Name: | FASTER CONSTRUCTION NY CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 11 Mar 2014 (11 years ago) |
Entity Number: | 4542170 |
ZIP code: | 11369 |
County: | New York |
Place of Formation: | New York |
Address: | 2360 96 street, East elm, NY, United States, 11369 |
Principal Address: | 2360 96 street, East wlm, NY, United States, 11369 |
Contact Details
Phone +1 347-832-8695
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 2360 96 street, East elm, NY, United States, 11369 |
Name | Role | Address |
---|---|---|
FASTER CONSTRUCTION NY CORP. | Chief Executive Officer | 2360 96 STREET, EAST ELMHURST, NY, United States, 11369 |
Number | Status | Type | Date | End date |
---|---|---|---|---|
2010687-DCA | Active | Business | 2014-07-15 | 2025-02-28 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
Q042024319A11 | 2024-11-14 | 2024-12-12 | REPAIR SIDEWALK | 43 AVENUE, QUEENS, FROM STREET 104 STREET TO STREET 108 STREET |
Q012024313D89 | 2024-11-08 | 2024-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 ROAD, QUEENS, FROM STREET 146 STREET |
Q012024313D88 | 2024-11-08 | 2024-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q012024313D87 | 2024-11-08 | 2024-12-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q042024306A05 | 2024-11-01 | 2024-11-30 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 58 ROAD, QUEENS, FROM STREET 146 STREET |
Q042024306A06 | 2024-11-01 | 2024-11-30 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 58 ROAD, QUEENS, FROM STREET 146 STREET |
Q042024306A04 | 2024-11-01 | 2024-11-30 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | 58 ROAD, QUEENS, FROM STREET 146 STREET |
Q042024305A35 | 2024-10-31 | 2024-11-27 | REPAIR SIDEWALK | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024305A63 | 2024-10-31 | 2024-11-27 | TEMPORARY PEDESTRIAN WALK | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024305A64 | 2024-10-31 | 2024-11-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q042024299A01 | 2024-10-25 | 2024-11-21 | REPAIR SIDEWALK | 46 AVENUE, QUEENS, FROM STREET 169 STREET TO STREET 170 STREET |
Q022024296C06 | 2024-10-22 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q022024296C07 | 2024-10-22 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q022024296C09 | 2024-10-22 | 2024-11-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q022024296C08 | 2024-10-22 | 2024-11-20 | TEMPORARY PEDESTRIAN WALK | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q012024296D37 | 2024-10-22 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q012024296D39 | 2024-10-22 | 2024-11-20 | RESET, REPAIR OR REPLACE CURB | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q042024296B40 | 2024-10-22 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q042024296B38 | 2024-10-22 | 2024-11-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q012024291A77 | 2024-10-17 | 2024-11-14 | RESET, REPAIR OR REPLACE CURB | 54 AVENUE, QUEENS, FROM STREET SEABURY STREET TO STREET VAN HORN STREET |
Q042024291A06 | 2024-10-17 | 2024-11-14 | REPAIR SIDEWALK | 54 AVENUE, QUEENS, FROM STREET SEABURY STREET TO STREET VAN HORN STREET |
Q012024285A01 | 2024-10-11 | 2024-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 19 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q012024285A00 | 2024-10-11 | 2024-11-01 | RESET, REPAIR OR REPLACE CURB | 19 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q042024285A00 | 2024-10-11 | 2024-11-01 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 19 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q042024285A01 | 2024-10-11 | 2024-10-24 | REPAIR SIDEWALK | CODWISE PLACE, QUEENS, FROM STREET BEND TO STREET KNEELAND AVENUE |
Q012024285A02 | 2024-10-11 | 2024-10-24 | RESET, REPAIR OR REPLACE CURB | CODWISE PLACE, QUEENS, FROM STREET BEND TO STREET KNEELAND AVENUE |
Q042024277A40 | 2024-10-03 | 2024-10-31 | REPAIR SIDEWALK | 28 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q012024277C14 | 2024-10-03 | 2024-10-31 | RESET, REPAIR OR REPLACE CURB | 28 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q042024275A39 | 2024-10-01 | 2024-10-26 | REPAIR SIDEWALK | 118 STREET, QUEENS, FROM STREET 85 AVENUE TO STREET HILLSIDE AVENUE |
Q042024275A40 | 2024-10-01 | 2024-10-26 | REPAIR SIDEWALK | 117 STREET, QUEENS, FROM STREET HILLSIDE AVENUE TO STREET JAMAICA AVENUE |
Q012024256A16 | 2024-09-12 | 2024-09-25 | RESET, REPAIR OR REPLACE CURB | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q042024256A04 | 2024-09-12 | 2024-09-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012024256A17 | 2024-09-12 | 2024-09-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q042024247A06 | 2024-09-03 | 2024-09-27 | REPAIR SIDEWALK | 59 AVENUE, QUEENS, FROM STREET 223 PLACE TO STREET 223 STREET |
Q042024247A05 | 2024-09-03 | 2024-09-27 | REPAIR SIDEWALK | 223 PLACE, QUEENS, FROM STREET 59 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024241E81 | 2024-08-28 | 2024-09-19 | RESET, REPAIR OR REPLACE CURB | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q012024241E69 | 2024-08-28 | 2024-09-20 | RESET, REPAIR OR REPLACE CURB | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q042024234A47 | 2024-08-21 | 2024-09-17 | REPAIR SIDEWALK | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q042024234A48 | 2024-08-21 | 2024-09-17 | REPAIR SIDEWALK | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q042024234A44 | 2024-08-21 | 2024-09-13 | REPAIR SIDEWALK | 63 AVENUE, QUEENS, FROM STREET 83 PLACE TO STREET 83 STREET |
Q042024234A45 | 2024-08-21 | 2024-09-17 | REPAIR SIDEWALK | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q042024225A14 | 2024-08-12 | 2024-09-06 | REPAIR SIDEWALK | 148 STREET, QUEENS, FROM STREET 12 AVENUE TO STREET CROSS ISLAND PARKWAY |
Q042024207A34 | 2024-07-25 | 2024-08-23 | REPAIR SIDEWALK | QUEENS BOULEVARD, QUEENS, FROM STREET 64 STREET TO STREET 65 STREET |
Q042024207A35 | 2024-07-25 | 2024-08-23 | REPAIR SIDEWALK | 65 STREET, QUEENS, FROM STREET LAUREL HILL BOULEVARD TO STREET QUEENS BOULEVARD |
Q012024206B02 | 2024-07-24 | 2024-08-22 | RESET, REPAIR OR REPLACE CURB | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q042024206A56 | 2024-07-24 | 2024-08-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q012024206B03 | 2024-07-24 | 2024-08-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
B042024199A13 | 2024-07-17 | 2024-08-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B012024199B46 | 2024-07-17 | 2024-08-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B012024199B45 | 2024-07-17 | 2024-08-14 | RESET, REPAIR OR REPLACE CURB | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
Q012024197D27 | 2024-07-15 | 2024-08-09 | RESET, REPAIR OR REPLACE CURB | LABURNUM AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET SMART STREET |
Q042024197A96 | 2024-07-15 | 2024-08-09 | REPLACE SIDEWALK | LABURNUM AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET SMART STREET |
Q012024194A96 | 2024-07-12 | 2024-08-10 | RESET, REPAIR OR REPLACE CURB | 84 STREET, QUEENS, FROM STREET 62 AVENUE TO STREET 63 AVENUE |
Q042024194A09 | 2024-07-12 | 2024-08-10 | REPAIR SIDEWALK | 84 STREET, QUEENS, FROM STREET 62 AVENUE TO STREET 63 AVENUE |
Q042024193A10 | 2024-07-11 | 2024-08-09 | REPAIR SIDEWALK | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
B012024185B30 | 2024-07-03 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FULTON STREET, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
B012024185B31 | 2024-07-03 | 2024-07-31 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012024185B32 | 2024-07-03 | 2024-08-01 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | FULTON STREET, BROOKLYN, FROM STREET WYONA STREET |
Q042024183A43 | 2024-07-01 | 2024-07-30 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012024183C27 | 2024-07-01 | 2024-07-30 | PAVE STREET-W/ ENGINEERING & INSP FEE | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012024183C26 | 2024-07-01 | 2024-07-30 | RESET, REPAIR OR REPLACE CURB | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012024180B76 | 2024-06-28 | 2024-07-27 | RESET, REPAIR OR REPLACE CURB | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q042024180A13 | 2024-06-28 | 2024-07-27 | REPAIR SIDEWALK | 202 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET 93 AVENUE |
Q012024179B83 | 2024-06-27 | 2024-07-25 | RESET, REPAIR OR REPLACE CURB | LABURNUM AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET SMART STREET |
Q042024179A09 | 2024-06-27 | 2024-07-25 | REPLACE SIDEWALK | LABURNUM AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET SMART STREET |
Q042024176B11 | 2024-06-24 | 2024-07-23 | REPAIR SIDEWALK | DORAN AVENUE, QUEENS, FROM STREET 89 STREET TO STREET WOODHAVEN BOULEVARD |
Q012024169C74 | 2024-06-17 | 2024-07-06 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
Q012024169C73 | 2024-06-17 | 2024-07-06 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
Q042024169A91 | 2024-06-17 | 2024-07-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
B012024159B55 | 2024-06-07 | 2024-07-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B042024159A37 | 2024-06-07 | 2024-07-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B012024159B54 | 2024-06-07 | 2024-07-04 | RESET, REPAIR OR REPLACE CURB | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
Q012024156B49 | 2024-06-04 | 2024-06-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q012024156B48 | 2024-06-04 | 2024-06-28 | RESET, REPAIR OR REPLACE CURB | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q042024156A61 | 2024-06-04 | 2024-06-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q042024155A12 | 2024-06-03 | 2024-06-28 | REPAIR SIDEWALK | CORONA AVENUE, QUEENS, FROM STREET 90 STREET TO STREET BEND |
B042024141A00 | 2024-05-20 | 2024-06-11 | REPAIR SIDEWALK | EUCLID AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
B012024141A00 | 2024-05-20 | 2024-06-11 | RESET, REPAIR OR REPLACE CURB-PROTECTED | EUCLID AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
B012024141A01 | 2024-05-20 | 2024-06-08 | RESET, REPAIR OR REPLACE CURB | SUTTER AVENUE, BROOKLYN, FROM STREET EUCLID AVENUE TO STREET PINE STREET |
B042024141A01 | 2024-05-20 | 2024-06-08 | REPAIR SIDEWALK | SUTTER AVENUE, BROOKLYN, FROM STREET EUCLID AVENUE TO STREET PINE STREET |
Q042024134A00 | 2024-05-13 | 2024-06-08 | REPAIR SIDEWALK | CODWISE PLACE, QUEENS, FROM STREET BEND TO STREET KNEELAND AVENUE |
Q012024134A01 | 2024-05-13 | 2024-06-08 | RESET, REPAIR OR REPLACE CURB | CODWISE PLACE, QUEENS, FROM STREET BEND TO STREET KNEELAND AVENUE |
B042024116A21 | 2024-04-25 | 2024-05-24 | REPAIR SIDEWALK | LINDEN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024116B68 | 2024-04-25 | 2024-05-18 | TEMPORARY PEDESTRIAN WALK | FULTON STREET, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
B012024116C70 | 2024-04-25 | 2024-05-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B042024116A50 | 2024-04-25 | 2024-05-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FULTON STREET, BROOKLYN, FROM STREET WYONA STREET |
B022024116B67 | 2024-04-25 | 2024-05-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B022024116B66 | 2024-04-25 | 2024-05-18 | TEMPORARY PEDESTRIAN WALK | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012024116C71 | 2024-04-25 | 2024-05-18 | RESET, REPAIR OR REPLACE CURB-PROTECTED | FULTON STREET, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
B042024116A52 | 2024-04-25 | 2024-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B042024116A55 | 2024-04-25 | 2024-05-18 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | FULTON STREET, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
B022024116B69 | 2024-04-25 | 2024-05-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | FULTON STREET, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
B042024116A49 | 2024-04-25 | 2024-05-23 | PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR | FULTON STREET, BROOKLYN, FROM STREET WYONA STREET |
B042024115A14 | 2024-04-24 | 2024-05-22 | REPAIR SIDEWALK | ETNA STREET, BROOKLYN, FROM STREET CHESTNUT STREET TO STREET RICHMOND STREET |
Q012024115A87 | 2024-04-24 | 2024-05-23 | RESET, REPAIR OR REPLACE CURB | 55 STREET, QUEENS, FROM STREET FLUSHING AVENUE TO STREET NURGE AVENUE |
Q042024115A09 | 2024-04-24 | 2024-05-23 | REPAIR SIDEWALK | 55 STREET, QUEENS, FROM STREET FLUSHING AVENUE TO STREET NURGE AVENUE |
Q042024108B35 | 2024-04-17 | 2024-05-09 | REPAIR SIDEWALK | FLUSHING AVENUE, QUEENS, FROM STREET 53 STREET TO STREET METROPOLITAN AVENUE |
Q042024096A40 | 2024-04-05 | 2024-04-26 | REPAIR SIDEWALK | 31 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET BROADWAY |
Q042024096A41 | 2024-04-05 | 2024-04-24 | REPAIR SIDEWALK | 177 STREET, QUEENS, FROM STREET 103 ROAD TO STREET LIBERTY AVENUE |
Q042024075A46 | 2024-03-15 | 2024-03-21 | REPLACE SIDEWALK | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q042024075A45 | 2024-03-15 | 2024-03-21 | REPLACE SIDEWALK | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012024075F04 | 2024-03-15 | 2024-03-21 | RESET, REPAIR OR REPLACE CURB | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012024075E99 | 2024-03-15 | 2024-03-21 | RESET, REPAIR OR REPLACE CURB | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
X042024071A19 | 2024-03-11 | 2024-03-21 | REPLACE SIDEWALK | VAN NEST AVENUE, BRONX, FROM STREET EAST 180 STREET TO STREET EAST TREMONT AVENUE |
X042024071A18 | 2024-03-11 | 2024-03-21 | REPLACE SIDEWALK | EAST TREMONT AVENUE, BRONX, FROM STREET BRONX RIVER PARKWAY TO STREET VAN NEST AVENUE |
X042024058A10 | 2024-02-27 | 2024-03-21 | REPLACE SIDEWALK | EAST 180 STREET, BRONX, FROM STREET BRONX RIVER PARKWAY TO STREET VAN NEST AVENUE |
X042024058A09 | 2024-02-27 | 2024-03-21 | REPLACE SIDEWALK | EAST TREMONT AVENUE, BRONX, FROM STREET BRONX RIVER PARKWAY TO STREET MORRIS PARK AVENUE |
Q042024026A01 | 2024-01-26 | 2024-02-23 | REPAIR SIDEWALK | QUEENS BOULEVARD, QUEENS, FROM STREET 64 STREET TO STREET 65 STREET |
Q012024025B47 | 2024-01-25 | 2024-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 218 STREET, QUEENS, FROM STREET 99 AVENUE TO STREET 100 AVENUE |
Q012024025B48 | 2024-01-25 | 2024-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 218 STREET, QUEENS, FROM STREET 99 AVENUE TO STREET 100 AVENUE |
Q012024025B49 | 2024-01-25 | 2024-02-23 | PAVE STREET-W/ ENGINEERING & INSP FEE | 218 STREET, QUEENS, FROM STREET 99 AVENUE TO STREET 100 AVENUE |
Q042024024A12 | 2024-01-24 | 2024-02-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 53 AVENUE, QUEENS, FROM STREET 230 STREET TO STREET HORATIO PARKWAY |
Q012024024C48 | 2024-01-24 | 2024-02-22 | RESET, REPAIR OR REPLACE CURB | 53 AVENUE, QUEENS, FROM STREET 230 STREET TO STREET HORATIO PARKWAY |
Q012024024C49 | 2024-01-24 | 2024-02-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | 53 AVENUE, QUEENS, FROM STREET 230 STREET TO STREET HORATIO PARKWAY |
Q012023355B31 | 2023-12-21 | 2023-12-29 | RESET, REPAIR OR REPLACE CURB | 22 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q042023355A18 | 2023-12-21 | 2023-12-29 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 22 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012023355B32 | 2023-12-21 | 2023-12-29 | PAVE STREET-W/ ENGINEERING & INSP FEE | 22 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012023340B29 | 2023-12-06 | 2023-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
Q042023340A25 | 2023-12-06 | 2023-12-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
Q012023340B28 | 2023-12-06 | 2023-12-26 | RESET, REPAIR OR REPLACE CURB | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
Q012023340B30 | 2023-12-06 | 2023-12-26 | RESET, REPAIR OR REPLACE CURB | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
Q012023340B31 | 2023-12-06 | 2023-12-26 | PAVE STREET-W/ ENGINEERING & INSP FEE | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
Q042023340A24 | 2023-12-06 | 2023-12-26 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 88 AVENUE, QUEENS, FROM STREET 80 STREET TO STREET 85 STREET |
Q012023324A99 | 2023-11-20 | 2023-12-09 | RESET, REPAIR OR REPLACE CURB | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q042023324A10 | 2023-11-20 | 2023-12-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012023324B00 | 2023-11-20 | 2023-12-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012023314A13 | 2023-11-10 | 2023-12-09 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q042023314A00 | 2023-11-10 | 2023-12-09 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q012023314A12 | 2023-11-10 | 2023-12-09 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q042023310A13 | 2023-11-06 | 2023-12-01 | REPAIR SIDEWALK | 167 STREET, QUEENS, FROM STREET 76 AVENUE TO STREET 77 ROAD |
Q042023305A64 | 2023-11-01 | 2023-11-23 | REPLACE SIDEWALK | 167 STREET, QUEENS, FROM STREET 76 AVENUE TO STREET 77 ROAD |
Q012023289C75 | 2023-10-16 | 2023-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | SUTPHIN BOULEVARD, QUEENS, FROM STREET 97 AVENUE TO STREET 146 STREET |
Q012023289C74 | 2023-10-16 | 2023-11-11 | RESET, REPAIR OR REPLACE CURB | SUTPHIN BOULEVARD, QUEENS, FROM STREET 97 AVENUE TO STREET 146 STREET |
Q012023289A73 | 2023-10-16 | 2023-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q012023289A72 | 2023-10-16 | 2023-10-28 | RESET, REPAIR OR REPLACE CURB | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q042023289A04 | 2023-10-16 | 2023-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q042023289A78 | 2023-10-16 | 2023-11-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SUTPHIN BOULEVARD, QUEENS, FROM STREET 97 AVENUE TO STREET 146 STREET |
Q012023286A95 | 2023-10-13 | 2023-11-11 | RESET, REPAIR OR REPLACE CURB | 58 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 136 STREET |
Q012023286A96 | 2023-10-13 | 2023-11-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 136 STREET |
Q042023286A51 | 2023-10-13 | 2023-11-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 58 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 136 STREET |
Q012023277B16 | 2023-10-04 | 2023-11-02 | PAVE STREET-W/ ENGINEERING & INSP FEE | 97 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q042023277A14 | 2023-10-04 | 2023-11-02 | REPAIR SIDEWALK | 54 PLACE, QUEENS, FROM STREET ARNOLD AVENUE TO STREET NURGE AVENUE |
Q012023277B15 | 2023-10-04 | 2023-11-01 | PAVE STREET-W/ ENGINEERING & INSP FEE | 34 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET |
Q012023276B99 | 2023-10-03 | 2023-10-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 57 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q012023276C00 | 2023-10-03 | 2023-10-28 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 57 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q042023276A30 | 2023-10-03 | 2023-10-28 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 57 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q022023275A02 | 2023-10-02 | 2023-10-20 | TEMPORARY PEDESTRIAN WALK | 34 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET |
Q012023275A06 | 2023-10-02 | 2023-10-21 | RESET, REPAIR OR REPLACE CURB | 97 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023275A07 | 2023-10-02 | 2023-10-20 | RESET, REPAIR OR REPLACE CURB | 34 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET |
Q022023275A00 | 2023-10-02 | 2023-10-21 | TEMPORARY PEDESTRIAN WALK | 97 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023275A01 | 2023-10-02 | 2023-10-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 97 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023275A03 | 2023-10-02 | 2023-10-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 34 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET |
Q042023275A07 | 2023-10-02 | 2023-10-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 97 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD |
Q042023275A08 | 2023-10-02 | 2023-10-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 34 AVENUE, QUEENS, FROM STREET 96 STREET TO STREET 97 STREET |
B042023268A00 | 2023-09-25 | 2023-10-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SHEFFIELD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012023268A00 | 2023-09-25 | 2023-10-21 | RESET, REPAIR OR REPLACE CURB | SHEFFIELD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012023268A01 | 2023-09-25 | 2023-10-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | SHEFFIELD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
Q012023264C30 | 2023-09-21 | 2023-10-20 | PAVE STREET-W/ ENGINEERING & INSP FEE | BELL BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q042023264A10 | 2023-09-21 | 2023-10-20 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BELL BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012023264C29 | 2023-09-21 | 2023-10-20 | RESET, REPAIR OR REPLACE CURB | BELL BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012023256B67 | 2023-09-13 | 2023-10-12 | PAVE STREET-W/ ENGINEERING & INSP FEE | 147 PLACE, QUEENS, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE |
Q042023256A16 | 2023-09-13 | 2023-10-12 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 147 PLACE, QUEENS, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE |
Q012023256B66 | 2023-09-13 | 2023-10-12 | RESET, REPAIR OR REPLACE CURB | 147 PLACE, QUEENS, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE |
Q012023252A01 | 2023-09-09 | 2023-10-06 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012023252A00 | 2023-09-09 | 2023-10-06 | RESET, REPAIR OR REPLACE CURB | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q042023252A00 | 2023-09-09 | 2023-10-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012023228A46 | 2023-08-16 | 2023-09-14 | RESET, REPAIR OR REPLACE CURB | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q042023228A04 | 2023-08-16 | 2023-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012023228A47 | 2023-08-16 | 2023-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012023222B42 | 2023-08-10 | 2023-09-08 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 55 ROAD, QUEENS, FROM STREET 85 STREET TO STREET MADISON STREET |
Q042023222A30 | 2023-08-10 | 2023-09-08 | REPLACE SIDEWALK | 55 ROAD, QUEENS, FROM STREET 85 STREET TO STREET MADISON STREET |
Q042023216A46 | 2023-08-04 | 2023-09-01 | REPAIR SIDEWALK | 84 STREET, QUEENS, FROM STREET 62 AVENUE TO STREET 63 AVENUE |
Q012023213C02 | 2023-08-01 | 2023-08-25 | RESET, REPAIR OR REPLACE CURB | 58 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 136 STREET |
Q042023213B36 | 2023-08-01 | 2023-08-25 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 58 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 136 STREET |
Q012023213C03 | 2023-08-01 | 2023-08-25 | PAVE STREET-W/ ENGINEERING & INSP FEE | 58 AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 136 STREET |
Q012023181E56 | 2023-06-30 | 2023-07-28 | PAVE STREET-W/ ENGINEERING & INSP FEE | 97 STREET, QUEENS, FROM STREET CORONA AVENUE |
Q012023179B28 | 2023-06-28 | 2023-07-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | CORONA AVENUE, QUEENS, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE |
Q022023179A15 | 2023-06-28 | 2023-07-21 | TEMPORARY PEDESTRIAN WALK | CORONA AVENUE, QUEENS, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE |
Q012023179B27 | 2023-06-28 | 2023-07-21 | RESET, REPAIR OR REPLACE CURB | CORONA AVENUE, QUEENS, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE |
Q022023179A16 | 2023-06-28 | 2023-07-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORONA AVENUE, QUEENS, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE |
Q042023179A05 | 2023-06-28 | 2023-07-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | CORONA AVENUE, QUEENS, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE |
Q042023174A39 | 2023-06-23 | 2023-07-21 | REPLACE SIDEWALK | 58 AVENUE, QUEENS, FROM STREET 263 STREET TO STREET 264 STREET |
Q042023173A11 | 2023-06-22 | 2023-07-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 85 AVENUE, QUEENS, FROM STREET 218 STREET |
Q012023173A50 | 2023-06-22 | 2023-07-18 | C.A.R. RESTORATION | 56 AVENUE, QUEENS, FROM STREET 228 STREET TO STREET 229 STREET |
Q042023173A10 | 2023-06-22 | 2023-07-19 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 56 AVENUE, QUEENS, FROM STREET 229 STREET |
Q042023173A13 | 2023-06-22 | 2023-07-20 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 85 AVENUE, QUEENS, FROM STREET 218 STREET |
Q042023139A08 | 2023-05-19 | 2023-05-31 | REPLACE SIDEWALK | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q012023139B15 | 2023-05-19 | 2023-05-31 | RESET, REPAIR OR REPLACE CURB | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
M022023135C09 | 2023-05-15 | 2023-05-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | EAST 91 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
B042023104A26 | 2023-04-14 | 2023-05-12 | REPAIR SIDEWALK | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B042023102A01 | 2023-04-12 | 2023-05-10 | REPLACE SIDEWALK | AVENUE M, BROOKLYN, FROM STREET EAST 98 STREET TO STREET EAST 99 STREET |
B042023102A00 | 2023-04-12 | 2023-05-10 | REPLACE SIDEWALK | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B012023102A00 | 2023-04-12 | 2023-05-10 | RESET, REPAIR OR REPLACE CURB | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
M022023100B01 | 2023-04-10 | 2023-05-09 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 12 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q012023096A42 | 2023-04-06 | 2023-05-05 | PAVE STREET-W/ ENGINEERING & INSP FEE | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q012023096A41 | 2023-04-06 | 2023-05-05 | RESET, REPAIR OR REPLACE CURB | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q042023096A06 | 2023-04-06 | 2023-05-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
Q042023096A00 | 2023-04-06 | 2023-05-04 | REPAIR SIDEWALK | JAMAICA AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q042023082A11 | 2023-03-23 | 2023-04-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 50 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042023082A12 | 2023-03-23 | 2023-04-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 51 STREET, QUEENS, FROM STREET ROOSEVELT AVENUE |
Q042023082A13 | 2023-03-23 | 2023-04-07 | REPAIR SIDEWALK | ROOSEVELT AVENUE, QUEENS, FROM STREET 50 STREET TO STREET 51 STREET |
Q042023082A09 | 2023-03-23 | 2023-04-07 | REPAIR SIDEWALK | 51 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET SKILLMAN AVENUE |
Q042023082A10 | 2023-03-23 | 2023-04-07 | REPAIR SIDEWALK | 50 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SKILLMAN AVENUE |
Q042023069A18 | 2023-03-10 | 2023-03-21 | REPAIR SIDEWALK | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
Q042023069A19 | 2023-03-10 | 2023-04-07 | REPAIR SIDEWALK | 253 STREET, QUEENS, FROM STREET 149 DRIVE TO STREET 149 ROAD |
Q042023069A20 | 2023-03-10 | 2023-04-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 149 ROAD, QUEENS, FROM STREET 253 STREET |
M022023069B80 | 2023-03-10 | 2023-04-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WEST 12 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q042023066A01 | 2023-03-07 | 2023-03-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 31 AVENUE, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
Q042023066A31 | 2023-03-07 | 2023-03-21 | REPAIR SIDEWALK | 149 ROAD, QUEENS, FROM STREET 253 STREET TO STREET WELLER LANE |
Q042023066A32 | 2023-03-07 | 2023-03-21 | REPAIR SIDEWALK | 253 STREET, QUEENS, FROM STREET BEND TO STREET HUXLEY STREET |
Q012023065A72 | 2023-03-06 | 2023-03-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 218 STREET, QUEENS, FROM STREET 85 AVENUE TO STREET GRAND CENTRAL PARKWAY |
Q012023065A71 | 2023-03-06 | 2023-03-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 85 AVENUE, QUEENS, FROM STREET 82 AVENUE TO STREET 218 STREET |
Q012023065A73 | 2023-03-06 | 2023-03-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | 85 AVENUE, QUEENS, FROM STREET 218 STREET |
Q012023064A03 | 2023-03-05 | 2023-03-21 | RESET, REPAIR OR REPLACE CURB | 85 AVENUE, QUEENS, FROM STREET 82 AVENUE TO STREET 218 STREET |
Q042023064A00 | 2023-03-05 | 2023-03-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
Q042023064A01 | 2023-03-05 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 85 AVENUE, QUEENS, FROM STREET 218 STREET |
Q042023064A02 | 2023-03-05 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 85 AVENUE, QUEENS, FROM STREET 218 STREET |
Q042023064A03 | 2023-03-05 | 2023-03-21 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 85 AVENUE, QUEENS, FROM STREET 218 STREET |
Q042023064A04 | 2023-03-05 | 2023-03-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 218 STREET, QUEENS, FROM STREET 85 AVENUE TO STREET GRAND CENTRAL PARKWAY |
Q042023064A05 | 2023-03-05 | 2023-03-21 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 85 AVENUE, QUEENS, FROM STREET 82 AVENUE TO STREET 218 STREET |
Q022023064A03 | 2023-03-05 | 2023-03-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 85 AVENUE, QUEENS, FROM STREET 82 AVENUE TO STREET 218 STREET |
Q022023064A02 | 2023-03-05 | 2023-03-21 | TEMPORARY PEDESTRIAN WALK | 85 AVENUE, QUEENS, FROM STREET 82 AVENUE TO STREET 218 STREET |
Q022023064A01 | 2023-03-05 | 2023-03-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 218 STREET, QUEENS, FROM STREET 85 AVENUE TO STREET GRAND CENTRAL PARKWAY |
Q022023064A00 | 2023-03-05 | 2023-03-21 | TEMPORARY PEDESTRIAN WALK | 218 STREET, QUEENS, FROM STREET 85 AVENUE TO STREET GRAND CENTRAL PARKWAY |
Q012023064A02 | 2023-03-05 | 2023-03-21 | RESET, REPAIR OR REPLACE CURB | 218 STREET, QUEENS, FROM STREET 85 AVENUE TO STREET GRAND CENTRAL PARKWAY |
B022023040A90 | 2023-02-09 | 2023-03-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 74 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012023040A79 | 2023-02-09 | 2023-03-02 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 74 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B042023040A09 | 2023-02-09 | 2023-03-02 | REPLACE SIDEWALK | 74 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B022023040A89 | 2023-02-09 | 2023-03-02 | TEMPORARY PEDESTRIAN WALK | 74 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
Q042023039A01 | 2023-02-08 | 2023-03-09 | REPAIR SIDEWALK | 22 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
Q012023039A19 | 2023-02-08 | 2023-03-09 | RESET, REPAIR OR REPLACE CURB | 22 AVENUE, QUEENS, FROM STREET 126 STREET TO STREET 127 STREET |
Q012023013A82 | 2023-01-13 | 2023-02-11 | PAVE STREET-W/ ENGINEERING & INSP FEE | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
Q022023013A15 | 2023-01-13 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
Q022023013A14 | 2023-01-13 | 2023-02-11 | TEMPORARY PEDESTRIAN WALK | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
Q042023013A09 | 2023-01-13 | 2023-02-11 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
Q012023013A81 | 2023-01-13 | 2023-02-11 | RESET, REPAIR OR REPLACE CURB | 39 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE |
B022023005C93 | 2023-01-05 | 2023-02-03 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q042022349A00 | 2022-12-15 | 2022-12-31 | REPLACE SIDEWALK | 223 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022349A15 | 2022-12-15 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | 223 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022349A16 | 2022-12-15 | 2022-12-31 | PAVE STREET-W/ ENGINEERING & INSP FEE | 223 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012022341A40 | 2022-12-07 | 2022-12-31 | RESET, REPAIR OR REPLACE CURB | MADISON STREET, QUEENS, FROM STREET 55 AVENUE TO STREET 55 ROAD |
Q042022341A03 | 2022-12-07 | 2023-01-05 | REPAIR SIDEWALK | MADISON STREET, QUEENS, FROM STREET 55 AVENUE TO STREET 55 ROAD |
B042022339A17 | 2022-12-05 | 2023-01-03 | REPAIR SIDEWALK | JEFFERSON AVENUE, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q042022329A03 | 2022-11-25 | 2022-12-16 | REPLACE SIDEWALK | 31 AVENUE, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
Q012022329A13 | 2022-11-25 | 2022-12-16 | PAVE STREET-W/ ENGINEERING & INSP FEE-P | 31 AVENUE, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
Q012022329A12 | 2022-11-25 | 2022-12-16 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 31 AVENUE, QUEENS, FROM STREET 14 STREET TO STREET 21 STREET |
Q042022309A01 | 2022-11-05 | 2022-11-23 | REPLACE SIDEWALK | 160 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
Q012022309A01 | 2022-11-05 | 2022-11-23 | RESET, REPAIR OR REPLACE CURB | 160 STREET, QUEENS, FROM STREET 59 AVENUE TO STREET BOOTH MEMORIAL AVENUE |
Q042022299A98 | 2022-10-26 | 2022-11-23 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 56 AVENUE, QUEENS, FROM STREET 231 STREET |
Q042022299A97 | 2022-10-26 | 2022-11-23 | REPLACE SIDEWALK | 231 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 57 AVENUE |
Q042022286A00 | 2022-10-13 | 2022-11-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | MARATHON PARKWAY, QUEENS, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY |
Q042022286A01 | 2022-10-13 | 2022-11-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | GRAND CENTRL PARKWAY, QUEENS, FROM STREET 247 STREET TO STREET MARATHON PARKWAY |
Q042022286A02 | 2022-10-13 | 2022-11-04 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND CENTRL PARKWAY, QUEENS, FROM STREET MARATHON PARKWAY |
Q042022286A03 | 2022-10-13 | 2022-11-04 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | GRAND CENTRL PARKWAY, QUEENS, FROM STREET MARATHON PARKWAY |
Q012022286A11 | 2022-10-13 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND CENTRL PARKWAY, QUEENS, FROM STREET MARATHON PARKWAY |
Q012022286A08 | 2022-10-13 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | GRAND CENTRL PARKWAY, QUEENS, FROM STREET 247 STREET TO STREET MARATHON PARKWAY |
Q012022286A07 | 2022-10-13 | 2022-11-04 | RESET, REPAIR OR REPLACE CURB | GRAND CENTRL PARKWAY, QUEENS, FROM STREET 247 STREET TO STREET MARATHON PARKWAY |
Q012022286A06 | 2022-10-13 | 2022-11-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | MARATHON PARKWAY, QUEENS, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY |
Q012022286A05 | 2022-10-13 | 2022-11-04 | RESET, REPAIR OR REPLACE CURB | MARATHON PARKWAY, QUEENS, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY |
Q042022278A56 | 2022-10-05 | 2022-11-02 | REPLACE SIDEWALK | 56 AVENUE, QUEENS, FROM STREET 228 STREET TO STREET 229 STREET |
Q012022276C42 | 2022-10-03 | 2022-11-01 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 79 STREET, QUEENS, FROM STREET ANKENER AVENUE TO STREET ELKS ROAD |
Q042022276A25 | 2022-10-03 | 2022-11-01 | REPLACE SIDEWALK | 79 STREET, QUEENS, FROM STREET ANKENER AVENUE TO STREET ELKS ROAD |
Q042022272A22 | 2022-09-29 | 2022-10-27 | REPLACE SIDEWALK | 41 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012022269C64 | 2022-09-26 | 2022-10-24 | PAVE STREET-W/ ENGINEERING & INSP FEE | 56 AVENUE, QUEENS, FROM STREET 229 STREET |
B022022266C10 | 2022-09-23 | 2022-10-22 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BLEECKER STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
Q042022265A03 | 2022-09-22 | 2022-10-19 | REPAIR SIDEWALK | 229 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 57 AVENUE |
Q042022265A02 | 2022-09-22 | 2022-10-19 | REPLACE SIDEWALK | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET MAIN STREET |
Q012022258F11 | 2022-09-15 | 2022-10-08 | RESET, REPAIR OR REPLACE CURB | 229 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 57 AVENUE |
Q012022258F14 | 2022-09-15 | 2022-10-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 56 AVENUE, QUEENS, FROM STREET 228 STREET TO STREET 229 STREET |
Q012022258F13 | 2022-09-15 | 2022-10-08 | RESET, REPAIR OR REPLACE CURB | 56 AVENUE, QUEENS, FROM STREET 228 STREET TO STREET 229 STREET |
Q012022258F12 | 2022-09-15 | 2022-10-08 | PAVE STREET-W/ ENGINEERING & INSP FEE | 229 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 57 AVENUE |
Q042022258A38 | 2022-09-15 | 2022-10-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 56 AVENUE, QUEENS, FROM STREET 229 STREET |
Q042022258A37 | 2022-09-15 | 2022-10-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 56 AVENUE, QUEENS, FROM STREET 229 STREET |
Q042022258A36 | 2022-09-15 | 2022-10-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 56 AVENUE, QUEENS, FROM STREET 229 STREET |
Q042022258A35 | 2022-09-15 | 2022-10-05 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | 56 AVENUE, QUEENS, FROM STREET 229 STREET |
Q042022258A34 | 2022-09-15 | 2022-10-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 56 AVENUE, QUEENS, FROM STREET 228 STREET TO STREET 229 STREET |
Q042022258A33 | 2022-09-15 | 2022-10-08 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 229 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 57 AVENUE |
Q012022250F63 | 2022-09-07 | 2022-10-04 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET UNION STREET |
Q012022250F62 | 2022-09-07 | 2022-10-04 | RESET, REPAIR OR REPLACE CURB | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET UNION STREET |
Q042022250A87 | 2022-09-07 | 2022-10-06 | REPLACE SIDEWALK | 59 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q042022250A88 | 2022-09-07 | 2022-10-06 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET UNION STREET |
Q012022235A81 | 2022-08-23 | 2022-09-21 | PAVE STREET-W/ ENGINEERING & INSP FEE | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
Q012022235A80 | 2022-08-23 | 2022-09-21 | RESET, REPAIR OR REPLACE CURB | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
Q042022231A26 | 2022-08-19 | 2022-09-17 | REPAIR SIDEWALK | 59 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q042022230A62 | 2022-08-18 | 2022-09-16 | REPLACE SIDEWALK | 59 AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q042022228A28 | 2022-08-16 | 2022-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
Q042022224A55 | 2022-08-12 | 2022-09-09 | REPLACE SIDEWALK | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET PARSONS BOULEVARD |
Q012022224C47 | 2022-08-12 | 2022-09-09 | RESET, REPAIR OR REPLACE CURB | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET PARSONS BOULEVARD |
Q012022224C48 | 2022-08-12 | 2022-09-09 | PAVE STREET-W/ ENGINEERING & INSP FEE | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET PARSONS BOULEVARD |
Q012022220C36 | 2022-08-08 | 2022-08-26 | RESET, REPAIR OR REPLACE CURB | 129 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 23 AVENUE |
Q012022220C35 | 2022-08-08 | 2022-08-26 | RESET, REPAIR OR REPLACE CURB | 128 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 22 AVENUE |
Q012022201B90 | 2022-07-20 | 2022-08-13 | RESET, REPAIR OR REPLACE CURB | 20 AVENUE, QUEENS, FROM STREET 128 STREET TO STREET 129 STREET |
B022022196A44 | 2022-07-15 | 2022-07-28 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | BLEECKER STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
Q042022182A03 | 2022-07-01 | 2022-07-29 | REPAIR SIDEWALK | 129 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 23 AVENUE |
Q042022182A06 | 2022-07-01 | 2022-07-29 | REPAIR SIDEWALK | 129 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 23 AVENUE |
Q042022182A05 | 2022-07-01 | 2022-07-30 | REPAIR SIDEWALK | 20 AVENUE, QUEENS, FROM STREET 128 STREET TO STREET 129 STREET |
Q042022179A19 | 2022-06-28 | 2022-07-28 | REPAIR SIDEWALK | 111 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE |
Q012022179D01 | 2022-06-28 | 2022-07-28 | RESET, REPAIR OR REPLACE CURB-PROTECTED | 111 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET 37 AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2024-01-18 | 2024-08-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-12-19 | 2024-01-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-29 | 2023-12-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-21 | 2023-11-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2014-03-11 | 2023-08-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
220727002235 | 2022-07-27 | BIENNIAL STATEMENT | 2022-03-01 |
140311010095 | 2014-03-11 | CERTIFICATE OF INCORPORATION | 2014-03-11 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-28 | No data | 22 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb to grade |
2024-10-25 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance |
2024-10-21 | No data | 19 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Q012024285A01• Curb to Curb width – 29’8” • Milled area – 50’8” X 20’• Depth of milled area – N/A• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no |
2024-10-19 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed I/F/O 19-12 149th Street |
2024-10-13 | No data | 202 STREET, FROM STREET 90 AVENUE TO STREET 93 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of my inspection found new sidewalk constructed . |
2024-10-07 | No data | 152 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb expansion joints sealed |
2024-10-02 | No data | WITHERS STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Violation should be issued to building operation. |
2024-09-22 | No data | 46 ROAD, FROM STREET 189 STREET TO STREET 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed in front of 189-41. |
2024-09-20 | No data | 53 AVENUE, FROM STREET 230 STREET TO STREET HORATIO PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration paving done. |
2024-09-17 | No data | 22 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave passed |
2024-09-17 | No data | 28 AVENUE, FROM STREET 150 STREET TO STREET MURRAY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave to grade |
2024-09-13 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 60' x 23' area milled 3" I/F/O 19-12 149th Street |
2024-09-12 | No data | LABURNUM AVENUE, FROM STREET BOWNE STREET TO STREET SMART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed I/F/O 143-19 Laburnum Avenue |
2024-09-05 | No data | 202 STREET, FROM STREET 90 AVENUE TO STREET 93 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb has been completely reset, restored & replaced in front of 90-18. |
2024-09-04 | No data | 84 STREET, FROM STREET 62 AVENUE TO STREET 63 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Currently new curb installed expansion joints recessed and sealed. |
2024-09-04 | No data | 58 AVENUE, FROM STREET 134 STREET TO STREET 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb restored expansion joints sealed I/F/O 134-20 58th Avenue |
2024-09-02 | No data | FULTON STREET, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL FACED CURB INSTALLED |
2024-08-31 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB INSTALLED |
2024-08-29 | No data | SUTTER AVENUE, FROM STREET EUCLID AVENUE TO STREET PINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cement face curb installed for corner property |
2024-08-28 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PAVED HALF +5 |
2024-08-28 | No data | 177 STREET, FROM STREET 103 ROAD TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple flags restored to grade along the sidewalk. |
2024-08-27 | No data | WITHERS STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cones i/f/o 226 have not been removed. All permits for address have expired, no new permit on file. |
2024-07-24 | No data | WITHERS STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed Curb- Curb: 29.4ftLength: 34ftWidth : 20ftDepth 3.5 inches |
2024-07-23 | No data | EAST 180 STREET, FROM STREET VAN NEST AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the SW corner quadrant are ADA compliant. Measured and collected in Prism on 3/11/24 |
2024-07-21 | No data | JAMAICA AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several sidewalk flags replaced and sealed. |
2024-07-12 | No data | WITHERS STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2024-07-08 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY CURB TO CURB IS 29FT 10IN MILLED ROADWAY IS 110FT X 20FT WITH A DEPTH OF 3 INCHES |
2024-07-08 | No data | FULTON STREET, FROM STREET WYONA STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY IS CURRENTLY MILLED 22FT X 22FTWITH A DEPTH OF 3 INCHES |
2024-07-08 | No data | FULTON STREET, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY IS CURB TO CURB IS 30FT MILLED ROADWAY IS 110FT X 20FT WITH A DEPTH OF 3 INCHES |
2024-07-02 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | B.P.P. milling in compliance at 64-21 214th Street: • Curb to Curb width – 29’ • Milled area – 64’1”x 20’ • Depth of milled area – 3” • ½ +5’ milled – YES • Waiver (yes/no)-NO |
2024-06-29 | No data | LABURNUM AVENUE, FROM STREET BOWNE STREET TO STREET SMART STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPLACED SIDEWALK, CREW ON SITE REMOVING WOOD FROM CURB AREA. NO WORK IN PROGRESS. ALSO HAD BARRIERS REMOVED FROM SIDEWALK. |
2024-06-28 | No data | 46 ROAD, FROM STREET 189 STREET TO STREET 192 STREET | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width – 29’ 1• Milled area – 50’ 4’’ X 20’ 4’’• Depth of milled area – N/A• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-noNO CREW ON SITE. WORK ALREADY DONE-PERM TO-GRADE |
2024-06-21 | No data | EUCLID AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | side walk flags installed expansion joints sealed in compliance. Side of property 1269. |
2024-06-17 | No data | 149 ROAD, FROM STREET 253 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant due excessive elements, ramps are functional and accessible. Measured and collected in prism on 3/24/23. |
2024-06-13 | No data | WITHERS STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | BPP complete Curb- Curb- 30ftLength- 70ftWidth- 21ftDepth: 3.5 inches |
2024-06-06 | No data | FULTON STREET, FROM STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 6/6/24. |
2024-06-02 | No data | GRAND CENTRL PARKWAY, FROM STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in roadway. In compliance |
2024-06-02 | No data | GRAND CENTRL PARKWAY, FROM STREET 247 STREET TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in roadway. In compliance |
2024-06-02 | No data | MARATHON PARKWAY, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in compliance |
2024-05-27 | No data | 253 STREET, FROM STREET 149 DRIVE TO STREET 149 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sporadic flags replaced |
2024-05-27 | No data | 253 STREET, FROM STREET BEND TO STREET HUXLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair |
2024-05-12 | No data | 88 AVENUE, FROM STREET 80 STREET TO STREET 85 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | @ time of inspection found new Curb installed. |
2024-05-07 | No data | 147 PLACE, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel face curb installed. |
2024-05-03 | No data | 149 ROAD, FROM STREET 253 STREET TO STREET WELLER LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W repaired. |
2024-04-09 | No data | EAST 180 STREET, FROM STREET VAN NEST AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Applicant’s designer of record (DOR) may explore all available options from H-1011 to design an ADA compliant solution. If DOR has questions regarding how to make ramps compliant, they can reach out to pedrampBPP@dot.nyc.gov for guidance |
2024-03-26 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor upgraded landing to satisfy CAR 20236880019. Upon re inspection of the NE corner quadrant, ramps in corner have been found to be ADA compliant. Measured and collected in Prism on 6/28/23. |
2024-03-26 | No data | 56 AVENUE, FROM STREET 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the SE4 corner quadrant was found to be non ADA compliant . Measured and collected in prism 12/13/22. "KM - IF NON COMPLIANT PLEASE WRITE A CAR! THANK YOU!" |
2024-03-11 | No data | EAST 180 STREET, FROM STREET VAN NEST AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the SW corner quadrant are ADA compliant. Measured and collected in Prism on 3/11/24. |
2024-02-28 | No data | 218 STREET, FROM STREET 99 AVENUE TO STREET 100 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2024-02-22 | No data | SUTPHIN BOULEVARD, FROM STREET 97 AVENUE TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb installed. |
2024-02-21 | No data | 85 AVENUE, FROM STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the NE3 corner quadrant was found to be ADA compliant. Updated in prism on 5/9/23. |
2024-01-30 | No data | 22 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed expansion joints sealed I/F/O 151-20 22nd Avenue. |
2024-01-26 | No data | 53 AVENUE, FROM STREET 230 STREET TO STREET HORATIO PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | 71' x 20' area milled 3" I/F/O 230-08 53rd Avenue |
2024-01-26 | No data | 28 AVENUE, FROM STREET 150 STREET TO STREET MURRAY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed expansion joints sealed I/F/O 150-20 28th Avenue |
2024-01-26 | No data | 218 STREET, FROM STREET 99 AVENUE TO STREET 100 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 34'x20'x3" BPP completed. |
2024-01-17 | No data | SUTPHIN BOULEVARD, FROM STREET 97 AVENUE TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration is acceptable. |
2024-01-16 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration in front of 69-16 to grade in the roadway. |
2024-01-02 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP complete and acceptable |
2023-12-30 | No data | 167 STREET, FROM STREET 76 AVENUE TO STREET 77 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 flags replaced and sealed. |
2023-12-27 | No data | 22 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP passed. 58’1” X 21’ area restored to grade in front of 151-20 22 Ave. |
2023-12-18 | No data | 88 AVENUE, FROM STREET 80 STREET TO STREET 85 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP done in front of 8031 88 Ave with an area of 56’ 5” X 19’ 2” X 3” |
2023-12-14 | No data | 34 AVENUE, FROM STREET 96 STREET TO STREET 97 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration |
2023-11-30 | No data | ROCKAWAY PARKWAY, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced in compliance |
2023-11-30 | No data | 111 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind |
2023-11-28 | No data | CORONA AVENUE, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Metal faced concrete curb restored in kind in front of 96-43 Corona Ave. |
2023-11-27 | No data | 28 AVENUE, FROM STREET 150 STREET TO STREET MURRAY LANE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is completed, curb to curb is 29’, milled area is 20’, Depth is 4”. |
2023-11-21 | No data | 97 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave perm to grade & sealed at 96-17 34th Avenue (Corner property) |
2023-11-15 | No data | 149 ROAD, FROM STREET 253 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant due excessive elements, ramps are functional and accessible. Measured and collected in prism on 3/24/23. |
2023-11-14 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP is completed, Curb to curb is 29’, Milled Area is 20’, Depth is 4” |
2023-11-13 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is reset & restored in front of 69-16. |
2023-11-13 | No data | BELL BOULEVARD, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored & reset in front of 64-30. |
2023-11-13 | No data | SHEFFIELD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb in compliance |
2023-11-11 | No data | 147 PLACE, FROM STREET 97 AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk replaced and sealed. |
2023-11-07 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB-PERM & SEALED |
2023-10-30 | No data | SUTPHIN BOULEVARD, FROM STREET 97 AVENUE TO STREET 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed, Curb to curb is 33’, Milled Area is 25’, Depth is 3”. |
2023-10-19 | No data | 57 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milling in compliance at 39-53 57th Street. • Curb to Curb width – 29'6" • Milled area – 97'x20'0" • Depth of milled area – 3"• ½ +5’ milled (yes) • Waiver (no). |
2023-10-19 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP milling in compliance in front of 39-58 58th Street. • Curb to Curb width – 30'0" • Milled area – 111'0"x20'0" • Depth of milled area – 3"• ½ +5’ milled (yes) • Waiver (no). |
2023-10-14 | No data | 85 AVENUE, FROM STREET 218 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition has been resolved within the SW1 corner quadrant. Newer permit Q042023173A13 on file |
2023-10-13 | No data | 58 AVENUE, FROM STREET 134 STREET TO STREET 136 STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP milled area completed. Curb to curb is 30’, milled area is 20’ 8” & depth is 3” |
2023-10-11 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition has been previously reported, BPP has been done under permit Q012023252A01. |
2023-10-10 | No data | CORONA AVENUE, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BBP restoration |
2023-10-10 | No data | 97 STREET, FROM STREET CORONA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration |
2023-10-06 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP roadway pavement work completed with correct home address 69-16 Cloverdale Blvd per permit # Q012023228A47. |
2023-09-27 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is restored and reset in front of 69-16. |
2023-09-27 | No data | 22 AVENUE, FROM STREET 126 STREET TO STREET 127 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-09-26 | No data | 223 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb is reset and restored in front of 69-32. |
2023-09-12 | No data | 39 STREET, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed joints sealed in front of 48-21. |
2023-09-08 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESET, REPAIR OR REPLACE CURB-perm and sealed |
2023-09-06 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP permit issued with the wrong address 69-19 Cloverdale Blvd work is performed IFO 69-16 Cloverdale Blvd new permit application is being obtained. |
2023-08-25 | No data | 58 AVENUE, FROM STREET 134 STREET TO STREET 136 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving roadway work started at this time of inspection. |
2023-08-14 | No data | 85 AVENUE, FROM STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant was found to be ADA compliant. Remeasured and updated in prism on 7/18/23. |
2023-08-02 | No data | MADISON STREET, FROM STREET 55 AVENUE TO STREET 55 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed. |
2023-07-24 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor upgraded landing to satisfy CAR 20236880019. Upon re inspection of the NE corner quadrant, ramps in corner have been found to be ADA compliant. Measured and collected in Prism on 6/28/23. |
2023-07-18 | No data | 85 AVENUE, FROM STREET 218 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the southwest corner quadrant was found to be ADA compliant. Remeasured and updated in prism on 7/18/23. |
2023-07-15 | No data | 56 AVENUE, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR repaired under permit number Q012023173A50. |
2023-07-15 | No data | 56 AVENUE, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sunken area within BPP restoration made flush with the roadway. |
2023-07-06 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP in compliance at this time. |
2023-06-30 | No data | 97 STREET, FROM STREET CORONA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. Curb to curb - 53' 1", milled - 26' 4" x 27' 3", depth - 3". |
2023-06-30 | No data | CORONA AVENUE, FROM STREET 97 STREET TO STREET ALSTYNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable in front of 96-43. Curb to curb - 44' 1", milled - 27' 2" x 85' 9", depth - 3". |
2023-06-28 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee obtained permit # Q042023173A10 and corrected landing serving 229 Street ramp. Please reference permit for further information. |
2023-06-28 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor upgraded landing to satisfy CAR 20236880019. Upon re inspection of the NE corner quadrant, corner has been found to be ADA compliant. Measured and collected in Prism on 6/28/23. |
2023-06-27 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel faced curb in compliance at this time. |
2023-06-23 | No data | GRAND CENTRL PARKWAY, FROM STREET 247 STREET TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Curb expansion joints full depth saw cuts and sealed at this time. |
2023-06-23 | No data | MARATHON PARKWAY, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Curb expansion joints full depth saw cuts and sealed at this time in front of 66-26. |
2023-06-17 | No data | MARATHON PARKWAY, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to install expansion joints throughout the entire depth of the curb. Joints were installed at top part of curb only. Respondent was notified by CAR# 20231100072. Permit# Q012022286A05 was used to ID respondent. |
2023-05-25 | No data | GRAND CENTRL PARKWAY, FROM STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the SW1 corner quadrant was found to be ADA complaint. Measured in prism on 11/9/2022. |
2023-05-19 | No data | EAST 91 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO CONTAINER ON STREET |
2023-05-17 | No data | ROCKAWAY PARKWAY, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced. |
2023-05-15 | No data | GRAND CENTRL PARKWAY, FROM STREET 247 STREET TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb expansion joint less than an inch in depth. Expansion joint needed in the full depth of the curb and sealed. |
2023-05-11 | No data | 149 ROAD, FROM STREET 253 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant due excessive elements,ramps are functional and accessible. Measured and collected in prism on 3/24/23. |
2023-05-09 | No data | 85 AVENUE, FROM STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant due to 2.8% excessive landing cross slope. Remeasured in prism on 5/9/23. |
2023-05-05 | No data | MARATHON PARKWAY, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joints in the curb not full depth and sealed |
2023-05-04 | No data | 51 STREET, FROM STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No ped ramp work started at this time for the NW2 corner quadrant. Permittee has restored sidewalk flags. Ped ramp not affected. |
2023-05-04 | No data | 50 STREET, FROM STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nat grid has a trench in the NE3 corner quadrant. Will issue a C.A.R. |
2023-04-28 | No data | 56 AVENUE, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. Area is sunken within a previously restored restoration. |
2023-04-10 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed. • Curb to Curb width –30’• Milled area – 20’• Depth of milled area – 3’’ |
2023-03-31 | No data | 50 STREET, FROM STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at this time for the NE3 corner quadrant. Permittee has restored sidewalk flags ped ramp not affected. Pre existing single ramp is functional and accessible. |
2023-03-31 | No data | 51 STREET, FROM STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No ped ramp work started at this time for the NW2 corner quadrant. Permittee has restored sidewalk flags. Ped ramp not affected. |
2023-03-26 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done in front of 134-22, as per inspector Sibiri Yakubu. |
2023-03-24 | No data | 149 ROAD, FROM STREET 253 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant ramps are functional and accessible. Measured and collected in prism on 3/24/23. |
2023-03-23 | No data | WEST 12 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Debris container in parking lane in front of 34. |
2023-03-13 | No data | WEST 12 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #34 open container on the street at time of inspection |
2023-03-10 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-10 | No data | 229 STREET, FROM STREET 56 AVENUE TO STREET 57 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-10 | No data | 56 AVENUE, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP to grade |
2023-03-10 | No data | 39 STREET, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2+5' width of roadway milled. |
2023-03-09 | No data | 85 AVENUE, FROM STREET 218 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Newly completed tangent ramps within the SW1 corner quadrant have been found to be non ADA compliant. Pavement key not finalized and exposed expansion joints, Also Roadway slope will need to be re measured. M&C in Prism on 3/9/23. |
2023-03-03 | No data | 32 AVENUE, FROM STREET 143 STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paving done as per inspector Brijnanand Persaud. |
2023-02-11 | No data | 39 STREET, FROM STREET 48 AVENUE TO STREET GREENPOINT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No street paving work has been at this time |
2023-02-09 | No data | 32 AVENUE, FROM STREET 143 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No such address found on segment. Permit expired. |
2023-02-05 | No data | 20 AVENUE, FROM STREET 128 STREET TO STREET 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb install at localized areas. |
2023-01-30 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps within the NE3 corner quadrant was found to be ADA complaint. Previously measured and collected in Prism on 11/7/22. |
2023-01-29 | No data | JEFFERSON AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is in compliance |
2023-01-25 | No data | 129 STREET, FROM STREET 20 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb installed. |
2023-01-22 | No data | 128 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new curb found. |
2023-01-19 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container on site |
2023-01-09 | No data | GRAND CENTRL PARKWAY, FROM STREET 247 STREET TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pave in compliance at this time. |
2023-01-04 | No data | GRAND CENTRL PARKWAY, FROM STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pave in compliance |
2023-01-04 | No data | MARATHON PARKWAY, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pave in compliance at this time. |
2022-12-16 | No data | 31 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | New steel-face curb installed for NB. No impaction to shared bike lanes. |
2022-12-13 | No data | 56 AVENUE, FROM STREET 231 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed single ramp within the SE4 corner quadrant is non Ada. Measured in prism 12/13/22. No action taken on landing at this time "KM - IF NON COMPLIANT PLEASE WRITE A CAR! THANK YOU!" |
2022-11-30 | No data | 31 AVENUE, FROM STREET 14 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk restored in front of 14-54 31st Avenue |
2022-11-22 | No data | 229 STREET, FROM STREET 56 AVENUE TO STREET 57 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2022-11-09 | No data | GRAND CENTRL PARKWAY, FROM STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed single ramp within the NW2 corner quadrant was found to be ADA compliant. Measured in prism on 11/9/2022. |
2022-11-07 | No data | 56 AVENUE, FROM STREET 231 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. No ped ramp work started at this time within the SE4 corner quadrant. Old existing single ramp is functional and accessible. |
2022-11-07 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant was found to be non Ada compliant. Measured in prism 9/20/22 |
2022-10-24 | No data | 32 AVENUE, FROM STREET 143 STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb replaced. |
2022-10-17 | No data | MARATHON PARKWAY, FROM STREET CULLMAN AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | 80’x30’x3” area milled |
2022-10-17 | No data | GRAND CENTRL PARKWAY, FROM STREET 247 STREET TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | 107’x17’x3” area milled |
2022-10-17 | No data | GRAND CENTRL PARKWAY, FROM STREET MARATHON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | 40’x17’x3” area milled |
2022-10-14 | No data | 56 AVENUE, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete curb installed |
2022-09-26 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | intersection observed milled at this time 30' x 20' down 3'' |
2022-09-26 | No data | 229 STREET, FROM STREET 56 AVENUE TO STREET 57 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway was observed milled with dimension= 66' x 20' down 3'' |
2022-09-26 | No data | 56 AVENUE, FROM STREET 228 STREET TO STREET 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway was observed milled with dimension= 110' x 30' down 3'' |
2022-09-20 | No data | 56 AVENUE, FROM STREET 229 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Completed tangent ramps within the SW1 corner quadrant are functional. Non Ada. Measured in prism 9/20/22 |
2022-09-09 | No data | 32 AVENUE, FROM STREET 143 STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | This BPP milling passed:• Curb to Curb width – 36’• Milled area – 23’• Depth of milled area – 3”• ½ +5’ milled (yes/no) –Yes.• Waiver (yes/no)-No. |
2022-09-09 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Active | Department of Transportation | New concrete curb installed. |
2022-08-23 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The below BPP is completed and acceptable. Curb to Curb width – 30’, Milled area – 20’ x 53’, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes. |
2014-06-28 | No data | Queens | Violation Issued | Inspectorate of the Department of Consumer and Workers' Rights Protection | Department of Consumer and Worker Protection | No data |
Fee Sequence Id | Fee type | Status | Date | Amount | Description |
---|---|---|---|---|---|
3611715 | TRUSTFUNDHIC | INVOICED | 2023-03-07 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
3611716 | RENEWAL | INVOICED | 2023-03-07 | 100 | Home Improvement Contractor License Renewal Fee |
3259806 | RENEWAL | INVOICED | 2020-11-19 | 100 | Home Improvement Contractor License Renewal Fee |
3259785 | TRUSTFUNDHIC | INVOICED | 2020-11-19 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
2920130 | RENEWAL | INVOICED | 2018-10-30 | 100 | Home Improvement Contractor License Renewal Fee |
2920129 | TRUSTFUNDHIC | INVOICED | 2018-10-30 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
2559334 | TRUSTFUNDHIC | INVOICED | 2017-02-23 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
2559335 | RENEWAL | INVOICED | 2017-02-23 | 100 | Home Improvement Contractor License Renewal Fee |
1904382 | RENEWAL | INVOICED | 2014-12-05 | 100 | Home Improvement Contractor License Renewal Fee |
1904381 | TRUSTFUNDHIC | INVOICED | 2014-12-05 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
1723608 | LICENSE | INVOICED | 2014-07-08 | 50 | Home Improvement Contractor License Fee |
1723609 | TRUSTFUNDHIC | INVOICED | 2014-07-08 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
1723612 | FINGERPRINT | INVOICED | 2014-07-08 | 75 | Fingerprint Fee |
1720113 | INTEREST | INVOICED | 2014-07-02 | 6.5 | Interest Payment |
1718776 | TRUSTFUNDHIC | CREDITED | 2014-07-01 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
1718778 | TRUSTFUNDHIC | INVOICED | 2014-07-01 | 200 | Home Improvement Contractor Trust Fund Enrollment Fee |
1718777 | PL VIO | INVOICED | 2014-07-01 | 1000 | PL - Padlock Violation |
Date | Outcome | Charge | Charge count | Counts sellted | Counts guilty | Counts not guilty |
---|---|---|---|---|---|---|
2014-06-28 | Settlement (Pre-Hearing) | UNLICENSED ACTIVITY | 1 | 1 | No data | No data |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-228194 | Office of Administrative Trials and Hearings | Issued | Early Settlement | 2023-12-23 | 2825 | No data | Each vehicle having a gross vehicle weight rating of twenty-six thousand pounds or more and a conventional cab configuration in which the engine is mounted in front of the operator must be equipped with a convex mirror positioned on the front of such vehicle. When such vehicle is being operated, such mirror shall be adjusted so as to enable the operator thereof to see all points on an imaginary horizontal line which is three feet above the road, is one foot directly forward from the midpoint of the front of such motor vehicle, and extends the full width of the front of such vehicle or combination of vehicles. |
THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.No related companies by address
Date of last update: 24 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com, Part of Big Data Integrated