Name: | D.P. PAVING & CONCRETE INC |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 23 Jan 2014 (11 years ago) |
Entity Number: | 4517825 |
ZIP code: | 11378 |
County: | Queens |
Place of Formation: | New York |
Activity Description: | Civil Construction - Flat work concrete and asphalt |
Address: | 5448 65th place, maspeth, queens, NY, United States, 11378 |
Principal Address: | 5448 65th place, maspeth, NY, United States, 11378 |
Contact Details
Website https://www.dppavingny.com
Phone +1 347-898-9251
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
MARIE MAHONY | DOS Process Agent | 5448 65th place, maspeth, queens, NY, United States, 11378 |
Name | Role | Address |
---|---|---|
MARIE MAHONY | Chief Executive Officer | 5448 65TH PLACE, MASPETH, NY, United States, 11378 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
Q002024320A02 | 2024-11-15 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012024320A84 | 2024-11-15 | 2024-12-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 177 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET MORRIS AVENUE |
X012024319A95 | 2024-11-14 | 2024-12-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GRINNELL PLACE, BRONX, FROM STREET BARRY STREET TO STREET TRUXTON STREET |
X042024319A16 | 2024-11-14 | 2024-12-08 | REPLACE SIDEWALK | TRUXTON STREET, BRONX, FROM STREET GRINNELL PLACE TO STREET LEGGETT AVENUE |
X042024319A15 | 2024-11-14 | 2024-12-08 | REPLACE SIDEWALK | GRINNELL PLACE, BRONX, FROM STREET BARRY STREET TO STREET TRUXTON STREET |
X012024319A96 | 2024-11-14 | 2024-12-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | TRUXTON STREET, BRONX, FROM STREET GRINNELL PLACE TO STREET LEGGETT AVENUE |
Q002024317A09 | 2024-11-12 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
X012024317C47 | 2024-11-12 | 2024-12-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LEGGETT AVENUE, BRONX, FROM STREET DUPONT STREET TO STREET RANDALL AVENUE |
X042024317A21 | 2024-11-12 | 2024-12-08 | REPLACE SIDEWALK | LEGGETT AVENUE, BRONX, FROM STREET DUPONT STREET TO STREET RANDALL AVENUE |
X022024317A94 | 2024-11-12 | 2024-12-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LEGGETT AVENUE, BRONX, FROM STREET DUPONT STREET TO STREET RANDALL AVENUE |
Q042024311A76 | 2024-11-06 | 2024-12-03 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 31 AVENUE, QUEENS, FROM STREET 56 STREET |
Q042024311A75 | 2024-11-06 | 2024-12-03 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 31 AVENUE, QUEENS, FROM STREET 56 STREET |
Q012024309C39 | 2024-11-04 | 2024-11-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 AVENUE, QUEENS, FROM STREET 264 STREET TO STREET BEND |
Q012024309C40 | 2024-11-04 | 2024-12-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | HEWLETT STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 60 AVENUE |
Q012024309C38 | 2024-11-04 | 2024-12-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 AVENUE, QUEENS, FROM STREET HEWLETT STREET |
B012024304B11 | 2024-10-30 | 2024-11-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE |
M002024295A28 | 2024-10-21 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012024290A85 | 2024-10-16 | 2024-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WEST 48 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012024284B31 | 2024-10-10 | 2024-10-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012024284B18 | 2024-10-10 | 2024-10-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, BROOKLYN, FROM STREET 53 STREET |
B012024281A40 | 2024-10-07 | 2024-11-05 | RESET, REPAIR OR REPLACE CURB | PRESTON COURT, BROOKLYN, FROM STREET BEND TO STREET KINGS HIGHWAY |
B012024281A39 | 2024-10-07 | 2024-11-05 | RESET, REPAIR OR REPLACE CURB | PRESTON COURT, BROOKLYN, FROM STREET BEND TO STREET EAST 56 STREET |
B022024281A11 | 2024-10-07 | 2024-11-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESTON COURT, BROOKLYN, FROM STREET BEND TO STREET KINGS HIGHWAY |
B042024281A14 | 2024-10-07 | 2024-11-13 | REPAIR SIDEWALK | KINGS HIGHWAY, BROOKLYN, FROM STREET LIRR BAY RIDGE DIV TO STREET PRESTON COURT |
B042024281A13 | 2024-10-07 | 2024-11-05 | REPLACE SIDEWALK | PRESTON COURT, BROOKLYN, FROM STREET BEND TO STREET KINGS HIGHWAY |
B042024281A12 | 2024-10-07 | 2024-11-05 | REPLACE SIDEWALK | PRESTON COURT, BROOKLYN, FROM STREET BEND TO STREET EAST 56 STREET |
B022024281A10 | 2024-10-07 | 2024-11-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PRESTON COURT, BROOKLYN, FROM STREET BEND TO STREET EAST 56 STREET |
B012024276B72 | 2024-10-02 | 2024-11-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, BROOKLYN, FROM STREET 53 STREET TO STREET 54 STREET |
X042024270A04 | 2024-09-26 | 2024-11-08 | REPLACE SIDEWALK | TRUXTON STREET, BRONX, FROM STREET GRINNELL PLACE TO STREET LEGGETT AVENUE |
X012024270A37 | 2024-09-26 | 2024-11-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | TRUXTON STREET, BRONX, FROM STREET GRINNELL PLACE TO STREET LEGGETT AVENUE |
X042024270A05 | 2024-09-26 | 2024-11-08 | REPLACE SIDEWALK | LEGGETT AVENUE, BRONX, FROM STREET DUPONT STREET TO STREET RANDALL AVENUE |
X012024270A36 | 2024-09-26 | 2024-11-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GRINNELL PLACE, BRONX, FROM STREET BARRY STREET TO STREET TRUXTON STREET |
X042024270A03 | 2024-09-26 | 2024-11-08 | REPLACE SIDEWALK | GRINNELL PLACE, BRONX, FROM STREET BARRY STREET TO STREET TRUXTON STREET |
X022024270A70 | 2024-09-26 | 2024-11-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LEGGETT AVENUE, BRONX, FROM STREET DUPONT STREET TO STREET RANDALL AVENUE |
X012024270A38 | 2024-09-26 | 2024-11-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | LEGGETT AVENUE, BRONX, FROM STREET DUPONT STREET TO STREET RANDALL AVENUE |
Q022024269A75 | 2024-09-25 | 2024-10-17 | TEMPORARY PEDESTRIAN WALK | 41 AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET |
Q012024269F16 | 2024-09-25 | 2024-10-17 | RESET, REPAIR OR REPLACE CURB | 41 AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET |
Q012024269F17 | 2024-09-25 | 2024-10-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 41 AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET |
Q022024269A74 | 2024-09-25 | 2024-10-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 41 AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET |
Q042024269B39 | 2024-09-25 | 2024-10-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 41 AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET |
Q022024269A76 | 2024-09-25 | 2024-10-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET |
Q042024254A13 | 2024-09-10 | 2024-10-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q042024254A15 | 2024-09-10 | 2024-10-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q042024254A14 | 2024-09-10 | 2024-10-09 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q042024250A24 | 2024-09-06 | 2024-10-05 | REPAIR SIDEWALK | BARCLAY AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
X042024249A11 | 2024-09-05 | 2024-10-02 | REPAIR SIDEWALK | POST ROAD, BRONX, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET |
X012024249A36 | 2024-09-05 | 2024-10-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | POST ROAD, BRONX, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET |
X012024241A31 | 2024-08-28 | 2024-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | SOUTHERN BOULEVARD, BRONX, FROM STREET JENNINGS STREET TO STREET LOUIS NINE BOULEVARD |
Q042024226A48 | 2024-08-13 | 2024-08-24 | REPAIR SIDEWALK | 41 AVENUE, QUEENS, FROM STREET 210 STREET TO STREET 211 STREET |
Q012024222A56 | 2024-08-09 | 2024-08-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 29 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q042024222A07 | 2024-08-09 | 2024-08-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 29 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q022024222A39 | 2024-08-09 | 2024-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 29 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
Q012024208A67 | 2024-07-26 | 2024-08-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | STEINWAY STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 20 ROAD |
B012024206A43 | 2024-07-24 | 2024-08-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | MALCOLM X BOULEVARD, BROOKLYN, FROM STREET HALSEY STREET TO STREET MACON STREET |
Q012024197B06 | 2024-07-15 | 2024-08-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q012024197B08 | 2024-07-15 | 2024-08-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | UNION STREET, QUEENS, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE |
Q012024197B07 | 2024-07-15 | 2024-08-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARCLAY AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
B012024190A78 | 2024-07-08 | 2024-08-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 45 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q042024180A02 | 2024-06-28 | 2024-07-22 | REPAIR SIDEWALK | HOLLIS COURT BOULEVARD, QUEENS, FROM STREET 58 AVENUE TO STREET FRANCIS LEWIS BOULEVARD |
Q042024180A03 | 2024-06-28 | 2024-07-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q042024180A04 | 2024-06-28 | 2024-07-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q042024180A05 | 2024-06-28 | 2024-07-22 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q012024180B36 | 2024-06-28 | 2024-07-25 | RESET, REPAIR OR REPLACE CURB | 80 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET BEND |
Q012024180B37 | 2024-06-28 | 2024-07-22 | RESET, REPAIR OR REPLACE CURB | HOLLIS COURT BOULEVARD, QUEENS, FROM STREET 58 AVENUE TO STREET FRANCIS LEWIS BOULEVARD |
Q022024180B55 | 2024-06-28 | 2024-07-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 80 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET BEND |
Q022024180B56 | 2024-06-28 | 2024-07-25 | TEMPORARY PEDESTRIAN WALK | 80 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET BEND |
Q022024180B57 | 2024-06-28 | 2024-07-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 80 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET BEND |
Q022024180B58 | 2024-06-28 | 2024-07-22 | TEMPORARY PEDESTRIAN WALK | HOLLIS COURT BOULEVARD, QUEENS, FROM STREET 58 AVENUE TO STREET FRANCIS LEWIS BOULEVARD |
Q042024180A01 | 2024-06-28 | 2024-07-25 | REPLACE SIDEWALK | 80 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET BEND |
M012024169A47 | 2024-06-17 | 2024-06-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
X042024162A15 | 2024-06-10 | 2024-07-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | POST ROAD, BRONX, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET |
X022024162C28 | 2024-06-10 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | POST ROAD, BRONX, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET |
X012024162B22 | 2024-06-10 | 2024-07-11 | RESET, REPAIR OR REPLACE CURB | POST ROAD, BRONX, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET |
M042024155A11 | 2024-06-03 | 2024-06-21 | REPAIR SIDEWALK | WEST 22 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 10 AVENUE |
B012024142A71 | 2024-05-21 | 2024-06-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET CORTELYOU ROAD |
Q012024127B42 | 2024-05-06 | 2024-06-05 | RESET, REPAIR OR REPLACE CURB | UNION STREET, QUEENS, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE |
Q042024127A37 | 2024-05-06 | 2024-06-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BARCLAY AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
Q042024127A34 | 2024-05-06 | 2024-06-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | UNION STREET, QUEENS, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE |
Q022024127A25 | 2024-05-06 | 2024-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BARCLAY AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
Q012024127B50 | 2024-05-06 | 2024-05-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARCLAY AVENUE, QUEENS, FROM STREET UNION STREET |
Q012024127B47 | 2024-05-06 | 2024-06-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | BARCLAY AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
Q012024127B46 | 2024-05-06 | 2024-06-04 | RESET, REPAIR OR REPLACE CURB | BARCLAY AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
Q012024127B43 | 2024-05-06 | 2024-06-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | UNION STREET, QUEENS, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE |
M012024102C16 | 2024-04-11 | 2024-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 22 STREET |
M012024101A94 | 2024-04-10 | 2024-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 22 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 10 AVENUE |
M012024101A93 | 2024-04-10 | 2024-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 21 STREET TO STREET WEST 22 STREET |
Q042024100A29 | 2024-04-09 | 2024-04-20 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | PENELOPE AVENUE, QUEENS, FROM STREET WOODHAVEN BOULEVARD |
Q012024100B58 | 2024-04-09 | 2024-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | PENELOPE AVENUE, QUEENS, FROM STREET 84 PLACE TO STREET WOODHAVEN BOULEVARD |
Q022024100A84 | 2024-04-09 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | PENELOPE AVENUE, QUEENS, FROM STREET 84 PLACE TO STREET WOODHAVEN BOULEVARD |
Q042024100A20 | 2024-04-09 | 2024-04-20 | REPAIR SIDEWALK | PENELOPE AVENUE, QUEENS, FROM STREET 84 PLACE TO STREET WOODHAVEN BOULEVARD |
Q042024100A21 | 2024-04-09 | 2024-04-20 | REPAIR SIDEWALK | WOODHAVEN BOULEVARD, QUEENS, FROM STREET 63 DRIVE TO STREET PENELOPE AVENUE |
M022024086A77 | 2024-03-26 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
B012024085F03 | 2024-03-25 | 2024-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE |
M042024082A05 | 2024-03-22 | 2024-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
M012024082A74 | 2024-03-22 | 2024-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
M022024082C84 | 2024-03-22 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
M022024082C85 | 2024-03-22 | 2024-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
M012024082A75 | 2024-03-22 | 2024-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
M022024082C86 | 2024-03-22 | 2024-04-20 | TEMPORARY PEDESTRIAN WALK | EAST 26 STREET, MANHATTAN, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE |
Q042024077A00 | 2024-03-17 | 2024-04-09 | REPAIR SIDEWALK | WOODHAVEN BOULEVARD, QUEENS, FROM STREET 63 DRIVE TO STREET PENELOPE AVENUE |
Q012024077A04 | 2024-03-17 | 2024-04-09 | RESET, REPAIR OR REPLACE CURB | WOODHAVEN BOULEVARD, QUEENS, FROM STREET 63 DRIVE TO STREET PENELOPE AVENUE |
Q012024039B08 | 2024-02-08 | 2024-03-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 28 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q012024039B06 | 2024-02-08 | 2024-03-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 28 AVENUE, QUEENS, FROM STREET 32 STREET |
Q012024039B13 | 2024-02-08 | 2024-03-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 32 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD |
M012024032B41 | 2024-02-01 | 2024-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 21 STREET TO STREET WEST 22 STREET |
M012024032B40 | 2024-02-01 | 2024-02-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 10 AVENUE, MANHATTAN, FROM STREET WEST 22 STREET |
M012024032B42 | 2024-02-01 | 2024-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 22 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 10 AVENUE |
B012024031C52 | 2024-01-31 | 2024-02-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CARLTON AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012024025B38 | 2024-01-25 | 2024-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | CARLTON AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q012024003A70 | 2024-01-03 | 2024-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | ELLWELL CRESCENT, QUEENS, FROM STREET ALDERTON STREET TO STREET CARLTON STREET |
B012023340A34 | 2023-12-06 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN STREET, BROOKLYN, FROM STREET WASHINGTON AVENUE |
B012023340A64 | 2023-12-06 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012023340A33 | 2023-12-06 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | WASHINGTON AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
B012023339A42 | 2023-12-05 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN STREET, BROOKLYN, FROM STREET WASHINGTON AVENUE |
B012023338B19 | 2023-12-04 | 2023-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | WASHINGTON AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
B012023332B58 | 2023-11-28 | 2023-12-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET CONSELYEA STREET TO STREET SKILLMAN AVENUE |
M002023324A27 | 2023-11-20 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M002023324A28 | 2023-11-20 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
M012023320B07 | 2023-11-16 | 2023-12-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 113 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
M042023314A05 | 2023-11-10 | 2023-12-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 113 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
M012023314A20 | 2023-11-10 | 2023-12-08 | RESET, REPAIR OR REPLACE CURB | WEST 113 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
M022023314A51 | 2023-11-10 | 2023-12-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 113 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
M022023314A50 | 2023-11-10 | 2023-12-08 | TEMPORARY PEDESTRIAN WALK | WEST 113 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
B042023305A30 | 2023-11-01 | 2023-12-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BUFFALO AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
B012023305B49 | 2023-11-01 | 2023-12-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BUFFALO AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
B022023305C49 | 2023-11-01 | 2023-12-13 | TEMPORARY PEDESTRIAN WALK | BUFFALO AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
B022023305C50 | 2023-11-01 | 2023-12-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BUFFALO AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
B012023305B50 | 2023-11-01 | 2023-12-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BUFFALO AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
Q012023303C44 | 2023-10-30 | 2023-11-28 | RESET, REPAIR OR REPLACE CURB | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023303C45 | 2023-10-30 | 2023-11-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q042023303A24 | 2023-10-30 | 2023-11-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023278A59 | 2023-10-05 | 2023-11-07 | RESET, REPAIR OR REPLACE CURB | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q042023278A03 | 2023-10-05 | 2023-11-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q012023278A60 | 2023-10-05 | 2023-11-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
S012023235B03 | 2023-08-23 | 2023-09-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S012023235B04 | 2023-08-23 | 2023-09-16 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S042023235A10 | 2023-08-23 | 2023-09-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
Q012023228A96 | 2023-08-16 | 2023-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | TUDOR ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
Q042023228A54 | 2023-08-16 | 2023-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | TUDOR ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
Q012023228A95 | 2023-08-16 | 2023-09-14 | RESET, REPAIR OR REPLACE CURB | TUDOR ROAD, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
Q042023222A54 | 2023-08-10 | 2023-09-08 | REPAIR SIDEWALK | 97 PLACE, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q012023201B23 | 2023-07-20 | 2023-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD |
Q012023201B24 | 2023-07-20 | 2023-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE |
Q012023201B25 | 2023-07-20 | 2023-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | HICKSVILLE ROAD, QUEENS, FROM STREET BEACH 9 STREET TO STREET BEND |
Q012023193C89 | 2023-07-12 | 2023-08-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
Q012023193C74 | 2023-07-12 | 2023-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
Q012023193C75 | 2023-07-12 | 2023-08-10 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
Q012023193C88 | 2023-07-12 | 2023-08-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
Q042023193A97 | 2023-07-12 | 2023-08-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
Q042023193A98 | 2023-07-12 | 2023-08-10 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
B012023187A62 | 2023-07-06 | 2023-08-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | GARFIELD PLACE, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B042023171A25 | 2023-06-20 | 2023-07-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAY 34 STREET, BROOKLYN, FROM STREET BENSON AVENUE |
Q012023167C10 | 2023-06-16 | 2023-07-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 68 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q042023165A48 | 2023-06-14 | 2023-07-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | HICKSVILLE ROAD, QUEENS, FROM STREET BEACH 9 STREET TO STREET BEND |
Q012023165B98 | 2023-06-14 | 2023-07-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE |
Q012023165C00 | 2023-06-14 | 2023-07-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | HICKSVILLE ROAD, QUEENS, FROM STREET BEACH 9 STREET TO STREET BEND |
Q012023165C09 | 2023-06-14 | 2023-07-18 | RESET, REPAIR OR REPLACE CURB | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE |
Q012023165C12 | 2023-06-14 | 2023-07-18 | RESET, REPAIR OR REPLACE CURB | HICKSVILLE ROAD, QUEENS, FROM STREET BEACH 9 STREET TO STREET BEND |
Q022023165B30 | 2023-06-14 | 2023-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE |
Q022023165B31 | 2023-06-14 | 2023-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HICKSVILLE ROAD, QUEENS, FROM STREET BEACH 9 STREET TO STREET BEND |
Q042023165A42 | 2023-06-14 | 2023-07-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD |
Q042023165A43 | 2023-06-14 | 2023-07-11 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD |
Q042023165A44 | 2023-06-14 | 2023-07-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD |
Q042023165A45 | 2023-06-14 | 2023-07-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE |
Q042023165A46 | 2023-06-14 | 2023-07-18 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BEACH 9 STREET, QUEENS, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE |
Q042023165A47 | 2023-06-14 | 2023-07-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | HICKSVILLE ROAD, QUEENS, FROM STREET BEACH 9 STREET TO STREET BEND |
B012023157B61 | 2023-06-06 | 2023-07-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
Q012023136B56 | 2023-05-16 | 2023-06-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 90 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M042023124A11 | 2023-05-04 | 2023-06-07 | REPAIR SIDEWALK | WEST 171 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023124B85 | 2023-05-04 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 171 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023124B84 | 2023-05-04 | 2023-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 171 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
B012023118B88 | 2023-04-28 | 2023-05-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 52 STREET, BROOKLYN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012023115C47 | 2023-04-25 | 2023-05-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 52 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
Q012023107C76 | 2023-04-17 | 2023-05-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | 131 STREET, QUEENS, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012023097B09 | 2023-04-07 | 2023-05-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 233 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
M042023097A19 | 2023-04-07 | 2023-05-06 | REPAIR SIDEWALK | WEST 46 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q042023096A29 | 2023-04-06 | 2023-05-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012023096B81 | 2023-04-06 | 2023-05-05 | RESET, REPAIR OR REPLACE CURB | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
B012023093A45 | 2023-04-03 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BAY 34 STREET, BROOKLYN, FROM STREET BENSON AVENUE |
B012023093C17 | 2023-04-03 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BAY 34 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B012023093A44 | 2023-04-03 | 2023-05-02 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BENSON AVENUE, BROOKLYN, FROM STREET 23 AVENUE TO STREET BAY 34 STREET |
B042023086A81 | 2023-03-27 | 2023-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAY 34 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B042023086A80 | 2023-03-27 | 2023-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BENSON AVENUE, BROOKLYN, FROM STREET 23 AVENUE TO STREET BAY 34 STREET |
B042023086A50 | 2023-03-27 | 2023-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORMAN AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022023086B62 | 2023-03-27 | 2023-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NORMAN AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012023086C06 | 2023-03-27 | 2023-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BAY 34 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B012023086C05 | 2023-03-27 | 2023-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | BENSON AVENUE, BROOKLYN, FROM STREET 23 AVENUE TO STREET BAY 34 STREET |
B012023086A82 | 2023-03-27 | 2023-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | NORMAN AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012023086A81 | 2023-03-27 | 2023-04-20 | RESET, REPAIR OR REPLACE CURB-PROTECTED | NORMAN AVENUE, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
Q012023080B59 | 2023-03-21 | 2023-04-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 90 ROAD, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
Q012023080B66 | 2023-03-21 | 2023-04-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | JAMAICA AVENUE, QUEENS, FROM STREET 153 STREET TO STREET GRACE CEMETERY BOUNDARY |
B012023075A75 | 2023-03-16 | 2023-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | JOHNSON AVENUE, BROOKLYN, FROM STREET GARDNER AVENUE TO STREET SCOTT AVENUE |
B012023075A76 | 2023-03-16 | 2023-04-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | JOHNSON AVENUE, BROOKLYN, FROM STREET SCOTT AVENUE |
B012023075A77 | 2023-03-16 | 2023-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | SCOTT AVENUE, BROOKLYN, FROM STREET JOHNSON AVENUE TO STREET RANDOLPH STREET |
Q012023074B15 | 2023-03-15 | 2023-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q002023073A00 | 2023-03-14 | No data | MISCELLANEOUS - MINOR SALES | No data |
B022023065A50 | 2023-03-06 | 2023-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LORIMER STREET, BROOKLYN, FROM STREET GRAND STREET TO STREET POWERS STREET |
B012023065B16 | 2023-03-06 | 2023-04-01 | RESET, REPAIR OR REPLACE CURB | LORIMER STREET, BROOKLYN, FROM STREET GRAND STREET TO STREET POWERS STREET |
B012023065B17 | 2023-03-06 | 2023-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET GRAND STREET TO STREET POWERS STREET |
B042023065A15 | 2023-03-06 | 2023-04-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LORIMER STREET, BROOKLYN, FROM STREET GRAND STREET TO STREET POWERS STREET |
B012023061A81 | 2023-03-02 | 2023-03-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | SHORE ROAD, BROOKLYN, FROM STREET 80 STREET TO STREET PEDESTRIAN OVERPASS |
Q012023040B06 | 2023-02-09 | 2023-02-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | UNION TURNPIKE, QUEENS, FROM STREET 169 STREET TO STREET 170 STREET |
Q042023039A03 | 2023-02-08 | 2023-03-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 191 STREET, QUEENS, FROM STREET PALO ALTO AVENUE |
Q012023039A45 | 2023-02-08 | 2023-02-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 191 STREET, QUEENS, FROM STREET HAYWOOD ROAD TO STREET PALO ALTO AVENUE |
Q042023039A05 | 2023-02-08 | 2023-03-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 191 STREET, QUEENS, FROM STREET PALO ALTO AVENUE |
Q012023039A46 | 2023-02-08 | 2023-02-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | PALO ALTO AVENUE, QUEENS, FROM STREET 191 STREET TO STREET BEND |
Q042023039A04 | 2023-02-08 | 2023-03-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 191 STREET, QUEENS, FROM STREET PALO ALTO AVENUE |
Q012023039A47 | 2023-02-08 | 2023-02-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 191 STREET, QUEENS, FROM STREET PALO ALTO AVENUE |
Q012023037A19 | 2023-02-06 | 2023-03-07 | RESET, REPAIR OR REPLACE CURB | PALO ALTO AVENUE, QUEENS, FROM STREET 191 STREET TO STREET BEND |
Q022023037A00 | 2023-02-06 | 2023-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 191 STREET, QUEENS, FROM STREET HAYWOOD ROAD TO STREET PALO ALTO AVENUE |
Q012023037A20 | 2023-02-06 | 2023-03-07 | RESET, REPAIR OR REPLACE CURB | 191 STREET, QUEENS, FROM STREET HAYWOOD ROAD TO STREET PALO ALTO AVENUE |
Q042023037A02 | 2023-02-06 | 2023-03-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PALO ALTO AVENUE, QUEENS, FROM STREET 191 STREET TO STREET BEND |
Q042023037A04 | 2023-02-06 | 2023-03-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 191 STREET, QUEENS, FROM STREET HAYWOOD ROAD TO STREET PALO ALTO AVENUE |
M042023037A02 | 2023-02-06 | 2023-03-02 | REPAIR SIDEWALK | ALLEN STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
Q012023033C08 | 2023-02-02 | 2023-02-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 192 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE |
Q012023018C01 | 2023-01-18 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 7 AVENUE, QUEENS, FROM STREET 129 STREET |
Q012023018A84 | 2023-01-18 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 140 STREET, QUEENS, FROM STREET 130 AVENUE TO STREET 133 AVENUE |
Q012023013B38 | 2023-01-13 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 80 DRIVE, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
Q012023013B40 | 2023-01-13 | 2023-01-29 | RESET, REPAIR OR REPLACE CURB | 80 DRIVE, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
Q012023013B37 | 2023-01-13 | 2023-01-29 | RESET, REPAIR OR REPLACE CURB | 80 DRIVE, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
Q012023013B41 | 2023-01-13 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 80 DRIVE, QUEENS, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET |
B012023012A40 | 2023-01-12 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FULTON STREET, BROOKLYN, FROM STREET ROCKAWAY AVENUE TO STREET SOMERS STREET |
Q012023006B51 | 2023-01-06 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
M042023006A03 | 2023-01-06 | 2023-01-21 | REPAIR SIDEWALK | MERCER STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M042023006A02 | 2023-01-06 | 2023-01-29 | REPAIR SIDEWALK | MERCER STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
Q012023006B49 | 2023-01-06 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023006B52 | 2023-01-06 | 2023-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
B012022350B48 | 2022-12-16 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET |
B012022350B52 | 2022-12-16 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 9 AVENUE, BROOKLYN, FROM STREET 60 STREET |
B012022350B47 | 2022-12-16 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 60 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022349B35 | 2022-12-15 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELDERT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012022349B36 | 2022-12-15 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | MADISON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022348A14 | 2022-12-14 | 2022-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022348A15 | 2022-12-14 | 2022-12-14 | RESET, REPAIR OR REPLACE CURB | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022348A16 | 2022-12-14 | 2022-12-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B042022348A02 | 2022-12-14 | 2022-12-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B042022348A03 | 2022-12-14 | 2022-12-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022348A51 | 2022-12-14 | 2022-12-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022348A50 | 2022-12-14 | 2022-12-14 | TEMPORARY PEDESTRIAN WALK | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022348A53 | 2022-12-14 | 2022-12-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022348A52 | 2022-12-14 | 2022-12-14 | TEMPORARY PEDESTRIAN WALK | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022348A13 | 2022-12-14 | 2022-12-14 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
Q012022346C34 | 2022-12-12 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 124 STREET, QUEENS, FROM STREET 11 AVENUE TO STREET 13 AVENUE |
M022022334C73 | 2022-11-30 | 2022-12-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MERCER STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
M042022334A08 | 2022-11-30 | 2022-12-17 | REPAIR SIDEWALK | MERCER STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET GRAND STREET |
Q042022331A00 | 2022-11-27 | 2022-12-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012022331A01 | 2022-11-27 | 2022-12-27 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012022331A02 | 2022-11-27 | 2022-12-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
M002022327A01 | 2022-11-23 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B042022320A28 | 2022-11-16 | 2022-12-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B042022320A27 | 2022-11-16 | 2022-12-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022320B95 | 2022-11-16 | 2022-12-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022320B94 | 2022-11-16 | 2022-12-17 | TEMPORARY PEDESTRIAN WALK | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022320B93 | 2022-11-16 | 2022-12-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B022022320B92 | 2022-11-16 | 2022-12-17 | TEMPORARY PEDESTRIAN WALK | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022320D86 | 2022-11-16 | 2022-12-17 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022320D85 | 2022-11-16 | 2022-12-17 | RESET, REPAIR OR REPLACE CURB-PROTECTED | GUIDER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022320D84 | 2022-11-16 | 2022-12-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
B012022320D83 | 2022-11-16 | 2022-12-17 | RESET, REPAIR OR REPLACE CURB | BANNER AVENUE, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET |
Q012022314B93 | 2022-11-10 | 2022-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012022314B92 | 2022-11-10 | 2022-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
Q012022314B94 | 2022-11-10 | 2022-11-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET |
Q022022306A69 | 2022-11-02 | 2022-11-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
Q042022306A16 | 2022-11-02 | 2022-11-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
Q022022306A68 | 2022-11-02 | 2022-11-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
Q012022306C31 | 2022-11-02 | 2022-11-18 | RESET, REPAIR OR REPLACE CURB | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
Q022022306A67 | 2022-11-02 | 2022-11-18 | TEMPORARY PEDESTRIAN WALK | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
Q002022304A02 | 2022-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012022298B28 | 2022-10-25 | 2022-11-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | HART STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE |
B022022292C74 | 2022-10-19 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022292C75 | 2022-10-19 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | DECATUR STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B042022292A21 | 2022-10-19 | 2022-11-19 | REPAIR SIDEWALK | DECATUR STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022292C73 | 2022-10-19 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022292C72 | 2022-10-19 | 2022-11-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DECATUR STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022292C70 | 2022-10-19 | 2022-11-30 | TEMPORARY PEDESTRIAN WALK | DECATUR STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022292C71 | 2022-10-19 | 2022-11-30 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B042022292A22 | 2022-10-19 | 2022-11-19 | REPAIR SIDEWALK | COOPER STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
Q042022286A34 | 2022-10-13 | 2022-11-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q042022286A35 | 2022-10-13 | 2022-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET |
Q042022286A36 | 2022-10-13 | 2022-11-14 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET |
Q012022286C94 | 2022-10-13 | 2022-11-14 | RESET, REPAIR OR REPLACE CURB | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022022286A35 | 2022-10-13 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022022286A34 | 2022-10-13 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
B002022276A02 | 2022-10-03 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012022272C23 | 2022-09-29 | 2022-10-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | FOWLER AVENUE, QUEENS, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD |
Q022022272A93 | 2022-09-29 | 2022-10-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FOWLER AVENUE, QUEENS, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD |
Q042022272A21 | 2022-09-29 | 2022-10-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FOWLER AVENUE, QUEENS, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD |
Q012022272C22 | 2022-09-29 | 2022-10-27 | RESET, REPAIR OR REPLACE CURB | FOWLER AVENUE, QUEENS, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD |
B022022264C12 | 2022-09-21 | 2022-10-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B022022264C10 | 2022-09-21 | 2022-10-31 | TEMPORARY PEDESTRIAN WALK | 17 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B012022264C12 | 2022-09-21 | 2022-10-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 17 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B012022264C11 | 2022-09-21 | 2022-10-20 | RESET, REPAIR OR REPLACE CURB | 17 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B042022264A12 | 2022-09-21 | 2022-10-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 17 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B022022264C11 | 2022-09-21 | 2022-10-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B012022259B04 | 2022-09-16 | 2022-10-16 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012022257A60 | 2022-09-14 | 2022-10-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
X012022256C61 | 2022-09-13 | 2022-10-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE |
Q012022251D76 | 2022-09-08 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 215 PLACE, QUEENS, FROM STREET 36 AVENUE TO STREET 38 AVENUE |
Q012022251D71 | 2022-09-08 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 36 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 216 STREET |
Q012022251D69 | 2022-09-08 | 2022-10-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | 36 AVENUE, QUEENS, FROM STREET 215 PLACE |
Q012022249D06 | 2022-09-06 | 2022-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 20 ROAD, QUEENS, FROM STREET STEINWAY STREET |
Q012022244A63 | 2022-09-01 | 2022-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | STEINWAY STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 20 ROAD |
B012022244B71 | 2022-09-01 | 2022-09-30 | RESET, REPAIR OR REPLACE CURB | NORTH HENRY STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B012022244B19 | 2022-09-01 | 2022-09-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | NORTH HENRY STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B042022244A29 | 2022-09-01 | 2022-09-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORTH HENRY STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
Q012022235B73 | 2022-08-23 | 2022-09-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 170 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 73 AVENUE |
B022022228B89 | 2022-08-16 | 2022-09-30 | TEMPORARY PEDESTRIAN WALK | DEVOE STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B042022228B18 | 2022-08-16 | 2022-09-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DEVOE STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B012022228B94 | 2022-08-16 | 2022-09-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | DEVOE STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022022228B90 | 2022-08-16 | 2022-09-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DEVOE STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022022228B91 | 2022-08-16 | 2022-09-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | DEVOE STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B012022228B93 | 2022-08-16 | 2022-09-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | DEVOE STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B012022227A64 | 2022-08-15 | 2022-09-15 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | DEVOE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
M012022224A65 | 2022-08-12 | 2022-09-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET |
M012022224A62 | 2022-08-12 | 2022-09-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 86 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE |
M012022224A66 | 2022-08-12 | 2022-09-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 86 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
X012022224A78 | 2022-08-12 | 2022-09-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | BERGEN AVENUE, BRONX, FROM STREET WESTCHESTER AVENUE |
X012022224A79 | 2022-08-12 | 2022-09-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | WESTCHESTER AVENUE, BRONX, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET |
Q012022223B63 | 2022-08-11 | 2022-09-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 15 AVENUE, QUEENS, FROM STREET 110 STREET TO STREET DEAD END |
Q012022223B58 | 2022-08-11 | 2022-09-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 110 STREET, QUEENS, FROM STREET 14 ROAD TO STREET 15 AVENUE |
Q012022221B92 | 2022-08-09 | 2022-09-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 233 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012022221B89 | 2022-08-09 | 2022-09-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | 64 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q012022221B91 | 2022-08-09 | 2022-09-07 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 64 AVENUE, QUEENS, FROM STREET 233 STREET |
Q012022220B25 | 2022-08-08 | 2022-09-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 81 STREET, QUEENS, FROM STREET 157 AVENUE |
Q012022217D02 | 2022-08-05 | 2022-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 157 AVENUE, QUEENS, FROM STREET 81 STREET TO STREET BEND |
Q012022217D09 | 2022-08-05 | 2022-09-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 81 STREET, QUEENS, FROM STREET 157 AVENUE TO STREET 158 AVENUE |
Q012022217D10 | 2022-08-05 | 2022-09-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 15 AVENUE, QUEENS, FROM STREET 110 STREET |
Q012022196A93 | 2022-07-15 | 2022-08-10 | PAVE STREET-W/ ENGINEERING & INSP FEE | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
Q012022196A92 | 2022-07-15 | 2022-08-10 | RESET, REPAIR OR REPLACE CURB | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
Q042022196A00 | 2022-07-15 | 2022-08-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
Q022022196A03 | 2022-07-15 | 2022-08-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 22 AVENUE TO STREET 23 AVENUE |
B012022195A24 | 2022-07-14 | 2022-08-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | DE KALB AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012022195A23 | 2022-07-14 | 2022-08-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | SUYDAM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M042022195A02 | 2022-07-14 | 2022-08-12 | REPAIR SIDEWALK | ALLEN STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
M012022195A76 | 2022-07-14 | 2022-08-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 40 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q012022188C17 | 2022-07-07 | 2022-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 157 AVENUE, QUEENS, FROM STREET 81 STREET TO STREET BEND |
Q012022180C43 | 2022-06-29 | 2022-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 75 STREET, QUEENS, FROM STREET JUNIPER VALLEY ROAD TO STREET PENELOPE AVENUE |
Q042022175A14 | 2022-06-24 | 2022-07-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE |
Q042022175A15 | 2022-06-24 | 2022-07-22 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE |
Q012022174A86 | 2022-06-23 | 2022-07-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 81 STREET, QUEENS, FROM STREET 157 AVENUE TO STREET 158 AVENUE |
Q012022167B68 | 2022-06-16 | 2022-07-19 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 32 AVENUE, QUEENS, FROM STREET 106 STREET TO STREET 107 STREET |
Q012022137B70 | 2022-05-17 | 2022-06-15 | PAVE STREET-W/ ENGINEERING & INSP FEE | MULBERRY AVENUE, QUEENS, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD |
B012022136B33 | 2022-05-16 | 2022-06-14 | RESET, REPAIR OR REPLACE CURB | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022136B18 | 2022-05-16 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022136B34 | 2022-05-16 | 2022-06-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B042022136A31 | 2022-05-16 | 2022-06-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012022133B67 | 2022-05-13 | 2022-06-10 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 231 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD |
Q022022133A74 | 2022-05-13 | 2022-06-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 231 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD |
Q042022133A30 | 2022-05-13 | 2022-06-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 231 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD |
Q012022133B68 | 2022-05-13 | 2022-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 231 STREET, QUEENS, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD |
Q012022124C20 | 2022-05-04 | 2022-06-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE |
Q012022123B28 | 2022-05-03 | 2022-06-02 | RESET, REPAIR OR REPLACE CURB | 164 PLACE, QUEENS, FROM STREET 110 ROAD TO STREET BRINKERHOFF AVENUE |
Q002022123A00 | 2022-05-03 | No data | MISCELLANEOUS - MINOR SALES | No data |
Q012022123B29 | 2022-05-03 | 2022-06-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 164 PLACE, QUEENS, FROM STREET 110 ROAD TO STREET BRINKERHOFF AVENUE |
Q042022123A14 | 2022-05-03 | 2022-06-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 164 PLACE, QUEENS, FROM STREET 110 ROAD TO STREET BRINKERHOFF AVENUE |
Q012022119C86 | 2022-04-29 | 2022-05-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE |
Q012022119C85 | 2022-04-29 | 2022-05-28 | RESET, REPAIR OR REPLACE CURB | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE |
Q022022119A51 | 2022-04-29 | 2022-05-28 | TEMPORARY PEDESTRIAN WALK | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE |
Q022022119A52 | 2022-04-29 | 2022-05-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE |
Q022022119A53 | 2022-04-29 | 2022-05-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE |
Q042022119A17 | 2022-04-29 | 2022-05-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CASE STREET, QUEENS, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE |
Q022022118B35 | 2022-04-28 | 2022-05-31 | TEMPORARY PEDESTRIAN WALK | LAMONT AVENUE, QUEENS, FROM STREET CASE STREET TO STREET DENMAN STREET |
Q042022118C45 | 2022-04-28 | 2022-05-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LAMONT AVENUE, QUEENS, FROM STREET CASE STREET TO STREET DENMAN STREET |
Q012022118C89 | 2022-04-28 | 2022-05-27 | RESET, REPAIR OR REPLACE CURB | LAMONT AVENUE, QUEENS, FROM STREET CASE STREET TO STREET DENMAN STREET |
Q012022118C90 | 2022-04-28 | 2022-05-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | LAMONT AVENUE, QUEENS, FROM STREET CASE STREET TO STREET DENMAN STREET |
Q022022118B36 | 2022-04-28 | 2022-05-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAMONT AVENUE, QUEENS, FROM STREET CASE STREET TO STREET DENMAN STREET |
Q012022115A92 | 2022-04-25 | 2022-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 31 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022115B31 | 2022-04-25 | 2022-05-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022110B31 | 2022-04-20 | 2022-04-26 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 192 STREET, QUEENS, FROM STREET HILLSIDE AVENUE |
Q042022104A45 | 2022-04-14 | 2022-05-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q012022104B68 | 2022-04-14 | 2022-05-13 | RESET, REPAIR OR REPLACE CURB | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q012022104B69 | 2022-04-14 | 2022-05-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q022022104A74 | 2022-04-14 | 2022-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q012022103C04 | 2022-04-13 | 2022-05-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 44 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE |
Q012022095B50 | 2022-04-05 | 2022-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | HILLSIDE AVENUE, QUEENS, FROM STREET 191 STREET TO STREET 192 STREET |
Q012022095B51 | 2022-04-05 | 2022-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 192 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE |
Q012022095B46 | 2022-04-05 | 2022-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 23 STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 30 ROAD |
B042022089A35 | 2022-03-30 | 2022-04-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAY RIDGE PARKWAY, BROOKLYN, FROM STREET BAY PARKWAY |
B042022089A34 | 2022-03-30 | 2022-04-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BAY RIDGE PARKWAY, BROOKLYN, FROM STREET BAY PARKWAY |
B012022077D39 | 2022-03-18 | 2022-04-16 | RESET, REPAIR OR REPLACE CURB | LORIMER STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET DEVOE STREET |
B022022077A86 | 2022-03-18 | 2022-04-16 | TEMPORARY PEDESTRIAN WALK | LORIMER STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET DEVOE STREET |
B022022077A87 | 2022-03-18 | 2022-04-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | LORIMER STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET DEVOE STREET |
B012022077D40 | 2022-03-18 | 2022-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | LORIMER STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET DEVOE STREET |
B042022077A06 | 2022-03-18 | 2022-04-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | LORIMER STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET DEVOE STREET |
B012022063A94 | 2022-03-04 | 2022-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012022063B52 | 2022-03-04 | 2022-04-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEDFORD AVENUE, BROOKLYN, FROM STREET HALSEY STREET TO STREET HANCOCK STREET |
B012022063B03 | 2022-03-04 | 2022-03-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BOX STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
Q012022049B22 | 2022-02-18 | 2022-03-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | NORTHERN BOULEVARD, QUEENS, FROM STREET 208 STREET TO STREET 209 STREET |
Q012022049C04 | 2022-02-18 | 2022-03-19 | RESET, REPAIR OR REPLACE CURB | NORTHERN BOULEVARD, QUEENS, FROM STREET 208 STREET TO STREET 209 STREET |
Q022022049B40 | 2022-02-18 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | NORTHERN BOULEVARD, QUEENS, FROM STREET 208 STREET TO STREET 209 STREET |
Q042022049A18 | 2022-02-18 | 2022-03-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | NORTHERN BOULEVARD, QUEENS, FROM STREET 208 STREET TO STREET 209 STREET |
B022022042B24 | 2022-02-11 | 2022-03-31 | TEMPORARY PEDESTRIAN WALK | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B042022042A09 | 2022-02-11 | 2022-03-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B022022042B26 | 2022-02-11 | 2022-03-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B012022042B67 | 2022-02-11 | 2022-03-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAY RIDGE PARKWAY, BROOKLYN, FROM STREET BAY PARKWAY |
B012022042B66 | 2022-02-11 | 2022-03-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B022022042B25 | 2022-02-11 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B012022042B65 | 2022-02-11 | 2022-03-11 | RESET, REPAIR OR REPLACE CURB | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
Q042022031A05 | 2022-01-31 | 2022-03-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 31 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q022022031A93 | 2022-01-31 | 2022-03-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q022022031A94 | 2022-01-31 | 2022-03-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q042022031A04 | 2022-01-31 | 2022-03-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022031A92 | 2022-01-31 | 2022-03-01 | RESET, REPAIR OR REPLACE CURB | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022031A93 | 2022-01-31 | 2022-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022031A95 | 2022-01-31 | 2022-03-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 31 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022031A96 | 2022-01-31 | 2022-03-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 31 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012022024B01 | 2022-01-24 | 2022-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | BEACH 67 STREET, QUEENS, FROM STREET ALMEDA AVENUE TO STREET DE COSTA AVENUE |
B012022024B43 | 2022-01-24 | 2022-01-29 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
Q042022019A13 | 2022-01-19 | 2022-01-29 | REPAIR SIDEWALK | 84 DRIVE, QUEENS, FROM STREET 143 STREET TO STREET BEND |
B022022002A00 | 2022-01-02 | 2022-01-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B022022002A01 | 2022-01-02 | 2022-01-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B042022002A00 | 2022-01-02 | 2022-01-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
M022021357B11 | 2021-12-23 | 2022-01-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ALLEN STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
M042021357A00 | 2021-12-23 | 2022-01-19 | REPAIR SIDEWALK | ALLEN STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET DIVISION STREET |
Q012021351A89 | 2021-12-17 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 30 STREET, QUEENS, FROM STREET 40 AVENUE |
Q012021347C05 | 2021-12-13 | 2021-12-31 | RESET, REPAIR OR REPLACE CURB | 40 AVENUE, QUEENS, FROM STREET 29 STREET TO STREET 30 STREET |
Q042021347A10 | 2021-12-13 | 2021-12-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 30 STREET, QUEENS, FROM STREET 40 AVENUE |
Q042021341A25 | 2021-12-07 | 2021-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 30 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q042021341A26 | 2021-12-07 | 2021-12-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 40 AVENUE, QUEENS, FROM STREET 29 STREET TO STREET 30 STREET |
Q022021341A16 | 2021-12-07 | 2022-01-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 38 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q012021341B69 | 2021-12-07 | 2022-01-05 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 38 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q012021341B68 | 2021-12-07 | 2022-01-05 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 38 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q022021341A21 | 2021-12-07 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | 40 AVENUE, QUEENS, FROM STREET 29 STREET TO STREET 30 STREET |
Q022021341A22 | 2021-12-07 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 40 AVENUE, QUEENS, FROM STREET 29 STREET TO STREET 30 STREET |
Q042021341A27 | 2021-12-07 | 2021-12-31 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 30 STREET, QUEENS, FROM STREET 40 AVENUE |
Q022021341A20 | 2021-12-07 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | 30 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q042021341A13 | 2021-12-07 | 2022-01-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 38 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q012021341C30 | 2021-12-07 | 2021-12-31 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 30 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q012021341C31 | 2021-12-07 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 30 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
B012021336A80 | 2021-12-02 | 2021-12-31 | RESET, REPAIR OR REPLACE CURB | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
B012021336A81 | 2021-12-02 | 2021-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
B022021336A49 | 2021-12-02 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
B022021336A50 | 2021-12-02 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
B022021336A51 | 2021-12-02 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
B042021336B10 | 2021-12-02 | 2021-12-31 | REPAIR SIDEWALK | MC DONALD AVENUE, BROOKLYN, FROM STREET 65 STREET TO STREET AVENUE O |
M042021333A05 | 2021-11-29 | 2021-12-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 19 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M022021326A29 | 2021-11-22 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 126 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET WEST 127 STREET |
M022021326A28 | 2021-11-22 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 126 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET WEST 127 STREET |
M042021326A02 | 2021-11-22 | 2021-12-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 126 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET WEST 127 STREET |
M042021326A03 | 2021-11-22 | 2021-12-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 127 STREET, MANHATTAN, FROM STREET CONVENT AVENUE TO STREET WEST 126 STREET |
B042021299A19 | 2021-10-26 | 2021-11-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAY RIDGE PARKWAY, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022021293B23 | 2021-10-20 | 2021-11-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B022021293B24 | 2021-10-20 | 2021-11-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
B042021293A16 | 2021-10-20 | 2021-11-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BAY PARKWAY, BROOKLYN, FROM STREET 76 STREET TO STREET STILLWELL AVENUE |
Q042021287A09 | 2021-10-14 | 2021-11-11 | REPAIR SIDEWALK | HUNTER STREET, QUEENS, FROM STREET CRESCENT STREET TO STREET 44 ROAD |
Q012021286B03 | 2021-10-13 | 2021-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 64 STREET, QUEENS, FROM STREET BEND TO STREET LAUREL HILL BOULEVARD |
B042021278A00 | 2021-10-05 | 2021-11-02 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | PARK PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012021278A37 | 2021-10-05 | 2021-11-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | PARK PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012021278A36 | 2021-10-05 | 2021-11-02 | RESET, REPAIR OR REPLACE CURB | PARK PLACE, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
Q012021264A57 | 2021-09-21 | 2021-10-19 | RESET, REPAIR OR REPLACE CURB | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q042021264A06 | 2021-09-21 | 2021-10-20 | REPAIR SIDEWALK | UNION TURNPIKE, QUEENS, FROM STREET 254 STREET TO STREET LITTLE NECK PARKWAY |
Q012021264A58 | 2021-09-21 | 2021-10-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q042021264A04 | 2021-09-21 | 2021-10-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q042021264A05 | 2021-09-21 | 2021-10-20 | REPAIR SIDEWALK | LITTLE NECK PARKWAY, QUEENS, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE |
Q012021263C61 | 2021-09-20 | 2021-10-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 33 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
M042021249A00 | 2021-09-06 | 2021-10-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 29 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012021249A05 | 2021-09-06 | 2021-10-05 | RESET, REPAIR OR REPLACE CURB | WEST 29 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
M012021249A06 | 2021-09-06 | 2021-10-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 29 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
Q012021238A38 | 2021-08-26 | 2021-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 134 STREET, QUEENS, FROM STREET UNION TURNPIKE |
Q012021238A26 | 2021-08-26 | 2021-09-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | UNION TURNPIKE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
M042021235A23 | 2021-08-23 | 2021-09-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 20 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
Q042021235A25 | 2021-08-23 | 2021-09-23 | REPAIR SIDEWALK | HUNTER STREET, QUEENS, FROM STREET CRESCENT STREET TO STREET 44 ROAD |
Q012021230A38 | 2021-08-18 | 2021-09-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | NORTHERN BOULEVARD, QUEENS, FROM STREET 103 STREET TO STREET 104 STREET |
B042021229A69 | 2021-08-17 | 2021-09-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SOUTH 2 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET |
Q012021229C23 | 2021-08-17 | 2021-09-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 104 STREET, QUEENS, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD |
Q012021229D62 | 2021-08-17 | 2021-09-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 104 STREET, QUEENS, FROM STREET NORTHERN BOULEVARD |
Q012021224A51 | 2021-08-12 | 2021-08-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUELL STREET, QUEENS, FROM STREET 31 AVENUE TO STREET 31 DRIVE |
Q012021222B19 | 2021-08-10 | 2021-09-07 | RESET, REPAIR OR REPLACE CURB | 88 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q042021222A16 | 2021-08-10 | 2021-09-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 150 STREET, QUEENS, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE |
Q042021222A15 | 2021-08-10 | 2021-09-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 88 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012021222B20 | 2021-08-10 | 2021-09-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 88 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012021210B00 | 2021-07-29 | 2021-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | AMSTEL BOULEVARD, QUEENS, FROM STREET BEACH 74 STREET |
Q012021210B01 | 2021-07-29 | 2021-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | AMSTEL BOULEVARD, QUEENS, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET |
X042021202A02 | 2021-07-21 | 2021-08-19 | REPAIR SIDEWALK | EAST 149 STREET, BRONX, FROM STREET EXTERIOR STREET TO STREET GERARD AVENUE |
B012021196A68 | 2021-07-15 | 2021-08-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD |
Q042021196A08 | 2021-07-15 | 2021-08-13 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 33 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
B042021193A11 | 2021-07-12 | 2021-08-07 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD |
B012021193B46 | 2021-07-12 | 2021-08-07 | RESET, REPAIR OR REPLACE CURB | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD |
Q012021189B00 | 2021-07-08 | 2021-08-06 | RESET, REPAIR OR REPLACE CURB | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q042021189A05 | 2021-07-08 | 2021-08-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 32 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
X042021173A01 | 2021-06-22 | 2021-07-21 | REPAIR SIDEWALK | EAST 233 STREET, BRONX, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE |
Q012021169B85 | 2021-06-18 | 2021-07-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | 46 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012021169B86 | 2021-06-18 | 2021-07-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | FLUSHING AVENUE, QUEENS, FROM STREET 61 STREET TO STREET FRESH POND ROAD |
B012021154A81 | 2021-06-03 | 2021-07-03 | PAVE STREET-W/ ENGINEERING & INSP FEE | 57 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q042021153A03 | 2021-06-02 | 2021-06-30 | REPAIR SIDEWALK | 11 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q042021153A02 | 2021-06-02 | 2021-06-30 | REPAIR SIDEWALK | 44 AVENUE, QUEENS, FROM STREET 11 STREET TO STREET 12 STREET |
Q042021143A02 | 2021-05-23 | 2021-06-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 33 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012021143A00 | 2021-05-23 | 2021-06-19 | RESET, REPAIR OR REPLACE CURB | 33 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012021119A90 | 2021-04-29 | 2021-05-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 33 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
S012021112B15 | 2021-04-22 | 2021-05-20 | RESET, REPAIR OR REPLACE CURB | SANDS STREET, STATEN ISLAND, FROM STREET VAN DUZER STREET TO STREET WAVE STREET |
S012021112B16 | 2021-04-22 | 2021-05-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | SANDS STREET, STATEN ISLAND, FROM STREET VAN DUZER STREET TO STREET WAVE STREET |
S042021112A07 | 2021-04-22 | 2021-05-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VAN DUZER STREET, STATEN ISLAND, FROM STREET PROSPECT STREET TO STREET SANDS STREET |
S042021112A08 | 2021-04-22 | 2021-05-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SANDS STREET, STATEN ISLAND, FROM STREET VAN DUZER STREET TO STREET WAVE STREET |
S042021097A68 | 2021-04-07 | 2021-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | VAN DUZER STREET, STATEN ISLAND, FROM STREET PROSPECT STREET TO STREET SANDS STREET |
S042021096A12 | 2021-04-06 | 2021-04-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SANDS STREET, STATEN ISLAND, FROM STREET VAN DUZER STREET TO STREET WAVE STREET |
S012021096B26 | 2021-04-06 | 2021-04-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | SANDS STREET, STATEN ISLAND, FROM STREET VAN DUZER STREET TO STREET WAVE STREET |
S012021096B25 | 2021-04-06 | 2021-04-20 | RESET, REPAIR OR REPLACE CURB | SANDS STREET, STATEN ISLAND, FROM STREET VAN DUZER STREET TO STREET WAVE STREET |
Q012021074F93 | 2021-03-15 | 2021-04-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 196 PLACE, QUEENS, FROM STREET 48 AVENUE TO STREET BEND |
B012021063C60 | 2021-03-04 | 2021-04-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 65 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
Q042021056A26 | 2021-02-25 | 2021-03-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 59 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET KISSENA BOULEVARD |
Q012021056B59 | 2021-02-25 | 2021-03-24 | RESET, REPAIR OR REPLACE CURB | 59 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET KISSENA BOULEVARD |
Q012021056B60 | 2021-02-25 | 2021-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 59 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET KISSENA BOULEVARD |
Q012021055B32 | 2021-02-24 | 2021-03-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 74 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET GRAND AVENUE |
Q012021053B23 | 2021-02-22 | 2021-03-24 | RESET, REPAIR OR REPLACE CURB | JUNIPER AVENUE, QUEENS, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD |
Q042021053A08 | 2021-02-22 | 2021-03-19 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 55 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 94 STREET |
Q042021053A09 | 2021-02-22 | 2021-03-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | JUNIPER AVENUE, QUEENS, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD |
Q012021053B24 | 2021-02-22 | 2021-03-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | JUNIPER AVENUE, QUEENS, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD |
Q012021035C49 | 2021-02-04 | 2021-03-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 45 AVENUE, QUEENS, FROM STREET 202 STREET TO STREET 203 STREET |
M012021004A97 | 2021-01-04 | 2021-01-22 | RESET, REPAIR OR REPLACE CURB | EAST 123 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012021004A98 | 2021-01-04 | 2021-01-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 123 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M042021004A07 | 2021-01-04 | 2021-01-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | EAST 123 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B042020365A02 | 2020-12-30 | 2021-01-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CARROLL STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
Q012020363B36 | 2020-12-28 | 2021-01-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 22 STREET, QUEENS, FROM STREET 25 ROAD TO STREET ASTORIA BOULEVARD |
Q042020325A15 | 2020-11-20 | 2020-11-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 AVENUE, QUEENS, FROM STREET 162 STREET |
Q042020325A14 | 2020-11-20 | 2020-11-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 AVENUE, QUEENS, FROM STREET 162 STREET |
Q042020325A16 | 2020-11-20 | 2020-11-30 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 89 AVENUE, QUEENS, FROM STREET 162 STREET |
Q012020311D33 | 2020-11-06 | 2020-12-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | 45 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET MURRAY STREET |
Q012020308A24 | 2020-11-03 | 2020-12-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 33 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET 212 STREET |
M042020303A29 | 2020-10-29 | 2020-11-27 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WEST 113 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
Q042020296A08 | 2020-10-22 | 2020-11-21 | REPAIR SIDEWALK | ROCKAWAY BOULEVARD, QUEENS, FROM STREET 149 ROAD TO STREET 175 STREET |
Q012020273B36 | 2020-09-29 | 2020-10-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 208 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
M012020269A28 | 2020-09-25 | 2020-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 22 STREET, MANHATTAN, FROM STREET HIGH LINE TO STREET 11 AVENUE |
Q012020268B52 | 2020-09-24 | 2020-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 231 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 57 AVENUE |
Q042020262A13 | 2020-09-18 | 2020-10-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 162 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
Q012020262A78 | 2020-09-18 | 2020-10-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 162 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
Q012020262A77 | 2020-09-18 | 2020-10-16 | RESET, REPAIR OR REPLACE CURB | 162 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE |
Q042020262A14 | 2020-09-18 | 2020-10-16 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 89 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET |
Q042020262A16 | 2020-09-18 | 2020-10-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 64 STREET, QUEENS, FROM STREET 55 DRIVE TO STREET HULL AVENUE |
Q012020261B55 | 2020-09-17 | 2020-10-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 64 STREET, QUEENS, FROM STREET 55 DRIVE TO STREET HULL AVENUE |
Q012020261B54 | 2020-09-17 | 2020-10-16 | RESET, REPAIR OR REPLACE CURB | 64 STREET, QUEENS, FROM STREET 55 DRIVE TO STREET HULL AVENUE |
Q042020244A03 | 2020-08-31 | 2020-09-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 167 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE |
Q012020244C61 | 2020-08-31 | 2020-09-29 | RESET, REPAIR OR REPLACE CURB | 167 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE |
Q012020244C62 | 2020-08-31 | 2020-09-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 167 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE |
B012020239A66 | 2020-08-26 | 2020-09-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012020238A64 | 2020-08-25 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 33 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET 212 STREET |
Q012020238A63 | 2020-08-25 | 2020-09-17 | RESET, REPAIR OR REPLACE CURB | 33 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET 212 STREET |
Q042020238A06 | 2020-08-25 | 2020-09-17 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 33 AVENUE, QUEENS, FROM STREET 211 STREET TO STREET 212 STREET |
M012020232A97 | 2020-08-19 | 2020-09-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
Q012020213B47 | 2020-07-31 | 2020-08-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 23 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
Q012020211B74 | 2020-07-29 | 2020-08-27 | PAVE STREET-W/ ENGINEERING & INSP FEE | 71 AVENUE, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET |
Q042020210A01 | 2020-07-28 | 2020-08-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 163 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET 46 AVENUE |
Q012020206B62 | 2020-07-24 | 2020-08-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 163 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET 46 AVENUE |
M012020206A28 | 2020-07-24 | 2020-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 1 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
Q012020206B61 | 2020-07-24 | 2020-08-22 | RESET, REPAIR OR REPLACE CURB | 163 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET 46 AVENUE |
Q012020182A77 | 2020-06-30 | 2020-07-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 18 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q012020177C08 | 2020-06-25 | 2020-07-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 71 AVENUE, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET |
Q042020177A67 | 2020-06-25 | 2020-07-24 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 71 AVENUE, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET |
Q012020177C07 | 2020-06-25 | 2020-07-24 | RESET, REPAIR OR REPLACE CURB | 71 AVENUE, QUEENS, FROM STREET 164 STREET TO STREET 165 STREET |
Q012020171A70 | 2020-06-19 | 2020-07-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 49 ROAD, QUEENS, FROM STREET BEND TO STREET HORATIO PARKWAY |
Q042020169A76 | 2020-06-17 | 2020-07-15 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 160 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012020150B61 | 2020-05-29 | 2020-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 92 STREET, BROOKLYN, FROM STREET FLATLANDS AVENUE |
B012020150B62 | 2020-05-29 | 2020-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | FLATLANDS AVENUE, BROOKLYN, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET |
B012020150B52 | 2020-05-29 | 2020-06-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 92 STREET, BROOKLYN, FROM STREET CONKLIN AVENUE TO STREET FLATLANDS AVENUE |
Q012020143B47 | 2020-05-22 | 2020-06-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | BEACH 74 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
Q012020132A71 | 2020-05-11 | 2020-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 37 STREET, QUEENS, FROM STREET QUEENS BOULEVARD |
Q012020132A80 | 2020-05-11 | 2020-06-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | QUEENS BOULEVARD, QUEENS, FROM STREET 37 STREET TO STREET 38 STREET |
Q012020132A67 | 2020-05-11 | 2020-05-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 37 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET NYCTA SUBWAY |
B012020087D59 | 2020-03-27 | 2020-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | FRANKLIN AVENUE, BROOKLYN, FROM STREET FULTON STREET |
B012020086C09 | 2020-03-26 | 2020-04-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
Q012020050A92 | 2020-02-19 | 2020-03-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 45 AVENUE, QUEENS, FROM STREET 158 STREET TO STREET 159 STREET |
Q012020050A91 | 2020-02-19 | 2020-03-19 | PAVE STREET-W/ ENGINEERING & INSP FEE | 45 AVENUE, QUEENS, FROM STREET 158 STREET |
M012020037A70 | 2020-02-06 | 2020-03-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 79 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B042020030A19 | 2020-01-30 | 2020-02-28 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | BEDFORD AVENUE, BROOKLYN, FROM STREET GATES AVENUE |
B012020007C28 | 2020-01-07 | 2020-01-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET MELROSE STREET |
B012020007C29 | 2020-01-07 | 2020-01-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | MELROSE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012020007C30 | 2020-01-07 | 2020-01-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | BUSHWICK AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET |
B012019343C77 | 2019-12-09 | 2019-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 8 STREET |
M012019340A11 | 2019-12-06 | 2019-12-31 | RESET, REPAIR OR REPLACE CURB | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET HUDSON STREET |
B012019339A88 | 2019-12-05 | 2019-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET |
B012019339A89 | 2019-12-05 | 2019-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENT AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET SOUTH 8 STREET |
Q012019318A73 | 2019-11-14 | 2019-12-17 | RESET, REPAIR OR REPLACE CURB | 49 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
Q012019273C01 | 2019-09-30 | 2019-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 82 AVENUE, QUEENS, FROM STREET 265 STREET TO STREET 266 STREET |
Q012019273C00 | 2019-09-30 | 2019-10-26 | RESET, REPAIR OR REPLACE CURB | 82 AVENUE, QUEENS, FROM STREET 265 STREET TO STREET 266 STREET |
Q012019273B97 | 2019-09-30 | 2019-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 82 AVENUE, QUEENS, FROM STREET 265 STREET |
Q012019269B18 | 2019-09-26 | 2019-10-26 | RESET, REPAIR OR REPLACE CURB | 265 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET 82 AVENUE |
Q042019269A23 | 2019-09-26 | 2019-10-24 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 82 AVENUE, QUEENS, FROM STREET 265 STREET |
Q012019269B19 | 2019-09-26 | 2019-10-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 265 STREET, QUEENS, FROM STREET 81 AVENUE TO STREET 82 AVENUE |
Q012019150A33 | 2019-05-30 | 2019-06-27 | RESET, REPAIR OR REPLACE CURB | DOUGLAS AVENUE, QUEENS, FROM STREET 168 STREET TO STREET 170 STREET |
M012019148B39 | 2019-05-28 | 2019-06-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENMARE STREET, MANHATTAN, FROM STREET BOWERY TO STREET ELIZABETH STREET |
Q012019134B97 | 2019-05-14 | 2019-06-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | JUNCTION BOULEVARD, QUEENS, FROM STREET 45 AVENUE TO STREET 46 AVENUE |
M012019134A92 | 2019-05-14 | 2019-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | FULTON STREET, MANHATTAN, FROM STREET DUTCH STREET TO STREET NASSAU STREET |
Q012019134B96 | 2019-05-14 | 2019-06-13 | PAVE STREET-W/ ENGINEERING & INSP FEE | 50 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 111 STREET |
M012019134B66 | 2019-05-14 | 2019-06-07 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 87 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
Q012019133D07 | 2019-05-13 | 2019-06-12 | RESET, REPAIR OR REPLACE CURB | 129 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
M012019133A26 | 2019-05-13 | 2019-06-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | WEST 148 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE |
B012019133C60 | 2019-05-13 | 2019-06-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
M012019127B47 | 2019-05-07 | 2019-05-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | KENMARE STREET, MANHATTAN, FROM STREET BOWERY TO STREET ELIZABETH STREET |
M012019126B31 | 2019-05-06 | 2019-05-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELIZABETH STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET KENMARE STREET |
Q012019113C95 | 2019-04-23 | 2019-05-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 90 AVENUE, QUEENS, FROM STREET 153 STREET TO STREET 155 STREET |
Q012019078A05 | 2019-03-19 | 2019-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | 129 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q012019078A04 | 2019-03-19 | 2019-04-16 | RESET, REPAIR OR REPLACE CURB | 129 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B012019078A29 | 2019-03-19 | 2019-04-16 | PAVE STREET-W/ ENGINEERING & INSP FEE | GATES AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012019078A28 | 2019-03-19 | 2019-04-16 | RESET, REPAIR OR REPLACE CURB | GATES AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012019042C22 | 2019-02-11 | 2019-03-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | HIMROD STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
M012019038B00 | 2019-02-07 | 2019-03-07 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M012019038B44 | 2019-02-07 | 2019-03-07 | RESET, REPAIR OR REPLACE CURB | EAST 87 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
X012018361A10 | 2018-12-27 | 2019-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012018361A09 | 2018-12-27 | 2019-01-18 | RESET, REPAIR OR REPLACE CURB | EAST 169 STREET, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
Q012018361C64 | 2018-12-27 | 2019-01-18 | RESET, REPAIR OR REPLACE CURB | 56 AVENUE, QUEENS, FROM STREET 61 STREET TO STREET 64 STREET |
Q012018361C65 | 2018-12-27 | 2019-01-18 | PAVE STREET-W/ ENGINEERING & INSP FEE | 56 AVENUE, QUEENS, FROM STREET 61 STREET TO STREET 64 STREET |
B012017170B02 | 2017-06-19 | 2017-07-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012017170B01 | 2017-06-19 | 2017-07-15 | RESET, REPAIR OR REPLACE CURB-PROTECTED | MYRTLE AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012017142B21 | 2017-05-22 | 2017-05-22 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | OCEAN VIEW AVENUE, BROOKLYN, FROM STREET BRIGHTON 4 PLACE TO STREET BRIGHTON 4 STREET |
Start date | End date | Type | Value |
---|---|---|---|
2024-07-17 | 2024-08-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-09 | 2024-01-09 | Address | 5448 65TH PLACE, MASPETH, NY, 11378, USA (Type of address: Chief Executive Officer) |
2024-01-09 | 2024-07-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-20 | 2024-01-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-28 | 2023-12-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-04 | 2023-06-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-12-22 | 2021-12-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-12-22 | 2022-08-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-22 | 2021-10-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-22 | 2021-12-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-01 | 2021-10-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-10 | 2021-10-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2014-01-23 | 2021-07-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2014-01-23 | 2024-01-09 | Address | 54-48 65 PLACE, MASPETH, NY, 11378, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240109002759 | 2024-01-09 | BIENNIAL STATEMENT | 2024-01-09 |
221220000392 | 2022-12-20 | BIENNIAL STATEMENT | 2022-01-01 |
140123010041 | 2014-01-23 | CERTIFICATE OF INCORPORATION | 2014-01-23 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-24 | No data | 7 AVENUE, FROM STREET 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to roadway being resurfaced permit Q152024241B55 |
2024-10-24 | No data | 124 STREET, FROM STREET 11 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade I/F/O 11-18 124th Street. |
2024-10-17 | No data | 41 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work started at this time of inspection. |
2024-10-17 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade within the intersection of Blossom Avenue & Main Street |
2024-10-17 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade at 134-50 Blossom Avenue. |
2024-10-17 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored expansion joints sealed I/F/O 134-28 Blossom Avenue |
2024-10-15 | No data | POST ROAD, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has new concrete s/w and failed to remove concrete debris, pebbles from inside of the s/w tree pits I/F/O 5104 ABC. |
2024-10-11 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be ADA compliant. Measured and collected in prism on 10/2/24. |
2024-10-09 | No data | 9 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway 43FT width of milled area 29FT length of milled area 95FT depth of milled area 3 in. BPP pass. |
2024-10-04 | No data | JAMAICA AVENUE, FROM STREET 153 STREET TO STREET GRACE CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on segment. |
2024-10-02 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the Naw3 corner quadrant was found to be ADA compliant. Measured and collected in prism on 10/2/24. |
2024-10-02 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit # Q042024254A15 has been obtained for the NW2 corner quadrant. Excessive elements slopes has been corrected . |
2024-09-18 | No data | BAYSIDE AVENUE, FROM STREET 29 AVENUE TO STREET 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave to grade |
2024-09-17 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp in the NE3 corner quadrant is non ADA compliant. Measured and collected in Prism on 12/30/21. |
2024-09-16 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance |
2024-09-15 | No data | REMINGTON STREET, FROM STREET 107 AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BPP in front of 10716 Remington street is re-sealed and no cracks found |
2024-09-14 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to restore BPP restoration at 88-12 which has not been squared or aligned at the cut limits as required by Standard Details Drawing H-1042(A) Note 3 after being notified via CAR # 20247490086 on 5/18/24. |
2024-09-12 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/21/23. |
2024-09-11 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work started at this time within the NW2 corner, meeting was held on 9/11/24 with contractors to correct excessive elements as per the H-1011-1 standard detail drawings. |
2024-09-11 | No data | MALCOLM X BOULEVARD, FROM STREET HALSEY STREET TO STREET MACON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN PAVED HALF +5 |
2024-09-10 | No data | PARK PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2024-09-08 | No data | BUFFALO AVENUE, FROM STREET PARK PLACE TO STREET PROSPECT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF *5 |
2024-09-07 | No data | FULTON STREET, FROM STREET ROCKAWAY AVENUE TO STREET SOMERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-08-12 | No data | 45 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed. Width of the Roadway- 30' Width of milled area- 20' Length of milled area -91'4" Depth of milled area- 4" |
2024-08-03 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent's BPP restoration at 88-12 has not been squared or aligned at the cut limits as required by Standard Details Drawing H-1042(A) Note 3 after being notified via C.A.R. 20247490086 on 5/18/24. |
2024-08-03 | No data | REMINGTON STREET, FROM STREET 107 AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent failed to properly reseal and maintain the wearing course of B.P.P. restoration at 107-16 Remington Avenue after notification via CAR# (20241700063) on 4/9/24. |
2024-08-02 | No data | MALCOLM X BOULEVARD, FROM STREET HALSEY STREET TO STREET MACON STREET | No data | Street Construction Inspections: Active | Department of Transportation | width of roadway- 42', width of milled area-26', length of milled area-34'7", depth of milled area-3" |
2024-08-02 | No data | STEINWAY STREET, FROM STREET 20 AVENUE TO STREET 20 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Not on site for paving. Inspection done after BPP paved. Curb to Curb width –40• Milled area –100’x25’• Depth of milled area – n/a• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2024-07-28 | No data | BARCLAY AVENUE, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5' of roadway at location repaved. |
2024-07-27 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving in the intersection is in compliance. |
2024-07-27 | No data | UNION STREET, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half plus 5' of roadway's width repaved. Lane markings restored. |
2024-07-25 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be non ADA compliant. Measured and collected in prism on 7/25/24. |
2024-07-23 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property in compliance |
2024-07-05 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new ped ramp work started at this time within the NW2 corner quadrant. Old existing tangent ramps are functional and accessible, we’ll re-inspect at a later date. |
2024-06-29 | No data | POST ROAD, FROM STREET FIELDSTONE TERRACE TO STREET WEST 252 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Has new s/w curbs. |
2024-06-23 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R reinspection failed, respondent's B.P.P. restoration in the roadway at 88-12 192nd Street is not squared/aligned at cut limits as required by standard Detail Drawings 1042A Note 3. Respondent previously notified via C.A.R. 20247490086 5/18/24. |
2024-06-22 | No data | REMINGTON STREET, FROM STREET 107 AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a permanent restoration in the roadway, that has edge cracking on the seal. The respondent failed to properly re-seal and maintain the wearing course. The respondent was notified via CAR# (20241700063) on 4/9/24. |
2024-06-20 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP was not monitored. However, the permittee did notify the borough on 6/19/24 (Holiday) at 9:34am for inspection. |
2024-06-12 | No data | 30 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed expansion joints sealed at 29-17 40th Avenue. (Corner property) |
2024-06-10 | No data | PENELOPE AVENUE, FROM STREET WOODHAVEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE corner quadrant was found to be non ADA compliant. Measured and collected in Prism on 6/10/24. |
2024-06-06 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp paved in compliance |
2024-06-05 | No data | UNION STREET, FROM STREET 41 AVENUE TO STREET BARCLAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving roadway work started at this time of inspection. |
2024-06-04 | No data | BARCLAY AVENUE, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving roadway work started at this time of inspection. |
2024-06-02 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | All sidewalk expansion joints were sealed. In compliance. No permit required. |
2024-05-28 | No data | BARCLAY AVENUE, FROM STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work started at this time of inspection. |
2024-05-23 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP Pass - - L17ft of 24ft W54ft D2in. Paving to be performed later today. |
2024-05-19 | No data | REMINGTON STREET, FROM STREET 107 AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent BPP restoration within the roadway with seals broken along the edges of restoration. Respondent failed to seal edges after CAR #20241700063 issued on 4/9/2024. ID by permit number. |
2024-05-18 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed, BPP restoration resealed in front of 88-12 192nd Street. |
2024-05-18 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B.P.P. needs to be restored at 88-12 192nd Street as per H-1042(A) Note 3 specifications indicating "All restorations shall be squared or rectangular shaped." |
2024-05-08 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaired curb |
2024-05-02 | No data | 10 AVENUE, FROM STREET WEST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Extending west through the intersection found a permanent flush to grade restoration within roadway. Lane markings restored. |
2024-05-02 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent flush to grade BPP restoration within the roadway. Lane markings restored. |
2024-04-26 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut resealed. |
2024-04-23 | No data | BAY 34 STREET, FROM STREET BENSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition repaired. Permittee removed plastic from DWS Mat in the SW1 corner. |
2024-04-22 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove white plastic caps and seal Expansion Joints around Sidewalk Flags. |
2024-04-22 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | NOV issued for the Respondent having Construction Safety Barrels and Barricades placed on the Sidewalk with no NYC DOT permit on file to do so. Occupancy of Sidewalk as Stipulated Permit # M022024082C85 expired on 4/20/2024 used for ID purpose only. |
2024-04-20 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started barricade within parking area of location. |
2024-04-19 | No data | WEST 22 STREET, FROM STREET HIGH LINE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | L 104ft x 20ft x 3’ ft down in the segment of 500 West 22 Street. |
2024-04-19 | No data | 10 AVENUE, FROM STREET WEST 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | L 3’x20’x3” down intersection. BPP is in compliance. |
2024-04-13 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration needs to be resealed. |
2024-04-11 | No data | BEACH 12 STREET, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2024-04-11 | No data | BANNER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk/curb reset done in compliance |
2024-04-09 | No data | REMINGTON STREET, FROM STREET 107 AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration with edges cracking needs to be re-sealed. |
2024-04-02 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb- curb- 33ftLength- 34ft fit Width: 22.6ft |
2024-04-02 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No EXCAVATOR on site. |
2024-04-01 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW milled by dot |
2024-03-28 | No data | EAST 26 STREET, FROM STREET BROADWAY ALLEY TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued for the Respondent using Safety Barrels for temporary protective Walkway in the Roadway, instead of water filled or Timber-wood Barriers, in violation of OCMC95 of the above permit which requires water filled or Timber-Wood Barriers. |
2024-03-21 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 3/16/23. |
2024-03-21 | No data | AMSTEL BOULEVARD, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-03-20 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance. |
2024-03-17 | No data | 150 STREET, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | f/o 148-37 88 Ave , currently BPP restoration in compliance. |
2024-03-16 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has cracked sealer around the full parameter of a BPP restoration in the roadway. The respondent failed to properly seal and maintain the wearing course. CAR# 20237770206 was issued on 6/29/23. |
2024-03-11 | No data | BAY RIDGE PARKWAY, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quadrant are Ada compliant. Previously Measured and collected in Prism on 5/12/22. |
2024-03-10 | No data | BAY 34 STREET, FROM STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | completed ramps within the SW1 corner quadrant are Ada compliant, however, ramps still has plastic covers on DWS. Previously Measured and collected in prism on 8/22/23. |
2024-02-28 | No data | BERGEN STREET, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2024-02-28 | No data | WASHINGTON AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done in the p/l |
2024-02-28 | No data | BERGEN STREET, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2024-02-27 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner quadrant are non ADA compliant. Previously measured and collected on Prism on 12/30/21. |
2024-02-26 | No data | 32 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | BPP DP Paving foreman Adrian’s crew on site finishing paving and sealing roadway joints. Previous milling inspection done. Permit still valid. In compliance at this time BPP work is ongoing. |
2024-02-25 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-02-25 | No data | 90 AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP roadway paving done. |
2024-02-23 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2024-02-22 | No data | 28 AVENUE, FROM STREET 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 30• Milled area – 25’x25’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2024-02-22 | No data | 28 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 40• Milled area – 63’x25’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2024-02-22 | No data | 32 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30• Milled area – 116’x20’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no |
2024-02-15 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism 6/29/22. Pass out permit as per Kerry. |
2024-02-04 | No data | 60 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving |
2024-02-01 | No data | CARLTON AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W of RDWY 34ft, W milled 23ft, L milled 30ft, D milled 3-inches. |
2024-01-29 | No data | CARLTON AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2024-01-29 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/21/23. |
2024-01-27 | No data | BAYSIDE AVENUE, FROM STREET 29 AVENUE TO STREET 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed expansion joints sealed I/F/O 154-16 Bayside Avenue |
2024-01-26 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has cracked sealer around the full parameter of a BPP restoration in the roadway. The respondent failed to properly seal and maintain the wearing course. CAR# 20237770206 was issued on 6/29/23. |
2024-01-23 | No data | ELLWELL CRESCENT, FROM STREET ALDERTON STREET TO STREET CARLTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP: 52'00" x 20'00" x 0'04" before paving. |
2024-01-06 | No data | 150 STREET, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealer added |
2023-12-23 | No data | BERGEN STREET, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New permit has been issued B012023340A34. |
2023-12-23 | No data | WASHINGTON AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | New permit taken out B012023340A33. |
2023-12-21 | No data | 134 STREET, FROM STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the intersection. |
2023-12-21 | No data | UNION TURNPIKE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the roadway. |
2023-12-17 | No data | AMSTEL BOULEVARD, FROM STREET BEACH 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP perm to grade restoration on roadway in complaince. |
2023-12-15 | No data | 90 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration in front of 153-24 to grade in the roadway. |
2023-12-13 | No data | 52 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved by BPP |
2023-12-10 | No data | 68 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVE STREET I/F/O 40-06 68 ST |
2023-12-09 | No data | 150 STREET, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints needs to be sealed. |
2023-12-08 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration lane markings restored |
2023-12-07 | No data | 32 AVENUE, FROM STREET 106 STREET TO STREET 107 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration |
2023-12-06 | No data | WASHINGTON AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | W milled 6ft, L milled 51ft, D milled 3-inches. |
2023-12-06 | No data | BERGEN STREET, FROM STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | L milled 8ft, W milled 5ft, D milled 3-inches |
2023-12-06 | No data | BERGEN STREET, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W milled 6ft, L milled 18ft, D milled 3-inches |
2023-12-04 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 35ftLength- 36ftWidth- 25ftDepth- 3.5 inches |
2023-12-01 | No data | 231 STREET, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving work done in roadway. |
2023-11-29 | No data | 192 STREET, FROM STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm BPP restoration in the intersection of 192nd St & Hillside Ave for 88-04. |
2023-11-27 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Inspected BBP 25' X 35' X 3''. |
2023-11-22 | No data | BUFFALO AVENUE, FROM STREET PARK PLACE TO STREET PROSPECT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-11-21 | No data | MERCER STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O contact sports Found 3 newly restored sidewalk flags that are to grade. Expansion joints sealed. |
2023-11-19 | No data | COLLEGE POINT BOULEVARD, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP flush to grade in the driving lane. |
2023-11-18 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2023-11-17 | No data | WEST 113 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Location is in compliance, sidewalk is open and temporary restoration is in compliance. |
2023-11-09 | No data | BUFFALO AVENUE, FROM STREET PARK PLACE TO STREET PROSPECT PLACE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB IS 40FT. MILLED ROADWAY IS 25FT X 30FT WITH A DEPTH OF 3 INCHES |
2023-11-06 | No data | PARK PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2023-11-02 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW repaved by BPP |
2023-11-02 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP is completed, Curb to curb is 29’, Milled Area is 20’, Depth is 3”. |
2023-10-29 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replace, joints sealed. |
2023-10-29 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to reseal its restoration along the roadway. Respondent was notified by CAR# 20237770206 on 06/29/23 to reseal restoration but, failed to do so. Permit# Q012020303C58 for work was used to identify respondent. |
2023-10-16 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w was paved. |
2023-10-12 | No data | BAYSIDE AVENUE, FROM STREET 29 AVENUE TO STREET 154 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable.• Curb to Curb width: 55'• Milled area: 51'x35'• Depth of milled area: 3"• ½ +5’ milled: Yes• Waiver: No |
2023-10-06 | No data | TUDOR ROAD, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored & reset in front of 184-56. |
2023-10-05 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w was paved. |
2023-09-28 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 534, permanent BPP restoration street opening joints have been properly sealed at this time. No permit needed. CAR Pass and email update to follow. |
2023-09-16 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 534, NOV for a permanent Builders' Pavement Plan restoration with worn street opening joint seal. Respondent notified via CAR# 20237850192 on 5/15/2023 and failed properly seal wearing course. |
2023-09-16 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to reseal its restoration along the roadway. Respondent was notified by CAR# 20237770206 on 06/29/23 to reseal restoration but, failed to do so. Permit# Q012020303C58 for work was used to identify respondent. |
2023-09-15 | No data | PALO ALTO AVENUE, FROM STREET 191 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored and replaced in front of 87-33. |
2023-09-15 | No data | 191 STREET, FROM STREET HAYWOOD ROAD TO STREET PALO ALTO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is replaced and restored in front of 87-33. |
2023-09-15 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm BPP restoration on the SEC of Palo Alto Avenue & 191st. |
2023-09-12 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New concrete curb installed at side of 903 Hicksville Road. All expansion joints recessed and sealed. |
2023-09-10 | No data | BAY RIDGE PARKWAY, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The intersection Has been repaved. Permit expired. No C.A.R. |
2023-09-01 | No data | 44 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2+5' width of r/w paved. |
2023-08-31 | No data | GARFIELD PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done |
2023-08-30 | No data | 162 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement restoration acceptable. |
2023-08-25 | No data | SCOTT AVENUE, FROM STREET JOHNSON AVENUE TO STREET RANDOLPH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced for new building |
2023-08-25 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | WORK COMPLETED BEFORE INSPECTION - PERMANENT (L) 33 FEET X (W) 34 FEET RE-PAVE RESTORATION AT NEW BUILDING DONE |
2023-08-22 | No data | BAY 34 STREET, FROM STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed ramps within the SW1 corner quadrant are Ada compliant, however, ramps still has plastic covers on DWS. Measured and collected in prism on 8/22/23. |
2023-08-17 | No data | TUDOR ROAD, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET | No data | Street Construction Inspections: Active | Department of Transportation | New curb installed section broken by BPP. contractor will repair. |
2023-08-15 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Builder's pave finalize using permit Q012023201B23 which expired on 8/1/2023 |
2023-08-14 | No data | 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bbp portion of r..w repaved |
2023-08-08 | No data | AMSTEL BOULEVARD, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w was paved. |
2023-08-05 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has cracked sealer around the full parameter of a BPP restoration in the roadway. The respondent failed to properly seal and maintain the wearing course. CAR# 20237770206 was issued on 6/29/23. |
2023-08-03 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #534 the BBP street opening joints are exposed and the permittee failed to restore as per the CAR that was issued. NOV issued to respondent. |
2023-08-02 | No data | 80 DRIVE, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2023-07-28 | No data | 75 STREET, FROM STREET JUNIPER VALLEY ROAD TO STREET PENELOPE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the roadway in front of 64-27. |
2023-07-26 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR is being passed out per Kerry McCaffrey and Vinny Maniscalco |
2023-07-26 | No data | HICKSVILLE ROAD, FROM STREET BEACH 9 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5' width of r/w milled. |
2023-07-26 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5' width of r/w milled. |
2023-07-26 | No data | BAY PARKWAY, FROM STREET 76 STREET TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been paved in front. |
2023-07-26 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | R/w milled. |
2023-07-25 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass out permanently per Kerry McCaffrey and Vinny Maniscalco |
2023-07-25 | No data | HICKSVILLE ROAD, FROM STREET BEACH 9 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is presently milled but not paved |
2023-07-25 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is presently milled but not paved |
2023-07-25 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass out permanently per Kerry McCaffrey and Vinny Maniscalco |
2023-07-25 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass out permanently per Kerry McCaffrey and Vinny Maniscalco |
2023-07-21 | No data | HICKSVILLE ROAD, FROM STREET BEACH 9 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit Q042023165A43 for the NW2 corner quadrant and inspection remarks. |
2023-07-21 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit Q042023165A44 for inspection remarks. |
2023-07-21 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant due to roadway milled and plastic on DWS mats. Measured and collected in prism on 7/21/23. |
2023-07-19 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the respondent milled a portion of the intersection for paving without DOT permit. Permit # Q012023165B98, for adjoining segment (Beach 9 street btw Hicksville road & Lanet avenue) used for ID purpose only. |
2023-07-19 | No data | 64 STREET, FROM STREET BEND TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm the grade & sealed in front of 44-19 64th Street |
2023-07-17 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Work started. SE corner quadrant is currently is excavated and surrounding area coned off. Will re inspect at later date once work is completed. |
2023-07-17 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps are accessible and non compliant due to plastic over DWS and excessive curb reveal. I spoke to foreman Dan from D.P Paving and he stated he will completing work by Wednesday. Will re inspect by Wednesday. |
2023-07-14 | No data | HICKSVILLE ROAD, FROM STREET BEACH 9 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Active construction work within the NW2 corner quadrant. Excavation within the corner. Will reinspect at a later date when ramps are completed. |
2023-07-13 | No data | GARFIELD PLACE, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed |
2023-07-08 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. Slight .5" mound at this time. Not enough for CAR at this time. |
2023-07-07 | No data | 68 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | This BPP paving has passed. The roadway has already been paved and no depth was measured.• Curb to Curb width –25’• Paved area –18’ • ½ +5’ milled (yes/no) –Yes • Waiver (yes/no) -No. |
2023-07-01 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No new ped ramp work started at this time within the SE4 corner quadrant. Ramp is not accessible at this time due to active construction. We’ll reinspect at a later date. |
2023-07-01 | No data | JOHNSON AVENUE, FROM STREET SCOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new building |
2023-07-01 | No data | JOHNSON AVENUE, FROM STREET GARDNER AVENUE TO STREET SCOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done for new building |
2023-07-01 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No ped ramp work started at this time. |
2023-06-29 | No data | BENSON AVENUE, FROM STREET 23 AVENUE TO STREET BAY 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP IN COMPLIANCE. Permit expired. |
2023-06-29 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The sealer is cracked around the full parameter of a permanent BPP restoration in front of 137-19. |
2023-06-28 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism 6/29/22. Condition remains the same. |
2023-06-26 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at time of inspection. |
2023-06-26 | No data | BEACH 9 STREET, FROM STREET HICKSVILLE ROAD TO STREET LANETT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | S/w excavated and barricaded |
2023-06-26 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible, roadway milled. |
2023-06-25 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found newly paved |
2023-06-24 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV failed to reseal the street opening joints around their permanent restoration in the roadway. Respondent was previously notified to correct this condition Via CAR #(20237850192) on 5/12/2023. |
2023-06-24 | No data | 33 AVENUE, FROM STREET 211 STREET TO STREET 212 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BPP restoration has been resealed. |
2023-06-16 | No data | 60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway was milled and paved. |
2023-06-12 | No data | WEST 171 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a restored sidewalk I/F/O 560 |
2023-06-11 | No data | 167 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At this time Builder's pavement has been Re-sealed. |
2023-06-07 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 29ft Half plus 5: 20ft Width: 35ft Down: 3in |
2023-06-06 | No data | 110 STREET, FROM STREET 14 ROAD TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-06-06 | No data | 15 AVENUE, FROM STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-06-06 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 3/16/23. |
2023-06-06 | No data | 15 AVENUE, FROM STREET 110 STREET TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-06-06 | No data | 131 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done by the permittee "STELLAR SINGLA INC" under permit # (Q012023116B19). |
2023-06-05 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 2/22/23. |
2023-06-04 | No data | CASE STREET, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2023-06-02 | No data | LAMONT AVENUE, FROM STREET CASE STREET TO STREET DENMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving was done. |
2023-06-02 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done. |
2023-05-30 | No data | EAST 123 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance. |
2023-05-26 | No data | 22 STREET, FROM STREET 25 ROAD TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-05-26 | No data | 23 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-05-25 | No data | 90 AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | R/w paved |
2023-05-24 | No data | HILLSIDE AVENUE, FROM STREET 191 STREET TO STREET 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BBP in good condition |
2023-05-24 | No data | BEACH 74 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w was resurfaced |
2023-05-22 | No data | BAY RIDGE PARKWAY, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner quad are Ada compliant. Previously Measured and collected in Prism on 5/12/22. |
2023-05-17 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This street opening permit has a 3 year guarantee period. Therefore, any defect which develops with the guarantee period, on this builder's pavement plan restoration, is your responsibility. Out Of Guarantee period ends 10/5/2024. CAR protest denied. |
2023-05-12 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #534 sealer has worn away, and exposing street opening joints and needs to be re-sealed In its entirety. |
2023-05-12 | No data | 131 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP paving roadway work was done by stellar singla inc. under permit #Q012023116B19. Please refer for inspection remarks. |
2023-05-10 | No data | WEST 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind. |
2023-05-09 | No data | WEST 126 STREET, FROM STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced. |
2023-05-09 | No data | WEST 126 STREET, FROM STREET AMSTERDAM AVENUE TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced under permit M152022133A09 at this time. |
2023-05-09 | No data | WEST 127 STREET, FROM STREET CONVENT AVENUE TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced under permit M152022137A33 at this time. |
2023-05-05 | No data | EAST 86 STREET, FROM STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection I/F/O 147 found entire roadway is resurfaced |
2023-05-05 | No data | EAST 86 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 147 found roadway fully resurfaced. No defects to report at this time. |
2023-05-05 | No data | 58 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration flush to grade in the roadway i/f/o 32-12. |
2023-05-01 | No data | 52 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 30 feetDepth of milled area: 3 inches |
2023-05-01 | No data | 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 32 feetDepth of milled area: 3 inches |
2023-04-29 | No data | 33 AVENUE, FROM STREET 211 STREET TO STREET 212 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection I saw various areas of restoration's edge that needed to be resealed. This work is still within the guarantee period with the city of NY until 12/2/23. Please re-apply AC sealer to satisfy C.A.R. |
2023-04-21 | No data | 167 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 6933 multiple cracks along the edges of BPP |
2023-04-21 | No data | UNION TURNPIKE, FROM STREET 169 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade. |
2023-04-19 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism 6/29/22. Condition remains the same. |
2023-04-19 | No data | 191 STREET, FROM STREET HAYWOOD ROAD TO STREET PALO ALTO AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat Visible On Site At Time Of Inspection |
2023-04-16 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 patched sidewalk flags has been replaced |
2023-04-16 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2023-04-13 | No data | NORMAN AVENUE, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:34’Width of milled area:22’Length of milled area:36’Depth of milled area:4” |
2023-04-10 | No data | 9 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance. |
2023-04-10 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance. |
2023-04-10 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk installed, in compliance |
2023-04-10 | No data | SCOTT AVENUE, FROM STREET JOHNSON AVENUE TO STREET RANDOLPH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Length milled 122ft property length 105ft RW width 43ft width milled 26ft Depth 4in |
2023-04-10 | No data | JOHNSON AVENUE, FROM STREET SCOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width 33ft milled 22ft length 35ft milled 22ft D 4in |
2023-04-10 | No data | JOHNSON AVENUE, FROM STREET GARDNER AVENUE TO STREET SCOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | RW width 33ft milled 22ft property length 110ft milled 125ft Depth 4 inches |
2023-04-08 | No data | 9 AVENUE, FROM STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance. |
2023-04-08 | No data | SHORE ROAD, FROM STREET 80 STREET TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance. |
2023-04-07 | No data | 215 PLACE, FROM STREET 36 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade, 1/2 + 5' |
2023-04-07 | No data | 36 AVENUE, FROM STREET 215 PLACE TO STREET 216 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade, 1/2 + 5' |
2023-04-07 | No data | 36 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade, 1/2 + 5' |
2023-04-05 | No data | 80 DRIVE, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP passed. |
2023-04-05 | No data | 23 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade in the d/p/l. |
2023-04-03 | No data | BENSON AVENUE, FROM STREET 23 AVENUE TO STREET BAY 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Width of roadway 41’6Width milled 25’10Length milled 116’3Depth 3” |
2023-04-03 | No data | BAY 34 STREET, FROM STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of intersection 29’10Width milled 20’2Length Milled 20’4Depth 3” |
2023-03-29 | No data | 64 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave in compliance |
2023-03-29 | No data | JUNIPER AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done as per inspector Lynn Stewart. |
2023-03-27 | No data | 33 AVENUE, FROM STREET 211 STREET TO STREET 212 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked around perimeter of Builders Pavement Plan. Re-seal Edges. |
2023-03-25 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed. |
2023-03-24 | No data | 90 ROAD, FROM STREET 153 STREET TO STREET 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | This BPP milling has passed:• Curb to Curb width –38’• Milled area –25’ • Depth of milled area –3” • ½ +5’ milled (yes/no) –Yes • Waiver (yes/no)-No. |
2023-03-23 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in front of 29-32. |
2023-03-22 | No data | 59 AVENUE, FROM STREET 153 STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done in front of 153-10. |
2023-03-21 | No data | OCEANIA STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-20 | No data | 58 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pave restoration |
2023-03-20 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 29’5’’• Milled area – 20’5’’ x 50'• Depth of milled area – 3’’ |
2023-03-19 | No data | 120 STREET, FROM STREET 149 AVENUE TO STREET 150 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP installed |
2023-03-19 | No data | 170 STREET, FROM STREET 71 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 rd/w perm cut in p/ |
2023-03-18 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway repaved by BPP |
2023-03-17 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 35FT, W MILLED 23FT, L MILLED 40FT, D MILLED 3 INCHES. |
2023-03-16 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non Ada compliant. Meanwhile and collected in prism on 2/22/23. |
2023-03-10 | No data | 49 ROAD, FROM STREET BEND TO STREET HORATIO PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-05 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed on roadway in front of 349 Prospect place |
2023-03-03 | No data | 18 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration to grade in the roadway. |
2023-03-03 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved, In compliance |
2023-03-03 | No data | SHORE ROAD, FROM STREET 80 STREET TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | BPP done in compliance. |
2023-03-02 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NW2 corner quadrant are functional and accessible. Non Ada compliant. Previously measured in prism on 11/17/20. |
2023-02-28 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent paved portion of the roadway in front of sited location without notifying the NYCDOT HIQA borough office within 4 hours prior to paving as per stip violation 1/2+5. |
2023-02-28 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 4-6 two new sidewalk flags installed. CAR #20237850049 on file for previous patchwork at this location. Permit remains active. |
2023-02-24 | No data | 157 AVENUE, FROM STREET 81 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2023-02-24 | No data | 81 STREET, FROM STREET 157 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2023-02-24 | No data | 81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2023-02-22 | No data | 191 STREET, FROM STREET PALO ALTO AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp within the SW1 corner quadrant was found to be non Ada compliant. Meanwhile and collected in prism on 2/22/23. |
2023-02-13 | No data | UNION TURNPIKE, FROM STREET 169 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30’• Milled area – 74’ x 20’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-yes |
2023-02-11 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW paved by BPP |
2023-02-10 | No data | BERGEN AVENUE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass in compliance lane markings restored |
2023-02-10 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2023-02-09 | No data | BANNER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved by builder |
2023-02-09 | No data | GUIDER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No street paved by builder on this side |
2023-02-06 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IFO PROPERTY #532. |
2023-02-03 | No data | 196 PLACE, FROM STREET 48 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-02-03 | No data | WEST 19 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanently restored sidewalk flags in front of 12. Insp.844 |
2023-02-02 | No data | NORTHERN BOULEVARD, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2023-02-02 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-02-01 | No data | 208 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced 2022 |
2023-02-01 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done in front of 137-17 & 137-15. |
2023-02-01 | No data | DE KALB AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway pa ed by BPP |
2023-02-01 | No data | 45 AVENUE, FROM STREET 202 STREET TO STREET 203 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-02-01 | No data | LEXINGTON AVENUE, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway remains in acceptable condition. |
2023-01-30 | No data | BEDFORD AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-29 | No data | MC DONALD AVENUE, FROM STREET 65 STREET TO STREET AVENUE O | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP final restoration acceptable |
2023-01-27 | No data | 57 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street has been paved in front of 640. |
2023-01-27 | No data | HART STREET, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP |
2023-01-26 | No data | COLLEGE POINT BOULEVARD, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed in front of 22-24. |
2023-01-25 | No data | SOUTH 2 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved. |
2023-01-24 | No data | 104 STREET, FROM STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced at the time of inspection. |
2023-01-24 | No data | 60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Road paved in front of 900. |
2023-01-24 | No data | NORTHERN BOULEVARD, FROM STREET 103 STREET TO STREET 104 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced at the time of inspection. |
2023-01-24 | No data | FULTON STREET, FROM STREET ROCKAWAY AVENUE TO STREET SOMERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY: 41FT, W MILLED: 25FT, L MILLED: 31FT, D MILLED: 3 in. |
2023-01-20 | No data | GUIDER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED- CONTRACTOR WITHDREW WORK AND DEFFERENT CONTRACTOR PERFORMED WORK.CAR #20234560002 ISSUED TO UPDATED CONTRACTOR |
2023-01-20 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | There was a scaffolding at location when that portion was restored around one of the leg of the scaffolding. Also, there was another leg closed to the curb where sidewalk was restored around it as well. Your CAR protest is denied. |
2023-01-20 | No data | BANNER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED- CONTRACTOR WOTHDRE PERMIT AND DIFFERENT VONTRACTOR TOOK OVER JOB CAR #20237740057 ISSUED TO CORRECT CONTRACTOR |
2023-01-19 | No data | NORTH HENRY STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE PERM RESTORATION IS IN GOOD CONDITION IFO PROPERTY #250. |
2023-01-18 | No data | 80 DRIVE, FROM STREET CHEVY CHASE STREET TO STREET KENT STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed and acceptable. (49'7" x 21' x 3") |
2023-01-17 | No data | ELDERT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP |
2023-01-15 | No data | 1 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP does not appear to have been completed at this location. |
2023-01-14 | No data | 164 PLACE, FROM STREET 110 ROAD TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVE STREET-PERM ROADWAY |
2023-01-13 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2023-01-12 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #6 (2) Sidewalk flags must be restored in-kind with existing sidewalk area Patchwork is unacceptable. |
2023-01-12 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW repaved by BPP |
2023-01-12 | No data | 58 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 85’x19’x3” bpp milled |
2023-01-12 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by BPP |
2023-01-12 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O #6 scaffolding, obstruction has been removed, patchwork still visible updated CAR to be issued |
2023-01-09 | No data | BUELL STREET, FROM STREET 31 AVENUE TO STREET 31 DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced at the time of inspection. |
2023-01-09 | No data | 64 STREET, FROM STREET 55 DRIVE TO STREET HULL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w paved by builder |
2023-01-05 | No data | 46 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement is acceptable. |
2023-01-04 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w |
2023-01-04 | No data | 17 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk acceptable |
2022-12-24 | No data | ELDERT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is flush to grade |
2022-12-23 | No data | GUIDER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please install and seal expansion joints in the sidewalk and curb. |
2022-12-23 | No data | BANNER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please seal expansion joints to curb in front of 1014 Banner Avenue. |
2022-12-22 | No data | 60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | portion off r.w in compliance with bpp |
2022-12-22 | No data | 9 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | portion of r.w in compliance with bpp |
2022-12-22 | No data | 9 AVENUE, FROM STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | portion of intersection in compliance with bpp |
2022-12-20 | No data | ELDERT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb- Curb- 29.7ftWidth- 21.7ftLength- 50ft Depth- 3 inches |
2022-12-20 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to Curb- 29.1ftWidth- 21ftLength- 35.6ftDepth: 3 inches |
2022-12-17 | No data | VAN DUZER STREET, FROM STREET PROSPECT STREET TO STREET SANDS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-12-14 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the NW2 corner quadrant is Ada. Measured in prism 12/14/22 |
2022-12-06 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB WAS INSTALLED |
2022-12-01 | No data | COOPER STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2022-12-01 | No data | DECATUR STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance |
2022-11-30 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 111 curb installation remains acceptable. |
2022-11-29 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism 6/29/22. |
2022-11-23 | No data | 17 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel Curb in compliance. |
2022-11-22 | No data | 40 AVENUE, FROM STREET 29 STREET TO STREET 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed in front of 29-17. |
2022-11-15 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | (condition not verified) sidewalk open, at this time no pedestrian observed walking in bus lane. sidewalk restored in kind |
2022-11-10 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection sidewalk construction in progress with valid permit. |
2022-11-09 | No data | NORTHERN BOULEVARD, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2022-11-09 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the respondent failed to adhere to stip 014 of their permit by not maintaining a protected pedestrian walkway in the roadway as required. The barriers have 10' gap in-between and was not ramped at the entrance for easy transition |
2022-11-04 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition not verified. No blocked construction observed. Sidewalk excavated and barricaded including the bus shelter. Walkway provided in the roadway. Spoke on the phone with foreman Dan. He informed that MTA authorized the closure of shelter. |
2022-11-01 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No ped ramp work started at this time of inspection within the SW1 corner quadrant, active construction work is going on within the area. We’ll reinspect at a later date. |
2022-10-26 | No data | HART STREET, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:26’Width of milled area:20’Length of milled area:86’Depth of milled area:3” |
2022-10-20 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done in the NW2 Corner quadrant old exist ramps, will measure and collect once completed. Permit still active |
2022-10-20 | No data | FOWLER AVENUE, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No bobcat on site |
2022-10-12 | No data | NORTH HENRY STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-10-12 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2022-10-06 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the NE3 corner quadrant is non Ada. Measured in prism 12/30/21 |
2022-10-04 | No data | FOWLER AVENUE, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent with an asphalt paver in the driving lane. Respondent failed to comply with the terms and conditions of DOT permit by violating STIP # 078 . |
2022-10-03 | No data | FOWLER AVENUE, FROM STREET FOWLER PATH TO STREET COLLEGE POINT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 62’x25’x3” milled area of bpp completed |
2022-09-30 | No data | WEST 126 STREET, FROM STREET AMSTERDAM AVENUE TO STREET WEST 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2022-09-29 | No data | DEVOE STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2022-09-28 | No data | 17 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length of Milling: 52ft 2in Width of Milling: 27ft 6in Full Width of Roadway: 43ft 4in Depth: 4in |
2022-09-21 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed in front of 37-19. |
2022-09-13 | No data | 215 PLACE, FROM STREET 36 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bpp monitored 115’x20’x3” completed |
2022-09-13 | No data | 36 AVENUE, FROM STREET 215 PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Bpp monitored 25’x22’x3” completed |
2022-09-13 | No data | 36 AVENUE, FROM STREET 215 PLACE TO STREET 216 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Bpp monitored 65’x25’x3” completed |
2022-09-13 | No data | WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET EAST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection. |
2022-09-10 | No data | BERGEN AVENUE, FROM STREET WESTCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work was done in intersection at time of inspection. |
2022-09-06 | No data | STEINWAY STREET, FROM STREET 20 AVENUE TO STREET 20 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | The roadway was already paved when I arrived. Paved area measure 94' x 26'• Curb to Curb width – 40’• Milled area – 94’ x26’• Q012022244A63Depth of milled area – n/a• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-n/a |
2022-09-02 | No data | NORTH HENRY STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 30ftWidth-21ftLength- 58.1ft Depth- 3 inches |
2022-09-01 | No data | 81 STREET, FROM STREET 157 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP paving on roadway is valid and completed at this time of inspection. Ok to pass as per Mr. Williams queens borough office. |
2022-08-30 | No data | 170 STREET, FROM STREET 71 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP measurements are accurate. |
2022-08-25 | No data | DEVOE STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb to curb- 30ftWidth- 21.8ftLength- 32 ftDepth- 3.5 inches |
2022-08-24 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BBP complete Curb to curb- 30ftWidth- 21ftLength- 32ft Depth- 4 inches |
2022-08-24 | No data | 49 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed expansion joints sealed |
2022-08-23 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the NW2 corner found to be non ADA compliant , ramp are functional and accessible. Previously measured and collected on Prism on 12/30/21. |
2022-08-17 | No data | EAST 86 STREET, FROM STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance L-20'6" W-16'7" D-3" |
2022-08-17 | No data | EAST 86 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance L-160'6" W-14'6" D-3" |
2022-08-17 | No data | LEXINGTON AVENUE, FROM STREET EAST 86 STREET TO STREET EAST 87 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP is in compliance L-117'8" W-19'2" D-3" |
2022-08-12 | No data | 15 AVENUE, FROM STREET 110 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP milling passed: • Curb to Curb width – 32’ • Milled area –22’ • Depth of milled area –3” • ½ +5’ milled (yes/no) –Yes • Waiver (yes/no) - No. |
2022-08-12 | No data | 110 STREET, FROM STREET 14 ROAD TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milling passed:• Curb to Curb width –25’ • Milled area –18’ • Depth of milled area –3” • ½ +5’ milled (yes/no) –Yes • Waiver (yes/no)-No. |
2022-08-12 | No data | 15 AVENUE, FROM STREET 110 STREET TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | BPP milling passed:• Curb to Curb width – 32’• Milled area –22’ • Depth of milled area –3” • ½ +5’ milled (yes/no) –Yes• Waiver (yes/no) - No |
2022-08-11 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O # 4 (1) sidewalk flag has been patched active permit at time of inspection. |
2022-08-10 | No data | 233 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 49’• Milled area – 29’ x 136’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2022-08-10 | No data | 64 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 49’• Milled area – 73’ x30’ 5”• Depth of milled area – 3”• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2022-08-10 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No ped ramp work started at this time for the SE4 corner quadrant. Ramps previously done by DOT under permit #Q152016090A38. Ramps are functional and accessible. |
2022-08-08 | No data | 157 AVENUE, FROM STREET 81 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 137'x22'x3" |
2022-08-08 | No data | 81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 30'x20'x3" |
2022-08-08 | No data | COLLEGE POINT BOULEVARD, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bobcat not visible |
2022-07-26 | No data | LAMONT AVENUE, FROM STREET CASE STREET TO STREET DENMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed, expansion joints sealed |
2022-07-22 | No data | 157 AVENUE, FROM STREET 81 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection F\O 157-03 81st Street. |
2022-07-22 | No data | DE KALB AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Width of Roadway:34’Width of milled area:22’Length of milled area:35’Depth of milled area:3 1/2” |
2022-07-22 | No data | 81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection F\O 157-03 81st Street. |
2022-07-21 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Location:101 Suydam StreetPermit:B012022195A23Width of Roadway:30’Width of milled area:20’Length of milled area:35’Depth of milled area:3” |
2022-07-19 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Active | Department of Transportation | On Division St, several separate repaired flags. |
2022-07-05 | No data | 164 PLACE, FROM STREET 110 ROAD TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET |
2022-07-01 | No data | 75 STREET, FROM STREET JUNIPER VALLEY ROAD TO STREET PENELOPE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | (condition verified) permanent to grade pavement observed active permit on file |
2022-06-30 | No data | 75 STREET, FROM STREET JUNIPER VALLEY ROAD TO STREET PENELOPE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 64-27 completed and acceptable.Curb to curb - 29' 7"milled area - 20' 4" x 153' 2"depth - 3" |
2022-06-29 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work. Ramps were upgrade prior to unit creation |
2022-06-27 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok seal |
2022-06-13 | No data | MC DONALD AVENUE, FROM STREET 65 STREET TO STREET AVENUE O | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset and acceptable |
2022-06-12 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Full swk restoration for newly constructed building. No defects & no impaction to protected bike lane. |
2022-06-09 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pave 20ft by 44ft down 3in |
2022-06-03 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb present and cobblestone restoration is acceptable. |
2022-06-02 | No data | 164 PLACE, FROM STREET 110 ROAD TO STREET BRINKERHOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. Building located adjacent to 163-49 111th Ave. |
2022-06-01 | No data | 231 STREET, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | mini digger not visible |
2022-05-30 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No digger found |
2022-05-26 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 137-15 - 137-17 completed and acceptable. Curb to curb - 29' 4", milled - 22' 11" x 59' 1", depth - 3". |
2022-05-17 | No data | 231 STREET, FROM STREET 50 AVENUE TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 30’, Milled area – 20’ x 61’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No. |
2022-05-13 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2022-05-12 | No data | BAY RIDGE PARKWAY, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In Prism the SW1 corner is marked as the NW2 corner. Newly completed tangent ramps in the SW1 corner quad are accessible and functional but not Ada compliant. Measured and collected in Prism on 5/12/22. |
2022-05-10 | No data | BAY PARKWAY, FROM STREET 76 STREET TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb ok |
2022-05-09 | No data | CASE STREET, FROM STREET LAMONT AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | R/w milled |
2022-05-09 | No data | LAMONT AVENUE, FROM STREET CASE STREET TO STREET DENMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | R/w milled |
2022-05-09 | No data | CASE STREET, FROM STREET LAMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | R/w milled. |
2022-05-08 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel-face curb in compliance. |
2022-05-07 | No data | 82 AVENUE, FROM STREET 265 STREET TO STREET 266 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb repaired |
2022-04-28 | No data | 30 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building paving done in compliance- perm to grade; half plus 5'. |
2022-04-26 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of in front of 37- 29 (walkthrough property) completed & acceptable. Curb to curb - 29' 6", milled - 70' 7" x 20' 2", depth - 3". |
2022-04-26 | No data | 31 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 37-29 completed and acceptable. Curb to curb - 59' 2", milled area - 98' 9" x 35' 6", depth 4". |
2022-04-23 | No data | WEST 127 STREET, FROM STREET CONVENT AVENUE TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2022-04-22 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 108-48 completed and acceptable. Curb to curb - 29' 0", milled area - 52' 1" x 20' 4", depth 3". |
2022-04-20 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Scaffolding is present at location in front of 4-6. |
2022-04-18 | No data | HILLSIDE AVENUE, FROM STREET 192 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the respondent open the roadway for repairs without a permit. 30'x34' width of the intersection milled. Permit # Q012022095B50 for (Hillside avenue btw 191 street & 192 street) used for ID purpose only. |
2022-04-18 | No data | HILLSIDE AVENUE, FROM STREET 191 STREET TO STREET 192 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5' width of the roadway milled. |
2022-04-18 | No data | 192 STREET, FROM STREET 90 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1/2+5' width of the roadway milled. |
2022-04-15 | No data | 44 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milling in compliance: • Curb to Curb width –……60’• Milled area – ……………..60’ x 20’ • Depth of milled area –….3” • ½ +5’ milled (yes/no) –..Yes • Waiver (yes/no)-…………..N/A |
2022-04-12 | No data | LORIMER STREET, FROM STREET AINSLIE STREET TO STREET DEVOE STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk r/w |
2022-04-12 | No data | 88 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced as per BPP, conventional bike lane marking restored. |
2022-04-11 | No data | 23 STREET, FROM STREET 30 AVENUE TO STREET 30 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb - 29' 6", milled area - 33' 11" x 20' 1", depth - 3". |
2022-03-30 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed apex ramp within the SE4 corner quadrant is functional and accessible. Non Ada compliant. Measured in collector 1/28/20 |
2022-03-27 | No data | 38 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB-PERM AND SEALED |
2022-03-17 | No data | NORTHERN BOULEVARD, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No equipment on site, sidewalk restored in kind |
2022-03-15 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | FW - 33’ W - 21’ L - 60’ D - 3” |
2022-03-08 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 11/17/20. |
2022-03-08 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-03-07 | No data | BEDFORD AVENUE, FROM STREET HALSEY STREET TO STREET HANCOCK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Bike Lane |
2022-03-07 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the NE3 corner quadrant was found not to be ADA compliant, ramps are functional and accessible. Measured on the 11/6/19. |
2022-03-01 | No data | HUNTER STREET, FROM STREET CRESCENT STREET TO STREET 44 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple sidewalk flags restored in kind. All adjacent expansion joints sealed. |
2022-03-01 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2022-03-01 | No data | 31 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2022-02-28 | No data | PARK PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2022-02-28 | No data | ROCKAWAY BOULEVARD, FROM STREET 149 ROAD TO STREET 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several flags replaced and sealed. |
2022-02-25 | No data | NORTHERN BOULEVARD, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work found at time of inspection |
2022-02-24 | No data | NORTHERN BOULEVARD, FROM STREET 208 STREET TO STREET 209 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP in front of 207-26 completed and acceptable. Curb to curb - 69' 5"milled area - 58' 7" x 39' 6"Depth - 3" |
2022-02-20 | No data | UNION TURNPIKE, FROM STREET 254 STREET TO STREET LITTLE NECK PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two new sidewalk flags restored |
2022-02-18 | No data | BAY PARKWAY, FROM STREET 76 STREET TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | full width of roadway milled 35' in compliance with bpp and acceptable inspection recorded in dash |
2022-02-18 | No data | BAY RIDGE PARKWAY, FROM STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | area in compliance with bpp inspection has been recorded in dash |
2022-02-17 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. I observed the above respondent with a regulatory temporary construction sign labeled "NO PARKING ANYTIME", along the sidewalk. The permittee failed to obtain an active DOT permit to post signage for no parking. |
2022-02-17 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in front of 665 Myrtle Avenue was partially repaired. |
2022-02-16 | No data | 84 DRIVE, FROM STREET 143 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored |
2022-02-16 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work observed on 2 sidewalk flags. Full flags must be restored in kind. Scaffolding is present at location in front of 4-6. |
2022-02-14 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NE3 corner found not to be ADA compliant. Ramp is functional and accessible. Measured & collected in Prism on 12/30/21. (Excessive landing running slope) |
2022-02-11 | No data | BAY RIDGE PARKWAY, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb has been replaced and acceptable |
2022-02-08 | No data | LITTLE NECK PARKWAY, FROM STREET 75 AVENUE TO STREET UNION TURNPIKE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w replaced |
2022-02-03 | No data | 31 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No visible diggers on location at this time |
2022-01-25 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. 20ft width of 30ft wide roadway milled for paving (1/2 + 5). Depth is >3inches. |
2022-01-25 | No data | 129 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed on a more current permit #Q012019133D07. |
2022-01-23 | No data | WEST 19 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Steel face curb installed. |
2022-01-18 | No data | BAY PARKWAY, FROM STREET 76 STREET TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No bobcat permit expired |
2022-01-16 | No data | ALLEN STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flags ifo # 4-6, sidewalk flag underneath sidewalk shed is patchy and needs to be restored as full flag. Permit still active. |
2022-01-13 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the NW2 corner found not to be ADA compliant. Ramp is functional and accessible. Measured & collected on Prism on 12/30/21. |
2021-12-30 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed single ramp within the NE3 corner found to be non ADA compliant, ramp is functional and accessible. Measured and collected on Prism on 12/30/21. |
2021-12-30 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb acceptable. |
2021-12-28 | No data | WEST 126 STREET, FROM STREET WEST 127 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time |
2021-12-21 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2021-12-20 | No data | 30 STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Q012021341C31• Curb to Curb width – 30’ 5’’• Milled area – 143’ 10’’ x 21’• Depth of milled area – 3’’ • ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2021-12-20 | No data | 38 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 37’• Milled area – 69’ X 24’ • Depth of milled area – 3’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2021-12-20 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Q012021351A89• Curb to Curb width – 30’• Milled area – 22’ x 20 3’’• Depth of milled area – 3’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no) - no |
2021-12-10 | No data | 30 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Active construction taken place at this time. No ped ramp work started. We’ll measure and reinspect when ramp is completed |
2021-12-08 | No data | EAST 92 STREET, FROM STREET CONKLIN AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, bpp ... |
2021-12-07 | No data | PARK PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed & sealed |
2021-12-06 | No data | MC DONALD AVENUE, FROM STREET 65 STREET TO STREET AVENUE O | No data | Street Construction Inspections: Active | Department of Transportation | BPP COMPLETE Curb to Curb- 60ftWidth- 36ftLength- 90ftDepth- 3.5 inches |
2021-12-03 | No data | BAY PARKWAY, FROM STREET 76 STREET TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2021-12-03 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to restore full pedestrian crosswalk lane marking just north of Northern Boulevard and also restore bicycling symbol marking inside bike lane 30' north of Northern Boulevard. |
2021-12-02 | No data | WEST 19 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #12 Roadway measures 33’ curb to curb/restoration (W)57’/property (W)24’/ 22’ of pavement/wearing course 3” is in compliance |
2021-11-29 | No data | WEST 126 STREET, FROM STREET AMSTERDAM AVENUE TO STREET WEST 127 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP is ready for paving. 1/2 +5 & 3 1/2 inches down. Spoke with Dan. |
2021-11-29 | No data | WEST 127 STREET, FROM STREET CONVENT AVENUE TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP is ready for paving. 1/2 +5 & 3 1/2 inches down. Spoke with Dan. |
2021-11-28 | No data | EAST 87 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2021-11-18 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole street: 29ft 5in Half plus 5: 19ft 10in Width: 27ft 9in Down 3in |
2021-11-10 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind |
2021-10-30 | No data | 129 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2021-10-28 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP was inspected. Before milling the width of roadway is 30' 3” Width milled is 20’ 3” & Length milled is 50' & Depth is 3". Foreman on site. |
2021-10-26 | No data | BAY PARKWAY, FROM STREET 76 STREET TO STREET STILLWELL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is not occupied at this time |
2021-10-21 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb reveal installed in front of property #37-21 32 STREET in compliance |
2021-10-06 | No data | 28 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Corner of intersection repaved in front of John Brown BBQ + Bar. |
2021-10-05 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified: No blocked construction. At this time sidewalk is open and clear for pedestrians. Sidewalk restored, Active temporary pedestrian walk permit Q022021264A26 on file. No crew on site. Roadway/Sidewalk open. |
2021-09-28 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint Not Verified: No blocked construction at this time. Portion of roadway was milled/paved as per BPP @ 37-19 . Monitored by Inspector |
2021-09-28 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint Not Verified: No blocked construction at this time. Portion of roadway was milled/paved as per BPP @ 37-19 . Monitored by Inspector |
2021-09-23 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 29' 7", milled area 123' 6" x 20' 6", depth of milled area 3". |
2021-09-23 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 36' 2", milled area 124' 10" x 22' 11", depth of milled area 3". |
2021-09-20 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk flag has been installed in front of 534. |
2021-09-16 | No data | SOUTH 2 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | BRUNO ARRIVED AT 11:15 AM- MILLED PAVED A PASS- TOTAL WIDTH OF ROADWAY IS 30 FEET - ROADWAY MILLED (L) 30 FEET X (W) 20 FEET X (D) 3 1/2 INCHES- |
2021-09-09 | No data | 88 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed. |
2021-09-08 | No data | WEST 20 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active job site, currently working on the sidewalk in front. |
2021-09-07 | No data | WEST 20 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP pass L-64' roadway W- 34' W-22' milled and 5' more on either sides. |
2021-09-05 | No data | 57 STREET, FROM STREET 43 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2021-08-29 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP completed |
2021-08-29 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk installed in front of 1101 Bedford avenue a.k.a. 322 Gates avenue |
2021-08-29 | No data | 65 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2021-08-27 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed apex ramp in the SE4 corner quadrant found not to be ADA compliant, ramp is accessible and functional previously measured and collected on 1/28/20. |
2021-08-27 | No data | UNION TURNPIKE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed and completed. 219' x 23' x 3" |
2021-08-27 | No data | 134 STREET, FROM STREET UNION TURNPIKE | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed and completed. 44' x 22' x 3" |
2021-08-27 | No data | CONEY ISLAND AVENUE, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 777. PAVING DONE. |
2021-08-25 | No data | 88 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 29’10” Milled area – 151’5” X 20’7” Depth of milled area – 3” ½ +5’ milled (yes/no) – Yes Waiver (yes/no)- No |
2021-08-25 | No data | 150 STREET, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 30’11” Milled area – 24’9” X 21’ Depth of milled area – 3” ½ +5’ milled (yes/no) – Yes Waiver (yes/no)- No |
2021-08-22 | No data | 88 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway in compliance. |
2021-08-22 | No data | 150 STREET, FROM STREET 88 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk as stipulated for repairs in compliance. (side of 148-37 88th Ave.) |
2021-08-18 | No data | NORTHERN BOULEVARD, FROM STREET 103 STREET TO STREET 104 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 30' 5", milled area 52' 11" x 20', depth 3". |
2021-08-18 | No data | 104 STREET, FROM STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 30' 5", milled area 58' 5" x 33' 11", depth 3". |
2021-08-18 | No data | 104 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb 29' 11", milled area 138' 4" x 20', depth 3". |
2021-08-17 | No data | BUELL STREET, FROM STREET 31 AVENUE TO STREET 31 DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | Q012021224A51• Curb to Curb width – 29' 1"• Milled area –20' 1"• Depth of milled area –3• ½ +5’ milled (yes/no) –yes• Waiver (yes/no)-no |
2021-08-17 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB |
2021-08-16 | No data | NORTH 6 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP roadway in good condition, ifo #61 and 63, black metal building. |
2021-08-12 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK w/sw open |
2021-08-03 | No data | SIMONSON STREET, FROM STREET BEND TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 plus 5' of roadway's width at location repaved. |
2021-07-30 | No data | 32 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no Bobcat |
2021-07-30 | No data | AMSTEL BOULEVARD, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 50'0", Milled area – 31'0" x 130'0", Depth of milled area – 3", ½ +5’ milled – Yes. Note: 22" concrete pad from curb to milled area. |
2021-07-30 | No data | AMSTEL BOULEVARD, FROM STREET BEACH 74 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 50'0", Milled area – 30'0" x 20'0", Depth of milled area – 3", ½ +5’ milled – Yes. |
2021-07-29 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced in front of 665 Myrtle avenue |
2021-07-28 | No data | 56 AVENUE, FROM STREET 61 STREET TO STREET 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored expansion joints sealed i/f/o 61-47 56ave |
2021-07-26 | No data | 228 STREET, FROM STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 30'0", Milled area – 22'0" x 33'0", Depth of milled area – 3", ½ +5’ milled – Yes. |
2021-07-26 | No data | MERRICK BOULEVARD, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 30'0", Milled area – 20'0" x 119'0", Depth of milled area – 3", ½ +5’ milled – Yes. |
2021-07-26 | No data | 228 STREET, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable.Curb to Curb width – 55'0", Milled area – 33'0" x 115'0", Depth of milled area – 3", ½ +5’ milled – Yes. |
2021-07-22 | No data | EAST 233 STREET, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Digger off the street |
2021-07-15 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary walkway on roadway |
2021-07-15 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb installed, joints sealed |
2021-07-15 | No data | CONEY ISLAND AVENUE, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY HAS BEEN MILLED. |
2021-07-15 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint Not Verified: Sidewalk under construction and barricaded off to pedestrians. Permitee has set up a clear protected temporary walkway on roadway, active permit Q022021196A41 on file for temporary walkway. |
2021-07-13 | No data | EAST 233 STREET, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Few flags replace |
2021-07-08 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced on corner of gates and bedford avenue east side of block |
2021-06-29 | No data | 57 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP done in compliance, The Property length is 20’. The milled length is 30’. The roadway width from curb to curb is 30’. The roadway milled off the curb is 20’, the required is ½ plus 5 feet. The milled depth 2.5” to 3” on all 4 sides |
2021-06-25 | No data | 46 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milled area: 29'03"x 24'10". |
2021-06-23 | No data | 11 STREET, FROM STREET 43 ROAD TO STREET 44 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New concrete sidewalk and curb installed at corner property “Art Strong”. Expansion joints installed but still need sealer. Corner quadrant not touched, has old concrete ramps. |
2021-06-23 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant was found not to be ADA compliant, however ramps are functional and accessible. Measured on the 11/6/19. |
2021-06-21 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant. Ramps are functional and accessible. Measured and collected in Prism on the 11/17/20. |
2021-06-19 | No data | FLUSHING AVENUE, FROM STREET 61 STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width- 44’• Milled area- 50’ x 28’• Depth of milled area- 4”• ½ +5’ milled (yes/no) – 28’• Waiver (yes/no)- No |
2021-06-19 | No data | OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Length of the milled roadway property line to property line:37’Width of the entire roadway curb to curb:70’Width of the milled roadway:40’ |
2021-06-18 | No data | 28 STREET, FROM STREET 40 AVENUE TO STREET 41 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 20'x5' width of the r/w milled in accordance with the waiver. |
2021-06-18 | No data | 40 AVENUE, FROM STREET 27 STREET TO STREET 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PAVE STREET-CREW ON SITE MILLING AND CLEANINING UP AREA BEFOORE 12PM PAVING. SITE IN COMPLIANCE . |
2021-06-18 | No data | 28 STREET, FROM STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 12'x5' width of the roadway milled as required by waiver |
2021-06-15 | No data | 67 STREET, FROM STREET DURYEA COURT TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. 6613 new utrecht ave |
2021-06-13 | No data | 74 STREET, FROM STREET 57 AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 1/2 + 5' of roadway repaved. Lane markings restored. |
2021-06-13 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK |
2021-06-09 | No data | REMINGTON STREET, FROM STREET 107 AVENUE TO STREET SHORE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - Curb to Curb width-30' • Milled area-30' 6'' X 20' 10''• Depth of milled area- 3''• ½ +5’ milled (yes/no) –YES • Waiver (yes/no)-NO |
2021-06-06 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb replaced |
2021-06-04 | No data | TOMPKINS AVENUE, FROM STREET HART STREET TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SEAL OK- |
2021-06-02 | No data | 220 STREET, FROM STREET 58 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored expansion joints sealed |
2021-05-26 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-05-25 | No data | 33 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bob cat on location at time of inspection. |
2021-05-23 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IS OK |
2021-05-18 | No data | EAST 123 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag in compliance |
2021-05-17 | No data | VAN DUZER STREET, FROM STREET PROSPECT STREET TO STREET SANDS STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP INSPECTION: ROADWAY WIDTH 28'4". ROADWAY WIDTH MILLED 19'8". MILLED DOWN 3 AND A HALF INCHES. |
2021-05-17 | No data | SANDS STREET, FROM STREET VAN DUZER STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP INSPECTION:INTERSECTION DIMENSIONS MILLED19’8” BY 19’4”MILLED DOWN 3 AND A HALF INCHES. |
2021-05-17 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP INSPECTION:ROADWAY WIDTH 27’2”ROADWAY WIDTH MILLED 19’4”MILLED DOWN 3 AND A HALF INCHES |
2021-05-04 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2021-05-03 | No data | JUNIPER AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joint sealed on curb |
2021-05-02 | No data | 64 STREET, FROM STREET 55 DRIVE TO STREET HULL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb installed at time of my inspection. |
2021-04-30 | No data | 163 STREET, FROM STREET 45 AVENUE TO STREET 46 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb restored expansion joints sealed at 45-12 |
2021-04-28 | No data | EAST 92 STREET, FROM STREET CONKLIN AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved 1/2+5ft. In compliance. |
2021-04-28 | No data | EAST 92 STREET, FROM STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection and roadway paved 1/2+5ft. In compliance. |
2021-04-28 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved 1/2+5 . In compliance. |
2021-04-28 | No data | 59 AVENUE, FROM STREET 153 STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb expansion joint sealed |
2021-04-25 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repaired at time of my inspection . |
2021-04-20 | No data | SANDS STREET, FROM STREET VAN DUZER STREET TO STREET WAVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2021-04-20 | No data | SANDS STREET, FROM STREET VAN DUZER STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2021-04-20 | No data | VAN DUZER STREET, FROM STREET PROSPECT STREET TO STREET SANDS STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2021-04-19 | No data | TOMPKINS AVENUE, FROM STREET HART STREET TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to re-seal cut after being notified on 10/31/2020 by CAR #20205250204. permit# used to I.D contractor |
2021-04-18 | No data | CARROLL STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb intact, no defects at this time |
2021-04-14 | No data | 49 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sections of s/w was replaced |
2021-04-09 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has obtained permit Q042020325A16 |
2021-04-08 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 71ft 6in Width of Milling: 20ft 6in Full Width of Roadway: 30ft Depth: 4in |
2021-03-24 | No data | 167 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb passed inspection joints appear to be full sawed covered by concrete. |
2021-03-20 | No data | CARROLL STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw ok seal |
2021-03-16 | No data | 196 PLACE, FROM STREET 48 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | The BPP completed and acceptable.• Curb to Curb width –30' • Milled area –20'6'' • Depth of milled area –3'' • ½ +5’ milled (yes/no) –Yes • Waiver (yes/no)-No |
2021-03-15 | No data | KING STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for pave |
2021-03-13 | No data | JUNIPER AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 25'• Milled area – 60'6"x20'• Depth of milled area – 3"• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-No |
2021-03-13 | No data | 45 AVENUE, FROM STREET 149 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of roadway's width plus 5' restored in kind - perm to grade. |
2021-03-11 | No data | BUSHWICK AVENUE, FROM STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PARTIALLY INTERSECTION REPAVED FOR BPP |
2021-03-11 | No data | 59 AVENUE, FROM STREET 153 STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Curb to Curb width – 30'10" Milled area – (50'6" X 20'7") Depth of milled area – 3" ½ +5’ milled (yes/no) – Yes Waiver (yes/no)- No (This inspection was done on 3/10/21 & approved) |
2021-03-06 | No data | 55 AVENUE, FROM STREET 92 STREET TO STREET 94 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work completed at location |
2021-03-05 | No data | 55 AVENUE, FROM STREET 92 STREET TO STREET 94 STREET | No data | Street Construction Inspections: Active | Department of Transportation | bobcat not on site |
2021-02-26 | No data | 74 STREET, FROM STREET 57 AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable • Curb to Curb width – 50’• Milled area – 30’ 3”• Depth of milled area – 3” |
2021-02-24 | No data | 45 AVENUE, FROM STREET 202 STREET TO STREET 203 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is acceptable.Curb to Curb width – 29' 0" , Milled area – 20' 0" , Depth of milled area – 3", ½ +5’ milled – Yes. |
2021-01-23 | No data | EAST 123 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Manhattan Borough was notified |
2021-01-14 | No data | 22 STREET, FROM STREET 25 ROAD TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed in compliance. (Ifo. 25-30/32)Curb to Curb width – 23’10” Milled area – 61’4” X 16’9” Depth of milled area – 3” ½ +5’ milled (yes/no) – Yes Waiver (yes/no)- No |
2021-01-12 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2021-01-10 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway was paved, in front of new building. |
2021-01-06 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1\2 +5 rw paved |
2020-12-14 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant was found not to be ADA compliant, however ramps are functional and accessible. Previously Measured on 11/6/19. |
2020-12-09 | No data | DOUGLAS AVENUE, FROM STREET 168 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2020-12-08 | No data | 71 AVENUE, FROM STREET 164 STREET TO STREET 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 plus 5' of paving done. |
2020-12-04 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NW corner quadrant found to be non Ada compliant. Ramps are functional and accessible. Measured and collected on Prism on 11/17/20. |
2020-12-03 | No data | 45 AVENUE, FROM STREET 149 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | BBP completed and acceptable. Curb to Curb width –30' Milled area –25' 6'' Depth of milled area –3'' |
2020-11-17 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the NW2 corner found to be non ADA compliant, ramps are functional and accessible. Measured and collected on Prism on 11/17/20. |
2020-11-12 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The above respondent failed to notify nyc dot hiqa borough office within 4 hour prior to paving. As per stipulation 1/2 + 5. If not admitting the charge you MUST APPEAR IN PERSON. |
2020-11-09 | No data | 33 AVENUE, FROM STREET 211 STREET TO STREET 212 STREET | No data | Street Construction Inspections: Active | Department of Transportation | R/w paved. width of r/w 34', Paved area 71'x25'x3'' |
2020-11-05 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PAVING DONE. |
2020-11-04 | No data | OAK AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Curb to curb width - 28'6"Milled area - 47'4"×19'4"×3"Depth of milled area - 3"1/2+5' - yes Waiver - noMilling accepted. Arrived at 9:12 am,leaving the site at 9:45 am. |
2020-10-31 | No data | TOMPKINS AVENUE, FROM STREET HART STREET TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IN FRONT OF 157. PLEASE RESEAL STREET OPENING JOINTS. |
2020-10-29 | No data | 162 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed ifo 88-56. |
2020-10-15 | No data | 208 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP acceptable in front of 48-66.Curb to curb = 29’ 6” Milled area = 20’ Depth of milled area = 4” ½ + 5 milled = Yes |
2020-10-15 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #76-84 in compliance |
2020-10-14 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed apex ramp in the SE4 corner quadrant found not to be ADA compliant, ramp is accessible and functional measured and collected on 1/28/20. |
2020-10-11 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repalaced |
2020-10-09 | No data | 64 STREET, FROM STREET 55 DRIVE TO STREET HULL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP inspection, 49'00"x 19'05" = Milled area. |
2020-10-09 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Please disregard previous inspection Milled area complete and acceptable 21'8" x 20' 8" x 3" |
2020-10-09 | No data | 162 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | please disregard previous inspectionmilling complete and acceptable 124'7" x 20'2" x 3" |
2020-10-08 | No data | GRAHAM AVENUE, FROM STREET JOHNSON AVENUE TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance. |
2020-10-07 | No data | 89 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat Visible On Site At Time Of Inspection |
2020-10-06 | No data | 89 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Milling complete and acceptable (inspection made 10/02/20)134' x 20' x 3" |
2020-10-06 | No data | 162 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2020-10-05 | No data | 162 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | not verified. D.P. Paving & Concrete Inc. permit #Q012020262A78 expires 10/16/20 is paving the roadway for a BPP. The roadway is open. |
2020-10-04 | No data | 208 STREET, FROM STREET 116 AVENUE TO STREET NASHVILLE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed adjacent to property AKA 207-05 expansion joints sealed in between the sidewalk & curb in compliance |
2020-10-02 | No data | 89 AVENUE, FROM STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | milled area in intersection length and width incorporated into adjoining blocks162 street between hillside and 89 avenue also 89 avenue between 162 street and161 street |
2020-10-02 | No data | 162 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | milling complete and acceptable124' x 20' x 3" |
2020-10-02 | No data | 50 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new walk ....n/s of block ... |
2020-09-30 | No data | 49 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new walk ....west side of street ... |
2020-09-24 | No data | HIMROD STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced roadway |
2020-09-17 | No data | 1 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No new work done on the roadway, permit still active. |
2020-09-17 | No data | 33 AVENUE, FROM STREET 211 STREET TO STREET 212 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started. No work done. No inspection found at this time. |
2020-09-15 | No data | 167 STREET, FROM STREET 69 AVENUE TO STREET JEWEL AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Milled portion of BPP is acceptable54'2" x 20'7" x 3" |
2020-09-13 | No data | NASSAU AVENUE, FROM STREET HUMBOLDT STREET TO STREET RUSSELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property AKA #151 RUSSELL STREET |
2020-09-13 | No data | BAY STREET, FROM STREET COLUMBIA STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Installation of BPP Plus 5 found on the Existing Roadway |
2020-09-13 | No data | SIGOURNEY STREET, FROM STREET COLUMBIA STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Installation of BPP Plus 5 on the Existing Roadway |
2020-09-11 | No data | 31 AVENUE, FROM STREET 23 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Milling acceptable. Curb to curb - 39'10"Milled area - 59'6"×24'11"Depth of milled area - 3"1/2+5' milled - yes Waiver - no.At my arrival lo. area was 1 to 2 inches deep - spoke to Dan,per my request milled down to 3 inches. |
2020-09-10 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent has obtained 410 permit #B042020030A19 for work done in the SE4 corner quadran. Completed apex ramp in the SE4 corner quadrant found not to be ADA compliant, however ramps are functional and accessible. Measured and collected on 1/28/20. |
2020-09-09 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is paved |
2020-09-07 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved by building pavers |
2020-09-05 | No data | EAST 92 STREET, FROM STREET CONKLIN AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was paved |
2020-09-02 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway was paved |
2020-09-02 | No data | EAST 92 STREET, FROM STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Intersection was paved |
2020-08-31 | No data | 84 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is paved |
2020-08-28 | No data | OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Length of milled roadway – 37'Width of roadway (curb to curb) – 70'Width of milled roadway – 40'Depth of milled roadway – 3" |
2020-08-27 | No data | 71 AVENUE, FROM STREET 164 STREET TO STREET 165 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO NOTIFY THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING NO NOTIFICATION WAS MADE AND WAS STREET PAVED AS PER 1/2 +5’ STIP |
2020-08-11 | No data | 163 STREET, FROM STREET 45 AVENUE TO STREET 46 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP pass Cut Dimension 43' x 20' below grade 4'' the width of the roadway was 30' so they did 15' + 5' |
2020-08-03 | No data | 23 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 39'• Milled area – 86' x 25'• Depth of milled area – 3"• ½ +5’ milled (yes/no) – yes• Waiver (yes/no) – no |
2020-08-01 | No data | 265 STREET, FROM STREET 81 AVENUE TO STREET 82 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in roadway |
2020-08-01 | No data | 82 AVENUE, FROM STREET 265 STREET TO STREET 266 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in roadway in compliance |
2020-08-01 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement partially in intersection |
2020-07-31 | No data | KING STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK AT 109-125 |
2020-07-29 | No data | 1 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this. Permit still active |
2020-07-29 | No data | 37 STREET, FROM STREET 47 AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New B/O 1/2+5 pavement completed in compliance. |
2020-07-29 | No data | 18 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP Inspection was made on Permit # Q012020181B46 7/13/20 and in compliance. No further action taken at this time. |
2020-07-29 | No data | FULTON STREET, FROM STREET DUTCH STREET TO STREET NASSAU STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved 1/2 + 5' is acceptable. |
2020-07-24 | No data | 71 AVENUE, FROM STREET 164 STREET TO STREET 165 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway work observed at this time. |
2020-07-21 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb in compliance. |
2020-07-20 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RE-PAVE OK |
2020-07-19 | No data | EAST 87 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. No defects to report |
2020-07-15 | No data | 160 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP Notification was made to HIQA Borough 6/22/20. No further action taken at this time. |
2020-07-14 | No data | EAST 169 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel faced curb installed |
2020-07-13 | No data | 149 STREET, FROM STREET 17 ROAD TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway Paving is in compliance.length r/way 36'1/2 r/way 18'+ 5' 23'Down 3"No Waiver |
2020-07-13 | No data | 18 AVENUE, FROM STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Length of r/way 30'1/2 r/way 15'+ 5' 20'Down 3"No Waiver |
2020-07-10 | No data | 160 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | R/w paved. No equip. |
2020-07-09 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: PASS - Length: 27ft 8in Width: 27ft 6in Full Width of Roadway: 42ft 4in Depth: 3in |
2020-07-06 | No data | 18 AVENUE, FROM STREET BENSON AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2020-06-30 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED 1/2 PLUS FIVE. |
2020-06-29 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been paved |
2020-06-23 | No data | KENMARE STREET, FROM STREET BOWERY TO STREET ELIZABETH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp Complete, AKA 154 Elizabeth Street on Kenmare Street |
2020-06-23 | No data | BEACH 74 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | BPP notification was made to HIQA borough on 5/28/20. No further action taken at this time. |
2020-06-23 | No data | 49 ROAD, FROM STREET BEND TO STREET HORATIO PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | full width 45'1/2+5 27'5" 3" 610' x 27'5" x 3" completed |
2020-06-23 | No data | ELIZABETH STREET, FROM STREET BROOME STREET TO STREET KENMARE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp complete - I/F/O 152 Elizabeth Street |
2020-06-22 | No data | BUSHWICK AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED |
2020-06-22 | No data | BUSHWICK AVENUE, FROM STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PART OF INTERSECTION WAS REPAVED |
2020-06-22 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY AREA WAS REPAVED |
2020-06-20 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2020-06-20 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2020-06-19 | No data | 60 STREET, FROM STREET 32 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30’ • Milled area – 21’ X 60’• Depth of milled area – 3’’• ½ +5’ milled (yes/no) – YES• Waiver (yes/no) –NO |
2020-06-04 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK |
2020-06-04 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired |
2020-06-02 | No data | EAST 92 STREET, FROM STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | milled 38' x 22' B.P.P requirement have been met |
2020-06-02 | No data | FLATLANDS AVENUE, FROM STREET EAST 91 STREET TO STREET EAST 92 STREET | No data | Street Construction Inspections: Active | Department of Transportation | milled 178' x 38 down 3 inches requirements have been met. |
2020-06-02 | No data | EAST 92 STREET, FROM STREET CONKLIN AVENUE TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | milled 120' x 22' down 3 inches B.P.P requirements have been met |
2020-06-01 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner quadrant was found not to be ADA compliant, however ramps are functional and accessible. Measured on 11/6/19. |
2020-05-28 | No data | EAST 78 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2020-05-28 | No data | DOUGLAS AVENUE, FROM STREET 168 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A few sections of sidewalk replaced and sealed. |
2020-05-22 | No data | NASHVILLE BOULEVARD, FROM STREET 116 ROAD TO STREET 208 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored in kind |
2020-04-17 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | no Equipment Type: Bobcat |
2020-04-17 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | no Equipment Type: Bobcat |
2020-04-15 | No data | ROSE FEISS BOULEVARD, FROM STREET DEAD END TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb reset/repaired |
2020-04-08 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #213 in compliance |
2020-03-20 | No data | EAST 86 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced. |
2020-03-14 | No data | STILLWELL AVENUE, FROM STREET BATH AVENUE TO STREET BAY 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BPP 1/2+5 in compliance in front of property #2359 |
2020-03-11 | No data | 158 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat Visible On Site At Time Of Inspection |
2020-03-11 | No data | 45 AVENUE, FROM STREET 158 STREET TO STREET 159 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat Visible On Site At Time Of Inspection |
2020-03-08 | No data | LINDEN PLACE, FROM STREET 31 ROAD TO STREET 32 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bobcat not visible |
2020-03-05 | No data | WEST 79 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | No work done, permit still active. |
2020-03-03 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed apex ramp in the SE4 corner quadrant found not to be ADA compliant, however ramps are functional and accessible. Measured and collected on 1/28/20. Expansion joints have been installed. |
2020-03-03 | No data | EAST 73 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. |
2020-03-02 | No data | 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP: Pass - Full Width of roadway: 29ft 10in Width of milling: 20ft 2in Length of Milling: 22ft 6in Depth: 4in |
2020-02-28 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 20' of 30' roadway has been milled |
2020-02-25 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed |
2020-02-25 | No data | 45 AVENUE, FROM STREET 158 STREET TO STREET 159 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 20• Milled area – 60’X25’• Depth of milled area – 3’’• ½ +5’ milled (yes/no) – YES• Waiver (yes/no) – NO• Was an inspection made in DASH under all associa |
2020-02-25 | No data | 158 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 30• Milled area – 114’ X 20’• Depth of milled area – 3’’• ½ +5’ milled (yes/no) – YES• Waiver (yes/no) – NO• Was an inspection made in DASH under all associ |
2020-02-25 | No data | 45 AVENUE, FROM STREET 158 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 20’• Milled area – 21’ X 25’• Depth of milled area – 3’• ½ +5’ milled (yes/no) – YES• Waiver (yes/no) – NO• Was an inspection made in DASH under all assoc |
2020-02-22 | No data | 57 STREET, FROM STREET 43 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK restored, joints sealed |
2020-02-22 | No data | 84 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2020-02-19 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed apex ramp in the SE4 corner quadrant is functional and accessible. Metal utility pole and FDNY call box need to be isolated. Ramp was measured and collected on 01/28/20. Ramp is non-Ada compliant. |
2020-02-12 | No data | 84 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway from curb to curb measures 30 feet. Contractor milled 20 feet of the roadway, adjacent to the property, to a depth of 3 inches. In compliance with BPP required measurements. |
2020-02-10 | No data | STILLWELL AVENUE, FROM STREET BATH AVENUE TO STREET BAY 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | MEASURED MILLED ROADWAY LENGTH OF THE ROADWAY IS 50FT WIDTH OF THE ROADWAY FROM CURB TO CURB IS 58FT HALF OF THAT IS 29FT ADD 5FT IS 34FT DEPTH IS 3 INCHES |
2020-01-29 | No data | DOUGLAS AVENUE, FROM STREET 168 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done, permit expired. |
2020-01-28 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Newly completed apex ramp in the SE4 corner found not to be ADA compliant, however ramp is functional and accessible. Measured and collected on 1/28/2020. |
2020-01-25 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #76-84 in compliance |
2020-01-10 | No data | MELROSE STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Whole: 30ft Half +5: 20.33in |
2020-01-10 | No data | BUSHWICK AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Whole: 50ft Half +5: 30L: 186ft3in |
2020-01-10 | No data | BUSHWICK AVENUE, FROM STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Whole: 34Half +5: 23 L: 553in |
2020-01-06 | No data | KENT AVENUE, FROM STREET BROADWAY TO STREET SOUTH 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT BIKE LANE GREEN OVER NEW PERMANENT HALF PLUS FIVE FEET ROADWAY RESURFACING, IN FRONT OF 416 KENT AVENUE BETWEEN SOUTH 8 STREET & BROADWAY. |
2020-01-06 | No data | KENT AVENUE, FROM STREET SOUTH 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT BIKE LANE GREEN OVER NEW PERMANENT HALF PLUS FIVE FEET ROADWAY RESURFACING, IN INTERSECTION OF ROADWAY AT KENT AVENUE & SOUTH 8 STREET. |
2020-01-06 | No data | KENT AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT BIKE LANE GREEN OVER NEW PERMANENT HALF PLUS FIVE FEET ROADWAY RESURFACING, IN FRONT OF 420 KENT AVENUE BETWEEN SOUTH 9 STREET & SOUTH 8 STREET. |
2019-12-12 | No data | EAST 141 STREET, FROM STREET AMTRAK RR TO STREET BRUCKNER EXPWY EB EN E 138 ST | No data | Street Construction Inspections: Active | Department of Transportation | THE PERMITTEE IS RESPONSIBLE FOR MILLING AND PAVING 1/2 + 5 FEET OF THE ROADWAY TO A DEPTH OF 3 INCHES AS A MINIMUM RESTORATION REQUIREMENT. THE PERMITTEE IS REQUIRED TO CALL THE NYC DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. |
2019-12-11 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel faced curb being installed. Cobblestones being removed at this time. Photos taken. |
2019-12-10 | No data | KENT AVENUE, FROM STREET SOUTH 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | RE-PAVING OF BPP WAS COMPLETED ON 12/10/19. IN-COMPLIANCE. (L) 27 FEET X (W) 24 FEET. |
2019-12-10 | No data | KENT AVENUE, FROM STREET BROADWAY TO STREET SOUTH 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | RE-PAVING OF BPP WAS COMPLETED ON 12/10/19. IN-COMPLIANCE. |
2019-12-10 | No data | KENT AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: Active | Department of Transportation | RE-PAVING OF BPP WAS COMPLETED ON 12/10/19. IN-COMPLIANCE |
2019-12-09 | No data | KENT AVENUE, FROM STREET BROADWAY TO STREET SOUTH 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BRUNO ARRIVED AT 705 AM -NO ONE ON SITE,RWY HAS 36 FOOT WIDTH-ROADWAY WAS MILLED (L) 188 feet X (W) 24 feet X (D) 2 3/4-3 inches-AT 416 KENT AVENUE-PASS |
2019-12-09 | No data | KENT AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BRUNO ARRIVED AT 705 AM -NO ONE ON SITE,RWY HAS 36 FOOT WIDTH-ROADWAY WAS MILLED (L) 280 feet X (W) 24 feet X (D) 2 3/4 inches-AT 420 KENT AVENUE-PASS |
2019-12-01 | No data | BAY STREET, FROM STREET COLUMBIA STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w - ok |
2019-11-28 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #181 in compliance |
2019-11-26 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to call the NYC DOT HIQA borough office within 4 hours prior to paving as per stipulation 1/2+5 of the DOT permit. |
2019-11-19 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #665 in compliance |
2019-11-16 | No data | 265 STREET, FROM STREET 81 AVENUE TO STREET 82 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at time of inspection, permit expired |
2019-11-14 | No data | EAST 78 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset in compliance. |
2019-11-14 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no roller stpred |
2019-11-06 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the NE3 corner found not to be ADA compliant, ramps are functional and accessible. Measured and collected on 11/6/19. |
2019-10-15 | No data | 82 AVENUE, FROM STREET 265 STREET TO STREET 266 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started, curb not touched, no crew on site, bike lane clear |
2019-10-15 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP site is in compliance. Permittee has a waiver to only do a 10' milled portion of the roadway at this time due to existing concrete in the roadway.No crew on site, bike lane clear |
2019-10-13 | No data | OCEANIA STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat 1 observed at this time. |
2019-10-12 | No data | OCEANIA STREET, FROM STREET 46 AVENUE TO STREET 46 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent paved a portion of the roadway at the sited location without notifying the NYC DOT HIQA borough office within 4 hours prior to paving as per stipulation 1/2+5. |
2019-10-08 | No data | 82 AVENUE, FROM STREET 265 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps in the NE3 corner are functional but not accessible due to active work site. Will re inspect at a later date. |
2019-10-08 | No data | 82 AVENUE, FROM STREET 265 STREET TO STREET 266 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP site is in compliance. Permittee has a waiver to only do a 10' milled portion of the roadway at this time due to existing concrete in the roadway. Warning was issued to permittee to have signs posted and name on barricade while working. |
2019-10-08 | No data | 265 STREET, FROM STREET 81 AVENUE TO STREET 82 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP site is in compliance. Permittee has a waiver to only do a 10' milled portion of the roadway at this time due to existing concrete in the roadway. Warning was issued to permittee to have signs posted and name on barricade while working. |
2019-10-05 | No data | EAST 87 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb in compliance at this time. |
2019-09-30 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #213 in compliance |
2019-09-15 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STREET PAVED HALF PLUS 5 FEET |
2019-09-15 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF PLUS 5 FEET |
2019-09-14 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of property #181 in compliance. |
2019-09-01 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF PLUS 5 FEET. |
2019-09-01 | No data | SIGOURNEY STREET, FROM STREET COLUMBIA STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of building #556 in compliance. |
2019-09-01 | No data | COLUMBIA STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of building #556 in compliance. |
2019-08-29 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Brand new sidewalk flags installed in front of property #76 - 84 in compliance. |
2019-08-27 | No data | 129 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. Joints sealed. |
2019-08-20 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb ... |
2019-08-15 | No data | SIMONSON STREET, FROM STREET BEND TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent paved a portion of the roadway at the sited location without notifying the NYC DOT HIQA borough office within 4 hours prior to paving as per stipulation 1/2+5. |
2019-08-09 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved half plus 5 feet. |
2019-08-09 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved half plus 5 feet. |
2019-07-27 | No data | EAST 91 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Confirmed BPP contractor tried calling since 7am no answer I told Phil they have properly milled and will comence with paving |
2019-07-06 | No data | 208 STREET, FROM STREET 116 AVENUE TO STREET NASHVILLE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags installed are completed |
2019-07-03 | No data | BROADWAY, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE SIDEWALK |
2019-06-21 | No data | DOUGLAS AVENUE, FROM STREET 168 STREET TO STREET 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Barricade Visible On Site At Time Of Inspection |
2019-06-16 | No data | GRAHAM AVENUE, FROM STREET JOHNSON AVENUE TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new curb install for new building in const.. on the south side of the street... |
2019-06-12 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT IN VIOLATION OF OCMC STIP ID# ½ + 5, WORK WAS COMPLETED UPON INSPECTION. THE PERMITTEE FAILED TO NOTIFY BROOKLYN DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. |
2019-06-11 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT IN VIOLATION OF OCMC STIP ID# ½ + 5, WORK WAS COMPLETED UPON INSPECTION. THE PERMITTEE FAILED TO NOTIFY BROOKLYN DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. |
2019-06-11 | No data | BEDFORD AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT IN VIOLATION OF OCMC STIP ID# ½ + 5, WORK WAS COMPLETED UPON INSPECTION. THE PERMITTEE FAILED TO NOTIFY BROOKLYN DOT HIQA BOROUGH OFFICE WITHIN 4 HOURS PRIOR TO PAVING. |
2019-06-09 | No data | GRAHAM AVENUE, FROM STREET JOHNSON AVENUE TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | all required paving preformed ...as well as .. street markings restored ... |
2019-06-07 | No data | GRAHAM AVENUE, FROM STREET JOHNSON AVENUE TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, 50x25x3" all milling as well as paving preformed ... |
2019-06-01 | No data | KENMARE STREET, FROM STREET BOWERY TO STREET ELIZABETH STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 154 Elizabeth, NOV issued for the respondent actively paving the wearing course as per Builders Pavement Plan. Respondent in violation of permit stip ½ + 5 by failing to contact NYC DOT prior to paving. |
2019-05-29 | No data | KENMARE STREET, FROM STREET BOWERY TO STREET ELIZABETH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway has not been restored as per BPP ( ½ + 5' ) at this time. Permit is still active. |
2019-05-29 | No data | ELIZABETH STREET, FROM STREET BROOME STREET TO STREET KENMARE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 154, NOV issued for the roadway has been restored as per the Builders Pavement Plan. Respondent in violation of permit stip 1/2 + 5 by failing to contact NYC DOT prior to paving. |
2019-05-23 | No data | NORTH 6 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY IS MILLED AND BEING PAVED. ROADWAY CURB TO CURB IS 30FT MILLED ROADWAY IS 20FT WITH A DEPTH OF 3INCHES |
2019-05-23 | No data | 50 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Bobcat Visible On Site At Time Of Inspection |
2019-05-22 | No data | FULTON STREET, FROM STREET DUTCH STREET TO STREET NASSAU STREET | No data | Street Construction Inspections: Active | Department of Transportation | rd/w ok |
2019-05-22 | No data | 50 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to comply with terms and conditions of DOT permitUpon arrival contractor has milled/paved roadway without prior call to borough office(NOV Issued) |
2019-05-19 | No data | COLLEGE AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT |
2019-05-16 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2019-05-13 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND PERMIT EXPIRED |
2019-05-10 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO BOBCAT ON THE ROADWAY |
2019-05-08 | No data | 120 STREET, FROM STREET 149 AVENUE TO STREET 150 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to contact DOT HIQA 4 hours prior to paving of the roadway as required by Stipulation 1/2 + 5. |
2019-05-04 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No curb replace at location |
2019-04-07 | No data | 56 AVENUE, FROM STREET 61 STREET TO STREET 64 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent to grade BO half plus five pavement at this time. |
2019-03-31 | No data | 129 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2019-03-27 | No data | GATES AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE EXCAVATING SIDE WALK PEDESTRIAN WALK WAY INSTALLED |
2019-03-11 | No data | EAST 87 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed on sidewalk at this time. |
2019-02-28 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of the street plus 5' milled and paved. (Trainee Karen Johnson) |
2019-02-21 | No data | EAST 87 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temp pedestrian walkway at location during this time. |
2019-02-17 | No data | 57 STREET, FROM STREET 43 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb repaired at time of my inspection. |
2019-02-06 | No data | BAY STREET, FROM STREET COLUMBIA STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk good. |
2019-01-23 | No data | EAST 169 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset , replace restore sidewalk |
2019-01-20 | No data | 56 AVENUE, FROM STREET 61 STREET TO STREET 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restoration completed in compliance with expansion joint seal. |
2019-01-07 | No data | COLLEGE AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew working on s/w |
2019-01-06 | No data | WEST 28 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The was not done, permit has expired. |
2018-12-22 | No data | 220 STREET, FROM STREET 58 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed |
2018-12-17 | No data | NORTH 6 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | street paved. |
2018-12-09 | No data | 67 STREET, FROM STREET DURYEA COURT TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed |
2018-12-06 | No data | NORTH 6 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY RESURFACED OK |
2018-12-04 | No data | NORTH 6 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | working on site at time of inspection |
2018-10-24 | No data | KINGS HIGHWAY, FROM STREET LIRR BAY RIDGE DIV TO STREET PRESTON COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk flags installed |
2018-10-24 | No data | ROSE FEISS BOULEVARD, FROM STREET DEAD END TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb re set |
2018-10-23 | No data | FRANCIS LEWIS BOULEVARD, FROM STREET 118 AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE CURB |
2018-09-30 | No data | 67 STREET, FROM STREET DURYEA COURT TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk Repair in Compliance |
2018-09-15 | No data | REVIEW AVENUE, FROM STREET BEND TO STREET RAILROAD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/p s/w flags and sealed |
2018-08-26 | No data | SCOTT AVENUE, FROM STREET JOHNSON AVENUE TO STREET RANDOLPH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-08-07 | No data | BROADWAY, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W and curb replaced, joints sealed. |
2018-08-07 | No data | 61 STREET, FROM STREET 37 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W and curb repaired and sealed. |
2018-07-22 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags sealed and in compliance |
2018-07-12 | No data | 45 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, work in progress. |
2018-06-28 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok |
2018-06-14 | No data | BROADWAY, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent D.P. Paving & Concrete INC stored two construction equipments on the roadway a Excavator and a Bobcat without any DOT permit on file for equipment storage. Respondent ID by permit #Q042018155A14 on file for sidewalk repair. |
2018-06-14 | No data | BROADWAY, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply to the terms and conditions of DOT permit stipulation 013 OCMC, by not providing a minimum 5 foot clear pedestrian walkway on the sidewalk. I/F/O 60-20 Broadway. Permit #Q042018155A14 used for ID purpose. |
2018-06-13 | No data | 61 STREET, FROM STREET 37 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Complaint | Department of Transportation | failed to comply with the terms and condition of DOT permit stipulation 014 by not providing an 5ft clear pedestrian walkway in the roadway on 61 Street between Broadway & 37 Ave AKA 60-20 broadway. Permit #Q022018155A68 used for ID purpose. |
2018-06-13 | No data | BROADWAY, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply to the terms and conditions of DOT permit stipulation 013 OCMC, by not providing a minimum 5 foot clear pedestrian walkway on the sidewalk. I/F/O 60-20 Broadway. Permit #Q042018155A14 used for ID purpose. |
2018-06-11 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is in compliance |
2018-06-10 | No data | 202 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | joints seal |
2018-04-21 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Curb Installed, Has expansion seal around joints in good condition |
2018-04-12 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK IS GOOD |
2018-04-11 | No data | EAST 3 STREET, FROM STREET AVENUE N TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved. |
2018-03-24 | No data | EAST 86 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reset |
2018-03-23 | No data | 202 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. New CAR issued |
2018-03-23 | No data | 202 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints needs to be sealed in front of 50-37 202 St. |
2018-03-17 | No data | GRAND AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb - expansion joints sealed. |
2018-03-17 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is in compliance |
2018-03-09 | No data | 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the above respondent paving the roadway on a protected street without a DOT permit to do so. ID by name printed on builder's truck (DP PAVING & CONCRETE). |
2018-02-13 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk flags not sealed |
2018-01-29 | No data | 126 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cement curb |
2018-01-03 | No data | KING STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED 1/2 +5 DONE PROPERLY CAR WRITTEN WORDS ON RWY |
2017-12-13 | No data | 42 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new work visible |
2017-11-26 | No data | 17 ROAD, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored to kind. at time of my inspection |
2017-11-12 | No data | 202 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to seal expansion joints as per subsection 2-09 (f)(4)(v). CAR #20176190177 issued on 8/19/2017. Respondent failed to comply. |
2017-11-08 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK FLAGS INSTALLED, HAS EXPANSION SEAL AROUND JOINTS IN GOOD CONDITION |
2017-11-07 | No data | 170 STREET, FROM STREET 39 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w repaved |
2017-10-30 | No data | KING STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Please restore X- ING SCHOOL markings on the roadway in front of 123 Kings Street |
2017-10-19 | No data | ROSE FEISS BOULEVARD, FROM STREET DEAD END TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb re set |
2017-10-11 | No data | 57 STREET, FROM STREET DEAD END TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb restored. |
2017-09-29 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok seal joints |
2017-09-15 | No data | 57 AVENUE, FROM STREET 73 PLACE TO STREET 73 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored, expansion joints sealed. |
2017-08-30 | No data | WEST 50 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag surrounding fire hydrant repaired |
2017-08-26 | No data | MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance |
2017-08-25 | No data | VAN BRUNT STREET, FROM STREET KING STREET TO STREET SULLIVAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk ok |
2017-08-24 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb ok joints seal |
2017-08-19 | No data | 202 STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints need to be sealed |
2017-08-02 | No data | GRAND AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored to kind. |
2017-08-01 | No data | EAST 86 STREET, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK PASS |
2017-07-29 | No data | 149 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb in compliance |
2017-07-29 | No data | 34 AVENUE, FROM STREET 149 PLACE TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb in compliance |
2017-07-15 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | MISSING CURB PERMIT, TALKED TO FOREMAN DAN, ABOUT TAKING OUT CURB PERMIT- WILL RETURN MONDAY |
2017-06-17 | No data | 51 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2017-06-13 | No data | GRAND AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with 24' of newly installed curb. Respondent failed to have a valid permit on file for installation of new curb. Respondent ID by name posted on vehicle an by permit posted in DOT website. |
2017-06-11 | No data | EAST 78 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB. |
2017-05-09 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk acceptable. |
2017-03-04 | No data | 126 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w - expansion joints sealed. |
2017-02-23 | No data | 42 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair curb, expansion joints were sealed. |
2017-02-22 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w |
2017-01-04 | No data | 72 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w fags repaired are restored |
2016-12-30 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2016-12-29 | No data | NORTHERN BOULEVARD, FROM STREET 72 STREET TO STREET 73 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2016-12-21 | No data | 72 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidwalk flags restored |
2016-12-07 | No data | 17 ROAD, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK REPAIRED IN KIND. EXPANSION JOINTS SEALED |
2016-11-26 | No data | 4 AVENUE, FROM STREET 5 STREET TO STREET 6 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permit to be placed on hold joints not seal |
2016-11-21 | No data | GARDNER AVENUE, FROM STREET GRAND STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance near bus stop q59 (corner property) |
2016-10-23 | No data | 57 STREET, FROM STREET DEAD END TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in good condition curb re-installed |
2016-10-22 | No data | 4 AVENUE, FROM STREET 5 STREET TO STREET 6 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O i observed the above respondent Failed to seal expansion joints on the sidewalk car issued on 9\2\2016 car 20161670483Lane of Cut: |
2016-10-21 | No data | LEXINGTON AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | seal applied |
2016-10-16 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved. |
2016-09-28 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp Ped. walk in the R/W |
2016-09-25 | No data | EAST 120 STREET, FROM STREET 1 AVENUE TO STREET PLEASANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | walkway in roadway |
2016-09-20 | No data | 42 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W repaired, Joints sealed. |
2016-09-02 | No data | 4 AVENUE, FROM STREET 5 STREET TO STREET 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints not seal |
2016-09-01 | No data | 17 ROAD, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP Paving to grade along the the P/D/L. |
2016-08-31 | No data | LEXINGTON AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Only a Portion of the Expansion Joints on the Sidewalk have been sealed, Sealant is needed on Joint adjacent to the Curb. I/F/O 164 Lexington Avenue |
2016-08-26 | No data | 51 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk in kind |
2016-08-22 | No data | 126 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w - expansion joints sealed. |
2016-08-01 | No data | 42 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk replaced |
2016-07-28 | No data | 6 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp walkway |
2016-07-23 | No data | LEXINGTON AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No sidewalk occupancy at this time. |
2016-07-18 | No data | 58 LANE, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repaired, Joints sealed. |
2016-07-14 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved. |
2016-07-01 | No data | 72 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored, expansion joints sealed. |
2016-06-30 | No data | 126 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w - expansion joints sealed. |
2016-06-15 | No data | 72 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored, expansion joints sealed. |
2016-06-15 | No data | NORTHERN BOULEVARD, FROM STREET 72 STREET TO STREET 73 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored, expansion joints sealed. |
2016-05-12 | No data | WOODPOINT ROAD, FROM STREET JACKSON STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new building rwy resurfacing ok |
2016-05-04 | No data | STANTON STREET, FROM STREET BOWERY TO STREET CHRYSTIE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO TEMP WALK |
2016-04-20 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, 80% of sidewalk replaced IFO premise. Expansion joints sealed. Acceptable |
2016-04-18 | No data | 58 LANE, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2016-03-23 | No data | BOWERY, FROM STREET PRINCE STREET TO STREET STANTON STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | construction container placed on street without a valid NYC DOT permit on file as required. "DP Paving & Concrete, Inc" markings on container used to identify respondent. NOV issued. |
2016-03-03 | No data | 65 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK REPAIRED IN KIND IFO 108-34. EXPANSION JOINTS SEALED |
2016-02-25 | No data | EAST HOUSTON STREET, FROM STREET AVENUE A TO STREET NORFOLK STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk restored expansion joints and sealer acceptable |
2016-02-22 | No data | WOODPOINT ROAD, FROM STREET JACKSON STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New s/w in compliance ok |
2016-02-03 | No data | 17 ROAD, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb restored to kind. |
2016-02-02 | No data | 17 ROAD, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored, expansion joints sealed. |
2016-01-05 | No data | 42 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repair expansion joints sealed |
2015-12-05 | No data | JUNCTION BOULEVARD, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair |
2015-12-03 | No data | OTTO ROAD, FROM STREET 66 PLACE TO STREET 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2015-11-14 | No data | 58 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk repair in kind expansion joints sealed |
2015-10-16 | No data | 42 STREET, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored expansion joints sealed |
2015-10-02 | No data | STANTON STREET, FROM STREET BOWERY TO STREET CHRYSTIE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance |
2015-09-27 | No data | 6 AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave str BPP |
2015-09-12 | No data | 72 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a few new flags replaced |
2015-08-21 | No data | OTTO ROAD, FROM STREET 65 STREET TO STREET 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at time of inspection #377 |
2015-08-21 | No data | OTTO ROAD, FROM STREET 66 PLACE TO STREET 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at time of inspection # 377 |
2015-08-18 | No data | STANTON STREET, FROM STREET BOWERY TO STREET CHRYSTIE STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk complete and sealed |
2015-07-15 | No data | WOODPOINT ROAD, FROM STREET JACKSON STREET TO STREET SKILLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New s/w installation in compliance ok |
2015-07-10 | No data | OTTO ROAD, FROM STREET 66 STREET TO STREET 70 AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the above respondent with several excavated sidewalk flags. Respondent failed to have a valid permit on site or file . Spoke to foreman Daniel on site |
2015-07-10 | No data | OTTO ROAD, FROM STREET 65 STREET TO STREET 66 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O/ I Observed the above respondent with several excavated sidewalk flags. Respondent failed to have a valid permit on site or file spoke to foreman Daniel |
2015-07-01 | No data | 72 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2015-06-14 | No data | JUNCTION BOULEVARD, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repaired |
2015-05-29 | No data | 58 LANE, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | sidewalk repair no truck on roadway or sidewalk spoke to supervisor to remov barricades when sealer dry |
2015-05-29 | No data | 58 LANE, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk repaired awaiting sealer to be apply |
2015-03-31 | No data | JUNCTION BOULEVARD, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W RESTORED |
2015-03-28 | No data | 65 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw work |
2015-01-23 | No data | 53 PLACE, FROM STREET 32 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints sealed |
2015-01-22 | No data | 58 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W EXPANSION JOINTS HAS BEEN RECESSED & SEALED AT TIME OF INSPECTION |
2014-11-20 | No data | 58 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THIS CONDITION IS NOT REPAIRED. THE PERMITTEE IS ON A STOP/HOLD FOR FAILURE TO CORRECT DEFECT. AN NOV WAS ISSUED. |
2014-10-27 | No data | 58 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to seal expansion joints CAR 20145870683 was issued on 9-3-14 to correct condition ,respondent failed to comply w/request |
2014-10-24 | No data | 53 PLACE, FROM STREET 32 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This condition was not repaired. The permittee is on a STOP/HOLD for failure to correct this condition. NOV was issued. |
2014-10-05 | No data | 53 PLACE, FROM STREET 32 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failed to seal expansion joints as per subsection,CAR 20145870674 was issued on 9-2-14 respondent failed to comply with request |
2014-09-18 | No data | JUNCTION BOULEVARD, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk |
2014-09-03 | No data | 58 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - ALL Sidewalk expansion joints need to be recessed and sealed |
2014-09-02 | No data | 53 PLACE, FROM STREET 32 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Expansion joints need to be installed at driveway cut need to have a seperation btwn curb and apron flags - Sidewalk expansion joints need to be sealed |
2014-06-17 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | rwy resurfaced |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-214913 | Office of Administrative Trials and Hearings | Issued | Settled | 2017-06-22 | 2500 | 2017-09-14 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
No related companies by address
Date of last update: 25 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated