondent for failure to restore two flags that contains sidewalk patchwork into 2 complete flags where feasible as per 34 RCNY 2-09 (f) (4)(vii). |
2023-03-30 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 sidewalk flags installed at 51 Clark st |
2023-03-29 | No data | BENSON AVENUE, FROM STREET 24 AVENUE TO STREET BAY 37 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavated s/w & parking lane, ifo #2419, water leak repair, 3day. |
2023-03-29 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka # 261 11 Avenue, found 2 temp to grade in the driving/parking lanes 10’ apart on each other. |
2023-03-29 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012023083C14 on file. |
2023-03-29 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M012022298A35 on file |
2023-03-28 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with a steel plated opening in roadway. Respondent failed to countersink steel plate flush with roadway during the Winter moratorium period (12/01/2022 - 03/31/2023). Active permit #B012023080B79 used for ID. |
2023-03-25 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance in the driving lane |
2023-03-22 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plates in roadway & sidewalk. New application submitted #2023032101025720. |
2023-03-17 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O # 9, found a permanent Restoration located in the driving/parking lanes. Also patch work around 2 Water Valve Boxes on the Sidewalk. No action taking at this time due to new building going up. |
2023-03-15 | No data | EAST 37 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found per Restoration in driving lanes with one sidewalk flag restored around water vavle |
2023-03-15 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway closure permit on file for plumbers trench in middle of roadway going along block segment. Roadway closed at this time. |
2023-03-15 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers trench work still in progress in middle of roadway. Has updated permit #X022023054A01. Has permit to close roadway. |
2023-03-14 | No data | 137 AVENUE, FROM STREET 156 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved over during BPP. |
2023-03-14 | No data | 6 AVENUE, FROM STREET WEST 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2023-03-10 | No data | WEST 16 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is up to grade. |
2023-03-10 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M012023054A00. |
2023-03-09 | No data | LIVONIA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN ROADWAY PARKING LANE IN COMPLIANCE OPPOSITE 570 LIVONIA AVE |
2023-03-07 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints not recessed and sealed in between restored sidewalk flags and curb. |
2023-03-07 | No data | 42 AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt sealer edges re-sealed on permanent water cut within driving lane |
2023-03-06 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to recess and seal the expansion joints between the restored sidewalk flags and concrete curb in front of 29-36 Ericsson Street, after CAR #20226710704 was issued on 8/24/2022 to address the condition. |
2023-03-06 | No data | WEST 24 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Three large countersunk plated excavations on rwy for corner property. No impaction to bike lane. |
2023-03-05 | No data | CHARLTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration in the Roadway currently inside of an active Building Operations pedestrian walkway. Restoration is flush to grade. |
2023-03-03 | No data | BURR AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumbers work was out of guarantee on 11/26/22. CAR for sidewalk expansion joint sealing was approved on 11/4/22. Concrete flags and roadway are in good condition. Expansion joints remain unsealed but are in good condition. Closing CAR. |
2023-03-01 | No data | 3 AVENUE, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to multiple vehicles and bikes on the road |
2023-03-01 | No data | BELL BOULEVARD, FROM STREET 58 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag restored |
2023-02-25 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints has been sealed |
2023-02-23 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2023-02-23 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work complete in front of 345. |
2023-02-23 | No data | 29 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the bike/parking lane missing more than 50% of asphaltic seal. Reseal entire cut. |
2023-02-19 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I found a steel plate marked IPS pinned and ramped within the bus/driving lane opposite 268. Also, the plate cannot be countersunk because it overlaps an s2 utility service box. |
2023-02-05 | No data | NORTH 6 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2023-02-03 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #345, a Perm restoration in the PLN.. Perm restoration slightly repaved by CON ED ELECTRICAL trench. |
2023-01-30 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced after work was done. |
2023-01-30 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent Emergency |
2023-01-29 | No data | EAST 9 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration that is flushed to grade within the driving lane. |
2023-01-27 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration from curb to curb & both sides of sidewalk restored in kind I/F/O 312. Insp #844. |
2023-01-25 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 12/31/2022. |
2023-01-23 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Delinquent Emergency |
2023-01-18 | No data | 47 STREET, FROM STREET 21 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing water service leak. DEP notice issued to property. Two excavations in roadway at this time |
2023-01-17 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a portion of a permanent restoration on the sidewalk running behind a greenwood fence mid-block into a active BO. |
2023-01-14 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench is up to grade & 2 sidewalk flags restored in kind. |
2023-01-12 | No data | WEST 49 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #452 REPAIR WATER - PROTECTED RESTORATION IN PARKING LANE a FLUSHED AND SEALED TO GRADE. |
2023-01-11 | No data | WATER STREET, FROM STREET GOUVERNEUR LANE TO STREET OLD SLIP | No data | Street Construction Inspections: E-Number | Department of Transportation | Commercial Domestic Water Service Leak in the Basement.Contractor currently making Repairs in the Roadway & Sidewalk.Building Super on site. |
2023-01-07 | No data | 3 AVENUE, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Fire sprinklers repairs from rd/w - curb , basement comes out to curb |
2023-01-05 | No data | 42 AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked on permanent water cut within driving lane |
2023-01-05 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Basement. Building currently undergoing new Construction. Building super on site. Water Service was Damaged during construction. |
2023-01-01 | No data | KING STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2023-01-01 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area within an active building operation work zone. |
2022-12-30 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | POOR SWK RESTORATION BY HOMEOWNER |
2022-12-22 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Perm cut plate removed |
2022-12-21 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #77 Wearing course completed-street opening joints sealed/area made safe/double yellow lines restored. |
2022-12-20 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #77 WATER CUT IN THE DRIVING LANE 1' compromised by building basement 4' x 3' backfilled 6" saw cut done.(L)5’5”(W)2’10”(D)4’6” |
2022-12-20 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Excavation in the Roadway Steel Plated & Contersunk in Compliance. According to Building Super 10 Dep Notice was Issued. Domestic Leak was in the Roadway. |
2022-12-19 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane and sidewalk, in front of 124 Columbia Heights. |
2022-12-18 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill reschedule to roadway being excavated. Backfill will be done another day. |
2022-12-18 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in the driving lane |
2022-12-18 | No data | EAST 90 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced |
2022-12-18 | No data | CHAMBERS STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy, ifo #77, water repair, 3day. Confirmed, Street closed OP #55. |
2022-12-18 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DELINQUENT CONFIRMATION - NEW FLAG AROUND WATER VALVE, TWO PERM RESTORATIONS IN THE DRIVING LANE IFO PROPERTY #300. |
2022-12-17 | No data | LAFAYETTE AVENUE, FROM STREET ADELPHI STREET TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE BIKE LANE IFO PROPERTY #185. |
2022-12-17 | No data | LINDEN BOULEVARD, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2022-12-13 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent plumbing restoration in roadway in compliance. |
2022-12-13 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A//T/P/O I observed the above respondent doing major sewer work with a street closure without a valid dot permit. Was Id by expired permit |
2022-12-13 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pass , Nov issued to x15 permit expired |
2022-12-11 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started yet. |
2022-12-06 | No data | DONGAN HILLS AVENUE, FROM STREET HUSSON STREET TO STREET VERA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CE SWK FLAGS - OVER SEWER WORK |
2022-12-04 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found plumbing restoration in compliance. |
2022-11-29 | No data | MC DONALD AVENUE, FROM STREET 65 STREET TO STREET AVENUE O | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 1703 McDonald Ave. |
2022-11-29 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating s/w against building, #329, water leak repair, leaking in the basement wall, Confirmed. |
2022-11-23 | No data | NORTH 6 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Basement Work Contained in the Sidewalk. Property Owner on site |
2022-11-23 | No data | ASTORIA BOULEVARD, FROM STREET 23 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No related work found |
2022-11-18 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe currently placed in roadway |
2022-11-16 | No data | 37 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2022-11-15 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pass. Spoke with Ben the foreman. Has a dot street closing permit. |
2022-11-14 | No data | AMETHYST STREET, FROM STREET NYCTA SUBWAY TO STREET RHINELANDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the roadway |
2022-11-12 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 298, NOV for water repair work on the sidewalk with exposed expansion joints. Respondent notified via CAR# 20226390723 on 10/5/2022. |
2022-11-10 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent repaired two flags with patchwork, which is unacceptable, and they must restore full flags where feasible as per 34 RCNY 2-09 (f)(4)(viii). |
2022-11-10 | No data | LISPENARD STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O #39 street opening joints have been Re- sealed and in compliance-No permit required. |
2022-11-09 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM RESTORATIONS IN THE DRIVING LANE, NEW FLAGS AROUND WATER VALVE IFO PROPERTY #300. |
2022-11-04 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent water restoration across the roadway from curb to curb. |
2022-11-03 | No data | LIVONIA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/2/22. |
2022-11-02 | No data | BURR AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete sidewalk flags , expansion joints must be sealed |
2022-11-02 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in compliance |
2022-11-02 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 379, wearing course for Sewer / Water cuts ( 3 ) replaced 61'L x 21'W x 2"D. Street opening joints were properly sealed and multiple IBM color code markers applied. Lane markings awaiting restoration. Departed: 2:07pm. |
2022-11-02 | No data | 150 STREET, FROM STREET 8 AVENUE TO STREET 8 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2022-10-30 | No data | UNION SQUARE WEST, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm restoration within the parking/driving lane and the sidewalk restored in kind. |
2022-10-30 | No data | EAST 25 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut within the parking lane. |
2022-10-29 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored back fill it pass compaction. |
2022-10-29 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Stop hold placed on permittee after NOV was approved for sidewalk defect(s) as per protocol after first failed C.A.R Re-Inspection. |
2022-10-26 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New s/w flag was sealed, new lot. |
2022-10-26 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 9ft by 7ft down 11ft |
2022-10-25 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 8/18/2022. |
2022-10-22 | No data | WEST 16 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Rd/w cut from p/l -d/l down 4 1/2 ft water shut off (leak on service ) water |
2022-10-22 | No data | BAILEY AVENUE, FROM STREET SUMMIT PLACE TO STREET WEST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2022-10-20 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 8/29/2022. |
2022-10-20 | No data | BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Ed paved over plumber work |
2022-10-19 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to recess and seal the expansion joints between the restored sidewalk flags and concrete curb in front of 29-36 Ericsson Street, after CAR #20226710704 was issued on 8/24/2022 to address the condition. |
2022-10-18 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration in roadway in compliance. |
2022-10-18 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration acceptable |
2022-10-14 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Work located in a T shaped intersection, LL14 Backfill rescheduled due to contractor had broken the water line prior and now amending their permit for replacing water line after bringing it to their attention. Confirmation will take a few days. |
2022-10-14 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work crew on site cutting back for wearing course for work that be done for a later date. |
2022-10-13 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 9:24AM Departure: 12:00PM2 cuts are in the parking/driving lane, in front and opposite 300 Clifton Place.#1 L: 4FT. 2IN. W: 3FT. 3IN. D: 3FT. 8IN.#2 L: 5FT. 3IN. W: 4FT. 3IN. D: 3FT. 3IN. |
2022-10-08 | No data | FINGERBOARD ROAD, FROM STREET BANG TERRACE TO STREET BAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT. |
2022-10-08 | No data | LAFAYETTE STREET, FROM STREET GRAND STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced Permit#M152020296A32 |
2022-10-08 | No data | EAST 236 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags in place with sealed expansion joints. I/F/O #283-287. |
2022-10-06 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | homeowner repaired s/w and assumes all responsibility for it, the plumber is only responsible for the work in the roadway |
2022-10-05 | No data | LISPENARD STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #39 street opening joints needs to be re-sealed in its entirety and made flush with surrounding area. |
2022-10-05 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | IFO #379 Grand Av; I found the respondent failed to use skid resistant plating with a surface equal or greater to the adjacent roadway. The respondent has multiple steel plates in the in roadway & sidewalk that is completely smooth to the touch. |
2022-10-04 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV material placed on the roadway without a DOT permit on file. Respondent was identified by permit #M022022248A23 which expired on 9/30/2022. In front of 379. |
2022-10-04 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 379, NOV for barricaded material stored in the roadway with no crew on site at this time. Respondent failed to comply with stip 078 by not having full width of roadway open to traffic when unattended. ID by permit on file. |
2022-10-03 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints must be sealed around sidewalk flag. In front of 298. |
2022-10-03 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints must be sealed around sidewalk flag. In front of 298. |
2022-09-29 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 379 ( "T" intersect ), portion of Sewer / Water repair trench ( 31'L x 5'W x 10'D - filled only 5'D ) and cut ( 6'L x 7'W x 11'D - filled only 2'8"D ) was performed for cont. water work. Add Conf# needed. Crew on site at time of depart: 1:00pm |
2022-09-29 | No data | WEST 133 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance in front of 666 bus depot entrance |
2022-09-27 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Spoke to contractor backfill was scheduled in error will reschedule |
2022-09-26 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Timber pile on the sidewalk by curb at the T intersection at Norfolk St, walkway clear over a steel plate. |
2022-09-20 | No data | EAST 9 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: Active | Department of Transportation | Found a permanent Restoration in the driving lane with a Sidewalk Flag restored with patch work due to a Sidewalk shed leg. |
2022-09-19 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Side walk flag expansion joint must be sealed. I/F/O 1779 WESTCHESTER AVENUE |
2022-09-13 | No data | 7 AVENUE, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR pass due to ID marker applied. |
2022-09-10 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All expansion joints, in sidewalk flag, were sealed. Condition corrected, pass. |
2022-09-10 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced Permit#M152021068A30 |
2022-09-09 | No data | EAST 9 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: LL14 | Department of Transportation | 18” cut backs were marked around 2 Restorations in the driving lane with work done within 1 Sidewalk Flag with a Shed leg. Cut # 1 L 4’ 9” W 3’ 8” Cut # 2 L 6’ W 2’ 11” |
2022-09-09 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | No cut for sewer on rwy for property. Both conventional bike lanes are clear. |
2022-09-08 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | South side of roadway area ( aka 9 Orchard St / 56 - 60 Canal St ) has been repaved permanent as per BPP ( M012022158A31 ) and work is no longer visible at this time. This permit has expired. |
2022-09-07 | No data | JEROME AVENUE, FROM STREET WEST MT EDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag near drive thru of McDonald’s |
2022-09-01 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill to be rescheduled |
2022-09-01 | No data | 108 AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pictures of CAR depict wrong cut for cited permit work. Work shown in photos is 2011 work. CAR passed out. (CAR CLEAN UP PROJECT) |
2022-08-30 | No data | GREENWICH STREET, FROM STREET CHARLTON STREET TO STREET KING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Unable to ascertain due to construction site. |
2022-08-27 | No data | EAST 9 STREET, FROM STREET AVENUE B TO STREET AVENUE C | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 DAY NOTICE FOR 14 , CUT IS IN THE DRIVER LANE B/T 614& 616 LEAK ON SERVICE , THE OWNER WILL HAVE THE PERMIT I/F/O CHANGED BUT I DONT FEEL ITS NECESSARY . |
2022-08-26 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w not repaired, CAR being re-issued |
2022-08-26 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR re-issued overdue for final |
2022-08-25 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Mid-block closer to FDR Drive, sidewalk expansion joints are all properly sealed. Wooden support has been removed. All pins / pin holes plugged and sealed. Curb to curb trench is flush to grade at this time. CAR Pass. |
2022-08-24 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints not recessed and sealed in between restored sidewalk flags and curb. |
2022-08-24 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cones must be removed from sidewalk. |
2022-08-24 | No data | EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating s/w & rwy parking lane, ifo #181, water leak repair basement. Confirmed. |
2022-08-24 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints not recessed and sealed in between restored sidewalk flags and curb. |
2022-08-23 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer has been addressed condition I now a NICA condition. |
2022-08-23 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Defective sidewalk flag has sunk 1 inch causing a tripping hazard. In front of 298. |
2022-08-20 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At crosswalk of Broome St ( East side ), perm restoration to curb is flush to grade at this time. |
2022-08-20 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Mid-block closer to FDR Drive, please refer to Open CAR under later permit# M012021349A01. Perm curb to curb trench is flush to grade and work within sidewalk ( N & S ). It appears all conductions were addressed from CAR at this time. |
2022-08-16 | No data | WEBSTER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cave in filled and patched with temporary asphalt |
2022-08-15 | No data | WEBSTER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the above respondent has a3ft x 2ft x .7ft Cave-in down 7 inches within its permanent restoration. Permit id by color code. CAR 20224390019 was issued at 12:34 p.m. |
2022-08-15 | No data | WEBSTER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sunken/cave-in 3''x2''x1' I/FO 1249 Webster Ave. Located in the bus/driving lane. |
2022-08-12 | No data | 108 AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed that the respondent failed to restored a temporary area of permanent restoration that is down 1'' as per standard detail drawing H1042 - D note #3. The condition remains despite prior notice in CAR # 20214610020 issued on 10/23/21 |
2022-08-12 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l. |
2022-08-10 | No data | FURMAN STREET, FROM STREET JORALEMON STREET TO STREET MONTAGUE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE IN RWY OR SWK AT NEW PARKS DEPT BUILDING 400 FROM JORALEMON STREET |
2022-08-09 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer - pass |
2022-08-09 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE INSTALL IPS PLUMBING CORP. COLOR CODE IN PERMANENT RESTORATION IN ROADWAY (OVER CITY WATER MAIN) & SEAL EXPANSION JOINT AROUND NEW IPS PLUMBING CORP. SIDEWALK FLAG AT 51 CLARK STREET BETWEEN HENRY STREET & HICKS STREET. |
2022-08-06 | No data | EAST 89 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay |
2022-08-05 | No data | ROCKAWAY BEACH BOULEVARD, FROM STREET BEACH 67 STREET TO STREET BEACH 69 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number prior to permit expiration. |
2022-08-04 | No data | SENECA AVENUE, FROM STREET CENTRE STREET TO STREET GEORGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number obtained prior to permit expiration. |
2022-07-31 | No data | GRAND STREET, FROM STREET ESSEX STREET TO STREET NORFOLK STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Sanitary Sewer Backing up into Property Work Contained in the Sidewalk ( Building Super on Site) |
2022-07-29 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut is flush and color coded opp 1782 |
2022-07-28 | No data | EAST 16 STREET, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In the Bike lane / Bike station, found a permanent Restoration. |
2022-07-26 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/24/22 |
2022-07-25 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The segment was recently resurfaced. |
2022-07-25 | No data | LIVONIA AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/8/22. |
2022-07-24 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut in the driving/parking lane, currently under B.O. barricades, I/F/O 261 entrance |
2022-07-24 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway and sidewalk is currently plated from the south sidewalk to the north, I/F/O 312 work is ongoing. Active permit maintained on file.. (M012022193A74) |
2022-07-23 | No data | 7 AVENUE, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent- Restoration Missing Color Code |
2022-07-20 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | aMid-block closer to FDR Drive, previous CAR attempt however, South sidewalk has expansion joints missing sealer and removal of wooden supports in empty tree pit. In East bound driving lane, 2 steel pins / 2 pin holes present. Need removal and sealer |
2022-07-20 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | aMid-block closer to FDR Drive, previous CAR attempt however, South sidewalk has expansion joints missing sealer and removal of wooden supports in empty tree pit. In East bound driving lane, 2 steel pins / 2 pin holes present. Need removal and sealer |
2022-07-12 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THE EXPANSION JOINTS HAVE BEEN SEALED IFO PROPERTY #659. |
2022-07-09 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings restored. |
2022-06-29 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to comply with prior CAR #20215340180 issued on 12/8/21 to install expansion joints between the sidewalk flags and concrete curb. |
2022-06-19 | No data | BRIGHTON BEACH AVENUE, FROM STREET BRIGHTON 5 STREET TO STREET BRIGHTON 6 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint sealed |
2022-06-18 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp cut on s/w overdue, all defects remain. |
2022-06-15 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete, 3'3" X 3'1" water cut. |
2022-06-15 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration in roadway not resealed. NOV issued. |
2022-06-13 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rwy currently being milled/paved. IPS crew on site restoring swk flags, opp of swk shed. Bike lane is clear. |
2022-06-11 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in the driving lane |
2022-06-07 | No data | 255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material pipes etc on the site at this time |
2022-06-07 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found respondent failed to seal expansion joints around sidewalk flag within their “REPAIR WATER”.Respondent Notified via CAR#20226390079 on 2/10/2022 And failed to install or seal expansion joints as per subsection. |
2022-05-28 | No data | 247 STREET, FROM STREET 41 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in roadway flush with surrounding area |
2022-05-27 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Mid-block closer to FDR Drive, NOV for Steam repair work within 2 sidewalk areas that have installed exposed expansion joints missing permanent sealer. Respondent notified via CAR# 20226390059 on 2/4/2022. ( perm curb to curb trench in RW ) |
2022-05-26 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane marking restored. |
2022-05-24 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite address. |
2022-05-22 | No data | 255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Debris barricaded in parking lane as per stipulated. Sidewalk excavation plated. New active permit Q012022140A01 |
2022-05-21 | No data | WORTH STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O # 93 Wearing Course pass with 12” Cut backs done around Restoration located in the driving / parking lanes. |
2022-05-21 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must restore bike lane. |
2022-05-19 | No data | WEST 26 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway/buffer zone is flush to grade, I/F/O 28 |
2022-05-17 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration is behind new building operation barricades. |
2022-05-17 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site actively working in a large open excavation about 265' West of 8th Avenue, work is ongoing and an active permit is being maintained on file.. (M012022119A36) |
2022-05-15 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEAL EXPANSION JOINTS AT THE CURB LINE IFO PROPERTY #659. |
2022-05-15 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work at site is ongoing, active permit maintained on file.. (M012022132A72) |
2022-05-14 | No data | WORTH STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O # 93, LL14 Backfill / Base pass. 18” cut backs were marked with 6” saw cut done on the Base Restoration located in the driving / parking lanes. |
2022-05-08 | No data | BRIGHTON BEACH AVENUE, FROM STREET BRIGHTON 6 STREET TO STREET BRIGHTON 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | wrong segment & work done on s/w i/f/o 512 |
2022-05-08 | No data | BRIGHTON BEACH AVENUE, FROM STREET BRIGHTON 5 STREET TO STREET BRIGHTON 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint need to be sealed on sidewalk & curb in front of 512 Brighton beach avenue & permit expired 2/2/2022. |
2022-05-05 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 270' W of FDR Drive / service road, perm major Steam trench curb to curb is flush to grade at this time. Lane markings restored in-kind. Open CAR under later Permit# M012021349A01 for both North /South sidewalk flags having exposed expansion joints. |
2022-05-03 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Crew is actively working on site, plates to be secured at end of work day I/F/O 350.. (CAR re-inspection Pass) |
2022-05-02 | No data | 108 AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed that the respondent failed to restored a temporary area of permanent restoration that is down 1'' as per standard detail drawing H1042 - D note #3. The condition remains despite prior notice in CAR # 20214610020 issued on 10/23/21. |
2022-04-30 | No data | WORTH STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O # 93, future protected Street LL14 Backfill pass slurry was used due to plenty obstruction in excavation Con Edison inspector said only sant under oil static line which will be backfill at another date L 22’ W 5’ 6” |
2022-04-30 | No data | WEST 133 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance |
2022-04-29 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a restoration not properly sealed in roadway. Respondent failed to seal and maintain wearing course. 3/17/2022. I observed the above respondent with a restoration not properly sealed in roadway. |
2022-04-29 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 2/25/2022. 2 active permits M012022119A36 & M012022097A63. |
2022-04-28 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 2/4/2022. |
2022-04-27 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found steel plated countersunk across the roadway with an updated permit. |
2022-04-26 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Segment was resurfaced in 2020. |
2022-04-23 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 1 cut outside of work zone ,,, the rest of the work is done behind the fence |
2022-04-23 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #472 Water cut in the driving/parking/bike lane extending curb to curb is in compliance |
2022-04-22 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-04-19 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints not properly recessed and sealed. |
2022-04-16 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a installed expansion joints which is missing sealer around 3 sidewalk flags form curb to curb and are exposed. Respondent notified via CAR#20226390059 on 2/4/2022, And failed to seal expansion joints as per subsection |
2022-04-15 | No data | GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET WASHINGTON PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site excavating rwy & s/w, water leak repair, substation leak, further damage to water service curved around concrete structure. Confirmed. |
2022-04-14 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY REPAIR WATER RESTORATION IN SIDEWALK-OVERDUE FOR FINAL; PLEASE INSTALL PROPER IPS PLUMBING CORP. COLOR CODE & PROPERLY RESTORE WHITE LANE MARKING -IN FRONT OF 79 TAFT AVENUE between BISMARK AVENUE and JERSEY STREET. |
2022-04-14 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMPORARY ASPHALT HAS BEEN INSTALLED IN SWK-RESTORED TO GRADE. IN-COMPLIANCE. |
2022-04-14 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV failed to seal the expansion joints for their sidewalk flag as required by rule. Respondent was previously notified to correct this condition via CAR #(20226390079) on 2/11/2022. In front of 298. |
2022-04-13 | No data | GROVE STREET, FROM STREET 7 AVENUE SOUTH TO STREET WASHINGTON PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy, water leak repair, 3day confirmed. |
2022-04-09 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to installed color coding markers at the end of restoration. CAR(20227870047) was issued 2/22/2022. Permit#B012021280A71 exp. 10/27/2021 was used for ID. |
2022-04-09 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Old stem pipes are still being used , but the temp fix didn’t hold up so now they have to repair the old pipe for the complex . This is why the emergencies permit was taken out today |
2022-04-07 | No data | SENECA AVENUE, FROM STREET CENTRE STREET TO STREET GEORGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #989 SENECA AVENUE |
2022-04-06 | No data | BEACH 116 STREET, FROM STREET BEACH CHANNEL DRIVE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | permanent pavement restoration to grade in parking and driving lane |
2022-04-06 | No data | WORTH STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavated rwy, sewer repair, back-up into building. ifo #90. Confirmed. |
2022-04-03 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance |
2022-04-02 | No data | 11 AVENUE, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Water service leaking in basement. One excavation in roadway at this time |
2022-03-31 | No data | WORTH STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Maintain full width of roadway when site unattended |
2022-03-29 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by BPP M012020310B40. |
2022-03-28 | No data | 34 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2022-03-22 | No data | 146 STREET, FROM STREET 123 AVENUE TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water restorations flush to grade in the parking and driving lanes, i/f/o 123-31/ 34. |
2022-03-20 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street is plated across the roadway with an updated permit on file. |
2022-03-17 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane. |
2022-03-15 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The BPP has resurfaced the plumber's work. |
2022-03-14 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I did not find any restoration in the roadway with the permittee IBM#. |
2022-03-10 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Contractor call the main office in Manhattan stating that the steel plates were reset. Spoke with Yolanda from IPS Plumbing Corp. today. |
2022-03-09 | No data | CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH |
2022-03-08 | No data | GRAND STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-03-08 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Place material on the street i/f/o 341 west 24 street |
2022-03-07 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 Out Of 4 Countersunken Steel Plates Loose & Noisy Crossing Roadway I/F/O 350 West 24th St. |
2022-03-06 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN SWK- NEEDS COLOR CODE- WHITE MARKING WAS REMOVED OR FAILED TO STICK ACROSS PERM RESTORATION |
2022-03-05 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers cut from curb to curb is in compliance. |
2022-03-05 | No data | MILL ROAD, FROM STREET NEW DORP LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK OBSERVED. R/WAY WAS SINCE PAVED |
2022-02-28 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2022-02-26 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete 6 “ cutbacks were done |
2022-02-22 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is missing color code IFO #361 Bedford Ave. Please installed color code. |
2022-02-22 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate found countersunk with raised plow sign posted and skid resistance |
2022-02-21 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 x 4 open trench in pk lane & open swk trench-on site for backfill |
2022-02-21 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ARRIVES 1020AM-BACKFILL A PASS-(L) 3 FT X (W) 4 FT X (D) 4 FT- TEST 98.8; WD 111.6, DD 101.6, MD 109.7, AM 9.9- CUTBACKS WERE DONE |
2022-02-20 | No data | WEST 26 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut flushed to grade within the Buffer zone. |
2022-02-19 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #26 plumbers cut in the driving /bike lane is in compliance Street opening joints are a little worn but not CAR worthy at this time. |
2022-02-18 | No data | TAFT AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | left Verizon job only to find this one is being re-scheduled |
2022-02-17 | No data | 7 AVENUE, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | confirmation # m20204718 Backfill started @ 11:00 pm & Ended @ 01:20 am L 5'7" W 3'4" D3'4" Contractor IPS Plumbing Corp supervisor Benny device Jumping Jack Lab Exclusive Technician Charles device Sand Cone wet density 106.6 dry density 101.0 Max de |
2022-02-12 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Found resurfaced |
2022-02-10 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench in the roadway however unable to verify color code due to jersey barriers for pedestrian walkway. |
2022-02-10 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints must be sealed around sidewalk in front of 298. |
2022-02-09 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in r/w. i/fo #1611 |
2022-02-07 | No data | 7 AVENUE, FROM STREET WEST 48 STREET TO STREET WEST 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started at time of inspection on segment on water main. |
2022-02-04 | No data | EAST 57 STREET, FROM STREET 1 AVENUE TO STREET QNSBORO BRDG APPROACH | No data | Street Construction Inspections: E-Number | Department of Transportation | ifo 345, 2 cuts plated. |
2022-02-04 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints must be sealed along the curb line around sidewalk flags. Both sidewalks from curb to curb restoration in front of Hippo Park. |
2022-01-31 | No data | 6 AVENUE, FROM STREET WEST 42 STREET TO STREET WEST 43 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2022-01-27 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/18/21. |
2022-01-26 | No data | 3 AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance. |
2022-01-19 | No data | WEST 28 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | temp to grade |
2022-01-18 | No data | 3 AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags have been installed in front of 83. |
2022-01-18 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 1/13/2022. Sidewalk only. |
2022-01-16 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has restored three sidewalk flags at the West end of the property. |
2022-01-14 | No data | NETHERLAND AVENUE, FROM STREET WEST 230 STREET TO STREET WEST 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk ok |
2022-01-10 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent repaired the curb. |
2022-01-10 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2022-01-06 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found sidewalk restored with water valve and water cut may have been paved over. |
2022-01-05 | No data | 37 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found by permittee in segment. Specific Location does not exist. |
2022-01-03 | No data | 34 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by new building BPP paving at location and new sidewalk. |
2021-12-30 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | leak on steam line for duel temp system, one excavation made on roadway at time of inspection. |
2021-12-28 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurfaced by BPP. |
2021-12-27 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No backhoe on site at time of inspection |
2021-12-27 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation on rwy going curb to curb IFO black gates. Plated excavation on both sidewalk’s as well. No countersinking at all. Bike lane is clear. |
2021-12-26 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded ifo 1611 ifo train station entrance |
2021-12-23 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurface by BPP. |
2021-12-22 | No data | BRIGHTON BEACH AVENUE, FROM STREET BRIGHTON 5 STREET TO STREET BRIGHTON 6 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Excavation under the train steps, no permit , sewer work. |
2021-12-21 | No data | BETHUNE STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has applied the incorrect color code marker with IBM# 00689, and they need to remove and use their tag with IBM 33401 on the permanent restoration. |
2021-12-17 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk flag curing at this time and perm restoration present in driving lane. Permit remains active. |
2021-12-16 | No data | 3 AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent Failure to countersink plates over opne excavation join the winter montessorian months dated 12/1/21 to 3/31/22. id by permit no one working on site |
2021-12-16 | No data | BROOME STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in basement ,one excavation made on roadway and one excavation made on sidewalk at time of inspection. |
2021-12-15 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-12-15 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Stem leak @ keswell school , s/w cut only crew on site waiting for the okay from the superintendent of the school |
2021-12-11 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway I/F/O 1779 Westchester avenue. |
2021-12-08 | No data | UNION AVENUE, FROM STREET WALLABOUT STREET TO STREET WALTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane 40ft from Walton St. |
2021-12-08 | No data | WALTON STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lave, 2 flags around 4 water valves IFO property #63. |
2021-12-08 | No data | ERICSSON STREET, FROM STREET 29 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in front of 29-36 Ericsson street expansion joints installed are not recessed or sealed |
2021-12-08 | No data | EAST 16 STREET, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done. |
2021-12-08 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2021-12-08 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across rdwy at the end of the Citibike dock, and 2 new flags by water valve, near the driveway/loading dock at back of market. |
2021-11-30 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across the width of roadway ifo #264-266-268 entrance. Also new sidewalk flags. Bike lanes on both sides of street restored with green paint. |
2021-11-30 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent IPS PLUMBING has sealed the expansion joints in between the sidewalk & curb in front of property #94-51 LEFFERTS BOULEVARD in compliance |
2021-11-30 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across width of roadway at midblock crosswalk. Crosswalk, lane markings, and green bike lane restored. Also new flags by S Ridge St, and new flags and ped ramp on opposite side. |
2021-11-24 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation going curb to curb. Currently, no impaction to both conventional bike lanes. |
2021-11-23 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET 112 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Resurfaced. |
2021-11-23 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I spoke to the on site supervisor about the loose and noisy plates and they will make better adjustments to correct the loose and noisy plates |
2021-11-23 | No data | PAULDING AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the the driving lane opposite #1001. |
2021-11-20 | No data | DONGAN HILLS AVENUE, FROM STREET HUSSON STREET TO STREET VERA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I SEE CUT UNDER VEHICLE, HOWEVER, IBM TAG IS NOT VISIBLE AT THIS TIME. CANT CONFIRM PERMITTEE . |
2021-11-20 | No data | WEST KINGSBRIDGE ROAD, FROM STREET KINGSBRIDGE TERRACE TO STREET SEDGWICK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water service leak. Visible in roadway. One excavation in roadway at this time |
2021-11-19 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Active | Department of Transportation | material on street is in compliance |
2021-11-18 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Active | Department of Transportation | IPS CREW ACTIVE ON JOB SITE, IN COMPLIANCE. |
2021-11-16 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sewer restoration is in compliance |
2021-11-13 | No data | EAST 236 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2021-11-13 | No data | WEST KINGSBRIDGE ROAD, FROM STREET KINGSBRIDGE TERRACE TO STREET SEDGWICK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in basement (visibly confirmed) , one excavation made on roadway , one excavation made on sidewalk at time of inspection. |
2021-11-10 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, working adjacent to DEP Sub (Delaney), excavating curb to curb - fixing private steam line. Corrected bike lane issues & spoke to foreman about renewals for storage of materials. Gave a pass today due to flaggers & correct bike lanesign |
2021-11-08 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Solid white lane marking missing from bike lane in roadway. In front of 524. |
2021-11-07 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w found resurfaced |
2021-11-05 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J Project-D1J issued. |
2021-11-04 | No data | WEST 26 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O #28 6” cut back done on (3) sides of the cut due to basement vault epoxy added are made safe/plated. Crew on site. |
2021-11-04 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work covered by BPP |
2021-10-29 | No data | WEST 26 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | heavy water leaking in basement at time of inspection (visibly confirmed) , crew to excavate roadway . |
2021-10-28 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was completed as of today. Continuity shown via permit #B012021259B25. |
2021-10-28 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ongoing steam restoration in the roadway with an active submitted permit on file is in compliance |
2021-10-26 | No data | GRAND STREET, FROM STREET F D R DRIVE TO STREET MADISON STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | The center of the Roadway is currently plated in order to perform a repair. Work is in progress and active permits maintained. |
2021-10-25 | No data | EAST 75 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has a permanent restoration for sewer repair backfilled o9n a protected street but failed to obtain a confirmation number least 2 hours prior to the commencement of the backfill. Permit M012021238A44 EXP 9/24/21. |
2021-10-23 | No data | 108 AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water cut on roadway (parking lane ) asphalt broken out 2-3” . |
2021-10-23 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Mid-block crosswalk, NOV for the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 8/21/2021. |
2021-10-23 | No data | WESTCHESTER AVENUE, FROM STREET BEACH AVENUE TO STREET ST LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued |
2021-10-20 | No data | 36 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection |
2021-10-06 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L9ft, W4ft, D9ft cut in the driving lane opposite property # 370. |
2021-10-05 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O The above Respondent has a permanent restoration for water repair on roadway. The Respondent has failed to restore lane markings. Respondent was previously Notified via CAR#20215010025 issued on 1/25/21. |
2021-10-02 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #540 Sewer repair in the driving lane is in compliance |
2021-09-30 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started bike lane is clear |
2021-09-28 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced . |
2021-09-28 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2021-09-23 | No data | ROOSEVELT AVENUE, FROM STREET 90 STREET TO STREET ELMHURST AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 7 train substation water service damaged. One excavation in sidewalk at this time |
2021-09-23 | No data | KISSENA BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 sidewalk flag installed in front of building #43-44 KISSENA BOULEVARD expansion joints sealed in between the sidewalk and curb in compliance |
2021-09-23 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #365 (2) Sidewalk flags have been repaired/sealed and in compliance. |
2021-09-16 | No data | CHARLTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the travel lane in front of 561. |
2021-09-05 | No data | CHARLTON STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent Restoration in the Roadway currently inside of an active Building Operations pedestrian walkway. Restoration is flush to grade. |
2021-08-29 | No data | CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION HAS BEEN MILLED AND RE-PAVED FLUSH TO GRADE |
2021-08-28 | No data | WEST 49 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored Backfill. Backfill pass & complete. Cut#1: 3'10"x3'x3' Cut#2: 4'10"x3'7"x3'5" Arrival: 9:23AM Departure: 12:47PM |
2021-08-28 | No data | AVENUE C, FROM STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2021-08-26 | No data | LOVE LANE, FROM STREET COLLEGE PLACE TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY |
2021-08-26 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2021-08-21 | No data | AVENUE C, FROM STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in intersection |
2021-08-19 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE OPPOSITE PROPERTY #48. |
2021-08-19 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut found on roadway in front of 230 Jay street |
2021-08-19 | No data | WEST 49 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | cutting on the rd/w now leak in building basement due to the valve being broke , will also be cutting s/w |
2021-08-19 | No data | UNION SQUARE WEST, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is up to grade & sidewalk restored in kind. |
2021-08-18 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE BEHIND FENCE AT BUILDING OPERATION |
2021-08-16 | No data | 146 STREET, FROM STREET 123 AVENUE TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water restorations to grade in the parking lanes, i/f/o 123-31. |
2021-08-15 | No data | AVENUE C, FROM STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in intersection |
2021-08-15 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET 112 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At this time r/w has been resurfaced. |
2021-08-15 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-08-14 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY |
2021-08-14 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 sidewalk flags restored at 401 |
2021-08-11 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT in 2019. |
2021-08-09 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags look to be repaired no defects found. |
2021-08-06 | No data | HATTING PLACE, FROM STREET BEND TO STREET CHAFFEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. |
2021-08-05 | No data | WEST 133 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Approx. 130' West of Broadway ( West Bound Driving ), cut paved final ( 8'2"L x 6'W ). Street opening joints sealed, 2 color codes / Double Yellow line restored in kind. Sidewalk work on South Side ( 4 flags ) expansion joints sealed. Depart: 12:20pm |
2021-08-04 | No data | EAST 16 STREET, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in bike lane and Citibike dock, lane markings restored. |
2021-08-04 | No data | WEST 133 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Site will be plated for concrete curing. |
2021-08-03 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut sealed at this time. |
2021-08-01 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O The above Respondent has a permanent restoration for water repair on roadway. The Respondent has failed to restore lane markings. Respondent was previously Notified via CAR#20215010025 issued on 1/25/21. |
2021-07-29 | No data | 29 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut over bike lane has lane marking that is broken out & fading away. |
2021-07-22 | No data | 113 STREET, FROM STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/20/21. |
2021-07-22 | No data | LINDEN BOULEVARD, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/1/21. |
2021-07-19 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench extending through the driving lane & bike lane is flush to grade, I/F/O 39 |
2021-07-18 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area has been made safe for pedestrians, contractors is using Con Edison safety equipment in front of 1576. |
2021-07-18 | No data | EAST 90 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Sidewalk in Compliance |
2021-07-18 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cave-in in front of 1576 3rd avenue causing an undermine under the roadway and sidewalk. |
2021-07-17 | No data | GATES AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane opposite property #1210. |
2021-07-16 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2021-07-08 | No data | WALTON STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2021-07-08 | No data | FILLMORE AVENUE, FROM STREET EAST 49 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag. |
2021-07-07 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 187 across the entire segment wearing course is in compliance |
2021-07-02 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: LL14 | Department of Transportation | 12" saw cut backs were done around Curb to Curb Restoration. North /South Sidewalk Plated. |
2021-06-30 | No data | 15 AVENUE, FROM STREET 142 STREET TO STREET 143 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk under construction and wooden boards on property grass area |
2021-06-28 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed that the respondent failed to reseal on permanent roadway restoration as required despite prior notice in CAR #20206630093 issued 2/24/2020. |
2021-06-27 | No data | AUSTIN STREET, FROM STREET 64 ROAD TO STREET 65 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2021-06-25 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Near Mid-Block traffic signal / crosswalk, multiple steel plates crossing curb to curb with sidewalk work on both sides. Spoke with foreman Benny and was informed this Backfill was cancelled upon arrival. Departing: 10:30am. |
2021-06-25 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed. |
2021-06-24 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 12, observed roadway has been resurfaced by BPP and work no longer visible. |
2021-06-22 | No data | EAST 16 STREET, FROM STREET IRVING PLACE TO STREET UNION SQUARE EAST | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2021-06-19 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street joint resealed |
2021-06-16 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK ON BOTH RE-SURFACED ON 2 SIDES ON NEW BUILDING AKA 61 BOND ST |
2021-06-16 | No data | CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A PERM RESTORATION IS SUNKEN DOWN 2" TO 3" BELOW ADJACENT R/WAY. PERM RESTORATION NEEDS TO BE MADE FLUSH TO ADJACENT R/WAY. |
2021-06-16 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK ON BOTH RE-SURFACED ON 2 SIDES ON NEW BUILDING AKA 61 BOND ST |
2021-06-11 | No data | 1 AVENUE, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Excavation made on rwy & swk has been restored. No defects & no obstruction to protected bike lane |
2021-06-10 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2021-06-09 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2021-06-05 | No data | 15 AVENUE, FROM STREET 142 STREET TO STREET 143 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Damaged sewer. One excavation in sidewalk at this time |
2021-06-03 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of KeyFood |
2021-06-03 | No data | LOVE LANE, FROM STREET COLLEGE PLACE TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2021-06-03 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a Permanent restoration in the Street; It is located within a temporary walkway in the Roadway. |
2021-06-02 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 13, found roadway resurfaced by BPP. Older work no longer visible at this time. Permit expired. |
2021-05-24 | No data | LAFAYETTE STREET, FROM STREET GRAND STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: Unable to locate |
2021-05-24 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. Permit expired 11/24/2020. |
2021-05-24 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the center of the Roadway about 95' West of Broadway. Restoration is Flush to grade. |
2021-05-21 | No data | 27 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP sidewalk in compliance at this time. |
2021-05-21 | No data | 146 STREET, FROM STREET 123 AVENUE TO STREET ROCKAWAY BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water shut off ( confirmed with home home owner ) 2 excavations made on roadway location in compliance |
2021-05-20 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done location in compliance |
2021-05-20 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Wearing course pass and complete IFO 1611. Measurements: L-8ft 4in, W- 11ft 4in, D-2in. |
2021-05-19 | No data | SOUTHERN BOULEVARD, FROM STREET AVENUE ST JOHN TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok |
2021-05-19 | No data | ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 8’10” X 7’3” Cut Backfill completed 6” cutbacks were made plates placed over shallow pipe and backfill left plated for concrete curing. |
2021-05-17 | No data | PALO ALTO AVENUE, FROM STREET HAYWOOD ROAD TO STREET SANTIAGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no related work found |
2021-05-17 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO respondent has bike lane closed off to cyclists while work site is unattended, respondent has failed to comply with the terms and conditions of DOT permit stipulation BIKE01 |
2021-05-17 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | ATPO respondent has a backhoe stored in the parking lane without a valid dot permit on file respondent was ID from work site area. |
2021-05-15 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY |
2021-05-14 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | There are multiple steel plates within the crosswalk , in front of 175 Clinton street , 1 plate has exposed edge and raises 1“ above the roadway surface creating a trip hazard for pedestrians crossing also deflecting 1” when traffic rides over it |
2021-05-14 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Inhouse protest. NICA was issued to wrong permit (storage permit)Will have re inspected and issued to correct permit the street opening |
2021-05-14 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | respondent on site applying temporary asphalt to the steel plates in the crosswalk that was creating a tripping hazard for pedestrians |
2021-05-13 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O on site unable to fully inspect inside fence area in the roadway. |
2021-05-12 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-05-11 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. Bike lane is cleared. |
2021-05-10 | No data | GATES AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | CUT OPP 1210 IN P/L TEMP |
2021-05-10 | No data | EAST 236 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor excavated 1 flag at Tree pit area, also awaiting parks department tree roots protruding above sidewalk grade |
2021-05-10 | No data | CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew excavating the roadway to repair damaged Sanitary sewer possibly caused by Con Ed Pole installation. Took statement from property owner in regard. Cut in the r/w. |
2021-05-09 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to resealed cracks in two permanent restoration street joints. Prior car notification # 20214820069 was issued on 3/31//21. Permit number above and green color code, in restoration , use for I.D.perpose |
2021-05-07 | No data | LINDEN BOULEVARD, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent stored construction materials on the roadway without an permit on file. The respondent had a 5-6ft pile of excavated materials in the roadway. The permit is only for sidewalk work. I ID by permit #Q012021120B31. |
2021-05-06 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent has a cut for water repair on roadway. Respondent failed to restore line markings. A CAR was issued on 1/25/21 , CAR#202150110025 |
2021-05-06 | No data | LINDEN BOULEVARD, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to comply with the terms and conditions of the DOT permit. Stip.#016 states full width of sidewalk must be opened when site is unattended. No one on site. I ID with permit #Q012021120B31. |
2021-05-04 | No data | LINDEN BOULEVARD, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site working in grass area. |
2021-05-02 | No data | LAFAYETTE AVENUE, FROM STREET ADELPHI STREET TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work in bike lane |
2021-05-01 | No data | LOVE LANE, FROM STREET COLLEGE PLACE TO STREET HENRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L: 3’ W: 4’ 11” D: 3’ |
2021-04-30 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a permanent restoration,(Repair water) backfilled on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit # (M012021004A57)expired [1-30-2021]. |
2021-04-30 | No data | LOVE LANE, FROM STREET COLLEGE PLACE TO STREET HENRY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy Domestic Water Service Leak in the Roadway 3 Day Dep Notice Issued. Property Owner on Site |
2021-04-30 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced over by BPP. |
2021-04-30 | No data | 29 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work being done in front of 3525 29th street |
2021-04-29 | No data | 27 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milled & acceptable. Refer to Inspector Sibiri's laptop. |
2021-04-28 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalks and roadway plated across the mid block crosswalk, and in the 2-way bike lane. Timber barricades on sidewalk on both sides of street. Bike lane is clear. |
2021-04-27 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2021-04-24 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | All 3 plates going from north to south curb lines are now skid resistant. Active permit. |
2021-04-22 | No data | ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6’6”x3’2” down 3” excavation in the driving lane ifo #1473. Denise from ETL on site. Supervisor Luis on site. |
2021-04-20 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O on site unable to fully inspect inside fence area in the roadway. |
2021-04-19 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN RWY BEHIND BARRICADES & DRIVING LANE AT NEW CORNER BUILDING |
2021-04-19 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has been updated M012021083A21 |
2021-04-19 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Acceptable |
2021-04-17 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work is being done at this time. |
2021-04-15 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the respondent failed to use skid resistant plating, all three plates are smooth to the touch. Above permit used to identify the respondent. |
2021-04-14 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced due to BPP |
2021-04-13 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | steel plate within roadway, properly ramped, s/w flags replaced. |
2021-04-13 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration acceptable |
2021-04-13 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Valid permit now on file, refer to latest permit for updated inspection: Q012021083D34 |
2021-04-09 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor is in compliance |
2021-04-08 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES WERE REMOVED |
2021-04-08 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PASS - PERMITTEE UNKNOWN |
2021-04-08 | No data | ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, DEP shut water off due to leak, cuts on roadway and sidewalk |
2021-04-08 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATED WAS REMOVED |
2021-04-06 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | MANAGEMENT OF BUILDING CALLED IN FOR PLUMBER (SHAREHOLDERS COMPLAINT ABOUT WATER PRESSURE ) LEAK ON BUILDING STEM SERVICE |
2021-04-06 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The segment was recently resurfaced, CAR condition no longer exists... (CAR passed out) |
2021-04-06 | No data | CORNELIA STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed. |
2021-04-04 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2021-04-03 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag replaced,but expansion joint between the replaced sidewalk flag and the curb not recessed and sealed at this time. |
2021-04-03 | No data | 29 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | DOMESTIC WATER LEAK , 4 STORY BUILDING |
2021-04-03 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag replaced,but expansion joint between the replaced sidewalk flag and the curb not recessed and sealed at this time. |
2021-03-31 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken and cracked in 2 plumber restoration joints, street joints needs to be resealed. |
2021-03-31 | No data | 36 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found at time of inspection |
2021-03-29 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CONCRETE PAD OK OPPOSITE 230 JAY ST |
2021-03-18 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/27/2020 |
2021-03-17 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O The above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [11-20-2020]. |
2021-03-15 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent steam restoration acceptable |
2021-03-13 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET DE KALB AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY NYC DOT |
2021-03-13 | No data | EMERALD STREET, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE OPPOSITE SIDE OF THE ROADWAY & PERM CUT ON THE SIDEWALK |
2021-03-11 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Open excavation in a 2 way protected bike lane, next to traffic light , middle of segment |
2021-03-09 | No data | BEECH AVENUE, FROM STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | A 21’ X 7’ down 5” depression in the driving lane apart of the crosswalk & adjacent to a Consolidated Edison manhole. No work observed done at this time. |
2021-03-08 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumbers cut ifo 1746 in compliance |
2021-03-05 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O Building #465 Plumbers restoration completed/sealed NO PERMANENT ID MARKERS ARE INSTALLED. |
2021-03-02 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1042A As per DOT note 3 the roadway cut wearing course should be paved into one cut if cuts are less than 10ft apart. This is just an water repair permit. No sewer permit. Cuts are 5' apart. |
2021-02-26 | No data | WEST 28 STREET, FROM STREET 5 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to active BO |
2021-02-25 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent- Restoration Missing Color Code: re-apply color code marker on your permanent restoration that was that was not resurfaced by the ECS trench. |
2021-02-25 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 Length 8’ 6” Width 5’ 2” Depth 2’ 10”, First Lift 98.9. I left backfill/base at 12:40. |
2021-02-24 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was found resurfaced. |
2021-02-24 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | The respondent base passed, and the trench was left plated for concrete curing. Also, the 6'' cutback's were completed with a previous inspector as per foreman Victor upon completion of the backfill. |
2021-02-24 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The condition was previously reported however, I could not inspect the restoration because it is within a construction barricaded in the parking lane |
2021-02-22 | No data | CLINTON STREET, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | The respondent did not start the work. |
2021-02-22 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having 3 steel plates on the roadway that was smooth to the touch. Respondent's plates did not have skid resistance greater than or equal to the adjacent roadway surface. ID by permit Q012021026B89. Two plates on s/w. |
2021-02-18 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Reschedule due to snowstorm |
2021-02-17 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Base pour complete 32’ steam restoration |
2021-02-16 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent cut flushed to grade in the driving lane. |
2021-02-16 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete, 16’ trench, 6” and 12” cutbacks were marked |
2021-02-10 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance no defects |
2021-02-10 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | trench is 64' long only 18' was backfilled, (L)18' (W)5'6" (D) 5' 1/2" trench plated made safe. |
2021-02-08 | No data | EAST 29 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The water main leak is due to an old abandon 5/8” driven tab, not a domestic line water leak. Not IPS Plumbing Corp. issue. Protest accepted. |
2021-02-08 | No data | EAST 29 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There's a 6x4 repair water cut that is down 7 inches in the driving lane. |
2021-02-04 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The respondent failed to adhere to Winter Moratorium Policey which states “Steel plates must be recessed/Countersunken With the surrounding area btwn December 1, 2020 & March 31,2021. I’d By ifo Address. |
2021-02-03 | No data | AVENUE Z, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 cuts rd/w-p/l-s/w leak on service 3 day notice issued to keyfood @ 599 ave Z |
2021-02-02 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface. ID by permit Q012021026B89. |
2021-01-29 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface as required by rule. ID by permit Q012021026B89. |
2021-01-29 | No data | BETHUNE STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, setting up, sawing cut rwy to excavate, water leak repair, 3day for 463 West St. Confirmed, Street closed OP #55. |
2021-01-28 | No data | HENRY HUDSON PARKWAY, FROM STREET WEST 250 STREET TO STREET WEST 252 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2021-01-28 | No data | EAST 29 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken water service. Leak in roadway. One excavation in roadway at this time |
2021-01-25 | No data | EAST 89 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Car will be issued to recent permit |
2021-01-25 | No data | AVENUE C, FROM STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-25 | No data | LISPENARD STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2021-01-25 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent has a plated street opening in the roadway and two plated sidewalk cuts without an active permit on file. Permit #Q012020287E53 expired on 10/28/20 work ID by permit number. |
2021-01-24 | No data | 76 AVENUE, FROM STREET 269 STREET TO STREET 270 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found, permit expired. |
2021-01-22 | No data | METROPOLITAN AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PERM ROADWAY |
2021-01-22 | No data | GRAND AVENUE, FROM STREET 47 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PERM RESTORATION ROADWAY |
2021-01-20 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20. |
2021-01-13 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATERd |
2021-01-13 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface as required by rule. ID by permit Q012020232A11. |
2021-01-12 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent has a plated street opening in the roadway and two plated sidewalk cuts without an active permit on file. Permit #Q012020232A11 expired on 9/23/20. |
2021-01-12 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Permanent water restoration in driving lane flush to grade in compliance. |
2021-01-08 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 307 wearing course is in compliance |
2021-01-08 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY - SWK REPLACED BY ANOTHER CONTRACTOR |
2021-01-07 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 307 backfill in parking/driving lane 21' length, 3' width, 4'8' in depth with 6" cutbacks on both sides in compliance. |
2021-01-07 | No data | WHITE PLAINS ROAD, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, MTA is also working in the r/w location. |
2021-01-06 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN DRIVING LANE |
2021-01-06 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY OPPOSITE 265 SCHERMERHORN STREET IN PK LANE |
2021-01-05 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, there was no work found in the roadway. |
2021-01-05 | No data | CAMPBELL DRIVE, FROM STREET BEND TO STREET STADIUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-01-05 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20 |
2021-01-03 | No data | BROADWAY, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance in front of 4250 |
2020-12-20 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated street opening in roadway behind barricades at building operation at 61 Bond Street |
2020-12-19 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated street opening in roadway behind barricades at building operation at 61 Bond Street |
2020-12-13 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE RESPONDENDENT HAS A TEMPORARY WATER RESTORATION DOWN 2'' ON THE ROADWAY DURING THE WINTER MORATORIUM PERIOD THAT RUNS FROM APIL 30, 2020 THRU DECEMBER 31, 2020. ALL RESTORATION MUST BE TO-GRADE. |
2020-12-10 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak 3 day notice |
2020-12-08 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20. |
2020-12-07 | No data | SAMUEL DICKSTEIN PLAZA, FROM STREET EAST BROADWAY TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work not done, and the permit has expired. |
2020-12-06 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut has been overlapped by more recent work. |
2020-12-05 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN DRIVING LANE |
2020-12-05 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAGS BY PARKS DEPT |
2020-12-05 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARICADES AT BUILDING OPERATION AT 61 BOND ST-NP B012020308A48 11/23/20- NEW PERMIT FOR PLATES |
2020-12-03 | No data | DONGAN HILLS AVENUE, FROM STREET HUSSON STREET TO STREET VERA STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | CREW IS ON SITE EXCAVATING SIDEWALK DIGGING TO SEWER LINE. SPOKE WITH HOMEOWNER HE IS STATING THAT HE HAD SEWER LINE SNAKED, BUT DIDNT FIX ISSUE WITH CLOGGED LINE. |
2020-12-01 | No data | CORNELIA STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #77 CORNELIA STREET & 1 brand new sidewalk flag installed with water valve expansion joints sealed in between the sidewalk & curb in compliance |
2020-11-28 | No data | SANTIAGO STREET, FROM STREET PALO ALTO AVENUE TO STREET RIO DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2020-11-28 | No data | 3 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Water was Shut off by Dep After 3 Day Notice was Issued. Leak in the Roadway. |
2020-11-26 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW SWK FLAGS FOR CORNER BUILDING WITH 2 NEW PERMITS |
2020-11-24 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20. |
2020-11-24 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water service leaking in sidewalk. One excavation in sidewalk at this time |
2020-11-23 | No data | CAMPBELL DRIVE, FROM STREET BEND TO STREET STADIUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2020-11-23 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARICADES AT BUILDING OPERATION AT 61 BOND ST-NP B012020308A48 11/23/20 |
2020-11-23 | No data | CAMPBELL DRIVE, FROM STREET BEND TO STREET STADIUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLACE MATERIAL ON STREET |
2020-11-14 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET DE KALB AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY MILLED BY NYC DOT |
2020-11-14 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & OPEN SWK STREET OPENING BEHIND FENCE-NP |
2020-11-14 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & OPEN SWK STREET OPENING BEHIND FENCE-NP |
2020-11-10 | No data | PAGE PLACE, FROM STREET GRAND AVENUE TO STREET MASPETH AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | heavy water leaking out of roadway from sprinkler system ( visibly confirmed ), one excavation made on roadway at time of inspection, crew on site location in compliance |
2020-11-09 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20 |
2020-11-09 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARICADES AT BUILDING OPERATION AT 61 BOND ST-NP B012020308A48 11/23/20 |
2020-11-09 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARICADES AT BUILDING OPERATION AT 61 BOND ST-NP B012020308A48 11/23/20 |
2020-11-09 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-11-07 | No data | EAST 163 STREET, FROM STREET ELTON AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not done |
2020-11-04 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARICADES AT BUILDING OPERATION AT 61 BOND ST-NP |
2020-11-04 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARICADES AT BUILDING OPERATION AT 61 BOND ST-NP |
2020-11-02 | No data | BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Edison paved over plumber cut |
2020-10-28 | No data | AVENUE C, FROM STREET MC DONALD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 5ft by 8ft down 4ft 6in |
2020-10-28 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored at location. |
2020-10-26 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPP of 14 East 47 Street Sewer Cut flushed and sealed. |
2020-10-25 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY AT BUILDING OPERAION 61 BOND ST OFF SCL OF SCHERMERHORN ST-NP |
2020-10-23 | No data | WEST 78 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken water service leaking in roadway. . One excavation made on roadway & one excavation on sidewalk at this time i/f/o 129 |
2020-10-21 | No data | SOUTH ROAD, FROM STREET BEND TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved. |
2020-10-21 | No data | CORNELIA STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut on the sidewalk and parking lane that i fully can not see |
2020-10-21 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20. |
2020-10-20 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20207380458-FAILED TO SEAL EXPANSION JOINT IN NEW SIDEWALK FLAG-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2020-10-15 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag seal breaking out. Also flag is cracking. The flag adjacent to cut was broken must replace. No patch work accepted. |
2020-10-14 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY 200 FROM BOND ST OFF SCL AT BUILDING OPERATION |
2020-10-13 | No data | PACIFIC STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2020-10-08 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving Emergency permit number B012020233A71 on 8/20/20. |
2020-10-08 | No data | EMERALD STREET, FROM STREET DUMONT AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Rwy plated. |
2020-10-05 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #512 found water trench partly paved over by BPP. |
2020-10-04 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed to properly seal and maintain wearing course as required by 2-11(e)(12)(viii). |
2020-10-02 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | As Per plumber no work done on the sidewalk. |
2020-10-02 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due to vehicles parked on the roadway |
2020-10-02 | No data | MELBOURNE AVENUE, FROM STREET 150 STREET TO STREET 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found roadway has been resurfaced. |
2020-10-01 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done on roadway. |
2020-10-01 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated water cut in the roadway & sidewalk with a valid permit |
2020-10-01 | No data | 138 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated water cut in the roadway & sidewalk |
2020-10-01 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated cut in the roadway & sidewalk with a valid permit |
2020-10-01 | No data | ARCHER AVENUE, FROM STREET 138 STREET TO STREET VAN WYCK EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in the roadway & sidewalk |
2020-10-01 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street has been resurfaced. |
2020-09-29 | No data | 1 AVENUE, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wearing failed, found no one on site with final wearing course completed. Measurements L 16' and w 11' 4". |
2020-09-29 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored at location. |
2020-09-26 | No data | 1 AVENUE, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete 6” and 12” cutbacks were done |
2020-09-24 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee placed on Stop/Hold 9/24/2020 |
2020-09-24 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cuts ok. |
2020-09-23 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2020-09-23 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found the respondent failed to fully restore 2 sidewalk flags as patch work is unacceptable. Previously notified by CAR# 20207640099 on 4/29/2020 to correct the condition. |
2020-09-22 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 4 ft 5 in by 3 ft down 3 ft 8 in. Inspection conducted by Andre Johnson with no access to internet or DASH |
2020-09-22 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | violation of STIP 20 of their permit they barricaded 13 ft off of the parking & driving lane they exceeded the amount of footage then they was allowed therefore the N.O.V was issued |
2020-09-19 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk restoration near 248. |
2020-09-16 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Rwy plated. debris barricaded. |
2020-09-14 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate restoration due to open restaurant detail |
2020-09-13 | No data | 1 AVENUE, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Contractor unable to complete backfill due to finding a leak coming from a 12” water main , DEP and ConEd are on location, DEP is currently investigating the condition. |
2020-09-13 | No data | HOE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-09-12 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20207380458-FAILED TO SEAL EXPANSION JOINT IN NEW SIDEWALK FLAG-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2020-09-12 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2020-09-12 | No data | 1 AVENUE, FROM STREET EAST 24 STREET TO STREET EAST 25 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking roadway ( visibly confirmed),one excavation made on roadway and 2 excavations made on sidewalk , 3 day notice issued from DEP. |
2020-09-11 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk has plywood over flags for on going work. |
2020-09-11 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired. Refer to permit #M012020244B24 on file. |
2020-09-10 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent restoration that is flushed to grade in the driveway/bike lane. |
2020-09-09 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway is up to grade. |
2020-09-07 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW repaved, Sw new,,,New building. |
2020-09-05 | No data | LAFAYETTE AVENUE, FROM STREET ADELPHI STREET TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE BIKE LANE. IFO 185. |
2020-09-05 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance near 248 Bay 38th St. |
2020-09-04 | No data | HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair |
2020-09-03 | No data | 36 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill Completed and Acceptable 4'8" by 3'1" Down 3' |
2020-08-29 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & NEW SWK FLAGS OFF SCL BY PARK OPP 333 |
2020-08-28 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled as per "Benny" of IPS Plumbing. |
2020-08-28 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. |
2020-08-24 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED STREET OPENING BEHIND BARRICADES AT CORNER BUILDING OPERATION |
2020-08-22 | No data | PROSPECT AVENUE, FROM STREET 11 AVENUE TO STREET TERRACE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | backfill completed upon arrival. |
2020-08-22 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced by newer work. |
2020-08-22 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 305, perm curb to curb Steam Line restoration is flush to grade. Lane markings restored ( no color codes installed ). Permit M012020211A45 on file for ongoing sidewalk work on North Side, No CAR for missing codes at this time. |
2020-08-22 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 512, portions of 2 perm 2018 cuts observed in North Side of roadway. Majority of cuts have been resurfaced by the BPP of 512. |
2020-08-21 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Parking lane plated. |
2020-08-20 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to 8th Ave ( South Sidewalk ), CAR previously issued under M042019354A00 for patchwork extending into 2 city sidewalk flags from behind property line. Remainder of work is within private property. |
2020-08-20 | No data | 36 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway to grade |
2020-08-20 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/WALK FLAGS |
2020-08-19 | No data | 36 STREET, FROM STREET 23 AVENUE TO STREET DITMARS BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway to grade |
2020-08-18 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY 200 FT EAST OF BOND ST OFF SCL AT BUILDING OPERATION |
2020-08-17 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to properly seal and maintain wearing course as required by 2-11(e)(12)(viii). CAR #20206630093 was issued on 2/24/2020, 5 months before expiration of guarantee. |
2020-08-17 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk. Building Super on Site |
2020-08-15 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway plated with a newer active permit on file |
2020-08-14 | No data | 137 AVENUE, FROM STREET 156 STREET TO STREET 157 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed 2 temporary asphalt long water cut in the driving lane i/f/o 156-14 137 Avenue |
2020-08-13 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to view work due to construction Barricades with Fence. |
2020-08-12 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Required cut back made |
2020-08-12 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Oppo 307, NOV issued for 2 disturbed / patched sidewalk flags adjacent to sidewalk repair work. Respondent notified via CAR 20207640099 on 4/29/2020 and failed to fully replace defective sidewalk flags. |
2020-08-10 | No data | BURR AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Vehicles double parked throughout segment unable to properly inspect |
2020-08-09 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-08-07 | No data | LEFFERTS BOULEVARD, FROM STREET 94 AVENUE TO STREET 95 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway to grade. Sidewalk excavation coned off |
2020-08-07 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts are sealed ok. |
2020-08-06 | No data | 108 AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken domestic water service. Leak in basement. One excavation in roadway at this time |
2020-08-05 | No data | 108 AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed I.P.S. Plumbing on site, excavating a water restoration in the parking lane and on the sidewalk to repair a water main broken |
2020-08-03 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20207380458-FAILED TO SEAL EXPANSION JOINT IN NEW SIDEWALK FLAG-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2020-08-03 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Street opening to plug water w/o permit-This permit was taken to plug sewer only which was done on the s/w (B012020178C51).Spoke to respondent.Nov issued pending a street opening permit which must be taken today or tomorrow morning- or NOV will stand |
2020-08-03 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed opening of protected street DOT permit. Respondent has opened the protected roadway to plug water without permit. Company Truck License Plate# - NEW YORK 15658- MH COMMERCIAL - Use for identification |
2020-07-29 | No data | VAN DUZER STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration to grade |
2020-07-25 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 512, portions of 2 perm 2018 cuts observed in North Side of roadway. Majority of cuts have been resurfaced by the BPP of 512. |
2020-07-22 | No data | WARREN STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2020-07-21 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES ON RWY OPP 265 SCHERMERHORN STREET- TALKED TO CONTRACTOR NEW DEP PERMIT REQUIRED |
2020-07-21 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP street resurfaced |
2020-07-20 | No data | PELHAM PARKWAY, FROM STREET BOLTON STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-07-16 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in the roadway |
2020-07-16 | No data | ASTORIA BOULEVARD, FROM STREET 25 STREET TO STREET 27 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No work visible at this time. Major gas installation in roadway. Several open excavations Gas crew on site ifo address |
2020-07-13 | No data | OAK POINT AVENUE, FROM STREET CRAVEN STREET TO STREET TRUXTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1154 water service leaking inside of MTA property |
2020-07-10 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 305, NOV issued for multiple unmarked steel plates fastened to the roadway and sidewalk area that are smooth to the touch and offer no skid resistance equal to or greater than the surrounding area. |
2020-07-08 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water restoration that is flush to grade in the parking/driving lane. |
2020-07-08 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2020-07-07 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES ON RWY OPP 265 SCHERMERHORN STREET- TALKED TO CONTRACTOR NEW DEP PERMIT REQUIRED DEP PERMIT OFFICE CLOSED TILL 7/16/20 |
2020-07-07 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY (BK LANE & DRIVING LANE)NEW SWK AT NEW BUILDING & ACTIVE WORK ON FRONT SIDE OF BUILDING |
2020-07-03 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES ON RWY OPP 265 SCHERMERHORN STREET |
2020-07-02 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Approx 300' from 8th Ave ( South Side ), perm 2019 cut within Parking Lane / Buffer Zone is flush to grade. Work within 1 sidewalk flag in compliance. |
2020-07-02 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Joint meeting w/ Charli from IPS Water Service and Edward from Mutual Redevelopment Houses. Contractor to restore area according to DOT specifications. Undermined areas will be fix. Photos taken. No true assessment given due to no visual, area plated |
2020-07-01 | No data | 42 AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken domestic water service. Crew excavating roadway at this time |
2020-06-29 | No data | 42 AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water service broken during gas main job ,(confirmed with home owner ) one excavation made on roadway and one excavation made in grass area at time of inspection. |
2020-06-27 | No data | LELAND AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in the parking lane and sidewalk |
2020-06-27 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | TEMPORARY RESTORATION ADJACENT TO PLUMBER'S CUT. |
2020-06-26 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 6FT X 5FT CAVE IN DOWN 6 INCHES ADJACENT TO PLUMBER'S CUT IN FRONT OF 51 CLARK STREET. IN NEED OF REPAIR. |
2020-06-26 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts on the roadway in compliance |
2020-06-26 | No data | BEACH AVENUE, FROM STREET SEWARD AVENUE TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-06-26 | No data | EAST 88 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and resurfaced. |
2020-06-26 | No data | EAST 89 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I’m unable to properly inspect due to vehicles double parked on the roadway |
2020-06-26 | No data | MALCOLM X BOULEVARD, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2020-06-25 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut in the driving lane, opposite 59 |
2020-06-23 | No data | UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-06-23 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect inside fence area,scaffolding present.Active Building operation at this time. |
2020-06-23 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-22 | No data | 76 AVENUE, FROM STREET 269 STREET TO STREET 270 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify work on the segment 76 av bet. 269 st & 270 st at this time. |
2020-06-22 | No data | 76 AVENUE, FROM STREET 271 STREET TO STREET HEWLETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade d/l. |
2020-06-22 | No data | 33 STREET, FROM STREET NYCTA SUBWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water main break giving water to MTA bathrooms for 33 st Rawson train station ( confirmed with MTA contractors on site) one excavation made on sidewalk at median at time of inspection. |
2020-06-22 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking / Bike lanes. |
2020-06-19 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 305, ongoing Steam Line pressure work across roadway ( curb to curb ). Roadway plated / crew on site at this time. South Sidewalk plated as well ( 1 plate ). Active permit M012020169B51 on file. |
2020-06-18 | No data | BELL BOULEVARD, FROM STREET 58 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | broken water valve to cool off transformer ( unable to cool down transformer)confirmed with con edison on site ,Crew on site ,one excavation made on sidewalk at time of inspection in front of transformer. |
2020-06-18 | No data | WEBSTER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | fire suppression system effected, crew on site, a long water cut is being cut. Crew may have to make additional cuts. |
2020-06-18 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced by BPP-M012020129A53 |
2020-06-18 | No data | VAN DUZER STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut perm state |
2020-06-16 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent cut in the parking/driving lane. |
2020-06-15 | No data | OAK POINT AVENUE, FROM STREET CRAVEN STREET TO STREET TRUXTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site, water service leaking inside of MTA property |
2020-06-14 | No data | UNION SQUARE WEST, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent cut that is flushed to grade in the parking lane and a ½ a flag has been restored around a water valve cover. |
2020-06-11 | No data | EAST 25 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent repair water cut in the parking lane and one sidewalk flag has been restored. |
2020-06-11 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 restorations; 1 located in parking lane and 2nd in driving lane measuring 3ft 5inches in width.No proper cut backs done |
2020-06-09 | No data | MC DONALD AVENUE, FROM STREET 65 STREET TO STREET AVENUE O | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-06-08 | No data | 247 STREET, FROM STREET 41 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken domestic sanitary sewer. One excavation on homeowners property at this time |
2020-06-05 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Complaint | Department of Transportation | crew is on site. I informed foreman of the complaint, and reminded him to make sure that the steel plates are secure at the end of the day. I witnessed the plates not making noise at the time of inspection. |
2020-06-05 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | - PLACE MATERIAL ON STREET |
2020-06-03 | No data | FINGERBOARD ROAD, FROM STREET BANG TERRACE TO STREET BAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Con Edison hit water service installing new pole..Paul onsite performing back fill..Inspected 5/21/20 @1:35pm |
2020-06-02 | No data | FILLMORE AVENUE, FROM STREET EAST 49 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w at Fillmore Ave & Utica |
2020-06-01 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES ON RWY OPP 265 SCHERMERHORN STREET-NP |
2020-06-01 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES ON RWY OPP 265 SCHERMERHORN STREET |
2020-05-26 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Complaint | Department of Transportation | crew is on site. I informed foreman of the complaint, and reminded him to make sure that the steel plates are secure at the end of the day. |
2020-05-24 | No data | LELAND AVENUE, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway/ temporary sidewalk flag to grade |
2020-05-22 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY |
2020-05-21 | No data | FINGERBOARD ROAD, FROM STREET BANG TERRACE TO STREET BAY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | found upon arrival at 1245 crew on site excavating open roadway cut 4 ft 7 in by 4 ft 2 in down 4 ft clean fill used cut back marking made 97.6 and 97.5 compaction back fill acceptable start 100 depart 150 |
2020-05-19 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench reaching curb final |
2020-05-14 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site putting shoring in the excavation |
2020-05-14 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-05-12 | No data | ASTORIA BOULEVARD, FROM STREET 23 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at 23-29 Astoria blvd. |
2020-05-12 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Complaint | Department of Transportation | Contractor are on location, spoke with foreman( Benny)and stated that at the end of the day to make sure the steel plates are tightly secured, he said that he will comply |
2020-05-12 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced with work completed during 7/2018. |
2020-05-11 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-05-11 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your restoration measure 3 feet 5 inches in width, proper cut backs were not made following H-1042D. It Should measure 54” in width doing the required cutbacks |
2020-05-11 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains |
2020-05-05 | No data | EAST 88 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed |
2020-05-04 | No data | BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | con-ed hit water line, plumber on-site |
2020-05-03 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #185 in compliance |
2020-05-01 | No data | WEST 4 STREET, FROM STREET PERRY STREET TO STREET WEST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | previous permit withcon# |
2020-04-29 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of building #61 BOND STREET AKA SCHERMERHORN STREET IN COMPLIANCE |
2020-04-29 | No data | BROADWAY, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate removed. |
2020-04-29 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition remain the same patchwork not accepted. CAR reissued. |
2020-04-29 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remain the same patchwork not accepted. CAR reissued. |
2020-04-28 | No data | BROADWAY, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J |
2020-04-28 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B |
2020-04-27 | No data | MILL ROAD, FROM STREET NEW DORP LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | POSSIBLY OVERLAPPED BY CON ED RESTORATION ON ROADWAY. |
2020-04-20 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW PERMIT B012020090D02 |
2020-04-20 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair sewer restoration on the north side in the crosswalk at Park avenue South due to the fact that the roadway has been paved by an ECS 2018 trench. |
2020-04-14 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent asphalt restorations 12’x4’ x 7’x4’) in roadway, Restoration needs to be re-sealed |
2020-04-14 | No data | CENTRAL PARK WEST, FROM STREET WEST 97 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced |
2020-04-09 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued for having 2 Steel Plates countersunk into the Roadway with no markings for Identification purpose. ID respondent by cited permit for repair Sewer work, expires on 4/17/2020. |
2020-04-09 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway Plated with no markings on Plate, to be investigated as to ownership of plate |
2020-04-08 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #51 & 1 brand new sidewalk flag installed with water valve, CAR being immediately installed expansion joints need to be sealed |
2020-04-04 | No data | EAST 37 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway to grade. One sidewalk flag restored in kind |
2020-04-03 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags good ifo 401 |
2020-04-03 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut has been repaved by con ed gas cut |
2020-04-03 | No data | 67 DRIVE, FROM STREET BOOTH STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY REPAVED Q152019171A49 |
2020-04-02 | No data | ATLANTIC AVENUE, FROM STREET 4 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2020-03-26 | No data | 150 STREET, FROM STREET 8 AVENUE TO STREET 8 ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Temporary restoration in roadway to grade |
2020-03-25 | No data | 37 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut P/D/L (Active BO) |
2020-03-24 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street openings ramped & pinned in the roadway of the driving lane in front of property #51 CLARK STREET |
2020-03-20 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 100 ( North side of roadway ), Cobble Stones from "Manhattan Bor" access cover appear in compliance for sewer work. |
2020-03-18 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-17 | No data | UNION SQUARE WEST, FROM STREET EAST 15 STREET TO STREET EAST 16 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work Crew on location |
2020-03-17 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer repair in the driving lane is in compliance. |
2020-03-12 | No data | KING STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in parking/driving lane. However unable to accurately inspect due to parked vehicles. |
2020-03-11 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration driving of roadway & perm restoration behind barricades of Building Operation (No restoration of double yellow lines) |
2020-03-10 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of building #61 BOND STREET in compliance |
2020-03-09 | No data | MILL ROAD, FROM STREET NEW DORP LANE | No data | Street Construction Inspections: E-Number | Department of Transportation | Sewer damaged when new pole was installed, specific location correct(on New Dorp Lane btwn Mill Road & HYLAN Blvd) contractor unable to pull out for segment |
2020-03-01 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent IPS PLUMBING CORP. failed to obtain a valid dot permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2020-03-01 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent IPS PLUMBING CORP failed to post steel plates ahead or raise plow sign & countersink the street opening flush with the roadway as per the winter moratorium policy 12-1-2019 to 3-31-2020. Nov issued |
2020-02-29 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway opp of #126. |
2020-02-28 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-02-28 | No data | WAVERLY PLACE, FROM STREET GREENE STREET TO STREET UNIVERSITY PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew excavated p/l, repairing water leak in building lower level. Confirmed. |
2020-02-27 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done with an active permit on file |
2020-02-26 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration in d/l is good. |
2020-02-25 | No data | BROADWAY, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate serving no purpose in bus lane |
2020-02-25 | No data | ASTORIA BOULEVARD, FROM STREET 23 STREET TO STREET 25 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water broken during gas repair ( confirmed with home owner)crew on site to repair. |
2020-02-24 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One cut in the driving/parking lane having 50%+ edge cracking at this time needs to be resealed. (side of 183-19 Hillside Ave.) |
2020-02-23 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of building #61 in compliance |
2020-02-23 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane in front of building #61 BOND STREET,valid dot permit on file #B012020036C26 |
2020-02-23 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration located in the restored concrete bus pad opposite from property #230 in compliance |
2020-02-23 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of building #333 in compliance |
2020-02-22 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-02-22 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent IPS PLUMBING CORP failed to post steel plates ahead or raise plow sign & countersink the street opening flush with the roadway as per the winter moratorium policy 12-1-2019 to 3-31-2020. Nov issued |
2020-02-21 | No data | LAFAYETTE AVENUE, FROM STREET ADELPHI STREET TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN BIKE LANE - PERMIT PAYMENT READY IN NYC STREETS |
2020-02-21 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass.CUT: 5' X 4'7'' X 3' WD:114.0 DD:107.2 MDD:111.0 AM: 6.4 LIFT: 98.5No existing concrete/binder was in place, only 5 inches of asphalt topping. So no base cut back can be performed. am allowing concrete base 9'' then 1' cut back on WC |
2020-02-21 | No data | SEWARD AVENUE, FROM STREET BEACH AVENUE TO STREET TAYLOR AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2020-02-21 | No data | BEACH AVENUE, FROM STREET SEWARD AVENUE TO STREET SOUNDVIEW AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2020-02-21 | No data | CLARK STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | IPS PLUMBING CORP crew on site currently excavating in the roadway of the parking lane in front of building #51 |
2020-02-19 | No data | LAFAYETTE AVENUE, FROM STREET ADELPHI STREET TO STREET CLERMONT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Roadway in Compliance |
2020-02-18 | No data | BROADWAY, FROM STREET WEST 180 STREET TO STREET WEST 181 STREET | No data | Street Construction Inspections: Active | Department of Transportation | active crew on site in compliance in front of 4250 |
2020-02-17 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts found on roadway |
2020-02-15 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration perm flush; however finished grade of asphalt questionable. To be monitored and addressed upon removal of barriers associated with current building operation. |
2020-02-12 | No data | SOUTHERN BOULEVARD, FROM STREET AVENUE ST JOHN TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-02-10 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I found the respondent failed to add identifying markings on 2 steel plates in the roadway. Identified respondent by cited permit for repair water. |
2020-02-10 | No data | LEONARD STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to active permit #M012020036A37 on file. 2 plates counter sunk in the roadway however NOV to be issued for no identifying markings. |
2020-02-09 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane in front of building #61 BOND STREET |
2020-02-09 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of SIXTEEN SYCAMORES PLAYGROUND IN COMPLIANCE |
2020-02-06 | No data | HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk in place |
2020-02-06 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm s/w flags were ok. (Behind 243 Veterans Rd West Woodrow Substation- Con Ed) |
2020-02-05 | No data | 164 STREET, FROM STREET DEPOT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 8x5 Permanent cut to grade. |
2020-02-05 | No data | 37 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on P/D/L |
2020-02-05 | No data | 34 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration across R/W |
2020-02-04 | No data | LAFAYETTE STREET, FROM STREET GRAND STREET TO STREET HOWARD STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew excavating parking lane, repairing watermain building #203-209 centre st. Confirmed. |
2020-02-01 | No data | PACIFIC STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from building #212A-212B in compliance |
2020-01-30 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored at location. |
2020-01-29 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 26 backfill is in compliance. L- 10' W- 8.8' D-4' |
2020-01-28 | No data | VAN DUZER STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | upon upon arrival at 230 back fill completed upon arrival restoration in permanent state flush with roadway surface and color coded |
2020-01-28 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill was completed before arrival |
2020-01-28 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane in front of building #61 |
2020-01-25 | No data | MALCOLM X BOULEVARD, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Le4ak in the Roadway & Sidewalk Currently Being Pumped out. 3 Day Dep Notice Issued |
2020-01-24 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, work not started, work area barricaded, water leak confirmed, visible street leak. |
2020-01-24 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & PLATED SWK BEHIND BARRICADES AT BUILDING OPERATION AKA 61 BOND STREET & STEEL PLATES COUNTERSUNK IN DRIVING LANE |
2020-01-23 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair 2 entire flags that have patch work. |
2020-01-21 | No data | WEST 11 STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 1/1/2020. |
2020-01-20 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | having a countersunken steel plate without any steel plate warning signs posted, covering excavation in roadway. Respondent failed to post steel plate warning sign during 2019/2020 Winter Moratorium. |
2020-01-17 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/10/2019. |
2020-01-17 | No data | EAST 88 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Lab Tech not on site Backfill will be rescheduled. Arrival: 8:55AM Departure:930AM |
2020-01-15 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M042019354A00 . (Insp. #778) |
2020-01-15 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found possibly covered by newer con Ed work & BPP from across the street. In front of 510. |
2020-01-13 | No data | EAST 89 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | heavy domestic water leaking in basement visibly confirmed,one excavation made on roadway and sidewalk at time of inspection,3 day notice issued from DEP. |
2020-01-11 | No data | BURR AVENUE, FROM STREET EAST 196 STREET TO STREET PELHAM PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found or visible at this time permit expired. |
2020-01-09 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no roadway cuts found sidewalk flags repaired behind property line |
2020-01-08 | No data | EAST 88 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plate removal. i/f/o #47 |
2020-01-08 | No data | LISPENARD STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 39 Permanent Restoration in the Parking lane. |
2020-01-07 | No data | EAST 86 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak..3 day notice |
2020-01-03 | No data | WEST 4 STREET, FROM STREET PERRY STREET TO STREET WEST 11 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete. Length 6.3 Width 3.5 in front of 282 in the parking lane. Base to follow. |
2020-01-01 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & PLATED SWK BEHIND BARRICADES AT BUILDING OPERATION AKA 61 BOND STREET-NEW PERMIT |
2020-01-01 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & PLATED SWK BEHIND BARRICADES AT BUILDING OPERATION AKA 61 BOND STREET |
2019-12-29 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut found on roadway |
2019-12-27 | No data | WEST 4 STREET, FROM STREET PERRY STREET TO STREET WEST 11 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back-fill acceptable opposite #255 West 11 Street in the parking/Driving lane. |
2019-12-25 | No data | JOHNSON AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2019-12-24 | No data | WEST 11 STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple plates in roadway for aka 282 for water main & sewer installation. Crew on site about to start working. |
2019-12-24 | No data | WEST 4 STREET, FROM STREET PERRY STREET TO STREET WEST 11 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm still active no work observed. |
2019-12-21 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary sewer restoration in the roadway over due for final @ 12 east 48 street on e. 47 st |
2019-12-19 | No data | WEST 11 STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site permit is still active. |
2019-12-18 | No data | WEST 132 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | okay |
2019-12-16 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone roadway work possibly covered by DOT. M152019143A01. |
2019-12-02 | No data | WEST 11 STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm active and work possibly covered by active building operation. Aka 282. |
2019-11-30 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequently secured permit for this work. |
2019-11-21 | No data | UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 5 + 1/2 down 4'' was observed milled |
2019-11-19 | No data | METROPOLITAN AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Plated excavation in roadway pinned and ramped |
2019-11-07 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w RESURFACED after this condition |
2019-11-07 | No data | SEXTON PLACE, FROM STREET BEND TO STREET YOUNG AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | plumber on site two permanent roadway cuts. |
2019-11-04 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk and roadway plated |
2019-11-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on sidewalk at mta train station, north bound section. |
2019-11-01 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/24/2019. |
2019-10-26 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection |
2019-10-26 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN OPEN TRENCH BEHIND BARRICADES 125 FT EAST OF BOND ST ON SCL |
2019-10-25 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints not properly recessed and sealed. |
2019-10-25 | No data | BANK STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-10-23 | No data | BANK STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2019-10-22 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY WITH NEW PERMIT |
2019-10-21 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active B.O.....jersey barriers in portion of roadway for #40 East End Ave. |
2019-10-21 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found at this time. |
2019-10-17 | No data | HOE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2019-10-17 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer: North side next to the Crosswalk at Park Ave Roadway |
2019-10-17 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk, north bound section at train station. |
2019-10-13 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the Driving/Parking Lane, also 4 distinctive flags have been restored and are free of defects... I/F/O 201 directly in front of entrance. |
2019-10-09 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your restoration measure 3ft 5 inches in length, proper cut backs were not made.Your trench is not sealed, as required. |
2019-10-08 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | within fence area, will try to gain access tomorrow. cut look sbinder flush. |
2019-10-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2019 cut found in the street |
2019-10-02 | No data | DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Quality plumbing did work in r/w over the old restoration |
2019-10-02 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumbers cut mostly paved over by BPP I/F/O 512 |
2019-09-29 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water and sewer repair/installation ongoing & appears to be coming out of the same excavation. Area remains plated 5' from DEP sewer. There is an active water permit M012019253B68 on file which aligns with two water valves on sidewalk behind fence. |
2019-09-28 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #613 |
2019-09-28 | No data | BERGEN STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-28 | No data | ATLANTIC AVENUE, FROM STREET 4 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway near MTA Subway Station |
2019-09-26 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w ok; r/w has been resurfaced. |
2019-09-25 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. in d+p/l |
2019-09-25 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water restoration in parking lane and 2 s/w flags east of building |
2019-09-25 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water restoration opposite of 305 |
2019-09-24 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2019-09-23 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w RESURFACED after this condition |
2019-09-22 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupying the sidewalk with no one on site, I/F/O 201 |
2019-09-19 | No data | EAST 21 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, excavation on the sidewalk and roadway directly in front of the building entrance, I/F/O 201 |
2019-09-16 | No data | PELHAM PARKWAY, FROM STREET BOLTON STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2019-09-14 | No data | FILLMORE AVENUE, FROM STREET EAST 49 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINTS NOT FOR PLUMBER CUT ,EXPANSION JOINTS THAT ARE NOT SEALED IS FOR THE CORNER QUADRANT THAT WAS REPAIRED , NOT BELONGING TO THE PLUMBER |
2019-09-09 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BIKE LANE RESTORATION RE-PAINTED GREEN |
2019-09-05 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | As per policy, limit NOV’s issued for this defect. Permittee placed on hold. |
2019-09-02 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration is covered by steel plates due to active gas work throughout segment. |
2019-08-30 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition previously reported |
2019-08-28 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway in front of building #61 |
2019-08-27 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, there were no defects found to the cobblestone roadway where the sewer work was performed. |
2019-08-27 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plates in roadway active perm. |
2019-08-27 | No data | ALEXANDER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET EAST 134 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-08-27 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active perm on file M012019221A29. |
2019-08-26 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Work appears to have been done in 2016. |
2019-08-21 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-08-21 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES |
2019-08-21 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY BEHIND BARRICADES WITH NEW PERMIT |
2019-08-20 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This condition has been addressed, condition has been repaved |
2019-08-20 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b project pass |
2019-08-20 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully inspect due to active BO (AS) |
2019-08-19 | No data | LISPENARD STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo respondent has a permanent restoration,water repair backfilled on a protected street but failed to obtain confirmation number at least two hours prior to the commencement of the backfill. Permit #M012019106B80 |
2019-08-17 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints not properly recessed and sealed. |
2019-08-15 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | container placed on on the restoration |
2019-08-14 | No data | CENTRAL PARK WEST, FROM STREET WEST 97 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway. |
2019-08-13 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Construction site found a permanent Restoration in the driving / parking lanes. |
2019-08-12 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The repair water restoration was resurfaced by a Con Edison 2018 gas trench. |
2019-08-12 | No data | CAMPUS PLACE, FROM STREET CRESCENT STREET TO STREET HEMLOCK STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak visible sidewalk..Mta doing work crane on s/w damaged curb valve |
2019-08-11 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20194510196-FAILED TO RE-PAINT BIKE LANE GREEN OVER PERMANENT IPS PLUMBING CORP. PERMANENT RESTORATION IN ROADWAY. |
2019-08-11 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrive 2:10- Start 2:30pm IPS Plumbing foreman Benny. L=10 'W=3'6" D=5'2". BACK FILL PASS ETL TESTER TROY ROLANDS. BLEND / TEST 98.3 96.3 IFO 140 |
2019-08-10 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BAC to be Rescheduled |
2019-08-10 | No data | FILLMORE AVENUE, FROM STREET EAST 49 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to seal expansion joints as per subsection. 2-09(V) of DOT HIGHWAY RULES. All expansion joints shall be recessed 1/2 inch below finished sidewalk and sealed with Departmental specified sealer. CAR#20193720108 was issued. |
2019-08-05 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-08-01 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration is in compliance in front of active BO. |
2019-07-30 | No data | WARREN STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time, active DDC site in front of address given (30). |
2019-07-29 | No data | WEST 25 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-07-28 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There were no defects found to the cobblestone roadway at the cited address. |
2019-07-28 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair, in p/l, acceptable |
2019-07-24 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water work done under permit M012017100C30. |
2019-07-17 | No data | BLEECKER STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work was not done and the permit has expired. |
2019-07-17 | No data | MINETTA STREET, FROM STREET 6 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water restoration that is flushed to grade in the driving lane and one sidewalk flag has been restored around a water valve cover. |
2019-07-17 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving / parking lanes, unable to properly view paring lane due to active Construction site. |
2019-07-11 | No data | RIVINGTON STREET, FROM STREET BOWERY TO STREET FREEMAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On segment ( South Side ), newer DDC Water Main installation performed ( M012019112A83 ) and could have resurfaced old plumber cut. No plumber work observed at this time. |
2019-07-10 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt is broken out up to an inch against the curb across from 540 in the driving lane. Make the area flush with the rest of the surrounding roadway. |
2019-07-08 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w RESURFACED after this condition |
2019-07-05 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit found, M012015327B17 |
2019-07-05 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 26 ( aka 568 - 572 Grand St - East Sidewalk ), work within 4 flags adjacent to tree pit. ( oppo aka 550 J. Grand St ) |
2019-07-05 | No data | FILLMORE AVENUE, FROM STREET EAST 49 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed respondent failed to seal expansion joints on sidewalk. CAR#201937201080 was issued to seal. Above permit was used to ID above respondent. |
2019-07-02 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset, repair, or replace CURB acceptable |
2019-07-01 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | trench plates, within construction zone. |
2019-07-01 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-07-01 | No data | STONE STREET, FROM STREET BROAD STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found, M012019164B87. |
2019-07-01 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm s/w acceptable |
2019-06-28 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20194510196-FAILED TO RE-PAINT BIKE LANE GREEN OVER PERMANENT IPS PLUMBING CORP. PERMANENT RESTOR |
2019-06-28 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER - SEWER repair acceptable |
2019-06-27 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-06-26 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of roadway resurfaced due to BPP at location. |
2019-06-23 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-06-23 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plastic caps not removed. |
2019-06-19 | No data | ESSEX STREET, FROM STREET GRAND STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 37, no sidewalk work by plumber observed at this time. Permit expired. |
2019-06-13 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. |
2019-06-12 | No data | WARREN STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not observed in this area, DDC job being done in this area. |
2019-06-06 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair water restoration due to the roadway that is made out of cobblestone. |
2019-06-05 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 S/WALK FLAGS AROUND, ROUND WATER VALVE |
2019-06-04 | No data | KING STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration is in compliance |
2019-05-30 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building # 13, found a permanent Restoration in the driving lane. |
2019-05-30 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Plated at an active Construction site with active permit # M012019122A01 on file. |
2019-05-30 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway Plated at an active Construction site. |
2019-05-29 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | taken over by M012018191A89. |
2019-05-22 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 long water cuts 32" in width do not meet 1042D restoration standards they are 6.5' apart and need to be connected also need properly cutback with minimum 54" in width |
2019-05-18 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to do the 18 inch cut back |
2019-05-16 | No data | WEST 132 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In complianc on north side of West 132 |
2019-05-09 | No data | WEST STREET, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2019-05-08 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved half plus 5 ft |
2019-05-08 | No data | FILLMORE AVENUE, FROM STREET EAST 49 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to seal expansion joint on sidewalk (plumber cut is in front of small door close to utica avenue) |
2019-05-04 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to properly recess and seal expansion joints. |
2019-05-04 | No data | PHILIP AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway currently milled and waiting to be paved, restoration resurfaced. |
2019-05-04 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN STREET OPENING 150 FEET EAST OF BOND ST ON SCL |
2019-05-01 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, I found a permanent repair water trench that is flushed to grade in the driving lane. |
2019-04-30 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | i/f/o 101 entrance. |
2019-04-30 | No data | LISPENARD STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | compressor broke down, incomplete. Two cut in the parking lane. |
2019-04-30 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway |
2019-04-24 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2019-04-22 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | street paved half plus 5 feet. |
2019-04-22 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED MY NEW BUILDING BPP |
2019-04-22 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER: the work is not completed at this location. Permit is still saying active. |
2019-04-20 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | no cut backs made to restoration in driving lane of roadway opp of #42. |
2019-04-17 | No data | 37 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-04-16 | No data | MANGIN AVENUE, FROM STREET HANNIBAL STREET TO STREET MAYVILLE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway resurfaced. |
2019-04-15 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway paved half plus 5 feet. |
2019-04-15 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEAL OK |
2019-04-10 | No data | 37 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done active permit on file Q012019073D08 |
2019-04-09 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealer on perm is acceptable |
2019-04-07 | No data | CAMBRELENG AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-04-07 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued for the respondent has failed to do the required 18'' cutback on both sides of a permanent repair water trench which measured 31'' in width. After the required cutbacks the trench should be a Minimum of 54'' in width as per H-1042D Note 6. |
2019-04-06 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES REMOVE PERM RESTORATION & NEW SIDEWALK FLAG |
2019-04-03 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk has been restored by B.O. contractor for the property under permit #(M042018298A08)... (CAR Re-inspection Pass) |
2019-04-01 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the existing repair Sewer restoration which was located on the north side next to the crosswalk at Park avenue south due to a 2019 ECS trench has overlapped the cut. |
2019-03-31 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: New Permit# M012019084C75 |
2019-03-30 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2019-03-30 | No data | SCHERMERHORN STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE |
2019-03-29 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-03-26 | No data | GRAND STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 61/2' x 4 'perm cut in r/w |
2019-03-25 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, sidewalk not finished. Building operation in progress. |
2019-03-22 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair acceptable cobblestone ok |
2019-03-20 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut adjacent to active B.O also plated excavation on site. Active permit M012019071A41 2 cuts within 10' distance from each other needs to be connected upon completion of work. |
2019-03-19 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb to curb perm trench. |
2019-03-16 | No data | SOUTHERN BOULEVARD, FROM STREET AVENUE ST JOHN TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded in the roadway |
2019-03-05 | No data | MANGIN AVENUE, FROM STREET HANNIBAL STREET TO STREET MAYVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked around water cut |
2019-02-28 | No data | 207 STREET, FROM STREET 111 AVENUE TO STREET 112 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2019-02-26 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No evidence of work at location. Active B.O present. Permit expired |
2019-02-22 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has update permit # X012016136A00. |
2019-02-21 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway. further information required regarding Gazebo restoration. |
2019-02-21 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration |
2019-02-16 | No data | WEST 28 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Respondent was repairing water line after previous emergency permit M012019035A45 was taking out on 2/4/2019. No water leaking on sidewalk at time of inspection, respondent could have applied for regular permit. |
2019-02-15 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-02-14 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | consecutive permit on file |
2019-02-13 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT BIKE LANE GREEN OVER NEW PERMANENT RESTORATION IN ROADWAY, IN FRONT OF 61 BOND STREET BETWEEN SCHERMERHORN STREET & STATE STREET. |
2019-02-07 | No data | EAST 48 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: I/F/O active B.O. |
2019-02-03 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent sewer restoration flushed to grade in the parking and driving lane however, I am unable to locate the permanent color coding marker due to barricades are placed on a portion of the restoration. |
2019-01-31 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | consecutive permit on file |
2019-01-29 | No data | CENTRAL PARK WEST, FROM STREET WEST 97 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects to report on short water cut |
2019-01-29 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the dept. |
2019-01-28 | No data | JOHNSON AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-28 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2019-01-23 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the respondent maintaining three steel plates in the roadway on a protected street over a sewer excavation with a permit that has expired on 11/14/2018. |
2019-01-20 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found 2 steel plates countersink to the level of the roadway in the driving lane however, the plates has no markings for identification. |
2019-01-17 | No data | WEST 29 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found the sidewalk restored on the south side of the segment just east of 9th avenue. |
2019-01-16 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Plate on site |
2019-01-16 | No data | CROTONA PARK EAST, FROM STREET CROTONA PARK NORTH TO STREET SOUTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, steel plate on site X012019015A01 active permit expires 2/12/2019 |
2019-01-16 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found intersection re-surfaced. |
2019-01-12 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: LL14 | Department of Transportation | Condition was left Plated |
2019-01-09 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(5’)W(9’)D(3’5”)TEST#1=97.7Backfill pass |
2019-01-09 | No data | WEST 24 STREET, FROM STREET 8 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Water Leak to heat supply line verified by building super, excavation in the Parking Lane on the S/S of the Street est. 300' West of 8th Avenue |
2019-01-08 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUMBER DOING BACKFILL IN SIDEWALK- NEW PERMIT IN SUBMITTED PHASE IN NYC STREETS |
2019-01-07 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete being poured to restore bus stop concrete pad opposite 230 Jay St |
2019-01-06 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival, I found a permanent sewer restoration flushed to grade in the driving lane. |
2019-01-05 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE |
2019-01-04 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site-unable to begin work until 10am. Notified Permittee of amendment |
2019-01-03 | No data | 36 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot inspect - work inside Kaufman studio's property - 36 st bet. 34 av & 35 av closed with fence,active BO inside. |
2019-01-02 | No data | AUSTIN STREET, FROM STREET 84 DRIVE TO STREET 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W resurfaced |
2018-12-27 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open sidewalk cut to replace steel piped to repair heat and hot water |
2018-12-27 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | MEET PERMITTEE ABOUT BUS PAD RESTORATION FOR JOHN TA 10 AM TO ? |
2018-12-22 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | return for photos& report for John Ta & Vinnie |
2018-12-22 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | emergency Repair Water crew on site - no stipulations on permit-held for external review in NYC STREETS. |
2018-12-18 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | CHASING WATER LEAK OFF SERVICE - 3 DAY NOTICE- DEP CUTS ALL OVER AREA-OPEN TRENCH IN BIKE LANE OF ROADWAY & SAW CUT ROADWAY OPPOSITE 230 JAY STREET. SIGNS UP FOR BIKE LANE. |
2018-12-18 | No data | JAY STREET, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | DEP on location confirmed 3 day notice and water affecting MTA rdwy and concrete bus pad excavated |
2018-12-17 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUTS: L#1:6' L#2:8' W#1:3' W:#2:3'1" D#1:5'1" D#2:4' WD:126.6 DD:115.2 MAX:120.0 Moisture:9.8 Cut#1 LIFT#1:96.9 LIFT#2:97.4 CUT#2: LIFT#1:96.4 LIFT#2:96.2 6" Cut back completed. Cuts are less than 10' apart, need to be made into one cut. Cuts pl |
2018-12-10 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair water work due to the cut within a construction barricaded area. |
2018-12-08 | No data | GREAT JONES STREET, FROM STREET BOWERY TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Basement. Went into Basement to Verify. |
2018-12-07 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut re-surfaced by other permittee. |
2018-12-04 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration near buidling operation |
2018-11-29 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk is old / there is expansion joints within 20' / lots of uneven flags in deserted area on sidewalk that doesn't go fully through. |
2018-11-28 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found the respondant failed to complete an irregular in shaped permanent repair water Trench in the Roadway, square or rectangular in shape as per H1042D note 3. Car 20186040197 was issued on 4/9/2018 prior to NOV being written. |
2018-11-28 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate within active BO |
2018-11-27 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR closed out. sewer cut re-surfaced by other permittee. |
2018-11-27 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR re-insp. Failed to install expansion s/w. NOV issued. |
2018-11-27 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES HAVE BEEN RE-SET- OK |
2018-11-25 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent with a permanent WATER repair, that is in need of being resealed and maintained, which Permittee failed to do. Permittee was issued CAR#20186520133, on 4/19/2018 to correct this condition, but failed to do so. |
2018-11-13 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 8'3"x5' down 4' IPS Plumbing Benny Foreman Jumping JackExclusive Testing Jason Sand ConeClean FIll Wet 121.1 Dry 110.3 Max 116 Actual 9.997.1 96.3 |
2018-11-09 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts on r.w |
2018-11-01 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration near parking lane acceptable |
2018-10-31 | No data | AUSTIN STREET, FROM STREET 64 ROAD TO STREET 65 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | perm cut to grade |
2018-10-27 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | please re-set steel plate in roadway at 61 bond street between state st & schermerhorn st. 311 noise complaint. |
2018-10-27 | No data | EAST 47 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk and roadway plated |
2018-10-24 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 steel plates with no markings covering a water restortion in the driving lane i/f/o 61 Bond street is very loose & noisy when vehicles drive over them. |
2018-10-22 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR re-insp. - Failed to install expansion joints. NOV issued. |
2018-10-20 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE CENTER OF RWY |
2018-10-18 | No data | WATERS PLACE, FROM STREET BEND TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site, doing sidewalk repair. I spoke to Timmy, who also repairing cave in condition adjacent to the curb. located opposite Liquor warehouse. |
2018-10-07 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This Final Restoration for WATER repair does not Conform with 1042D restoration, trench measures 50" minimum requirement is 54". Please have this condition corrected. |
2018-10-07 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent with a permanent WATER repair, that is in need of being resealed and maintained, which Permittee failed to do. Permittee was issued CAR#20186520133, on 4/19/2018 to correct this condition, but failed to do so. |
2018-10-06 | No data | ESSEX STREET, FROM STREET GRAND STREET TO STREET HESTER STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Failure to begin emergency work within 2 hours after authorization |
2018-10-06 | No data | WHITE PLAINS ROAD, FROM STREET EAST 216 STREET TO STREET EAST 217 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass in compliance |
2018-10-01 | No data | TIERNEY PLACE, FROM STREET EAST 177 STREET TO STREET LONGSTREET AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No roadway cut. |
2018-09-30 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut not cutback as per 1042D #6 |
2018-09-27 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer cut not visible due to two "GAZEBO" marked steel plates on roadway. |
2018-09-26 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water-sewer restorations ok |
2018-09-21 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration acceptable |
2018-09-19 | No data | 76 AVENUE, FROM STREET 271 STREET TO STREET HEWLETT STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Basement ( Katz Womens Hospital Super on Site) |
2018-09-15 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2018-09-11 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to complete an irregular in shaped perm repair water Trench in the Roadway, square or rectangular in shape as per H1042D note 3 states all Trenches must be square or rectangular in shaped. Car 20186040197 prior on 4/9/2018. |
2018-09-08 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer cut not visible due to two "GAZEBO" (M012018232B55) marked steel plates on roadway. |
2018-09-07 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | AT/P/O I observed a water restoration on the sidewalk with patchwork. Respondent failed to fully replace defective sidewalk flag . repondent was notifed via CAR ##20186030807 on 7.26.18 to make repairs but failed to make repairs |
2018-08-25 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR# 20183340289 issued 6/4 notifying respondent of 2 Sidewalk flags installed around water valve without expansion joints installed between old and new concrete. At this time no expansion joints were found. |
2018-08-24 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot properly inspect due to active B.O, barriers, fence, and material in the driving/parking lane. |
2018-08-22 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 6/24/2018. Respondent failed to obtain a c |
2018-08-15 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-08-11 | No data | QUEENS BOULEVARD, FROM STREET 67 DRIVE TO STREET 102 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in compliance at time of inspection. |
2018-08-11 | No data | 67 DRIVE, FROM STREET BOOTH STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration at crosswalk at 67 drive and queens boulevard. |
2018-08-03 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee failed to re-seal cut in roadway after being notified by C.A.R#20185270283 on 3/28/18 and condition remains. permit# used to I.D contractor |
2018-08-02 | No data | MULBERRY STREET, FROM STREET KENMARE STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-08-02 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. |
2018-07-29 | No data | MELBOURNE AVENUE, FROM STREET 150 STREET TO STREET 152 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp. 150-60 two perm. cuts to grade p/d/l - work for Queens college. |
2018-07-27 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | building operation took out permit# B02 2018 204B88 to cover plumber |
2018-07-26 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork on the Sidewalk is unacceptable, full flag restoration is required by rule. Also the Expansion Joint between the Curb and Sidewalk needs to be recessed and sealed, I/F/O 1210 |
2018-07-24 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2018-07-21 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to install expansion joints. |
2018-07-20 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A STEEL PLATED STREET OPENING DOEN 9 FEET IN SIDEWALK-WITHOUT A VALID DOT PERMIT TO DO SO. SIDEWALK STREET OPENING-NO PERMIT. EXPIRED DOT PERMIT#B012018142D67 EXP 6/24 |
2018-07-18 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your sidewalk expansion joint were never seal, please do so. |
2018-07-14 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to install permittee color code at the end of their sewer restoration. NOV issued. |
2018-07-13 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in the roadway |
2018-07-12 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 406, found segment roadway resurfaced and observed no work on sidewalk. |
2018-07-11 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR open under permit M012018121C21 for missing color code. |
2018-07-08 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm flush w/color codes. |
2018-07-05 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Called contractor ask them to take out new permit and repair improper cross streets- bruno |
2018-07-04 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CORRECT IN FRONT OF ADDRESS, INCORRECT CROSS STREETS, PERMIT EXPIRED D01 ISSUED |
2018-06-29 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut is in compliance |
2018-06-24 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I found a "T" shaped permanent restoration on the roadway. Therefore respondent failed to permanently restore water cut according to DOT standard specs H-1042D note 3 & 6. irregular shaped restoration. |
2018-06-21 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent with a permanent WATER repair, that is in need of being resealed and maintained, which Permittee failed to do. Permittee was issued CAR#20186520133, on 4/19/2018 to make repairs, but failed to do so. |
2018-06-14 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut not cutback as per 1042D #6. |
2018-06-04 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Sidewalk flags replaced in kind around valve are missing expansion joints between original and new concrete and along curb, wood left at tree pit. |
2018-06-04 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 Sidewalk flags replaced in kind around valve are missing expansion joints between original and new concrete and along curb, wood left at tree pit. |
2018-06-04 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee failed to re-seal cut in roadway after being notified by C.A.R#20185270283 on 3/28/18 and condition remains. permit# used to I.D contractor |
2018-05-30 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work on s/w or r/w found |
2018-05-29 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please install 2018 color code (33401) to permanent sewer cut. In front of 20-26 |
2018-05-28 | No data | PELHAM PARKWAY, FROM STREET BOLTON STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut work done |
2018-05-22 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | One steel plate secured in the roadway. ( The steel plate is within an active building operation temporary pedestrian walkway in the roadway ) |
2018-05-15 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in driving lane IFO 195 Fulton street. |
2018-05-11 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration on s/w and r/w |
2018-05-11 | No data | GRAND AVENUE, FROM STREET 47 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 3/21/2018. |
2018-05-07 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water-Sewer" restoration flush to grade in the parking/driving lane. |
2018-05-06 | No data | 4 AVENUE, FROM STREET 147 STREET TO STREET I 678 | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2018-05-06 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass, Arrive @ 11:45am schedule @ 12pm started @ 12:30pm departed 2pm (L-12'.8'' X D-6'-4' X D-3'.8'') IPS Plumbing corp, Foreman-Benny, Jumping jack,Exclusive Testing Labs Inc,Lab tech- Barbara,testing Device-sand cone. No cutbacks was done |
2018-05-05 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. permit expired 2/11/2018. Respondent failed to obtain a confirmation number |
2018-05-03 | No data | WEST 132 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | above respondent obtained street opening permit on protected street but failed to obtain confirmation number prior to expiration of permit as required. Permit expired 3-8-18. Respondent failed to obtain a confirmation number from the department. |
2018-05-03 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Driving Lane I/F/O 510, currently active B.O. |
2018-05-02 | No data | BOND STREET, FROM STREET SCHERMERHORN STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working |
2018-05-02 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2018-04-28 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to active Construction site. |
2018-04-21 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rd/w paved by BPP, s/w flush expansion joints sealed. |
2018-04-19 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR reissue. |
2018-04-19 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R Re-inspection passed. sidewalk patchwork on small portion of flag around tree pit is acceptable not Warranted a Car, sidewalk flag was nicely isolated with the add flag around the tree pit. |
2018-04-19 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration needs to be resealed. The edges and corners are slightly starting to break out. CAR20186550030 |
2018-04-14 | No data | MANGIN AVENUE, FROM STREET HANNIBAL STREET TO STREET MAYVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration. |
2018-04-13 | No data | BANK STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate 2017 water cut, however there is 2016 water cut in driving lane acceptable. |
2018-04-11 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the repsondent having a countersunk steel plate in the roadway with no identifying permitee information. ID respondent by specific location provided on permit. |
2018-04-09 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Irregular T shaped restoration in the driving lane measuring 31'' in width not conform with H-1042D Note 3 & 6. street opening joints needs resealing. pinholes must be filled with a fine asphalt concrete mix. Previous[CAR #20176030003] |
2018-04-09 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R Re-inspection failed. Permanent Irregular T shaped restoration measured 31'' in width not conform with H-1042D note 3 and 6. New car will be reissued for for permanent irregular T shaped restoration not conform with H-1042D note 3 and 6. |
2018-04-06 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION TRENCH ON THE ROADWAY IS FLUSH TO GRADE |
2018-04-03 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steal plates removed |
2018-03-29 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXPANSION JOINT ALONG CURB LINE IS VOID OF SEALER. PLEASE APPLY SEALER. REMOVE WOOD FORM THAT WAS LEFT BEHIND AFTER S/WALK WAS INSTALLED. *** CAR RE-ISSUED VIA CAR CLEAN UP *** |
2018-03-29 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINT ALONG CURB LINE IS VOID OF SEALER. PLEASE APPLY SEALER. REMOVE WOOD FORM THAT WAS LEFT BEHIND AFTER S/WALK WAS INSTALLED. *** CAR RE-ISSUED VIA CAR CLEAN UP *** |
2018-03-28 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | spike holes needs to be filled and also remove temporary asphalt from roadway. |
2018-03-28 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | spike holes needs to be filled and also remove temporary asphalt from roadway. |
2018-03-27 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER : Crew on site. |
2018-03-26 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Project-Condition remains, CAR will be re-issued. |
2018-03-26 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut not cutback as per 1042D #6. |
2018-03-24 | No data | BANK STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in this location 2016 has minor cracks acceptable. |
2018-03-20 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration I/F/O 511. |
2018-03-20 | No data | PHILIP AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 perm trench 10' apart in the driving lanes. |
2018-03-17 | No data | HUGHES AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2018-03-17 | No data | 164 STREET, FROM STREET DEPOT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade. |
2018-03-16 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | action taken on latest permit |
2018-03-16 | No data | PACIFIC STREET, FROM STREET BOERUM PLACE TO STREET COURT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | RESCHEDULED |
2018-03-16 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration permanent to grade in parking. (side of 183-19 Hillside Ave.) |
2018-03-15 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk plates in the roadway new permit on file at this time. |
2018-03-14 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plate in roadway with rasied plw sign |
2018-03-13 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate secured to the Sidewalk I/F/O 1210 |
2018-03-13 | No data | CAMBRELENG AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done by Con Edison |
2018-03-11 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done permit expired no newer permit found on file |
2018-03-10 | No data | WEST 132 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 5.5 x 3.3 x 2 tested 97.3 |
2018-03-06 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-125.7, Dry-Den-116.9, Max. Dry-Den-124.5, Act. Moist-7.5, Material- Clean fill (Blend), Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Shakeel, Compaction results- (96.7, 97.5) |
2018-03-05 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new work observed at this time of inspection |
2018-03-05 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT HAS A STEEL PLATED EXCAVATION ON THE ROADWAY WITHOUT A VALID PERMIT TO DO SO. DOT PERMIT#B012018032C39 EXP 3/2/2018 USED FOR ID. |
2018-03-03 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXPANSION JOINT ALONG CURB LINE IS VOID OF SEALER. PLEASE APPLY SEALER. REMOVE WOOD FORM THAT WAS LEFT BEHIND AFTER S/WALK WAS INSTALLED. |
2018-03-03 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD A FIBERGLASS PLATED SIDEWALK REPAIR WATER STREET OPENING DOWN 2 FEET IN SIDEWALK-WITHOUT A VALID DOT PERMIT TO DO SO. SIDEWALK STREET OPENING-NO PERMIT. EXPIRED DOT PERMIT#B012018032C39 EXP 3/2/18 WAS |
2018-03-01 | No data | 170 STREET, FROM STREET 81 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in d/l |
2018-03-01 | No data | SOUTH ROAD, FROM STREET BEND TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration flushed to grade in roadway. |
2018-02-28 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two Perm cuts flush to grade I.F.O 481 with no defects. |
2018-02-26 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2018-02-24 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | plumber restoration in roadway |
2018-02-22 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel Plate secured to the Sidewalk without a valid Permit, I/F/O 1210 |
2018-02-20 | No data | GRAND AVENUE, FROM STREET 47 STREET TO STREET 49 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued |
2018-02-18 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY, FIBERGLASS PLATED SIDEWALK BY PARK |
2018-02-17 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the above respondent failed to countersink steel plates that respondent has over a plumbers excavation on roadway during the winter moratorium which started 12/1/17 to 4/30/18. expired permit B012017310A76 used as id. |
2018-02-14 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed due to Active Building Operation. |
2018-02-13 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the department. |
2018-02-12 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/31/2017. Respondent |
2018-02-11 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY, FIBERGLASS PLATED SIDEWALK BY PARK |
2018-02-09 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber is working for the mta bus depot i spoke to supervisor of maintenance for the ulmer park bus depot anthony mancini . and he confirms that excavation belongs to the above plumber |
2018-02-09 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR condition still remains on sidewalk. |
2018-02-08 | No data | WEST 132 STREET, FROM STREET 12 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | Water cut in the parking lane . |
2018-02-08 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | 2 Perm restoration in roadway, upon side, work done for MTA. located at 3512-3514 |
2018-02-04 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resufraced roadway. |
2018-02-03 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the above respondent failed to countersink steel plates that respondent has over a plumbers excavation on roadway during the winter moratorium which started 12/1/17 to 3/31/18. expired permit B012017310A76 used as id. |
2018-02-03 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2018-02-03 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At this time no work done in the street. |
2018-02-03 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work in the roadway at this time. |
2018-02-02 | No data | WEST 26 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 sidewalk flags free of defects 279' from 8 avenue, 8' SSC. |
2018-01-31 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate secured in the bus lane I/F/O 1215 |
2018-01-30 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber is working for the mta bus depot i spoke to supervisor of maintenance for the ulmer park bus depot anthony mancini . and he confirms that excavation belongs to the above plumber |
2018-01-30 | No data | 76 AVENUE, FROM STREET 271 STREET TO STREET HEWLETT STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT HAS OPEN EXCAVATION ON A PROTECTED ROADWAY WITHOUT A VALID D.O.T PERMIT ON FILE. SPOKE TO FOREMAN (BENNY) ON SITE AND INFORMED HIM ABOUT THE VIOLATION. |
2018-01-29 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please re-seal perm water cut in bike lane ifo 52. |
2018-01-29 | No data | 2 AVENUE, FROM STREET EAST 63 STREET TO STREET EAST 64 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plate secured to the Sidewalk void of identifying markings, I/F/O 1210 |
2018-01-27 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD A FIBERGLASS PLATED SIDEWALK REPAIR WATER STREET OPENING DOWN 2 FEET IN SIDEWALK-WITHOUT A VALID DOT PERMIT TODO SO. SIDEWALK STREET OPENING-NO PERMIT. EXPIRED DOT PERMIT#B012017361A40 EXP 1/1 |
2018-01-26 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer: North side next to the Crosswalk at Park Ave Roadway |
2018-01-25 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Active | Department of Transportation | permit check |
2018-01-22 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | spike holes needs to be filled and also remove temporary asphalt from roadway. |
2018-01-20 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | work done in roadway, uptown side |
2018-01-19 | No data | BERGEN STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: LL14 | Department of Transportation | Re-scheduled due to no compaction guy |
2018-01-18 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I'm unable to inspect due to ongoing building Opp at this location. |
2018-01-16 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway / sidewalk plated. temp cut in the roadway with active permit on file |
2018-01-16 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Active | Department of Transportation | one steel plate on the sidewalk and one area plated and barricaded off in the parking lane. with a temp cut opposite |
2018-01-11 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber is working for the mta bus depot i spoke to supervisor of maintenance for the ulmer park bus depot anthony mancini . and he confirms that excavation belongs to the above plumber |
2018-01-10 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: E-Number | Department of Transportation | I observed a steel plate covering an excavated temporary water restoration on the sidewalk i/f/o 126 West 53 street. The area is barricaded with iron barricades |
2018-01-05 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | plumber cuts covered in snow. uptown side |
2018-01-03 | No data | 76 AVENUE, FROM STREET 269 STREET TO STREET 270 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | specific location opp LI J hospital entrance 76 ave / 271 st crew at site |
2018-01-03 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber is working for the mta bus depot i spoke to supervisor of maintenance for the ulmer park bus depot anthony mancini . and he confirms that excavation belongs to the above plumber |
2018-01-03 | No data | WHITE PLAINS ROAD, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cut in the roadway, uptown side |
2018-01-02 | No data | WEST 21 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-01-02 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag is in compliance adjacent to the curb. Insp. # 679 |
2017-12-30 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber is working for the mta bus depot i spoke to supervisor of maintenance for the ulmer park bus depot anthony mancini . and he confirms that excavation belongs to the above plumber |
2017-12-29 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cuts need to be re-sealed |
2017-12-19 | No data | BAY 38 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber is working for the mta bus depot i spoke to supervisor of maintenance for the ulmer park bus depot anthony mancini . and he confirms that excavation belongs to the above plumber |
2017-12-15 | No data | CENTRAL PARK WEST, FROM STREET WEST 97 STREET TO STREET WEST 100 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water service broken, Excavation in the driving lane i/f/o building #400. (DEP shunt off notice. ) |
2017-12-12 | No data | WEST 9 STREET, FROM STREET 5 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of bike lane & parking lane left in temp asphalt acceptable under active permit M012017340A01 |
2017-12-08 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk |
2017-12-08 | No data | FRONT STREET, FROM STREET OLD SLIP | No data | Street Construction Inspections: E-Number | Department of Transportation | Steel plate in the crosswalk of Front St and Old Slip, Specific location is correct |
2017-12-05 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH ROADWAY DURING WINTER MORATORIUM POLICY. |
2017-12-03 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH THE ROADWAY DURING WINTER MORATORIUM POLICY. |
2017-12-02 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration, |
2017-11-30 | No data | MELBOURNE AVENUE, FROM STREET 150 STREET TO STREET 152 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; visible water leak on 4 inch service to Queens College--excavating in the roadway on Melbourne Ave |
2017-11-26 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued for the above respondent has a permanent "Water" restoration measured 40'' in width in the roadway. Permittee restoration should be a minimum of 54'' in width after the required 18'' cutback was done as per H-1042D Note 6. |
2017-11-26 | No data | PHILIP AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondents permanent restoration has the wearing course not flush with surrounding roadway having asphalt broken out and cracked adjacent to cut. Respondent was notified as per CAR #20176490173 issued on 8/2/17, and has yet to be corrected. |
2017-11-22 | No data | WHITE PLAINS ROAD, FROM STREET EAST 216 STREET TO STREET EAST 217 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-11-22 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | no material stored |
2017-11-18 | No data | PHILIP AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the respondents permanent restorations of the wearing course not flush with the surrounding area. Respondent notified of cuts with asphalt breaking out in CAR 20176490173 but failed to make repairs. |
2017-11-17 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | - REPAIR WATER : Monitored back fill arrived 0911-1215: Wet density:120.6/120.9 Dry density:111.0/111.2 Max Dry:116.5/116.5 moisture: 8.7/8.7#1 Lift: 97.3 #2 Lift: 97.6 cut was plated. mark for cut back. Contractor had to get more material. |
2017-11-11 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | St. was resurfaced i/f/o location. |
2017-11-08 | No data | ARTHUR KILL ROAD, FROM STREET ENGERT STREET TO STREET ST LUKES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 10/7/17. |
2017-11-06 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR WATER -: Crew is on site working |
2017-11-05 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2017-11-04 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER : New permit # M012017306B32. There is an ongoing B.O. here at thislocation. |
2017-10-29 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut is sealed and in compliance |
2017-10-28 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New restoration done at location with ID tag 33401. Small cut adjacent to their cut doen't belong to permittee. |
2017-10-28 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to uniformly square off to a single width their Permanent irregular shape Water trench in the roadway as per NYCDOT Standard Detail Drawing H-1042D note 3. The respondent was notified by CAR #20176030003 issued on 1/4/17. |
2017-10-28 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-10-28 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO PERMANENTLY RESTORE 2 BASE RESTORATIONS IN ROADWAY WITHIN WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012017086C72 EXP 4/21/17 |
2017-10-24 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed concrete base restoration not flush with surrounding area. Concrete base is down 2 to 2 1/2 inches in roadway not flush with the surrounding area. |
2017-10-20 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B/O unable to locate work. |
2017-10-20 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active BO unable to view roadway |
2017-10-20 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced by new building |
2017-10-19 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY AND SIDEWALK |
2017-10-18 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 86 ROAD TO STREET FOOTHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done permit expired roadway and sidewalk in compliance. |
2017-10-17 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags around Water valve restored in kind. Cobble stone roadway to grade. |
2017-10-12 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | More recent permit on file (M012017270A12) |
2017-10-10 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE4FT0IN X 2FT0IN X 3FT7IN C:95.7 (1), 95.2 (2)WD:124.8; DD:114.8; MDD:119.5; MST:8.7%START 12:38 END 1:04 |
2017-10-10 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | found steel plate over open roadway cut |
2017-10-06 | No data | BROADWAY, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway at this time. |
2017-10-06 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the crosswalk closet to fulton st |
2017-10-06 | No data | WEST 85 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, Water service leaking in the basement, Excavation on the sidewalk and in the parking lane. |
2017-10-04 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2017-09-30 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the driving lane IFo 15 |
2017-09-29 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Make all required cutback as per 1042D #6, your 3ft x 2ft 8in cut is unacceptable. |
2017-09-28 | No data | RIVINGTON STREET, FROM STREET BOWERY TO STREET FREEMAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane acceptable. |
2017-09-28 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL 6FT X 8FT PERM RESTORATION CUT ON THE ROADWAY IN THE DRIVING LANE IN FRONT OF 613 |
2017-09-28 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag around Water valve restored to grade. Expansion joint at curb sealed. |
2017-09-27 | No data | 9 AVENUE, FROM STREET WEST 31 STREET TO STREET LINCOLN TUNNEL APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SIDEWALK |
2017-09-27 | No data | 69 STREET, FROM STREET 37 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade across the r/w |
2017-09-26 | No data | 67 DRIVE, FROM STREET BOOTH STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration permanent to grade. |
2017-09-26 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site making repair in rw |
2017-09-13 | No data | BLEECKER STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on Minetta Lane side of building - Perm to grade cut in the driving lane. One sidewalk flag around water valve restored in kind. Expansion joint at curbline sealed. |
2017-09-13 | No data | MINETTA STREET, FROM STREET 6 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in the driving lane. One sidewalk flag around water valve restored in kind. Expansion joint at curbline sealed. |
2017-09-08 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane in compliance at time of inspection at hillside and 184 street. |
2017-09-08 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Seal restored on Permanent Water Restoration. |
2017-08-31 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag around Water valve restored to grade. Expansion joint at curb sealed. |
2017-08-31 | No data | HUGHES AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Ed steel plates on site |
2017-08-28 | No data | EAST 76 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017233B74-new permit |
2017-08-24 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench acceptable.....full sidewalk replacement taking place |
2017-08-24 | No data | QUEENS BOULEVARD, FROM STREET 67 DRIVE TO STREET 102 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Base completed and acceptable. |
2017-08-24 | No data | WEST 29 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 Sidewalk flags have been restored opposite 357-359.. expansion joints between the curb and sidewalk are unsealed but within the MFM Storage site.. check on next inspection. |
2017-08-23 | No data | QUEENS BOULEVARD, FROM STREET 67 DRIVE TO STREET 102 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed in compliance (4'2" X 2'10" down 2'9") |
2017-08-23 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire Roadway resurfaced. |
2017-08-23 | No data | 67 DRIVE, FROM STREET BOOTH STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed the Respondent had an Steel Plated Excavation in the Roadway without an Valid Permit. Advised Site Foreman on 8/15/17 to Obtain a Permit if Required to Work in Segment as Part of an Water Leak in the MTA Substation. |
2017-08-23 | No data | 69 STREET, FROM STREET 37 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade across the r/w |
2017-08-15 | No data | QUEENS BOULEVARD, FROM STREET 67 DRIVE TO STREET 102 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Water Leaking into MTA Substation Work Crew Looking for Tap @ Location in the E/B Queens Blvd Service Road. MTA Reps on Site. |
2017-08-12 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for work in area. |
2017-08-09 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 35FT X 42FT PERM RESTORATION TRENCH ON THE ROADWAY I/F/O THE TRAIN STATION ON FULTON AND CLINTON IS FLUSH TO GRADE IN GOOD CONDITION |
2017-08-05 | No data | ATLANTIC AVENUE, FROM STREET 4 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT ON THE STREET OK |
2017-08-05 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain confirmation number two hours prior to the commencement of a backfill on a protected street |
2017-08-02 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN REPAVED I/F/O 500-502 |
2017-08-02 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to perform cutback upon finalizing restoration in roadway |
2017-08-02 | No data | PHILIP AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Adjacent to 1 out of the 4, perm water cuts there is asphalt broken out and cracked, also must add color code with year and IBM # on all 4 cuts, driving lane I/F/O parking lot , AKA 737. |
2017-07-29 | No data | SCHERMERHORN STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance, found in driving lane across from nyc park |
2017-07-23 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Driving/Parking Lane I/F/O 540 is Flush to Grade. |
2017-07-18 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at 114 E.25th St, 11'ft south of north curb ; restore seal on west side of your perm restoration |
2017-07-18 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut pehind barricades |
2017-07-06 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | North side next to the Crosswalk at Park Ave Roadway and Sidewalk Plated. |
2017-06-29 | No data | 164 STREET, FROM STREET DEPOT ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Started at 9:50, 5' 1'x2'x3' 4" cut backfilled, base to follow |
2017-06-28 | No data | EAST 32 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | North side next to the Crosswalk at Park Ave Roadway and Sidewalk Plated. |
2017-06-26 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in the driving lane in front of 101 Wall St. |
2017-06-24 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for the work in area. |
2017-06-23 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con-ed perm gas cut coverd perm water cut. |
2017-06-20 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017144B83 |
2017-06-20 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | concrete awaiting top asphalt |
2017-06-20 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in parking lane acceptable. |
2017-06-17 | No data | MANGIN AVENUE, FROM STREET HANNIBAL STREET TO STREET MAYVILLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two long water restoration in good condition color coded and sealed |
2017-06-16 | No data | KING STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR condition acceptable, water cut in compliance with 1042 procedures |
2017-06-08 | No data | BANK STREET, FROM STREET BLEECKER STREET TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-06-04 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway I/F/O 540 Plated, Permittee is maintaining an active Permit on file for this location. (M012017144B82) |
2017-06-02 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to comply with H-1042D note 3. |
2017-05-31 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm to grade long water cuts across roadway ( next to hydrant ). |
2017-05-22 | No data | CLINTON STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer repair acceptable |
2017-05-18 | No data | NOSTRAND AVENUE, FROM STREET AVENUE H TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 1 cut in bus pad in front of McDonalds. Note: DEP has a temporary exploratory cut in bus pad in front of McDonalds also. |
2017-05-18 | No data | NOSTRAND AVENUE, FROM STREET AVENUE H TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut in bus pad in front of McDonalds. 4ft x 4ft, down 4ft,97.2% & 96.6%. Arrival 11:38am to 1:10pm |
2017-05-14 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass roadway and sidewalk |
2017-05-13 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW STEEL PLATED WORK BY TIME WARNER OVER RESTORATION |
2017-05-12 | No data | NOSTRAND AVENUE, FROM STREET AVENUE H TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Roadway Flush to Grade @ opp 2161 Nostrand Ave. |
2017-05-07 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | all cuts were re-sealed. |
2017-05-03 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER REPAIRS ARE IN COMPLIANCE |
2017-05-02 | No data | KING STREET, FROM STREET 6 AVENUE TO STREET VARICK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor failed to do proper cutbacks on a non protected street (1042D). Repair water cut measures in width to 48" . Please comply with 1042 restoration procedures. (i/f/o 43) |
2017-05-01 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut ifo244 at driving lane needs to be sawcut anh have minimum of 42" as per standard diagram 1042D . |
2017-05-01 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICA condition doesn't belong to IPS Plumbing. This patch area over sewer main belongs to DEP & it has been there since before May 2009 (as per Google maps). Water cut on parking lane. |
2017-04-29 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: I/F/O #481 |
2017-04-28 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 94 Barrow Street there is a temp water cut on a cobblestone roadway that is overdue and asphalt is broken out and sunken in various areas, cobblestones are loose and causing a dangerous condition to vehicle traffic. |
2017-04-28 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | asphalt patch i/f/o 94 is pre-existant to 2014. |
2017-04-23 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE 4 TEMPORARY RESTORATIONS IN THE ROADWAY WITHIN REQUIRED TIME.PERMIT ON FILE EXPIRED ON 4/16/2017 |
2017-04-23 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut , not squared |
2017-04-20 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE 4 RESTORATION IN THE ROADWAY WITHIN REQUIRED TIME, LAST PERMIT ON FILE EXPIRED. 4/16/2017 |
2017-04-20 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED DUE TO NEW BUILDING |
2017-04-19 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to perform full flag restoration |
2017-04-16 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued for the above respondent failure to uniformly square off their Permanent irregular shape Water trench flush to grade in the roadway as per dot drawing H-1042D note 3. respondent was previously notify to correct this condition. |
2017-04-12 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cuts in r.w, |
2017-04-12 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to comply with DOT standard specifications on cobblestone roadway as per stip. -- NOV issued. |
2017-04-12 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed before expiration.. |
2017-04-02 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew is on site with with DEP awaiting a DEP inspector to arrive. I spoke to the DEP crew on site the ETA is 1 hour. Segment is currently closed off. |
2017-03-30 | No data | CANAL STREET, FROM STREET CENTRE STREET TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (2) cuts along parking lane. 4'6"X 4'3" X 18" 7 5' X 3'6" X 1'11". Wet-129.0/ Dry-120'1/ Max-124.0 Moisture-7.5 Tests 1)-98.7 & 96.7 |
2017-03-27 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition made safe with temporary asphalt |
2017-03-26 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | your sidewalk water restoration has sunken 2 1/2inches. |
2017-03-25 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the d/l, only able to see a portion of the cut due to active B.O, jersey berriers in the d/l. |
2017-03-25 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut restoration in compliance - no defects. |
2017-03-23 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | water cut present under plastic barrier. |
2017-03-22 | No data | DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Snow/ice may have obscured a sewer/water rest. |
2017-03-21 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | work appears to be complete however parking lane is very dirty |
2017-03-11 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with course that has not been squared off as required by standard drawing h-1042. respondent failed to comply with dot standard detail drawings as required by 34 rcny 2-11(e)(16)(iii)after 10\8\16 CAR #20164510849 |
2017-03-08 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 8:55-9:30. Contractor that was suppose to do wearing course cancelled on IPS Plumbing last minute. IPS plumbing will be calling office to re-schedule. |
2017-03-04 | No data | WHITE PLAINS ROAD, FROM STREET EAST 216 STREET TO STREET EAST 217 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on /w |
2017-03-04 | No data | 69 STREET, FROM STREET 37 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Water Service Heavy Water Leak going into the Subway Service R Line. MTA Rep on Site. |
2017-03-03 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found. |
2017-03-03 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | temp cut found under ped-walk barrier |
2017-03-03 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W PLATED WITH ACTIVE PERMIT M012017059B63 |
2017-02-28 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer repair or connection ongoing -- roadway & sidewalk plated. Photos taken. |
2017-02-26 | No data | 170 STREET, FROM STREET 81 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | address doesnt add up |
2017-02-20 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working in the parking lane. |
2017-02-14 | No data | PHILIP AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two temporary restorations on both sides of roadway |
2017-02-11 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk in driving lane with Raise Plow sign posted. Slush covered. |
2017-02-05 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNK PLATES IN R/W. |
2017-02-03 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I FOUND THE RESPONDENT ACTIVELY WORKING ON A FRIDAY WHEN ONLY ALLOWED TO" WORK SATURDAY, 8AM-6PM AND SUNDAY 9AM-6P M". AS PER STIPULATION 074. THIS LOCATION IS NOT IN A SCHOOL ZONE. PERMITTEE IS IN VIOLATION OF STIPULATION 074. |
2017-02-02 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: I/F/O # 481 two cuts. |
2017-01-30 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2017-01-30 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2017-01-28 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with course that has not been squared off as required by standard drawing h-1042. respondent failed to comply with dot standard detail drawings as required by 34 rcny 2-11(e)(16)(iii)after 10\8\16 CAR #20164510849 |
2017-01-26 | No data | EAST 115 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, DEP installing tap, closer to park Ave |
2017-01-20 | No data | CAMBRELENG AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2017-01-19 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane ok. Sidewalk flag that was redone also had been broken up from Con Edison. Car was written to Con Ed |
2017-01-14 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway. |
2017-01-13 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-01-06 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to visibly see water cuts they are located behind fence on concrete barriers. small portion sticking out in roadway,cant determine |
2017-01-04 | No data | ATLANTIC AVENUE, FROM STREET 4 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2017-01-04 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please refer to Permit #(M012016335A00) |
2017-01-04 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Visible water repair area acceptable. Couldn't see entire roadway excavation due to mini-containers (more then 20) placed over area. Sidewalk appears not touch. |
2017-01-04 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot located due to active B.O (M042016356A04) |
2017-01-04 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Four permanent water restorations in the roadway creating a long water cut from east to west Firehydrants. flushed to grade and color coded for identification. |
2016-12-29 | No data | WEST 53 STREET, FROM STREET 6 1/2 AVENUE TO STREET AVENUE OF THE AMERICAS | No data | Street Construction Inspections: E-Number | Department of Transportation | 2'x2' saw cut ( only ) in roadway opp. of 126. |
2016-12-27 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new repair water work observed in the roadway IFO 540, ACTIVE B/O occupying other half of roadway, unable to observe if a water cut was done. |
2016-12-23 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane of roadway. |
2016-12-23 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong permittee |
2016-12-21 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NICAA issued under newer permit # B012015216D15 |
2016-12-20 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut no long visible due to con ed trench over it |
2016-12-19 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew working on site cut starts near corner where capital one bank is. On Clinton street |
2016-12-19 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:30-12:30 5 cuts- 5 x 3 x 2, 6 x 3 x 4, 3 x 2'6" x 2'6", 7 x 3'6" x 3, 6 x 3 x 2 |
2016-12-12 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number. |
2016-12-08 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobble stones ok |
2016-12-08 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in the roadway. |
2016-12-07 | No data | MINETTA STREET, FROM STREET 6 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 2 cuts in the rdwy 1 left temp to grade with color code marker proper cut backs appear not to be done and i cut is plated...placement of cuts appear cuts will need to be joined as one and squared off...1 s/w flag replaced |
2016-12-07 | No data | BLEECKER STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work started on segment |
2016-12-06 | No data | WEST 29 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag in compliance, CAR WILL be issued at a later date as the expansion joints are not sealed. However, DDC contractor working in area and the flags are partailly within the storage zone on the sidewalk. |
2016-12-02 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED CAR RE-INSPECTION. |
2016-11-28 | No data | EAST 25 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Steel Plates secured to the Roadway and 1 on the Sidewalk, renewal is currently being held under holds review. |
2016-11-23 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobble stones completed, some depression forming. Unable to see entire restoration due to materials placed on roadway. Photos taken. |
2016-11-23 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repairs ongoing. Roadway plated IFO 100 Barrow st. |
2016-11-22 | No data | LEWIS STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | contractor failed to restore water repair cut on sidewalk leaving 38"(3'2") of the sidewalk flag unfinished around tree pit . Have contractor restore full flag. |
2016-11-20 | No data | FULTON STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 2 Temp cuts in the roadway , in front of garage for A.K.A 195 Broadway |
2016-11-04 | No data | RIVINGTON STREET, FROM STREET BOWERY TO STREET FREEMAN PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete. 2 lifts 2 tests passing wih a reading of 96.8% and 96.4%. 6" cut backs marked out. |
2016-10-28 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed, area IFO location is currenlty occupied by an active building operation. will observe when clear. |
2016-10-28 | No data | WEST STREET, FROM STREET GREEN STREET TO STREET HURON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk. Property Owner on Site. |
2016-10-24 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | cobble stone restoration complete |
2016-10-19 | No data | CLINTON STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION ACCEPTABLE |
2016-10-18 | No data | AVENUE Y, FROM STREET EAST 15 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-10-15 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | signs remove off the pole |
2016-10-13 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | cobble stone Restoration complete |
2016-10-09 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water roadway cut in compliance. no defects. |
2016-10-08 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please re-mill and restore permanent restoration at 613 Batic St- in a square or rectangle shape, odd shaped restorations are unacceptable.NYC DOT passed new section/rules in Highway Rules on September 8,2016. |
2016-10-05 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration flush to grade I/F/O 481. |
2016-09-27 | No data | 9 AVENUE, FROM STREET WEST 31 STREET TO STREET LINCOLN TUNNEL APPROACH | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp. to grade cut on sidewalk and roadway |
2016-09-26 | No data | 9 AVENUE, FROM STREET WEST 31 STREET TO STREET LINCOLN TUNNEL APPROACH | No data | Street Construction Inspections: Active | Department of Transportation | work done left temp asphalt at driving lane |
2016-09-25 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair restoration acceptable |
2016-09-24 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in r/w. at liquor warehouse wine |
2016-09-20 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated center rwy 80 ft east of 4 ave |
2016-09-16 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable |
2016-09-14 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repairs ongoing. Sidewalk & roadway plated. New permit applications were released. |
2016-09-12 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-09-10 | No data | CAMBRELENG AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | material removed |
2016-09-08 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER CUT IN TEMP WALKWAY IS IN COMPLIANCE |
2016-09-05 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2016-09-03 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm flush. |
2016-09-02 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | A/T/O I observed the Resondent failed to Begin Emergency work within 2 Hours after Obtaining ermit. No Excavations were found on the Existing Roadway Or Sidewalk. |
2016-09-01 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 86 ROAD TO STREET FOOTHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found in r/w or s/w |
2016-08-31 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cobblestones roadway & sidewalk plated. Renewal permit application released today, 8/31/16. Ongoing water repair acceptable. |
2016-08-29 | No data | EAST 51 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER. |
2016-08-23 | No data | BARROW STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2016-08-17 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm-Water restoration in compliance ,updated permit on file (M012016063B21). |
2016-08-13 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I obseerved the above respondent failure to remove their no raise plow sign from location as previously requester per car 20164330150 |
2016-07-25 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2016-07-24 | No data | CLINTON STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I Observed the respondent failed to seal expansion joints on sidewalk flag after completion of repair sewer perm cut, A (CAR #20165810328) was issued on 4/13/16, Noaction was taken |
2016-07-14 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Core survey, sidewalk flags have patchwork and is sunken 1.5". Expansion joints also not sealed |
2016-07-13 | No data | WHITE PLAINS ROAD, FROM STREET EAST 216 STREET TO STREET EAST 217 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w |
2016-07-12 | No data | WHITE PLAINS ROAD, FROM STREET EAST 216 STREET TO STREET EAST 217 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-06-26 | No data | CAMBRELENG AVENUE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped on the roadway / plated and ramped on the sidewalk |
2016-06-25 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Safely plated. |
2016-06-25 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced, sidewalk restored; joints sealed. |
2016-06-24 | No data | MANGIN AVENUE, FROM STREET HANNIBAL STREET TO STREET MAYVILLE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Serrvice Leak @ Tap. Property Owner on site. |
2016-06-18 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water |
2016-06-11 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | remove raise plow sign |
2016-06-11 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 steel plate in the driving lane pinned / ramped i/f/o 3615. |
2016-06-06 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 7' x 4' backfill |
2016-06-04 | No data | CLINTON STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | a/t/p/o i observed the respondent failed to seal expansion joints,permittee was notifies by CAR#20165810328 on 4/13/16 |
2016-06-03 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 steel plate in the driving lane pinned / ramped. |
2016-06-02 | No data | 8 AVENUE, FROM STREET WEST 34 STREET TO STREET WEST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER: Work in progress |
2016-05-31 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water restoration acceptable |
2016-05-18 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | worked done |
2016-05-16 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut acceptable |
2016-05-16 | No data | WEST 29 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Sidewalk excavation for complex, next to 9 ave . Water leak in the basement . |
2016-05-15 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w |
2016-05-15 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. ( Property Owner on Site) |
2016-05-14 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. in compliance |
2016-05-12 | No data | CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. |
2016-05-10 | No data | EAST 51 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street Mill Awaiting paving. |
2016-04-30 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut acceptable |
2016-04-29 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to respondent for failing to obtained a street opening permit on a protected street and completed the backfill, but failed to obtain a confirmation number prior to the expiration of such permit, as required. Permit expired 3/6/16 |
2016-04-26 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates in r/w newer permit on file |
2016-04-22 | No data | WAVERLY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE.ACTUAL START: 11:47PMDEPARTURE: 12:20PMDIMENSIONS: (L)16âX(W)4âX(D)3â5âCOMPACTION: 98.6% |
2016-04-20 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are {3) restorations in the roadway. |
2016-04-13 | No data | CLINTON STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, found sidewalk flags not restored as required to match rest of pavement. two 4'x3.5' flags require. Also, expansion joints between flag & curb not sealed. Set expansion joints 1/2" below pavement surface & apply sealer. IFO #63 |
2016-04-09 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IBM COLOR CODE APPLIED. |
2016-04-08 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | missing permanent IBM 33401 was installed opposite 20 West 39 street |
2016-04-07 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code installed |
2016-04-04 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code applied condition corrected |
2016-03-24 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway is in compliance |
2016-03-23 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | BF arrival time 9:57am & finish time 12:57pm. Cut backs was done. |
2016-03-22 | No data | AVENUE Y, FROM STREET EAST 15 STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w,s/w restoration found in compliance |
2016-03-12 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working in excavation in r/w |
2016-03-10 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut acceptable |
2016-02-21 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, unmarked plumber's countersunk steel plates(2) present IFO #99. NOV issued on valid permit M012016050B64 for not posting "Raise Plow" sign(s) 5 ft prior to location of plates. |
2016-02-21 | No data | WALL STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to post "Raise Plow" or "Lift Plow Blade" 5' prior to location of unmarked countersunk steel plates(2) as required during winter moratorium. Identified respondent through code 53 green paint dots around plates - plumber work. NOV issued. |
2016-02-20 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK-FILL COMPLETE AND ACCEPTABLE IN ROADWAY ON 7'X 4' BEFORE CUT-BACK EXCAVATION. CONCRETE BASE AFTER. |
2016-02-10 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 86 ROAD TO STREET FOOTHILL AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in Basement Building Super on Line. |
2016-02-10 | No data | WEST 26 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration flush to grade within construction zone. |
2016-02-06 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to post raised sign and countersink their steel plate with the roadway during winter moratorium. |
2016-01-21 | No data | AUSTIN STREET, FROM STREET 84 DRIVE TO STREET 125 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | no show need to reschedule location |
2016-01-20 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill pass/completed and acceptable |
2016-01-13 | No data | 184 STREET, FROM STREET DALNY ROAD TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; investigating location of water leak affecting MTA subway station underneath--excavation in r/w full with water |
2016-01-08 | No data | WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | could not properly inspect due to building operation on site |
2015-12-25 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D5C Atpo I observed the above respondent failed to respond to corrective action request#20154510774 and failed to install new color code(marker) in new permanent trenches in roadway- a violation of the above section/rule of Hig |
2015-12-23 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 20, Missing Permanent pavement marker with IBM # 33401 must be installed on permanent restoration. |
2015-12-18 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water leak on the main excavation on the sidewalk. |
2015-12-18 | No data | WATERS PLACE, FROM STREET EASTCHESTER ROAD TO STREET INDUSTRIAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | prevously condition |
2015-12-17 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated. |
2015-12-17 | No data | WHITE PLAINS ROAD, FROM STREET EAST 216 STREET TO STREET EAST 217 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w |
2015-12-14 | No data | WEST 24 STREET, FROM STREET 9 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent in violation of stipulation 078 of the above permit, by leaving metal Barricades with Cones around a Steel Plate with no markings and no pinning and ramping. No one was on site at the time of inspection. |
2015-12-10 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | C.A.R issued to newer permit on file for failure to install perm color code marker. M012015327B17 |
2015-12-10 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm restorations in the driving/parking lane finalized. Permanent color code marker identifying permittee has not been installed. Perm color code marker needs to be installed. |
2015-12-09 | No data | EAST 51 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Possible water cuts on block segmant have been covered in asphalt and pavement marker is not visible only other water cut on block does not match permittee. |
2015-11-28 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Active | Department of Transportation | R/W PLATED |
2015-11-28 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10'9" x 4" trench back filled in the parking/driving lane. cut backs have been completed and base is scheduled for later today. |
2015-11-27 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above Respondent maintaining 3 Steel Plate securing to the Roadway with no markings and no valid NYC DOT Permit on file for use of the Street. The above Permit expired on 11/22/15. |
2015-11-24 | No data | CLIFF STREET, FROM STREET FULTON STREET TO STREET JOHN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates at corner property building operation ok. |
2015-11-18 | No data | WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated. |
2015-11-02 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent fail to use skid resistant plating in the roadway. Respondent has 2 steel plates with green spray color code dots around them in the roadway marked "Bx ELEC" that are slippery to the touch. |
2015-10-31 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | D5C Atpo I observed the above respondent failed to respond to corrective action request#20155270774 and to install a permanent color code to identify the above permittee.Above expired dot permit was used for ID. |
2015-10-31 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please install expansion joint in new sidewalk flags, in front of 414 adelphi st. |
2015-10-19 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | N.O.V issued to MNP2015602036 for 2 plates on roadway after permit expired. |
2015-10-19 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | above respondent with use/opening of the roadway without a valid D.O.T permit on file to do so by having 2 steel plates in the parking lane marked "Bx ELEC". Permit # M012015267A04 for repair water expired on 10/9/2015 |
2015-10-11 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to install the required permanent identifying color code marker within a permanent restoration. C.A.R #20154790102 was issued to correct condition on 8/5/15. Condition still remains uncorrected. |
2015-10-09 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates in parking lane pinned and ramped ok. |
2015-10-07 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Crew not ready to install the wearing course 12 inch cut back done on the wearing course and 6 inches done on the base in front of 2947 |
2015-10-07 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent has 5 steel plates in the roadway w/o skid resistant on the plates. Plates are slippery when vehicles go over the steel plates i/f/o 2947. |
2015-10-06 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | failed no epoxy used 2 cuts |
2015-10-06 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent violate stip # SCHOOL working ONE HOUR AFTER END OF SCHOOL TIME 2:35PM. |
2015-10-02 | No data | CLINTON STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in curb lane in compliance. |
2015-10-01 | No data | BEDFORD PARK BL WEST, FROM STREET BEDFORD PARK BOULEVARD TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Check permit permittee working on site. |
2015-09-21 | No data | ADELPHI STREET, FROM STREET FULTON STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please add IBM color codes to 3 Perm cuts in front of 414 Adelphi street. |
2015-09-15 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | water cut plated pinned and ramp acceptable |
2015-09-04 | No data | BROADWAY, FROM STREET FRANKLIN STREET TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | no cut found |
2015-08-05 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: Active | Department of Transportation | upon completion of street opening on permanent c/c applied |
2015-07-25 | No data | BROADWAY, FROM STREET LISPENARD STREET TO STREET WALKER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, water repairs IFO premise in progress. roadway currently plated with green paint dot markings. |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-227756 | Office of Administrative Trials and Hearings | Issued | Settled | 2023-10-10 | 1000 | 2024-06-28 | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-226190 | Office of Administrative Trials and Hearings | Issued | Settled | 2023-03-27 | 1000 | 2023-07-05 | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-225925 | Office of Administrative Trials and Hearings | Issued | Settled | 2023-03-02 | 1000 | 2023-07-05 | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-225704 | Office of Administrative Trials and Hearings | Issued | Settled | 2023-01-20 | 1000 | 2023-07-05 | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-223374 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-02-16 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222903 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-11-09 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222846 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-10-28 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222851 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-10-09 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222300 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-08-09 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222274 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-31 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222177 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-15 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222175 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-12 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221982 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-06-28 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221604 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-01 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221529 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-27 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221480 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-06 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221362 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-03-30 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-219416 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-05-21 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
ASDRUBAL AGUIRRE
DPH PLUMBING GROUP INC IPSS PLUMBING, CORP. GMD PLUMBING, CORP.6506 GRAND AVENUE, MASPETH, NY, United States, 11378
DPH PLUMBING GROUP INC GMD PLUMBING, CORP. LORRY TRANSPORTATION INC. GREEN STAR ALL CONSTRUCTION, CORP.Date of last update: 25 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated