Name: | PLUMBING NYC, INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 15 Sep 2014 (10 years ago) |
Entity Number: | 4635965 |
County: | Kings |
Place of Formation: | New York |
Address: | 7622 17TH AVENUE, BROOKLYN, NY, United States, 11214 |
Address ZIP Code: | 11214 |
Principal Address: | 142 5TH STREET, BROOKLYN, NY, United States, 11215 |
Principal Address ZIP Code: | 11215 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
ROCCO MURDOCCA | Chief Executive Officer | 142 5TH STREET, BROOKLYN, NY, United States, 11215 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 7622 17TH AVENUE, BROOKLYN, NY, United States, 11214 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
Q022024313B53 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
Q022024313B52 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
M022024313E88 | 2024-11-08 | 2024-12-13 | TEMPORARY PEDESTRIAN WALK | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024313B35 | 2024-11-08 | 2024-12-13 | REPAIR WATER - SEWER | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B022024313C04 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
Q022024313B62 | 2024-11-08 | 2024-12-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024313B61 | 2024-11-08 | 2024-12-07 | OCCUPANCY OF ROADWAY AS STIPULATED | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024313B60 | 2024-11-08 | 2024-12-07 | TEMPORARY PEDESTRIAN WALK | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024313B51 | 2024-11-08 | 2024-12-14 | TEMPORARY PEDESTRIAN WALK | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
B012024313B38 | 2024-11-08 | 2024-12-14 | REPAIR WATER | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B012024313B39 | 2024-11-08 | 2024-12-14 | REPAIR WATER - SEWER | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024313B93 | 2024-11-08 | 2024-12-14 | TEMPORARY PEDESTRIAN WALK | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B022024313B94 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B022024313B95 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B022024313B96 | 2024-11-08 | 2024-12-14 | TEMPORARY PEDESTRIAN WALK | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024313B97 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024313B98 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024313B99 | 2024-11-08 | 2024-12-14 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024313C00 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
Q012024313D67 | 2024-11-08 | 2024-12-23 | REPAIR WATER - SEWER | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
Q012024313D66 | 2024-11-08 | 2024-11-30 | REPAIR WATER - SEWER | WOODSIDE AVENUE, QUEENS, FROM STREET 80 STREET TO STREET BEND |
Q012024313D84 | 2024-11-08 | 2024-12-07 | REPAIR WATER - SEWER | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012024313B40 | 2024-11-08 | 2024-12-14 | REPAIR WATER - SEWER | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B012024313B41 | 2024-11-08 | 2024-12-14 | REPAIR SEWER | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024313C01 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024313C02 | 2024-11-08 | 2024-12-14 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
M022024313E90 | 2024-11-08 | 2024-12-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022024313E89 | 2024-11-08 | 2024-12-13 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B022024313C03 | 2024-11-08 | 2024-12-14 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
Q022024312A22 | 2024-11-07 | 2024-12-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 25 DRIVE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q022024312A21 | 2024-11-07 | 2024-12-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 25 DRIVE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q022024312A20 | 2024-11-07 | 2024-12-05 | TEMPORARY PEDESTRIAN WALK | 25 DRIVE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012024312A31 | 2024-11-07 | 2024-12-05 | REPAIR WATER - SEWER - PROTECTED | 25 DRIVE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012024312A30 | 2024-11-07 | 2024-12-06 | REPAIR SEWER | BEACH 73 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
B022024311B39 | 2024-11-06 | 2024-12-07 | OCCUPANCY OF ROADWAY AS STIPULATED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024311B38 | 2024-11-06 | 2024-12-07 | TEMPORARY PEDESTRIAN WALK | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024311B35 | 2024-11-06 | 2024-12-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022024311B34 | 2024-11-06 | 2024-12-01 | OCCUPANCY OF ROADWAY AS STIPULATED | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022024311B33 | 2024-11-06 | 2024-12-01 | TEMPORARY PEDESTRIAN WALK | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022024311B40 | 2024-11-06 | 2024-12-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
Q012024311E68 | 2024-11-06 | 2024-12-06 | REPAIR WATER - SEWER | 124 STREET, QUEENS, FROM STREET 18 AVENUE TO STREET 20 AVENUE |
Q012024311E70 | 2024-11-06 | 2024-11-30 | REPAIR WATER - SEWER | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
Q022024311C69 | 2024-11-06 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
Q022024311C67 | 2024-11-06 | 2024-11-30 | TEMPORARY PEDESTRIAN WALK | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
Q022024311C68 | 2024-11-06 | 2024-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
B012024311B78 | 2024-11-06 | 2024-12-06 | REPAIR WATER - SEWER - PROTECTED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024311B61 | 2024-11-06 | 2024-12-01 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
M022024304C36 | 2024-10-30 | 2024-11-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012024304B41 | 2024-10-30 | 2024-11-23 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024304C35 | 2024-10-30 | 2024-11-23 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024304C39 | 2024-10-30 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024304C38 | 2024-10-30 | 2024-11-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024304C37 | 2024-10-30 | 2024-11-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012024302D07 | 2024-10-28 | 2024-11-17 | REPAIR WATER - SEWER | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
X022024302B07 | 2024-10-28 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X022024302B06 | 2024-10-28 | 2024-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X022024302B05 | 2024-10-28 | 2024-11-30 | TEMPORARY PEDESTRIAN WALK | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X012024302A79 | 2024-10-28 | 2024-11-27 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
Q012024302C60 | 2024-10-28 | 2024-11-27 | REPAIR WATER - SEWER | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
B022024302H52 | 2024-10-28 | 2024-11-29 | TEMPORARY PEDESTRIAN WALK | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B022024302H51 | 2024-10-28 | 2024-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024302H50 | 2024-10-28 | 2024-11-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024302D01 | 2024-10-28 | 2024-11-24 | REPAIR WATER - SEWER | BALTIC STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012024302D03 | 2024-10-28 | 2024-11-19 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024302H49 | 2024-10-28 | 2024-11-19 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024302H57 | 2024-10-28 | 2024-11-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B022024302H56 | 2024-10-28 | 2024-11-17 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B022024302H55 | 2024-10-28 | 2024-11-17 | TEMPORARY PEDESTRIAN WALK | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B022024302H54 | 2024-10-28 | 2024-11-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B022024302H53 | 2024-10-28 | 2024-11-29 | OCCUPANCY OF ROADWAY AS STIPULATED | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012024302D06 | 2024-10-28 | 2024-11-29 | REPAIR WATER - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B022024299B14 | 2024-10-25 | 2024-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024299B12 | 2024-10-25 | 2024-11-30 | TEMPORARY PEDESTRIAN WALK | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024299B13 | 2024-10-25 | 2024-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012024299B51 | 2024-10-25 | 2024-12-05 | REPAIR WATER - SEWER - PROTECTED | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
Q012024297A83 | 2024-10-23 | 2024-11-27 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B022024296A98 | 2024-10-22 | 2024-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012024296B96 | 2024-10-22 | 2024-11-20 | REPAIR SEWER | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
M022024295C05 | 2024-10-21 | 2024-11-13 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012024295D19 | 2024-10-21 | 2024-11-12 | TEST PITS, CORES OR BORING | NEVINS STREET, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
B012024295C92 | 2024-10-21 | 2024-10-30 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024295C94 | 2024-10-21 | 2024-11-19 | REPAIR WATER - SEWER | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012024295D05 | 2024-10-21 | 2024-11-26 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012024295D07 | 2024-10-21 | 2024-11-30 | REPAIR WATER - SEWER - PROTECTED | 14 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024295D22 | 2024-10-21 | 2024-11-14 | REPAIR WATER | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B012024295D21 | 2024-10-21 | 2024-11-26 | REPAIR WATER - SEWER - PROTECTED | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
Q012024295B84 | 2024-10-21 | 2024-11-19 | C.A.R. RESTORATION | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
M022024295C06 | 2024-10-21 | 2024-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M022024295C04 | 2024-10-21 | 2024-11-13 | TEMPORARY PEDESTRIAN WALK | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012024295A78 | 2024-10-21 | 2024-11-13 | REPAIR WATER - SEWER | EAST 110 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B022024295C46 | 2024-10-21 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B022024295C45 | 2024-10-21 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B022024295C44 | 2024-10-21 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
B022024295C30 | 2024-10-21 | 2024-11-26 | OCCUPANCY OF ROADWAY AS STIPULATED | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B022024295C29 | 2024-10-21 | 2024-11-26 | TEMPORARY PEDESTRIAN WALK | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B022024295C26 | 2024-10-21 | 2024-11-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024295C25 | 2024-10-21 | 2024-11-26 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024295C24 | 2024-10-21 | 2024-11-26 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024295C31 | 2024-10-21 | 2024-11-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B022024292A07 | 2024-10-18 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
Q012024292A50 | 2024-10-18 | 2024-11-10 | REPAIR WATER | JAMAICA AVENUE, QUEENS, FROM STREET GRACE CEMETERY BOUNDARY TO STREET GRACE CEMETERY BOUNDARY |
B022024292A08 | 2024-10-18 | 2024-10-31 | TEMPORARY PEDESTRIAN WALK | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B022024292A06 | 2024-10-18 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024292A09 | 2024-10-18 | 2024-10-31 | OCCUPANCY OF ROADWAY AS STIPULATED | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B022024292A05 | 2024-10-18 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
M022024292A11 | 2024-10-18 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M022024292A10 | 2024-10-18 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
S012024292A33 | 2024-10-18 | 2024-11-14 | REPAIR WATER | FOREST AVENUE, STATEN ISLAND, FROM STREET ELIZABETH GROVE ROAD TO STREET MEEKER AVENUE |
B012024292A66 | 2024-10-18 | 2024-11-12 | REPAIR WATER - SEWER - PROTECTED | STILLWELL AVENUE, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET BODY OF WATER |
B012024292B58 | 2024-10-18 | 2024-10-31 | REPAIR WATER - PROTECTED | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
B012024292A70 | 2024-10-18 | 2024-11-14 | REPAIR WATER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
M022024292A09 | 2024-10-18 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
B022024292A10 | 2024-10-18 | 2024-10-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAC DONOUGH STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE |
M012024292A50 | 2024-10-18 | 2024-11-14 | REPAIR WATER - SEWER - PROTECTED | WEST 171 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M012024292A40 | 2024-10-18 | 2024-11-14 | REPAIR WATER - SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
B022024291A26 | 2024-10-17 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
M022024291C65 | 2024-10-17 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M022024291C64 | 2024-10-17 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M022024291C63 | 2024-10-17 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
B022024291A27 | 2024-10-17 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012024291A84 | 2024-10-17 | 2024-11-14 | REPAIR WATER - SEWER | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024291A61 | 2024-10-17 | 2024-11-25 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
M012024291A92 | 2024-10-17 | 2024-11-14 | REPAIR WATER - SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
B022024291A62 | 2024-10-17 | 2024-11-25 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024291A63 | 2024-10-17 | 2024-11-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
Q022024291A10 | 2024-10-17 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q022024291A11 | 2024-10-17 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q012024291A52 | 2024-10-17 | 2024-11-14 | REPAIR WATER - SEWER | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
B012024291B72 | 2024-10-17 | 2024-11-25 | REPAIR WATER - SEWER - PROTECTED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024291A25 | 2024-10-17 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
Q012024290D08 | 2024-10-16 | 2024-11-12 | C.A.R. RESTORATION | GORSLINE STREET, QUEENS, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE |
M012024290B18 | 2024-10-16 | 2024-11-13 | REPAIR WATER | BANK STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
X012024289G02 | 2024-10-15 | 2024-11-14 | C.A.R. RESTORATION - PROTECTED | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
B042024289A30 | 2024-10-15 | 2024-11-12 | REPAIR SIDEWALK | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024288A89 | 2024-10-14 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
Q022024288A15 | 2024-10-14 | 2024-11-12 | OCCUPANCY OF ROADWAY AS STIPULATED | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024288A14 | 2024-10-14 | 2024-11-12 | TEMPORARY PEDESTRIAN WALK | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024288A13 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024288A12 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024288A11 | 2024-10-14 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024288A16 | 2024-10-14 | 2024-11-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024288A21 | 2024-10-14 | 2024-11-09 | REPAIR WATER - SEWER | 124 STREET, QUEENS, FROM STREET 18 AVENUE TO STREET 20 AVENUE |
Q012024288A20 | 2024-10-14 | 2024-11-12 | REPAIR WATER - SEWER | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024288A19 | 2024-10-14 | 2024-11-14 | REPAIR WATER - SEWER | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
M022024288A18 | 2024-10-14 | 2024-11-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022024288A17 | 2024-10-14 | 2024-11-11 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022024288A16 | 2024-10-14 | 2024-11-11 | TEMPORARY PEDESTRIAN WALK | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024288A16 | 2024-10-14 | 2024-11-11 | REPAIR WATER - SEWER - PROTECTED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022024288A91 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B022024288A90 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B022024288A88 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024288A87 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024288A86 | 2024-10-14 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024288A75 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024288A74 | 2024-10-14 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024288A73 | 2024-10-14 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024288A72 | 2024-10-14 | 2024-11-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024288A71 | 2024-10-14 | 2024-11-06 | OCCUPANCY OF ROADWAY AS STIPULATED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024288A70 | 2024-10-14 | 2024-11-06 | TEMPORARY PEDESTRIAN WALK | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022024288A08 | 2024-10-14 | 2024-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024288A07 | 2024-10-14 | 2024-11-13 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024288A06 | 2024-10-14 | 2024-11-13 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024288A05 | 2024-10-14 | 2024-11-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024288A04 | 2024-10-14 | 2024-11-13 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024288A03 | 2024-10-14 | 2024-11-13 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024288A21 | 2024-10-14 | 2024-11-14 | REPAIR WATER - SEWER | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B012024288A20 | 2024-10-14 | 2024-11-14 | REPAIR WATER - SEWER | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B012024288A19 | 2024-10-14 | 2024-11-14 | REPAIR SEWER | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B012024288A18 | 2024-10-14 | 2024-11-06 | REPAIR WATER - SEWER - PROTECTED | MILFORD STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B012024288A12 | 2024-10-14 | 2024-11-13 | REPAIR SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012024288A10 | 2024-10-14 | 2024-11-13 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024288A08 | 2024-10-14 | 2024-11-14 | REPAIR WATER - SEWER | 22 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012024282A75 | 2024-10-08 | 2024-10-31 | REPAIR WATER - SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024282C20 | 2024-10-08 | 2024-11-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024282C19 | 2024-10-08 | 2024-11-12 | OCCUPANCY OF ROADWAY AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024282C18 | 2024-10-08 | 2024-11-12 | TEMPORARY PEDESTRIAN WALK | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024282C27 | 2024-10-08 | 2024-11-12 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M012024282A98 | 2024-10-08 | 2024-10-18 | REPAIR WATER - SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012024282A89 | 2024-10-08 | 2024-10-18 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET |
Q012024281A90 | 2024-10-07 | 2024-10-28 | REPAIR WATER - SEWER | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
B022024281B08 | 2024-10-07 | 2024-11-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B022024281B07 | 2024-10-07 | 2024-11-05 | TEMPORARY PEDESTRIAN WALK | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B012024281C26 | 2024-10-07 | 2024-11-05 | REPAIR SEWER | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
Q022024278A79 | 2024-10-04 | 2024-11-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
Q022024278A77 | 2024-10-04 | 2024-11-04 | TEMPORARY PEDESTRIAN WALK | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
Q012024278B58 | 2024-10-04 | 2024-10-27 | REPAIR WATER - SEWER - PROTECTED | 25 DRIVE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012024278B54 | 2024-10-04 | 2024-11-06 | REPAIR SEWER | BEACH 73 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
Q012024278B44 | 2024-10-04 | 2024-11-08 | REPAIR WATER - SEWER | 83 PLACE, QUEENS, FROM STREET 58 AVENUE TO STREET 60 AVENUE |
Q012024278B42 | 2024-10-04 | 2024-11-08 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
Q012024278B32 | 2024-10-04 | 2024-11-05 | REPAIR WATER - SEWER | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
X022024278D37 | 2024-10-04 | 2024-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X022024278D36 | 2024-10-04 | 2024-10-28 | TEMPORARY PEDESTRIAN WALK | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X012024278A89 | 2024-10-04 | 2024-11-05 | REPAIR WATER - SEWER | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X012024278A87 | 2024-10-04 | 2024-10-28 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
Q022024278A78 | 2024-10-04 | 2024-11-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 81 AVENUE, QUEENS, FROM STREET AUSTIN STREET TO STREET KEW GARDENS ROAD |
X022024278D41 | 2024-10-04 | 2024-11-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X022024278D40 | 2024-10-04 | 2024-11-05 | OCCUPANCY OF ROADWAY AS STIPULATED | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X022024278D39 | 2024-10-04 | 2024-11-05 | TEMPORARY PEDESTRIAN WALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X022024278D38 | 2024-10-04 | 2024-10-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
B012024277B54 | 2024-10-03 | 2024-11-05 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022024277B57 | 2024-10-03 | 2024-11-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022024277B56 | 2024-10-03 | 2024-11-05 | OCCUPANCY OF ROADWAY AS STIPULATED | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022024277B55 | 2024-10-03 | 2024-11-05 | TEMPORARY PEDESTRIAN WALK | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
S012024276A24 | 2024-10-02 | 2024-10-30 | REPAIR WATER | BAY STREET, STATEN ISLAND, FROM STREET BOROUGH PLACE TO STREET BEND |
B012024274B40 | 2024-09-30 | 2024-11-03 | REPAIR SEWER | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024274C03 | 2024-09-30 | 2024-10-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024274C02 | 2024-09-30 | 2024-10-20 | OCCUPANCY OF ROADWAY AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024274C01 | 2024-09-30 | 2024-10-20 | TEMPORARY PEDESTRIAN WALK | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024274C00 | 2024-09-30 | 2024-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024274B99 | 2024-09-30 | 2024-10-26 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024274B98 | 2024-09-30 | 2024-10-26 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024274B97 | 2024-09-30 | 2024-11-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
S012024274A21 | 2024-09-30 | 2024-10-26 | REPAIR WATER - SEWER | FOREST AVENUE, STATEN ISLAND, FROM STREET GRANDVIEW AVENUE TO STREET SAMUEL PLACE |
Q022024274A82 | 2024-09-30 | 2024-10-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q022024274A81 | 2024-09-30 | 2024-10-24 | TEMPORARY PEDESTRIAN WALK | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q012024274C33 | 2024-09-30 | 2024-10-24 | REPAIR WATER - SEWER | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q012024274C29 | 2024-09-30 | 2024-10-26 | REPAIR WATER - SEWER - PROTECTED | THORNHILL AVENUE, QUEENS, FROM STREET 252 STREET TO STREET BROWVALE LANE |
Q012024274C25 | 2024-09-30 | 2024-10-26 | REPAIR WATER - SEWER - PROTECTED | 191 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET STATION ROAD |
Q012024274C05 | 2024-09-30 | 2024-10-22 | REPAIR WATER | JAMAICA AVENUE, QUEENS, FROM STREET GRACE CEMETERY BOUNDARY TO STREET GRACE CEMETERY BOUNDARY |
Q012024274C04 | 2024-09-30 | 2024-10-26 | REPAIR WATER | 215 STREET, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
M022024274G45 | 2024-09-30 | 2024-11-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024274G44 | 2024-09-30 | 2024-11-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024274G43 | 2024-09-30 | 2024-11-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024274G42 | 2024-09-30 | 2024-11-02 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024274G41 | 2024-09-30 | 2024-11-02 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012024274B22 | 2024-09-30 | 2024-11-02 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012024274B43 | 2024-09-30 | 2024-10-20 | REPAIR WATER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012024274B42 | 2024-09-30 | 2024-10-31 | REPAIR WATER - SEWER | BALTIC STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012024274B41 | 2024-09-30 | 2024-10-26 | REPAIR WATER - SEWER - PROTECTED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024274B96 | 2024-09-30 | 2024-11-03 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024274B95 | 2024-09-30 | 2024-11-03 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
M012024269B20 | 2024-09-25 | 2024-10-24 | REPAIR WATER - SEWER - PROTECTED | WEST 171 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
Q012024269F18 | 2024-09-25 | 2024-10-19 | REPAIR WATER - SEWER - PROTECTED | 45 AVENUE, QUEENS, FROM STREET 72 STREET TO STREET AMTRAK RAILROAD |
Q012024268B31 | 2024-09-24 | 2024-10-22 | REPAIR WATER - SEWER | 171 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET CROCHERON AVENUE |
B022024267C10 | 2024-09-23 | 2024-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024267C18 | 2024-09-23 | 2024-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B022024267C17 | 2024-09-23 | 2024-10-19 | OCCUPANCY OF ROADWAY AS STIPULATED | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B022024267C16 | 2024-09-23 | 2024-10-19 | TEMPORARY PEDESTRIAN WALK | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B022024267C09 | 2024-09-23 | 2024-10-19 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024267C08 | 2024-09-23 | 2024-10-19 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B022024267C06 | 2024-09-23 | 2024-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024267C05 | 2024-09-23 | 2024-10-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024267C04 | 2024-09-23 | 2024-10-30 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022024267C03 | 2024-09-23 | 2024-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024267C02 | 2024-09-23 | 2024-10-30 | TEMPORARY PEDESTRIAN WALK | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B012024267B36 | 2024-09-23 | 2024-10-19 | REPAIR WATER - SEWER | KOSCIUSKO STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT |
B012024267B34 | 2024-09-23 | 2024-10-19 | REPAIR WATER - SEWER | DE KALB AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET |
B012024267B32 | 2024-09-23 | 2024-10-30 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024267B31 | 2024-09-23 | 2024-10-30 | REPAIR WATER | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B012024264D11 | 2024-09-20 | 2024-10-19 | REPAIR WATER - SEWER | 22 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024264B35 | 2024-09-20 | 2024-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 66 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B022024264B34 | 2024-09-20 | 2024-10-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 66 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B022024264B33 | 2024-09-20 | 2024-10-30 | TEMPORARY PEDESTRIAN WALK | 66 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B022024264D96 | 2024-09-20 | 2024-10-18 | TEMPORARY PEDESTRIAN WALK | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024264D86 | 2024-09-20 | 2024-10-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024264D85 | 2024-09-20 | 2024-10-21 | OCCUPANCY OF ROADWAY AS STIPULATED | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024264D84 | 2024-09-20 | 2024-10-21 | TEMPORARY PEDESTRIAN WALK | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
M012024264C12 | 2024-09-20 | 2024-10-22 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET |
B012024264D14 | 2024-09-20 | 2024-10-21 | REPAIR SEWER - PROTECTED | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012024264D15 | 2024-09-20 | 2024-10-18 | REPAIR SEWER | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B012024264B94 | 2024-09-20 | 2024-10-22 | REPAIR SEWER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024264D81 | 2024-09-20 | 2024-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 22 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q022024264B67 | 2024-09-20 | 2024-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024264B66 | 2024-09-20 | 2024-10-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024264B65 | 2024-09-20 | 2024-10-19 | TEMPORARY PEDESTRIAN WALK | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
B012024264B95 | 2024-09-20 | 2024-10-30 | REPAIR WATER - SEWER | 66 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
Q012024264D08 | 2024-09-20 | 2024-10-19 | REPAIR WATER - SEWER | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q012024264C93 | 2024-09-20 | 2024-10-19 | REPAIR WATER - SEWER - PROTECTED | 45 AVENUE, QUEENS, FROM STREET 72 STREET TO STREET AMTRAK RAILROAD |
B022024264D79 | 2024-09-20 | 2024-10-30 | TEMPORARY PEDESTRIAN WALK | 22 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024264D80 | 2024-09-20 | 2024-10-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 22 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024264D98 | 2024-09-20 | 2024-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024264D97 | 2024-09-20 | 2024-10-18 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET |
B022024263A35 | 2024-09-19 | 2024-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B022024263A34 | 2024-09-19 | 2024-10-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B022024263A33 | 2024-09-19 | 2024-10-30 | TEMPORARY PEDESTRIAN WALK | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B012024263A88 | 2024-09-19 | 2024-10-30 | REPAIR WATER - SEWER | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B012024261E29 | 2024-09-17 | 2024-10-20 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CHURCH AVENUE |
X012024260B06 | 2024-09-16 | 2024-10-15 | C.A.R. RESTORATION - PROTECTED | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
X022024260A29 | 2024-09-16 | 2024-10-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024260A28 | 2024-09-16 | 2024-10-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024260A27 | 2024-09-16 | 2024-10-15 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024260A26 | 2024-09-16 | 2024-10-15 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024260A25 | 2024-09-16 | 2024-10-15 | PLACE MATERIAL ON STREET | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X012024260B09 | 2024-09-16 | 2024-10-15 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
Q012024260B55 | 2024-09-16 | 2024-10-15 | REPAIR SEWER | BEACH 74 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
M022024260D67 | 2024-09-16 | 2024-10-18 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022024260D66 | 2024-09-16 | 2024-10-18 | TEMPORARY PEDESTRIAN WALK | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022024260D68 | 2024-09-16 | 2024-10-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024260C24 | 2024-09-16 | 2024-10-17 | REPAIR WATER | BANK STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012024260C12 | 2024-09-16 | 2024-10-18 | REPAIR WATER - SEWER - PROTECTED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022024260B70 | 2024-09-16 | 2024-10-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024260B69 | 2024-09-16 | 2024-10-21 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024260B68 | 2024-09-16 | 2024-10-21 | TEMPORARY PEDESTRIAN WALK | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024260B67 | 2024-09-16 | 2024-10-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024260B66 | 2024-09-16 | 2024-10-14 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024260B65 | 2024-09-16 | 2024-10-14 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024260B63 | 2024-09-16 | 2024-10-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024260B62 | 2024-09-16 | 2024-10-14 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024260B61 | 2024-09-16 | 2024-10-14 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024260B60 | 2024-09-16 | 2024-10-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B022024260B59 | 2024-09-16 | 2024-10-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B022024260B58 | 2024-09-16 | 2024-10-14 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B012024260C66 | 2024-09-16 | 2024-10-21 | REPAIR WATER - SEWER | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012024260C54 | 2024-09-16 | 2024-10-14 | REPAIR SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012024260C53 | 2024-09-16 | 2024-10-14 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024260C52 | 2024-09-16 | 2024-10-14 | REPAIR SEWER - PROTECTED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B012024257B56 | 2024-09-13 | 2024-09-22 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
M022024255B65 | 2024-09-11 | 2024-10-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012024255A83 | 2024-09-11 | 2024-10-12 | REPAIR WATER - SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012024255A68 | 2024-09-11 | 2024-10-04 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B012024255B00 | 2024-09-11 | 2024-10-10 | REPAIR WATER - SEWER | NORTH HENRY STREET, BROOKLYN, FROM STREET HERBERT STREET TO STREET RICHARDSON STREET |
X022024255A12 | 2024-09-11 | 2024-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X022024255A11 | 2024-09-11 | 2024-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X022024255A10 | 2024-09-11 | 2024-10-12 | TEMPORARY PEDESTRIAN WALK | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X012024255A68 | 2024-09-11 | 2024-10-12 | REPAIR WATER - SEWER | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
Q012024255C24 | 2024-09-11 | 2024-10-08 | REPAIR SEWER | BEACH 73 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
Q012024255C23 | 2024-09-11 | 2024-10-10 | REPAIR WATER - SEWER | 83 PLACE, QUEENS, FROM STREET 58 AVENUE TO STREET 60 AVENUE |
Q012024255C22 | 2024-09-11 | 2024-10-10 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
M022024255B64 | 2024-09-11 | 2024-10-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024255B63 | 2024-09-11 | 2024-10-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024255B61 | 2024-09-11 | 2024-10-04 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024255B62 | 2024-09-11 | 2024-10-04 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
Q022024250A42 | 2024-09-06 | 2024-11-14 | TEMPORARY PEDESTRIAN WALK | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
Q022024250A40 | 2024-09-06 | 2024-09-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q022024250A39 | 2024-09-06 | 2024-09-24 | TEMPORARY PEDESTRIAN WALK | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q022024250A36 | 2024-09-06 | 2024-09-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q022024250A37 | 2024-09-06 | 2024-09-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q012024250B02 | 2024-09-06 | 2024-10-10 | REPAIR WATER - SEWER - PROTECTED | 25 DRIVE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012024250B01 | 2024-09-06 | 2024-10-11 | REPAIR WATER - SEWER | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
Q012024250A95 | 2024-09-06 | 2024-09-24 | REPAIR WATER - SEWER | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q012024250A93 | 2024-09-06 | 2024-09-22 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
B022024250B63 | 2024-09-06 | 2024-10-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024250B62 | 2024-09-06 | 2024-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024250B61 | 2024-09-06 | 2024-10-01 | TEMPORARY PEDESTRIAN WALK | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012024250B70 | 2024-09-06 | 2024-10-01 | REPAIR WATER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012024250B69 | 2024-09-06 | 2024-09-22 | REPAIR SEWER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
X022024250A27 | 2024-09-06 | 2024-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X022024250A26 | 2024-09-06 | 2024-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X022024250A25 | 2024-09-06 | 2024-10-12 | TEMPORARY PEDESTRIAN WALK | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
X012024250A44 | 2024-09-06 | 2024-10-12 | REPAIR WATER - SEWER | EAST 165 STREET, BRONX, FROM STREET BUTTERNUT STREET TO STREET GRAND CONCOURSE |
Q022024250A44 | 2024-09-06 | 2024-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
Q022024250A43 | 2024-09-06 | 2024-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 246 PLACE, QUEENS, FROM STREET 60 AVENUE TO STREET 61 AVENUE |
B012024243A78 | 2024-08-30 | 2024-10-01 | REPAIR WATER - SEWER - PROTECTED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
Q012024243B32 | 2024-08-30 | 2024-09-24 | REPAIR WATER - SEWER | 171 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET CROCHERON AVENUE |
Q012024243B30 | 2024-08-30 | 2024-09-26 | REPAIR WATER - SEWER - PROTECTED | 45 AVENUE, QUEENS, FROM STREET 72 STREET TO STREET AMTRAK RAILROAD |
Q012024243B29 | 2024-08-30 | 2024-09-26 | REPAIR WATER - SEWER - PROTECTED | 45 AVENUE, QUEENS, FROM STREET 72 STREET TO STREET AMTRAK RAILROAD |
Q012024243B26 | 2024-08-30 | 2024-09-24 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B022024243B59 | 2024-08-30 | 2024-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024243B60 | 2024-08-30 | 2024-10-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
M012024243A78 | 2024-08-30 | 2024-09-26 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET |
Q012024243B09 | 2024-08-30 | 2024-09-24 | REPAIR WATER - SEWER | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
B022024243B55 | 2024-08-30 | 2024-10-04 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024243B56 | 2024-08-30 | 2024-10-04 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024243B57 | 2024-08-30 | 2024-10-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024243B58 | 2024-08-30 | 2024-10-01 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
Q012024243B07 | 2024-08-30 | 2024-10-10 | REPAIR WATER | HANFORD STREET, QUEENS, FROM STREET BEND TO STREET RUSHMORE AVENUE |
B012024243A77 | 2024-08-30 | 2024-10-04 | REPAIR SEWER | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B012024243A74 | 2024-08-30 | 2024-10-01 | REPAIR WATER - SEWER - PROTECTED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024243B49 | 2024-08-30 | 2024-10-01 | TEMPORARY PEDESTRIAN WALK | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024243B50 | 2024-08-30 | 2024-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B022024243B51 | 2024-08-30 | 2024-10-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012024243A76 | 2024-08-30 | 2024-09-27 | REPAIR SEWER - PROTECTED | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024243B52 | 2024-08-30 | 2024-09-27 | TEMPORARY PEDESTRIAN WALK | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024243B53 | 2024-08-30 | 2024-09-27 | OCCUPANCY OF ROADWAY AS STIPULATED | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024243A08 | 2024-08-30 | 2024-09-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024243A07 | 2024-08-30 | 2024-09-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
Q022024243A05 | 2024-08-30 | 2024-10-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANFORD STREET, QUEENS, FROM STREET BEND TO STREET RUSHMORE AVENUE |
Q022024243A04 | 2024-08-30 | 2024-10-10 | OCCUPANCY OF ROADWAY AS STIPULATED | HANFORD STREET, QUEENS, FROM STREET BEND TO STREET RUSHMORE AVENUE |
Q022024243A03 | 2024-08-30 | 2024-10-10 | TEMPORARY PEDESTRIAN WALK | HANFORD STREET, QUEENS, FROM STREET BEND TO STREET RUSHMORE AVENUE |
Q022024243A06 | 2024-08-30 | 2024-09-24 | TEMPORARY PEDESTRIAN WALK | 221 STREET, QUEENS, FROM STREET 36 AVENUE TO STREET CORBETT ROAD |
B022024243B54 | 2024-08-30 | 2024-09-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | STOCKHOLM STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q012024239B54 | 2024-08-26 | 2024-09-24 | REPAIR WATER - SEWER | DELAWARE AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
B012024239B16 | 2024-08-26 | 2024-09-21 | REPAIR WATER - SEWER | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024239A96 | 2024-08-26 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024239A98 | 2024-08-26 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022024239A97 | 2024-08-26 | 2024-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012024236B25 | 2024-08-23 | 2024-09-28 | REPAIR WATER - SEWER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024234B33 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024234B17 | 2024-08-21 | 2024-09-17 | REPAIR SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
X022024234D30 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST TREMONT AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SOMMER PLACE |
X022024234D29 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST TREMONT AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SOMMER PLACE |
X022024234D28 | 2024-08-21 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | EAST TREMONT AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SOMMER PLACE |
X012024234B85 | 2024-08-21 | 2024-09-17 | REPAIR WATER - SEWER | EAST TREMONT AVENUE, BRONX, FROM STREET LAFAYETTE AVENUE TO STREET SOMMER PLACE |
M022024234B00 | 2024-08-21 | 2024-09-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022024234A99 | 2024-08-21 | 2024-09-18 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022024234A98 | 2024-08-21 | 2024-09-18 | TEMPORARY PEDESTRIAN WALK | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012024234A98 | 2024-08-21 | 2024-09-12 | REPAIR WATER - SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012024234A97 | 2024-08-21 | 2024-09-18 | REPAIR WATER - SEWER - PROTECTED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022024234B36 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024234B35 | 2024-08-21 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024234B34 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024234B32 | 2024-08-21 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024234B28 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B022024234B27 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B022024234B26 | 2024-08-21 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B022024234B37 | 2024-08-21 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012024234B18 | 2024-08-21 | 2024-09-20 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CHURCH AVENUE |
B012024234B15 | 2024-08-21 | 2024-09-17 | REPAIR WATER - SEWER - PROTECTED | HERBERT STREET, BROOKLYN, FROM STREET KINGSLAND AVENUE TO STREET MONITOR STREET |
B012024234B16 | 2024-08-21 | 2024-09-17 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024234A85 | 2024-08-21 | 2024-09-17 | REPAIR SEWER - PROTECTED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B012024233A97 | 2024-08-20 | 2024-09-17 | REPAIR SEWER - PROTECTED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B022024233A97 | 2024-08-20 | 2024-09-17 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B022024233A98 | 2024-08-20 | 2024-09-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B022024233A99 | 2024-08-20 | 2024-09-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET BUTLER STREET |
B012024232A94 | 2024-08-19 | 2024-09-17 | REPAIR WATER - SEWER | WEST STREET, BROOKLYN, FROM STREET AVENUE U TO STREET WHITNEY PLACE |
B022024232A16 | 2024-08-19 | 2024-09-18 | TEMPORARY PEDESTRIAN WALK | WEST STREET, BROOKLYN, FROM STREET AVENUE U TO STREET WHITNEY PLACE |
B022024232A17 | 2024-08-19 | 2024-09-18 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST STREET, BROOKLYN, FROM STREET AVENUE U TO STREET WHITNEY PLACE |
B022024232A18 | 2024-08-19 | 2024-09-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST STREET, BROOKLYN, FROM STREET AVENUE U TO STREET WHITNEY PLACE |
B022024229A41 | 2024-08-16 | 2024-09-19 | TEMPORARY PEDESTRIAN WALK | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B012024229A81 | 2024-08-16 | 2024-09-03 | REPAIR WATER | CARROLL STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B012024229A79 | 2024-08-16 | 2024-09-19 | REPAIR WATER - SEWER | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
M012024229A26 | 2024-08-16 | 2024-09-17 | REPAIR WATER | BANK STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
Q012024229A93 | 2024-08-16 | 2024-09-19 | REPAIR SEWER | BEACH 74 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
Q022024229D20 | 2024-08-16 | 2024-09-15 | TEMPORARY PEDESTRIAN WALK | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
Q022024229D21 | 2024-08-16 | 2024-09-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
Q022024229D22 | 2024-08-16 | 2024-09-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
Q012024229A94 | 2024-08-16 | 2024-09-15 | REPAIR WATER - SEWER | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
X012024229A27 | 2024-08-16 | 2024-09-18 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024229A28 | 2024-08-16 | 2024-09-18 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024229A29 | 2024-08-16 | 2024-09-18 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024229A30 | 2024-08-16 | 2024-09-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024229A31 | 2024-08-16 | 2024-09-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B022024229A45 | 2024-08-16 | 2024-09-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024229A44 | 2024-08-16 | 2024-09-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024229A43 | 2024-08-16 | 2024-09-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024229A42 | 2024-08-16 | 2024-09-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
M022024226B41 | 2024-08-13 | 2024-09-10 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 91 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M022024226B42 | 2024-08-13 | 2024-09-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 91 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M012024226A24 | 2024-08-13 | 2024-09-10 | REPAIR WATER - SEWER | EAST 91 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M022024226B40 | 2024-08-13 | 2024-09-10 | TEMPORARY PEDESTRIAN WALK | EAST 91 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET YORK AVENUE |
M022024225B11 | 2024-08-12 | 2024-09-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024225B09 | 2024-08-12 | 2024-09-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024225B08 | 2024-08-12 | 2024-09-13 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024225B07 | 2024-08-12 | 2024-09-13 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024225B10 | 2024-08-12 | 2024-09-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012024225A41 | 2024-08-12 | 2024-09-13 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
Q022024222A88 | 2024-08-09 | 2024-08-22 | TEMPORARY PEDESTRIAN WALK | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
Q022024222A89 | 2024-08-09 | 2024-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
Q022024222A90 | 2024-08-09 | 2024-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
B022024222A07 | 2024-08-09 | 2024-09-07 | TEMPORARY PEDESTRIAN WALK | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024222A08 | 2024-08-09 | 2024-09-07 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024222A09 | 2024-08-09 | 2024-09-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024222A44 | 2024-08-09 | 2024-08-31 | REPAIR WATER - SEWER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q012024222A65 | 2024-08-09 | 2024-08-22 | REPAIR WATER - SEWER | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
B022024221B77 | 2024-08-08 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024221B74 | 2024-08-08 | 2024-08-20 | TEMPORARY PEDESTRIAN WALK | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024221B78 | 2024-08-08 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024221B76 | 2024-08-08 | 2024-08-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B012024221B35 | 2024-08-08 | 2024-08-20 | REPAIR WATER - SEWER | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024221B75 | 2024-08-08 | 2024-08-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024220C15 | 2024-08-07 | 2024-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024220C13 | 2024-08-07 | 2024-09-05 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024220C14 | 2024-08-07 | 2024-09-05 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B012024220B19 | 2024-08-07 | 2024-09-04 | REPAIR SEWER | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
Q022024218A42 | 2024-08-05 | 2024-09-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
M012024218B11 | 2024-08-05 | 2024-08-22 | REPAIR WATER - SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012024218B27 | 2024-08-05 | 2024-09-03 | REPAIR WATER - SEWER - PROTECTED | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q012024218A83 | 2024-08-05 | 2024-08-26 | REPAIR WATER - SEWER | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q012024218A72 | 2024-08-05 | 2024-09-03 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q012024218A56 | 2024-08-05 | 2024-09-08 | REPAIR SEWER | BEACH 73 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
B012024218B28 | 2024-08-05 | 2024-09-03 | REPAIR SEWER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024218A51 | 2024-08-05 | 2024-09-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024218A50 | 2024-08-05 | 2024-09-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024218A49 | 2024-08-05 | 2024-09-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024218A48 | 2024-08-05 | 2024-09-07 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024218A47 | 2024-08-05 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024218A46 | 2024-08-05 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024218A45 | 2024-08-05 | 2024-08-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024218A44 | 2024-08-05 | 2024-08-20 | TEMPORARY PEDESTRIAN WALK | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024218A43 | 2024-08-05 | 2024-09-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024218A42 | 2024-08-05 | 2024-09-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024218A41 | 2024-08-05 | 2024-09-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024218A40 | 2024-08-05 | 2024-09-03 | OCCUPANCY OF ROADWAY AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024218A39 | 2024-08-05 | 2024-09-03 | TEMPORARY PEDESTRIAN WALK | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
Q022024218A41 | 2024-08-05 | 2024-09-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
B012024218B30 | 2024-08-05 | 2024-09-07 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012024218B29 | 2024-08-05 | 2024-08-20 | REPAIR WATER | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
Q022024218A18 | 2024-08-05 | 2024-09-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q022024218A19 | 2024-08-05 | 2024-09-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q022024218A22 | 2024-08-05 | 2024-08-26 | TEMPORARY PEDESTRIAN WALK | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024218A23 | 2024-08-05 | 2024-08-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024218A24 | 2024-08-05 | 2024-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024218A25 | 2024-08-05 | 2024-08-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024218A26 | 2024-08-05 | 2024-08-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
X012024218B63 | 2024-08-05 | 2024-08-09 | REPAIR WATER - SEWER - PROTECTED | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
Q022024213B27 | 2024-07-31 | 2024-09-07 | TEMPORARY PEDESTRIAN WALK | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q042024213A68 | 2024-07-31 | 2024-08-27 | REPAIR SIDEWALK | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B022024213B93 | 2024-07-31 | 2024-09-08 | TEMPORARY PEDESTRIAN WALK | COLUMBIA STREET, BROOKLYN, FROM STREET SACKETT STREET TO STREET UNION STREET |
B022024213B94 | 2024-07-31 | 2024-09-08 | OCCUPANCY OF ROADWAY AS STIPULATED | COLUMBIA STREET, BROOKLYN, FROM STREET SACKETT STREET TO STREET UNION STREET |
B022024213B95 | 2024-07-31 | 2024-09-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLUMBIA STREET, BROOKLYN, FROM STREET SACKETT STREET TO STREET UNION STREET |
B012024213B84 | 2024-07-31 | 2024-09-07 | REPAIR WATER - SEWER - PROTECTED | CLASSON AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012024213B83 | 2024-07-31 | 2024-09-08 | REPAIR WATER - PROTECTED | COLUMBIA STREET, BROOKLYN, FROM STREET SACKETT STREET TO STREET UNION STREET |
Q012024213C06 | 2024-07-31 | 2024-09-07 | REPAIR WATER - SEWER | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
Q022024213B28 | 2024-07-31 | 2024-09-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | SMART STREET, QUEENS, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE |
B012024212B59 | 2024-07-30 | 2024-09-07 | REPAIR WATER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
B022024212C09 | 2024-07-30 | 2024-09-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
B022024212C08 | 2024-07-30 | 2024-09-07 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
B022024212C07 | 2024-07-30 | 2024-09-07 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
M012024211B99 | 2024-07-29 | 2024-08-27 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 47 STREET TO STREET WEST 48 STREET |
B022024208C32 | 2024-07-26 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024208C31 | 2024-07-26 | 2024-08-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024208C33 | 2024-07-26 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024208C29 | 2024-07-26 | 2024-08-20 | TEMPORARY PEDESTRIAN WALK | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024208C30 | 2024-07-26 | 2024-08-20 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q022024208A94 | 2024-07-26 | 2024-08-27 | OCCUPANCY OF ROADWAY AS STIPULATED | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
B012024208B73 | 2024-07-26 | 2024-08-20 | REPAIR WATER - SEWER | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q022024208A95 | 2024-07-26 | 2024-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
Q022024208A96 | 2024-07-26 | 2024-08-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
Q022024208A97 | 2024-07-26 | 2024-08-27 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
B012024208B74 | 2024-07-26 | 2024-08-20 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012024208B75 | 2024-07-26 | 2024-09-03 | REPAIR SEWER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024208C37 | 2024-07-26 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024208C36 | 2024-07-26 | 2024-08-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024208C35 | 2024-07-26 | 2024-08-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024208C34 | 2024-07-26 | 2024-08-20 | TEMPORARY PEDESTRIAN WALK | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
Q022024207B30 | 2024-07-25 | 2024-08-22 | TEMPORARY PEDESTRIAN WALK | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
Q022024207B31 | 2024-07-25 | 2024-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
B012024207B93 | 2024-07-25 | 2024-08-21 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET CHURCH AVENUE |
Q022024207B32 | 2024-07-25 | 2024-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
B022024207B27 | 2024-07-25 | 2024-08-22 | TEMPORARY PEDESTRIAN WALK | 6 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M012024207B00 | 2024-07-25 | 2024-08-23 | REPAIR WATER | BANK STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B012024202A01 | 2024-07-25 | 2024-08-18 | REPAIR WATER | VERMONT STREET, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
Q012024207B84 | 2024-07-25 | 2024-08-22 | REPAIR WATER - SEWER | 65 PLACE, QUEENS, FROM STREET LONG ISLAND RAILROAD TO STREET BKLYN QNS EXPRESSWAY ENTRANCE SB |
B022024207B28 | 2024-07-25 | 2024-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 6 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024207B29 | 2024-07-25 | 2024-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 6 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024207B30 | 2024-07-25 | 2024-08-22 | TEMPORARY PEDESTRIAN WALK | 1 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024207B31 | 2024-07-25 | 2024-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 1 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024207B32 | 2024-07-25 | 2024-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 1 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024207C01 | 2024-07-25 | 2024-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024207C02 | 2024-07-25 | 2024-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024207C03 | 2024-07-25 | 2024-08-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024207C04 | 2024-07-25 | 2024-08-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012024207B56 | 2024-07-25 | 2024-08-30 | REPAIR WATER - PROTECTED | 42 STREET, QUEENS, FROM STREET 34 AVENUE TO STREET BROADWAY |
B012024207B11 | 2024-07-25 | 2024-08-22 | REPAIR WATER - PROTECTED | 6 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024207B12 | 2024-07-25 | 2024-08-22 | REPAIR WATER | 1 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024207B63 | 2024-07-25 | 2024-08-08 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
X022024204B30 | 2024-07-22 | 2024-08-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024204B27 | 2024-07-22 | 2024-09-19 | PLACE MATERIAL ON STREET | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
M022024204C81 | 2024-07-22 | 2024-08-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024204C80 | 2024-07-22 | 2024-08-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024204C79 | 2024-07-22 | 2024-08-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024204C78 | 2024-07-22 | 2024-08-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024204C77 | 2024-07-22 | 2024-08-14 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X022024204B28 | 2024-07-22 | 2024-08-19 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X012024204A68 | 2024-07-22 | 2024-08-19 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
M012024204B95 | 2024-07-22 | 2024-08-14 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X022024204B29 | 2024-07-22 | 2024-08-19 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B012024204C91 | 2024-07-22 | 2024-08-21 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X022024204B31 | 2024-07-22 | 2024-08-19 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
Q012024204E17 | 2024-07-22 | 2024-08-20 | REPAIR SEWER | BEACH 74 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
Q012024204E16 | 2024-07-22 | 2024-08-24 | REPAIR SEWER | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
B012024204D21 | 2024-07-22 | 2024-08-04 | REPAIR WATER - SEWER - PROTECTED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
Q012024197D58 | 2024-07-15 | 2024-08-09 | REPAIR SEWER | BEACH 73 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
B022024193C25 | 2024-07-11 | 2024-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024193C24 | 2024-07-11 | 2024-08-07 | TEMPORARY PEDESTRIAN WALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q022024193A36 | 2024-07-11 | 2024-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024193A35 | 2024-07-11 | 2024-08-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024193A34 | 2024-07-11 | 2024-08-12 | TEMPORARY PEDESTRIAN WALK | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q012024193A52 | 2024-07-11 | 2024-08-12 | REPAIR WATER - SEWER | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
M012024193A59 | 2024-07-11 | 2024-08-09 | REPAIR WATER - SEWER | WEST 48 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012024193A25 | 2024-07-11 | 2024-08-07 | REPAIR WATER - SEWER - PROTECTED | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
Q022024193A38 | 2024-07-11 | 2024-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024193A37 | 2024-07-11 | 2024-08-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
B012024193B35 | 2024-07-11 | 2024-08-07 | REPAIR WATER - SEWER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024193C26 | 2024-07-11 | 2024-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024193C27 | 2024-07-11 | 2024-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
X022024192A61 | 2024-07-10 | 2024-08-07 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
Q012024192B79 | 2024-07-10 | 2024-08-10 | REPAIR WATER - SEWER - PROTECTED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q012024192B78 | 2024-07-10 | 2024-08-10 | REPAIR WATER - SEWER | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q012024192B77 | 2024-07-10 | 2024-08-10 | REPAIR WATER - SEWER - PROTECTED | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
B012024192B49 | 2024-07-10 | 2024-08-08 | REPAIR WATER | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B012024192B48 | 2024-07-10 | 2024-08-08 | REPAIR WATER - SEWER - PROTECTED | DEVOE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B012024192B52 | 2024-07-10 | 2024-08-04 | REPAIR WATER - SEWER - PROTECTED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B012024192B53 | 2024-07-10 | 2024-08-07 | REPAIR WATER - SEWER | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024192B31 | 2024-07-10 | 2024-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024192B30 | 2024-07-10 | 2024-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024192B29 | 2024-07-10 | 2024-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024192B28 | 2024-07-10 | 2024-08-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
B022024192B27 | 2024-07-10 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024192B26 | 2024-07-10 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024192B25 | 2024-07-10 | 2024-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
X022024192A64 | 2024-07-10 | 2024-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
M012024192A84 | 2024-07-10 | 2024-08-06 | REPAIR WATER | MAIDEN LANE, MANHATTAN, FROM STREET LIBERTY PLACE TO STREET NASSAU STREET |
B022024192B24 | 2024-07-10 | 2024-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024192B23 | 2024-07-10 | 2024-08-04 | TEMPORARY PEDESTRIAN WALK | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024192B19 | 2024-07-10 | 2024-08-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024192B18 | 2024-07-10 | 2024-08-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024192B17 | 2024-07-10 | 2024-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024192B16 | 2024-07-10 | 2024-08-08 | TEMPORARY PEDESTRIAN WALK | 20 DRIVE, BROOKLYN, FROM STREET 19 LANE TO STREET 20 AVENUE |
B022024192B15 | 2024-07-10 | 2024-08-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DEVOE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024192B14 | 2024-07-10 | 2024-08-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DEVOE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024192B13 | 2024-07-10 | 2024-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | DEVOE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024192B12 | 2024-07-10 | 2024-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | DEVOE STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE |
B022024192B32 | 2024-07-10 | 2024-08-07 | TEMPORARY PEDESTRIAN WALK | 3 STREET, BROOKLYN, FROM STREET BOND STREET TO STREET BODY OF WATER |
X022024192A63 | 2024-07-10 | 2024-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
X022024192A62 | 2024-07-10 | 2024-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
X022024192A60 | 2024-07-10 | 2024-08-07 | TEMPORARY PEDESTRIAN WALK | EAST 225 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE |
M022024192B62 | 2024-07-10 | 2024-08-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MAIDEN LANE, MANHATTAN, FROM STREET LIBERTY PLACE TO STREET NASSAU STREET |
M022024192B60 | 2024-07-10 | 2024-08-06 | OCCUPANCY OF ROADWAY AS STIPULATED | MAIDEN LANE, MANHATTAN, FROM STREET LIBERTY PLACE TO STREET NASSAU STREET |
M022024192B61 | 2024-07-10 | 2024-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAIDEN LANE, MANHATTAN, FROM STREET LIBERTY PLACE TO STREET NASSAU STREET |
M022024192B63 | 2024-07-10 | 2024-08-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MAIDEN LANE, MANHATTAN, FROM STREET LIBERTY PLACE TO STREET NASSAU STREET |
Q022024192A21 | 2024-07-10 | 2024-08-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024192A20 | 2024-07-10 | 2024-08-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024192A19 | 2024-07-10 | 2024-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024192A18 | 2024-07-10 | 2024-08-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024192A17 | 2024-07-10 | 2024-08-10 | TEMPORARY PEDESTRIAN WALK | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024192A16 | 2024-07-10 | 2024-08-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024192A15 | 2024-07-10 | 2024-08-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024192A10 | 2024-07-10 | 2024-08-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q022024192A12 | 2024-07-10 | 2024-08-10 | TEMPORARY PEDESTRIAN WALK | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024192A11 | 2024-07-10 | 2024-08-10 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q022024192A14 | 2024-07-10 | 2024-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024192A13 | 2024-07-10 | 2024-08-10 | OCCUPANCY OF ROADWAY AS STIPULATED | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
B022024191A55 | 2024-07-09 | 2024-08-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024191A54 | 2024-07-09 | 2024-08-06 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024191A53 | 2024-07-09 | 2024-08-06 | PLACE MATERIAL ON STREET | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024191A57 | 2024-07-09 | 2024-08-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B012024191A35 | 2024-07-09 | 2024-08-06 | REPAIR WATER - SEWER | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024191A56 | 2024-07-09 | 2024-08-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FRANKLIN AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
X012024185B63 | 2024-07-03 | 2024-08-01 | C.A.R. RESTORATION | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B012024185B46 | 2024-07-03 | 2024-07-30 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024185C25 | 2024-07-03 | 2024-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024185C24 | 2024-07-03 | 2024-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024185C23 | 2024-07-03 | 2024-07-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024185C22 | 2024-07-03 | 2024-07-30 | TEMPORARY PEDESTRIAN WALK | 44 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024184C85 | 2024-07-02 | 2024-07-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024184C87 | 2024-07-02 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024184C83 | 2024-07-02 | 2024-07-31 | TEMPORARY PEDESTRIAN WALK | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024184C84 | 2024-07-02 | 2024-07-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024184C86 | 2024-07-02 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012024184F39 | 2024-07-02 | 2024-07-31 | REPAIR WATER - SEWER | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022024183A70 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024183A69 | 2024-07-01 | 2024-08-04 | TEMPORARY PEDESTRIAN WALK | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024183A68 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024183A67 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024183A66 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024183A65 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024183A64 | 2024-07-01 | 2024-08-04 | TEMPORARY PEDESTRIAN WALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q022024183B29 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024183B32 | 2024-07-01 | 2024-08-04 | TEMPORARY PEDESTRIAN WALK | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024183D05 | 2024-07-01 | 2024-08-04 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q012024183D06 | 2024-07-01 | 2024-08-04 | REPAIR WATER - SEWER | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q012024183D07 | 2024-07-01 | 2024-08-04 | REPAIR WATER - SEWER | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024183D10 | 2024-07-01 | 2024-08-04 | REPAIR WATER - SEWER - PROTECTED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024183D11 | 2024-07-01 | 2024-07-25 | REPAIR SEWER | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
Q022024183B24 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
B012024183A84 | 2024-07-01 | 2024-08-04 | REPAIR SEWER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012024183A88 | 2024-07-01 | 2024-08-03 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024183B43 | 2024-07-01 | 2024-07-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
Q022024183B41 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024183B40 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024183B39 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024183B38 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024183B37 | 2024-07-01 | 2024-08-04 | TEMPORARY PEDESTRIAN WALK | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024183B28 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024183B27 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024183B26 | 2024-07-01 | 2024-08-04 | TEMPORARY PEDESTRIAN WALK | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024183B25 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
B022024183A83 | 2024-07-01 | 2024-08-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024183A82 | 2024-07-01 | 2024-08-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024183A81 | 2024-07-01 | 2024-08-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024183A80 | 2024-07-01 | 2024-08-03 | OCCUPANCY OF ROADWAY AS STIPULATED | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024183A79 | 2024-07-01 | 2024-08-03 | TEMPORARY PEDESTRIAN WALK | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024183A73 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024183A72 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024183A71 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
Q022024183B42 | 2024-07-01 | 2024-07-31 | OCCUPANCY OF ROADWAY AS STIPULATED | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
Q022024183B45 | 2024-07-01 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
B012024183A82 | 2024-07-01 | 2024-08-04 | REPAIR WATER - SEWER | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q022024183B30 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024183B44 | 2024-07-01 | 2024-07-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HILLYER STREET, QUEENS, FROM STREET 51 AVENUE TO STREET BEND |
Q022024183B34 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024183B33 | 2024-07-01 | 2024-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024183B36 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024183B35 | 2024-07-01 | 2024-08-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
M042024180A18 | 2024-06-28 | 2024-07-25 | REPAIR SIDEWALK | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
Q022024177C21 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
B022024177D27 | 2024-06-25 | 2024-07-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 14 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024177D26 | 2024-06-25 | 2024-07-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 14 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024177C14 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024177A55 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q022024177A53 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024177C16 | 2024-06-25 | 2024-07-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024177C17 | 2024-06-25 | 2024-07-11 | TEMPORARY PEDESTRIAN WALK | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024177C18 | 2024-06-25 | 2024-07-11 | OCCUPANCY OF ROADWAY AS STIPULATED | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024177A52 | 2024-06-25 | 2024-07-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
B012024177C19 | 2024-06-25 | 2024-07-30 | REPAIR WATER - SEWER - PROTECTED | 14 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024177C17 | 2024-06-25 | 2024-07-24 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024177B48 | 2024-06-25 | 2024-07-11 | REPAIR WATER - SEWER | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024177C19 | 2024-06-25 | 2024-07-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
X022024177B19 | 2024-06-25 | 2024-07-30 | TEMPORARY PEDESTRIAN WALK | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
X022024177B20 | 2024-06-25 | 2024-07-30 | OCCUPANCY OF ROADWAY AS STIPULATED | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
X022024177B21 | 2024-06-25 | 2024-07-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
X022024177B22 | 2024-06-25 | 2024-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
X022024177B23 | 2024-06-25 | 2024-07-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
X012024177B66 | 2024-06-25 | 2024-07-30 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
B022024177C10 | 2024-06-25 | 2024-07-11 | TEMPORARY PEDESTRIAN WALK | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024177C11 | 2024-06-25 | 2024-07-11 | OCCUPANCY OF ROADWAY AS STIPULATED | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024177A54 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q012024177A65 | 2024-06-25 | 2024-07-11 | REPAIR WATER - SEWER - PROTECTED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q012024177A66 | 2024-06-25 | 2024-07-11 | REPAIR WATER - SEWER - PROTECTED | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q012024177C07 | 2024-06-25 | 2024-07-13 | REPAIR WATER - SEWER | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q012024177C08 | 2024-06-25 | 2024-07-11 | REPAIR WATER - SEWER | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q012024177C09 | 2024-06-25 | 2024-07-23 | REPAIR SEWER | BEACH 74 STREET, QUEENS, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE |
Q022024177C15 | 2024-06-25 | 2024-07-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024177C14 | 2024-06-25 | 2024-07-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024177C13 | 2024-06-25 | 2024-07-13 | OCCUPANCY OF ROADWAY AS STIPULATED | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024177C12 | 2024-06-25 | 2024-07-13 | TEMPORARY PEDESTRIAN WALK | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
B022024177D28 | 2024-06-25 | 2024-07-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 14 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q022024177C20 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024177A56 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
B022024177C12 | 2024-06-25 | 2024-07-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024177C13 | 2024-06-25 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024177A51 | 2024-06-25 | 2024-07-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024177A50 | 2024-06-25 | 2024-07-11 | TEMPORARY PEDESTRIAN WALK | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
B022024177D29 | 2024-06-25 | 2024-07-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 14 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024176B98 | 2024-06-24 | 2024-07-08 | REPAIR WATER - SEWER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012024176B95 | 2024-06-24 | 2024-07-24 | REPAIR WATER - SEWER - PROTECTED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B012024176B74 | 2024-06-24 | 2024-07-20 | REPAIR WATER - SEWER - PROTECTED | STOCKHOLM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q012024176E63 | 2024-06-24 | 2024-07-11 | REPAIR WATER - SEWER - PROTECTED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
B022024176B00 | 2024-06-24 | 2024-07-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024176A99 | 2024-06-24 | 2024-07-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024176A98 | 2024-06-24 | 2024-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024176A96 | 2024-06-24 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024176A95 | 2024-06-24 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024176A94 | 2024-06-24 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024176A93 | 2024-06-24 | 2024-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024176A92 | 2024-06-24 | 2024-07-24 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024176A79 | 2024-06-24 | 2024-07-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | STOCKHOLM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024176A78 | 2024-06-24 | 2024-07-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | STOCKHOLM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024176A77 | 2024-06-24 | 2024-07-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | STOCKHOLM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024176A76 | 2024-06-24 | 2024-07-20 | OCCUPANCY OF ROADWAY AS STIPULATED | STOCKHOLM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X012024176A39 | 2024-06-24 | 2024-07-20 | REPAIR SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
Q022024176C32 | 2024-06-24 | 2024-07-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
X022024176A49 | 2024-06-24 | 2024-07-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
Q022024176C31 | 2024-06-24 | 2024-07-11 | TEMPORARY PEDESTRIAN WALK | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
B022024176A75 | 2024-06-24 | 2024-07-20 | TEMPORARY PEDESTRIAN WALK | STOCKHOLM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024176A97 | 2024-06-24 | 2024-07-08 | TEMPORARY PEDESTRIAN WALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q022024176C35 | 2024-06-24 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024176C34 | 2024-06-24 | 2024-07-11 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024176C33 | 2024-06-24 | 2024-07-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
X022024176A45 | 2024-06-24 | 2024-07-20 | PLACE MATERIAL ON STREET | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024176A46 | 2024-06-24 | 2024-07-20 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024176A47 | 2024-06-24 | 2024-07-20 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024176A48 | 2024-06-24 | 2024-07-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B022024172D81 | 2024-06-20 | 2024-07-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
M012024172C52 | 2024-06-20 | 2024-07-24 | REPAIR WATER | BANK STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
X022024172A80 | 2024-06-20 | 2024-07-25 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024172A81 | 2024-06-20 | 2024-07-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
B022024172D80 | 2024-06-20 | 2024-07-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024172D82 | 2024-06-20 | 2024-07-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
M022024172E38 | 2024-06-20 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012024172B29 | 2024-06-20 | 2024-07-25 | REPAIR WATER - SEWER | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
M022024172E39 | 2024-06-20 | 2024-07-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B022024172D78 | 2024-06-20 | 2024-07-21 | TEMPORARY PEDESTRIAN WALK | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
M012024172C53 | 2024-06-20 | 2024-07-24 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B022024172D79 | 2024-06-20 | 2024-07-21 | OCCUPANCY OF ROADWAY AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
X022024172A83 | 2024-06-20 | 2024-07-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
B012024172E10 | 2024-06-20 | 2024-07-21 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B012024172E15 | 2024-06-20 | 2024-07-03 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
X022024172A82 | 2024-06-20 | 2024-07-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
M022024172E35 | 2024-06-20 | 2024-07-24 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024172E36 | 2024-06-20 | 2024-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024172E37 | 2024-06-20 | 2024-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
Q012024170B73 | 2024-06-18 | 2024-07-18 | REPAIR WATER - SEWER - PROTECTED | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
Q022024170B38 | 2024-06-18 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
Q022024170B37 | 2024-06-18 | 2024-07-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
B022024169B30 | 2024-06-17 | 2024-07-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024169B29 | 2024-06-17 | 2024-07-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024169B26 | 2024-06-17 | 2024-07-21 | TEMPORARY PEDESTRIAN WALK | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B012024169B76 | 2024-06-17 | 2024-07-21 | REPAIR WATER | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024169B27 | 2024-06-17 | 2024-07-21 | OCCUPANCY OF ROADWAY AS STIPULATED | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024169B28 | 2024-06-17 | 2024-07-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B012024165B52 | 2024-06-13 | 2024-07-05 | REPAIR SEWER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024165B59 | 2024-06-13 | 2024-07-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024165B60 | 2024-06-13 | 2024-07-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024165B61 | 2024-06-13 | 2024-07-05 | TEMPORARY PEDESTRIAN WALK | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024165B62 | 2024-06-13 | 2024-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024165B63 | 2024-06-13 | 2024-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022024165B58 | 2024-06-13 | 2024-07-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024165B57 | 2024-06-13 | 2024-07-06 | OCCUPANCY OF ROADWAY AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024165B56 | 2024-06-13 | 2024-07-06 | TEMPORARY PEDESTRIAN WALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024165B64 | 2024-06-13 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
Q022024165A02 | 2024-06-13 | 2024-07-05 | TEMPORARY PEDESTRIAN WALK | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024165A03 | 2024-06-13 | 2024-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024165A04 | 2024-06-13 | 2024-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024165A05 | 2024-06-13 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024165A06 | 2024-06-13 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024165A07 | 2024-06-13 | 2024-07-05 | TEMPORARY PEDESTRIAN WALK | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024165A08 | 2024-06-13 | 2024-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012024165A90 | 2024-06-13 | 2024-07-05 | REPAIR WATER - SEWER | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024165A09 | 2024-06-13 | 2024-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024165A10 | 2024-06-13 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022024165A11 | 2024-06-13 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 17 ROAD, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
B022024165B65 | 2024-06-13 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
Q012024165A89 | 2024-06-13 | 2024-07-05 | REPAIR WATER - SEWER - PROTECTED | 31 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B012024165B49 | 2024-06-13 | 2024-07-06 | REPAIR SEWER - PROTECTED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012024165B50 | 2024-06-13 | 2024-07-09 | REPAIR WATER - SEWER - PROTECTED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
Q012024164B08 | 2024-06-12 | 2024-07-05 | REPAIR WATER - SEWER | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
B022024164E03 | 2024-06-12 | 2024-07-05 | TEMPORARY PEDESTRIAN WALK | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024164E04 | 2024-06-12 | 2024-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024164E05 | 2024-06-12 | 2024-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024164E06 | 2024-06-12 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
B022024164E07 | 2024-06-12 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
Q022024164A68 | 2024-06-12 | 2024-07-05 | TEMPORARY PEDESTRIAN WALK | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024164A69 | 2024-06-12 | 2024-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024164A70 | 2024-06-12 | 2024-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024164A71 | 2024-06-12 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
Q022024164A72 | 2024-06-12 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 65 AVENUE, QUEENS, FROM STREET 167 STREET TO STREET 168 STREET |
B012024164C24 | 2024-06-12 | 2024-07-05 | REPAIR WATER - SEWER - PROTECTED | FT HAMILTON PARKWAY, BROOKLYN, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE |
Q022024163B45 | 2024-06-11 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024163B44 | 2024-06-11 | 2024-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024163B43 | 2024-06-11 | 2024-07-14 | TEMPORARY PEDESTRIAN WALK | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024163B40 | 2024-06-11 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163B39 | 2024-06-11 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163B38 | 2024-06-11 | 2024-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163B37 | 2024-06-11 | 2024-07-14 | TEMPORARY PEDESTRIAN WALK | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163A50 | 2024-06-11 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q022024163A49 | 2024-06-11 | 2024-07-05 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q022024163A40 | 2024-06-11 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163A39 | 2024-06-11 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163A38 | 2024-06-11 | 2024-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024163A37 | 2024-06-11 | 2024-07-14 | TEMPORARY PEDESTRIAN WALK | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
X012024163A64 | 2024-06-11 | 2024-06-25 | REPAIR WATER - SEWER | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024163A63 | 2024-06-11 | 2024-06-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024163A62 | 2024-06-11 | 2024-06-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024163A61 | 2024-06-11 | 2024-06-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024163A60 | 2024-06-11 | 2024-06-25 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
B022024163A11 | 2024-06-11 | 2024-07-04 | TEMPORARY PEDESTRIAN WALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024163A12 | 2024-06-11 | 2024-07-04 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024163A13 | 2024-06-11 | 2024-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024163A14 | 2024-06-11 | 2024-07-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024163A15 | 2024-06-11 | 2024-07-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022024163D89 | 2024-06-11 | 2024-07-04 | TEMPORARY PEDESTRIAN WALK | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012024163A54 | 2024-06-11 | 2024-07-05 | REPAIR WATER - SEWER | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012024163C05 | 2024-06-11 | 2024-07-04 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q012024163A61 | 2024-06-11 | 2024-07-04 | C.A.R. RESTORATION | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q012024163A60 | 2024-06-11 | 2024-07-05 | C.A.R. RESTORATION | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET HAWTREE STREET |
Q012024163A55 | 2024-06-11 | 2024-07-14 | REPAIR WATER - SEWER | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q012024163A59 | 2024-06-11 | 2024-07-14 | REPAIR WATER - SEWER | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q012024163A23 | 2024-06-11 | 2024-07-05 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 56 STREET TO STREET 57 STREET |
Q012024163A21 | 2024-06-11 | 2024-07-14 | REPAIR WATER - SEWER | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
M012024147A00 | 2024-06-11 | 2024-06-24 | REPAIR WATER | BANK STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B022024163D93 | 2024-06-11 | 2024-07-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024163D92 | 2024-06-11 | 2024-07-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024163D91 | 2024-06-11 | 2024-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024163D90 | 2024-06-11 | 2024-07-04 | OCCUPANCY OF ROADWAY AS STIPULATED | JEFFERSON STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q022024163B46 | 2024-06-11 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
B022024162E82 | 2024-06-10 | 2024-07-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B012024162B88 | 2024-06-10 | 2024-07-09 | REPAIR WATER - SEWER - PROTECTED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024162E79 | 2024-06-10 | 2024-07-09 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024162E80 | 2024-06-10 | 2024-07-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024162E78 | 2024-06-10 | 2024-07-09 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024162E81 | 2024-06-10 | 2024-07-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024158A99 | 2024-06-06 | 2024-06-21 | OCCUPANCY OF ROADWAY AS STIPULATED | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024158B00 | 2024-06-06 | 2024-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
Q012024158C67 | 2024-06-06 | 2024-07-14 | REPAIR WATER - SEWER | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024158D03 | 2024-06-06 | 2024-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024158D02 | 2024-06-06 | 2024-07-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024158D01 | 2024-06-06 | 2024-07-14 | TEMPORARY PEDESTRIAN WALK | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
B152024158A00 | 2024-06-06 | 2024-07-13 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012024158B00 | 2024-06-06 | 2024-06-21 | REPAIR WATER | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B012024158B09 | 2024-06-06 | 2024-06-21 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024158B01 | 2024-06-06 | 2024-06-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024158B02 | 2024-06-06 | 2024-06-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024158B41 | 2024-06-06 | 2024-06-21 | OCCUPANCY OF ROADWAY AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
Q022024158D05 | 2024-06-06 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
B022024158B40 | 2024-06-06 | 2024-06-21 | TEMPORARY PEDESTRIAN WALK | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
Q022024158D04 | 2024-06-06 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
B022024158B44 | 2024-06-06 | 2024-06-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024158B43 | 2024-06-06 | 2024-06-21 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024158B42 | 2024-06-06 | 2024-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024158A98 | 2024-06-06 | 2024-06-21 | TEMPORARY PEDESTRIAN WALK | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
M022024157A97 | 2024-06-05 | 2024-07-14 | TEMPORARY PEDESTRIAN WALK | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B012024157A30 | 2024-06-05 | 2024-07-03 | REPAIR SEWER | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
M012024157A57 | 2024-06-05 | 2024-07-14 | REPAIR SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024157A98 | 2024-06-05 | 2024-07-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024157A99 | 2024-06-05 | 2024-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024157B00 | 2024-06-05 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024157B01 | 2024-06-05 | 2024-07-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B022024157A47 | 2024-06-05 | 2024-07-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024157A46 | 2024-06-05 | 2024-07-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024157A45 | 2024-06-05 | 2024-07-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024157A44 | 2024-06-05 | 2024-07-03 | OCCUPANCY OF ROADWAY AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024157A43 | 2024-06-05 | 2024-07-03 | TEMPORARY PEDESTRIAN WALK | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
M022024152H40 | 2024-05-31 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024152H37 | 2024-05-31 | 2024-06-14 | TEMPORARY PEDESTRIAN WALK | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024152H41 | 2024-05-31 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012024152B67 | 2024-05-31 | 2024-06-14 | REPAIR SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024152H39 | 2024-05-31 | 2024-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024152H38 | 2024-05-31 | 2024-06-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B012024145B91 | 2024-05-24 | 2024-06-15 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024145B25 | 2024-05-24 | 2024-06-15 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024145B26 | 2024-05-24 | 2024-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024145B29 | 2024-05-24 | 2024-06-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024145B33 | 2024-05-24 | 2024-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024145B34 | 2024-05-24 | 2024-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024145B35 | 2024-05-24 | 2024-06-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024145B28 | 2024-05-24 | 2024-06-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024145B36 | 2024-05-24 | 2024-06-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024145B88 | 2024-05-24 | 2024-06-15 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024145B27 | 2024-05-24 | 2024-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012024141A44 | 2024-05-22 | 2024-05-22 | REPAIR WATER - PROTECTED | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
S012024142B39 | 2024-05-21 | 2024-06-18 | REPAIR WATER - SEWER | EDGEGROVE AVENUE, STATEN ISLAND, FROM STREET ALBEE AVENUE TO STREET BEND |
B022024137A11 | 2024-05-16 | 2024-06-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024137A09 | 2024-05-16 | 2024-06-06 | TEMPORARY PEDESTRIAN WALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024137A12 | 2024-05-16 | 2024-06-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024137A10 | 2024-05-16 | 2024-06-06 | OCCUPANCY OF ROADWAY AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024137A13 | 2024-05-16 | 2024-06-06 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012024137A37 | 2024-05-16 | 2024-06-06 | REPAIR SEWER - PROTECTED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024136B83 | 2024-05-15 | 2024-06-16 | TEMPORARY PEDESTRIAN WALK | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022024136B84 | 2024-05-15 | 2024-06-16 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012024136D35 | 2024-05-15 | 2024-06-24 | REPAIR SEWER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024136D31 | 2024-05-15 | 2024-06-16 | REPAIR WATER - SEWER | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012024136D28 | 2024-05-15 | 2024-06-24 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024136D24 | 2024-05-15 | 2024-06-24 | REPAIR WATER - SEWER - PROTECTED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B012024136D22 | 2024-05-15 | 2024-06-09 | REPAIR WATER - SEWER - PROTECTED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
Q022024136B25 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024136B24 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024136B23 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024136B22 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q022024136B21 | 2024-05-15 | 2024-06-24 | TEMPORARY PEDESTRIAN WALK | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
M022024136B78 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024136B77 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B022024136B85 | 2024-05-15 | 2024-06-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
X022024136A07 | 2024-05-15 | 2024-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024136A08 | 2024-05-15 | 2024-06-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024136B86 | 2024-05-15 | 2024-06-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
X022024136A09 | 2024-05-15 | 2024-06-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024136B87 | 2024-05-15 | 2024-06-16 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022024136B88 | 2024-05-15 | 2024-06-24 | TEMPORARY PEDESTRIAN WALK | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024136B89 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024136B90 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024136B91 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024136B92 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M022024136B76 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B022024136B74 | 2024-05-15 | 2024-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024136B72 | 2024-05-15 | 2024-06-09 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024136B73 | 2024-05-15 | 2024-06-09 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024136B75 | 2024-05-15 | 2024-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024136B76 | 2024-05-15 | 2024-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
M022024136B75 | 2024-05-15 | 2024-06-24 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B022024136B77 | 2024-05-15 | 2024-06-24 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
X022024136A06 | 2024-05-15 | 2024-06-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024136A05 | 2024-05-15 | 2024-06-12 | TEMPORARY PEDESTRIAN WALK | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024136B78 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024136B79 | 2024-05-15 | 2024-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024136B80 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
M022024136B79 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
X012024136A66 | 2024-05-15 | 2024-06-12 | REPAIR WATER - SEWER | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024136B81 | 2024-05-15 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
M012024136B37 | 2024-05-15 | 2024-06-24 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
Q012024136F04 | 2024-05-15 | 2024-06-25 | REPAIR WATER - SEWER | 19 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD |
Q012024134C07 | 2024-05-13 | 2024-06-24 | REPAIR WATER - SEWER | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q012024134B23 | 2024-05-13 | 2024-06-24 | REPAIR WATER - SEWER - PROTECTED | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q012024134B22 | 2024-05-13 | 2024-06-24 | REPAIR WATER - SEWER - PROTECTED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
B022024134F15 | 2024-05-13 | 2024-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024134F13 | 2024-05-13 | 2024-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024134F12 | 2024-05-13 | 2024-06-09 | OCCUPANCY OF ROADWAY AS STIPULATED | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024134F11 | 2024-05-13 | 2024-06-09 | TEMPORARY PEDESTRIAN WALK | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
M022024134G35 | 2024-05-13 | 2024-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024134G34 | 2024-05-13 | 2024-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024134G33 | 2024-05-13 | 2024-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024134G32 | 2024-05-13 | 2024-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024134G31 | 2024-05-13 | 2024-05-17 | TEMPORARY PEDESTRIAN WALK | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
S012024134A24 | 2024-05-13 | 2024-06-09 | REPAIR WATER - SEWER | LOVELACE AVENUE, STATEN ISLAND, FROM STREET DEAD END TO STREET STROUD AVENUE |
X012024134A74 | 2024-05-13 | 2024-06-07 | REPAIR WATER - SEWER | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X012024134B24 | 2024-05-13 | 2024-06-29 | REPAIR WATER - SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
Q022024134A84 | 2024-05-13 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024134A83 | 2024-05-13 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024134A82 | 2024-05-13 | 2024-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024134A81 | 2024-05-13 | 2024-06-14 | TEMPORARY PEDESTRIAN WALK | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024134A80 | 2024-05-13 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024134A79 | 2024-05-13 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024134A78 | 2024-05-13 | 2024-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024134A77 | 2024-05-13 | 2024-06-14 | TEMPORARY PEDESTRIAN WALK | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024134A76 | 2024-05-13 | 2024-06-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024134A75 | 2024-05-13 | 2024-06-23 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024134A74 | 2024-05-13 | 2024-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024134A73 | 2024-05-13 | 2024-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024134A72 | 2024-05-13 | 2024-06-23 | TEMPORARY PEDESTRIAN WALK | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024134A71 | 2024-05-13 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024134A70 | 2024-05-13 | 2024-06-14 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024134A69 | 2024-05-13 | 2024-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024134A68 | 2024-05-13 | 2024-06-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024134A67 | 2024-05-13 | 2024-06-14 | TEMPORARY PEDESTRIAN WALK | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024134A66 | 2024-05-13 | 2024-06-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024134A62 | 2024-05-13 | 2024-06-26 | TEMPORARY PEDESTRIAN WALK | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024134A38 | 2024-05-13 | 2024-06-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q022024134A37 | 2024-05-13 | 2024-06-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 44 AVENUE, QUEENS, FROM STREET 69 STREET TO STREET 72 STREET |
Q022024134A36 | 2024-05-13 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024134A35 | 2024-05-13 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024134A34 | 2024-05-13 | 2024-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024134A33 | 2024-05-13 | 2024-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024134A32 | 2024-05-13 | 2024-06-24 | TEMPORARY PEDESTRIAN WALK | 134 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q022024134A65 | 2024-05-13 | 2024-06-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024134A64 | 2024-05-13 | 2024-06-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
Q022024134A63 | 2024-05-13 | 2024-06-26 | OCCUPANCY OF ROADWAY AS STIPULATED | ROSE AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET |
B022024134F02 | 2024-05-13 | 2024-06-24 | TEMPORARY PEDESTRIAN WALK | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024134F03 | 2024-05-13 | 2024-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024134F04 | 2024-05-13 | 2024-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024134F05 | 2024-05-13 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024134F06 | 2024-05-13 | 2024-06-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022024134F07 | 2024-05-13 | 2024-06-26 | TEMPORARY PEDESTRIAN WALK | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024134F08 | 2024-05-13 | 2024-06-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024134F09 | 2024-05-13 | 2024-06-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022024134F10 | 2024-05-13 | 2024-06-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
X022024134A87 | 2024-05-13 | 2024-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024134A86 | 2024-05-13 | 2024-06-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024134A85 | 2024-05-13 | 2024-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024134A84 | 2024-05-13 | 2024-06-29 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024134A83 | 2024-05-13 | 2024-06-29 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024134A33 | 2024-05-13 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024134A32 | 2024-05-13 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024134A31 | 2024-05-13 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
X022024134A30 | 2024-05-13 | 2024-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 194 STREET, BRONX, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE |
M012024134C94 | 2024-05-13 | 2024-05-17 | REPAIR SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
Q012024134C13 | 2024-05-13 | 2024-06-14 | REPAIR WATER - SEWER | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q012024134C11 | 2024-05-13 | 2024-06-14 | REPAIR WATER - SEWER | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
B012024134D76 | 2024-05-13 | 2024-06-09 | REPAIR WATER - PROTECTED | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012024134D75 | 2024-05-13 | 2024-06-24 | REPAIR WATER - SEWER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012024134D73 | 2024-05-13 | 2024-06-24 | REPAIR WATER - SEWER | ELDERT STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q012024134C10 | 2024-05-13 | 2024-06-21 | REPAIR WATER | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q012024134C09 | 2024-05-13 | 2024-06-14 | REPAIR WATER - SEWER | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
B022024134F14 | 2024-05-13 | 2024-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
M022024130B68 | 2024-05-09 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024130B67 | 2024-05-09 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024130B66 | 2024-05-09 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M012024130B60 | 2024-05-09 | 2024-06-07 | REPAIR WATER - SEWER | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
Q012024130B27 | 2024-05-09 | 2024-06-07 | C.A.R. RESTORATION | VERNON BOULEVARD, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
M022024130B64 | 2024-05-09 | 2024-06-07 | TEMPORARY PEDESTRIAN WALK | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
M022024130B65 | 2024-05-09 | 2024-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 84 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY |
B022024129C22 | 2024-05-08 | 2024-06-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024129C20 | 2024-05-08 | 2024-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024129C21 | 2024-05-08 | 2024-06-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022024129C19 | 2024-05-08 | 2024-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
Q022024129A49 | 2024-05-08 | 2024-06-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
Q022024129A50 | 2024-05-08 | 2024-06-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
B022024129C18 | 2024-05-08 | 2024-06-15 | TEMPORARY PEDESTRIAN WALK | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012024129B09 | 2024-05-08 | 2024-06-15 | REPAIR WATER - SEWER | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
Q012024129A99 | 2024-05-08 | 2024-06-18 | REPAIR WATER - SEWER - PROTECTED | 31 DRIVE, QUEENS, FROM STREET 12 STREET TO STREET VERNON BOULEVARD |
B022024128A83 | 2024-05-07 | 2024-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012024128B27 | 2024-05-07 | 2024-06-09 | REPAIR WATER - SEWER - PROTECTED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B012024128B32 | 2024-05-07 | 2024-06-17 | REPAIR WATER - SEWER | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024128A96 | 2024-05-07 | 2024-06-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024128A95 | 2024-05-07 | 2024-06-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024128A94 | 2024-05-07 | 2024-06-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024128A93 | 2024-05-07 | 2024-06-17 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024128A92 | 2024-05-07 | 2024-06-17 | TEMPORARY PEDESTRIAN WALK | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024128A85 | 2024-05-07 | 2024-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024128A84 | 2024-05-07 | 2024-06-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024128A82 | 2024-05-07 | 2024-06-09 | OCCUPANCY OF ROADWAY AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024128A81 | 2024-05-07 | 2024-06-09 | TEMPORARY PEDESTRIAN WALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B002024128A00 | 2024-05-07 | No data | MISCELLANEOUS - MINOR SALES | No data |
B022024127A79 | 2024-05-06 | 2024-06-01 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022024127A80 | 2024-05-06 | 2024-06-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022024127A81 | 2024-05-06 | 2024-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022024127A82 | 2024-05-06 | 2024-06-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022024127A83 | 2024-05-06 | 2024-06-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012024127A66 | 2024-05-06 | 2024-06-01 | REPAIR SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B152024124A00 | 2024-05-03 | 2024-06-09 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024123B98 | 2024-05-02 | 2024-05-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
X012024123C21 | 2024-05-02 | 2024-06-01 | REPAIR WATER - SEWER | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B012024123B23 | 2024-05-02 | 2024-05-26 | REPAIR WATER - SEWER | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B012024118A02 | 2024-05-02 | 2024-05-26 | REPAIR WATER | ST MARKS AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
Q012024123B28 | 2024-05-02 | 2024-05-29 | C.A.R. RESTORATION - PROTECTED | 66 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD |
Q012024123B58 | 2024-05-02 | 2024-05-29 | REPAIR WATER - PROTECTED | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET |
X022024123B08 | 2024-05-02 | 2024-06-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024123B07 | 2024-05-02 | 2024-06-01 | TEMPORARY PEDESTRIAN WALK | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024123B09 | 2024-05-02 | 2024-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024123B10 | 2024-05-02 | 2024-06-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
X022024123B11 | 2024-05-02 | 2024-06-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 144 STREET, BRONX, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE |
B022024123C00 | 2024-05-02 | 2024-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022024123B99 | 2024-05-02 | 2024-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022024123B97 | 2024-05-02 | 2024-05-26 | OCCUPANCY OF ROADWAY AS STIPULATED | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022024123B96 | 2024-05-02 | 2024-05-26 | TEMPORARY PEDESTRIAN WALK | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
Q012024121B28 | 2024-04-30 | 2024-05-30 | REPAIR WATER - SEWER | 56 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET DEAD END |
B022024120B18 | 2024-04-29 | 2024-06-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022024120B19 | 2024-04-29 | 2024-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022024120B20 | 2024-04-29 | 2024-06-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022024120B21 | 2024-04-29 | 2024-05-28 | TEMPORARY PEDESTRIAN WALK | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024120B22 | 2024-04-29 | 2024-05-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024120B23 | 2024-04-29 | 2024-05-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024120B24 | 2024-04-29 | 2024-05-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022024120B25 | 2024-04-29 | 2024-05-28 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012024120B07 | 2024-04-29 | 2024-06-04 | REPAIR WATER - SEWER | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012024120B03 | 2024-04-29 | 2024-06-07 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
Q022024120B01 | 2024-04-29 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024120B00 | 2024-04-29 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024120A98 | 2024-04-29 | 2024-05-30 | TEMPORARY PEDESTRIAN WALK | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q022024120A97 | 2024-04-29 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024120A96 | 2024-04-29 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024120A95 | 2024-04-29 | 2024-05-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
Q022024120A94 | 2024-04-29 | 2024-05-30 | TEMPORARY PEDESTRIAN WALK | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
B022024120A99 | 2024-04-29 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024120B11 | 2024-04-29 | 2024-06-08 | TEMPORARY PEDESTRIAN WALK | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024120A95 | 2024-04-29 | 2024-06-07 | TEMPORARY PEDESTRIAN WALK | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024120A96 | 2024-04-29 | 2024-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024120A97 | 2024-04-29 | 2024-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
Q022024120A99 | 2024-04-29 | 2024-05-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
B022024120A98 | 2024-04-29 | 2024-06-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024120B12 | 2024-04-29 | 2024-06-08 | OCCUPANCY OF ROADWAY AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B012024120B08 | 2024-04-29 | 2024-05-28 | REPAIR WATER - PROTECTED | 79 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012024120A84 | 2024-04-29 | 2024-06-07 | REPAIR WATER | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B022024120B13 | 2024-04-29 | 2024-06-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024120B14 | 2024-04-29 | 2024-06-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024120B15 | 2024-04-29 | 2024-06-08 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SNYDER AVENUE, BROOKLYN, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE |
B022024120B16 | 2024-04-29 | 2024-06-04 | TEMPORARY PEDESTRIAN WALK | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B022024120B17 | 2024-04-29 | 2024-06-04 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
Q012024120B06 | 2024-04-29 | 2024-05-30 | REPAIR WATER - SEWER | 39 AVENUE, QUEENS, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET |
Q012024120B05 | 2024-04-29 | 2024-05-30 | REPAIR WATER - SEWER | CORPORAL STONE STREET, QUEENS, FROM STREET 39 AVENUE TO STREET 40 AVENUE |
B022024117A17 | 2024-04-26 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
Q012024117A72 | 2024-04-26 | 2024-05-22 | REPAIR WATER | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
B022024117A20 | 2024-04-26 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024117A19 | 2024-04-26 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B012024117B46 | 2024-04-26 | 2024-05-26 | REPAIR WATER - SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024117B45 | 2024-04-26 | 2024-05-30 | REPAIR WATER - SEWER - PROTECTED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B012024117B44 | 2024-04-26 | 2024-05-26 | REPAIR WATER - SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024117B37 | 2024-04-26 | 2024-05-18 | REPAIR WATER - SEWER | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B012024117B36 | 2024-04-26 | 2024-05-26 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012024117B19 | 2024-04-26 | 2024-06-02 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024117B18 | 2024-04-26 | 2024-05-22 | REPAIR WATER - SEWER - PROTECTED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B012024117B56 | 2024-04-26 | 2024-05-22 | REPAIR WATER - SEWER - PROTECTED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
X022024117A19 | 2024-04-26 | 2024-05-13 | TEMPORARY PEDESTRIAN WALK | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024117A20 | 2024-04-26 | 2024-05-13 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024117A21 | 2024-04-26 | 2024-05-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024117A22 | 2024-04-26 | 2024-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024117A23 | 2024-04-26 | 2024-05-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024117A18 | 2024-04-26 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
B022024117A16 | 2024-04-26 | 2024-05-25 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE C TO STREET BEVERLY ROAD |
Q022024117A67 | 2024-04-26 | 2024-05-25 | TEMPORARY PEDESTRIAN WALK | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024117A68 | 2024-04-26 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024117A69 | 2024-04-26 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024117A70 | 2024-04-26 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
Q022024117A71 | 2024-04-26 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 204 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 34 AVENUE |
B022024117A45 | 2024-04-26 | 2024-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024117A44 | 2024-04-26 | 2024-05-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024117A43 | 2024-04-26 | 2024-05-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024117A42 | 2024-04-26 | 2024-05-22 | OCCUPANCY OF ROADWAY AS STIPULATED | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024117A41 | 2024-04-26 | 2024-05-22 | TEMPORARY PEDESTRIAN WALK | FLEET PLACE, BROOKLYN, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET |
B022024117A40 | 2024-04-26 | 2024-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024117A39 | 2024-04-26 | 2024-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024117A38 | 2024-04-26 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024117A37 | 2024-04-26 | 2024-05-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024117A36 | 2024-04-26 | 2024-05-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024117A35 | 2024-04-26 | 2024-05-26 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024117A34 | 2024-04-26 | 2024-05-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024117A33 | 2024-04-26 | 2024-05-26 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024117A32 | 2024-04-26 | 2024-05-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024117A31 | 2024-04-26 | 2024-05-30 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024117A30 | 2024-04-26 | 2024-05-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024117A29 | 2024-04-26 | 2024-05-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024117A28 | 2024-04-26 | 2024-05-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024117A27 | 2024-04-26 | 2024-05-18 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024117A26 | 2024-04-26 | 2024-05-18 | TEMPORARY PEDESTRIAN WALK | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024117A25 | 2024-04-26 | 2024-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024117A24 | 2024-04-26 | 2024-05-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024117A23 | 2024-04-26 | 2024-05-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024117A22 | 2024-04-26 | 2024-05-26 | TEMPORARY PEDESTRIAN WALK | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
X012024114A62 | 2024-04-23 | 2024-05-13 | REPAIR WATER - SEWER | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024114A65 | 2024-04-23 | 2024-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024114A63 | 2024-04-23 | 2024-05-25 | TEMPORARY PEDESTRIAN WALK | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012024114C42 | 2024-04-23 | 2024-05-25 | REPAIR SEWER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M022024114B18 | 2024-04-23 | 2024-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024114B16 | 2024-04-23 | 2024-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024114B17 | 2024-04-23 | 2024-05-17 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024114B15 | 2024-04-23 | 2024-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B022024114A67 | 2024-04-23 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024114A66 | 2024-04-23 | 2024-05-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024114A64 | 2024-04-23 | 2024-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012024114B73 | 2024-04-23 | 2024-05-17 | REPAIR SEWER - PROTECTED | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M022024114B14 | 2024-04-23 | 2024-05-17 | TEMPORARY PEDESTRIAN WALK | WEST 11 STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B022024113A21 | 2024-04-22 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B012024113A18 | 2024-04-22 | 2024-04-30 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A27 | 2024-04-22 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A06 | 2024-04-22 | 2024-05-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024113A05 | 2024-04-22 | 2024-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024113A19 | 2024-04-22 | 2024-04-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A18 | 2024-04-22 | 2024-04-30 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A26 | 2024-04-22 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A25 | 2024-04-22 | 2024-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A24 | 2024-04-22 | 2024-04-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A04 | 2024-04-22 | 2024-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024113A20 | 2024-04-22 | 2024-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A03 | 2024-04-22 | 2024-05-04 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024113A23 | 2024-04-22 | 2024-04-30 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B012024113A16 | 2024-04-22 | 2024-05-04 | REPAIR WATER - SEWER - PROTECTED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024113A17 | 2024-04-22 | 2024-04-30 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A22 | 2024-04-22 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024113A07 | 2024-04-22 | 2024-05-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012024110A91 | 2024-04-19 | 2024-04-30 | REPAIR WATER - SEWER | 56 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET DEAD END |
Q012024109B51 | 2024-04-18 | 2024-05-17 | REPAIR WATER - PROTECTED | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET |
Q012024109B52 | 2024-04-18 | 2024-05-17 | REPAIR WATER - PROTECTED | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET |
Q022024106B39 | 2024-04-15 | 2024-05-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024106B38 | 2024-04-15 | 2024-05-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024106B37 | 2024-04-15 | 2024-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024106B36 | 2024-04-15 | 2024-05-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024106B35 | 2024-04-15 | 2024-05-15 | TEMPORARY PEDESTRIAN WALK | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q022024106B34 | 2024-04-15 | 2024-05-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022024106B33 | 2024-04-15 | 2024-05-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
B012024106A84 | 2024-04-15 | 2024-05-07 | REPAIR WATER - SEWER | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
Q022024106B27 | 2024-04-15 | 2024-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q012024106D10 | 2024-04-15 | 2024-05-15 | REPAIR WATER - SEWER | 45 STREET, QUEENS, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD |
Q012024106D09 | 2024-04-15 | 2024-05-15 | REPAIR WATER - SEWER | 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022024106B26 | 2024-04-15 | 2024-05-15 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q022024106B25 | 2024-04-15 | 2024-05-15 | TEMPORARY PEDESTRIAN WALK | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q012024106D08 | 2024-04-15 | 2024-05-15 | REPAIR WATER - SEWER | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
B022024106A35 | 2024-04-15 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022024106A34 | 2024-04-15 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
Q022024106B32 | 2024-04-15 | 2024-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
B022024106A31 | 2024-04-15 | 2024-05-09 | TEMPORARY PEDESTRIAN WALK | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022024106A32 | 2024-04-15 | 2024-05-09 | OCCUPANCY OF ROADWAY AS STIPULATED | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022024106A33 | 2024-04-15 | 2024-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | CONSELYEA STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
Q022024106B31 | 2024-04-15 | 2024-05-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022024106B30 | 2024-04-15 | 2024-05-15 | TEMPORARY PEDESTRIAN WALK | 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE |
Q022024106B29 | 2024-04-15 | 2024-05-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q022024106B28 | 2024-04-15 | 2024-05-15 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
B022024103B72 | 2024-04-12 | 2024-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | ST MARKS PLACE, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X022024103B44 | 2024-04-12 | 2024-05-13 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024103B45 | 2024-04-12 | 2024-05-13 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024103B46 | 2024-04-12 | 2024-05-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
B022024103B74 | 2024-04-12 | 2024-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ST MARKS PLACE, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012024103A72 | 2024-04-12 | 2024-05-13 | C.A.R. RESTORATION | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X012024103A71 | 2024-04-12 | 2024-05-13 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
B012024103B73 | 2024-04-12 | 2024-05-01 | REPAIR WATER - SEWER - PROTECTED | ST MARKS PLACE, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024103B70 | 2024-04-12 | 2024-05-01 | TEMPORARY PEDESTRIAN WALK | ST MARKS PLACE, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024103B71 | 2024-04-12 | 2024-05-01 | OCCUPANCY OF ROADWAY AS STIPULATED | ST MARKS PLACE, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024103B73 | 2024-04-12 | 2024-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ST MARKS PLACE, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024100A76 | 2024-04-09 | 2024-05-07 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024100A77 | 2024-04-09 | 2024-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024100A76 | 2024-04-09 | 2024-04-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024100A75 | 2024-04-09 | 2024-04-30 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024100A35 | 2024-04-09 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CARROLL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024100A34 | 2024-04-09 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CARROLL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024100A33 | 2024-04-09 | 2024-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | CARROLL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024100A32 | 2024-04-09 | 2024-05-09 | OCCUPANCY OF ROADWAY AS STIPULATED | CARROLL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024100A31 | 2024-04-09 | 2024-05-09 | TEMPORARY PEDESTRIAN WALK | CARROLL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022024100A78 | 2024-04-09 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024100A79 | 2024-04-09 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B012024100B01 | 2024-04-09 | 2024-04-30 | REPAIR WATER - SEWER - PROTECTED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024099B37 | 2024-04-08 | 2024-04-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
Q022024099A47 | 2024-04-08 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024099A46 | 2024-04-08 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B022024099B25 | 2024-04-08 | 2024-05-12 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024099B26 | 2024-04-08 | 2024-05-12 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024099B27 | 2024-04-08 | 2024-05-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024099B28 | 2024-04-08 | 2024-05-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024099B29 | 2024-04-08 | 2024-05-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024099B31 | 2024-04-08 | 2024-04-20 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B32 | 2024-04-08 | 2024-04-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B33 | 2024-04-08 | 2024-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B34 | 2024-04-08 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B35 | 2024-04-08 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B36 | 2024-04-08 | 2024-04-20 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B38 | 2024-04-08 | 2024-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B39 | 2024-04-08 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B40 | 2024-04-08 | 2024-04-20 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B022024099B46 | 2024-04-08 | 2024-05-09 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024099B47 | 2024-04-08 | 2024-05-09 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024099B48 | 2024-04-08 | 2024-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024099B49 | 2024-04-08 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024099B50 | 2024-04-08 | 2024-05-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q012024099B43 | 2024-04-08 | 2024-05-09 | REPAIR WATER - SEWER | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024099B42 | 2024-04-08 | 2024-05-09 | REPAIR WATER - SEWER | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024099B36 | 2024-04-08 | 2024-05-09 | REPAIR WATER - SEWER | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
B012024099B11 | 2024-04-08 | 2024-05-01 | REPAIR WATER - SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024099A71 | 2024-04-08 | 2024-04-20 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B012024099A70 | 2024-04-08 | 2024-04-20 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET ST MARKS PLACE TO STREET WARREN STREET |
B012024099A68 | 2024-04-08 | 2024-05-12 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012024099A63 | 2024-04-08 | 2024-04-24 | REPAIR WATER - SEWER - PROTECTED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012024096A62 | 2024-04-05 | 2024-05-01 | REPAIR WATER - SEWER | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024096A76 | 2024-04-05 | 2024-04-30 | TEMPORARY PEDESTRIAN WALK | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024096A78 | 2024-04-05 | 2024-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024096A79 | 2024-04-05 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024096A80 | 2024-04-05 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
B022024096A77 | 2024-04-05 | 2024-04-30 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 35 STREET, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE |
Q012024096C24 | 2024-04-05 | 2024-04-09 | REPAIR WATER - SEWER | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B022024094C17 | 2024-04-03 | 2024-05-02 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094C19 | 2024-04-03 | 2024-05-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094C18 | 2024-04-03 | 2024-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094C16 | 2024-04-03 | 2024-05-02 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024094B74 | 2024-04-03 | 2024-05-02 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024094C20 | 2024-04-03 | 2024-05-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024093A99 | 2024-04-02 | 2024-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024093A88 | 2024-04-02 | 2024-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024093A97 | 2024-04-02 | 2024-05-01 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024093A98 | 2024-04-02 | 2024-05-01 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024093A89 | 2024-04-02 | 2024-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q022024093A66 | 2024-04-02 | 2024-04-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
B012024093D79 | 2024-04-02 | 2024-05-01 | REPAIR WATER - SEWER - PROTECTED | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024093D63 | 2024-04-02 | 2024-05-03 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012024093D62 | 2024-04-02 | 2024-05-01 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024093B00 | 2024-04-02 | 2024-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q022024093A65 | 2024-04-02 | 2024-04-30 | TEMPORARY PEDESTRIAN WALK | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q012024093C17 | 2024-04-02 | 2024-04-30 | REPAIR WATER - SEWER | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
B022024093B01 | 2024-04-02 | 2024-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DE KALB AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q022024093A67 | 2024-04-02 | 2024-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
B022024093A87 | 2024-04-02 | 2024-05-01 | TEMPORARY PEDESTRIAN WALK | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024093A90 | 2024-04-02 | 2024-05-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024088F75 | 2024-03-28 | 2024-04-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024088F65 | 2024-03-28 | 2024-04-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024088F68 | 2024-03-28 | 2024-04-25 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012024088E01 | 2024-03-28 | 2024-04-25 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012024088E00 | 2024-03-28 | 2024-04-25 | REPAIR SEWER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024088F64 | 2024-03-28 | 2024-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024088F69 | 2024-03-28 | 2024-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022024088F63 | 2024-03-28 | 2024-04-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024088F62 | 2024-03-28 | 2024-04-25 | TEMPORARY PEDESTRIAN WALK | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024088F67 | 2024-03-28 | 2024-04-25 | TEMPORARY PEDESTRIAN WALK | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022024088F66 | 2024-03-28 | 2024-04-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 13 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022024088F70 | 2024-03-28 | 2024-04-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022024088F71 | 2024-03-28 | 2024-04-25 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022024088F72 | 2024-03-28 | 2024-04-24 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024088F73 | 2024-03-28 | 2024-04-24 | OCCUPANCY OF ROADWAY AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024088F74 | 2024-03-28 | 2024-04-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022024088F76 | 2024-03-28 | 2024-04-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012024086B48 | 2024-03-26 | 2024-04-24 | REPAIR WATER - SEWER | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B022024086D15 | 2024-03-26 | 2024-04-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024086D14 | 2024-03-26 | 2024-04-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
X022024086B39 | 2024-03-26 | 2024-04-30 | TEMPORARY PEDESTRIAN WALK | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024086B43 | 2024-03-26 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
B012024086C02 | 2024-03-26 | 2024-04-29 | REPAIR WATER | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024086D13 | 2024-03-26 | 2024-04-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024086D12 | 2024-03-26 | 2024-04-29 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024086D11 | 2024-03-26 | 2024-04-29 | TEMPORARY PEDESTRIAN WALK | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
X022024086B40 | 2024-03-26 | 2024-04-30 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024086B41 | 2024-03-26 | 2024-04-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X022024086B42 | 2024-03-26 | 2024-04-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 163 STREET, BRONX, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE |
X012024086B23 | 2024-03-26 | 2024-04-20 | C.A.R. RESTORATION | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
Q022024082A09 | 2024-03-22 | 2024-04-21 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012024082A66 | 2024-03-22 | 2024-04-21 | REPAIR WATER - SEWER | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024082A10 | 2024-03-22 | 2024-04-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024082A08 | 2024-03-22 | 2024-04-21 | TEMPORARY PEDESTRIAN WALK | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X022024081D14 | 2024-03-21 | 2024-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X012024081B57 | 2024-03-21 | 2024-04-15 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024081D12 | 2024-03-21 | 2024-04-15 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024081D13 | 2024-03-21 | 2024-04-15 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
B022024080D42 | 2024-03-20 | 2024-04-13 | OCCUPANCY OF ROADWAY AS STIPULATED | CARROLL STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS |
B012024080B61 | 2024-03-20 | 2024-04-13 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS |
B022024080D44 | 2024-03-20 | 2024-04-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CARROLL STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS |
B022024080D43 | 2024-03-20 | 2024-04-13 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | CARROLL STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS |
Q042024080A49 | 2024-03-20 | 2024-04-17 | REPAIR SIDEWALK | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024080C80 | 2024-03-20 | 2024-04-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024080C79 | 2024-03-20 | 2024-04-18 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B012024076A00 | 2024-03-20 | 2024-04-14 | REPAIR WATER - PROTECTED | 71 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012024080E87 | 2024-03-20 | 2024-04-18 | REPAIR SEWER | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024078B06 | 2024-03-18 | 2024-04-15 | TEMPORARY PEDESTRIAN WALK | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q012024078E04 | 2024-03-18 | 2024-04-15 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
B022024078D13 | 2024-03-18 | 2024-04-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024078D01 | 2024-03-18 | 2024-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | MEEKER AVENUE, BROOKLYN, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET |
B022024078D02 | 2024-03-18 | 2024-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | MEEKER AVENUE, BROOKLYN, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET |
Q022024078B07 | 2024-03-18 | 2024-04-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
B012024078D01 | 2024-03-18 | 2024-04-12 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012024078D00 | 2024-03-18 | 2024-04-12 | REPAIR SEWER - PROTECTED | MEEKER AVENUE, BROOKLYN, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET |
B012024078D06 | 2024-03-18 | 2024-04-18 | REPAIR WATER | 58 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY |
Q012024078E05 | 2024-03-18 | 2024-04-09 | REPAIR WATER - SEWER - PROTECTED | 160 STREET, QUEENS, FROM STREET 76 ROAD TO STREET 77 AVENUE |
B022024078D00 | 2024-03-18 | 2024-04-12 | TEMPORARY PEDESTRIAN WALK | MEEKER AVENUE, BROOKLYN, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET |
B022024078D03 | 2024-03-18 | 2024-04-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MEEKER AVENUE, BROOKLYN, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET |
Q022024078B08 | 2024-03-18 | 2024-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
B022024078D04 | 2024-03-18 | 2024-04-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MEEKER AVENUE, BROOKLYN, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET |
B022024078D09 | 2024-03-18 | 2024-04-12 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024078D10 | 2024-03-18 | 2024-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024078D11 | 2024-03-18 | 2024-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022024078D12 | 2024-03-18 | 2024-04-12 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
Q012024073A82 | 2024-03-13 | 2024-04-10 | REPAIR WATER - SEWER | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
Q022024073B09 | 2024-03-13 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022024073B08 | 2024-03-13 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012024073A83 | 2024-03-13 | 2024-04-09 | REPAIR WATER - SEWER | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B022024071D54 | 2024-03-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
X022024071D06 | 2024-03-11 | 2024-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024071D07 | 2024-03-11 | 2024-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
B022024071D55 | 2024-03-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
Q012024071B14 | 2024-03-11 | 2024-04-15 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
B012024071C30 | 2024-03-11 | 2024-04-09 | REPAIR WATER - SEWER - PROTECTED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
Q012024071B12 | 2024-03-11 | 2024-04-15 | REPAIR WATER - SEWER | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
X012024071B03 | 2024-03-11 | 2024-03-16 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
Q022024071C40 | 2024-03-11 | 2024-04-09 | TEMPORARY PEDESTRIAN WALK | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q022024071B49 | 2024-03-11 | 2024-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 160 STREET, QUEENS, FROM STREET 76 ROAD TO STREET 77 AVENUE |
Q022024071B48 | 2024-03-11 | 2024-04-09 | OCCUPANCY OF ROADWAY AS STIPULATED | 160 STREET, QUEENS, FROM STREET 76 ROAD TO STREET 77 AVENUE |
Q022024071B47 | 2024-03-11 | 2024-04-09 | TEMPORARY PEDESTRIAN WALK | 160 STREET, QUEENS, FROM STREET 76 ROAD TO STREET 77 AVENUE |
Q022024071B51 | 2024-03-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 160 STREET, QUEENS, FROM STREET 76 ROAD TO STREET 77 AVENUE |
Q022024071B50 | 2024-03-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 160 STREET, QUEENS, FROM STREET 76 ROAD TO STREET 77 AVENUE |
Q012024071B10 | 2024-03-11 | 2024-04-09 | REPAIR SEWER | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
B022024071D51 | 2024-03-11 | 2024-04-09 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024071D52 | 2024-03-11 | 2024-04-09 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
B022024071D53 | 2024-03-11 | 2024-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET CLAY STREET TO STREET DUPONT STREET |
X022024071D05 | 2024-03-11 | 2024-03-16 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
Q022024071C50 | 2024-03-11 | 2024-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024071C49 | 2024-03-11 | 2024-04-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024071C48 | 2024-03-11 | 2024-04-15 | TEMPORARY PEDESTRIAN WALK | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024071C47 | 2024-03-11 | 2024-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024071C46 | 2024-03-11 | 2024-04-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024071C45 | 2024-03-11 | 2024-04-15 | TEMPORARY PEDESTRIAN WALK | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024071C44 | 2024-03-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q022024071C43 | 2024-03-11 | 2024-04-09 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q022024071C42 | 2024-03-11 | 2024-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
Q022024071C41 | 2024-03-11 | 2024-04-09 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD STREET, QUEENS, FROM STREET BEND TO STREET IOWA ROAD |
B012024068B34 | 2024-03-08 | 2024-04-03 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q022024066A66 | 2024-03-06 | 2024-04-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 25 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022024066A67 | 2024-03-06 | 2024-04-02 | TEMPORARY PEDESTRIAN WALK | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q012024066A83 | 2024-03-06 | 2024-04-04 | REPAIR WATER - PROTECTED | 25 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022024066A62 | 2024-03-06 | 2024-04-04 | TEMPORARY PEDESTRIAN WALK | 25 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q012024066A86 | 2024-03-06 | 2024-04-02 | REPAIR WATER - SEWER | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022024066A69 | 2024-03-06 | 2024-04-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022024066A64 | 2024-03-06 | 2024-04-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 25 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022024066A65 | 2024-03-06 | 2024-04-04 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 25 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022024066A63 | 2024-03-06 | 2024-04-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 25 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022024066A68 | 2024-03-06 | 2024-04-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
X022024061A14 | 2024-03-01 | 2024-04-01 | TEMPORARY PEDESTRIAN WALK | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
B022024061A66 | 2024-03-01 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024061A65 | 2024-03-01 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024061A64 | 2024-03-01 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024061A63 | 2024-03-01 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024061A62 | 2024-03-01 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022024061A38 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024061A37 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
X022024061A16 | 2024-03-01 | 2024-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
X022024061A15 | 2024-03-01 | 2024-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
X022024061A17 | 2024-03-01 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
X022024061A18 | 2024-03-01 | 2024-04-01 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
B012024061A33 | 2024-03-01 | 2024-03-19 | REPAIR WATER | 58 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY |
B012024061A35 | 2024-03-01 | 2024-03-22 | REPAIR SEWER | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024061A36 | 2024-03-01 | 2024-03-30 | REPAIR WATER | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012024061A37 | 2024-03-01 | 2024-03-17 | REPAIR WATER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
B012024061A44 | 2024-03-01 | 2024-04-02 | REPAIR WATER - SEWER - PROTECTED | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012024061A45 | 2024-03-01 | 2024-04-02 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024061A81 | 2024-03-01 | 2024-03-03 | REPAIR WATER - SEWER | SOUTH 2 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
X012024061A12 | 2024-03-01 | 2024-04-01 | REPAIR SEWER | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
M012024061A13 | 2024-03-01 | 2024-04-02 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET |
Q012024061A85 | 2024-03-01 | 2024-04-02 | REPAIR WATER - SEWER | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q012024061A84 | 2024-03-01 | 2024-03-16 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q012024061A82 | 2024-03-01 | 2024-04-02 | REPAIR WATER - SEWER | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q012024061A81 | 2024-03-01 | 2024-03-16 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q012024061A75 | 2024-03-01 | 2024-03-16 | REPAIR WATER - SEWER | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012024061A74 | 2024-03-01 | 2024-04-02 | REPAIR WATER | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q012024061A47 | 2024-03-01 | 2024-03-22 | REPAIR WATER | MYRTLE AVENUE, QUEENS, FROM STREET HANCOCK STREET TO STREET WEIRFIELD STREET |
Q012024061A45 | 2024-03-01 | 2024-03-22 | REPAIR WATER - SEWER | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024061A62 | 2024-03-01 | 2024-03-22 | TEMPORARY PEDESTRIAN WALK | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024061A63 | 2024-03-01 | 2024-03-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024061A64 | 2024-03-01 | 2024-03-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024061B15 | 2024-03-01 | 2024-04-02 | TEMPORARY PEDESTRIAN WALK | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024061B16 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024061B17 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024061B18 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024061B19 | 2024-03-01 | 2024-03-16 | TEMPORARY PEDESTRIAN WALK | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024061B20 | 2024-03-01 | 2024-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024061B21 | 2024-03-01 | 2024-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024061B22 | 2024-03-01 | 2024-03-16 | TEMPORARY PEDESTRIAN WALK | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024061B23 | 2024-03-01 | 2024-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024061B24 | 2024-03-01 | 2024-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024061B25 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024061B26 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024061B27 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024061B28 | 2024-03-01 | 2024-03-16 | TEMPORARY PEDESTRIAN WALK | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024061B29 | 2024-03-01 | 2024-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024061B30 | 2024-03-01 | 2024-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024061B31 | 2024-03-01 | 2024-04-02 | TEMPORARY PEDESTRIAN WALK | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024061B32 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024061B33 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
B022024061A36 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024061A35 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024061A34 | 2024-03-01 | 2024-04-02 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024061A33 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024061A32 | 2024-03-01 | 2024-04-02 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024061A31 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024061A30 | 2024-03-01 | 2024-04-02 | OCCUPANCY OF ROADWAY AS STIPULATED | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024061A29 | 2024-03-01 | 2024-04-02 | TEMPORARY PEDESTRIAN WALK | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024061A22 | 2024-03-01 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024061A21 | 2024-03-01 | 2024-03-30 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024061A20 | 2024-03-01 | 2024-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024061A19 | 2024-03-01 | 2024-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024061A18 | 2024-03-01 | 2024-03-30 | TEMPORARY PEDESTRIAN WALK | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024061A17 | 2024-03-01 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024061A16 | 2024-03-01 | 2024-03-22 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024061A15 | 2024-03-01 | 2024-03-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024061A14 | 2024-03-01 | 2024-03-22 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024061A13 | 2024-03-01 | 2024-03-22 | TEMPORARY PEDESTRIAN WALK | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
Q022024059A72 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024059A25 | 2024-02-28 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024059A24 | 2024-02-28 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024059A23 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q022024059A22 | 2024-02-28 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q012024059C47 | 2024-02-28 | 2024-03-03 | REPAIR WATER | MYRTLE AVENUE, QUEENS, FROM STREET HANCOCK STREET TO STREET WEIRFIELD STREET |
Q012024059C48 | 2024-02-28 | 2024-03-03 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
M012024048A00 | 2024-02-28 | 2024-03-03 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET |
X022024059A61 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024059A60 | 2024-02-28 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024059A62 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
B022024059A84 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024059A83 | 2024-02-28 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024059A87 | 2024-02-28 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024059A86 | 2024-02-28 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012024059B39 | 2024-02-28 | 2024-03-03 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B012024059B49 | 2024-02-28 | 2024-03-03 | REPAIR WATER - SEWER | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q022024059A73 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024059A71 | 2024-02-28 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
B022024059A85 | 2024-02-28 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q012024059C34 | 2024-02-28 | 2024-03-03 | REPAIR WATER | 36 AVENUE, QUEENS, FROM STREET 24 STREET TO STREET 25 STREET |
Q012024057B14 | 2024-02-26 | 2024-03-03 | REPAIR WATER - SEWER | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024057A50 | 2024-02-26 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024057A52 | 2024-02-26 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024057A51 | 2024-02-26 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 67 DRIVE, QUEENS, FROM STREET 73 PLACE TO STREET 75 STREET |
Q022024052A26 | 2024-02-21 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024052A25 | 2024-02-21 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024052A22 | 2024-02-21 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012024052A58 | 2024-02-21 | 2024-03-03 | REPAIR WATER | 58 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY |
Q022024052A21 | 2024-02-21 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024052A24 | 2024-02-21 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024052A23 | 2024-02-21 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012024052A61 | 2024-02-21 | 2024-03-03 | REPAIR WATER - SEWER | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012024052A65 | 2024-02-21 | 2024-03-03 | REPAIR WATER - SEWER | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
X012024047A31 | 2024-02-16 | 2024-03-03 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
Q012024043B31 | 2024-02-12 | 2024-03-03 | REPAIR WATER - SEWER | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
B022024043A27 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012024043A65 | 2024-02-12 | 2024-03-03 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
M012024043B03 | 2024-02-12 | 2024-02-25 | REPAIR WATER | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
B022024043A20 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024043A26 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024043A21 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024043A25 | 2024-02-12 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q022024043A43 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022024043A42 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022024043A41 | 2024-02-12 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022024043A40 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022024043A39 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022024043A38 | 2024-02-12 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022024043A46 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B022024043A19 | 2024-02-12 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024043A18 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
B022024043A17 | 2024-02-12 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
Q012024043B36 | 2024-02-12 | 2024-03-03 | REPAIR WATER - SEWER | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012024043A68 | 2024-02-12 | 2024-03-03 | REPAIR WATER - SEWER | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012024043A62 | 2024-02-12 | 2024-03-03 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
B012024043A61 | 2024-02-12 | 2024-03-03 | REPAIR WATER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
Q012024043B32 | 2024-02-12 | 2024-03-03 | REPAIR WATER - SEWER - PROTECTED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022024043A44 | 2024-02-12 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024043A45 | 2024-02-12 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
M022024043A63 | 2024-02-12 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
M022024043A62 | 2024-02-12 | 2024-02-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
M022024043A61 | 2024-02-12 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
B022024040C39 | 2024-02-09 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022024040C40 | 2024-02-09 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022024040C41 | 2024-02-09 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022024040C42 | 2024-02-09 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 53 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022024040C43 | 2024-02-09 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | 53 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022024040C29 | 2024-02-09 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024040C30 | 2024-02-09 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024040C31 | 2024-02-09 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024040C32 | 2024-02-09 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024040C33 | 2024-02-09 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022024040C34 | 2024-02-09 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024040C35 | 2024-02-09 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024040C36 | 2024-02-09 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024040C37 | 2024-02-09 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022024040C38 | 2024-02-09 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012024040D05 | 2024-02-09 | 2024-03-03 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012024040D06 | 2024-02-09 | 2024-03-03 | REPAIR WATER - SEWER - PROTECTED | DECATUR STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B012024040D10 | 2024-02-09 | 2024-03-03 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022024038B61 | 2024-02-07 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024038A75 | 2024-02-07 | 2024-03-03 | REPAIR WATER | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012024038A86 | 2024-02-07 | 2024-03-03 | REPAIR SEWER | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012024038A87 | 2024-02-07 | 2024-03-03 | REPAIR WATER - SEWER | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
B022024038B67 | 2024-02-07 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
B022024038B66 | 2024-02-07 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
B022024038B65 | 2024-02-07 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
B022024038B64 | 2024-02-07 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
B022024038B63 | 2024-02-07 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
B022024038B60 | 2024-02-07 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024038B59 | 2024-02-07 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024038B58 | 2024-02-07 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024038B62 | 2024-02-07 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | HANCOCK STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B022024038B17 | 2024-02-07 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024038B16 | 2024-02-07 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024038B15 | 2024-02-07 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024038B14 | 2024-02-07 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022024038B13 | 2024-02-07 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | EAST 17 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
X022024033A85 | 2024-02-02 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
X012024033A71 | 2024-02-02 | 2024-03-03 | REPAIR SEWER | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
B022024033B61 | 2024-02-02 | 2024-02-25 | OCCUPANCY OF ROADWAY AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024033B62 | 2024-02-02 | 2024-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
X022024033A89 | 2024-02-02 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
X022024033A60 | 2024-02-02 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B022024033B60 | 2024-02-02 | 2024-02-25 | TEMPORARY PEDESTRIAN WALK | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B012024033C13 | 2024-02-02 | 2024-02-25 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X022024033A58 | 2024-02-02 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B012024033C14 | 2024-02-02 | 2024-02-25 | REPAIR WATER | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
X022024033A59 | 2024-02-02 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022024033A88 | 2024-02-02 | 2024-03-03 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
Q022024033A51 | 2024-02-02 | 2024-03-03 | TEMPORARY PEDESTRIAN WALK | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
X022024033A87 | 2024-02-02 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
X012024033A47 | 2024-02-02 | 2024-03-03 | REPAIR WATER | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
Q022024033A52 | 2024-02-02 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q022024033A53 | 2024-02-02 | 2024-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q012024033B73 | 2024-02-02 | 2024-03-02 | REPAIR WATER - SEWER - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
X022024033A86 | 2024-02-02 | 2024-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | GERARD AVENUE, BRONX, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET |
B022024032A08 | 2024-02-01 | 2024-02-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012024032B24 | 2024-02-01 | 2024-02-29 | REPAIR WATER - SEWER | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024032A05 | 2024-02-01 | 2024-02-29 | TEMPORARY PEDESTRIAN WALK | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024032A06 | 2024-02-01 | 2024-02-29 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024032A07 | 2024-02-01 | 2024-02-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024032A09 | 2024-02-01 | 2024-02-29 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012024030A84 | 2024-01-30 | 2024-02-17 | REPAIR WATER - SEWER | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024030A92 | 2024-01-30 | 2024-02-17 | TEMPORARY PEDESTRIAN WALK | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024030A93 | 2024-01-30 | 2024-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022024030A94 | 2024-01-30 | 2024-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q012024029B41 | 2024-01-29 | 2024-02-18 | REPAIR WATER - SEWER | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024029A56 | 2024-01-29 | 2024-02-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024029A57 | 2024-01-29 | 2024-02-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q012024029B72 | 2024-01-29 | 2024-02-27 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024029A55 | 2024-01-29 | 2024-02-27 | TEMPORARY PEDESTRIAN WALK | 102 STREET, QUEENS, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE |
Q022024029A33 | 2024-01-29 | 2024-02-18 | OCCUPANCY OF ROADWAY AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024029A32 | 2024-01-29 | 2024-02-18 | TEMPORARY PEDESTRIAN WALK | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q022024029A34 | 2024-01-29 | 2024-02-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
B012024026C06 | 2024-01-26 | 2024-02-12 | REPAIR SEWER | NEVINS STREET, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B022024025C19 | 2024-01-25 | 2024-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
Q022024025A55 | 2024-01-25 | 2024-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024025A54 | 2024-01-25 | 2024-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024025A53 | 2024-01-25 | 2024-02-17 | TEMPORARY PEDESTRIAN WALK | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024025A52 | 2024-01-25 | 2024-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q022024025A51 | 2024-01-25 | 2024-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
X012024025B03 | 2024-01-25 | 2024-02-16 | REPAIR WATER - SEWER | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
Q022024025A50 | 2024-01-25 | 2024-02-21 | TEMPORARY PEDESTRIAN WALK | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012024018B28 | 2024-01-25 | 2024-02-16 | REPAIR WATER | 58 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY |
B012024025B82 | 2024-01-25 | 2024-02-27 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B012024025B85 | 2024-01-25 | 2024-02-17 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
X022024025A93 | 2024-01-25 | 2024-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024025A92 | 2024-01-25 | 2024-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
X022024025A91 | 2024-01-25 | 2024-02-22 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BRONX, FROM STREET NORTH STREET TO STREET WEST 184 STREET |
B022024025C20 | 2024-01-25 | 2024-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024025C18 | 2024-01-25 | 2024-02-17 | TEMPORARY PEDESTRIAN WALK | MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET |
B022024025C17 | 2024-01-25 | 2024-02-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022024025C16 | 2024-01-25 | 2024-02-29 | OCCUPANCY OF ROADWAY AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022024025C15 | 2024-01-25 | 2024-02-29 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012024025C02 | 2024-01-25 | 2024-02-27 | REPAIR WATER | MYRTLE AVENUE, QUEENS, FROM STREET HANCOCK STREET TO STREET WEIRFIELD STREET |
Q012024025C03 | 2024-01-25 | 2024-02-21 | REPAIR WATER - SEWER | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012024025C04 | 2024-01-25 | 2024-02-17 | REPAIR WATER - SEWER | 220 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022024023A25 | 2024-01-23 | 2024-02-17 | TEMPORARY PEDESTRIAN WALK | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q012024023A67 | 2024-01-23 | 2024-02-17 | REPAIR WATER - SEWER - PROTECTED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022024023A26 | 2024-01-23 | 2024-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022024023A27 | 2024-01-23 | 2024-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
M022024019C10 | 2024-01-19 | 2024-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
M012024019B07 | 2024-01-19 | 2024-02-17 | REPAIR WATER | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
M022024019C08 | 2024-01-19 | 2024-02-17 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
M022024019C09 | 2024-01-19 | 2024-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, MANHATTAN, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET |
B012024013A00 | 2024-01-17 | 2024-02-11 | REPAIR WATER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
B012024011C35 | 2024-01-11 | 2024-02-08 | REPAIR WATER | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B012024011C33 | 2024-01-11 | 2024-02-10 | REPAIR WATER - SEWER - PROTECTED | 24 AVENUE, BROOKLYN, FROM STREET 83 STREET TO STREET 84 STREET |
B012024011C32 | 2024-01-11 | 2024-02-10 | REPAIR WATER - SEWER | 84 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET 24 AVENUE |
B022024011C03 | 2024-01-11 | 2024-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024011C02 | 2024-01-11 | 2024-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024011C01 | 2024-01-11 | 2024-02-08 | TEMPORARY PEDESTRIAN WALK | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022024011C00 | 2024-01-11 | 2024-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 24 AVENUE, BROOKLYN, FROM STREET 83 STREET TO STREET 84 STREET |
B022024011B99 | 2024-01-11 | 2024-02-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 24 AVENUE, BROOKLYN, FROM STREET 83 STREET TO STREET 84 STREET |
B022024011B98 | 2024-01-11 | 2024-02-10 | TEMPORARY PEDESTRIAN WALK | 24 AVENUE, BROOKLYN, FROM STREET 83 STREET TO STREET 84 STREET |
B022024011B97 | 2024-01-11 | 2024-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 84 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET 24 AVENUE |
B022024011B96 | 2024-01-11 | 2024-02-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 84 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET 24 AVENUE |
B022024011B95 | 2024-01-11 | 2024-02-10 | TEMPORARY PEDESTRIAN WALK | 84 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET 24 AVENUE |
B012024011C36 | 2024-01-11 | 2024-02-08 | REPAIR WATER - SEWER | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE |
B012024011C34 | 2024-01-11 | 2024-02-08 | REPAIR WATER - SEWER - PROTECTED | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X022024010A75 | 2024-01-10 | 2024-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B022024010A98 | 2024-01-10 | 2024-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
Q022024010A53 | 2024-01-10 | 2024-02-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q012024010B23 | 2024-01-10 | 2024-02-17 | REPAIR WATER - SEWER | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
B012024010B01 | 2024-01-10 | 2024-02-12 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
Q022024010A54 | 2024-01-10 | 2024-02-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
X012024010B21 | 2024-01-10 | 2024-02-08 | REPAIR WATER | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
Q022024010A52 | 2024-01-10 | 2024-02-17 | TEMPORARY PEDESTRIAN WALK | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
B012024010B03 | 2024-01-10 | 2024-02-08 | REPAIR WATER - SEWER | WASHINGTON AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE |
X022024010A73 | 2024-01-10 | 2024-02-08 | TEMPORARY PEDESTRIAN WALK | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022024010A74 | 2024-01-10 | 2024-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | FINDLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B022024010A94 | 2024-01-10 | 2024-02-12 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
B012024010B04 | 2024-01-10 | 2024-02-08 | REPAIR WATER | MANHATTAN AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022024010A95 | 2024-01-10 | 2024-02-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
B022024010A96 | 2024-01-10 | 2024-02-08 | TEMPORARY PEDESTRIAN WALK | MANHATTAN AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022024010A97 | 2024-01-10 | 2024-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | MANHATTAN AVENUE, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
M022024009B21 | 2024-01-09 | 2024-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022024009B22 | 2024-01-09 | 2024-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022024009B20 | 2024-01-09 | 2024-02-08 | TEMPORARY PEDESTRIAN WALK | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
B022024009A87 | 2024-01-09 | 2024-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022024009A86 | 2024-01-09 | 2024-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022024009A85 | 2024-01-09 | 2024-02-08 | TEMPORARY PEDESTRIAN WALK | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
M012023357A01 | 2024-01-09 | 2024-01-21 | REPAIR WATER - PROTECTED | 3 AVENUE, MANHATTAN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
M012024009A67 | 2024-01-09 | 2024-02-08 | REPAIR SEWER | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
B012024009B13 | 2024-01-09 | 2024-02-08 | REPAIR WATER - SEWER | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022024008B99 | 2024-01-08 | 2024-02-06 | TEMPORARY PEDESTRIAN WALK | ECKFORD STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B022024008C00 | 2024-01-08 | 2024-02-06 | OCCUPANCY OF ROADWAY AS STIPULATED | ECKFORD STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B022024008C01 | 2024-01-08 | 2024-02-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | ECKFORD STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B012024008B78 | 2024-01-08 | 2024-02-06 | REPAIR WATER | ECKFORD STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B022024004C25 | 2024-01-04 | 2024-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024004C47 | 2024-01-04 | 2024-02-02 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024004C48 | 2024-01-04 | 2024-02-02 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024004C49 | 2024-01-04 | 2024-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012024004A66 | 2024-01-04 | 2024-02-01 | REPAIR WATER - SEWER | QUINCY STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B012024004B55 | 2024-01-04 | 2024-01-30 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012024004B75 | 2024-01-04 | 2024-01-30 | REPAIR WATER - SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022024004C26 | 2024-01-04 | 2024-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024004C24 | 2024-01-04 | 2024-02-01 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022024004A36 | 2024-01-04 | 2024-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUINCY STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B022024004A35 | 2024-01-04 | 2024-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | QUINCY STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B022024004A34 | 2024-01-04 | 2024-02-01 | TEMPORARY PEDESTRIAN WALK | QUINCY STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
B022024003D14 | 2024-01-03 | 2024-01-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
B022024003D12 | 2024-01-03 | 2024-01-29 | TEMPORARY PEDESTRIAN WALK | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
B012024003B76 | 2024-01-03 | 2024-01-29 | REPAIR WATER | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
B022024003D13 | 2024-01-03 | 2024-01-29 | OCCUPANCY OF ROADWAY AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
Q022023362D38 | 2023-12-28 | 2024-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q022023362D36 | 2023-12-28 | 2024-01-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q022023362D35 | 2023-12-28 | 2024-01-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q022023362D34 | 2023-12-28 | 2024-01-30 | TEMPORARY PEDESTRIAN WALK | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q022023362D46 | 2023-12-28 | 2024-01-29 | OCCUPANCY OF ROADWAY AS STIPULATED | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
Q022023362D47 | 2023-12-28 | 2024-01-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
B022023362F03 | 2023-12-28 | 2024-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023362F02 | 2023-12-28 | 2024-01-31 | TEMPORARY PEDESTRIAN WALK | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023362F25 | 2023-12-28 | 2024-01-31 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023362F26 | 2023-12-28 | 2024-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023362F04 | 2023-12-28 | 2024-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023362F27 | 2023-12-28 | 2024-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q012023362B98 | 2023-12-28 | 2024-01-30 | REPAIR SEWER | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q012023362C01 | 2023-12-28 | 2024-02-01 | REPAIR WATER - SEWER - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q012023362C05 | 2023-12-28 | 2024-01-29 | REPAIR WATER - SEWER - PROTECTED | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
M002023362A07 | 2023-12-28 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012023362B04 | 2023-12-28 | 2024-01-27 | REPAIR WATER | COMMERCIAL STREET, BROOKLYN, FROM STREET ASH STREET TO STREET BOX STREET |
B012023362B03 | 2023-12-28 | 2024-01-30 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012023362B01 | 2023-12-28 | 2024-01-30 | REPAIR WATER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
Q022023362D45 | 2023-12-28 | 2024-01-29 | TEMPORARY PEDESTRIAN WALK | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
M012023362B47 | 2023-12-28 | 2024-01-26 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET |
Q022023362D39 | 2023-12-28 | 2024-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q022023362D37 | 2023-12-28 | 2024-02-01 | TEMPORARY PEDESTRIAN WALK | STEINWAY STREET, QUEENS, FROM STREET 30 AVENUE TO STREET 31 AVENUE |
Q022023361C46 | 2023-12-27 | 2024-01-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
B022023361D50 | 2023-12-27 | 2024-01-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
Q012023361C73 | 2023-12-27 | 2024-01-19 | REPAIR WATER - SEWER | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
B012023361C72 | 2023-12-27 | 2024-01-13 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
M012023361A95 | 2023-12-27 | 2024-02-01 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
B022023361D49 | 2023-12-27 | 2024-01-13 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
B022023361D81 | 2023-12-27 | 2024-01-29 | TEMPORARY PEDESTRIAN WALK | 8 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022023361D82 | 2023-12-27 | 2024-01-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 8 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q022023361C47 | 2023-12-27 | 2024-01-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
M022023361D66 | 2023-12-27 | 2024-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
M022023361D67 | 2023-12-27 | 2024-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
Q022023361C45 | 2023-12-27 | 2024-01-19 | TEMPORARY PEDESTRIAN WALK | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022023361C26 | 2023-12-27 | 2024-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
B012023361C86 | 2023-12-27 | 2024-01-29 | REPAIR WATER - PROTECTED | 8 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q022023361C25 | 2023-12-27 | 2024-01-31 | TEMPORARY PEDESTRIAN WALK | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
M022023361D65 | 2023-12-27 | 2024-02-01 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
Q022023361C27 | 2023-12-27 | 2024-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
Q012023361C63 | 2023-12-27 | 2024-01-29 | REPAIR WATER - SEWER | 157 STREET, QUEENS, FROM STREET 24 AVENUE TO STREET 24 ROAD |
X022023355A26 | 2023-12-21 | 2024-01-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X022023355A24 | 2023-12-21 | 2024-01-08 | TEMPORARY PEDESTRIAN WALK | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X012023355A93 | 2023-12-21 | 2024-01-08 | REPAIR WATER | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X022023355A25 | 2023-12-21 | 2024-01-08 | OCCUPANCY OF ROADWAY AS STIPULATED | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
B022023354B10 | 2023-12-20 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023354B22 | 2023-12-20 | 2024-01-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023354B21 | 2023-12-20 | 2024-01-18 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023354B20 | 2023-12-20 | 2024-01-18 | TEMPORARY PEDESTRIAN WALK | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023354B11 | 2023-12-20 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023354B09 | 2023-12-20 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023354B08 | 2023-12-20 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023354B07 | 2023-12-20 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023354B06 | 2023-12-20 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012023354A53 | 2023-12-20 | 2024-01-16 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012023354A50 | 2023-12-20 | 2024-01-16 | REPAIR WATER - SEWER | DEAD END, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
M022023348C43 | 2023-12-14 | 2023-12-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022023348C42 | 2023-12-14 | 2023-12-18 | OCCUPANCY OF ROADWAY AS STIPULATED | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022023348C41 | 2023-12-14 | 2023-12-18 | TEMPORARY PEDESTRIAN WALK | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
B012023348C00 | 2023-12-14 | 2023-12-31 | REPAIR WATER - PROTECTED | POWERS STREET, BROOKLYN, FROM STREET JUDGE STREET TO STREET OLIVE STREET |
B022023348E65 | 2023-12-14 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | POWERS STREET, BROOKLYN, FROM STREET JUDGE STREET TO STREET OLIVE STREET |
B022023348E66 | 2023-12-14 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | POWERS STREET, BROOKLYN, FROM STREET JUDGE STREET TO STREET OLIVE STREET |
B022023348E67 | 2023-12-14 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | POWERS STREET, BROOKLYN, FROM STREET JUDGE STREET TO STREET OLIVE STREET |
B012023348C13 | 2023-12-14 | 2023-12-31 | REPAIR WATER - SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012023348C14 | 2023-12-14 | 2023-12-31 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
M012023348A76 | 2023-12-14 | 2023-12-18 | REPAIR SEWER | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
Q022023345B13 | 2023-12-11 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
Q022023345B12 | 2023-12-11 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
B012023345A91 | 2023-12-11 | 2023-12-31 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q022023345B14 | 2023-12-11 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
B022023345D11 | 2023-12-11 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023345D12 | 2023-12-11 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023345D13 | 2023-12-11 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q012023345A60 | 2023-12-11 | 2023-12-31 | REPAIR WATER - SEWER - PROTECTED | SUTTER AVENUE, QUEENS, FROM STREET 127 STREET TO STREET 128 STREET |
B022023341C30 | 2023-12-07 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | 20 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B012023341B44 | 2023-12-07 | 2023-12-31 | REPAIR WATER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
Q022023341A41 | 2023-12-07 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q022023341A40 | 2023-12-07 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q012023341B49 | 2023-12-07 | 2023-12-31 | REPAIR SEWER | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
Q022023341A39 | 2023-12-07 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | 61 AVENUE, QUEENS, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY |
B012023341B42 | 2023-12-07 | 2023-12-31 | REPAIR WATER - SEWER | 20 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B022023341C31 | 2023-12-07 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 20 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B022023341C32 | 2023-12-07 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 20 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B022023341C33 | 2023-12-07 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023341C34 | 2023-12-07 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023341C35 | 2023-12-07 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022023340A33 | 2023-12-06 | 2023-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
B022023340A34 | 2023-12-06 | 2023-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
B022023340A32 | 2023-12-06 | 2023-12-31 | TEMPORARY PEDESTRIAN WALK | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
B012023340A66 | 2023-12-06 | 2023-12-31 | REPAIR WATER | MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE J TO STREET BAY PARKWAY |
Q012023339A49 | 2023-12-05 | 2023-12-31 | REPAIR WATER - PROTECTED | 71 STREET, QUEENS, FROM STREET CENTRAL AVENUE TO STREET COOPER AVENUE |
X012023338A52 | 2023-12-04 | 2023-12-15 | REPAIR WATER | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X022023338B40 | 2023-12-04 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X022023338B41 | 2023-12-04 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
X022023338B39 | 2023-12-04 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | CRUGER AVENUE, BRONX, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE |
M012023334A17 | 2023-11-30 | 2023-12-26 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET |
B022023334A20 | 2023-11-30 | 2023-12-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | KENT AVENUE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
B012023334B00 | 2023-11-30 | 2023-12-26 | REPAIR SEWER | KENT AVENUE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
B012023334A98 | 2023-11-30 | 2023-12-29 | REPAIR WATER | COMMERCIAL STREET, BROOKLYN, FROM STREET ASH STREET TO STREET BOX STREET |
B022023334A18 | 2023-11-30 | 2023-12-26 | TEMPORARY PEDESTRIAN WALK | KENT AVENUE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
B022023334A19 | 2023-11-30 | 2023-12-26 | OCCUPANCY OF ROADWAY AS STIPULATED | KENT AVENUE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
B012023332A55 | 2023-11-28 | 2023-12-27 | REPAIR WATER - SEWER | ST JOHN'S PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
Q022023324A30 | 2023-11-20 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 189 STREET, QUEENS, FROM STREET 45 DRIVE TO STREET 45 ROAD |
B022023324C48 | 2023-11-20 | 2023-12-19 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
Q022023324A28 | 2023-11-20 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | 189 STREET, QUEENS, FROM STREET 45 DRIVE TO STREET 45 ROAD |
Q012023324A40 | 2023-11-20 | 2023-12-19 | C.A.R. RESTORATION | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q012023324A42 | 2023-11-20 | 2023-12-15 | REPAIR WATER - SEWER | 189 STREET, QUEENS, FROM STREET 45 DRIVE TO STREET 45 ROAD |
B012023324C79 | 2023-11-20 | 2023-12-19 | REPAIR WATER | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
Q022023324A29 | 2023-11-20 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 189 STREET, QUEENS, FROM STREET 45 DRIVE TO STREET 45 ROAD |
B022023324C49 | 2023-11-20 | 2023-12-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET 6 STREET TO STREET 7 STREET |
B022023321C71 | 2023-11-17 | 2023-12-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023321C72 | 2023-11-17 | 2023-12-19 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023321C73 | 2023-11-17 | 2023-12-19 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023321C74 | 2023-11-17 | 2023-12-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023321C69 | 2023-11-17 | 2023-12-19 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023321C70 | 2023-11-17 | 2023-12-19 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012023320B54 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | DEAD END, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023320B53 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | NYCTA SUBWAY, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
Q022023320A55 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
B022023320A93 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | 40 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q022023320A51 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q022023320A52 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q022023320A53 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q022023320A54 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q022023320A50 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
B022023320A94 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 40 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022023320A95 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 40 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022023320B29 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B022023320B30 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B022023320B31 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B022023320B71 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023320B52 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012023320B50 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B012023320B17 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023320B12 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B012023320A85 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | 40 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q002023320A04 | 2023-11-16 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B022023320C33 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023320C32 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023320C31 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023320C12 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023320C11 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023320C10 | 2023-11-16 | 2023-12-15 | TEMPORARY PEDESTRIAN WALK | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023320B73 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023320B72 | 2023-11-16 | 2023-12-15 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012023320B06 | 2023-11-16 | 2023-12-15 | REPAIR WATER | PALO ALTO AVENUE, QUEENS, FROM STREET BEND TO STREET BEND |
Q012023320B10 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | 146 STREET, QUEENS, FROM STREET 58 ROAD TO STREET 59 AVENUE |
Q012023320B11 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER | 58 ROAD, QUEENS, FROM STREET 142 STREET TO STREET 146 STREET |
Q012023320B94 | 2023-11-16 | 2023-12-15 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET LONG ISLAND RAILROAD |
B012023320C40 | 2023-11-16 | 2023-12-15 | C.A.R. RESTORATION | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
Q012023312B04 | 2023-11-13 | 2023-11-14 | REPAIR WATER | PALO ALTO AVENUE, QUEENS, FROM STREET BEND TO STREET BEND |
B012023310B36 | 2023-11-06 | 2023-11-14 | REPAIR WATER - SEWER | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022023310B44 | 2023-11-06 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022023306C31 | 2023-11-02 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
M022023306D30 | 2023-11-02 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022023306D31 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M022023306D32 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
M042023306A25 | 2023-11-02 | 2023-11-14 | REPAIR SIDEWALK | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
B022023306C32 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022023306C33 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022023306C36 | 2023-11-02 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | NEW JERSEY AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
B022023306C37 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW JERSEY AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
B022023306C38 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW JERSEY AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
B022023306C39 | 2023-11-02 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023306C40 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B022023306C41 | 2023-11-02 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012023306B29 | 2023-11-02 | 2023-11-02 | REPAIR WATER - SEWER | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012023306B30 | 2023-11-02 | 2023-11-14 | REPAIR WATER - PROTECTED | NEW JERSEY AVENUE, BROOKLYN, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE |
B012023306B31 | 2023-11-02 | 2023-11-14 | REPAIR WATER - SEWER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
M012023306B56 | 2023-11-02 | 2023-11-14 | REPAIR SEWER | JANE STREET, MANHATTAN, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET |
Q022023303A55 | 2023-10-30 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X022023303B35 | 2023-10-30 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X012023303A65 | 2023-10-30 | 2023-11-14 | REPAIR WATER - SEWER | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
Q022023303A53 | 2023-10-30 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022023303A54 | 2023-10-30 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
X022023303B36 | 2023-10-30 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X012023303A64 | 2023-10-30 | 2023-11-14 | REPAIR WATER - SEWER | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023303B37 | 2023-10-30 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023303B38 | 2023-10-30 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023303B34 | 2023-10-30 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023303B39 | 2023-10-30 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
M012023303A37 | 2023-10-30 | 2023-11-14 | REPAIR WATER - PROTECTED | LENOX AVENUE, MANHATTAN, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET |
Q012023303B26 | 2023-10-30 | 2023-11-14 | REPAIR WATER - SEWER - PROTECTED | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012023303A84 | 2023-10-30 | 2023-11-14 | REPAIR SEWER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
M152023300A17 | 2023-10-27 | 2023-11-14 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M152023299A03 | 2023-10-26 | 2023-11-14 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023298B75 | 2023-10-25 | 2023-11-12 | REPAIR WATER | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
M012023298A96 | 2023-10-25 | 2023-11-14 | REPAIR WATER - PROTECTED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012023298C70 | 2023-10-25 | 2023-11-14 | REPAIR WATER - SEWER | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B022023298B19 | 2023-10-25 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B022023298B18 | 2023-10-25 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B022023298B17 | 2023-10-25 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | WITHERS STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
M022023298C19 | 2023-10-25 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023298C20 | 2023-10-25 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023298C21 | 2023-10-25 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023298D51 | 2023-10-25 | 2023-11-12 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
M022023298D52 | 2023-10-25 | 2023-11-12 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
M022023298D53 | 2023-10-25 | 2023-11-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET |
M012023298A98 | 2023-10-25 | 2023-11-14 | C.A.R. RESTORATION | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
B022023296C89 | 2023-10-23 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B012023296B70 | 2023-10-23 | 2023-11-14 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012023296A82 | 2023-10-23 | 2023-11-14 | REPAIR WATER - SEWER | DEAD END, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023296A81 | 2023-10-23 | 2023-11-14 | REPAIR WATER - SEWER | NYCTA SUBWAY, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B022023296C91 | 2023-10-23 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
Q012023296A65 | 2023-10-23 | 2023-11-14 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
M012023296B46 | 2023-10-23 | 2023-11-14 | C.A.R. RESTORATION | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
B022023296C90 | 2023-10-23 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
Q022023296A76 | 2023-10-23 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022023296A75 | 2023-10-23 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
B012023296B71 | 2023-10-23 | 2023-11-14 | REPAIR WATER - SEWER | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
Q022023296A74 | 2023-10-23 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022023289A20 | 2023-10-16 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q012023289B27 | 2023-10-16 | 2023-11-14 | REPAIR WATER - SEWER | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q022023289A19 | 2023-10-16 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q022023289A21 | 2023-10-16 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 46 ROAD, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
B022023286A56 | 2023-10-13 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD |
B022023286A55 | 2023-10-13 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD |
B022023286A54 | 2023-10-13 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023286A53 | 2023-10-13 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023286A52 | 2023-10-13 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012023286B45 | 2023-10-13 | 2023-11-14 | REPAIR WATER - PROTECTED | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD |
B012023286B73 | 2023-10-13 | 2023-11-11 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012023286B52 | 2023-10-13 | 2023-11-14 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023286A67 | 2023-10-13 | 2023-11-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022023286A66 | 2023-10-13 | 2023-11-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022023286A60 | 2023-10-13 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023286A65 | 2023-10-13 | 2023-11-11 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B022023286A59 | 2023-10-13 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023286A58 | 2023-10-13 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023286A57 | 2023-10-13 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | ROCKAWAY PARKWAY, BROOKLYN, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD |
B022023285C33 | 2023-10-12 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | 17 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012023282A02 | 2023-10-12 | 2023-11-07 | REPAIR WATER | WEST END AVENUE, BROOKLYN, FROM STREET HAMPTON AVENUE TO STREET NEPTUNE COURT |
B012023285B10 | 2023-10-12 | 2023-11-09 | REPAIR WATER - SEWER - PROTECTED | 17 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012023285B11 | 2023-10-12 | 2023-11-09 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012023285B12 | 2023-10-12 | 2023-11-09 | REPAIR WATER - SEWER | 14 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022023285C42 | 2023-10-12 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 14 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022023285C41 | 2023-10-12 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 14 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022023285C40 | 2023-10-12 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | 14 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022023285C38 | 2023-10-12 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022023285C37 | 2023-10-12 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022023285C36 | 2023-10-12 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022023285C35 | 2023-10-12 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B022023285C34 | 2023-10-12 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
Q022023284A31 | 2023-10-11 | 2023-10-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
Q012023284A76 | 2023-10-11 | 2023-10-31 | REPAIR WATER - PROTECTED | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
B022023284A34 | 2023-10-11 | 2023-11-14 | TEMPORARY PEDESTRIAN WALK | BAY 35 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B022023284A35 | 2023-10-11 | 2023-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY 35 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B022023284A36 | 2023-10-11 | 2023-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY 35 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B012023284A56 | 2023-10-11 | 2023-11-09 | REPAIR WATER - SEWER - PROTECTED | BAY 35 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
Q022023284A29 | 2023-10-11 | 2023-10-31 | TEMPORARY PEDESTRIAN WALK | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
Q022023284A30 | 2023-10-11 | 2023-10-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
B012023278A53 | 2023-10-10 | 2023-10-28 | REPAIR WATER - PROTECTED | 80 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012023279C00 | 2023-10-06 | 2023-10-22 | REPAIR WATER - SEWER | DEAD END, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023279C01 | 2023-10-06 | 2023-10-22 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023279B98 | 2023-10-06 | 2023-10-22 | TEMPORARY PEDESTRIAN WALK | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
M022023279E17 | 2023-10-06 | 2023-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 71 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012023279C02 | 2023-10-06 | 2023-10-22 | REPAIR WATER - SEWER | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B012023279B99 | 2023-10-06 | 2023-10-22 | REPAIR WATER - SEWER | NYCTA SUBWAY, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B022023279B99 | 2023-10-06 | 2023-10-22 | OCCUPANCY OF ROADWAY AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023279C00 | 2023-10-06 | 2023-10-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
Q022023275C44 | 2023-10-02 | 2023-10-27 | TEMPORARY PEDESTRIAN WALK | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012023275B59 | 2023-10-02 | 2023-10-27 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022023275C45 | 2023-10-02 | 2023-10-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q022023275C46 | 2023-10-02 | 2023-10-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
X022023272A39 | 2023-09-29 | 2023-11-01 | TEMPORARY PEDESTRIAN WALK | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
B012023272B29 | 2023-09-29 | 2023-10-30 | REPAIR SEWER | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
X022023272A41 | 2023-09-29 | 2023-11-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023272A40 | 2023-09-29 | 2023-11-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023272A36 | 2023-09-29 | 2023-11-01 | TEMPORARY PEDESTRIAN WALK | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X022023272A38 | 2023-09-29 | 2023-11-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
B022023272C29 | 2023-09-29 | 2023-10-30 | OCCUPANCY OF ROADWAY AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022023272C30 | 2023-09-29 | 2023-10-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
X022023272A37 | 2023-09-29 | 2023-11-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
X012023272A85 | 2023-09-29 | 2023-11-01 | REPAIR WATER - SEWER | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
B022023272C28 | 2023-09-29 | 2023-10-30 | TEMPORARY PEDESTRIAN WALK | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
X012023272A84 | 2023-09-29 | 2023-11-01 | REPAIR WATER - SEWER | EAST 170 STREET, BRONX, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE |
M012023269A50 | 2023-09-26 | 2023-10-29 | REPAIR WATER - PROTECTED | LENOX AVENUE, MANHATTAN, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET |
B012023269B11 | 2023-09-26 | 2023-10-29 | REPAIR WATER - SEWER - PROTECTED | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
M022023269A93 | 2023-09-26 | 2023-10-29 | TEMPORARY PEDESTRIAN WALK | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023269A94 | 2023-09-26 | 2023-10-29 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023269A95 | 2023-09-26 | 2023-10-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B022023269B06 | 2023-09-26 | 2023-10-29 | TEMPORARY PEDESTRIAN WALK | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
B022023269B07 | 2023-09-26 | 2023-10-29 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
Q012023269B48 | 2023-09-26 | 2023-10-22 | REPAIR WATER - SEWER | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
B022023269B08 | 2023-09-26 | 2023-10-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
Q022023269A21 | 2023-09-26 | 2023-10-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023269A20 | 2023-09-26 | 2023-10-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023269A19 | 2023-09-26 | 2023-10-22 | TEMPORARY PEDESTRIAN WALK | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
M012023269A49 | 2023-09-26 | 2023-10-29 | REPAIR WATER - PROTECTED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012023269B13 | 2023-09-26 | 2023-10-24 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022023269B10 | 2023-09-26 | 2023-10-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022023269B09 | 2023-09-26 | 2023-10-24 | TEMPORARY PEDESTRIAN WALK | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
Q022023264A94 | 2023-09-21 | 2023-10-19 | TEMPORARY PEDESTRIAN WALK | 208 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q012023264B91 | 2023-09-21 | 2023-10-19 | REPAIR SEWER - PROTECTED | 208 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022023264A96 | 2023-09-21 | 2023-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 208 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022023264A95 | 2023-09-21 | 2023-10-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 208 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
Q022023262B45 | 2023-09-19 | 2023-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q022023262B44 | 2023-09-19 | 2023-10-19 | OCCUPANCY OF ROADWAY AS STIPULATED | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q012023262A57 | 2023-09-19 | 2023-10-17 | REPAIR WATER | FARMERS BOULEVARD, QUEENS, FROM STREET MARS PLACE TO STREET SIDWAY PLACE |
Q022023262B40 | 2023-09-19 | 2023-10-19 | TEMPORARY PEDESTRIAN WALK | FARMERS BOULEVARD, QUEENS, FROM STREET MARS PLACE TO STREET SIDWAY PLACE |
Q022023262B41 | 2023-09-19 | 2023-10-19 | OCCUPANCY OF ROADWAY AS STIPULATED | FARMERS BOULEVARD, QUEENS, FROM STREET MARS PLACE TO STREET SIDWAY PLACE |
Q012023262A62 | 2023-09-19 | 2023-10-17 | REPAIR WATER - SEWER - PROTECTED | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q022023262B43 | 2023-09-19 | 2023-10-19 | TEMPORARY PEDESTRIAN WALK | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q022023262B42 | 2023-09-19 | 2023-10-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | FARMERS BOULEVARD, QUEENS, FROM STREET MARS PLACE TO STREET SIDWAY PLACE |
B022023256B05 | 2023-09-13 | 2023-10-11 | OCCUPANCY OF ROADWAY AS STIPULATED | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B022023256B06 | 2023-09-13 | 2023-10-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012023256B50 | 2023-09-13 | 2023-10-10 | REPAIR SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012023256B49 | 2023-09-13 | 2023-10-10 | REPAIR SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE |
B022023256B04 | 2023-09-13 | 2023-10-11 | TEMPORARY PEDESTRIAN WALK | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012023256B47 | 2023-09-13 | 2023-10-11 | REPAIR WATER - SEWER - PROTECTED | WYONA STREET, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
M022023254A70 | 2023-09-11 | 2023-09-29 | TEMPORARY PEDESTRIAN WALK | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M012023254B23 | 2023-09-11 | 2023-09-29 | REPAIR WATER - PROTECTED | LENOX AVENUE, MANHATTAN, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET |
M012023254B26 | 2023-09-11 | 2023-09-29 | REPAIR WATER - PROTECTED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023254A72 | 2023-09-11 | 2023-09-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023254A71 | 2023-09-11 | 2023-09-29 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B022023251E22 | 2023-09-08 | 2023-10-16 | TEMPORARY PEDESTRIAN WALK | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023251E30 | 2023-09-08 | 2023-09-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023251E29 | 2023-09-08 | 2023-09-30 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023251E28 | 2023-09-08 | 2023-09-30 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023251E24 | 2023-09-08 | 2023-10-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012023251C78 | 2023-09-08 | 2023-10-10 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012023251C84 | 2023-09-08 | 2023-09-30 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012023251C81 | 2023-09-08 | 2023-10-12 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
Q022023251C98 | 2023-09-08 | 2023-10-08 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q022023251C97 | 2023-09-08 | 2023-10-08 | TEMPORARY PEDESTRIAN WALK | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q022023251C96 | 2023-09-08 | 2023-10-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
Q022023251C95 | 2023-09-08 | 2023-10-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
Q022023251C94 | 2023-09-08 | 2023-10-15 | TEMPORARY PEDESTRIAN WALK | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
B022023251E23 | 2023-09-08 | 2023-10-16 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
Q012023251B75 | 2023-09-08 | 2023-10-12 | REPAIR WATER - SEWER - PROTECTED | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
B012023251C80 | 2023-09-08 | 2023-10-12 | REPAIR WATER | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
Q022023251C99 | 2023-09-08 | 2023-10-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023251E14 | 2023-09-08 | 2023-10-12 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023251E15 | 2023-09-08 | 2023-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023251E16 | 2023-09-08 | 2023-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023251E18 | 2023-09-08 | 2023-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
Q012023251B77 | 2023-09-08 | 2023-10-08 | REPAIR SEWER | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023251E19 | 2023-09-08 | 2023-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023251E20 | 2023-09-08 | 2023-10-12 | TEMPORARY PEDESTRIAN WALK | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B022023251E21 | 2023-09-08 | 2023-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B012023251C75 | 2023-09-08 | 2023-10-12 | REPAIR WATER - SEWER | NYCTA SUBWAY, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023251C76 | 2023-09-08 | 2023-10-12 | REPAIR WATER - SEWER | DEAD END, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023251C77 | 2023-09-08 | 2023-10-12 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012023251C79 | 2023-09-08 | 2023-10-12 | REPAIR WATER - SEWER | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023251E17 | 2023-09-08 | 2023-10-12 | TEMPORARY PEDESTRIAN WALK | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023250A57 | 2023-09-07 | 2023-09-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012023250A49 | 2023-09-07 | 2023-09-30 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022023250A53 | 2023-09-07 | 2023-10-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 61 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B012023250A48 | 2023-09-07 | 2023-10-10 | REPAIR WATER | 61 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B022023250A56 | 2023-09-07 | 2023-09-30 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022023250A52 | 2023-09-07 | 2023-10-10 | TEMPORARY PEDESTRIAN WALK | 61 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B022023250A54 | 2023-09-07 | 2023-10-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 61 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B022023250A55 | 2023-09-07 | 2023-09-30 | TEMPORARY PEDESTRIAN WALK | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012023244B99 | 2023-09-01 | 2023-09-30 | REPAIR WATER - SEWER - PROTECTED | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
B022023243B99 | 2023-08-31 | 2023-09-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
B022023243C15 | 2023-08-31 | 2023-10-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022023243C14 | 2023-08-31 | 2023-10-03 | OCCUPANCY OF ROADWAY AS STIPULATED | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022023243C13 | 2023-08-31 | 2023-10-03 | TEMPORARY PEDESTRIAN WALK | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B022023243C11 | 2023-08-31 | 2023-10-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023243C02 | 2023-08-31 | 2023-10-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B022023243C05 | 2023-08-31 | 2023-10-03 | TEMPORARY PEDESTRIAN WALK | 14 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022023243C06 | 2023-08-31 | 2023-10-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 14 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022023243C09 | 2023-08-31 | 2023-10-03 | TEMPORARY PEDESTRIAN WALK | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023243C10 | 2023-08-31 | 2023-10-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023243B98 | 2023-08-31 | 2023-09-30 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
Q012023243C10 | 2023-08-31 | 2023-10-06 | REPAIR WATER - SEWER | 79 STREET, QUEENS, FROM STREET 66 ROAD TO STREET JUNIPER VALLEY ROAD |
Q012023243C05 | 2023-08-31 | 2023-09-29 | REPAIR WATER - SEWER | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023243A75 | 2023-08-31 | 2023-09-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023243A76 | 2023-08-31 | 2023-09-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
B012023243B76 | 2023-08-31 | 2023-10-03 | REPAIR SEWER | QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE |
B012023243B75 | 2023-08-31 | 2023-10-03 | REPAIR WATER - SEWER - PROTECTED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q022023243A74 | 2023-08-31 | 2023-09-30 | TEMPORARY PEDESTRIAN WALK | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
B022023243B97 | 2023-08-31 | 2023-09-30 | TEMPORARY PEDESTRIAN WALK | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET |
B022023243C00 | 2023-08-31 | 2023-10-06 | TEMPORARY PEDESTRIAN WALK | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B022023243C01 | 2023-08-31 | 2023-10-06 | OCCUPANCY OF ROADWAY AS STIPULATED | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B012023243B73 | 2023-08-31 | 2023-10-03 | REPAIR WATER - SEWER - PROTECTED | 14 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012023243B71 | 2023-08-31 | 2023-10-06 | REPAIR SEWER - PROTECTED | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
M012023240B23 | 2023-08-28 | 2023-09-12 | REPAIR WATER - PROTECTED | LENOX AVENUE, MANHATTAN, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET |
B022023240C59 | 2023-08-28 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
M022023240C56 | 2023-08-28 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023240C57 | 2023-08-28 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012023240C70 | 2023-08-28 | 2023-09-12 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
M012023240B24 | 2023-08-28 | 2023-09-12 | REPAIR WATER - PROTECTED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023240C55 | 2023-08-28 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B022023240C61 | 2023-08-28 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012023240C71 | 2023-08-28 | 2023-09-12 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023240C60 | 2023-08-28 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
Q022023237A93 | 2023-08-25 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
B022023237D11 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023237D10 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B022023237D09 | 2023-08-25 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
Q022023237A95 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q022023237A94 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q012023237B81 | 2023-08-25 | 2023-09-12 | REPAIR WATER - SEWER - PROTECTED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
B022023237D08 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023237D07 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023237D06 | 2023-08-25 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023237A03 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022023237A02 | 2023-08-25 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022023237A01 | 2023-08-25 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B012023237A04 | 2023-08-25 | 2023-09-12 | REPAIR WATER - SEWER | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B012023237C81 | 2023-08-25 | 2023-09-12 | REPAIR WATER - SEWER | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B012023237C82 | 2023-08-25 | 2023-09-12 | REPAIR WATER - SEWER | NYCTA SUBWAY, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023237C83 | 2023-08-25 | 2023-09-12 | REPAIR WATER - SEWER | DEAD END, BROOKLYN, FROM STREET SHEEPSHEAD BAY ROAD |
B012023237C84 | 2023-08-25 | 2023-09-12 | REPAIR WATER - SEWER | WEST 6 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012023237C92 | 2023-08-25 | 2023-09-12 | REPAIR SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE |
B012023237C93 | 2023-08-25 | 2023-09-12 | REPAIR SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012023236B64 | 2023-08-24 | 2023-09-12 | REPAIR WATER | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B022023236C12 | 2023-08-24 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B022023236C13 | 2023-08-24 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
Q022023235A16 | 2023-08-23 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 220 STREET |
Q042023235A15 | 2023-08-23 | 2023-09-12 | REPAIR SIDEWALK | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023235A28 | 2023-08-23 | 2023-09-12 | REPAIR SEWER - PROTECTED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 220 STREET |
Q012023235A29 | 2023-08-23 | 2023-09-12 | C.A.R. RESTORATION | 192 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 45 AVENUE |
Q022023235A14 | 2023-08-23 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 220 STREET |
B012023235A41 | 2023-08-23 | 2023-09-12 | REPAIR WATER - SEWER - PROTECTED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
Q022023235A15 | 2023-08-23 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 220 STREET |
B022023234A39 | 2023-08-22 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 6 AVENUE, BROOKLYN, FROM STREET 14 STREET TO STREET 15 STREET |
B022023234A38 | 2023-08-22 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 6 AVENUE, BROOKLYN, FROM STREET 14 STREET TO STREET 15 STREET |
Q012023234A33 | 2023-08-22 | 2023-09-12 | REPAIR WATER - SEWER | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B012023234C04 | 2023-08-22 | 2023-09-12 | REPAIR WATER | 6 AVENUE, BROOKLYN, FROM STREET 14 STREET TO STREET 15 STREET |
Q022023230B04 | 2023-08-18 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023230A99 | 2023-08-18 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023230A98 | 2023-08-18 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023230A97 | 2023-08-18 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q012023230B39 | 2023-08-18 | 2023-09-12 | REPAIR WATER - PROTECTED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023230B38 | 2023-08-18 | 2023-09-12 | REPAIR WATER - SEWER | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012023230B37 | 2023-08-18 | 2023-09-12 | REPAIR WATER - SEWER | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023230B03 | 2023-08-18 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023230B02 | 2023-08-18 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023230B05 | 2023-08-18 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023230B01 | 2023-08-18 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023230B00 | 2023-08-18 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022023229B00 | 2023-08-17 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | TAAFFE PLACE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
Q022023229A48 | 2023-08-17 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
B022023229B01 | 2023-08-17 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | TAAFFE PLACE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
Q012023229B05 | 2023-08-17 | 2023-09-12 | REPAIR WATER - SEWER - PROTECTED | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
Q022023229A47 | 2023-08-17 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
B012023229C66 | 2023-08-17 | 2023-09-12 | REPAIR WATER - SEWER | TAAFFE PLACE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
Q022023229A46 | 2023-08-17 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 78 AVENUE, QUEENS, FROM STREET 165 STREET TO STREET 166 STREET |
B022023229B02 | 2023-08-17 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | TAAFFE PLACE, BROOKLYN, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE |
B022023228A27 | 2023-08-16 | 2023-08-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012023228C41 | 2023-08-16 | 2023-09-10 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012023228A54 | 2023-08-16 | 2023-09-12 | REPAIR WATER | GATES AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE |
B012023228A14 | 2023-08-16 | 2023-08-21 | REPAIR SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023228A85 | 2023-08-16 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | GATES AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE |
B022023228A84 | 2023-08-16 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | GATES AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE |
B022023228A26 | 2023-08-16 | 2023-08-21 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B152023223A00 | 2023-08-11 | 2023-08-21 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
Q022023222B29 | 2023-08-10 | 2023-08-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023222B28 | 2023-08-10 | 2023-08-26 | TEMPORARY PEDESTRIAN WALK | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023222A10 | 2023-08-10 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q022023222A09 | 2023-08-10 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q022023222A08 | 2023-08-10 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023222B25 | 2023-08-10 | 2023-08-27 | TEMPORARY PEDESTRIAN WALK | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
Q022023222A07 | 2023-08-10 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
B022023222B26 | 2023-08-10 | 2023-08-27 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022023222A05 | 2023-08-10 | 2023-09-06 | TEMPORARY PEDESTRIAN WALK | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B022023222A06 | 2023-08-10 | 2023-09-06 | OCCUPANCY OF ROADWAY AS STIPULATED | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
M022023222C07 | 2023-08-10 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022023222B30 | 2023-08-10 | 2023-08-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
M022023222C05 | 2023-08-10 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022023222A06 | 2023-08-10 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
Q022023222A05 | 2023-08-10 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
B012023222A21 | 2023-08-10 | 2023-09-06 | REPAIR SEWER - PROTECTED | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B022023222A07 | 2023-08-10 | 2023-09-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
Q012023222A27 | 2023-08-10 | 2023-09-12 | REPAIR SEWER - PROTECTED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
Q012023222A37 | 2023-08-10 | 2023-09-11 | REPAIR SEWER | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012023222B48 | 2023-08-10 | 2023-08-26 | REPAIR WATER - PROTECTED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
B012023222B55 | 2023-08-10 | 2023-08-27 | REPAIR WATER - SEWER | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022023222B27 | 2023-08-10 | 2023-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
M022023222C06 | 2023-08-10 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012023220B32 | 2023-08-08 | 2023-09-06 | C.A.R. RESTORATION | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B022023220B03 | 2023-08-08 | 2023-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B022023220B18 | 2023-08-08 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | 14 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022023220B19 | 2023-08-08 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 14 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012023220B35 | 2023-08-08 | 2023-08-27 | REPAIR WATER | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B022023220B02 | 2023-08-08 | 2023-08-27 | OCCUPANCY OF ROADWAY AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
Q012023220B65 | 2023-08-08 | 2023-09-06 | REPAIR WATER - SEWER | 79 STREET, QUEENS, FROM STREET 66 ROAD TO STREET JUNIPER VALLEY ROAD |
B022023220B01 | 2023-08-08 | 2023-08-27 | TEMPORARY PEDESTRIAN WALK | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012023220B43 | 2023-08-08 | 2023-09-06 | REPAIR WATER - SEWER - PROTECTED | 14 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022023219A60 | 2023-08-07 | 2023-09-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023219A59 | 2023-08-07 | 2023-09-03 | TEMPORARY PEDESTRIAN WALK | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023219A58 | 2023-08-07 | 2023-09-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023219A57 | 2023-08-07 | 2023-09-03 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023219A56 | 2023-08-07 | 2023-09-03 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023219A52 | 2023-08-07 | 2023-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022023219A51 | 2023-08-07 | 2023-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022023219A50 | 2023-08-07 | 2023-09-01 | TEMPORARY PEDESTRIAN WALK | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q012023219B06 | 2023-08-07 | 2023-08-22 | REPAIR WATER - SEWER | 39 AVENUE, QUEENS, FROM STREET 31 STREET TO STREET 32 STREET |
B012023219A76 | 2023-08-07 | 2023-09-03 | REPAIR WATER - SEWER - PROTECTED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023219A73 | 2023-08-07 | 2023-09-01 | REPAIR WATER - SEWER | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012023219A74 | 2023-08-07 | 2023-09-03 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023219A61 | 2023-08-07 | 2023-09-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023215C96 | 2023-08-03 | 2023-09-11 | TEMPORARY PEDESTRIAN WALK | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023215C97 | 2023-08-03 | 2023-09-11 | OCCUPANCY OF ROADWAY AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023215C98 | 2023-08-03 | 2023-09-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023215C99 | 2023-08-03 | 2023-08-31 | TEMPORARY PEDESTRIAN WALK | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
B022023215D00 | 2023-08-03 | 2023-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
B022023215D01 | 2023-08-03 | 2023-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
M022023215B63 | 2023-08-03 | 2023-08-30 | TEMPORARY PEDESTRIAN WALK | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023215B64 | 2023-08-03 | 2023-08-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M022023215B65 | 2023-08-03 | 2023-08-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M012023215B39 | 2023-08-03 | 2023-08-30 | REPAIR WATER - PROTECTED | WEST 129 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
M012023215B40 | 2023-08-03 | 2023-08-30 | REPAIR WATER - PROTECTED | LENOX AVENUE, MANHATTAN, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET |
Q022023215A46 | 2023-08-03 | 2023-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q022023215A45 | 2023-08-03 | 2023-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q022023215A44 | 2023-08-03 | 2023-09-01 | TEMPORARY PEDESTRIAN WALK | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
B012023215B67 | 2023-08-03 | 2023-08-31 | REPAIR WATER - SEWER | ALBEMARLE ROAD, BROOKLYN, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE |
B012023215B66 | 2023-08-03 | 2023-08-31 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012023215A75 | 2023-08-03 | 2023-09-01 | REPAIR WATER - SEWER - PROTECTED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
X012023213A52 | 2023-08-01 | 2023-08-02 | REPAIR WATER - SEWER | ROPES AVENUE, BRONX, FROM STREET HOLLERS AVENUE TO STREET PELHAM BAY PARK WEST |
M022023212D76 | 2023-07-31 | 2023-08-29 | TEMPORARY PEDESTRIAN WALK | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M012023212B85 | 2023-07-31 | 2023-08-29 | REPAIR WATER - SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023212C37 | 2023-07-31 | 2023-08-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023212C36 | 2023-07-31 | 2023-08-29 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023212C35 | 2023-07-31 | 2023-08-29 | TEMPORARY PEDESTRIAN WALK | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023212C27 | 2023-07-31 | 2023-08-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023212C26 | 2023-07-31 | 2023-08-17 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023212C25 | 2023-07-31 | 2023-08-17 | TEMPORARY PEDESTRIAN WALK | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012023212B34 | 2023-07-31 | 2023-08-29 | REPAIR WATER - SEWER - PROTECTED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
B022023212B09 | 2023-07-31 | 2023-08-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
M012023212B30 | 2023-07-31 | 2023-08-23 | REPAIR WATER - SEWER - PROTECTED | WEST 52 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023212D77 | 2023-07-31 | 2023-08-29 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
M022023212D78 | 2023-07-31 | 2023-08-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE C, MANHATTAN, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET |
B022023212B04 | 2023-07-31 | 2023-09-01 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023212B05 | 2023-07-31 | 2023-09-01 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023212B06 | 2023-07-31 | 2023-09-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023212B07 | 2023-07-31 | 2023-08-27 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023212B08 | 2023-07-31 | 2023-08-27 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012023212B43 | 2023-07-31 | 2023-09-01 | REPAIR WATER - SEWER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012023212B44 | 2023-07-31 | 2023-08-27 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023209A65 | 2023-07-28 | 2023-09-12 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012023209B22 | 2023-07-28 | 2023-09-03 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023209A67 | 2023-07-28 | 2023-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023209A66 | 2023-07-28 | 2023-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
X022023207A44 | 2023-07-26 | 2023-08-17 | TEMPORARY PEDESTRIAN WALK | HOLLERS AVENUE, BRONX, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE |
X012023207A39 | 2023-07-26 | 2023-08-23 | REPAIR WATER - SEWER | HOLLERS AVENUE, BRONX, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE |
B022023207D37 | 2023-07-26 | 2023-08-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023207D36 | 2023-07-26 | 2023-08-11 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
X022023207A46 | 2023-07-26 | 2023-08-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | HOLLERS AVENUE, BRONX, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE |
B022023207D35 | 2023-07-26 | 2023-08-11 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
X022023207A45 | 2023-07-26 | 2023-08-17 | OCCUPANCY OF ROADWAY AS STIPULATED | HOLLERS AVENUE, BRONX, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE |
B012023207D98 | 2023-07-26 | 2023-08-11 | REPAIR SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023206D02 | 2023-07-25 | 2023-08-15 | TEMPORARY PEDESTRIAN WALK | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012023206B88 | 2023-07-25 | 2023-08-15 | REPAIR WATER - SEWER | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B022023206D03 | 2023-07-25 | 2023-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B022023206D04 | 2023-07-25 | 2023-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
X022023205D00 | 2023-07-24 | 2023-08-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023205C99 | 2023-07-24 | 2023-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
Q012023205A55 | 2023-07-24 | 2023-08-28 | REPAIR WATER - SEWER | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
X022023205C98 | 2023-07-24 | 2023-08-31 | TEMPORARY PEDESTRIAN WALK | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
B152023205A02 | 2023-07-24 | 2023-08-11 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
Q012023205A50 | 2023-07-24 | 2023-08-25 | REPAIR WATER - SEWER | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023205A12 | 2023-07-24 | 2023-08-25 | TEMPORARY PEDESTRIAN WALK | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023205A11 | 2023-07-24 | 2023-08-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023205A09 | 2023-07-24 | 2023-08-25 | TEMPORARY PEDESTRIAN WALK | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023205A10 | 2023-07-24 | 2023-08-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023205A13 | 2023-07-24 | 2023-08-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023205A14 | 2023-07-24 | 2023-08-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012023205A53 | 2023-07-24 | 2023-08-22 | REPAIR WATER - SEWER | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012023205A51 | 2023-07-24 | 2023-08-25 | REPAIR WATER - SEWER | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023205A15 | 2023-07-24 | 2023-08-22 | TEMPORARY PEDESTRIAN WALK | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
X012023205A95 | 2023-07-24 | 2023-08-28 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
Q022023205A16 | 2023-07-24 | 2023-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022023205A17 | 2023-07-24 | 2023-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 32 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022023205A18 | 2023-07-24 | 2023-08-28 | TEMPORARY PEDESTRIAN WALK | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q022023205A19 | 2023-07-24 | 2023-08-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q022023205A20 | 2023-07-24 | 2023-08-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q022023202C69 | 2023-07-21 | 2023-08-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023202C68 | 2023-07-21 | 2023-08-17 | OCCUPANCY OF ROADWAY AS STIPULATED | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023202C67 | 2023-07-21 | 2023-08-17 | TEMPORARY PEDESTRIAN WALK | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B012023202B95 | 2023-07-21 | 2023-08-22 | REPAIR WATER - SEWER | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012023202B94 | 2023-07-21 | 2023-08-04 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012023202B93 | 2023-07-21 | 2023-08-22 | C.A.R. RESTORATION | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
B012023202B01 | 2023-07-21 | 2023-08-17 | REPAIR WATER | GATES AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE |
B022023202C06 | 2023-07-21 | 2023-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B022023202C05 | 2023-07-21 | 2023-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B022023202C04 | 2023-07-21 | 2023-08-22 | TEMPORARY PEDESTRIAN WALK | FROST STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B022023202C03 | 2023-07-21 | 2023-08-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023202C02 | 2023-07-21 | 2023-08-04 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023202C01 | 2023-07-21 | 2023-08-04 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023202A60 | 2023-07-21 | 2023-08-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | GATES AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE |
B022023202A59 | 2023-07-21 | 2023-08-17 | TEMPORARY PEDESTRIAN WALK | GATES AVENUE, BROOKLYN, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE |
Q012023202C64 | 2023-07-21 | 2023-08-19 | REPAIR WATER - SEWER | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023201B91 | 2023-07-20 | 2023-08-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
Q012023201B60 | 2023-07-20 | 2023-08-17 | REPAIR SEWER - PROTECTED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
Q022023201B89 | 2023-07-20 | 2023-08-17 | TEMPORARY PEDESTRIAN WALK | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
Q022023201B90 | 2023-07-20 | 2023-08-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 43 AVENUE, QUEENS, FROM STREET 220 PLACE TO STREET 221 STREET |
B022023199B24 | 2023-07-18 | 2023-08-16 | TEMPORARY PEDESTRIAN WALK | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
Q022023199A35 | 2023-07-18 | 2023-08-12 | TEMPORARY PEDESTRIAN WALK | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B012023199B56 | 2023-07-18 | 2023-08-21 | REPAIR WATER - SEWER - PROTECTED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
Q022023199A36 | 2023-07-18 | 2023-08-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023199B25 | 2023-07-18 | 2023-08-16 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022023199B26 | 2023-07-18 | 2023-08-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022023199B36 | 2023-07-18 | 2023-08-31 | TEMPORARY PEDESTRIAN WALK | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023199B37 | 2023-07-18 | 2023-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023199B38 | 2023-07-18 | 2023-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023199B46 | 2023-07-18 | 2023-08-31 | TEMPORARY PEDESTRIAN WALK | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022023199B47 | 2023-07-18 | 2023-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022023199B48 | 2023-07-18 | 2023-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B012023199B55 | 2023-07-18 | 2023-08-17 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012023199B54 | 2023-07-18 | 2023-08-21 | REPAIR WATER | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012023199B53 | 2023-07-18 | 2023-08-15 | REPAIR WATER - SEWER | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
Q012023199A32 | 2023-07-18 | 2023-08-12 | REPAIR SEWER | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012023199A33 | 2023-07-18 | 2023-08-12 | C.A.R. RESTORATION | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023199A37 | 2023-07-18 | 2023-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
X022023195A94 | 2023-07-14 | 2023-08-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
B012023195D32 | 2023-07-14 | 2023-08-12 | C.A.R. RESTORATION | DE GRAW STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
X022023195A76 | 2023-07-14 | 2023-08-31 | TEMPORARY PEDESTRIAN WALK | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X022023195A77 | 2023-07-14 | 2023-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X012023195B57 | 2023-07-14 | 2023-08-21 | REPAIR WATER - SEWER | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X012023195C02 | 2023-07-14 | 2023-08-14 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023195A93 | 2023-07-14 | 2023-08-14 | OCCUPANCY OF ROADWAY AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023195A92 | 2023-07-14 | 2023-08-14 | TEMPORARY PEDESTRIAN WALK | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023195A78 | 2023-07-14 | 2023-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
M012023195B00 | 2023-07-14 | 2023-07-27 | CORE RE-DIG | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE |
B012023194A57 | 2023-07-13 | 2023-07-27 | REPAIR SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
X012023194B08 | 2023-07-13 | 2023-07-29 | REPAIR WATER - PROTECTED | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X012023194A85 | 2023-07-13 | 2023-08-10 | REPAIR WATER - SEWER - PROTECTED | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
X022023194A19 | 2023-07-13 | 2023-08-10 | OCCUPANCY OF ROADWAY AS STIPULATED | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
X022023194A20 | 2023-07-13 | 2023-08-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
X022023194A37 | 2023-07-13 | 2023-07-29 | OCCUPANCY OF ROADWAY AS STIPULATED | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X022023194A38 | 2023-07-13 | 2023-07-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X022023194A36 | 2023-07-13 | 2023-07-29 | TEMPORARY PEDESTRIAN WALK | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X022023194A18 | 2023-07-13 | 2023-08-10 | TEMPORARY PEDESTRIAN WALK | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
B022023194A72 | 2023-07-13 | 2023-07-27 | TEMPORARY PEDESTRIAN WALK | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023194A73 | 2023-07-13 | 2023-07-27 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023194A74 | 2023-07-13 | 2023-07-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023191C39 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
Q012023191B82 | 2023-07-10 | 2023-08-08 | REPAIR WATER - SEWER - PROTECTED | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
X022023191B67 | 2023-07-10 | 2023-08-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X012023191B58 | 2023-07-10 | 2023-08-11 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
B022023191C14 | 2023-07-10 | 2023-08-08 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023191C15 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023191C16 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023191C19 | 2023-07-10 | 2023-07-29 | TEMPORARY PEDESTRIAN WALK | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023191C20 | 2023-07-10 | 2023-07-29 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023191C21 | 2023-07-10 | 2023-07-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023191C22 | 2023-07-10 | 2023-08-02 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023191C23 | 2023-07-10 | 2023-08-02 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023191C24 | 2023-07-10 | 2023-08-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023191C26 | 2023-07-10 | 2023-07-31 | TEMPORARY PEDESTRIAN WALK | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023191C27 | 2023-07-10 | 2023-07-31 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023191C28 | 2023-07-10 | 2023-07-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023191C29 | 2023-07-10 | 2023-08-08 | TEMPORARY PEDESTRIAN WALK | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023191C30 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023191C31 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B022023191C32 | 2023-07-10 | 2023-08-08 | TEMPORARY PEDESTRIAN WALK | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023191C33 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023191C34 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023191C35 | 2023-07-10 | 2023-08-08 | TEMPORARY PEDESTRIAN WALK | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023191C36 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023191C37 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023191C38 | 2023-07-10 | 2023-08-08 | TEMPORARY PEDESTRIAN WALK | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B022023191C40 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
X022023191B66 | 2023-07-10 | 2023-08-11 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023191B65 | 2023-07-10 | 2023-08-11 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
B012023191D27 | 2023-07-10 | 2023-08-08 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B012023191D35 | 2023-07-10 | 2023-07-29 | REPAIR WATER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012023191D36 | 2023-07-10 | 2023-08-02 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012023191D37 | 2023-07-10 | 2023-07-31 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023191D38 | 2023-07-10 | 2023-08-08 | REPAIR WATER - SEWER | 54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B012023191D39 | 2023-07-10 | 2023-08-08 | REPAIR WATER | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B012023191D40 | 2023-07-10 | 2023-08-08 | REPAIR WATER - SEWER - PROTECTED | 17 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023191D41 | 2023-07-10 | 2023-08-08 | REPAIR WATER | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
Q022023191A47 | 2023-07-10 | 2023-08-08 | TEMPORARY PEDESTRIAN WALK | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q022023191A48 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF ROADWAY AS STIPULATED | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q022023191A49 | 2023-07-10 | 2023-08-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAWRENCE STREET, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
B012023187A84 | 2023-07-06 | 2023-07-17 | REPAIR WATER - SEWER | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023187B99 | 2023-07-06 | 2023-08-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023187B98 | 2023-07-06 | 2023-08-03 | OCCUPANCY OF ROADWAY AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023187B97 | 2023-07-06 | 2023-08-03 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B022023187A73 | 2023-07-06 | 2023-07-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023187A69 | 2023-07-06 | 2023-07-17 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023187A70 | 2023-07-06 | 2023-07-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
Q012023187C72 | 2023-07-06 | 2023-07-30 | REPAIR WATER | GORSLINE STREET, QUEENS, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE |
B022023187A72 | 2023-07-06 | 2023-07-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023187A71 | 2023-07-06 | 2023-07-22 | TEMPORARY PEDESTRIAN WALK | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023187A68 | 2023-07-06 | 2023-07-17 | TEMPORARY PEDESTRIAN WALK | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012023187C32 | 2023-07-06 | 2023-08-02 | REPAIR WATER - SEWER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012023187C31 | 2023-07-06 | 2023-08-03 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012023187A85 | 2023-07-06 | 2023-07-22 | REPAIR WATER | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023181C49 | 2023-06-30 | 2023-07-30 | TEMPORARY PEDESTRIAN WALK | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012023181B72 | 2023-06-30 | 2023-07-25 | C.A.R. RESTORATION | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
B012023181B71 | 2023-06-30 | 2023-07-30 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
Q012023181F11 | 2023-06-30 | 2023-07-29 | REPAIR WATER - SEWER - PROTECTED | 44 DRIVE, QUEENS, FROM STREET 11 STREET TO STREET 21 STREET |
Q012023181F12 | 2023-06-30 | 2023-07-31 | REPAIR WATER - SEWER | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q012023181F13 | 2023-06-30 | 2023-07-29 | REPAIR WATER - SEWER | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
B022023181C54 | 2023-06-30 | 2023-08-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023181C53 | 2023-06-30 | 2023-08-02 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023181C52 | 2023-06-30 | 2023-08-02 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023181C51 | 2023-06-30 | 2023-07-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023181C50 | 2023-06-30 | 2023-07-30 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
X022023181A96 | 2023-06-30 | 2023-07-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
Q022023181F41 | 2023-06-30 | 2023-07-31 | TEMPORARY PEDESTRIAN WALK | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023181F42 | 2023-06-30 | 2023-07-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023181F43 | 2023-06-30 | 2023-07-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023181F44 | 2023-06-30 | 2023-07-29 | TEMPORARY PEDESTRIAN WALK | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q022023181F45 | 2023-06-30 | 2023-07-29 | OCCUPANCY OF ROADWAY AS STIPULATED | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q022023181F46 | 2023-06-30 | 2023-07-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
X012023181B46 | 2023-06-30 | 2023-07-29 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X012023181B47 | 2023-06-30 | 2023-08-02 | REPAIR WATER - SEWER - PROTECTED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X012023181B48 | 2023-06-30 | 2023-07-15 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023181A88 | 2023-06-30 | 2023-07-29 | TEMPORARY PEDESTRIAN WALK | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023181A89 | 2023-06-30 | 2023-07-29 | OCCUPANCY OF ROADWAY AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023181A90 | 2023-06-30 | 2023-07-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023181A91 | 2023-06-30 | 2023-08-02 | TEMPORARY PEDESTRIAN WALK | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023181A92 | 2023-06-30 | 2023-08-02 | OCCUPANCY OF ROADWAY AS STIPULATED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023181A93 | 2023-06-30 | 2023-08-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023181A94 | 2023-06-30 | 2023-07-15 | TEMPORARY PEDESTRIAN WALK | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023181A95 | 2023-06-30 | 2023-07-15 | OCCUPANCY OF ROADWAY AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
B022023180C65 | 2023-06-29 | 2023-07-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BAY 25 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE |
B152023180A01 | 2023-06-29 | 2023-07-27 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B022023180C66 | 2023-06-29 | 2023-07-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAY 25 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE |
B022023180C64 | 2023-06-29 | 2023-07-28 | TEMPORARY PEDESTRIAN WALK | BAY 25 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE |
B012023180B31 | 2023-06-29 | 2023-07-28 | REPAIR WATER - SEWER | BAY 25 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE |
Q022023178C25 | 2023-06-27 | 2023-07-15 | TEMPORARY PEDESTRIAN WALK | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q022023178B94 | 2023-06-27 | 2023-07-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023178B93 | 2023-06-27 | 2023-07-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023178B92 | 2023-06-27 | 2023-07-26 | TEMPORARY PEDESTRIAN WALK | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q022023178B97 | 2023-06-27 | 2023-07-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023178B96 | 2023-06-27 | 2023-07-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023178C27 | 2023-06-27 | 2023-07-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012023178D64 | 2023-06-27 | 2023-07-15 | REPAIR WATER - SEWER | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012023178C41 | 2023-06-27 | 2023-07-26 | REPAIR WATER - SEWER | 213 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 29 AVENUE |
Q012023178C45 | 2023-06-27 | 2023-07-26 | REPAIR WATER - SEWER | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q022023178C26 | 2023-06-27 | 2023-07-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q022023178B95 | 2023-06-27 | 2023-07-26 | TEMPORARY PEDESTRIAN WALK | 201 STREET, QUEENS, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M012023178B70 | 2023-06-27 | 2023-07-25 | C.A.R. RESTORATION | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
X012023174B10 | 2023-06-23 | 2023-07-01 | REPAIR WATER - SEWER | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
Q022023174A69 | 2023-06-23 | 2023-07-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q022023174A68 | 2023-06-23 | 2023-07-21 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B012023174B47 | 2023-06-23 | 2023-07-14 | REPAIR WATER - SEWER | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023174A85 | 2023-06-23 | 2023-07-14 | TEMPORARY PEDESTRIAN WALK | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023174A86 | 2023-06-23 | 2023-07-14 | OCCUPANCY OF ROADWAY AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023174A87 | 2023-06-23 | 2023-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
Q022023174A67 | 2023-06-23 | 2023-07-21 | TEMPORARY PEDESTRIAN WALK | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012023174B11 | 2023-06-23 | 2023-07-21 | REPAIR SEWER | 149 STREET, QUEENS, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
M012023174B07 | 2023-06-23 | 2023-07-21 | C.A.R. RESTORATION | CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET |
X022023174A74 | 2023-06-23 | 2023-07-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023174A73 | 2023-06-23 | 2023-07-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023174A72 | 2023-06-23 | 2023-07-01 | TEMPORARY PEDESTRIAN WALK | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B022023173D36 | 2023-06-22 | 2023-07-22 | TEMPORARY PEDESTRIAN WALK | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022023173D38 | 2023-06-22 | 2023-07-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022023173D37 | 2023-06-22 | 2023-07-22 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B012023173C62 | 2023-06-22 | 2023-07-22 | REPAIR WATER - SEWER - PROTECTED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B012023170A14 | 2023-06-19 | 2023-06-30 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
X022023165A28 | 2023-06-14 | 2023-07-07 | OCCUPANCY OF ROADWAY AS STIPULATED | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X022023165A29 | 2023-06-14 | 2023-07-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X022023165A27 | 2023-06-14 | 2023-07-07 | TEMPORARY PEDESTRIAN WALK | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
X012023165A62 | 2023-06-14 | 2023-07-07 | REPAIR WATER - PROTECTED | FENTON AVENUE, BRONX, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE |
Q012023163A58 | 2023-06-12 | 2023-06-19 | REPAIR WATER - SEWER | 44 AVENUE, QUEENS, FROM STREET 189 STREET TO STREET 192 STREET |
Q012023163A56 | 2023-06-12 | 2023-06-19 | REPAIR WATER - SEWER | BURLING STREET, QUEENS, FROM STREET 45 AVENUE TO STREET GEORGIA ROAD |
X012023159A30 | 2023-06-08 | 2023-07-07 | REPAIR WATER - SEWER - PROTECTED | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
X022023159A12 | 2023-06-08 | 2023-07-07 | OCCUPANCY OF ROADWAY AS STIPULATED | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
X022023159A13 | 2023-06-08 | 2023-07-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
B022023159C00 | 2023-06-08 | 2023-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B012023159B36 | 2023-06-08 | 2023-06-29 | REPAIR WATER - SEWER - PROTECTED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012023159B35 | 2023-06-08 | 2023-06-29 | REPAIR WATER - SEWER | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
X022023159A11 | 2023-06-08 | 2023-07-07 | TEMPORARY PEDESTRIAN WALK | HULL AVENUE, BRONX, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD |
B022023158C05 | 2023-06-07 | 2023-07-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023158C04 | 2023-06-07 | 2023-07-12 | TEMPORARY PEDESTRIAN WALK | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023158B31 | 2023-06-07 | 2023-07-12 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023158C06 | 2023-06-07 | 2023-07-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023157B67 | 2023-06-06 | 2023-07-12 | REPAIR WATER - SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012023157B68 | 2023-06-06 | 2023-07-05 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012023157B71 | 2023-06-06 | 2023-07-06 | REPAIR WATER - SEWER | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
X022023157B13 | 2023-06-06 | 2023-07-22 | TEMPORARY PEDESTRIAN WALK | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X022023157B14 | 2023-06-06 | 2023-07-22 | OCCUPANCY OF ROADWAY AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X022023157B15 | 2023-06-06 | 2023-07-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
B022023157C36 | 2023-06-06 | 2023-07-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023157C35 | 2023-06-06 | 2023-07-06 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023157C34 | 2023-06-06 | 2023-07-06 | TEMPORARY PEDESTRIAN WALK | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023157C24 | 2023-06-06 | 2023-07-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023157C23 | 2023-06-06 | 2023-07-06 | OCCUPANCY OF ROADWAY AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
X012023157B26 | 2023-06-06 | 2023-07-22 | REPAIR WATER - SEWER | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
B022023157C22 | 2023-06-06 | 2023-07-06 | TEMPORARY PEDESTRIAN WALK | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
M012023157A49 | 2023-06-06 | 2023-07-02 | C.A.R. RESTORATION | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B012023157B63 | 2023-06-06 | 2023-07-06 | REPAIR WATER - SEWER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B012023157B66 | 2023-06-06 | 2023-07-05 | C.A.R. RESTORATION | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B022023156D54 | 2023-06-05 | 2023-07-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023156D47 | 2023-06-05 | 2023-07-05 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023156D48 | 2023-06-05 | 2023-07-05 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023156D49 | 2023-06-05 | 2023-07-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023156D50 | 2023-06-05 | 2023-07-15 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023156D51 | 2023-06-05 | 2023-07-15 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023156D52 | 2023-06-05 | 2023-07-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023156D53 | 2023-06-05 | 2023-07-12 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023156D55 | 2023-06-05 | 2023-07-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023156D70 | 2023-06-05 | 2023-07-12 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023156D71 | 2023-06-05 | 2023-07-12 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023156D72 | 2023-06-05 | 2023-07-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023156D73 | 2023-06-05 | 2023-07-06 | TEMPORARY PEDESTRIAN WALK | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023156D74 | 2023-06-05 | 2023-07-06 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023156D75 | 2023-06-05 | 2023-07-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023156D76 | 2023-06-05 | 2023-07-07 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023156D77 | 2023-06-05 | 2023-07-07 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023156D78 | 2023-06-05 | 2023-07-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
Q012023156D38 | 2023-06-05 | 2023-07-18 | REPAIR WATER - SEWER | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012023156D37 | 2023-06-05 | 2023-07-04 | REPAIR WATER - SEWER | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET SMART STREET |
Q012023156D35 | 2023-06-05 | 2023-07-07 | REPAIR WATER - SEWER | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q012023156D25 | 2023-06-05 | 2023-07-08 | REPAIR WATER | GORSLINE STREET, QUEENS, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE |
B012023156C22 | 2023-06-05 | 2023-07-18 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012023156C27 | 2023-06-05 | 2023-07-15 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012023156C28 | 2023-06-05 | 2023-07-12 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023156C33 | 2023-06-05 | 2023-07-06 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012023156C34 | 2023-06-05 | 2023-07-07 | REPAIR WATER - SEWER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
Q012023156D34 | 2023-06-05 | 2023-07-04 | REPAIR WATER - SEWER | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023156B31 | 2023-06-05 | 2023-07-04 | TEMPORARY PEDESTRIAN WALK | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET SMART STREET |
Q022023156B32 | 2023-06-05 | 2023-07-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET SMART STREET |
Q022023156B33 | 2023-06-05 | 2023-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET SMART STREET |
Q022023156B25 | 2023-06-05 | 2023-07-04 | TEMPORARY PEDESTRIAN WALK | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023156B26 | 2023-06-05 | 2023-07-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023156B27 | 2023-06-05 | 2023-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 204 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET BEND |
Q022023156B28 | 2023-06-05 | 2023-07-07 | TEMPORARY PEDESTRIAN WALK | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023156B29 | 2023-06-05 | 2023-07-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023156B30 | 2023-06-05 | 2023-07-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023156B34 | 2023-06-05 | 2023-07-18 | TEMPORARY PEDESTRIAN WALK | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023156B35 | 2023-06-05 | 2023-07-18 | OCCUPANCY OF ROADWAY AS STIPULATED | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023156B36 | 2023-06-05 | 2023-07-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023153B29 | 2023-06-02 | 2023-07-08 | TEMPORARY PEDESTRIAN WALK | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
B012023153A50 | 2023-06-02 | 2023-06-24 | REPAIR WATER - SEWER | BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
X022023153B17 | 2023-06-02 | 2023-07-22 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
Q022023153B26 | 2023-06-02 | 2023-07-22 | TEMPORARY PEDESTRIAN WALK | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023153B25 | 2023-06-02 | 2023-07-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023153B24 | 2023-06-02 | 2023-07-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023153B23 | 2023-06-02 | 2023-07-22 | TEMPORARY PEDESTRIAN WALK | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023153B34 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q012023153C78 | 2023-06-02 | 2023-07-01 | REPAIR WATER - SEWER | CODWISE PLACE, QUEENS, FROM STREET BEND TO STREET KNEELAND AVENUE |
Q022023153B33 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF ROADWAY AS STIPULATED | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022023153B32 | 2023-06-02 | 2023-07-08 | TEMPORARY PEDESTRIAN WALK | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q022023153B31 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q022023153B30 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF ROADWAY AS STIPULATED | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
B012023153B60 | 2023-06-02 | 2023-07-04 | REPAIR WATER | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023153A43 | 2023-06-02 | 2023-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
X012023153A55 | 2023-06-02 | 2023-07-22 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X012023153A56 | 2023-06-02 | 2023-07-08 | REPAIR WATER - SEWER - PROTECTED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X012023153A57 | 2023-06-02 | 2023-07-06 | REPAIR WATER | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023153B24 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF ROADWAY AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023153B25 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
Q022023153B27 | 2023-06-02 | 2023-07-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023153B28 | 2023-06-02 | 2023-07-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
B022023153B84 | 2023-06-02 | 2023-07-04 | TEMPORARY PEDESTRIAN WALK | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023153B85 | 2023-06-02 | 2023-07-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012023153C80 | 2023-06-02 | 2023-07-04 | REPAIR WATER - SEWER | 189 STREET, QUEENS, FROM STREET 43 ROAD TO STREET 44 AVENUE |
Q012023153C79 | 2023-06-02 | 2023-07-04 | REPAIR WATER - SEWER | 40 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
Q012023153C77 | 2023-06-02 | 2023-07-01 | REPAIR WATER - SEWER - PROTECTED | 44 DRIVE, QUEENS, FROM STREET 11 STREET TO STREET 21 STREET |
Q012023153C76 | 2023-06-02 | 2023-07-22 | REPAIR SEWER - PROTECTED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023153C75 | 2023-06-02 | 2023-07-22 | REPAIR WATER - PROTECTED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
B022023153B86 | 2023-06-02 | 2023-07-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
X022023153B23 | 2023-06-02 | 2023-07-08 | TEMPORARY PEDESTRIAN WALK | TELLER AVENUE, BRONX, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE |
X022023153B22 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023153B21 | 2023-06-02 | 2023-07-08 | OCCUPANCY OF ROADWAY AS STIPULATED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023153B20 | 2023-06-02 | 2023-07-08 | TEMPORARY PEDESTRIAN WALK | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023153B19 | 2023-06-02 | 2023-07-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023153B18 | 2023-06-02 | 2023-07-22 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
B012023152C63 | 2023-06-01 | 2023-06-24 | REPAIR WATER - SEWER | BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
B012023152C26 | 2023-06-01 | 2023-06-29 | REPAIR WATER - SEWER - PROTECTED | MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012023152C25 | 2023-06-01 | 2023-06-29 | REPAIR WATER - SEWER | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023152D20 | 2023-06-01 | 2023-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023152D21 | 2023-06-01 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023152D22 | 2023-06-01 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B022023152D23 | 2023-06-01 | 2023-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B022023152D24 | 2023-06-01 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B022023152D64 | 2023-06-01 | 2023-06-24 | TEMPORARY PEDESTRIAN WALK | BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
B022023152D65 | 2023-06-01 | 2023-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
B022023152D66 | 2023-06-01 | 2023-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | BERRY STREET, BROOKLYN, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET |
B022023152D19 | 2023-06-01 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023151A88 | 2023-05-31 | 2023-06-29 | TEMPORARY PEDESTRIAN WALK | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B022023151A89 | 2023-05-31 | 2023-06-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B022023151A87 | 2023-05-31 | 2023-07-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023151A86 | 2023-05-31 | 2023-07-12 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023151A85 | 2023-05-31 | 2023-07-12 | TEMPORARY PEDESTRIAN WALK | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012023151B64 | 2023-05-31 | 2023-07-12 | REPAIR WATER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012023151B65 | 2023-05-31 | 2023-06-29 | REPAIR WATER - SEWER - PROTECTED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
Q012023150C50 | 2023-05-30 | 2023-06-28 | REPAIR WATER - PROTECTED | VERNON BOULEVARD, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022023150B80 | 2023-05-30 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | VERNON BOULEVARD, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022023150B81 | 2023-05-30 | 2023-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | VERNON BOULEVARD, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022023150B82 | 2023-05-30 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | VERNON BOULEVARD, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
X022023150B10 | 2023-05-30 | 2023-07-12 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023150B09 | 2023-05-30 | 2023-07-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023150B08 | 2023-05-30 | 2023-07-15 | OCCUPANCY OF ROADWAY AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023150B07 | 2023-05-30 | 2023-07-15 | TEMPORARY PEDESTRIAN WALK | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X012023150B19 | 2023-05-30 | 2023-07-12 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023150B15 | 2023-05-30 | 2023-07-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023150B14 | 2023-05-30 | 2023-07-01 | OCCUPANCY OF ROADWAY AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023150B13 | 2023-05-30 | 2023-07-01 | TEMPORARY PEDESTRIAN WALK | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023150B12 | 2023-05-30 | 2023-07-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023150B11 | 2023-05-30 | 2023-07-12 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X012023150B18 | 2023-05-30 | 2023-07-15 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X012023150B20 | 2023-05-30 | 2023-07-01 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
M022023146B24 | 2023-05-26 | 2023-07-14 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M022023146B25 | 2023-05-26 | 2023-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M022023146B26 | 2023-05-26 | 2023-06-27 | TEMPORARY PEDESTRIAN WALK | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023146B27 | 2023-05-26 | 2023-06-27 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023146B28 | 2023-05-26 | 2023-06-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012023146B29 | 2023-05-26 | 2023-06-27 | REPAIR SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023146B23 | 2023-05-26 | 2023-07-14 | TEMPORARY PEDESTRIAN WALK | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M012023146B36 | 2023-05-26 | 2023-06-29 | REPAIR WATER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023146B28 | 2023-05-26 | 2023-07-14 | REPAIR WATER - SEWER | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M022023146B37 | 2023-05-26 | 2023-06-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022023146B36 | 2023-05-26 | 2023-06-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022023146B35 | 2023-05-26 | 2023-06-30 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022023145C71 | 2023-05-25 | 2023-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | MILLER AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022023145C66 | 2023-05-25 | 2023-06-23 | TEMPORARY PEDESTRIAN WALK | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
Q022023145B07 | 2023-05-25 | 2023-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
B012023145A61 | 2023-05-25 | 2023-06-12 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023145B87 | 2023-05-25 | 2023-06-22 | REPAIR WATER - SEWER - PROTECTED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B012023145B88 | 2023-05-25 | 2023-06-22 | REPAIR WATER - SEWER | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023145C68 | 2023-05-25 | 2023-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
Q022023145B02 | 2023-05-25 | 2023-06-22 | TEMPORARY PEDESTRIAN WALK | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023145B03 | 2023-05-25 | 2023-06-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023145B04 | 2023-05-25 | 2023-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023145B05 | 2023-05-25 | 2023-06-23 | TEMPORARY PEDESTRIAN WALK | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q022023145B06 | 2023-05-25 | 2023-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
X022023145B51 | 2023-05-25 | 2023-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X022023145B49 | 2023-05-25 | 2023-06-22 | TEMPORARY PEDESTRIAN WALK | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
X022023145B50 | 2023-05-25 | 2023-06-22 | OCCUPANCY OF ROADWAY AS STIPULATED | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
Q012023145B93 | 2023-05-25 | 2023-06-22 | REPAIR SEWER - PROTECTED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
Q012023145B94 | 2023-05-25 | 2023-06-22 | REPAIR WATER - PROTECTED | 220 PLACE, QUEENS, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD |
B022023145C69 | 2023-05-25 | 2023-06-23 | TEMPORARY PEDESTRIAN WALK | MILLER AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022023145C70 | 2023-05-25 | 2023-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | MILLER AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE |
B022023145C65 | 2023-05-25 | 2023-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
X012023145B07 | 2023-05-25 | 2023-06-22 | REPAIR WATER - SEWER | OGDEN AVENUE, BRONX, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET |
B022023145C64 | 2023-05-25 | 2023-06-22 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022023145C63 | 2023-05-25 | 2023-06-22 | TEMPORARY PEDESTRIAN WALK | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022023145C67 | 2023-05-25 | 2023-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE |
B022023143A83 | 2023-05-23 | 2023-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
X022023143A30 | 2023-05-23 | 2023-06-21 | OCCUPANCY OF ROADWAY AS STIPULATED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023143A31 | 2023-05-23 | 2023-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
X022023143A32 | 2023-05-23 | 2023-06-22 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023143A33 | 2023-05-23 | 2023-06-22 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023143A34 | 2023-05-23 | 2023-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
B012023143B95 | 2023-05-23 | 2023-06-13 | REPAIR WATER - SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012023143A82 | 2023-05-23 | 2023-06-20 | REPAIR WATER - SEWER | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
X012023143A25 | 2023-05-23 | 2023-06-22 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X012023143A24 | 2023-05-23 | 2023-06-21 | REPAIR WATER - SEWER - PROTECTED | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
B012023143A76 | 2023-05-23 | 2023-06-20 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
Q012023143B00 | 2023-05-23 | 2023-06-26 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
B022023143A81 | 2023-05-23 | 2023-06-22 | TEMPORARY PEDESTRIAN WALK | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023143A82 | 2023-05-23 | 2023-06-22 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 6 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
X022023143A29 | 2023-05-23 | 2023-06-21 | TEMPORARY PEDESTRIAN WALK | MONROE AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET |
M012023142A49 | 2023-05-22 | 2023-06-18 | REPAIR SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M012023137B30 | 2023-05-17 | 2023-06-14 | REPAIR WATER - SEWER | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M022023137C67 | 2023-05-17 | 2023-06-14 | TEMPORARY PEDESTRIAN WALK | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M022023137C69 | 2023-05-17 | 2023-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
M022023137C68 | 2023-05-17 | 2023-06-14 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 123 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012023136B04 | 2023-05-16 | 2023-06-12 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X022023136A75 | 2023-05-16 | 2023-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023136A74 | 2023-05-16 | 2023-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023136A73 | 2023-05-16 | 2023-06-15 | TEMPORARY PEDESTRIAN WALK | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023136A81 | 2023-05-16 | 2023-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
M022023136B41 | 2023-05-16 | 2023-06-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M022023136B40 | 2023-05-16 | 2023-06-18 | OCCUPANCY OF ROADWAY AS STIPULATED | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M012023136B07 | 2023-05-16 | 2023-05-30 | REPAIR WATER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023136B13 | 2023-05-16 | 2023-06-18 | REPAIR SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
B022023136B00 | 2023-05-16 | 2023-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X012023136A61 | 2023-05-16 | 2023-06-15 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
B022023136A99 | 2023-05-16 | 2023-06-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023136A98 | 2023-05-16 | 2023-06-12 | TEMPORARY PEDESTRIAN WALK | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X012023136A63 | 2023-05-16 | 2023-06-10 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X012023136A64 | 2023-05-16 | 2023-06-12 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023136A76 | 2023-05-16 | 2023-06-10 | TEMPORARY PEDESTRIAN WALK | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X022023136A77 | 2023-05-16 | 2023-06-10 | OCCUPANCY OF ROADWAY AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X022023136A78 | 2023-05-16 | 2023-06-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X022023136A79 | 2023-05-16 | 2023-06-12 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023136A80 | 2023-05-16 | 2023-06-12 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
Q022023132A13 | 2023-05-12 | 2023-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
B012023132A42 | 2023-05-12 | 2023-06-14 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012023132A40 | 2023-05-12 | 2023-06-12 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023132A39 | 2023-05-12 | 2023-06-12 | REPAIR WATER - SEWER - PROTECTED | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012023132A38 | 2023-05-12 | 2023-06-15 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012023132A37 | 2023-05-12 | 2023-06-08 | REPAIR WATER - SEWER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012023132A34 | 2023-05-12 | 2023-06-12 | REPAIR WATER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012023132A33 | 2023-05-12 | 2023-06-02 | REPAIR WATER - SEWER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
M012023132A25 | 2023-05-12 | 2023-06-13 | REPAIR SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
Q012023132B57 | 2023-05-12 | 2023-06-18 | REPAIR WATER - SEWER | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012023132B59 | 2023-05-12 | 2023-06-15 | REPAIR WATER - SEWER | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023132B60 | 2023-05-12 | 2023-06-15 | REPAIR WATER - SEWER | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023132A06 | 2023-05-12 | 2023-06-18 | TEMPORARY PEDESTRIAN WALK | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023132A07 | 2023-05-12 | 2023-06-18 | OCCUPANCY OF ROADWAY AS STIPULATED | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023132A08 | 2023-05-12 | 2023-06-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q022023132A09 | 2023-05-12 | 2023-06-15 | TEMPORARY PEDESTRIAN WALK | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023132A10 | 2023-05-12 | 2023-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023132A11 | 2023-05-12 | 2023-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023132A12 | 2023-05-12 | 2023-06-23 | TEMPORARY PEDESTRIAN WALK | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023132A14 | 2023-05-12 | 2023-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
B022023132A36 | 2023-05-12 | 2023-06-15 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023132A37 | 2023-05-12 | 2023-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023132A38 | 2023-05-12 | 2023-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023132A39 | 2023-05-12 | 2023-06-15 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023132A40 | 2023-05-12 | 2023-06-15 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023132A41 | 2023-05-12 | 2023-06-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023132A42 | 2023-05-12 | 2023-06-12 | TEMPORARY PEDESTRIAN WALK | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023132A43 | 2023-05-12 | 2023-06-12 | OCCUPANCY OF ROADWAY AS STIPULATED | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023132A44 | 2023-05-12 | 2023-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023132A45 | 2023-05-12 | 2023-06-12 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023132A46 | 2023-05-12 | 2023-06-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023132A47 | 2023-05-12 | 2023-06-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023132A51 | 2023-05-12 | 2023-06-14 | TEMPORARY PEDESTRIAN WALK | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023132A52 | 2023-05-12 | 2023-06-14 | OCCUPANCY OF ROADWAY AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023132A53 | 2023-05-12 | 2023-06-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q012023131B30 | 2023-05-11 | 2023-06-08 | REPAIR WATER | GORSLINE STREET, QUEENS, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE |
B022023131A38 | 2023-05-11 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023131A37 | 2023-05-11 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022023131A36 | 2023-05-11 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012023131C06 | 2023-05-11 | 2023-06-06 | REPAIR WATER - SEWER | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
Q012023131A65 | 2023-05-11 | 2023-06-08 | REPAIR WATER - PROTECTED | 65 PLACE, QUEENS, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE |
B022023131A81 | 2023-05-11 | 2023-06-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023131A80 | 2023-05-11 | 2023-06-06 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023131A79 | 2023-05-11 | 2023-06-06 | TEMPORARY PEDESTRIAN WALK | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023130A70 | 2023-05-10 | 2023-06-06 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023130A71 | 2023-05-10 | 2023-06-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012023130B29 | 2023-05-10 | 2023-06-06 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023130A69 | 2023-05-10 | 2023-06-06 | TEMPORARY PEDESTRIAN WALK | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022023129A56 | 2023-05-09 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B022023129A57 | 2023-05-09 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B022023129A58 | 2023-05-09 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
M152023129A00 | 2023-05-09 | 2023-06-18 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
B012023129A97 | 2023-05-09 | 2023-06-06 | REPAIR WATER | HEYWARD STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B022023125B76 | 2023-05-05 | 2023-06-06 | TEMPORARY PEDESTRIAN WALK | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023125B75 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
B022023125B74 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
B022023125B73 | 2023-05-05 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
M012023125B21 | 2023-05-05 | 2023-06-04 | REPAIR SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012023125C13 | 2023-05-05 | 2023-06-03 | REPAIR WATER | GROVE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET GOODWIN PLACE |
B012023125C14 | 2023-05-05 | 2023-06-07 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
M022023125C87 | 2023-05-05 | 2023-06-04 | TEMPORARY PEDESTRIAN WALK | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023125C88 | 2023-05-05 | 2023-06-04 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023125C89 | 2023-05-05 | 2023-06-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022023125B70 | 2023-05-05 | 2023-06-03 | TEMPORARY PEDESTRIAN WALK | GROVE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET GOODWIN PLACE |
B012023125C15 | 2023-05-05 | 2023-06-06 | REPAIR WATER - SEWER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
Q012023125B87 | 2023-05-05 | 2023-06-07 | REPAIR WATER - SEWER | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q012023125B89 | 2023-05-05 | 2023-06-07 | REPAIR WATER | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q012023125B90 | 2023-05-05 | 2023-06-07 | REPAIR WATER | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
B022023125B72 | 2023-05-05 | 2023-06-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | GROVE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET GOODWIN PLACE |
B022023125B71 | 2023-05-05 | 2023-06-03 | OCCUPANCY OF ROADWAY AS STIPULATED | GROVE STREET, BROOKLYN, FROM STREET BROADWAY TO STREET GOODWIN PLACE |
Q022023125A91 | 2023-05-05 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023125A92 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023125A93 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023125A94 | 2023-05-05 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022023125A95 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022023125A96 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022023125A97 | 2023-05-05 | 2023-06-07 | TEMPORARY PEDESTRIAN WALK | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022023125A98 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022023125A99 | 2023-05-05 | 2023-06-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
B022023125B78 | 2023-05-05 | 2023-06-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023125B77 | 2023-05-05 | 2023-06-06 | OCCUPANCY OF ROADWAY AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023124A10 | 2023-05-04 | 2023-05-20 | TEMPORARY PEDESTRIAN WALK | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012023124A64 | 2023-05-04 | 2023-06-09 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012023124A15 | 2023-05-04 | 2023-05-20 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023124A44 | 2023-05-04 | 2023-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023124A43 | 2023-05-04 | 2023-06-09 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023124A42 | 2023-05-04 | 2023-06-09 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023124A12 | 2023-05-04 | 2023-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023124A11 | 2023-05-04 | 2023-05-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
Q042023123A01 | 2023-05-03 | 2023-05-31 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
B152023122A05 | 2023-05-02 | 2023-05-20 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023121C51 | 2023-05-01 | 2023-06-03 | TEMPORARY PEDESTRIAN WALK | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
B022023121C40 | 2023-05-01 | 2023-06-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012023121C09 | 2023-05-01 | 2023-06-05 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B012023121C08 | 2023-05-01 | 2023-06-03 | REPAIR SEWER - PROTECTED | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
M022023121B41 | 2023-05-01 | 2023-05-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012023121A72 | 2023-05-01 | 2023-05-30 | REPAIR WATER - SEWER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023121B40 | 2023-05-01 | 2023-05-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022023121B39 | 2023-05-01 | 2023-05-30 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022023121B44 | 2023-05-01 | 2023-05-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023121B43 | 2023-05-01 | 2023-05-30 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023121B42 | 2023-05-01 | 2023-05-30 | TEMPORARY PEDESTRIAN WALK | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X022023121C51 | 2023-05-01 | 2023-06-03 | TEMPORARY PEDESTRIAN WALK | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023121C50 | 2023-05-01 | 2023-05-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023121C49 | 2023-05-01 | 2023-05-27 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023121C48 | 2023-05-01 | 2023-05-27 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
B022023121C39 | 2023-05-01 | 2023-06-05 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023121C38 | 2023-05-01 | 2023-06-05 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023121C56 | 2023-05-01 | 2023-06-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B022023121C55 | 2023-05-01 | 2023-06-05 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B022023121C54 | 2023-05-01 | 2023-06-05 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B022023121C53 | 2023-05-01 | 2023-06-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
B022023121C52 | 2023-05-01 | 2023-06-02 | OCCUPANCY OF ROADWAY AS STIPULATED | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
X012023121B00 | 2023-05-01 | 2023-05-27 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X012023121B02 | 2023-05-01 | 2023-06-01 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X012023121B03 | 2023-05-01 | 2023-06-05 | REPAIR WATER | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B012023121C02 | 2023-05-01 | 2023-06-05 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
X022023121C61 | 2023-05-01 | 2023-06-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023121C60 | 2023-05-01 | 2023-06-05 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023121C59 | 2023-05-01 | 2023-06-05 | TEMPORARY PEDESTRIAN WALK | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023121C53 | 2023-05-01 | 2023-06-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023121C52 | 2023-05-01 | 2023-06-03 | OCCUPANCY OF ROADWAY AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X012023118A93 | 2023-04-28 | 2023-06-01 | REPAIR WATER - SEWER | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023118A78 | 2023-04-28 | 2023-06-01 | TEMPORARY PEDESTRIAN WALK | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023118A80 | 2023-04-28 | 2023-06-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023118A79 | 2023-04-28 | 2023-06-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B022023117C22 | 2023-04-27 | 2023-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012023117D21 | 2023-04-27 | 2023-05-15 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023117C20 | 2023-04-27 | 2023-05-15 | TEMPORARY PEDESTRIAN WALK | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023117C07 | 2023-04-27 | 2023-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
B012023117D20 | 2023-04-27 | 2023-05-20 | REPAIR WATER - SEWER | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
Q012023117C69 | 2023-04-27 | 2023-05-27 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
B022023117C21 | 2023-04-27 | 2023-05-15 | OCCUPANCY OF ROADWAY AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012023117D22 | 2023-04-27 | 2023-05-19 | REPAIR WATER - SEWER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B022023117C05 | 2023-04-27 | 2023-05-20 | TEMPORARY PEDESTRIAN WALK | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
B022023117C06 | 2023-04-27 | 2023-05-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
X022023116B36 | 2023-04-26 | 2023-05-19 | OCCUPANCY OF ROADWAY AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X022023116B35 | 2023-04-26 | 2023-05-19 | TEMPORARY PEDESTRIAN WALK | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X012023116A69 | 2023-04-26 | 2023-05-19 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B012023116B02 | 2023-04-26 | 2023-05-21 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X022023116B37 | 2023-04-26 | 2023-05-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
Q022023111A61 | 2023-04-21 | 2023-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012023111B92 | 2023-04-21 | 2023-05-19 | REPAIR WATER - SEWER | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
B012023111B23 | 2023-04-21 | 2023-05-17 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023111A86 | 2023-04-21 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
Q022023111A60 | 2023-04-21 | 2023-05-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
B022023111A87 | 2023-04-21 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023111A88 | 2023-04-21 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
Q022023111A59 | 2023-04-21 | 2023-05-20 | TEMPORARY PEDESTRIAN WALK | 59 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 150 STREET |
Q012023111B93 | 2023-04-21 | 2023-05-29 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q022023110A57 | 2023-04-20 | 2023-05-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
M022023110B54 | 2023-04-20 | 2023-05-28 | TEMPORARY PEDESTRIAN WALK | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
B012023110B29 | 2023-04-20 | 2023-05-17 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012023110B94 | 2023-04-20 | 2023-05-17 | REPAIR SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
Q022023110A55 | 2023-04-20 | 2023-05-24 | TEMPORARY PEDESTRIAN WALK | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q022023110A67 | 2023-04-20 | 2023-05-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
M012023110C03 | 2023-04-20 | 2023-05-14 | REPAIR SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M012023110B82 | 2023-04-20 | 2023-05-14 | REPAIR SEWER | THOMPSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET SPRING STREET |
M022023110B56 | 2023-04-20 | 2023-05-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
Q022023110A66 | 2023-04-20 | 2023-05-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
M022023110B55 | 2023-04-20 | 2023-05-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
Q022023110A65 | 2023-04-20 | 2023-05-27 | TEMPORARY PEDESTRIAN WALK | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023110A56 | 2023-04-20 | 2023-05-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q012023110D47 | 2023-04-20 | 2023-05-27 | REPAIR WATER - SEWER | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q012023110C33 | 2023-04-20 | 2023-05-24 | REPAIR WATER - SEWER - PROTECTED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
M012023110C04 | 2023-04-20 | 2023-05-28 | REPAIR WATER - SEWER - PROTECTED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
B012023109B03 | 2023-04-19 | 2023-05-18 | REPAIR SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B022023109A28 | 2023-04-19 | 2023-05-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B022023109A26 | 2023-04-19 | 2023-05-18 | TEMPORARY PEDESTRIAN WALK | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B022023109A27 | 2023-04-19 | 2023-05-18 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B022023108A93 | 2023-04-18 | 2023-05-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023108A85 | 2023-04-18 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023108A86 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023108A87 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B022023108A88 | 2023-04-18 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023108A89 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023108A90 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B022023108A91 | 2023-04-18 | 2023-05-11 | TEMPORARY PEDESTRIAN WALK | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023108A92 | 2023-04-18 | 2023-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022023108A94 | 2023-04-18 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023108A95 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B022023108A96 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
X022023108B13 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023108B12 | 2023-04-18 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023108B11 | 2023-04-18 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
Q012023108C28 | 2023-04-18 | 2023-05-16 | C.A.R. RESTORATION - PROTECTED | 149 STREET, QUEENS, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B012023108B09 | 2023-04-18 | 2023-05-17 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012023108B08 | 2023-04-18 | 2023-05-11 | REPAIR WATER - SEWER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B012023108B07 | 2023-04-18 | 2023-05-17 | REPAIR WATER - SEWER - PROTECTED | LAKE STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012023108C29 | 2023-04-18 | 2023-05-16 | C.A.R. RESTORATION - PROTECTED | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
X012023108B98 | 2023-04-18 | 2023-05-17 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET JESUP PLACE TO STREET WEST 172 STREET |
X022023107A49 | 2023-04-17 | 2023-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023107A47 | 2023-04-17 | 2023-05-16 | TEMPORARY PEDESTRIAN WALK | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
B012023107B85 | 2023-04-17 | 2023-05-11 | C.A.R. RESTORATION | BRAGG STREET, BROOKLYN, FROM STREET AVENUE V TO STREET AVENUE W |
B012023107B87 | 2023-04-17 | 2023-05-16 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012023107B86 | 2023-04-17 | 2023-05-16 | REPAIR WATER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
Q022023107B80 | 2023-04-17 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023107B86 | 2023-04-17 | 2023-05-16 | TEMPORARY PEDESTRIAN WALK | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023107B87 | 2023-04-17 | 2023-05-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023107B88 | 2023-04-17 | 2023-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023107B85 | 2023-04-17 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023107C24 | 2023-04-17 | 2023-05-15 | REPAIR WATER - SEWER | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET HAWTREE STREET |
Q012023107D52 | 2023-04-17 | 2023-05-17 | REPAIR WATER - SEWER | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023107D53 | 2023-04-17 | 2023-05-17 | REPAIR WATER - SEWER | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q012023107D54 | 2023-04-17 | 2023-05-16 | REPAIR WATER - SEWER | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023107B84 | 2023-04-17 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
B022023107C48 | 2023-04-17 | 2023-05-16 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023107C49 | 2023-04-17 | 2023-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
X012023107B12 | 2023-04-17 | 2023-05-16 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
Q022023107B83 | 2023-04-17 | 2023-05-17 | TEMPORARY PEDESTRIAN WALK | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023107B82 | 2023-04-17 | 2023-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023107B81 | 2023-04-17 | 2023-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
B022023107C44 | 2023-04-17 | 2023-05-31 | TEMPORARY PEDESTRIAN WALK | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023107C45 | 2023-04-17 | 2023-05-31 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023107C46 | 2023-04-17 | 2023-05-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023107C47 | 2023-04-17 | 2023-05-16 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
X022023107A48 | 2023-04-17 | 2023-05-16 | OCCUPANCY OF ROADWAY AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023104A83 | 2023-04-14 | 2023-05-01 | OCCUPANCY OF ROADWAY AS STIPULATED | DAVIDSON AVENUE, BRONX, FROM STREET FEATHERBED LANE TO STREET WEST 174 STREET |
X022023104A82 | 2023-04-14 | 2023-05-01 | TEMPORARY PEDESTRIAN WALK | DAVIDSON AVENUE, BRONX, FROM STREET FEATHERBED LANE TO STREET WEST 174 STREET |
X012023104B04 | 2023-04-14 | 2023-05-01 | REPAIR WATER | DAVIDSON AVENUE, BRONX, FROM STREET FEATHERBED LANE TO STREET WEST 174 STREET |
X022023104A84 | 2023-04-14 | 2023-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | DAVIDSON AVENUE, BRONX, FROM STREET FEATHERBED LANE TO STREET WEST 174 STREET |
B022023103A65 | 2023-04-13 | 2023-04-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | WYONA STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
B022023103A63 | 2023-04-13 | 2023-04-26 | TEMPORARY PEDESTRIAN WALK | WYONA STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
B012023103B98 | 2023-04-13 | 2023-04-26 | REPAIR WATER | WYONA STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
B022023103A64 | 2023-04-13 | 2023-04-26 | OCCUPANCY OF ROADWAY AS STIPULATED | WYONA STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD |
B022023102A19 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
B022023102A18 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
Q022023102A16 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022023102A17 | 2023-04-12 | 2023-05-11 | TEMPORARY PEDESTRIAN WALK | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q022023102A19 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
B012023102B29 | 2023-04-12 | 2023-05-11 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
M022023102A68 | 2023-04-12 | 2023-04-29 | TEMPORARY PEDESTRIAN WALK | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023102A69 | 2023-04-12 | 2023-04-29 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023102A70 | 2023-04-12 | 2023-04-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022023102A17 | 2023-04-12 | 2023-05-11 | TEMPORARY PEDESTRIAN WALK | AVENUE R, BROOKLYN, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET |
Q022023102A14 | 2023-04-12 | 2023-05-11 | TEMPORARY PEDESTRIAN WALK | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022023102A18 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
Q012023102B07 | 2023-04-12 | 2023-05-11 | REPAIR WATER | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q012023102B05 | 2023-04-12 | 2023-05-11 | REPAIR WATER - SEWER - PROTECTED | HARMAN STREET, QUEENS, FROM STREET FAIRVIEW AVENUE TO STREET WOODWARD AVENUE |
Q012023102B04 | 2023-04-12 | 2023-05-06 | REPAIR WATER - SEWER - PROTECTED | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012023102B08 | 2023-04-12 | 2023-05-11 | REPAIR WATER | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022023102A12 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022023102A13 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022023102A11 | 2023-04-12 | 2023-05-11 | TEMPORARY PEDESTRIAN WALK | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q012023102B13 | 2023-04-12 | 2023-05-11 | REPAIR WATER - SEWER | 152 STREET, QUEENS, FROM STREET 12 ROAD TO STREET 14 AVENUE |
M012023102A21 | 2023-04-12 | 2023-04-29 | REPAIR WATER - SEWER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022023102A15 | 2023-04-12 | 2023-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022023101A02 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
B022023101A15 | 2023-04-11 | 2023-05-15 | OCCUPANCY OF ROADWAY AS STIPULATED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023101A16 | 2023-04-11 | 2023-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023101A37 | 2023-04-11 | 2023-05-03 | TEMPORARY PEDESTRIAN WALK | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023101A38 | 2023-04-11 | 2023-05-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023101A39 | 2023-04-11 | 2023-05-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023101A11 | 2023-04-11 | 2023-05-07 | TEMPORARY PEDESTRIAN WALK | DE GRAW STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B022023101A10 | 2023-04-11 | 2023-05-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B022023101A09 | 2023-04-11 | 2023-05-12 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B022023101A08 | 2023-04-11 | 2023-05-12 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B022023101A07 | 2023-04-11 | 2023-05-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023101A06 | 2023-04-11 | 2023-05-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023101A05 | 2023-04-11 | 2023-05-10 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023101A04 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023101A03 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023101A02 | 2023-04-11 | 2023-05-06 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
X012023101A10 | 2023-04-11 | 2023-05-06 | REPAIR WATER | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X012023101A11 | 2023-04-11 | 2023-05-14 | REPAIR WATER - PROTECTED | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
Q022023101A10 | 2023-04-11 | 2023-05-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023101A09 | 2023-04-11 | 2023-05-15 | TEMPORARY PEDESTRIAN WALK | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023101A00 | 2023-04-11 | 2023-05-06 | TEMPORARY PEDESTRIAN WALK | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022023101A05 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q022023101A04 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF ROADWAY AS STIPULATED | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q022023101A03 | 2023-04-11 | 2023-05-06 | TEMPORARY PEDESTRIAN WALK | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
B022023101A14 | 2023-04-11 | 2023-05-15 | TEMPORARY PEDESTRIAN WALK | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
Q022023101A01 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF ROADWAY AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012023101A65 | 2023-04-11 | 2023-05-15 | REPAIR WATER - SEWER | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q012023101A41 | 2023-04-11 | 2023-05-06 | REPAIR WATER - SEWER | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
M022023101A10 | 2023-04-11 | 2023-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023101A09 | 2023-04-11 | 2023-05-09 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023101A08 | 2023-04-11 | 2023-05-09 | TEMPORARY PEDESTRIAN WALK | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
B012023101A14 | 2023-04-11 | 2023-05-06 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B012023101A15 | 2023-04-11 | 2023-05-10 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012023101A16 | 2023-04-11 | 2023-05-06 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD |
B012023101A17 | 2023-04-11 | 2023-05-07 | REPAIR WATER | DE GRAW STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012023101A25 | 2023-04-11 | 2023-05-15 | REPAIR WATER - SEWER - PROTECTED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012023101A40 | 2023-04-11 | 2023-04-28 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012023101A81 | 2023-04-11 | 2023-05-03 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X022023101A25 | 2023-04-11 | 2023-05-06 | TEMPORARY PEDESTRIAN WALK | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023101A26 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023101A27 | 2023-04-11 | 2023-05-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
M012023101A11 | 2023-04-11 | 2023-05-09 | REPAIR WATER - SEWER | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
X022023101A30 | 2023-04-11 | 2023-05-14 | TEMPORARY PEDESTRIAN WALK | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X022023101A31 | 2023-04-11 | 2023-05-14 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X022023101A32 | 2023-04-11 | 2023-05-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
Q022023101A11 | 2023-04-11 | 2023-05-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B022023101A12 | 2023-04-11 | 2023-05-07 | OCCUPANCY OF ROADWAY AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B022023101A13 | 2023-04-11 | 2023-05-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B152023100A15 | 2023-04-10 | 2023-05-03 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | 21 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022023095A08 | 2023-04-05 | 2023-05-04 | TEMPORARY PEDESTRIAN WALK | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
M022023095A26 | 2023-04-05 | 2023-04-28 | TEMPORARY PEDESTRIAN WALK | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
B022023095A10 | 2023-04-05 | 2023-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
M022023095A27 | 2023-04-05 | 2023-04-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
M022023095A28 | 2023-04-05 | 2023-04-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
B022023095A09 | 2023-04-05 | 2023-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
M012023095A31 | 2023-04-05 | 2023-04-28 | REPAIR WATER - SEWER - PROTECTED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
B012023095A47 | 2023-04-05 | 2023-05-04 | REPAIR SEWER - PROTECTED | KNICKERBOCKER AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET HARMAN STREET |
B012023094A86 | 2023-04-04 | 2023-05-01 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022023090B50 | 2023-03-31 | 2023-05-05 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
X022023090A70 | 2023-03-31 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022023090A71 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022023090A64 | 2023-03-31 | 2023-05-03 | TEMPORARY PEDESTRIAN WALK | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X012023090A77 | 2023-03-31 | 2023-05-02 | REPAIR WATER | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X012023090A78 | 2023-03-31 | 2023-05-03 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X012023090B16 | 2023-03-31 | 2023-05-02 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
B022023090B49 | 2023-03-31 | 2023-05-05 | TEMPORARY PEDESTRIAN WALK | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023090A40 | 2023-03-31 | 2023-04-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023090A39 | 2023-03-31 | 2023-04-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023090A38 | 2023-03-31 | 2023-04-10 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023090B59 | 2023-03-31 | 2023-04-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B022023090B58 | 2023-03-31 | 2023-04-28 | TEMPORARY PEDESTRIAN WALK | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B022023090B51 | 2023-03-31 | 2023-05-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
X022023090B28 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023090B27 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF ROADWAY AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
B022023090B56 | 2023-03-31 | 2023-04-28 | OCCUPANCY OF ROADWAY AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023090B55 | 2023-03-31 | 2023-04-28 | TEMPORARY PEDESTRIAN WALK | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023090B54 | 2023-03-31 | 2023-05-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023090B53 | 2023-03-31 | 2023-05-03 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023090B52 | 2023-03-31 | 2023-05-03 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
X012023090A76 | 2023-03-31 | 2023-05-02 | REPAIR WATER - SEWER | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X012023090A75 | 2023-03-31 | 2023-05-03 | REPAIR WATER | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
B022023090B60 | 2023-03-31 | 2023-04-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B022023090B61 | 2023-03-31 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023090B57 | 2023-03-31 | 2023-04-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023090B63 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023090B38 | 2023-03-31 | 2023-04-28 | REPAIR WATER - SEWER - PROTECTED | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B012023090B36 | 2023-03-31 | 2023-05-02 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023090B35 | 2023-03-31 | 2023-05-03 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B012023090B34 | 2023-03-31 | 2023-05-05 | REPAIR WATER - SEWER - PROTECTED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
X022023090A65 | 2023-03-31 | 2023-05-03 | OCCUPANCY OF ROADWAY AS STIPULATED | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022023090A66 | 2023-03-31 | 2023-05-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022023090A67 | 2023-03-31 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023090A68 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF ROADWAY AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023090A69 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023090A72 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022023090A73 | 2023-03-31 | 2023-05-03 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023090A74 | 2023-03-31 | 2023-05-03 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023090A75 | 2023-03-31 | 2023-05-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023090B26 | 2023-03-31 | 2023-05-02 | TEMPORARY PEDESTRIAN WALK | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
B022023090B62 | 2023-03-31 | 2023-05-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022023089D47 | 2023-03-30 | 2023-04-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
M022023089D46 | 2023-03-30 | 2023-04-28 | TEMPORARY PEDESTRIAN WALK | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
B012023089B67 | 2023-03-30 | 2023-04-13 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M022023089D48 | 2023-03-30 | 2023-04-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
M012023089B61 | 2023-03-30 | 2023-04-28 | REPAIR WATER - SEWER - PROTECTED | EAST 101 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR |
Q012023087B19 | 2023-03-28 | 2023-04-27 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
Q012023087B12 | 2023-03-28 | 2023-04-27 | REPAIR WATER - SEWER | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q012023087B11 | 2023-03-28 | 2023-04-26 | REPAIR WATER - SEWER | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023087A27 | 2023-03-28 | 2023-04-26 | TEMPORARY PEDESTRIAN WALK | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023087A28 | 2023-03-28 | 2023-04-26 | OCCUPANCY OF ROADWAY AS STIPULATED | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023087A29 | 2023-03-28 | 2023-04-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
B012023087B02 | 2023-03-28 | 2023-04-24 | REPAIR WATER - SEWER | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
Q022023087A32 | 2023-03-28 | 2023-04-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023087A31 | 2023-03-28 | 2023-04-27 | TEMPORARY PEDESTRIAN WALK | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
B012023087B05 | 2023-03-28 | 2023-04-26 | REPAIR WATER - SEWER | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
B022023087A80 | 2023-03-28 | 2023-04-24 | TEMPORARY PEDESTRIAN WALK | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B022023087A82 | 2023-03-28 | 2023-04-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B022023087A81 | 2023-03-28 | 2023-04-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B022023087A83 | 2023-03-28 | 2023-04-26 | TEMPORARY PEDESTRIAN WALK | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
B022023087A84 | 2023-03-28 | 2023-04-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
B022023087A85 | 2023-03-28 | 2023-04-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 6 AVENUE, BROOKLYN, FROM STREET 21 STREET TO STREET 22 STREET |
Q022023087A33 | 2023-03-28 | 2023-04-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023086A44 | 2023-03-27 | 2023-04-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q022023086A42 | 2023-03-27 | 2023-04-24 | TEMPORARY PEDESTRIAN WALK | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q012023086B96 | 2023-03-27 | 2023-04-29 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q012023086B95 | 2023-03-27 | 2023-04-24 | REPAIR WATER - SEWER - PROTECTED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q022023086A43 | 2023-03-27 | 2023-04-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q012023081F98 | 2023-03-22 | 2023-04-18 | REPAIR WATER - SEWER | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
B012023081A95 | 2023-03-22 | 2023-04-03 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B012023081A97 | 2023-03-22 | 2023-04-10 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012023081A99 | 2023-03-22 | 2023-04-24 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022023081B60 | 2023-03-22 | 2023-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023081B59 | 2023-03-22 | 2023-04-03 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
Q012023081F14 | 2023-03-22 | 2023-04-19 | REPAIR WATER - SEWER - PROTECTED | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012023081F15 | 2023-03-22 | 2023-04-24 | REPAIR WATER - SEWER | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q012023081F85 | 2023-03-22 | 2023-04-19 | REPAIR WATER - SEWER | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
B012023081A94 | 2023-03-22 | 2023-04-22 | REPAIR WATER - SEWER - PROTECTED | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023081B58 | 2023-03-22 | 2023-04-03 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023081B56 | 2023-03-22 | 2023-04-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023081B55 | 2023-03-22 | 2023-04-22 | OCCUPANCY OF ROADWAY AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023081B54 | 2023-03-22 | 2023-04-22 | TEMPORARY PEDESTRIAN WALK | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
X022023081A39 | 2023-03-22 | 2023-04-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | HOSMER AVENUE, BRONX, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE |
X022023081A38 | 2023-03-22 | 2023-04-19 | OCCUPANCY OF ROADWAY AS STIPULATED | HOSMER AVENUE, BRONX, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE |
X012023081A16 | 2023-03-22 | 2023-04-19 | REPAIR WATER - SEWER - PROTECTED | HOSMER AVENUE, BRONX, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE |
X022023081A37 | 2023-03-22 | 2023-04-19 | TEMPORARY PEDESTRIAN WALK | HOSMER AVENUE, BRONX, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE |
Q022023081A68 | 2023-03-22 | 2023-04-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023081A69 | 2023-03-22 | 2023-04-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023081A67 | 2023-03-22 | 2023-04-19 | TEMPORARY PEDESTRIAN WALK | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022023081A50 | 2023-03-22 | 2023-04-24 | TEMPORARY PEDESTRIAN WALK | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023081A51 | 2023-03-22 | 2023-04-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023081A52 | 2023-03-22 | 2023-04-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023081A86 | 2023-03-22 | 2023-04-20 | TEMPORARY PEDESTRIAN WALK | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023081A87 | 2023-03-22 | 2023-04-20 | OCCUPANCY OF ROADWAY AS STIPULATED | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023081A88 | 2023-03-22 | 2023-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEECH AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
Q022023079A38 | 2023-03-20 | 2023-04-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 120 AVENUE, QUEENS, FROM STREET 217 STREET TO STREET SPRINGFIELD BOULEVARD |
X022023079C23 | 2023-03-20 | 2023-04-14 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X022023079C22 | 2023-03-20 | 2023-04-14 | TEMPORARY PEDESTRIAN WALK | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X022023079B00 | 2023-03-20 | 2023-04-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023079A99 | 2023-03-20 | 2023-04-22 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023079A98 | 2023-03-20 | 2023-04-22 | TEMPORARY PEDESTRIAN WALK | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023079A90 | 2023-03-20 | 2023-04-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
B012023079B52 | 2023-03-20 | 2023-04-15 | REPAIR WATER - SEWER - PROTECTED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
Q022023079A37 | 2023-03-20 | 2023-04-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 120 AVENUE, QUEENS, FROM STREET 217 STREET TO STREET SPRINGFIELD BOULEVARD |
X022023079C24 | 2023-03-20 | 2023-04-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
X022023079A89 | 2023-03-20 | 2023-04-18 | OCCUPANCY OF ROADWAY AS STIPULATED | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X022023079A88 | 2023-03-20 | 2023-04-18 | TEMPORARY PEDESTRIAN WALK | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
Q012023079D22 | 2023-03-20 | 2023-04-14 | REPAIR WATER - SEWER - PROTECTED | 120 AVENUE, QUEENS, FROM STREET 217 STREET TO STREET SPRINGFIELD BOULEVARD |
Q012023079H33 | 2023-03-20 | 2023-04-22 | REPAIR WATER - SEWER | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
X012023079A27 | 2023-03-20 | 2023-04-18 | REPAIR WATER - SEWER | MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET |
X012023079A29 | 2023-03-20 | 2023-04-22 | REPAIR WATER - SEWER | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012023079A53 | 2023-03-20 | 2023-04-14 | REPAIR WATER - PROTECTED | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
Q022023079B20 | 2023-03-20 | 2023-04-22 | TEMPORARY PEDESTRIAN WALK | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023079B21 | 2023-03-20 | 2023-04-22 | OCCUPANCY OF ROADWAY AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023079B22 | 2023-03-20 | 2023-04-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
B012023079B85 | 2023-03-20 | 2023-04-19 | REPAIR WATER - SEWER - PROTECTED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
Q022023079A36 | 2023-03-20 | 2023-04-14 | TEMPORARY PEDESTRIAN WALK | 120 AVENUE, QUEENS, FROM STREET 217 STREET TO STREET SPRINGFIELD BOULEVARD |
B022023079A95 | 2023-03-20 | 2023-04-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023079A94 | 2023-03-20 | 2023-04-19 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023079A93 | 2023-03-20 | 2023-04-19 | TEMPORARY PEDESTRIAN WALK | EAST 10 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022023079A77 | 2023-03-20 | 2023-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023079A76 | 2023-03-20 | 2023-04-15 | OCCUPANCY OF ROADWAY AS STIPULATED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023079A75 | 2023-03-20 | 2023-04-15 | TEMPORARY PEDESTRIAN WALK | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012023076B96 | 2023-03-17 | 2023-04-12 | REPAIR WATER - SEWER | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
Q012023076D31 | 2023-03-17 | 2023-04-18 | REPAIR WATER - SEWER | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET HAWTREE STREET |
X022023074C18 | 2023-03-15 | 2023-04-13 | TEMPORARY PEDESTRIAN WALK | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
B022023074A98 | 2023-03-15 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023074A99 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
B022023074B00 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | COOPER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE |
M012023074A54 | 2023-03-15 | 2023-04-12 | REPAIR WATER - SEWER | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023074B54 | 2023-03-15 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023074B55 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
M022023074B56 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE |
Q012023074A69 | 2023-03-15 | 2023-04-12 | REPAIR SEWER | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q012023074A70 | 2023-03-15 | 2023-04-12 | REPAIR WATER - SEWER | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q012023074A71 | 2023-03-15 | 2023-04-12 | REPAIR WATER - SEWER | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q022023074A17 | 2023-03-15 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023074A18 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023074A19 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023074A22 | 2023-03-15 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023074A23 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023074A24 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 58 AVENUE, QUEENS, FROM STREET 262 STREET TO STREET 263 STREET |
Q022023074A25 | 2023-03-15 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q022023074A26 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q022023074A27 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 46 ROAD, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
Q022023074A28 | 2023-03-15 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022023074A29 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q022023074A30 | 2023-03-15 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | CORPORAL STONE STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
X012023074B04 | 2023-03-15 | 2023-04-08 | REPAIR WATER - SEWER | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X012023074B05 | 2023-03-15 | 2023-04-13 | REPAIR WATER | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023074C19 | 2023-03-15 | 2023-04-13 | OCCUPANCY OF ROADWAY AS STIPULATED | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023074C15 | 2023-03-15 | 2023-04-08 | TEMPORARY PEDESTRIAN WALK | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023074C16 | 2023-03-15 | 2023-04-08 | OCCUPANCY OF ROADWAY AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023074C17 | 2023-03-15 | 2023-04-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | EASTBURN AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
X022023074C20 | 2023-03-15 | 2023-04-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLAY AVENUE, BRONX, FROM STREET BEND TO STREET EAST 169 STREET |
X022023073B01 | 2023-03-14 | 2023-04-08 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X012023073A72 | 2023-03-14 | 2023-04-08 | REPAIR WATER | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022023073A90 | 2023-03-14 | 2023-04-08 | TEMPORARY PEDESTRIAN WALK | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023073A91 | 2023-03-14 | 2023-04-08 | OCCUPANCY OF ROADWAY AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023073A92 | 2023-03-14 | 2023-04-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023073B00 | 2023-03-14 | 2023-04-08 | TEMPORARY PEDESTRIAN WALK | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
X022023073A87 | 2023-03-14 | 2023-04-08 | OCCUPANCY OF ROADWAY AS STIPULATED | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X012023073A56 | 2023-03-14 | 2023-04-08 | REPAIR WATER | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022023073A86 | 2023-03-14 | 2023-04-08 | TEMPORARY PEDESTRIAN WALK | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X022023073A88 | 2023-03-14 | 2023-04-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | LONGFELLOW AVENUE, BRONX, FROM STREET BEND TO STREET JENNINGS STREET |
X012023073A59 | 2023-03-14 | 2023-04-08 | REPAIR WATER - SEWER | SEDGWICK AVENUE, BRONX, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET |
X022023073B02 | 2023-03-14 | 2023-04-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 174 STREET, BRONX, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE |
B012023072D68 | 2023-03-13 | 2023-04-09 | REPAIR WATER - SEWER | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
M012023072B25 | 2023-03-13 | 2023-04-11 | REPAIR WATER - SEWER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012023072D69 | 2023-03-13 | 2023-04-08 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B022023072F00 | 2023-03-13 | 2023-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023072F01 | 2023-03-13 | 2023-04-08 | TEMPORARY PEDESTRIAN WALK | CARROLL STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
M022023072D35 | 2023-03-13 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022023072F02 | 2023-03-13 | 2023-04-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | CARROLL STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
M022023072D37 | 2023-03-13 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022023072D36 | 2023-03-13 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022023072E98 | 2023-03-13 | 2023-04-09 | TEMPORARY PEDESTRIAN WALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023072E99 | 2023-03-13 | 2023-04-09 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023068B02 | 2023-03-09 | 2023-04-06 | TEMPORARY PEDESTRIAN WALK | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012023068A69 | 2023-03-09 | 2023-04-06 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023068B04 | 2023-03-09 | 2023-04-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023068B03 | 2023-03-09 | 2023-04-06 | OCCUPANCY OF ROADWAY AS STIPULATED | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012023066B84 | 2023-03-07 | 2023-03-25 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
X022023066B19 | 2023-03-07 | 2023-04-03 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
B012023066B86 | 2023-03-07 | 2023-04-06 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B022023066C25 | 2023-03-07 | 2023-04-16 | TEMPORARY PEDESTRIAN WALK | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023066C26 | 2023-03-07 | 2023-04-16 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023066C27 | 2023-03-07 | 2023-04-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
Q022023066A88 | 2023-03-07 | 2023-04-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023066A87 | 2023-03-07 | 2023-04-15 | TEMPORARY PEDESTRIAN WALK | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q012023066C07 | 2023-03-07 | 2023-04-15 | REPAIR WATER - SEWER | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q012023066C06 | 2023-03-07 | 2023-03-28 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
X022023066B20 | 2023-03-07 | 2023-04-03 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X012023066B02 | 2023-03-07 | 2023-04-12 | REPAIR WATER - SEWER - PROTECTED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B012023066B83 | 2023-03-07 | 2023-03-25 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012023066B85 | 2023-03-07 | 2023-03-25 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012023066B89 | 2023-03-07 | 2023-04-16 | REPAIR WATER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012023066B90 | 2023-03-07 | 2023-04-01 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
X012023066B01 | 2023-03-07 | 2023-04-03 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023066B21 | 2023-03-07 | 2023-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
Q022023066A89 | 2023-03-07 | 2023-04-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
X022023066B22 | 2023-03-07 | 2023-04-12 | TEMPORARY PEDESTRIAN WALK | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023066B23 | 2023-03-07 | 2023-04-12 | OCCUPANCY OF ROADWAY AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023066B24 | 2023-03-07 | 2023-04-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B012023062A85 | 2023-03-03 | 2023-03-30 | REPAIR WATER - SEWER - PROTECTED | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B012023062A84 | 2023-03-03 | 2023-03-30 | REPAIR WATER - SEWER | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
Q022023062A76 | 2023-03-03 | 2023-04-01 | TEMPORARY PEDESTRIAN WALK | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
B022023062B19 | 2023-03-03 | 2023-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
Q012023062B48 | 2023-03-03 | 2023-03-31 | REPAIR WATER - SEWER - PROTECTED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
B022023062B18 | 2023-03-03 | 2023-03-31 | TEMPORARY PEDESTRIAN WALK | BALTIC STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE |
Q022023062A77 | 2023-03-03 | 2023-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
Q022023062A78 | 2023-03-03 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 11 AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 148 STREET |
B022023062B20 | 2023-03-03 | 2023-03-30 | TEMPORARY PEDESTRIAN WALK | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B022023062B21 | 2023-03-03 | 2023-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B022023062B22 | 2023-03-03 | 2023-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE L TO STREET AVENUE M |
B012023062A86 | 2023-03-03 | 2023-03-25 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022023061B69 | 2023-03-02 | 2023-03-30 | OCCUPANCY OF ROADWAY AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023061C21 | 2023-03-02 | 2023-04-03 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023061C23 | 2023-03-02 | 2023-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023061B38 | 2023-03-02 | 2023-03-30 | REPAIR WATER - SEWER | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q022023061B44 | 2023-03-02 | 2023-03-27 | TEMPORARY PEDESTRIAN WALK | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023061B45 | 2023-03-02 | 2023-03-27 | OCCUPANCY OF ROADWAY AS STIPULATED | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023061B46 | 2023-03-02 | 2023-03-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q012023061B47 | 2023-03-02 | 2023-03-27 | REPAIR WATER - SEWER | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
B012023061B80 | 2023-03-02 | 2023-04-03 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023061C22 | 2023-03-02 | 2023-04-03 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023061B68 | 2023-03-02 | 2023-03-30 | TEMPORARY PEDESTRIAN WALK | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022023061B70 | 2023-03-02 | 2023-03-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | SCHAEFER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B152023060A02 | 2023-03-01 | 2023-03-25 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B152023060A00 | 2023-03-01 | 2023-03-25 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B152023060A01 | 2023-03-01 | 2023-03-25 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012023059C71 | 2023-02-28 | 2023-03-23 | REPAIR WATER - SEWER | 86 STREET, BROOKLYN, FROM STREET BATTERY AVENUE TO STREET DAHLGREN PLACE |
B022023059B35 | 2023-02-28 | 2023-04-01 | TEMPORARY PEDESTRIAN WALK | DE GRAW STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022023059B32 | 2023-02-28 | 2023-03-05 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023059B31 | 2023-02-28 | 2023-04-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B012023059C64 | 2023-02-28 | 2023-04-05 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012023059C65 | 2023-02-28 | 2023-03-29 | REPAIR WATER | 97 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B012023059C66 | 2023-02-28 | 2023-04-10 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012023059C67 | 2023-02-28 | 2023-04-08 | REPAIR WATER - PROTECTED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B012023059C68 | 2023-02-28 | 2023-03-05 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012023059C69 | 2023-02-28 | 2023-04-01 | REPAIR WATER - SEWER | DE GRAW STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012023059C70 | 2023-02-28 | 2023-04-05 | REPAIR WATER - SEWER - PROTECTED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012023059C72 | 2023-02-28 | 2023-03-23 | REPAIR WATER - SEWER | BATTERY AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET 88 STREET |
B012023059C73 | 2023-02-28 | 2023-04-03 | REPAIR WATER | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023059B33 | 2023-02-28 | 2023-03-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023059B34 | 2023-02-28 | 2023-03-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023059B36 | 2023-02-28 | 2023-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022023059B37 | 2023-02-28 | 2023-04-05 | TEMPORARY PEDESTRIAN WALK | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023059B39 | 2023-02-28 | 2023-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023059B40 | 2023-02-28 | 2023-04-04 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023059B30 | 2023-02-28 | 2023-04-08 | TEMPORARY PEDESTRIAN WALK | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B022023059B38 | 2023-02-28 | 2023-04-05 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023059B23 | 2023-02-28 | 2023-04-07 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B022023059B24 | 2023-02-28 | 2023-03-29 | TEMPORARY PEDESTRIAN WALK | 97 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B022023059B25 | 2023-02-28 | 2023-03-29 | OCCUPANCY OF ROADWAY AS STIPULATED | 97 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B022023059B26 | 2023-02-28 | 2023-03-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 97 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B022023059B27 | 2023-02-28 | 2023-04-11 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023059B28 | 2023-02-28 | 2023-04-11 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023059B29 | 2023-02-28 | 2023-04-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
X012023059B67 | 2023-02-28 | 2023-04-09 | REPAIR WATER - SEWER | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X022023059C81 | 2023-02-28 | 2023-04-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X022023059C80 | 2023-02-28 | 2023-04-09 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X022023059C79 | 2023-02-28 | 2023-04-09 | TEMPORARY PEDESTRIAN WALK | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
Q012023058C36 | 2023-02-27 | 2023-03-25 | REPAIR WATER | MENAHAN STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
M012023055A52 | 2023-02-24 | 2023-03-12 | REPAIR SEWER | BROADWAY, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
B022023054D06 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B022023054D05 | 2023-02-23 | 2023-03-25 | TEMPORARY PEDESTRIAN WALK | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B022023054D04 | 2023-02-23 | 2023-03-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023054D03 | 2023-02-23 | 2023-03-23 | OCCUPANCY OF ROADWAY AS STIPULATED | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
X022023054B77 | 2023-02-23 | 2023-03-13 | TEMPORARY PEDESTRIAN WALK | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B012023054B74 | 2023-02-23 | 2023-03-25 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B012023054B72 | 2023-02-23 | 2023-03-25 | REPAIR WATER - SEWER - PROTECTED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012023054B71 | 2023-02-23 | 2023-03-25 | REPAIR WATER - PROTECTED | 21 AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B012023054B70 | 2023-02-23 | 2023-03-25 | REPAIR WATER - SEWER | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
B012023054B69 | 2023-02-23 | 2023-03-23 | REPAIR WATER - SEWER - PROTECTED | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023054D02 | 2023-02-23 | 2023-03-23 | TEMPORARY PEDESTRIAN WALK | SOUTH 2 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023054D13 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B022023054D12 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
X022023054B78 | 2023-02-23 | 2023-03-13 | OCCUPANCY OF ROADWAY AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B022023054D16 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023054D15 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023054D14 | 2023-02-23 | 2023-03-25 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023054D11 | 2023-02-23 | 2023-03-25 | TEMPORARY PEDESTRIAN WALK | SPENCER STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
X012023054B05 | 2023-02-23 | 2023-03-13 | REPAIR WATER - SEWER - PROTECTED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023054B79 | 2023-02-23 | 2023-03-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B022023054D10 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 21 AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B022023054D09 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 21 AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B022023054D08 | 2023-02-23 | 2023-03-25 | TEMPORARY PEDESTRIAN WALK | 21 AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B022023054D07 | 2023-02-23 | 2023-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 17 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST |
Q022023053B63 | 2023-02-22 | 2023-03-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023053B61 | 2023-02-22 | 2023-03-28 | TEMPORARY PEDESTRIAN WALK | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023053B60 | 2023-02-22 | 2023-03-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023053B59 | 2023-02-22 | 2023-03-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023053B58 | 2023-02-22 | 2023-03-23 | TEMPORARY PEDESTRIAN WALK | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
B022023053C28 | 2023-02-22 | 2023-03-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023053C27 | 2023-02-22 | 2023-03-27 | OCCUPANCY OF ROADWAY AS STIPULATED | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023053C26 | 2023-02-22 | 2023-03-27 | TEMPORARY PEDESTRIAN WALK | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
Q012023053A97 | 2023-02-22 | 2023-03-23 | REPAIR WATER - SEWER | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023053A98 | 2023-02-22 | 2023-03-28 | REPAIR WATER - SEWER | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q012023053A99 | 2023-02-22 | 2023-03-30 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
B022023053C21 | 2023-02-22 | 2023-03-21 | TEMPORARY PEDESTRIAN WALK | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
B022023053C22 | 2023-02-22 | 2023-03-21 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
B022023053C23 | 2023-02-22 | 2023-03-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
B022023053C24 | 2023-02-22 | 2023-03-21 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY |
B022023053C25 | 2023-02-22 | 2023-03-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY |
B012023053C22 | 2023-02-22 | 2023-03-27 | REPAIR WATER - SEWER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012023053C21 | 2023-02-22 | 2023-03-21 | REPAIR WATER - SEWER | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY |
B012023053C20 | 2023-02-22 | 2023-03-21 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
Q022023053B62 | 2023-02-22 | 2023-03-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
X022023052A46 | 2023-02-21 | 2023-03-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023052A45 | 2023-02-21 | 2023-03-23 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012023052A35 | 2023-02-21 | 2023-03-23 | REPAIR WATER - SEWER | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012023052A34 | 2023-02-21 | 2023-04-03 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
X022023052A41 | 2023-02-21 | 2023-04-03 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
X022023052A42 | 2023-02-21 | 2023-04-03 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
X022023052A43 | 2023-02-21 | 2023-04-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
X022023052A44 | 2023-02-21 | 2023-03-23 | TEMPORARY PEDESTRIAN WALK | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
Q022023048B05 | 2023-02-17 | 2023-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
Q022023048B04 | 2023-02-17 | 2023-03-16 | TEMPORARY PEDESTRIAN WALK | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B022023048B66 | 2023-02-17 | 2023-03-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B022023048B65 | 2023-02-17 | 2023-03-24 | OCCUPANCY OF ROADWAY AS STIPULATED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B022023048B64 | 2023-02-17 | 2023-03-24 | TEMPORARY PEDESTRIAN WALK | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B022023048A56 | 2023-02-17 | 2023-03-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022023048A55 | 2023-02-17 | 2023-03-23 | OCCUPANCY OF ROADWAY AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022023048A54 | 2023-02-17 | 2023-03-23 | TEMPORARY PEDESTRIAN WALK | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022023048A53 | 2023-02-17 | 2023-03-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023048A52 | 2023-02-17 | 2023-03-18 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B022023048A51 | 2023-02-17 | 2023-03-18 | TEMPORARY PEDESTRIAN WALK | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
Q022023048B79 | 2023-02-17 | 2023-03-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q022023048B78 | 2023-02-17 | 2023-03-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q022023048B76 | 2023-02-17 | 2023-03-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023048B75 | 2023-02-17 | 2023-03-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023048B74 | 2023-02-17 | 2023-03-25 | TEMPORARY PEDESTRIAN WALK | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023048B06 | 2023-02-17 | 2023-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B012023048A77 | 2023-02-17 | 2023-03-18 | REPAIR WATER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012023048A78 | 2023-02-17 | 2023-03-23 | REPAIR WATER - SEWER - PROTECTED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012023048B43 | 2023-02-17 | 2023-03-24 | REPAIR WATER | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B012023048B45 | 2023-02-17 | 2023-03-24 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012023048B49 | 2023-02-17 | 2023-03-21 | REPAIR WATER | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012023048B50 | 2023-02-17 | 2023-03-11 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q022023048B77 | 2023-02-17 | 2023-03-23 | TEMPORARY PEDESTRIAN WALK | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
B022023048B75 | 2023-02-17 | 2023-03-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023048B74 | 2023-02-17 | 2023-03-11 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023048B73 | 2023-02-17 | 2023-03-11 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023048B72 | 2023-02-17 | 2023-03-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022023048B71 | 2023-02-17 | 2023-03-21 | OCCUPANCY OF ROADWAY AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022023048B70 | 2023-02-17 | 2023-03-21 | TEMPORARY PEDESTRIAN WALK | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022023048B69 | 2023-02-17 | 2023-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023048B68 | 2023-02-17 | 2023-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012023048B54 | 2023-02-17 | 2023-03-23 | REPAIR WATER - SEWER | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q012023048B53 | 2023-02-17 | 2023-03-25 | REPAIR WATER - SEWER | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q012023048A98 | 2023-02-17 | 2023-03-21 | REPAIR WATER - SEWER | 125 STREET, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
B022023048B67 | 2023-02-17 | 2023-03-31 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012023047D13 | 2023-02-16 | 2023-03-14 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
X022023044A32 | 2023-02-13 | 2023-03-16 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X012023044A29 | 2023-02-13 | 2023-03-16 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023044A34 | 2023-02-13 | 2023-03-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023044A33 | 2023-02-13 | 2023-03-16 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X012023041A76 | 2023-02-10 | 2023-03-10 | REPAIR WATER - SEWER | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X012023041A75 | 2023-02-10 | 2023-03-04 | REPAIR WATER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
B022023041B28 | 2023-02-10 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY |
Q012023041B89 | 2023-02-10 | 2023-03-14 | REPAIR WATER - SEWER | 58 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
X022023041A53 | 2023-02-10 | 2023-03-10 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X022023041A54 | 2023-02-10 | 2023-03-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
B012023041D40 | 2023-02-10 | 2023-02-28 | REPAIR WATER - SEWER | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY |
B022023041B27 | 2023-02-10 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY |
X022023041A52 | 2023-02-10 | 2023-03-10 | TEMPORARY PEDESTRIAN WALK | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
Q012023040A68 | 2023-02-09 | 2023-02-28 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
X022023039A68 | 2023-02-08 | 2023-03-04 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
X022023039A70 | 2023-02-08 | 2023-03-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
Q022023039B41 | 2023-02-08 | 2023-03-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023039B36 | 2023-02-08 | 2023-03-09 | TEMPORARY PEDESTRIAN WALK | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023039B37 | 2023-02-08 | 2023-03-09 | OCCUPANCY OF ROADWAY AS STIPULATED | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023039B38 | 2023-02-08 | 2023-03-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q022023039B39 | 2023-02-08 | 2023-03-09 | TEMPORARY PEDESTRIAN WALK | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
Q022023039B40 | 2023-02-08 | 2023-03-09 | OCCUPANCY OF ROADWAY AS STIPULATED | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
B022023039B10 | 2023-02-08 | 2023-03-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023039B06 | 2023-02-08 | 2023-03-15 | TEMPORARY PEDESTRIAN WALK | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023039B07 | 2023-02-08 | 2023-03-15 | OCCUPANCY OF ROADWAY AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023039B08 | 2023-02-08 | 2023-03-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022023039B09 | 2023-02-08 | 2023-03-10 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023039B11 | 2023-02-08 | 2023-03-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022023039B12 | 2023-02-08 | 2023-03-06 | TEMPORARY PEDESTRIAN WALK | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023039B13 | 2023-02-08 | 2023-03-06 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023039B14 | 2023-02-08 | 2023-03-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B022023039B15 | 2023-02-08 | 2023-03-09 | TEMPORARY PEDESTRIAN WALK | DE GRAW STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022023039B16 | 2023-02-08 | 2023-03-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE GRAW STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B022023039B17 | 2023-02-08 | 2023-03-07 | TEMPORARY PEDESTRIAN WALK | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023039B18 | 2023-02-08 | 2023-03-07 | OCCUPANCY OF ROADWAY AS STIPULATED | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023039B19 | 2023-02-08 | 2023-03-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B022023039B20 | 2023-02-08 | 2023-03-04 | OCCUPANCY OF ROADWAY AS STIPULATED | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022023039B21 | 2023-02-08 | 2023-03-14 | TEMPORARY PEDESTRIAN WALK | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023039B22 | 2023-02-08 | 2023-03-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023039B23 | 2023-02-08 | 2023-03-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012023039B23 | 2023-02-08 | 2023-03-09 | REPAIR WATER - SEWER | BAYSIDE AVENUE, QUEENS, FROM STREET 29 AVENUE TO STREET 154 STREET |
Q012023039B24 | 2023-02-08 | 2023-03-09 | REPAIR WATER - SEWER | 60 AVENUE, QUEENS, FROM STREET 136 STREET TO STREET LAWRENCE STREET |
B012023039C01 | 2023-02-08 | 2023-03-14 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012023039C00 | 2023-02-08 | 2023-03-14 | REPAIR SEWER | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012023039B99 | 2023-02-08 | 2023-03-04 | REPAIR WATER | NOSTRAND AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012023039B98 | 2023-02-08 | 2023-03-09 | REPAIR WATER - SEWER | SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012023039B97 | 2023-02-08 | 2023-03-09 | REPAIR WATER - SEWER | DE GRAW STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
B012023039B96 | 2023-02-08 | 2023-03-06 | REPAIR WATER - SEWER - PROTECTED | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012023039B95 | 2023-02-08 | 2023-03-09 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012023039B94 | 2023-02-08 | 2023-03-14 | REPAIR WATER - SEWER | MENAHAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
X022023039A69 | 2023-02-08 | 2023-03-04 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE |
M012023038A41 | 2023-02-07 | 2023-02-21 | REPAIR WATER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B012023037A00 | 2023-02-06 | 2023-03-07 | REPAIR WATER - PROTECTED | BENSON AVENUE, BROOKLYN, FROM STREET 19 AVENUE TO STREET BAY 20 STREET |
B022023037A03 | 2023-02-06 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022023037A02 | 2023-02-06 | 2023-03-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | BENSON AVENUE, BROOKLYN, FROM STREET 19 AVENUE TO STREET BAY 20 STREET |
Q042023037A00 | 2023-02-06 | 2023-02-28 | REPAIR SIDEWALK | 47 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET OCEANIA STREET |
Q042023037A13 | 2023-02-06 | 2023-02-18 | REPAIR SIDEWALK | 208 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET 48 AVENUE |
B012023037A07 | 2023-02-06 | 2023-02-28 | REPAIR WATER - SEWER | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022023037A00 | 2023-02-06 | 2023-03-07 | TEMPORARY PEDESTRIAN WALK | BENSON AVENUE, BROOKLYN, FROM STREET 19 AVENUE TO STREET BAY 20 STREET |
B022023037A04 | 2023-02-06 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022023037A05 | 2023-02-06 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE N, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022023037A01 | 2023-02-06 | 2023-03-07 | OCCUPANCY OF ROADWAY AS STIPULATED | BENSON AVENUE, BROOKLYN, FROM STREET 19 AVENUE TO STREET BAY 20 STREET |
M012023033A68 | 2023-02-02 | 2023-03-02 | REPAIR SEWER | BROADWAY, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
B022023031A01 | 2023-01-31 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
B012023031A11 | 2023-01-31 | 2023-02-28 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
B012023031A10 | 2023-01-31 | 2023-03-01 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012023031A09 | 2023-01-31 | 2023-03-01 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012023031A08 | 2023-01-31 | 2023-03-01 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B022023031A02 | 2023-01-31 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
B022023031A03 | 2023-01-31 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O |
Q022023027A80 | 2023-01-27 | 2023-03-01 | TEMPORARY PEDESTRIAN WALK | 47 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET OCEANIA STREET |
Q022023027A85 | 2023-01-27 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
X022023027A85 | 2023-01-27 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
Q022023027A82 | 2023-01-27 | 2023-03-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET OCEANIA STREET |
B022023027A84 | 2023-01-27 | 2023-03-11 | TEMPORARY PEDESTRIAN WALK | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022023027A85 | 2023-01-27 | 2023-03-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022023027A87 | 2023-01-27 | 2023-02-25 | OCCUPANCY OF ROADWAY AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022023027A88 | 2023-01-27 | 2023-02-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B022023027A86 | 2023-01-27 | 2023-02-25 | TEMPORARY PEDESTRIAN WALK | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
X022023027A87 | 2023-01-27 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
Q022023027A81 | 2023-01-27 | 2023-03-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 47 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET OCEANIA STREET |
X022023027A86 | 2023-01-27 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B012023027B89 | 2023-01-27 | 2023-03-01 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012023027C03 | 2023-01-27 | 2023-02-28 | REPAIR WATER - SEWER | BATTERY AVENUE, BROOKLYN, FROM STREET 86 STREET TO STREET 88 STREET |
B012023027C02 | 2023-01-27 | 2023-02-28 | REPAIR WATER - SEWER | 86 STREET, BROOKLYN, FROM STREET BATTERY AVENUE TO STREET DAHLGREN PLACE |
B012023027B95 | 2023-01-27 | 2023-03-05 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
Q012023027A85 | 2023-01-27 | 2023-02-28 | REPAIR WATER - SEWER - PROTECTED | 47 AVENUE, QUEENS, FROM STREET 208 STREET TO STREET OCEANIA STREET |
B012023027B94 | 2023-01-27 | 2023-02-25 | REPAIR WATER - SEWER - PROTECTED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012023027B87 | 2023-01-27 | 2023-03-01 | REPAIR WATER - PROTECTED | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X012023027A42 | 2023-01-27 | 2023-02-28 | REPAIR WATER - SEWER - PROTECTED | MT HOPE PLACE, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
Q022023027A84 | 2023-01-27 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q022023027A83 | 2023-01-27 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023027A86 | 2023-01-27 | 2023-02-28 | REPAIR WATER - SEWER | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012023027B04 | 2023-01-27 | 2023-02-28 | REPAIR SEWER | BROADWAY, QUEENS, FROM STREET 11 STREET TO STREET 12 STREET |
Q012023027B03 | 2023-01-27 | 2023-02-28 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q012023027A89 | 2023-01-27 | 2023-02-26 | REPAIR WATER - SEWER | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET RALEIGH STREET |
Q012023027A88 | 2023-01-27 | 2023-02-26 | REPAIR WATER - SEWER | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET HAWTREE STREET |
B152023026A05 | 2023-01-26 | 2023-03-03 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B152023026A03 | 2023-01-26 | 2023-03-03 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
Q012023026A07 | 2023-01-26 | 2023-02-27 | REPAIR WATER | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
B012023026A11 | 2023-01-26 | 2023-03-10 | REPAIR WATER - PROTECTED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B012023026A12 | 2023-01-26 | 2023-02-23 | REPAIR WATER | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B012023026A13 | 2023-01-26 | 2023-03-06 | REPAIR WATER - SEWER - PROTECTED | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
Q022023026A02 | 2023-01-26 | 2023-02-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
B012023026A09 | 2023-01-26 | 2023-03-03 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023026A02 | 2023-01-26 | 2023-03-03 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023026A03 | 2023-01-26 | 2023-03-03 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023026A04 | 2023-01-26 | 2023-03-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023026A06 | 2023-01-26 | 2023-03-06 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B022023026A07 | 2023-01-26 | 2023-03-10 | TEMPORARY PEDESTRIAN WALK | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B022023026A08 | 2023-01-26 | 2023-03-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B022023026A09 | 2023-01-26 | 2023-02-23 | TEMPORARY PEDESTRIAN WALK | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B022023026A10 | 2023-01-26 | 2023-02-23 | OCCUPANCY OF ROADWAY AS STIPULATED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B022023026A11 | 2023-01-26 | 2023-02-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE |
B022023026A12 | 2023-01-26 | 2023-03-06 | TEMPORARY PEDESTRIAN WALK | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022023026A13 | 2023-01-26 | 2023-03-06 | OCCUPANCY OF ROADWAY AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022023026A14 | 2023-01-26 | 2023-03-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022023026A15 | 2023-01-26 | 2023-03-06 | TEMPORARY PEDESTRIAN WALK | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023026A16 | 2023-01-26 | 2023-03-06 | OCCUPANCY OF ROADWAY AS STIPULATED | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023026A17 | 2023-01-26 | 2023-03-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012023026A10 | 2023-01-26 | 2023-03-06 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
Q022023026A01 | 2023-01-26 | 2023-02-27 | OCCUPANCY OF ROADWAY AS STIPULATED | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
Q022023026A00 | 2023-01-26 | 2023-02-27 | TEMPORARY PEDESTRIAN WALK | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
B012023026A14 | 2023-01-26 | 2023-03-06 | REPAIR WATER - SEWER | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B152023026A04 | 2023-01-26 | 2023-03-03 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
Q012023025C04 | 2023-01-25 | 2023-02-23 | REPAIR WATER - SEWER | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B012023025B83 | 2023-01-25 | 2023-02-23 | REPAIR WATER | 65 STREET, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023025B48 | 2023-01-25 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023025B49 | 2023-01-25 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023025B50 | 2023-01-25 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022023025B71 | 2023-01-25 | 2023-02-23 | TEMPORARY PEDESTRIAN WALK | 65 STREET, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023025B72 | 2023-01-25 | 2023-02-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 65 STREET, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
B022023025B73 | 2023-01-25 | 2023-02-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 65 STREET, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
S022023025A04 | 2023-01-25 | 2023-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S012023025A66 | 2023-01-25 | 2023-02-28 | REPAIR WATER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022023025A05 | 2023-01-25 | 2023-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
Q012023025C05 | 2023-01-25 | 2023-03-04 | REPAIR SEWER | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q012023025C10 | 2023-01-25 | 2023-02-27 | REPAIR SEWER - PROTECTED | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
B012023025B72 | 2023-01-25 | 2023-02-28 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
S022023025A02 | 2023-01-25 | 2023-02-28 | PLACE MATERIAL ON STREET | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022023025A03 | 2023-01-25 | 2023-02-28 | TEMPORARY PEDESTRIAN WALK | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
Q022023025A64 | 2023-01-25 | 2023-02-23 | TEMPORARY PEDESTRIAN WALK | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023025A65 | 2023-01-25 | 2023-02-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023025A66 | 2023-01-25 | 2023-02-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 41 AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022023025A67 | 2023-01-25 | 2023-03-04 | TEMPORARY PEDESTRIAN WALK | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023025A68 | 2023-01-25 | 2023-03-04 | OCCUPANCY OF ROADWAY AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023025A69 | 2023-01-25 | 2023-03-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023025A94 | 2023-01-25 | 2023-02-27 | TEMPORARY PEDESTRIAN WALK | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
Q022023025A95 | 2023-01-25 | 2023-02-27 | OCCUPANCY OF ROADWAY AS STIPULATED | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
Q022023025A96 | 2023-01-25 | 2023-02-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
Q012023024A79 | 2023-01-24 | 2023-02-23 | REPAIR WATER - SEWER | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q022023024A13 | 2023-01-24 | 2023-02-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q022023024A14 | 2023-01-24 | 2023-02-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q022023024A12 | 2023-01-24 | 2023-02-23 | TEMPORARY PEDESTRIAN WALK | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
X022023023A23 | 2023-01-23 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X022023023A21 | 2023-01-23 | 2023-02-11 | TEMPORARY PEDESTRIAN WALK | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X012023023A61 | 2023-01-23 | 2023-02-11 | REPAIR WATER - SEWER | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X022023023A22 | 2023-01-23 | 2023-02-11 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 198 STREET, BRONX, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE |
X012023020A19 | 2023-01-20 | 2023-02-14 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
B022023020A12 | 2023-01-20 | 2023-02-11 | TEMPORARY PEDESTRIAN WALK | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B022023020A14 | 2023-01-20 | 2023-02-22 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023020A15 | 2023-01-20 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023020A31 | 2023-01-20 | 2023-03-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022023020A30 | 2023-01-20 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022023020A29 | 2023-01-20 | 2023-02-22 | TEMPORARY PEDESTRIAN WALK | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022023020A10 | 2023-01-20 | 2023-02-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022023020A11 | 2023-01-20 | 2023-02-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
X022023020A46 | 2023-01-20 | 2023-02-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
B012023020A43 | 2023-01-20 | 2023-02-20 | REPAIR WATER - SEWER - PROTECTED | NEWKIRK AVENUE, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012023020A44 | 2023-01-20 | 2023-02-22 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012023020A41 | 2023-01-20 | 2023-02-19 | REPAIR WATER | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012023020A42 | 2023-01-20 | 2023-02-11 | REPAIR WATER - PROTECTED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B012023020A45 | 2023-01-20 | 2023-02-22 | REPAIR WATER - SEWER | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B012023020A46 | 2023-01-20 | 2023-02-24 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012023020A47 | 2023-01-20 | 2023-02-24 | REPAIR WATER - SEWER | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012023020A61 | 2023-01-20 | 2023-02-22 | REPAIR WATER - SEWER | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022023020A16 | 2023-01-20 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
X022023020A45 | 2023-01-20 | 2023-02-14 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023020A44 | 2023-01-20 | 2023-02-14 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022023020A43 | 2023-01-20 | 2023-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023020A42 | 2023-01-20 | 2023-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023020A41 | 2023-01-20 | 2023-02-21 | TEMPORARY PEDESTRIAN WALK | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B022023020A13 | 2023-01-20 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | REMSEN STREET, BROOKLYN, FROM STREET DEAD END TO STREET MONTAGUE TERRACE |
B022023020A17 | 2023-01-20 | 2023-02-22 | TEMPORARY PEDESTRIAN WALK | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022023020A18 | 2023-01-20 | 2023-02-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022023020A19 | 2023-01-20 | 2023-02-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022023020A20 | 2023-01-20 | 2023-02-24 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023020A21 | 2023-01-20 | 2023-02-24 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023020A22 | 2023-01-20 | 2023-02-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022023020A23 | 2023-01-20 | 2023-02-24 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022023020A24 | 2023-01-20 | 2023-02-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012023020A20 | 2023-01-20 | 2023-02-21 | REPAIR WATER - SEWER | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B022023020A09 | 2023-01-20 | 2023-02-19 | TEMPORARY PEDESTRIAN WALK | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012023017B93 | 2023-01-17 | 2023-02-12 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012023016A14 | 2023-01-16 | 2023-02-12 | REPAIR SEWER | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012023016A15 | 2023-01-16 | 2023-02-14 | REPAIR WATER | 58 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023016A05 | 2023-01-16 | 2023-02-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 58 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023016A02 | 2023-01-16 | 2023-02-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023016A03 | 2023-01-16 | 2023-02-14 | TEMPORARY PEDESTRIAN WALK | 58 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023016A04 | 2023-01-16 | 2023-02-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 58 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022023016A01 | 2023-01-16 | 2023-02-13 | OCCUPANCY OF ROADWAY AS STIPULATED | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023016A00 | 2023-01-16 | 2023-02-13 | TEMPORARY PEDESTRIAN WALK | 54 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022023013B16 | 2023-01-13 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022023013B14 | 2023-01-13 | 2023-02-11 | TEMPORARY PEDESTRIAN WALK | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B022023013B15 | 2023-01-13 | 2023-02-11 | OCCUPANCY OF ROADWAY AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012023013B59 | 2023-01-13 | 2023-02-11 | REPAIR WATER - SEWER - PROTECTED | PULASKI STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012023013B58 | 2023-01-13 | 2023-02-11 | REPAIR WATER - SEWER | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023013B13 | 2023-01-13 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023013B12 | 2023-01-13 | 2023-02-11 | OCCUPANCY OF ROADWAY AS STIPULATED | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022023013B11 | 2023-01-13 | 2023-02-11 | TEMPORARY PEDESTRIAN WALK | SOUTH 8 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012023007A03 | 2023-01-12 | 2023-01-31 | REPAIR WATER | FLATBUSH AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET BAUGHMAN PLACE |
B022023010B13 | 2023-01-10 | 2023-02-07 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
Q012023010B78 | 2023-01-10 | 2023-02-03 | REPAIR WATER | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
Q022023010B00 | 2023-01-10 | 2023-02-03 | OCCUPANCY OF ROADWAY AS STIPULATED | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
Q022023010A99 | 2023-01-10 | 2023-02-03 | TEMPORARY PEDESTRIAN WALK | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
B012023010B08 | 2023-01-10 | 2023-02-07 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
Q022023010B01 | 2023-01-10 | 2023-02-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | GROVE STREET, QUEENS, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE |
X022023006A43 | 2023-01-06 | 2023-01-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X022023006A42 | 2023-01-06 | 2023-01-22 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
Q022023006A48 | 2023-01-06 | 2023-02-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
Q012023006A33 | 2023-01-06 | 2023-02-03 | REPAIR SEWER - PROTECTED | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
Q022023006A47 | 2023-01-06 | 2023-02-03 | OCCUPANCY OF ROADWAY AS STIPULATED | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
Q022023006A46 | 2023-01-06 | 2023-02-03 | TEMPORARY PEDESTRIAN WALK | FRESH POND ROAD, QUEENS, FROM STREET GROVE STREET TO STREET MENAHAN STREET |
X022023006A41 | 2023-01-06 | 2023-01-22 | TEMPORARY PEDESTRIAN WALK | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
X012023006A28 | 2023-01-06 | 2023-01-22 | REPAIR WATER - SEWER | EAST 177 STREET, BRONX, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE |
B012023005B87 | 2023-01-05 | 2023-02-03 | REPAIR WATER - SEWER | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
Q012023005A07 | 2023-01-05 | 2023-02-02 | REPAIR WATER | 88 LANE, QUEENS, FROM STREET FOREST PARK BOUNDARY TO STREET MYRTLE AVENUE |
Q012023005E11 | 2023-01-05 | 2023-02-07 | REPAIR WATER - SEWER | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET HAWTREE STREET |
Q012023005E10 | 2023-01-05 | 2023-02-07 | REPAIR WATER - SEWER | ECKFORD AVENUE, QUEENS, FROM STREET BEND TO STREET RALEIGH STREET |
Q022023004B03 | 2023-01-04 | 2023-02-03 | TEMPORARY PEDESTRIAN WALK | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q012023004B74 | 2023-01-04 | 2023-02-02 | REPAIR SEWER | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023004B04 | 2023-01-04 | 2023-02-03 | OCCUPANCY OF ROADWAY AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022023004B05 | 2023-01-04 | 2023-02-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
B022023003D87 | 2023-01-03 | 2023-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023003D85 | 2023-01-03 | 2023-02-01 | TEMPORARY PEDESTRIAN WALK | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B012023003C09 | 2023-01-03 | 2023-02-01 | REPAIR WATER - SEWER | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B022023003D86 | 2023-01-03 | 2023-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | PITKIN AVENUE, BROOKLYN, FROM STREET POWELL STREET TO STREET SACKMAN STREET |
B012022364A04 | 2022-12-30 | 2023-01-30 | REPAIR WATER - SEWER | ST MARKS AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET EASTERN PARKWAY |
B012022364A05 | 2022-12-30 | 2023-01-22 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022364A06 | 2022-12-30 | 2023-01-27 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
X022022364A00 | 2022-12-30 | 2023-01-31 | TEMPORARY PEDESTRIAN WALK | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022022364A02 | 2022-12-30 | 2023-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X012022364A00 | 2022-12-30 | 2023-01-21 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
X022022364A01 | 2022-12-30 | 2023-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
B012022364A07 | 2022-12-30 | 2023-01-30 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022364A03 | 2022-12-30 | 2023-01-21 | REPAIR WATER - SEWER - PROTECTED | NEWKIRK AVENUE, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022364A01 | 2022-12-30 | 2023-01-30 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022364A02 | 2022-12-30 | 2023-01-30 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022363A01 | 2022-12-29 | 2023-01-30 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B152022362A04 | 2022-12-28 | 2023-02-02 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B022022362E17 | 2022-12-28 | 2023-01-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022362E16 | 2022-12-28 | 2023-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022362E15 | 2022-12-28 | 2023-01-30 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022362D84 | 2022-12-28 | 2023-01-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022022362D83 | 2022-12-28 | 2023-01-22 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022022362D82 | 2022-12-28 | 2023-01-22 | TEMPORARY PEDESTRIAN WALK | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022022362D81 | 2022-12-28 | 2023-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022362D67 | 2022-12-28 | 2023-01-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022022362D65 | 2022-12-28 | 2023-01-25 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022022362D63 | 2022-12-28 | 2023-01-25 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022022362D80 | 2022-12-28 | 2023-02-11 | TEMPORARY PEDESTRIAN WALK | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022362D56 | 2022-12-28 | 2023-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022022362D55 | 2022-12-28 | 2023-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022022362D54 | 2022-12-28 | 2023-01-31 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022022362D53 | 2022-12-28 | 2023-01-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022022362D52 | 2022-12-28 | 2023-01-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022022362D51 | 2022-12-28 | 2023-01-20 | TEMPORARY PEDESTRIAN WALK | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022022362C85 | 2022-12-28 | 2023-01-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022022362C84 | 2022-12-28 | 2023-01-25 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022022362B84 | 2022-12-28 | 2023-01-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022022362B83 | 2022-12-28 | 2023-01-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022022362B82 | 2022-12-28 | 2023-01-27 | TEMPORARY PEDESTRIAN WALK | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012022362C00 | 2022-12-28 | 2023-01-25 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LEWIS AVENUE TO STREET STRONG AVENUE |
Q012022362C08 | 2022-12-28 | 2023-01-29 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
S012022362A36 | 2022-12-28 | 2023-01-30 | REPAIR WATER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022362A01 | 2022-12-28 | 2023-02-02 | PLACE MATERIAL ON STREET | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022362A02 | 2022-12-28 | 2023-02-02 | TEMPORARY PEDESTRIAN WALK | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022362A03 | 2022-12-28 | 2023-02-02 | OCCUPANCY OF ROADWAY AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022362A04 | 2022-12-28 | 2023-02-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
B012022362B03 | 2022-12-28 | 2023-01-25 | REPAIR WATER - SEWER | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012022362B10 | 2022-12-28 | 2023-01-20 | REPAIR WATER | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012022362B12 | 2022-12-28 | 2023-01-30 | REPAIR WATER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012022362B13 | 2022-12-28 | 2023-01-25 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012022362B15 | 2022-12-28 | 2023-01-30 | REPAIR WATER - PROTECTED | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022362B17 | 2022-12-28 | 2023-01-22 | REPAIR WATER - SEWER | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012022362B19 | 2022-12-28 | 2023-01-30 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
M022022362D37 | 2022-12-28 | 2023-01-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M022022362D36 | 2022-12-28 | 2023-01-30 | TEMPORARY PEDESTRIAN WALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M022022362D38 | 2022-12-28 | 2023-01-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M012022362A80 | 2022-12-28 | 2023-01-30 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
B152022362A03 | 2022-12-28 | 2023-02-02 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B152022362A05 | 2022-12-28 | 2023-02-02 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B022022361A89 | 2022-12-27 | 2023-01-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022361A97 | 2022-12-27 | 2023-01-23 | TEMPORARY PEDESTRIAN WALK | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022022361A98 | 2022-12-27 | 2023-01-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022022361A99 | 2022-12-27 | 2023-01-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
Q012022361A42 | 2022-12-27 | 2023-01-22 | REPAIR WATER - SEWER - PROTECTED | 57 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
B012022361A36 | 2022-12-27 | 2023-01-23 | REPAIR WATER - SEWER | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B012022361A30 | 2022-12-27 | 2023-01-23 | REPAIR WATER - SEWER | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022361A87 | 2022-12-27 | 2023-01-23 | TEMPORARY PEDESTRIAN WALK | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022361A88 | 2022-12-27 | 2023-01-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022355C35 | 2022-12-21 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022022355C36 | 2022-12-21 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B022022355C37 | 2022-12-21 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012022355C30 | 2022-12-21 | 2022-12-31 | REPAIR WATER | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012022355C29 | 2022-12-21 | 2022-12-31 | REPAIR WATER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
X022022350A11 | 2022-12-16 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
B012022350A57 | 2022-12-16 | 2022-12-31 | REPAIR WATER - SEWER | ST MARKS AVENUE, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET EASTERN PARKWAY |
B012022350A41 | 2022-12-16 | 2022-12-31 | REPAIR WATER - PROTECTED | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022350B20 | 2022-12-16 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B022022350B21 | 2022-12-16 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WASHINGTON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
X022022350A09 | 2022-12-16 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X022022350A10 | 2022-12-16 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
X012022350A04 | 2022-12-16 | 2022-12-31 | REPAIR WATER | NELSON AVENUE, BRONX, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE |
S022022349A01 | 2022-12-15 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
B012022349A08 | 2022-12-15 | 2022-12-31 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022349A07 | 2022-12-15 | 2022-12-24 | REPAIR WATER - PROTECTED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
S022022349A03 | 2022-12-15 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022349A02 | 2022-12-15 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022349A00 | 2022-12-15 | 2022-12-31 | PLACE MATERIAL ON STREET | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S012022349A02 | 2022-12-15 | 2022-12-31 | REPAIR WATER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
B022022349A21 | 2022-12-15 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022022349A20 | 2022-12-15 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022022349A19 | 2022-12-15 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | STANHOPE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B022022348B82 | 2022-12-14 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012022348A65 | 2022-12-14 | 2022-12-31 | REPAIR WATER - SEWER | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022022348B83 | 2022-12-14 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022022348B84 | 2022-12-14 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B022022342D50 | 2022-12-08 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022342D48 | 2022-12-08 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B152022342A01 | 2022-12-08 | 2023-01-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
X022022342B55 | 2022-12-08 | 2022-12-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 164 STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET REV JAMES POLITE AVENUE |
B012022342E04 | 2022-12-08 | 2022-12-31 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
X022022342B54 | 2022-12-08 | 2022-12-26 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 164 STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET REV JAMES POLITE AVENUE |
B012022342E03 | 2022-12-08 | 2022-12-31 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B152022342A03 | 2022-12-08 | 2023-01-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022342E02 | 2022-12-08 | 2022-12-31 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022342D67 | 2022-12-08 | 2022-12-31 | REPAIR WATER - SEWER | SHEFFIELD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B152022342A02 | 2022-12-08 | 2023-01-05 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
X012022342A64 | 2022-12-08 | 2022-12-26 | REPAIR WATER - SEWER | EAST 164 STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET REV JAMES POLITE AVENUE |
X012022342A63 | 2022-12-08 | 2022-12-31 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B012022342D62 | 2022-12-08 | 2022-12-31 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022342D64 | 2022-12-08 | 2022-12-31 | REPAIR WATER - SEWER | SHEFFIELD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
X022022342B53 | 2022-12-08 | 2022-12-26 | TEMPORARY PEDESTRIAN WALK | EAST 164 STREET, BRONX, FROM STREET PROSPECT AVENUE TO STREET REV JAMES POLITE AVENUE |
B022022342D49 | 2022-12-08 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022340A04 | 2022-12-06 | 2022-12-26 | TEMPORARY PEDESTRIAN WALK | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022022340A07 | 2022-12-06 | 2022-12-26 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012022340A12 | 2022-12-06 | 2022-12-26 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012022340A18 | 2022-12-06 | 2022-12-26 | REPAIR WATER - SEWER | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
Q012022340A11 | 2022-12-06 | 2022-12-26 | REPAIR WATER - SEWER - PROTECTED | 102 STREET, QUEENS, FROM STREET LEWIS AVENUE TO STREET STRONG AVENUE |
Q012022340A01 | 2022-12-06 | 2022-12-31 | REPAIR WATER - SEWER - PROTECTED | 57 STREET, QUEENS, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE |
B022022340A06 | 2022-12-06 | 2022-12-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022022340A05 | 2022-12-06 | 2022-12-26 | OCCUPANCY OF ROADWAY AS STIPULATED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B022022340A08 | 2022-12-06 | 2022-12-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M022022336B09 | 2022-12-02 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M012022336A27 | 2022-12-02 | 2022-12-31 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
Q012022336B40 | 2022-12-02 | 2022-12-22 | REPAIR WATER - SEWER | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
Q012022336A61 | 2022-12-02 | 2022-12-22 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET 231 STREET TO STREET EASTHAMPTON BOULEVARD |
Q012022336B29 | 2022-12-02 | 2022-12-31 | REPAIR WATER - SEWER | WHITNEY AVENUE, QUEENS, FROM STREET ELBERTSON STREET TO STREET FORLEY STREET |
M022022336B11 | 2022-12-02 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
B012022336B90 | 2022-12-02 | 2022-12-30 | REPAIR WATER - PROTECTED | BERGEN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
M022022336B10 | 2022-12-02 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
B022022334A81 | 2022-11-30 | 2022-12-23 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022334A61 | 2022-11-30 | 2022-12-10 | REPAIR WATER - SEWER - PROTECTED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
X012022334A31 | 2022-11-30 | 2022-12-27 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
B012022334A62 | 2022-11-30 | 2022-12-24 | REPAIR WATER - SEWER | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B012022334A63 | 2022-11-30 | 2022-12-24 | REPAIR WATER - SEWER | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B012022334A66 | 2022-11-30 | 2022-12-17 | REPAIR WATER - SEWER | NEW UTRECHT AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B012022334A68 | 2022-11-30 | 2022-12-31 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012022334A69 | 2022-11-30 | 2022-12-23 | REPAIR WATER - SEWER | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022334A72 | 2022-11-30 | 2022-12-31 | REPAIR WATER - SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012022334A74 | 2022-11-30 | 2022-12-25 | REPAIR SEWER - PROTECTED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B022022334A55 | 2022-11-30 | 2022-12-10 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022334A54 | 2022-11-30 | 2022-12-10 | TEMPORARY PEDESTRIAN WALK | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022334A92 | 2022-11-30 | 2022-12-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B022022334A91 | 2022-11-30 | 2022-12-25 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B022022334A90 | 2022-11-30 | 2022-12-25 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B022022334A86 | 2022-11-30 | 2022-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022334A85 | 2022-11-30 | 2022-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022334A84 | 2022-11-30 | 2022-12-31 | TEMPORARY PEDESTRIAN WALK | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022334A82 | 2022-11-30 | 2022-12-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022334A80 | 2022-11-30 | 2022-12-23 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022334A71 | 2022-11-30 | 2022-12-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022022334A70 | 2022-11-30 | 2022-12-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022022334A69 | 2022-11-30 | 2022-12-24 | TEMPORARY PEDESTRIAN WALK | 37 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE |
B022022334A68 | 2022-11-30 | 2022-12-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022334A67 | 2022-11-30 | 2022-12-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022334A66 | 2022-11-30 | 2022-12-24 | TEMPORARY PEDESTRIAN WALK | 36 STREET, BROOKLYN, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD |
B022022334A56 | 2022-11-30 | 2022-12-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
Q012022334A50 | 2022-11-30 | 2022-12-30 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q022022332A04 | 2022-11-28 | 2022-12-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 213 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012022332A16 | 2022-11-28 | 2022-12-22 | REPAIR SEWER | 213 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022332A02 | 2022-11-28 | 2022-12-22 | TEMPORARY PEDESTRIAN WALK | 213 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022332A03 | 2022-11-28 | 2022-12-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 213 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
B012022322A93 | 2022-11-18 | 2022-12-22 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
Q012022320C11 | 2022-11-16 | 2022-12-26 | REPAIR WATER - SEWER | 244 STREET, QUEENS, FROM STREET 54 AVENUE TO STREET THORNHILL AVENUE |
B022022320C92 | 2022-11-16 | 2022-12-22 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022320C91 | 2022-11-16 | 2022-12-22 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
X012022320A94 | 2022-11-16 | 2022-12-26 | REPAIR WATER | GRAND AVENUE, BRONX, FROM STREET WEST 174 STREET TO STREET WEST 174 STREET |
X012022320A93 | 2022-11-16 | 2022-12-26 | REPAIR WATER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
B012022320E43 | 2022-11-16 | 2022-12-22 | REPAIR WATER - SEWER | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022320C93 | 2022-11-16 | 2022-12-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022319C19 | 2022-11-15 | 2022-12-14 | REPAIR WATER - SEWER - PROTECTED | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
X012022319A82 | 2022-11-15 | 2022-12-13 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
M012022319B35 | 2022-11-15 | 2022-12-10 | REPAIR WATER | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
X012022319A84 | 2022-11-15 | 2022-11-26 | REPAIR WATER | GRAND AVENUE, BRONX, FROM STREET WEST 174 STREET TO STREET WEST 174 STREET |
M022022319C08 | 2022-11-15 | 2022-12-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M022022319C07 | 2022-11-15 | 2022-12-06 | OCCUPANCY OF ROADWAY AS STIPULATED | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
M022022319C06 | 2022-11-15 | 2022-12-06 | TEMPORARY PEDESTRIAN WALK | 2 AVENUE, MANHATTAN, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET |
X012022319A83 | 2022-11-15 | 2022-11-26 | REPAIR WATER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
Q022022318A86 | 2022-11-14 | 2022-12-12 | TEMPORARY PEDESTRIAN WALK | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q012022318D59 | 2022-11-14 | 2022-12-12 | REPAIR WATER - SEWER - PROTECTED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022022318A87 | 2022-11-14 | 2022-12-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022022318A88 | 2022-11-14 | 2022-12-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q012022314C12 | 2022-11-10 | 2022-12-08 | REPAIR WATER - SEWER | 53 AVENUE, QUEENS, FROM STREET 230 STREET TO STREET HORATIO PARKWAY |
B012022313B68 | 2022-11-09 | 2022-12-12 | REPAIR WATER - SEWER | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B012022313C45 | 2022-11-09 | 2022-12-06 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022313B80 | 2022-11-09 | 2022-12-02 | REPAIR WATER - SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012022313C46 | 2022-11-09 | 2022-12-06 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
Q022022313A62 | 2022-11-09 | 2022-12-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q012022313D65 | 2022-11-09 | 2022-12-06 | REPAIR WATER - SEWER | 162 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012022313B71 | 2022-11-09 | 2022-12-06 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
Q022022313A61 | 2022-11-09 | 2022-12-12 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022313A60 | 2022-11-09 | 2022-12-12 | TEMPORARY PEDESTRIAN WALK | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B022022313B05 | 2022-11-09 | 2022-12-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022313B04 | 2022-11-09 | 2022-12-02 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022313B03 | 2022-11-09 | 2022-12-02 | TEMPORARY PEDESTRIAN WALK | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022313A96 | 2022-11-09 | 2022-12-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022313A95 | 2022-11-09 | 2022-12-12 | OCCUPANCY OF ROADWAY AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022313A94 | 2022-11-09 | 2022-12-12 | TEMPORARY PEDESTRIAN WALK | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
Q012022311C38 | 2022-11-07 | 2022-11-26 | REPAIR WATER - SEWER | 244 STREET, QUEENS, FROM STREET 54 AVENUE TO STREET THORNHILL AVENUE |
Q012022308A69 | 2022-11-04 | 2022-12-09 | REPAIR WATER - SEWER | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B022022308A23 | 2022-11-04 | 2022-12-05 | TEMPORARY PEDESTRIAN WALK | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022308A25 | 2022-11-04 | 2022-12-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012022308B27 | 2022-11-04 | 2022-12-05 | REPAIR SEWER | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022308A24 | 2022-11-04 | 2022-12-05 | OCCUPANCY OF ROADWAY AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
Q012022307C23 | 2022-11-03 | 2022-11-30 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q022022305A97 | 2022-11-01 | 2022-12-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
B012022305A76 | 2022-11-01 | 2022-12-02 | REPAIR WATER - SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012022305B65 | 2022-11-01 | 2022-12-01 | REPAIR WATER - SEWER | NEW UTRECHT AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B012022305B70 | 2022-11-01 | 2022-12-13 | REPAIR WATER - SEWER | NORTH 7 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012022305B74 | 2022-11-01 | 2022-12-12 | REPAIR WATER - SEWER | SHEFFIELD AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B002022305A02 | 2022-11-01 | No data | MISCELLANEOUS - MINOR SALES | No data |
B012022305B85 | 2022-11-01 | 2022-12-01 | REPAIR WATER - PROTECTED | WALWORTH STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
Q012022305B77 | 2022-11-01 | 2022-12-06 | REPAIR WATER - SEWER | 136 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 57 ROAD |
B022022305C40 | 2022-11-01 | 2022-11-30 | TEMPORARY PEDESTRIAN WALK | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
Q012022305B73 | 2022-11-01 | 2022-12-08 | REPAIR WATER - SEWER | WHITNEY AVENUE, QUEENS, FROM STREET ELBERTSON STREET TO STREET FORLEY STREET |
Q012022305B72 | 2022-11-01 | 2022-12-08 | REPAIR WATER - SEWER - PROTECTED | 57 AVENUE, QUEENS, FROM STREET 231 STREET TO STREET EASTHAMPTON BOULEVARD |
B022022305C41 | 2022-11-01 | 2022-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
Q012022305B44 | 2022-11-01 | 2022-12-01 | REPAIR WATER - SEWER | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q012022305A49 | 2022-11-01 | 2022-11-30 | REPAIR WATER - PROTECTED | ONDERDONK AVENUE, QUEENS, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET |
Q022022305A96 | 2022-11-01 | 2022-12-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
Q022022305A95 | 2022-11-01 | 2022-12-01 | TEMPORARY PEDESTRIAN WALK | 28 AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY LANE |
B012022305B86 | 2022-11-01 | 2022-11-29 | REPAIR SEWER - PROTECTED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B022022305C42 | 2022-11-01 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
Q012022305B66 | 2022-11-01 | 2022-11-30 | REPAIR WATER - PROTECTED | ARCHER AVENUE, QUEENS, FROM STREET 160 STREET TO STREET UNION HALL STREET |
Q002022304A08 | 2022-10-31 | No data | MISCELLANEOUS - EMBARGO WAIVER REQUEST | No data |
B012022301B91 | 2022-10-28 | 2022-11-22 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022301B92 | 2022-10-28 | 2022-11-27 | REPAIR WATER - SEWER - PROTECTED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012022301B95 | 2022-10-28 | 2022-11-27 | REPAIR WATER - SEWER | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022301A80 | 2022-10-28 | 2022-11-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022301A79 | 2022-10-28 | 2022-11-30 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022301A78 | 2022-10-28 | 2022-11-30 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022301A77 | 2022-10-28 | 2022-11-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022301A76 | 2022-10-28 | 2022-11-27 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022301A75 | 2022-10-28 | 2022-11-27 | TEMPORARY PEDESTRIAN WALK | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
Q022022299A71 | 2022-10-26 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
M012022299B29 | 2022-10-26 | 2022-11-14 | REPAIR WATER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022299B85 | 2022-10-26 | 2022-11-14 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
M022022299C06 | 2022-10-26 | 2022-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022299C07 | 2022-10-26 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022299C47 | 2022-10-26 | 2022-11-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022299C46 | 2022-10-26 | 2022-11-22 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022299C45 | 2022-10-26 | 2022-11-22 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022299C27 | 2022-10-26 | 2022-11-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022299C26 | 2022-10-26 | 2022-11-05 | OCCUPANCY OF ROADWAY AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022299C25 | 2022-10-26 | 2022-11-05 | TEMPORARY PEDESTRIAN WALK | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
Q012022299B51 | 2022-10-26 | 2022-11-09 | REPAIR WATER - SEWER | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022299A72 | 2022-10-26 | 2022-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022299A73 | 2022-10-26 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B012022299C03 | 2022-10-26 | 2022-11-22 | REPAIR WATER - SEWER | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022299B87 | 2022-10-26 | 2022-11-05 | REPAIR SEWER | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012022299B61 | 2022-10-26 | 2022-11-14 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
M022022299C05 | 2022-10-26 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022297C54 | 2022-10-24 | 2022-11-22 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022297B09 | 2022-10-24 | 2022-11-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022297B08 | 2022-10-24 | 2022-11-22 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022297B07 | 2022-10-24 | 2022-11-22 | TEMPORARY PEDESTRIAN WALK | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
X012022294C00 | 2022-10-21 | 2022-11-27 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
B022022294B25 | 2022-10-21 | 2022-11-19 | TEMPORARY PEDESTRIAN WALK | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
M012022294B33 | 2022-10-21 | 2022-11-21 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022294A68 | 2022-10-21 | 2022-11-17 | REPAIR SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022294B27 | 2022-10-21 | 2022-11-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022294B26 | 2022-10-21 | 2022-11-19 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
X012022294C09 | 2022-10-21 | 2022-11-19 | REPAIR WATER - SEWER | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B012022292A56 | 2022-10-19 | 2022-11-14 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022292A21 | 2022-10-19 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022292A22 | 2022-10-19 | 2022-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022292A23 | 2022-10-19 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022291B94 | 2022-10-18 | 2022-11-11 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET |
B012022291B95 | 2022-10-18 | 2022-10-28 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022291B93 | 2022-10-18 | 2022-11-11 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B152022290A02 | 2022-10-17 | 2022-12-06 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
S012022290A02 | 2022-10-17 | 2022-11-08 | REPAIR WATER - SEWER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
S022022290A03 | 2022-10-17 | 2022-11-08 | OCCUPANCY OF ROADWAY AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
B022022290A39 | 2022-10-17 | 2022-11-11 | TEMPORARY PEDESTRIAN WALK | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
X012022290A21 | 2022-10-17 | 2022-11-14 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B022022290A41 | 2022-10-17 | 2022-11-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B152022290A01 | 2022-10-17 | 2022-12-06 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B022022290A40 | 2022-10-17 | 2022-11-11 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B152022290A00 | 2022-10-17 | 2022-12-06 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022290B23 | 2022-10-17 | 2022-11-11 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012022290A96 | 2022-10-17 | 2022-11-14 | REPAIR WATER - SEWER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
Q012022289A09 | 2022-10-16 | 2022-11-14 | REPAIR WATER - SEWER - PROTECTED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022022289A09 | 2022-10-16 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022022289A10 | 2022-10-16 | 2022-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
Q022022289A11 | 2022-10-16 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 206 STREET, QUEENS, FROM STREET 46 ROAD TO STREET 47 AVENUE |
B022022287C41 | 2022-10-14 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022287C43 | 2022-10-14 | 2022-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022287C44 | 2022-10-14 | 2022-11-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
X012022287B06 | 2022-10-14 | 2022-11-14 | REPAIR WATER | GRAND AVENUE, BRONX, FROM STREET WEST 174 STREET TO STREET WEST 174 STREET |
X012022287B05 | 2022-10-14 | 2022-11-14 | REPAIR WATER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET |
B022022287C42 | 2022-10-14 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B012022287B58 | 2022-10-14 | 2022-11-14 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022287B59 | 2022-10-14 | 2022-11-14 | REPAIR WATER - SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012022287B60 | 2022-10-14 | 2022-11-14 | REPAIR WATER - SEWER | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022287C39 | 2022-10-14 | 2022-11-14 | TEMPORARY PEDESTRIAN WALK | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B022022287C40 | 2022-10-14 | 2022-11-14 | OCCUPANCY OF ROADWAY AS STIPULATED | NORTH 1 STREET, BROOKLYN, FROM STREET BERRY STREET TO STREET WYTHE AVENUE |
B012022285A83 | 2022-10-12 | 2022-11-14 | REPAIR WATER - SEWER - PROTECTED | LEXINGTON AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
Q012022284A70 | 2022-10-11 | 2022-10-25 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
X012022284A43 | 2022-10-11 | 2022-10-20 | REPAIR WATER - SEWER | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B022022284A78 | 2022-10-11 | 2022-10-28 | TEMPORARY PEDESTRIAN WALK | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022284A79 | 2022-10-11 | 2022-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022284A80 | 2022-10-11 | 2022-10-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B022022284A81 | 2022-10-11 | 2022-10-28 | TEMPORARY PEDESTRIAN WALK | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022284A82 | 2022-10-11 | 2022-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022284A83 | 2022-10-11 | 2022-10-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B012022284A63 | 2022-10-11 | 2022-11-11 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET |
B012022284A70 | 2022-10-11 | 2022-10-25 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022284A75 | 2022-10-11 | 2022-10-23 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012022284A86 | 2022-10-11 | 2022-11-03 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022284A87 | 2022-10-11 | 2022-10-28 | REPAIR WATER - SEWER | THROOP AVENUE, BROOKLYN, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET |
B012022284A88 | 2022-10-11 | 2022-10-28 | REPAIR WATER - SEWER | BARTLETT STREET, BROOKLYN, FROM STREET BROADWAY TO STREET THROOP AVENUE |
B022022284A75 | 2022-10-11 | 2022-10-23 | TEMPORARY PEDESTRIAN WALK | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022284A76 | 2022-10-11 | 2022-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022284A77 | 2022-10-11 | 2022-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012022280A19 | 2022-10-07 | 2022-10-09 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET |
B012022280A91 | 2022-10-07 | 2022-10-22 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET |
S012022279A27 | 2022-10-06 | 2022-11-08 | REPAIR WATER - PROTECTED | PIAVE AVENUE, STATEN ISLAND, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET |
Q012022279B75 | 2022-10-06 | 2022-11-08 | REPAIR WATER - SEWER | 244 STREET, QUEENS, FROM STREET 54 AVENUE TO STREET THORNHILL AVENUE |
Q012022279A13 | 2022-10-06 | 2022-11-08 | REPAIR WATER - SEWER | 53 AVENUE, QUEENS, FROM STREET 230 STREET TO STREET HORATIO PARKWAY |
B022022276B73 | 2022-10-03 | 2022-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022276B74 | 2022-10-03 | 2022-10-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
Q012022276B07 | 2022-10-03 | 2022-10-31 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
Q012022276B08 | 2022-10-03 | 2022-10-31 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q012022276B58 | 2022-10-03 | 2022-10-28 | REPAIR SEWER | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
X012022276B30 | 2022-10-03 | 2022-11-01 | REPAIR WATER - SEWER | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
X022022276B50 | 2022-10-03 | 2022-11-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
X022022276B49 | 2022-10-03 | 2022-11-02 | OCCUPANCY OF ROADWAY AS STIPULATED | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
X022022276B48 | 2022-10-03 | 2022-11-02 | TEMPORARY PEDESTRIAN WALK | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
Q022022276A42 | 2022-10-03 | 2022-10-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022022276A41 | 2022-10-03 | 2022-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | NEWPORT AVENUE, QUEENS, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET |
Q022022276A18 | 2022-10-03 | 2022-10-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022276A17 | 2022-10-03 | 2022-10-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022276A16 | 2022-10-03 | 2022-10-31 | TEMPORARY PEDESTRIAN WALK | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022276A15 | 2022-10-03 | 2022-10-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
Q022022276A13 | 2022-10-03 | 2022-10-31 | TEMPORARY PEDESTRIAN WALK | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
B022022276B95 | 2022-10-03 | 2022-11-01 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022276B96 | 2022-10-03 | 2022-11-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022276B72 | 2022-10-03 | 2022-10-28 | TEMPORARY PEDESTRIAN WALK | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
X012022276B43 | 2022-10-03 | 2022-10-28 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
Q022022276A14 | 2022-10-03 | 2022-10-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
B012022276B04 | 2022-10-03 | 2022-11-01 | REPAIR WATER - SEWER - PROTECTED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022276A99 | 2022-10-03 | 2022-10-17 | REPAIR WATER - SEWER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012022276A91 | 2022-10-03 | 2022-11-01 | REPAIR WATER - SEWER - PROTECTED | 3 AVENUE, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
B012022276A89 | 2022-10-03 | 2022-10-25 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022276A83 | 2022-10-03 | 2022-10-25 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022276B02 | 2022-10-03 | 2022-10-28 | REPAIR WATER - SEWER - PROTECTED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012022273A35 | 2022-09-30 | 2022-10-30 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B022022272B03 | 2022-09-29 | 2022-10-29 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q012022272A83 | 2022-09-29 | 2022-10-23 | REPAIR WATER - SEWER | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
Q012022272A88 | 2022-09-29 | 2022-10-28 | REPAIR WATER - SEWER | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q022022272A15 | 2022-09-29 | 2022-10-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q022022272A14 | 2022-09-29 | 2022-10-29 | OCCUPANCY OF ROADWAY AS STIPULATED | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q022022272A13 | 2022-09-29 | 2022-10-29 | TEMPORARY PEDESTRIAN WALK | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
Q022022272A12 | 2022-09-29 | 2022-10-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
Q022022272A11 | 2022-09-29 | 2022-10-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
Q022022272A10 | 2022-09-29 | 2022-10-28 | TEMPORARY PEDESTRIAN WALK | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
B012022272B06 | 2022-09-29 | 2022-10-29 | REPAIR WATER - SEWER | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012022272B02 | 2022-09-29 | 2022-10-27 | REPAIR WATER | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022272B04 | 2022-09-29 | 2022-10-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022022272B02 | 2022-09-29 | 2022-10-29 | TEMPORARY PEDESTRIAN WALK | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
Q022022269A61 | 2022-09-26 | 2022-10-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022269A62 | 2022-09-26 | 2022-10-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q012022269B94 | 2022-09-26 | 2022-10-27 | REPAIR WATER - SEWER | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
M022022269A44 | 2022-09-26 | 2022-10-05 | TEMPORARY PEDESTRIAN WALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
X022022269A42 | 2022-09-26 | 2022-10-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | VALENTINE AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET |
X022022269A41 | 2022-09-26 | 2022-10-20 | OCCUPANCY OF ROADWAY AS STIPULATED | VALENTINE AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET |
M022022269A45 | 2022-09-26 | 2022-10-05 | OCCUPANCY OF ROADWAY AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022269A46 | 2022-09-26 | 2022-10-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022269A47 | 2022-09-26 | 2022-10-20 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022269A48 | 2022-09-26 | 2022-10-20 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022269A49 | 2022-09-26 | 2022-10-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012022269A34 | 2022-09-26 | 2022-10-20 | REPAIR WATER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q022022269A60 | 2022-09-26 | 2022-10-27 | TEMPORARY PEDESTRIAN WALK | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
X012022269A29 | 2022-09-26 | 2022-10-20 | REPAIR WATER - SEWER - PROTECTED | VALENTINE AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET |
X022022269A40 | 2022-09-26 | 2022-10-20 | TEMPORARY PEDESTRIAN WALK | VALENTINE AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET |
Q022022263A03 | 2022-09-20 | 2022-10-23 | TEMPORARY PEDESTRIAN WALK | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
M012022263A65 | 2022-09-20 | 2022-10-06 | REPAIR WATER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M012022263A83 | 2022-09-20 | 2022-10-22 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022022263A04 | 2022-09-20 | 2022-10-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
Q022022263A05 | 2022-09-20 | 2022-10-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
Q012022263A22 | 2022-09-20 | 2022-10-23 | REPAIR SEWER | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
B022022263A20 | 2022-09-20 | 2022-10-01 | TEMPORARY PEDESTRIAN WALK | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B022022263A21 | 2022-09-20 | 2022-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022263A20 | 2022-09-20 | 2022-10-12 | REPAIR WATER - SEWER | ST MARKS AVENUE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B012022263A19 | 2022-09-20 | 2022-10-01 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022263A16 | 2022-09-20 | 2022-10-18 | REPAIR WATER - SEWER | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B022022263A22 | 2022-09-20 | 2022-10-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B022022263A23 | 2022-09-20 | 2022-10-14 | TEMPORARY PEDESTRIAN WALK | ST MARKS AVENUE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022022263A24 | 2022-09-20 | 2022-10-14 | OCCUPANCY OF ROADWAY AS STIPULATED | ST MARKS AVENUE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
B022022263A25 | 2022-09-20 | 2022-10-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | ST MARKS AVENUE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE |
M012022263A17 | 2022-09-20 | 2022-10-20 | REPAIR WATER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X022022259A36 | 2022-09-16 | 2022-10-02 | TEMPORARY PEDESTRIAN WALK | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
X022022259A37 | 2022-09-16 | 2022-10-02 | OCCUPANCY OF ROADWAY AS STIPULATED | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
Q012022259C00 | 2022-09-16 | 2022-10-01 | REPAIR SEWER | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
X012022259A19 | 2022-09-16 | 2022-10-02 | REPAIR WATER - SEWER | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
X022022259A38 | 2022-09-16 | 2022-10-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEREID AVENUE, BRONX, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE |
B152022257A70 | 2022-09-14 | 2022-10-25 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B152022257A69 | 2022-09-14 | 2022-10-25 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B152022257A68 | 2022-09-14 | 2022-10-25 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022256B74 | 2022-09-13 | 2022-10-15 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022256B73 | 2022-09-13 | 2022-10-12 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022256B72 | 2022-09-13 | 2022-10-12 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012022256B71 | 2022-09-13 | 2022-10-16 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022256B70 | 2022-09-13 | 2022-10-03 | REPAIR WATER - SEWER - PROTECTED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022256B69 | 2022-09-13 | 2022-10-12 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET |
B012022256B62 | 2022-09-13 | 2022-10-11 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022256B61 | 2022-09-13 | 2022-10-12 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012022256B60 | 2022-09-13 | 2022-10-03 | REPAIR SEWER | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
S012022256A81 | 2022-09-13 | 2022-10-10 | REPAIR WATER - SEWER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
B022022256C71 | 2022-09-13 | 2022-10-03 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022256C73 | 2022-09-13 | 2022-10-16 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022256C75 | 2022-09-13 | 2022-10-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022256C76 | 2022-09-13 | 2022-10-12 | TEMPORARY PEDESTRIAN WALK | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022256C77 | 2022-09-13 | 2022-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022256C78 | 2022-09-13 | 2022-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
S022022256A27 | 2022-09-13 | 2022-10-10 | OCCUPANCY OF ROADWAY AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
X012022256C62 | 2022-09-13 | 2022-10-16 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B022022256C56 | 2022-09-13 | 2022-10-12 | TEMPORARY PEDESTRIAN WALK | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022256C57 | 2022-09-13 | 2022-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022256C74 | 2022-09-13 | 2022-10-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022256C58 | 2022-09-13 | 2022-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B022022256C72 | 2022-09-13 | 2022-10-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022256C54 | 2022-09-13 | 2022-10-03 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B022022256C55 | 2022-09-13 | 2022-10-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B012022255D24 | 2022-09-12 | 2022-10-12 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022255B53 | 2022-09-12 | 2022-10-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022255B51 | 2022-09-12 | 2022-10-12 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022255B52 | 2022-09-12 | 2022-10-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
Q012022252C16 | 2022-09-09 | 2022-09-18 | REPAIR SEWER | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q012022251D95 | 2022-09-08 | 2022-09-18 | REPAIR SEWER | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q012022251E68 | 2022-09-08 | 2022-10-05 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
Q012022251E69 | 2022-09-08 | 2022-10-05 | REPAIR WATER - SEWER | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q012022251E71 | 2022-09-08 | 2022-10-06 | REPAIR WATER - SEWER | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q012022251E98 | 2022-09-08 | 2022-10-11 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
B022022251B70 | 2022-09-08 | 2022-10-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022251B69 | 2022-09-08 | 2022-10-08 | OCCUPANCY OF ROADWAY AS STIPULATED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022251B68 | 2022-09-08 | 2022-10-08 | TEMPORARY PEDESTRIAN WALK | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022251B67 | 2022-09-08 | 2022-10-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B022022251B66 | 2022-09-08 | 2022-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B022022251B65 | 2022-09-08 | 2022-10-01 | TEMPORARY PEDESTRIAN WALK | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B022022251B63 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022251B62 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF ROADWAY AS STIPULATED | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022251B61 | 2022-09-08 | 2022-10-07 | TEMPORARY PEDESTRIAN WALK | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B022022251B11 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B022022251B10 | 2022-09-08 | 2022-10-07 | OCCUPANCY OF ROADWAY AS STIPULATED | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B022022251B09 | 2022-09-08 | 2022-10-07 | TEMPORARY PEDESTRIAN WALK | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
Q022022251B34 | 2022-09-08 | 2022-10-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022251B33 | 2022-09-08 | 2022-10-06 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022251B32 | 2022-09-08 | 2022-10-06 | TEMPORARY PEDESTRIAN WALK | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022251B31 | 2022-09-08 | 2022-10-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022251B30 | 2022-09-08 | 2022-10-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022251B29 | 2022-09-08 | 2022-10-05 | TEMPORARY PEDESTRIAN WALK | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD |
Q022022251B28 | 2022-09-08 | 2022-10-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
Q022022251B27 | 2022-09-08 | 2022-10-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
Q022022251B26 | 2022-09-08 | 2022-10-05 | TEMPORARY PEDESTRIAN WALK | 150 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE |
Q022022251B25 | 2022-09-08 | 2022-10-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 130 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251B24 | 2022-09-08 | 2022-10-08 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH 130 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251B23 | 2022-09-08 | 2022-10-08 | TEMPORARY PEDESTRIAN WALK | BEACH 130 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
Q022022251A16 | 2022-09-08 | 2022-09-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q022022251A15 | 2022-09-08 | 2022-09-18 | OCCUPANCY OF ROADWAY AS STIPULATED | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q022022251A14 | 2022-09-08 | 2022-09-18 | TEMPORARY PEDESTRIAN WALK | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
X012022251B01 | 2022-09-08 | 2022-09-16 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X012022251A99 | 2022-09-08 | 2022-10-06 | REPAIR WATER - SEWER | FAIRMOUNT PLACE, BRONX, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE |
B012022251A11 | 2022-09-08 | 2022-09-18 | REPAIR WATER - SEWER | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B012022251B46 | 2022-09-08 | 2022-10-07 | REPAIR WATER | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B012022251B53 | 2022-09-08 | 2022-10-07 | REPAIR SEWER | KEAP STREET, BROOKLYN, FROM STREET AINSLIE STREET TO STREET HOPE STREET |
B012022251B54 | 2022-09-08 | 2022-09-15 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022251B57 | 2022-09-08 | 2022-10-01 | REPAIR WATER | MAC KAY PLACE, BROOKLYN, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE |
B012022251B58 | 2022-09-08 | 2022-10-05 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012022251B59 | 2022-09-08 | 2022-10-07 | REPAIR WATER - SEWER - PROTECTED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012022251B62 | 2022-09-08 | 2022-10-06 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET |
Q012022251B21 | 2022-09-08 | 2022-09-18 | REPAIR SEWER | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q012022251E67 | 2022-09-08 | 2022-10-07 | REPAIR WATER - SEWER - PROTECTED | BEACH 130 STREET, QUEENS, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE |
X012022250A39 | 2022-09-07 | 2022-09-28 | REPAIR WATER - SEWER - PROTECTED | JESUP AVENUE, BRONX, FROM STREET BEND TO STREET WEST 172 STREET |
Q022022250B28 | 2022-09-07 | 2022-09-10 | TEMPORARY PEDESTRIAN WALK | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q012022250E17 | 2022-09-07 | 2022-09-10 | REPAIR SEWER | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q022022250B29 | 2022-09-07 | 2022-09-10 | OCCUPANCY OF ROADWAY AS STIPULATED | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
Q022022250B30 | 2022-09-07 | 2022-09-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | MYRTLE AVENUE, QUEENS, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE |
B022022245B61 | 2022-09-02 | 2022-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022245B60 | 2022-09-02 | 2022-09-16 | TEMPORARY PEDESTRIAN WALK | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B022022245B59 | 2022-09-02 | 2022-09-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B022022245B58 | 2022-09-02 | 2022-09-29 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
M022022245B82 | 2022-09-02 | 2022-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022245B81 | 2022-09-02 | 2022-09-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022245B61 | 2022-09-02 | 2022-10-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B022022245B45 | 2022-09-02 | 2022-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
B022022245B41 | 2022-09-02 | 2022-10-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022245B40 | 2022-09-02 | 2022-10-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022245B39 | 2022-09-02 | 2022-10-01 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022245B18 | 2022-09-02 | 2022-09-16 | REPAIR WATER - SEWER - PROTECTED | MIDWOOD STREET, BROOKLYN, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE |
B012022245B16 | 2022-09-02 | 2022-09-29 | REPAIR WATER - SEWER | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012022245B15 | 2022-09-02 | 2022-10-01 | REPAIR WATER - SEWER - PROTECTED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
B012022245B12 | 2022-09-02 | 2022-09-30 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B012022245B07 | 2022-09-02 | 2022-10-01 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022245B05 | 2022-09-02 | 2022-10-02 | REPAIR WATER - SEWER - PROTECTED | 3 AVENUE, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
B012022245A94 | 2022-09-02 | 2022-09-12 | REPAIR SEWER | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B022022245B57 | 2022-09-02 | 2022-09-29 | TEMPORARY PEDESTRIAN WALK | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
M022022245B60 | 2022-09-02 | 2022-10-05 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012022245A28 | 2022-09-02 | 2022-10-05 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022245B80 | 2022-09-02 | 2022-09-23 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022245B59 | 2022-09-02 | 2022-10-05 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012022244C04 | 2022-09-01 | 2022-09-30 | REPAIR WATER - SEWER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012022242B94 | 2022-08-30 | 2022-09-13 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022242B95 | 2022-08-30 | 2022-09-13 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022242B92 | 2022-08-30 | 2022-09-13 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
B012022242A47 | 2022-08-30 | 2022-09-21 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022242A59 | 2022-08-30 | 2022-09-21 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022242A60 | 2022-08-30 | 2022-09-21 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022242A61 | 2022-08-30 | 2022-09-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012022241A08 | 2022-08-29 | 2022-09-16 | REPAIR WATER | EAST 18 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022022241A02 | 2022-08-29 | 2022-09-16 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 18 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022022241A03 | 2022-08-29 | 2022-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 18 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B022022241A66 | 2022-08-29 | 2022-09-16 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022241A67 | 2022-08-29 | 2022-09-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022241A98 | 2022-08-29 | 2022-09-16 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022241A68 | 2022-08-29 | 2022-09-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022241A86 | 2022-08-29 | 2022-09-26 | REPAIR WATER - SEWER - PROTECTED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
X022022241A29 | 2022-08-29 | 2022-09-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B012022241B15 | 2022-08-29 | 2022-09-06 | REPAIR WATER - SEWER - PROTECTED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
Q022022241A37 | 2022-08-29 | 2022-09-23 | TEMPORARY PEDESTRIAN WALK | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
Q022022241A38 | 2022-08-29 | 2022-09-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
B022022241A01 | 2022-08-29 | 2022-09-16 | TEMPORARY PEDESTRIAN WALK | EAST 18 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
Q022022241A60 | 2022-08-29 | 2022-09-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022241A59 | 2022-08-29 | 2022-09-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022241A58 | 2022-08-29 | 2022-09-27 | TEMPORARY PEDESTRIAN WALK | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022241A39 | 2022-08-29 | 2022-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
X022022241A27 | 2022-08-29 | 2022-09-11 | TEMPORARY PEDESTRIAN WALK | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X022022241A28 | 2022-08-29 | 2022-09-11 | OCCUPANCY OF ROADWAY AS STIPULATED | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
Q012022241B98 | 2022-08-29 | 2022-09-27 | REPAIR WATER - SEWER | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q012022241B84 | 2022-08-29 | 2022-09-23 | REPAIR SEWER | 64 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD |
X012022241A44 | 2022-08-29 | 2022-09-11 | REPAIR WATER | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B022022241A83 | 2022-08-29 | 2022-09-06 | OCCUPANCY OF ROADWAY AS STIPULATED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
M012022238B24 | 2022-08-26 | 2022-09-23 | REPAIR WATER - SEWER - PROTECTED | WEST 38 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022236B13 | 2022-08-24 | 2022-09-23 | TEMPORARY PEDESTRIAN WALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022236B14 | 2022-08-24 | 2022-09-23 | OCCUPANCY OF ROADWAY AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M012022236A37 | 2022-08-24 | 2022-09-22 | REPAIR WATER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022236B15 | 2022-08-24 | 2022-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B012022235B10 | 2022-08-23 | 2022-09-16 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
Q022022235A02 | 2022-08-23 | 2022-09-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
Q022022235A01 | 2022-08-23 | 2022-09-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
Q022022235A00 | 2022-08-23 | 2022-09-04 | TEMPORARY PEDESTRIAN WALK | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
B022022235B24 | 2022-08-23 | 2022-09-23 | TEMPORARY PEDESTRIAN WALK | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B022022235B25 | 2022-08-23 | 2022-09-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
B022022235B26 | 2022-08-23 | 2022-09-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 57 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY |
X012022235A66 | 2022-08-23 | 2022-09-21 | REPAIR WATER - SEWER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
Q012022235A19 | 2022-08-23 | 2022-09-04 | REPAIR WATER - PROTECTED | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
X012022235A65 | 2022-08-23 | 2022-09-23 | REPAIR WATER - SEWER - PROTECTED | COLGATE AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
B022022234A60 | 2022-08-22 | 2022-09-06 | TEMPORARY PEDESTRIAN WALK | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022234B26 | 2022-08-22 | 2022-09-18 | REPAIR WATER - SEWER | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
B012022234B33 | 2022-08-22 | 2022-09-06 | REPAIR WATER - SEWER | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q022022234A58 | 2022-08-22 | 2022-09-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B022022234A57 | 2022-08-22 | 2022-09-18 | TEMPORARY PEDESTRIAN WALK | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
B022022234A58 | 2022-08-22 | 2022-09-18 | OCCUPANCY OF ROADWAY AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
Q022022234A57 | 2022-08-22 | 2022-09-06 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B012022234B59 | 2022-08-22 | 2022-09-21 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
Q012022234E57 | 2022-08-22 | 2022-09-06 | REPAIR WATER - SEWER | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B022022234A72 | 2022-08-22 | 2022-09-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022234A71 | 2022-08-22 | 2022-09-21 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022234A70 | 2022-08-22 | 2022-09-21 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022234A59 | 2022-08-22 | 2022-09-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
B022022234A62 | 2022-08-22 | 2022-09-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022234A61 | 2022-08-22 | 2022-09-06 | OCCUPANCY OF ROADWAY AS STIPULATED | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
Q022022234A56 | 2022-08-22 | 2022-09-06 | TEMPORARY PEDESTRIAN WALK | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B152022231A01 | 2022-08-19 | 2022-09-06 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | VANDERBILT AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET PROSPECT PLACE |
Q022022228A58 | 2022-08-16 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
Q012022228B14 | 2022-08-16 | 2022-09-12 | REPAIR WATER - SEWER - PROTECTED | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
M012022228A35 | 2022-08-16 | 2022-09-12 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022022228A59 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
B012022228B03 | 2022-08-16 | 2022-09-12 | REPAIR WATER - SEWER - PROTECTED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B012022228B11 | 2022-08-16 | 2022-09-12 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M022022228B24 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022228B23 | 2022-08-16 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022228B29 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
M022022228B25 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022228B28 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022228B27 | 2022-08-16 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022228B26 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022228B25 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022228B24 | 2022-08-16 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
Q022022228A60 | 2022-08-16 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
X012022228A42 | 2022-08-16 | 2022-09-12 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X012022228A43 | 2022-08-16 | 2022-09-12 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B012022228B14 | 2022-08-16 | 2022-09-12 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012022228B15 | 2022-08-16 | 2022-09-12 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B012022228B20 | 2022-08-16 | 2022-09-07 | REPAIR WATER - SEWER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B012022228B17 | 2022-08-16 | 2022-09-12 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET |
B012022223B07 | 2022-08-11 | 2022-08-30 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
M012022223A22 | 2022-08-11 | 2022-09-05 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012022223A99 | 2022-08-11 | 2022-09-12 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022223A98 | 2022-08-11 | 2022-09-06 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET |
B012022223B00 | 2022-08-11 | 2022-09-06 | REPAIR SEWER | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B012022223B03 | 2022-08-11 | 2022-09-06 | REPAIR WATER - SEWER - PROTECTED | 3 AVENUE, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
B012022223B09 | 2022-08-11 | 2022-08-30 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET NORTH 1 STREET |
B012022223B10 | 2022-08-11 | 2022-09-06 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022223B11 | 2022-08-11 | 2022-08-30 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
Q022022223A01 | 2022-08-11 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | POPLE AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET SAULL STREET |
Q022022223A02 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | POPLE AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET SAULL STREET |
Q022022223A03 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | POPLE AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET SAULL STREET |
B022022223B26 | 2022-08-11 | 2022-09-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022223B25 | 2022-08-11 | 2022-09-06 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022223B24 | 2022-08-11 | 2022-09-06 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022223B23 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
B022022223B22 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 3 AVENUE, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
B022022223B21 | 2022-08-11 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | 3 AVENUE, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
Q012022223A57 | 2022-08-11 | 2022-09-07 | REPAIR WATER - SEWER | POPLE AVENUE, QUEENS, FROM STREET COLLEGE POINT BOULEVARD TO STREET SAULL STREET |
M022022223A65 | 2022-08-11 | 2022-09-05 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022223A66 | 2022-08-11 | 2022-09-05 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022223A67 | 2022-08-11 | 2022-09-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B022022223B20 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B022022223B19 | 2022-08-11 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | WARREN STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B022022223B18 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022223B17 | 2022-08-11 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022223B16 | 2022-08-11 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022217A30 | 2022-08-05 | 2022-09-03 | TEMPORARY PEDESTRIAN WALK | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
Q012022217C23 | 2022-08-05 | 2022-09-03 | REPAIR WATER - SEWER | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012022217A49 | 2022-08-05 | 2022-09-03 | REPAIR WATER - SEWER | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022022217A32 | 2022-08-05 | 2022-09-03 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012022217A45 | 2022-08-05 | 2022-08-21 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022022217A31 | 2022-08-05 | 2022-09-03 | OCCUPANCY OF ROADWAY AS STIPULATED | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012022216B03 | 2022-08-04 | 2022-08-30 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022216A99 | 2022-08-04 | 2022-08-30 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
B012022216A90 | 2022-08-04 | 2022-08-30 | REPAIR WATER - SEWER - PROTECTED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
X012022216A37 | 2022-08-04 | 2022-08-31 | REPAIR WATER | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
B022022216A50 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022216B09 | 2022-08-04 | 2022-08-31 | REPAIR WATER | 62 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
B012022216B11 | 2022-08-04 | 2022-08-31 | REPAIR WATER | LAMONT COURT, BROOKLYN, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE |
B022022216A57 | 2022-08-04 | 2022-08-21 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE R, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022022216A56 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | LAMONT COURT, BROOKLYN, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE |
B022022216A55 | 2022-08-04 | 2022-08-31 | TEMPORARY PEDESTRIAN WALK | LAMONT COURT, BROOKLYN, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE |
B022022216A43 | 2022-08-04 | 2022-09-12 | TEMPORARY PEDESTRIAN WALK | PULASKI STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022022216A44 | 2022-08-04 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022022216A45 | 2022-08-04 | 2022-09-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | PULASKI STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
B022022216A48 | 2022-08-04 | 2022-08-31 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022216A49 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B022022216A52 | 2022-08-04 | 2022-08-31 | TEMPORARY PEDESTRIAN WALK | 62 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
B022022216A53 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
B022022216A54 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 62 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
B012022216B12 | 2022-08-04 | 2022-09-05 | REPAIR WATER - SEWER | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
X022022216A09 | 2022-08-04 | 2022-08-31 | TEMPORARY PEDESTRIAN WALK | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
S012022216A41 | 2022-08-04 | 2022-09-10 | REPAIR WATER - SEWER - PROTECTED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
X022022216A10 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF ROADWAY AS STIPULATED | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
X022022216A11 | 2022-08-04 | 2022-08-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | GRANT AVENUE, BRONX, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET |
S022022216A25 | 2022-08-04 | 2022-09-12 | OCCUPANCY OF ROADWAY AS STIPULATED | VAN DUZER STREET, STATEN ISLAND, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE |
B012022216B08 | 2022-08-04 | 2022-08-31 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012022216B04 | 2022-08-04 | 2022-09-08 | REPAIR WATER | PULASKI STREET, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
Q022022213A11 | 2022-08-01 | 2022-08-22 | TEMPORARY PEDESTRIAN WALK | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022213A12 | 2022-08-01 | 2022-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022213A13 | 2022-08-01 | 2022-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
B012022213A11 | 2022-08-01 | 2022-08-24 | REPAIR WATER - SEWER | LYNCH STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022213A09 | 2022-08-01 | 2022-09-05 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
Q022022213A09 | 2022-08-01 | 2022-08-30 | OCCUPANCY OF ROADWAY AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022213A10 | 2022-08-01 | 2022-08-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q012022213A31 | 2022-08-01 | 2022-08-30 | REPAIR WATER - SEWER | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022213A08 | 2022-08-01 | 2022-08-30 | TEMPORARY PEDESTRIAN WALK | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
B012022213A15 | 2022-08-01 | 2022-09-02 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
Q012022213A32 | 2022-08-01 | 2022-08-22 | REPAIR WATER - SEWER - PROTECTED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q012022213B85 | 2022-08-01 | 2022-08-01 | REPAIR WATER - SEWER | 49 AVENUE, QUEENS, FROM STREET 5 STREET TO STREET VERNON BOULEVARD |
X012022213A07 | 2022-08-01 | 2022-08-30 | REPAIR WATER - SEWER | CLAY AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B022022208A95 | 2022-07-27 | 2022-08-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
B022022208A93 | 2022-07-27 | 2022-08-24 | TEMPORARY PEDESTRIAN WALK | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
B022022208B09 | 2022-07-27 | 2022-08-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M022022208A92 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022208A91 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022208A90 | 2022-07-27 | 2022-08-23 | TEMPORARY PEDESTRIAN WALK | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022208A72 | 2022-07-27 | 2022-08-23 | REPAIR WATER - SEWER - PROTECTED | ELDERT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012022208A73 | 2022-07-27 | 2022-08-09 | REPAIR WATER | SOUTH 8 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022208A80 | 2022-07-27 | 2022-08-19 | REPAIR WATER - PROTECTED | 4 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012022208A58 | 2022-07-27 | 2022-09-01 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
M012022208A54 | 2022-07-27 | 2022-08-23 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022208A94 | 2022-07-27 | 2022-08-24 | OCCUPANCY OF ROADWAY AS STIPULATED | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
B012022208A61 | 2022-07-27 | 2022-08-23 | REPAIR WATER - SEWER | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022208A60 | 2022-07-27 | 2022-08-06 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
X012022208A23 | 2022-07-27 | 2022-08-22 | REPAIR WATER - SEWER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
X012022208A24 | 2022-07-27 | 2022-08-24 | REPAIR WATER - SEWER - PROTECTED | COLGATE AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
B022022208B07 | 2022-07-27 | 2022-08-18 | TEMPORARY PEDESTRIAN WALK | 4 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012022208A57 | 2022-07-27 | 2022-08-25 | REPAIR WATER - SEWER | MC DONALD AVENUE, BROOKLYN, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY |
Q022022208B41 | 2022-07-27 | 2022-08-20 | TEMPORARY PEDESTRIAN WALK | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
Q022022208B42 | 2022-07-27 | 2022-08-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
Q022022208B43 | 2022-07-27 | 2022-08-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
Q022022208B44 | 2022-07-27 | 2022-08-23 | TEMPORARY PEDESTRIAN WALK | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
Q022022208B45 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
Q022022208B46 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
Q022022208B40 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q022022208B39 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B022022208B05 | 2022-07-27 | 2022-08-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
Q012022208B32 | 2022-07-27 | 2022-08-23 | REPAIR WATER - SEWER | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
Q012022208B35 | 2022-07-27 | 2022-08-20 | REPAIR WATER - SEWER - PROTECTED | 38 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
Q012022208B36 | 2022-07-27 | 2022-08-23 | REPAIR WATER - PROTECTED | 11 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
B012022208A62 | 2022-07-27 | 2022-08-24 | REPAIR WATER - SEWER | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022208B04 | 2022-07-27 | 2022-08-22 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B022022208B03 | 2022-07-27 | 2022-08-22 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
Q022022208B38 | 2022-07-27 | 2022-08-23 | TEMPORARY PEDESTRIAN WALK | BEACH 14 STREET, QUEENS, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD |
B022022208B02 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022208B08 | 2022-07-27 | 2022-08-18 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B022022208B01 | 2022-07-27 | 2022-08-23 | OCCUPANCY OF ROADWAY AS STIPULATED | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022208B00 | 2022-07-27 | 2022-08-23 | TEMPORARY PEDESTRIAN WALK | MARCY AVENUE, BROOKLYN, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE |
B022022208A99 | 2022-07-27 | 2022-08-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022208A98 | 2022-07-27 | 2022-08-25 | OCCUPANCY OF ROADWAY AS STIPULATED | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022208A97 | 2022-07-27 | 2022-08-25 | TEMPORARY PEDESTRIAN WALK | PALMETTO STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022208A96 | 2022-07-27 | 2022-08-06 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE R, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012022208A68 | 2022-07-27 | 2022-08-22 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012022207A90 | 2022-07-26 | 2022-08-19 | REPAIR WATER - SEWER | WEIRFIELD STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B152022203A01 | 2022-07-22 | 2022-08-21 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | AVENUE R, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B022022201A12 | 2022-07-20 | 2022-08-14 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B012022201A26 | 2022-07-20 | 2022-08-14 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B012022201A23 | 2022-07-20 | 2022-08-16 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET |
B012022201A22 | 2022-07-20 | 2022-08-16 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET |
B012022201A21 | 2022-07-20 | 2022-08-22 | REPAIR WATER - SEWER | NEWELL STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
M012022201A29 | 2022-07-20 | 2022-08-12 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B022022201A13 | 2022-07-20 | 2022-08-14 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
M022022201A07 | 2022-07-20 | 2022-08-12 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022201A08 | 2022-07-20 | 2022-08-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022201A09 | 2022-07-20 | 2022-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B022022201A14 | 2022-07-20 | 2022-08-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B012022200C30 | 2022-07-19 | 2022-08-02 | REPAIR WATER - SEWER | QUINCY STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012022199A81 | 2022-07-18 | 2022-08-11 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
M022022199B07 | 2022-07-18 | 2022-08-12 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022199B08 | 2022-07-18 | 2022-08-12 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M022022199B09 | 2022-07-18 | 2022-08-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012022199A84 | 2022-07-18 | 2022-08-11 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE |
B012022199A85 | 2022-07-18 | 2022-08-11 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET NORTH 1 STREET |
M012022199A72 | 2022-07-18 | 2022-08-12 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B152022196A29 | 2022-07-15 | 2022-08-16 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | AVENUE R, BROOKLYN, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET |
B152022196A28 | 2022-07-15 | 2022-08-16 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | AVENUE R, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET |
B012022196A86 | 2022-07-15 | 2022-08-06 | REPAIR WATER - SEWER | SKILLMAN AVENUE, BROOKLYN, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE |
B012022194B28 | 2022-07-13 | 2022-08-11 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022194B00 | 2022-07-13 | 2022-08-13 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012022194E01 | 2022-07-13 | 2022-08-16 | REPAIR WATER - SEWER | 159 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012022194A90 | 2022-07-13 | 2022-08-10 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022194B26 | 2022-07-13 | 2022-08-12 | REPAIR WATER - SEWER - PROTECTED | GRAND AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B152022193A12 | 2022-07-12 | 2022-08-30 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B152022193A10 | 2022-07-12 | 2022-08-30 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B152022193A11 | 2022-07-12 | 2022-08-30 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022192A72 | 2022-07-11 | 2022-08-06 | REPAIR WATER - SEWER | PUTNAM AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022189B31 | 2022-07-08 | 2022-08-06 | REPAIR WATER - SEWER | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B012022189B51 | 2022-07-08 | 2022-08-07 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET |
M022022189C32 | 2022-07-08 | 2022-07-24 | TEMPORARY PEDESTRIAN WALK | BROADWAY, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M022022189C33 | 2022-07-08 | 2022-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
M022022189C34 | 2022-07-08 | 2022-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | BROADWAY, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
B022022189A87 | 2022-07-08 | 2022-08-15 | TEMPORARY PEDESTRIAN WALK | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022189B17 | 2022-07-08 | 2022-08-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022189B16 | 2022-07-08 | 2022-08-13 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022189B73 | 2022-07-08 | 2022-08-07 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012022189C90 | 2022-07-08 | 2022-08-09 | REPAIR WATER | FARMERS BOULEVARD, QUEENS, FROM STREET 137 AVENUE TO STREET 138 AVENUE |
B012022189B93 | 2022-07-08 | 2022-08-14 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET |
B012022189B96 | 2022-07-08 | 2022-08-03 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012022189B97 | 2022-07-08 | 2022-08-13 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022189C02 | 2022-07-08 | 2022-07-31 | REPAIR WATER - SEWER - PROTECTED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022189B12 | 2022-07-08 | 2022-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022189B15 | 2022-07-08 | 2022-08-13 | TEMPORARY PEDESTRIAN WALK | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
M012022189B00 | 2022-07-08 | 2022-07-24 | REPAIR WATER - SEWER | BROADWAY, MANHATTAN, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET |
X012022189A80 | 2022-07-08 | 2022-08-14 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X012022189A73 | 2022-07-08 | 2022-08-14 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B022022189A88 | 2022-07-08 | 2022-08-15 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022189A89 | 2022-07-08 | 2022-08-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022189B10 | 2022-07-08 | 2022-08-07 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022189B11 | 2022-07-08 | 2022-08-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022189B44 | 2022-07-08 | 2022-08-15 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012022187B52 | 2022-07-06 | 2022-08-05 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012022187B54 | 2022-07-06 | 2022-07-23 | REPAIR WATER - SEWER | NEWELL STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
Q012022187A68 | 2022-07-06 | 2022-08-09 | REPAIR WATER - SEWER | 49 AVENUE, QUEENS, FROM STREET 5 STREET TO STREET VERNON BOULEVARD |
X012022186A79 | 2022-07-05 | 2022-07-31 | REPAIR WATER - SEWER - PROTECTED | VALENTINE AVENUE, BRONX, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET |
M012022180A55 | 2022-06-29 | 2022-07-24 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022022180B38 | 2022-06-29 | 2022-07-24 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012022180A51 | 2022-06-29 | 2022-08-02 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022180A59 | 2022-06-29 | 2022-07-31 | REPAIR WATER - SEWER - PROTECTED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
M022022180B37 | 2022-06-29 | 2022-07-24 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022022180B39 | 2022-06-29 | 2022-07-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012022179B71 | 2022-06-28 | 2022-07-30 | REPAIR WATER - SEWER | OLINVILLE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
X012022179B70 | 2022-06-28 | 2022-07-30 | REPAIR WATER - PROTECTED | FAILE STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
M012022179A85 | 2022-06-28 | 2022-07-27 | C.A.R. RESTORATION | EAST 117 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
X012022179B68 | 2022-06-28 | 2022-07-23 | REPAIR WATER - SEWER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
X012022179B69 | 2022-06-28 | 2022-07-29 | REPAIR WATER - SEWER - PROTECTED | COLGATE AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
B012022179B89 | 2022-06-28 | 2022-07-30 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022174A71 | 2022-06-23 | 2022-07-08 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022174A84 | 2022-06-23 | 2022-07-26 | REPAIR WATER - SEWER | GROVE STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET GOODWIN PLACE |
B012022174A86 | 2022-06-23 | 2022-07-26 | REPAIR WATER | SOUTH 8 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022174A87 | 2022-06-23 | 2022-07-12 | REPAIR WATER - SEWER | STILLWELL AVENUE, BROOKLYN, FROM STREET BOWERY TO STREET DEAD END |
B012022174A88 | 2022-06-23 | 2022-07-20 | REPAIR WATER - SEWER | WEIRFIELD STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012022174A89 | 2022-06-23 | 2022-07-21 | REPAIR WATER - SEWER | AVENUE R, BROOKLYN, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET |
B012022174A95 | 2022-06-23 | 2022-07-23 | REPAIR WATER - SEWER - PROTECTED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
Q012022174A83 | 2022-06-23 | 2022-07-31 | REPAIR WATER - SEWER | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
M012022174A56 | 2022-06-23 | 2022-07-23 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022022174A51 | 2022-06-23 | 2022-07-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022174A50 | 2022-06-23 | 2022-07-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022174A49 | 2022-06-23 | 2022-07-31 | TEMPORARY PEDESTRIAN WALK | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
M022022174C10 | 2022-06-23 | 2022-07-23 | TEMPORARY PEDESTRIAN WALK | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022174C11 | 2022-06-23 | 2022-07-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022174C12 | 2022-06-23 | 2022-07-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022174C10 | 2022-06-23 | 2022-07-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022174C09 | 2022-06-23 | 2022-07-23 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022174C08 | 2022-06-23 | 2022-07-23 | TEMPORARY PEDESTRIAN WALK | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022174C07 | 2022-06-23 | 2022-07-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022174C06 | 2022-06-23 | 2022-07-08 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022174C05 | 2022-06-23 | 2022-07-08 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022174B89 | 2022-06-23 | 2022-07-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022174B88 | 2022-06-23 | 2022-07-21 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B022022174B87 | 2022-06-23 | 2022-07-21 | TEMPORARY PEDESTRIAN WALK | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012022174A69 | 2022-06-23 | 2022-07-21 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012022174A70 | 2022-06-23 | 2022-07-30 | REPAIR WATER - SEWER | EAST 99 STREET, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE |
B012022174A78 | 2022-06-23 | 2022-07-24 | REPAIR WATER - SEWER - PROTECTED | ELDERT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012022171A15 | 2022-06-20 | 2022-07-19 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
M022022171A04 | 2022-06-20 | 2022-07-19 | TEMPORARY PEDESTRIAN WALK | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022171A09 | 2022-06-20 | 2022-07-19 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022171A08 | 2022-06-20 | 2022-07-19 | TEMPORARY PEDESTRIAN WALK | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022171A06 | 2022-06-20 | 2022-07-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
Q022022171A10 | 2022-06-20 | 2022-07-23 | OCCUPANCY OF ROADWAY AS STIPULATED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022171A11 | 2022-06-20 | 2022-07-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022171A09 | 2022-06-20 | 2022-07-23 | TEMPORARY PEDESTRIAN WALK | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
M022022171A05 | 2022-06-20 | 2022-07-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
B022022171A00 | 2022-06-20 | 2022-07-19 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
M012022171A17 | 2022-06-20 | 2022-07-19 | REPAIR WATER - SEWER - PROTECTED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M012022171A15 | 2022-06-20 | 2022-07-19 | REPAIR WATER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022171A10 | 2022-06-20 | 2022-07-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
B022022171A01 | 2022-06-20 | 2022-07-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022171A02 | 2022-06-20 | 2022-07-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
Q012022171A23 | 2022-06-20 | 2022-07-23 | REPAIR WATER - SEWER - PROTECTED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
B012022167C35 | 2022-06-16 | 2022-07-15 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET |
B022022165A01 | 2022-06-14 | 2022-07-01 | TEMPORARY PEDESTRIAN WALK | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
Q012022165A05 | 2022-06-14 | 2022-06-29 | REPAIR WATER - PROTECTED | 95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE |
B012022165A10 | 2022-06-14 | 2022-07-01 | REPAIR SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
B022022165A02 | 2022-06-14 | 2022-07-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD |
B012022165A06 | 2022-06-14 | 2022-07-09 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022165A03 | 2022-06-14 | 2022-07-11 | PRIVATE SEWER | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B012022164B65 | 2022-06-13 | 2022-07-01 | REPAIR WATER - SEWER - PROTECTED | VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
X012022164A90 | 2022-06-13 | 2022-07-19 | REPAIR WATER - SEWER | CLAY AVENUE, BRONX, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET |
B012022161A96 | 2022-06-10 | 2022-07-12 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012022157A37 | 2022-06-10 | 2022-06-30 | REPAIR WATER | 40 STREET, BROOKLYN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
X012022161A98 | 2022-06-10 | 2022-07-08 | REPAIR WATER - SEWER - PROTECTED | COLGATE AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
B012022161B08 | 2022-06-10 | 2022-07-11 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022161B10 | 2022-06-10 | 2022-07-16 | REPAIR WATER - SEWER | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B012022161B06 | 2022-06-10 | 2022-07-09 | REPAIR WATER - SEWER | LYNCH STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
Q012022160A96 | 2022-06-09 | 2022-07-11 | REPAIR WATER - SEWER | 47 AVENUE, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
B012022160A55 | 2022-06-09 | 2022-07-14 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022160A35 | 2022-06-09 | 2022-07-19 | REPAIR WATER - SEWER | QUINCY STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B022022160A79 | 2022-06-09 | 2022-07-14 | TEMPORARY PEDESTRIAN WALK | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022160A80 | 2022-06-09 | 2022-07-14 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022160A81 | 2022-06-09 | 2022-07-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022160A56 | 2022-06-09 | 2022-07-07 | REPAIR WATER - SEWER | GOLD STREET, BROOKLYN, FROM STREET FRONT STREET TO STREET WATER STREET |
B152022158A88 | 2022-06-07 | 2022-07-09 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | FILLMORE PLACE, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET |
B152022158A89 | 2022-06-07 | 2022-07-09 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012022158B84 | 2022-06-07 | 2022-07-03 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
X012022158A40 | 2022-06-07 | 2022-07-15 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
X012022158A39 | 2022-06-07 | 2022-07-15 | REPAIR WATER - SEWER | TELLER AVENUE, BRONX, FROM STREET BEND TO STREET EAST 171 STREET |
B022022157A72 | 2022-06-06 | 2022-07-09 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A79 | 2022-06-06 | 2022-07-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A78 | 2022-06-06 | 2022-07-02 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A77 | 2022-06-06 | 2022-07-02 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A76 | 2022-06-06 | 2022-07-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A75 | 2022-06-06 | 2022-07-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A74 | 2022-06-06 | 2022-07-10 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022157B16 | 2022-06-06 | 2022-06-30 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022157B14 | 2022-06-06 | 2022-07-07 | REPAIR WATER - SEWER | 16 AVENUE, BROOKLYN, FROM STREET 50 STREET TO STREET 51 STREET |
B012022157B13 | 2022-06-06 | 2022-07-07 | REPAIR WATER - SEWER | PUTNAM AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022157B12 | 2022-06-06 | 2022-07-14 | REPAIR WATER - SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET |
B012022157B11 | 2022-06-06 | 2022-07-02 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A73 | 2022-06-06 | 2022-07-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022157A71 | 2022-06-06 | 2022-07-09 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022157B10 | 2022-06-06 | 2022-07-10 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022157B07 | 2022-06-06 | 2022-07-09 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022157B04 | 2022-06-06 | 2022-07-03 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022157B00 | 2022-06-06 | 2022-07-03 | REPAIR WATER - SEWER | GOLD STREET, BROOKLYN, FROM STREET FRONT STREET TO STREET WATER STREET |
X012022157A54 | 2022-06-06 | 2022-07-05 | REPAIR WATER - PROTECTED | EAST 183 STREET, BRONX, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE |
X012022157A62 | 2022-06-06 | 2022-06-15 | REPAIR WATER - SEWER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
B152022157A02 | 2022-06-06 | 2022-07-09 | DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
Q012022154B35 | 2022-06-03 | 2022-07-01 | REPAIR WATER - SEWER - PROTECTED | 61 AVENUE, QUEENS, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY |
Q012022154F96 | 2022-06-03 | 2022-07-01 | REPAIR WATER - SEWER - PROTECTED | 25 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET 157 STREET |
Q012022154F97 | 2022-06-03 | 2022-07-01 | REPAIR WATER - SEWER - PROTECTED | 67 AVENUE, QUEENS, FROM STREET 232 STREET TO STREET 233 STREET |
Q022022154B57 | 2022-06-03 | 2022-07-02 | TEMPORARY PEDESTRIAN WALK | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022154B58 | 2022-06-03 | 2022-07-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q022022154B59 | 2022-06-03 | 2022-07-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q012022154F98 | 2022-06-03 | 2022-07-01 | REPAIR WATER - SEWER | 1 STREET, QUEENS, FROM STREET 27 AVENUE TO STREET BEND |
Q012022154B21 | 2022-06-03 | 2022-07-01 | REPAIR WATER - SEWER - PROTECTED | 135 STREET, QUEENS, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE |
Q012022152B77 | 2022-06-01 | 2022-06-23 | REPAIR WATER - SEWER - PROTECTED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022152A96 | 2022-06-01 | 2022-06-23 | TEMPORARY PEDESTRIAN WALK | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022152A98 | 2022-06-01 | 2022-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
Q022022152A97 | 2022-06-01 | 2022-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | SPRINGFIELD BOULEVARD, QUEENS, FROM STREET 67 AVENUE TO STREET 69 AVENUE |
B022022151B66 | 2022-05-31 | 2022-06-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022151A90 | 2022-05-31 | 2022-06-22 | REPAIR SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022151B64 | 2022-05-31 | 2022-06-22 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022151B44 | 2022-05-31 | 2022-06-30 | REPAIR WATER - SEWER | EAST 99 STREET, BROOKLYN, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE |
B012022151A95 | 2022-05-31 | 2022-06-19 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
X012022151A61 | 2022-05-31 | 2022-06-30 | REPAIR WATER - PROTECTED | FAILE STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
B022022151B65 | 2022-05-31 | 2022-06-22 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022147C64 | 2022-05-27 | 2022-06-10 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012022147C60 | 2022-05-27 | 2022-07-01 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022147C63 | 2022-05-27 | 2022-06-20 | REPAIR WATER - SEWER | WEIRFIELD STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022145A89 | 2022-05-25 | 2022-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022145A96 | 2022-05-25 | 2022-06-23 | TEMPORARY PEDESTRIAN WALK | CARROLL STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
B022022145A97 | 2022-05-25 | 2022-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | CARROLL STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
B012022145B23 | 2022-05-25 | 2022-06-23 | REPAIR WATER - SEWER | STILLWELL AVENUE, BROOKLYN, FROM STREET BOWERY TO STREET DEAD END |
B012022145B15 | 2022-05-25 | 2022-06-23 | REPAIR WATER - SEWER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
B012022145B14 | 2022-05-25 | 2022-06-23 | REPAIR WATER | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012022145B13 | 2022-05-25 | 2022-06-23 | REPAIR WATER - SEWER - PROTECTED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022145A93 | 2022-05-25 | 2022-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022022145A92 | 2022-05-25 | 2022-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022022145A91 | 2022-05-25 | 2022-06-23 | TEMPORARY PEDESTRIAN WALK | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B022022145A90 | 2022-05-25 | 2022-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
B022022145A88 | 2022-05-25 | 2022-06-23 | TEMPORARY PEDESTRIAN WALK | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
M022022143D37 | 2022-05-23 | 2022-06-24 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022022143D49 | 2022-05-23 | 2022-06-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022143D48 | 2022-05-23 | 2022-06-23 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022143D47 | 2022-05-23 | 2022-06-23 | TEMPORARY PEDESTRIAN WALK | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022143D46 | 2022-05-23 | 2022-06-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022143D45 | 2022-05-23 | 2022-06-21 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022143D44 | 2022-05-23 | 2022-06-21 | TEMPORARY PEDESTRIAN WALK | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022143D39 | 2022-05-23 | 2022-06-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022022143D38 | 2022-05-23 | 2022-06-24 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
X012022143A13 | 2022-05-23 | 2022-06-21 | REPAIR WATER - SEWER - PROTECTED | COLLEGE AVENUE, BRONX, FROM STREET EAST 170 STREET TO STREET EAST 171 STREET |
X012022143A12 | 2022-05-23 | 2022-06-30 | REPAIR WATER - SEWER | OLINVILLE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
M012022143B68 | 2022-05-23 | 2022-06-23 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022143B67 | 2022-05-23 | 2022-06-21 | REPAIR WATER - SEWER - PROTECTED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M012022143B66 | 2022-05-23 | 2022-06-24 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012022139A39 | 2022-05-23 | 2022-06-17 | REPAIR WATER | 88 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD |
B012022143B03 | 2022-05-23 | 2022-06-26 | REPAIR SEWER | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022143A41 | 2022-05-23 | 2022-06-26 | TEMPORARY PEDESTRIAN WALK | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022143A42 | 2022-05-23 | 2022-06-26 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022143A43 | 2022-05-23 | 2022-06-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022143C44 | 2022-05-23 | 2022-06-19 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022143C45 | 2022-05-23 | 2022-06-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022143C46 | 2022-05-23 | 2022-06-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
M012022140A74 | 2022-05-20 | 2022-06-19 | REPAIR WATER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022140C74 | 2022-05-20 | 2022-06-19 | TEMPORARY PEDESTRIAN WALK | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022140C76 | 2022-05-20 | 2022-06-19 | OCCUPANCY OF SIDEWALK AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022140C75 | 2022-05-20 | 2022-06-19 | OCCUPANCY OF ROADWAY AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
Q012022134A00 | 2022-05-17 | 2022-06-12 | REPAIR WATER - PROTECTED | 95 STREET, QUEENS, FROM STREET 162 AVENUE TO STREET 163 AVENUE |
B012022137B13 | 2022-05-17 | 2022-06-15 | REPAIR SEWER - PROTECTED | BROADWAY, BROOKLYN, FROM STREET DITMARS STREET TO STREET VERNON AVENUE |
B012022136B56 | 2022-05-16 | 2022-06-11 | PRIVATE SEWER | DRIGGS AVENUE, BROOKLYN, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET |
B012022136B55 | 2022-05-16 | 2022-06-11 | PRIVATE SEWER | NORTH 1 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
Q012022131A36 | 2022-05-11 | 2022-06-16 | REPAIR WATER - SEWER | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
M022022131A40 | 2022-05-11 | 2022-06-02 | TEMPORARY PEDESTRIAN WALK | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012022131A27 | 2022-05-11 | 2022-06-02 | REPAIR WATER - SEWER | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012022131A36 | 2022-05-11 | 2022-06-11 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022131A34 | 2022-05-11 | 2022-06-16 | REPAIR WATER - SEWER | GRAVESEND NECK ROAD, BROOKLYN, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET |
B012022131A33 | 2022-05-11 | 2022-06-04 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
M022022131A41 | 2022-05-11 | 2022-06-02 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M022022131A42 | 2022-05-11 | 2022-06-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 86 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
Q012022131A37 | 2022-05-11 | 2022-06-11 | REPAIR WATER - SEWER | 47 AVENUE, QUEENS, FROM STREET 202 STREET TO STREET 204 STREET |
B012022129A55 | 2022-05-09 | 2022-06-12 | REPAIR WATER - SEWER | NEWELL STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B012022129A45 | 2022-05-09 | 2022-06-04 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022129A60 | 2022-05-09 | 2022-06-03 | REPAIR WATER - SEWER | GOLD STREET, BROOKLYN, FROM STREET FRONT STREET TO STREET WATER STREET |
B012022129A49 | 2022-05-09 | 2022-06-12 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012022129A53 | 2022-05-09 | 2022-06-09 | REPAIR WATER - SEWER | LYNCH STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022129A47 | 2022-05-09 | 2022-06-09 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B012022129A52 | 2022-05-09 | 2022-05-24 | REPAIR WATER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012022124B40 | 2022-05-04 | 2022-06-03 | REPAIR WATER - SEWER - PROTECTED | MONTGOMERY STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE |
B022022124B49 | 2022-05-04 | 2022-06-09 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022124B50 | 2022-05-04 | 2022-06-09 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022124B51 | 2022-05-04 | 2022-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
X012022124C71 | 2022-05-04 | 2022-05-20 | REPAIR WATER - SEWER - PROTECTED | COLLEGE AVENUE, BRONX, FROM STREET EAST 170 STREET TO STREET EAST 171 STREET |
B012022124B57 | 2022-05-04 | 2022-05-27 | REPAIR WATER - SEWER - PROTECTED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012022124B56 | 2022-05-04 | 2022-05-20 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B012022124B53 | 2022-05-04 | 2022-06-08 | REPAIR WATER - SEWER - PROTECTED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
M022022124B97 | 2022-05-04 | 2022-05-25 | TEMPORARY PEDESTRIAN WALK | MADISON AVENUE, MANHATTAN, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET |
M012022124B47 | 2022-05-04 | 2022-05-25 | REPAIR WATER - SEWER | MADISON AVENUE, MANHATTAN, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET |
B012022124B50 | 2022-05-04 | 2022-06-03 | REPAIR WATER - SEWER - PROTECTED | LINCOLN PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
M022022124B98 | 2022-05-04 | 2022-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET |
M022022124B99 | 2022-05-04 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | MADISON AVENUE, MANHATTAN, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET |
B012022124B39 | 2022-05-04 | 2022-06-04 | REPAIR SEWER | 45 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012022124B38 | 2022-05-04 | 2022-06-09 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022123B31 | 2022-05-03 | 2022-06-10 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
M012022123A95 | 2022-05-03 | 2022-06-11 | REPAIR WATER - PROTECTED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022123B37 | 2022-05-03 | 2022-06-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022123B35 | 2022-05-03 | 2022-06-11 | TEMPORARY PEDESTRIAN WALK | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022123B36 | 2022-05-03 | 2022-06-11 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022122C97 | 2022-05-02 | 2022-05-27 | TEMPORARY PEDESTRIAN WALK | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022022122C82 | 2022-05-02 | 2022-06-09 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022122C81 | 2022-05-02 | 2022-06-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022122C80 | 2022-05-02 | 2022-06-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022122C79 | 2022-05-02 | 2022-06-10 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
X012022122B52 | 2022-05-02 | 2022-05-31 | REPAIR WATER - SEWER | OLINVILLE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
X012022122B51 | 2022-05-02 | 2022-06-04 | REPAIR WATER - PROTECTED | EAST 183 STREET, BRONX, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE |
B012022122C74 | 2022-05-02 | 2022-06-09 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022122C78 | 2022-05-02 | 2022-05-07 | REPAIR WATER - SEWER | GOLD STREET, BROOKLYN, FROM STREET FRONT STREET TO STREET WATER STREET |
B022022122C98 | 2022-05-02 | 2022-05-27 | OCCUPANCY OF ROADWAY AS STIPULATED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022022122C99 | 2022-05-02 | 2022-05-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022022122C96 | 2022-05-02 | 2022-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022122C95 | 2022-05-02 | 2022-05-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022122C94 | 2022-05-02 | 2022-05-20 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022122C87 | 2022-05-02 | 2022-06-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022122C86 | 2022-05-02 | 2022-06-08 | OCCUPANCY OF ROADWAY AS STIPULATED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022122C85 | 2022-05-02 | 2022-06-08 | TEMPORARY PEDESTRIAN WALK | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022122C84 | 2022-05-02 | 2022-06-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022122C83 | 2022-05-02 | 2022-06-09 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022119B65 | 2022-04-29 | 2022-05-27 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012022119B62 | 2022-04-29 | 2022-05-22 | REPAIR WATER - PROTECTED | MESEROLE AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET LEONARD STREET |
B012022116A36 | 2022-04-29 | 2022-05-25 | REPAIR WATER | BAY 34 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE |
B022022119B58 | 2022-04-29 | 2022-05-28 | TEMPORARY PEDESTRIAN WALK | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022119B59 | 2022-04-29 | 2022-05-28 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022119B60 | 2022-04-29 | 2022-05-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B022022119C30 | 2022-04-29 | 2022-05-28 | TEMPORARY PEDESTRIAN WALK | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B022022119C31 | 2022-04-29 | 2022-05-28 | OCCUPANCY OF ROADWAY AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B022022119C32 | 2022-04-29 | 2022-05-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022119B61 | 2022-04-29 | 2022-05-28 | REPAIR SEWER | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B012022119C18 | 2022-04-29 | 2022-05-13 | REPAIR WATER - SEWER | NEWELL STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
B012022119C17 | 2022-04-29 | 2022-05-28 | REPAIR WATER - SEWER | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022119B64 | 2022-04-29 | 2022-05-27 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B022022117B82 | 2022-04-27 | 2022-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
X012022117A54 | 2022-04-27 | 2022-05-21 | REPAIR WATER - PROTECTED | BARRETTO STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
B012022117C08 | 2022-04-27 | 2022-05-25 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022117B08 | 2022-04-27 | 2022-05-25 | REPAIR WATER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
X012022117A55 | 2022-04-27 | 2022-05-25 | REPAIR WATER | BRUCKNER BOULEVARD, BRONX, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET |
B022022117B01 | 2022-04-27 | 2022-05-25 | TEMPORARY PEDESTRIAN WALK | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B012022117C10 | 2022-04-27 | 2022-05-27 | REPAIR WATER - SEWER | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B022022117B02 | 2022-04-27 | 2022-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022022117B03 | 2022-04-27 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022022117B81 | 2022-04-27 | 2022-05-25 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
X022022117A79 | 2022-04-27 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRUCKNER BOULEVARD, BRONX, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET |
X022022117A78 | 2022-04-27 | 2022-05-25 | OCCUPANCY OF ROADWAY AS STIPULATED | BRUCKNER BOULEVARD, BRONX, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET |
X022022117A77 | 2022-04-27 | 2022-05-25 | TEMPORARY PEDESTRIAN WALK | BRUCKNER BOULEVARD, BRONX, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET |
B012022104A03 | 2022-04-27 | 2022-05-13 | REPAIR WATER - PROTECTED | EAST 32 STREET, BROOKLYN, FROM STREET FARRAGUT PLACE TO STREET FARRAGUT ROAD |
B012022117C09 | 2022-04-27 | 2022-05-26 | REPAIR WATER - SEWER | WEIRFIELD STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B022022117B83 | 2022-04-27 | 2022-05-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M012022115A45 | 2022-04-25 | 2022-05-24 | REPAIR WATER - PROTECTED | EAST 82 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012022104A48 | 2022-04-25 | 2022-05-13 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
X012022115A51 | 2022-04-25 | 2022-05-29 | REPAIR WATER - SEWER - PROTECTED | COLGATE AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
M022022115A97 | 2022-04-25 | 2022-05-24 | TEMPORARY PEDESTRIAN WALK | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022115A98 | 2022-04-25 | 2022-05-24 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022115A99 | 2022-04-25 | 2022-05-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022115C31 | 2022-04-25 | 2022-05-06 | REPAIR WATER - SEWER | STANHOPE STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE |
M012022115A47 | 2022-04-25 | 2022-05-24 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022108B00 | 2022-04-18 | 2022-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
M012022108A45 | 2022-04-18 | 2022-05-22 | REPAIR WATER - SEWER - PROTECTED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M012022108A46 | 2022-04-18 | 2022-05-16 | REPAIR WATER - PROTECTED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012022108A48 | 2022-04-18 | 2022-05-20 | REPAIR WATER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
B012022108B22 | 2022-04-18 | 2022-05-18 | REPAIR WATER - SEWER | 18 AVENUE, BROOKLYN, FROM STREET 46 STREET |
B012022108B21 | 2022-04-18 | 2022-05-10 | REPAIR WATER - SEWER | LYNCH STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022108B20 | 2022-04-18 | 2022-05-17 | REPAIR WATER - SEWER | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B012022108B17 | 2022-04-18 | 2022-05-20 | REPAIR SEWER - PROTECTED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022108B16 | 2022-04-18 | 2022-05-09 | REPAIR WATER - SEWER - PROTECTED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B012022108B13 | 2022-04-18 | 2022-05-14 | REPAIR WATER - SEWER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B012022108B10 | 2022-04-18 | 2022-05-12 | REPAIR WATER - SEWER | BERGEN STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012022108B08 | 2022-04-18 | 2022-05-12 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012022108B03 | 2022-04-18 | 2022-05-11 | REPAIR WATER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
M022022108A53 | 2022-04-18 | 2022-05-20 | TEMPORARY PEDESTRIAN WALK | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022108A47 | 2022-04-18 | 2022-05-22 | TEMPORARY PEDESTRIAN WALK | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022108A48 | 2022-04-18 | 2022-05-22 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022108A49 | 2022-04-18 | 2022-05-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022108A50 | 2022-04-18 | 2022-05-16 | TEMPORARY PEDESTRIAN WALK | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022108A51 | 2022-04-18 | 2022-05-16 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022108A52 | 2022-04-18 | 2022-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022108A54 | 2022-04-18 | 2022-05-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022108A55 | 2022-04-18 | 2022-05-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
B022022108A83 | 2022-04-18 | 2022-05-13 | TEMPORARY PEDESTRIAN WALK | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B022022108A84 | 2022-04-18 | 2022-05-13 | OCCUPANCY OF ROADWAY AS STIPULATED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B022022108A85 | 2022-04-18 | 2022-05-13 | OCCUPANCY OF SIDEWALK AS STIPULATED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B022022108A95 | 2022-04-18 | 2022-05-09 | TEMPORARY PEDESTRIAN WALK | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022108A96 | 2022-04-18 | 2022-05-09 | OCCUPANCY OF ROADWAY AS STIPULATED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022108A97 | 2022-04-18 | 2022-05-09 | OCCUPANCY OF SIDEWALK AS STIPULATED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022108A98 | 2022-04-18 | 2022-05-20 | TEMPORARY PEDESTRIAN WALK | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022108A99 | 2022-04-18 | 2022-05-20 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022108B11 | 2022-04-18 | 2022-05-17 | TEMPORARY PEDESTRIAN WALK | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B022022108B12 | 2022-04-18 | 2022-05-17 | OCCUPANCY OF ROADWAY AS STIPULATED | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B022022108B13 | 2022-04-18 | 2022-05-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
X012022108A63 | 2022-04-18 | 2022-05-14 | REPAIR WATER - SEWER | AUSTIN PLACE, BRONX, FROM STREET BEND TO STREET DEAD END |
X012022108A62 | 2022-04-18 | 2022-05-13 | REPAIR WATER - SEWER | OLINVILLE AVENUE, BRONX, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE |
X022022108A68 | 2022-04-18 | 2022-05-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | AUSTIN PLACE, BRONX, FROM STREET BEND TO STREET DEAD END |
X022022108A67 | 2022-04-18 | 2022-05-14 | OCCUPANCY OF ROADWAY AS STIPULATED | AUSTIN PLACE, BRONX, FROM STREET BEND TO STREET DEAD END |
X022022108A66 | 2022-04-18 | 2022-05-14 | TEMPORARY PEDESTRIAN WALK | AUSTIN PLACE, BRONX, FROM STREET BEND TO STREET DEAD END |
Q022022105A35 | 2022-04-15 | 2022-05-12 | TEMPORARY PEDESTRIAN WALK | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012022105A81 | 2022-04-15 | 2022-05-12 | REPAIR WATER - SEWER | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022022105A37 | 2022-04-15 | 2022-05-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022022105A36 | 2022-04-15 | 2022-05-12 | OCCUPANCY OF ROADWAY AS STIPULATED | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012022104A20 | 2022-04-14 | 2022-05-13 | REPAIR WATER - SEWER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B022022101B45 | 2022-04-11 | 2022-05-10 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022022101B44 | 2022-04-11 | 2022-05-10 | TEMPORARY PEDESTRIAN WALK | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022022101B46 | 2022-04-11 | 2022-05-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B012022101C37 | 2022-04-11 | 2022-05-10 | REPAIR WATER - SEWER - PROTECTED | WOODPOINT ROAD, BROOKLYN, FROM STREET FROST STREET TO STREET WITHERS STREET |
B022022098B43 | 2022-04-08 | 2022-05-04 | TEMPORARY PEDESTRIAN WALK | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B022022098B42 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022098B41 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022098B40 | 2022-04-08 | 2022-05-04 | TEMPORARY PEDESTRIAN WALK | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022098B39 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | MINNA STREET, BROOKLYN, FROM STREET 36 STREET TO STREET CHESTER AVENUE |
Q012022098A92 | 2022-04-08 | 2022-05-06 | REPAIR WATER | 80 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
B022022098B37 | 2022-04-08 | 2022-05-04 | TEMPORARY PEDESTRIAN WALK | MINNA STREET, BROOKLYN, FROM STREET 36 STREET TO STREET CHESTER AVENUE |
B022022098B36 | 2022-04-08 | 2022-05-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022098B35 | 2022-04-08 | 2022-05-05 | OCCUPANCY OF ROADWAY AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022098B34 | 2022-04-08 | 2022-05-05 | TEMPORARY PEDESTRIAN WALK | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012022098A95 | 2022-04-08 | 2022-05-07 | REPAIR WATER | 77 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012022098B33 | 2022-04-08 | 2022-05-05 | REPAIR WATER - SEWER | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012022098B34 | 2022-04-08 | 2022-05-10 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B012022098B35 | 2022-04-08 | 2022-05-12 | REPAIR WATER - SEWER | 18 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
B012022098B36 | 2022-04-08 | 2022-05-04 | REPAIR WATER - SEWER | MINNA STREET, BROOKLYN, FROM STREET 36 STREET TO STREET CHESTER AVENUE |
B012022098B37 | 2022-04-08 | 2022-05-04 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE |
B022022098B38 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | MINNA STREET, BROOKLYN, FROM STREET 36 STREET TO STREET CHESTER AVENUE |
Q012022098A95 | 2022-04-08 | 2022-05-04 | REPAIR WATER - SEWER - PROTECTED | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022022098A93 | 2022-04-08 | 2022-05-06 | TEMPORARY PEDESTRIAN WALK | 80 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q022022098A94 | 2022-04-08 | 2022-05-06 | OCCUPANCY OF ROADWAY AS STIPULATED | 80 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
Q022022098A95 | 2022-04-08 | 2022-05-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | 80 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE |
B022022098B44 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
Q022022098A96 | 2022-04-08 | 2022-05-04 | TEMPORARY PEDESTRIAN WALK | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022022098A97 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q022022098A98 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 168 STREET, QUEENS, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B022022098B45 | 2022-04-08 | 2022-05-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012022098B38 | 2022-04-08 | 2022-05-04 | REPAIR WATER - SEWER - PROTECTED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
M012022094A66 | 2022-04-04 | 2022-04-28 | REPAIR WATER - PROTECTED | EAST 82 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012022094B96 | 2022-04-04 | 2022-04-18 | REPAIR WATER - SEWER | 18 AVENUE, BROOKLYN, FROM STREET 46 STREET |
X012022094A56 | 2022-04-04 | 2022-05-01 | REPAIR WATER | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
B012022089D39 | 2022-03-30 | 2022-05-05 | REPAIR WATER - SEWER | DE KALB AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B022022089D54 | 2022-03-30 | 2022-05-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D53 | 2022-03-30 | 2022-05-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D52 | 2022-03-30 | 2022-05-10 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D51 | 2022-03-30 | 2022-05-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D50 | 2022-03-30 | 2022-05-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D49 | 2022-03-30 | 2022-05-10 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D46 | 2022-03-30 | 2022-05-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D45 | 2022-03-30 | 2022-05-11 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D44 | 2022-03-30 | 2022-05-11 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022089D18 | 2022-03-30 | 2022-05-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B022022089D17 | 2022-03-30 | 2022-05-05 | OCCUPANCY OF ROADWAY AS STIPULATED | DE KALB AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B022022089D16 | 2022-03-30 | 2022-05-05 | TEMPORARY PEDESTRIAN WALK | DE KALB AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
S012022089B09 | 2022-03-30 | 2022-04-29 | REPAIR WATER | PORT RICHMOND AVENUE, STATEN ISLAND, FROM STREET GROVE AVENUE TO STREET VREELAND STREET |
X012022089A71 | 2022-03-30 | 2022-05-05 | REPAIR WATER - PROTECTED | EAST 183 STREET, BRONX, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE |
X012022089A72 | 2022-03-30 | 2022-04-29 | REPAIR WATER - SEWER - PROTECTED | COLGATE AVENUE, BRONX, FROM STREET DEAD END TO STREET WATSON AVENUE |
M012022089A92 | 2022-03-30 | 2022-04-28 | REPAIR WATER | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012022089A95 | 2022-03-30 | 2022-04-22 | REPAIR WATER - SEWER - PROTECTED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022089D60 | 2022-03-30 | 2022-04-28 | TEMPORARY PEDESTRIAN WALK | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022089D61 | 2022-03-30 | 2022-04-28 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022089D62 | 2022-03-30 | 2022-04-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 14 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M022022089D66 | 2022-03-30 | 2022-04-22 | TEMPORARY PEDESTRIAN WALK | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022089D67 | 2022-03-30 | 2022-04-22 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
M022022089D68 | 2022-03-30 | 2022-04-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 152 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE |
B012022089D51 | 2022-03-30 | 2022-05-01 | REPAIR WATER - PROTECTED | ROGERS AVENUE, BROOKLYN, FROM STREET CROWN STREET TO STREET MONTGOMERY STREET |
B012022089D49 | 2022-03-30 | 2022-05-10 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022089D48 | 2022-03-30 | 2022-05-10 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022089D45 | 2022-03-30 | 2022-05-11 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022089D43 | 2022-03-30 | 2022-04-29 | REPAIR WATER - SEWER | GOLD STREET, BROOKLYN, FROM STREET FRONT STREET TO STREET WATER STREET |
B012022089D42 | 2022-03-30 | 2022-05-05 | REPAIR WATER - SEWER | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
Q012022084G47 | 2022-03-25 | 2022-04-27 | REPAIR WATER | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
B012022084D20 | 2022-03-25 | 2022-05-16 | REPAIR WATER - PROTECTED | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B012022084D18 | 2022-03-25 | 2022-04-30 | REPAIR WATER - SEWER | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B012022084D17 | 2022-03-25 | 2022-04-18 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B022022084C35 | 2022-03-25 | 2022-04-22 | TEMPORARY PEDESTRIAN WALK | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022084C36 | 2022-03-25 | 2022-04-22 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B022022084C37 | 2022-03-25 | 2022-04-22 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
Q022022084A77 | 2022-03-25 | 2022-04-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022084A76 | 2022-03-25 | 2022-04-27 | OCCUPANCY OF ROADWAY AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
B022022084C38 | 2022-03-25 | 2022-04-23 | TEMPORARY PEDESTRIAN WALK | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022084C39 | 2022-03-25 | 2022-04-23 | OCCUPANCY OF ROADWAY AS STIPULATED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B022022084C40 | 2022-03-25 | 2022-04-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
Q022022084A75 | 2022-03-25 | 2022-04-27 | TEMPORARY PEDESTRIAN WALK | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
M022022084D69 | 2022-03-25 | 2022-05-01 | TEMPORARY PEDESTRIAN WALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022084D70 | 2022-03-25 | 2022-05-01 | OCCUPANCY OF ROADWAY AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022084D71 | 2022-03-25 | 2022-05-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B012022084D05 | 2022-03-25 | 2022-04-26 | REPAIR WATER - SEWER | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET WEST STREET |
B012022084C70 | 2022-03-25 | 2022-05-01 | REPAIR WATER | WASHINGTON AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012022084C49 | 2022-03-25 | 2022-04-23 | REPAIR WATER - SEWER - PROTECTED | GELSTON AVENUE, BROOKLYN, FROM STREET 88 STREET TO STREET 90 STREET |
B012022084C47 | 2022-03-25 | 2022-04-22 | REPAIR SEWER - PROTECTED | MONTGOMERY STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012022084C43 | 2022-03-25 | 2022-04-18 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012022084A85 | 2022-03-25 | 2022-05-01 | REPAIR WATER - SEWER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B022022084C72 | 2022-03-25 | 2022-05-16 | TEMPORARY PEDESTRIAN WALK | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B022022084C73 | 2022-03-25 | 2022-05-16 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B022022084C74 | 2022-03-25 | 2022-05-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
M022022082C90 | 2022-03-23 | 2022-04-20 | TEMPORARY PEDESTRIAN WALK | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022082C91 | 2022-03-23 | 2022-04-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022082C92 | 2022-03-23 | 2022-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
M022022082C93 | 2022-03-23 | 2022-04-21 | TEMPORARY PEDESTRIAN WALK | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022082C94 | 2022-03-23 | 2022-04-21 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022082C95 | 2022-03-23 | 2022-04-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022082D73 | 2022-03-23 | 2022-04-21 | TEMPORARY PEDESTRIAN WALK | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022082D74 | 2022-03-23 | 2022-04-21 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M022022082D75 | 2022-03-23 | 2022-04-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012022082B28 | 2022-03-23 | 2022-04-21 | REPAIR WATER - PROTECTED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012022082B03 | 2022-03-23 | 2022-04-21 | REPAIR WATER - PROTECTED | EAST 12 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012022082B02 | 2022-03-23 | 2022-04-20 | REPAIR WATER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
Q022022081B35 | 2022-03-22 | 2022-04-17 | TEMPORARY PEDESTRIAN WALK | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
B022022081D12 | 2022-03-22 | 2022-04-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 43 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022081D11 | 2022-03-22 | 2022-04-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 43 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022081D10 | 2022-03-22 | 2022-04-16 | TEMPORARY PEDESTRIAN WALK | 43 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B022022081D05 | 2022-03-22 | 2022-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B022022081D04 | 2022-03-22 | 2022-04-20 | OCCUPANCY OF ROADWAY AS STIPULATED | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B022022081D03 | 2022-03-22 | 2022-04-20 | TEMPORARY PEDESTRIAN WALK | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B012022042B15 | 2022-03-22 | 2022-02-28 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012022081C53 | 2022-03-22 | 2022-04-17 | REPAIR WATER - SEWER | CENTRAL AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B012022081C93 | 2022-03-22 | 2022-04-16 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
Q022022081B36 | 2022-03-22 | 2022-04-17 | OCCUPANCY OF ROADWAY AS STIPULATED | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022022081B37 | 2022-03-22 | 2022-04-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q022022081B38 | 2022-03-22 | 2022-04-20 | TEMPORARY PEDESTRIAN WALK | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEND TO STREET MOTT AVENUE |
Q022022081B39 | 2022-03-22 | 2022-04-20 | OCCUPANCY OF ROADWAY AS STIPULATED | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEND TO STREET MOTT AVENUE |
Q022022081B40 | 2022-03-22 | 2022-04-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEND TO STREET MOTT AVENUE |
Q012022081B60 | 2022-03-22 | 2022-04-17 | REPAIR WATER | 85 STREET, QUEENS, FROM STREET 149 AVENUE TO STREET 151 AVENUE |
Q012022081B61 | 2022-03-22 | 2022-04-20 | REPAIR WATER - SEWER | BEACH CHANNEL DRIVE, QUEENS, FROM STREET BEND TO STREET MOTT AVENUE |
B022022077B04 | 2022-03-18 | 2022-04-25 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M012022050A00 | 2022-03-18 | 2022-03-12 | REPAIR WATER | 9 AVENUE, MANHATTAN, FROM STREET BEND TO STREET WEST 15 STREET |
Q012022077C54 | 2022-03-18 | 2022-04-24 | REPAIR WATER | ROOSEVELT AVENUE, QUEENS, FROM STREET 51 STREET TO STREET 52 STREET |
M012022077A59 | 2022-03-18 | 2022-04-21 | REPAIR WATER - SEWER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
Q012022077B97 | 2022-03-18 | 2022-04-19 | REPAIR WATER - SEWER | MURRAY STREET, QUEENS, FROM STREET 17 ROAD TO STREET 18 AVENUE |
B012022077E68 | 2022-03-18 | 2022-04-15 | REPAIR WATER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B022022077B42 | 2022-03-18 | 2022-04-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B022022077B41 | 2022-03-18 | 2022-04-14 | OCCUPANCY OF ROADWAY AS STIPULATED | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B022022077B40 | 2022-03-18 | 2022-04-14 | TEMPORARY PEDESTRIAN WALK | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B022022077B06 | 2022-03-18 | 2022-04-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022077B05 | 2022-03-18 | 2022-04-25 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022077E44 | 2022-03-18 | 2022-04-16 | REPAIR WATER - SEWER | LYNCH STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022077E46 | 2022-03-18 | 2022-04-25 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022077E61 | 2022-03-18 | 2022-04-16 | REPAIR WATER - PROTECTED | MONTROSE AVENUE, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET |
B012022073A40 | 2022-03-14 | 2022-04-12 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022070C48 | 2022-03-11 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022070C47 | 2022-03-11 | 2022-03-31 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022070C63 | 2022-03-11 | 2022-04-10 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012022070B63 | 2022-03-11 | 2022-04-14 | REPAIR WATER - SEWER | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q012022070B49 | 2022-03-11 | 2022-04-08 | REPAIR WATER - PROTECTED | 52 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD |
B012022070B83 | 2022-03-11 | 2022-04-12 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022070B82 | 2022-03-11 | 2022-04-12 | REPAIR WATER - SEWER | 18 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
B012022070B78 | 2022-03-11 | 2022-04-15 | REPAIR WATER - SEWER - PROTECTED | GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET LEONARD STREET |
B012022070B86 | 2022-03-11 | 2022-04-11 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022070B85 | 2022-03-11 | 2022-04-11 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B012022070B84 | 2022-03-11 | 2022-04-05 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012022063A30 | 2022-03-11 | 2022-04-01 | REPAIR WATER | WASHINGTON AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012022070B90 | 2022-03-11 | 2022-04-10 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022070B91 | 2022-03-11 | 2022-04-05 | REPAIR WATER - SEWER | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
M012022070B34 | 2022-03-11 | 2022-03-31 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012022070B14 | 2022-03-11 | 2022-04-13 | REPAIR WATER - SEWER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
M022022070C49 | 2022-03-11 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q022022070A43 | 2022-03-11 | 2022-04-14 | OCCUPANCY OF ROADWAY AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022022070A44 | 2022-03-11 | 2022-04-14 | OCCUPANCY OF SIDEWALK AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B022022070C62 | 2022-03-11 | 2022-04-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C61 | 2022-03-11 | 2022-04-11 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C60 | 2022-03-11 | 2022-04-11 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022070B87 | 2022-03-11 | 2022-04-10 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C71 | 2022-03-11 | 2022-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022070C70 | 2022-03-11 | 2022-04-05 | OCCUPANCY OF ROADWAY AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022070C69 | 2022-03-11 | 2022-04-05 | TEMPORARY PEDESTRIAN WALK | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022070C68 | 2022-03-11 | 2022-04-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C67 | 2022-03-11 | 2022-04-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C66 | 2022-03-11 | 2022-04-10 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C65 | 2022-03-11 | 2022-04-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022070C64 | 2022-03-11 | 2022-04-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q022022070A42 | 2022-03-11 | 2022-04-14 | TEMPORARY PEDESTRIAN WALK | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
M022022067C96 | 2022-03-08 | 2022-04-01 | OCCUPANCY OF ROADWAY AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022067C95 | 2022-03-08 | 2022-04-01 | TEMPORARY PEDESTRIAN WALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022067C97 | 2022-03-08 | 2022-04-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
Q012022067C53 | 2022-03-08 | 2022-04-05 | REPAIR WATER - SEWER | 42 AVENUE, QUEENS, FROM STREET 190 STREET TO STREET 191 STREET |
M012022067B79 | 2022-03-08 | 2022-04-01 | REPAIR WATER - SEWER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
X012022067A61 | 2022-03-08 | 2022-04-01 | REPAIR WATER | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
S012022063B17 | 2022-03-04 | 2022-04-12 | REPAIR WATER | PORT RICHMOND AVENUE, STATEN ISLAND, FROM STREET GROVE AVENUE TO STREET VREELAND STREET |
B012022063A92 | 2022-03-04 | 2022-04-12 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 57 STREET TO STREET 58 STREET |
B012022063A88 | 2022-03-04 | 2022-04-12 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012022063A77 | 2022-03-04 | 2022-04-12 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
M012022063A46 | 2022-03-04 | 2022-03-22 | REPAIR WATER - SEWER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
X012022061A84 | 2022-03-02 | 2022-03-08 | REPAIR WATER - PROTECTED | EAST 164 STREET, BRONX, FROM STREET FINDLAY AVENUE TO STREET TELLER AVENUE |
M012022060A54 | 2022-03-01 | 2022-03-30 | REPAIR SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET |
B012022060B75 | 2022-03-01 | 2022-03-31 | REPAIR WATER - SEWER - PROTECTED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022060A16 | 2022-03-01 | 2022-04-01 | REPAIR WATER - PROTECTED | ROGERS AVENUE, BROOKLYN, FROM STREET CROWN STREET TO STREET MONTGOMERY STREET |
X012022059A26 | 2022-02-28 | 2022-04-03 | REPAIR WATER - SEWER | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X022022059A11 | 2022-02-28 | 2022-04-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X022022059A10 | 2022-02-28 | 2022-04-05 | OCCUPANCY OF ROADWAY AS STIPULATED | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
Q012022059A67 | 2022-02-28 | 2022-03-25 | REPAIR WATER | ROOSEVELT AVENUE, QUEENS, FROM STREET 51 STREET TO STREET 52 STREET |
Q012022059A75 | 2022-02-28 | 2022-03-28 | REPAIR WATER | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q012022059A66 | 2022-02-28 | 2022-03-20 | REPAIR WATER - SEWER | MURRAY STREET, QUEENS, FROM STREET 17 ROAD TO STREET 18 AVENUE |
B022022059A16 | 2022-02-28 | 2022-04-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
M022022059A28 | 2022-02-28 | 2022-03-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022059A15 | 2022-02-28 | 2022-04-18 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022059A14 | 2022-02-28 | 2022-04-18 | TEMPORARY PEDESTRIAN WALK | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
X022022059A09 | 2022-02-28 | 2022-04-05 | TEMPORARY PEDESTRIAN WALK | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
B012022059A50 | 2022-02-28 | 2022-03-31 | REPAIR WATER - SEWER | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B012022059A52 | 2022-02-28 | 2022-04-09 | REPAIR WATER - SEWER | EAST 21 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
M012022059B07 | 2022-02-28 | 2022-03-30 | REPAIR SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET |
M012022059A42 | 2022-02-28 | 2022-03-11 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022059A54 | 2022-02-28 | 2022-04-06 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B012022059A82 | 2022-02-28 | 2022-03-29 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012022059A85 | 2022-02-28 | 2022-03-29 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B012022059C11 | 2022-02-28 | 2022-03-29 | REPAIR WATER - PROTECTED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022059C60 | 2022-02-28 | 2022-04-01 | REPAIR WATER - SEWER | AVENUE T, BROOKLYN, FROM STREET EAST 1 STREET TO STREET WEST STREET |
Q012022059A68 | 2022-02-28 | 2022-03-31 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
X012022059A25 | 2022-02-28 | 2022-04-07 | REPAIR WATER - PROTECTED | FINDLAY AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET |
Q022022059A05 | 2022-02-28 | 2022-03-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022059A04 | 2022-02-28 | 2022-03-28 | OCCUPANCY OF ROADWAY AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022059A03 | 2022-02-28 | 2022-03-28 | TEMPORARY PEDESTRIAN WALK | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
M022022059A26 | 2022-02-28 | 2022-03-11 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022059A27 | 2022-02-28 | 2022-03-11 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012022056B63 | 2022-02-25 | 2022-03-29 | REPAIR WATER - SEWER - PROTECTED | 165 STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012022055B65 | 2022-02-24 | 2022-03-24 | REPAIR WATER - SEWER - PROTECTED | SUYDAM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022055B66 | 2022-02-24 | 2022-03-08 | REPAIR WATER - SEWER - PROTECTED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET |
Q012022055B46 | 2022-02-24 | 2022-03-12 | REPAIR WATER - SEWER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
B012022055B67 | 2022-02-24 | 2022-03-07 | REPAIR WATER - SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012022055B68 | 2022-02-24 | 2022-03-08 | REPAIR WATER - SEWER | FRANKLIN STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET |
M022022055F15 | 2022-02-24 | 2022-03-06 | OCCUPANCY OF SIDEWALK AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022055F13 | 2022-02-24 | 2022-03-06 | TEMPORARY PEDESTRIAN WALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022055F14 | 2022-02-24 | 2022-03-06 | OCCUPANCY OF ROADWAY AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
X012022055A39 | 2022-02-24 | 2022-03-26 | REPAIR WATER | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
B012022055B69 | 2022-02-24 | 2022-03-08 | REPAIR WATER - SEWER | COMMERCIAL STREET, BROOKLYN, FROM STREET CLAY STREET TO STREET FRANKLIN STREET |
Q012022055B47 | 2022-02-24 | 2022-03-12 | REPAIR SEWER - PROTECTED | 41 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 20 ROAD |
M012022055B80 | 2022-02-24 | 2022-03-06 | REPAIR WATER - SEWER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B012022055B64 | 2022-02-24 | 2022-03-12 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B012022053A45 | 2022-02-22 | 2022-03-20 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012022053A34 | 2022-02-22 | 2022-03-27 | REPAIR WATER - SEWER - PROTECTED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022053A90 | 2022-02-22 | 2022-03-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022053A89 | 2022-02-22 | 2022-03-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022053A88 | 2022-02-22 | 2022-03-26 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012022053B62 | 2022-02-22 | 2022-03-22 | REPAIR WATER | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
B012022053B27 | 2022-02-22 | 2022-03-12 | REPAIR SEWER | 48 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012022053A86 | 2022-02-22 | 2022-03-12 | REPAIR SEWER | WILLOUGHBY STREET, BROOKLYN, FROM STREET JAY STREET TO STREET PEARL STREET |
B012022053A79 | 2022-02-22 | 2022-03-18 | REPAIR WATER | GRACE COURT ALLEY, BROOKLYN, FROM STREET DEAD END TO STREET HICKS STREET |
B012022053A78 | 2022-02-22 | 2022-03-26 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022053A72 | 2022-02-22 | 2022-03-20 | REPAIR WATER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012022053A57 | 2022-02-22 | 2022-03-22 | REPAIR WATER - SEWER | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012022053A42 | 2022-02-22 | 2022-03-14 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
X012022052A06 | 2022-02-21 | 2022-03-20 | REPAIR WATER | HOLLERS AVENUE, BRONX, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE |
X012022052A07 | 2022-02-21 | 2022-03-05 | REPAIR WATER - SEWER | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
Q022022049A88 | 2022-02-18 | 2022-03-18 | TEMPORARY PEDESTRIAN WALK | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022022049A89 | 2022-02-18 | 2022-03-18 | OCCUPANCY OF ROADWAY AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022022049A90 | 2022-02-18 | 2022-03-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B022022049A33 | 2022-02-18 | 2022-03-18 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022049A98 | 2022-02-18 | 2022-03-17 | REPAIR SEWER | AVENUE T, BROOKLYN, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET |
X012022049A23 | 2022-02-18 | 2022-03-14 | REPAIR WATER - SEWER | HOLLAND AVENUE, BRONX, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET |
Q012022049B05 | 2022-02-18 | 2022-03-18 | REPAIR WATER - SEWER | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B012022049A61 | 2022-02-18 | 2022-03-22 | REPAIR WATER - SEWER - PROTECTED | GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET LEONARD STREET |
B012022049A67 | 2022-02-18 | 2022-03-08 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET |
B012022049A70 | 2022-02-18 | 2022-03-18 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022049A77 | 2022-02-18 | 2022-03-17 | REPAIR WATER - SEWER | LYNCH STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012022049A80 | 2022-02-18 | 2022-03-11 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022049A85 | 2022-02-18 | 2022-03-06 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012022049A90 | 2022-02-18 | 2022-03-08 | REPAIR WATER - SEWER | COMMERCIAL STREET, BROOKLYN, FROM STREET FRANKLIN STREET |
B012022049A92 | 2022-02-18 | 2022-03-08 | REPAIR WATER - SEWER | COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET |
B022022049A34 | 2022-02-18 | 2022-03-18 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022049A35 | 2022-02-18 | 2022-03-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022049A39 | 2022-02-18 | 2022-03-11 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022049A40 | 2022-02-18 | 2022-03-11 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022049A41 | 2022-02-18 | 2022-03-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022048A11 | 2022-02-17 | 2022-03-01 | REPAIR SEWER - PROTECTED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
X012022047B14 | 2022-02-16 | 2022-02-26 | REPAIR WATER | MONTGOMERY AVENUE, BRONX, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET |
Q012022047A52 | 2022-02-16 | 2022-03-15 | REPAIR WATER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q012022047A56 | 2022-02-16 | 2022-03-18 | REPAIR WATER | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022047A12 | 2022-02-16 | 2022-03-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022047A11 | 2022-02-16 | 2022-03-18 | OCCUPANCY OF ROADWAY AS STIPULATED | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022047A10 | 2022-02-16 | 2022-03-18 | TEMPORARY PEDESTRIAN WALK | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022047A09 | 2022-02-16 | 2022-03-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022022047A08 | 2022-02-16 | 2022-03-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022022047A07 | 2022-02-16 | 2022-03-15 | TEMPORARY PEDESTRIAN WALK | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q012022046A12 | 2022-02-15 | 2022-03-04 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
Q012022046A26 | 2022-02-15 | 2022-03-04 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
B012022045C01 | 2022-02-14 | 2022-03-16 | REPAIR WATER - SEWER | 18 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
Q012022045B28 | 2022-02-14 | 2022-03-13 | REPAIR WATER - PROTECTED | 52 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD |
Q012022042C06 | 2022-02-11 | 2022-03-08 | REPAIR WATER - SEWER | ROOSEVELT AVENUE, QUEENS, FROM STREET 51 STREET TO STREET 52 STREET |
B012022042B13 | 2022-02-11 | 2022-03-07 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
X012022042A46 | 2022-02-11 | 2022-03-08 | REPAIR WATER - PROTECTED | FINDLAY AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET |
B012022035A10 | 2022-02-11 | 2022-02-28 | REPAIR WATER - SEWER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
Q012022041A76 | 2022-02-10 | 2022-03-04 | REPAIR WATER - SEWER | COLLEGE POINT BOULEVARD, QUEENS, FROM STREET 23 AVENUE TO STREET 25 AVENUE |
X022022039A31 | 2022-02-08 | 2022-03-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
B022022039A68 | 2022-02-08 | 2022-03-12 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022039A67 | 2022-02-08 | 2022-03-12 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
X022022039A30 | 2022-02-08 | 2022-03-04 | OCCUPANCY OF ROADWAY AS STIPULATED | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
B022022039A70 | 2022-02-08 | 2022-03-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B012022039A93 | 2022-02-08 | 2022-03-11 | REPAIR WATER - SEWER | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B012022039A92 | 2022-02-08 | 2022-03-12 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022039A91 | 2022-02-08 | 2022-02-26 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022039A88 | 2022-02-08 | 2022-03-10 | REPAIR WATER - SEWER | EAST 21 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B022022039A69 | 2022-02-08 | 2022-03-11 | TEMPORARY PEDESTRIAN WALK | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
X022022039A29 | 2022-02-08 | 2022-03-04 | TEMPORARY PEDESTRIAN WALK | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
X012022039A35 | 2022-02-08 | 2022-03-04 | REPAIR WATER - SEWER | CHISHOLM STREET, BRONX, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE |
B022022039A66 | 2022-02-08 | 2022-03-12 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012022039B20 | 2022-02-08 | 2022-03-10 | REPAIR WATER - SEWER | MURRAY STREET, QUEENS, FROM STREET 17 ROAD TO STREET 18 AVENUE |
B022022039A71 | 2022-02-08 | 2022-03-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B022022038B36 | 2022-02-07 | 2022-03-08 | TEMPORARY PEDESTRIAN WALK | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022038B38 | 2022-02-07 | 2022-03-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022038B37 | 2022-02-07 | 2022-03-08 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022038B23 | 2022-02-07 | 2022-03-08 | TEMPORARY PEDESTRIAN WALK | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012022038B45 | 2022-02-07 | 2022-02-25 | REPAIR WATER - SEWER - PROTECTED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B012022038B44 | 2022-02-07 | 2022-03-08 | REPAIR WATER - SEWER | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012022038B37 | 2022-02-07 | 2022-03-08 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B022022038B25 | 2022-02-07 | 2022-03-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022038B24 | 2022-02-07 | 2022-03-08 | OCCUPANCY OF ROADWAY AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022035A87 | 2022-02-04 | 2022-02-18 | TEMPORARY PEDESTRIAN WALK | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022035A88 | 2022-02-04 | 2022-02-18 | OCCUPANCY OF ROADWAY AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022035A63 | 2022-02-04 | 2022-02-18 | REPAIR SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022035A89 | 2022-02-04 | 2022-02-18 | OCCUPANCY OF SIDEWALK AS STIPULATED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022022034A63 | 2022-02-03 | 2022-02-16 | TEMPORARY PEDESTRIAN WALK | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
B012022034A51 | 2022-02-03 | 2022-02-25 | REPAIR WATER - SEWER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
Q012022034B75 | 2022-02-03 | 2022-02-16 | REPAIR WATER | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022034A64 | 2022-02-03 | 2022-02-16 | OCCUPANCY OF ROADWAY AS STIPULATED | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q022022034A65 | 2022-02-03 | 2022-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | 214 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
X012022032A49 | 2022-02-01 | 2022-03-02 | REPAIR WATER | EVERGREEN AVENUE, BRONX, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE |
Q012022032A70 | 2022-02-01 | 2022-02-08 | REPAIR SEWER - PROTECTED | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
B012022032B06 | 2022-02-01 | 2022-02-28 | REPAIR WATER - PROTECTED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012022031E15 | 2022-01-31 | 2022-02-26 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
Q012022028B03 | 2022-01-28 | 2022-02-16 | REPAIR WATER - SEWER | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B022022028A60 | 2022-01-28 | 2022-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022028A59 | 2022-01-28 | 2022-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022022028A58 | 2022-01-28 | 2022-02-28 | TEMPORARY PEDESTRIAN WALK | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012022028A52 | 2022-01-28 | 2022-02-26 | REPAIR WATER - SEWER | EAGLE AVENUE, BRONX, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE |
M012022028A42 | 2022-01-28 | 2022-03-07 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012022028B01 | 2022-01-28 | 2022-02-25 | REPAIR WATER - SEWER - PROTECTED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
B022022028A83 | 2022-01-28 | 2022-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022028A82 | 2022-01-28 | 2022-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022028A81 | 2022-01-28 | 2022-02-08 | TEMPORARY PEDESTRIAN WALK | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022028A79 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022028A78 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022028A77 | 2022-01-28 | 2022-02-26 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022022028A63 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B022022028A62 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B012022028B38 | 2022-01-28 | 2022-02-08 | REPAIR WATER - SEWER - PROTECTED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B012022028B36 | 2022-01-28 | 2022-02-26 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012022028B35 | 2022-01-28 | 2022-02-21 | REPAIR WATER - SEWER | GROVE STREET, BROOKLYN, FROM STREET BEND TO STREET BUSHWICK AVENUE |
B012022028B30 | 2022-01-28 | 2022-02-26 | REPAIR WATER - SEWER - PROTECTED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B012022028B29 | 2022-01-28 | 2022-02-27 | REPAIR WATER - SEWER - PROTECTED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022028B27 | 2022-01-28 | 2022-03-01 | REPAIR WATER - SEWER | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B012022028B26 | 2022-01-28 | 2022-02-16 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q022022028A12 | 2022-01-28 | 2022-02-20 | OCCUPANCY OF ROADWAY AS STIPULATED | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022022028A08 | 2022-01-28 | 2022-02-26 | TEMPORARY PEDESTRIAN WALK | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022022028A09 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF ROADWAY AS STIPULATED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022022028A10 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022022028A11 | 2022-01-28 | 2022-02-20 | TEMPORARY PEDESTRIAN WALK | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022022028A13 | 2022-01-28 | 2022-02-20 | OCCUPANCY OF SIDEWALK AS STIPULATED | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022022028A14 | 2022-01-28 | 2022-02-16 | TEMPORARY PEDESTRIAN WALK | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022022028A15 | 2022-01-28 | 2022-02-16 | OCCUPANCY OF ROADWAY AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022022028A16 | 2022-01-28 | 2022-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022022028A20 | 2022-01-28 | 2022-02-15 | TEMPORARY PEDESTRIAN WALK | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022022028A21 | 2022-01-28 | 2022-02-15 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022022028A22 | 2022-01-28 | 2022-02-15 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022022028A23 | 2022-01-28 | 2022-02-26 | TEMPORARY PEDESTRIAN WALK | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022028A24 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF ROADWAY AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022028A25 | 2022-01-28 | 2022-02-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
M022022028B47 | 2022-01-28 | 2022-03-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022028B46 | 2022-01-28 | 2022-03-07 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022028B45 | 2022-01-28 | 2022-03-07 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012022028B06 | 2022-01-28 | 2022-02-26 | REPAIR WATER | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q012022028B05 | 2022-01-28 | 2022-02-15 | REPAIR WATER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
B022022028A61 | 2022-01-28 | 2022-02-26 | TEMPORARY PEDESTRIAN WALK | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B012022025B23 | 2022-01-25 | 2022-02-22 | REPAIR WATER - SEWER - PROTECTED | SUYDAM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012022025B22 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER | COMMERCIAL STREET, BROOKLYN, FROM STREET CLAY STREET TO STREET FRANKLIN STREET |
B012022025B21 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE |
B012022025B20 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET COMMERCIAL STREET |
B012022025B19 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012022025B18 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER - PROTECTED | DUPONT STREET, BROOKLYN, FROM STREET FRANKLIN STREET |
B012022025B17 | 2022-01-25 | 2022-02-04 | REPAIR WATER - SEWER | EAST 51 STREET, BROOKLYN, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD |
B012022025B16 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER | COMMERCIAL STREET, BROOKLYN, FROM STREET BOX STREET TO STREET CLAY STREET |
B012022025B15 | 2022-01-25 | 2022-02-15 | REPAIR WATER - SEWER | COMMERCIAL STREET, BROOKLYN, FROM STREET FRANKLIN STREET |
B012022025B14 | 2022-01-25 | 2022-02-17 | REPAIR WATER - SEWER | FRANKLIN STREET, BROOKLYN, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET |
B012022025B13 | 2022-01-25 | 2022-02-21 | REPAIR WATER - SEWER | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022022025B09 | 2022-01-25 | 2022-02-21 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022022025B08 | 2022-01-25 | 2022-02-21 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022022025B07 | 2022-01-25 | 2022-02-21 | TEMPORARY PEDESTRIAN WALK | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012022019A87 | 2022-01-25 | 2022-02-17 | REPAIR WATER | ROBINSON STREET, QUEENS, FROM STREET 45 AVENUE TO STREET CHERRY AVENUE |
Q012022025B96 | 2022-01-25 | 2022-02-26 | REPAIR WATER - SEWER - PROTECTED | 43 AVENUE, QUEENS, FROM STREET 217 STREET TO STREET 218 STREET |
Q012022025B99 | 2022-01-25 | 2022-02-26 | REPAIR WATER - SEWER | 207 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET 48 AVENUE |
Q012022025C00 | 2022-01-25 | 2022-02-20 | REPAIR WATER - SEWER | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q012022025C01 | 2022-01-25 | 2022-02-24 | REPAIR WATER - SEWER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
Q012022025C02 | 2022-01-25 | 2022-02-04 | REPAIR WATER - SEWER | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q012022025C03 | 2022-01-25 | 2022-02-22 | REPAIR WATER | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
M012022025B48 | 2022-01-25 | 2022-02-26 | REPAIR WATER - SEWER | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
Q022022025A63 | 2022-01-25 | 2022-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
Q022022025A62 | 2022-01-25 | 2022-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
Q022022025A61 | 2022-01-25 | 2022-02-28 | TEMPORARY PEDESTRIAN WALK | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
Q022022025A60 | 2022-01-25 | 2022-02-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022025A59 | 2022-01-25 | 2022-02-04 | OCCUPANCY OF ROADWAY AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022022025A58 | 2022-01-25 | 2022-02-04 | TEMPORARY PEDESTRIAN WALK | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
M022022025B56 | 2022-01-25 | 2022-02-26 | TEMPORARY PEDESTRIAN WALK | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022025B57 | 2022-01-25 | 2022-02-26 | OCCUPANCY OF ROADWAY AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
M022022025B58 | 2022-01-25 | 2022-02-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET |
B012022024B37 | 2022-01-24 | 2022-02-15 | REPAIR WATER - SEWER | 18 AVENUE, BROOKLYN, FROM STREET 45 STREET TO STREET 46 STREET |
X012022021A68 | 2022-01-21 | 2022-02-18 | REPAIR WATER | HOLLERS AVENUE, BRONX, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE |
B012022019B29 | 2022-01-19 | 2022-02-16 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022019B15 | 2022-01-19 | 2022-02-16 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
S012022019A41 | 2022-01-19 | 2022-02-16 | REPAIR WATER - SEWER | PATTERSON AVENUE, STATEN ISLAND, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE |
B022022019B16 | 2022-01-19 | 2022-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022019B18 | 2022-01-19 | 2022-02-22 | REPAIR WATER | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012022019B16 | 2022-01-19 | 2022-02-22 | REPAIR SEWER | 48 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012022019B30 | 2022-01-19 | 2022-02-16 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012022019B80 | 2022-01-19 | 2022-01-29 | REPAIR WATER - SEWER | DOWNING STREET, QUEENS, FROM STREET 31 ROAD TO STREET 32 AVENUE |
B012022019B19 | 2022-01-19 | 2022-02-18 | REPAIR WATER - SEWER - PROTECTED | 21 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B022022019B11 | 2022-01-19 | 2022-02-16 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022019B12 | 2022-01-19 | 2022-02-16 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022019B14 | 2022-01-19 | 2022-02-16 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022019B13 | 2022-01-19 | 2022-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012022019B74 | 2022-01-19 | 2022-02-22 | REPAIR SEWER - PROTECTED | 41 STREET, QUEENS, FROM STREET 20 AVENUE TO STREET 20 ROAD |
B012022014B58 | 2022-01-14 | 2022-02-16 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012022014B55 | 2022-01-14 | 2022-02-15 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012022014B56 | 2022-01-14 | 2022-02-08 | REPAIR WATER - SEWER | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022014B50 | 2022-01-14 | 2022-02-08 | TEMPORARY PEDESTRIAN WALK | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022014B51 | 2022-01-14 | 2022-02-08 | OCCUPANCY OF ROADWAY AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022014B52 | 2022-01-14 | 2022-02-08 | OCCUPANCY OF SIDEWALK AS STIPULATED | BLEECKER STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B022022014B53 | 2022-01-14 | 2022-02-16 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B022022014B57 | 2022-01-14 | 2022-02-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
Q012022014B44 | 2022-01-14 | 2022-02-08 | REPAIR WATER - SEWER - PROTECTED | 52 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD |
Q012022014B45 | 2022-01-14 | 2022-02-12 | REPAIR WATER - SEWER | ROOSEVELT AVENUE, QUEENS, FROM STREET 51 STREET TO STREET 52 STREET |
B022022014B54 | 2022-01-14 | 2022-02-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B022022014B55 | 2022-01-14 | 2022-02-11 | TEMPORARY PEDESTRIAN WALK | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B022022014B56 | 2022-01-14 | 2022-02-11 | OCCUPANCY OF ROADWAY AS STIPULATED | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
M012022014A67 | 2022-01-14 | 2022-02-13 | REPAIR WATER - PROTECTED | WEST 47 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022014B63 | 2022-01-14 | 2022-01-31 | REPAIR WATER - SEWER - PROTECTED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012022014B62 | 2022-01-14 | 2022-01-31 | REPAIR WATER - SEWER - PROTECTED | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012022014B60 | 2022-01-14 | 2022-02-10 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022014B59 | 2022-01-14 | 2022-02-09 | REPAIR WATER - SEWER | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B022022010A39 | 2022-01-10 | 2022-02-10 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022010A44 | 2022-01-10 | 2022-02-09 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012022010A45 | 2022-01-10 | 2022-02-12 | REPAIR WATER - SEWER | IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE |
B012022010A46 | 2022-01-10 | 2022-02-06 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B022022010A40 | 2022-01-10 | 2022-02-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022010A38 | 2022-01-10 | 2022-02-10 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
M012022007A97 | 2022-01-07 | 2022-02-05 | REPAIR WATER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022007A88 | 2022-01-07 | 2022-02-05 | OCCUPANCY OF ROADWAY AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M022022007A87 | 2022-01-07 | 2022-02-05 | TEMPORARY PEDESTRIAN WALK | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022007A99 | 2022-01-07 | 2022-02-15 | REPAIR SEWER | AVENUE T, BROOKLYN, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET |
B012022007B01 | 2022-01-07 | 2022-02-08 | REPAIR WATER - SEWER | EAST 21 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
M022022007A89 | 2022-01-07 | 2022-02-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022007B00 | 2022-01-07 | 2022-02-06 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012022006A96 | 2022-01-06 | 2022-01-31 | REPAIR SEWER - PROTECTED | EAST 54 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET KINGS HIGHWAY |
B022022006A79 | 2022-01-06 | 2022-02-04 | TEMPORARY PEDESTRIAN WALK | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022022006A80 | 2022-01-06 | 2022-02-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022022006A81 | 2022-01-06 | 2022-02-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022022006A92 | 2022-01-06 | 2022-01-29 | TEMPORARY PEDESTRIAN WALK | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B022022006C77 | 2022-01-06 | 2022-02-01 | TEMPORARY PEDESTRIAN WALK | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B022022006A93 | 2022-01-06 | 2022-01-29 | OCCUPANCY OF ROADWAY AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B022022006A94 | 2022-01-06 | 2022-01-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B022022006C91 | 2022-01-06 | 2022-02-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022022006C90 | 2022-01-06 | 2022-02-28 | OCCUPANCY OF ROADWAY AS STIPULATED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022022006C79 | 2022-01-06 | 2022-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B012022006C11 | 2022-01-06 | 2022-02-01 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012022006C10 | 2022-01-06 | 2022-02-01 | REPAIR WATER - SEWER - PROTECTED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B012022006C09 | 2022-01-06 | 2022-01-28 | REPAIR WATER - SEWER - PROTECTED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012022006B25 | 2022-01-06 | 2022-01-29 | REPAIR WATER - SEWER - PROTECTED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B012022006A99 | 2022-01-06 | 2022-02-05 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012022006A98 | 2022-01-06 | 2022-02-04 | REPAIR WATER - SEWER | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022022006C89 | 2022-01-06 | 2022-02-28 | TEMPORARY PEDESTRIAN WALK | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022022006C78 | 2022-01-06 | 2022-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 21 STREET, BROOKLYN, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE |
B012022005A64 | 2022-01-05 | 2022-02-04 | REPAIR SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
B012022005A68 | 2022-01-05 | 2022-01-31 | REPAIR WATER - SEWER - PROTECTED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B022022003B29 | 2022-01-03 | 2022-01-17 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012022003B76 | 2022-01-03 | 2022-01-31 | REPAIR SEWER - PROTECTED | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
Q012022003B70 | 2022-01-03 | 2022-02-01 | REPAIR WATER - SEWER | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET UNION STREET |
B012022003B26 | 2022-01-03 | 2022-01-11 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022003B25 | 2022-01-03 | 2022-01-17 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022003B24 | 2022-01-03 | 2022-01-16 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012022003B14 | 2022-01-03 | 2022-01-16 | REPAIR WATER - SEWER | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022022003B26 | 2022-01-03 | 2022-01-16 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B20 | 2022-01-03 | 2022-01-16 | TEMPORARY PEDESTRIAN WALK | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022022003B21 | 2022-01-03 | 2022-01-16 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022022003B22 | 2022-01-03 | 2022-01-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022022003B25 | 2022-01-03 | 2022-01-16 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B27 | 2022-01-03 | 2022-01-16 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B30 | 2022-01-03 | 2022-01-17 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B31 | 2022-01-03 | 2022-01-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B32 | 2022-01-03 | 2022-01-11 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B33 | 2022-01-03 | 2022-01-11 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022022003B34 | 2022-01-03 | 2022-01-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q022021364C36 | 2021-12-30 | 2022-01-29 | TEMPORARY PEDESTRIAN WALK | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022021364C40 | 2021-12-30 | 2022-01-23 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
Q022021364C41 | 2021-12-30 | 2022-01-23 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
Q012021364B90 | 2021-12-30 | 2022-01-23 | REPAIR WATER | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
Q012021364B89 | 2021-12-30 | 2022-01-28 | REPAIR WATER - PROTECTED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
B022021364F23 | 2021-12-30 | 2022-01-28 | OCCUPANCY OF ROADWAY AS STIPULATED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B022021364F22 | 2021-12-30 | 2022-01-28 | TEMPORARY PEDESTRIAN WALK | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q022021364C39 | 2021-12-30 | 2022-01-23 | TEMPORARY PEDESTRIAN WALK | 51 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
B022021364F24 | 2021-12-30 | 2022-01-28 | OCCUPANCY OF SIDEWALK AS STIPULATED | 16 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q022021364C38 | 2021-12-30 | 2022-01-29 | OCCUPANCY OF SIDEWALK AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
Q022021364C37 | 2021-12-30 | 2022-01-29 | OCCUPANCY OF ROADWAY AS STIPULATED | 149 AVENUE, QUEENS, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE |
B022021361D81 | 2021-12-27 | 2022-01-31 | TEMPORARY PEDESTRIAN WALK | ADELPHI STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022021361D73 | 2021-12-27 | 2022-01-27 | OCCUPANCY OF SIDEWALK AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022021361D82 | 2021-12-27 | 2022-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | ADELPHI STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022021361D83 | 2021-12-27 | 2022-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | ADELPHI STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012021361A95 | 2021-12-27 | 2022-01-27 | REPAIR WATER - PROTECTED | ADELPHI STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012021361A94 | 2021-12-27 | 2022-01-27 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012021361A93 | 2021-12-27 | 2022-01-24 | REPAIR WATER - SEWER | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022021361D71 | 2021-12-27 | 2022-01-27 | TEMPORARY PEDESTRIAN WALK | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B022021361D29 | 2021-12-27 | 2022-01-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022021361D28 | 2021-12-27 | 2022-01-24 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022021361D27 | 2021-12-27 | 2022-01-24 | TEMPORARY PEDESTRIAN WALK | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022021361D72 | 2021-12-27 | 2022-01-27 | OCCUPANCY OF ROADWAY AS STIPULATED | 51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012021357A45 | 2021-12-23 | 2022-01-25 | REPAIR WATER - SEWER | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
B022021357C12 | 2021-12-23 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022021357C11 | 2021-12-23 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B022021357B55 | 2021-12-23 | 2022-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET |
B022021357B54 | 2021-12-23 | 2022-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | NEW YORK AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET |
B022021357B53 | 2021-12-23 | 2022-01-31 | TEMPORARY PEDESTRIAN WALK | NEW YORK AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET |
Q022021357A61 | 2021-12-23 | 2022-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022021357A62 | 2021-12-23 | 2022-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022021357A65 | 2021-12-23 | 2022-01-31 | TEMPORARY PEDESTRIAN WALK | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022021357A66 | 2021-12-23 | 2022-01-31 | OCCUPANCY OF ROADWAY AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022021357A67 | 2021-12-23 | 2022-01-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022021357A68 | 2021-12-23 | 2022-02-01 | TEMPORARY PEDESTRIAN WALK | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q012021357A50 | 2021-12-23 | 2022-01-30 | REPAIR WATER - SEWER | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022021357A69 | 2021-12-23 | 2022-02-01 | OCCUPANCY OF ROADWAY AS STIPULATED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022021357A70 | 2021-12-23 | 2022-02-01 | OCCUPANCY OF SIDEWALK AS STIPULATED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
B022021357C13 | 2021-12-23 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012021357A63 | 2021-12-23 | 2022-02-01 | REPAIR WATER - SEWER - PROTECTED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q012021357A64 | 2021-12-23 | 2022-01-25 | REPAIR WATER - SEWER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
B012021357B82 | 2021-12-23 | 2021-12-31 | REPAIR WATER - SEWER | 45 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012021357B83 | 2021-12-23 | 2022-01-20 | REPAIR SEWER | 55 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012021357B85 | 2021-12-23 | 2022-01-25 | REPAIR WATER - PROTECTED | COLUMBIA STREET, BROOKLYN, FROM STREET DE GRAW STREET TO STREET SACKETT STREET |
B012021357B69 | 2021-12-23 | 2022-01-27 | REPAIR WATER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET |
B012021357B79 | 2021-12-23 | 2022-01-23 | REPAIR WATER - SEWER - PROTECTED | SUYDAM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012021357B80 | 2021-12-23 | 2022-01-25 | REPAIR WATER - SEWER - PROTECTED | 4 AVENUE, BROOKLYN, FROM STREET 3 STREET TO STREET 5 STREET |
B012021357B97 | 2021-12-23 | 2022-01-15 | REPAIR WATER - SEWER | SUYDAM STREET, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
Q022021357A60 | 2021-12-23 | 2022-01-31 | TEMPORARY PEDESTRIAN WALK | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
B012021355A44 | 2021-12-21 | 2022-01-19 | REPAIR WATER - SEWER | RUTLAND ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012021355A36 | 2021-12-21 | 2022-01-10 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q012021354B81 | 2021-12-20 | 2022-01-25 | REPAIR WATER - SEWER | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q022021354A62 | 2021-12-20 | 2022-01-25 | TEMPORARY PEDESTRIAN WALK | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
B022021354B79 | 2021-12-20 | 2022-01-17 | OCCUPANCY OF SIDEWALK AS STIPULATED | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q022021354A64 | 2021-12-20 | 2022-01-25 | OCCUPANCY OF SIDEWALK AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q012021354B80 | 2021-12-20 | 2022-01-18 | REPAIR WATER - SEWER | DOWNING STREET, QUEENS, FROM STREET 31 ROAD TO STREET 32 AVENUE |
B012021354B31 | 2021-12-20 | 2022-01-17 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q022021354A63 | 2021-12-20 | 2022-01-25 | OCCUPANCY OF ROADWAY AS STIPULATED | BARCLAY AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
B022021354B78 | 2021-12-20 | 2022-01-17 | TEMPORARY PEDESTRIAN WALK | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012021349B60 | 2021-12-15 | 2022-01-02 | REPAIR WATER - SEWER | 32 AVENUE, QUEENS, FROM STREET 143 STREET TO STREET UNION STREET |
S012021349A61 | 2021-12-15 | 2022-01-17 | REPAIR WATER - SEWER | PATTERSON AVENUE, STATEN ISLAND, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE |
B012021349A89 | 2021-12-15 | 2022-01-11 | REPAIR SEWER - PROTECTED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B012021349A88 | 2021-12-15 | 2022-01-06 | REPAIR WATER | BUSHWICK AVENUE, BROOKLYN, FROM STREET KOSCIUSKO STREET TO STREET STANHOPE STREET |
B012021349A86 | 2021-12-15 | 2022-01-10 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021349A85 | 2021-12-15 | 2022-01-13 | REPAIR WATER - SEWER | IVAN COURT, BROOKLYN, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE |
B022021349B37 | 2021-12-15 | 2022-01-11 | TEMPORARY PEDESTRIAN WALK | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022021349B38 | 2021-12-15 | 2022-01-11 | OCCUPANCY OF ROADWAY AS STIPULATED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022021349B39 | 2021-12-15 | 2022-01-11 | OCCUPANCY OF SIDEWALK AS STIPULATED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022021347B75 | 2021-12-13 | 2022-01-10 | TEMPORARY PEDESTRIAN WALK | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B022021347B76 | 2021-12-13 | 2022-01-10 | OCCUPANCY OF ROADWAY AS STIPULATED | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012021347C34 | 2021-12-13 | 2022-01-10 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012021347D45 | 2021-12-13 | 2022-01-11 | REPAIR WATER - SEWER - PROTECTED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
B022021347B77 | 2021-12-13 | 2022-01-10 | OCCUPANCY OF SIDEWALK AS STIPULATED | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q022021344B87 | 2021-12-10 | 2022-01-04 | OCCUPANCY OF SIDEWALK AS STIPULATED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q012021344D00 | 2021-12-10 | 2022-01-04 | REPAIR WATER - SEWER - PROTECTED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022021344B85 | 2021-12-10 | 2022-01-04 | TEMPORARY PEDESTRIAN WALK | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q022021344B86 | 2021-12-10 | 2022-01-04 | OCCUPANCY OF ROADWAY AS STIPULATED | 160 STREET, QUEENS, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE |
Q012021344C99 | 2021-12-10 | 2022-01-10 | REPAIR WATER - SEWER | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012021342B24 | 2021-12-08 | 2022-01-05 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q022021342A62 | 2021-12-08 | 2022-01-07 | OCCUPANCY OF ROADWAY AS STIPULATED | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
Q022021342A63 | 2021-12-08 | 2022-01-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012021342B23 | 2021-12-08 | 2022-01-05 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012021342B29 | 2021-12-08 | 2022-01-06 | REPAIR WATER | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
Q012021342B47 | 2021-12-08 | 2022-01-04 | REPAIR SEWER - PROTECTED | BOOTH MEMORIAL AVENUE, QUEENS, FROM STREET 134 STREET TO STREET 135 STREET |
B022021342B05 | 2021-12-08 | 2022-01-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012021342B31 | 2021-12-08 | 2022-01-02 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B012021342B30 | 2021-12-08 | 2022-01-05 | REPAIR WATER - SEWER | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B012021342B29 | 2021-12-08 | 2022-01-07 | REPAIR WATER - SEWER - PROTECTED | COOPER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012021342B28 | 2021-12-08 | 2022-01-05 | REPAIR SEWER | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012021342B27 | 2021-12-08 | 2022-01-05 | REPAIR WATER | SUMMIT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B012021342A42 | 2021-12-08 | 2022-01-08 | REPAIR SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q022021342A61 | 2021-12-08 | 2022-01-07 | TEMPORARY PEDESTRIAN WALK | 45 AVENUE, QUEENS, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD |
B012021337A10 | 2021-12-08 | 2021-12-31 | REPAIR WATER - PROTECTED | BOND STREET, BROOKLYN, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET |
B012021342B25 | 2021-12-08 | 2022-01-05 | REPAIR WATER - PROTECTED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A97 | 2021-12-08 | 2022-01-05 | TEMPORARY PEDESTRIAN WALK | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B022021342A98 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B022021342A99 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B022021342B00 | 2021-12-08 | 2022-01-05 | TEMPORARY PEDESTRIAN WALK | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022021342B01 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF ROADWAY AS STIPULATED | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022021342B02 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
B022021342B03 | 2021-12-08 | 2022-01-02 | TEMPORARY PEDESTRIAN WALK | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022021342B04 | 2021-12-08 | 2022-01-02 | OCCUPANCY OF ROADWAY AS STIPULATED | LEONARD STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE |
B022021342A83 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A84 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A76 | 2021-12-08 | 2022-01-05 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A77 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF ROADWAY AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A78 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A79 | 2021-12-08 | 2022-01-05 | TEMPORARY PEDESTRIAN WALK | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A80 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF ROADWAY AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A81 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | BRAGG STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A82 | 2021-12-08 | 2022-01-05 | TEMPORARY PEDESTRIAN WALK | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B022021342A94 | 2021-12-08 | 2022-01-05 | TEMPORARY PEDESTRIAN WALK | SUMMIT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022021342A95 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF ROADWAY AS STIPULATED | SUMMIT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022021342A96 | 2021-12-08 | 2022-01-05 | OCCUPANCY OF SIDEWALK AS STIPULATED | SUMMIT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B022021341B67 | 2021-12-07 | 2022-01-02 | OCCUPANCY OF SIDEWALK AS STIPULATED | 100 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021341A93 | 2021-12-07 | 2021-12-31 | REPAIR WATER - SEWER | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B012021341A94 | 2021-12-07 | 2022-01-02 | REPAIR WATER - SEWER | 100 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B022021341B61 | 2021-12-07 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022021341B62 | 2021-12-07 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022021341B63 | 2021-12-07 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | CLASSON AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE |
B022021341B65 | 2021-12-07 | 2022-01-02 | TEMPORARY PEDESTRIAN WALK | 100 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
B022021341B66 | 2021-12-07 | 2022-01-02 | OCCUPANCY OF ROADWAY AS STIPULATED | 100 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY |
Q022021337A68 | 2021-12-03 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q012021337D46 | 2021-12-03 | 2021-12-31 | REPAIR WATER - SEWER | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B012021337B53 | 2021-12-03 | 2022-01-02 | REPAIR SEWER - PROTECTED | EAST 54 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET KINGS HIGHWAY |
Q022021337A67 | 2021-12-03 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
Q022021337A66 | 2021-12-03 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | LABURNUM AVENUE, QUEENS, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET |
B022021333B91 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | EAST 34 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B022021333B90 | 2021-11-29 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | EAST 34 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021333A67 | 2021-11-29 | 2022-01-03 | REPAIR SEWER | GRACE COURT ALLEY, BROOKLYN, FROM STREET DEAD END TO STREET HICKS STREET |
B012021333A68 | 2021-11-29 | 2021-12-31 | REPAIR WATER | EAST 34 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B022021333B92 | 2021-11-29 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | EAST 34 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021328C00 | 2021-11-24 | 2021-12-30 | REPAIR WATER - SEWER - PROTECTED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B012021328C01 | 2021-11-24 | 2021-12-30 | REPAIR WATER - SEWER | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022021328B98 | 2021-11-24 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B022021328B99 | 2021-11-24 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B022021328C17 | 2021-11-24 | 2021-12-30 | OCCUPANCY OF SIDEWALK AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022021328C16 | 2021-11-24 | 2021-12-30 | OCCUPANCY OF ROADWAY AS STIPULATED | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022021328C15 | 2021-11-24 | 2021-12-30 | TEMPORARY PEDESTRIAN WALK | HANCOCK STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B022021328C00 | 2021-11-24 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 38 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET DAHILL ROAD |
B042021322A02 | 2021-11-18 | 2021-12-16 | REPAIR SIDEWALK | CARROLL STREET, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
Q022021320A94 | 2021-11-16 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022021320A92 | 2021-11-16 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q022021320A93 | 2021-11-16 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | 87 STREET, QUEENS, FROM STREET ATLANTIC AVENUE TO STREET BEND |
Q012021288B87 | 2021-10-15 | 2021-10-29 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
Q012021286B89 | 2021-10-13 | 2021-11-11 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
B012021286B30 | 2021-10-13 | 2021-11-07 | REPAIR SEWER | EAST 27 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012021286B40 | 2021-10-13 | 2021-10-29 | REPAIR WATER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012021286B59 | 2021-10-13 | 2021-10-25 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021281B34 | 2021-10-08 | 2021-11-04 | REPAIR WATER - SEWER - PROTECTED | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
B012021281A01 | 2021-10-08 | 2021-11-03 | REPAIR WATER - SEWER | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012021277D23 | 2021-10-04 | 2021-10-26 | REPAIR WATER | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021277D24 | 2021-10-04 | 2021-10-25 | REPAIR WATER | MAPLE STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE |
B012021277D25 | 2021-10-04 | 2021-11-03 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021274C57 | 2021-10-01 | 2021-10-19 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021274C60 | 2021-10-01 | 2021-10-15 | REPAIR WATER - SEWER | KINGSLAND AVENUE, BROOKLYN, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE |
Q012021274C04 | 2021-10-01 | 2021-10-28 | REPAIR WATER - PROTECTED | 10 AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012021274C96 | 2021-10-01 | 2021-11-02 | REPAIR WATER - SEWER | 229 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012021270B28 | 2021-09-27 | 2021-10-28 | REPAIR SEWER - PROTECTED | PRINCE STREET, QUEENS, FROM STREET 36 ROAD TO STREET 37 AVENUE |
Q012021270B27 | 2021-09-27 | 2021-10-28 | REPAIR WATER - PROTECTED | 169 STREET, QUEENS, FROM STREET LITHONIA AVENUE TO STREET UNDERHILL AVENUE |
B012021266A27 | 2021-09-27 | 2021-10-22 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012021270B64 | 2021-09-27 | 2021-10-25 | REPAIR WATER | EAST 24 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012021270B62 | 2021-09-27 | 2021-10-25 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012021267A23 | 2021-09-24 | 2021-10-12 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET BEND |
B012021267B49 | 2021-09-24 | 2021-10-25 | REPAIR WATER | EAST 18 STREET, BROOKLYN, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE |
B012021267B50 | 2021-09-24 | 2021-10-12 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, BROOKLYN, FROM STREET BALTIC STREET TO STREET STERLING PLACE |
B012021267B47 | 2021-09-24 | 2021-10-22 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012021267C11 | 2021-09-24 | 2021-10-26 | REPAIR WATER | KANE PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
X012021265A08 | 2021-09-22 | 2021-10-23 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
Q012021265A42 | 2021-09-22 | 2021-10-26 | REPAIR WATER - SEWER | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
B012021264B26 | 2021-09-21 | 2021-10-19 | REPAIR SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET BRIDGE STREET TO STREET CHAPEL STREET |
Q012021264B27 | 2021-09-21 | 2021-10-21 | REPAIR SEWER | 43 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 111 STREET |
Q012021258A02 | 2021-09-15 | 2021-10-12 | REPAIR SEWER | MULBERRY AVENUE, QUEENS, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD |
Q012021257B86 | 2021-09-14 | 2021-10-12 | REPAIR WATER - SEWER - PROTECTED | CLOVERDALE BOULEVARD, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
Q012021257B82 | 2021-09-14 | 2021-10-17 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET |
B012021253C34 | 2021-09-10 | 2021-09-22 | REPAIR WATER | BUSHWICK AVENUE, BROOKLYN, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET |
B012021253C35 | 2021-09-10 | 2021-10-12 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021253C08 | 2021-09-10 | 2021-10-12 | REPAIR WATER | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
B012021253B87 | 2021-09-10 | 2021-10-12 | REPAIR WATER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012021253B09 | 2021-09-10 | 2021-10-12 | REPAIR SEWER | BROOKLYN AVENUE, BROOKLYN, FROM STREET PARK PLACE TO STREET STERLING PLACE |
B012021253B07 | 2021-09-10 | 2021-10-12 | REPAIR SEWER | EAST 27 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012021253C32 | 2021-09-10 | 2021-10-05 | REPAIR WATER | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012021253C30 | 2021-09-10 | 2021-10-08 | REPAIR WATER | MAPLE STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE |
B012021253C16 | 2021-09-10 | 2021-10-05 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021253B81 | 2021-09-10 | 2021-10-07 | REPAIR WATER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
Q012021253D00 | 2021-09-10 | 2021-10-12 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
B012021251A76 | 2021-09-08 | 2021-10-05 | REPAIR WATER - SEWER - PROTECTED | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
M012021251B13 | 2021-09-08 | 2021-10-12 | REPAIR WATER - SEWER | EAST 1 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012021251A77 | 2021-09-08 | 2021-09-28 | REPAIR SEWER | EAST 34 STREET, BROOKLYN, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD |
B012021251B06 | 2021-09-08 | 2021-10-04 | REPAIR WATER | 56 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
B012021246B70 | 2021-09-03 | 2021-10-05 | REPAIR WATER | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021246B72 | 2021-09-03 | 2021-09-21 | REPAIR WATER - SEWER | WEIRFIELD STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
Q012021244C64 | 2021-09-01 | 2021-09-30 | REPAIR WATER - PROTECTED | 169 STREET, QUEENS, FROM STREET LITHONIA AVENUE TO STREET UNDERHILL AVENUE |
B012021242B59 | 2021-08-30 | 2021-09-26 | REPAIR WATER | EAST 18 STREET, BROOKLYN, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE |
B012021242B51 | 2021-08-30 | 2021-09-26 | REPAIR SEWER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012021242B49 | 2021-08-30 | 2021-09-26 | REPAIR WATER | KANE PLACE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
Q012021242F29 | 2021-08-30 | 2021-09-29 | REPAIR WATER - PROTECTED | 36 ROAD, QUEENS, FROM STREET BUD PLACE TO STREET PRINCE STREET |
B012021242B58 | 2021-08-30 | 2021-09-29 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
X012021242B77 | 2021-08-30 | 2021-09-28 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET BEND |
B012021242B16 | 2021-08-30 | 2021-09-26 | REPAIR WATER | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012021242B53 | 2021-08-30 | 2021-09-19 | REPAIR SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET BRIDGE STREET TO STREET CHAPEL STREET |
B012021242B52 | 2021-08-30 | 2021-09-12 | REPAIR SEWER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
Q012021242F27 | 2021-08-30 | 2021-09-28 | REPAIR WATER | 165 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
Q012021239C99 | 2021-08-27 | 2021-09-12 | REPAIR WATER | 83 STREET, QUEENS, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE |
B012021239A93 | 2021-08-27 | 2021-09-12 | REPAIR WATER | 56 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
B012021235B43 | 2021-08-23 | 2021-09-12 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012021235A89 | 2021-08-23 | 2021-09-12 | REPAIR WATER - SEWER | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
B012021233A01 | 2021-08-21 | 2021-09-12 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021232B50 | 2021-08-20 | 2021-09-12 | REPAIR WATER | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
B012021232B43 | 2021-08-20 | 2021-09-12 | REPAIR WATER - SEWER | LINWOOD STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012021232B45 | 2021-08-20 | 2021-09-12 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021232B46 | 2021-08-20 | 2021-09-12 | REPAIR WATER - SEWER | EAST 34 STREET, BROOKLYN, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD |
B012021232B47 | 2021-08-20 | 2021-09-12 | REPAIR WATER - SEWER - PROTECTED | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
M012021232B29 | 2021-08-20 | 2021-09-12 | REPAIR WATER - SEWER | EAST 1 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
Q012021232B95 | 2021-08-20 | 2021-09-12 | REPAIR SEWER | 10 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
B012021231A88 | 2021-08-19 | 2021-09-03 | REPAIR SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET BRIDGE STREET TO STREET CHAPEL STREET |
M012021228B20 | 2021-08-16 | 2021-09-12 | REPAIR WATER | EAST 62 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT |
B012021224B14 | 2021-08-12 | 2021-09-10 | REPAIR WATER | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012021223A94 | 2021-08-11 | 2021-09-11 | REPAIR WATER - SEWER | BUSHWICK AVENUE, BROOKLYN, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET |
B012021219A00 | 2021-08-11 | 2021-08-31 | REPAIR WATER - PROTECTED | 18 AVENUE, BROOKLYN, FROM STREET 64 STREET TO STREET 65 STREET |
B012021223B04 | 2021-08-11 | 2021-08-30 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012021223B05 | 2021-08-11 | 2021-09-07 | REPAIR WATER - SEWER | MAPLE STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE |
Q012021223B50 | 2021-08-11 | 2021-09-09 | REPAIR WATER - PROTECTED | STEINWAY STREET, QUEENS, FROM STREET 28 AVENUE TO STREET 30 AVENUE |
B012021221A34 | 2021-08-09 | 2021-08-28 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021221A49 | 2021-08-09 | 2021-09-04 | REPAIR WATER | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
Q012021221A63 | 2021-08-09 | 2021-09-10 | REPAIR SEWER - PROTECTED | PRINCE STREET, QUEENS, FROM STREET 36 ROAD TO STREET 37 AVENUE |
B012021221A33 | 2021-08-09 | 2021-09-08 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
Q012021215C43 | 2021-08-03 | 2021-08-31 | REPAIR WATER - SEWER | 192 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 45 AVENUE |
B012021215B38 | 2021-08-03 | 2021-09-06 | REPAIR SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
Q012021215C45 | 2021-08-03 | 2021-08-31 | REPAIR WATER - PROTECTED | 36 ROAD, QUEENS, FROM STREET BUD PLACE TO STREET PRINCE STREET |
Q012021215C44 | 2021-08-03 | 2021-08-29 | REPAIR WATER | 165 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
B012021215B42 | 2021-08-03 | 2021-08-31 | REPAIR WATER - SEWER - PROTECTED | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
B012021215B28 | 2021-08-03 | 2021-09-01 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021215B27 | 2021-08-03 | 2021-08-23 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021215B24 | 2021-08-03 | 2021-08-16 | REPAIR WATER | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
B012021215B14 | 2021-08-03 | 2021-09-01 | REPAIR WATER - SEWER - PROTECTED | WYTHE AVENUE, BROOKLYN, FROM STREET BANKER STREET TO STREET NORTH 15 STREET |
B012021215B03 | 2021-08-03 | 2021-09-01 | REPAIR WATER - SEWER - PROTECTED | BANKER STREET, BROOKLYN, FROM STREET NORMAN AVENUE TO STREET NORTH 15 STREET |
B012021215A13 | 2021-08-03 | 2021-08-31 | REPAIR WATER - SEWER | 52 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
M012021211A52 | 2021-07-30 | 2021-08-25 | REPAIR WATER - SEWER | EAST 1 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012021210B02 | 2021-07-29 | 2021-08-31 | REPAIR WATER | BERGEN STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012021210B03 | 2021-07-29 | 2021-08-21 | REPAIR WATER - SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021210A98 | 2021-07-29 | 2021-08-27 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
M012021210A50 | 2021-07-29 | 2021-08-25 | REPAIR WATER - SEWER | EAST 1 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
X012021210A37 | 2021-07-29 | 2021-08-27 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET LESTER STREET |
B012021208B99 | 2021-07-27 | 2021-08-25 | REPAIR SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE R TO STREET AVENUE S |
B012021207C36 | 2021-07-26 | 2021-08-22 | REPAIR SEWER | HERKIMER STREET, BROOKLYN, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE |
Q012021207D02 | 2021-07-26 | 2021-08-29 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 9 STREET TO STREET 10 STREET |
B012021207C41 | 2021-07-26 | 2021-08-22 | REPAIR WATER - SEWER | LINWOOD STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012021207C40 | 2021-07-26 | 2021-08-31 | REPAIR WATER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012021207C38 | 2021-07-26 | 2021-08-31 | REPAIR WATER - SEWER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET WYONA STREET |
B012021204A29 | 2021-07-23 | 2021-08-07 | REPAIR SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
Q012021203C09 | 2021-07-22 | 2021-08-20 | REPAIR SEWER | 10 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
B012021202A98 | 2021-07-21 | 2021-08-13 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012021201B89 | 2021-07-20 | 2021-08-14 | REPAIR SEWER | SOUTH PORTLAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B012021201B84 | 2021-07-20 | 2021-07-23 | REPAIR SEWER | LINWOOD STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012021201B91 | 2021-07-20 | 2021-08-15 | REPAIR WATER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
B012021201B86 | 2021-07-20 | 2021-08-15 | REPAIR WATER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012021201B81 | 2021-07-20 | 2021-08-23 | REPAIR WATER - SEWER - PROTECTED | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B012021201B60 | 2021-07-20 | 2021-08-20 | REPAIR SEWER | EAST 37 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012021197A68 | 2021-07-16 | 2021-08-13 | REPAIR WATER - PROTECTED | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
B012021195B45 | 2021-07-14 | 2021-08-10 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012021195B44 | 2021-07-14 | 2021-08-10 | REPAIR WATER - SEWER | PALMETTO STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE |
B012021195B43 | 2021-07-14 | 2021-08-09 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B012021195B36 | 2021-07-14 | 2021-08-12 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
Q012021195B69 | 2021-07-14 | 2021-08-01 | REPAIR SEWER | 165 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
Q012021195B71 | 2021-07-14 | 2021-08-01 | REPAIR WATER - PROTECTED | 36 ROAD, QUEENS, FROM STREET BUD PLACE TO STREET PRINCE STREET |
B012021195B34 | 2021-07-14 | 2021-08-01 | REPAIR WATER - SEWER - PROTECTED | WEBSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY |
B012021195B42 | 2021-07-14 | 2021-07-28 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
Q012021195B70 | 2021-07-14 | 2021-08-07 | REPAIR WATER | 213 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012021195B68 | 2021-07-14 | 2021-08-11 | REPAIR SEWER - PROTECTED | PRINCE STREET, QUEENS, FROM STREET 36 ROAD TO STREET 37 AVENUE |
Q012021195B67 | 2021-07-14 | 2021-08-01 | REPAIR WATER - SEWER | 192 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 45 AVENUE |
B012021194B57 | 2021-07-13 | 2021-08-13 | REPAIR WATER | MADISON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012021193B52 | 2021-07-12 | 2021-08-14 | REPAIR SEWER | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
Q012021190C28 | 2021-07-09 | 2021-07-31 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 9 STREET TO STREET 10 STREET |
B012021189A29 | 2021-07-08 | 2021-07-28 | REPAIR WATER - SEWER | HERKIMER STREET, BROOKLYN, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE |
B012021189A28 | 2021-07-08 | 2021-08-06 | REPAIR WATER | EAST 8 STREET, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET DITMAS AVENUE |
B012021189B30 | 2021-07-08 | 2021-08-04 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE |
B012021189B31 | 2021-07-08 | 2021-07-23 | REPAIR WATER - SEWER | LINWOOD STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
X012021189A59 | 2021-07-08 | 2021-07-20 | REPAIR WATER - PROTECTED | COURTLANDT AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
B012021183B56 | 2021-07-02 | 2021-07-31 | REPAIR WATER - PROTECTED | 20 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012021183A52 | 2021-07-02 | 2021-07-13 | REPAIR WATER - SEWER | 10 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
B012021182B55 | 2021-07-01 | 2021-08-02 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021182B54 | 2021-07-01 | 2021-08-03 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021182B43 | 2021-07-01 | 2021-07-03 | REPAIR WATER - SEWER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012021182B50 | 2021-07-01 | 2021-07-28 | REPAIR WATER - SEWER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012021182B53 | 2021-07-01 | 2021-08-06 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021182B51 | 2021-07-01 | 2021-08-06 | REPAIR WATER - PROTECTED | DEVOE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012021182B52 | 2021-07-01 | 2021-08-03 | REPAIR WATER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021182B44 | 2021-07-01 | 2021-08-03 | REPAIR WATER - SEWER | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET |
B012021182A65 | 2021-07-01 | 2021-07-26 | REPAIR WATER | HENRY STREET, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
Q012021181B40 | 2021-06-30 | 2021-07-17 | REPAIR WATER - SEWER - PROTECTED | 36 ROAD, QUEENS, FROM STREET BUD PLACE TO STREET PRINCE STREET |
Q012021181B41 | 2021-06-30 | 2021-07-17 | REPAIR WATER - SEWER - PROTECTED | PRINCE STREET, QUEENS, FROM STREET 36 ROAD TO STREET 37 AVENUE |
X012021181A93 | 2021-06-30 | 2021-07-28 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET LESTER STREET |
B012021181B74 | 2021-06-30 | 2021-07-24 | REPAIR SEWER - PROTECTED | 5 AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
B012021181B63 | 2021-06-30 | 2021-07-24 | REPAIR SEWER | EAST 37 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012021179A00 | 2021-06-28 | 2021-07-14 | REPAIR WATER | MADISON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012021176E02 | 2021-06-25 | 2021-07-23 | REPAIR SEWER | SOUTH PORTLAND AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B012021176E01 | 2021-06-25 | 2021-07-07 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021176E03 | 2021-06-25 | 2021-07-23 | REPAIR WATER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
Q012021175B31 | 2021-06-24 | 2021-07-23 | REPAIR WATER - PROTECTED | BLEECKER STREET, QUEENS, FROM STREET 60 PLACE TO STREET 61 STREET |
Q012021174D83 | 2021-06-23 | 2021-07-20 | REPAIR WATER - SEWER | JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE |
M012021174B18 | 2021-06-23 | 2021-07-26 | REPAIR WATER | EAST 117 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012021174C00 | 2021-06-23 | 2021-07-21 | REPAIR WATER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
Q012021173B67 | 2021-06-22 | 2021-07-14 | REPAIR WATER | 213 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
B012021173A87 | 2021-06-22 | 2021-07-24 | REPAIR WATER - SEWER - PROTECTED | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B012021173A88 | 2021-06-22 | 2021-07-16 | REPAIR SEWER | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012021169B47 | 2021-06-18 | 2021-07-04 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012021168A44 | 2021-06-17 | 2021-06-28 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET LESTER STREET |
B012021166F36 | 2021-06-15 | 2021-07-07 | REPAIR WATER - PROTECTED | DEVOE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012021166F76 | 2021-06-15 | 2021-07-10 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
B012021166F43 | 2021-06-15 | 2021-07-09 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE |
B012021166F42 | 2021-06-15 | 2021-07-03 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021166F38 | 2021-06-15 | 2021-07-12 | REPAIR WATER - SEWER | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012021166F27 | 2021-06-15 | 2021-07-12 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021165B12 | 2021-06-14 | 2021-07-07 | REPAIR WATER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021165B27 | 2021-06-14 | 2021-06-30 | REPAIR WATER - SEWER | HOWARD AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
X012021165A56 | 2021-06-14 | 2021-07-15 | REPAIR WATER - PROTECTED | COURTLANDT AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
B012021165B17 | 2021-06-14 | 2021-07-04 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q012021165A63 | 2021-06-14 | 2021-07-13 | REPAIR SEWER | 165 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
B012021162C03 | 2021-06-11 | 2021-07-02 | REPAIR SEWER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012021162C08 | 2021-06-11 | 2021-07-03 | REPAIR WATER - SEWER - PROTECTED | 92 STREET, QUEENS, FROM STREET 101 AVENUE TO STREET 103 AVENUE |
B012021159B55 | 2021-06-08 | 2021-06-28 | REPAIR WATER - SEWER | HERKIMER STREET, BROOKLYN, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE |
Q012021159B10 | 2021-06-08 | 2021-07-06 | REPAIR WATER - SEWER | JACKSON AVENUE, QUEENS, FROM STREET 50 AVENUE TO STREET 51 AVENUE |
Q012021159B03 | 2021-06-08 | 2021-07-07 | REPAIR WATER - SEWER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 9 STREET TO STREET 10 STREET |
X012021159A27 | 2021-06-08 | 2021-06-28 | REPAIR WATER - SEWER | BARKER AVENUE, BRONX, FROM STREET ADEE AVENUE TO STREET LESTER STREET |
Q012021159B02 | 2021-06-08 | 2021-07-07 | REPAIR WATER - SEWER | 10 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 38 AVENUE |
B012021159B59 | 2021-06-08 | 2021-07-06 | REPAIR WATER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021159B57 | 2021-06-08 | 2021-06-30 | REPAIR WATER - SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET CHAPEL STREET TO STREET CONCORD STREET |
B012021159B56 | 2021-06-08 | 2021-07-06 | REPAIR WATER - SEWER | LINWOOD STREET, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE |
B012021158D93 | 2021-06-07 | 2021-07-03 | REPAIR WATER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE |
B012021158D89 | 2021-06-07 | 2021-06-20 | REPAIR WATER - SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
B012021158D79 | 2021-06-07 | 2021-07-07 | REPAIR SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
B012021155B77 | 2021-06-04 | 2021-06-25 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012021153H81 | 2021-06-02 | 2021-06-30 | REPAIR SEWER - PROTECTED | 5 AVENUE, BROOKLYN, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET |
M012021152B25 | 2021-06-01 | 2021-06-26 | REPAIR WATER | EAST 117 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012021152E96 | 2021-06-01 | 2021-06-21 | REPAIR WATER - SEWER | MURRAY STREET, QUEENS, FROM STREET 17 ROAD TO STREET 18 AVENUE |
B012021152D85 | 2021-06-01 | 2021-06-23 | REPAIR WATER - PROTECTED | EAST 54 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET KINGS HIGHWAY |
B012021152D82 | 2021-06-01 | 2021-06-24 | REPAIR WATER - SEWER - PROTECTED | DIKEMAN STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET |
B012021148A25 | 2021-06-01 | 2021-06-26 | REPAIR WATER - PROTECTED | 20 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012021147B40 | 2021-05-27 | 2021-06-26 | REPAIR WATER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012021147B76 | 2021-05-27 | 2021-06-13 | REPAIR SEWER | 165 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
B012021147B39 | 2021-05-27 | 2021-06-26 | REPAIR WATER - SEWER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012021147B41 | 2021-05-27 | 2021-06-25 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021147B51 | 2021-05-27 | 2021-06-26 | REPAIR SEWER | BROADWAY, BROOKLYN, FROM STREET STUYVESANT AVENUE TO STREET VERNON AVENUE |
B012021145B43 | 2021-05-25 | 2021-06-23 | REPAIR WATER - SEWER - PROTECTED | HARRISON AVENUE, BROOKLYN, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET |
B012021144C01 | 2021-05-24 | 2021-06-24 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
Q012021144B49 | 2021-05-24 | 2021-06-19 | REPAIR WATER - SEWER - PROTECTED | 92 STREET, QUEENS, FROM STREET 101 AVENUE TO STREET 103 AVENUE |
B012021140B46 | 2021-05-20 | 2021-06-30 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021140B41 | 2021-05-20 | 2021-06-20 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD |
B012021140B43 | 2021-05-20 | 2021-06-19 | REPAIR SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012021140B45 | 2021-05-20 | 2021-06-18 | REPAIR WATER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021137B71 | 2021-05-17 | 2021-06-12 | REPAIR WATER - SEWER | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012021137B72 | 2021-05-17 | 2021-06-12 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
X012021137A79 | 2021-05-17 | 2021-06-15 | REPAIR WATER - PROTECTED | COURTLANDT AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
B012021137B63 | 2021-05-17 | 2021-06-14 | REPAIR WATER - SEWER | HOWARD AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012021137B65 | 2021-05-17 | 2021-06-14 | REPAIR WATER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021137B66 | 2021-05-17 | 2021-06-20 | REPAIR WATER | 41 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021137B69 | 2021-05-17 | 2021-06-20 | REPAIR WATER - SEWER - PROTECTED | POWERS STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012021134B37 | 2021-05-14 | 2021-05-25 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012021134B55 | 2021-05-14 | 2021-06-11 | REPAIR WATER - PROTECTED | DEVOE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012021134B60 | 2021-05-14 | 2021-06-08 | REPAIR WATER - SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET DEAD END |
B012021134B34 | 2021-05-14 | 2021-05-22 | REPAIR WATER | STAGG STREET, BROOKLYN, FROM STREET STEWART AVENUE TO STREET VARICK AVENUE |
B012021134B38 | 2021-05-14 | 2021-06-07 | REPAIR SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
B012021133A86 | 2021-05-13 | 2021-06-11 | REPAIR SEWER - PROTECTED | 13 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012021133A89 | 2021-05-13 | 2021-06-11 | REPAIR WATER | EAST 37 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE |
Q012021131C15 | 2021-05-11 | 2021-06-11 | REPAIR WATER - PROTECTED | 92 STREET, QUEENS, FROM STREET 101 AVENUE TO STREET 103 AVENUE |
B012021127B43 | 2021-05-07 | 2021-06-07 | REPAIR WATER - SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
B012021127B42 | 2021-05-07 | 2021-05-25 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021127B41 | 2021-05-07 | 2021-06-06 | REPAIR WATER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021127A82 | 2021-05-07 | 2021-06-03 | REPAIR SEWER | BROADWAY, BROOKLYN, FROM STREET STUYVESANT AVENUE TO STREET VERNON AVENUE |
B012021127A76 | 2021-05-07 | 2021-05-15 | REPAIR WATER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021127B37 | 2021-05-07 | 2021-06-09 | REPAIR WATER - SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET CHAPEL STREET TO STREET CONCORD STREET |
B012021127B27 | 2021-05-07 | 2021-05-21 | REPAIR WATER - SEWER - PROTECTED | POWERS STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012021127B45 | 2021-05-07 | 2021-06-12 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021127B46 | 2021-05-07 | 2021-06-09 | REPAIR SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
Q012021127C38 | 2021-05-07 | 2021-06-03 | REPAIR SEWER | 165 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE |
B012021127B34 | 2021-05-07 | 2021-05-21 | REPAIR WATER - SEWER | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012021127B35 | 2021-05-07 | 2021-06-03 | REPAIR WATER - PROTECTED | EAST 54 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET KINGS HIGHWAY |
B012021127B44 | 2021-05-07 | 2021-06-14 | REPAIR WATER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
Q012021127B63 | 2021-05-07 | 2021-06-03 | REPAIR SEWER | MULBERRY AVENUE, QUEENS, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD |
B012021124A44 | 2021-05-04 | 2021-06-07 | REPAIR WATER - PROTECTED | 56 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
M012021124A18 | 2021-05-04 | 2021-06-03 | REPAIR WATER | EAST 117 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
Q012021124A22 | 2021-05-04 | 2021-06-02 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 22 STREET |
X012021124A18 | 2021-05-04 | 2021-05-27 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
B012021123C77 | 2021-05-03 | 2021-05-29 | REPAIR WATER | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021119A81 | 2021-04-29 | 2021-05-31 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012021119A43 | 2021-04-29 | 2021-06-17 | REPAIR WATER - SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012021119A86 | 2021-04-29 | 2021-05-31 | REPAIR WATER - SEWER - PROTECTED | 92 STREET, QUEENS, FROM STREET 101 AVENUE TO STREET 103 AVENUE |
B012021119A84 | 2021-04-29 | 2021-05-08 | REPAIR WATER - PROTECTED | 56 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012021119A83 | 2021-04-29 | 2021-06-04 | REPAIR WATER - PROTECTED | STEWART AVENUE, BROOKLYN, FROM STREET MEADOW STREET TO STREET STAGG STREET |
B012021119A82 | 2021-04-29 | 2021-05-31 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021119A80 | 2021-04-29 | 2021-05-25 | REPAIR WATER - SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET DEAD END |
B012021119A79 | 2021-04-29 | 2021-06-01 | REPAIR WATER - SEWER | NEWELL STREET, BROOKLYN, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE |
X012021117A68 | 2021-04-27 | 2021-05-22 | REPAIR WATER - PROTECTED | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
X012021117A71 | 2021-04-27 | 2021-05-16 | REPAIR WATER - PROTECTED | COURTLANDT AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
B012021117B07 | 2021-04-27 | 2021-05-21 | REPAIR SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012021117B09 | 2021-04-27 | 2021-05-16 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021117A81 | 2021-04-27 | 2021-05-29 | REPAIR SEWER | BAY 11 STREET, BROOKLYN, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE |
M012021117A47 | 2021-04-27 | 2021-05-28 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021117B10 | 2021-04-27 | 2021-05-18 | REPAIR WATER - SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
X012021117A72 | 2021-04-27 | 2021-05-17 | REPAIR WATER - SEWER | CROSS BRONX EXPRESSWAY, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
B012021116B05 | 2021-04-26 | 2021-04-30 | REPAIR WATER - SEWER - PROTECTED | BELMONT AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
X012021116C10 | 2021-04-26 | 2021-05-29 | REPAIR WATER - PROTECTED | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
B012021116B40 | 2021-04-26 | 2021-05-23 | REPAIR WATER | PITKIN AVENUE, BROOKLYN, FROM STREET AMBOY STREET TO STREET HERZL STREET |
B012021116B06 | 2021-04-26 | 2021-05-22 | REPAIR WATER - SEWER | FENIMORE STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
Q012021116C35 | 2021-04-26 | 2021-05-16 | REPAIR WATER - SEWER | 9 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
X012021113A45 | 2021-04-23 | 2021-05-22 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
B012021112B05 | 2021-04-22 | 2021-05-20 | REPAIR WATER | ROCHESTER AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012021110B32 | 2021-04-20 | 2021-05-09 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021110B31 | 2021-04-20 | 2021-06-05 | REPAIR WATER - SEWER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
B012021110B30 | 2021-04-20 | 2021-05-16 | REPAIR WATER | KENT STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET |
X012021110A87 | 2021-04-20 | 2021-05-18 | REPAIR WATER - SEWER | CHISHOLM STREET, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
B012021110B40 | 2021-04-20 | 2021-05-30 | REPAIR WATER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
M012021110A68 | 2021-04-20 | 2021-05-18 | REPAIR WATER - SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012021110A50 | 2021-04-20 | 2021-05-14 | REPAIR SEWER - PROTECTED | 32 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET POWER ROAD |
B012021110B54 | 2021-04-20 | 2021-05-15 | REPAIR WATER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012021110B56 | 2021-04-20 | 2021-05-10 | REPAIR SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B012021110B57 | 2021-04-20 | 2021-05-21 | REPAIR SEWER | MONROE STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012021110B58 | 2021-04-20 | 2021-05-25 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD |
B012021109C50 | 2021-04-19 | 2021-05-17 | REPAIR WATER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012021109C83 | 2021-04-19 | 2021-05-15 | REPAIR SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
B012021106C46 | 2021-04-16 | 2021-05-03 | REPAIR WATER - PROTECTED | AVENUE K, BROOKLYN, FROM STREET EAST 23 STREET TO STREET EAST 24 STREET |
B012021106C41 | 2021-04-16 | 2021-05-11 | REPAIR WATER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M012021106B11 | 2021-04-16 | 2021-05-04 | REPAIR WATER | EAST 117 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET 2 AVENUE |
B012021106C47 | 2021-04-16 | 2021-05-14 | REPAIR WATER - SEWER | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012021106C45 | 2021-04-16 | 2021-05-15 | REPAIR WATER - SEWER | FLATBUSH AVENUE EXTENSION, BROOKLYN, FROM STREET CHAPEL STREET TO STREET CONCORD STREET |
B012021106C43 | 2021-04-16 | 2021-05-21 | REPAIR WATER | 41 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021106B89 | 2021-04-16 | 2021-05-16 | REPAIR WATER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET ESSEX STREET TO STREET LINWOOD STREET |
B012021106B17 | 2021-04-16 | 2021-05-07 | REPAIR WATER - SEWER | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012021105A64 | 2021-04-15 | 2021-05-05 | REPAIR WATER - PROTECTED | STEWART AVENUE, BROOKLYN, FROM STREET MEADOW STREET TO STREET STAGG STREET |
B012021105A63 | 2021-04-15 | 2021-05-01 | REPAIR WATER - SEWER | BLEECKER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012021105A48 | 2021-04-15 | 2021-05-21 | REPAIR WATER | KOSCIUSKO STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M012021104A17 | 2021-04-14 | 2021-04-29 | REPAIR WATER | WEST 39 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021104A99 | 2021-04-14 | 2021-04-16 | REPAIR WATER | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
X012021104A19 | 2021-04-14 | 2021-05-04 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET WILLIS AVENUE BRIDGE EXIT RAMP TO STREET WILLIS AVENUE |
B012021104B00 | 2021-04-14 | 2021-04-15 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012021103A08 | 2021-04-13 | 2021-05-04 | REPAIR WATER - SEWER - PROTECTED | 92 STREET, QUEENS, FROM STREET 101 AVENUE TO STREET 103 AVENUE |
X012021102A18 | 2021-04-12 | 2021-04-16 | REPAIR WATER - SEWER | GRAND CONCOURSE, BRONX, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET |
B012021102A62 | 2021-04-12 | 2021-05-09 | REPAIR WATER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021102A65 | 2021-04-12 | 2021-05-09 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021102A66 | 2021-04-12 | 2021-05-05 | REPAIR WATER | KOSCIUSKO STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012021102A63 | 2021-04-12 | 2021-05-15 | REPAIR WATER - SEWER | HOWARD AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012021102A11 | 2021-04-12 | 2021-04-17 | REPAIR SEWER | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012021099A07 | 2021-04-09 | 2021-05-01 | REPAIR WATER - SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET DEAD END |
B012021099B60 | 2021-04-09 | 2021-05-06 | REPAIR WATER - SEWER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
B012021099B57 | 2021-04-09 | 2021-04-25 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD |
B012021099B53 | 2021-04-09 | 2021-05-02 | REPAIR WATER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021099B32 | 2021-04-09 | 2021-04-17 | REPAIR WATER | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 55 STREET TO STREET BEND |
B012021099A11 | 2021-04-09 | 2021-04-16 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
X012021096A72 | 2021-04-06 | 2021-04-22 | REPAIR WATER - PROTECTED | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
B012021092B72 | 2021-04-02 | 2021-04-23 | REPAIR WATER - SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET |
B012021089A17 | 2021-03-30 | 2021-04-11 | REPAIR WATER | EAST 26 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012021089A16 | 2021-03-30 | 2021-04-18 | REPAIR WATER - SEWER | EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD |
Q012021085A41 | 2021-03-26 | 2021-04-13 | REPAIR SEWER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 192 STREET TO STREET 193 STREET |
B012021085A25 | 2021-03-26 | 2021-04-04 | REPAIR SEWER | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012021085A43 | 2021-03-26 | 2021-05-01 | REPAIR WATER - SEWER | 21 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP |
Q012021085A42 | 2021-03-26 | 2021-05-03 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 22 STREET |
M012021085A17 | 2021-03-26 | 2021-04-28 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012021082B45 | 2021-03-23 | 2021-04-18 | REPAIR WATER - SEWER | CHISHOLM STREET, BRONX, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET |
B012021082B27 | 2021-03-23 | 2021-04-02 | REPAIR WATER - SEWER | 83 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
X012021082A65 | 2021-03-23 | 2021-05-06 | REPAIR WATER | MIDDLETOWN ROAD, BRONX, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE |
B012021082B00 | 2021-03-23 | 2021-04-21 | REPAIR SEWER | MONROE STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012021082B20 | 2021-03-23 | 2021-04-17 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD |
B012021082B26 | 2021-03-23 | 2021-04-24 | REPAIR WATER - PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
B012021082B22 | 2021-03-23 | 2021-04-22 | REPAIR WATER - SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
B012021082B21 | 2021-03-23 | 2021-04-16 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021082B19 | 2021-03-23 | 2021-04-17 | REPAIR WATER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
Q012021081B91 | 2021-03-22 | 2021-04-06 | REPAIR WATER - SEWER | 21 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP |
B012021081C76 | 2021-03-22 | 2021-04-19 | REPAIR WATER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012021081B98 | 2021-03-22 | 2021-04-29 | REPAIR WATER - PROTECTED | 92 STREET, QUEENS, FROM STREET 101 AVENUE TO STREET 103 AVENUE |
Q012021081B94 | 2021-03-22 | 2021-04-17 | REPAIR WATER | 9 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
Q012021081B93 | 2021-03-22 | 2021-04-18 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012021081B87 | 2021-03-22 | 2021-05-01 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 22 STREET |
Q012021081B69 | 2021-03-22 | 2021-04-20 | REPAIR WATER - SEWER | 172 STREET, QUEENS, FROM STREET 82 AVENUE TO STREET GRAND CENTRL PARKWAY |
Q012021081B65 | 2021-03-22 | 2021-04-18 | REPAIR WATER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012021081B64 | 2021-03-22 | 2021-04-21 | REPAIR SEWER - PROTECTED | 32 AVENUE, QUEENS, FROM STREET 98 STREET TO STREET POWER ROAD |
Q012021081B63 | 2021-03-22 | 2021-04-18 | REPAIR WATER - SEWER | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
B012021081C57 | 2021-03-22 | 2021-04-17 | REPAIR WATER - SEWER - PROTECTED | BELMONT AVENUE, BROOKLYN, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET |
B012021081C59 | 2021-03-22 | 2021-05-01 | REPAIR WATER - PROTECTED | 56 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012021081C66 | 2021-03-22 | 2021-04-17 | REPAIR WATER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012021081C74 | 2021-03-22 | 2021-04-17 | REPAIR WATER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021081C75 | 2021-03-22 | 2021-04-17 | REPAIR WATER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET ESSEX STREET TO STREET LINWOOD STREET |
B012021081C77 | 2021-03-22 | 2021-04-20 | REPAIR SEWER - PROTECTED | GREENPOINT AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET WEST STREET |
B012021081C78 | 2021-03-22 | 2021-04-20 | REPAIR WATER | KENT STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET |
B012021081C81 | 2021-03-22 | 2021-05-01 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
M012021081B67 | 2021-03-22 | 2021-04-19 | REPAIR WATER - SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M012021081B69 | 2021-03-22 | 2021-04-06 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012021081B71 | 2021-03-22 | 2021-04-18 | REPAIR WATER - SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012021081A73 | 2021-03-22 | 2021-04-17 | REPAIR WATER - SEWER | CROSS BRONX EXPRESSWAY, BRONX, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE |
B012021077B42 | 2021-03-18 | 2021-04-21 | REPAIR WATER | 41 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021077A91 | 2021-03-18 | 2021-04-20 | REPAIR SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B012021077B37 | 2021-03-18 | 2021-04-16 | REPAIR WATER - SEWER - PROTECTED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012021077A88 | 2021-03-18 | 2021-04-16 | REPAIR WATER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012021077B43 | 2021-03-18 | 2021-04-09 | REPAIR WATER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021077A90 | 2021-03-18 | 2021-05-01 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021077A87 | 2021-03-18 | 2021-04-16 | REPAIR WATER - SEWER | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012021077B63 | 2021-03-18 | 2021-04-09 | REPAIR WATER - PROTECTED | 1 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST |
B012021077A86 | 2021-03-18 | 2021-04-11 | REPAIR WATER | EAST 26 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012021077A85 | 2021-03-18 | 2021-04-16 | REPAIR WATER - SEWER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021077A82 | 2021-03-18 | 2021-04-16 | REPAIR WATER | SOMERS STREET, BROOKLYN, FROM STREET BEND TO STREET FULTON STREET |
B012021077A89 | 2021-03-18 | 2021-04-15 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021077B32 | 2021-03-18 | 2021-04-09 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021077A40 | 2021-03-18 | 2021-04-15 | REPAIR WATER - SEWER | HOWARD AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012021077B39 | 2021-03-18 | 2021-03-22 | REPAIR WATER - SEWER - PROTECTED | 147 STREET, QUEENS, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE |
B012021077B21 | 2021-03-18 | 2021-04-15 | REPAIR WATER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012021075A40 | 2021-03-16 | 2021-04-05 | REPAIR WATER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE |
B012021075E43 | 2021-03-16 | 2021-04-14 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021075E42 | 2021-03-16 | 2021-04-22 | REPAIR WATER - SEWER - PROTECTED | CLINTON AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET GREENE AVENUE |
B012021075E40 | 2021-03-16 | 2021-05-07 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012021075E39 | 2021-03-16 | 2021-04-20 | REPAIR SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B012021075E45 | 2021-03-16 | 2021-03-20 | REPAIR WATER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
X012021075A63 | 2021-03-16 | 2021-04-18 | REPAIR WATER - PROTECTED | COURTLANDT AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
Q012021070C11 | 2021-03-11 | 2021-04-20 | REPAIR WATER - SEWER - PROTECTED | 147 STREET, QUEENS, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE |
B012021069B06 | 2021-03-10 | 2021-03-28 | REPAIR WATER - SEWER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET ESSEX STREET TO STREET LINWOOD STREET |
B012021069B07 | 2021-03-10 | 2021-04-06 | REPAIR WATER - SEWER | GARDEN PLACE, BROOKLYN, FROM STREET JORALEMON STREET TO STREET STATE STREET |
B012021069B09 | 2021-03-10 | 2021-04-07 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
Q012021069A62 | 2021-03-10 | 2021-04-13 | REPAIR SEWER - PROTECTED | LINDEN BOULEVARD, QUEENS, FROM STREET 192 STREET TO STREET 193 STREET |
Q012021069A63 | 2021-03-10 | 2021-04-04 | REPAIR WATER | 9 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
B012021068C39 | 2021-03-09 | 2021-04-07 | REPAIR WATER | 41 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021064B98 | 2021-03-05 | 2021-03-31 | REPAIR WATER - SEWER - PROTECTED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
M012021064A29 | 2021-03-05 | 2021-04-06 | REPAIR SEWER | WEST 28 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012021064A30 | 2021-03-05 | 2021-04-01 | REPAIR WATER | EAST 30 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021064A66 | 2021-03-05 | 2021-04-01 | REPAIR WATER - SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012021064A67 | 2021-03-05 | 2021-04-13 | REPAIR WATER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
B012021064C89 | 2021-03-05 | 2021-04-02 | REPAIR WATER | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012021064C29 | 2021-03-05 | 2021-04-01 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021064C28 | 2021-03-05 | 2021-03-28 | REPAIR WATER - SEWER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021064C00 | 2021-03-05 | 2021-03-15 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021064B90 | 2021-03-05 | 2021-04-06 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD |
B012021064B89 | 2021-03-05 | 2021-04-03 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE T TO STREET AVENUE U |
B012021064B88 | 2021-03-05 | 2021-04-15 | REPAIR WATER - SEWER | HOWARD AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012021064B86 | 2021-03-05 | 2021-04-02 | REPAIR WATER | 61 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
Q012021064A53 | 2021-03-05 | 2021-04-02 | REPAIR WATER - SEWER | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
Q012021064B28 | 2021-03-05 | 2021-04-07 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 22 STREET |
X012021064A17 | 2021-03-05 | 2021-04-06 | REPAIR WATER | MIDDLETOWN ROAD, BRONX, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE |
X012021064A14 | 2021-03-05 | 2021-04-08 | REPAIR WATER - PROTECTED | MANIDA STREET, BRONX, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE |
B012021064C25 | 2021-03-05 | 2021-03-14 | REPAIR WATER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012021064C41 | 2021-03-05 | 2021-04-01 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021062F69 | 2021-03-03 | 2021-03-13 | REPAIR WATER - SEWER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021061B32 | 2021-03-02 | 2021-03-30 | REPAIR WATER - SEWER | EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD |
M012021061A56 | 2021-03-02 | 2021-04-12 | REPAIR SEWER - PROTECTED | WEST 121 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
M012021061A47 | 2021-03-02 | 2021-04-03 | REPAIR WATER - PROTECTED | EAST 7 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET AVENUE D |
M012021061A46 | 2021-03-02 | 2021-04-12 | REPAIR SEWER - PROTECTED | WEST 121 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
B012021061C66 | 2021-03-02 | 2021-03-21 | REPAIR WATER | SOMERS STREET, BROOKLYN, FROM STREET BEND TO STREET FULTON STREET |
Q012021061C45 | 2021-03-02 | 2021-03-26 | REPAIR WATER | POWER ROAD, QUEENS, FROM STREET 63 AVENUE TO STREET 63 ROAD |
B012021061C63 | 2021-03-02 | 2021-03-20 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
Q012021061C40 | 2021-03-02 | 2021-03-20 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
Q012021061C43 | 2021-03-02 | 2021-03-26 | REPAIR WATER - SEWER | 21 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP |
Q012021061C44 | 2021-03-02 | 2021-04-05 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012021056B96 | 2021-02-25 | 2021-03-29 | REPAIR WATER - SEWER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021054B36 | 2021-02-23 | 2021-03-21 | REPAIR WATER | KENT STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET |
Q012021054C68 | 2021-02-23 | 2021-03-20 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD |
B012021054B32 | 2021-02-23 | 2021-03-20 | REPAIR WATER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
M012021054B46 | 2021-02-23 | 2021-03-24 | REPAIR WATER | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012021054B44 | 2021-02-23 | 2021-03-20 | REPAIR WATER - SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M012021054B45 | 2021-02-23 | 2021-03-24 | REPAIR WATER | WEST 39 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012021054A65 | 2021-02-23 | 2021-03-13 | REPAIR WATER - PROTECTED | EAST 240 STREET, BRONX, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST |
X012021054A56 | 2021-02-23 | 2021-03-19 | REPAIR WATER - PROTECTED | COURTLANDT AVENUE, BRONX, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET |
B012021054B42 | 2021-02-23 | 2021-03-23 | REPAIR WATER - SEWER | 83 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012021054B41 | 2021-02-23 | 2021-03-23 | REPAIR WATER | MONROE STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012021054B39 | 2021-02-23 | 2021-03-31 | REPAIR WATER | EAST 26 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012021054B38 | 2021-02-23 | 2021-03-21 | REPAIR SEWER - PROTECTED | GREENPOINT AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET WEST STREET |
B012021054B35 | 2021-02-23 | 2021-03-29 | REPAIR SEWER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012021054B33 | 2021-02-23 | 2021-03-15 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE R TO STREET AVENUE S |
B012021054B31 | 2021-02-23 | 2021-03-20 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021042A28 | 2021-02-23 | 2021-03-06 | REPAIR WATER - PROTECTED | AVENUE U, BROOKLYN, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET |
M012021049B21 | 2021-02-18 | 2021-03-14 | REPAIR WATER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
X012021047A93 | 2021-02-16 | 2021-03-14 | REPAIR WATER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE |
X012021043A11 | 2021-02-12 | 2021-03-23 | REPAIR WATER - SEWER | EAST 172 STREET, BRONX, FROM STREET ELDER AVENUE TO STREET WHEELER AVENUE |
B012021043A30 | 2021-02-12 | 2021-03-08 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012021039A29 | 2021-02-12 | 2021-03-01 | REPAIR WATER | 14 AVENUE, BROOKLYN, FROM STREET 41 STREET TO STREET 42 STREET |
B012021043A36 | 2021-02-12 | 2021-03-09 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021043A32 | 2021-02-12 | 2021-03-01 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021043A40 | 2021-02-12 | 2021-03-19 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
Q012021043A53 | 2021-02-12 | 2021-03-23 | REPAIR WATER - SEWER | 172 STREET, QUEENS, FROM STREET 82 AVENUE TO STREET GRAND CENTRL PARKWAY |
Q012021043A50 | 2021-02-12 | 2021-03-07 | REPAIR WATER - PROTECTED | 193 STREET, QUEENS, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD |
B012021043A43 | 2021-02-12 | 2021-03-06 | REPAIR WATER - SEWER - PROTECTED | BOX STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012021043A35 | 2021-02-12 | 2021-02-28 | REPAIR WATER - SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET DEAD END |
M012021043A42 | 2021-02-12 | 2021-02-22 | REPAIR WATER | WEST 38 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021043A41 | 2021-02-12 | 2021-03-20 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012021043A42 | 2021-02-12 | 2021-03-15 | REPAIR WATER - PROTECTED | WEST 10 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET HIGHLAWN AVENUE |
Q012021043A63 | 2021-02-12 | 2021-03-08 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 22 STREET |
B012021042A32 | 2021-02-11 | 2021-03-09 | REPAIR WATER - SEWER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
M012021042A68 | 2021-02-11 | 2021-03-11 | REPAIR WATER - SEWER | EAST 30 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021042A15 | 2021-02-11 | 2021-03-13 | REPAIR SEWER - PROTECTED | WEST 121 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
B012021041A59 | 2021-02-10 | 2021-03-13 | REPAIR WATER - PROTECTED | HERKIMER PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE |
M012021040A69 | 2021-02-09 | 2021-03-12 | REPAIR WATER - PROTECTED | EAST 7 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET AVENUE D |
Q012021040A43 | 2021-02-09 | 2021-03-08 | REPAIR WATER - SEWER | 21 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP |
Q012021040A76 | 2021-02-09 | 2021-03-06 | REPAIR WATER - SEWER | 133 STREET, QUEENS, FROM STREET DEAD END TO STREET JAMAICA AVENUE |
Q012021040A81 | 2021-02-09 | 2021-03-06 | REPAIR WATER | POWER ROAD, QUEENS, FROM STREET 63 AVENUE TO STREET 63 ROAD |
S012021040A40 | 2021-02-09 | 2021-03-01 | REPAIR WATER - SEWER | HYLAN BOULEVARD, STATEN ISLAND, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE |
Q012021040A49 | 2021-02-09 | 2021-03-10 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012021040A50 | 2021-02-09 | 2021-03-01 | REPAIR WATER - SEWER - PROTECTED | BEACH 87 STREET, QUEENS, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY |
B012021040A40 | 2021-02-09 | 2021-02-26 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021040A41 | 2021-02-09 | 2021-02-27 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
M012021040A65 | 2021-02-09 | 2021-02-22 | REPAIR WATER | WEST 39 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021039A37 | 2021-02-08 | 2021-02-28 | REPAIR WATER | WOODHULL STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE |
B012021035A86 | 2021-02-04 | 2021-02-25 | REPAIR WATER | KENT STREET, BROOKLYN, FROM STREET BODY OF WATER TO STREET WEST STREET |
B012021035A87 | 2021-02-04 | 2021-02-26 | REPAIR SEWER - PROTECTED | GREENPOINT AVENUE, BROOKLYN, FROM STREET DEAD END TO STREET WEST STREET |
B012021035A88 | 2021-02-04 | 2021-03-01 | REPAIR WATER - SEWER | 61 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
B012021035A89 | 2021-02-04 | 2021-02-27 | REPAIR WATER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
B012021035A90 | 2021-02-04 | 2021-03-02 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012021035A73 | 2021-02-04 | 2021-02-27 | REPAIR SEWER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
Q012021035C40 | 2021-02-04 | 2021-03-01 | REPAIR WATER - SEWER - PROTECTED | SANFORD AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q012021035C80 | 2021-02-04 | 2021-03-09 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 154 STREET TO STREET MURRAY STREET |
B012021035A58 | 2021-02-04 | 2021-02-20 | REPAIR WATER - PROTECTED | WEST 10 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET HIGHLAWN AVENUE |
X012021035A23 | 2021-02-04 | 2021-02-27 | REPAIR WATER | KATONAH AVENUE, BRONX, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET |
B012021035A56 | 2021-02-04 | 2021-03-16 | REPAIR WATER - SEWER - PROTECTED | LIBERTY AVENUE, BROOKLYN, FROM STREET ESSEX STREET TO STREET LINWOOD STREET |
B012021029B76 | 2021-02-04 | 2021-02-27 | REPAIR WATER | BRAGG STREET, BROOKLYN, FROM STREET AVENUE V TO STREET AVENUE W |
B012021035A85 | 2021-02-04 | 2021-03-02 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
Q012021035C28 | 2021-02-04 | 2021-02-27 | REPAIR WATER - SEWER - PROTECTED | 150 STREET, QUEENS, FROM STREET SANFORD AVENUE |
Q012021035C43 | 2021-02-04 | 2021-02-09 | REPAIR WATER - SEWER | 33 AVENUE, QUEENS, FROM STREET 156 STREET TO STREET 157 STREET |
B012021035A77 | 2021-02-04 | 2021-03-09 | REPAIR WATER - SEWER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021035A79 | 2021-02-04 | 2021-03-09 | REPAIR WATER - SEWER | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012021035A82 | 2021-02-04 | 2021-03-04 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012021035A81 | 2021-02-04 | 2021-02-26 | REPAIR WATER - SEWER | EAST 11 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
Q012021026B29 | 2021-01-26 | 2021-02-09 | REPAIR WATER - SEWER | 156 STREET, QUEENS, FROM STREET 33 AVENUE TO STREET 35 AVENUE |
B012021019A50 | 2021-01-26 | 2021-02-04 | REPAIR WATER | ROCKAWAY AVENUE, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
X012021026A34 | 2021-01-26 | 2021-02-21 | REPAIR WATER - PROTECTED | EAST 240 STREET, BRONX, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST |
B012021026C28 | 2021-01-26 | 2021-02-25 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE R TO STREET AVENUE S |
M012021026A54 | 2021-01-26 | 2021-02-10 | REPAIR WATER - PROTECTED | EAST 7 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET AVENUE D |
M012021026A48 | 2021-01-26 | 2021-02-09 | REPAIR WATER - SEWER | EAST 30 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M012021026A31 | 2021-01-26 | 2021-02-20 | REPAIR SEWER - PROTECTED | CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET |
B012021026B40 | 2021-01-26 | 2021-02-23 | REPAIR WATER - PROTECTED | MOFFAT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012021026B44 | 2021-01-26 | 2021-03-02 | REPAIR WATER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012021026C23 | 2021-01-26 | 2021-01-31 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012021026B41 | 2021-01-26 | 2021-03-02 | REPAIR WATER | SOMERS STREET, BROOKLYN, FROM STREET BEND TO STREET FULTON STREET |
B012021026B42 | 2021-01-26 | 2021-03-02 | REPAIR WATER - SEWER | VERNON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012021026B43 | 2021-01-26 | 2021-02-19 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012021026B39 | 2021-01-26 | 2021-02-17 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
B012021026B45 | 2021-01-26 | 2021-03-02 | REPAIR WATER - SEWER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021026B57 | 2021-01-26 | 2021-02-19 | REPAIR WATER - PROTECTED | HERKIMER PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE |
B012021026C22 | 2021-01-26 | 2021-02-20 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012021026C24 | 2021-01-26 | 2021-02-05 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
Q012021026B17 | 2021-01-26 | 2021-02-22 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD |
B012021022B01 | 2021-01-22 | 2021-02-21 | REPAIR WATER - SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
M012021022A45 | 2021-01-22 | 2021-02-20 | REPAIR SEWER - PROTECTED | CHARLES STREET, MANHATTAN, FROM STREET BLEECKER STREET TO STREET HUDSON STREET |
B012021022A91 | 2021-01-22 | 2021-02-22 | REPAIR WATER - SEWER | BAY 16 STREET, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B012021020C10 | 2021-01-20 | 2021-02-15 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012021018A14 | 2021-01-18 | 2021-02-11 | REPAIR WATER - SEWER - PROTECTED | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012021018A18 | 2021-01-18 | 2021-02-16 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012021015A77 | 2021-01-15 | 2021-02-05 | REPAIR WATER - SEWER - PROTECTED | LEONARD STREET, BROOKLYN, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE |
Q012021015B05 | 2021-01-15 | 2021-02-04 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012021015B49 | 2021-01-15 | 2021-02-13 | REPAIR WATER - SEWER | HUDSON STREET, MANHATTAN, FROM STREET CHARLES STREET TO STREET PERRY STREET |
B012021014A31 | 2021-01-14 | 2021-02-16 | REPAIR WATER - SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET DEAD END |
B012021014A05 | 2021-01-14 | 2021-01-16 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012021014B55 | 2021-01-14 | 2021-02-11 | REPAIR WATER - SEWER - PROTECTED | BEACH 87 STREET, QUEENS, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY |
Q012021014B57 | 2021-01-14 | 2021-01-31 | REPAIR WATER - SEWER | 33 AVENUE, QUEENS, FROM STREET 156 STREET TO STREET 157 STREET |
B012021014A37 | 2021-01-14 | 2021-02-11 | REPAIR WATER - SEWER - PROTECTED | COLUMBIA STREET, BROOKLYN, FROM STREET HAMILTON AVENUE TO STREET WOODHULL STREET |
B012021014B37 | 2021-01-14 | 2021-01-22 | REPAIR WATER - SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
B012021013A72 | 2021-01-13 | 2021-02-09 | REPAIR WATER - SEWER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012021013A34 | 2021-01-13 | 2021-02-16 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012021013A71 | 2021-01-13 | 2021-01-31 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012021013A73 | 2021-01-13 | 2021-02-12 | REPAIR WATER - SEWER - PROTECTED | 58 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012021013A70 | 2021-01-13 | 2021-02-12 | REPAIR WATER - SEWER - PROTECTED | BOX STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
M012021013B09 | 2021-01-13 | 2021-02-07 | REPAIR WATER - SEWER | EAST 30 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012021013A54 | 2021-01-13 | 2021-02-10 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE |
B012021013A53 | 2021-01-13 | 2021-02-10 | REPAIR WATER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE |
Q012021013A82 | 2021-01-13 | 2021-02-16 | REPAIR WATER | 41 AVENUE, QUEENS, FROM STREET 21 STREET TO STREET 22 STREET |
Q012021013A90 | 2021-01-13 | 2021-02-10 | REPAIR WATER - SEWER | 21 STREET, QUEENS, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP |
B012021013A38 | 2021-01-13 | 2021-02-09 | REPAIR WATER | NOSTRAND AVENUE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
S012021013A15 | 2021-01-13 | 2021-02-13 | REPAIR WATER - SEWER | HYLAN BOULEVARD, STATEN ISLAND, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE |
Q012021013A67 | 2021-01-13 | 2021-02-16 | REPAIR WATER - PROTECTED | 193 STREET, QUEENS, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD |
B012021008B83 | 2021-01-08 | 2021-02-09 | REPAIR WATER - SEWER | 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012021007A70 | 2021-01-07 | 2021-02-05 | REPAIR WATER - SEWER | 32 AVENUE, QUEENS, FROM STREET 146 STREET TO STREET 147 PLACE |
Q012021007A34 | 2021-01-07 | 2021-02-05 | REPAIR WATER - SEWER - PROTECTED | SANFORD AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
B012021007A29 | 2021-01-07 | 2021-02-05 | REPAIR WATER - SEWER | EAST 11 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
M012021005A82 | 2021-01-05 | 2021-02-03 | REPAIR WATER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
B012021004B74 | 2021-01-04 | 2021-01-24 | REPAIR WATER - PROTECTED | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012021004B83 | 2021-01-04 | 2021-01-17 | REPAIR WATER - SEWER - PROTECTED | 58 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012021004B96 | 2021-01-04 | 2021-01-24 | REPAIR WATER - SEWER | EAST 31 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
B012021004B67 | 2021-01-04 | 2021-01-27 | REPAIR WATER | BLEECKER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M012021004B10 | 2021-01-04 | 2021-01-27 | REPAIR WATER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012021004A61 | 2021-01-04 | 2021-01-27 | REPAIR WATER - SEWER | EAST 30 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012021004B58 | 2021-01-04 | 2021-01-28 | REPAIR WATER | 5 AVENUE, BROOKLYN, FROM STREET 62 STREET TO STREET 63 STREET |
Q012021004A80 | 2021-01-04 | 2021-01-23 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD |
B012020365A12 | 2020-12-30 | 2021-01-17 | REPAIR WATER - SEWER | 16 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012020365A03 | 2020-12-30 | 2021-01-28 | REPAIR WATER | KATONAH AVENUE, BRONX, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET |
Q012020365A45 | 2020-12-30 | 2021-01-23 | REPAIR WATER - SEWER | 230 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012020365A79 | 2020-12-30 | 2021-01-15 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020363C08 | 2020-12-28 | 2021-01-23 | REPAIR WATER - SEWER | BAY 16 STREET, BROOKLYN, FROM STREET 86 STREET TO STREET BENSON AVENUE |
B012020358E71 | 2020-12-23 | 2021-01-11 | REPAIR WATER - SEWER | EAST 22 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020358E63 | 2020-12-23 | 2021-01-11 | REPAIR WATER | BEDFORD AVENUE, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
B012020358E64 | 2020-12-23 | 2021-01-19 | REPAIR WATER | 39 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020358E65 | 2020-12-23 | 2021-01-24 | REPAIR WATER - PROTECTED | MOFFAT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012020358E66 | 2020-12-23 | 2021-01-30 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020358E67 | 2020-12-23 | 2021-01-18 | REPAIR WATER - PROTECTED | 1 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST |
B012020358E68 | 2020-12-23 | 2021-01-05 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012020358E73 | 2020-12-23 | 2021-01-10 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012020358E69 | 2020-12-23 | 2021-01-06 | REPAIR WATER - SEWER | EAST 11 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
B012020358E70 | 2020-12-23 | 2021-01-17 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012020358E72 | 2020-12-23 | 2021-01-23 | REPAIR WATER - SEWER | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
M012020358C18 | 2020-12-23 | 2021-01-18 | REPAIR WATER - PROTECTED | EAST 7 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET AVENUE D |
Q012020356B63 | 2020-12-21 | 2021-01-16 | REPAIR WATER - SEWER | MULBERRY AVENUE, QUEENS, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD |
B012020345A54 | 2020-12-15 | 2020-12-31 | REPAIR WATER | HARMAN STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
Q012020350B44 | 2020-12-15 | 2020-12-31 | REPAIR WATER - SEWER | 230 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
B012020345A53 | 2020-12-15 | 2020-12-31 | REPAIR WATER - SEWER - PROTECTED | DE GRAW STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
Q012020349D80 | 2020-12-14 | 2020-12-26 | REPAIR WATER - SEWER - PROTECTED | SANFORD AVENUE, QUEENS, FROM STREET 150 STREET TO STREET MURRAY STREET |
Q012020349D10 | 2020-12-14 | 2020-12-31 | REPAIR WATER - SEWER | 46 STREET, QUEENS, FROM STREET 54 DRIVE TO STREET 55 AVENUE |
Q012020346A86 | 2020-12-11 | 2020-12-31 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020343E13 | 2020-12-08 | 2020-12-31 | REPAIR WATER - PROTECTED | 1 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST |
Q012020342B88 | 2020-12-07 | 2020-12-31 | REPAIR WATER - SEWER | 35 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET |
B012020342C44 | 2020-12-07 | 2020-12-27 | REPAIR WATER - SEWER | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
Q012020338A55 | 2020-12-07 | 2020-12-31 | REPAIR WATER | 108 STREET, QUEENS, FROM STREET 37 AVENUE TO STREET 37 DRIVE |
B012020342C45 | 2020-12-07 | 2020-12-31 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020339A97 | 2020-12-04 | 2020-12-31 | REPAIR WATER | 39 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020339A95 | 2020-12-04 | 2020-12-31 | REPAIR WATER - PROTECTED | MOFFAT STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
Q012020339B85 | 2020-12-04 | 2020-12-31 | REPAIR WATER - SEWER - PROTECTED | GOLDSMITH STREET, QUEENS, FROM STREET GRAND AVENUE TO STREET QUEENS BOULEVARD |
M012020339A68 | 2020-12-04 | 2020-12-31 | REPAIR WATER - PROTECTED | EAST 7 STREET, MANHATTAN, FROM STREET AVENUE C TO STREET AVENUE D |
B012020339B04 | 2020-12-04 | 2020-12-25 | REPAIR WATER - SEWER | 52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012020337E29 | 2020-12-02 | 2020-12-31 | REPAIR WATER - SEWER | EAST 22 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
X012020337C80 | 2020-12-02 | 2020-12-09 | REPAIR WATER | MORRIS AVENUE, BRONX, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET |
X012020337C79 | 2020-12-02 | 2020-12-15 | REPAIR WATER | BURKE AVENUE, BRONX, FROM STREET COLDEN AVENUE TO STREET RADCLIFF AVENUE |
B012020337E99 | 2020-12-02 | 2020-12-21 | REPAIR WATER - SEWER | EAST 11 STREET, BROOKLYN, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE |
B012020337E96 | 2020-12-02 | 2020-12-31 | REPAIR WATER - PROTECTED | LEFFERTS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE |
B012020337E83 | 2020-12-02 | 2020-12-28 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012020337A79 | 2020-12-02 | 2020-12-30 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020337A78 | 2020-12-02 | 2020-12-28 | REPAIR WATER - SEWER - PROTECTED | ST MARKS AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020337A77 | 2020-12-02 | 2020-12-30 | REPAIR WATER | BEDFORD AVENUE, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
M012020336A43 | 2020-12-01 | 2020-12-23 | REPAIR WATER - PROTECTED | WEST 121 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE |
Q012020336C62 | 2020-12-01 | 2020-12-31 | REPAIR WATER - SEWER | 9 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 40 AVENUE |
B012020329C02 | 2020-11-24 | 2020-12-22 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012020329B99 | 2020-11-24 | 2020-12-19 | REPAIR SEWER | LEGION STREET, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012020328B41 | 2020-11-23 | 2020-12-20 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012020325A22 | 2020-11-20 | 2020-11-28 | REPAIR WATER - SEWER - PROTECTED | ST MARKS AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
Q012020324C58 | 2020-11-19 | 2020-12-18 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020324A23 | 2020-11-19 | 2020-12-18 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET BREVOORT PLACE TO STREET FULTON STREET |
B012020323A42 | 2020-11-18 | 2020-12-16 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012020323A07 | 2020-11-18 | 2020-12-17 | REPAIR WATER | WHITE PLAINS ROAD, BRONX, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET |
Q012020323A51 | 2020-11-18 | 2020-12-17 | REPAIR SEWER | 215 STREET, QUEENS, FROM STREET 15 ROAD TO STREET BEND |
B012020323A37 | 2020-11-18 | 2020-12-16 | REPAIR WATER - SEWER | HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012020323A39 | 2020-11-18 | 2020-12-16 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET FORD STREET TO STREET UTICA AVENUE |
B012020322A39 | 2020-11-17 | 2020-12-14 | REPAIR SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012020322A40 | 2020-11-17 | 2020-12-07 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012020322A37 | 2020-11-17 | 2020-12-14 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020322A38 | 2020-11-17 | 2020-12-07 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020321A35 | 2020-11-16 | 2020-11-29 | REPAIR WATER - SEWER | EAST 22 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET DEAD END |
M012020318B27 | 2020-11-13 | 2020-11-23 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
B012020318B27 | 2020-11-13 | 2020-12-14 | REPAIR WATER | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE |
M012020318B35 | 2020-11-13 | 2020-12-23 | REPAIR WATER - SEWER - PROTECTED | WEST 24 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012020315B21 | 2020-11-10 | 2020-12-07 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012020315A87 | 2020-11-10 | 2020-12-08 | REPAIR WATER | KATONAH AVENUE, BRONX, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET |
X012020315A96 | 2020-11-10 | 2020-12-05 | REPAIR WATER | EAST 135 STREET, BRONX, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE |
M012020315B22 | 2020-11-10 | 2020-12-07 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012020315B20 | 2020-11-10 | 2020-11-23 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
M012020315B19 | 2020-11-10 | 2020-12-07 | REPAIR SEWER | WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT |
Q012020315A66 | 2020-11-10 | 2020-12-08 | REPAIR WATER - SEWER | 46 STREET, QUEENS, FROM STREET 54 DRIVE TO STREET 55 AVENUE |
Q012020315B00 | 2020-11-10 | 2020-12-07 | REPAIR WATER - SEWER | 35 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET |
Q012020315A99 | 2020-11-10 | 2020-12-05 | REPAIR SEWER - PROTECTED | 66 STREET, QUEENS, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD |
B012020315B73 | 2020-11-10 | 2020-12-08 | REPAIR WATER - SEWER | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012020315B72 | 2020-11-10 | 2020-12-08 | REPAIR SEWER | 40 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012020315B15 | 2020-11-10 | 2020-12-08 | REPAIR WATER - SEWER | 46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE |
Q012020311E33 | 2020-11-06 | 2020-12-01 | REPAIR WATER - SEWER - PROTECTED | 162 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE |
M012020310A78 | 2020-11-05 | 2020-12-07 | REPAIR SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
B012020310A81 | 2020-11-05 | 2020-11-30 | REPAIR WATER | BEDFORD AVENUE, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
B012020310A82 | 2020-11-05 | 2020-11-30 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020310A84 | 2020-11-05 | 2020-11-30 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012020310A85 | 2020-11-05 | 2020-11-29 | REPAIR WATER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B012020310A86 | 2020-11-05 | 2020-11-29 | REPAIR WATER | GROVE PLACE, BROOKLYN, FROM STREET DEAD END TO STREET HANOVER PLACE |
B012020310B95 | 2020-11-05 | 2020-11-14 | REPAIR WATER - SEWER - PROTECTED | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012020309A03 | 2020-11-04 | 2020-11-11 | REPAIR WATER - SEWER - PROTECTED | ST MARKS AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020309A04 | 2020-11-04 | 2020-11-22 | REPAIR WATER | BAY COURT, BROOKLYN, FROM STREET SHORE PARKWAY |
B012020309A05 | 2020-11-04 | 2020-11-14 | REPAIR WATER - SEWER - PROTECTED | 83 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET BAY PARKWAY |
B012020304D20 | 2020-10-30 | 2020-11-14 | REPAIR WATER - SEWER - PROTECTED | 68 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
X012020304B06 | 2020-10-30 | 2020-11-27 | REPAIR WATER | BURKE AVENUE, BRONX, FROM STREET COLDEN AVENUE TO STREET RADCLIFF AVENUE |
B012020304D25 | 2020-10-30 | 2020-11-07 | REPAIR WATER - SEWER | EAST 22 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET DEAD END |
B012020304D30 | 2020-10-30 | 2020-11-14 | REPAIR WATER | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE |
B012020304D29 | 2020-10-30 | 2020-11-14 | REPAIR SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
S012020304A75 | 2020-10-30 | 2020-11-27 | REPAIR WATER - SEWER | HYLAN BOULEVARD, STATEN ISLAND, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE |
X012020304B14 | 2020-10-30 | 2020-11-27 | REPAIR WATER | MORRIS AVENUE, BRONX, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET |
M012020301A51 | 2020-10-27 | 2020-11-14 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
B012020301A58 | 2020-10-27 | 2020-11-14 | REPAIR SEWER - PROTECTED | BAYARD STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
M012020301A52 | 2020-10-27 | 2020-11-14 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020301B72 | 2020-10-27 | 2020-11-14 | REPAIR WATER | WEIRFIELD STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012020301B70 | 2020-10-27 | 2020-11-14 | REPAIR WATER | MAUJER STREET, BROOKLYN, FROM STREET MORGAN AVENUE TO STREET WATERBURY STREET |
B012020297D81 | 2020-10-23 | 2020-11-14 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020297D88 | 2020-10-23 | 2020-11-14 | REPAIR WATER - SEWER | KENT AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012020297D90 | 2020-10-23 | 2020-11-14 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
M042020295A03 | 2020-10-21 | 2020-11-14 | REPAIR SIDEWALK | EAST 62 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
M042020295A01 | 2020-10-21 | 2020-11-14 | REPAIR SIDEWALK | MADISON AVENUE, MANHATTAN, FROM STREET EAST 61 STREET TO STREET EAST 62 STREET |
B012020295A36 | 2020-10-21 | 2020-11-14 | REPAIR WATER - PROTECTED | 3 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B012020295A33 | 2020-10-21 | 2020-11-13 | REPAIR WATER | 11 AVENUE, BROOKLYN, FROM STREET 55 STREET TO STREET 56 STREET |
B012020295A21 | 2020-10-21 | 2020-11-14 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012020295A14 | 2020-10-21 | 2020-11-14 | REPAIR WATER | 41 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
Q012020295A96 | 2020-10-21 | 2020-11-13 | REPAIR WATER - SEWER | 35 AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 109 STREET |
M042020295A02 | 2020-10-21 | 2020-11-14 | REPAIR SIDEWALK | EAST 61 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET MADISON AVENUE |
B012020294B38 | 2020-10-20 | 2020-11-13 | REPAIR WATER - PROTECTED | JAVA STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
Q012020293B38 | 2020-10-19 | 2020-11-09 | REPAIR WATER - SEWER - PROTECTED | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
B012020293B27 | 2020-10-19 | 2020-11-14 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
X012020293B28 | 2020-10-19 | 2020-11-08 | REPAIR WATER | EAST 135 STREET, BRONX, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE |
X012020289A53 | 2020-10-15 | 2020-11-13 | REPAIR WATER - SEWER | EAST 195 STREET, BRONX, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE |
B012020289A78 | 2020-10-15 | 2020-11-13 | REPAIR WATER | ELTON STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY |
M012020289A47 | 2020-10-15 | 2020-11-07 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012020288A49 | 2020-10-14 | 2020-10-30 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012020288A95 | 2020-10-14 | 2020-11-08 | REPAIR WATER | WHITE STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET WEST BROADWAY |
Q012020288A47 | 2020-10-14 | 2020-11-07 | REPAIR WATER - SEWER - PROTECTED | 162 STREET, QUEENS, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE |
M012020283A75 | 2020-10-09 | 2020-11-07 | REPAIR SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
B012020283A03 | 2020-10-09 | 2020-11-10 | REPAIR WATER | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012020283A04 | 2020-10-09 | 2020-11-10 | REPAIR WATER | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B012020283A05 | 2020-10-09 | 2020-11-10 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012020283B53 | 2020-10-09 | 2020-11-05 | REPAIR WATER | BAY COURT, BROOKLYN, FROM STREET SHORE PARKWAY |
B012020283B62 | 2020-10-09 | 2020-11-05 | REPAIR WATER - SEWER - PROTECTED | ST MARKS AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020283B67 | 2020-10-09 | 2020-11-05 | REPAIR SEWER - PROTECTED | WILLOW STREET, BROOKLYN, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET |
B012020283B66 | 2020-10-09 | 2020-11-05 | REPAIR WATER - SEWER - PROTECTED | 40 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
B012020283B64 | 2020-10-09 | 2020-11-05 | REPAIR WATER - SEWER | KEAP STREET, BROOKLYN, FROM STREET GRAND STREET EXTENSION TO STREET SOUTH 2 STREET |
M012020283A67 | 2020-10-09 | 2020-11-07 | REPAIR SEWER | WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT |
B012020283B65 | 2020-10-09 | 2020-11-05 | REPAIR WATER - SEWER | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012020280D78 | 2020-10-06 | 2020-10-31 | REPAIR WATER - SEWER - PROTECTED | 83 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET BAY PARKWAY |
Q012020280C41 | 2020-10-06 | 2020-10-31 | REPAIR SEWER | 251 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET CULLMAN AVENUE |
B012020279C49 | 2020-10-05 | 2020-10-31 | REPAIR WATER - SEWER - PROTECTED | 68 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
X012020275A74 | 2020-10-01 | 2020-10-30 | REPAIR SEWER | BRONXWOOD AVENUE, BRONX, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET |
B012020275B04 | 2020-10-01 | 2020-10-30 | REPAIR WATER | WEIRFIELD STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
B012020274A63 | 2020-09-30 | 2020-10-24 | REPAIR SEWER | MAC DOUGAL STREET, BROOKLYN, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD |
B012020273A80 | 2020-09-29 | 2020-10-16 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012020273C03 | 2020-09-29 | 2020-10-29 | REPAIR WATER - SEWER - PROTECTED | 72 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET |
B012020273A84 | 2020-09-29 | 2020-10-23 | REPAIR SEWER - PROTECTED | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020273A83 | 2020-09-29 | 2020-10-23 | REPAIR SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020273A82 | 2020-09-29 | 2020-10-30 | REPAIR WATER | GROVE PLACE, BROOKLYN, FROM STREET DEAD END TO STREET HANOVER PLACE |
B012020273A81 | 2020-09-29 | 2020-10-26 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020273A79 | 2020-09-29 | 2020-10-30 | REPAIR WATER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
M012020273A58 | 2020-09-29 | 2020-10-27 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
M012020273A54 | 2020-09-29 | 2020-10-27 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020269A43 | 2020-09-25 | 2020-10-23 | REPAIR WATER - SEWER | EAST 27 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
S012020268A37 | 2020-09-24 | 2020-10-16 | REPAIR SEWER - PROTECTED | RICHMOND ROAD, STATEN ISLAND, FROM STREET CUNARD PLACE TO STREET MARY STREET |
B012020265E00 | 2020-09-21 | 2020-10-20 | REPAIR WATER | HANCOCK STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE |
X012020261A59 | 2020-09-17 | 2020-10-16 | REPAIR WATER | EAST 135 STREET, BRONX, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE |
B012020261C18 | 2020-09-17 | 2020-10-20 | REPAIR WATER - SEWER | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE |
B012020261C15 | 2020-09-17 | 2020-10-16 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020261C12 | 2020-09-17 | 2020-10-16 | REPAIR WATER | 41 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
Q012020261C18 | 2020-09-17 | 2020-10-16 | REPAIR WATER - SEWER - PROTECTED | BEACH 12 STREET, QUEENS, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE |
M012020260B08 | 2020-09-16 | 2020-09-30 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
B012020260E37 | 2020-09-16 | 2020-10-12 | REPAIR WATER - SEWER | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012020260E36 | 2020-09-16 | 2020-10-12 | REPAIR SEWER - PROTECTED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET RYDER AVENUE |
B012020260E35 | 2020-09-16 | 2020-10-12 | REPAIR SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020260D82 | 2020-09-16 | 2020-10-10 | REPAIR SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012020260D81 | 2020-09-16 | 2020-10-15 | REPAIR WATER - SEWER | 60 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012020260B65 | 2020-09-16 | 2020-10-12 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020259C72 | 2020-09-15 | 2020-10-11 | REPAIR WATER | BRIGHAM STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012020259C74 | 2020-09-15 | 2020-10-11 | REPAIR WATER | AVENUE V, BROOKLYN, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET |
B012020259C73 | 2020-09-15 | 2020-10-11 | REPAIR WATER | KNAPP STREET, BROOKLYN, FROM STREET AVENUE V TO STREET BEND |
B012020258F81 | 2020-09-14 | 2020-10-13 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
Q012020255C29 | 2020-09-11 | 2020-10-09 | REPAIR WATER - SEWER - PROTECTED | 156 STREET, QUEENS, FROM STREET BEECH AVENUE TO STREET SANFORD AVENUE |
M012020255A93 | 2020-09-11 | 2020-09-28 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012020255C40 | 2020-09-11 | 2020-10-12 | REPAIR WATER | 55 AVENUE, QUEENS, FROM STREET BEND TO STREET JUSTICE AVENUE |
Q012020255C30 | 2020-09-11 | 2020-10-11 | REPAIR WATER - SEWER - PROTECTED | 221 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012020255C26 | 2020-09-11 | 2020-10-09 | REPAIR WATER - SEWER - PROTECTED | 46 ROAD, QUEENS, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY |
B012020253B48 | 2020-09-09 | 2020-09-22 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020253B46 | 2020-09-09 | 2020-09-30 | REPAIR WATER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
M012020253A60 | 2020-09-09 | 2020-10-08 | REPAIR SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M012020253A61 | 2020-09-09 | 2020-09-28 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012020253A62 | 2020-09-09 | 2020-10-08 | REPAIR SEWER | WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT |
B012020253B49 | 2020-09-09 | 2020-09-30 | REPAIR WATER | GROVE PLACE, BROOKLYN, FROM STREET DEAD END TO STREET HANOVER PLACE |
B012020253B47 | 2020-09-09 | 2020-09-22 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
Q012020252C04 | 2020-09-08 | 2020-09-29 | REPAIR WATER - SEWER - PROTECTED | 157 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012020252C05 | 2020-09-08 | 2020-09-26 | REPAIR WATER - SEWER - PROTECTED | 54 STREET, QUEENS, FROM STREET GRAND AVENUE TO STREET LONG ISLAND RAILROAD |
B012020248B27 | 2020-09-04 | 2020-10-02 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020246D06 | 2020-09-02 | 2020-10-01 | REPAIR SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
Q012020246A68 | 2020-09-02 | 2020-10-01 | REPAIR WATER | VERNON BOULEVARD, QUEENS, FROM STREET 35 AVENUE TO STREET 36 AVENUE |
B012020246D07 | 2020-09-02 | 2020-10-01 | REPAIR SEWER - PROTECTED | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020246D08 | 2020-09-02 | 2020-09-12 | REPAIR WATER - PROTECTED | AVENUE U, BROOKLYN, FROM STREET EAST 70 STREET TO STREET EAST 71 STREET |
B012020244A82 | 2020-09-02 | 2020-09-29 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE |
B012020245D05 | 2020-09-01 | 2020-09-27 | REPAIR WATER - SEWER | OVINGTON AVENUE, BROOKLYN, FROM STREET 7 AVENUE TO STREET STEWART AVENUE |
M012020244A33 | 2020-08-31 | 2020-09-29 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
B012020244B06 | 2020-08-31 | 2020-09-29 | REPAIR WATER - SEWER | WILLIAMS AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET EAST NEW YORK AVENUE |
B012020244A68 | 2020-08-31 | 2020-09-26 | REPAIR WATER - SEWER | EAST 27 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
Q012020244C24 | 2020-08-31 | 2020-09-29 | REPAIR WATER - SEWER - PROTECTED | 72 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET |
Q012020244C27 | 2020-08-31 | 2020-09-30 | REPAIR SEWER - PROTECTED | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
B012020244A67 | 2020-08-31 | 2020-09-20 | REPAIR WATER - SEWER | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE |
B012020244A54 | 2020-08-31 | 2020-09-25 | REPAIR WATER - SEWER - PROTECTED | REGENT PLACE, BROOKLYN, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE |
B012020241E11 | 2020-08-28 | 2020-09-28 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
B012020241E10 | 2020-08-28 | 2020-09-28 | REPAIR WATER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020241E12 | 2020-08-28 | 2020-09-28 | REPAIR WATER - SEWER - PROTECTED | 23 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012020240A99 | 2020-08-27 | 2020-09-15 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020239B52 | 2020-08-26 | 2020-09-24 | REPAIR WATER | ROCHESTER AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012020237C09 | 2020-08-24 | 2020-09-11 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012020234C05 | 2020-08-21 | 2020-09-17 | REPAIR WATER - SEWER | PROSPECT PLACE, BROOKLYN, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE |
B012020232A59 | 2020-08-19 | 2020-08-29 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012020232A51 | 2020-08-19 | 2020-09-12 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020232A58 | 2020-08-19 | 2020-09-12 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012020232A61 | 2020-08-19 | 2020-09-12 | REPAIR SEWER - PROTECTED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET RYDER AVENUE |
B012020232A53 | 2020-08-19 | 2020-09-12 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET BREVOORT PLACE TO STREET FULTON STREET |
B012020232A52 | 2020-08-19 | 2020-09-12 | REPAIR SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020230B42 | 2020-08-19 | 2020-09-01 | REPAIR WATER | BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET |
B012020232A60 | 2020-08-19 | 2020-09-12 | REPAIR WATER - SEWER | ALBANY AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
B012020230C01 | 2020-08-17 | 2020-09-05 | REPAIR WATER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B012020230C27 | 2020-08-17 | 2020-09-11 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012020230A59 | 2020-08-17 | 2020-09-12 | REPAIR WATER - PROTECTED | JEROME AVENUE, BRONX, FROM STREET MT HOPE PLACE TO STREET WEST 177 STREET |
M012020230A85 | 2020-08-17 | 2020-09-12 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
M012020230A86 | 2020-08-17 | 2020-08-23 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012020230A91 | 2020-08-17 | 2020-09-12 | REPAIR WATER | READE STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M012020230A92 | 2020-08-17 | 2020-09-08 | REPAIR SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
M012020230A93 | 2020-08-17 | 2020-09-08 | REPAIR SEWER | WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT |
M012020230A97 | 2020-08-17 | 2020-09-11 | REPAIR WATER | 7 AVENUE, MANHATTAN, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET |
Q012020230A85 | 2020-08-17 | 2020-08-30 | REPAIR WATER - SEWER - PROTECTED | 72 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET |
B012020230C38 | 2020-08-17 | 2020-09-06 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020230C02 | 2020-08-17 | 2020-09-05 | REPAIR WATER | GROVE PLACE, BROOKLYN, FROM STREET DEAD END TO STREET HANOVER PLACE |
Q012020227D98 | 2020-08-14 | 2020-09-10 | REPAIR WATER - SEWER | HUNTER STREET, QUEENS, FROM STREET 28 STREET TO STREET QNSBORO BR UP RY APR |
B012020226C03 | 2020-08-13 | 2020-09-11 | REPAIR WATER | EAST 71 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012020226C03 | 2020-08-13 | 2020-09-11 | REPAIR WATER - SEWER - PROTECTED | 221 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE |
Q012020224B91 | 2020-08-11 | 2020-09-06 | REPAIR WATER - SEWER - PROTECTED | 157 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
Q012020224B82 | 2020-08-11 | 2020-09-09 | REPAIR WATER - SEWER - PROTECTED | 54 STREET, QUEENS, FROM STREET GRAND AVENUE TO STREET LONG ISLAND RAILROAD |
Q012020223B25 | 2020-08-10 | 2020-09-12 | REPAIR WATER | 55 AVENUE, QUEENS, FROM STREET BEND TO STREET JUSTICE AVENUE |
B012020223A77 | 2020-08-10 | 2020-08-22 | REPAIR SEWER - PROTECTED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY |
B012020220D14 | 2020-08-07 | 2020-09-08 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
M012020220A88 | 2020-08-07 | 2020-09-02 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012020220E47 | 2020-08-07 | 2020-08-31 | REPAIR SEWER - PROTECTED | MAIN STREET, QUEENS, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE |
M012020220A86 | 2020-08-07 | 2020-09-05 | REPAIR WATER - SEWER - PROTECTED | WEST 40 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020220D16 | 2020-08-07 | 2020-08-30 | REPAIR WATER - SEWER - PROTECTED | 23 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012020220D22 | 2020-08-07 | 2020-08-29 | REPAIR SEWER - PROTECTED | BATCHELDER STREET, BROOKLYN, FROM STREET EMMONS AVENUE TO STREET GUNNISON COURT |
B012020220D15 | 2020-08-07 | 2020-09-07 | REPAIR WATER - SEWER | HART STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012020220A21 | 2020-08-07 | 2020-09-01 | REPAIR WATER - SEWER - PROTECTED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012020217A96 | 2020-08-04 | 2020-09-02 | REPAIR WATER - SEWER - PROTECTED | REGENT PLACE, BROOKLYN, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE |
B012020216C25 | 2020-08-03 | 2020-08-18 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
M012020216A72 | 2020-08-03 | 2020-08-30 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
M012020216A74 | 2020-08-03 | 2020-08-16 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020216C26 | 2020-08-03 | 2020-08-30 | REPAIR WATER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020216C28 | 2020-08-03 | 2020-09-01 | REPAIR SEWER | MOORE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012020216C29 | 2020-08-03 | 2020-08-10 | REPAIR WATER | MANHATTAN AVENUE, BROOKLYN, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE |
B012020216C33 | 2020-08-03 | 2020-09-01 | REPAIR WATER - SEWER | ERASMUS STREET, BROOKLYN, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE |
B012020216C34 | 2020-08-03 | 2020-08-08 | REPAIR WATER - SEWER | HART STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
M012020212A85 | 2020-07-30 | 2020-08-13 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020211B96 | 2020-07-29 | 2020-08-22 | REPAIR SEWER - PROTECTED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY |
B012020211B95 | 2020-07-29 | 2020-08-29 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020211B97 | 2020-07-29 | 2020-08-15 | REPAIR SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
X012020211A83 | 2020-07-29 | 2020-08-17 | REPAIR WATER | EAST 162 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE |
B012020210A46 | 2020-07-28 | 2020-08-26 | REPAIR WATER - SEWER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
B012020210A49 | 2020-07-28 | 2020-08-25 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET BREVOORT PLACE TO STREET FULTON STREET |
B012020210A47 | 2020-07-28 | 2020-08-26 | REPAIR WATER - SEWER - PROTECTED | UNION STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012020209A36 | 2020-07-27 | 2020-08-24 | REPAIR SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
M012020206A26 | 2020-07-24 | 2020-08-18 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
B012020206A69 | 2020-07-24 | 2020-08-20 | REPAIR WATER - SEWER - PROTECTED | JEFFERSON AVENUE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012020206B41 | 2020-07-24 | 2020-08-14 | REPAIR WATER | ROCHESTER AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012020206B47 | 2020-07-24 | 2020-08-20 | REPAIR WATER - SEWER | HART STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012020206B51 | 2020-07-24 | 2020-08-15 | REPAIR WATER - PROTECTED | GRAHAM AVENUE, BROOKLYN, FROM STREET MOORE STREET TO STREET SEIGEL STREET |
B012020203A79 | 2020-07-21 | 2020-08-14 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020203A75 | 2020-07-21 | 2020-08-20 | REPAIR WATER - SEWER - PROTECTED | PENN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012020202B22 | 2020-07-20 | 2020-08-14 | REPAIR WATER - PROTECTED | 60 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012020202B21 | 2020-07-20 | 2020-08-15 | REPAIR WATER | MACON STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET VERONA PLACE |
B012020202B20 | 2020-07-20 | 2020-08-15 | REPAIR WATER - SEWER | GREENE AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M012020202A87 | 2020-07-20 | 2020-08-14 | REPAIR WATER | READE STREET, MANHATTAN, FROM STREET BROADWAY TO STREET CHURCH STREET |
M012020202A85 | 2020-07-20 | 2020-08-14 | REPAIR WATER - SEWER - PROTECTED | EAST 101 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
Q012020202B18 | 2020-07-20 | 2020-08-17 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020199B62 | 2020-07-17 | 2020-08-01 | REPAIR WATER | LEXINGTON AVENUE, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
M012020197A75 | 2020-07-15 | 2020-08-08 | REPAIR SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
B012020197A63 | 2020-07-15 | 2020-07-31 | REPAIR WATER - SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
B012020197A79 | 2020-07-15 | 2020-08-09 | REPAIR WATER - SEWER - PROTECTED | 23 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012020197A83 | 2020-07-15 | 2020-08-08 | REPAIR WATER - PROTECTED | LEWIS AVENUE, BROOKLYN, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET |
B012020197A86 | 2020-07-15 | 2020-08-13 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012020197A87 | 2020-07-15 | 2020-08-13 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020197A89 | 2020-07-15 | 2020-08-03 | REPAIR WATER - SEWER | MANHATTAN AVENUE, BROOKLYN, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE |
B012020197A90 | 2020-07-15 | 2020-08-09 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012020197A91 | 2020-07-15 | 2020-08-07 | REPAIR WATER - SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
Q012020197A98 | 2020-07-15 | 2020-08-04 | REPAIR WATER | PLAINVIEW AVENUE, QUEENS, FROM STREET BEACH 19 STREET TO STREET BEACH 20 STREET |
Q012020197A97 | 2020-07-15 | 2020-08-08 | REPAIR WATER - SEWER | 192 STREET, QUEENS, FROM STREET 44 AVENUE TO STREET 45 AVENUE |
Q012020197A96 | 2020-07-15 | 2020-08-08 | REPAIR WATER - SEWER - PROTECTED | 72 AVENUE, QUEENS, FROM STREET 161 STREET TO STREET 162 STREET |
Q012020197A90 | 2020-07-15 | 2020-08-13 | REPAIR WATER | 55 AVENUE, QUEENS, FROM STREET BEND TO STREET JUSTICE AVENUE |
M012020192A36 | 2020-07-15 | 2020-07-13 | REPAIR WATER - PROTECTED | AMSTERDAM AVENUE, MANHATTAN, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET |
M012020197A76 | 2020-07-15 | 2020-08-08 | REPAIR SEWER | WEST 40 STREET, MANHATTAN, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT |
B012020197A88 | 2020-07-15 | 2020-08-02 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012020196A89 | 2020-07-14 | 2020-07-31 | REPAIR SEWER | MOORE STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012020188B46 | 2020-07-06 | 2020-07-30 | REPAIR WATER - SEWER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET |
Q012020188A61 | 2020-07-06 | 2020-07-18 | REPAIR WATER - SEWER - PROTECTED | SENECA AVENUE, QUEENS, FROM STREET HARMAN STREET TO STREET HIMROD STREET |
B012020188B45 | 2020-07-06 | 2020-07-30 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020188A84 | 2020-07-06 | 2020-07-30 | REPAIR WATER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE |
B012020188A78 | 2020-07-06 | 2020-07-31 | REPAIR WATER - PROTECTED | HOOPER STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012020188A77 | 2020-07-06 | 2020-07-31 | REPAIR WATER - SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
M012020188A22 | 2020-07-06 | 2020-08-01 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
M012020188A25 | 2020-07-06 | 2020-07-30 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012020188A26 | 2020-07-06 | 2020-07-30 | REPAIR WATER - SEWER | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020184A73 | 2020-07-06 | 2020-07-18 | REPAIR WATER | HART STREET, BROOKLYN, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE |
B012020182A49 | 2020-07-06 | 2020-07-29 | REPAIR WATER - PROTECTED | WILSON AVENUE, BROOKLYN, FROM STREET COVERT STREET TO STREET SCHAEFER STREET |
Q012020188A95 | 2020-07-06 | 2020-07-18 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012020188A96 | 2020-07-06 | 2020-07-18 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
B012020184A92 | 2020-07-02 | 2020-07-18 | REPAIR SEWER - PROTECTED | CALYER STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012020182A95 | 2020-06-30 | 2020-07-18 | REPAIR WATER - SEWER | FRANKLIN STREET, BROOKLYN, FROM STREET CALYER STREET TO STREET QUAY STREET |
B012020182B00 | 2020-06-30 | 2020-07-10 | REPAIR WATER | HALSEY STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012020182B84 | 2020-06-30 | 2020-07-28 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
M012020182A93 | 2020-06-30 | 2020-08-02 | REPAIR SEWER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
B012020182B23 | 2020-06-30 | 2020-07-22 | REPAIR WATER - SEWER | 38 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY |
B012020182A96 | 2020-06-30 | 2020-07-18 | REPAIR WATER - SEWER | QUAY STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET WEST STREET |
B012020181B00 | 2020-06-29 | 2020-07-18 | REPAIR WATER - SEWER - PROTECTED | 11 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012020178B33 | 2020-06-26 | 2020-07-25 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET KINGS HIGHWAY |
B012020177A14 | 2020-06-25 | 2020-07-01 | REPAIR WATER - SEWER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012020176B61 | 2020-06-24 | 2020-07-05 | REPAIR WATER - SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020176A31 | 2020-06-24 | 2020-07-01 | REPAIR WATER | BAYARD STREET, BROOKLYN, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE |
B012020176A34 | 2020-06-24 | 2020-07-12 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012020176B64 | 2020-06-24 | 2020-07-22 | REPAIR WATER - PROTECTED | BUSHWICK AVENUE, BROOKLYN, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE |
B012020176A33 | 2020-06-24 | 2020-07-14 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012020176A32 | 2020-06-24 | 2020-07-16 | REPAIR WATER | STERLING PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
M012020176A44 | 2020-06-24 | 2020-07-18 | REPAIR WATER - SEWER - PROTECTED | EAST 101 STREET, MANHATTAN, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE |
B012020175D85 | 2020-06-23 | 2020-07-11 | REPAIR SEWER | VAN SICKLEN STREET, BROOKLYN, FROM STREET AVENUE S TO STREET LLOYD COURT |
B012020174A31 | 2020-06-22 | 2020-07-10 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012020174A43 | 2020-06-22 | 2020-07-14 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020174A38 | 2020-06-22 | 2020-07-17 | REPAIR WATER | ATLANTIC AVENUE, BROOKLYN, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE |
B012020174A33 | 2020-06-22 | 2020-07-14 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012020174A32 | 2020-06-22 | 2020-07-15 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020174A54 | 2020-06-22 | 2020-07-22 | REPAIR WATER - SEWER | 38 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY |
Q012020174A64 | 2020-06-22 | 2020-06-28 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
M012020174A68 | 2020-06-22 | 2020-07-20 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
X012020170A87 | 2020-06-18 | 2020-07-15 | REPAIR WATER | EAST 162 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE |
Q012020169A81 | 2020-06-17 | 2020-07-16 | REPAIR WATER | BEACH 19 STREET, QUEENS, FROM STREET PLAINVIEW AVENUE TO STREET SEAGIRT BOULEVARD |
Q012020169A82 | 2020-06-17 | 2020-07-15 | REPAIR WATER | PLAINVIEW AVENUE, QUEENS, FROM STREET BEACH 19 STREET TO STREET BEACH 20 STREET |
B012020169A52 | 2020-06-17 | 2020-07-14 | REPAIR WATER | BAYARD STREET, BROOKLYN, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE |
B012020164C44 | 2020-06-12 | 2020-07-11 | REPAIR WATER - SEWER | MANHATTAN AVENUE, BROOKLYN, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE |
Q012020163A24 | 2020-06-11 | 2020-06-24 | REPAIR WATER - SEWER - PROTECTED | BEACH 146 STREET, QUEENS, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD |
M012020163A38 | 2020-06-11 | 2020-06-27 | REPAIR WATER | WEST 92 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
Q012020163A17 | 2020-06-11 | 2020-06-28 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020155A41 | 2020-06-11 | 2020-06-30 | REPAIR WATER | BLEECKER STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012020162A62 | 2020-06-10 | 2020-06-24 | REPAIR WATER - SEWER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012020161A01 | 2020-06-09 | 2020-06-28 | REPAIR WATER - SEWER - PROTECTED | 11 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
B012020157B38 | 2020-06-05 | 2020-07-04 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE |
B012020157B37 | 2020-06-05 | 2020-07-04 | REPAIR WATER - SEWER | HASTINGS STREET, BROOKLYN, FROM STREET HAMPTON AVENUE TO STREET SHORE BOULEVARD |
B012020157C82 | 2020-06-05 | 2020-07-07 | REPAIR SEWER | SHORE BOULEVARD, BROOKLYN, FROM STREET GIRARD STREET TO STREET HASTINGS STREET |
M012020157A70 | 2020-06-05 | 2020-06-25 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
M012020157B27 | 2020-06-05 | 2020-07-04 | REPAIR SEWER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
B012020156A86 | 2020-06-04 | 2020-07-01 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD |
M012020156A56 | 2020-06-04 | 2020-07-01 | REPAIR WATER - PROTECTED | WEST 43 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020156A85 | 2020-06-04 | 2020-06-24 | REPAIR WATER - SEWER - PROTECTED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020150A02 | 2020-06-02 | 2020-06-27 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET INGRAHAM STREET TO STREET SCOTT AVENUE |
B012020153B48 | 2020-06-01 | 2020-06-30 | REPAIR WATER - SEWER | EAST 34 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012020153B51 | 2020-06-01 | 2020-06-30 | REPAIR WATER - SEWER - PROTECTED | BROOKLYN AVENUE, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012020150A17 | 2020-05-29 | 2020-06-27 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012020150B33 | 2020-05-29 | 2020-06-10 | REPAIR WATER - SEWER | JEFFERSON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012020149C16 | 2020-05-28 | 2020-06-24 | REPAIR WATER - SEWER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012020149C15 | 2020-05-28 | 2020-06-23 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020149C00 | 2020-05-28 | 2020-06-25 | REPAIR WATER | STERLING PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE |
B012020149C18 | 2020-05-28 | 2020-06-25 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012020149C14 | 2020-05-28 | 2020-06-24 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012020147A32 | 2020-05-26 | 2020-06-24 | REPAIR WATER - SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020143B63 | 2020-05-22 | 2020-06-23 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020143B65 | 2020-05-22 | 2020-06-18 | REPAIR SEWER - PROTECTED | UNION STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020143B60 | 2020-05-22 | 2020-06-24 | REPAIR WATER | BAYARD STREET, BROOKLYN, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE |
B012020143B61 | 2020-05-22 | 2020-06-23 | REPAIR WATER - SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020143B64 | 2020-05-22 | 2020-06-23 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012020142B50 | 2020-05-21 | 2020-06-19 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012020142B49 | 2020-05-21 | 2020-06-19 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020140A33 | 2020-05-19 | 2020-06-17 | REPAIR SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
B012020139B04 | 2020-05-18 | 2020-06-16 | REPAIR WATER - SEWER | ALBANY AVENUE, BROOKLYN, FROM STREET BERGEN STREET TO STREET DEAN STREET |
B012020139A29 | 2020-05-18 | 2020-06-15 | REPAIR WATER | KOSCIUSKO STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012020139B01 | 2020-05-18 | 2020-06-13 | REPAIR WATER - SEWER | 42 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012020135B07 | 2020-05-14 | 2020-06-06 | REPAIR WATER - SEWER - PROTECTED | PARK AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET |
B012020132B09 | 2020-05-11 | 2020-06-09 | REPAIR WATER - SEWER - PROTECTED | 11 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
M012020132A44 | 2020-05-11 | 2020-06-06 | REPAIR WATER | WEST 92 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
Q012020132A54 | 2020-05-11 | 2020-06-09 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012020132A55 | 2020-05-11 | 2020-06-15 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
B012020125A87 | 2020-05-04 | 2020-06-03 | REPAIR WATER - SEWER - PROTECTED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020125A85 | 2020-05-04 | 2020-06-05 | REPAIR WATER - SEWER | PARKVILLE AVENUE, BROOKLYN, FROM STREET EAST 8 STREET TO STREET OCEAN PARKWAY |
B012020125A86 | 2020-05-04 | 2020-05-20 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020121A50 | 2020-04-30 | 2020-05-25 | REPAIR WATER - SEWER - PROTECTED | UNION AVENUE, BROOKLYN, FROM STREET JACKSON STREET TO STREET WITHERS STREET |
B012020119A37 | 2020-04-28 | 2020-05-25 | REPAIR WATER | BAYARD STREET, BROOKLYN, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE |
B012020119A38 | 2020-04-28 | 2020-05-25 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012020113A29 | 2020-04-28 | 2020-05-21 | REPAIR WATER | CONOVER STREET, BROOKLYN, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET |
B012020114A89 | 2020-04-23 | 2020-05-26 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012020114A77 | 2020-04-23 | 2020-05-25 | REPAIR WATER - SEWER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012020114A84 | 2020-04-23 | 2020-05-24 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
B012020114A83 | 2020-04-23 | 2020-05-25 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012020114A22 | 2020-04-23 | 2020-05-23 | REPAIR WATER - SEWER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE |
Q012020114B74 | 2020-04-23 | 2020-05-16 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
B012020114A74 | 2020-04-23 | 2020-05-24 | REPAIR WATER - SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020114A85 | 2020-04-23 | 2020-04-26 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012020114A75 | 2020-04-23 | 2020-05-16 | REPAIR WATER | KOSCIUSKO STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012020114A76 | 2020-04-23 | 2020-05-24 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020114A86 | 2020-04-23 | 2020-05-25 | REPAIR WATER - SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
M012020112A54 | 2020-04-21 | 2020-05-26 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020111C38 | 2020-04-20 | 2020-05-21 | REPAIR WATER - SEWER | JEFFERSON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
Q012020106B66 | 2020-04-15 | 2020-05-06 | REPAIR WATER - SEWER - PROTECTED | BEACH 146 STREET, QUEENS, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD |
B012020106B63 | 2020-04-15 | 2020-05-20 | REPAIR SEWER - PROTECTED | LUQUER STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012020101A58 | 2020-04-10 | 2020-05-04 | REPAIR WATER - SEWER - PROTECTED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020101A57 | 2020-04-10 | 2020-05-16 | REPAIR WATER - SEWER | LEXINGTON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
Q012020098B01 | 2020-04-07 | 2020-05-10 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012020097A67 | 2020-04-06 | 2020-05-07 | REPAIR WATER | WEST 92 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020094B21 | 2020-04-03 | 2020-04-23 | REPAIR WATER - SEWER | NORTH 5 STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET |
B012020094B19 | 2020-04-03 | 2020-04-25 | REPAIR WATER - SEWER | JEFFERSON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012020094B18 | 2020-04-03 | 2020-04-26 | REPAIR WATER - SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
B012020094B17 | 2020-04-03 | 2020-04-26 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012020094B15 | 2020-04-03 | 2020-05-06 | REPAIR WATER - SEWER | PARKVILLE AVENUE, BROOKLYN, FROM STREET EAST 8 STREET TO STREET OCEAN PARKWAY |
X012020094A36 | 2020-04-03 | 2020-04-23 | REPAIR WATER - SEWER - PROTECTED | TELLER AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE |
B012020094B22 | 2020-04-03 | 2020-04-24 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE |
M012020094A87 | 2020-04-03 | 2020-05-06 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020094B20 | 2020-04-03 | 2020-04-25 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012020092A51 | 2020-04-01 | 2020-05-01 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020092A54 | 2020-04-01 | 2020-04-24 | REPAIR WATER - SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020092A53 | 2020-04-01 | 2020-04-25 | REPAIR WATER - SEWER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012020092A55 | 2020-04-01 | 2020-04-24 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020090D19 | 2020-03-30 | 2020-04-26 | REPAIR WATER | KOSCIUSKO STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD |
B012020090C83 | 2020-03-30 | 2020-04-17 | REPAIR WATER - SEWER | LEXINGTON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012020090D18 | 2020-03-30 | 2020-04-29 | REPAIR WATER | BAYARD STREET, BROOKLYN, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE |
Q012020087A78 | 2020-03-27 | 2020-04-26 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
B012020087C00 | 2020-03-27 | 2020-04-12 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012020087B99 | 2020-03-27 | 2020-04-22 | REPAIR WATER - SEWER | PARKVILLE AVENUE, BROOKLYN, FROM STREET EAST 8 STREET TO STREET OCEAN PARKWAY |
M012020087A68 | 2020-03-27 | 2020-04-13 | REPAIR WATER - SEWER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020087C02 | 2020-03-27 | 2020-04-12 | REPAIR WATER - SEWER | FOSTER AVENUE, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
Q012020085C21 | 2020-03-25 | 2020-04-10 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020080A44 | 2020-03-24 | 2020-04-18 | REPAIR WATER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE |
B012020084D21 | 2020-03-24 | 2020-04-11 | REPAIR WATER - SEWER | JEFFERSON STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
X012020084A50 | 2020-03-24 | 2020-04-22 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
M012020084A65 | 2020-03-24 | 2020-04-22 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020083C54 | 2020-03-23 | 2020-04-10 | REPAIR WATER - SEWER - PROTECTED | 11 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE |
Q012020083B33 | 2020-03-23 | 2020-04-22 | REPAIR WATER - SEWER - PROTECTED | BEACH 146 STREET, QUEENS, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD |
Q012020083B34 | 2020-03-23 | 2020-04-17 | REPAIR SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012020083C53 | 2020-03-23 | 2020-04-03 | REPAIR WATER - SEWER | LEXINGTON AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012020080A43 | 2020-03-20 | 2020-04-17 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020073G42 | 2020-03-18 | 2020-04-11 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012020077C07 | 2020-03-17 | 2020-04-14 | REPAIR WATER - SEWER - PROTECTED | EAST 2 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020077C01 | 2020-03-17 | 2020-04-14 | REPAIR WATER - SEWER - PROTECTED | PARK AVENUE, BROOKLYN, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET |
M012020077A28 | 2020-03-17 | 2020-04-07 | REPAIR WATER | WEST 92 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020077B14 | 2020-03-17 | 2020-04-07 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012020077B15 | 2020-03-17 | 2020-04-14 | REPAIR SEWER | 41 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020077B18 | 2020-03-17 | 2020-04-10 | REPAIR WATER - SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020077C09 | 2020-03-17 | 2020-04-14 | REPAIR WATER - SEWER | JACKSON STREET, BROOKLYN, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD |
B012020077C05 | 2020-03-17 | 2020-04-11 | REPAIR WATER - SEWER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
Q012020076C23 | 2020-03-16 | 2020-03-27 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
B012020071A25 | 2020-03-16 | 2020-03-31 | REPAIR WATER | CLINTON AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE |
B012020073A06 | 2020-03-13 | 2020-04-11 | REPAIR SEWER - PROTECTED | 51 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012020073A06 | 2020-03-13 | 2020-04-10 | REPAIR WATER - SEWER | ROOSEVELT AVENUE, QUEENS, FROM STREET 147 STREET TO STREET 149 STREET |
B012020073A07 | 2020-03-13 | 2020-04-11 | REPAIR WATER - SEWER | 46 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020070A86 | 2020-03-13 | 2020-03-31 | REPAIR WATER | 91 STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD |
B012020073A11 | 2020-03-13 | 2020-04-02 | REPAIR WATER - PROTECTED | STERLING PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY |
X012020070C53 | 2020-03-10 | 2020-03-22 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
B012020070E15 | 2020-03-10 | 2020-04-10 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
Q012020070B50 | 2020-03-10 | 2020-03-28 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012020070B62 | 2020-03-10 | 2020-04-03 | REPAIR WATER - SEWER | WEST 76 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE |
B012020069D34 | 2020-03-09 | 2020-04-02 | REPAIR WATER - SEWER - PROTECTED | LEXINGTON AVENUE, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012020066D77 | 2020-03-06 | 2020-04-08 | REPAIR WATER - SEWER - PROTECTED | AINSLIE STREET, BROOKLYN, FROM STREET KEAP STREET TO STREET RODNEY STREET |
B012020066D29 | 2020-03-06 | 2020-04-02 | REPAIR WATER | HEYWARD STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE |
B012020065A29 | 2020-03-05 | 2020-03-21 | REPAIR WATER - SEWER | NEWKIRK AVENUE, BROOKLYN, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE |
B012020065A16 | 2020-03-05 | 2020-03-24 | REPAIR WATER - SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012020063B31 | 2020-03-03 | 2020-03-25 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD |
M012020062A29 | 2020-03-02 | 2020-03-26 | REPAIR WATER - SEWER | YORK AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
B012020062A80 | 2020-03-02 | 2020-03-26 | REPAIR WATER - SEWER | 4 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B012020062A78 | 2020-03-02 | 2020-03-26 | REPAIR WATER - SEWER - PROTECTED | MOTHER GASTON BOULEVARD, BROOKLYN, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE |
B012020062A81 | 2020-03-02 | 2020-03-26 | REPAIR SEWER - PROTECTED | WASHINGTON AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE |
M012020062B23 | 2020-03-02 | 2020-03-31 | REPAIR WATER - SEWER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020059D62 | 2020-02-28 | 2020-03-26 | REPAIR WATER - SEWER | STANHOPE STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE |
B012020058E40 | 2020-02-27 | 2020-03-26 | REPAIR WATER - SEWER | HEWES STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE |
Q012020058B70 | 2020-02-27 | 2020-03-17 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
M012020058B40 | 2020-02-27 | 2020-03-26 | REPAIR WATER - SEWER | YORK AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012020058B39 | 2020-02-27 | 2020-03-25 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012020057E78 | 2020-02-26 | 2020-03-25 | REPAIR WATER | PROSPECT PARK WEST, BROOKLYN, FROM STREET 15 STREET TO STREET BEND |
X012020056B33 | 2020-02-25 | 2020-03-11 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
B012020056B78 | 2020-02-25 | 2020-03-10 | REPAIR WATER - PROTECTED | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012020056B74 | 2020-02-25 | 2020-03-25 | REPAIR WATER - SEWER - PROTECTED | SKILLMAN STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
B012020056B73 | 2020-02-25 | 2020-03-01 | REPAIR WATER | 39 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020056B72 | 2020-02-25 | 2020-03-10 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
B012020056B71 | 2020-02-25 | 2020-03-11 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020056B70 | 2020-02-25 | 2020-03-12 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012020056B06 | 2020-02-25 | 2020-03-09 | REPAIR WATER - SEWER - PROTECTED | AINSLIE STREET, BROOKLYN, FROM STREET KEAP STREET TO STREET RODNEY STREET |
B012020050B00 | 2020-02-19 | 2020-03-18 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012020050A30 | 2020-02-19 | 2020-03-18 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012020045A22 | 2020-02-14 | 2020-03-14 | REPAIR SEWER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
X012020045A05 | 2020-02-14 | 2020-02-28 | REPAIR SEWER | EAST 135 STREET, BRONX, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE |
B012020044D08 | 2020-02-13 | 2020-03-10 | REPAIR WATER - PROTECTED | CONEY ISLAND AVENUE, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012020044C47 | 2020-02-13 | 2020-03-16 | REPAIR WATER - SEWER - PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
X012020044A26 | 2020-02-13 | 2020-03-10 | REPAIR WATER - SEWER - PROTECTED | DAVIDSON AVENUE, BRONX, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE |
Q012020044B72 | 2020-02-13 | 2020-03-14 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020044D10 | 2020-02-13 | 2020-03-10 | REPAIR SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
B012020042C33 | 2020-02-11 | 2020-03-10 | REPAIR WATER - SEWER | EAST 9 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012020042C18 | 2020-02-11 | 2020-03-09 | REPAIR WATER - SEWER - PROTECTED | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012020038B00 | 2020-02-07 | 2020-03-10 | REPAIR SEWER - PROTECTED | 12 AVENUE, BROOKLYN, FROM STREET 38 STREET TO STREET 39 STREET |
B012020038B10 | 2020-02-07 | 2020-03-10 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY |
Q012020037B04 | 2020-02-06 | 2020-03-03 | REPAIR SEWER | PARSONS BOULEVARD, QUEENS, FROM STREET ASH AVENUE TO STREET BEECH AVENUE |
B012020037A97 | 2020-02-06 | 2020-02-22 | REPAIR WATER | PROSPECT PARK WEST, BROOKLYN, FROM STREET 15 STREET TO STREET BEND |
Q012020037A99 | 2020-02-06 | 2020-02-22 | REPAIR SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
Q012020037B01 | 2020-02-06 | 2020-03-03 | REPAIR WATER - SEWER | AVERY AVENUE, QUEENS, FROM STREET 131 STREET TO STREET BEND |
M012020037A38 | 2020-02-06 | 2020-02-23 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
Q012020037B02 | 2020-02-06 | 2020-03-03 | REPAIR WATER - SEWER | 131 STREET, QUEENS, FROM STREET FOWLER PATH TO STREET AVERY AVENUE |
M012020035B46 | 2020-02-04 | 2020-03-03 | REPAIR SEWER - PROTECTED | WEST 41 STREET, MANHATTAN, FROM STREET 10 AVENUE TO STREET DYER AVENUE |
B012020035B44 | 2020-02-04 | 2020-03-03 | REPAIR WATER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012020034C49 | 2020-02-03 | 2020-03-03 | REPAIR WATER - SEWER - PROTECTED | AVENUE J, BROOKLYN, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET |
Q012020031A78 | 2020-01-31 | 2020-02-13 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012020031C10 | 2020-01-31 | 2020-02-15 | REPAIR WATER - SEWER - PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012020031C03 | 2020-01-31 | 2020-02-27 | REPAIR WATER - SEWER | NOSTRAND AVENUE, BROOKLYN, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE |
B012020030A63 | 2020-01-30 | 2020-02-27 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
X012020028A19 | 2020-01-28 | 2020-02-26 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
Q012020028A70 | 2020-01-28 | 2020-02-23 | REPAIR WATER - PROTECTED | 48 AVENUE, QUEENS, FROM STREET 92 STREET TO STREET 93 STREET |
M012020028A11 | 2020-01-28 | 2020-02-13 | REPAIR SEWER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012020028E26 | 2020-01-28 | 2020-02-08 | REPAIR WATER | PROSPECT PARK WEST, BROOKLYN, FROM STREET 15 STREET TO STREET BEND |
B012020028C11 | 2020-01-28 | 2020-02-26 | REPAIR WATER - SEWER - PROTECTED | LYNCH STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012020028C10 | 2020-01-28 | 2020-02-26 | REPAIR WATER - SEWER - PROTECTED | RUTLAND ROAD, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012020028B80 | 2020-01-28 | 2020-02-26 | REPAIR WATER - SEWER | MALCOLM X BOULEVARD, BROOKLYN, FROM STREET JEFFERSON AVENUE TO STREET PUTNAM AVENUE |
B012020028B03 | 2020-01-28 | 2020-02-26 | REPAIR WATER | BEDFORD AVENUE, BROOKLYN, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET |
B012020028A74 | 2020-01-28 | 2020-02-26 | REPAIR WATER | PUTNAM AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012020027B05 | 2020-01-27 | 2020-02-22 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
M012020027A42 | 2020-01-27 | 2020-02-21 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
B012019364B93 | 2020-01-24 | 2020-01-28 | REPAIR WATER | PUTNAM AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012020023B57 | 2020-01-23 | 2020-02-21 | REPAIR WATER | ROGERS AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012020023B37 | 2020-01-23 | 2020-02-18 | REPAIR WATER - PROTECTED | CHAUNCEY STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
B012020023A48 | 2020-01-23 | 2020-02-21 | REPAIR WATER | 39 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012020022F51 | 2020-01-22 | 2020-02-21 | REPAIR WATER - SEWER | EAST 4 STREET, BROOKLYN, FROM STREET AVENUE U TO STREET AVENUE V |
Q012020022A14 | 2020-01-22 | 2020-02-03 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012020022B22 | 2020-01-22 | 2020-02-21 | REPAIR WATER - SEWER | YORK AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
M012020017B07 | 2020-01-17 | 2020-01-30 | REPAIR WATER - SEWER | WEST 126 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012020017B08 | 2020-01-17 | 2020-01-31 | REPAIR SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012020017B45 | 2020-01-17 | 2020-02-15 | REPAIR WATER - SEWER - PROTECTED | 52 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET DAHILL ROAD |
B012020017B46 | 2020-01-17 | 2020-02-15 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE |
M012020017B06 | 2020-01-17 | 2020-02-09 | REPAIR WATER - SEWER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
X012020016A22 | 2020-01-16 | 2020-02-01 | REPAIR WATER - SEWER | LIBRARY AVENUE, BRONX, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE |
X012020016A64 | 2020-01-16 | 2020-02-14 | REPAIR SEWER | EAST 135 STREET, BRONX, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE |
Q012020013B15 | 2020-01-16 | 2020-02-11 | REPAIR WATER - PROTECTED | 15 DRIVE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
B012020016A58 | 2020-01-16 | 2020-02-08 | REPAIR WATER | PROSPECT PARK WEST, BROOKLYN, FROM STREET 15 STREET TO STREET BEND |
B012020014B65 | 2020-01-14 | 2020-01-29 | REPAIR WATER - SEWER | 58 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET DEAD END |
M012020013B59 | 2020-01-13 | 2020-02-09 | REPAIR WATER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
M012020013B72 | 2020-01-13 | 2020-02-09 | REPAIR WATER - SEWER | WEST 125 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET LENOX AVENUE |
B012020013C83 | 2020-01-13 | 2020-02-08 | REPAIR WATER - SEWER - PROTECTED | QUINCY STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
B012020013C29 | 2020-01-13 | 2020-02-08 | REPAIR WATER - SEWER - PROTECTED | MOFFAT STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012020008A56 | 2020-01-13 | 2020-02-06 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012020010B40 | 2020-01-10 | 2020-02-08 | REPAIR WATER - SEWER | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
M012020009A39 | 2020-01-09 | 2020-01-30 | REPAIR SEWER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012020006A97 | 2020-01-06 | 2020-02-01 | REPAIR WATER - SEWER - PROTECTED | ST JOHNS PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
Q012020006C57 | 2020-01-06 | 2020-01-22 | REPAIR WATER - SEWER - PROTECTED | 182 STREET, QUEENS, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE |
Q012020006C45 | 2020-01-06 | 2020-02-06 | REPAIR WATER - SEWER | DAVIS STREET, QUEENS, FROM STREET DEAD END TO STREET NYCTA SUBWAY |
B012020002C58 | 2020-01-02 | 2020-01-25 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019365C74 | 2019-12-31 | 2020-01-29 | REPAIR WATER - SEWER | 58 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET DEAD END |
B012019361A22 | 2019-12-31 | 2020-01-25 | REPAIR WATER | PUTNAM AVENUE, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012019360B20 | 2019-12-30 | 2020-01-24 | REPAIR WATER - PROTECTED | WILSON AVENUE, BROOKLYN, FROM STREET HARMAN STREET TO STREET HIMROD STREET |
B012019364E97 | 2019-12-30 | 2020-01-15 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012019364F04 | 2019-12-30 | 2020-01-31 | REPAIR WATER - SEWER - PROTECTED | CHURCH AVENUE, BROOKLYN, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET |
B012019360B01 | 2019-12-26 | 2020-01-08 | REPAIR WATER - SEWER - PROTECTED | POWERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET LORIMER STREET |
B012019357B46 | 2019-12-23 | 2020-01-03 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
Q012019357B17 | 2019-12-23 | 2020-01-07 | REPAIR WATER - SEWER | DAVIS STREET, QUEENS, FROM STREET DEAD END TO STREET NYCTA SUBWAY |
Q012019357B00 | 2019-12-23 | 2020-01-14 | REPAIR SEWER | I 678, QUEENS, FROM STREET WHITESTONE EXPRESSWAY ET 17 SB TO STREET BEND |
Q012019357A05 | 2019-12-23 | 2020-01-20 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012019357A04 | 2019-12-23 | 2020-01-18 | REPAIR WATER - PROTECTED | BLOSSOM AVENUE, QUEENS, FROM STREET MAIN STREET TO STREET SAULL STREET |
B012019357C02 | 2019-12-23 | 2020-01-09 | REPAIR WATER - SEWER | COOK STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET |
B012019357B47 | 2019-12-23 | 2020-01-21 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019357A07 | 2019-12-23 | 2020-01-14 | REPAIR WATER - PROTECTED | AVENUE I, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET |
X012019357A55 | 2019-12-23 | 2020-01-08 | REPAIR WATER - SEWER | DALY AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
X012019357A00 | 2019-12-23 | 2020-01-18 | REPAIR WATER - SEWER | LIBRARY AVENUE, BRONX, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE |
M012019353A72 | 2019-12-19 | 2020-01-17 | REPAIR WATER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE |
B012019351C08 | 2019-12-17 | 2020-01-15 | REPAIR SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE F TO STREET DITMAS AVENUE |
B012019346A17 | 2019-12-12 | 2020-01-07 | REPAIR WATER - SEWER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
B012019346A09 | 2019-12-12 | 2020-01-09 | REPAIR SEWER - PROTECTED | 55 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012019346A14 | 2019-12-12 | 2020-01-07 | REPAIR WATER - SEWER | VAN SICKLEN STREET, BROOKLYN, FROM STREET AVENUE S TO STREET LLOYD COURT |
B012019346A10 | 2019-12-12 | 2019-12-25 | REPAIR WATER | BOERUM STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012019346A16 | 2019-12-12 | 2020-01-07 | REPAIR WATER - PROTECTED | 3 STREET, BROOKLYN, FROM STREET HOYT STREET TO STREET SMITH STREET |
M012019345C09 | 2019-12-11 | 2019-12-18 | REPAIR WATER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE |
B012019344D61 | 2019-12-10 | 2020-01-08 | REPAIR WATER - PROTECTED | RALPH AVENUE, BROOKLYN, FROM STREET BAINBRIDGE STREET TO STREET CHAUNCEY STREET |
B012019343A32 | 2019-12-09 | 2020-01-07 | REPAIR SEWER - PROTECTED | 12 AVENUE, BROOKLYN, FROM STREET 38 STREET TO STREET 39 STREET |
B012019343A73 | 2019-12-09 | 2020-01-07 | REPAIR WATER - SEWER | QUINCY STREET, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET DOWNING STREET |
B012019343A72 | 2019-12-09 | 2020-01-07 | REPAIR WATER - SEWER | VERONICA PLACE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
Q012019340A24 | 2019-12-06 | 2019-12-21 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
X012019338A39 | 2019-12-04 | 2019-12-04 | REPAIR WATER - SEWER - PROTECTED | EAST 142 STREET, BRONX, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE |
M012019338A25 | 2019-12-04 | 2019-12-31 | REPAIR WATER - SEWER | YORK AVENUE, MANHATTAN, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET |
B012019337C26 | 2019-12-03 | 2019-12-31 | REPAIR WATER - SEWER | WILSON AVENUE, BROOKLYN, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET |
Q012019336B43 | 2019-12-02 | 2019-12-31 | REPAIR WATER - SEWER - PROTECTED | 182 STREET, QUEENS, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE |
B012019336E18 | 2019-12-02 | 2019-12-31 | REPAIR WATER | MADISON STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012019336E13 | 2019-12-02 | 2019-12-31 | REPAIR WATER - SEWER | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012019336E20 | 2019-12-02 | 2019-12-25 | REPAIR WATER - SEWER - PROTECTED | POWERS STREET, BROOKLYN, FROM STREET LEONARD STREET TO STREET LORIMER STREET |
B012019330C13 | 2019-11-26 | 2019-12-24 | REPAIR WATER - SEWER | EAST 28 STREET, BROOKLYN, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD |
B012019329D01 | 2019-11-25 | 2019-12-24 | REPAIR WATER - SEWER - PROTECTED | EAST 7 STREET, BROOKLYN, FROM STREET AVENUE O TO STREET AVENUE P |
B012019329D18 | 2019-11-25 | 2019-12-20 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019326B96 | 2019-11-22 | 2019-12-25 | REPAIR WATER - SEWER - PROTECTED | RUTLEDGE STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012019326B97 | 2019-11-22 | 2019-12-26 | REPAIR WATER - SEWER | COOK STREET, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET |
X012019326B73 | 2019-11-22 | 2019-12-25 | REPAIR WATER - SEWER | DALY AVENUE, BRONX, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET |
Q012019326C53 | 2019-11-22 | 2019-12-07 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012019326D64 | 2019-11-22 | 2019-12-24 | REPAIR WATER - SEWER | DAVIS STREET, QUEENS, FROM STREET DEAD END TO STREET NYCTA SUBWAY |
B012019322B22 | 2019-11-21 | 2019-12-06 | REPAIR WATER - PROTECTED | 60 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019323B49 | 2019-11-19 | 2019-12-18 | REPAIR WATER - SEWER | EAST 11 STREET, BROOKLYN, FROM STREET CORTELYOU ROAD TO STREET SLOCUM PLACE |
B012019322D43 | 2019-11-18 | 2019-12-18 | REPAIR WATER - SEWER | EAST 8 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
M012019322B08 | 2019-11-18 | 2019-12-18 | REPAIR WATER | WEST 187 STREET, MANHATTAN, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE |
B012019319A20 | 2019-11-15 | 2019-11-22 | REPAIR WATER - SEWER - PROTECTED | 3 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET HENRY STREET |
B012019318A12 | 2019-11-14 | 2019-12-11 | REPAIR WATER | BOERUM STREET, BROOKLYN, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE |
B012019318A14 | 2019-11-14 | 2019-11-28 | REPAIR WATER - SEWER | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
M012019318A04 | 2019-11-14 | 2019-12-11 | REPAIR WATER - PROTECTED | WEST 163 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE |
B012019318A32 | 2019-11-14 | 2019-12-14 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019318D96 | 2019-11-14 | 2019-11-17 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019318A16 | 2019-11-14 | 2019-11-28 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012019318A20 | 2019-11-14 | 2019-12-14 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019312B08 | 2019-11-08 | 2019-12-05 | REPAIR WATER - SEWER - PROTECTED | 19 AVENUE, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B012019311A35 | 2019-11-07 | 2019-12-05 | REPAIR WATER - SEWER | LORIMER STREET, BROOKLYN, FROM STREET GRAND STREET TO STREET MAUJER STREET |
Q012019311A85 | 2019-11-07 | 2019-11-14 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012019310C02 | 2019-11-06 | 2019-12-04 | REPAIR WATER | VILLAGE ROAD SOUTH, BROOKLYN, FROM STREET GRAVESEND CEMETERY BOUNDARY TO STREET MC DONALD AVENUE |
B012019310C83 | 2019-11-06 | 2019-12-05 | REPAIR WATER - SEWER | BROOKLYN AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012019305A05 | 2019-11-01 | 2019-11-14 | REPAIR WATER - SEWER | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET WOODBINE STREET |
B012019305A02 | 2019-11-01 | 2019-11-14 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE |
B012019305C22 | 2019-11-01 | 2019-11-14 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019305C38 | 2019-11-01 | 2019-11-14 | REPAIR WATER | MC DONALD AVENUE, BROOKLYN, FROM STREET GRAVESEND NECK ROAD TO STREET VILLAGE ROAD SOUTH |
B012019298A94 | 2019-10-25 | 2019-11-14 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019298C57 | 2019-10-25 | 2019-11-14 | REPAIR WATER - SEWER - PROTECTED | FARRAGUT ROAD, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET |
B012019297C64 | 2019-10-24 | 2019-11-14 | REPAIR WATER | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012019297B89 | 2019-10-24 | 2019-11-14 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012019295A81 | 2019-10-22 | 2019-11-14 | REPAIR WATER - SEWER | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T |
B012019295B48 | 2019-10-22 | 2019-10-31 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE |
B012019294B03 | 2019-10-21 | 2019-11-11 | REPAIR WATER - SEWER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012019294F40 | 2019-10-21 | 2019-11-04 | REPAIR WATER - SEWER | 59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019294B02 | 2019-10-21 | 2019-11-14 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
B012019291B70 | 2019-10-18 | 2019-11-14 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
S012019289A02 | 2019-10-16 | 2019-11-09 | REPAIR WATER | BUEL AVENUE, STATEN ISLAND, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD |
B012019289C14 | 2019-10-16 | 2019-11-13 | REPAIR WATER | 12 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012019288C45 | 2019-10-15 | 2019-11-07 | REPAIR WATER - SEWER - PROTECTED | WEST 122 STREET, MANHATTAN, FROM STREET MANHATTAN AVENUE TO STREET ST NICHOLAS AVENUE |
M012019288C44 | 2019-10-15 | 2019-11-14 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
M012019288C43 | 2019-10-15 | 2019-11-14 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
B012019283B02 | 2019-10-15 | 2019-10-31 | REPAIR WATER - PROTECTED | 16 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
X012019288A47 | 2019-10-15 | 2019-11-13 | REPAIR WATER - SEWER | WHITE PLAINS ROAD, BRONX, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET |
M012019288C47 | 2019-10-15 | 2019-10-26 | REPAIR WATER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012019288C46 | 2019-10-15 | 2019-11-07 | REPAIR WATER - SEWER | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET 8 AVENUE TO STREET WEST 122 STREET |
M012019288C42 | 2019-10-15 | 2019-11-14 | REPAIR WATER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012019284C52 | 2019-10-11 | 2019-11-04 | REPAIR WATER - SEWER | BROOKLYN AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
X012019284B12 | 2019-10-11 | 2019-11-02 | REPAIR WATER - PROTECTED | 3 AVENUE, BRONX, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET |
B012019284C53 | 2019-10-11 | 2019-11-07 | REPAIR WATER - SEWER | 87 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE |
B012019284C51 | 2019-10-11 | 2019-11-09 | REPAIR WATER | PROSPECT PARK WEST, BROOKLYN, FROM STREET 15 STREET TO STREET BEND |
B012019282A71 | 2019-10-09 | 2019-11-07 | REPAIR WATER - SEWER | 11 AVENUE, BROOKLYN, FROM STREET 85 STREET TO STREET 86 STREET |
B012019282A72 | 2019-10-09 | 2019-11-06 | REPAIR WATER | WEST 16 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012019280A35 | 2019-10-09 | 2019-10-31 | REPAIR WATER | EAST 14 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET ELM AVENUE |
Q012019282D38 | 2019-10-09 | 2019-11-07 | REPAIR WATER - SEWER - PROTECTED | 157 STREET, QUEENS, FROM STREET 43 AVENUE TO STREET 45 AVENUE |
B012019282A70 | 2019-10-09 | 2019-11-07 | REPAIR WATER | MALCOLM X BOULEVARD, BROOKLYN, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE |
B012019281D14 | 2019-10-08 | 2019-10-19 | REPAIR WATER - SEWER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
B012019281D12 | 2019-10-08 | 2019-10-27 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
Q012019281B99 | 2019-10-08 | 2019-11-08 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012019281D13 | 2019-10-08 | 2019-10-26 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE |
Q012019276F03 | 2019-10-03 | 2019-11-01 | REPAIR WATER - SEWER | 20 AVENUE, QUEENS, FROM STREET 149 STREET TO STREET 150 STREET |
B012019266D92 | 2019-09-26 | 2019-10-22 | REPAIR SEWER | AVENUE M, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
M012019269B01 | 2019-09-26 | 2019-10-24 | REPAIR SEWER - PROTECTED | WEST 29 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012019269A99 | 2019-09-26 | 2019-10-25 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
Q012019269C68 | 2019-09-26 | 2019-10-24 | REPAIR WATER - PROTECTED | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
M012019267B10 | 2019-09-24 | 2019-10-23 | REPAIR WATER - PROTECTED | 1 AVENUE, MANHATTAN, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET |
B012019267F67 | 2019-09-24 | 2019-10-23 | REPAIR WATER - SEWER | IRVING PLACE, BROOKLYN, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE |
B012019267F68 | 2019-09-24 | 2019-10-23 | REPAIR WATER - SEWER | EMMONS AVENUE, BROOKLYN, FROM STREET BATCHELDER STREET TO STREET BROWN STREET |
B012019267F69 | 2019-09-24 | 2019-10-22 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012019267B11 | 2019-09-24 | 2019-10-24 | REPAIR SEWER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012019267B12 | 2019-09-24 | 2019-10-23 | REPAIR WATER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
M012019267B13 | 2019-09-24 | 2019-10-21 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012019267F70 | 2019-09-24 | 2019-10-22 | REPAIR WATER - SEWER | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET WOODBINE STREET |
Q012019267C41 | 2019-09-24 | 2019-10-23 | REPAIR WATER - SEWER - PROTECTED | 233 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET 67 AVENUE |
Q012019267C46 | 2019-09-24 | 2019-10-23 | REPAIR WATER - SEWER | 255 STREET, QUEENS, FROM STREET 57 AVENUE TO STREET 58 AVENUE |
Q012019267C47 | 2019-09-24 | 2019-10-23 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012019262C75 | 2019-09-19 | 2019-10-18 | REPAIR WATER - SEWER - PROTECTED | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019262A57 | 2019-09-19 | 2019-10-18 | REPAIR WATER - SEWER - PROTECTED | 70 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012019262C74 | 2019-09-19 | 2019-10-21 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019261D18 | 2019-09-18 | 2019-10-18 | REPAIR WATER - SEWER | ROCHESTER AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
B012019260D12 | 2019-09-17 | 2019-09-28 | REPAIR WATER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
M012019260C12 | 2019-09-17 | 2019-10-17 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
M012019260C11 | 2019-09-17 | 2019-10-17 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019260C14 | 2019-09-17 | 2019-10-16 | REPAIR SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
M012019260C13 | 2019-09-17 | 2019-10-16 | REPAIR WATER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
B012019260D06 | 2019-09-17 | 2019-10-15 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
B012019260D08 | 2019-09-17 | 2019-10-15 | REPAIR WATER - SEWER | CARLTON AVENUE, BROOKLYN, FROM STREET BEND TO STREET CUMBERLAND WALK |
B012019260D07 | 2019-09-17 | 2019-10-15 | REPAIR WATER - SEWER | EAST 28 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012019260D09 | 2019-09-17 | 2019-10-15 | REPAIR WATER | EAST 8 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019260D10 | 2019-09-17 | 2019-10-15 | REPAIR WATER | PROSPECT PARK WEST, BROOKLYN, FROM STREET 15 STREET TO STREET BEND |
B012019259G27 | 2019-09-16 | 2019-10-15 | REPAIR WATER - SEWER | BROOKLYN AVENUE, BROOKLYN, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE |
B012019255C15 | 2019-09-12 | 2019-09-22 | REPAIR WATER - SEWER | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET WOODBINE STREET |
B012019255C13 | 2019-09-12 | 2019-10-10 | REPAIR WATER - SEWER - PROTECTED | HERKIMER PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE |
Q012019255D81 | 2019-09-12 | 2019-10-09 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012019255C20 | 2019-09-12 | 2019-10-06 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE |
B012019255C14 | 2019-09-12 | 2019-10-06 | REPAIR WATER - SEWER - PROTECTED | STERLING PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019254A18 | 2019-09-11 | 2019-10-06 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
M012019253B19 | 2019-09-10 | 2019-09-23 | REPAIR WATER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
B012019253C20 | 2019-09-10 | 2019-10-11 | REPAIR WATER | SOUTH 4 STREET, BROOKLYN, FROM STREET BEND TO STREET MARCY AVENUE |
B012019253C18 | 2019-09-10 | 2019-10-06 | REPAIR WATER - SEWER | SOUTH OXFORD STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE |
M012019253B17 | 2019-09-10 | 2019-09-23 | REPAIR WATER - PROTECTED | 1 AVENUE, MANHATTAN, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET |
M012019253B18 | 2019-09-10 | 2019-09-22 | REPAIR SEWER - PROTECTED | WEST 29 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
Q012019252D63 | 2019-09-09 | 2019-09-25 | REPAIR WATER - PROTECTED | 107 STREET, QUEENS, FROM STREET 97 AVENUE TO STREET 101 AVENUE |
X012019249C20 | 2019-09-06 | 2019-10-06 | REPAIR WATER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET |
B012019249B79 | 2019-09-06 | 2019-09-11 | REPAIR WATER | SOUTH 4 STREET, BROOKLYN, FROM STREET BEND TO STREET MARCY AVENUE |
M012019249B70 | 2019-09-06 | 2019-09-24 | REPAIR SEWER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012019248A57 | 2019-09-05 | 2019-09-30 | REPAIR WATER - PROTECTED | WEST 14 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012019248C40 | 2019-09-05 | 2019-09-19 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019248C39 | 2019-09-05 | 2019-10-06 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012019248C38 | 2019-09-05 | 2019-10-02 | REPAIR SEWER | DAHILL ROAD, BROOKLYN, FROM STREET 50 STREET TO STREET AVENUE I |
Q012019248D75 | 2019-09-05 | 2019-09-17 | REPAIR WATER - SEWER | 37 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
M012019248A60 | 2019-09-05 | 2019-09-29 | REPAIR WATER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
B012019242D51 | 2019-08-30 | 2019-09-27 | REPAIR WATER - PROTECTED | AVENUE I, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET |
B012019242D56 | 2019-08-30 | 2019-09-26 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE |
M012019242B11 | 2019-08-30 | 2019-09-14 | REPAIR WATER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
B012019241A13 | 2019-08-29 | 2019-09-27 | REPAIR WATER - SEWER - PROTECTED | LEFFERTS AVENUE, BROOKLYN, FROM STREET BALFOUR PLACE TO STREET BROOKLYN AVENUE |
B012019240B89 | 2019-08-28 | 2019-09-27 | REPAIR WATER - SEWER - PROTECTED | 71 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012019239C67 | 2019-08-27 | 2019-09-19 | REPAIR WATER | EAST 26 STREET, BROOKLYN, FROM STREET AVENUE K TO STREET AVENUE L |
B012019239C68 | 2019-08-27 | 2019-09-24 | REPAIR WATER - SEWER - PROTECTED | 39 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
B012019239C66 | 2019-08-27 | 2019-09-21 | REPAIR WATER | WEST 16 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
B012019238F97 | 2019-08-26 | 2019-09-21 | REPAIR WATER | DE KALB AVENUE, BROOKLYN, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE |
M012019238C64 | 2019-08-26 | 2019-09-24 | REPAIR WATER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
B012019238F96 | 2019-08-26 | 2019-09-21 | REPAIR WATER - SEWER | WEIRFIELD STREET, BROOKLYN, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE |
B012019238F93 | 2019-08-26 | 2019-09-24 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019238F94 | 2019-08-26 | 2019-09-25 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012019238C06 | 2019-08-26 | 2019-09-25 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012019238F95 | 2019-08-26 | 2019-09-22 | REPAIR WATER - SEWER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012019235A95 | 2019-08-23 | 2019-09-16 | REPAIR WATER | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET |
M012019234A37 | 2019-08-22 | 2019-09-22 | REPAIR SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
Q012019234C39 | 2019-08-22 | 2019-09-09 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012019234B71 | 2019-08-22 | 2019-09-18 | REPAIR WATER - SEWER | ROCHESTER AVENUE, BROOKLYN, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET |
M012019232A79 | 2019-08-20 | 2019-09-16 | REPAIR WATER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012019232A80 | 2019-08-20 | 2019-09-17 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
Q012019232D23 | 2019-08-20 | 2019-09-15 | REPAIR WATER - SEWER - PROTECTED | ONDERDONK AVENUE, QUEENS, FROM STREET HARMAN STREET TO STREET HIMROD STREET |
M012019232A81 | 2019-08-20 | 2019-09-16 | REPAIR SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
M012019232A82 | 2019-08-20 | 2019-09-11 | REPAIR WATER - SEWER | LITTLE WEST 12 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
M012019232A83 | 2019-08-20 | 2019-09-17 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
M012019232B38 | 2019-08-20 | 2019-09-21 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012019232D00 | 2019-08-20 | 2019-09-13 | REPAIR WATER - SEWER | EVERGREEN AVENUE, BROOKLYN, FROM STREET MADISON STREET TO STREET WOODBINE STREET |
B012019232C83 | 2019-08-20 | 2019-08-26 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019232C82 | 2019-08-20 | 2019-08-25 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
Q012019232D28 | 2019-08-20 | 2019-09-14 | REPAIR SEWER | 26 AVENUE, QUEENS, FROM STREET 1 STREET TO STREET 2 STREET |
Q012019232D26 | 2019-08-20 | 2019-09-19 | REPAIR WATER - SEWER | 38 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
B012019228A45 | 2019-08-16 | 2019-09-03 | REPAIR WATER - SEWER | 43 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019228D72 | 2019-08-16 | 2019-09-11 | REPAIR WATER - PROTECTED | STERLING PLACE, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY |
B012019224A62 | 2019-08-16 | 2019-09-10 | REPAIR WATER | SHORE PARKWAY, BROOKLYN, FROM STREET 18 AVENUE TO STREET BAY 19 STREET |
B012019228A48 | 2019-08-16 | 2019-09-10 | REPAIR SEWER - PROTECTED | NORTH 3 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012019227A23 | 2019-08-15 | 2019-08-17 | REPAIR WATER - PROTECTED | BLAKE AVENUE, BROOKLYN, FROM STREET JUNIUS STREET TO STREET POWELL STREET |
B012019227A22 | 2019-08-15 | 2019-08-17 | REPAIR WATER | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET |
Q012019226B54 | 2019-08-14 | 2019-08-20 | REPAIR WATER - SEWER | 38 AVENUE, QUEENS, FROM STREET 215 PLACE TO STREET 215 STREET |
M012019226B57 | 2019-08-14 | 2019-09-12 | REPAIR WATER - PROTECTED | 1 AVENUE, MANHATTAN, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET |
B012019224C35 | 2019-08-12 | 2019-08-27 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
Q012019224D78 | 2019-08-12 | 2019-08-24 | REPAIR WATER | CHRISTIE AVENUE, QUEENS, FROM STREET 102 STREET TO STREET 103 STREET |
Q012019224D77 | 2019-08-12 | 2019-09-12 | REPAIR WATER | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
X012019224B14 | 2019-08-12 | 2019-09-07 | REPAIR WATER | ELTON AVENUE, BRONX, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET |
B012019224C32 | 2019-08-12 | 2019-09-06 | REPAIR WATER - SEWER | EAST 32 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012019224C34 | 2019-08-12 | 2019-09-11 | REPAIR WATER | SOUTH 4 STREET, BROOKLYN, FROM STREET BEND TO STREET MARCY AVENUE |
B012019224C37 | 2019-08-12 | 2019-09-05 | REPAIR WATER - PROTECTED | HALL STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
M012019224C56 | 2019-08-12 | 2019-09-06 | REPAIR WATER - PROTECTED | BANK STREET, MANHATTAN, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE |
Q012019221D48 | 2019-08-09 | 2019-09-07 | REPAIR WATER - SEWER | 37 STREET, QUEENS, FROM STREET 31 AVENUE TO STREET BROADWAY |
B012019220C42 | 2019-08-08 | 2019-09-05 | REPAIR SEWER - PROTECTED | DEAN STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012019220C41 | 2019-08-08 | 2019-09-05 | REPAIR WATER - PROTECTED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE I TO STREET BAY PARKWAY |
X012019220A30 | 2019-08-08 | 2019-09-06 | REPAIR WATER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET |
Q012019219D80 | 2019-08-07 | 2019-08-26 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
B012019219D59 | 2019-08-07 | 2019-09-04 | REPAIR WATER - SEWER - PROTECTED | PALMETTO STREET, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012019219D60 | 2019-08-07 | 2019-09-04 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
Q012019219D90 | 2019-08-07 | 2019-08-15 | REPAIR SEWER | 26 AVENUE, QUEENS, FROM STREET 1 STREET TO STREET 2 STREET |
B012019219D58 | 2019-08-07 | 2019-09-05 | REPAIR SEWER | DAHILL ROAD, BROOKLYN, FROM STREET 50 STREET TO STREET AVENUE I |
M012019219D80 | 2019-08-07 | 2019-09-08 | REPAIR SEWER - PROTECTED | WEST 29 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
M012019219D81 | 2019-08-07 | 2019-09-04 | REPAIR SEWER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET BROADWAY |
Q012019219D79 | 2019-08-07 | 2019-08-15 | REPAIR WATER | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q012019219D91 | 2019-08-07 | 2019-09-09 | REPAIR WATER | 43 AVENUE, QUEENS, FROM STREET 91 PLACE TO STREET GLEANE STREET |
M012019217B39 | 2019-08-05 | 2019-08-31 | REPAIR SEWER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
B012019217C11 | 2019-08-05 | 2019-08-28 | REPAIR WATER - SEWER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
M012019217B38 | 2019-08-05 | 2019-08-31 | REPAIR WATER - SEWER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
Q012019217C60 | 2019-08-05 | 2019-08-31 | REPAIR WATER | ELIOT AVENUE, QUEENS, FROM STREET 62 STREET TO STREET FRESH POND ROAD |
M012019213B58 | 2019-08-01 | 2019-08-18 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
B012019213C86 | 2019-08-01 | 2019-08-29 | REPAIR WATER - SEWER | CLAY STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD |
B012019213C87 | 2019-08-01 | 2019-08-06 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
M012019213B57 | 2019-08-01 | 2019-08-16 | REPAIR WATER - SEWER | LITTLE WEST 12 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET |
B012019211B12 | 2019-07-30 | 2019-08-15 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019211A12 | 2019-07-30 | 2019-08-09 | REPAIR WATER | 50 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE |
B012019211B11 | 2019-07-30 | 2019-08-15 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B012019211B10 | 2019-07-30 | 2019-08-15 | REPAIR SEWER | 56 STREET, BROOKLYN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012019211A52 | 2019-07-30 | 2019-08-25 | REPAIR WATER - SEWER - PROTECTED | WASHINGTON AVENUE, BRONX, FROM STREET EAST 164 STREET TO STREET WEIHER COURT |
X012019211A91 | 2019-07-30 | 2019-08-15 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
B012019211B13 | 2019-07-30 | 2019-08-15 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019211B14 | 2019-07-30 | 2019-08-15 | REPAIR WATER - SEWER - PROTECTED | 57 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019211B15 | 2019-07-30 | 2019-08-15 | REPAIR WATER - SEWER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B012019210A57 | 2019-07-29 | 2019-08-17 | REPAIR WATER - SEWER - PROTECTED | AVENUE I, BROOKLYN, FROM STREET EAST 45 STREET TO STREET TROY AVENUE |
B012019206B75 | 2019-07-25 | 2019-08-21 | REPAIR WATER | AMITY STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
B012019206B74 | 2019-07-25 | 2019-08-14 | REPAIR WATER - PROTECTED | BLAKE AVENUE, BROOKLYN, FROM STREET JUNIUS STREET TO STREET POWELL STREET |
B012019206B73 | 2019-07-25 | 2019-08-23 | REPAIR WATER | POWELL STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE |
B012019206B72 | 2019-07-25 | 2019-08-23 | REPAIR WATER - SEWER - PROTECTED | 23 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012019206B71 | 2019-07-25 | 2019-08-24 | REPAIR WATER - SEWER | WEST 13 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET KINGS HIGHWAY |
Q012019206D47 | 2019-07-25 | 2019-08-23 | REPAIR WATER - SEWER | 149 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET BEND |
M012019205A12 | 2019-07-24 | 2019-08-18 | REPAIR WATER | WEST 35 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
X012019205A33 | 2019-07-24 | 2019-08-05 | REPAIR WATER - PROTECTED | EVELYN PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE |
B012019205A51 | 2019-07-24 | 2019-08-20 | REPAIR WATER - PROTECTED | 48 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
M012019205A13 | 2019-07-24 | 2019-08-22 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012019205A48 | 2019-07-24 | 2019-08-12 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019205A49 | 2019-07-24 | 2019-08-12 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE |
B012019199C01 | 2019-07-18 | 2019-08-26 | REPAIR WATER - SEWER - PROTECTED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
Q012019199D06 | 2019-07-18 | 2019-08-06 | REPAIR SEWER | 26 AVENUE, QUEENS, FROM STREET 1 STREET TO STREET 2 STREET |
B012019199B96 | 2019-07-18 | 2019-08-14 | REPAIR WATER | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET |
M012019199B63 | 2019-07-18 | 2019-08-17 | REPAIR SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
M012019199B60 | 2019-07-18 | 2019-08-13 | REPAIR WATER - PROTECTED | BANK STREET, MANHATTAN, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE |
M012019199A58 | 2019-07-18 | 2019-07-23 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012019199A57 | 2019-07-18 | 2019-08-04 | REPAIR WATER - SEWER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
B012019199B94 | 2019-07-18 | 2019-08-17 | REPAIR WATER - PROTECTED | 18 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET |
B012019199B95 | 2019-07-18 | 2019-08-10 | REPAIR WATER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
B012019199B97 | 2019-07-18 | 2019-08-14 | REPAIR WATER | WEST 16 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE |
M012019198B32 | 2019-07-17 | 2019-08-14 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
M012019198B31 | 2019-07-17 | 2019-08-14 | REPAIR WATER - SEWER | WEST 16 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
X012019198A98 | 2019-07-17 | 2019-08-16 | REPAIR WATER - SEWER | BROWN PLACE, BRONX, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BRUCKNER BOULEVARD |
B012019198B74 | 2019-07-17 | 2019-08-14 | REPAIR WATER - PROTECTED | BLAKE AVENUE, BROOKLYN, FROM STREET JUNIUS STREET TO STREET POWELL STREET |
B012019196C18 | 2019-07-15 | 2019-07-31 | REPAIR WATER - SEWER - PROTECTED | 57 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012019196A94 | 2019-07-15 | 2019-08-10 | REPAIR WATER | 43 AVENUE, QUEENS, FROM STREET 91 PLACE TO STREET GLEANE STREET |
B012019196C65 | 2019-07-15 | 2019-08-11 | REPAIR WATER - SEWER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012019196C16 | 2019-07-15 | 2019-07-27 | REPAIR WATER - SEWER - PROTECTED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
M012019190A02 | 2019-07-15 | 2019-07-12 | REPAIR WATER - PROTECTED | WEST 15 STREET, MANHATTAN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
X012019193B12 | 2019-07-12 | 2019-08-05 | REPAIR WATER | ELTON AVENUE, BRONX, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET |
B012019193G41 | 2019-07-12 | 2019-08-01 | REPAIR WATER - SEWER - PROTECTED | LIVINGSTON STREET, BROOKLYN, FROM STREET HANOVER PLACE TO STREET NEVINS STREET |
B012019191D99 | 2019-07-10 | 2019-08-09 | REPAIR WATER - SEWER | 45 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012019191E00 | 2019-07-10 | 2019-08-08 | REPAIR WATER - SEWER - PROTECTED | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
B012019191E06 | 2019-07-10 | 2019-08-07 | REPAIR WATER - SEWER - PROTECTED | LYNCH STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012019191E04 | 2019-07-10 | 2019-07-21 | REPAIR WATER - PROTECTED | 48 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019191E03 | 2019-07-10 | 2019-07-30 | REPAIR WATER - SEWER - PROTECTED | TRUXTON STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET SACKMAN STREET |
B012019191E02 | 2019-07-10 | 2019-08-01 | REPAIR WATER - SEWER - PROTECTED | KINGS HIGHWAY, BROOKLYN, FROM STREET STILLWELL AVENUE TO STREET WEST 13 STREET |
B012019191E01 | 2019-07-10 | 2019-08-07 | REPAIR WATER | 11 AVENUE, BROOKLYN, FROM STREET 51 STREET TO STREET 52 STREET |
Q012019191C07 | 2019-07-10 | 2019-08-08 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012019191C08 | 2019-07-10 | 2019-07-31 | REPAIR SEWER - PROTECTED | 43 AVENUE, QUEENS, FROM STREET 58 STREET TO STREET 60 STREET |
Q012019191C09 | 2019-07-10 | 2019-07-22 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
X012019191A96 | 2019-07-10 | 2019-08-07 | REPAIR WATER - PROTECTED | CROTONA AVENUE, BRONX, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET |
B012019191E08 | 2019-07-10 | 2019-08-07 | REPAIR SEWER - PROTECTED | EAST 45 STREET, BROOKLYN, FROM STREET AVENUE H TO STREET AVENUE I |
B012019191E07 | 2019-07-10 | 2019-08-05 | REPAIR WATER - SEWER | 44 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY |
M012019189C29 | 2019-07-08 | 2019-08-07 | REPAIR SEWER - PROTECTED | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
B012019189F26 | 2019-07-08 | 2019-08-07 | REPAIR WATER - SEWER - PROTECTED | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012019184E04 | 2019-07-03 | 2019-07-30 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019184D99 | 2019-07-03 | 2019-07-31 | REPAIR WATER | 43 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012019184E00 | 2019-07-03 | 2019-07-30 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
M012019184B57 | 2019-07-03 | 2019-08-01 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019184B58 | 2019-07-03 | 2019-08-02 | REPAIR WATER - SEWER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
M012019184B59 | 2019-07-03 | 2019-08-01 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
X012019184A83 | 2019-07-03 | 2019-07-30 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
B012019179C92 | 2019-06-28 | 2019-07-26 | REPAIR WATER - SEWER | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012019179C91 | 2019-06-28 | 2019-07-26 | REPAIR WATER - SEWER - PROTECTED | NORTH 3 STREET, BROOKLYN, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE |
B012019179C90 | 2019-06-28 | 2019-07-26 | REPAIR WATER - SEWER | KENT AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET |
B012019179C88 | 2019-06-28 | 2019-07-26 | REPAIR WATER - SEWER | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE H TO STREET GLENWOOD ROAD |
B012019179C86 | 2019-06-28 | 2019-07-09 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019179C85 | 2019-06-28 | 2019-07-20 | REPAIR WATER - PROTECTED | 72 STREET, BROOKLYN, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD |
X012019179A81 | 2019-06-28 | 2019-07-26 | REPAIR WATER - PROTECTED | EVELYN PLACE, BRONX, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE |
Q012019179A93 | 2019-06-28 | 2019-07-26 | REPAIR WATER - SEWER | PARSONS BOULEVARD, QUEENS, FROM STREET ASH AVENUE TO STREET BEECH AVENUE |
B012019179C94 | 2019-06-28 | 2019-07-26 | REPAIR WATER | HEWES STREET, BROOKLYN, FROM STREET BQE EB EN WILLIAMSBURG STREET E TO STREET BEDFORD AVENUE |
Q012019177B62 | 2019-06-26 | 2019-07-09 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012019177A63 | 2019-06-26 | 2019-07-25 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019172A16 | 2019-06-21 | 2019-07-18 | REPAIR WATER - SEWER | WEST 16 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012019172A15 | 2019-06-21 | 2019-07-21 | REPAIR SEWER | 3 AVENUE, MANHATTAN, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET |
X012019171A54 | 2019-06-20 | 2019-07-17 | REPAIR WATER - SEWER | BROWN PLACE, BRONX, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BRUCKNER BOULEVARD |
M012019171B39 | 2019-06-20 | 2019-07-18 | REPAIR WATER - SEWER | WEST 16 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012019171C36 | 2019-06-20 | 2019-07-03 | RESTORATION RE-DIG | JUNO STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
M012019171B42 | 2019-06-20 | 2019-06-25 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
Q012019171C06 | 2019-06-20 | 2019-07-19 | REPAIR SEWER | 26 AVENUE, QUEENS, FROM STREET 1 STREET TO STREET 2 STREET |
B012019170B53 | 2019-06-19 | 2019-07-17 | REPAIR SEWER - PROTECTED | 20 AVENUE, BROOKLYN, FROM STREET 61 STREET TO STREET 62 STREET |
B012019169D43 | 2019-06-18 | 2019-07-06 | REPAIR WATER - SEWER | 47 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019169D45 | 2019-06-18 | 2019-07-13 | REPAIR WATER - SEWER - PROTECTED | 19 AVENUE, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
B012019169D46 | 2019-06-18 | 2019-07-17 | REPAIR WATER - SEWER - PROTECTED | 84 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
M012019169B84 | 2019-06-18 | 2019-07-14 | REPAIR WATER - SEWER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
M012019169B85 | 2019-06-18 | 2019-07-17 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
B012019169D42 | 2019-06-18 | 2019-07-17 | REPAIR SEWER | STANWIX STREET, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET MONTIETH STREET |
B012019169D44 | 2019-06-18 | 2019-07-18 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
M012019168E05 | 2019-06-17 | 2019-07-14 | REPAIR WATER - SEWER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
X012019168B28 | 2019-06-17 | 2019-06-29 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
M012019168E06 | 2019-06-17 | 2019-07-06 | REPAIR WATER - SEWER - PROTECTED | EAST 71 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012019168E76 | 2019-06-17 | 2019-07-08 | REPAIR WATER - SEWER - PROTECTED | 52 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
Q012019165C66 | 2019-06-14 | 2019-07-13 | REPAIR WATER - SEWER | 149 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET BEND |
M012019164B53 | 2019-06-13 | 2019-06-25 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019164B54 | 2019-06-13 | 2019-07-08 | REPAIR SEWER - PROTECTED | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
B012019157A57 | 2019-06-13 | 2019-06-30 | REPAIR WATER - PROTECTED | OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE W TO STREET AVENUE X |
B012019164E69 | 2019-06-13 | 2019-07-08 | REPAIR WATER - SEWER - PROTECTED | 67 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012019164E71 | 2019-06-13 | 2019-07-13 | REPAIR WATER - SEWER - PROTECTED | RICHARDSON STREET, BROOKLYN, FROM STREET LORIMER STREET TO STREET UNION AVENUE |
X012019164B31 | 2019-06-13 | 2019-07-11 | REPAIR WATER | ELTON AVENUE, BRONX, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET |
B012019158D56 | 2019-06-07 | 2019-07-09 | REPAIR WATER - SEWER - PROTECTED | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
Q012019158C24 | 2019-06-07 | 2019-06-26 | REPAIR WATER - SEWER | PARSONS BOULEVARD, QUEENS, FROM STREET ASH AVENUE TO STREET BEECH AVENUE |
M012019158B77 | 2019-06-07 | 2019-07-15 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
Q012019158C26 | 2019-06-07 | 2019-07-09 | REPAIR WATER - SEWER - PROTECTED | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
B012019158D57 | 2019-06-07 | 2019-07-04 | REPAIR WATER - PROTECTED | PROSPECT AVENUE, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B012019158D55 | 2019-06-07 | 2019-06-30 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019158D53 | 2019-06-07 | 2019-07-09 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019158D54 | 2019-06-07 | 2019-07-04 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012019154A21 | 2019-06-05 | 2019-07-02 | REPAIR WATER | 43 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
M012019155B38 | 2019-06-04 | 2019-07-03 | REPAIR WATER - SEWER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
Q012019155B80 | 2019-06-04 | 2019-06-25 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
M012019155B39 | 2019-06-04 | 2019-07-02 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019155B40 | 2019-06-04 | 2019-06-17 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
M012019155B41 | 2019-06-04 | 2019-07-02 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
Q012019155B81 | 2019-06-04 | 2019-07-08 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012019155D70 | 2019-06-04 | 2019-06-29 | REPAIR WATER - SEWER - PROTECTED | 53 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019155D69 | 2019-06-04 | 2019-07-04 | REPAIR WATER - SEWER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019155D68 | 2019-06-04 | 2019-07-04 | REPAIR WATER - PROTECTED | 22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE |
B012019155D67 | 2019-06-04 | 2019-06-28 | REPAIR WATER | DAHILL ROAD, BROOKLYN, FROM STREET 50 STREET TO STREET AVENUE I |
B012019155D66 | 2019-06-04 | 2019-06-18 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
B012019155C39 | 2019-06-04 | 2019-06-28 | REPAIR WATER | WILLOUGHBY AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE |
B012019155C23 | 2019-06-04 | 2019-06-29 | REPAIR WATER - SEWER | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
B012019155C21 | 2019-06-04 | 2019-06-30 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019155C22 | 2019-06-04 | 2019-07-08 | REPAIR WATER - SEWER - PROTECTED | 67 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
M012019154D20 | 2019-06-03 | 2019-06-03 | REPAIR WATER - SEWER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
B012019151D09 | 2019-05-31 | 2019-06-27 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE |
B012019151D10 | 2019-05-31 | 2019-06-22 | REPAIR WATER | PROSPECT PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY |
B012019151D08 | 2019-05-31 | 2019-06-27 | REPAIR WATER - SEWER | SNYDER AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019149F14 | 2019-05-29 | 2019-06-22 | REPAIR WATER - SEWER | EAST 28 STREET, BROOKLYN, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE |
B012019149F13 | 2019-05-29 | 2019-06-15 | REPAIR SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012019149F12 | 2019-05-29 | 2019-06-27 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019148F81 | 2019-05-28 | 2019-06-09 | REPAIR WATER - SEWER - PROTECTED | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
B012019148F78 | 2019-05-28 | 2019-06-10 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012019148F80 | 2019-05-28 | 2019-07-01 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
B012019148F79 | 2019-05-28 | 2019-06-27 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
M012019148C83 | 2019-05-28 | 2019-06-08 | REPAIR WATER - SEWER | EAST 72 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012019148F77 | 2019-05-28 | 2019-06-22 | REPAIR WATER | 39 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
X012019148B52 | 2019-05-28 | 2019-06-22 | REPAIR WATER - SEWER | BRUCKNER BOULEVARD, BRONX, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP |
M012019143B35 | 2019-05-23 | 2019-06-15 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012019143B06 | 2019-05-23 | 2019-06-15 | REPAIR SEWER - PROTECTED | SHEEPSHEAD BAY ROAD, BROOKLYN, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY |
B012019137B26 | 2019-05-17 | 2019-06-05 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
M012019137A45 | 2019-05-17 | 2019-06-14 | REPAIR SEWER - PROTECTED | WEST 48 STREET, MANHATTAN, FROM STREET 11 AVENUE TO STREET AMTRAK RR |
Q012019137A56 | 2019-05-17 | 2019-06-15 | REPAIR WATER - SEWER | WOODBINE STREET, QUEENS, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE |
B012019137B25 | 2019-05-17 | 2019-06-15 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019136A78 | 2019-05-16 | 2019-06-08 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
Q012019136B35 | 2019-05-16 | 2019-06-07 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012019136B38 | 2019-05-16 | 2019-06-17 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
B012019136A67 | 2019-05-16 | 2019-06-10 | REPAIR WATER - SEWER - PROTECTED | WILLIAMS AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE |
B012019134E22 | 2019-05-14 | 2019-06-09 | REPAIR WATER - SEWER - PROTECTED | HUNTINGTON STREET, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012019134E24 | 2019-05-14 | 2019-06-09 | REPAIR WATER - SEWER | BEDFORD AVENUE, BROOKLYN, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET |
B012019134E23 | 2019-05-14 | 2019-06-11 | REPAIR WATER | CLIFTON PLACE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012019133D79 | 2019-05-13 | 2019-06-09 | REPAIR WATER | 45 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012019133D14 | 2019-05-13 | 2019-06-09 | REPAIR WATER - SEWER - PROTECTED | SMART STREET, QUEENS, FROM STREET LABURNUM AVENUE TO STREET NEGUNDO AVENUE |
Q012019133D16 | 2019-05-13 | 2019-06-09 | REPAIR WATER - SEWER | PARSONS BOULEVARD, QUEENS, FROM STREET ASH AVENUE TO STREET BEECH AVENUE |
Q012019133D17 | 2019-05-13 | 2019-06-09 | REPAIR WATER - SEWER - PROTECTED | SMART STREET, QUEENS, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE |
B012019133D82 | 2019-05-13 | 2019-06-08 | REPAIR WATER - PROTECTED | GATES AVENUE, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE |
B012019133D80 | 2019-05-13 | 2019-06-09 | REPAIR WATER - SEWER | 57 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012019133D78 | 2019-05-13 | 2019-06-09 | REPAIR WATER - SEWER - PROTECTED | 50 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
Q012019130B82 | 2019-05-10 | 2019-06-15 | REPAIR WATER - PROTECTED | 55 AVENUE, QUEENS, FROM STREET 90 STREET TO STREET JUSTICE AVENUE |
M012019130B30 | 2019-05-10 | 2019-06-08 | REPAIR SEWER | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET 8 AVENUE TO STREET WEST 122 STREET |
B012019130D08 | 2019-05-10 | 2019-05-31 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
Q012019130B81 | 2019-05-10 | 2019-06-09 | REPAIR WATER - PROTECTED | 65 PLACE, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
B012019129A28 | 2019-05-09 | 2019-06-02 | REPAIR WATER - SEWER - PROTECTED | HOYT STREET, BROOKLYN, FROM STREET PRESIDENT STREET TO STREET UNION STREET |
Q012019129A63 | 2019-05-09 | 2019-06-08 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
Q012019129A64 | 2019-05-09 | 2019-05-18 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
B012019127F25 | 2019-05-07 | 2019-06-05 | REPAIR WATER - SEWER - PROTECTED | RIVER STREET, BROOKLYN, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET |
B012019127C50 | 2019-05-07 | 2019-06-08 | REPAIR WATER - SEWER - PROTECTED | 67 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012019127C49 | 2019-05-07 | 2019-06-01 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
B012019127C48 | 2019-05-07 | 2019-05-20 | REPAIR WATER - SEWER | ST NICHOLAS AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET LINDEN STREET |
B012019127C47 | 2019-05-07 | 2019-05-28 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019127C45 | 2019-05-07 | 2019-06-02 | REPAIR WATER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012019127C44 | 2019-05-07 | 2019-06-02 | REPAIR SEWER - PROTECTED | OXFORD STREET, BROOKLYN, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD |
B012019127B04 | 2019-05-07 | 2019-06-05 | REPAIR WATER - SEWER | KENT AVENUE, BROOKLYN, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET |
B012019127B02 | 2019-05-07 | 2019-05-31 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012019127B05 | 2019-05-07 | 2019-06-05 | REPAIR WATER - SEWER | METROPOLITAN AVENUE, BROOKLYN, FROM STREET KENT AVENUE TO STREET RIVER STREET |
M012019127B04 | 2019-05-07 | 2019-06-10 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012019127C46 | 2019-05-07 | 2019-05-22 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
M012019127B05 | 2019-05-07 | 2019-06-01 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
Q012019127A52 | 2019-05-07 | 2019-06-02 | REPAIR WATER - PROTECTED | 157 STREET, QUEENS, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD |
M012019123A98 | 2019-05-03 | 2019-06-02 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
B012019122B72 | 2019-05-02 | 2019-05-29 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET AVENUE D TO STREET CLARENDON ROAD |
Q012019122E26 | 2019-05-02 | 2019-05-30 | REPAIR WATER - SEWER | 188 STREET, QUEENS, FROM STREET 87 DRIVE TO STREET HILLSIDE AVENUE |
Q012019122E25 | 2019-05-02 | 2019-05-30 | REPAIR WATER - SEWER - PROTECTED | HILLSIDE AVENUE, QUEENS, FROM STREET 188 STREET TO STREET 189 STREET |
B012019121D14 | 2019-05-01 | 2019-05-29 | REPAIR WATER - SEWER - PROTECTED | CLARENDON ROAD, BROOKLYN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET |
B012019119B96 | 2019-04-29 | 2019-05-18 | REPAIR WATER | 6 AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE |
B012019119A88 | 2019-04-29 | 2019-05-18 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET TAAFFE PLACE |
B012019119B91 | 2019-04-29 | 2019-05-18 | REPAIR WATER - SEWER | CLASSON AVENUE, BROOKLYN, FROM STREET FLUSHING AVENUE TO STREET WALLABOUT STREET |
M012019119C13 | 2019-04-29 | 2019-05-12 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
B012019119B95 | 2019-04-29 | 2019-05-18 | REPAIR WATER - SEWER | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012019119B97 | 2019-04-29 | 2019-05-25 | REPAIR WATER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
M012019113A05 | 2019-04-26 | 2019-05-21 | REPAIR WATER - PROTECTED | PINE STREET, MANHATTAN, FROM STREET PEARL STREET TO STREET WILLIAM STREET |
M012019116C72 | 2019-04-26 | 2019-06-02 | REPAIR WATER - SEWER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
B012019116C57 | 2019-04-26 | 2019-06-03 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
M012019116C71 | 2019-04-26 | 2019-06-02 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019116C73 | 2019-04-26 | 2019-05-20 | REPAIR WATER - SEWER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012019116C74 | 2019-04-26 | 2019-06-02 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
B012019116C58 | 2019-04-26 | 2019-05-25 | REPAIR WATER - SEWER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012019116C59 | 2019-04-26 | 2019-05-26 | REPAIR WATER - SEWER - PROTECTED | HERKIMER PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE |
B012019116E11 | 2019-04-26 | 2019-05-26 | REPAIR WATER - SEWER | LEXINGTON AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE |
M012019115A35 | 2019-04-25 | 2019-05-11 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019115A37 | 2019-04-25 | 2019-05-12 | REPAIR SEWER | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET 8 AVENUE TO STREET WEST 122 STREET |
Q012019115B17 | 2019-04-25 | 2019-05-12 | REPAIR SEWER | 28 AVENUE, QUEENS, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS |
Q012019115B18 | 2019-04-25 | 2019-05-24 | REPAIR WATER - SEWER | ARCHER AVENUE, QUEENS, FROM STREET 148 STREET TO STREET 149 STREET |
Q012019115B92 | 2019-04-25 | 2019-05-23 | REPAIR WATER | 116 STREET, QUEENS, FROM STREET 14 AVENUE TO STREET 14 ROAD |
B012019114F37 | 2019-04-24 | 2019-05-10 | REPAIR WATER - SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET |
B012019110A02 | 2019-04-23 | 2019-05-19 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET FULTON STREET TO STREET REMSEN STREET |
Q012019113C78 | 2019-04-23 | 2019-05-22 | REPAIR SEWER - PROTECTED | 50 AVENUE, QUEENS, FROM STREET 65 PLACE TO STREET 66 STREET |
B012019113F60 | 2019-04-23 | 2019-05-22 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET |
B012019113F59 | 2019-04-23 | 2019-05-22 | REPAIR WATER - SEWER - PROTECTED | RUTLEDGE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE |
Q012019112B96 | 2019-04-22 | 2019-05-11 | REPAIR WATER - PROTECTED | 65 PLACE, QUEENS, FROM STREET 48 AVENUE TO STREET 50 AVENUE |
M012019109A92 | 2019-04-19 | 2019-05-12 | REPAIR SEWER | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET 8 AVENUE TO STREET WEST 122 STREET |
B012019109A66 | 2019-04-19 | 2019-05-23 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET HUMBOLDT STREET |
B012019108A95 | 2019-04-18 | 2019-05-25 | REPAIR WATER - SEWER | LEFFERTS AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
B012019108B83 | 2019-04-18 | 2019-05-17 | REPAIR WATER - SEWER | ROGERS AVENUE, BROOKLYN, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE |
B012019108A92 | 2019-04-18 | 2019-05-17 | PAVE STREET-W/ ENGINEERING & INSP FEE | 19 STREET, BROOKLYN, FROM STREET 4 AVENUE TO STREET 5 AVENUE |
B012019108A94 | 2019-04-18 | 2019-05-23 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET HUMBOLDT STREET |
M012019108B26 | 2019-04-18 | 2019-05-03 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
Q012019108B05 | 2019-04-18 | 2019-05-11 | REPAIR WATER - SEWER | 72 AVENUE, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET |
M012019108A56 | 2019-04-18 | 2019-05-12 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
Q012019107A45 | 2019-04-17 | 2019-05-18 | REPAIR WATER | 14 AVENUE, QUEENS, FROM STREET 116 STREET TO STREET 117 STREET |
M012019107A42 | 2019-04-17 | 2019-05-06 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
B012019107C75 | 2019-04-17 | 2019-05-16 | REPAIR WATER - SEWER - PROTECTED | SUYDAM STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012019107C74 | 2019-04-17 | 2019-05-04 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
B012019107C16 | 2019-04-17 | 2019-05-04 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD |
Q012019107A44 | 2019-04-17 | 2019-05-11 | REPAIR WATER | 66 ROAD, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
B012019106D29 | 2019-04-16 | 2019-04-27 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
M012019106A61 | 2019-04-16 | 2019-05-03 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
Q012019106C92 | 2019-04-16 | 2019-05-16 | REPAIR WATER - SEWER | 50 AVENUE, QUEENS, FROM STREET 65 PLACE TO STREET 65 STREET |
B012019106E85 | 2019-04-16 | 2019-04-30 | REPAIR WATER - SEWER - PROTECTED | 84 STREET, BROOKLYN, FROM STREET 21 AVENUE TO STREET BAY PARKWAY |
B012019106D31 | 2019-04-16 | 2019-04-26 | REPAIR WATER - SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET |
B012019106D30 | 2019-04-16 | 2019-05-12 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD |
M012019106B26 | 2019-04-16 | 2019-04-22 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012019106B23 | 2019-04-16 | 2019-05-12 | REPAIR SEWER | ST NICHOLAS AVENUE, MANHATTAN, FROM STREET 8 AVENUE TO STREET WEST 122 STREET |
B012019101B60 | 2019-04-16 | 2019-05-10 | REPAIR WATER - PROTECTED | AVENUE K, BROOKLYN, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE |
M012019106A62 | 2019-04-16 | 2019-04-27 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
B012019102E36 | 2019-04-12 | 2019-05-10 | REPAIR WATER - PROTECTED | EAST 3 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J |
B012019102F13 | 2019-04-12 | 2019-05-12 | REPAIR WATER - SEWER | 42 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012019102E93 | 2019-04-12 | 2019-05-13 | REPAIR WATER - SEWER | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012019102E92 | 2019-04-12 | 2019-05-13 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012019102E91 | 2019-04-12 | 2019-04-27 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012019102E90 | 2019-04-12 | 2019-05-11 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE |
B012019102E89 | 2019-04-12 | 2019-04-25 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019102E88 | 2019-04-12 | 2019-04-25 | REPAIR WATER - SEWER | LEFFERTS AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
M012019102A93 | 2019-04-12 | 2019-04-26 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
M012019102A91 | 2019-04-12 | 2019-05-03 | REPAIR WATER - SEWER | HUDSON STREET, MANHATTAN, FROM STREET BROOME STREET TO STREET CANAL STREET |
B012019099E06 | 2019-04-09 | 2019-04-20 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
B012019099E33 | 2019-04-09 | 2019-05-04 | REPAIR WATER - PROTECTED | HOWARD PLACE, BROOKLYN, FROM STREET PROSPECT AVENUE TO STREET WINDSOR PLACE |
B012019099E34 | 2019-04-09 | 2019-05-02 | REPAIR WATER - SEWER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
Q012019099B97 | 2019-04-09 | 2019-05-09 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
Q012019099B98 | 2019-04-09 | 2019-05-08 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
B012019099E32 | 2019-04-09 | 2019-05-05 | REPAIR WATER | STOCKHOLM STREET, BROOKLYN, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE |
B012019099E07 | 2019-04-09 | 2019-05-09 | REPAIR WATER - SEWER - PROTECTED | 67 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
M012019098A94 | 2019-04-08 | 2019-05-07 | REPAIR WATER | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B012019095G79 | 2019-04-05 | 2019-05-04 | REPAIR WATER - SEWER - PROTECTED | HERKIMER STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
Q012019091A24 | 2019-04-05 | 2019-04-30 | REPAIR WATER | 78 STREET, QUEENS, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE |
M012019095B18 | 2019-04-05 | 2019-04-19 | REPAIR WATER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012019093H47 | 2019-04-03 | 2019-05-05 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B012019093H46 | 2019-04-03 | 2019-05-05 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
Q012019093D58 | 2019-04-03 | 2019-04-18 | REPAIR WATER | 14 AVENUE, QUEENS, FROM STREET 116 STREET TO STREET 117 STREET |
B012019093H55 | 2019-04-03 | 2019-04-26 | REPAIR WATER - SEWER - PROTECTED | HERKIMER PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE |
Q012019092E33 | 2019-04-02 | 2019-04-27 | REPAIR WATER - SEWER | 72 AVENUE, QUEENS, FROM STREET 163 STREET TO STREET 164 STREET |
B012019092C79 | 2019-04-02 | 2019-04-10 | REPAIR WATER - SEWER | 58 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012019092C73 | 2019-04-02 | 2019-04-13 | REPAIR WATER - SEWER | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012019084C71 | 2019-04-02 | 2019-04-23 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET HUMBOLDT STREET |
M012019092A81 | 2019-04-02 | 2019-04-19 | REPAIR WATER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
M012019092A80 | 2019-04-02 | 2019-04-28 | REPAIR WATER - SEWER - PROTECTED | WEST 28 STREET, MANHATTAN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
Q012019087F11 | 2019-03-28 | 2019-04-11 | REPAIR WATER - SEWER | 76 AVENUE, QUEENS, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD |
B012019087C80 | 2019-03-28 | 2019-04-14 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012019087C81 | 2019-03-28 | 2019-05-05 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012019087C82 | 2019-03-28 | 2019-05-05 | REPAIR WATER - SEWER | ST NICHOLAS AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET LINDEN STREET |
B012019087C83 | 2019-03-28 | 2019-04-14 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
M012019087B86 | 2019-03-28 | 2019-04-22 | REPAIR WATER - SEWER | MORNINGSIDE DRIVE, MANHATTAN, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET |
Q012019087F09 | 2019-03-28 | 2019-05-06 | REPAIR WATER - SEWER - PROTECTED | 45 AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET SMART STREET |
Q012019087F10 | 2019-03-28 | 2019-05-01 | REPAIR WATER - SEWER | 51 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
Q012019085C57 | 2019-03-26 | 2019-04-19 | REPAIR WATER | 66 ROAD, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q012019085C58 | 2019-03-26 | 2019-04-20 | REPAIR WATER | JUNO STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012019085C59 | 2019-03-26 | 2019-04-28 | REPAIR SEWER | 28 AVENUE, QUEENS, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS |
B012019085A75 | 2019-03-26 | 2019-04-05 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012019085A76 | 2019-03-26 | 2019-04-05 | REPAIR WATER - SEWER | ST NICHOLAS AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET LINDEN STREET |
B012019081E58 | 2019-03-22 | 2019-04-13 | REPAIR WATER - SEWER - PROTECTED | EVERGREEN AVENUE, BROOKLYN, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET |
B012019080C22 | 2019-03-21 | 2019-04-09 | REPAIR WATER - SEWER - PROTECTED | 67 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
M012019080B71 | 2019-03-21 | 2019-04-07 | REPAIR WATER | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B012019080A09 | 2019-03-21 | 2019-04-05 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
Q012019080C89 | 2019-03-21 | 2019-04-04 | REPAIR WATER | 14 AVENUE, QUEENS, FROM STREET 116 STREET TO STREET 117 STREET |
B012019080C80 | 2019-03-21 | 2019-04-05 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
B012019080C81 | 2019-03-21 | 2019-04-05 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B012019079A67 | 2019-03-20 | 2019-04-11 | REPAIR WATER - SEWER - PROTECTED | 20 STREET, BROOKLYN, FROM STREET 6 AVENUE TO STREET 7 AVENUE |
M012019079A46 | 2019-03-20 | 2019-04-20 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019079A47 | 2019-03-20 | 2019-04-20 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
M012019079A48 | 2019-03-20 | 2019-04-15 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019079A68 | 2019-03-20 | 2019-03-22 | REPAIR WATER - SEWER | ST NICHOLAS AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET LINDEN STREET |
B012019077D22 | 2019-03-18 | 2019-04-14 | REPAIR WATER - SEWER | FAYETTE STREET, BROOKLYN, FROM STREET BEAVER STREET TO STREET BROADWAY |
Q012019077A78 | 2019-03-18 | 2019-04-01 | REPAIR WATER - SEWER | 51 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
B012019046A35 | 2019-03-18 | 2019-02-19 | REPAIR WATER | 43 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
B012019077D23 | 2019-03-18 | 2019-03-29 | REPAIR WATER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
B012019077D24 | 2019-03-18 | 2019-04-14 | REPAIR WATER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
B012019077D25 | 2019-03-18 | 2019-04-12 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET |
B012019077D21 | 2019-03-18 | 2019-04-14 | REPAIR WATER - SEWER - PROTECTED | NOSTRAND AVENUE, BROOKLYN, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET |
M012019074A93 | 2019-03-15 | 2019-04-13 | REPAIR WATER | PEARL STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET PLATT STREET |
B012019074E87 | 2019-03-15 | 2019-04-12 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE |
B012019074E86 | 2019-03-15 | 2019-04-11 | REPAIR WATER - SEWER | LEFFERTS AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
B012019074E90 | 2019-03-15 | 2019-04-15 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD |
B012019074E91 | 2019-03-15 | 2019-03-29 | REPAIR WATER - SEWER - PROTECTED | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
M012019074A95 | 2019-03-15 | 2019-04-13 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012019074A94 | 2019-03-15 | 2019-04-14 | REPAIR WATER - PROTECTED | EAST 43 STREET, MANHATTAN, FROM STREET 2 AVENUE TO STREET 3 AVENUE |
M012019073A91 | 2019-03-14 | 2019-04-12 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
B012019072C02 | 2019-03-13 | 2019-03-22 | REPAIR WATER - SEWER | 50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD |
B012019072B98 | 2019-03-13 | 2019-04-07 | REPAIR WATER | 59 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
Q012019072B91 | 2019-03-13 | 2019-04-12 | REPAIR WATER - SEWER | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
B012019072C04 | 2019-03-13 | 2019-04-13 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012019072C05 | 2019-03-13 | 2019-04-15 | REPAIR WATER - SEWER - PROTECTED | NORTH 7 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012019072B87 | 2019-03-13 | 2019-03-31 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
B012019072C03 | 2019-03-13 | 2019-04-12 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012019072C01 | 2019-03-13 | 2019-03-22 | REPAIR WATER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
B012019072B99 | 2019-03-13 | 2019-04-13 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019072C00 | 2019-03-13 | 2019-04-13 | REPAIR WATER | DE KALB AVENUE, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
Q012019071D39 | 2019-03-12 | 2019-04-08 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q012019071D52 | 2019-03-12 | 2019-04-04 | REPAIR WATER | 116 STREET, QUEENS, FROM STREET 14 AVENUE TO STREET 14 ROAD |
B012019070A80 | 2019-03-11 | 2019-04-11 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
Q012019070B17 | 2019-03-11 | 2019-04-09 | REPAIR WATER - SEWER - PROTECTED | NORTHERN BOULEVARD, QUEENS, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD |
B012019070A79 | 2019-03-11 | 2019-04-11 | REPAIR WATER - SEWER | EAGLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012019070A78 | 2019-03-11 | 2019-04-09 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
B012019067E46 | 2019-03-08 | 2019-03-29 | REPAIR WATER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012019067E47 | 2019-03-08 | 2019-04-04 | REPAIR WATER - SEWER | LEONARD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE |
Q012019066B22 | 2019-03-07 | 2019-03-18 | REPAIR WATER - SEWER | 51 AVENUE, QUEENS, FROM STREET 2 STREET TO STREET 5 STREET |
M012019066B01 | 2019-03-07 | 2019-03-21 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
M012019066B02 | 2019-03-07 | 2019-03-21 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019066B81 | 2019-03-07 | 2019-04-05 | REPAIR WATER - SEWER - PROTECTED | EAST 39 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012019065A15 | 2019-03-06 | 2019-04-02 | REPAIR WATER - SEWER | MORNINGSIDE DRIVE, MANHATTAN, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET |
B012019057A19 | 2019-03-06 | 2019-03-23 | REPAIR WATER | 13 AVENUE, BROOKLYN, FROM STREET 48 STREET TO STREET 49 STREET |
B012019065A59 | 2019-03-06 | 2019-03-17 | REPAIR WATER - PROTECTED | NEW YORK AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET |
B012019065A62 | 2019-03-06 | 2019-03-30 | REPAIR WATER - SEWER - PROTECTED | FRANKLIN AVENUE, BROOKLYN, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE |
B012019065A63 | 2019-03-06 | 2019-03-16 | REPAIR WATER - SEWER - PROTECTED | NORTH 7 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012019065A58 | 2019-03-06 | 2019-04-02 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
X012019065A26 | 2019-03-06 | 2019-03-17 | REPAIR WATER | EAST 230 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY |
M012019065A16 | 2019-03-06 | 2019-03-30 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
Q012019060A13 | 2019-03-06 | 2019-03-30 | REPAIR WATER | 56 DRIVE, QUEENS, FROM STREET 58 PLACE TO STREET MELVINA PLACE |
B012019065A61 | 2019-03-06 | 2019-03-30 | REPAIR WATER - SEWER | FULTON STREET, BROOKLYN, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE |
B012019065A60 | 2019-03-06 | 2019-03-30 | REPAIR WATER - SEWER | 63 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
Q012019064A18 | 2019-03-05 | 2019-04-02 | REPAIR WATER - SEWER | 76 AVENUE, QUEENS, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD |
B012019059E37 | 2019-02-28 | 2019-03-14 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
Q012019059B84 | 2019-02-28 | 2019-03-16 | REPAIR SEWER | METROPOLITAN AVENUE, QUEENS, FROM STREET ARNOLD AVENUE TO STREET GRANDVIEW AVENUE |
Q012019059A93 | 2019-02-28 | 2019-03-13 | REPAIR WATER - SEWER | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
Q012019059A90 | 2019-02-28 | 2019-03-29 | REPAIR SEWER | 28 AVENUE, QUEENS, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS |
M012019059A48 | 2019-02-28 | 2019-03-16 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012019059A49 | 2019-02-28 | 2019-03-14 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012019059A50 | 2019-02-28 | 2019-03-14 | REPAIR WATER | PEARL STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET PLATT STREET |
M012019059A55 | 2019-02-28 | 2019-03-10 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
B012019059D92 | 2019-02-28 | 2019-03-27 | REPAIR WATER - SEWER | 58 STREET, BROOKLYN, FROM STREET 20 AVENUE TO STREET 21 AVENUE |
B012019059D91 | 2019-02-28 | 2019-03-14 | REPAIR WATER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
B012019059D90 | 2019-02-28 | 2019-03-28 | REPAIR WATER - SEWER - PROTECTED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE |
B012019059D88 | 2019-02-28 | 2019-03-14 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012019059D87 | 2019-02-28 | 2019-03-14 | REPAIR WATER | DE KALB AVENUE, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019057F42 | 2019-02-26 | 2019-03-26 | REPAIR WATER - SEWER - PROTECTED | 67 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012019056C15 | 2019-02-25 | 2019-03-16 | REPAIR WATER - SEWER | DEAN STREET, BROOKLYN, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD |
B012019056D59 | 2019-02-25 | 2019-03-26 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
Q012019056D67 | 2019-02-25 | 2019-03-10 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q012019056D88 | 2019-02-25 | 2019-03-24 | REPAIR WATER | JUNO STREET, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012019056B89 | 2019-02-25 | 2019-02-28 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019056B94 | 2019-02-25 | 2019-03-12 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012019056C13 | 2019-02-25 | 2019-03-24 | REPAIR WATER - SEWER | EAST 25 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012019056C10 | 2019-02-25 | 2019-03-24 | REPAIR SEWER | THROOP AVENUE, BROOKLYN, FROM STREET GATES AVENUE TO STREET MONROE STREET |
B012019056C08 | 2019-02-25 | 2019-03-26 | REPAIR WATER - SEWER - PROTECTED | CLASSON AVENUE, BROOKLYN, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE |
B012019056C05 | 2019-02-25 | 2019-03-10 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
B012019056B95 | 2019-02-25 | 2019-03-12 | REPAIR WATER - SEWER | EAGLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012019056B90 | 2019-02-25 | 2019-03-28 | REPAIR WATER - SEWER - PROTECTED | 19 AVENUE, BROOKLYN, FROM STREET BATH AVENUE TO STREET BENSON AVENUE |
M012019056C15 | 2019-02-25 | 2019-03-07 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
M012019056C19 | 2019-02-25 | 2019-03-14 | REPAIR WATER - SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET CHURCH STREET TO STREET GREENE STREET |
B012019053C45 | 2019-02-22 | 2019-03-22 | REPAIR WATER | 43 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET 14 AVENUE |
M012019053B45 | 2019-02-22 | 2019-03-24 | REPAIR WATER | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
B012019053C46 | 2019-02-22 | 2019-03-22 | REPAIR WATER | DOUGLASS STREET, BROOKLYN, FROM STREET COURT STREET TO STREET SMITH STREET |
B012019052C82 | 2019-02-21 | 2019-03-20 | REPAIR WATER | COFFEY STREET, BROOKLYN, FROM STREET CONOVER STREET TO STREET FERRIS STREET |
Q012019051A45 | 2019-02-20 | 2019-02-27 | REPAIR SEWER | 28 AVENUE, QUEENS, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS |
B012019051C86 | 2019-02-20 | 2019-03-25 | REPAIR WATER - SEWER | MYRTLE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET LEWIS AVENUE |
X012019051A10 | 2019-02-20 | 2019-03-20 | REPAIR WATER - PROTECTED | DR M L KING JR BOULEVARD, BRONX, FROM STREET HALL OF FAME TERRACE TO STREET WEST 183 STREET |
B012019051C89 | 2019-02-20 | 2019-03-23 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
B012019051C82 | 2019-02-20 | 2019-03-20 | REPAIR WATER | SOUTH 1 STREET, BROOKLYN, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET |
B012019051C88 | 2019-02-20 | 2019-03-14 | REPAIR WATER | 59 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019049A12 | 2019-02-18 | 2019-03-20 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET |
B012019049A10 | 2019-02-18 | 2019-02-27 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
B012019049A09 | 2019-02-18 | 2019-02-27 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
M012019049A07 | 2019-02-18 | 2019-03-16 | REPAIR WATER - SEWER | WEST 60 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE |
Q012019049A10 | 2019-02-18 | 2019-02-27 | REPAIR WATER - SEWER | JEWEL AVENUE, QUEENS, FROM STREET 108 STREET TO STREET 110 STREET |
B012019049A13 | 2019-02-18 | 2019-03-20 | REPAIR WATER - SEWER | AMITY STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
B012019049A11 | 2019-02-18 | 2019-03-03 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
Q012019046D96 | 2019-02-15 | 2019-03-07 | REPAIR WATER - SEWER | 182 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012019046C82 | 2019-02-15 | 2019-03-03 | REPAIR WATER - SEWER | 76 AVENUE, QUEENS, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD |
Q012019043A99 | 2019-02-15 | 2019-03-13 | REPAIR WATER | 195 STREET, QUEENS, FROM STREET 56 AVENUE TO STREET 58 AVENUE |
M012019046A45 | 2019-02-15 | 2019-03-03 | REPAIR WATER - SEWER | MORNINGSIDE DRIVE, MANHATTAN, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET |
B012019046C24 | 2019-02-15 | 2019-03-23 | REPAIR WATER - PROTECTED | GRAND STREET EXTENSION, BROOKLYN, FROM STREET SOUTH 1 STREET |
B012019046C23 | 2019-02-15 | 2019-03-07 | REPAIR WATER - SEWER - PROTECTED | EVERGREEN AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
M012019046A46 | 2019-02-15 | 2019-03-03 | REPAIR WATER - SEWER - PROTECTED | EAST 39 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
B012019045C57 | 2019-02-14 | 2019-03-15 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
M012019045B19 | 2019-02-14 | 2019-02-28 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
B012019045C59 | 2019-02-14 | 2019-03-16 | REPAIR WATER - SEWER - PROTECTED | WINTHROP STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019045C62 | 2019-02-14 | 2019-03-13 | REPAIR WATER - SEWER - PROTECTED | 10 AVENUE, BROOKLYN, FROM STREET 43 STREET TO STREET 44 STREET |
B012019045C63 | 2019-02-14 | 2019-03-13 | REPAIR WATER - SEWER | 50 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD |
B012019043A90 | 2019-02-14 | 2019-03-13 | REPAIR WATER | 43 STREET, BROOKLYN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B012019045C53 | 2019-02-14 | 2019-02-26 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012019045C54 | 2019-02-14 | 2019-02-26 | REPAIR WATER - SEWER | EAGLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012019045C55 | 2019-02-14 | 2019-02-18 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET |
B012019045C56 | 2019-02-14 | 2019-03-02 | REPAIR SEWER - PROTECTED | 48 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019043A00 | 2019-02-12 | 2019-03-12 | REPAIR WATER - SEWER | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET |
B012019043E24 | 2019-02-12 | 2019-02-26 | REPAIR WATER - SEWER - PROTECTED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE |
B012019043E30 | 2019-02-12 | 2019-02-28 | REPAIR WATER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
M012019043B07 | 2019-02-12 | 2019-03-07 | REPAIR WATER - PROTECTED | LAFAYETTE STREET, MANHATTAN, FROM STREET CATHERINE LANE TO STREET LEONARD STREET |
M012019043B05 | 2019-02-12 | 2019-02-26 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
B012019043F75 | 2019-02-12 | 2019-02-24 | REPAIR WATER - SEWER | 64 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019043F66 | 2019-02-12 | 2019-03-10 | REPAIR WATER - SEWER | LEONARD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE |
B012019043E33 | 2019-02-12 | 2019-03-03 | REPAIR WATER - SEWER - PROTECTED | LORIMER STREET, BROOKLYN, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE |
B012019043A01 | 2019-02-12 | 2019-03-12 | REPAIR WATER - SEWER | WEST 17 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012019039B27 | 2019-02-08 | 2019-02-22 | REPAIR WATER | 59 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
M012019039B02 | 2019-02-08 | 2019-02-22 | REPAIR WATER | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
M012019039B04 | 2019-02-08 | 2019-02-08 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
M012019039B30 | 2019-02-08 | 2019-02-22 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
B012019039B29 | 2019-02-08 | 2019-02-23 | REPAIR WATER - SEWER | MYRTLE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET LEWIS AVENUE |
Q012019039B49 | 2019-02-08 | 2019-02-17 | REPAIR WATER - SEWER | 76 AVENUE, QUEENS, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD |
X012019038A76 | 2019-02-07 | 2019-03-06 | REPAIR WATER | EAST 230 STREET, BRONX, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY |
B012019038B89 | 2019-02-07 | 2019-02-21 | REPAIR WATER - PROTECTED | GRAND STREET EXTENSION, BROOKLYN, FROM STREET SOUTH 1 STREET |
B012019037D73 | 2019-02-06 | 2019-03-05 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
M012019035A55 | 2019-02-04 | 2019-03-02 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
M012019035A56 | 2019-02-04 | 2019-02-08 | REPAIR WATER - SEWER | GREENE STREET, MANHATTAN, FROM STREET CANAL STREET TO STREET GRAND STREET |
M012019035A53 | 2019-02-04 | 2019-02-28 | REPAIR WATER | PLATT STREET, MANHATTAN, FROM STREET GOLD STREET TO STREET PEARL STREET |
M012019035A52 | 2019-02-04 | 2019-02-28 | REPAIR WATER | PEARL STREET, MANHATTAN, FROM STREET FLETCHER STREET TO STREET PLATT STREET |
B012019035A83 | 2019-02-04 | 2019-02-28 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET |
B012019035A80 | 2019-02-04 | 2019-02-21 | REPAIR WATER | GRAND ST EXTENSION, BROOKLYN, FROM STREET HOOPER STREET TO STREET SOUTH 1 STREET |
Q012019035B62 | 2019-02-04 | 2019-03-05 | REPAIR WATER - SEWER | 55 AVENUE, QUEENS, FROM STREET BEND TO STREET JUSTICE AVENUE |
B012019035A71 | 2019-02-04 | 2019-02-17 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012019035A70 | 2019-02-04 | 2019-02-16 | REPAIR WATER - SEWER | BOERUM STREET, BROOKLYN, FROM STREET BROADWAY TO STREET LORIMER STREET |
B012019035A64 | 2019-02-04 | 2019-02-16 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012019035A63 | 2019-02-04 | 2019-02-16 | REPAIR WATER - SEWER | EAGLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012019035A60 | 2019-02-04 | 2019-02-28 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012019035A44 | 2019-02-04 | 2019-02-18 | REPAIR WATER - SEWER | AMITY STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
B012019035A29 | 2019-02-04 | 2019-02-24 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 63 STREET TO STREET 64 STREET |
B012019035A26 | 2019-02-04 | 2019-02-23 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019030E42 | 2019-01-30 | 2019-02-28 | REPAIR WATER | DE KALB AVENUE, BROOKLYN, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE |
B012019030E44 | 2019-01-30 | 2019-02-18 | REPAIR WATER - SEWER | 58 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Q012019030B19 | 2019-01-30 | 2019-02-28 | REPAIR WATER | 160 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE |
B012019029C60 | 2019-01-29 | 2019-02-11 | REPAIR WATER | BAINBRIDGE STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012019029C64 | 2019-01-29 | 2019-02-10 | REPAIR WATER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
B012019029C78 | 2019-01-29 | 2019-02-12 | REPAIR WATER - SEWER | 64 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012019029C23 | 2019-01-29 | 2019-02-26 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
Q012019029C33 | 2019-01-29 | 2019-02-26 | REPAIR WATER - SEWER | EASTHAMPTON BOULEVARD, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
B012019029C79 | 2019-01-29 | 2019-02-10 | REPAIR WATER - SEWER | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET |
B012019029C80 | 2019-01-29 | 2019-02-10 | REPAIR WATER - SEWER | WEST 17 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012019029C81 | 2019-01-29 | 2019-02-13 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
M012019029B79 | 2019-01-29 | 2019-02-14 | REPAIR WATER - SEWER | WEST 60 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE |
M012019022A80 | 2019-01-29 | 2019-02-20 | REPAIR WATER | WEST 71 STREET, MANHATTAN, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE |
B012019028E81 | 2019-01-28 | 2019-02-24 | REPAIR WATER - SEWER | ST JOHNS PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE |
B012019025C77 | 2019-01-25 | 2019-02-14 | REPAIR WATER | BROADWAY, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET |
B012019025C76 | 2019-01-25 | 2019-01-27 | REPAIR WATER - SEWER | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET |
B012019025C75 | 2019-01-25 | 2019-02-09 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019025C74 | 2019-01-25 | 2019-02-09 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
M012019025B99 | 2019-01-25 | 2019-02-17 | REPAIR WATER - SEWER | MORNINGSIDE DRIVE, MANHATTAN, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET |
B012019022C66 | 2019-01-22 | 2019-02-21 | REPAIR WATER - SEWER - PROTECTED | EVERGREEN AVENUE, BROOKLYN, FROM STREET HIMROD STREET TO STREET STANHOPE STREET |
B012019022A27 | 2019-01-22 | 2019-02-21 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
Q012019022G00 | 2019-01-22 | 2019-02-21 | REPAIR WATER - SEWER | 182 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012019016A89 | 2019-01-22 | 2019-02-14 | REPAIR WATER | HERZL STREET, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE |
B012019022C67 | 2019-01-22 | 2019-02-17 | REPAIR WATER | SOUTH 1 STREET, BROOKLYN, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET |
B012019021A09 | 2019-01-21 | 2019-02-02 | REPAIR WATER | WEST 5 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY |
B012019021A10 | 2019-01-21 | 2019-02-04 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 63 STREET TO STREET 64 STREET |
M012019021A11 | 2019-01-21 | 2019-02-14 | REPAIR WATER - SEWER - PROTECTED | 5 AVENUE, MANHATTAN, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET |
M012019021A12 | 2019-01-21 | 2019-02-17 | REPAIR WATER - SEWER - PROTECTED | EAST 39 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET PARK AVENUE |
M012019021A10 | 2019-01-21 | 2019-02-13 | REPAIR WATER | WEST 137 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
B012019021A14 | 2019-01-21 | 2019-02-16 | REPAIR SEWER - PROTECTED | 48 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019021A15 | 2019-01-21 | 2019-01-31 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012019021A08 | 2019-01-21 | 2019-02-02 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012019021A13 | 2019-01-21 | 2019-02-16 | REPAIR WATER | DEAN STREET, BROOKLYN, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE |
B012019021A11 | 2019-01-21 | 2019-02-02 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
Q012019021A13 | 2019-01-21 | 2019-02-16 | REPAIR SEWER | 28 AVENUE, QUEENS, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS |
M012019021A09 | 2019-01-21 | 2019-02-02 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019016C98 | 2019-01-16 | 2019-01-28 | REPAIR WATER | BAINBRIDGE STREET, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012019014A00 | 2019-01-14 | 2019-01-26 | REPAIR WATER - PROTECTED | OCEAN PARKWAY, BROOKLYN, FROM STREET AVENUE I TO STREET BAY PARKWAY |
B012019014C91 | 2019-01-14 | 2019-02-04 | REPAIR WATER - SEWER | AMITY STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
M012019014B82 | 2019-01-14 | 2019-02-12 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
Q012019014D02 | 2019-01-14 | 2019-01-27 | REPAIR WATER - SEWER | EASTHAMPTON BOULEVARD, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
Q012019014D00 | 2019-01-14 | 2019-01-27 | REPAIR WATER - SEWER - PROTECTED | JAMAICA AVENUE, QUEENS, FROM STREET 160 STREET TO STREET 161 STREET |
M012019014B87 | 2019-01-14 | 2019-01-28 | REPAIR WATER - SEWER - PROTECTED | WEST 19 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
M012019011B46 | 2019-01-11 | 2019-02-08 | REPAIR WATER | LEROY STREET, MANHATTAN, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET |
Q012019011C22 | 2019-01-11 | 2019-02-03 | REPAIR WATER - SEWER | 55 AVENUE, QUEENS, FROM STREET BEND TO STREET JUSTICE AVENUE |
B012019011C31 | 2019-01-11 | 2019-01-27 | REPAIR WATER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
B012019011C30 | 2019-01-11 | 2019-02-08 | REPAIR WATER | 59 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE |
B012019011C29 | 2019-01-11 | 2019-02-06 | REPAIR WATER - SEWER | 48 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012019011C28 | 2019-01-11 | 2019-02-09 | REPAIR WATER - SEWER | MYRTLE AVENUE, BROOKLYN, FROM STREET BROADWAY TO STREET LEWIS AVENUE |
M012019009A54 | 2019-01-09 | 2019-01-19 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012019009E90 | 2019-01-09 | 2019-01-19 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012019009E88 | 2019-01-09 | 2019-01-29 | REPAIR WATER - SEWER | 64 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019008E51 | 2019-01-08 | 2019-02-10 | REPAIR WATER - SEWER - PROTECTED | LORIMER STREET, BROOKLYN, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE |
B012019008E55 | 2019-01-08 | 2019-01-22 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
B012019008E79 | 2019-01-08 | 2019-02-02 | REPAIR WATER - SEWER | EAGLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012019008E78 | 2019-01-08 | 2019-01-26 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012019008E77 | 2019-01-08 | 2019-02-13 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
B012019008E72 | 2019-01-08 | 2019-02-02 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012019008E68 | 2019-01-08 | 2019-01-25 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
B012019008E56 | 2019-01-08 | 2019-01-23 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
B012019008E67 | 2019-01-08 | 2019-01-19 | REPAIR WATER | 61 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
Q012019008D83 | 2019-01-08 | 2019-01-22 | REPAIR WATER - SEWER | 182 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
Q012019008D81 | 2019-01-08 | 2019-01-08 | REPAIR WATER - SEWER | 182 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012019004C02 | 2019-01-04 | 2019-02-01 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE |
B012019004C58 | 2019-01-04 | 2019-01-26 | REPAIR WATER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012019003A07 | 2019-01-03 | 2019-01-21 | REPAIR WATER - SEWER | STOCKTON STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
M012019003C15 | 2019-01-03 | 2019-01-14 | REPAIR WATER | WEST 137 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
M012019003C14 | 2019-01-03 | 2019-01-13 | REPAIR WATER | LEONARD STREET, MANHATTAN, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET |
B012019003C80 | 2019-01-03 | 2019-01-21 | REPAIR WATER - SEWER | 12 AVENUE, BROOKLYN, FROM STREET 63 STREET TO STREET 64 STREET |
B012019003C79 | 2019-01-03 | 2019-01-19 | REPAIR WATER | WEST 5 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY |
B012019003C73 | 2019-01-03 | 2019-01-27 | REPAIR WATER - SEWER | WEST 17 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012019003C56 | 2019-01-03 | 2019-01-30 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012018365E39 | 2018-12-31 | 2019-01-05 | REPAIR WATER | 53 STREET, BROOKLYN, FROM STREET 11 AVENUE TO STREET 12 AVENUE |
B012018365E78 | 2018-12-31 | 2019-01-08 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET |
B012018365E74 | 2018-12-31 | 2019-01-14 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
B012018365A06 | 2018-12-31 | 2019-01-09 | REPAIR WATER - SEWER - PROTECTED | 63 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE |
Q012018362B36 | 2018-12-28 | 2019-01-12 | REPAIR WATER - SEWER | 83 STREET, QUEENS, FROM STREET 159 AVENUE TO STREET 160 AVENUE |
Q012018362B38 | 2018-12-28 | 2019-01-11 | REPAIR WATER - SEWER | JUSTICE AVENUE, QUEENS, FROM STREET 54 AVENUE TO STREET 55 AVENUE |
B012018362A02 | 2018-12-28 | 2019-01-19 | REPAIR WATER - SEWER | EAST 5 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N |
Q012018362B35 | 2018-12-28 | 2019-01-09 | REPAIR SEWER | 210 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET 48 AVENUE |
Q012018362B37 | 2018-12-28 | 2019-01-11 | REPAIR WATER - SEWER | 55 AVENUE, QUEENS, FROM STREET BEND TO STREET JUSTICE AVENUE |
B012018360D37 | 2018-12-26 | 2019-01-25 | REPAIR WATER - SEWER | EAST 22 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K |
B012018360D36 | 2018-12-26 | 2019-01-14 | REPAIR WATER - SEWER | AMITY STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
B012018360D62 | 2018-12-26 | 2019-01-19 | REPAIR WATER - SEWER | CLIFTON PLACE, BROOKLYN, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE |
B012018360D53 | 2018-12-26 | 2019-01-07 | REPAIR WATER - SEWER - PROTECTED | 56 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE |
Q012018360C34 | 2018-12-26 | 2019-01-09 | REPAIR SEWER | 210 STREET, QUEENS, FROM STREET 47 AVENUE TO STREET 48 AVENUE |
B012018355F41 | 2018-12-21 | 2019-01-02 | REPAIR WATER - SEWER - PROTECTED | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
Q012018355I61 | 2018-12-21 | 2019-01-04 | REPAIR WATER - SEWER | 160 STREET, QUEENS, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE |
B012018355F42 | 2018-12-21 | 2019-01-12 | REPAIR WATER - SEWER - PROTECTED | CLIFTON PLACE, BROOKLYN, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE |
M012018355B53 | 2018-12-21 | 2019-01-31 | REPAIR WATER - SEWER | WEST 60 STREET, MANHATTAN, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE |
B012018355F40 | 2018-12-21 | 2018-12-31 | REPAIR WATER - SEWER | 51 STREET, BROOKLYN, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE |
B012018355F39 | 2018-12-21 | 2019-01-05 | REPAIR WATER - PROTECTED | EAST 11 STREET, BROOKLYN, FROM STREET AVENUE X TO STREET AVENUE Y |
M012018355B54 | 2018-12-21 | 2019-01-19 | REPAIR WATER | WEST 23 STREET, MANHATTAN, FROM STREET 7 AVENUE TO STREET 8 AVENUE |
B012018354E50 | 2018-12-20 | 2019-01-03 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
B012018353D16 | 2018-12-19 | 2019-01-17 | REPAIR WATER - SEWER - PROTECTED | GRAHAM AVENUE, BROOKLYN, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE |
B012018353D20 | 2018-12-19 | 2018-12-29 | REPAIR WATER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
M012018353B85 | 2018-12-19 | 2019-01-14 | REPAIR WATER - SEWER - PROTECTED | WEST 19 STREET, MANHATTAN, FROM STREET 9 AVENUE TO STREET 10 AVENUE |
B012018353D19 | 2018-12-19 | 2018-12-31 | REPAIR WATER - SEWER | PACIFIC STREET, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE |
B012018353D18 | 2018-12-19 | 2019-01-05 | REPAIR WATER | 61 STREET, BROOKLYN, FROM STREET 15 AVENUE TO STREET 16 AVENUE |
B012018351A39 | 2018-12-17 | 2019-01-15 | REPAIR WATER - PROTECTED | NEPTUNE AVENUE, BROOKLYN, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET |
Q012018351A00 | 2018-12-17 | 2019-01-13 | REPAIR WATER - SEWER | EASTHAMPTON BOULEVARD, QUEENS, FROM STREET 57 ROAD TO STREET 58 AVENUE |
B012018351A38 | 2018-12-17 | 2019-01-17 | REPAIR WATER - SEWER | FLUSHING AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET |
B012018348B49 | 2018-12-14 | 2018-12-31 | REPAIR WATER - SEWER | MIDDLETON STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET UNION AVENUE |
B012018348B47 | 2018-12-14 | 2019-01-12 | REPAIR WATER - SEWER | WALWORTH STREET, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE |
M012018348B21 | 2018-12-14 | 2018-12-31 | REPAIR WATER | WEST 137 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE |
B012018347B76 | 2018-12-13 | 2018-12-31 | REPAIR WATER - SEWER - PROTECTED | 83 STREET, BROOKLYN, FROM STREET 23 AVENUE TO STREET BAY PARKWAY |
B012018345F31 | 2018-12-11 | 2018-12-31 | REPAIR WATER - SEWER | AMITY STREET, BROOKLYN, FROM STREET HENRY STREET TO STREET HICKS STREET |
Q012018345C02 | 2018-12-11 | 2018-12-31 | REPAIR WATER - SEWER | 182 STREET, QUEENS, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY |
B012018341D46 | 2018-12-07 | 2018-12-31 | REPAIR WATER - SEWER | LINDEN BOULEVARD, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012018341D61 | 2018-12-07 | 2018-12-31 | REPAIR WATER - SEWER | WEST 17 STREET, BROOKLYN, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE |
B012018341D60 | 2018-12-07 | 2018-12-31 | REPAIR WATER - SEWER | GATES AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE |
B012018338A55 | 2018-12-04 | 2018-12-31 | REPAIR WATER | PULASKI STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE |
B012018338B79 | 2018-12-04 | 2018-12-15 | REPAIR WATER - PROTECTED | 61 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE |
B012018332A25 | 2018-11-28 | 2018-12-21 | REPAIR WATER - SEWER - PROTECTED | MONTROSE AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET |
B012018332A84 | 2018-11-28 | 2018-12-12 | REPAIR WATER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012018325D50 | 2018-11-21 | 2018-12-16 | REPAIR WATER - SEWER - PROTECTED | EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE |
B012018325D44 | 2018-11-21 | 2018-12-31 | REPAIR WATER - SEWER | EAGLE STREET, BROOKLYN, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE |
B012018318B28 | 2018-11-14 | 2018-12-08 | REPAIR WATER - PROTECTED | WEST 5 STREET, BROOKLYN, FROM STREET NEPTUNE AVENUE TO STREET WEST AVENUE |
X012018311A78 | 2018-11-07 | 2018-12-09 | REPAIR WATER - SEWER - PROTECTED | WASHINGTON AVENUE, BRONX, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET |
B012018310A18 | 2018-11-06 | 2018-11-28 | REPAIR WATER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE |
B012018309D58 | 2018-11-05 | 2018-11-14 | REPAIR WATER - PROTECTED | DE GRAW STREET, BROOKLYN, FROM STREET BOND STREET TO STREET HOYT STREET |
B012018306B65 | 2018-11-02 | 2018-11-14 | REPAIR WATER - SEWER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012018306D41 | 2018-11-02 | 2018-11-14 | REPAIR WATER - SEWER - PROTECTED | 13 AVENUE, BROOKLYN, FROM STREET 67 STREET TO STREET OVINGTON AVENUE |
B012018292D07 | 2018-10-19 | 2018-11-04 | REPAIR SEWER - PROTECTED | HOOPER STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012018269D51 | 2018-09-26 | 2018-10-26 | REPAIR WATER - SEWER - PROTECTED | AVENUE K, BROOKLYN, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET |
M012018269C55 | 2018-09-26 | 2018-10-10 | REPAIR SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018269C35 | 2018-09-26 | 2018-10-23 | REPAIR WATER - SEWER - PROTECTED | WASHINGTON AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE |
M012018250C79 | 2018-09-07 | 2018-09-30 | REPAIR WATER - SEWER - PROTECTED | WEST 30 STREET, MANHATTAN, FROM STREET 8 AVENUE TO STREET 9 AVENUE |
M012018250C80 | 2018-09-07 | 2018-09-30 | REPAIR WATER - SEWER - PROTECTED | 8 AVENUE, MANHATTAN, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET |
M012018249B01 | 2018-09-06 | 2018-09-26 | REPAIR SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018242D24 | 2018-08-30 | 2018-09-22 | REPAIR WATER - SEWER - PROTECTED | WASHINGTON AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE |
B012018236E22 | 2018-08-24 | 2018-09-12 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012018236E17 | 2018-08-24 | 2018-08-29 | REPAIR WATER - SEWER - PROTECTED | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012018215C27 | 2018-08-03 | 2018-08-29 | REPAIR SEWER - PROTECTED | EAST 17 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012018200C30 | 2018-07-19 | 2018-08-17 | REPAIR WATER - SEWER - PROTECTED | 2 PLACE, BROOKLYN, FROM STREET CLINTON STREET TO STREET COURT STREET |
B012018200C33 | 2018-07-19 | 2018-08-01 | REPAIR WATER - SEWER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B012018183C14 | 2018-07-02 | 2018-07-28 | REPAIR SEWER - PROTECTED | EAST 17 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012018180C27 | 2018-06-29 | 2018-07-28 | REPAIR WATER - PROTECTED | COURT STREET, BROOKLYN, FROM STREET DEAN STREET TO STREET PACIFIC STREET |
B012018179E11 | 2018-06-28 | 2018-07-18 | REPAIR WATER - SEWER - PROTECTED | PROSPECT PLACE, BROOKLYN, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE |
B012018172E72 | 2018-06-21 | 2018-07-07 | REPAIR WATER - SEWER - PROTECTED | 47 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012018163E97 | 2018-06-12 | 2018-06-28 | REPAIR WATER - SEWER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE |
B012018163C10 | 2018-06-12 | 2018-06-27 | REPAIR WATER - PROTECTED | HANCOCK STREET, BROOKLYN, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE |
B012018163E98 | 2018-06-12 | 2018-06-23 | REPAIR WATER - PROTECTED | CARROLL STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE |
B012018158C70 | 2018-06-07 | 2018-07-14 | REPAIR WATER - SEWER - PROTECTED | FLUSHING AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET |
B012018156C67 | 2018-06-05 | 2018-07-03 | REPAIR WATER - PROTECTED | BLAKE AVENUE, BROOKLYN, FROM STREET OSBORN STREET TO STREET ROCKAWAY AVENUE |
B012018149C78 | 2018-05-29 | 2018-06-20 | REPAIR WATER - SEWER - PROTECTED | BERGEN STREET, BROOKLYN, FROM STREET KINGSBOROUGH 5 WALK TO STREET KINGSBOROUGH 6 WALK |
B012018143F29 | 2018-05-23 | 2018-06-18 | REPAIR WATER - SEWER - PROTECTED | FLUSHING AVENUE, BROOKLYN, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET |
M012018141B45 | 2018-05-21 | 2018-06-20 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018136B79 | 2018-05-16 | 2018-05-30 | REPAIR WATER - SEWER - PROTECTED | 80 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
Q012018134E72 | 2018-05-14 | 2018-06-15 | REPAIR WATER - PROTECTED | 235 STREET, QUEENS, FROM STREET 118 AVENUE TO STREET CROSS ISLAND PARKWAY |
B012018128D20 | 2018-05-08 | 2018-05-25 | REPAIR WATER - PROTECTED | EAST 17 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
M012018123B58 | 2018-05-03 | 2018-05-21 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
Q012018123C19 | 2018-05-03 | 2018-05-16 | REPAIR WATER - PROTECTED | 235 STREET, QUEENS, FROM STREET 118 AVENUE TO STREET CROSS ISLAND PARKWAY |
M012018121B20 | 2018-05-01 | 2018-05-07 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018117A80 | 2018-04-27 | 2018-05-17 | REPAIR SEWER - PROTECTED | LORIMER STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET MARCY AVENUE |
B012018117B20 | 2018-04-27 | 2018-05-22 | REPAIR WATER - PROTECTED | MADISON STREET, BROOKLYN, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE |
Q012018116E84 | 2018-04-26 | 2018-05-20 | REPAIR WATER - SEWER - PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012018114C55 | 2018-04-24 | 2018-05-16 | REPAIR WATER - SEWER - PROTECTED | 80 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE |
M012018110D17 | 2018-04-20 | 2018-05-18 | REPAIR WATER - SEWER - PROTECTED | CANAL STREET, MANHATTAN, FROM STREET ALLEN STREET TO STREET ORCHARD STREET |
M012018106B00 | 2018-04-16 | 2018-04-30 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018103B83 | 2018-04-13 | 2018-05-11 | REPAIR WATER - PROTECTED | EAST 17 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE |
B012018095D09 | 2018-04-05 | 2018-04-19 | REPAIR WATER - PROTECTED | 6 AVENUE, BROOKLYN, FROM STREET 8 STREET TO STREET 9 STREET |
Q012018095C86 | 2018-04-05 | 2018-04-19 | REPAIR WATER - SEWER - PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
Q012018093C37 | 2018-04-03 | 2018-05-02 | REPAIR WATER - PROTECTED | 235 STREET, QUEENS, FROM STREET 118 AVENUE TO STREET CROSS ISLAND PARKWAY |
B012018075A17 | 2018-03-16 | 2018-04-05 | REPAIR WATER - PROTECTED | 6 AVENUE, BROOKLYN, FROM STREET 8 STREET TO STREET 9 STREET |
M012018067B91 | 2018-03-08 | 2018-04-16 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
M012018067B92 | 2018-03-08 | 2018-04-09 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
Q012018067B77 | 2018-03-08 | 2018-04-05 | REPAIR WATER - SEWER - PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012018064E27 | 2018-03-05 | 2018-03-18 | REPAIR WATER - SEWER - PROTECTED | DECATUR STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012018059C54 | 2018-02-28 | 2018-03-24 | REPAIR WATER - SEWER - PROTECTED | THROOP AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET |
M012018053A99 | 2018-02-22 | 2018-03-10 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
M012018052A46 | 2018-02-21 | 2018-03-17 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018046A90 | 2018-02-15 | 2018-03-03 | REPAIR WATER - PROTECTED | ST MARKS AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
M012018046A42 | 2018-02-15 | 2018-03-02 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
B012018046B08 | 2018-02-15 | 2018-03-03 | REPAIR WATER - SEWER - PROTECTED | THROOP AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET |
B012018044C63 | 2018-02-13 | 2018-02-25 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
M012018027A11 | 2018-02-09 | 2018-02-17 | REPAIR WATER - PROTECTED | SPRING STREET, MANHATTAN, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET |
M012018040B43 | 2018-02-09 | 2018-02-24 | REPAIR WATER - SEWER - PROTECTED | EAST 13 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET AVENUE A |
B012018036B83 | 2018-02-05 | 2018-03-03 | REPAIR WATER - PROTECTED | LORIMER STREET, BROOKLYN, FROM STREET MARCY AVENUE TO STREET UNION AVENUE |
M012018027A06 | 2018-02-05 | 2018-02-17 | REPAIR WATER - PROTECTED | SPRING STREET, MANHATTAN, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET |
B012018036B96 | 2018-02-05 | 2018-02-17 | REPAIR WATER - PROTECTED | ST MARKS AVENUE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012018036B95 | 2018-02-05 | 2018-03-03 | REPAIR WATER - PROTECTED | SKILLMAN STREET, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012018036B94 | 2018-02-05 | 2018-03-03 | REPAIR WATER - SEWER - PROTECTED | PUTNAM AVENUE, BROOKLYN, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD |
B012018036B93 | 2018-02-05 | 2018-02-11 | REPAIR WATER - PROTECTED | PRESIDENT STREET, BROOKLYN, FROM STREET COLUMBIA STREET TO STREET HICKS STREET |
B012018036B85 | 2018-02-05 | 2018-03-09 | REPAIR WATER - SEWER - PROTECTED | DECATUR STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M012018033A77 | 2018-02-02 | 2018-02-15 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
B012018033A74 | 2018-02-02 | 2018-02-15 | REPAIR WATER - PROTECTED | SHORE PARKWAY, BROOKLYN, FROM STREET OCEAN AVENUE TO STREET SHEEPSHEAD BAY ROAD |
B012018025C67 | 2018-01-25 | 2018-02-11 | REPAIR WATER - SEWER - PROTECTED | VAN BUREN STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012018025D04 | 2018-01-25 | 2018-02-07 | REPAIR WATER - SEWER - PROTECTED | DECATUR STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
B012018023D02 | 2018-01-23 | 2018-02-12 | REPAIR WATER - PROTECTED | NORTH 8 STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE |
B012018019B79 | 2018-01-19 | 2018-02-17 | REPAIR WATER - SEWER - PROTECTED | THROOP AVENUE, BROOKLYN, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET |
B012018018C38 | 2018-01-18 | 2018-01-26 | REPAIR WATER - SEWER - PROTECTED | VAN BUREN STREET, BROOKLYN, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE |
B012018012C30 | 2018-01-12 | 2018-01-24 | REPAIR WATER - SEWER - PROTECTED | DECATUR STREET, BROOKLYN, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE |
M012018010B00 | 2018-01-10 | 2018-02-01 | REPAIR WATER - PROTECTED | BROADWAY, MANHATTAN, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE |
B012018008C08 | 2018-01-08 | 2018-02-01 | REPAIR WATER - PROTECTED | SHORE PARKWAY, BROOKLYN, FROM STREET OCEAN AVENUE TO STREET SHEEPSHEAD BAY ROAD |
Q012018005B22 | 2018-01-05 | 2018-01-28 | REPAIR WATER - SEWER - PROTECTED | 228 STREET, QUEENS, FROM STREET 69 AVENUE TO STREET 73 AVENUE |
B012017352B07 | 2017-12-18 | 2018-01-17 | REPAIR WATER - SEWER - PROTECTED | 74 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE |
B012017352B44 | 2017-12-18 | 2018-01-06 | REPAIR SEWER - PROTECTED | MERMAID AVENUE, BROOKLYN, FROM STREET WEST 32 STREET TO STREET WEST 33 STREET |
B012017341C44 | 2017-12-07 | 2017-12-25 | REPAIR WATER - SEWER - PROTECTED | HAWTHORNE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
Q012017332D70 | 2017-11-28 | 2017-12-27 | REPAIR WATER - PROTECTED | 37 AVENUE, QUEENS, FROM STREET 10 STREET TO STREET 11 STREET |
B012017326A94 | 2017-11-22 | 2017-12-11 | REPAIR WATER - SEWER - PROTECTED | HAWTHORNE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012017317C91 | 2017-11-13 | 2017-12-14 | REPAIR WATER - SEWER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012017317B95 | 2017-11-13 | 2017-11-28 | REPAIR WATER - SEWER - PROTECTED | HAWTHORNE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012017312B92 | 2017-11-08 | 2017-11-14 | REPAIR WATER - SEWER - PROTECTED | MONROE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE |
B012017305B43 | 2017-11-01 | 2017-11-14 | REPAIR WATER - SEWER - PROTECTED | HAWTHORNE STREET, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE |
B012017290B50 | 2017-10-17 | 2017-11-14 | REPAIR WATER - SEWER - PROTECTED | BEDFORD AVENUE, BROOKLYN, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE |
B012017277C95 | 2017-10-04 | 2017-10-31 | REPAIR WATER - SEWER - PROTECTED | WARWICK STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012017265B97 | 2017-09-22 | 2017-10-16 | REPAIR WATER - PROTECTED | 60 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B012017257A48 | 2017-09-14 | 2017-09-27 | REPAIR WATER - PROTECTED | 60 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
Q012017256C79 | 2017-09-13 | 2017-10-13 | REPAIR WATER - SEWER - PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012017256C86 | 2017-09-13 | 2017-10-02 | REPAIR WATER - SEWER - PROTECTED | WARWICK STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012017249A00 | 2017-09-06 | 2017-09-13 | REPAIR WATER - PROTECTED | 60 STREET, BROOKLYN, FROM STREET 10 AVENUE TO STREET 11 AVENUE |
B012017243C04 | 2017-08-31 | 2017-09-13 | REPAIR WATER - SEWER - PROTECTED | WARWICK STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
Q012017233E82 | 2017-08-21 | 2017-09-13 | REPAIR WATER - SEWER - PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012017229B62 | 2017-08-17 | 2017-09-06 | REPAIR WATER - SEWER - PROTECTED | WARWICK STREET, BROOKLYN, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE |
B012017223C43 | 2017-08-11 | 2017-08-26 | REPAIR SEWER - PROTECTED | CORBIN PLACE, BROOKLYN, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE |
Q012017223C24 | 2017-08-11 | 2017-08-25 | REPAIR WATER - SEWER - PROTECTED | PARSONS BOULEVARD, QUEENS, FROM STREET 71 AVENUE TO STREET 72 AVENUE |
B012017118A66 | 2017-04-28 | 2017-05-14 | REPAIR SEWER - PROTECTED | 76 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
B012017116B41 | 2017-04-26 | 2017-04-30 | REPAIR SEWER - PROTECTED | 76 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2024-08-08 | 2024-08-08 | Address | 517 DEGRAW STREET, SUITE A, BROOKLYN, NY, 11217, USA (Type of address: Chief Executive Officer) |
2024-08-08 | 2024-09-18 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-08 | 2024-08-08 | Address | 142 5TH STREET, BROOKLYN, NY, 11215, USA (Type of address: Chief Executive Officer) |
2024-07-29 | 2024-08-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-07-01 | 2024-07-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-06-07 | 2024-07-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-20 | 2024-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-05-15 | 2024-05-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-04-23 | 2024-05-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-20 | 2024-04-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-12 | 2024-02-20 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-02-01 | 2024-02-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-01-11 | 2024-02-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-27 | 2024-01-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-06 | 2023-11-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-06 | 2023-11-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-03 | 2023-11-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-11-02 | 2023-11-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-23 | 2023-10-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-23 | 2023-11-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-10-19 | 2023-10-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-09-29 | 2023-10-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-08-02 | 2023-09-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-21 | 2023-08-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-14 | 2023-07-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-13 | 2023-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-07-11 | 2023-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-21 | 2023-07-11 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-16 | 2023-06-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-13 | 2023-06-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-07 | 2023-06-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-03 | 2023-06-07 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-06-02 | 2023-06-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-05-19 | 2023-06-02 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-22 | 2023-05-19 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-17 | 2023-04-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-04-17 | 2023-04-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-03-30 | 2023-04-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-03-06 | 2023-03-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-23 | 2023-03-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-23 | 2023-01-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-10 | 2023-01-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2023-01-10 | 2023-01-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-30 | 2023-01-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-29 | 2022-12-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-29 | 2022-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-12-16 | 2022-12-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-16 | 2022-12-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-10 | 2022-11-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-11-10 | 2022-11-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-10-17 | 2022-11-10 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-22 | 2022-10-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-09-13 | 2022-09-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-23 | 2022-08-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-23 | 2022-09-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-04 | 2022-08-23 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-08-01 | 2022-08-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-28 | 2022-08-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-22 | 2022-07-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-30 | 2022-07-22 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-05-04 | 2022-06-30 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-15 | 2022-05-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-04-15 | 2022-04-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-24 | 2022-04-15 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-04 | 2022-03-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-03-03 | 2022-03-04 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-17 | 2022-03-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-16 | 2022-02-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-08 | 2022-02-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-08 | 2022-02-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-24 | 2022-02-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-03 | 2021-11-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-11-03 | 2021-11-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-26 | 2021-10-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-26 | 2021-11-03 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-08-27 | 2021-10-26 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-16 | 2021-08-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2018-12-18 | 2024-08-08 | Address | 517 DEGRAW STREET, SUITE A, BROOKLYN, NY, 11217, USA (Type of address: Chief Executive Officer) |
2014-09-15 | 2024-08-08 | Address | 517 DEGRAW STREET SUITE A, BROOKLYN, NY, 11217, USA (Type of address: Service of Process) |
2014-09-15 | 2021-07-16 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240808003557 | 2024-08-08 | CERTIFICATE OF CHANGE BY ENTITY | 2024-08-08 |
221129001399 | 2022-11-29 | BIENNIAL STATEMENT | 2022-09-01 |
181218006164 | 2018-12-18 | BIENNIAL STATEMENT | 2018-09-01 |
140915000148 | 2014-09-15 | CERTIFICATE OF INCORPORATION | 2014-09-15 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-10-31 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found 2 permanent restorations in the roadway also the restorations have the incorrect year color code marker on them and there is an active permit#M012024288A16 on file. |
2024-10-30 | No data | EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced under DOT permit number X152024191A01 work started on July 9, 2024/ Work End on August 30, 2024 |
2024-10-30 | No data | MAC DONOUGH STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass in compliance in roadway ifo 688 3 cuts. C1. 5’x3.6’x3’ TT. 96.3 C2. 5’x5.6’x4’ BT. 97.0 TT. 96.8 C3. 3’x3’x3’ TT. 96.5 actual moisture 7.5 |
2024-10-30 | No data | MAC DONOUGH STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival 3 open excavations in the roadway ifo 688 C1. 5’x3.6’x3’ C2. 5’x5.6’x4’ C3. 3’x3’x3’ 1 open flag |
2024-10-30 | No data | BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M012024290B18 on file. |
2024-10-30 | No data | 77 STREET, FROM STREET BROADWAY TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm concrete s/w, r/w resurfaced. |
2024-10-27 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2024-10-27 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is in compliance |
2024-10-26 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found 2 IBM markers have not been replaced at Time of inspection NOV recently issued on 10/19/2024. |
2024-10-26 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway cut to grade partially resurfaced by Builder pave |
2024-10-26 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water/sewer restoration on roadway parking lane to curb. |
2024-10-25 | No data | SMART STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible At Time Of Inspection |
2024-10-24 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done refer to latest permit B012024061A37 |
2024-10-24 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-10-23 | No data | DE KALB AVENUE, FROM STREET NOSTRAND AVENUE TO STREET WALWORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done new permit B022024288A8 on file |
2024-10-23 | No data | NOSTRAND AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time new permit B022024288A74 on file |
2024-10-23 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway extending into plated sidewalk for NB77 new permit B012024288A21 on file |
2024-10-22 | No data | 221 STREET, FROM STREET 36 AVENUE TO STREET CORBETT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-10-22 | No data | 61 AVENUE, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement covering roadway |
2024-10-22 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The two cuts in the driving lane are 6 feet apart and need to be combined as one restoration as per the 1042A Drawing Note #9. A series of small holes spaced 10 feet or less from edge to abutting edge shall be opened to a continuous trench. |
2024-10-22 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK, pass |
2024-10-21 | No data | 221 STREET, FROM STREET 36 AVENUE TO STREET CORBETT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Being Occupied At Time Of Inspection |
2024-10-21 | No data | 246 PLACE, FROM STREET 60 AVENUE TO STREET 61 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Ped ramp on site |
2024-10-21 | No data | FOREST AVENUE, FROM STREET GRANDVIEW AVENUE TO STREET SAMUEL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN OPEN TRENCH AT 12 PM NEXT TO DELI - AT PARKING LOT OFF SCL - |
2024-10-19 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I found the respondent had 2024 repair water permanent res with damaged color code markers missing rear. Respondent failed to replace the 2 markers with visible year as notified in CAR# 20246720220 issues on 8/27/2024 |
2024-10-19 | No data | 20 AVENUE, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired NOV issued on create permit QNP2024293A07 |
2024-10-19 | No data | 20 AVENUE, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the respondent with a plated water excavation within the driving lane I/F/O 145-43 20th Avenue without DOT permit. The respondent was ID by permit Q012024243B26 which expired on 9/24/2024. |
2024-10-19 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET HAWTREE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee repaired partial cut and then protest the c-a-r after the repairs was done |
2024-10-18 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on the roadway |
2024-10-18 | No data | BEACH 73 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM SEWER CUT N THE ROADWAY and WORK DONE ON THE SIDEWALK |
2024-10-16 | No data | 204 STREET, FROM STREET 47 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the driving lane partly covered by 2024 gas restoration opp 47-12. |
2024-10-15 | No data | 189 STREET, FROM STREET 45 DRIVE TO STREET 45 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench to grade across the roadway in front of 45-31. |
2024-10-14 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2024-10-14 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane, new flag around water valve IFO property #19. |
2024-10-14 | No data | PALO ALTO AVENUE, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration in good condition color coded and sealed. |
2024-10-12 | No data | CLASSON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance |
2024-10-12 | No data | EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent restored the parking lane without 0135 NOV will issued |
2024-10-12 | No data | EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent repaired the condition on CAR # 20246500195 without the noted 0135 permit |
2024-10-11 | No data | 191 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (3'6" x 3'3" x 3'5") |
2024-10-11 | No data | EAST 31 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. Valid permit on file |
2024-10-11 | No data | 58 ROAD, FROM STREET 142 STREET TO STREET 146 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent has a temporary patched area within a permanent restoration trench across the roadway that is overdue for final. Respondent failed to permanently finalize patched area after. CAR #20246270269 issued on 9/7/2024. |
2024-10-10 | No data | SEDGWICK AVENUE, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp in place at time of inspection. |
2024-10-10 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway driving lane to curb and new sidewalk flags installed around utility. |
2024-10-10 | No data | HANCOCK STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Add correct IBM color year (2024) within restoration in front of 168 Hancock Street. (water valve on s/w & perm trench along the r/w) |
2024-10-10 | No data | HILLYER STREET, FROM STREET 51 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w trench to grade, perm concrete s/w, BO. |
2024-10-09 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restorations in the driving lane. Two flags around water valve IFO property #210. |
2024-10-08 | No data | 3 AVENUE, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Active | Department of Transportation | no crew on site |
2024-10-07 | No data | 4 AVENUE, FROM STREET ST MARKS PLACE TO STREET WARREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple Permanent Cut in Travel Lane. Permit expired. |
2024-10-07 | No data | 4 STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TEMP PEDESTRIAN WALKWAY FOUND |
2024-10-07 | No data | GLENWOOD STREET, FROM STREET BEND TO STREET IOWA ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to BPP paving done front of 48-04. |
2024-10-07 | No data | 152 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2024-10-06 | No data | BOND STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done and the permit expired 9/22/24. Newer permit on file #B012024264B94. |
2024-10-06 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with a temporary patched restoration in the parking lane after repairing previous NICA condition. The respondent failed to permanently restore cut within the required time. |
2024-10-06 | No data | 3 AVENUE, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the p/l, d/l and flag on s/w, is incompliance. |
2024-10-05 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a permanent restoration on the roadway with two color code markers missing 2024 to reflect the year on permit. Respondent failed to install 2024 color code markers on the permanent restoration on the roadway. Cited permit used for ID. |
2024-10-04 | No data | 171 STREET, FROM STREET 39 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2024-10-04 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | GC’s Temp walkway present under M022024250D09 |
2024-10-04 | No data | 171 STREET, FROM STREET 39 AVENUE TO STREET CROCHERON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cuts to grade , excavation material in parking lane contractor on site |
2024-10-03 | No data | BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit #M012024260C24 on file. |
2024-10-03 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED, pass |
2024-10-03 | No data | SMART STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew onsite working on installing sewer & water connection within the driving lane I/F/O 46-11/13 Smart Street. Active permit on file Crew onsite working on installing |
2024-10-03 | No data | BEACH 73 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM SEWER CUT N THE ROADWAYO |
2024-10-02 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At My Time Of Re-Inspection I Observed The Condition Is Not Corrected Defective Color Code Marker Remains Within Perm Restoration CAR Failed. |
2024-10-01 | No data | 45 AVENUE, FROM STREET 72 STREET TO STREET AMTRAK RAILROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet 123.3 dry 115.9 max dry 120.0 moisture 6.4% blend 12’x4’x3’. Foreman Mike. ETL Steven. Water cut driving lane and sidewalk. 9” Concrete base restored in kind. Top test 97.6. |
2024-10-01 | No data | BEACH 74 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR SEWER WORK IN PROGRESS |
2024-10-01 | No data | BEACH 74 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK IN PROGRESS NEW PERMIT OBTAINED-Q012024260B55 |
2024-09-29 | No data | 6 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance |
2024-09-29 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit, X012024260B09 work in progress. |
2024-09-29 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance at this time |
2024-09-29 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2024-09-28 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please notify above permittee IBM is missing year restoration was done. Ifo 1252 39 street. |
2024-09-26 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | First cut: L4'0'' x W10'5'' x D11'0'' located in the driving lane i/f/o 230 Stockholm St.Second cut: L2'9'' x W3'5'' x D3'0'' located in the driving lane opposite of 230 Stockholm St. |
2024-09-25 | No data | MANHATTAN AVENUE, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 387 & 391 Manhattan Ave, please recess and seal your expansion joints, located on the sidewalk. |
2024-09-25 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20246780247 issued on 4/5/2024. Respondent failed to permanently restore a cut, in the sidewalk, within required time. |
2024-09-24 | No data | 4 STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no water found |
2024-09-24 | No data | CARROLL STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2024-09-24 | No data | 3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2024-09-24 | No data | WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking/driving lane with 2 flags reset on sidewalk in compliance |
2024-09-24 | No data | OCEAN PARKWAY, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking/driving lane with 3 flags reset on sidewalk in compliance |
2024-09-24 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site working i/f/o 230 with the sidewalk closed. Crew made no effort to make a protected pedestrian walkway in the street. |
2024-09-23 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition previously reported on permit #Q012024043B32. |
2024-09-23 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-09-22 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration in roadway |
2024-09-20 | No data | EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sw repaunderway, update permit on file |
2024-09-20 | No data | WASHINGTON AVENUE, FROM STREET EAST 164 STREET TO STREET WEIHER COURT | No data | Street Construction Inspections: Active | Department of Transportation | Roadway in compliance |
2024-09-20 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk expansion joints sealed |
2024-09-19 | No data | QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by DOT IN-HOUSE PAVING AND MILLING Permit #B152024250C09 |
2024-09-18 | No data | 79 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm water restoration cut properly sealed on roadway |
2024-09-18 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2024-09-18 | No data | 3 AVENUE, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Counter-sunk plated r/w excavation in the bike lane, parking lane and full s/w flag replaced and curing incompliance, with an active newer permit on file #B012024260C52. |
2024-09-18 | No data | OCEAN PARKWAY, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm plumber restorations on parking/driving lane IFO property in compliance |
2024-09-17 | No data | BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O#105- Temporary asphalt water cut in the driving lane observed under plastic barriers. Permit remains active. |
2024-09-17 | No data | VERONICA PLACE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water trench on Snyder Ave. |
2024-09-16 | No data | 42 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in parking lane. Water valve in sidewalk. |
2024-09-14 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags restored expansion joints sealed I/F/O 19-12 149th Street. Work was done on builder's pave permit Q042024256A04 type 405 |
2024-09-13 | No data | 3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | no compressor found |
2024-09-13 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew currently on site working on the sidewalk and parking lane IFO property 2 |
2024-09-13 | No data | BURLING STREET, FROM STREET 45 AVENUE TO STREET GEORGIA ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired inspection done on recent permit Q012024117B82 |
2024-09-13 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-09-13 | No data | 4 STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | no crew on site |
2024-09-13 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2024-09-12 | No data | 204 STREET, FROM STREET 33 AVENUE TO STREET 34 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within parking lane front of 33-22. |
2024-09-12 | No data | 3 AVENUE, FROM STREET BALTIC STREET TO STREET BUTLER STREET | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walkway found |
2024-09-12 | No data | 162 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave |
2024-09-12 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#B022024250B63, pass |
2024-09-11 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been re-surfaced. |
2024-09-11 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the driving lane partially cover by builder's pave I/F/O 56-25 135th Street |
2024-09-10 | No data | 37 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated plumber long water cut going across roadway. No one on site. |
2024-09-10 | No data | 37 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber work is being done under updated permit Q012024250A93 On file. Work not finalized under this permit. |
2024-09-09 | No data | SOUTH 2 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible within the roadway due to DOT Paving of the segment after the permit expired. B152024222A06 |
2024-09-07 | No data | 58 ROAD, FROM STREET 142 STREET TO STREET 146 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sunken area on a permanent sewer restoration has been made temporary to grade within the driving lane. NICA Re-Inspection made safe |
2024-09-07 | No data | 37 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete on 2 excavations on the roadway i/f/o 56-08 On Street: 37 AVENUE |
2024-09-07 | No data | 58 ROAD, FROM STREET 142 STREET TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a 1'6" x 1' area on an permanent sewer restoration that is sunken 4" within the driving lane 85' from the corner of 58th road & 146th Street. Work was done for corner property 58-28 146th Street. Also requesting a Re-Dig. |
2024-09-07 | No data | 146 STREET, FROM STREET 58 ROAD TO STREET 59 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done permit expired |
2024-09-06 | No data | LAWRENCE STREET, FROM STREET 57 ROAD TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking lane opposite of 57-39 Lawrence Street |
2024-09-06 | No data | WEST 13 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking/driving lane IFO property #2167 - #2169 in compliance |
2024-09-05 | No data | 17 ROAD, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2024-09-05 | No data | HANCOCK STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM ELECTRICAL TRENCH ACROSS THE ROADWAY AND 2 SIDE WALK FLAGS INSTALLED |
2024-09-05 | No data | ELDERT STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closing old permit, refer to the latest permit: B012024177B48. |
2024-09-05 | No data | 134 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across the roadway I/F/O 57-09 134th Street |
2024-09-05 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY CURB TO CURB HALF OF TRENCH IS COVERED BY BPP |
2024-09-03 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut partially resurfaced by BBP. |
2024-09-03 | No data | EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers rectangular permanent restoration falls between two lanes and must be permanently restored to near curb as per SKT009 stipulation . |
2024-09-02 | No data | VERMONT STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR ALREADY ISSUED FOR CONES NOT REMOVED AND EXPANSION JOINT NOT SEALED AT THE CURB |
2024-09-02 | No data | SMART STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two plated excavation in the parking lane I/F/O 46-11/13 Smart Street. |
2024-09-01 | No data | WEST 84 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2024-08-31 | No data | 19 AVENUE, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water cuts across both the eastbound and the westbound parking lanes. |
2024-08-31 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to finalize repair. |
2024-08-31 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed, sidewalk flag restored under permit Q042024213A68 obtained 7/31/24 after issuance of C.A.R. 20241450039 on 7/14/24. |
2024-08-30 | No data | HANCOCK STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 7ft x 4ft 5in x 11ft = 95.8%, 98.4%6ft 5in x 5ft 4in x 5ft = 97.1%, 97.5%WD:125.4,DD:117.9,MD:124.0,AM:6.4%WD:125.4,DD:117.9,MD:124.0,AM:6.4% |
2024-08-30 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. Another construction crew on site. |
2024-08-30 | No data | 20 DRIVE, FROM STREET 19 LANE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-08-30 | No data | 3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple plated excavation in the r/w with an active permit close to bond st |
2024-08-29 | No data | CLASSON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Two restorations located within the driving lane IFO property 820. 1st Cut- L-14'1" W-4' D-9'4" 2nd Cut L-6' W-3'9" D-3'4" |
2024-08-29 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration from curb to curb is incompliance, IFO 152. |
2024-08-29 | No data | EAST TREMONT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SOMMER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER |
2024-08-28 | No data | BEACH 73 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration found at corner of beach 73 street and amstel boulevard |
2024-08-28 | No data | BEACH 74 STREET, FROM STREET AMSTEL BOULEVARD TO STREET BEACH CHANNEL DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration found at corner of beach 73 street and amstel boulevard |
2024-08-27 | No data | OCEAN PARKWAY, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2024-08-27 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 332, plug / seal pin hole from plating and remove scratched out color code markers ( 2 ) and replace them with both visible five digit IBM# 33387 and two digit year 24'. |
2024-08-26 | No data | FRANKLIN AVENUE, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway, parking/driving lane sealed in compliance IF0 893 |
2024-08-23 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2024-08-22 | No data | EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2024-08-22 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | two restorations left plated within the driving lane IFO property 210.1st cut L-4'6" W-3' D-2'4" 2nd Cut L-5'2" W-3'3" D-3'4" |
2024-08-22 | No data | 42 STREET, FROM STREET 34 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Water Sidewalk+ Parking Lane 6’x5’x4’ blend JumpingJack SandCone ETL Joseph Wet 127.5 dry 117.3 max 122.0 moisture 8.7% bottom test 97.1 TopTest 6” concrete base, restored in-kind. 6’x6’ with cutback. |
2024-08-21 | No data | 6 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Ifo 282 construction site 3 roadway excavations 1 ifo, with 2 opposite. Cut 1. 5’x4’x3’ (97.3)Cut 2. 4’x4’x3’ (97) Cut 3. 3’x4’x3’ (97.6) with an actual moisture of (6.8) |
2024-08-21 | No data | SNYDER AVENUE, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane .. in compliance |
2024-08-21 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration mounded and sunken 1/12 inches within the area of the cut creating a hump causing resident's home foundations to shake while vehicles are in motion. As per thorough inspection the r/w is on the list to be re-paved. |
2024-08-21 | No data | 6 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2024-08-20 | No data | 1 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2024-08-20 | No data | 44 AVENUE, FROM STREET 69 STREET TO STREET 72 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed, 10’ x 6’ x 9’ repair sewer restoration extending in the parking & driving lane in front of 69-27. |
2024-08-16 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore temporary restoration. |
2024-08-15 | No data | SMART STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Being Occupied At Time Of Inspection |
2024-08-14 | No data | 3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER | No data | Street Construction Inspections: Active | Department of Transportation | Several plates crossing the roadway curb to curb ramped and in compliance |
2024-08-13 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area made temp to grade with temporary asphalt |
2024-08-13 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of plumbers cut caved in 2 ‘ 4x3 down 2’ in the driving lane. |
2024-08-12 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration mounded and sunken 1/12 inches within the area of the cut creating a hump causing resident's home foundations to shake while vehicles are in motion. As per thorough inspection the r/w is on the list to be re-paved. |
2024-08-11 | No data | EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water cut is to grade in compliance. |
2024-08-11 | No data | NEVINS STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag sealed and in compliance |
2024-08-10 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work observed within the segment |
2024-08-10 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-08-09 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in front of 2142 in compliance |
2024-08-07 | No data | EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Due to picking up 1037A from NYPD Vernon and I reaches local law late, 2 cuts 3' x 3' depth 3' backfilled, Lab Exclusive Testing, Charles, Sand Cone, completed proctor. Blend was used, wet 120.9 dry 112.4 max density 116.0 actual 7.5 test 98.4/ 97.7 |
2024-08-07 | No data | 14 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-08-07 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closing old permit, refer to the latest permit on file, B012024204C91. |
2024-08-07 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in the roadway, site is in compliance. |
2024-08-07 | No data | EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER - PROTECTED |
2024-08-06 | No data | WEST 13 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2024-08-04 | No data | CARROLL STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the p/l, d/l and two s/w flags with a water valve, is incompliance IUFO #74. |
2024-08-03 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the parking/driving lane, in front and opposite 324 58 Street. |
2024-08-03 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete patch left across sidewalk. |
2024-08-03 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway |
2024-08-02 | No data | FT HAMILTON PARKWAY, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water restoration opposite 6812 Ft Hamilton pkwy. |
2024-08-02 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This area remains the same, the above respondent failed to acknowledge a CAR #20246780247 issued on 04/05/2024, Temporary restoration on sidewalk needs to be restored in kind. |
2024-08-01 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site open excavation ifo property 379 construction site |
2024-08-01 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the the roadway is flush to grade |
2024-07-30 | No data | HILLYER STREET, FROM STREET 51 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | area inspected and in compliance |
2024-07-30 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane, two flags around water valve. |
2024-07-29 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2024-07-28 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-07-27 | No data | 31 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 24' x 5' x 1'1" base passed |
2024-07-27 | No data | JESUP AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Resealed |
2024-07-27 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1 of the 2 perm cuts in the driving lane was resurfaced by Con Ed. |
2024-07-27 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-07-26 | No data | 65 AVENUE, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the parking lane at this time. Active permit on file (Q012024183D06). |
2024-07-26 | No data | 65 AVENUE, FROM STREET 167 STREET TO STREET 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCC roadway at time of inspection. |
2024-07-26 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in the roadway driving lane extending to the curb new sidewalk flags ifo 291 Construction site in compliance |
2024-07-26 | No data | DEVOE STREET, FROM STREET LEONARD STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2024-07-25 | No data | COMMERCIAL STREET, FROM STREET ASH STREET TO STREET BOX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-07-25 | No data | 36 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking/driving lane, sidewalk flag restored around water valve at the of 35-58 Crescent St (Corner property) |
2024-07-25 | No data | FT HAMILTON PARKWAY, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 4FT width 3FT depth 3FT TEST RESULTS 98.2 |
2024-07-24 | No data | 134 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete on 2 excavations on the roadway. |
2024-07-23 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on driving/parking lane in compliance |
2024-07-22 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in the roadway is flush to grade on DuPont st |
2024-07-21 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by bpp |
2024-07-21 | No data | MYRTLE AVENUE, FROM STREET HANCOCK STREET TO STREET WEIRFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three Perm to grade restorations on roadway at location. |
2024-07-20 | No data | 39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut o grade within the driving lane. Work done on permit Q012024163A61 type 135 |
2024-07-20 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition has been co. INM color code marker installed to sewer cut and raises plow sign has been removed |
2024-07-20 | No data | BROADWAY, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent sidewalk restoration in compliance. Active 0401 - REPAIR SIDEWALK permit #M042024180A18 expires on 7/25/2024. |
2024-07-20 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to install the missing IBM color code marker in the permanent restoration in response to CAR #20247720197) issued on 4/23/2024. |
2024-07-20 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT HAS BEEN RESEALED |
2024-07-20 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The condition has been corrected tape has been removed from flag ifo 232 |
2024-07-20 | No data | VERMONT STREET, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued. Property Owner on site |
2024-07-20 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint missing sealer at the curb line ifo 232 |
2024-07-19 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2024-07-19 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Awaiting backfill |
2024-07-18 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Awaiting backfill |
2024-07-18 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled, crew will finish cutbacks to the curb tomorrow |
2024-07-18 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in the roadway opposite one another ifo property 1182 sealed in compliance 1 sidewalk flag installed around gas hardware good |
2024-07-18 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived: 10:00 Departure: 1:45pm Cut1: L30ftxW5ft6inxD10ft1st test: 98.3% 2nd test: 98.2% 3rd test: 98.5% |
2024-07-17 | No data | FT HAMILTON PARKWAY, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain. |
2024-07-17 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restorations are flushed to grade. |
2024-07-16 | No data | EDGEGROVE AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R/WAY. S/WALK FLAG IN LINE WITH R/WAY CUT |
2024-07-16 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 6/24/2024. |
2024-07-15 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 5/22/2024 |
2024-07-15 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 7/8/2024. (Multiple plated excavation in the r/w) |
2024-07-15 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no crew on site |
2024-07-15 | No data | 14 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work found |
2024-07-15 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts #1 L 12FT W 4FT D 9FT #2 L 3FT 9IN W3FT 9IN D 3FT WD 124.2 DD 114.3 MD 120.5 AM 8.7; #1 98.6% #2 98.2% 98.4% |
2024-07-15 | No data | WEST 35 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flush to grade in the parking/driving lane. |
2024-07-15 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site with 2 open excavation, 1 opposite new building |
2024-07-14 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration color coded and sealed . Sidewalk has temporary asphalt ,permit expired C.A.R will be issued under permit # Qo12024082a10 . |
2024-07-13 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration not finalized. |
2024-07-13 | No data | 79 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST # 20248280300 (ISSUED 6/5/2024)-FAILED TO INSTALL PROPER 2024 # 33387 PLUMBING NYC, INC.. COLOR CODE IN PERMANENT REPAIR WATER RESTORATION IN ROADWAY. |
2024-07-12 | No data | 3 AVENUE, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2024-07-11 | No data | EAST 35 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L .. IN COMPLIANCE |
2024-07-11 | No data | CORPORAL STONE STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-07-11 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seg was resurfaced |
2024-07-10 | No data | STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L14ft, W5ft, D9.5ft cut in the driving lane IFO property #63. |
2024-07-10 | No data | 39 AVENUE, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Occupied At Time Of Inspection |
2024-07-09 | No data | 39 AVENUE, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-07-08 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2024-07-07 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sign was removed |
2024-07-06 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2024-07-04 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two steel plates on sidewalk 20’ east of Gate A. Two more steel plates leading to center of roadway. |
2024-07-04 | No data | NEVINS STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm restoration in the r/w |
2024-07-04 | No data | 45 STREET, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway trench sidewalk restored front of BO. |
2024-07-04 | No data | MADISON STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in parking lane new permit on file |
2024-07-03 | No data | CARROLL STREET, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway parking lane sealed in compliance new sidewalk flags adjacent to property line of school yard and around water cap in compliance opp 934 |
2024-07-02 | No data | ROSE AVENUE, FROM STREET KISSENA BOULEVARD TO STREET ROBINSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-07-01 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo property 293 perm restoration in the roadway dividing lane 2 new sidewalk flags installed around water cap sealed in compliance |
2024-07-01 | No data | EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2’8” x 4’ portion of permanent restoration sunken 1’5” in the driving lane of the roadway. Area needs to be restored. |
2024-06-29 | No data | EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2024-06-29 | No data | EAST 101 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023110C04 |
2024-06-29 | No data | 39 AVENUE, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | REPAIR WATER- CONTAINMENT ONLY TO RESTRICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL IS ALLOWED. BAGS OF SAND STORED IN PARKING LANE IN COMPLIANCE . |
2024-06-29 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has a temporary restoration and sidewalk flag installed. The respondent has failed to replace distinctive sidewalk in kind. CAR#20246780247 was issued 5/4/2024. |
2024-06-28 | No data | 3 AVENUE, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects on SW or roadway at time of inspection. |
2024-06-27 | No data | EAST 35 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L OPP LOCATION .. IN COMPLIANCE |
2024-06-26 | No data | SNYDER AVENUE, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PALTED EXCAVATION IN THE D/L P/L .. IN COMPLIANCE .. UNDER VALID PERMIT # B012024172E10 EXP 7/21/24 |
2024-06-26 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane 2 new sidewalk flags sealed in compliance ifo 702 |
2024-06-26 | No data | EAST 28 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L .. IN COMPLIANCE |
2024-06-25 | No data | 102 STREET, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in front of 55-06 to grade in the parking/driving lane. |
2024-06-24 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-06-23 | No data | BEACH CHANNEL DRIVE, FROM STREET BEACH 73 STREET TO STREET BEACH 74 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two Permanent roadway restoration in good condition color coded and sealed , sidewalk has one flag around flags . |
2024-06-22 | No data | WEST 11 STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete , 6 inch cutbacks were done. 12 inch cutbacks were marked out for final restoration . 10'x8' Temporary water restoration in the parking lane |
2024-06-22 | No data | BOND STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings restored at this time |
2024-06-21 | No data | 134 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Roadway Occupied At Time Of Inspection |
2024-06-21 | No data | JESUP AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal is missing from permanent restoration. Restoration needs to be resealed IFO 1434 |
2024-06-20 | No data | 4 AVENUE, FROM STREET ST MARKS PLACE TO STREET WARREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6 individual cut’s in Travel Lane In front of #79-95. No Corrective Action Request. Permit expired. |
2024-06-20 | No data | CONSELYEA STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane lane is flush to grade |
2024-06-20 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on driving lane IFO property #265 in compliance |
2024-06-20 | No data | VERONICA PLACE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE WORKING AT THIS TIME OF INSPECTION, UNDER VALID PERMIT # B012024158B00 EXP 6/21/24 |
2024-06-20 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to BPP no work found on the segment. |
2024-06-19 | No data | 31 DRIVE, FROM STREET 12 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill pass cut sizes: 10' x 7' x 4' , 6' x 4' x5'3''. |
2024-06-18 | No data | 204 STREET, FROM STREET 33 AVENUE TO STREET 34 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-06-18 | No data | 160 STREET, FROM STREET 76 ROAD TO STREET 77 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across the roadway at this time. Sidewalk flags restored in kind. |
2024-06-18 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway extending from curb to curb sealed in compliance ifo 379 |
2024-06-18 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seg was resurfaced |
2024-06-16 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White tape used to seal expansion joints need to removed from the sidewalk and curb in front of 232 8 Street. |
2024-06-16 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White tape used to seal expansion joints need to removed from the sidewalk and curb in front of 232 8 Street. |
2024-06-16 | No data | WARREN STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w sealed |
2024-06-15 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site awaiting backfill |
2024-06-15 | No data | FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2024-06-15 | No data | BROADWAY, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to fully restore sidewalk flag surrounding a water valve cover containing concrete patchwork. Respondent was notified by via CAR # 20244410030, issued on 3/15/24 to correct the condition but failed to do so. |
2024-06-15 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has 2 perm cuts 2' apart in the driving lane. Failed to combine both restoration and make square on all side shape as per 1042 A note # 3. As per CAR# 20234170201. |
2024-06-14 | No data | 37 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No backhoe found |
2024-06-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property permit #B012023243C83 |
2024-06-14 | No data | EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has updated permit # X012024163A64 |
2024-06-14 | No data | EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Has 3 open excavation with steel plates pinned, ramp r/w, also on the s/w has open excavation with 2 steel plates ramped. Opp 361 E 194 St. Spoke to foreman Nicolas on site. Need to put skid resistance on all the steel plates, marking on all plates. |
2024-06-14 | No data | CORPORAL STONE STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | VERIFIED- REPAIR WATER-SEWER CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FT, 8 FT ADJACENT TO THE CURB DURING NON-WORK HOURS. CONTAINMENT ONLY TO RESTRICT FOR STORAGE OF EXCAVATED MATERIAL/FILL. BAGS OF DEBRIS IN P/L. SPOKE WITH WORKER ON SITE. |
2024-06-14 | No data | 39 AVENUE, FROM STREET 214 PLACE TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER-CREW ON SITE SETTING UP. 7AM STIPS IN COMPLIANCE. PLATED EXCAVATIONS ON SEGMENT. |
2024-06-13 | No data | 79 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2024-06-12 | No data | LOVELACE AVENUE, FROM STREET DEAD END TO STREET STROUD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found. #104 is located at dead end, where street is inaccessible and roadway is grass/gravel. |
2024-06-12 | No data | 66 STREET, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration |
2024-06-12 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN THE ROADWAY NEEDS TO RESEALED CAR BEING ISSUED TO LATEST PERMIT |
2024-06-11 | No data | 21 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking/driving lane in compliance |
2024-06-11 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by DOT IN-HOUSE PAVING AND MILLING Permit #B152023223B10 |
2024-06-10 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR closed. The sidewalk expansion joints were sealed. Some area of the expansion are exposed, however the condition is minor at this time. |
2024-06-08 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair CAR #20247440158 issued on 4/24/2024. Failed to remove a "Raise Plow" construction sign from the sidewalk, prior to the expiration of their permit. ID by respondent's #33387 installed on sign. |
2024-06-08 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code marker missing year |
2024-06-08 | No data | FENTON AVENUE, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2024-06-08 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to install or seal expansion joints as per subsection |
2024-06-07 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O#51-42, Temporary Restoration must be Permanently repaired. |
2024-06-07 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw has been resurfaced by bpp |
2024-06-07 | No data | 4 AVENUE, FROM STREET ST MARKS PLACE TO STREET WARREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #79 |
2024-06-07 | No data | 5 AVENUE, FROM STREET EAST 128 STREET TO STREET EAST 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and SW incompliance at time of inspection. |
2024-06-07 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. Cave in within roadway. |
2024-06-07 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cave-In has been addressed, made Temporarily Safe, pass |
2024-06-06 | No data | COLUMBIA STREET, FROM STREET HAMILTON AVENUE TO STREET WOODHULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration from curb to curb, located closer to Columbia & Woodhull St. |
2024-06-06 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut1L7’0 W5’0 D2’0 Compaction 98.3Cut2L5’0 W4’0 D2’Compaction 97.7 |
2024-06-06 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of the r/w found resurfaced 1/2 + 5 done bpp for new building done |
2024-06-06 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the p/l, d/l and sidewalk flag around water valve, IFO #203. |
2024-06-05 | No data | 4 AVENUE, FROM STREET ST MARKS PLACE TO STREET WARREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done behind construction fence . |
2024-06-05 | No data | 79 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please notify above permittee to install IBM color code marker and to properly seal restoration on roadway parking lane. |
2024-06-05 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O: 60, the restoration was cored and passed. The restoration had 3" W/C & 11" Concrete. The existing had 4" W/C & 7" Concrete. |
2024-06-03 | No data | 54 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done for property covering plumbing restoration permit #B012023306B19 |
2024-06-03 | No data | 45 STREET, FROM STREET GREENPOINT AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in roadway active permit on file |
2024-06-02 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible. Builders pavement covering roadway |
2024-06-01 | No data | 66 STREET, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration within the driving lane, sidewalk flags restored expansion joints sealed I/F/O 46-23 48th Avenue. Work done on permit Q012024123B28 type 135 |
2024-06-01 | No data | VERNON BOULEVARD, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary water restoration across the roadway made permanent to grade at 46-40 Vernon Blvd. Work on permit Q012024130B27 type 135 |
2024-05-31 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration on the roadway, parking/driving lane seal in compliance IFO property 636 |
2024-05-31 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in parking lane. |
2024-05-30 | No data | 39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - In Driving LaneRestoration SunkenRestoration sunken next to curb. 8 feet wide. |
2024-05-30 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done roadway roadway resurfaced by b/o |
2024-05-30 | No data | NEW JERSEY AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the PL/SW |
2024-05-29 | No data | 36 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking/driving lane, sidewalk flag restored around water valve side of 35-58 Crescent Street. Work done on 36th Avenue Avenue. |
2024-05-28 | No data | 25 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking lane I/F/O 35-58 Crescent Street. |
2024-05-28 | No data | EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work started has active permit on file X012024136A66 |
2024-05-28 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site actively working under new permit #B012024136D22 |
2024-05-28 | No data | EAST 17 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in parking lane sealed and flush. |
2024-05-26 | No data | BANK STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site shutting off water for vacant property. Non emergency work. One excavation in cobblestone roadway at this time |
2024-05-26 | No data | DECATUR STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane and water repair on the sidewalk |
2024-05-26 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has posted a “Raise Plow” sign after the winter moratorium which ended on 3/31/2024. CAR# 20247720181 was issued 4/16/2024. Permit# B012024071C30 was used for ID. |
2024-05-25 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has 2 perm cuts 2' apart in the driving lane. Failed to combine both restoration and make square on all side shape as per 1042 A note # 3. As per CAR# 20234170201. Also failed to repair. |
2024-05-25 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR acknowledged. Perm sealed. |
2024-05-23 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration on sw and roadway acceptable |
2024-05-23 | No data | 56 STREET, FROM STREET 39 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench lane marking restored |
2024-05-23 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backfill complete upon arrival ifo 293 roadway parking /driving lane 2 sidewalk flags |
2024-05-22 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway parking lane ifo 379 construction site new permit on file |
2024-05-22 | No data | EAST 35 STREET, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site repairing cut , i advised him to have 25 linear ft of the material on the st in the p/l .. |
2024-05-22 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2024-05-21 | No data | CORPORAL STONE STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | VERIFIED- REPAIR WATER- SEWER WORK WAS DONE. PLATED EXCAVATION IN ROADWAY WITH BAGS OF SAND STORED IN PARKING LANE. CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS.POLICE SIGN POST ON BARRIERS |
2024-05-20 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RDWY resurfaced B152024121A02. |
2024-05-20 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the roadway parking lane ifo 379 new permit on file |
2024-05-20 | No data | ST MARKS PLACE, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the Rodeway, parking lane sealed in compliance, IFO property 79 |
2024-05-20 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in the roadway parking / driving lane sealed in compliance ifo 636 |
2024-05-20 | No data | CORPORAL STONE STREET, FROM STREET 39 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | VERIFIED- REPAIR WATER- SEWER WORK WAS DONE. PLATED EXCAVATION IN ROADWAY WITH BAGS OF SAND STORED IN PARKING LANE. CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. |
2024-05-20 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leaking out of sidewalk ,one sidewalk flag restored at time of inspection. |
2024-05-20 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer in compliance |
2024-05-18 | No data | HANCOCK STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw has been resurfaced by dot |
2024-05-18 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET HAWTREE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - to make permanent, a temporary patch left in water/sewer restoration at the side of 149-42 Hawtree Street. |
2024-05-17 | No data | 56 STREET, FROM STREET 39 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | 8’x5’x1’ water service excavation inside of cobblestone distinctive sidewalk. Cobblestones excavated were saved for final restoration which requires in-kind restoration. Crew on site, Spoke with John on site. Cut closer to dead end. |
2024-05-17 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no crew on site |
2024-05-17 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flags on sidewalk around water valve are flush & sealed, IFO PROPERTY 40. |
2024-05-14 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the d/l, IFO #32. |
2024-05-14 | No data | 102 STREET, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in front of 55-04 & 55-06 to grade across the roadway. |
2024-05-10 | No data | WARREN STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration on the opposite side of 295, that is in the d/l p/l and flags on the s/w around the hydrant, IFO 259. |
2024-05-10 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Tape not removed from restored flag ifo 232 |
2024-05-10 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This area remains the same, the above respondent failed to acknowledge a CAR #20246780247 issued on 04/05/2024, Temporary restoration on sidewalk needs to be restored in kind. |
2024-05-10 | No data | BOND STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Lane marking is unacceptable in the roadway in front of 335 Bond Street. A Thermoplastic pavement marking is needed & permit expired on 11/14/2023. |
2024-05-10 | No data | BOND STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane marking is unacceptable in the roadway in front of 335 Bond Street. A Thermoplastic pavement marking is needed & permit expired on 11/14/2023. |
2024-05-10 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed at the curb line in compliance ifo 232 |
2024-05-09 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the p/l, and d/l, IFO #89. |
2024-05-08 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation okay new permit on file |
2024-05-08 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced by permit #B012024012A76. IFO property 103. |
2024-05-08 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced by NYC DOT In-House Paving permit #B152023321A19. Flag around water valve, IFO #102. |
2024-05-06 | No data | MANHATTAN AVENUE, FROM STREET WEST 116 STREET TO STREET WEST 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Latest Permit# M012024043B03 |
2024-05-03 | No data | HOLLERS AVENUE, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done at Corner Property of Ropes Ave |
2024-05-03 | No data | ROPES AVENUE, FROM STREET HOLLERS AVENUE TO STREET PELHAM BAY PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the parking lane, i.f.o. 3491 |
2024-05-02 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | There is no need to pursue this CAR any longer since the lane is no longer a bus lane. There is a plaza area now. |
2024-05-02 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the Rodeway parking lane filled in compliance IFO 291 |
2024-04-30 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | Temporary steel plates on roadway from curb to curb and steel plate on sidewalk. Construction materials on roadway parking lane. |
2024-04-30 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Found roadway resurfaced. |
2024-04-30 | No data | 54 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the parking/driving lane, in front and opposite 1122 54 Street. |
2024-04-30 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration opposite 69-16 to grade in the bike lane. |
2024-04-30 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary steel plates on roadway from curb to curb and steel plate on sidewalk. New permit # B012024099A68 |
2024-04-29 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway has been resurfaced at this time. |
2024-04-28 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to replace partial white lane markings for BUS ONLY as per CAR #20238390239 issued on 10/19/23 |
2024-04-27 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water shut off,notice issued from DEP,2 excavation to be made on roadway and one excavation made on sidewalk. |
2024-04-26 | No data | BROADWAY, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to fully restore sidewalk flag around water valve for water repair. A CAR was issued on 3/15/24, CAR # 20244410030. |
2024-04-26 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of segment ifo location is resurfaced due too BPP 1/2 + 5 pave by CENTRAL CONCRETE INC. under permit # B012023220A52 exp 9/2/23 |
2024-04-25 | No data | VERNON BOULEVARD, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent failed to finalize restoration within the parking lane opposite 46-40 Vernon Boulevard after notification was made via C.A.R. 20235460233 on 11/13/23. |
2024-04-25 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been resurfaced by BPP. However repair permit number Q012023324A40 was obtained. |
2024-04-24 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to seal expansion joint on the sidewalk as per subsection . CAR # 20247790088 issued on 2/23/2024 but has yet to be corrected. |
2024-04-24 | No data | CARROLL STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L5'.0''xW4'.0"xD3'.3". IFO property #74. |
2024-04-24 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IBM Color missing opp 643 & remove sign from s/w i/f/o 660 |
2024-04-24 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A sidewalk contractor restored the entire sidewalk under permit#M042023244A06. |
2024-04-23 | No data | ST MARKS PLACE, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber crew on site and doing saw cut and concrete base |
2024-04-23 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber crew on site and doing saw cut and concrete base |
2024-04-23 | No data | MURRAY STREET, FROM STREET 17 ROAD TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking/driving lane I/F/O 17-44 Murray Street |
2024-04-23 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done permit expired |
2024-04-23 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The color code markers are missing the year 24. Install the correct 2024 color code markers. |
2024-04-23 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to BPP at 151-57 20th Avenue |
2024-04-23 | No data | 4 AVENUE, FROM STREET ST MARKS PLACE TO STREET WARREN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber crew on site and doing saw cut and concrete base |
2024-04-23 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 2024 cuts perm to grade ifo 1305 |
2024-04-23 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 plumbers cuts, perm to grade, under X012024103A72 |
2024-04-23 | No data | 66 STREET, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut with cracked, and broken asphalt in the driving lane, re-apply.Sidewalk expansion joints not recessed. |
2024-04-22 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L3ft, W3ft, D4ft cut in the parking lane. |
2024-04-22 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the p/l with an active permit |
2024-04-22 | No data | ST MARKS PLACE, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 L3ft, W3ft, D3ft. Cut #2 L3ft, W3ft, D3ft cut in the parking lane. |
2024-04-22 | No data | 4 AVENUE, FROM STREET ST MARKS PLACE TO STREET WARREN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 L3ft,W3ft, D4ft, Cut #2 L4ft,W3ft, D4ft, Cut #3 L4ft, W3ft, D3ft, Cut #4 L3ft, W3ft, D3ft, Cut#5 L3ft, W3ft, D3ft, Cut #6 L3ft, W3ft, D3ft in the driving lane. CUT #7 L4ft, W3ft, D3ft in the driving lane 96.9% |
2024-04-21 | No data | 168 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR: Re-inspection passed. Sidewalk flags restored, using permit #Q042024080A49. |
2024-04-20 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20248520046 issued on 2/14/2024. Respondent failed to seal a permanent restoration, in the roadway. Respondent ID by permit # B012021029B76 |
2024-04-18 | No data | 56 STREET, FROM STREET 39 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE RESPONDENT HAS FAILED TO MARK OUT PROPOSED EXCAVATION AREA AS REQUIRED. NO MARKOUT FOUND ON THE ENTIRE SEGMENT. RESPONDENT ID THRU APPLICATION #2024041700932653 ON FILE. |
2024-04-18 | No data | 102 STREET, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. Updated permit on file has BAC and BSE confirmations which were monitored. Plumbers permanent restoration in driving lane closer to Larue Av. Ifo b.o. |
2024-04-17 | No data | DECATUR STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired on 3/3/2024. |
2024-04-17 | No data | BROADWAY, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2024-04-16 | No data | EAST 17 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane with 1 flag on sidewalk with valve in compliance |
2024-04-16 | No data | MANHATTAN AVENUE, FROM STREET CLAY STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/9/2024. Cited permit used for ID. |
2024-04-15 | No data | HANCOCK STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in the roadway opposite one another ifo property 178 sealed in compliance 1 sidewalk flag around water valve good |
2024-04-13 | No data | 102 STREET, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY IN COMPLIANCE |
2024-04-13 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the parking lane and temp on the sidewalk new permit on file B012024094B74 |
2024-04-13 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane and temp on the sidewalk |
2024-04-13 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent Has 2 perm cuts 2' apart in the driving lane. Failed to combine both restoration and make square on all side shape as per 1042 A note # 3. As per CAR# 20234170201. Also failed to repair. |
2024-04-13 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings installed |
2024-04-13 | No data | OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration was permanently restored to grade. Permit #B012023320C40 exp. 12/15/2023, acquired to repair CAR. |
2024-04-12 | No data | EAST 37 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw found resurfaced |
2024-04-11 | No data | QUINCY STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in the roadway driving lane ifo property 56 sealed in compliance |
2024-04-11 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | No active construction at time of inspection. |
2024-04-11 | No data | EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L4ft7in W12ft2in D9ft - - BACKFILL BASED WATER/SEWER REPAIR FOR NEW BUILDING #1020, STEEL PLATES IN ROADWAY PARKING LANE WORK DONE IN SIDEWALK AS WELL. (CUTBACKS MADE). |
2024-04-10 | No data | GERARD AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane of roadway. |
2024-04-10 | No data | STEINWAY STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber work was resurfaced by BPP. Roadway paved. |
2024-04-09 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new flag around water valve IFO property #19 |
2024-04-08 | No data | HANCOCK STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in the roadway opposite one another ifo 178 sealed in compliance 1 new sidewalk flag Installed around water cap |
2024-04-07 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag restored in kind around water valve in front of 132-33 60 Ave. |
2024-04-06 | No data | NEW JERSEY AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sign removed at this time. |
2024-04-05 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk remains temporary, will pass out CAR and re-issue. |
2024-04-05 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to seal expansion joint on sidewalk as per (CAR #20247440047) issued on 2/16/2024. Cited permit used for ID. |
2024-04-05 | No data | 160 STREET, FROM STREET 76 ROAD TO STREET 77 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 76-33 completed and acceptable. Cut 1 IFO (sewer) 11' 6" x 4' x 7' 4", cut 2 OPP (water) 4' 3" x 4' x 2' 11". |
2024-04-05 | No data | MEEKER AVENUE, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET RUSSELL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | One cut in the driving lane 11’8x4’3x10’2. Compaction 95.7/96.7 |
2024-04-05 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration, in the sidewalk, is overdue for final. Restore sidewalk in kind. Permit expired on 9/1/2023.In front of 683 East 3 Street between Avenue F and Ditmas Avenue. |
2024-04-04 | No data | EAST 10 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway and sidewalk restored in kind. |
2024-04-04 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Perm cut with missing color code adjacent to plumbers cut. Unable to connect second restoration to Plumbing NYC at this time. |
2024-04-04 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk and roadway done for building |
2024-04-03 | No data | EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walk in compliance |
2024-04-03 | No data | MILLER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance |
2024-04-03 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm curb to curb restoration in compliance |
2024-04-02 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations in the roadway, opposite one another IFO property, 24 |
2024-04-01 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW milled by DOT, water valve on the SW |
2024-04-01 | No data | 13 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2024-03-29 | No data | KENT AVENUE, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane ifo 799 sealed in compliance |
2024-03-28 | No data | BUSHWICK AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the PL, water valve on the SW |
2024-03-27 | No data | EAST 7 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer cut in d/l, IFO house 1686. |
2024-03-27 | No data | 40 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair restoration in compliance |
2024-03-26 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-03-26 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area indicated on permit has been resurfaced. |
2024-03-26 | No data | OCEAN PARKWAY, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway driving lane. |
2024-03-25 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the parking/driving lane, in front and opposite 324 58 Street. |
2024-03-25 | No data | BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench |
2024-03-25 | No data | 44 DRIVE, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the parking lane. |
2024-03-25 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2024-03-23 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | Nothing found. |
2024-03-22 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color code marker needs to be installed, IFO property #142. |
2024-03-22 | No data | EAST 17 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on sidewalk 2 flags 1 with valve and restoration on parking lane in compliance |
2024-03-22 | No data | FINDLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers restoration in rw, CAR will be done on latest permit. |
2024-03-22 | No data | 165 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to BPP paving done in front of 71-20. |
2024-03-22 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to use skid resistant plating/decking in it's entirety either equal to or greater than the adjacent roadway surface within the driving lane I/F/O 24-11 157th Street. Plated used found smooth to touch. |
2024-03-22 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Inspection done on recent permit Q012024061A85 |
2024-03-21 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent failed to make restoration as one cut as per NYC Standard Detail Drawing 1042D note # 9. |
2024-03-20 | No data | 24 AVENUE, FROM STREET 83 STREET TO STREET 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer restoration on roadway parking lane up to curb on 24 avenue & 84th street. |
2024-03-20 | No data | 102 STREET, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed 12 x 4'4' x 3' |
2024-03-19 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED BY BPP |
2024-03-19 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane okay |
2024-03-19 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & 2 perm restoration in the r/w |
2024-03-17 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut along with Swk flags in compliance |
2024-03-16 | No data | WEST 6 STREET, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed. |
2024-03-16 | No data | 71 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently working in the Roadway & Sidewalk. 3 Day Dep Notice Issued. Property Owner on site. |
2024-03-16 | No data | 102 STREET, FROM STREET LARUE AVENUE TO STREET MARTENSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk opened at time of my inspection. |
2024-03-15 | No data | BROADWAY, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag around water valve has patch work. Entire flag need to be restored. |
2024-03-14 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street paved by builder - B012024059B76 |
2024-03-14 | No data | EAST 2 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2024-03-13 | No data | QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway parking lane active construction site restoration is behind yodock barriers. |
2024-03-13 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2024-03-13 | No data | 78 AVENUE, FROM STREET 165 STREET TO STREET 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench across the roadway. |
2024-03-13 | No data | 53 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair acceptable |
2024-03-13 | No data | 62 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2024-03-12 | No data | LENOX AVENUE, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK NOT DONE PERMIT EXPIRED AKA 60 W 129 STREET REPAIR WATER - PROTECTED RESTORATION FOUN ON 129 STREET NO EXCAVATION OBSERVED ON LENOX AVE |
2024-03-12 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway not rolled properly, there is loose asphalt within restoration. |
2024-03-12 | No data | 162 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Failure to use plating and/or decking that is skid-resistant in its entirety on roadway |
2024-03-12 | No data | 168 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags patched work un-acceptable in front of 61-11 168 Street. |
2024-03-12 | No data | 162 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Inspection done on recent permit Q012024071B12 |
2024-03-11 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w incompliance. |
2024-03-11 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired. |
2024-03-11 | No data | 25 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active job site, currently working in the parking lane. |
2024-03-11 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Failed To Provide Adequate Protection Using Traffic Barrels In Place Of Temporary Pedestrian Walkway. |
2024-03-11 | No data | 25 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | IFO 35-58 Crescent St. Parking Lane 5’x4’x3’ Wet 121.2 Dry 111.5 Max 117.5 Moisture 8.7% TopTest 96.8% Foreman German ETL Sam JumpingJack SandCone Blend. Existing roadway concrete base was restored to greater depth. Backfill and base monitored. |
2024-03-11 | No data | 36 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active job site, doing work in parking lane. |
2024-03-10 | No data | GRAND AVENUE, FROM STREET NORTH STREET TO STREET WEST 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in compliance |
2024-03-09 | No data | LENOX AVENUE, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK NOT DONE PERMIT EXPIRED REPAIR WATER DONE I/F/O 60 W 129 STREET ON W129 ST. WITH PERMIT M012023298A96 |
2024-03-08 | No data | MYRTLE AVENUE, FROM STREET HANCOCK STREET TO STREET WEIRFIELD STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER- CREW ON SITE WORKING IN ROADWAY OPEN EXCAVATION. 2 FLAG MEN ON SITE DIRECTING TRAFFIC WHEN ONE LANE IS BLOCKED DUE BACKHOE |
2024-03-08 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Occupied At Time Of Inspection |
2024-03-08 | No data | 189 STREET, FROM STREET 43 ROAD TO STREET 44 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-03-08 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | construction crew working inside the open excavation in the r/w & payment ready on NYCSTREETS |
2024-03-08 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance |
2024-03-07 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced by STELLAR SINGLA INC under permit # B012021270B69 exp 10/22/21 |
2024-03-07 | No data | BROADWAY, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival for the LL14 base course inspection the permittee was not ready so it was initially rescheduled. As per commissioners directive I returned to monitor the base course. Base course pass and complete. |
2024-03-07 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Roadway Occupied At Time Of Inspection |
2024-03-07 | No data | BROADWAY, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill. Backfill pass and complete. Cut 4’ x 4’ x 24”. |
2024-03-06 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut covered by con Edison trench |
2024-03-06 | No data | MC DONALD AVENUE, FROM STREET AVENUE J TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2024-03-05 | No data | 36 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file. |
2024-03-05 | No data | 36 AVENUE, FROM STREET 24 STREET TO STREET 25 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Barricades in parking lane. |
2024-03-03 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration resurfaced by BPP. |
2024-03-03 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw sealed and in compliance |
2024-03-03 | No data | EAST 32 STREET, FROM STREET FARRAGUT PLACE TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags along with perm cut okay |
2024-03-01 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 17' x 4'6" x 6'4" backfill passed within the parking/driving lane I/F/O 46-43 206th Street. |
2024-03-01 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut opposite 977 in compliance |
2024-03-01 | No data | QUINCY STREET, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway, extending from the driving lane to the curb. ifo property 56. |
2024-02-29 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-02-29 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in compliance |
2024-02-29 | No data | WILLOUGHBY AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway, driving lane extending to curb in front of 564 Willoughby sealed in compliance . |
2024-02-28 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench in the r/w |
2024-02-28 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-02-27 | No data | MANHATTAN AVENUE, FROM STREET FROST STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new work observed in segment |
2024-02-27 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut covered by bpp |
2024-02-25 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent flush to grade curb to curb restoration within the roadway. |
2024-02-25 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2024-02-24 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | II/F/O #734-(1) sidewalk flag restored near water valve to satisfy CAR#20226720312. |
2024-02-24 | No data | 84 STREET, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway parking lane. |
2024-02-23 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #60 your repair water restoration has one sidewalk flag with white expansion joints covering, that needs to be removed and properly sealed |
2024-02-23 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# 20226150708 issued on 12/19/22 without the noted permit listed as required. |
2024-02-23 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-02-22 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NO COLOR CODE MARKER ADDED |
2024-02-21 | No data | FARMERS BOULEVARD, FROM STREET MARS PLACE TO STREET SIDWAY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water trench flushed and sealed in the roadway 2 sidewalk flags restored IFO 126-24 farmers boulevard |
2024-02-21 | No data | ECKFORD STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2024-02-20 | No data | NEW JERSEY AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | remove "RAISE PLOW" signs from pole serving no purpose |
2024-02-19 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-02-18 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street has been resurfaced. |
2024-02-17 | No data | BROADWAY, FROM STREET WEST 85 STREET TO STREET WEST 86 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently making Repairs in the Roadway & Sidewalk 3 Day Dep Notice Issued Building Super on site. |
2024-02-16 | No data | QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site excavating roadway parking lane new permit # B012024033C14 |
2024-02-16 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2024-02-16 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench along the r/w |
2024-02-15 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in rw in compliance |
2024-02-15 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Occupied At Time Of Inspection |
2024-02-15 | No data | STEINWAY STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet 125.1 Dry 117.6 Max 121.5 Moisture 6.4 Plumbing Nicholas ETL Melo SandCone JumpingJack Blend (Cut A: 10’x6’x8’ BottomTest 96.0 TopTest 96.8) (Cut B: 5’x6’x6’ BottomTest 97.6 TopTest 98.0) D/L & P/L & S/W ifo B/O new building. LL14 Pass. |
2024-02-14 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Roadway Occupied At Time Of Inspection |
2024-02-14 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration in driving lane partially resurfaced by con Edison restoration flush to grade. |
2024-02-14 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sealer is worn away and broken in other spots restoration needs to be resealed. |
2024-02-13 | No data | 189 STREET, FROM STREET 43 ROAD TO STREET 44 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not being Occupied At Time Of Inspection |
2024-02-12 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway parking / driving lane sealed in compliance ifo 952 |
2024-02-11 | No data | 3 AVENUE, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023346A20 |
2024-02-10 | No data | 32 AVENUE, FROM STREET 146 STREET TO STREET 147 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade within the parking lane sidewalk not fully restored around water valve I/F/O 146-29 32nd Avenue. Location is an active B.O. site |
2024-02-10 | No data | 14 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2024-02-10 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in compliane |
2024-02-09 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2024-02-08 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #817 |
2024-02-08 | No data | NYCTA SUBWAY, FROM STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-02-08 | No data | DEAD END, FROM STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-02-08 | No data | 58 AVENUE, FROM STREET 262 STREET TO STREET 263 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This Condition has been addressed, wooden forms have been removed |
2024-02-08 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Occupied At Time Of Inspection |
2024-02-08 | No data | WEST 6 STREET, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please seal expansion joints between sidewalk flag and curb. |
2024-02-08 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152023135A65 |
2024-02-07 | No data | 149 AVENUE, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced. |
2024-02-06 | No data | SUTTER AVENUE, FROM STREET 127 STREET TO STREET 128 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair perm roadway trench in D/L maintain to grade. |
2024-02-06 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued for not have raise pole signs posted during winter moratorium months |
2024-02-06 | No data | 42 AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found, bpp restoration on site |
2024-02-06 | No data | 157 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk sewer excavation within the driving lane I/F/O 24-11 157th Street. Active permit on file Q012024029B41 |
2024-02-02 | No data | EAST 14 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2024-02-02 | No data | 24 AVENUE, FROM STREET 83 STREET TO STREET 84 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete in parking lane tested at 97.6 |
2024-02-01 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed Respondent had (3)Steel Plates on the Roadway, marked "PNYCI", Respondent failed to properly Fasten by Splicing, Spiking, Pinning or Ramping to prevent movement. Plates are Loose and moving as Vehicles drove over them. |
2024-02-01 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane and sidewalk for property #2190 (permit is wrong) cross streets are Brigham Street and Bragg street. |
2024-02-01 | No data | 41 STREET, FROM STREET 20 AVENUE TO STREET 20 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two sidewalk flags were restored. The Roadway was resurfaced. |
2024-02-01 | No data | FLATBUSH AVENUE, FROM STREET AVENUE P TO STREET BAUGHMAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w ifo 2051, water repair on s/w around water valve incompliance. |
2024-01-31 | No data | 43 AVENUE, FROM STREET 220 PLACE TO STREET 221 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway ifo 220-19 |
2024-01-31 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2024-01-31 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts to grade within the driving lane water vales in grass area & sidewalk I/F/O 151-57 & 151-61 20th Avenue. |
2024-01-31 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION OPPOSITE ADDRESS CUT ORIGINALLY IN PARKING LANE COVERED BY BPP |
2024-01-31 | No data | 43 AVENUE, FROM STREET 220 PLACE TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-01-31 | No data | 220 PLACE, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file Q012023230B39 |
2024-01-30 | No data | 20 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2024-01-30 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on parking lane and sidewalk in compliance for property #2171 |
2024-01-29 | No data | AVENUE R, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in driving lane,okay |
2024-01-29 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway on list to be paved. Originally asked contractor to bring down due to mounding. |
2024-01-27 | No data | SUTTER AVENUE, FROM STREET 127 STREET TO STREET 128 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer cut in driving lane also water valve in grass area. |
2024-01-26 | No data | 3 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the driving lane. |
2024-01-26 | No data | JANE STREET, FROM STREET JOE DIMAGGIO HIGHWAY TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #134- crew onsite within open cobblestone restoration in the driving lane next to active BO.Permit remains active. |
2024-01-25 | No data | TAAFFE PLACE, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane sealed in compliance ifo 75 |
2024-01-25 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway. |
2024-01-25 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Permanent restoration is sunken 1 1/2 inches on one side of the street and is mounded on the other side creating a bump. Spoke to a resident who said it shakes his whole house. |
2024-01-25 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | please add required raise plow signs |
2024-01-25 | No data | 3 AVENUE, FROM STREET 6 STREET TO STREET 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no temp pedestrian walk way found |
2024-01-24 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 282 17 Street. |
2024-01-24 | No data | ROOSEVELT AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2024-01-24 | No data | NEWPORT AVENUE, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new BPP was installed at specific location given |
2024-01-24 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate was reset & isn't noisy at the moment. |
2024-01-24 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to affix their five-digit ID number in lower right hand corner (FRONT) & lower right/left (BACK) of the sign using a waterproof label or sticker. |
2024-01-24 | No data | 61 AVENUE, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration in front of 244-73 to grade across the roadway. |
2024-01-24 | No data | LENOX AVENUE, FROM STREET WEST 128 STREET TO STREET WEST 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued for the above Respondent has restored the Sidewalk for repair water work, Backed on a protected Street but failed to obtain a confirmation number. Permit # M012023303A37 expired on 11/14/2023. |
2024-01-23 | No data | OGDEN AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway |
2024-01-23 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder paved over cut |
2024-01-22 | No data | ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in the r/w |
2024-01-21 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut on the sidewalk |
2024-01-20 | No data | 61 AVENUE, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY | No data | Street Construction Inspections: Active | Department of Transportation | No work started. |
2024-01-19 | No data | 147 STREET, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to builder's pave at 42-10 147th Street permit Q012023178D92 |
2024-01-19 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: E-Number | Department of Transportation | one temporary cut on roadway at time of inspection. |
2024-01-19 | No data | STEINWAY STREET, FROM STREET 30 AVENUE TO STREET 31 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber excavation in driving lane, closing one of two driving lanes. Stipulation violation issued. |
2024-01-18 | No data | BEACH 116 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2024-01-18 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags around gas cap roadwork covered by bpp ifo 226 |
2024-01-18 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway driving lane sealed in compliance ifo 952 |
2024-01-16 | No data | 24 AVENUE, FROM STREET 83 STREET TO STREET 84 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2024-01-16 | No data | 84 STREET, FROM STREET 23 AVENUE TO STREET 24 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2024-01-15 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade |
2024-01-14 | No data | 80 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint sealed |
2024-01-13 | No data | 3 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill passed with no work performed on the Sidewalk. Restoration located in the driving lane. L 5’ and W 3’ 9” |
2024-01-13 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent with a permanent cut in the roadway missing IBM code to be identified. Respondent failed to respond to CAR #20237980098 ISSUED 11/30/2023 for conditoon. Cited permit expired 9/12/2023 used for ID |
2024-01-13 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak Contractor currently Making Repairs in the Roadway # Day Dep Notice Issued |
2024-01-11 | No data | CORPORAL STONE STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file Q012023102B04 |
2024-01-11 | No data | 3 AVENUE, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023362B47 |
2024-01-11 | No data | MIDDLETOWN ROAD, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2024-01-11 | No data | 85 STREET, FROM STREET 149 AVENUE TO STREET 151 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on sidewalk on 149 Avenue side newer permit on file.Q012023125B89 |
2024-01-11 | No data | 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm restoration in the r/w |
2024-01-10 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2024-01-10 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored |
2024-01-10 | No data | 208 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2024-01-09 | No data | 8 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 9’ Width 3’ 5” Depth 2’ 5” First Lift 98.7 CUT #2 Length 4’ 6” Width 3’ 10” Depth 2’ 5” First Lift 98.3. Cutbacks was done & I left at 1:40 |
2024-01-09 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O#19, THere is (1)Steel Plate, marked "PNYCI", Countersunk, that is Noisy when rolled on by Vehicular Traffic. will be referred to NYC DEP. |
2024-01-09 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has obtained the proper permitM022023279E17 to satisfy the CAR. |
2024-01-09 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived: 10:45 Departure: 12:00 Cut1: L7ftxW4ftxD3ft1st test: 97.7% |
2024-01-09 | No data | AVENUE R, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration curb to curb done in compliance |
2024-01-09 | No data | 61 AVENUE, FROM STREET NORTH HILLS GOLF BOUNDARY TO STREET NORTH HILLS GOLF BOUNDARY | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating roadway in front of 244-73. |
2024-01-09 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration partially cover by builder's pave from 42-15 to 42-23 165th Street. |
2024-01-08 | No data | 61 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 1071 61 Street. |
2024-01-08 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been partially resurfaced by BPP. |
2024-01-08 | No data | 136 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration partially resurfaced by BPP. |
2024-01-08 | No data | 41 STREET, FROM STREET 20 AVENUE TO STREET 20 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by DOT permit #Q152022179C39. |
2024-01-06 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2024-01-06 | No data | 61 STREET, FROM STREET 39 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restored |
2024-01-06 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations partially covered by DDC sewer job at 149-54/56 Sanford Avenue |
2024-01-06 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain repair permit. |
2024-01-05 | No data | WITHERS STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the RW |
2024-01-04 | No data | EAST 14 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration opposite of property #1933 in compliance |
2024-01-03 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates have been removed. |
2024-01-02 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work no longer visible beaneath BPP |
2023-12-31 | No data | GRAND AVENUE, FROM STREET WEST 174 STREET TO STREET WEST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work found resurfaced by newly paved roadway |
2023-12-31 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway and in sidewalk restored in kind |
2023-12-29 | No data | DAVIDSON AVENUE, FROM STREET FEATHERBED LANE TO STREET WEST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in roadway |
2023-12-28 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration crossing roadway, partially resurfaced by gas trench |
2023-12-28 | No data | 162 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE REPAIR WATER CUT IN THE P/L AND ON THE S/W |
2023-12-28 | No data | CRUGER AVENUE, FROM STREET BURKE AVENUE TO STREET SOUTH OAK DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK AS STIPULATED |
2023-12-27 | No data | POWERS STREET, FROM STREET JUDGE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 CUTS #1 L 5FT W 4FT D 3FT #2 L 4FT W 3FT D 3FT #3 L 3FT W 3FT D 3FT. WD 112.5 DD 103.5 MD 108.0 AM 8.7 #1 96.4 #2 96.8 #3 98.2 |
2023-12-27 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut in the roadway |
2023-12-27 | No data | POWERS STREET, FROM STREET JUDGE STREET TO STREET OLIVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site with 2 open excavation in the PL, one opposite property |
2023-12-27 | No data | LINDEN BOULEVARD, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to more recent permit Q012021085A41 |
2023-12-27 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair work done in the parking lane |
2023-12-26 | No data | SEDGWICK AVENUE, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer repair restoration work done in roadway |
2023-12-26 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags surrounding water caps. Road restoration connected. |
2023-12-26 | No data | 51 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration on roadway parking lane. |
2023-12-26 | No data | FARMERS BOULEVARD, FROM STREET 137 AVENUE TO STREET 138 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway restoration maintain to grade. |
2023-12-26 | No data | DEAN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut has been found resurfaced by A BPP. Permit expired. |
2023-12-23 | No data | 3 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leaking out of street. Contractor excavating in roadway to shut off water and replace broken service. DEP 3-Day notice acquired. |
2023-12-23 | No data | 58 AVENUE, FROM STREET 262 STREET TO STREET 263 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit number Q012023269B48. |
2023-12-23 | No data | BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water trench across roadway. New sidewalk at location. |
2023-12-23 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Water cut in the roadway is flush to grade |
2023-12-23 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-12-23 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w & rwy restored |
2023-12-23 | No data | 3 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Found crew on site, excavating roadway, driving lane For Emergency water repair. |
2023-12-21 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber work was resurfaced by BPP new home I/F/O 20238. |
2023-12-21 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple water cuts in roadway for new properties 614- 600 sealed in compliance |
2023-12-20 | No data | AVENUE T, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE . IN COMPLIANCE |
2023-12-20 | No data | 189 STREET, FROM STREET 43 ROAD TO STREET 44 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber Work actually done on 44 Av side of corner property. |
2023-12-19 | No data | 44 AVENUE, FROM STREET 189 STREET TO STREET 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration in driving lane on the side of corner property b.o. 43-45 189 Street. |
2023-12-19 | No data | PALO ALTO AVENUE, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm repair water restoration in the parking lane & one repair water sidewalk flag restored in front of 86-71. |
2023-12-19 | No data | 78 AVENUE, FROM STREET 165 STREET TO STREET 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sewer installed and water. |
2023-12-19 | No data | 46 ROAD, FROM STREET 189 STREET TO STREET 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration going across roadway in front of b.o. |
2023-12-18 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by in house milling & paving |
2023-12-18 | No data | SUTTER AVENUE, FROM STREET 127 STREET TO STREET 128 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway at this time. Active permit on file. |
2023-12-16 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2023-12-15 | No data | 71 STREET, FROM STREET CENTRAL AVENUE TO STREET COOPER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE ON 9' 1'' X 8' 4'' X 3' 6'' EXCAVATION IN ROADWAY |
2023-12-14 | No data | PIAVE AVENUE, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AREA OF R/WAY WAS PAVED VIA BPP |
2023-12-13 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-12-13 | No data | EAST 170 STREET, FROM STREET BRISTOW STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMPORARY PEDESTRIAN WALK is in compliance with DOT rules and regulations |
2023-12-13 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no active work at time of inspection |
2023-12-13 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2023-12-12 | No data | BOND STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White lane marking in the bike lane area need to be restored in kind in front of 335 Bond Street & permit on 11/14/2023 |
2023-12-12 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2023-12-12 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done on this segment |
2023-12-12 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED, pass |
2023-12-11 | No data | LAKE STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-12-11 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in rw sealed and in compliance |
2023-12-11 | No data | CORPORAL STONE STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and sidewalk was resurfaced by BPP for new home. I/F/O 38-19. |
2023-12-10 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-12-09 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced |
2023-12-08 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance in the roadway |
2023-12-07 | No data | PITKIN AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done work on herself st |
2023-12-06 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway opp 802 ifo covered by bpp |
2023-12-05 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water and sewer in compliance |
2023-12-05 | No data | 63 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2023-12-05 | No data | 17 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2023-12-04 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance ifo property 682 |
2023-12-04 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on driving/parking lane in compliance |
2023-12-04 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw has been resurfaced |
2023-12-04 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the RW/SW, both in compliance |
2023-12-02 | No data | BENSON AVENUE, FROM STREET 19 AVENUE TO STREET BAY 20 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 1853 Benson Avenue. |
2023-12-01 | No data | 53 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer restoration on roadway parking lane. |
2023-12-01 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer restoration on roadway driving lane to parking lane. |
2023-12-01 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer trench in the roadway sealed in compliance starting from yellow line to curb IFO new property 1845. |
2023-12-01 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair in compliance |
2023-11-30 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In the Southeast portion of the intersection your Permanent Cut is missing your color code ID. Install color code as soon as possible. |
2023-11-30 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Cut in the Roadway around sewer hardware. Permit expired. New Permit. |
2023-11-30 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WITH STEEL PLATED EXCAVATION IN THE ROADWAY FOR NEW BUILDING INFORMED CONTRACTOR THAT THIS IS A NEW SEWER INSTALL HE NEEDS TO FULLY EXCAVATE TRENCH TOMTHE CURB AS PERMRULE, |
2023-11-30 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PARTIALLY COMPLETE. L 15FT X W 4FT 8IN X D 9FTTEST 98.2 NEW CONFIRMATION NEEDED TO COMPLETE BACKFILL DUE TO DUMP TRUCK TAKING TOO LONG FOR TO COMPLETE TRIPS FROM YARD . ARRIVED 10:35am LEFT 2:15pm |
2023-11-29 | No data | BAY 35 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2023-11-29 | No data | 150 STREET, FROM STREET 38 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER CUT IN THE P/L |
2023-11-29 | No data | 150 STREET, FROM STREET 38 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM TRENCH REPAIR WATER SEWER SERVICE DONE - WORK WAS DONE IN FRONT OF 150-02 NORTHERN BLVD |
2023-11-28 | No data | JACKSON AVENUE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the roadway. |
2023-11-26 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw resurfaced by bpp |
2023-11-25 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent Has 2 perm cuts 2' apart in the driving lane. Failed to combine both restoration and make square on all side shape as per 1042 A note # 3. As per CAR# 20234170201. Also failed to repair. |
2023-11-25 | No data | 80 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 611 80 Street. |
2023-11-25 | No data | GRAND AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane mostly covered by Consolidated Edison perm restoration IFO property #445. |
2023-11-25 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-11-23 | No data | ROCKAWAY PARKWAY, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway, parking lane sealed in compliance two new sidewalk flags installed around water cap in compliance IFO 663 |
2023-11-23 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2023-11-23 | No data | PUTNAM AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated water cut in the roadway |
2023-11-22 | No data | HOLLERS AVENUE, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP covered cut in roadway |
2023-11-21 | No data | VERNON BOULEVARD, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts were never sealed |
2023-11-21 | No data | 61 STREET, FROM STREET 39 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER- Base complete on 4' 8'' x 3' 9'' x1' excavation in the parking lane. |
2023-11-21 | No data | NEW JERSEY AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw has been resurfaced |
2023-11-21 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration on the sidewalk need to be permanently restored ifo 683 E 3 St |
2023-11-20 | No data | 79 STREET, FROM STREET 66 ROAD TO STREET JUNIPER VALLEY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W resurfaced. |
2023-11-20 | No data | EAST 177 STREET, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in roadway found resurfaced by newly paved roadway |
2023-11-20 | No data | WEST 152 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rest. okay |
2023-11-20 | No data | 61 STREET, FROM STREET 39 AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. 3'8'' x 2'9'' x 3'7'' within the parking lane in front of 39-07 cut left temp to grade. |
2023-11-20 | No data | BROADWAY, FROM STREET FAIRVIEW AVENUE TO STREET WEST 192 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found two sidewalk flags restored in kind I/F/O 4484 |
2023-11-19 | No data | EAST 164 STREET, FROM STREET FINDLAY AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in parking lane |
2023-11-19 | No data | COLLEGE POINT BOULEVARD, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-11-19 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Full replacement of a sidewalk flag acceptable, also newer permit on file M042023306A25 |
2023-11-18 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Perm flush at this time. In compliance |
2023-11-18 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR acknowledged. Cones removed |
2023-11-17 | No data | AVENUE U, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-11-16 | No data | 53 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled down by DOT NEW SIDEWALK FLAGS INSTALLED FOR NEW BUILDING OPERATIONS. |
2023-11-16 | No data | OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2023-11-16 | No data | EASTHAMPTON BOULEVARD, FROM STREET 57 ROAD TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers work resurfaced by DOT paving roadway curb to curb. |
2023-11-16 | No data | 57 AVENUE, FROM STREET 231 STREET TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP for 231-12 Resurfaced plumbing work. |
2023-11-16 | No data | WEST 152 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012022171A17-latest permit |
2023-11-16 | No data | 28 AVENUE, FROM STREET 150 STREET TO STREET MURRAY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM TRENCH IN THE D/L |
2023-11-16 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer, cut in the roadway extending from the yellow lines, sealed and compliance in front of property 1845 |
2023-11-16 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2023-11-15 | No data | 53 AVENUE, FROM STREET 230 STREET TO STREET HORATIO PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt plumbers cut flush to grade in parking lane in front of b/o new home. Also water valve with concrete patched in sidewalk. BPP of b/o will resurface roadway work. Will monitor for b/o SCARA, BPP. Will issue CAR if required. |
2023-11-15 | No data | 218 STREET, FROM STREET 134 ROAD TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flushed and sealed IFO 131-29 |
2023-11-15 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving/parking lane. |
2023-11-15 | No data | WEST END AVENUE, FROM STREET HAMPTON AVENUE TO STREET NEPTUNE COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind |
2023-11-14 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced paved by DOT. Also, permit #Q012018155B80 was out of guarantee on 6/20/2021. |
2023-11-14 | No data | NEW JERSEY AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Backfill pass |
2023-11-13 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Restoration completed |
2023-11-13 | No data | VERNON BOULEVARD, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temp cuts in the roadway are overdue for final restoration (In front and opposite 46-40).Permit expired on 6/28/23. |
2023-11-11 | No data | 201 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER CUT ON THE ROADWAY |
2023-11-09 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA passed, Temporary asphalt applied on perm sewer restoration in the driving lane in front of 246-03 correcting NICA #20238410106. Condition has been temporarily made safe & is now overdue for final. Re-dig will be completed on a future date. |
2023-11-09 | No data | 213 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber restoration going across roadway. DOT is about to mill the roadway, plumbers work will be resurfaced. Also one sidewalk flag restored around water valve. I/F/O 2830. |
2023-11-09 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5’x3’ area of perm repair sewer trench is sunken 3 1/2” in the driving lane in front of 246-03. Area is posing a hazardous condition to vehicular traffic & needs to be made safe at this time. |
2023-11-08 | No data | 108 STREET, FROM STREET 66 AVENUE TO STREET 66 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no address or work visible |
2023-11-08 | No data | 168 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in front of 61-11 completed and acceptable. Cut 1: IFO (sewer) 10' x 4' x 8' 4", cut 2 OPP (water) 4' 4" x 4' 1" x 2' 7". |
2023-11-08 | No data | WILLOUGHBY AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is in compliance |
2023-11-08 | No data | PALO ALTO AVENUE, FROM STREET BEND TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic water leak in roadway. Excavation in roadway. |
2023-11-08 | No data | BAY 35 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete tested twice at 96.2 98.4 |
2023-11-08 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023283A35 Secured permit |
2023-11-08 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee has restored roadway marking in kind at this time. |
2023-11-07 | No data | 44 DRIVE, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Coned curb to curb perm restoration over cut |
2023-11-07 | No data | BOND STREET, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 11’ Width 4’ Depth 5’ 8” First Lift 98.4 & Second Lift 97.8 Cutbacks was done & I left at 12:30 |
2023-11-06 | No data | EAST 37 STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEGMENT FOUND RESURFACED BY DOT UNDER PERMIT # B152023293B19 EXP 11/23/23 |
2023-11-06 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP PEDESTRIAN WALKWAY FOUND |
2023-11-05 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration the parking lane in compliance |
2023-11-04 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway on location at this time |
2023-11-03 | No data | MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway found resurfaced by newly paved roadway |
2023-11-03 | No data | NYCTA SUBWAY, FROM STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer in compliance |
2023-11-03 | No data | WEST 6 STREET, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer in compliance |
2023-11-03 | No data | DEAD END, FROM STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-11-02 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | lane markout needs to be installed, permit expired 10/24/2023 |
2023-11-02 | No data | WARREN STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed on the sidewalk around a fire hydrant in front of property 259 is in compliance |
2023-11-02 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-11-01 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP |
2023-11-01 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two Plumber’s permanent restorations, long water cut, I/F/O and opposite 215-20. Also new sidewalk flags in place. Water valve in grassy area of sidewalk. |
2023-11-01 | No data | WARREN STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed on the side walk in front of property 259 is in compliance |
2023-11-01 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts in the p/l d/l info 151-57 and 151-61 |
2023-10-31 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in parking lane sealed and flush. |
2023-10-31 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done in the roadway |
2023-10-30 | No data | GRACE COURT ALLEY, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on driving/parking lane in compliance |
2023-10-29 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-10-29 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench on the roadway in compliance |
2023-10-27 | No data | CARROLL STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & 2 perm restoration in the r/w |
2023-10-27 | No data | OCEAN PARKWAY, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-10-27 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2023-10-26 | No data | ROCKAWAY PARKWAY, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass in compliance 2 excavations in roadway parking lane ifo 667 cut 1. 4.6’x3.6’x2.6’ (98.2) cut 2. 3.6’x2.6’x2.6 (96.5) saw cut for base cut backs. |
2023-10-26 | No data | ROCKAWAY PARKWAY, FROM STREET AVENUE B TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site upon arrival 2 open excavations in roadway parking lane 1 sidewalk opening ifo property 665-667 |
2023-10-26 | No data | 17 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L5’0 W6’0 D3’3Compaction 97.0L3’0 W3’0 D3’6Compaction 98.3L5’0 W4’0 D3’6Compaction 96.7Pass |
2023-10-26 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012023282A22) |
2023-10-26 | No data | 80 STREET, FROM STREET 41 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint between curb and sidewalk needs to be sealed |
2023-10-26 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-10-25 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance new sidewalk flags around water cap in compliance ifo 1847 |
2023-10-25 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration covered by gas installation permit #B012023297B15 |
2023-10-25 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Newer permit on file, refer to permit #M012023283A35 |
2023-10-24 | No data | 53 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 13ft width 4ft 5in depth 10ft test results 98.2 98.6 full trench to curb was done. |
2023-10-24 | No data | TAAFFE PLACE, FROM STREET LITTLE NASSAU STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in the roadway |
2023-10-24 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023269A49 Active permit on file. |
2023-10-23 | No data | 17 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill scheduled at this location in error. It will be re-scheduled when ready. |
2023-10-23 | No data | 63 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 12:10PM Departure: 1:20PMCuts are in the parking/driving lane, AKA 6224 17 Ave.#1 L: 11FT. W: 4FT. D: 2FT.#2 L: 12FT. W: 4FT. D: 10FT.(I only monitored the top lift of the 2nd cut, backfill was assigned to me at 12:00PM) |
2023-10-22 | No data | BEACH CHANNEL DRIVE, FROM STREET BEND TO STREET MOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACE BY ANOTHERS PLUMBERS INSTALLATION CUTS |
2023-10-22 | No data | CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in compliance |
2023-10-22 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed as roadway has been resurfaced by BPP restoration. |
2023-10-21 | No data | QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway on location |
2023-10-21 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent made multiple patches on the sidewalk flags adjacent to the water valve. Respondent was notified by CAR #20236150338 on 06/22/23 to fully restore flags but, failed to do so. Permit# Q012023110D47 for work was used to identify respondent. |
2023-10-19 | No data | WEST 6 STREET, FROM STREET NEPTUNE AVENUE TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2023-10-19 | No data | NYCTA SUBWAY, FROM STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-10-19 | No data | DEAD END, FROM STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water in compliance |
2023-10-19 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in compliance |
2023-10-19 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #560 within the parking/driving lane, the permanent water restoration is starting to sink down 2”. Also the street opening joints need to be re-sealed & solid white lane markings along with top of words “ONLY” must be restored. CAR issued. |
2023-10-19 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No CAR to be issued so permits could be taken out to satisfy the CAR once repairs are made. |
2023-10-18 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the respondent failed to place ramping surrounding all sides of multiple steel plates as required by 34 RCNY 2-11(e)(10)(ii) within the driving lane of segment. Markings on the steel plate is CWR 4012. Permit used for identification. |
2023-10-18 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has multiple steel plates in the driving lane covering an active excavation without a valid DOT permit on file. Respondent ID by permit B012023256B50 on file that expired 10/10/2023. |
2023-10-18 | No data | ROPES AVENUE, FROM STREET HOLLERS AVENUE TO STREET PELHAM BAY PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate cut , dep manhole cover temp asphalt maybe work |
2023-10-18 | No data | HOLLERS AVENUE, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over cut |
2023-10-17 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three cones left on site. Request to remove cones from sidewalk. |
2023-10-15 | No data | EASTBURN AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on sidewalk i/f/o 1681 |
2023-10-15 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #560 (Margaritaville) the respondent has failed to make their restoration flush with the surrounding roadway. CAR re-inspection failed, NOV issued. |
2023-10-15 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates removed |
2023-10-14 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp pedestrian walk found |
2023-10-14 | No data | GATES AVENUE, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-10-12 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active new building construction IFO 287-291 Livingston street |
2023-10-12 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done for this segment |
2023-10-12 | No data | 80 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete 11:50am (Length 8ft10in)(width 6ft2in)(depth 3ft10in) on parking lane and sidewalk (1flag) done in compliance |
2023-10-12 | No data | 120 AVENUE, FROM STREET 217 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent REPAIR WATER cut in parking Lane to grade and sealed IFO 216-11 120 ave in compliance |
2023-10-11 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on driving lane in compliance |
2023-10-11 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed, cut backs made and ready for concrete. |
2023-10-11 | No data | COLUMBIA STREET, FROM STREET HAMILTON AVENUE TO STREET WOODHULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration curb to curb in compliance |
2023-10-11 | No data | WOODHULL STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration covered by BPP permit #B012021062C28 |
2023-10-11 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE REPAIR WATER - SEWER - CUT ON THE ROADWAY |
2023-10-11 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving/parking lane sealed in compliance new sidewalk flags installed for new building 1847 |
2023-10-10 | No data | WOODPOINT ROAD, FROM STREET FROST STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the PL |
2023-10-09 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill re-schedule. Upon arrival, I found backfill to be completed. Backfill done without a DOT inspector on site. Backfill was scheduled for 3:17PM and at arrival, 2:48PM, the cut was backfilled. |
2023-10-09 | No data | WEST END AVENUE, FROM STREET HAMPTON AVENUE TO STREET NEPTUNE COURT | No data | Street Construction Inspections: E-Number | Department of Transportation | Heavy domestic water leaking in sidewalk (visibly confirmed),one excavation made on roadway and one excavation made on sidewalk. |
2023-10-09 | No data | MONROE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2023-10-09 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent had backfilled a street opening prior to their 3:17PM scheduled start time, without a DOT inspector on site. In no case shall the permittee commence the backfill prior to the scheduled start time. Permit used for ID. |
2023-10-07 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent Has 2 perm cuts 2' apart in the driving lane. Failed to combine both restoration and make square on all side shape as per 1042 A note # 3. As per CAR# 20234170201. Also failed to repair. |
2023-10-07 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO respondent has patchwork within one sidewalk flag. The patchwork is not permitted, and full flag restoration is required. A CAR#20216030049, was issued on 7/18/2023. |
2023-10-06 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done permit #B012021294C85 |
2023-10-05 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2023-10-05 | No data | WYONA STREET, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Awaiting backfill |
2023-10-05 | No data | BAY 25 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, opposite 181 Bay 25 Street. |
2023-10-05 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway has been milled and paved by D.O.T |
2023-10-05 | No data | 80 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavated rwy, ifo #611, water leak repair, street closed Op# |
2023-10-04 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration trench curb to curb in front of property 15 is in compliance |
2023-10-04 | No data | WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway has been milled and paved by DOT. |
2023-10-03 | No data | PRESIDENT STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One flag surrounding a water valve and perm restoration on parking lane in compliance |
2023-10-03 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023269A49 secured permit. |
2023-10-02 | No data | 220 PLACE, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers permanent restoration in the west side parking lane 20’ from 43 Av. Debris container was placed over plumbers cut, cannot inspect restoration fully at this time. |
2023-10-02 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration opposite of address on parking lane and one new sidewalk flag IFO property #102 |
2023-10-02 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on driving lane in compliance |
2023-10-01 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pin holes has been filled |
2023-10-01 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV acknowledged. Restoration flush at this time. |
2023-09-30 | No data | 229 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer restoration is covered by BPP restoration in front of 61-19. |
2023-09-29 | No data | 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Active Permit #B012023243B73 when CAR was issued. |
2023-09-28 | No data | 208 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed 10' x 3 1/2 x 11.6 |
2023-09-28 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the driving lane in front of 232-15. |
2023-09-28 | No data | 136 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent repaired the condition on CAR# 20236150335 issued on 6/22/23 without the noted permit listed as required. |
2023-09-28 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway cut restored to grade in the driving lane. It is partially covered up by the bus lane. |
2023-09-28 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent repaired the condition on CAR# 20226150708 issued on 12/19/22 without the noted permit listed as required. |
2023-09-28 | No data | 244 STREET, FROM STREET 54 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2" FROM THE SEAL OF A 18' X 5' REPAIR WATER - SEWER TRENCH IS A DEPRESSION DOWN 2" |
2023-09-28 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-09-28 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed. Permit Q042023235A15 type 0401 obtained 8/23/23 after issuance of C.A.R. 20236150347 on 6/26/23. |
2023-09-27 | No data | 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore the lane markings IFO property #333. |
2023-09-27 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent repaired the condition on CAR #20236150357 issued on 6/28/2023 without the noted permit listed as required. |
2023-09-27 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on roadway and sidewalk flags in compliance. |
2023-09-27 | No data | FENTON AVENUE, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass work done in compliance |
2023-09-27 | No data | EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in the roadway and sidewalk |
2023-09-27 | No data | 6 AVENUE, FROM STREET 14 STREET TO STREET 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #547. |
2023-09-26 | No data | SPRINGFIELD BOULEVARD, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in the parking & driving lane in front of 68-29. |
2023-09-26 | No data | 192 STREET, FROM STREET 44 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection passed. Permit Q012023235A29 obtained 8/23/23 after issuance of C.A.R. 20238290084 on 4/25/23. |
2023-09-26 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration within parking. Unable to properly inspect due to park car but restoration looks to have some minor defect will minor. |
2023-09-25 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR # 20227380728 issued on 11/28/2022 without the noted permit listed as required. |
2023-09-25 | No data | ROPES AVENUE, FROM STREET HOLLERS AVENUE TO STREET PELHAM BAY PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not in borough different county |
2023-09-25 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw resurafaced |
2023-09-23 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in compliance |
2023-09-22 | No data | WILLOUGHBY AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Occupancy in compliance. Active permit on file. |
2023-09-22 | No data | WILLOUGHBY AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I observed that the respondent’s temp walkway forced vehicles into the bike lane. Permittee should have placed SC-145 ahead of the site as well as set up a temp bike path on the road as required by the BikeMPT, which violates the Bike02 stip. |
2023-09-21 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO AKA 1227 Broadway unable to locate plumber cut. Active B.O may be obstructing cut. |
2023-09-21 | No data | THOMPSON STREET, FROM STREET BROOME STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On the side of 180 Thompson st, 75 feet south of spring found 3 sidewalk flags restored to grade. Expansion joints sealed. |
2023-09-21 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET EAST 2 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 backfill complete in parking lane tested at 97.6 96.3 98.2 |
2023-09-20 | No data | 213 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration is covering work that was completed. |
2023-09-20 | No data | HEYWARD STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is flush to grade |
2023-09-20 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM RESTORATIONS ROADWAY |
2023-09-20 | No data | FROST STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by DOT |
2023-09-20 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-09-20 | No data | 78 AVENUE, FROM STREET 165 STREET TO STREET 166 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed 14' x 3.63.6 x 3.6 |
2023-09-20 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #12 within the bike lane there is a portion of a permanent restoration flush to grade. Green bike paint applied. |
2023-09-20 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in compliance |
2023-09-19 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street milled for paving. |
2023-09-18 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no temp pedestrian walk found |
2023-09-17 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2023-09-17 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2023-09-16 | No data | 65 PLACE, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint has been sealed along the curb line in front of 71-33. |
2023-09-16 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to restore in kind on the roadway. Respondent didn’t repaint roadway in beige color. CAR#(20227720409) was issued on 9/11/2022. Permit# B012022129A47 was used for iD. |
2023-09-16 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway resurfaced by permittee. Permit Type: 0135 - C.A.R. RESTORATION was issued permit #B012023220B32 |
2023-09-16 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Hardware installed on the sw ifo 1542 |
2023-09-15 | No data | NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code marker installed at this time |
2023-09-15 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane of the roadway in front of property 1627 is in compliance |
2023-09-14 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023254B26 New permit on file. |
2023-09-14 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on the RW/SW |
2023-09-13 | No data | BROADWAY, FROM STREET DITMARS STREET TO STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2023-09-13 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | After joint inspections with Tony from Rocko plumbing NYC. The overdue portion exposing wearing course belongs to an expired con Edison permit from 2020: NOV’s will be adjudicated. |
2023-09-13 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration on sidewalk and roadway in compliance |
2023-09-12 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut1L4’0 W12’0 D4’0Compaction 96.8&97.9Cut1L4’0 W4’0 D2’6Compaction 97.2 |
2023-09-11 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work has not started |
2023-09-10 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR reinspected on 09/03/23. Patchwork still was on sidewalk. NOV was issued. |
2023-09-10 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R. reinspection failed as respondent failed to restore permanent restoration to grade within the driving lane opposite 39-57 58th Street after C.A.R. 20230720027 notification on 6/15/23. Permanent restoration remains sunken 1.5". |
2023-09-09 | No data | 43 AVENUE, FROM STREET 220 PLACE TO STREET 221 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | This permit was pulled in error. No work done in this block segment. Backfill and base course were done under permit# Q012023235A28. |
2023-09-09 | No data | 43 AVENUE, FROM STREET 220 PLACE TO STREET 220 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 35' x 3'6" down 7'6" backfill, across the roadway, complete and acceptable. |
2023-09-09 | No data | ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench curb to curb in compliance |
2023-09-08 | No data | 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L10ft, W5ft, D10ft cut in the driving lane IFO property #333. |
2023-09-08 | No data | 213 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2023-09-08 | No data | 43 AVENUE, FROM STREET 220 PLACE TO STREET 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-09-08 | No data | 220 PLACE, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-09-08 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. Two cuts (10' x 4' x 10', 6' x 4' x 2'6") |
2023-09-08 | No data | 43 AVENUE, FROM STREET 220 PLACE TO STREET 221 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-09-08 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in roadway |
2023-09-08 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Color Code was applied to perm cut jus hidden behind barricades. |
2023-09-08 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the PL leading to RW |
2023-09-07 | No data | WILLOUGHBY AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-09-06 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No plates found in the segment although I did find 1 or 2 steel plates n the intersection although its pinned and ramped they make noise whenever vehicle traffic rolls over them |
2023-09-05 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm long water cut in rw okay |
2023-09-05 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration on roadway driving lane to sidewalk steel plates on roadway and sidewalk in compliance at this time. New permit # B012023243B75 |
2023-09-04 | No data | 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-09-04 | No data | 6 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway milled and paved, found resurfaced. |
2023-09-03 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent made multiple patches on the sidewalk flags adjacent to the water valve. Respondent was notified by CAR #20236150338 on 06/22/23. Permit# Q012023110D47 for work was used to identify respondent. |
2023-09-03 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wooden forms removed. |
2023-09-03 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #560 (Margaritaville) the respondent has failed to make their restoration flush with the surrounding roadway. CAR re-inspection failed, NOV issued. |
2023-09-02 | No data | MILLER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IN COMPLIANCE WITH CAR ISSUED .. COLOR CODE WITH IBM TAG # APPLEID .. AN SEALED |
2023-09-02 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has a perm trench with asphalt broken out 2'' exposing concrete Base in the parking lane. As per CAR # 20238310259 was issued on 5/3/23. |
2023-09-02 | No data | SOUTH 2 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo construction site 232 |
2023-09-02 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in compliance |
2023-09-02 | No data | GATES AVENUE, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restoration in the driving lane. New flag around water valve IFO property #122. |
2023-09-01 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Has 2 perm cuts 2' apart in the driving lane. Failed to combine both restoration and make square on all side shape as per 1042 A note # 3. |
2023-09-01 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2023-08-31 | No data | JESUP AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration in driving lane. Sidewalk patchwork in place but building operation will resurface sidewalk and possibly roadway. |
2023-08-31 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plates stacked in the roadway parking lane ifo 674 |
2023-08-31 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-08-31 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in the roadway driving lane ifo 684 driggs |
2023-08-30 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition: Lane markings restored - New condition : Permanent restoration mounded 1 to 1 1/2 inch - creating a speed bump - From a complaint : Reference# DOT-612792-B7F8 - Unable to issue a new car |
2023-08-30 | No data | GRAND AVENUE, FROM STREET WEST 174 STREET TO STREET WEST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file. Roadway resurfaced by DOT. |
2023-08-30 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER |
2023-08-30 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED- wrote in error. contractor was asked to |
2023-08-30 | No data | WEST 174 STREET, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in driving lane I/F/O 1665 Davidson Ave a.k.a. Dead End, adjacent to 1672. |
2023-08-30 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench in the r/w |
2023-08-29 | No data | 11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Bpp done to this location no water seen on both sides corner property |
2023-08-29 | No data | 169 STREET, FROM STREET LITHONIA AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered under BPP permit # Q012022150A07 |
2023-08-29 | No data | 201 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-08-28 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET RALEIGH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk for new bldg was done on permit# Q042023146A31 and not by the plumber. |
2023-08-27 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012020315B22 on file. |
2023-08-27 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Site in compliance |
2023-08-27 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012020318B27 on file. |
2023-08-26 | No data | 149 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-08-26 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete 6 inch cutbacks were done 12 inch cutbacks we’re marked out |
2023-08-25 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2023-08-25 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp pedestrian walk available |
2023-08-25 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair done in front of new building |
2023-08-25 | No data | ST MARKS AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET EASTERN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is flush to grade |
2023-08-25 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration on driving lane in compliance |
2023-08-24 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade |
2023-08-24 | No data | SHEFFIELD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS IN THE D/L IN COMPLIANCE |
2023-08-24 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012020318B27 on file. |
2023-08-23 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Color code marker missing from sewer cut in roadway ifo construction site 50 |
2023-08-23 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Parking lane in front of 90 occupied by plastic barriers. |
2023-08-23 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2023-08-23 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several pin holes must be sealed. Located around plumber’s permanent restoration I/F/O 1311. |
2023-08-23 | No data | 201 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-08-23 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started valid permit on file |
2023-08-23 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the sidewalk |
2023-08-23 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to restore lane markings (double yellow line) over perm plumber restoration. |
2023-08-22 | No data | 21 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done in the sidewalk or roadway, permit expired. |
2023-08-22 | No data | 220 PLACE, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-08-22 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2023-08-22 | No data | 213 STREET, FROM STREET 28 AVENUE TO STREET 29 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | r/w occupied |
2023-08-20 | No data | OCEAN PARKWAY, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in service road in front of 2045 ocean parkway |
2023-08-20 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a permanent plumbing restoration in the driving lane sunken 2 1/2”. Respondent failed to restore sunken restoration after CAR 20233720112 issued 7/17/23. Respondent ID by cited permit and Color code marker. |
2023-08-20 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration made perm to grade. C.A.R. Restoration permit# Q012023199A33 pulled to do work. |
2023-08-20 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber restoration in roadway and sidewalk - in compliance |
2023-08-20 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to the respondent for patchwork within one sidewalk flag. The patchwork is not permitted, and full flag restoration is required. The respondent was previously CAR#20216030049, which was issued on 7/18/2023. |
2023-08-20 | No data | EAST 9 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2023-08-20 | No data | EAST 7 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-08-20 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY NEW PERMIT ON FILE |
2023-08-19 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code marker embedded in restoration. |
2023-08-19 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration in roadway in compliance. |
2023-08-19 | No data | WEST 129 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Crew not prepared for backfill work and will reschedule at another time. |
2023-08-19 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway resurfaced by BPP for property #171 B012023223A49. |
2023-08-18 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE CLOSING UP A STEEL PLATED EXCAVATION ON THE ROADWAY |
2023-08-18 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not visible |
2023-08-18 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut |
2023-08-17 | No data | WEST 40 STREET, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012020315B19 on file. |
2023-08-17 | No data | LINCOLN PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-08-16 | No data | 36 STREET, FROM STREET LOUISA STREET TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 1352 36 Street. |
2023-08-16 | No data | 220 PLACE, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill in compliance 7’2”X3’6”X3’4”. |
2023-08-16 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit # M012020310A78 on file. |
2023-08-16 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, opposite 1242 39 Street. The roadway in front of the property was milled and paved (1/2 + 5). |
2023-08-16 | No data | WOODPOINT ROAD, FROM STREET FROST STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in the roadway |
2023-08-15 | No data | 52 STREET, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by New Building BPP Paving done at location after work was done. |
2023-08-15 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2023-08-15 | No data | 192 STREET, FROM STREET 44 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# (20238290084) issued on 8/15/23 without the noted permit listed as required. |
2023-08-15 | No data | 54 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Container in place and in compliance |
2023-08-15 | No data | 64 AVENUE, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-08-15 | No data | TELLER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new sidewalk done by new building. |
2023-08-15 | No data | EAST 10 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-08-15 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane with portion covered by recent fiber optic work . |
2023-08-15 | No data | GROVE STREET, FROM STREET BROADWAY TO STREET GOODWIN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-08-14 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET RALEIGH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | protest denied as per inspection |
2023-08-14 | No data | MENAHAN STREET, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area resurfaced by BPP. |
2023-08-14 | No data | GROVE STREET, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area resurfaced by BPP. |
2023-08-13 | No data | POWER ROAD, FROM STREET 63 AVENUE TO STREET 63 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the parking/driving lane with vehicle parked over cut. Sidewalk flags restored around water valve. |
2023-08-13 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR #20236150357 was issued on 6/28/2023 without the noted permit listed as required. |
2023-08-12 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/sidewalk is flush to grade |
2023-08-12 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane in front of 261. |
2023-08-12 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New work has covered previous cut |
2023-08-12 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR #20236150347 was issued on 6/26/2023 without the noted permit listed as required. |
2023-08-11 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway extending from curb to curb sealed in compliance for construction site 65 |
2023-08-11 | No data | COLLEGE AVENUE, FROM STREET EAST 170 STREET TO STREET EAST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber restoration in driving lane. Updated permit on file. Portion of plumbers restoration obstructed by double parked vehicle. |
2023-08-11 | No data | CLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber permanent restoration going across roadway. Sidewalk resurfaced. I/F/O 1358. Also, existing roadway around plumbers cut is in poor condition. |
2023-08-10 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Color code was installed under barricade. |
2023-08-10 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane. |
2023-08-10 | No data | 65 PLACE, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recess and seal expansion joint along the curbline around water valve in front of 71-33. |
2023-08-10 | No data | TELLER AVENUE, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 1507 concrete curing in sidewalk. Concrete flags done in driveway area. Also two plumbers permanent restorations asphalt pitted, should be made into one wearing course restoration. Expansion joints unsealed. Permit still valid will monitor. |
2023-08-10 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo257 construction site |
2023-08-09 | No data | NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance (2 Cuts) |
2023-08-09 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Installed the color code marker in the perm restoration IFO property #16. |
2023-08-09 | No data | BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut across r/w. |
2023-08-09 | No data | AVENUE R, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway - in compliance |
2023-08-09 | No data | AVENUE R, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway - in compliance |
2023-08-09 | No data | AVENUE R, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration in driving lane - Roadway marking is faded - no action |
2023-08-08 | No data | EAST 10 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: LL14 | Department of Transportation | arrived 11:00 Departed 1:45. Two cuts 11’2x4’x8’7 and 4’8x3’10x4’2. Compaction 97.7/96.9 and 97.3% |
2023-08-08 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 520 - 522 17 Street. Restoration is partially sunken and a CAR was issued on a newer permit, #B012023087B02 exp. 4/24/2023 (CAR #20236780479). |
2023-08-08 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found in compliance |
2023-08-08 | No data | OGDEN AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no temp sidewalk found |
2023-08-07 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance ifo 257 |
2023-08-05 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration curb to curb IFO property #231. |
2023-08-04 | No data | GORSLINE STREET, FROM STREET 51 AVENUE TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the parking lane in front of 51-44. |
2023-08-04 | No data | CODWISE PLACE, FROM STREET BEND TO STREET KNEELAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade within the driving lane opposite 51-63. |
2023-08-04 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts opposite address acceptable. |
2023-08-04 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Reinspect and reissue CAR to the correct permittee |
2023-08-03 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done new permit on file |
2023-08-03 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET HAWTREE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints not recessed nor sealed, white plastic casing not removed. Wood form not removed.Perm r/w cuts to grade. CAR issued using a different permit. |
2023-08-03 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET RALEIGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk expansion joints not recessed nor sealed, white plastic casing not removed. Wood form not removed.Perm r/w cuts to grade. |
2023-08-03 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (4ft. x 3ft.) area of a permanent restoration, in the driving lane, is sunken down 2 inches.In front of 520 - 522 17 Street between 10 Avenue and Prospect Park West. |
2023-08-02 | No data | BARKER AVENUE, FROM STREET ADEE AVENUE TO STREET LESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw resurfaced curb to curb |
2023-08-02 | No data | GATES AVENUE, FROM STREET CAMBRIDGE PLACE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed 27 linear feet of construction equipment stored in the parking lane at 6:30PM on a Wednesday. Respondent ID #33387 is in violation of stipulation #020, CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING |
2023-08-02 | No data | EAST 164 STREET, FROM STREET PROSPECT AVENUE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk and roadway paved at new building, BPP. |
2023-08-01 | No data | LAWRENCE STREET, FROM STREET 57 ROAD TO STREET 58 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Not Verified. Crew on site working along the segment. Wood with cones pinned on top has been removed at time of inspection after speaking with the foreman. Active permit on file. |
2023-07-31 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates countersunk on the roadway. Active permit on file B012023199B55. |
2023-07-31 | No data | NORTH 6 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced by in house milling entire segment |
2023-07-31 | No data | 54 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the parking/driving lane, in front and opposite 1122 54 Street. Sidewalk flag repaired in front of property. |
2023-07-31 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2023-07-30 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore wearing course flush with surrounding roadway surface - summons issued. |
2023-07-29 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has concrete patch work around a newly installed water valve on the sidewalk. The respondent failed to restored full flags in kind. CAR# 20236150338 was issued on 6/22/23. |
2023-07-29 | No data | SHEFFIELD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | in compliance with car issued .. cut resealed in d/l |
2023-07-29 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a permanent restoration in roadway/plaza. Respondent failed to restore plaza in kind with beige paint. CAR #20227720409 issued 9/11/22. Respondent ID by cited permit. |
2023-07-29 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass water cut restored to grade. |
2023-07-29 | No data | 136 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# 20236150335 issued on 6/22/23 without the noted permit listed as required. |
2023-07-28 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration complete in front of 1341. |
2023-07-28 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2023-07-28 | No data | 44 DRIVE, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to use skid resistant plating/decking either equal to or greater than the adjacent roadway surface within the driving lane in front of 11-52 44th Drive. Plate used smooth to the touch. |
2023-07-28 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has a perm trench with asphalt broken out 2'' exposing concrete Base in the parking lane. As per CAR # 20238310259 was issued on 5/3/23. |
2023-07-27 | No data | TELLER AVENUE, FROM STREET BEND TO STREET EAST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber’s permanent restoration parking lane I/F/O 1437-1441. Portion of plumber cut was resurfaced by ConEdison electric cut against curb. |
2023-07-27 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking/driving lane in compliance |
2023-07-27 | No data | TELLER AVENUE, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file. Plumbing Valentin and crew on site. Excavation started behind property line. Will open sidewalk. Updated permit on file. |
2023-07-27 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired inspection done on most recent permit Q012023143B00 |
2023-07-27 | No data | JESUP AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, water repair backfilled on a protected street but failed to obtain a confirmation number. Permit # x012023136a64 expired 6/12/23 |
2023-07-27 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flag around pole with VZ hardware sealed in compliance for 996 Manhattan av |
2023-07-27 | No data | TELLER AVENUE, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Valentin and crew on site. Excavation behind property line and sidewalk. Sidewalk access maintained at this time. Spoke to Valentin to provide flagger to assist pedestrian when sidewalk needs to be closed. X02 permits also on file. |
2023-07-26 | No data | FENTON AVENUE, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 cuts in rw. |
2023-07-26 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER BACK FILL COMPLETED UNDER LATEST PERMIT |
2023-07-26 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 3. Cuts in rw, Instructed to combine cuts from 3 into 2 |
2023-07-26 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with a excavated roadway for sew installed at open construction site in compliance roadway fully closed valid permit on file |
2023-07-25 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2023-07-25 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR # 20227380728 issued on 11/24/2022 without the noted permit listed as required. |
2023-07-25 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 cuts in rw, work on sw, Instructed Silvario to condense 2 into 1 upon completion of Wearing course. 1 large cut, 1 small cut should remain. |
2023-07-25 | No data | JESUP AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Plumbing Germin 24’x3’x2’6” D/L & S/W JumpingJack SandCone ETL Shaq blend Wet 127.8 Dry 118.9 MD 124.0 AM 7.5% TopTest 97.5. Existing concrete base, cutbacks done. |
2023-07-24 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l p/l in compliance |
2023-07-24 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied, CAR stands as issued |
2023-07-24 | No data | EAST 10 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 5/16/23 |
2023-07-24 | No data | BEDFORD AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo property 422 |
2023-07-23 | No data | EAST 10 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-07-23 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-23 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ sidewalk is in compliance |
2023-07-23 | No data | EAST 7 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across the roadway valid permit on file. |
2023-07-22 | No data | BEACH 12 STREET, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade across the roadway in front of 1147. |
2023-07-22 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# 20226150708 issued on 12/19/22 without the noted permit listed as required. |
2023-07-22 | No data | BEACH 12 STREET, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR condition repaired under permit number Q012023108C29. |
2023-07-22 | No data | HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway. |
2023-07-22 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2023-07-22 | No data | FENTON AVENUE, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Rw totally open, no specified walkway. |
2023-07-22 | No data | 44 DRIVE, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent observed working on the street performing water repair during the 2023 summer street embargo. Permittee does not have a waiver to work at this location. |
2023-07-22 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wooden forms not removed from tree pit. |
2023-07-22 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-21 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway extending from curb to curb sealed in compliance ifo property 54 |
2023-07-21 | No data | MILLER AVENUE, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE DRIVING LANE MISSING ITS IBM COLOR CODE CAP TO IDENTIFY THE RESPONDENT , INSTALL COLOR CODE WITH IBM TAG # |
2023-07-20 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane and one sidewalk flag restored in front of 232-15. (JG) |
2023-07-20 | No data | TELLER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber’s permanent restoration is missing color code. Color code must be installed. Also, sidewalk expansion joint at curb must be sealed. I/F/O 1246. |
2023-07-20 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain |
2023-07-19 | No data | FENTON AVENUE, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm cuts in rw, new sw flags in compliance. |
2023-07-19 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP |
2023-07-19 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | waitng on DEP to repair water at location. sewer done. |
2023-07-19 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site open excavation in roadway parking/driving lane ifo 257 new permit on file |
2023-07-18 | No data | CARROLL STREET, FROM STREET FORD STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-07-18 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP for property #385 B012020349A01. |
2023-07-18 | No data | 40 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy of roadway |
2023-07-18 | No data | MACON STREET, FROM STREET NOSTRAND AVENUE TO STREET VERONA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced B152022314A39. |
2023-07-18 | No data | 220 PLACE, FROM STREET 43 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walk in roadway |
2023-07-17 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Permanent sewer trench is sunken 1 1/2 to 2 inches in driving lane - As per homeowner across the street at 2715 Avenue R, house is shaking every time heavy vehicles rolled over the depressed area. (Bus route) |
2023-07-17 | No data | WHITE STREET, FROM STREET 6 AVENUE TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair acceptable |
2023-07-17 | No data | EAST 14 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration - building site at location |
2023-07-16 | No data | 20 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-07-15 | No data | 54 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the parking/driving lane, in front and opposite 1122 54 Street. Sidewalk flag repaired in front of property. |
2023-07-15 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #106 in the driving lane there is a permanent restoration flush to grade. CAR re-inspection passed. C.A.R Restoration permit number: M012023174B07 |
2023-07-15 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.AR. re-inspection passed. Permanent restoration resealed within driving lane nearest 27th Avenue. |
2023-07-14 | No data | JESUP AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DEPcut off cut. |
2023-07-14 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wearing course resealed at this time. |
2023-07-13 | No data | WEST 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #131 in the parking lane there is a permanent restoration flush to grade with asphalt sealed and 2019 color code marker applied. Multiple sidewalk flags appear to have been restored. |
2023-07-13 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 734, please refer to Open CAR under later work permit# M012020244A33. Patchwork on sidewalk and perm restoration in parking / bike lane. |
2023-07-13 | No data | WEST 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active building operation taking place IFO #249, unable to inspect. |
2023-07-13 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR closed, new CAR will be reissued with 1042 procedures. Cut is not squared . |
2023-07-13 | No data | OGDEN AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walk found |
2023-07-13 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permanent water restoration in the roadway is not squared and aligned at the cut limits as required by Standard Detail Drawing 1042D note #3. |
2023-07-12 | No data | EAST 123 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts flushed to grade. |
2023-07-12 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration found resurfaced by BPP. |
2023-07-12 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2023-07-12 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway is found to be resurfaced BPP (B012023152C75) |
2023-07-11 | No data | OGDEN AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 163 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | At this time 2 plates in the middle of roadway covering excavation currently is in compliance, active permit |
2023-07-11 | No data | 64 AVENUE, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across roadway. |
2023-07-10 | No data | EAST 7 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived 10:50 Departed 2:45. Two cuts 4’2x3’9x4’1 & 13’x4’1x10’4. Compaction 97.2 & 97.3/98.2% |
2023-07-09 | No data | 28 AVENUE, FROM STREET 150 STREET TO STREET MURRAY LANE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-07-09 | No data | HARMAN STREET, FROM STREET FAIRVIEW AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Ped. ramp at location was recently installed by other permittee. Temp. sidewalk was part of ped. ramp. Area (corner quadrant) was restored. No need to pull a permit or do any work. |
2023-07-09 | No data | 192 STREET, FROM STREET 44 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent repaired the condition on CAR# (20238290084) issued on 4/25/23 without the noted permit listed as required. |
2023-07-09 | No data | EAST 2 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-07-08 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 734, NOV for a partially restored / patched sidewalk flag from Water repair work. Patchwork is not permitted and full flag restoration is required. Respondent notified via CAR# 20226720312 on 8/26/2022. |
2023-07-08 | No data | 44 DRIVE, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to abide by stipulation 013 by failing to maintain a minimum 5' clear unobstructed pedestrian path on the sidewalk in front of 11-52 44th Drive. |
2023-07-07 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IBM color code needs to be applied |
2023-07-06 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has acquired a permit to repair the CAR. Permit #B012023181B72 exp. 7/25/2023. |
2023-07-06 | No data | 65 PLACE, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 71-33 to grade in the driving lane. |
2023-07-06 | No data | BERRY STREET, FROM STREET NORTH 6 STREET TO STREET NORTH 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on this segment work around corner on north 6 |
2023-07-06 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restorations acceptable no defects found |
2023-07-06 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavations in roadway parking/driving lane ifo property 257 new permit on file |
2023-07-06 | No data | FENTON AVENUE, FROM STREET BOSTON ROAD TO STREET GIVAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Waiting for DEP, BF rescheduled. |
2023-07-06 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway & Sidewalk in compliance. |
2023-07-06 | No data | NORTH 6 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple perm restorations in roadway driving lane sealed in compliance |
2023-07-05 | No data | JESUP AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET JESUP PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three plumbers cuts less than 10’ apart, wearing course needs to be made into one permanent restoration. In driving lane I/F/O #1434. CAR restoration permit required. In accordance with 34RCNY 2-11(e)12(iv) and Standard Detail Drawing 1042. |
2023-07-05 | No data | JESUP AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated plumbers cut in driving lane. |
2023-07-05 | No data | JESUP AVENUE, FROM STREET BEND TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by building paving plan and sidewalk SCARA. |
2023-07-05 | No data | JESUP AVENUE, FROM STREET JESUP PLACE TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated plumbers excavation in driving lane. Has updated permit on file. |
2023-07-05 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite of 140-18, There is a 1' x 1' portion of permanent restoration, that is sunken 5" in localized area of the driving lane. Restore roadway with surrounding area immediately. |
2023-07-05 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a partial section of the job in the roadway but due to BO roadway has also been resurfaced. |
2023-07-05 | No data | SEDGWICK AVENUE, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumbers excavations in driving and parking lane, crew on site. |
2023-07-05 | No data | SEDGWICK AVENUE, FROM STREET CBE SOUTHBOUND EXIT 1 D TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber excavation in roadway and crew on site. Has updated valid permit on file. |
2023-07-05 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Opposite 140-18, There is a temporary restoration, that is overdue for final restoration, after repair of defective sunken condition to permanent restoration. Finalize temporary restoration. |
2023-07-05 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER : Active B.O. barricades in the R/W |
2023-07-05 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to foreman Slebero regarding closing the street, he complied open the street stated roadway is macadam and had to take out a big stone from excavation in roadway |
2023-07-04 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permittee failed to finalize cut in roadway permit expired |
2023-07-04 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in front of property 1036. |
2023-07-03 | No data | STEINWAY STREET, FROM STREET 28 AVENUE TO STREET 30 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in the parkway |
2023-07-03 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20237440101 issued on 4/13/2023. Respondent failed to seal a permanent restoration, in the roadway. Cited permit used for ID. |
2023-07-02 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumbing restoration |
2023-07-02 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET SMART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Partial temp cut with partial perm cut with missing seal in the parking/driving lane at time of inspection. Active permit on file. |
2023-07-02 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a permanent restoration in the driving lane that has not been sealed, overdue for final. CAR #20238400079 issued 5/24/2023. Respondent failed to permanently restore cut within the required time. Cited permit expired 5/18/2023 used for ID. |
2023-07-02 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced by builder |
2023-07-01 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2023-07-01 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cut flushed to grade. CAR permit obtained. |
2023-07-01 | No data | WEST 13 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag with water hardware and permanent restoration trench in the Roadway. Permit expired. |
2023-07-01 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the drivng lane under valid permit # B012023174B47 exp 7/14/23.. in compliance |
2023-06-30 | No data | KNICKERBOCKER AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done on the sidewalk and parking lane |
2023-06-30 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in crosswalk area with lane markings restored at this time. |
2023-06-29 | No data | EAST 101 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm water restorations in r/w in compliance (ifo 123-25) |
2023-06-28 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in compliance. |
2023-06-28 | No data | WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk as stipulated in front. |
2023-06-28 | No data | 135 STREET, FROM STREET BOOTH MEMORIAL AVENUE TO STREET ELDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway. Slight edge cracking on seal. Not enough for CAR at this time. |
2023-06-28 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway and sidewalk in compliance - however wrong cross street - |
2023-06-28 | No data | SOUTH 2 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo construction site 232 |
2023-06-27 | No data | WHITNEY AVENUE, FROM STREET ELBERTSON STREET TO STREET FORLEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the driving lane, partly covered by BPP paving in front 90-12. |
2023-06-27 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the driving lane in compliance |
2023-06-27 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the driving lane under valid permit # B012023174B47 exp 7/14/23 |
2023-06-27 | No data | NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 10:47, L: 3’4” W: 3’ D: 3’7” Departed: 14:01 |
2023-06-26 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 134-28, There is a patched sidewalk flag, adjacent to restored flag around water valve, along the sidewalk. Patchwork not acceptable. Restore in FULL flag restoration. |
2023-06-26 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane in compliance. |
2023-06-25 | No data | GLENWOOD ROAD, FROM STREET EAST 55 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | area resurfaced B012022052A15 |
2023-06-24 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in compliance with lane markings restored at time of inspection. Work corrected under permit M012023157A49. |
2023-06-24 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two countersunk plated excavations in roadway opposite one another ifo property 54 in compliance new permit on file |
2023-06-24 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued to most recent permit # (Q012023110D47). |
2023-06-24 | No data | VERNON BOULEVARD, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed & acceptable within the driving lanes in front of & opposite 46-40 Vernon Boulevard. Dimensions: 4'8"x3'0"x3'10" = Cut-1 / 7'2"x6'2"x3'0" = Cut-2. Base to follow. |
2023-06-23 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued to most recent permit # (Q012023110D47). |
2023-06-22 | No data | 136 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of & opposite 57-21, There are two permanent restorations, where the asphalt is broken out in localized area's of the cut. Restore wearing course on two perm restorations. |
2023-06-22 | No data | 60 AVENUE, FROM STREET 136 STREET TO STREET LAWRENCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 132-33, There is a patched sidewalk around water valve, along the sidewalk. Patchwork not acceptable. Restore sidewalk in FULL flag restoration. |
2023-06-22 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary walkway is on site |
2023-06-22 | No data | HULL AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No work started |
2023-06-21 | No data | EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | Sidewalk is open for all pedestrians side and roadway is plated |
2023-06-21 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE21FT0IN X 3FT8IN X 3FT9IN C: 97.06FT4IN X 5FT4IN X 3FT0IN C: 97.5WD: 115.8; DD: 110.0; MDD: 114.5; MST: 5.3%START 12:26 END 1:36 |
2023-06-21 | No data | VERNON BOULEVARD, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee observed not maintaining 2 lanes for traffic 1 lane in each direction as required by stipulation 027. Spoke with crew on site, roadway opened in compliance. |
2023-06-21 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration sunken down 3" in the parking lane in front of 455 Degraw Street & Permit expired on 5/7/2023. |
2023-06-21 | No data | DE GRAW STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in the r/w |
2023-06-21 | No data | BAYSIDE AVENUE, FROM STREET 29 AVENUE TO STREET 154 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file Q012023087B11 |
2023-06-21 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2023-06-20 | No data | MAUJER STREET, FROM STREET MORGAN AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the sidewalk n |
2023-06-20 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-06-20 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbers work resurfaced by new building SCARA new sidewalk and roadway paved. |
2023-06-20 | No data | MURRAY STREET, FROM STREET 17 ROAD TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered under bpp permit Q012023044A88 |
2023-06-19 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm REPAIR WATER - SEWER, pass |
2023-06-19 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The raise plow sign has been removed. |
2023-06-19 | No data | 149 AVENUE, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm REPAIR WATER, sw and rw, pass |
2023-06-18 | No data | WEST 182 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a cut flush to grade in the parking lane and three sidewalk flags restored in kind I/F/O 553 |
2023-06-18 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sewer for new building |
2023-06-17 | No data | WILLOUGHBY AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-06-17 | No data | 149 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permament restoration made flush to grade in the roadway. |
2023-06-17 | No data | 149 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR repaired under permit number Q012023108C28. |
2023-06-17 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action car #20227720409 issued on 9/11/2022. Respondent failed to restore the beige painted plaza over a permanent restoration. Respondent ID by permit # B012022129A47 |
2023-06-17 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. Materials & Equipment are being stored in the parking lane, in front of 148-01 at time of inspection. Active permit on file. |
2023-06-17 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition(s) on CAR #20227380728, (CAR date 11/24/2022) without the noted permit listed as required. |
2023-06-17 | No data | FLUSHING AVENUE, FROM STREET INGRAHAM STREET TO STREET SCOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway was resurfaced |
2023-06-16 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in compliance and resealed |
2023-06-16 | No data | WEST 14 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #351 there is a permanent restoration flush to grade (partly within B.O) with a single sidewalk flag restoration around a water valve box. (Red bus paint cover a portion of the restoration) |
2023-06-16 | No data | LONGFELLOW AVENUE, FROM STREET BEND TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway I/F/O 1425 |
2023-06-15 | No data | HALSEY STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on the roadway is flush to grade |
2023-06-15 | No data | HART STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in the parking lane |
2023-06-15 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2023-06-15 | No data | SHEFFIELD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane has worn sealer around the cut , re- seal perm cut in roadway |
2023-06-15 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 39-57 58st - Perm restoration ( area adjacent) sunken 1"-2" beyond BPP limit |
2023-06-15 | No data | EAST 101 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 125 opposite 130, restoration cored: 12 1/2" wearing course. Existing roadway: 7" wearing course, 5" concrete. Failed coring. |
2023-06-14 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration in driving lane and parking lane. |
2023-06-14 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking/driving lane in compliance. |
2023-06-14 | No data | EAST 14 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | construction site |
2023-06-14 | No data | AVENUE T, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2023-06-14 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #215 active B/O , work is behind barriers/fenced area, Permit Expired. |
2023-06-13 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on working in excavation in parking lane. Portion in driving lane is plated. |
2023-06-11 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/t/p/o i observed the above respondent with a permanent cut in roadway and wearing course not flushed with surround area, exposing concrete base. After being notified with car 20238310259 on 5/3/23. Was id by expired permit |
2023-06-10 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV failed to restore the asphalt/wearing course 1 inch below grade after measuring within their permanent restoration. Respondent was previously notified to correct this condition Via CAR#(20236390320) on 5/1/2023. |
2023-06-09 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber restoration - in compliance |
2023-06-09 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 13ft x 4ft 2in x 8ft = 96.6%, 98.1%W: 122.7, DD: 112.9, MD:118.5, AM:8.7 |
2023-06-08 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint sealed |
2023-06-08 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permittee failed to restore in kind roadway by leaving temporary restoration throughout segment |
2023-06-07 | No data | EAST 101 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 123-125, two perm cuts in d/l in compliance |
2023-06-07 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations going across roadway and work done in sidewalk. Also, current Restani gas work is cutting into one of the two permanent restorations, in the parking lane. Restani Camil on site. |
2023-06-07 | No data | EAST 14 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | Plumber restoration construction site |
2023-06-07 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done, hydrant relocate |
2023-06-07 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Pass |
2023-06-06 | No data | 25 AVENUE, FROM STREET 154 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway |
2023-06-06 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts acceptable |
2023-06-05 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Crew on site, they have excavated the sunken area and are waiting for their truck with material. As per foreman, they will backfill and leave the area temporary to grade. Will pass out NICA and re-inspect later today. |
2023-06-05 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #225 fire hydrant on the north side, Work not started. Permit expired. |
2023-06-05 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration, in the parking/driving lane, is sunken down 4 to 5 inches.In front of 1052 57 Street between 11 Avenue and Ft Hamilton Parkway. |
2023-06-03 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO #106 in the driving lane an attempt has been made to make restoration flush with the roadway, however the restoration has started to sink an 1’ 1/2”. CAR passed & a new CAR has been issued. |
2023-06-03 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a permanent restoration with cracked and worn wearing course. Respondent failed to properly maintain seal to wearing course. CAR 20224890590 issued 9/24/22. Respondent ID by cited permit expired 8/31/21. |
2023-06-03 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed a temporary restoration in the driving lane that is overdue for final. CAR# 20237690087 issued 4/12/2023. Respondent failed to permanently restore the cut within the required time. Cited permit used for ID. |
2023-06-03 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 734, NOV for a partially restored / patched sidewalk flag from Water repair work. Patchwork is not permitted and full flag restoration is required. Respondent notified via CAR# 20226720312 on 8/26/2022. |
2023-06-03 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO #106 in the driving lane an attempt has been made to make restoration flush with the roadway, however the restoration has started to sink an 1’ 1/2”. CAR passed & a new CAR has been issued. |
2023-06-03 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed above respondent fail to remove wooden form from tree pit on the sidewalk , upon expiration of permit. Respondent was notified by CAR# 20222930008 on 11/5/22. |
2023-06-03 | No data | FRESH POND ROAD, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration resurfaced by BPP. |
2023-06-03 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to obtain proper permits to repair the conditions reported on a CAR. |
2023-06-03 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed steel plates stacked in the parking lane without a DOT permit in front of property #674. Respondent failed to obtain a DOT permit to store the steel plates on the roadway. Cited permit expired 3/25/2023 used for ID. |
2023-06-02 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the r/w with an active |
2023-06-02 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with stipulation BIKE02 |
2023-06-02 | No data | LAKE STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the roadway |
2023-06-02 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut1L4’3 W17’0 D8’6Compaction 97.8 98.5Pass |
2023-06-01 | No data | 65 PLACE, FROM STREET CENTRAL AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill opposite 71-33 completed. Cut 1: 4' 4" x 4' x 3', cut 2: 3' 7" x 3' 3" x 3'. |
2023-06-01 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible, Permit expired. |
2023-05-31 | No data | THOMPSON STREET, FROM STREET BROOME STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate with permittee name around 75 feet south of spring. |
2023-05-31 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed |
2023-05-31 | No data | STERLING PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane/ sidewalk is flush to grade |
2023-05-31 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-05-31 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | core passed |
2023-05-31 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2023-05-29 | No data | 61 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-05-29 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN RWY & NEW SWK FLAG AT BUILDING OPERATION |
2023-05-29 | No data | MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-05-27 | No data | WILSON AVENUE, FROM STREET COVERT STREET TO STREET SCHAEFER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-05-27 | No data | LAKE STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | no temporary pedestrian walk found |
2023-05-27 | No data | 133 STREET, FROM STREET DEAD END TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER -PERM ROADWAY |
2023-05-26 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020258F02) |
2023-05-26 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the parking lane in compliance. New permit on file B012023145A61. |
2023-05-26 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked on permanent water cut. Re-seal cut. Towards corner 27 Ave. |
2023-05-26 | No data | COMMERCIAL STREET, FROM STREET CLAY STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-05-26 | No data | COMMERCIAL STREET, FROM STREET BOX STREET TO STREET CLAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-05-25 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area within permanent restoration was repaired. Permit #B012023107B85 exp. 5/11/2023, acquired to repair the CAR. |
2023-05-25 | No data | JAVA STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway parking lane sealed in compliance ifo property 192 |
2023-05-25 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer restoration extending across roadway sealed in compliance ifo property 58 |
2023-05-24 | No data | EAST 14 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2023-05-24 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent having a steel plate on the roadway that was smooth to the touch. Respondent's plate did not have skid resistance greater than or equal to the adjacent roadway surface. I ID by permit Q01202311B93. |
2023-05-24 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew working within excavation, in the driving lane, in front of 1242 39 Street. New permit on file, B012023124A64 exp. 6/9/2023 |
2023-05-24 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, is sunken down 2 1/2 inches.In front of 1116 40 Street between 12 Avenue and 13 Avenue. |
2023-05-24 | No data | HARMAN STREET, FROM STREET FAIRVIEW AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags need to be fully restored in kind in front of 19-04. Patch work is unacceptable. |
2023-05-24 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water valve on the SW |
2023-05-24 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a plumbers cut in the roadway that has not been sealed or saw cut. This restoration is overdue for final expired permit (B012023109B03) 5/18/2023 |
2023-05-24 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-05-24 | No data | UNION AVENUE, FROM STREET JACKSON STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced by BPP for new building |
2023-05-24 | No data | LEXINGTON AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2023-05-24 | No data | EAST 82 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 49 found final restoration in the driving lane fully restored. No defects to report at this time. |
2023-05-24 | No data | BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w |
2023-05-23 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2023-05-23 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent plumbing restoration in the driving. Sealer is worn and cracked. |
2023-05-23 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED- RESTORAATION IN FRONT OF NEW BUILDING COMING UP |
2023-05-23 | No data | AVENUE R, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates found flush on roadway in front of 2714 Avenue R |
2023-05-23 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2023-05-22 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | hydrant in grass area |
2023-05-22 | No data | NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (2 Cuts) found to be in compliance |
2023-05-22 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor actively working on site. Active permit #Q012023117C69 on file. |
2023-05-22 | No data | LAKE STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with 2 open excavation in the roadway |
2023-05-22 | No data | EAST 7 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation opposite of address |
2023-05-22 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Plated Excavation In Driving Lane |
2023-05-22 | No data | LAKE STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts #1 L 10ft W 5ft D 9ft #2 L 6ft W 3ft 6in D 5ft WD 123.0 DD 114.4 MD 121.0 AM 7.52 test on each cut #1 95.7, 96.5#2 97.7, 96.2 |
2023-05-21 | No data | GOLDSMITH STREET, FROM STREET GRAND AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to BPP paving done. |
2023-05-21 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flags restored on sidewalk |
2023-05-21 | No data | WEST 182 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent cut flush to grade in the parking/Roadway I/F/O 553 |
2023-05-20 | No data | 63 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-05-20 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed |
2023-05-20 | No data | KNICKERBOCKER AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L 6ft W 5ft D 8ft 2 different material #1 blend WD 121.8 DD 113.3 MD 119.5 AM 7.5 #2 sand WD 111.6 DD 102.7 MD 105.5 AM 8.7, 1 lift 97.4% |
2023-05-20 | No data | KNICKERBOCKER AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the PL/SW |
2023-05-20 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCC roadway at time of inspection. Active permit on file. |
2023-05-20 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2023-05-20 | No data | JESUP AVENUE, FROM STREET BEND TO STREET WEST 172 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three plumbers permanent restorations in driving lane I/F/O # 1550-1546 a.k.a. New blue building. |
2023-05-20 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - CREW ON SITE. NO WORK IN PROGRESS. PLATED EXCAVATION ON THE ROADWAY. SAT STIP . |
2023-05-19 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates remain shifted in roadway |
2023-05-19 | No data | 152 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2023-05-19 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file Q012019129A63 |
2023-05-18 | No data | DE GRAW STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration on roadway driving to parking lane and new sidewalk flag |
2023-05-18 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 of 5 plates marked PNY are shifted 5” exposing excavation down 5 feet |
2023-05-18 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE. |
2023-05-18 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #89. |
2023-05-18 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | tunneling done |
2023-05-17 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Raise plow sign was removed from street light. |
2023-05-17 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a permanent water restoration in crosswalk of roadway. Respondent failed to restore in kind all roadway pavement markings after receiving CAR #20225280111 notification on 3/31/23. |
2023-05-17 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | There is a 3’ in diameter area sunken 3” in the driving lane, adjacent to steel plate PNCY markings, over plumbers cut. Sunken area needs to be made flush with surrounding roadway. I/F/O #1311. |
2023-05-17 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-05-17 | No data | EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance. |
2023-05-17 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-05-17 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WAS REPAIRING SHIFTED PLATES. BUILDING OWNER CONTACTED CONTRACTOR ABOUT DEFECTIVE PLATES. NO VIOLATION. CREW ON ROADWAY UPON DEPARTURE. WEEKEND STIPS . |
2023-05-15 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed Respondent with (5)Steel Plates in Roadway, failed to Properly Fasten Plating and Decking, Plates are Noisy when Rolled on by Vehicular Traffic. Respondent was Identified through above permit, and Markings on Plates. |
2023-05-15 | No data | BURNS STREET, FROM STREET 67 AVENUE TO STREET YELLOWSTONE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving lane. |
2023-05-14 | No data | RICHMOND ROAD, FROM STREET CUNARD PLACE TO STREET MARY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN PK LANE OF RWY - AT NEW BUILDING AT 586-OK |
2023-05-14 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest d/l p/l |
2023-05-14 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-05-13 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent plumbing restoration in driving lane in front of 2013. |
2023-05-13 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REMOVE RAISE PLOW SIGN. THE WINTER MORATORIUM ENDED 3/31/2023. |
2023-05-13 | No data | 60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the roadway in compliance |
2023-05-12 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been resurfaced |
2023-05-12 | No data | 51 AVENUE, FROM STREET 92 STREET TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Long water restorations to grade within the parking/driving lane in front of 92-18. |
2023-05-11 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 3511 Farragut road |
2023-05-11 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-05-11 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 3014 GLENWOOD ROAD |
2023-05-11 | No data | KNICKERBOCKER AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in bike lane and sidewalk. Active permit on file. |
2023-05-11 | No data | NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut#1 Length 15' Width 4' Depth 9' First lift 96.8 & Second Lift 97.8. Cut#2 Length 7' Width 5' Depth 1' 8". First Lift 97.2. Cutback was done & I left at 2:15 |
2023-05-11 | No data | 54 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane and in the sidewalk, in front of 1122 54 Street. |
2023-05-11 | No data | 58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance |
2023-05-11 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed |
2023-05-11 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags around water valve. Duplicate. |
2023-05-10 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on the SW/PL 60ft from Bragg st |
2023-05-10 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2023-05-10 | No data | BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2023-05-10 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to provide smooth riding surface free of defects in the final completed wearing course of Sewer cut in the roadway sunken 1''. The condition remains despite prior notice in CAR 20226150708 issued on 12/19/22. |
2023-05-10 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane mark out installed |
2023-05-09 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. Sidewalk flags currently curing. Duplicate. |
2023-05-09 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INSTALLATION OF NEW SEWER LINE AND FAILED TO FULLY TRENCH TO TYE CURB |
2023-05-09 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench restoration in roadway. Sidewalk flags currently curing. |
2023-05-09 | No data | MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber work done |
2023-05-09 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Permittee failed to remove Steele plates from the roadway permit expired driggs Ave btwn north 1 st and filmore pl |
2023-05-09 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK, pass |
2023-05-08 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench restoration in roadway. |
2023-05-08 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. Duplicate. |
2023-05-08 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to BPP paving done in front of 45-20. |
2023-05-08 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permament sewer restoration in front of 147-26 to grade across the roadway. |
2023-05-08 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Plumbing NYC, CORP. Fredo, jumping jack, blend. Exclusive Testing, Charles, sand cone. W 124.2 D 114.2 Max 120.5 Moisture 8.7%. 4 cuts: Top test 1:98.0% 2: 97.2% 3: 97.9% 4: 98.5%. Backfill accepted |
2023-05-08 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit number Q012023110C33. |
2023-05-07 | No data | EAST 10 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-05-07 | No data | MIDDLETOWN ROAD, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The permittee Plumbing N.Y.C Inc I/F/O 3006 Block/Lot: description of work: install new curb valve and curb box for existing water service. Research shows a update DOT permit number . |
2023-05-05 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has expired, at this time there is an ongoing BO at this location 1165 Madison Avenue |
2023-05-05 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in place and in compliance in the driving lane |
2023-05-05 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the p/l, d/l. Water repair on the s/w incompliance. |
2023-05-04 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade trench in rw. |
2023-05-04 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | (condition verified) steel plate observed in driving lane very noisy when vehicle goes by courtesy call will make for active permit on file |
2023-05-04 | No data | KATONAH AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-05-03 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | It in roadway has broken out asphalt, exposing concrete base. Also cut needs to be resealed |
2023-05-03 | No data | DEAN STREET, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with stipulation 078 |
2023-05-02 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | in complaince with car issued plow sign removed |
2023-05-02 | No data | 11 AVENUE, FROM STREET 147 STREET TO STREET 148 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. (14'2" x 4' x 7') |
2023-05-01 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Plumber cut plated in the roadway, also stipulation 020 allows for storage of excavated debris in the parking lane. Plumber permit valid until 5/14/23. Incompliance at this time |
2023-05-01 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration is starting to sink down 1 inch. Also street opening joints need to be resealed & solid whit lane markings along with top of words ONLY must be restored. In front of 560. |
2023-05-01 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. |
2023-05-01 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder paved over cut |
2023-05-01 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in roadway parking/driving lane sealed in compliance ifo construction site AKA 65 DuPont st |
2023-05-01 | No data | WYONA STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-04-30 | No data | EAST 101 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No temporary pedestrian walkway |
2023-04-30 | No data | WEST 14 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2022 water repair cut between driving lane and parking lane IFO 351-357 West 14 Street acceptable. |
2023-04-29 | No data | CORPORAL STONE STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill / Base rescheduled. No contractor or crew on site. 30 min grace period from 11:00 A.M. start time expired as of 11:30 A.M. 4/29/23. |
2023-04-29 | No data | CORPORAL STONE STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to use skid-resistant plating/decking in its entirety either equal to or greater than the adjacent roadway surface within the parking/driving lanes in front of & opposite 38-19 Corporal Stone Street. |
2023-04-29 | No data | 61 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP has covered work on the roadway |
2023-04-29 | No data | BROADWAY, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M012023055A52. |
2023-04-29 | No data | CORPORAL STONE STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA PASSED. Skid Resistant steel plated hardware labeled "P NYC I" has been applied to the grass portion of the sidewalk at this time in front of 38-19. Area has been made safe at this time. |
2023-04-29 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated restoration in front of 232-15 to grade in the parking lane. |
2023-04-28 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L 10 W 4 D 2 wet 120.6 dry 112.2 max 190.0 moisture 7.5 test 97.2 |
2023-04-28 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary cut Opposite 69-16 overdue for final. C.A.R. only at this time see- Protested C.A.R.#20231100044 |
2023-04-27 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane opposite 1101 President street |
2023-04-27 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10’ x 4’ x 6’6” in parking lane.Test - 96.9WD - 121.1DD - 112.7MDD - 119.5M - 7.5Arrived at 10:49 am. A Verizon fiber optics cable was sliced during excavation of roadway, resulting in incompletion of backfill. Verizon is on location. |
2023-04-27 | No data | GROVE PLACE, FROM STREET DEAD END TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PRIVATE STREET |
2023-04-27 | No data | WARREN STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the sidewalk, in front of 259 Warren Street. |
2023-04-27 | No data | 41 AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ped/walk not visible |
2023-04-27 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk in front of 1015A Presidente street |
2023-04-26 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench sealed and in compliance |
2023-04-26 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts #1 L 4ft W 4ft D 3ft #2 L 11ft W 4ft D 9ft WD 122.1 DD 114.8 MD 120.0 AM 6,4#1 96.3% #2 97.0, 96.7 |
2023-04-26 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with 2 open excavation |
2023-04-26 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in parking lane - in compliance |
2023-04-26 | No data | BAYSIDE AVENUE, FROM STREET 29 AVENUE TO STREET 154 STREET | No data | Street Construction Inspections: Active | Department of Transportation | r/w not occupied |
2023-04-25 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1708 found 1 concrete sidewalk flag fully replaced around a water valve |
2023-04-25 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk in front of 349 prospect place |
2023-04-25 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway. Active permit on file. Duplicate. |
2023-04-25 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flag around water valve in compliance |
2023-04-25 | No data | 192 STREET, FROM STREET 44 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1’ diameter sunken permanent water cut in the driving lane down 2”. |
2023-04-25 | No data | 152 STREET, FROM STREET 12 ROAD TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-04-25 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway. Active permit on file. |
2023-04-25 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l on opp side |
2023-04-24 | No data | WEST 13 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/6/23. Backfilled under permit B012023090B34 |
2023-04-24 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Open excavation crew on site active permit Q012023101A41. |
2023-04-24 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway in front of 171. Duplicate. |
2023-04-24 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2023-04-23 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ parking lane is flush to grade |
2023-04-23 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench to grade across the roadway nearest 125 St. |
2023-04-23 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR acknowledged. Sealer restored. |
2023-04-23 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was done over the restoration |
2023-04-22 | No data | EAST 101 STREET, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O # 126 and 130 with Sidewalk excavated at both properties. 2 Restorations one in front of each property on the North side. LL14 Backfill pass. Cut # 1 I/F/O # 126 L 3’ 7” W 2’ 9”. Cut # 2 I/F/O # 130 L 3’ 5” W 2’ 8” |
2023-04-20 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped/walk not visible |
2023-04-20 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupancy in compliance |
2023-04-19 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET BRIDGE STREET TO STREET CHAPEL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk around water valve no roadwork found resurfaced by BPP 22 chapel st |
2023-04-19 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest across r/w and s/w |
2023-04-19 | No data | 37 STREET, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2023-04-19 | No data | 168 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade |
2023-04-18 | No data | FLATBUSH AVENUE, FROM STREET AVENUE P TO STREET BAUGHMAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | inspected for possible core dig. |
2023-04-18 | No data | TELLER AVENUE, FROM STREET BEND TO STREET EAST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway I/F/O 1433 |
2023-04-18 | No data | TELLER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway and sidewalk in compliance. |
2023-04-18 | No data | CLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was done on property. |
2023-04-17 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2023-04-17 | No data | BEDFORD AVENUE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2023-04-17 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO POST SIGNS FOR CONTAINMENT OF MATERIALS IN ROADWAY. SIGNS MUST BE POSTED. WAS ID BY PERMIT AND MARKINGS ON STEEL PLATE |
2023-04-17 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No at this time , gave Nov to plumber |
2023-04-17 | No data | REMSEN STREET, FROM STREET DEAD END TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on roadway parking lane IFO 16 Remsen street |
2023-04-16 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete bus pad restored. BPP paving done. |
2023-04-16 | No data | AVENUE I, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-04-16 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw found resurfaced by BPP |
2023-04-16 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane opposite address |
2023-04-16 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk in front of 647 Baltic street, perm water cut found on roadway |
2023-04-15 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for the Respondent failed to restore white lane pavement markings on a permanent Restoration located in the Roadway. CAR # 20227380728 was issued prior on 11/24/2022 to correct this condition. |
2023-04-15 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (P/L) found in compliance (I/F/O 407) |
2023-04-15 | No data | DEAN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2023-04-14 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2023-04-14 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-04-14 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance ifo property 203 |
2023-04-14 | No data | ROOSEVELT AVENUE, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is covered by BPP. |
2023-04-14 | No data | MORRIS AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy of roadway |
2023-04-14 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in the r/w |
2023-04-13 | No data | CLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk found |
2023-04-13 | No data | 97 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2023-04-13 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w i/f/o 1777 |
2023-04-13 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane. Bike lane markings not fully restored but passed under inspectors discretion due to active B.O and BBP proposal. |
2023-04-13 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway bike lane behind Jersey barriers sealed in compliance |
2023-04-13 | No data | HANOVER PLACE, FROM STREET GROVE PLACE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not verified |
2023-04-13 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IBM color code installed |
2023-04-13 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane is missing color code & need to be resealed |
2023-04-12 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway. |
2023-04-12 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observe no expansion joints in between sidewalk flag. CAR 20224170319 was issued. Respondent failed to install and seal expansion joints. I identify by expired permit X012022235A65. |
2023-04-12 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trash was removed. |
2023-04-12 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent closed off 30 feet by 10 feet of roadway with steel plates without a permit. Respondent failed to obtain a NYC DOT permit. Permit #B012023066B85 expired 3/25/2023 used for ID. |
2023-04-12 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench to grade |
2023-04-12 | No data | WEST 13 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETEL 22' X W 6' X D 10'WET: 120.6 DRY: 112.2 MAX: 119.0 MOIST: 7.5% COMPACTION: 97.4%, 98.1%START: 11:30AM END: 1:45PM |
2023-04-11 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut parking lane/ roadway is flush to grade |
2023-04-11 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on car # 20223720087 dated 9/18/2022 without the noted permit listed as required. Respondent is identified by color tag and permit #B012021029B76 |
2023-04-11 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET BRIDGE STREET TO STREET CHAPEL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced for new building per bpp |
2023-04-10 | No data | 35 AVENUE, FROM STREET BELL BOULEVARD TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut |
2023-04-10 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The above respondent has excavated material stored in the parking lane and has failed to display the required signs with the company name, permit number, start and ending dates, emergency telephone number. |
2023-04-10 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be sealed. |
2023-04-10 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ped /walk not visible |
2023-04-10 | No data | SOUTH 8 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. |
2023-04-10 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE EXCAVATING ROADWAY IN FRONT OF 1426 PACIFIC STREET |
2023-04-10 | No data | GRACE COURT ALLEY, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance ifo stated property |
2023-04-09 | No data | OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2023-04-09 | No data | 120 AVENUE, FROM STREET 217 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in place |
2023-04-08 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm trench on the roadway |
2023-04-08 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate in the roadway, active permit on file |
2023-04-07 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | THERE IS A SHIFTED STEEL PLATE IN THE DRIVING LANE EXPOSING A 3 INCH GAP. THE STEEL PLATE IS LOOSE AND MAKES NOISE WHILE OTHER VEHICLES ROLL OVER IT. IFO PROPERTY #138 SCHAFFER ST BTW EVERGREEN AV & CENTRAL AV. |
2023-04-07 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action car #20227720409 issued on 9/11/2022. Respondent failed to restore the beige painted plaza over a permanent restoration. Respondent ID by permit # B012022129A47 |
2023-04-07 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2023-04-07 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA passed Steel plates is pinned & rammed & in compliance |
2023-04-07 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in the roadway |
2023-04-07 | No data | 213 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave |
2023-04-06 | No data | BEACH 12 STREET, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent water restoration with a localized area sunken 2" within the parking lane. I/f/o 11-47 |
2023-04-06 | No data | HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 5’x4’6”x3’ water service plumber Foreman Silverio Jumping Jack CleanFill SandCone ETL Able Wet122.7Dry114.1Max118.5AM7.5 TopTest96.4 Opposite #204 in parking lane, I/F/O #207 driveway. Base work scheduled for tomorrow. Temp flush at this time. |
2023-04-06 | No data | 58 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Three loose and noisy plates in the driving lane need to be reset; please notify the permittee. |
2023-04-06 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the parking lane. |
2023-04-06 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Complaint | Department of Transportation | Sidewalk close while work is underway. Signage and temporary walkway in compliance |
2023-04-06 | No data | NOSTRAND AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w |
2023-04-05 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt cracked/broken out & down 4" in the driving lane opposite of 824 East New York Ave & permit expired on 12/16/18 |
2023-04-05 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate in the roadway, active permit on file |
2023-04-05 | No data | 156 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2023-04-05 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER -PERM ROADWAY |
2023-04-05 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sewer restoration with a defective area of asphalt that has broken/cracked in the Driving lane.Respondent notified via CAR#20236390009 on 1/2/2023 and failed to provide smooth riding surface free of defects in the final completed wearing course. |
2023-04-05 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in the roadway counter sunk, In compliance |
2023-04-04 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site working in the parking lane necessary permits on file and signage for closed sw posted |
2023-04-04 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAY, SIDEWALK I/F/O 1847/1849 |
2023-04-03 | No data | SPENCER STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-04-03 | No data | EAST 9 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site awaiting backfill |
2023-04-03 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated inspection sent photos with email. |
2023-04-03 | No data | GRACE COURT ALLEY, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration extending across roadway sealed in compliance ifo property 16 |
2023-04-03 | No data | EAST 9 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2023-04-03 | No data | WEST 13 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Complaint | Department of Transportation | Occupancy of roadway in compliance. |
2023-04-03 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-04-02 | No data | 21 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2023-04-02 | No data | 8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway has been resurfaced due to BBP. |
2023-04-02 | No data | 107 STREET, FROM STREET 97 AVENUE TO STREET 101 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration in good condition color coded and sealed. Sidewalk flags flush to grade. |
2023-04-01 | No data | 149 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Wearing course not flush with roadway. |
2023-04-01 | No data | EAST 9 STREET, FROM STREET AVENUE L TO STREET AVENUE M | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plate. In rw okay new permit on file |
2023-04-01 | No data | BEACH 130 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Multiple s/w flags replaced and sealed. |
2023-04-01 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-04-01 | No data | AVENUE N, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-03-31 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012023038A41-latest permit |
2023-03-31 | No data | SOUTH 2 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-03-30 | No data | EAST 7 STREET, FROM STREET AVENUE N TO STREET AVENUE O | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-03-30 | No data | CALYER STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite 81. Duplicate. |
2023-03-30 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2023-03-30 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site excavating cut in driving lane |
2023-03-30 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in the driving lane |
2023-03-30 | No data | CARROLL STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 10:30AM Departure: 12:00PMCut is in the parking lane, opposite 322 Carroll Street.L: 5FT. 6IN. W: 4FT. 6IN. D: 3FT. 6IN. |
2023-03-30 | No data | LAMONT COURT, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w & half of cut resurfaced by BPP |
2023-03-29 | No data | OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-03-29 | No data | 86 STREET, FROM STREET BATTERY AVENUE TO STREET DAHLGREN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair near building op |
2023-03-29 | No data | BATTERY AVENUE, FROM STREET 86 STREET TO STREET 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done by buidling op |
2023-03-29 | No data | EAST 32 STREET, FROM STREET FARRAGUT PLACE TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm restoration in the r/w |
2023-03-29 | No data | REMSEN STREET, FROM STREET DEAD END TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain at this time due to on going gas construction at location |
2023-03-29 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking / driving lane acceptable |
2023-03-29 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RAISE PLOW SIGN NOT REMOVED |
2023-03-28 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane sealed in compliance ifo 26 cut ifo 32 covered by street paint |
2023-03-28 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2023-03-28 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Plated excavation in parking lane. Active permit on file. |
2023-03-28 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water/sewer repair restoration in roadway |
2023-03-28 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway driving lane and parking lane sealed in compliance ifo property |
2023-03-28 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to reseal permanent restoration in front of 6420 18th Ave. A CAR # 20224890590 was issued on 9/24/22. The respondent was identified by DOT permit # B012021219A00 exp 8/31/2021. |
2023-03-28 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sewer and water cut to grade |
2023-03-27 | No data | SPRINGFIELD BOULEVARD, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut to grade in the parking lane |
2023-03-26 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway IFO 1845/1847 Pitkin Avenue |
2023-03-26 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the driving lane opposite 134-22. |
2023-03-25 | No data | EAST 18 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-03-24 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave |
2023-03-24 | No data | BROADWAY, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | after further research the plates on the sidewalk were placed there by the BO ( Prestige ) as per the MTA to protect the subway grating while crossing the sidewalk with equipment by the BO. do not issue ticket to plumber. Thanks |
2023-03-23 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition previously reported. |
2023-03-23 | No data | BROADWAY, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to M012023055A52. |
2023-03-23 | No data | 57 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2023-03-22 | No data | BATTERY AVENUE, FROM STREET 86 STREET TO STREET 88 STREET | No data | Street Construction Inspections: Active | Department of Transportation | active work for sewer repair |
2023-03-22 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l in compliance |
2023-03-22 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-03-22 | No data | SOUTH 2 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass test 98.1 test #2 98.2 L13’ W 4’ D 8’ |
2023-03-22 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has construction material/debris stored on the sidewalk without a DOT permit to do so. Permit#B012023020A41 exp2/19/2023. Use for I.D |
2023-03-22 | No data | 43 AVENUE, FROM STREET 217 STREET TO STREET 218 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut opposite parking lane |
2023-03-21 | No data | 43 AVENUE, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut opposite parking lane, partially covered by BPP |
2023-03-21 | No data | 47 AVENUE, FROM STREET 208 STREET TO STREET OCEANIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2023-03-21 | No data | BLEECKER STREET, FROM STREET 60 PLACE TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w and on s/w |
2023-03-20 | No data | 102 STREET, FROM STREET LEWIS AVENUE TO STREET STRONG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flush to grade in the parking & driving lane i/f/o 5310. |
2023-03-20 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sealer fully worn out IFO 682A. CAR issued. |
2023-03-19 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - PLATED EXCAVATIONS ROADWAY AND SIDEWALK. |
2023-03-19 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER - PERM ROADWAY |
2023-03-18 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway curb to curb is flush to grade. |
2023-03-17 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the respondent failed to install expansion joint between curb and sidewalk. Sealer applied but not expansion joint installed under sealer. Notified prior by car #20225980002 dated 11/21/2022 |
2023-03-17 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration remains in Good Condition. No defects to report at this time |
2023-03-16 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. Property AKA 89 Throop Ave. |
2023-03-16 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied at time |
2023-03-16 | No data | 21 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew awaiting backfill |
2023-03-16 | No data | 108 STREET, FROM STREET 37 AVENUE TO STREET 37 DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flush to grade in the parking & driving lane i/f/o 3725. |
2023-03-16 | No data | 15 DRIVE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 149-19 to grade in the parking lane. |
2023-03-16 | No data | 21 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Base pass |
2023-03-15 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in parking lane |
2023-03-15 | No data | 95 STREET, FROM STREET 162 AVENUE TO STREET 163 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water cut in the parking lane |
2023-03-15 | No data | 62 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-03-15 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Test 96.6 97.5 backfill pass |
2023-03-15 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent plumber restoration in parking/ driving lane in front of 207 in compliance. |
2023-03-15 | No data | OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2023-03-15 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 steel Plated excavation counter sunk in roadway with raise plow sign posted odd side of segment ifo property 477 permit on file |
2023-03-15 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE ROADWAY OPPOSITE ADDRESS EXCAVATED DEBRIS STORED NEW PERMIT ON FILE |
2023-03-14 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced due too new building bpp |
2023-03-14 | No data | SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED DEBRIS/DIRT IN THE PARKING LANE BLOCKING THE GUTTER. RESPONDENT FAILED TO CLEAR THE GUTTER OF DEBRIS/DIRT. CITED PERMIT USED FOR ID. |
2023-03-14 | No data | AVENUE R, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in the r/w ifo property in compliance. |
2023-03-13 | No data | DE GRAW STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut was resealed and color code marker was installed. Condition corrected, pass. |
2023-03-13 | No data | BROADWAY, FROM STREET 11 STREET TO STREET 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2023-03-12 | No data | 125 STREET, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-03-12 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM WATER CUTS FOND ON ROADWAY N FRONT OF 617 WARREN STREET, VALVE INSTALLED ON SIDEWALK |
2023-03-11 | No data | 55 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the RDWY & new SWK flag with hardware. Permit expired & out of guarantee. |
2023-03-11 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-03-10 | No data | 57 AVENUE, FROM STREET 231 STREET TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench across roadway |
2023-03-10 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway milled under M012022133A30. |
2023-03-09 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Multiple plated excavations on top of existing cut that was supposed to be re-sealed. Active permit # (Q012023048B54) on file by the permittee "PLUMBING NYC, INC.". NOV issued for not countersinking steel plates during Winter Mor. PASS. |
2023-03-09 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk contractor restored the sidewalk in kind. |
2023-03-09 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut within parking lane |
2023-03-09 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with multiple plated excavations labeled "P NYC I", in the roadway. The respondent failed to countersink steel plates, flushed with the roadway, during the Winter Moratorium. |
2023-03-08 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed. Temporary restoration in roadway. Active permit on file. |
2023-03-08 | No data | MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupy r/w in compliance |
2023-03-08 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in compliance |
2023-03-08 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration has been resealed |
2023-03-08 | No data | EAST 7 STREET, FROM STREET AVENUE N TO STREET AVENUE O | No data | Street Construction Inspections: Active | Department of Transportation | Crew working on open excavation |
2023-03-08 | No data | EAST 7 STREET, FROM STREET AVENUE N TO STREET AVENUE O | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass |
2023-03-07 | No data | BATTERY AVENUE, FROM STREET 86 STREET TO STREET 88 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2023-03-07 | No data | 86 STREET, FROM STREET BATTERY AVENUE TO STREET DAHLGREN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file for active work |
2023-03-07 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates were repaired |
2023-03-07 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Active | Department of Transportation | there are (2)Steel Plates, marked "FELIX", that are very loose and noisy and slightly separated in front of 160-05 archer avenue |
2023-03-07 | No data | 86 STREET, FROM STREET BATTERY AVENUE TO STREET DAHLGREN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | active work on going near active bo |
2023-03-06 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sw occupied |
2023-03-06 | No data | POPLE AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET SAULL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Grass area restored with dirt on sidewalk. |
2023-03-06 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Counter-sunken steel found within the driving lane of the roadway in-compliance at this time (plow sign posted). Active permit #Q012023053A97 on file. |
2023-03-06 | No data | BROADWAY, FROM STREET WEST 27 STREET TO STREET WEST 28 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple steel plated excavations on swk, IFO BO site. Swk is open to peds and no impaction to protected bike lane. |
2023-03-06 | No data | CALYER STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | W 120.9 D 112.4 M 119.0 M 7.5 Test 97.6 |
2023-03-06 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed from roadway |
2023-03-06 | No data | 97 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | No roadway occupancy at this time |
2023-03-06 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates deflecting 3” |
2023-03-05 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & mutiple perm cut in the r/w |
2023-03-05 | No data | EAST 7 STREET, FROM STREET AVENUE N TO STREET AVENUE O | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit removal, new permit on file. Plated excavation in parking lane . |
2023-03-05 | No data | AVENUE N, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plates in driving lane okay |
2023-03-05 | No data | AVENUE N, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2023-03-05 | No data | ARCHER AVENUE, FROM STREET 160 STREET TO STREET UNION HALL STREET | No data | Street Construction Inspections: Active | Department of Transportation | 160-05 Archer Ave b/t 160 st & Union Hall st - found 2 steel plates marked PNYCI / FELIX counter-sunken 2" below grade and 3" deflection at driving lane of roadway. Also excavation cave-in at edge of plates creating dangerous condition to motorists |
2023-03-05 | No data | EAST 7 STREET, FROM STREET AVENUE N TO STREET AVENUE O | No data | Street Construction Inspections: Active | Department of Transportation | Failed to countersink plates |
2023-03-04 | No data | BENSON AVENUE, FROM STREET 19 AVENUE TO STREET BAY 20 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 9:30 Departed: 11:15. One cut in front of 1853. 4’10x3’0x4’9. Compaction 97.5% |
2023-03-03 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observe no expansion joints in between sidewalk flag. Respondent failed to install and seal expansion joints. I identify by expired permit X012022235A65. |
2023-03-02 | No data | 65 STREET, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane opposite of property. |
2023-03-02 | No data | 36 ROAD, FROM STREET BUD PLACE TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration to grade within the driving lane, partly covered by BPP paving nearest Prince street. |
2023-03-02 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE ROADWAY OPPOSITE ADDRESS AND BARRICADES STORED |
2023-03-01 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV ISSUED IN OFFICE |
2023-02-28 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm restoration on the roadway |
2023-02-28 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plates removed |
2023-02-28 | No data | NEWPORT AVENUE, FROM STREET BEACH 130 STREET TO STREET BEACH 131 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy of roadway at this time of inspection. |
2023-02-28 | No data | REMSEN STREET, FROM STREET DEAD END TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass test 97.2 and 97.7 |
2023-02-28 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Plates were removed from roadway. |
2023-02-28 | No data | CALYER STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2023-02-27 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Raise plow sign installed |
2023-02-27 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Plate is now counter sunken in the roadway |
2023-02-27 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plate has been removed. Permanent restoration remains in location of steel plate. |
2023-02-27 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5 PLUMBER CUTS IN THE DRIVING / PARKING LANE .. IN COMPLIANCE |
2023-02-27 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for Failure to remove wood forms upon expiration of the permit. |
2023-02-27 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration crossing roadway, work also done on sidewalk multiple new flags found around water valve |
2023-02-27 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permanent restoration in compliance, steel plates removed |
2023-02-26 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench in the r/w |
2023-02-25 | No data | 12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP rwy restoration in place. Unable to locate plumbers cuts. |
2023-02-25 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Multiple countersunk steel plates in rwy IFO #1242. |
2023-02-24 | No data | 102 STREET, FROM STREET LEWIS AVENUE TO STREET STRONG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flush to grade in the parking & driving lane i/f/o 5310. |
2023-02-24 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2023-02-24 | No data | DRIGGS AVENUE, FROM STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp in intersection. Active permit on file. |
2023-02-24 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in roadway at Fillmore Pl. Duplicate. |
2023-02-24 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Overturned jersey barriers and construction drums causing a buildup of trash. |
2023-02-23 | No data | GROVE STREET, FROM STREET FRESH POND ROAD TO STREET TRAFFIC AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w |
2023-02-23 | No data | MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BLOCK FOUND RESURFACED |
2023-02-23 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced. |
2023-02-23 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 9:35AM Departure: 1:05PMCut is in the parking/driving lane, in front of 195a Pulaski Street.L: 15FT. 0IN. W: 4FT. 0IN. D: 8FT. 0IN. |
2023-02-22 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the driving lane in front of 146-30. |
2023-02-22 | No data | AVENUE R, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the d/l in compliance. |
2023-02-21 | No data | 244 STREET, FROM STREET 54 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench across roadway, sidewalk flag restored(BO) |
2023-02-19 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by DOT |
2023-02-19 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l need to be resealed active permit on file |
2023-02-19 | No data | 54 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated roadway and sidewalk excavation with a newer active permit on file. |
2023-02-19 | No data | 136 STREET, FROM STREET 57 AVENUE TO STREET 57 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration trench to grade within the driving lane in front of 57-21 |
2023-02-18 | No data | 58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent roadway restorations in compliance |
2023-02-18 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate in the RW counter sunken, active permit on file |
2023-02-17 | No data | ECKFORD AVENUE, FROM STREET BEND TO STREET RALEIGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut ton driving and parking lane |
2023-02-17 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate in the RW counter sunken, active permit on file |
2023-02-17 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate in the RW counter sunken |
2023-02-17 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed Permittee's Plastic Barriers stored on Roadway, failed to mark outer surface of Barriers with high intensity Fluorescent Paint or Reflectors capable of producing warning glow when struck by Vehicle Headlamps. |
2023-02-16 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived: 11:30 Departure:12:30Cut1:L3ft5inxW3ftxD2ft8in1st test: 98.7% |
2023-02-16 | No data | SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE ROADWAY OPPOSITE ADDRESS AND EXCAVATED DEBRIS STORED |
2023-02-15 | No data | 63 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration out of warranty |
2023-02-15 | No data | REMSEN STREET, FROM STREET DEAD END TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2023-02-15 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk closed, signs posted, flaggers posted. Working in excavation. Valenteen on site. |
2023-02-15 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in PL, in compliance |
2023-02-14 | No data | FRESH POND ROAD, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in r/w and on s/w |
2023-02-13 | No data | EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE | No data | Street Construction Inspections: Active | Department of Transportation | Plates countersunk crossing rw. Material left in pL in compliance. |
2023-02-13 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent restoration flush to grade in driving/bike lanes. Partial over lapped by Con Edison 2022 gas trench. |
2023-02-12 | No data | CROWN STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 385 CROWN STREET |
2023-02-12 | No data | MONTGOMERY STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 687 MONTGOMERY STREET |
2023-02-12 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on the roadway |
2023-02-12 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 577 MONTGOMERY STREET |
2023-02-12 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed a countersunk steel plate in the roadway. Respondent failed to post “Raise Plow” signs in accordance with the winter moratorium from 12/1/22-3/31/23. Respondent ID by active permit B012023020A44. opposite 1242 39th Street |
2023-02-12 | No data | CHURCH AVENUE, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in Rw sealed and in compliance |
2023-02-11 | No data | KOSCIUSKO STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RDWY RESURFACED B152022325A00. |
2023-02-11 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-02-10 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restorations in roadway. Work done for 171 North 1 St. Active permit on file. Duplicate. |
2023-02-10 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2023-02-10 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-02-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Worked ongoing in front of 1341. |
2023-02-10 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp restorations in roadway. Work done for 171 North 1 St. Active permit on file. |
2023-02-10 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair restoration in driving lane |
2023-02-10 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Counter sunken plate in the RW, active permit on file |
2023-02-09 | No data | NORTH 1 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2023-02-09 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #425. NEW FLAG AROUND WATER VALVE. |
2023-02-08 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I observed an 8.3 x 8 previously backfilled excavation concrete base being poured. 14 inches concrete poured. |
2023-02-08 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk flags sealed and in compliance |
2023-02-08 | No data | PITKIN AVENUE, FROM STREET POWELL STREET TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work being perform at this time. Active permit B012023026A09 on file. Permit expired. |
2023-02-07 | No data | 46 ROAD, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut within parking lane, partially covered by BPP |
2023-02-07 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts. |
2023-02-07 | No data | NORTH 7 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with a plated street opening in parking lane. Respondent failed to obtain a NYC DOT street opening permit. Name on plate and previous permit #B012022305B70 expired 12/13/2022 used for ID. |
2023-02-07 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O#134-28, there is a Steel Plate, marked "PNYCI", is Noisy when Rolled on by Vehicular Traffic. Condition Previously Reported, CAR#20233620027 was issued on 2/5/2023. |
2023-02-07 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 11:30-1:20 L-5’11”x W-5’2”x D-3’ Test: 96.3% Cut is located opposite address in parking/driving lane |
2023-02-06 | No data | ST MARKS AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET EASTERN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER VALVE INSTALLED ON SIDEWALK IN FRONT OF 1694 ST MARKS AVENUE, PERM WATER CUT FOUND IN PARKING LANE |
2023-02-05 | No data | 37 STREET, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in compliance. |
2023-02-05 | No data | WEST 152 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO |
2023-02-05 | No data | NEW UTRECHT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2023-02-05 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 134 -28 Blossom Ave - found steel plate marked PNYCI counter-sunken not resting properly in the groove creating excessive noise at driving lane of roadway. (plow sign posted)car issued as per 311-13377388 |
2023-02-04 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 1537 44 Street. New permit on file, B012023020A41 exp. 2/19/2023. |
2023-02-04 | No data | 37 STREET, FROM STREET 13 AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in compliance |
2023-02-04 | No data | 62 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane and in the sidewalk (1 flag), in front of 2047 62 Street. |
2023-02-03 | No data | FLATBUSH AVENUE, FROM STREET AVENUE P TO STREET BAUGHMAN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the roadway, water valve on s/w in compliance. |
2023-02-03 | No data | PIAVE AVENUE, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration to grade in p/l |
2023-02-03 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Plate counter sunken, In compliance |
2023-02-03 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the RW, In compliance |
2023-02-02 | No data | EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2023-02-02 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane, IFO property. No defects & bike lane is clear. |
2023-02-02 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in PL |
2023-02-02 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut within parking lane |
2023-02-02 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the RW flushed to grade |
2023-02-01 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated water in the roadway |
2023-02-01 | No data | 207 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2023-01-31 | No data | 47 AVENUE, FROM STREET 208 STREET TO STREET OCEANIA STREET | No data | Street Construction Inspections: Active | Department of Transportation | not started |
2023-01-30 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the parking/driving lane in front of 43-36. |
2023-01-30 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please refer to the latest permit:M022022354D60 on file. |
2023-01-30 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate work due to BPP paving done in front of 46-39. |
2023-01-30 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-01-29 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed a countersunk steel plate in the roadway. Respondent failed to post “Raise Plow” signs in accordance with the winter moratorium from 12/1/22-3/31/23. Respondent ID by active permit B012023020A44. |
2023-01-29 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway curb to curb is flush to grade |
2023-01-28 | No data | SHEFFIELD AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN THE ROADWAY AND 2 SIDE WALK FLAGS INSTALLED AROUND WATER CAP COVERS. 1 RESTORATION INSTALLED IN FRONT OF EACH ADDRESS #51 & #55 |
2023-01-28 | No data | BUSHWICK AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the RW |
2023-01-28 | No data | PULASKI STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is clear |
2023-01-26 | No data | 28 AVENUE, FROM STREET 150 STREET TO STREET MURRAY LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 150-20 to grade in the driving lane. |
2023-01-26 | No data | COLLEGE POINT BOULEVARD, FROM STREET 23 AVENUE TO STREET 25 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the paring lane. |
2023-01-26 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-01-26 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm restoration in the r/w |
2023-01-25 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water restoration in front of 151-48 to grade across the roadway. |
2023-01-25 | No data | 57 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2023-01-25 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair acceptable |
2023-01-24 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MULTIPLE PERM CUTS. |
2023-01-24 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration has been made final. No defects to report |
2023-01-24 | No data | WARREN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary walk in roadway |
2023-01-24 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Full width of the roadway is open |
2023-01-23 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple water cuts on roadway driving lane IFO 289 Livingston street |
2023-01-23 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Passed due to continuity present in permit B012022301B91 |
2023-01-23 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #123 plumber cut in the bike lane /driving lane going into citi bike station is flush to grade. |
2023-01-22 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2023-01-22 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found |
2023-01-21 | No data | 62 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane and in the sidewalk (1 flag), in front of 2047 62 Street. |
2023-01-21 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-01-21 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2023-01-21 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on roadway driving lane |
2023-01-21 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area in perm cut needs to be repaired, circular hole inside of restoration |
2023-01-21 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration, in the parking lane, in front of 1537 44 Street. New permit on file, B012023020A41 exp. 2/19/2023. |
2023-01-20 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in hte p/l & d/l in compliance |
2023-01-20 | No data | FRESH POND ROAD, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation on s/w and in r/w. Crew onsite |
2023-01-20 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 13’ Width 4’ 3” Depth 6’ 5”, First Lift 98.3 & Second Lift 98.1. Cutbacks was done & I left backfill at 12:20. |
2023-01-19 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Long perm trench from middle of rwy extending into property. All lane markings restored & protected bike lane is clear. |
2023-01-19 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 NEWSIDEWALK FLAGS INSTALLED AT CORNER PROPERTY OF 249 ROCHESTER AVENUE, PERM WATER CUT FOUND ON ROADWAY |
2023-01-18 | No data | 10 AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 148-32 to grade in the parking lane. |
2023-01-17 | No data | DE GRAW STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration, in the parking lane, is missing a color code marker and needs to be resealed.- Remove wooden form and install proper expansion joints, in between sidewalk flag and curb.In front of 605 De Graw Street between 3 Avenue and 4 Avenue. |
2023-01-17 | No data | 3 AVENUE, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work paved over by a 2022 major installation gas restoration, found resurfaced. |
2023-01-17 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AS VALVE INSTALLED ON SIDEWALKMIN FRONT OF 1707 DEAN STREET |
2023-01-17 | No data | 57 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 15’x 6’6”x8’ backfill completed |
2023-01-16 | No data | 4 AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, AKA 375 Dean Street. |
2023-01-16 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent gas restoration, in the driving lane and in the sidewalk, in front of 309 Bergen Street. |
2023-01-16 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by a 2022 gas restoration, found resurfaced. |
2023-01-16 | No data | QUINCY STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR #637. |
2023-01-15 | No data | 11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the parking lane. |
2023-01-13 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Full width of the sidewalk is open to pedestrians |
2023-01-12 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking and driving lane acceptable |
2023-01-11 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2023-01-11 | No data | 88 LANE, FROM STREET FOREST PARK BOUNDARY TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | three repair water cuts in the p/l |
2023-01-11 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A CAR has been issued under permit M012022330A00. Please refer to this permit. |
2023-01-11 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to active BO. |
2023-01-10 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent plumbing restoration in the parking lane in front of property 2177 east 4th street. |
2023-01-09 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | At My Time Of Arrival I Observed 3 Steel Plates Marked "CWR" Loose & Noisy In Driving Lane Of Segment On Driggs Ave Btwn Fillmore Pl & North 1st St. |
2023-01-09 | No data | 4 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2023-01-09 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 246-03, Re-seal permanent restoration in the driving/parking lane. |
2023-01-09 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IS FLUSH AND COLOR CODED IFO 925 |
2023-01-08 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2023-01-08 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The sidewalk was restored in kind. |
2023-01-08 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut sealed and in compliance |
2023-01-08 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated water cut |
2023-01-07 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE TO STREET WEST 177 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2023-01-07 | No data | FLATBUSH AVENUE, FROM STREET AVENUE P TO STREET BAUGHMAN PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Leak in basement 3 day notice issued , one cut in driving lane |
2023-01-06 | No data | 88 LANE, FROM STREET FOREST PARK BOUNDARY TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection I found 3 water cuts on the roadway. Wearing course to grade awaiting to be sealed . Plumbing NYC. Inc. has an active permit Q012023005A07 that expires on 2/2/2023. The location is actually 88 Lane Between myrtle Ave and Dead End. |
2023-01-06 | No data | NEWKIRK AVENUE, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w & debris in p/l in compliance with stip |
2023-01-06 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench to grade across the roadway |
2023-01-06 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found |
2023-01-06 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2023-01-06 | No data | 57 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL Backfill restoration Pass cut size 15' x 4' x 8'. |
2023-01-05 | No data | NEREID AVENUE, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber’s restoration in driving/parking lane |
2023-01-05 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was milled and paved by DOT, found resurfaced. Also, no new curb was installed. |
2023-01-04 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a Temporary Sewer cut on the sidewalk that is overdue for final restoration. However, the sidewalk scaffold prevents the contractor from restoring the sidewalk. |
2023-01-04 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the r/w, new s/w flags. |
2023-01-04 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found in compliance |
2023-01-03 | No data | 102 STREET, FROM STREET LEWIS AVENUE TO STREET STRONG AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. Cut size: 11'0" x 4'0" x 10'0" in the parking & driving lane in front of 53-10 102 Street. |
2023-01-03 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on the sidewalk is in compliance |
2023-01-02 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken & cracked down 1 1/2 inches not providing a smooth driving surface. In front of 106. |
2023-01-02 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE. TWO NEW FLAGS AROUND WATER VALVE. |
2023-01-01 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TWO NEW FLAGS IFO PROPERTY #166. |
2022-12-30 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 12:12, L: 3’ W: 2’ D: 4’ 2” Departed: 13:20, 6” Base cutbacks also done at this time |
2022-12-30 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is the parking lane is flush to grade |
2022-12-30 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in roadway. Active permit on file. |
2022-12-30 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance |
2022-12-28 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2022-12-28 | No data | 57 STREET, FROM STREET 39 AVENUE TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 15' x 3'6" x 8' backfill |
2022-12-27 | No data | WEST 125 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed under permit M012020058B39 |
2022-12-27 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate in roadway with no purpose. |
2022-12-26 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done permit expired. |
2022-12-26 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in p/l |
2022-12-26 | No data | KEAP STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2022-12-25 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | EXCAVATED DEBRIS ON RWY - RAISE PLOW SIGN POSTED-OK PK LANE |
2022-12-24 | No data | FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-12-23 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the p/l with an active |
2022-12-23 | No data | EAST 195 STREET, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of plumber's water repair restoration resurfaced in roadway |
2022-12-22 | No data | 62 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walkway. |
2022-12-21 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | two steel plates marked PNYC pinned and ramped in driving lane. Respondent failed to countersink 2 out of 5 steel plates in roadway during the Winter Moratorium. |
2022-12-20 | No data | GRAND AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane |
2022-12-20 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate has been replaced. |
2022-12-20 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has mutiple marked "PNYCI" plated excavation ramped onto the roadway. Respondent failed to countersink the steel plate flush with the surrounding roadway during winter moratorium period started 12/1/2022 to 3/31/2023. |
2022-12-20 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | In front of 1709 there is a steel plate marked PWI that is bent 3” above the roadway surface and deflecting 2” when traffic rides over it, dangerous condition for oncoming vehicles immédiate attention is needed |
2022-12-20 | No data | MOTHER GASTON BOULEVARD, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench sealed and in compliance |
2022-12-20 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | In front of 1709 there is a steel plate marked PWI that is bent 3” above the roadway surface dangerous condition for oncoming vehicles immédiate attention is needed |
2022-12-20 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance |
2022-12-20 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration needs to be resealed. |
2022-12-20 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Prem cut on roadway driving lane IFO 89 Throop Avenue |
2022-12-20 | No data | VAN SICKLEN STREET, FROM STREET AVENUE S TO STREET LLOYD COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok in compliance |
2022-12-20 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the sidewalk, in front of 40 4 Place. |
2022-12-19 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Ifo 229, There is a permanent cut, that is sunken 1" in the driving lane. Also, The asphalt is broken out on the wearing course. In addition, There is a restored flag around water valve, that is 5'6" x 4'. Needs to match adjacent 4' x 4' flag. |
2022-12-19 | No data | CLINTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE 123FT SOUTH OF FLUSHING AV. |
2022-12-19 | No data | WILLIAMS AVENUE, FROM STREET ATLANTIC AVENUE TO STREET EAST NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DDC contractor work done. RW with multiple trenches by DDC |
2022-12-18 | No data | QUINCY STREET, FROM STREET CLASSON AVENUE TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR PROPERTY #25. |
2022-12-17 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | 3’x1’ cave is sunken 1 foot adjacent to plate marked CWR. Cave in has wooden studs sticking out causing a hazard. Permittee ID by permit B012022342E03. |
2022-12-17 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No signs posted |
2022-12-17 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Plated excavation with no permit |
2022-12-17 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | While on site, a Plumbing NYC crew arrived. They backfilled the caved-in area and applied temporary asphalt, the area is now repaired. Condition corrected, pass. |
2022-12-16 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Larger steel plate will be needed to cover hole. |
2022-12-16 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-12-16 | No data | WOODPOINT ROAD, FROM STREET FROST STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2022-12-16 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV ISSUED TO MOST RECENT PERMIT. B012022334A68 |
2022-12-16 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED DIRT AND DEBRIS OBSTRUCTING THE GUTTER. RESPONDANT FAILED TO REMOVE THE DIRT AND DEBRIS FROM THE GUTTER CAUSING A PONDING CONDITION ON THE ROADWAY AND SIDEWALK. CITED PERMIT AND NAME PNYC INC ON THE STEEL PLATE. |
2022-12-16 | No data | ONDERDONK AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long repair water restoration flush to grade in the driving lane i/f/o 550. |
2022-12-16 | No data | 2 AVENUE, FROM STREET EAST 88 STREET TO STREET EAST 89 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon inspection of Complaint wearing course located adjacent to “PNYC” marked steel plate that was cracked and broken down creating a dangerous driving condition.has now been plated pinned and ramped on the roadway NICA Pass. |
2022-12-15 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L3’8 W3’8 D 2’7Compaction 97.3Pass |
2022-12-15 | No data | WILSON AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in parking lane is flush to grade |
2022-12-15 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane |
2022-12-15 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway sealed and flush |
2022-12-15 | No data | PORT RICHMOND AVENUE, FROM STREET GROVE AVENUE TO STREET VREELAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2022-12-14 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition previously reported under CAR 20227740526 |
2022-12-14 | No data | EAST 9 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NWK found at time of inspection. R/W found resurfaced by DOT IN-HOUSE PAVING. Permit number B152022210A89 |
2022-12-13 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore lane marking in the parking in front of property 2171.Please install expansion joint to curb in front of property 2171. |
2022-12-13 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Failure to countersink plates flush with roadway |
2022-12-13 | No data | 244 STREET, FROM STREET 54 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench to grade sidewalk restored in front BO. |
2022-12-12 | No data | STILLWELL AVENUE, FROM STREET BOWERY TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2022-12-12 | No data | 213 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupancy in compliance |
2022-12-12 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD EXCAVATED CONSTRUCTION DEBRIS(DIRT,ASPHALT,CONCRETE)ON ROADWAY-A VIOLATION OF SECTION/RULE 34RCNY2-11(C)(3) OF HIGHWAY RULES-WITHOUT A VALID DOT PERMIT.DEBRIS ON STREET-NO PERMIT (NO STORAGE PERMIT ON FILE.) |
2022-12-12 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED RESPONDENT HAD A STEEL PLATED REPAIR WATER&SEWER STREET OPENING DOWN 4 FEET IN PROTECTED STREET(ROADWAY)-WITHOUT A VALID DOT PERMIT TO DO SO. PROTECTED STREET OPENING-NO PERMIT. |
2022-12-12 | No data | 57 AVENUE, FROM STREET 231 STREET TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass cut size= (1) 9' x 4' down 10', (2) 4'8'' x 3'10'' down 3'10'' |
2022-12-10 | No data | NORTH 1 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2022-12-10 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started |
2022-12-09 | No data | EAST 18 STREET, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in roadway - in compliance |
2022-12-09 | No data | 8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O# 401 The white line within your REPAIR WATER - SEWER Restoration has become faded and stripped away, All lane markings must be restored in kind within all finalized street restoration |
2022-12-08 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES ON THE ROADWAY DURING THE WINTER MORATORIUM. ID BY PERMIT #B012022334A68 EXPIRES 12/21/2022. |
2022-12-08 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | NOV issued for excavations with no permit |
2022-12-07 | No data | GRAND AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L4ft W12ft D8ft 10in - - Temp in roadway IFO 445 |
2022-12-07 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed plate that is not countersink. Respondent failed countersink plates during winter moratorium which begins December 1st 2022 -March 31st 2023. Permit# B012022322A93 was used for ID. |
2022-12-07 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM RESTORATIONS IN THE DRIVING LANE & OPP PARKING LANE. |
2022-12-06 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR #20223720087, 9/19/22 issued without the noted permit listed as required. |
2022-12-06 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 13ft 7in x 4ft 2in x 9ft = 98.2%, 98.0%6ft 7in x 5ft 2in x 3ft = 98.7%WD:123.3%, DD:113.4 , MD:120.5, AM:8.7 |
2022-12-06 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | NOV issued for overdue for final restoration |
2022-12-06 | No data | VALENTINE AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAY I/F/O2895 |
2022-12-05 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUTS FOUND ON ROADWAY IN FRONT OF 104 LINDEN BOULEVARD |
2022-12-04 | No data | BEACH 130 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 405, There is a restored flag around water valve, that is patched and does not match the adjacent flags. Also, fill and seal all bore holes, adjacent to cut. In addition, install joint between the curb & sidewalk. |
2022-12-04 | No data | STERLING PLACE, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm n roadway IFO 632 sealed and flush. |
2022-12-03 | No data | 77 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2022-12-03 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Issuing NOV and CAR on most recent permit |
2022-12-02 | No data | PITKIN AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w sealed and in compliance |
2022-12-02 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2022-12-02 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cut in the roadway |
2022-12-02 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in compliance |
2022-12-01 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-11-30 | No data | 162 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm r/w and s/w cuts to grade ; permit still valid. |
2022-11-30 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-11-30 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permanent roadway cut |
2022-11-30 | No data | PARSONS BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut partially visible within the driving lane in front of 42-29 found flushed to grade. Cut has been partially resurfaced by BPP restoration. |
2022-11-29 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ALL EXPANSION JOINTS HAVE BEEN SEALED. |
2022-11-29 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-11-29 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES HAVE BEEN REOVED FROM THE ROADWAY. |
2022-11-29 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The perm restoration in the driving lane has been sealed. |
2022-11-29 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-11-29 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-11-28 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Missing lane marking was repainted. Roadway in compliance. |
2022-11-28 | No data | BROADWAY, FROM STREET DITMARS STREET TO STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2022-11-28 | No data | STILLWELL AVENUE, FROM STREET BOWERY TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2022-11-27 | No data | TELLER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavated material stored opp 1246 Teller ave. plated excavation in the roadway |
2022-11-27 | No data | TELLER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2022-11-26 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action car #20227720409 issued on 9/11/2022. Respondent failed to restore the beige painted plaza over a permanent restoration. Cited permit used for ID. |
2022-11-26 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial perm cut covered by builders pave in compliance at this time. |
2022-11-26 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavation plated and pin and ramped |
2022-11-26 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012022313B71 active permit excavation plated |
2022-11-26 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates pin and ramped |
2022-11-25 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012022320E43 permit active and plated excavation in the roadway |
2022-11-25 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration in compliance. |
2022-11-25 | No data | BARTLETT STREET, FROM STREET BROADWAY TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the roadway |
2022-11-25 | No data | 64 AVENUE, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across the roadway in front of 97-30 64th Avenue |
2022-11-24 | No data | THROOP AVENUE, FROM STREET BARTLETT STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2022-11-24 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Parking Laneplease restore/repair white divided roadway pavement lane marking in kind over permanent water-sewer restoration in the roadway in front of property #259 EAST 71 STREET, in a timely fashion. CAR issued |
2022-11-23 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 9:30AM Departure: 12:40PMCut is in the parking/driving lane, in front 167 Skillman Street.L: 15FT. 6IN. W: 5FT. 6IN. D: 11FT. 0IN. |
2022-11-23 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2022-11-22 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration between the p/l and d/l in compliance |
2022-11-22 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired |
2022-11-22 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts, |
2022-11-22 | No data | 53 AVENUE, FROM STREET 230 STREET TO STREET HORATIO PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation active permit on file |
2022-11-21 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to restore lane marking in the roadway on Avenue V aka 2171 Bragg Street.Failure to install expansion joints between curb and sidewalk. |
2022-11-21 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in parking and driving lane |
2022-11-21 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND IN PARKING LANE IN FRONT OF 250 WINTHROP STREET |
2022-11-21 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NWK done on this segment. 2190 is on Avenue V b/t Brigham & Bragg Street. |
2022-11-19 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration, this is a new construction a BPP may be done after. |
2022-11-18 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent has failed to install sidewalk expansion joints. Opposite 1095 Colgate Ave. As per CAR# 20224170319 was issued 10/7/2022. |
2022-11-18 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in roadway, |
2022-11-18 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance |
2022-11-17 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-11-17 | No data | GRANT AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in rw. |
2022-11-16 | No data | NEREID AVENUE, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the roadway. |
2022-11-15 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV failed to fully restore a disturbed sidewalk flag with patch work. As per rule the patching of individual flags is restricted. Respondent was previously notified to correct this condition Via CAR #(20226720312) on 8/26/2022. |
2022-11-15 | No data | WILSON AVENUE, FROM STREET COVERT STREET TO STREET SCHAEFER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-11-15 | No data | 206 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill restoration Pass cut size: 8'6'' x 8' x 3'. |
2022-11-15 | No data | KEAP STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-11-14 | No data | DALY AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work found resurfaced, street paved by Stellar Singla INC |
2022-11-14 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration not CAR worthy. |
2022-11-13 | No data | AVENUE T, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration - in compliance |
2022-11-12 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The roadway restoration was resealed. |
2022-11-12 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate reset |
2022-11-12 | No data | DRIGGS AVENUE, FROM STREET NORTH 1 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate reset |
2022-11-11 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 0114P - REPAIR SEWER - PROTECTED RESTORATION PAVED OVER DUE TO BPP |
2022-11-11 | No data | 47 AVENUE, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2022-11-10 | No data | HART STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-11-10 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in compliance |
2022-11-10 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane/ sidewalk is flush to grade |
2022-11-10 | No data | GRAND AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp active on file B012022305B86 |
2022-11-09 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water cuts found on roadway in front of 410 - 412 Fenimore street water valves installed on sidewalk |
2022-11-08 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 2553 Bedford avenue, water valve installed on sidewalk |
2022-11-08 | No data | JEFFERSON AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated cut in the parking lane |
2022-11-07 | No data | JESUP AVENUE, FROM STREET BEND TO STREET WEST 172 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 14x4x4.4 in driving and parking lane. Concrete base and 6 inch cutbacks partially observed. Transformer vault preventing rectangular shape of trench. |
2022-11-07 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas cut in the parking lane is flush to grade |
2022-11-07 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | CAR#20225200115 was issued on 10/31/2022. |
2022-11-06 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. Partially resurfaced by BPP. Duplicate. |
2022-11-06 | No data | FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded in the r/w ifo 785 |
2022-11-06 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane in front of 404 Midwood street |
2022-11-05 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration was resealed awaiting reinspection. |
2022-11-05 | No data | IVAN COURT, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags and roadway resurfaced. |
2022-11-05 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration with a barricaded plated and backfill only Nat Grid restoration within closer to the curb. |
2022-11-05 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT HAS BEEN FOUND RESURFACED BY BPP |
2022-11-05 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon restoration of sidewalk failed to remove wood forms from tree pit |
2022-11-04 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-11-04 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. Duplicate. |
2022-11-03 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk in front of 88 Linden Boulevard. Perm water cut found on roadway |
2022-11-02 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-11-01 | No data | IVAN COURT, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2022-11-01 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance |
2022-11-01 | No data | EAST 2 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane in compliance. |
2022-10-31 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Debris from excavation, active permit on file with crew on site. |
2022-10-31 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass,perm ... |
2022-10-31 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration this is a new construction a BPP probably will follow. |
2022-10-31 | No data | EAST 17 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2022-10-31 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across the the roadway in compliance |
2022-10-31 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT HAS BEEN COVERED BY BPP |
2022-10-31 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance, this is a B/O a BPP may follow upon completion |
2022-10-31 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | IFO 674 Driggs ave Multiple steel plates marked CWR is loose and noisy when drunk over. |
2022-10-30 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2022-10-30 | No data | 149 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/O 10-03 149 ST, 13' x 5' perm roadway restoration sunken 1'' -2'' in localized area |
2022-10-29 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012022287B58 active permit on file |
2022-10-29 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed two temporary restorations in the roadway respondent failed to finalize temporary restorations with the required time, permit, B012022070B83 expired 4/12/22. CAR 20228270003 issued 9/20/22. Cited permit used for ID. |
2022-10-29 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The restoration was not resealed. |
2022-10-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1950 amsterdam water restoration in compliance |
2022-10-29 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-10-28 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6x6’ permanent plumber’s water repair cut in roadway IFO 1634, updated permit on file |
2022-10-27 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a permanent restoration, (REPAIR WATER-SEWER) backfilled on a protected street but failed to obtain a confirmation number. Permit #B012022245B12 expired 9/30/2022. |
2022-10-27 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple perm cuts in r/w curb to curb okay |
2022-10-27 | No data | BEACH 14 STREET, FROM STREET HEYSON ROAD TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No roadway occupancy at this time |
2022-10-26 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 09:44, (2 Cuts) Cut-1- L: 6’ W: 4’ D: 4’6”. Cut-2- L: 15’ W: 4’ D: 11’ Concrete Base cutbacks done at this time Departed: 14:32 |
2022-10-25 | No data | SOUTH 8 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut in the parking lane |
2022-10-25 | No data | KEAP STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane and new sidewalk flags around water valve. |
2022-10-24 | No data | ELDERT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane/ sidewalk is flush to grade |
2022-10-24 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O 674 & 676 Driggs Ave.,•5 - Inadequately secured "CWR" marked steel plates at an excavation in roadway, are VERY noisy when rolled upon by vehicular traffic. |
2022-10-24 | No data | DRIGGS AVENUE, FROM STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | having steel plate covering excavation in roadway, without securing an active NYC DOT permit to maintain use of street, after expiration of NYC DOT permit on 8/30/2022. Roadway remains plated in use. |
2022-10-24 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front f 404 Midwood street |
2022-10-24 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate found in parking lane in front of 250 Winthrop street |
2022-10-24 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate found in parking lane in front of 250 Winthrop street |
2022-10-23 | No data | FARMERS BOULEVARD, FROM STREET 137 AVENUE TO STREET 138 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RESTORATION ROADWAY. WORK DONE IN GRASS AREA AROUND WATER VALVE IN COMPLIANCE |
2022-10-23 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway parking lane sealed and flush |
2022-10-23 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent repaired the condition on CAR # 20223720087 issued 9/19/22 without the noted permit listed as required. Respondent ID by above permit and color code marker. |
2022-10-23 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag sealed and in compliance. |
2022-10-23 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 271 YOUR CUT ON THE SIDEWALK WITH YOUR HARDWARE THE EXPANSION JOINT NEED TO BE SEAL |
2022-10-22 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2022-10-22 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT on permit # B152022202A38. |
2022-10-22 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD AN UNSEALED PERMANENT RESTORATION IN THE DRIVIING LANE. CAR#20227720432 ISSUED 9/17/2022. RESPONDENT FAILED TO PROPERLY SEAL & MAINTAIN THE WEARING COURSE. ID BY PERMIT #B012019346A17 EXPIRED 1/7/2020. |
2022-10-21 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This is a N/B building operation a BPP should follow |
2022-10-21 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival time 10:50am: Backfill Pass. 3 Roadway Restorations. New Construction. Departure time: 1:20pm. |
2022-10-19 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2022-10-19 | No data | SUYDAM STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-10-19 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2022-10-19 | No data | 64 AVENUE, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the parking/driving lane in front of 97-30 64th Avenue |
2022-10-18 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration outside of the BPP located in front of 2021 52nd Street. |
2022-10-18 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 406 - 410 Fenimore street |
2022-10-18 | No data | VALENTINE AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway. DOB in progress |
2022-10-18 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 422 RUTLAND ROAD |
2022-10-18 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY OPPOSITE 350 RUTLAND ROAD |
2022-10-17 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | National grid paved over the restorations |
2022-10-17 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration near 20th Ave. |
2022-10-17 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance not quite CAR worthy this is a new construction a BPP should follow. |
2022-10-17 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 824 EAST NEW YORK AVENUE |
2022-10-17 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple plated excavations on rwy. No impaction to bike lane. |
2022-10-17 | No data | PIAVE AVENUE, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I observed a 4.6 x 3.6 and 4 x 3 excavation backfilled and they passed with compaction of 98 and 98.3 |
2022-10-15 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair Corrective Action Request #20227720409 issued on 9/11/2022. Respondent failed to restore the beige painted plaza over a permanent restoration. Cited permit used for ID. |
2022-10-15 | No data | MAC KAY PLACE, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-10-14 | No data | 38 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade within the parking/driving lane nearest 38 Ave. |
2022-10-14 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2022-10-14 | No data | LAMONT COURT, FROM STREET EMPIRE BOULEVARD TO STREET LEFFERTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 23 LAMONT COURT |
2022-10-14 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two plated excavations in the parking lane in compliance. |
2022-10-13 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration in compliance. |
2022-10-13 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-10-13 | No data | MC DONALD AVENUE, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No restorations found, the address is not on file it goes from 1477 to 1487 |
2022-10-13 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-10-13 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane. |
2022-10-13 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IN RESPONSE TO COMPLAINT #311-12073407. THE STEEL PLATES IFO PROPERTY #317 MAKES NOISE WHILE VEHICLES ROLL OVER THEM. SECURE THE PLATES IN THE ROADWAY. |
2022-10-12 | No data | 84 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2022-10-11 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in bike lane in front of 631 Vanderbilt avenue |
2022-10-11 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate found in parking lane in front of 250 Winthrop street |
2022-10-11 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate found in parking lane in front of 250 Winthrop street, new permit on file:B012022276A99 |
2022-10-10 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2022-10-10 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived: 9:30 Departure 12:00 Cut1: L14ftxW5ftxD3ft5in 1st lift: 97.4% 2nd lift: 96.1% Cut2: L6ftxW4ftxD2ft5in 1st lift : 98.2% |
2022-10-08 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind via BPP 1/2+5 course in compliance |
2022-10-08 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 1622 51st Street.. |
2022-10-08 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation in the parking and driving lane in compliance pinned and ramped. |
2022-10-08 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 1864 60th Street needs to be resealed. |
2022-10-08 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file on file. |
2022-10-07 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length 13’ Width 4’ 4” Depth 11’ 3”, First Lift 98.3 & Second Lift 97.7. Cutbacks was done & I left backfill & base at 1:15. |
2022-10-07 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to install s/w expansion joints on a new concrete s/w flag. Opposite 1095 Colgate Ave. |
2022-10-06 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DA5 VIOLATION |
2022-10-05 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Sidewalk excavated and parking lane / driving lane sewer trench |
2022-10-05 | No data | 64 AVENUE, FROM STREET 98 STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation pinned and ramped within the driving lane in front of 97-30 64th Avenue |
2022-10-05 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2022-10-04 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk flags installed restored in kind in front of property #1341 AMSTERDAM AVENUE & 2 perm water restorations flush to grade in the roadway of the driving lanes in compliance |
2022-10-04 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | CAR has been issued |
2022-10-03 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Found temporary pedestrian walk walkway on roadway in compliance. |
2022-10-02 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated parking / driving lane |
2022-10-01 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation in the parking and driving lane in compliance pinned and ramped. |
2022-10-01 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP covering all restorations. |
2022-09-30 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV failed to fully restore a disturbed sidewalk flag with patch work. As per rule the patching of individual flags is restricted. Respondent was previously notified to correct this condition Via CAR #(20226720312) on 8/26/2022. |
2022-09-30 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 15ft x 5ft 6in x 10ft= 96.3% , 96.8%5ft 9in x 4ft x 2ft = 96.1%WD:112.5,DD:106.9,MD:111.0,AM:5.3 |
2022-09-30 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway and sidewalk - permit renewed B012022256B69 |
2022-09-30 | No data | BEACH 130 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BASE COMPLETE ON18' 6''X 6' 2'' X 1' EXCAVATION IN ROADWAY. NO COMPACTION DEVICE DUE TO CONCRETE |
2022-09-30 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-09-30 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M012020244A33. |
2022-09-29 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon inspection i found 4 steel plates loose and noisy in the driving lane. |
2022-09-29 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in front of 1341 and there is a cut in the crosswalk of west 125th street. Crew in compliance |
2022-09-29 | No data | EAST 3 STREET, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration between the p/l and d/l ok in compliance. |
2022-09-29 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway in front of 366/368. |
2022-09-29 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway in front of 366/368. Active permit on file. |
2022-09-29 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-09-29 | No data | VAN DUZER STREET, FROM STREET HANNAH STREET TO STREET ST PAULS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated sidewalk in front of and a plated roadway excavation opposite of address with excavated debris and a pipe between against the curb |
2022-09-29 | No data | EAST 8 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w on opp side |
2022-09-29 | No data | PULASKI STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (2 Cuts) found to be in compliance |
2022-09-29 | No data | DRIGGS AVENUE, FROM STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection i found 4 steel plates in the intersection that are loose and noisy. Markings on the plate is CWR. ( SR Number: 311-11930602 ) |
2022-09-28 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file |
2022-09-28 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates in compliance on sidewalk |
2022-09-28 | No data | EAST 21 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2022-09-27 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the p/l ok in compliance. |
2022-09-27 | No data | 66 STREET, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER - TRENCH ON THE R/W |
2022-09-27 | No data | POPLE AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET SAULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sidewalk cut in dirt area, 4" below grade. Restore to grade evenly |
2022-09-26 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking/driving lane sealed and flush OPP 3514 |
2022-09-26 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate found on roadway , new permit B012022256B70 on file |
2022-09-26 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 412 Fenimore street |
2022-09-26 | No data | MIDWOOD STREET, FROM STREET MIAMI COURT TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate found on roadway |
2022-09-25 | No data | AVENUE R, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane. |
2022-09-25 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done |
2022-09-25 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found roadway resurfaced B152021249B28 9/15/2021 TO: 9/21/2021 |
2022-09-25 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flags restored on sidewalk - no cut in roadway |
2022-09-25 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved due to BPP for new buliding |
2022-09-25 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-09-25 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on a newer active permit, temporary sidewalk restoration with 2 permanent roadway restoration. |
2022-09-25 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary sidewalk restoration with 2 permanent roadway restoration. |
2022-09-25 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration color coded, the restoration was not sealed, no CAR was issued this is a new construction a BPP should follow upon completion |
2022-09-25 | No data | AVENUE R, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in compliance. |
2022-09-24 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation in the parking and driving lane in compliance pinned and ramped |
2022-09-24 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 6420 18th Avenue needs to be resealed. |
2022-09-24 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Number not in the system |
2022-09-22 | No data | MC DONALD AVENUE, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No restorations found |
2022-09-22 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed debris/construction materials obstructing gutters. Water cannot flow. Above street opening permit B012022256B69 and markings on steel plates (P.N.Y C.I) use for identification |
2022-09-22 | No data | NEREID AVENUE, FROM STREET BRONX BOULEVARD TO STREET BULLARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk in compliance with the DOT rules and regulation's. Description of work install water and sewer service tap connection tap/wet connection 1 1/2 “ to a 2 inches length of service 25 feets |
2022-09-22 | No data | 149 AVENUE, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | S/W FLAG REPALCED AND SEALED. (CAR CLEAN UP PROJECT) |
2022-09-21 | No data | MAC KAY PLACE, FROM STREET LOUISE TERRACE TO STREET NARROWS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk in roadway |
2022-09-21 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-09-21 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2022-09-21 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2022-09-20 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation on rwy IFO BO site. No impaction to conventional bike lane. |
2022-09-20 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway excavation in the parking lane with a newer active permit on file. |
2022-09-20 | No data | EAST 18 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve in grass area & perm restoration in p/l |
2022-09-20 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by bpp job. |
2022-09-20 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in the parking lane overdue for final. |
2022-09-20 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance not quite CAR worthy. |
2022-09-19 | No data | 62 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent long water restorations 10'3"apart and a sidewalk restoration in compliance. |
2022-09-19 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway excavation in the parking lane with a newer active permit on file. |
2022-09-19 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Expansion joint needs to be sealed between the curb and the sidewalk. In Front of 373 Avenue T Between East 1 Street and West Street. |
2022-09-19 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on street segment. |
2022-09-19 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in parking lane. |
2022-09-19 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration, in the driving lane, was permanently restored to grade. Condition corrected, pass. |
2022-09-19 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Roadway and sidewalk clear. |
2022-09-19 | No data | VERONICA PLACE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 51 Veronica place |
2022-09-18 | No data | EAST 8 STREET, FROM STREET CORTELYOU ROAD TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l on opp side |
2022-09-18 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber restoration is sunken 2 to 2 1/2 inches along the entire cut - New wearing course is required to correct the problem |
2022-09-18 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-09-18 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2022-09-18 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration in parking and driving lanes - in compliance |
2022-09-17 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration covered by BPP for the completed B/O |
2022-09-17 | No data | MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair in the parking lane |
2022-09-17 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation |
2022-09-17 | No data | DRIGGS AVENUE, FROM STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation |
2022-09-17 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL THE PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #986.REPLACE THE FADED COLOR CODE MARKER. |
2022-09-16 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-09-16 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 91-46 to grade in the driving lane. |
2022-09-16 | No data | BEACH 130 STREET, FROM STREET CRONSTON AVENUE TO STREET NEWPORT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy in compliance |
2022-09-16 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L4’0 W11’6 D1’8Compaction 97.8 |
2022-09-15 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration IFO 90 Gelston Ave |
2022-09-15 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2022-09-15 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new sidewalk flags around water valve. |
2022-09-15 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration within a Nat Grid perm restoration. |
2022-09-14 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway of the driving lane adjacent to building AKA #1165 MADISON AVENUE |
2022-09-14 | No data | VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to ascertain due to construction site. |
2022-09-14 | No data | 42 AVENUE, FROM STREET 190 STREET TO STREET 191 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no sign of work done |
2022-09-13 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | passes in dash |
2022-09-13 | No data | MIDDLETOWN ROAD, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk |
2022-09-13 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plate street opening’s ramped & pinned in the roadway of the driving lane adjacent to building AKA #1165 MADISON AVENUE |
2022-09-13 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET MAUJER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2022-09-13 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway in front of 215 Winthrop street |
2022-09-12 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w & patchwork on s/w i/f/o NB or AL |
2022-09-12 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration in r.w acceptable |
2022-09-12 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND IN PARKING LANE IN FRONT OF 350 RUTLAND ROAD |
2022-09-12 | No data | GRAND AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | L14FT,W7FT,D4FT CUT OIN THE DRIVING LANE IFO PROPERTY #445. WORK DONE ON THE SIDEWALK |
2022-09-12 | No data | 48 AVENUE, FROM STREET 92 STREET TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade within the parking lane in front of 92-03. |
2022-09-12 | No data | PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-09-12 | No data | 91 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-09-11 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW CAR ISSUED. |
2022-09-11 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2022-09-11 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE PERM RESTORATION IN THE PLAZA AREA NEEDS TO BE PAINTED BEIGE. RESTORE IN KIND. |
2022-09-11 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-09-11 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm trench in the r/w close to ave K |
2022-09-10 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2022-09-10 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCMC stip 020 was being violated. |
2022-09-10 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in p/l |
2022-09-10 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | r/w occupied |
2022-09-09 | No data | MC DONALD AVENUE, FROM STREET WASHINGTON CEMETERY BOUNDARY TO STREET WASHINGTON CEMETERY BOUNDARY | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-09-09 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2022-09-09 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer active permit on file. |
2022-09-09 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent roadway restoration and a plated sidewalk excavation in compliance |
2022-09-09 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L3’10 W17’L17’0 D5’0Compaction 96.1 98.6Cot#2L4’0 W4’0 D 4’0.Compaction 97.9 |
2022-09-09 | No data | ROCHESTER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020169B65) |
2022-09-08 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | South side of roadway area ( aka 9 Orchard St / 56 - 60 Canal St ) has been repaved permanent as per BPP ( M012022158A31 ) and work is no longer visible at this time. This permit has expired. |
2022-09-07 | No data | EAST 22 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2022-09-07 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration was partially paved over by National Grid. |
2022-09-07 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer roadway restoration in compliance |
2022-09-07 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent roadway restorations with 1 of the restorations not quite CAR worthy 2 feet of sea.ler missing |
2022-09-06 | No data | FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-09-06 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent with a plated excavation in roadway. Respondent failed to obtain a valid DOT street opening permit. Permit #B012022213A09 expired 9/5/2022 used for ID. |
2022-09-05 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No cut on rwy for sewer. All bike lanes are clear. |
2022-09-05 | No data | BAY 34 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway is currently milled. Restoration will be resurfaced. |
2022-09-04 | No data | AVENUE R, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in the r/w |
2022-09-04 | No data | EAST 26 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-09-04 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in roadway. |
2022-09-04 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in r/w sealed and in compliance |
2022-09-03 | No data | CLAY AVENUE, FROM STREET EAST 173 STREET TO STREET EAST 174 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-09-03 | No data | WEST 92 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020163A38-latest permit |
2022-09-02 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - In Driving Laneplease alter/recess shifted steel plate decking flush with the street surface exposing 6” down 1’ water-sewer opening in the roadway adjacent to building AKA #1165 MADISON AVENUE, in a timely fashion. NICA issued |
2022-09-02 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm trench along the r/w |
2022-09-02 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent PLUMBING NYC INC has properly altered/recessed the steel plate decking flush with the street surface in the roadway of the driving lane adjacent to building AKA #1165 MADISON AVENUE in compliance. NICA closed |
2022-09-02 | No data | EAST 86 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection |
2022-09-02 | No data | 53 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and r.w work acceptable |
2022-09-01 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O aka 699 East 6th St., on Ave C, permanent Sewer restoration has solid white line bike lane markings restored in-kind. Cut is flush to grade at this time. CAR Pass. |
2022-09-01 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2022-09-01 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area made perm but installed a 2022 color code. |
2022-09-01 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp. #25 CRSC CHECKS CASHED STORE in the tracel lane Plaza tan color is not restored. |
2022-08-31 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening’s ramped in the sidewalk in front of property #1341 AMSTERDAM AVENUE & 2 steel plate street opening’s ramped & pinned in the roadway of the driving lane |
2022-08-31 | No data | MADISON AVENUE, FROM STREET EAST 85 STREET TO STREET EAST 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done within this segment |
2022-08-31 | No data | EAST 86 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates in the sidewalk with an active permit on file is in compliance |
2022-08-31 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation on rwy/swk IFO property. New permit on file, Q012022241B98. No impaction to shared bike lanes. |
2022-08-30 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled due to Water main leak at connection to building service line. Spoke with Foreman Nicholas on site. Plumbing NYC will coordinate with DEP regarding water main leak. |
2022-08-29 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber restoration in parking lane and sidewalk - in compliance |
2022-08-28 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2022-08-27 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-08-27 | No data | LYNCH STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIOM IN THE DRIVING LANE IFO PROPERTY #57. |
2022-08-27 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in p/l |
2022-08-27 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2 +5 |
2022-08-27 | No data | EAST 71 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment on ave u milled in prep to pave by jr cruz .. |
2022-08-26 | No data | AVENUE U, FROM STREET EAST 70 STREET TO STREET EAST 71 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found milled in prep to pave by jr cruz |
2022-08-26 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 734, sidewalk water repair work ( 2 flags ), 1. Patchwork around Water valve close to property - full flag restoration required. 2. Flag along curb is missing expansion joint as per existing area. CAR cleanup - pass to re-issue. |
2022-08-26 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR cleanup - passed out ( Duplicative ) and re-issued under later permit# M012020244A33 at this time. |
2022-08-26 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent PLUMBING NYC, INC has restored/repaired continuous permanent water restoration to grade flush with the surrounding areas as per 1042D NOTE 9 in the roadway adjacent to building AKA #2274 2 AVENUE in compliance |
2022-08-25 | No data | STEWART AVENUE, FROM STREET MEADOW STREET TO STREET STAGG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Gas cut in the parking lane is flush to #200 |
2022-08-25 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2022-08-25 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water repair acceptable |
2022-08-25 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-08-24 | No data | 11 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable in front of 38-04 in the parking lane. 7' 2" x 4' x 2' 11". |
2022-08-24 | No data | 63 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer cceptable |
2022-08-24 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp area of cut restored perm in the roadway. |
2022-08-24 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-08-24 | No data | EAST 37 STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration resealed |
2022-08-23 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | One steel plate opp. #218. Crew currently getting ready to excavate parking lane . I Explained to the Forman he needs to get two more BIKE MPT SIGNS for full compliance. No Nov issued. |
2022-08-23 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent water restoration in compliance. |
2022-08-23 | No data | EAST 82 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 49 permanent water restoration in the parking/ driving lane is in compliance |
2022-08-23 | No data | 62 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-08-22 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | strert resurfaced ... spring of 2022 |
2022-08-22 | No data | STAGG STREET, FROM STREET STEWART AVENUE TO STREET VARICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2022-08-22 | No data | 38 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2022-08-22 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway and sidewalk - Permit renewed B012022228B17 |
2022-08-20 | No data | EAST 11 STREET, FROM STREET CORTELYOU ROAD TO STREET SLOCUM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane |
2022-08-20 | No data | QUINCY STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-08-19 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... /09 |
2022-08-18 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r.w acceptable |
2022-08-18 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT 33387 - PLUMBING NYC , INC. REPAIR WATER - SEWER RESTORATION DOWN 1 3/4 INCHES DRIVING LANE OF ROADWAY(5 FEET OFF MEDIAN/OVERPASS)- IN FRONT OF 143 PARK AVENUE BETWEEN CARLTON AVENUE & CUMBERLAND STREET. PLEASE RESTORE ROADWAY TO GRADE. |
2022-08-18 | No data | ELDERT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Two cuts in roadway. 5’ x 4’ x 4’ Test - 96.912’ x 4’ x 4’ Test - 97.7WD - 126.6DD - 119.0MDD - 124.5M - 6.5. Arrived at 11:47pm. Completed at 1:22pm. |
2022-08-18 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration made flush |
2022-08-18 | No data | 49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled at this time. |
2022-08-18 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2022-08-17 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm in parking lane acceptable |
2022-08-17 | No data | EAST 28 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in Rw sealed and in compliance |
2022-08-17 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed |
2022-08-17 | No data | AVENUE R, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm plumber restoration |
2022-08-17 | No data | AVENUE R, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber restoration |
2022-08-17 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r.w new bo |
2022-08-15 | No data | WEST 76 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm cut flush to grade within the driving lane. |
2022-08-15 | No data | FILLMORE PLACE, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATES IN THE DRIVING LANE AND INTERSECTION OF DRIGGS AV. TEMP RESTORATION IN THE DRIVING LANE IFO PROPERTY #171. |
2022-08-15 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE PERMIT ON FILE. B012022216B03 EXP 8/30/22. STEEL PLATES IN THE DRIVING LANE & TEMP RESTORATION IN THE DRIVING LANE IFO PROPERTY #171. |
2022-08-15 | No data | 32 AVENUE, FROM STREET 143 STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut within parking lane |
2022-08-15 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN RWY & NEW SWK FLAG-OK |
2022-08-15 | No data | DOWNING STREET, FROM STREET 31 ROAD TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade sewer restoration across roadway, sidewalk flag restored |
2022-08-14 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO VISIBLE WORK DONE. |
2022-08-14 | No data | TELLER AVENUE, FROM STREET BEND TO STREET EAST 171 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in front of building operation |
2022-08-14 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 442 & 436, plumber cuts present made by different permittee ( M012019144B20 & M012019144B19 ) and this work is no longer visible at this time. This permit has expired. |
2022-08-14 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATES IN THE DRIVING LANE. |
2022-08-14 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE, TWO NEW FLAGS AROUND WATER VALVE ON THE SIDE IFO PROPERTY #276 BEDFORD AV. |
2022-08-14 | No data | RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR PROPERTY #219 & 221. B012020195F15 |
2022-08-14 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE FOUND ON ROADWAY IN FRONT OF 511 MONTGOMERY STREET |
2022-08-14 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE FOUND ON ROADWAY IN FRONT OF 511 MONTGOMERY STREET |
2022-08-13 | No data | KINGSLAND AVENUE, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade curb to curb |
2022-08-13 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in parking lane, new permit on file |
2022-08-13 | No data | EAST 164 STREET, FROM STREET FINDLAY AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags expansion joints restored |
2022-08-12 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file for steel plate B012022216B12 |
2022-08-12 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts down 2in and needs to be reseal |
2022-08-12 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in parking lane |
2022-08-11 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut in r/w plated |
2022-08-11 | No data | SKILLMAN AVENUE, FROM STREET LORIMER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated water cut in the parking lane/ roadway |
2022-08-11 | No data | LEONARD STREET, FROM STREET MEEKER AVENUE TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated water cut in the roadway IFO #368 |
2022-08-11 | No data | ELDERT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway opposite address. Active permit on file. |
2022-08-11 | No data | SHORE PARKWAY, FROM STREET 18 AVENUE TO STREET BAY 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration in compliance. |
2022-08-11 | No data | WILLOUGHBY STREET, FROM STREET JAY STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT PERMANENT 33387 - PLUMBING NYC, INC. REPAIR SEWER RESTORATION IN ROADWAY (SANDY/BROWN IN PLAZA)- AT WILLOUGHBY STREET between JAY STREET and PEARL STREET. |
2022-08-11 | No data | 4 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3ft.2in by 4ft 7in down 3ft \4ft1in by 4ft3in down 4ft |
2022-08-10 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew working on cut in r/w new permit on file |
2022-08-10 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway and sidewalk |
2022-08-10 | No data | NORTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file B012022216B03 exp 8/30/22. TEMP RESTORATION IN THE DRIVING LANE. STEEL PLATES IN THE DRIVING LANE NEAR DRIGGS AV. |
2022-08-10 | No data | GROVE STREET, FROM STREET BUSHWICK AVENUE TO STREET GOODWIN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-08-09 | No data | ROOSEVELT AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to builder's pave at 43-08 |
2022-08-09 | No data | AVENUE R, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway - new permit B012022217A45 on file |
2022-08-09 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO aka 1464 Watson Avenue permittee has obstructed the gutter flow with construction debris/materials. |
2022-08-09 | No data | LYNCH STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE PERMIT ON FILE B012022213A11 EXP 8/24/22. TWO STEEL PLATES IN THE PARKING LANE IFO PROPERTY #55. |
2022-08-09 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway in front of 1209/1211 Putnam Ave. |
2022-08-08 | No data | AVENUE I, FROM STREET EAST 45 STREET TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-08-08 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY OFF ST MARKS PLACE AT BUILDING OPERATION |
2022-08-07 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flush to grade in the roadway. |
2022-08-06 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STREET IS MILLED , IN THE PROCESS OF PAVING |
2022-08-06 | No data | 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-08-06 | No data | 40 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-08-05 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-08-05 | No data | LINCOLN PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2022-08-05 | No data | DRIGGS AVENUE, FROM STREET FILLMORE PLACE TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. |
2022-08-05 | No data | DRIGGS AVENUE, FROM STREET NORTH 1 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. Spoke to the Forman. Crew members are working on North 1st street. |
2022-08-04 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway. Sidewalk saw cut. Active permit B012022207A90 on file. Duplicate. |
2022-08-03 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in roadway. |
2022-08-02 | No data | ROCHESTER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-08-02 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Follow up for fence at property line for house #2523/2525 Olinvile Ave. Plumber's cut in the parking lane and temp in sidewalk awaiting final restoration with BO. |
2022-08-01 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM GAS CUTS IN THE ROADWAY (LONG WATER) 1 CUT PARTIALLY COVERED |
2022-08-01 | No data | AVENUE U, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2022-08-01 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water in r.w acceptable |
2022-08-01 | No data | AVENUE R, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway - New permit B012022201A22 on file |
2022-07-31 | No data | SOUTH 8 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE PERMIT ON FILE B012022208A73 EXP 8/9/2022. THREE STEEL PLATES PINNED & RAMPED IN THE DRIVING LANE. STEEL PLATE ON THE SIDEWALK IFO PROPERTY #139. |
2022-07-30 | No data | CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in driving lane in compliance |
2022-07-30 | No data | LYNCH STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done on the roadway or sidewalk. |
2022-07-29 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #123REPAIR WATER - PROTECTED RESTORATION WIDTH IF THE ROADWAY IS FLUSHED AND SEALED TO GRADE. |
2022-07-29 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-07-27 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavations in roadway and sidewalk - new permit B012022189B44 on file |
2022-07-27 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | r.w has been milled |
2022-07-27 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealer applied to restoration in r.w |
2022-07-27 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/driving lane curb to curb intersecting with perm Nat Grid trench |
2022-07-27 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench sealed and in compliance |
2022-07-27 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. |
2022-07-27 | No data | 56 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut reseal |
2022-07-27 | No data | BAY 34 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I Observed a permanent restoration between the parking lane and driving lane not properly sealed. Respondent failed to properly seal and maintain the wearing course. CAR 20221720219 was issued 6/16/2022. Cited permit used for ID. |
2022-07-27 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut at 4423 sealed and in compliance |
2022-07-26 | No data | BRUCKNER BOULEVARD, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm I/F/O 581 in conpliance. |
2022-07-26 | No data | AUSTIN PLACE, FROM STREET BEND TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway I/F/O 581 |
2022-07-26 | No data | WEST 152 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in d/l ok |
2022-07-25 | No data | WEST 152 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J issued. |
2022-07-25 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Perm cut on roadway with IBM tag 50575 for MES Construction Corp. |
2022-07-24 | No data | MESEROLE AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint was resealed |
2022-07-24 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #79 |
2022-07-24 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-07-22 | No data | WEST 54 STREET, FROM STREET 8 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm trench flush to grade across the roadway and 2 sidewalk flags were restored. |
2022-07-21 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent with plated street openings in roadway and sidewalk. Respondent failed to obtain a valid street opening permit. Permit #B012022053A57 which expired on 3/22/2022 and name on steel plates used for ID. |
2022-07-20 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2022-07-20 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'x4' patchwork within permanent restoration overdue for final restoration within the driving lane opposite 5303 Douglaston Parkway. |
2022-07-20 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 6'x4' patchwork within permanent restoration overdue for final restoration within the driving lane opposite 5303 Douglaston Parkway. |
2022-07-19 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER PERM CUT IN THE P/L |
2022-07-19 | No data | QUINCY STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on-site working on the roadway |
2022-07-19 | No data | QUINCY STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I’m compliance |
2022-07-19 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 12, water repair made and cobblestone restoration finalized by Harris under permit #M012019252B28. |
2022-07-19 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy of sidewalk |
2022-07-19 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 plumber permanent restorations in r/w. |
2022-07-19 | No data | EAST 37 STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent plumbing restoration in the parking lane in front of property 1515. |
2022-07-19 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN THE ROADWAY (LONG WATER) |
2022-07-18 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on this permit of the side of the property - Contractor has permit to work on the other side of the property - B012022189B93 |
2022-07-18 | No data | 16 AVENUE, FROM STREET 50 STREET TO STREET 51 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water repair acceptable |
2022-07-16 | No data | DAVIS STREET, FROM STREET DEAD END TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration covered by trench. |
2022-07-15 | No data | SPRINGFIELD BOULEVARD, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Being Occupied At Time Of Inspection |
2022-07-14 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm repair water in parking lane acceptable |
2022-07-14 | No data | WEST 152 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10x10x8’ site will be plated for concrete curing. |
2022-07-14 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | white stripe has been added |
2022-07-14 | No data | MERMAID AVENUE, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration resurfaced. |
2022-07-14 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT HAS BEEN RESURFACED BY BPP |
2022-07-14 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair acceptable |
2022-07-13 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5 PERM TRENCHS IN THE ROADWAY FOR THESE ADDRESSES ON PERMIT |
2022-07-12 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2022-07-12 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration opposite 2064 over due for final |
2022-07-12 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench in roadway. |
2022-07-12 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in compliance |
2022-07-11 | No data | 55 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair acceptable |
2022-07-11 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane .. in compliance |
2022-07-11 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated restoration in in sidewalk. Active permit on file. |
2022-07-11 | No data | EAST 99 STREET, FROM STREET FLATLANDS AVENUE TO STREET TRUCKELMANS LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the parking / driving lane under valid permit # B012022174A70 exp 7/30/22 |
2022-07-10 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite 250. |
2022-07-10 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Multiple plated excavation along the r/w & s/w |
2022-07-10 | No data | CARROLL STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM WATER CUTS FOUND IN PARKING LANE IN FRONT OF 1432 CARROLL STREET |
2022-07-09 | No data | GOLD STREET, FROM STREET FRONT STREET TO STREET WATER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO PROPERTY #68. |
2022-07-09 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut repaired |
2022-07-09 | No data | EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2022-07-09 | No data | EAST 164 STREET, FROM STREET FINDLAY AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to install s/w expansion joints between the curb, s/w. Also need to seal 2 s/w flags, expansion joints. |
2022-07-09 | No data | EAST 164 STREET, FROM STREET FINDLAY AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Re-issued CAR. |
2022-07-08 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 1042D Note 9. When there is 10ft or less btwn the edge of the restorations, the cut shall be jointed as one at the wearing course upon finalizing. After CAR#20225010068 issued 5-27-2022 The restoration remains 4ft apart |
2022-07-08 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. |
2022-07-08 | No data | WASHINGTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in the parking lane |
2022-07-08 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work made finial under new permit |
2022-07-07 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags where water repair was made. Roadway cut resurfaced. |
2022-07-07 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w |
2022-07-07 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew working on s/w with an active & perm restoration in p/l |
2022-07-07 | No data | AVENUE V, FROM STREET BRAGG STREET TO STREET BRIGHAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair - plated excavation (multiple cuts) roadway and sidewalk |
2022-07-06 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-07-06 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w sealed and in compliance |
2022-07-06 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in PL flushed to grade |
2022-07-06 | No data | GRAVESEND NECK ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple plated excavation in the r/w with an active |
2022-07-06 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed |
2022-07-05 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration paved under BPP |
2022-07-05 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water valve installed on sidewalk in front of 1346 Pacific street perm water cut found on roadway |
2022-07-05 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Found restoration completed however permanent has been previously issued to not having appropriate permit of file. |
2022-07-05 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Ramped steel plates in roadway and sidewalk near 27 Ave, roadway and sidewalk clear. |
2022-07-03 | No data | EAST 4 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Restoration in Compliance |
2022-07-03 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Restoration in Compliance |
2022-07-03 | No data | EAST 5 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Restoration in Compliance |
2022-07-03 | No data | EAST 3 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Restoration in Compliance |
2022-07-03 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced . |
2022-07-02 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumber cut plated in the driving lane, also pinned and ramped |
2022-07-02 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut plated in the driving lane. Researching for updated permit |
2022-07-02 | No data | 88 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance |
2022-07-02 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration on the roadway is sunken 1" ifo 1089 DeKalb Ave |
2022-07-01 | No data | FAILE STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill passes |
2022-07-01 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fully restored sidewalk flag adjacent water valve |
2022-07-01 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION OPPOSITE ADDRESS CUT ORIGINALLY IN PARKING LANE COVERED BY BPP |
2022-07-01 | No data | SPRINGFIELD BOULEVARD, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway clear at time |
2022-06-30 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal street cut |
2022-06-30 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt within repair sewer restoration needs to be removed and make a Permanent repair/Street opening joints need to be resealed. |
2022-06-30 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION HAS BEEN RESTORED AND RESEALED. |
2022-06-30 | No data | WEST 122 STREET, FROM STREET MANHATTAN AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade , no defects. |
2022-06-30 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS THE DRIVING LANE. |
2022-06-30 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt within repair sewer restoration needs to be removed and make a Permanent repair/Street opening joints need to be resealed. |
2022-06-29 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 1346 Pacific street |
2022-06-29 | No data | DEAN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2022-06-29 | No data | EAST 3 STREET, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - Two temp water restorations in roadway. |
2022-06-29 | No data | WEST 187 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration remains in acceptable condition. No defects to report |
2022-06-28 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The above permittee Plumbing NYC, INC I/F/O 2523/2525 work started on June 1,2022/ work end on June 30, 2022 purpose installation of water and sewer services in compliance with the DOT rules and regulations |
2022-06-28 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The above permittee Plumbing NYC, INC has a updated permit X012022143A12 work started on June 1, 2022 / work end on June 30, 2022 currently in compliance with the DOT rules and regulations |
2022-06-28 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok p\l |
2022-06-28 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | an attempt was made no summons to be issued |
2022-06-27 | No data | 95 STREET, FROM STREET 162 AVENUE TO STREET 163 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 5'x4'x3' |
2022-06-27 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street .. resurfaced .... |
2022-06-27 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-06-27 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Active | Department of Transportation | No crew on site. Roadway open to traffic. |
2022-06-26 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration in bike lane/parking lane is flushed and sealed to Grade. |
2022-06-25 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut repaired |
2022-06-25 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect due to Building operation |
2022-06-25 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok parking lane |
2022-06-24 | No data | 18 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markers have been restored |
2022-06-24 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | raise plow sign removed from site |
2022-06-23 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration across the roadway in p/l and d/l ok.restoration is partially coverd in p/l by brooklyn union gas trench. |
2022-06-23 | No data | DEAN STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2022-06-22 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane okay |
2022-06-22 | No data | SPRINGFIELD BOULEVARD, FROM STREET 67 AVENUE TO STREET 69 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed (cut1 15' x 4'2 x 11') (cut2 5' x 4'5'' x 3'3'' ) in the parking/driving lane in front of 68-29, one cut made on sidewalk. |
2022-06-22 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE IFO PROPERTY #70. |
2022-06-22 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival 9:40 Departure 1:15. One cut in front of 2170 Brigham Street. 4’3x3’5x4’2. Compaction 96.6%. |
2022-06-22 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-06-21 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #734 There is A repair water restoration In the parking / Bike lane with bike lane makings that has faded these lane markings needs to be properly restored |
2022-06-21 | No data | 3 AVENUE, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | runing east to west in compliance in driving lane 2236 |
2022-06-21 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site awaiting backfill |
2022-06-21 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2022-06-21 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSSAW CUTS DONE |
2022-06-21 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in the bus Lane. |
2022-06-21 | No data | 18 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration near crosswalk lane markers restored |
2022-06-20 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm water cut resealed on roadway in front of 1561 Bedford avenue |
2022-06-20 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water cut resealed in parking lane opposite corner of 1066 President street |
2022-06-19 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane sealed and in compliance |
2022-06-19 | No data | EAST 31 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in compliance |
2022-06-19 | No data | WEST 35 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2022-06-18 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT OK P\L |
2022-06-18 | No data | EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut incompliance |
2022-06-17 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Active | Department of Transportation | No work found. Permit still active. |
2022-06-17 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber on site doing sewer repair |
2022-06-17 | No data | CARROLL STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 10:47, Cut-1- L: 8’ W: 4’ D: 8’ Cut-2- L: 5’6” W: 4’ D: 3’ I/F/O 1432 Departed: 13:21 |
2022-06-17 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in roadway. |
2022-06-17 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | atpo i observed respondent failed to provide smooth riding surface free of clear asphalt defects in the final completed wearing course. Respondent was issued car 5/10/22 and failed to make correction. id by expired permit on file |
2022-06-16 | No data | EAST 37 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in compliance |
2022-06-16 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade opposite #151 |
2022-06-16 | No data | BAY 34 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration needs to be resealed between the parking lane and driving lane. Opposite 239 Bay 34 Street between Bath Avenue and Cropsey Avenue. |
2022-06-15 | No data | EAST 195 STREET, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP paved over portion of plumber restoration |
2022-06-15 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in compliance in the roadway. |
2022-06-15 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found permanent water restoration flushed crosswalk. |
2022-06-15 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White lane markings in compliance |
2022-06-15 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in the bus lane . |
2022-06-15 | No data | 43 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bike lane markings.applied |
2022-06-15 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT SEALED |
2022-06-14 | No data | MERMAID AVENUE, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut resurfaced. |
2022-06-14 | No data | 157 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible due to BPP. |
2022-06-13 | No data | 45 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok pl |
2022-06-13 | No data | CARROLL STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | NOV ISSUED |
2022-06-13 | No data | CARROLL STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to follow 020 stipulation |
2022-06-13 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2022-06-13 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-06-13 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in roadway. |
2022-06-12 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated in compliance |
2022-06-12 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on the sidewalk is in compliance |
2022-06-12 | No data | MONTGOMERY STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 687 Montgomery street |
2022-06-12 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 577 Montgomery street |
2022-06-12 | No data | MESEROLE AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal expansion joint IFO #139 Meserole Ave |
2022-06-11 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street cut not seal no parking Tuesday 9.30. to 11am |
2022-06-10 | No data | 25 AVENUE, FROM STREET 154 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 5' x 5' wearing course completed upon my arrival. In the parking lane opposite 154-30. |
2022-06-10 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been corrected however NOV has been previously issued. |
2022-06-10 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | base completed 6' x 5' concrete cut in p/l |
2022-06-10 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated pinned and ramped install new sewer/water inspect and n compliance |
2022-06-10 | No data | 1 STREET, FROM STREET 27 AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-06-10 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water cut on the sidewalk is flush to grade |
2022-06-10 | No data | 149 AVENUE, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On the side of 149-01 85th Street, There is a permanent restoration, where the asphalt is broken out in localized area's. Also, Re-seal sidewalk flag around water valve, between the sidewalk and curb. |
2022-06-10 | No data | 25 AVENUE, FROM STREET 154 STREET TO STREET 157 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 3’3” x 3’x 3’9” |
2022-06-09 | No data | 56 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL STREET CUT |
2022-06-09 | No data | MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM RESTORATIONS IN THE DRIVING LANE, NEW FLAG AROUND WATER VALVE IFO PROPERTY #170. |
2022-06-09 | No data | GLENWOOD ROAD, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sealed and in compliance |
2022-06-09 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 699 East 6th St on Ave C, permanent Sewer restoration is missing solid white line lane markings as per existing Bike lane area. Please restore all roadway lane markings in-kind. |
2022-06-08 | No data | COLGATE AVENUE, FROM STREET DEAD END TO STREET WATSON AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | steel plate pinned and ramped in the driving lane covering an active excavation without a DOT permit. Markings on the steel plates are P.N.Y.C. Permit # X012022115A51 expired 5/29/2022 and used for Identification. Protected Street. |
2022-06-08 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer repair acceptable |
2022-06-08 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work under BPP |
2022-06-07 | No data | 61 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER -BACKFILL COMPLETE ON 3' X 3' X 4' EXCAVATION IN ROADWAY |
2022-06-07 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Ramped steel plate over the bike and parking lane ifo #69-15. |
2022-06-07 | No data | 67 AVENUE, FROM STREET 232 STREET TO STREET 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-06-06 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced in the r/w |
2022-06-06 | No data | 40 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Roadway 3 Day Dep Notice Issued Property Owner on site |
2022-06-05 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2022-06-05 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The effected area has been fully restored, AKA 1227 Broadway on West 25th Street.. (CAR re-inspection Pass) |
2022-06-04 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 123 ( long water installation ), 2 separate cuts ( 1= 15'5"L x 4'W, 2= 6'9"L x 4'W ) backfilled and base being saw-cut for concrete to follow. Only roadway work ( no sidewalk ) at this time. |
2022-06-03 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two plates countersunk I/F/O 2525 in compliance. |
2022-06-03 | No data | EAST 32 STREET, FROM STREET FARRAGUT PLACE TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w sealed and in compliance |
2022-06-02 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO PRROPERTY #74. |
2022-06-02 | No data | EAST 101 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152021214A17-r/w resurfaced |
2022-06-02 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy of roadway |
2022-06-02 | No data | COLLEGE AVENUE, FROM STREET EAST 170 STREET TO STREET EAST 171 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL -E from |
2022-06-01 | No data | DE KALB AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water relay restorations in parking lane. |
2022-06-01 | No data | 255 STREET, FROM STREET 57 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored |
2022-06-01 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts. |
2022-06-01 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2022-06-01 | No data | EMMONS AVENUE, FROM STREET BATCHELDER STREET TO STREET BROWN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w |
2022-06-01 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench ok r\l p\l |
2022-06-01 | No data | EAST 101 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020202A85-latest permit |
2022-06-01 | No data | 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT OK RW |
2022-05-31 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN THE ROADWAY AND 2 TEMP TO GRADE SIDE WALK CUTS (BLACK TOPPED) FRONT OF ADDRESSES |
2022-05-31 | No data | 4 AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2022-05-30 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new sidewalk flags.duplicate. |
2022-05-29 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR acknowledged. Steel plate removed. |
2022-05-29 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2022-05-29 | No data | BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance i/f/o 611 |
2022-05-28 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut down 3in parking lane |
2022-05-28 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the the parking lane is flush to grade |
2022-05-28 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane & sw flags installed with hardware |
2022-05-28 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut repaired |
2022-05-27 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plate on rwy, left side of #82. |
2022-05-27 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Accodring to 1042d standards of non protective street Any restoration 10ft or less apart from one another shall be jointed at the wearing course. cut measured 4ft.3" apart |
2022-05-27 | No data | KANE PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-05-26 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file restoration needs sealer applied |
2022-05-26 | No data | 11 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT. |
2022-05-26 | No data | 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2022-05-25 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk in the roadway |
2022-05-25 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in place |
2022-05-25 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-05-25 | No data | PACIFIC STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2022-05-25 | No data | WOODPOINT ROAD, FROM STREET FROST STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in on the sidewalk is in compliance |
2022-05-24 | No data | BARCLAY AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done, permit expired. |
2022-05-24 | No data | HARMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2022-05-24 | No data | 51 AVENUE, FROM STREET 92 STREET TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent to grade long water cuts |
2022-05-24 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 577 Montgomery street |
2022-05-24 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE PERM RESTORATION IN THE DRIVING LANE. ASPHALT IS BROKEN OUT AND NEEDS TO BE RESEALED IFO PROPERTY #79. |
2022-05-23 | No data | MINNA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw flag ok |
2022-05-23 | No data | MONTGOMERY STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L.13'0 x W.7'0 x D.10'0 backfill condcuted by Hasabi Joseph with no internt access. |
2022-05-23 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2022-05-23 | No data | 4 AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in open excavation, had lanes closed to traffic. Spoke to foreman to open all back. Bike lane currently clear. |
2022-05-23 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench ok rw p\l |
2022-05-23 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut found in the roadway or sidewalk |
2022-05-23 | No data | LYNCH STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERMIT ON FILE B012022129A53. TEMP RESTORATION IN THE PARKING. |
2022-05-23 | No data | 77 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration around a water valve. |
2022-05-23 | No data | 4 AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 09:32, 2 Cuts, Cut-1- L: 9’ W: 4’ D: 3’8” Cut-2- L: 9’ W: 7’ D: 4’2” I/F/O 35 4th Ave. Departed: 13:40 |
2022-05-22 | No data | MURRAY STREET, FROM STREET 17 ROAD TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed under permit #Q012022077B97. |
2022-05-22 | No data | 85 STREET, FROM STREET 149 AVENUE TO STREET 151 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the roadway. |
2022-05-22 | No data | EAST 164 STREET, FROM STREET FINDLAY AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags related to water repair need expansion joints sealed. |
2022-05-22 | No data | FINDLAY AVENUE, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Con Ed cut over restoration. |
2022-05-20 | No data | 63 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair sewer acceptable |
2022-05-20 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | covered by BPP |
2022-05-20 | No data | LINCOLN PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12ft x 9ft x 10ft =96.1% 96.5% |
2022-05-19 | No data | 88 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working making the restoration flush with the surrounding using a vibrating plate |
2022-05-19 | No data | 88 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | ONE CUT OPPOSITE LOCATION IN RD/W NEXT TO A 3X3 SINKE HOLE |
2022-05-19 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Wearing course has broken out exposing concrete base. Not providing a smooth driving surface. In front of 50. |
2022-05-18 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN THE ROADWAY AND 2 TEMP CUTS ON THE SIDE WALK ALONG CURB |
2022-05-17 | No data | PORT RICHMOND AVENUE, FROM STREET GROVE AVENUE TO STREET VREELAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench across r/w |
2022-05-17 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | r.w resotration sealer acceptable |
2022-05-17 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET WEST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2022-05-16 | No data | MOTHER GASTON BOULEVARD, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY |
2022-05-15 | No data | EAST 21 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-05-15 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w |
2022-05-15 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration in compliance. |
2022-05-15 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w |
2022-05-14 | No data | 95 STREET, FROM STREET 162 AVENUE TO STREET 163 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Plated excavation in parking lane pinned and ramped |
2022-05-14 | No data | 18 AVENUE, FROM STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please restore crosswalk markers |
2022-05-14 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration not quite CAR worthy |
2022-05-13 | No data | MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM RESTORATIONS IN THE PARKING LANE IFO PROPERTY #170. |
2022-05-13 | No data | MESEROLE AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill reschedule due to no material |
2022-05-13 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | please remove raise plow sign serving no purpose |
2022-05-13 | No data | GREENPOINT AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway/ bike lane is flush to grade |
2022-05-13 | No data | DEAN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in open sewer excavation. Has own bike signs & using BO’s signs as well. Has rwy open to traffic. |
2022-05-12 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Incorrect color code/ IBM marker installed within permanent water trench. There are two different color codes marked with years "21" and "20" within trench. need to use one correct year best suited for work, "21" or "22". 126-24 45th ave. |
2022-05-12 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane along with swk flags |
2022-05-12 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | An attempt was made to render area safe. Temporary asphalt placed to flush area. However vehicles are still bottoming upon contact. Joint field meeting will be held with the Plumber and Con Edison on restoration. 146-24 45th ave |
2022-05-12 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2022-05-12 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint verified: There is a permanent water trench across the roadway, driving lane, that has sunken 3" below grade. 146-24 45th ave. |
2022-05-12 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk plated excavation on rwy, left side of property. No impaction to protected bike lane. |
2022-05-11 | No data | WASHINGTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done on the sidewalk and parking lane |
2022-05-11 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite 1001 Bushwick Ave. |
2022-05-11 | No data | LEFFERTS PLACE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY |
2022-05-11 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO OCCUPANCY OF SIDEWALK |
2022-05-10 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patched area over permanent restoration - asphalt is broken out - Old wearing course must be removed - New wearing course should be applied |
2022-05-10 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 577 Montgomery streetL.12'2" x W.4'8" x D.4'3"Wet density:1223.6Dry density:116.2Max dry density:119.0Actual moisture:6.4%Bottom test:97.3%Top test:97.0%Departing backfill |
2022-05-10 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer applied - pass |
2022-05-10 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was rectified. Permanent Restoration in the parking lane has been resealed. opposite 1946 80 Street. |
2022-05-10 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patched area over permanent restoration - asphalt is broken out - Old wearing course must be removed - New wearing course should be applied |
2022-05-09 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2022-05-09 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT WAS RESURFACED BY B.P.P |
2022-05-09 | No data | STANHOPE STREET, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-05-09 | No data | AVENUE U, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2022-05-09 | No data | ROGERS AVENUE, FROM STREET CROWN STREET TO STREET MONTGOMERY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND IN PARKING LANE IN FRONT OF 314 ROGERS AVENUE |
2022-05-08 | No data | 71 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water & Sewer Plug in the Roadway in Compliance |
2022-05-08 | No data | 20 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible due to BPP. |
2022-05-08 | No data | WEST 14 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation safely plated and secured to the roadway. |
2022-05-08 | No data | WEST 14 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2022-05-08 | No data | 43 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Large perm trench IFO #346 missing bike lane markings. |
2022-05-07 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm in crosswalk lane markers need to be restored |
2022-05-07 | No data | EAST 82 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill it pass compaction at 96.7%. |
2022-05-07 | No data | DEAN STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the rw & sw flags with hardware |
2022-05-07 | No data | 50 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw cut ok |
2022-05-06 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench restoration in roadway. |
2022-05-06 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. Duplicate. |
2022-05-06 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent PLUMBING NYC INC has restored/repaired wearing course of permanent sewer restoration flush to grade with surrounding areas in the roadway in front of property #216-56 28 AVENUE in compliance |
2022-05-06 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration cut on bike/parking lane, lane markings restored but missing full width of bike symbol. Also, new swk flag installed IFO property. Conventional bike lane is clear. |
2022-05-05 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2022-05-05 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new permit B012022124B57 on file and valid. cut is concrete base at this time. in compliance |
2022-05-05 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-05-04 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 264, perm restoration has IBM color code marker ID# 33387 installed in wearing course and no roadway scaring observed near restoration at this time. CAR Pass. |
2022-05-04 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L4ft W11ft 8in D10in 5in - - WD122.7 DD112.9 MD120.5 AM8.7 - - Cut IFO 412 |
2022-05-03 | No data | LINDEN BOULEVARD, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings restored over permanent sewer restoration in the roadway in front of 192-20. |
2022-05-03 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints sealed between the sidewalk & curb side of 192-20 193 Street. |
2022-05-03 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-05-03 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut on the sidewalk is overdue for final restoration IFO #57. |
2022-05-03 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration acceptable |
2022-05-03 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on s/w or r/w |
2022-05-02 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Request to restore lane markings. Bike lane markings worn out. ‘21 restoration. |
2022-05-02 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 roadway base restorations is plated awaiting wearing course, more than 11 feet of the roadway is open to vehicular traffic, the Nat Grid gas main is not obstructed awaiting to back filled. |
2022-05-01 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 168 MONROE STREET |
2022-04-30 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The restoration was not properly sealed |
2022-04-30 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cuts & Water Valve in the Sidewalk in Compliance |
2022-04-29 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O #264 color code marker has been installed and in compliance. |
2022-04-29 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates were removed and the restorations were finalized. Condition corrected, pass. |
2022-04-29 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass.. 2 cuts. 1. 12’L x 4’W x 9’D: Test 98.2% & 96.3% . 2. 4’L x 3’6”W x 4’D: Test 97.1% |
2022-04-28 | No data | WILLOUGHBY AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR acknowledged. Patch work performed. Roadway flush at this time. |
2022-04-28 | No data | 4 AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk in front of 82. |
2022-04-28 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code maker has been installed. |
2022-04-28 | No data | 37 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across westbound lanes on roadway at side of 37-10 11th Street. Portion of trench across eastbound lanes is covered by New Building BPP paving. |
2022-04-28 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 10:30AM Departure: 12:50PMCuts are in the parking lane, in front of 285 and 287 Livingston Street.# 1 L: 3FT. 10IN. W: 3FT. 5IN. D: 2FT. 8IN.# 2 L: 4FT. 3IN. W: 3FT. 6IN. D: 4FT. 0IN. |
2022-04-28 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w flags restored |
2022-04-27 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has installed a fire hydrant at the curb. |
2022-04-27 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O #1334, There is a Steel Plate that is Loose and Noisy. |
2022-04-27 | No data | EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Complaint | Department of Transportation | PLATED WATER REPAIR, acceptable |
2022-04-27 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work is ongoing. Steel plates above sewer line in front of 123. |
2022-04-27 | No data | 72 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration between the p/l and bike lane ok in compliance |
2022-04-27 | No data | EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - PROTECTED |
2022-04-27 | No data | EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on the sidewalk and driving lane |
2022-04-27 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade. |
2022-04-27 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane IFO property #1089. |
2022-04-27 | No data | ALBANY AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area resurfaced by BPP for property #1381 Bergen St. |
2022-04-26 | No data | BAY 34 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Long water cut , 2 cuts on rd/w , 3 day notices issued |
2022-04-26 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found repaved |
2022-04-26 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Large perm cut on parking/bike lane with faded away sealer, IFO #1561. |
2022-04-26 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced in p/l by BPP & perm restoration in p/l on opp side |
2022-04-26 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation without a valid DOT permit. |
2022-04-25 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water restoration in driving lane in compliance. |
2022-04-25 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, needs to be resealed.In front of 26 Court Street between Remsen Street and Fulton Street (Montague Street). |
2022-04-24 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 805 WASHINGTON AVENUE |
2022-04-24 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane in compliance. |
2022-04-24 | No data | PROSPECT PLACE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New flag around water valve IFO property #825. |
2022-04-24 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2022-04-24 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane, new flag around water valve IFO property #1163. |
2022-04-24 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut fond on roadway adjacent to grocery store |
2022-04-24 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D02 STEEL PLATED GAS CUT. VIOLATION IN PARKING LANE |
2022-04-24 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 776 FRANKLIN AVENUE |
2022-04-23 | No data | 5 AVENUE, FROM STREET EAST 128 STREET TO STREET EAST 129 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2086 5 ave no defects found restoration in compliance |
2022-04-23 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 106 ( aka 540 Hudson St ), permanent asphalt applied within defective area of wearing course and restoration is flush to grade at this time. CAR Pass. |
2022-04-23 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane. |
2022-04-22 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2022-04-22 | No data | WEST 35 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER |
2022-04-22 | No data | 149 STREET, FROM STREET 35 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No related work found due to BPP paving done. |
2022-04-21 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench curb and curb sealed and flush IFO 101 |
2022-04-21 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. Duplicate. |
2022-04-21 | No data | SOUTH OXFORD STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, in front of 43 South Oxford Street. |
2022-04-21 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in open cut on swk & countersunk steel plates on rwy IFO property. Foreman complied with bike lane & made correct bike set-up. Also has flagger posted. |
2022-04-21 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2022-04-21 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw has been resurfaced |
2022-04-21 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of cut resurfaced by BPP |
2022-04-20 | No data | 157 STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration to grade in the parking lane, sidewalk flag restored in front of 156-19. |
2022-04-20 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2022-04-20 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane OPP 115 STANWIX sealed and flush |
2022-04-20 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent had an unsealed permanent restoration on the roadway. Respondent failed to seal and maintain the wearing course. CAR#20217381002 was issued 10/4/2021. ID by permit on file. |
2022-04-19 | No data | PALMETTO STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway=y parking lane sealed and flush. |
2022-04-19 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND |
2022-04-19 | No data | WOODPOINT ROAD, FROM STREET FROST STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | work crew on site permit is active |
2022-04-18 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk steel plated excavation on rwy opp of #5221. No impaction to bike lane. |
2022-04-18 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Previous cuts covered by BPP, and a crew on site pouring concrete for new sidewalk. |
2022-04-18 | No data | 168 STREET, FROM STREET 65 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 3'6''x2'10''x3'6'' |
2022-04-17 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, walk ,street ..ok |
2022-04-16 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by half plus five. |
2022-04-16 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2022-04-15 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water restoration resealed. |
2022-04-15 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the sidewalk |
2022-04-15 | No data | ROGERS AVENUE, FROM STREET CROWN STREET TO STREET MONTGOMERY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 11:39, (2 Cuts), Cut-1- L:4’2” W: 4’ D: 4’ Cut-2- L: 7’ W: 2’ D: 5’4”I/F/O 314, Departed: 13:23 |
2022-04-15 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | temp to grade s/w |
2022-04-14 | No data | EAST 32 STREET, FROM STREET FARRAGUT PLACE TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 cuts , long water cut 3 day notices issued |
2022-04-14 | No data | AVENUE T, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the PL extending into the RW |
2022-04-14 | No data | FRANKLIN STREET, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bike lane installed |
2022-04-13 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates removed |
2022-04-13 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Property line expansion joint sealed. |
2022-04-13 | No data | NEW YORK AVENUE, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2022-04-13 | No data | 20 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sewer restoration resealed. |
2022-04-12 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No water repair done on this permit |
2022-04-12 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Active | Department of Transportation | No water repair done on this permit |
2022-04-12 | No data | 4 AVENUE, FROM STREET 3 STREET TO STREET 5 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane marking! ok |
2022-04-11 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w expansion joints has been sealed |
2022-04-11 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | full sidewalk flag has been repaired. Lane marking in the roadway has been applied |
2022-04-11 | No data | MURRAY STREET, FROM STREET 17 ROAD TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in parking/driving lane |
2022-04-09 | No data | DEAN STREET, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2022-04-09 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway |
2022-04-09 | No data | JAVA STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Majority of restoration paved over by BPP, portion visible is flush and sealed in the parking lane ifo 192 |
2022-04-09 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway |
2022-04-08 | No data | CENTRAL AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No cut on rwy/swk for water. Opp conventional bike lane is clear. |
2022-04-08 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Half of cut resurfaced BPP & cut was sealed |
2022-04-08 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration not resealed. NOV issued. |
2022-04-07 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to take out Proper 0135 CAR Permit to complete Restoration. |
2022-04-07 | No data | GREENPOINT AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration cut on rwy IFO property. Both shared bike lanes are clear. |
2022-04-07 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | There is a permanent restoration in front of 259 that is missing the lane marking. Respondent was previously notified via CAR 20212930025. Respondent has failed to restore the lane marking. |
2022-04-07 | No data | ROGERS AVENUE, FROM STREET CROWN STREET TO STREET MONTGOMERY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file B012022089D51. Steel plate counter sunk in the Bus lane OPP property #314. |
2022-04-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street opening joints have been adequately sealed. |
2022-04-07 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cones have been removed |
2022-04-07 | No data | PORT RICHMOND AVENUE, FROM STREET GROVE AVENUE TO STREET VREELAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | restoration to grade across the r/w |
2022-04-06 | No data | COMMERCIAL STREET, FROM STREET BOX STREET TO STREET CLAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway ifo coffee shop |
2022-04-06 | No data | EAST 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-04-06 | No data | 43 AVENUE, FROM STREET 91 PLACE TO STREET GLEANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in parking lane to grade |
2022-04-06 | No data | EAST 72 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance |
2022-04-06 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway. Active permit on file. |
2022-04-05 | No data | MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2022-04-05 | No data | GREENPOINT AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking |
2022-04-05 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN MEDIAN |
2022-04-05 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok parking \driving ok |
2022-04-05 | No data | 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Acceptable at 12:55pm Two cuts between the p/l and the d/l cut number 1 L9FT W 7FT D 5FT SECOND CUT L 11FT W 7FT D6FT |
2022-04-05 | No data | HOLLERS AVENUE, FROM STREET PELHAM BAY PARK WEST TO STREET ROPES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2022-04-04 | No data | WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-04-04 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area has been resurfaced as part of cobblestone BPP. |
2022-04-04 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2022-04-03 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has applied Temporary asphalt to the area, making it flush in the driving lane. |
2022-04-03 | No data | 3 AVENUE, FROM STREET EAST 121 STREET TO STREET EAST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded in the r/w |
2022-04-03 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk opp 1622 |
2022-04-03 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Killing permit |
2022-04-03 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r/w and s/w cuts restored to grade. |
2022-04-03 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A fire hydrant installed on the sidewalk at the curb. |
2022-04-03 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found asphalt broken out 3’’ below grade on area within a permanent restoration that exposed the concrete base in the driving lane. |
2022-04-03 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration still in compliance. |
2022-04-02 | No data | 38 STREET, FROM STREET 15 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway, sidewalk flags flush and sealed. |
2022-04-02 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway curb to curb ifo a.k.a 4505 15th Ave |
2022-04-02 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced in the Left Turning lane at East 34 Street. |
2022-04-02 | No data | SOUTH 4 STREET, FROM STREET BEND TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #277 |
2022-04-02 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the driving lane, new flag around 2 water valves IFO property #88. |
2022-04-02 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor in the Process of Installing an New Domestic Water & Sanitary Sewer Line. Work Allowed on Saturdays from 8 Am-4 Pm |
2022-04-01 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench along the r/w |
2022-04-01 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2022-04-01 | No data | GELSTON AVENUE, FROM STREET 88 STREET TO STREET 90 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 12' x 10' of the roadway is plated and ramped with a excavator stored in the parking lane to restrict parking lane. Permit # B022022084C89 Occupancy of the roadway in effect. |
2022-04-01 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple perm restoration in the r/w & Temp cut in the r/w i/f/o 412 CAR will be issued |
2022-03-31 | No data | STERLING PLACE, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok parking lane \driving |
2022-03-31 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2 +5 |
2022-03-31 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway |
2022-03-31 | No data | EAST 37 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closing permit updated on permit |
2022-03-31 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 12, water restoration on cobblestone roadway completed by Harris ( M012019270C68 ). This permit has expired. |
2022-03-30 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #46 - 50 LAFAYETTE STREET REPAIR WATER RESTORATION FLUSHED AND SEALED TO GRADE |
2022-03-30 | No data | GREENPOINT AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete Arrived 1:45 Departed 3:00pm Cut1: L3ft2inxW2ft10inxD2ft10in1st lift: 97.8% |
2022-03-30 | No data | GRACE COURT ALLEY, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the roadway, in front of 16 Grace Court Alley. |
2022-03-30 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut on roadway |
2022-03-30 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. Active DDC roadway reconstruction. |
2022-03-30 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file q012022049b05 |
2022-03-30 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file q012021344c99 |
2022-03-29 | No data | 43 AVENUE, FROM STREET 58 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in the parking and driving lane in front of 58-41. Three sidewalk flags restored in kind. |
2022-03-29 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New hydrant |
2022-03-27 | No data | GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time |
2022-03-23 | No data | MONTGOMERY AVENUE, FROM STREET WEST 175 STREET TO STREET WEST 176 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway crossing from curb to curb ifo #1658. |
2022-03-23 | No data | 66 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut on roadway |
2022-03-23 | No data | 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No water cut on rwy/swk IFO property. Bike lane is clear. |
2022-03-22 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2022-03-22 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. New active permit on file. |
2022-03-22 | No data | 12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working in open excavation on rwy IFO property. Long cut, spoke to foreman about opening of swk. Has flaggers posted for traffic. Gave a pass for swk stip due to area not really having lots of peds traffic. |
2022-03-22 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2022-03-22 | No data | UNION STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations in the parking lane, 2 new flags IFO property #1451. |
2022-03-22 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration across roadway, edges slightly cracked, no CAR warranted |
2022-03-21 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE OPPOSITE #249 |
2022-03-21 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 9:30AM Departure: 11:00AMCuts are in the parking and driving lane, in front of 283 Livingston Street.#1 L: 3FT. 8IN. W: 2FT. 5IN. D: 4FT. 0IN.#2 L: 3FT. 6IN. W: 2FT. 6IN. D: 2FT. 0IN. |
2022-03-21 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in the driving lane |
2022-03-21 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file, q022022070a42 |
2022-03-21 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active worksite in compliance |
2022-03-20 | No data | ST JOHNS PLACE, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration across the roadway IFO property #1120. |
2022-03-19 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2022-03-19 | No data | EAST 17 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-03-19 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration in compliance in front 4804 13th Ave |
2022-03-19 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the parking lane, new flag around water valve IFO property #1163. |
2022-03-19 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2022-03-19 | No data | EAST 21 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-03-19 | No data | EAST 21 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration found on the roadway and sw |
2022-03-18 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area resurfaced by BPP for 1015A. |
2022-03-17 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavator working in the sewer line |
2022-03-17 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has 2 steel plates countersunk into the roadway, without a valid DOT permit on file. Expired permit, #B012022035A10 exp. 2/28/2022, used for ID. |
2022-03-17 | No data | HANOVER PLACE, FROM STREET GROVE PLACE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 15 Hanover Place. |
2022-03-17 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent posted sign less than required footage from excavation. Sign posted 2 feet PAST the excavation in this case. |
2022-03-17 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush |
2022-03-17 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 344 Willoughby Avenue. |
2022-03-17 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate in roadway. Active permit B012022070B91 On file. |
2022-03-17 | No data | 165 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration within parking lane flushed to grade & sealed in front of 71-20 165th Street. |
2022-03-17 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2022-03-16 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on this permit |
2022-03-16 | No data | 165 STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed & acceptable within the parking lane in front of 71-20 165th Street. Dimensions: 3'7"x 3'1"x 2'4". Base to follow. |
2022-03-16 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on this permit |
2022-03-15 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2022-03-15 | No data | 58 STREET, FROM STREET 16 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2022-03-15 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. Restoration flush to grade. |
2022-03-15 | No data | PARSONS BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file q012019179a93 |
2022-03-15 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pave covering work q012020015a88 |
2022-03-15 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration extended into the bike lane. 2 new flags around a water valve IFO property #1561. |
2022-03-14 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water cut flush to grade in the parking & driving lane in front of 148-18. |
2022-03-14 | No data | EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2022-03-14 | No data | 52 STREET, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete in front of 43-08. 24' 8" x 4' x 3' 6". Work also done on the sidewalk. |
2022-03-14 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Round found resurfaced. |
2022-03-14 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #50 PERMANENT REPAIR WATER RESTORATION IN PL IS FLUSHED AND SEALED TO GRADE. |
2022-03-14 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP |
2022-03-14 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok parking lane \driving lane |
2022-03-13 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | multiple perm cut in the r/w |
2022-03-13 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush and sealed in the roadway |
2022-03-13 | No data | COMMERCIAL STREET, FROM STREET CLAY STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush and sealed in the roadway ifo coffee shop |
2022-03-13 | No data | COMMERCIAL STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2022-03-13 | No data | FRANKLIN STREET, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permit water restorations flush and flush and sealed in the roadway ifo playground, 1 near DuPont 1 near Commercial |
2022-03-13 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2022-03-13 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several flags flush, perm restorations in the parking lane opp #80, #64, #56, & #54 |
2022-03-12 | No data | HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2022-03-12 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN THE ROADWAY (LONG WATER) AND SIDE WALK FLAGS INSTALLED |
2022-03-12 | No data | WYTHE AVENUE, FROM STREET BANKER STREET TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade |
2022-03-12 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane 65ft west of the 2nd street light. |
2022-03-11 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving and parking lane. |
2022-03-11 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates reset and made safe. NICA Pass. |
2022-03-11 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plated excavation in front of 4522 18th made safe |
2022-03-11 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work on the sidewalk IFO #24 Richardson street. |
2022-03-11 | No data | WEST 47 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut on parking lane IFO property. Bike lane is clear. |
2022-03-10 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by B012022063A45 pave work. |
2022-03-10 | No data | BUSHWICK AVENUE, FROM STREET KOSCIUSKO STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane IFO AKA 664 Kosc. St. |
2022-03-10 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated restoration in opp driving lane has sunken. NICA has been issued on most recent active permit. |
2022-03-10 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Collapsed area around excavation. Steel plate has fallen inside cut. NICA issued. |
2022-03-10 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2022-03-10 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6ft by 3ft 8in done 3ft in 3ft by 2ft 9in down 5ft |
2022-03-10 | No data | 9 AVENUE, FROM STREET BEND TO STREET WEST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk plated excavation on bike/driving lane. No active permit on file for plate. |
2022-03-09 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work being conducted crew on site. New permit on file under permit B012022059A54. |
2022-03-09 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 11ft by 4ft down 9ft |
2022-03-09 | No data | GRAND STREET EXTENSION, FROM STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-03-09 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020315B63) |
2022-03-09 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020315B65) |
2022-03-08 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 533 permanent sewer restoration is in compliance |
2022-03-08 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration across roadway, edges slightly cracked, no CAR warranted |
2022-03-08 | No data | WASHINGTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Countersunk steel plate, in the parking/driving lane, opposite 52 Washington Avenue. A water leak was reported and an emergency permit was acquired for the work. A new permit for this location has been submitted. (No sunken cut found at location) |
2022-03-08 | No data | 41 STREET, FROM STREET 20 AVENUE TO STREET 20 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR SEWER -BACKFILL CMPLETE ON 14' 6'' X 4' 6'' X 9' 6'' EXCAVATION IN THE ROADWAY |
2022-03-08 | No data | 10 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration across the parking lane driving lanes at location. |
2022-03-08 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush to grade in the roadway. |
2022-03-08 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Several flags flush, perm restorations in the parking lane opp #80, #64, #56, & #54 |
2022-03-08 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2022-03-08 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent water restorations flush and sealed in the roadway opp building operation |
2022-03-08 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway |
2022-03-07 | No data | NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area resurfaced by BPP for property #570. |
2022-03-07 | No data | COMMERCIAL STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut flush and sealed in the roadway |
2022-03-07 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in roadway |
2022-03-07 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT REPAIR WATER RESTORATION WITHIN THE PARKING/DRIVING LANE IS FLUSHED AND SEALED TO GRADE. |
2022-03-07 | No data | COMMERCIAL STREET, FROM STREET CLAY STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut flush and sealed in the roadway |
2022-03-06 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 12ft x 6ft perm restoration in the driving lane IFO property #692. |
2022-03-06 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO INSPECT VERY BUSY AREA AND MULTIPLE CUTS UNABLE TO FIND CUT |
2022-03-06 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, water repair ... /09 |
2022-03-05 | No data | ELIOT AVENUE, FROM STREET 62 STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane 97’ FROM FRESH POND ROAD opposite front adjacent property #60-79 FRESH POND ROAD in compliance |
2022-03-05 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on a newer permit. |
2022-03-05 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration needs to be resealed. |
2022-03-05 | No data | OXFORD STREET, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in compliance |
2022-03-05 | No data | WASHINGTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Excavation in the Roadway Steel Plated at Opp 52 in Compliance |
2022-03-04 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (WORK WAS DONE ON 3/3/22)CUT#1=10’x5’x4’TEST#1=98.3TEST#2=98.7CUT#2=6’x4’x4’TEST#1=98.5TEST#2=98.3BACKFILL PASS ARRIVED=10:30DEPARTED=1:15 |
2022-03-04 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... water relay ... |
2022-03-03 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | condition previously addressed and car issued (CAR #20224960018) to Plumbing NYC INC. 1out of 2 steel plates countersink not resting properly in the grove also overlapped with 2" deflection at driving lane of roadway. |
2022-03-03 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane & on the sidewalk is in compliance |
2022-03-03 | No data | GREENPOINT AVENUE, FROM STREET ECKFORD STREET TO STREET LEONARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-03-03 | No data | COMMERCIAL STREET, FROM STREET BOX STREET TO STREET CLAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Restoration is at four from the road near coffee shop. Closer to broken down building. |
2022-03-03 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Restoration is at four from the road near coffee shop. Closer to broken down building. |
2022-03-03 | No data | COMMERCIAL STREET, FROM STREET CLAY STREET TO STREET FRANKLIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Restoration is at four from the road near coffee shop. Closer to broken down building. |
2022-03-03 | No data | COMMERCIAL STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Restoration is at four from the road near coffee shop. Closer to broken down building. |
2022-03-03 | No data | FRANKLIN STREET, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two rectangular restorations on west side of road next to park. One more north one more south. |
2022-03-03 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-03-03 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2022-03-02 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O 4804 13Ave., •2 of 3 - Inadequately secured non-counter sunk, “PNYC” marked steel plates at excavation in roadway are very noisy when rolled upon by vehicular traffic. |
2022-03-01 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the roadway |
2022-03-01 | No data | SOUTH 1 STREET, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-02-28 | No data | 149 AVENUE, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill competed. 4' x 3'9'' x 3'5''. |
2022-02-28 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2022-02-28 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway under construction by a DDC contractor. |
2022-02-27 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several flags flush, perm restorations in the parking lane opp #80, #64, #56, & #54 |
2022-02-27 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Several flags flush, perm restorations in the parking lane opp #80, #64, #56, & #54 |
2022-02-27 | No data | LEONARD STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush and sealed in parking lane |
2022-02-27 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane opp #151 |
2022-02-27 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration in the roadway ifo 23 |
2022-02-27 | No data | CLAY STREET, FROM STREET COMMERCIAL STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp restoration in the roadway ifo 23 |
2022-02-26 | No data | 65 PLACE, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PERM ROADWAY (BPP) . SIDEWALK IN COMPLIANCE. |
2022-02-26 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the Curb / driving / Bike lanes. |
2022-02-26 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy in compliance |
2022-02-26 | No data | 50 AVENUE, FROM STREET 65 PLACE TO STREET 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER - PERM ROADWAY (BPP). SIDEWALK IN COMPLIANCE. |
2022-02-26 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2022-02-26 | No data | 50 AVENUE, FROM STREET 65 PLACE TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM ROADWAY |
2022-02-25 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2022-02-25 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walkway clear |
2022-02-25 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2022-02-24 | No data | 43 AVENUE, FROM STREET 91 PLACE TO STREET GLEANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sidewalk cut |
2022-02-23 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L - 4’ 6” W - 4’ 5” D - 3’ |
2022-02-23 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2 +5 |
2022-02-23 | No data | 4 AVENUE, FROM STREET 3 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut on buffer zone of bike lane. Missing complete full width of white lane markings. |
2022-02-23 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS. opp #4684 |
2022-02-23 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in roadway, permit expired. Active permit #Q012022047A56 on file. |
2022-02-23 | No data | GREENPOINT AVENUE, FROM STREET DEAD END TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway |
2022-02-23 | No data | BOND STREET, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the roadway in compliance |
2022-02-23 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent with a plated excavation opposite 64-21 214 Street and failed to countersink steel plate flush with surrounding roadway. Plate is 1”below grade. Cited permit used for identification along with steel plate marked “PNYCI.” |
2022-02-23 | No data | KENT STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway curb to curb |
2022-02-23 | No data | 60 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no restorations found on the roadway or sidewalk |
2022-02-22 | No data | 4 AVENUE, FROM STREET 3 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance |
2022-02-22 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 5 WALK TO STREET KINGSBOROUGH 6 WALK | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY PARTIALLY COVERED BY BPP |
2022-02-22 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking/driving lane |
2022-02-22 | No data | AVENUE T, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. Entrance to building on coleman st, |
2022-02-22 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY |
2022-02-21 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in roadway is flush to grade |
2022-02-21 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple perm water restorations in the roadway. |
2022-02-21 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway, lane markings restored |
2022-02-21 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane near fire hydrant |
2022-02-20 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in roadway |
2022-02-20 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration trench on rwy IFO property. No defects & Bike lane is clear. |
2022-02-20 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway, sidewalk flag flush and sealed |
2022-02-20 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk plated excavation on parking/driving lanes IFO property. No impaction to opp conventional bike lane. |
2022-02-19 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cuts & plated excavation on swk remain. Renewal permit on file ready for payment, 2022021100808960. |
2022-02-19 | No data | FRANKLIN STREET, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration cut on driving lane, side of park, closer to commercial street. |
2022-02-19 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY |
2022-02-19 | No data | 9 AVENUE, FROM STREET BEND TO STREET WEST 15 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | No crew on site. Plated excavation in roadway. Plate countersink in compliance/ raise plow sign posted as per DOT winter moratorium |
2022-02-18 | No data | 52 STREET, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER -CREW ON SITE WORKING IN SIDEWALK EXCAVATION . SIDEWALK WAS TEMP CLOSED WITH2 FLAGGERS ON SITE. UPON DEPARTURE SIDEWALK IS NOW IN COMPLIANCE. SPOKE WITH SUPERVISOR ON SITE.SIDEWALK PLATED AND CLEAR FOR PEDESTRIANS.SR Number: 311-09401153 |
2022-02-18 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 10:39, L: 10’8” W: 4’ D: 10’ I/F/O 406, Departed: 13:32. |
2022-02-18 | No data | 52 STREET, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | VERIFIED- REPAIR WATER -CREW ON SITE WORKING IN SIDEWALK EXCAVATION . SIDEWALK WAS TEMP CLOSED WITH2 FLAGGERS ON SITE. UPON DEPARTURE SIDEWALK IS NOW IN COMPLIANCE. SPOKE WITH SUPERVISOR ON SITE. SIDEWALK PLATED AND CLEAR FOR PEDESTRIANS. |
2022-02-18 | No data | 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk steel plate on parking lane IFO property. RAISE PLOW sign posted as well. No defects & bike lane is clear. |
2022-02-18 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-02-18 | No data | IVAN COURT, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2022-02-17 | No data | EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | Work in progress. No obstruction of driveway. |
2022-02-17 | No data | FRANKLIN STREET, FROM STREET COMMERCIAL STREET TO STREET DUPONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I observed that the permittee impacted the bike lane with cones and construction. Respondent failed to post signs: SC-145, SC-151 and SC-152 as required by Bike03 permit. Identified by permit. |
2022-02-17 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time of inspection, permit is in compliance. |
2022-02-17 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020315B63) |
2022-02-16 | No data | GRAND ST EXTENSION, FROM STREET HOOPER STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush and sealed in the roadway paved over slightly by Verizon |
2022-02-16 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12ft x 4ft x 9ft = 96.1%, 98.8% |
2022-02-15 | No data | MERMAID AVENUE, FROM STREET WEST 32 STREET TO STREET WEST 33 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag. |
2022-02-14 | No data | 43 AVENUE, FROM STREET 217 STREET TO STREET 218 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed within parking lane opposite 217-08 43rd Avenue. Dimensions: 4'0" x 2'2" x 3'6". Base to follow. |
2022-02-14 | No data | WEST 35 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1) - Temporary Restoration Overdue for FINAL RESTORATION: 1)Temporary restoration on the sidewalk that is overdue for final restoration.2) Apply color code marker to permanent restoration in the roadway. |
2022-02-14 | No data | 61 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane in compliance |
2022-02-13 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on the roadway opp 1095 |
2022-02-13 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER-PERM RESTORATION WITH (2) PLATED EXCAVATIONS IN PERM AREA. NO CREW ON SITE. |
2022-02-12 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recessed steel plated excavation is found to be in roadway, work site in compliance. (Active permit B012022038B37) |
2022-02-12 | No data | IVAN COURT, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp work on r/w okay |
2022-02-12 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway. |
2022-02-12 | No data | 46 STREET, FROM STREET 54 DRIVE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in compliance |
2022-02-12 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restorations in compliance |
2022-02-12 | No data | WEST 47 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill started at 10:20am now complete 6” cutbacks were done / 5’ x 7’ temporary water restoration in the parking lane in front of 359 West 47th st |
2022-02-12 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2 +5 |
2022-02-11 | No data | ROOSEVELT AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | At My Time Of Arrival I Observed The Steel Plate Marked "PNYC" Is Countersunken To Grade & Secured In Driving/Parking Lane At The Side Of 43-08 52nd St On Roosevelt Ave. Defect Not Found No Action Taken. |
2022-02-11 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done. |
2022-02-11 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass, now plated ..... |
2022-02-11 | No data | EAST 51 STREET, FROM STREET REMSEN AVENUE TO STREET RUTLAND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Pass, now plated ....east side of street .. |
2022-02-11 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS ON THE ROADWAY 1 ON EACH SIDE OF THE STREET |
2022-02-11 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench roadway restoration found in compliance |
2022-02-11 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | countersunk plate okay new permit on filr |
2022-02-11 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp rd/w cuts |
2022-02-10 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 535 permanent sewer restoration is in compliance |
2022-02-10 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk is clear for pedestrians and is in compliance at this time of inspection. |
2022-02-10 | No data | WEST 16 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Binder base cut within the parking/driving lane is overdue for the final restoration. |
2022-02-10 | No data | 38 STREET, FROM STREET 15 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site finalizing cut on rwy. No defects |
2022-02-10 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O #264 plumbers cut missing color code marker/needs to be installed to identify. Asphalt broken and cracked needs to be made flush with surrounding area. |
2022-02-10 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway/swk. |
2022-02-10 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in place in the roadway, Sidewalk open to pedestrians at this time |
2022-02-09 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent did not do the work, and the permit has expired. |
2022-02-09 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plated excavation in driving lane okay. new permit on file |
2022-02-09 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-02-09 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 11ft by 4ft down 9ft |
2022-02-09 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working on open excavation on swk, opp of #64. Has multiple cuts on swk & one on parking lane. Spoke to foreman to post RAISE PLOW sign for rwy cut. Bike lane is clear. |
2022-02-09 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2022-02-09 | No data | SUYDAM STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway in compliance. |
2022-02-09 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working, the 11:00am Back fill was re-assigned. |
2022-02-08 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway ifo #201 (ifo hydrant in bus stop) portion of restoration paved over by BPP |
2022-02-08 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L: 5’ 4” W: 14’ D: 4’ 5” |
2022-02-08 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 10:41, L: 11’ W: 4’ D: 10’ I/F/O 408, Departed: 15:30 |
2022-02-07 | No data | 38 STREET, FROM STREET 15 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - L – 10ft 2in W – 3ft 7in D – 8ft 0in Lift One: 95.5% Lift Two: 96.1% |
2022-02-07 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut new permit on file |
2022-02-07 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 344 Willoughby Street. |
2022-02-07 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew onsite, work is being done within stipulated time. |
2022-02-07 | No data | DUPONT STREET, FROM STREET FRANKLIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at time of inspection |
2022-02-06 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway excavation counter sunk with a raise plow sign posted with a newer active permit on file |
2022-02-06 | No data | IVAN COURT, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in compliance |
2022-02-06 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation counter sunk with a raise plow sign posted. |
2022-02-05 | No data | EAST 21 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above has a steel plated excavation in the roadway. The respondent has failed to post a Raise plow sign as required during the winter moratorium. Permit#B012022007B01. |
2022-02-04 | No data | COMMERCIAL STREET, FROM STREET BOX STREET TO STREET CLAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew onsite working in open excavation |
2022-02-04 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Permanent roadway restoration in compliance |
2022-02-04 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade curb to curb |
2022-02-04 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated excavation new permit on file |
2022-02-04 | No data | BLEECKER STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp roadway ok. |
2022-02-04 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notices cut on rd/w-s/w |
2022-02-04 | No data | EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress. |
2022-02-04 | No data | 149 AVENUE, FROM STREET 85 STREET TO STREET SOUTH CONDUIT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temp pedestrian walkway on site at this time of inspection. |
2022-02-04 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated excavation. new permit on file |
2022-02-03 | No data | AVENUE T, FROM STREET COLEMAN STREET TO STREET HENDRICKSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work observed |
2022-02-03 | No data | BARCLAY AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary walkway permit is in compliance at this time of inspection. |
2022-02-03 | No data | 207 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found |
2022-02-02 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates with permittee name are compliant in front of address. |
2022-02-02 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATES REMOVED ROADWAY PERM |
2022-02-02 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work conducted under this permit. Permit expired. |
2022-02-02 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Cut is under construction, contractor on site. Spoke with workers about making sure plates are secure when finished. Raised Plow signs posted. 2 plates on roadway |
2022-02-01 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in the roadway. |
2022-01-31 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk covered in snow |
2022-01-31 | No data | AMSTERDAM AVENUE, FROM STREET WEST 125 STREET TO STREET WEST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway in compliance |
2022-01-31 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | snow covering ground |
2022-01-29 | No data | 52 STREET, FROM STREET 43 AVENUE TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER -NO VISISBILITY DUE TO SNOW. (SNOW STORM) |
2022-01-28 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No occupancy of sidewalk |
2022-01-28 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No temporary pedestrian walk in the roadway |
2022-01-28 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, running from curb to curb. In front of 188 Adelphi Street. |
2022-01-28 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration, in the parking/driving lane, running from curb to curb. In front of 188 Adelphi Street. Sidewalk flags also repaired. |
2022-01-28 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 10:48, L: 12’ W: 4’ D: 9’6”, I/F/O 410, Departed: 15:30 |
2022-01-27 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut was made. no steel plates on site |
2022-01-27 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate countersunk, active permit on file (B012022006C11) |
2022-01-27 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 734, perm 2020 cut within East parking lane to curb is flush to grade. Lane markings restored in kind. Work within 1 sidewalk flag around Water valve is restored in kind. |
2022-01-27 | No data | SUYDAM STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway IFO active BO. |
2022-01-27 | No data | 14 AVENUE, FROM STREET 116 STREET TO STREET 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify 2019 water work, at time of inspection. |
2022-01-27 | No data | 116 STREET, FROM STREET 14 AVENUE TO STREET 14 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify 2019 water work, at time of inspection. |
2022-01-27 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk, rise plow sign posted |
2022-01-26 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate initials PNYCI countersunk on parking lane ifo property. |
2022-01-26 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration |
2022-01-25 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done in a bus concrete pad in front of 436 Flushing Avenue, 45 feet from Bedford Avenue. Roadway was paved. |
2022-01-25 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New active Permit Number: B012022005A68. |
2022-01-25 | No data | FLUSHING AVENUE, FROM STREET CLASSON AVENUE TO STREET TAAFFE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was paved, found resurfaced. |
2022-01-25 | No data | OCEAN AVENUE, FROM STREET AVENUE W TO STREET AVENUE X | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags in compliance |
2022-01-25 | No data | KINGSLAND AVENUE, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway curb to curb, portion of restoration paved over by 22’ gas |
2022-01-24 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | Pass, sewer water relays....... |
2022-01-24 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench to grade |
2022-01-24 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. 486 Neptune avenue |
2022-01-24 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2022-01-24 | No data | 51 AVENUE, FROM STREET 92 STREET TO STREET 93 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk plated excavation on parking lane IFO property. New permit on file. |
2022-01-24 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2022-01-24 | No data | 83 STREET, FROM STREET 45 AVENUE TO STREET WHITNEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temporary cut to grade in parking/driving lane |
2022-01-23 | No data | WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has 2 perm cuts-One in the South parking lane and the other within the North parking/driving lane. |
2022-01-23 | No data | WEST 16 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found within the roadway. |
2022-01-23 | No data | BRAGG STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-01-22 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk has been resurfaced IFO property #17. |
2022-01-22 | No data | GRACE COURT ALLEY, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the roadway, in front of 6 Grace Court Alley. |
2022-01-22 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ALL CONTRACTORS ARE REQUIRED TO COUNTERSINK SAID PLATES FLUSH TO THE LEVEL OF THE ROADWAY AS PER RULES OF WINTER MORATORIUM WHICH COMMENCED ON 12-1-2021. |
2022-01-22 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cones on the sidewalk at E 24 st btwn avej & Ave K AKA 2317 Ave K need to be removed. |
2022-01-21 | No data | COOPER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3ft 8in x 3ft x 2ft 5in 98.2% |
2022-01-21 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work done on sidewalk & temp left on the sidewalk overdue for final. Please make sidewalk flush to grade. |
2022-01-21 | No data | 55 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No crew on site. Roadway open to traffic. Area is in compliance. |
2022-01-20 | No data | MERMAID AVENUE, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway partially resurfaced by DDC contractor. No visible cuts. |
2022-01-20 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2022-01-20 | No data | 63 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp sewer cut in roadway. |
2022-01-19 | No data | 63 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=12’x3’x8’6”TEST#1=96.4TEST#2=96.5ARRIVED=9:45DEPARTED=3:00BACKFILL PASS |
2022-01-19 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut found on roadway in front of 373 Classon avenue |
2022-01-19 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 535 permanent sewer restoration is in compliance |
2022-01-19 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 steel plates countersunk across the roadway ifo #134-22, with temp asphalt cut on sidewalk. Raise plow sign posted in both directions. Active permit on file. |
2022-01-19 | No data | HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MOST OF RESTORATION IS COVERED BY BPP SMALLER PORTION OF RESTORATION IS IN THE ROADWAY OPPOSITE ADDRESS |
2022-01-19 | No data | 63 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | arrived at 9:40 for backfill |
2022-01-19 | No data | MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane in compliance |
2022-01-19 | No data | WOODBINE STREET, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway of the parking lane opposite from property #16-64 WOODBINE STREET in compliance |
2022-01-19 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2022-01-19 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site. Heavy water service leak in sidewalk. One excavation in roadway at this time |
2022-01-19 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plates countersunk across the roadway ifo #134-22, with temp asphalt cut on sidewalk. Raise plow sign posted in both directions. All lanes open for traffic. |
2022-01-18 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS REPAIRED |
2022-01-18 | No data | SOUTH 1 STREET, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2022-01-18 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration flush in the parking lane/driving lane with sidewalk flag restored. No defects to report |
2022-01-17 | No data | RUTLAND ROAD, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration trench starting from opp parking & leading into BO site. No impaction to bike lane. |
2022-01-16 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2022-01-15 | No data | CARROLL STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane IFO property #1251. |
2022-01-15 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade |
2022-01-15 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work was yet started *** new active permit on file *** |
2022-01-15 | No data | PATTERSON AVENUE, FROM STREET LINCOLN AVENUE TO STREET MIDLAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work was yet started *** new active permit on file *** |
2022-01-14 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #200 Kent |
2022-01-14 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | multiple perm restoration in the r/w |
2022-01-14 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags remain in acceptable condition. Unable to properly inspect roadway due to vehicles parked |
2022-01-14 | No data | 5 AVENUE, FROM STREET BALTIC STREET TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2022-01-14 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now perm |
2022-01-13 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in parking/driving lane and sidewalk flags. |
2022-01-13 | No data | EAST 172 STREET, FROM STREET ELDER AVENUE TO STREET WHEELER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | installation of water and sewer service |
2022-01-13 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2022-01-13 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 601 Washington St on Leroy St, Cobblestone roadway recently restored ( from North curb ) as per BPP - latest permit M012021334A22 on file. Old plumber work no longer visible at this time. This permit has expired. |
2022-01-13 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of cut resurfaced by BPP |
2022-01-12 | No data | NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway ifo #50 (garage). |
2022-01-12 | No data | EAST 21 STREET, FROM STREET KENMORE COURT TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance. |
2022-01-12 | No data | 229 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/p/l. |
2022-01-12 | No data | EAST 18 STREET, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w in compliance |
2022-01-12 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced under bpp |
2022-01-12 | No data | RIVER STREET, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration paved over by BPP |
2022-01-12 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020315B65) |
2022-01-11 | No data | DEAN STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane IFO property #1245. |
2022-01-11 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, opposite 218 Classon Avenue. |
2022-01-10 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | WD 122.7 DD 114.1 MD 116.0 AM 7.5 2 CUTS #1 L: 12ft W: 8ft D: 5ft 6in #2 L: 10ft W: 6ft D; 3ft. #1 2lift 97.2% 96.9% #2 96.3% |
2022-01-10 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has a permanent trench in the driving lane that extends within a barricaded area in the parking lane. |
2022-01-10 | No data | 4 AVENUE, FROM STREET 3 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at this time. |
2022-01-10 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water trench flush to grade in the parking & driving lane in front of 92-27. |
2022-01-10 | No data | BARCLAY AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2022-01-10 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 9:30AM Departure: 11:45AM2 cuts in the parking and driving lane, in front and opposite 188 Adelphi Street.#1: L: 7FT. 0IN. W: 3FT. 0IN. D: 4FT. 0IN.#2: L: 6FT. 0IN. W: 4FT. 0IN. D: 4FT. 6IN. |
2022-01-10 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please seal expansion joint along the property line of building #102. |
2022-01-10 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with 2 open excavation in the RW |
2022-01-10 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary restoration cut in the parking lane. |
2022-01-09 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2022-01-09 | No data | AVENUE I, FROM STREET EAST 45 STREET TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2022-01-09 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk , perm water cut found on roadway in front of 862 De kalb avenue |
2022-01-09 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2022-01-08 | No data | NEW YORK AVENUE, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walkway not found to be on roadway at this time |
2022-01-08 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2022-01-08 | No data | 64 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT on permit # B152021301A88 |
2022-01-06 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walkway on site at this time of inspection. |
2022-01-06 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable across roadway in front of 134-22 Booth Memorial Avenue. Dimensions: 23'0" x 4'0" x 3'0". Base to follow. |
2022-01-06 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plate has been removed from roadway, area of roadway found to be resurfaced BPP (B012021352A13) |
2022-01-06 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee failed to maintain 2 lanes for traffic at 134-22 Booth Memorial Avenue as required by permit stipulation 027. Permittee blocking westbound lane with excavator / cones. |
2022-01-06 | No data | BARCLAY AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk r/w |
2022-01-06 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk in compliance. |
2022-01-06 | No data | COLUMBIA STREET, FROM STREET DE GRAW STREET TO STREET SACKETT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival 11:30 departure 1:30 1 cut in front of 203 Columbia Street 7’6x4’3x3’6 compaction 97.4 |
2022-01-05 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of building #30 Morningside Drive, full flag restoration is required for 6 sidewalk flags; patchwork not acceptable. Please restore. |
2022-01-05 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration along the roadway in front of 977/979 east 34 street need to be sealed & permit expired on 12/31/2021. |
2022-01-04 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w on opp side |
2022-01-04 | No data | ST NICHOLAS AVENUE, FROM STREET GATES AVENUE TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway/swk ok. |
2022-01-04 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in roadway and sidewalk flags. |
2022-01-04 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2022-01-04 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2022-01-04 | No data | EAST 28 STREET, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2022-01-04 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY |
2022-01-04 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2022-01-04 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in opposite parking lane. |
2022-01-03 | No data | DEAN STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #1245. |
2022-01-03 | No data | WEST 16 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The respondent has an updated permit: M012019198B31 on file. |
2022-01-03 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in opp parking lane. |
2022-01-03 | No data | 63 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2022-01-02 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored in kind sealed and flush |
2022-01-01 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2022-01-01 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw trench ok |
2021-12-30 | No data | HILLSIDE AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration to grade in the driving lane if/o 188-11. |
2021-12-30 | No data | PITKIN AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found on the rw |
2021-12-30 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on sidewalk new building operation new sidewalk will be installed. |
2021-12-30 | No data | 188 STREET, FROM STREET 87 DRIVE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on roadway along segment. |
2021-12-30 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across bike, floating parking, and driving lanes, opp #1 entrance. |
2021-12-29 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-12-29 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 6' x 5'6" down 3'9" backfill, across the northbound parking and driving lanes, complete and acceptable. |
2021-12-29 | No data | NEW YORK AVENUE, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass -- CUT #1 L4ft W15ft D6ft - CUT #2 L3ft 10in W5ft 9in D3ft 6in -- Steel plate counter sunk in roadway driving/parking lanes ifo & opp #882 |
2021-12-29 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible On Site At Time Of Inspection |
2021-12-28 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway excavation countersunk with a raise plow sign posted before the excavation on the pole with a newer active permit on file. |
2021-12-28 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in place |
2021-12-28 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation countersunk with a raise plow sign posted before the excavation on the pole with a newer active permit on file. |
2021-12-28 | No data | 55 AVENUE, FROM STREET BEND TO STREET JUSTICE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush to grade in the parking & bike lane in front of 88-08. |
2021-12-28 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New active permit# Q012021342B47 pulled for work. Plated excavation in the westbound driving lane. |
2021-12-28 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 134 STREET TO STREET 135 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the westbound driving lane. Plate in countersunk. |
2021-12-27 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration still in compliance |
2021-12-27 | No data | LORIMER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane, new flag IFO property #43. |
2021-12-27 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water curb to curb restorations to grade in front of 108-23/108-25. |
2021-12-27 | No data | BURNS STREET, FROM STREET 67 AVENUE TO STREET YELLOWSTONE BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of roadway in compliance. Roadway clear for traffic. |
2021-12-27 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #79. |
2021-12-26 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in compliance |
2021-12-26 | No data | 169 STREET, FROM STREET LITHONIA AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/p/l. Sidewalk flag restored around water valve. |
2021-12-26 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush ifo 4423 |
2021-12-25 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 steel plate street opening’s counter sunken in the roadway of the driving lane in front of property #91-46 - 91-48 87 STREET “RAISE PLOW” sign posted ahead, valid dot permit on file #Q012021357A45 |
2021-12-25 | No data | LEONARD STREET, FROM STREET CALYER STREET TO STREET MESEROLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk plated excavation on parking/ bike lane IFO property. Plate is skid-resistant & RAISE PLOW sign is posted. No impaction to conventional bike lane. |
2021-12-25 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-12-25 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening’s counter sunken in the roadway of the driving lane in front of property #91-46 - 91-48 87 STREET “RAISE PLOW” sign posted ahead |
2021-12-24 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway extending into the parking lane in front of property #108-37 JEWEL AVENUE in compliance |
2021-12-24 | No data | NEW YORK AVENUE, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plate waiver inspection |
2021-12-24 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane |
2021-12-23 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2021-12-23 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane ifo #7-9. Sidewalk shed still over sidewalk. |
2021-12-23 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations against south curb, opp of #39 and #43. |
2021-12-23 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER -BACKFILL COMPLETE ON 12' 6'' X 4' 3'' X 8' 8'' EXCAVATION ON THE ROADWAY |
2021-12-23 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration needs to be resealed |
2021-12-23 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=2’x3’x3’TEST#1=95.3CUT#1=12’x4’x4’TEST#1=96.3ARRIVED=10:30DEPARTED=12:20 |
2021-12-23 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation countersunk with a raise plow sign posted before the excavation on the pole. |
2021-12-23 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation with a newer active permit on file |
2021-12-23 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane |
2021-12-23 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A CAR was issued on 12/16 for this location. |
2021-12-22 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No temporary pedestrian walk in roadway |
2021-12-22 | No data | DE GRAW STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw cut ok |
2021-12-22 | No data | MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway trench IFO active BO. |
2021-12-22 | No data | DAHILL ROAD, FROM STREET 50 STREET TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done |
2021-12-22 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation counter sunk with a raise plow sign posted on a tree before the excavation. |
2021-12-21 | No data | 57 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 832 57 Street. |
2021-12-21 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by New Building BPP paving and new sidewalk from 45-37 to 45-51. |
2021-12-21 | No data | IVAN COURT, FROM STREET BARTLETT PLACE TO STREET CYRUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | will come back later today and make sure plates are extending 12" outwards from excavation |
2021-12-20 | No data | 20 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane needs to be sealed |
2021-12-20 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET BRIDGE STREET TO STREET CHAPEL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-12-20 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cars parked on both sides of the roadway unable to see restorations |
2021-12-20 | No data | NEW YORK AVENUE, FROM STREET LINDEN BOULEVARD TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with stipulation ID 014 |
2021-12-20 | No data | SMART STREET, FROM STREET LABURNUM AVENUE TO STREET NEGUNDO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by new building BPP paving and new sidewalk at location. |
2021-12-20 | No data | WEST 54 STREET, FROM STREET 8 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking and driving lane ifo Mandl School (between steam pads), and new flags on sidewalk around water valve. |
2021-12-19 | No data | 61 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done covering 1 of the restorations and the other under a car in the parking lane opposite 2062 61st Street. |
2021-12-19 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2021-12-19 | No data | ADELPHI STREET, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE ROADWAY |
2021-12-19 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance. |
2021-12-18 | No data | LINDEN BOULEVARD, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2021-12-17 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4ft by 3ft down 4ft |
2021-12-17 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC INC failed to comply with terms & conditions of stipulation #049, occupy 8 FOOT WIDTH OF THE ROADWAY adjacent to the east curb-line. Nov issued foreman has told me he is able to via roadway permit!! |
2021-12-17 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 15’x 4’ x 6’10”p/d/l of roadway, 92-29. plated |
2021-12-17 | No data | PARSONS BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by new building BPP paving at location and new sidewalk. 42-29 is bet. Ash and Franklin. |
2021-12-17 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance on glenwood rd |
2021-12-17 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy in compliance |
2021-12-17 | No data | 51 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The roadway is occupied with jersey barriers |
2021-12-17 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Occupied At Time Of Inspection |
2021-12-16 | No data | 42 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT in August 2021 on permit # B152021234A89. |
2021-12-16 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration |
2021-12-16 | No data | BEDFORD AVENUE, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the parking lane is flush to grade |
2021-12-16 | No data | STEWART AVENUE, FROM STREET MEADOW STREET TO STREET STAGG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #200 Stewart Av. |
2021-12-16 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Spoke to foreman about blocking the driveway in front of 459 East 25 Street & Foreman also spoke to the house owner. Crew working in an open excavation. |
2021-12-16 | No data | STAGG STREET, FROM STREET STEWART AVENUE TO STREET VARICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane at corner property on the north side of the block. |
2021-12-16 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found an area within a permanent restoration sunken 1 ½ ‘’ inches below grade in the driving lane in front of 106. |
2021-12-16 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in front of 1751 48th Street is sunken 1.5" in the driving lane and needs to be resealed. |
2021-12-16 | No data | 32 AVENUE, FROM STREET 146 STREET TO STREET 147 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut across the eastbound parking and driving lanes. |
2021-12-15 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is flush to grade IFO #2317 |
2021-12-15 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway covered by BPP M012019210A68. Sidewalk restored in kind. |
2021-12-15 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Patchwork observed on sidewalk. Full sidewalk flag must be restored in kind. Also lane marking missing from roadway. In front of 115. |
2021-12-15 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Transformer vault installed on s/w i/f/o school |
2021-12-15 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M012021319B48. |
2021-12-14 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L27ft, W5ft, D4ft cut across the driving lane IFO property #24. |
2021-12-14 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plate waiver inspection |
2021-12-14 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-12-13 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration trench going from opp parking lane to curb IFO property. Lane markings restored & no impaction to conventional bike lane. |
2021-12-13 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2021-12-13 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags have been installed in front of 418. |
2021-12-13 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration trench going from opp parking lane to curb IFO property. Lane markings restored & no impaction to conventional bike lane. |
2021-12-12 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration on cobblestone acceptable |
2021-12-12 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a BPP 1/2 + 5 overlapping permanent water restoration |
2021-12-12 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced |
2021-12-12 | No data | KINGSLAND AVENUE, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration trench IFO property going curb to curb. Also, two new swk flags installed with water valve in center of it. Bike lane is clear. |
2021-12-11 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2021-12-11 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2021-12-11 | No data | 38 STREET, FROM STREET 15 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway on site |
2021-12-11 | No data | 51 STREET, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restorations in compliance |
2021-12-10 | No data | BUSHWICK AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work in the roadway |
2021-12-10 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND FIBER GLASS PLATE ON THE SIDE WALK IN FRONT OF BUILDING OPERATION NEW PERMIT ON FILE |
2021-12-10 | No data | SUYDAM STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work crew on site |
2021-12-10 | No data | SUYDAM STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012021326B85 active permit work crew on site |
2021-12-10 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-12-10 | No data | BURNS STREET, FROM STREET 67 AVENUE TO STREET YELLOWSTONE BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No roadway occupancy at this time |
2021-12-10 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sidewalk restorations with 1 of the 2 flags around a gas valve in front of 188 Webster Ave |
2021-12-10 | No data | PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET NEVINS STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating parking lane, water leak repair, 3day. Confirmed. |
2021-12-10 | No data | 55 AVENUE, FROM STREET BEND TO STREET JUSTICE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in front of 88-08 to grade in the driving lane. |
2021-12-10 | No data | JUSTICE AVENUE, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in front of 88-08 to grade in the parking/driving lane. |
2021-12-09 | No data | BURNS STREET, FROM STREET 67 AVENUE TO STREET YELLOWSTONE BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER -BACKFILL COMPLETE ON 4' X 2' 7'' X 6' EXCAVATION IN ROADWAY. 6'' CUT-BACK DONE. |
2021-12-09 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2021-12-09 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates counter sunk in roadway, crew on site at this time. Excavation in progress. Active permit B012021333A68 on file. |
2021-12-09 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration needs to be Resealed also asphalt is broken out in the parking lane. Opposite 1946 80 Street. |
2021-12-09 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration trench found on roadway in front of 532 Clinton avenue |
2021-12-08 | No data | 87 STREET, FROM STREET ATLANTIC AVENUE TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening’s counter sunken in the roadway of the driving lane in front of property #91-46 - 91-48 87 STREET |
2021-12-08 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to post ''Steel Plates Ahead" or "Raise Plow Sign '' as required in the Winter Moratorium Policy |
2021-12-08 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in p/l with an active permit |
2021-12-08 | No data | 76 AVENUE, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement covering roadway |
2021-12-07 | No data | GRACE COURT, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-12-07 | No data | GRACE COURT ALLEY, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-12-07 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Counter sunk plates in the parking lanes |
2021-12-06 | No data | 43 AVENUE, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 12' x 4' down 7' backfill across the eastbound parking land driving lanes and 5' x 4'6" down 4' backfill in the westbound (opposite) parking lane, complete and acceptable. |
2021-12-06 | No data | BURNS STREET, FROM STREET 67 AVENUE TO STREET YELLOWSTONE BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk is in compliance at this time of inspection. |
2021-12-05 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2021-12-04 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temp walkway in the roadway |
2021-12-04 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Restoration in the Roadway. |
2021-12-03 | No data | 43 AVENUE, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupied |
2021-12-03 | No data | BOND STREET, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2ft 8in by 7ft down 3ft |
2021-12-03 | No data | 56 DRIVE, FROM STREET 58 PLACE TO STREET MELVINA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration needs to be Sealedplease seal all outer edges of the 2 permanent water restorations with liquid asphalt seal in the roadway in front of property #58-55 56 DRIVE, in a timely fashion. CAR issued |
2021-12-03 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED AND SIDE WALK FLAGS INSTALLED |
2021-12-03 | No data | BOND STREET, FROM STREET BUTLER STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy, ifo @235, water leak repair, 3day. Confirmed. |
2021-12-02 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2021-12-01 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw cut ok |
2021-12-01 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in roadway. However lane marking is missing from roadway & patch work observed on sidewalk. Perm still active no CAR at this time. In front of 115. |
2021-12-01 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration across the southbound driving lane. Two sidewalk flags restored in kind. |
2021-11-29 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of roadway is in compliance at this time of inspection. |
2021-11-29 | No data | 78 STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w |
2021-11-27 | No data | 37 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Double yellow lane marker restored |
2021-11-27 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT OK RW |
2021-11-26 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The roadway restoration was resealed |
2021-11-26 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The roadway restoration was resealed |
2021-11-26 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags remain in acceptable condition. Im unable to properly inspect due to vehicles on the roadway |
2021-11-25 | No data | HOWARD PLACE, FROM STREET PROSPECT AVENUE TO STREET WINDSOR PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the roadway is in compliance |
2021-11-25 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealedplease seal expansion joints in between the sidewalk & curb 40’ FROM CORNER LINDEN BOULEVARD AKA adjacent to property #192-20 LINDEN BOULEVARD, in a timely fashion. CAR issued |
2021-11-25 | No data | LINDEN BOULEVARD, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Laneplease restore/repair roadway pavement lane markings in kind over permanent sewer restoration in the roadway in front of property #192-20 LINDEN BOULEVARD, in a timely fashion. CAR issued |
2021-11-25 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No water cut on segment. Both conventional bike lanes are clear. |
2021-11-24 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=10’x4’x9’TEST#1=97.8TEST#2=96.6CUT#1=4’x4’x3’TEST#1=97.3BACKFILL PASSBASE PASSArrived=12:10Departed=2:50 |
2021-11-24 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCC roadway at time of inspection. Active permit on file. |
2021-11-24 | No data | EAST 31 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2021-11-24 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | arrived crew on site awaiting backfill |
2021-11-24 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration the entire sidewalk is covered with leaves. |
2021-11-24 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 countersunk steel plates, in the parking and driving lane, in front and opposite 1122 52 Street. New permit on file, B012021320B94 exp. 12/14/2021. |
2021-11-23 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking & driving lane |
2021-11-23 | No data | 192 STREET, FROM STREET 44 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across roadway. |
2021-11-23 | No data | 51 AVENUE, FROM STREET 2 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-11-23 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 849 53 Street. Restoration needs to be resealed but there is a new permit on file, #B012021326B86 exp. 12/21/2021. |
2021-11-23 | No data | 55 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, in front of 966 55 Street. Restoration was partially paved over by a Major Gas Installation restoration. |
2021-11-23 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temporary pedestrian walkway is in compliance |
2021-11-22 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2021-11-22 | No data | 160 STREET, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied |
2021-11-22 | No data | ATLANTIC AVENUE, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk was reconstructed |
2021-11-22 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=7’x3’x5’TEST#1=97.1TEST#2=97.7CUT#2=6’x3’x5TEST#1=96.8CUT#3=6’x6’x5’TEST#1=98.8TEST#2=98.7BACKFILL PASSArrived=12:00Departed=2:45 |
2021-11-22 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active - plated excavation in the driving lane at location. |
2021-11-22 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate found in parking lane in front of 377 12 street |
2021-11-22 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file:B012021309B23 |
2021-11-21 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm to grade cuts/restorations across the parking and driving lanes. |
2021-11-21 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O, I observed the respondent with a 26' x 14' permanent roadway cut sunken 2''-3'' in localized areas. CAR # 20211100215 issued to respondent on 8/12/21 condition remains the same. |
2021-11-20 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration needs to be resealed. |
2021-11-20 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/WAY AREA WAS PAVED VIA BPP |
2021-11-20 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Hydrant has been installed IFO property #319. |
2021-11-19 | No data | 57 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 832 57 Street. |
2021-11-19 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in driving and parking lane ifo #344, temp asphalt and fiberglass plate on the sidewalk. |
2021-11-19 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN THE PARKING LANE CREW ON SITE |
2021-11-19 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED (L)5FT X (W)3FT 6IN X (D)2FT 10IN TEST 98.4 BASE SAW CUT BACKS ARE BEING DONE. |
2021-11-19 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 roadway excavations plated |
2021-11-18 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | The sidewalk is occupied with a jersey barrier |
2021-11-18 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water repair in r.w acceptable |
2021-11-18 | No data | WYTHE AVENUE, FROM STREET BANKER STREET TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm restorations on west side of street. Crew on site working in excavation on east sidewalk. |
2021-11-16 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Excavation was 35 ft x 5ft x 3'6" backfill was competed 6 inch cutback made only concrete base restored cut will be left plated |
2021-11-16 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r.w |
2021-11-16 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 57 permanent gas restoration is in compliance |
2021-11-16 | No data | EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working. Perm still active following time stip. |
2021-11-16 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk steel plate, in the parking/driving lane, opposite 1140 43 Street. |
2021-11-16 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok sw |
2021-11-15 | No data | 195 STREET, FROM STREET 56 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to conduct proper inspection due to Parks Dept. Tree Crew. |
2021-11-15 | No data | GRACE COURT, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work on rw |
2021-11-14 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2021-11-14 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent trench that extends from the parking lane into the driving lane. |
2021-11-13 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to properly seal and maintain the wearing course |
2021-11-13 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | east side of york ave water/sewer excavation paved over by BPP West side of york water/sewer trench restored |
2021-11-13 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code installed, in compliance |
2021-11-13 | No data | HANOVER PLACE, FROM STREET GROVE PLACE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-12:50pmc-3'8''x3'x4'6'' test- 98% & 98.2%c2-5'x2'x4' - 98.4 & 98.3hermanjumping jackETLDenises.cblendw-120.6d-111md-118am-8.7%backfill passes |
2021-11-13 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut have been resurfaced in the parking lane |
2021-11-12 | No data | LABURNUM AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-11-12 | No data | AVENUE C, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No water cut on segment for property. Protected bike lane is clear. |
2021-11-12 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-11-11 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work on r/w |
2021-11-11 | No data | HANOVER PLACE, FROM STREET GROVE PLACE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated excavation on roadway and temp work on sidewalk |
2021-11-10 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration to grade with the sidewalk to grade. |
2021-11-10 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Large perm r/w restoration maintain to grade. |
2021-11-10 | No data | GRACE COURT, FROM STREET DEAD END TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work viewed at time of inspection |
2021-11-10 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to reinstall white lane marking for permanent water restoration. CAR was issued on 9/11/21 CAR #202129300025 |
2021-11-10 | No data | 43 AVENUE, FROM STREET 219 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-11-09 | No data | 45 AVENUE, FROM STREET BOWNE STREET TO STREET SMART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by New Building BPP paving at location. |
2021-11-09 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench restoration in roadway. |
2021-11-09 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across roadway. Two sidewalk flag restored in kind. |
2021-11-09 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-11-09 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP resurfaced |
2021-11-08 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied at time |
2021-11-08 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sewer excavation on rwy, IFO property, not started. Conventional bike lane is clear. |
2021-11-08 | No data | 45 AVENUE, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk plated excavation in the driving lane. |
2021-11-08 | No data | 169 STREET, FROM STREET LITHONIA AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/p/l. Two sidewalk flags restored around water valve. |
2021-11-07 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in the r/w |
2021-11-07 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has restored the bike symbol in the roadway. |
2021-11-07 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking/bike lane. |
2021-11-07 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved in front of 1134 Fulton street |
2021-11-07 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | Multiple steel plates in roadway parking lanes. |
2021-11-06 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-11-06 | No data | FRANKLIN AVENUE, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Two backfills: 10' x 4' down 4' across the eastbound driving lane and 5' x 4' down 4' across the westbound driving lane, complete and acceptable. |
2021-11-06 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in p/l with an active permit |
2021-11-06 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2+5 |
2021-11-06 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced in the r/w |
2021-11-06 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10' x 4' down 10' sewer backfill, across the parking and driving lanes, complete and acceptable. |
2021-11-06 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-11-05 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumbing restoration in the driving/parking lane. |
2021-11-05 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in front of property #143. |
2021-11-04 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 09:47, L: 18’ W: 5’ D: 9’ ,I/F/O 1015, Departed: 12:30 |
2021-11-04 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation without a valid permit |
2021-11-04 | No data | 66 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane opposite from property #108-02 66 ROAD in compliance |
2021-11-03 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway |
2021-11-03 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm concrete water cuts in the roadway |
2021-11-03 | No data | WILLOUGHBY AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street depression between two perm restorations is down 2 inches under grade.Restore roadway in kind. |
2021-11-01 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Roadway and sidewalk excavation plated |
2021-11-01 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done. |
2021-10-31 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, sidewalk clear for pedestrian traffic. |
2021-10-31 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-10-30 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This is a Building Operation for a new house a new sidewalk will be installed upon completion of the project. |
2021-10-30 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | green fence and scaffolding occupying sidewalk |
2021-10-30 | No data | 160 STREET, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection |
2021-10-30 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Roadway and sidewalk excavation plated |
2021-10-30 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration has been sealed IFO property #200. |
2021-10-29 | No data | HANOVER PLACE, FROM STREET GROVE PLACE TO STREET LIVINGSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary asphalt around fire hydrant in front of 15. |
2021-10-28 | No data | 14 AVENUE, FROM STREET 116 STREET TO STREET 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration |
2021-10-27 | No data | BROOKLYN AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2021-10-27 | No data | NEWKIRK AVENUE, FROM STREET EAST 26 STREET TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in the r/w |
2021-10-27 | No data | KINGSLAND AVENUE, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work complete in front of 305. Stretches almost to 300. |
2021-10-26 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temporary Pedestrian Walk observed at the construction site, at the time of inspection i/f/o 46-39 Union street |
2021-10-26 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Continuous permit issued, in compliance |
2021-10-25 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration not quite CAR worthy |
2021-10-25 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l opp 458 & 466 |
2021-10-25 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Continuous permit issued, in compliance |
2021-10-25 | No data | 5 AVENUE, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Large restoration trench in parking lane IFO property. Sealer & color code marker applied. Both bike lanes are clear. |
2021-10-25 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | The roadway is occupied with container and jersey barriers |
2021-10-25 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk AKA 134-16 36 Road |
2021-10-24 | No data | 147 STREET, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving lane. |
2021-10-24 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS CURRENTLY MILLED |
2021-10-24 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 1365 56 Street. |
2021-10-23 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY BPP |
2021-10-23 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp plated excavation on parking lane, IFO property, is countersunk. Opp of conventional bike lane. Bike lane is clear. |
2021-10-23 | No data | 9 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water restorations flush to grade in the roadway of the driving lane/extending into the parking lane in front of property #38-39 9 STREET in compliance |
2021-10-23 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/12/21. |
2021-10-23 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in compliance |
2021-10-23 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water/ bus lane pave overlapping perm cut. |
2021-10-23 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane extending to the driving lane, no color code was visible in the driving lane, I am currently unable to see the entire restoration and color code. |
2021-10-23 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done and covering most of the restoration and part is extending outwards from the BPP. |
2021-10-22 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation |
2021-10-22 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2021-10-22 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2021-10-22 | No data | CROWN STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts in the roadway was backfill 1 cut 11 x 4 x 4 ft 2nd cut 5'7" x 4 x 2'10" 6 inch cutback made only concrete base restore cuts will be left plated |
2021-10-22 | No data | UNION STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived: 11:14, L: 3’6” W: 3’ D: 4’3” 2- Cuts, I/F/O 1451, Departed: 12:31 |
2021-10-22 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was recently resurfaced by DOT |
2021-10-21 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Final Restoration completed CAR will be issued for missing Color Code, not fully seal and holes less than 10’ apart. |
2021-10-21 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent asphalt restoration in roadway, Restoration Sunken down 1 3/4” below the surrounding roadway surface. (2)- Restoration needs to be re-sealed. |
2021-10-21 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Your 2 Restorations measured 7’ 9” apart of each other. H 1042 D note # 9 requires when holes are less then 10’ apart must made into 1 Restoration. Color Code Marer is missing from 1 out 2 restorations Missing Street opening seal on cut in Curb lane |
2021-10-20 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Two perm restoration trenches on rwy, one IFO property on parking lane. Second opp of property in parking/bike lane. Also, two new swk flags with water valve in center of it. Both conventional bike lanes are clear. |
2021-10-20 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Several perm trenches to grade across roadway. |
2021-10-20 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2021-10-19 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2021-10-19 | No data | 43 AVENUE, FROM STREET 108 STREET TO STREET 111 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walkway on site at this time of inspection. Sidewalk clear for pedestrians. |
2021-10-19 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced in 2019 |
2021-10-19 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration needs to be resealed |
2021-10-06 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway. |
2021-10-06 | No data | 182 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration covered by BPP. |
2021-10-06 | No data | 10 AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4' x 4' down 3" wearing course, adjacent to curb, complete and acceptable. |
2021-10-06 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | r/w joints not sealed. |
2021-10-06 | No data | EAST 37 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-10-05 | No data | 20 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by New Building sidewalk and BPP Paving on roadway. |
2021-10-04 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IBM color code added in p/l on opp side |
2021-10-04 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration in front of 6420 18th Ave. |
2021-10-04 | No data | FRANKLIN AVENUE, FROM STREET BOWNE STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane 55’ FROM CORNER BOWNE STREET AKA adjacent to property #42-08 BOWNE STREET |
2021-10-04 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to properly seal and maintain the wearing course |
2021-10-04 | No data | 149 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cuts size 4'x3'6''x3', 4'x2'6''x3' & 3'x2'x3' |
2021-10-04 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - - L6ft 10in W14ft 7in D10ft - - WD108.6 DD103.2 MD107 AM5.3 - - ifo #485 p/l & d/l. Base @1pm. |
2021-10-04 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate removed. Restoration is perm to grade. |
2021-10-04 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White line have been replaced |
2021-10-03 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation counter sunk in the driving lane |
2021-10-03 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway excavation counter sunk in the driving lane with a newer active permit on file. |
2021-10-02 | No data | POWER ROAD, FROM STREET 63 AVENUE TO STREET 63 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no sign of work started |
2021-10-02 | No data | EAST 37 STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut has been re sealed |
2021-10-01 | No data | 14 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration, in the parking/driving lane, opposite 4102 14 Avenue was permanently restored to grade. Condition corrected, pass. |
2021-10-01 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected |
2021-10-01 | No data | 51 AVENUE, FROM STREET 2 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2021-10-01 | No data | 21 STREET, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut covered by BPP. |
2021-10-01 | No data | AVENUE U, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoration in r.w has been resealed |
2021-10-01 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | There is a perm cut that is sunken in the parking lane in front of 425 that was temporary patched need to be made permanently restored up to grade |
2021-10-01 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a perm cut that is sunken in the parking lane in front of 425 that was temporary patched need to be made permanently restored up to grade |
2021-09-30 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED (L)16FT X (W)5FT 8IN X (D)10FT 5IN TEST 97,8 97.0 RESPONDENT HAD UNDERMINING ON 2 SIDES OF EXCAVATION AND THAT WAS CUT OUT WHEN SHORING WAS REMOVED ARRIVED AT 1005 BACK FILL COMPLETE AT 100 STAYING FOR BASE |
2021-09-30 | No data | EAST 24 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | ped / walk not visible |
2021-09-30 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate placed down on sidewalk labeled “PNYCI” in front of 118. Active permit on site (M012021251B13) |
2021-09-30 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate labeled “PNYCI” placed down on the sidewalk in front of 118. |
2021-09-30 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE EXCAVATING THE SIDE WALK AND THERE IS A STEEL PLATED EXCAVATION IN THE ROADWAY. |
2021-09-30 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the roadway. |
2021-09-29 | No data | JACKSON AVENUE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration from curb to yellow paint median in roadway. Bike lane marking restored. |
2021-09-29 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2021-09-29 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in RWY SCL of Willoughby Avenue. Conventional bike lane clear. |
2021-09-29 | No data | CLINTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Perm water cuts found on roadway in front of 14 Clinton avenue |
2021-09-29 | No data | DEAN STREET, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO property #2427, |
2021-09-29 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible, roadway resurfaced. |
2021-09-29 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 442 permanent water restoration is in compliance |
2021-09-29 | No data | EAST 18 STREET, FROM STREET JEROME AVENUE TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2021-09-28 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-09-28 | No data | EAST 34 STREET, FROM STREET BROOKLYN ROAD TO STREET FARRAGUT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Perm roadway restoration found to be in compliance |
2021-09-28 | No data | 169 STREET, FROM STREET LITHONIA AVENUE TO STREET UNDERHILL AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed 12' x 4' x 7' |
2021-09-27 | No data | 50 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & r/w paved |
2021-09-27 | No data | EAST 62 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumbing work is complete. |
2021-09-27 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent has 1' x1' area of the permanent cut sunk 2-3 inches in the driving lane. Respondent was notified by CAR# 20211100215 8/12/21. permit expired 5/12/19. |
2021-09-26 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the r/w with an active permit on file |
2021-09-26 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2021-09-26 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a perm cut in the crosswalk of Lenard Street. |
2021-09-26 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | All restorations covered by the BPP. |
2021-09-26 | No data | 43 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk Flag in Compliance |
2021-09-25 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-09-25 | No data | WEIRFIELD STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE, TWO NEW FLAGS IFO PROPERTY #11. |
2021-09-25 | No data | EAST 5 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on the roadway |
2021-09-25 | No data | EAST 230 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done at rear of Laundromat building on East 230 Street |
2021-09-25 | No data | 149 STREET, FROM STREET 35 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway of the parking lane in front of property #35-07 149 STREET in compliance |
2021-09-25 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 perm water restorations flush to grade in the roadway of the driving lane in front of property #42-15 - 42-23 165 STREET in compliance |
2021-09-25 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm water restorations flush to grade in the roadway of the driving lane in front of property #42-15 - 42-23 165 STREET in compliance |
2021-09-25 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2021-09-24 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass.. perm .. |
2021-09-24 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, s/w plated, temp to grade rwy, debris barricaded. |
2021-09-24 | No data | MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced.... |
2021-09-23 | No data | BLOSSOM AVENUE, FROM STREET MAIN STREET TO STREET SAULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway extending into the parking lane in front of property #134-40 BLOSSOM AVENUE in compliance |
2021-09-23 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer restorations flush to grade in the roadway extending into the parking lane in front of property #137-15 & 137-17 MULBERRY AVENUE in compliance |
2021-09-23 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE ROADWAY AND NEW PERMIT ON FILE |
2021-09-23 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ON THE ROADWAY ABOUT 60FT FROM LIBERTY CORNER |
2021-09-23 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #36-41 PRINCE STREET, valid dot permit on file #Q012021253E06 |
2021-09-23 | No data | 50 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & segment paved |
2021-09-23 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street opening’s ramped & pinned in the roadway extending into both parking lanes in front of property #133-20 41 ROAD |
2021-09-23 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the bus lane in front of property #42-80 MAIN STREET & 6 sidewalk flags installed expansion joints sealed & pavement markings restored in kind in compliance |
2021-09-23 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in the r/w |
2021-09-22 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway extending into the parking lane in front of property #46-39 UNION STREET |
2021-09-22 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #36-41 PRINCE STREET |
2021-09-22 | No data | 36 ROAD, FROM STREET BUD PLACE TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the segment of the crosswalk corner PRINCE STREET |
2021-09-22 | No data | 36 ROAD, FROM STREET BUD PLACE TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the segment of the crosswalk corner PRINCE STREET |
2021-09-22 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY BY FIRE HYDRANT |
2021-09-22 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cuts size 11'x5'x3'10'' & 7'x5'x5' |
2021-09-22 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION ON THE ROADWAY NEW PERMIT ON FILE |
2021-09-22 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening counter sunken in the roadway extending into the parking lane in front of property #46-39 UNION STREET, valid dot permit on file #Q012021253E02 |
2021-09-22 | No data | BAINBRIDGE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass,,water relay .... |
2021-09-21 | No data | WYTHE AVENUE, FROM STREET BANKER STREET TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One new flag ifo gate of Matthew Fairbanks Design, and 2 perm restorations in the roadway opposite of new flag. |
2021-09-21 | No data | BANKER STREET, FROM STREET NORMAN AVENUE TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flag next to tree pit ifo #150, perm restoration in adjacent roadway. |
2021-09-20 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in crosswalk area of roadway at Morningside Drive remains in acceptable condition. No defects to report |
2021-09-19 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20214510555-FAILED TO PROPERLY SEAL JOINT EDGES OF PERMANENT PLUMBING NYC , INC. RESTORATION IN ROADWAY- OPPOSITE 199 MONTROSE AVENUE. |
2021-09-19 | No data | MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass../77 |
2021-09-19 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, water relay .... |
2021-09-19 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway restoration was paved over by a Con Edison trench |
2021-09-19 | No data | KANE PLACE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the parking lane in front of property #35 KANE PLACE |
2021-09-18 | No data | 10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2021-09-18 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has a plated excavation across the sidewalk and and two plated excavations across the roadway without having/maintaining an active permit to do so. Respondent was identified by "PNYC INC" marked on plates and expired permit# Q012021233A03. |
2021-09-18 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-09-18 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent asphalt restoration in roadway, Restoration needs to be re-sealed |
2021-09-18 | No data | ONDERDONK AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt sealer edges re-sealed sealed IFO 455 on perm cut BIKE02 Lane marking restored IFO 455 |
2021-09-17 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut remains in acceptable condition. Sidewalk flags remain in acceptable condition. No defects to report |
2021-09-17 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for final. |
2021-09-17 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2021-09-16 | No data | CLOVERDALE BOULEVARD, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no D E P inspection of tap as required back fill and base to be rescheduled confirmation number q202125943 cancelled by permittee |
2021-09-16 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ped /walk not visible |
2021-09-16 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in RWY SCL of Willoughby Avenue. Conventional bike lane clear. |
2021-09-16 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane, Temp restoration on the sidewalk underneath scaffolding I/F/O property #373. |
2021-09-16 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New hydrant installed |
2021-09-16 | No data | 60 AVENUE, FROM STREET 84 PLACE TO STREET 84 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent trench resealed |
2021-09-15 | No data | DEAN STREET, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-09-15 | No data | 32 AVENUE, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection. Permit expired. |
2021-09-14 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Nov issued to the respondent for having two restorations in the roadway, and one has a color code marker with IBM# 33387 applied. However, they failed to restore the cut within the required time permanently. |
2021-09-14 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent trenches across roadway. |
2021-09-13 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway is flush to grade |
2021-09-13 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now repaired |
2021-09-13 | No data | 36 ROAD, FROM STREET BUD PLACE TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed respondent has failed to abide by terms and regulations of D.O.T. required permit stipulation 023-OCMC Streets (Maintain 1 -11 foot lane for traffic). Permittee has a full roadway closure in front of 134-16 36th Road. ID by permit. |
2021-09-13 | No data | 36 ROAD, FROM STREET BUD PLACE TO STREET PRINCE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable within the parking / driving lanes in front of 134-16 36th Avenue. Dimensions: Cut-1 = 7'10" x 7'0' x 3'0" Cut-2= 7'2" x 3'9" x 4'0". Base to follow. |
2021-09-13 | No data | THROOP AVENUE, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw found resurfaced. Conventional bike lane clear. |
2021-09-13 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, re topp |
2021-09-13 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-09-12 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival PLUMBING NYC has restored/repaired permanent water-sewer to grade flush with surrounding areas temporary pavement asphalt in the driving lane in front of property #824 EAST NEW YORK AVENUE in compliance |
2021-09-12 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET |
2021-09-12 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are two 5X5 sidewalk flag that need to be replaced in front of 1466 East 55 Street & permit expired on 9/8/2021 |
2021-09-11 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the parking lane in front of property #485 EAST 28 STREET |
2021-09-11 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #2809 CLARENDON ROAD |
2021-09-11 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk |
2021-09-11 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK in compliance |
2021-09-11 | No data | 50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-09-11 | No data | BARKER AVENUE, FROM STREET ADEE AVENUE TO STREET LESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ifo 3013 has been resurfaced. |
2021-09-11 | No data | EAST 72 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk at 252 E 72 street is restored for plug and cap |
2021-09-11 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #476 MAPLE STREET, valid dot permit on file #B012021253C30 |
2021-09-11 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | white lane markings missing from permanent restoration |
2021-09-11 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY AND NEW SWK FLAG -NP |
2021-09-11 | No data | 18 AVENUE, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced |
2021-09-11 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #476 MAPLE STREET |
2021-09-11 | No data | DEAN STREET, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2021-09-10 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was Rectified. Permanent restoration between the p/l and d/l repaired flush with the surrounding area. |
2021-09-10 | No data | 41 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut on driving lane, partially covered by BPP |
2021-09-10 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking and driving lane, lane marking restored. Steel/fiberglass plate over the sidewalk next to tree pit in line with perm cut. Active permit on file. |
2021-09-10 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in parking and driving lane, lane marking restored. Steel/fiberglass plate over the sidewalk next to tree pit in line with perm cut. Construction fence for new building still up. |
2021-09-10 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active - Plated restoration across the roaway. |
2021-09-10 | No data | 41 ROAD, FROM STREET FRAME PLACE TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation across roadway. Active permit# Q012021233A03 exists for work. |
2021-09-09 | No data | 32 AVENUE, FROM STREET 146 STREET TO STREET 147 PLACE | No data | Street Construction Inspections: Active | Department of Transportation | steel 3 steel plates pinned and ramped |
2021-09-09 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A/T/P/O I observed a temporary cut on the sidewalk that was not permanently restored within the required time of the above DOT permit (expired 2/15/2021). Permit used to ID. |
2021-09-09 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm water cut in the parking lane without a pavement marker. They was notified by C.A.R# 20214580133 AND FAIL TO MAKE THE CORRECTION NEED |
2021-09-09 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW PERMIT-Perm water cut found on roadway in front of 444 Clinton avenue- NOV D01 WAS FOUND IN DEFAULT |
2021-09-08 | No data | 37 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade trench across roadway |
2021-09-08 | No data | 54 STREET, FROM STREET GRAND AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts to grade in the p/d/l sidewalk flags restored around water valve IFO 58-98 54st |
2021-09-08 | No data | 10 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade sewer restoration on parking/driving lane |
2021-09-08 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Solid white lane markings on the roadway has been restored. |
2021-09-08 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued to the respondent for failure to restore the head for the bicycle symbol in the bike lane. They were previously notified to correct this condition via CAR #20216030049 issued on 7/18/2021. |
2021-09-08 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm restoration flush and sealed curb to curb ifo 996 Manhattan Ave- 6 D01 NOV'S ISSUED - IN DEFAULT |
2021-09-07 | No data | BAINBRIDGE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now perm.. |
2021-09-07 | No data | PROSPECT PLACE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 13ft (W): 4ft (D): 9ftTest Results: 98.3%; 98.1%Located in P/L-D/L IFO 825.Arrival: 11:40AMDeparture: 2:35PM |
2021-09-07 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done for new building |
2021-09-06 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the r/w with an active permit |
2021-09-05 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w |
2021-09-04 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2+5 |
2021-09-04 | No data | 52 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 rw cuts ok |
2021-09-04 | No data | 51 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-09-04 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw rw cut OK opp 1342 |
2021-09-03 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 PERMANENT REPAIR WATER RESTORATIONS (LONG & SHORT WATER) & TEMPORARY REAPIR WATER RESTORATION IN SWK AT 6220 5 AVENUE -NP |
2021-09-03 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERMANENT REPAIR WATER RESTORATIONS (LONG & SHORT WATER) & TEMPORARY REAPIR WATER RESTORATION IN SWK AT 6220 5 AVENUE -NP |
2021-09-03 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM WATER CUTS IN THE ROADWAY 1 HAVE A PERM GAS CUT I IT |
2021-09-03 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm trenches in the r/w |
2021-09-02 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved sidewalk ok |
2021-09-02 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | No temp ped walkway at this time |
2021-09-01 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2021-09-01 | No data | EAST 4 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w close to 18 ave |
2021-09-01 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway i9s clear, at the time of inspection |
2021-08-31 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cut in the r/w |
2021-08-31 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk is occupied with fence i/f0 46-39 Union street |
2021-08-31 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Steel plates have been removed from the sidewalk and roadway. |
2021-08-31 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Job to be re-scheduled for a later date. |
2021-08-31 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012019277B62) |
2021-08-31 | No data | 58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced |
2021-08-30 | No data | EAST 3 STREET, FROM STREET AVENUE J TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-08-30 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Active | Department of Transportation | Temp asphalt cut on the sidewalk and adjacent roadway, under sidewalk shed and jersey barriers with fence on top. |
2021-08-29 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration outside of the BPP. |
2021-08-29 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated in Compliance |
2021-08-28 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & TEMP SWK AT BUILDING OPERATION |
2021-08-28 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BUILDERS PAVING COVERIING PLUMBING CUT |
2021-08-28 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer |
2021-08-28 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT OK |
2021-08-27 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Concrete base restoration currently curing in the roadway extending into the parking lane in front of property #1015 A PRESIDENT STREET |
2021-08-26 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w & s/w |
2021-08-26 | No data | SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION RWY & NEW SWK FLAG |
2021-08-26 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 15ft (W): 4ft (D): 9ftTest Result: 98.6%; 98.1%Located in P/L-D/L IFO 1015A.Arrival: 10:30AMDeparture: 2:15PM |
2021-08-26 | No data | AVENUE U, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration ifo 136 ave U needs to be resealed in the parking lane |
2021-08-26 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site plating excavation in the roadway |
2021-08-25 | No data | THROOP AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW FOUND RESURFACED CONVENTIONAL BIKE LANE RESTORED. |
2021-08-25 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk |
2021-08-25 | No data | STEINWAY STREET, FROM STREET 28 AVENUE TO STREET 30 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed/passed: Start: 12:38 End 1350. Cut#1: 4' x 3'6" x 3' Cut#2: 3'2" x 2'10" x 3' |
2021-08-24 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM IN ROADWAY, SIDEWALK I/F/O 1847/1849 CROSS BRONX EXPRESSWAY |
2021-08-24 | No data | EAST 1 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate, pinned and ramped on the sidewalk under shed, with another steel plate, countersunk, in the roadway overlapping parking and turning lane, ifo 118. |
2021-08-23 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file B012021230A27. |
2021-08-23 | No data | LIBERTY AVENUE, FROM STREET BRADFORD STREET TO STREET WYONA STREET | No data | Street Construction Inspections: Active | Department of Transportation | LOOSE AND NOSY STEEL PLATE |
2021-08-23 | No data | 213 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No temp. pedestrian w/way - s/w open at this time. |
2021-08-22 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent has a plated excavation on the roadway. Respondent has failed to make temporary asphalt flush to surrounding roadway. |
2021-08-22 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #476 MAPLE STREET |
2021-08-22 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | -In Parking Lane-Restoration Missing Color Codeplease install missing IBM COLOR CODE MARKER in the permanent water-sewer restoration in the roadway extending into the parking opposite from property#350 - 352 RUTLAND ROAD, in a timely fashion. CAR |
2021-08-22 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THE ASPHALT IS BROKEN/ CRACKED AREA IS STARTING TO SINK . ALSO FILL AND SEAL ALL PINHOLE. YOU COULD RESEAL |
2021-08-22 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation found on the roadway and sidewalk. Valid permit on file |
2021-08-22 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway valid permit on file |
2021-08-21 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water work done in the roadway |
2021-08-21 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #2809 CLARENDON ROAD |
2021-08-21 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #2809 CLARENDON ROAD, valid dot permit on file #B012021232B50 |
2021-08-21 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE BEHIND FENCE |
2021-08-21 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET, valid dot permit on file #B012021224B14 |
2021-08-21 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-08-21 | No data | MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2021-08-21 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut found on roadway in front of 444 Clinton avenue |
2021-08-20 | No data | 54 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of perm trench resurfaced by BPP |
2021-08-20 | No data | 64 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2 +5 |
2021-08-20 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l opp 1571 & plumber cut also resurfaced by BPP |
2021-08-20 | No data | 57 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2021-08-20 | No data | 55 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-08-20 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2021-08-19 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway valid permit on file |
2021-08-19 | No data | POWELL STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by b.p.p |
2021-08-19 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE, TWO NEW FLAGS I/F/O PROPERTY #959. |
2021-08-19 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OFF ECL AT 261 |
2021-08-19 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-08-19 | No data | PROSPECT PLACE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway of the parking lane in front of property #825 PROSPECT PLACE |
2021-08-18 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-08-18 | No data | EAST 3 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 1848 East 3 Street. |
2021-08-18 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY AND 1 SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2021-08-18 | No data | STANHOPE STREET, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AREA FOUND RESUFACED. |
2021-08-18 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012021214B34) |
2021-08-18 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area found resurfaced by NB BPP. |
2021-08-18 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations, in the parking and driving lane, in front of 1919 East 5 Street. |
2021-08-18 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020162B76) |
2021-08-18 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway lane marking need to be restored in front of 1627 |
2021-08-18 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 1926 Ocean Parkway. Cut runs from curb to curb. |
2021-08-18 | No data | EAST 4 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 1813 East 4 Street. Restoration runs from curb to curb. |
2021-08-17 | No data | SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut found in parking lane in front of 16 South Portland avenue |
2021-08-17 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area found resurfaced. |
2021-08-17 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Parking Lane, water relay cut sunken in localized areas...cut in need of re-top ... |
2021-08-17 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file B012021221A49. Temp restoration in the driving lane & sidewalk. Active worksite. |
2021-08-17 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED ACROSS RWY TO NEW BUILDING AT 142 |
2021-08-17 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No temp ped walk in rw currently. |
2021-08-17 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade (curb to curb) |
2021-08-17 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm restoration in p/l |
2021-08-17 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW was resurfaced, water val on SW. |
2021-08-17 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | small patch next to sidewalk flag needs to be restored in front of 119 Webster Ave & permit expired on 8/13/2021 |
2021-08-16 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Hole 1 – 11’10”(L) x 4’1”(W) x 1’5”(D)Hole 2 – 3’11”(L) x 3’10”(W) x 1’5”(D) |
2021-08-16 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2021-08-16 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC crew on site currently performing work/excavating in the roadway of the parking lane in front of property #476 MAPLE STREET in a efficient manner in compliance |
2021-08-16 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... |
2021-08-16 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating on bus lane IFO #6217 & rwy IFO #6220. Foreman brought correct bike lane signs an hour later. Circled around & everything was set up |
2021-08-15 | No data | EAST 5 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pinned and ramped steel plates, in the parking/driving lane, in front of 2015 East 5 Street. New permit on file, #B012021215B38 exp. 9/6/2021. |
2021-08-15 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued to the respondent for failure to permanently restore 2 cuts within the required time. |
2021-08-14 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Recently Resurfaced |
2021-08-14 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Restoration in Compliance |
2021-08-14 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to resurfaced BPP (B012020209A77) |
2021-08-14 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done for new building |
2021-08-14 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY bpp |
2021-08-14 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r.w |
2021-08-14 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CURB TO CURB ACROSS REY - NEW SWK FLAG |
2021-08-14 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET |
2021-08-14 | No data | SHORE PARKWAY, FROM STREET 18 AVENUE TO STREET BAY 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration with a car over the r/w restoration |
2021-08-13 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2021-08-13 | No data | 55 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - Cut 1: L – 12ft 0in W – 4ft 0in D – 9ft 4in Lift One: 98.1% Lift Two: 98.3% Cut 2: L – 5ft 8in W – 4ft 3in D – 4ft 0in One Lift: 98.3% |
2021-08-13 | No data | 61 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l on opp side & BPP covering other half of cut |
2021-08-13 | No data | ST JOHNS PLACE, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench running across roadway in compliance. |
2021-08-13 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-08-13 | No data | EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-08-12 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved 1\2 +5 |
2021-08-12 | No data | GREENPOINT AVENUE, FROM STREET DEAD END TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush and sealed in the roadway |
2021-08-12 | No data | 215 STREET, FROM STREET 40 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade parking lane |
2021-08-12 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plate found in the roadway in compliance. |
2021-08-12 | No data | MAPLE STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #476 MAPLE STREET |
2021-08-12 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1' x1' area of a permanent trench sunk 2 inches in the parking lane and cut needs to be sealed. |
2021-08-12 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts ok rw |
2021-08-12 | No data | BANKER STREET, FROM STREET NORMAN AVENUE TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Open cut in the sidewalk ifo #150 next to tree pit, (dirt surrounding hole). Hole is blocked with conebars, a ladder is sticking out of the hole. Crew on break. |
2021-08-12 | No data | WYTHE AVENUE, FROM STREET BANKER STREET TO STREET NORTH 15 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plumbing Works Subsurface crew on site, digging in 2 holes on opposite sides of the street. Traffic lane is open. Sidewalks are open. |
2021-08-12 | No data | BANKER STREET, FROM STREET NORMAN AVENUE TO STREET NORTH 15 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | L: 3’ 7” W: 3’ 8” D: 2’ 9” |
2021-08-12 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-08-12 | No data | WYTHE AVENUE, FROM STREET BANKER STREET TO STREET NORTH 15 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | #1 L: 4’ W: 3’ D: 3’ 6” #2 L: 4’ W: 3’ 8” D: 3’ 7” |
2021-08-11 | No data | NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer trench on roadway ok. |
2021-08-11 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by DOT on permit # B152019284A80 |
2021-08-11 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation on r/w |
2021-08-11 | No data | 57 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l on opp side & BPP covering half of cut |
2021-08-11 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Segment repaved |
2021-08-11 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w |
2021-08-11 | No data | BERGEN STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No water excavation for residential building, bike lane is clear |
2021-08-10 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved in front of 672 Flushing avenue |
2021-08-10 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2021-08-10 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY PK LANE & DRIVING LANE AT 26 COURT ST |
2021-08-10 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is flush to grade |
2021-08-10 | No data | 53 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-08-09 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on s/w |
2021-08-09 | No data | 83 STREET, FROM STREET 159 AVENUE TO STREET 160 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm trench restored to grade. |
2021-08-09 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking lane IFO active BO. |
2021-08-09 | No data | 14 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut flushed to grade |
2021-08-09 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT1: L. 14'5" x W. 4'0" x D. 4'0"First lift: 98.4% Last lift: 982%CUT2: L. 5'9" x W.4'3" x D3'0"First lift:98.2%W.density:120.6D.density:111.0M. dry density:117.5%A. moisture:8.7%444 Clinton avenue/Blend |
2021-08-09 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates fond on roadway in front of 444 Clinton avenue |
2021-08-09 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration needs to be Sealedplease seal all outer edges of the permanent water restoration with liquid asphalt seal in the roadway of the parking lane in front of building #1089 PRESIDENT STREET, in a timely fashion. CAR issued |
2021-08-09 | No data | 14 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration sunken down 3" in the roadway below surrounding area in front of 4101 14th avenue. Please flush to grade. |
2021-08-09 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in roadway lane sunken down approx 1 inch in front of #3008. |
2021-08-08 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent PLUMBING NYC has restored/repaired the permanent water-sewer to grade flush with surrounding areas in the driving lane in front of property #1024 NEW YORK AVENUE in compliance |
2021-08-08 | No data | GRAND STREET EXTENSION, FROM STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the intersection is flush to grade. |
2021-08-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1950 Amsterdam ave re-seal permanent restoration on roadway |
2021-08-07 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 CUT. 5FT X 3 1/2FT, DOWN 4FT. 98.9% & 98.2% BLEND. WET 117.3 DRY 110.3 MAX 114.0 MOISTURE 6.4% |
2021-08-07 | No data | 18 AVENUE, FROM STREET 64 STREET TO STREET 65 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Domestic Water Service Leak in the Sidewalk. 3 Day DEP Notice Issued. Property Owner on Site |
2021-08-07 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-08-07 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l with a temp cut on s/w with an active permit |
2021-08-07 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE I/F/O PROPERTY #89. |
2021-08-07 | No data | MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2021-08-07 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORED RE-SEAL PROPERLY |
2021-08-07 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway |
2021-08-07 | No data | SOUTH 1 STREET, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-08-06 | No data | EAST 37 STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent with an unsealed restoration in parking lane. Respondent failed to properly seal wearing course. CAR #20215150102 was issued on 6/22/2021. Permit B012021133A89 used for ID. |
2021-08-06 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw cut ok |
2021-08-06 | No data | 91 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water restoration has been resealed and made flush to grade with surrounding roadway. |
2021-08-06 | No data | 35 AVENUE, FROM STREET 108 STREET TO STREET 109 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade trench across roadway. |
2021-08-06 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-08-05 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking lane in compliance. |
2021-08-05 | No data | EAST 4 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, in front of 1813 East 4 Street. Restoration runs from curb to curb. |
2021-08-05 | No data | 84 STREET, FROM STREET 60 AVENUE TO STREET 60 ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water restoration in the parking lane has been resealed at 84-02 60ave |
2021-08-05 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the r/w with an active permit |
2021-08-05 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway IFO active BO. |
2021-08-05 | No data | WEBSTER AVENUE, FROM STREET EAST 3 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 CUT. 3FT, 8 INCHES X 3FT, 7 INCHES, DOWN 2FT, 8 INCHES. BLEND. 98.0 WET 124.5 DRY 114.5 MAX 121.0 MOISTURE 8.7% IFO 119. |
2021-08-04 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OFF ECL AT 261 |
2021-08-04 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, now perm ......water sewer installed .... |
2021-08-04 | No data | 71 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane |
2021-08-04 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok. |
2021-08-04 | No data | MENAHAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP. BPP in compliance |
2021-08-04 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of roadway not in use at this time. |
2021-08-04 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration complete with color code tags. |
2021-08-04 | No data | HANCOCK STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2021-08-04 | No data | BROADWAY, FROM STREET STUYVESANT AVENUE TO STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, sewer relay .... /walk ..ok ..as well |
2021-08-04 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #2809 CLARENDON ROAD |
2021-08-04 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is flush to grade. |
2021-08-03 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration across the roadway d/l and p/l sidewalk in compliance. |
2021-08-03 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file. B012021201C04. |
2021-08-03 | No data | HARMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in PL one opposite property, in compliance |
2021-08-03 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | pass, 9'x5'x9'- 4'x4'5' .....new sewer new sprinkler installed.....new building. s/s of street .... |
2021-08-03 | No data | 70 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway and sidewalk restoration around a gas valve |
2021-08-03 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2021-08-03 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found 2 permanent restorations flushed to grade in the roadway. |
2021-08-03 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush and sealed curb to curb ifo 996 Manhattan Ave |
2021-08-03 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass..perm .... |
2021-08-02 | No data | 37 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no OCCUPANCY OF SIDEWALK |
2021-08-02 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY OPPOSITE PK/DRIVING LANE OFF SCL OFF CONOVER STREET OLD ADDRESS 183 CONOVER STREET- NEW ADDRESS 142 DIKEMAN STREET- AT NEW BUILDING-NP |
2021-08-02 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY OPPOSITE PK/DRIVING LANE OFF SCL OFF CONOVER STREET OLD ADDRESS 183 CONOVER STREET- NEW ADDRESS 142 DIKEMAN STREET- AT NEW BUILDING-NP |
2021-08-02 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY OPPOSITE PK/DRIVING LANE OFF SCL OFF CONOVER STREET OLD ADDRESS 183 CONOVER STREET- NEW ADDRESS 142 DIKEMAN STREET- AT NEW BUILDING-NP |
2021-08-02 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 STEEL PLATE FOUND IN PARKING LANE OPPOSITE 444 CLINTON AVENUE |
2021-08-02 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CTS FOUND ON ROADWAY IN FRONT OF 444 CLINTON AVENUE, 1 STEEL PLATE FOIND IN PARKING LANE OPPOSITE 444 CLINTON AVENUE. NEW PERMIT ON FILE:B012021201B91 |
2021-08-02 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the p/l in compliance long water |
2021-08-02 | No data | 37 AVENUE, FROM STREET 9 STREET TO STREET 10 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated exc opp parking lane |
2021-08-02 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration between d/l and p/l ok |
2021-08-01 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was Resurfaced by Plus 5 BPP |
2021-08-01 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration flushed to grade in the parking/driving lane. |
2021-08-01 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm long water restoration across entire RW IFO HOUSE 960. |
2021-07-31 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED ACROSS RWY & TEMP RESTORATION IN SWK AT BUILDING OPERATION |
2021-07-31 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Recently Resurfaced |
2021-07-31 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED ACROSS RWY & TEMP RESTORATION IN SWK AT BUILDING OPERATION-NP AT 532 |
2021-07-31 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk Flags in Compliance |
2021-07-31 | No data | EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration in Compliance |
2021-07-30 | No data | MERMAID AVENUE, FROM STREET WEST 32 STREET TO STREET WEST 33 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-07-30 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & TEMPORARY RESTORATION IN SWK AT NEW BUILDING-NP |
2021-07-30 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on s/w with an active permit & perm restoration in p/l |
2021-07-30 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-07-30 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk observed i/f/o 46-39 Union Street |
2021-07-30 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION IN RWY & TEMPORARY RESTORATION IN SWK AT NEW BUILDING |
2021-07-29 | No data | 36 ROAD, FROM STREET BUD PLACE TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the sidewalk i/f/o 134-16 36 Road |
2021-07-29 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the sidewalk |
2021-07-29 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2021-07-29 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THERE IS A PERM WATER CUT IN THE PARKING LANE IN FRONT OF 670 THAT IS MISSING A PAVEMENT MARKER |
2021-07-29 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the the parking lane and driving lane |
2021-07-29 | No data | PRINCE STREET, FROM STREET 36 ROAD TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the sidewalk AKA 134-16 36 Road |
2021-07-28 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - PROTECTED |
2021-07-28 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET, valid dot permit on file #B012021193B52 |
2021-07-28 | No data | ALBANY AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway/swk ok. |
2021-07-27 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration’s (3 Cuts) found to be in compliance |
2021-07-27 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut in compliance. |
2021-07-27 | No data | JEFFERSON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, sewer and water install .... |
2021-07-27 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Sewer Restoration across the Roadway in d/l and p/l ok in compliance sidewalk ok. |
2021-07-27 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .... |
2021-07-27 | No data | 5 AVENUE, FROM STREET EAST 128 STREET TO STREET EAST 129 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored back fill it pass at 97.7% compaction. |
2021-07-27 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2021-07-27 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE, TWO NEW FLAGS I/F/O PROPERTY #959. |
2021-07-27 | No data | 162 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cracked edges of perm trench across r/w resealed |
2021-07-27 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut IFO active BO. |
2021-07-26 | No data | PALMETTO STREET, FROM STREET IRVING AVENUE TO STREET RIDGEWOOD PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water-sewer/Plated excavation |
2021-07-26 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | occupancy of roadway in use for installation of water service. |
2021-07-25 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in travel lane IFO house 6220. Shared bike lane clear. |
2021-07-24 | No data | BRONXWOOD AVENUE, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done |
2021-07-24 | No data | MOORE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade |
2021-07-24 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2021-07-23 | No data | EAST 9 STREET, FROM STREET AVENUE I TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT SEWER RESTORATION BT D/L AND P/L PARTIALLY COVERED BY JERSEY BARRIER IN FRONT OF BUILDING OPERATION |
2021-07-23 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration in compliance. |
2021-07-23 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10ft x 4ft cut in the driving lane I/F/O property #156. Work done on the sidewalk. |
2021-07-23 | No data | 61 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okrw |
2021-07-23 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance. |
2021-07-22 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-07-22 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway parking lane. |
2021-07-22 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced |
2021-07-22 | No data | 213 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - steel plated p/l - parked truck on top at this time,active BO. |
2021-07-22 | No data | 58 STREET, FROM STREET 16 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved |
2021-07-22 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in he roadway |
2021-07-22 | No data | 213 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No pedestrian w/way on r/w at this time. |
2021-07-20 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest Accepted. Active permit number B012021182B54 expires on 8/3/2021. |
2021-07-20 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | multiple perm water cuts found on roadway in front of 446 Clinton avenue |
2021-07-20 | No data | MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER/ PLATED EXCAVATION ON ROADWAY |
2021-07-20 | No data | JACKSON AVENUE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no TEMPORARY PEDESTRIAN WALK necessary not onsite |
2021-07-20 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair water/perm restoration on roadway |
2021-07-19 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Wearing course breaking away. Inadequate wearing Course Depthplease restore/repair permanent water-sewer to grade flush with surrounding areas sunken down 1 1/2” in the driving lane in front of property #824 EAST NEW YORK AVENUE. CAR issued |
2021-07-19 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane I/F/O property # 1064. |
2021-07-19 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2021-07-18 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A portion (head) of the bike lane figure in the roadway is missing and needs to be restored over the water cut. Also the plaza's double white lane marking as well as the beige coating needs to be restored in the corner of the restoration... I/F/O 734 |
2021-07-18 | No data | EAST 5 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plate, in the parking lane, opposite 2015 East 5 Street. The permit expired but I did research on NYC Streets and a new permit was submitted for this location. |
2021-07-18 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2021-07-18 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway |
2021-07-18 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bike lane marking requested has been has been restored, New CAR to be issued, I/F/O 734... (CAR re-inspection Pass) |
2021-07-17 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal cut |
2021-07-17 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw found resurfaced |
2021-07-17 | No data | BUSHWICK AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane, two new flags around water valve. |
2021-07-17 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE I/F/O PROPERTY #1285. NEW FLAG AROUND WATER VALVE. |
2021-07-17 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | multiple perm cuts on r/w |
2021-07-16 | No data | MIDDLETOWN ROAD, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration has been resurfaced. |
2021-07-16 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 344 WILLOUGHBY AVENUE |
2021-07-16 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration - new plumber cut found at location with a valid permit B012021190A95 expiration date 7/28/2021 |
2021-07-16 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 271 SKILLMAN STREET |
2021-07-16 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4' by 4' backfill |
2021-07-16 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent roadway restorations long water cuts. |
2021-07-16 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance. |
2021-07-15 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane opposite from property #2809 CLARENDON ROAD |
2021-07-15 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway in front of 37 Irving plac |
2021-07-15 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2021-07-15 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced by BPP |
2021-07-15 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 151 Quincy street |
2021-07-15 | No data | QUINCY STREET, FROM STREET CLASSON AVENUE TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane |
2021-07-15 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found on the roadway valid permit on file |
2021-07-15 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced by BPP |
2021-07-15 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | occupancy of sidewalk in use. |
2021-07-14 | No data | KATONAH AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2021-07-14 | No data | 47 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench along the r/w |
2021-07-14 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE NEW PERM RESTORATION IN ECL AT 261 HENRY STREET |
2021-07-14 | No data | JACKSON AVENUE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration in the roadway from curb to traffic lane, which crosses the temporary pedestrian path and bike lane protected by jersey barriers. |
2021-07-14 | No data | BLEECKER STREET, FROM STREET 60 PLACE TO STREET 61 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed :( Start Time 10:05 End 11:35) Cut#1 Size: 5'6" x 3'9" x 2'6" Cut#2 Size: 4'5" x 2'7" x 2'6"( cuts 5'10" apart) |
2021-07-14 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w opp. address |
2021-07-13 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near 12 driving lane, cobblestones restored and by Harris. Water cobblestone restoration remain acceptable at this time. |
2021-07-13 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on s/w with an active NB on file & perm trench along the r/w i/f/o 1544 |
2021-07-13 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Multiple counter-sunken steel plates along the segment under heavy trucks and cars at time of inspection. There is one rain garden along the segment ifo 42-33, that is not affected by any active work at this time. |
2021-07-13 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 385 classon avenue |
2021-07-12 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET |
2021-07-12 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with plated excavation IFO BUILDING OPS SITE, closer to Joralemon street. Crew not working today due to parked car on top of their plate. Spoke to crew & informed them about their bike lane signs & set up, pass for today |
2021-07-12 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the parking lane & sidewalk |
2021-07-12 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No excavation to property for sewer. Conventional bike lane is clear & running |
2021-07-12 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was rectified Permanent Restoration in the parking lane has been resealed. opposite 1127 East 17 Street. |
2021-07-12 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been sealed in compliance. |
2021-07-12 | No data | 14 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Asphalt has been added bring cut back to grade. |
2021-07-12 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-15’ 3”Width of the cut-4’ 1”Depth of the cut-8’W.D-118.2D.D-109.2M.D.D-117.5A.M-7.5%1st lift-97.7%last lift-97.1% |
2021-07-11 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in p/l i/f/o 1539 & i/f/o 1542 was paved by BPP |
2021-07-11 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass,,sewer relay .. installed ..... |
2021-07-11 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water-sewer restorations flush to grade in the roadway extending into the parking lane opposite from property #894, 890 & 900 NEW YORK AVENUE in compliance |
2021-07-10 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Fail to seal excavation. |
2021-07-10 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-07-10 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found the respondent has failed to restore the white lane marking on a permanent water repair in the roadway. The respondent was previously notified to correct the condition via CAR #20216390287 issued on 5/6/2021 |
2021-07-09 | No data | BARKER AVENUE, FROM STREET ADEE AVENUE TO STREET LESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut plated in the parking lane |
2021-07-09 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file. B012021159B59. |
2021-07-09 | No data | CLARENDON ROAD, FROM STREET EAST 28 STREET TO STREET EAST 29 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No excavation for water/sewer for new building ops, both conventional bike lanes are up & running |
2021-07-08 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush and sealed in the roadway nearly curb to curb. |
2021-07-08 | No data | MURRAY STREET, FROM STREET 17 ROAD TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w |
2021-07-08 | No data | FLUSHING AVENUE, FROM STREET CLASSON AVENUE TO STREET TAAFFE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 345 flushing avenue |
2021-07-08 | No data | GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-07-07 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1:L.5'4"W.3'4"D3'0"Cut 2:L.11'8"W.4'6"D.4'0"W. density124.8D. density:114.8M. dry density:121.0Actual moisture:8.7%Cut 1:98.3%Cut 2:First lift :98.3%Second cut:First lift: 98.3%Last lift: 98.5% |
2021-07-07 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cuts covered with steel plates while concrete is curing |
2021-07-07 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2021-07-07 | No data | 72 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New B/O 1/2+5 pavement covers all previous cuts at this time. |
2021-07-07 | No data | BROADWAY, FROM STREET STUYVESANT AVENUE TO STREET VERNON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored ... |
2021-07-06 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - active BO. |
2021-07-06 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-07-06 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water acceptable |
2021-07-06 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced due to BPP |
2021-07-05 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET |
2021-07-05 | No data | FENIMORE STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 steel plate street opening's ramped & pinned/counter sunken in the roadway of the parking lane in front of property #406-412 FENIMORE STREET, valid dot permit on file #B012021173A88 |
2021-07-05 | No data | HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway and on the sidewalk is in compliance. |
2021-07-05 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway from curb to curb is flush to grade. |
2021-07-05 | No data | 53 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in p/l |
2021-07-05 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench in the r/w |
2021-07-05 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2021-07-05 | No data | SOUTH 2 STREET, FROM STREET HOOPER STREET TO STREET KEAP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade IFO #382 Keap st |
2021-07-04 | No data | 33 AVENUE, FROM STREET 156 STREET TO STREET 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012021035C43 on file. |
2021-07-04 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway curb to curb is flush to grade. |
2021-07-04 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm trench in the r/w |
2021-07-04 | No data | 18 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-07-04 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | -Wearing course breaking away. Inadequate wearing Course Depth-Restoration Sunkenplease restore/repair permanent water-sewer to grade flush with surrounding areas sunken down 2” in the driving lane in front of property #1024 NEW YORK AVENUE. CAR |
2021-07-03 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-07-03 | No data | 192 STREET, FROM STREET 44 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving lane at 44-15 192st |
2021-07-02 | No data | MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... sidewalk restored/street as well ... |
2021-07-02 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut on swk IFO PROPERTY. Has green industry code 53 mark outs. Right next to gas valve. No obstruction to shared bike lane |
2021-07-02 | No data | 5 AVENUE, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-13’ 1”Width of the cut-4’ 3”Depth of the cut-9’ 5”W.D-121.8D.D-112.1M.D.D-118A.M-8.7%1st lift-98%last lift-98.3% |
2021-07-01 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration acceptable |
2021-07-01 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY. IFO 615. SIDEWALK FLAG. |
2021-07-01 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in font of 344 willoughby avenue |
2021-07-01 | No data | DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-06-30 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber (sewer) restoration - in compliance |
2021-06-30 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC INC failed to obtain a confirmation number prior to the expiration date of the DOT permit on a protected street. Nov issued |
2021-06-30 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I Observed Respondent failed to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street. permit expired 6/26/2021 |
2021-06-30 | No data | 60 AVENUE, FROM STREET 84 PLACE TO STREET 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Broken seal around permanent trench across roadway, in front of 84-02 edges need to be reseal. |
2021-06-30 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Not Being Occupied At Time Of Inspection |
2021-06-29 | No data | HERKIMER STREET, FROM STREET GUNTHER PLACE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 STEEL PLATED EXCAVATIONS IN THE PARKING LANE WITHOUT A PERMIT |
2021-06-29 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration opposite by the Dumpster area |
2021-06-29 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp done i/f/o 455 building completed |
2021-06-29 | No data | 84 STREET, FROM STREET 60 AVENUE TO STREET 60 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges cracked on permanent water cut , side of 84-02 60th Avenue |
2021-06-28 | No data | 60 AVENUE, FROM STREET 84 PLACE TO STREET 84 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work visible, roadway resurfaced. |
2021-06-27 | No data | EAST 71 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Valve installed in sidewalk. Sidewalk flag restored. |
2021-06-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | within a barricade area Cobblestones appear to be restored in kind. |
2021-06-27 | No data | BEDFORD AVENUE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 2329 bedford avenue |
2021-06-27 | No data | 91 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Permanent restoration, in the parking lane, is sunken down 2.5 inches.- Restoration needs to be resealed.In front of 223 91 Street between 3 Avenue and Ridge Boulevard. |
2021-06-27 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY |
2021-06-25 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway under construction by a DDC contractor |
2021-06-25 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench in compliance |
2021-06-25 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Per cut in the RW flushed to grade |
2021-06-25 | No data | WILSON AVENUE, FROM STREET COVERT STREET TO STREET SCHAEFER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance. |
2021-06-25 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is flush to grade. |
2021-06-25 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active B.O. |
2021-06-24 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-06-24 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area found resurface by BPP B012021003A04. |
2021-06-24 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2021-06-24 | No data | MORRIS AVENUE, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-06-24 | No data | BROADWAY, FROM STREET STUYVESANT AVENUE TO STREET VERNON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not visible |
2021-06-24 | No data | OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #2537 OCEAN AVENUE in compliance |
2021-06-24 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully locate/inspect restoration at Barricaded area within a Active BO at specific Location given, on cobblestone roadway |
2021-06-24 | No data | 50 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass. Start: 10:02AM End: 11:30AM#1 L: 6FT. W: 3FT. 4IN. D: 4FT. 8IN. (98.7% & 97.6%)#2 L: 6FT. W: 4FT. 0IN. D: 4FT. 0IN. (96.8% & 96.9%)#3 L: 3FT. 6IN. W: 3FT. 3IN. D: 4FT. 0IN. (96.0% & 96.6%)Long water cuts, IFO 1224 50 Street. |
2021-06-24 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cuts found on roadway |
2021-06-23 | No data | ST JOHNS PLACE, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut1 L16’0 W4’0 D 5’0Compaction 97.7 95.6Cut 2L6’0 W 4’0 D 6’0Compaction 96.7 97.4Pass monitored 11:08-1:45 |
2021-06-23 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 1561 bedford avenue |
2021-06-23 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully locate/inspect restoration at Barricaded area within a Active BO at specific Location given on cobblestone roadway |
2021-06-23 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 1551 bedford avenue |
2021-06-23 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OBSERVED WATER HARDWARE ON SIDEWALK. |
2021-06-22 | No data | EAST 37 STREET, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts (wearing course) in the parking lane and driving lane mssing sealer , seal roadway cuts |
2021-06-22 | No data | AVENUE U, FROM STREET EAST 70 STREET TO STREET EAST 71 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway parking lane sealed and flush. |
2021-06-22 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area found resurfaced due to NB BPP. |
2021-06-21 | No data | LINDEN BOULEVARD, FROM STREET CATON AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 5 linden blvd |
2021-06-21 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk in front of 171linden blvd |
2021-06-21 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration by the Dumpster Area gate |
2021-06-20 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance. |
2021-06-20 | No data | COLLEGE POINT BOULEVARD, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work by permittee visible. Large part of roadway covered by temp. sewer trench as part of Major sewer/reconstruction work being done by EIC Associates. New sidewalk installed at location. |
2021-06-20 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2021-06-20 | No data | OVINGTON AVENUE, FROM STREET 7 AVENUE TO STREET STEWART AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the driving lane, in front of 643 Ovington Avenue (opposite 642 Ovington Avenue). |
2021-06-19 | No data | OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #2537 OCEAN AVENUE in compliance |
2021-06-19 | No data | 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-06-19 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-06-18 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2021-06-18 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane |
2021-06-18 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut resurfaced by newer restoration. |
2021-06-18 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | WD - 123.3 | DD - 112.2 | MD - 117.5 | AM - 9.9Size – Hole 1 – 10’5”(L) x 4’1”(W) x 9’2”(D)Compaction Hole 1 – Test 1 - 97.6% Test 2 - 98.1% |
2021-06-17 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water sewer cut in the roadway |
2021-06-17 | No data | EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | strip paved DEP contract |
2021-06-17 | No data | WEST 90 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut has been partially resurfaced by a Con Edison restoration Located I/F/O 50. Sidewalk flag surrounding water valve cover fully replaced and remains in acceptable condition. |
2021-06-17 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent roadway restoration in the parking lane 85 feet from Ave T. |
2021-06-17 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in d/l ok |
2021-06-16 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O on site unable to locate cut inside fence area. |
2021-06-16 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut paved over due to BPP |
2021-06-16 | No data | ST JOHNS PLACE, FROM STREET HAMPTON PLACE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee has bike lane obstructed with compressor and backhoe; failed to comply with BIKE MPT GUIDELINES: BIKE01. |
2021-06-16 | No data | WOODHULL STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Restoration paved over by BPP |
2021-06-16 | No data | HEWES STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in compliance. |
2021-06-16 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active job site in front of 207. Can’t see what work has or hasn’t been done. Permit expired on 12/7/2020. |
2021-06-16 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration cut in the parking lane leading into the travel lane around the corner of 424. Across the street from 1 west 39th street. |
2021-06-16 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A- 9:30amc1-5'x4'x2'6'' test-98.5%c2-9'x4'x9' test-98.1% & 98.1%valentinejjETLfatimas.cblendw-124.5d-114.5md-121.5am-8.7%backfill passes - cut backs in progress |
2021-06-16 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | ATPO I observer the above respondent with a temporary restoration on the sidewalk in front of house 1163. Respondent has been ID by cited permit exp: 2/15/21 and hardware found in the restoration. |
2021-06-16 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2021-06-15 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass.. now perm |
2021-06-15 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reseal permanent restoration in front of property #98. |
2021-06-15 | No data | 160 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of permanent cut to grade, missing some seal. Remainder of cut overlapped by BPP. |
2021-06-15 | No data | 3 AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-06-15 | No data | LINWOOD STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening ramped & pinned in the roadway extending into the parking lane in front of property #377 LINWOOD STREET AKA #720 LIBERTY AVENUE |
2021-06-15 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane/swk ok. |
2021-06-15 | No data | EAST 4 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2021-06-15 | No data | 83 STREET, FROM STREET 159 AVENUE TO STREET 160 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 4'x4' area of permanent trench sunken 2" |
2021-06-15 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on s/w |
2021-06-14 | No data | KENT STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | DEBRIS HAS BEEN REMOVED. |
2021-06-14 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced. |
2021-06-14 | No data | RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking lane in compliance. |
2021-06-14 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - BACKFILL COMPLETE ON 2 EXCAVATIONS (11' 8'' X 3' 11'' X 4' 9'' & 6' 4'' X 4' 4'' X 2' 7'') IN THE ROADWAY |
2021-06-14 | No data | DEAN STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the parking lane in front of 1245. |
2021-06-14 | No data | 53 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored backfill from 115pm to 145pm one restoration in the parking lane length 4ft width 4ft depth 4ft 8inches. |
2021-06-14 | No data | BAYARD STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE I/F/O NEW BUILDING 150. |
2021-06-14 | No data | PENN STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across roadway in compliance. |
2021-06-14 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE- NO WORK STARTED AT BUILDING OPERATION-NP |
2021-06-14 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE- NO WORK STARTED AT BUILDING OPERATION-NP |
2021-06-13 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cuts on r/w |
2021-06-13 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in p/l. |
2021-06-12 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | PLATE IS IN THE ROADWAY. |
2021-06-12 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration flush to grade in the roadway of the parking lane in front of building #2140 KNAPP STREET & 2 sidewalk flags installed in compliance |
2021-06-12 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the driving lane in front of building #2165 BRIGHAM STREET & 4 sidewalk flags installed in compliance |
2021-06-12 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN FRONT 3506 IN THE DRIVING LANE. |
2021-06-12 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Raise plow sign has been removed I/F/O property #178. |
2021-06-12 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 sidewalk flags installed in front of building #3105 AVENUE V in compliance |
2021-06-12 | No data | DE GRAW STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush and sealed in the roadway, sidewalk flag flush and sealed |
2021-06-11 | No data | CLASSON AVENUE, FROM STREET FLUSHING AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Massive construction being done for new building unable to see restoration. |
2021-06-11 | No data | BROADWAY, FROM STREET STUYVESANT AVENUE TO STREET VERNON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2021-06-11 | No data | HEWES STREET, FROM STREET BQE EB EN WILLIAMSBURG STREET E TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced |
2021-06-11 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit plates over cut |
2021-06-10 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified: At this time permitte is on site working within permit stipulation. Crew excavating on parking lane,. crew maintaining 1 11' lane. Debris on parking lane to be removed at end of work day. |
2021-06-10 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in p/l & color code missing in p/l i/f/o 763 & temp cut in p/l i//f/o 761 & s/w active permit on file |
2021-06-10 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-06-10 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the RW leading into new building, in compliance |
2021-06-10 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WD - 124.8 | DD - 114.8 | MD - 119.5 | AM - 8.7Size – Hole 1 – 12’2”(L) x 4’10”(W) x 9’4”(D)Compaction Hole 1 – Test 1 - 96.0% Test 2 - 96.3% |
2021-06-10 | No data | EAST 16 STREET, FROM STREET DITMAS AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the parking lane |
2021-06-09 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2021-06-09 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER VALVE FOUND ON SIDEWALK |
2021-06-09 | No data | BAY 11 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2021-06-09 | No data | JACKSON AVENUE, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No water cut on block segment. Conventional bike lane is free from obstruction |
2021-06-09 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN OPEN EXCAVATION IN THE PARKING LANE |
2021-06-09 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer work being completed over previous work. |
2021-06-09 | No data | 16 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-06-09 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PEERM WATER CUT FOUND ON ROADWAY |
2021-06-09 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done new building |
2021-06-09 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee is maintaining 1 steel plate in the roadway pinned and ramped, also inside active B.O fence area 2 plates secure in between the materials. |
2021-06-09 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to updated permit on file.M012021119A43 |
2021-06-09 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in the driving lane ok |
2021-06-09 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l & p/l. |
2021-06-08 | No data | CARROLL STREET, FROM STREET FORD STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE IN FRONT OF BUILDING OPERATION |
2021-06-08 | No data | PRESIDENT STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restoration flush and sealed in the roadway, one flag flush |
2021-06-08 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1: 6'2x5'6x6''0Cut 2: 11'2x4'3x10'0WD 120.3DD 111.9MD 119.0AM 7.5Compaction Cut 1: 97.8/97.5Cut 2: 97.0x96.5 |
2021-06-08 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the p/l ok sidewalk |
2021-06-08 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | `new sidewalk flags installed |
2021-06-08 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to construction activity |
2021-06-07 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & 19 perm trench in the r/w |
2021-06-07 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & TEMP SWK AT BUILDING OPERATION |
2021-06-07 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE OPPOSITE HOUSE # 151. |
2021-06-07 | No data | 5 AVENUE, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2021-06-07 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed |
2021-06-07 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw sw cut ok |
2021-06-07 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer restoration across the roadway in the d/l and p/l ok. |
2021-06-06 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass.... water sewer relay ... |
2021-06-06 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flag along with perm cut okay |
2021-06-06 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2021-06-06 | No data | 162 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One trench across the roadway having 50%+ edge cracking at this time needs to be resealed. (Ifo. 33-45) |
2021-06-06 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Roadway excavation plated |
2021-06-06 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway excavation with a newer active permit on file. |
2021-06-05 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on Coolidge ,roadway paved by BBP . |
2021-06-05 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONSTRUCTION SIGNS WERE REMOVED |
2021-06-05 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 113 west 24 Street Backfill completed awaiting concrete base L 17' W 8'6 D 5'6 in the parking / driving lane. |
2021-06-05 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PASS |
2021-06-04 | No data | HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed Cut1: L14ft1inxW4ft1inxD6ft2in 1st Lift-96.6% 2nd Lift-97.2%Cut2: L4ft6inxW3ft6inxD3ft1in 1st Lift -96.3% |
2021-06-04 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass start time= 11:20, end time= 1:00. Cut dimensions=(1) 13' x 4' down 5', (2) 4' x 3'6'' down3' |
2021-06-04 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file. B012020273A84. |
2021-06-04 | No data | 14 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Complaint | Department of Transportation | perm cut down2in at the curb |
2021-06-03 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020220A88-latest permit |
2021-06-03 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN THE ROADWAY {LONG WATER} AND 2 SIDE WALK FLAGS INSTALLED |
2021-06-03 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2021-06-03 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE IFO NEW BO. ON EVEN NUMBERED SIDE. |
2021-06-03 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY PART OF CUT WAS RESURFACED BY BPP |
2021-06-03 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2021-06-03 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration that is flushed to grade in the turning lane. |
2021-06-03 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started. |
2021-06-03 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO INSPECT LOCATION. TRUCKS DOUBLE PARKED. |
2021-06-03 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE OPPOSITE #249 |
2021-06-02 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate street opening ramped & pinned in the roadway extending into the parking lane opposite from building #802 HOWARD AVENUE, valid dot permit on file #B012021137B63 |
2021-06-02 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts to grade in the roadway. |
2021-06-02 | No data | 218 STREET, FROM STREET 134 ROAD TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RESTORATION ROADWAY |
2021-06-02 | No data | 67 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts. |
2021-06-02 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on s/w & active permit on file & perm restoration in p/l |
2021-06-01 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in the p/l ok. |
2021-06-01 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLate in the roadway, permit expired. Newer permit on file. B012021147B40. |
2021-06-01 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-9:40amc-4'x3'5''x4' test-97.1c2-10'8''x4'x9' test-96.4% & 96.8%valentinej.jETLjasons.cc.fw-119.4d-111md-113.5am-7.5%passes |
2021-06-01 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb installed in front of 2157/2159. |
2021-05-31 | No data | KOSCIUSKO STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2021-05-30 | No data | BAY COURT, FROM STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection |
2021-05-30 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-05-29 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-05-29 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway & s/w open to the public |
2021-05-29 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway on site |
2021-05-29 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-05-29 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2021-05-29 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-05-29 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in P/L and temp cut on sidewalk IFO 6220. B/L clear. |
2021-05-29 | No data | EAST 54 STREET, FROM STREET AVENUE D TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | SW open for pedestrian walkway |
2021-05-28 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway needs to be seal. |
2021-05-28 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work crew on site |
2021-05-28 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in bus stop/driving lane. Shoulder lane markings restored at corner of Metropolitan Ave. |
2021-05-28 | No data | POWERS STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012021137B69 active permit work crew on site |
2021-05-28 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2021-05-28 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking is flush to grade |
2021-05-28 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration across the roadway d/l and p/l ok . temporary gas trench by brooklyn union gas is partially covering restoration in p/l. |
2021-05-28 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Roadway in Compliance |
2021-05-27 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-05-27 | No data | WEST 17 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced |
2021-05-27 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walk observed i/f/o 137-15 Mulberry Avenue |
2021-05-27 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-05-27 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2021-05-27 | No data | AVENUE K, FROM STREET EAST 23 STREET TO STREET EAST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2021-05-27 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-05-26 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent asphalt restoration in roadway, Restoration needs to be re-sealed |
2021-05-26 | No data | HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED PK LANE & DRIVING LANE |
2021-05-26 | No data | PITKIN AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm..opening made on Herzl street side of block |
2021-05-26 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2021-05-26 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three sidewalk flags flush and sealed |
2021-05-26 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane and on the sidewalk is in compliance. |
2021-05-26 | No data | NEW YORK AVENUE, FROM STREET CARROLL STREET TO STREET CROWN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area found resurfaced by BBP. |
2021-05-26 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, excavation remains plated ....east side of street ... |
2021-05-26 | No data | ELTON AVENUE, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-05-25 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO I observer the above respondent with a temporary restoration on the sidewalk in front of house 1163. Respondent has been ID by cited permit exp: 2/15/21 and color code marker. |
2021-05-25 | No data | 68 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut resurfaced by BPP. |
2021-05-25 | No data | DEVOE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. in p/l |
2021-05-25 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2021-05-25 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane in compliance. |
2021-05-24 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2021-05-24 | No data | ST MARKS AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-05-24 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-05-24 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2021-05-24 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2021-05-24 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-11:22amc1-9'x4'x9'8'' test-97.2% & 96.8%c2-4'x4'x3'6'' test-96.4%valentinej.jETLandrews.cC.Fw-123.3d-117.1md-119am-5.3%cut backs in progress |
2021-05-24 | No data | KENT STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across the roadway in front of property #26. |
2021-05-23 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY PARTIALLY COVERED BY BPP |
2021-05-23 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water cut has been restored and partially overlapped by a recent curb installation trench... (CAR re-inspection pass) |
2021-05-23 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Roadway excavation plated in the driving lane |
2021-05-23 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, cut perm .....water relay... |
2021-05-23 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | last inspection was suppose to saypartial plated and partial temp cut on roadway |
2021-05-23 | No data | 50 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w |
2021-05-23 | No data | 32 AVENUE, FROM STREET 146 STREET TO STREET 147 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent to grade cuts in the parking lane. (opposite side of a B/O. at 146-40) |
2021-05-22 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & cut resurfaced by BPP i/f/o 1333 |
2021-05-22 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | refer to active permit Q012021119A86 |
2021-05-22 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on r/w in compliance |
2021-05-22 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm work on r/w |
2021-05-22 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane and on the sidewalk is in compliance |
2021-05-22 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file- multiple plated excavations on r/w |
2021-05-22 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | multiple plated excavations on the roadway |
2021-05-22 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-05-22 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced by BPP |
2021-05-21 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Counter sunken plated excavation opposite 101-21 in the roadway at time of inspection. Valid permit on file. |
2021-05-21 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plea over cut new permit B012021127B41 |
2021-05-21 | No data | 92 STREET, FROM STREET 101 AVENUE TO STREET 103 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Counter sunken plated excavation opposite 101-21 in the roadway at time of inspection. Valid permit on file (Q012021131C15). There are two rain gardens opposite 101-47 & ifo 101-26, that is not affected by any work. |
2021-05-21 | No data | 68 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut resurfaced by BPP. |
2021-05-21 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Spaced lane markings restored in kind. |
2021-05-21 | No data | 21 STREET, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Current new building just constructed on corner. Crew on site milling road/BPP. Unable to see water excavation. Bike lane up & running |
2021-05-21 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Repair sewer IFO house #317a has a permanent restoration in parking / travel lane and two sidewalk flags restored. |
2021-05-20 | No data | 1 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-05-20 | No data | 61 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2021-05-20 | No data | MIDDLETOWN ROAD, FROM STREET CROSBY AVENUE TO STREET HOLLYWOOD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the life of the guarantee period. In accordance with the section 34RCNY2-11(e) (12) (viii) |
2021-05-20 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-05-20 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush and sealed in the roadway, sidewalk flags flush and sealed. |
2021-05-19 | No data | FRANKLIN AVENUE, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade partially overlapped by Con Edison cut. |
2021-05-19 | No data | WOODHULL STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Temp restoration |
2021-05-19 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer restorations flush to grade in the roadway of the driving lane/extending into the parking lane in front of property #1780 SHEEPSHEAD BAY ROAD in compliance |
2021-05-19 | No data | STEWART AVENUE, FROM STREET MEADOW STREET TO STREET STAGG STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no TEMPORARY PEDESTRIAN WALK - exp |
2021-05-19 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION ON THE SIDEWALK OVERDUE FOR FINAL. SIDE OF 996 MANHATTAN AV. |
2021-05-19 | No data | 52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Condition was rectified temporary sidewalk cut was restored in kind. made permanent |
2021-05-19 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l. |
2021-05-18 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut on sidewalk in front of 6220 5th Ave. 6ft by 3ft. Also in roadway on the shared lane 8 ft by 5 ft. Permit still active |
2021-05-18 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has responded to this request, signs removed from site in compliance |
2021-05-18 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-05-18 | No data | BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - active BO. |
2021-05-18 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | PASS CAR ISSUED |
2021-05-18 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL JOINT EDGES OF PERMANENT RESTORATION IN ROADWAY- OPPOSITE 199 MONTROSE AVENUE HUMBOLDT STREET & BUSHWICK AVENUE. |
2021-05-18 | No data | EAST 11 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Raise plow sign has been removed |
2021-05-18 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Repair water IFO house #344 permanent restoration in travel lane. Bike lane clear. |
2021-05-17 | No data | BROWN PLACE, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BRUCKNER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2021-05-17 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was rectified. Raise plow sign has been removed from street light |
2021-05-17 | No data | 52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was rectified. Permanent restoration in the parking lane has been resealed. |
2021-05-17 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition was rectified raise plow sign has been removed |
2021-05-17 | No data | FLATBUSH AVENUE EXTENSION, FROM STREET CHAPEL STREET TO STREET CONCORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2021-05-16 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent failed to permanently restore cut within required time on the sidewalk, in front of 30 Vernon st. Permit #B012021102A11 expired on 4/17/2021. ID by permit # on file. |
2021-05-16 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance. |
2021-05-16 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway and on the sidewalk is in compliance |
2021-05-15 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2021-05-15 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection |
2021-05-15 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restoration flush and sealed in the roadway |
2021-05-15 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | respondent has 60' (combined) of the roadway occupied with debris while site was unattended. respondent violated stipulation#020 which allows them 25' linear feet to be occupied while site is unattended for debris/fill. permit# used to I.D |
2021-05-15 | No data | EAST 31 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION HAS BEEN SEALED. |
2021-05-14 | No data | WEST 54 STREET, FROM STREET 8 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Final restoration with paint and color code is complete. |
2021-05-14 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP paving work done at the time of inspection. |
2021-05-14 | No data | MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Jose, Jumping Jack, Blend, CUTS 5' x 4' depth 3' & 4' x 3' depth 3' Lab. Exclusive Testing, Troy, Sand Cone,(W)116.1(D)109.1 (MD)113.0 (AM)6.4 Test 98.5 & 96.2 / 2 cuts in the roadway Back fill accepted . |
2021-05-14 | No data | 165 STREET, FROM STREET 43 AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Compliant verified, Several steel plates countersink in the driving lane with barricades taped in the parking lane. |
2021-05-14 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-05-14 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w in compliance |
2021-05-12 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved by builder sidewalk new |
2021-05-12 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | WD - 128.1 | DD117.9 | MD120.5 | AM - 8.7Size – Hole 1 – 12’4”(L) x 4’5”(W) x 9’1”(D) Hole 2 – 8’6”(L) x 4’3”(W) x 2’2”(D)Compaction Hole 1 – Test 1 - 95.2% Test 2 – 96.0Hole 2 – 97.5% |
2021-05-12 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, water' cut remains plated .... |
2021-05-12 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on 48ave BTWN 210st 211st multiple perm cuts to grade partially cover by builder's pave |
2021-05-12 | No data | CHARLES STREET, FROM STREET BLEECKER STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Roadway resurfaced. |
2021-05-11 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file. B012021110B40. |
2021-05-11 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2021-05-11 | No data | 19 AVENUE, FROM STREET 74 STREET TO STREET BAY RIDGE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in parking lane. |
2021-05-11 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bike lane marker has been replaced on top of perm restoration. |
2021-05-11 | No data | 64 AVENUE, FROM STREET 220 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved by builder sidewalk new |
2021-05-11 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2021-05-11 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-05-10 | No data | JAVA STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS THE ROADWAY, TWO NEW FLAGS AROUND WATER VALVE I/F/O HOUSE #189. |
2021-05-10 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER / WATER CUT IN THE ROADWAY |
2021-05-10 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp sidewalk is in front of active Building operation. Not overdue as per HIQA policy. |
2021-05-10 | No data | HERZL STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, short water install.... crew on location .... |
2021-05-10 | No data | 131 STREET, FROM STREET FOWLER PATH TO STREET AVERY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut to grade |
2021-05-10 | No data | AVERY AVENUE, FROM STREET 131 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench across roadway |
2021-05-09 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced in front of 217 Pearl Street on Platt Street by the BPP restoration. |
2021-05-09 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced by the BPP restoration. |
2021-05-09 | No data | 162 STREET, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012020311E33 on file. |
2021-05-09 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-05-09 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY |
2021-05-09 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Segment repaved |
2021-05-08 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced by dot |
2021-05-08 | No data | KATONAH AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire wearing course needs to do over that has asphalt broken up and out in various areas, also street joints needs to be resealed. |
2021-05-08 | No data | HUNTER STREET, FROM STREET 28 STREET TO STREET QNSBORO BR UP RY APR | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At 42-62 Hunter St previous building was demolished and is now an active B.O. site permit Q00377241-11-FN. Sidewalk flag was restored but expansion joints was not sealed for work that was done by company named ( Plumbing NYC Inc |
2021-05-08 | No data | THROOP AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway and on the sidewalk is in compliance |
2021-05-08 | No data | KOSCIUSKO STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2021-05-08 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the parking lane/driving lane with sidewalk flag restored. |
2021-05-08 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK OBSERVED. |
2021-05-07 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK |
2021-05-07 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration resurfaced by roadway paving. |
2021-05-07 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY |
2021-05-07 | No data | 41 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk in use at this time. |
2021-05-06 | No data | 172 STREET, FROM STREET 82 AVENUE TO STREET GRAND CENTRL PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench flush to grade within the driving lane, i/f/o 82-11 |
2021-05-06 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-05-06 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill is going to be rescheduled |
2021-05-06 | No data | WEST 39 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Solid white lane markings missing from roadway. Opposite 1. |
2021-05-06 | No data | OCEAN AVENUE, FROM STREET AVENUE W TO STREET AVENUE X | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #2748 OCEAN AVENUE & sidewalk flags installed with water valve in compliance |
2021-05-06 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & TEMP SWK-NP |
2021-05-06 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION ACROSS RWY & TEMP SWK-NP |
2021-05-06 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SWK FLAGS WERE SEALED & 2 NEW COLOR CODES WERE INSTALLED |
2021-05-06 | No data | 58 AVENUE, FROM STREET 230 STREET TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber's work no visible due to builder's pave at 57-40 corner property |
2021-05-06 | No data | EAST 26 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-05-05 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Roadway excavation plated in the parking lane ifo address. |
2021-05-05 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | grass area restored to grade |
2021-05-05 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration in compliance |
2021-05-05 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2021-05-05 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway excavation plated in the parking lane with a newer active permit on file. |
2021-05-05 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | active worksite crew is on site water and sewer repair. |
2021-05-05 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm to grade |
2021-05-05 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2021-05-05 | No data | MULBERRY AVENUE, FROM STREET COLDEN STREET TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | grass area of sidewalk with water valve sunk 5 inches |
2021-05-05 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2021-05-04 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file.B012020092A51. |
2021-05-04 | No data | SOMERS STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE AND 4 SIDE WALK FLAGS INSTALLED CLOSER TO FULTON CORNER |
2021-05-04 | No data | PALMETTO STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway IFO active BO. |
2021-05-04 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-05-04 | No data | KATONAH AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber restoration wearing course breaking up |
2021-05-03 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2021-05-03 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of building #2250 BRAGG STREET in compliance |
2021-05-03 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on the sidewalk is in compliance. |
2021-05-03 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupy roadway |
2021-05-02 | No data | ROGERS AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in compliance |
2021-05-02 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has 2 steel plates in the parking lane without a valid DOT permit on file. Respondent ID by permit B012021077B21 on file expired 4/15/2021. |
2021-05-02 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut resurfaced |
2021-05-01 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve on s/w & perm restoration in the r/w |
2021-05-01 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade |
2021-05-01 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance |
2021-05-01 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATE OV ER C UT OK new permit B012021102A62 |
2021-05-01 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm work on r/w |
2021-05-01 | No data | GREENE AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags repaired , roadway paved over at time of my inspection. |
2021-05-01 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | consolidated edison temp cut on s/w & p/l with active permit on file |
2021-04-30 | No data | GREENPOINT AVENUE, FROM STREET DEAD END TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE OPPOSITE BUILDING #18. |
2021-04-30 | No data | LEXINGTON AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-04-30 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restorations in opp parking lane from 1946 & 1950. |
2021-04-30 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY |
2021-04-30 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-04-30 | No data | CUMBERLAND STREET, FROM STREET GREENE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | blue stone s/w around hardware in compliance |
2021-04-30 | No data | KENT STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERMIT ON FILE, B022021110A70 STEEL PLATE COUNTER SUNK IN THE DRIVING LANE OPPOSITE NEW BUILDING #30 KENT ST. |
2021-04-29 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... street and walk |
2021-04-29 | No data | WEST 28 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active B.O on site unable to fully inspect inside fence area. |
2021-04-29 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restorations in opp parking lane from 1946 & 1950. |
2021-04-29 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-04-28 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | majority resurfaced by builder pave. permanent cut parking lane |
2021-04-28 | No data | CARROLL STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the parking lane in front of property |
2021-04-28 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2021-04-28 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway/swk. In compliance. |
2021-04-28 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway in compliance. |
2021-04-28 | No data | HUDSON STREET, FROM STREET CHARLES STREET TO STREET PERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced Permit#M152021068B65 |
2021-04-28 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to permit expiration. NOV issued. |
2021-04-28 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUMBERS CUT OPPOSITE 1127 IS OK. |
2021-04-27 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to permit expiration. NOV issued. |
2021-04-27 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-04-27 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration within parking lane in front of 60-87 partially visible at time of inspection due to vehicles parked. |
2021-04-27 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit X012021110A87 |
2021-04-27 | No data | CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Active work crew on site.Site in compliance |
2021-04-27 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass water repair remains plated |
2021-04-27 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATE OV ER C UT OK |
2021-04-27 | No data | 71 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite address. |
2021-04-27 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | excavation remains plated, new permit obtained |
2021-04-27 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATE OVER CUT OK NEW PERMIT B012021102A62 |
2021-04-26 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to permit expiration. NOV issued. |
2021-04-26 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/3/2021. |
2021-04-26 | No data | HOWARD AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, remains plated .. new permit.. obtained |
2021-04-26 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder pave |
2021-04-26 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | walkway for pedestrians on sidewalk at this time. |
2021-04-25 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration |
2021-04-25 | No data | EAST 117 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2021-04-24 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-04-24 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the 7 steel plate street opening's counter sunken in the roadway down 2 1/2’ on a protected street. Nov issued |
2021-04-24 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the 4 steel plate street opening's counter sunken/ramp & pinned in the roadway down 8 1/2’ on a protected street. Nov issued |
2021-04-24 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012021061A56-LATEST PERMIT |
2021-04-24 | No data | TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-04-23 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed cutbacks was made there will be a concrete base restored today cut will be left plated |
2021-04-23 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer-water restorations flush to grade in the roadway of the driving lane /extending into the parking lane in front of property #287 FRANKLIN AVENUE, (confirmation number obtained prior to the expiration date via #B012021040A41) |
2021-04-23 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work by permittee found at location. New sidewalk and New building paving done on roadway. |
2021-04-23 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to obtain confirmation number prior to permit expiration. NOV issued. |
2021-04-22 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration |
2021-04-22 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2021-04-22 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN DRIVING LANE OF RWY EAST OF KENT AVE |
2021-04-22 | No data | 39 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l. Two sidewalk flags restored around water valve. |
2021-04-22 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2021-04-22 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-04-22 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY |
2021-04-21 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 CUT IN DRIVING LANE. IFO 3506 FARRAGUT ROAD . 10FT X 4FT, 8 INCHES, DOWN 5FT. BLEND. 97.8% & 98.1%. WET 123.3 DRY 120.5 MAX 113.4 MOISTURE 8.7% |
2021-04-21 | No data | BAY 16 STREET, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway in front of 8664. |
2021-04-21 | No data | GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-04-21 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2021-04-21 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade within the p/l. obstructed by BPP |
2021-04-20 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected |
2021-04-20 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair adjacent to curb is over lap with 2020 Cablevision restoration |
2021-04-20 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2021-04-20 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012019087B86-latest permit |
2021-04-20 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in d/l. |
2021-04-20 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway of the driving lane in front of property #430 BELMONT AVENUE & 1 sidewalk flag installed in compliance |
2021-04-20 | No data | 35 AVENUE, FROM STREET BELL BOULEVARD TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave no plumber's work visible at 214-11 |
2021-04-19 | No data | GROVE PLACE, FROM STREET DEAD END TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION IN RWY-PRIVATE STREET |
2021-04-19 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Light Stand Visible On Site At Time Of Inspection |
2021-04-19 | No data | WOODHULL STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for final. |
2021-04-19 | No data | WOODHULL STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Summons has to be issued for overdue |
2021-04-19 | No data | VILLAGE ROAD SOUTH, FROM STREET GRAVESEND CEMETERY BOUNDARY TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in the parking lane ifo 2390. |
2021-04-19 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway of the parking lane opposite from property #656 WARWICK STREET in compliance |
2021-04-19 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found the respondent has a perm Cut flushed to grade in the parking lane , and they restored a sidewalk flag. |
2021-04-19 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work completed. |
2021-04-19 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CALLED ROCCO TO MAKE PAYMENT ON PERMIT- CREW WORKING IN SWK STREET OPENING & 2 PLATES COUNTERSUNK IN ROADWAY AT BUILDING OPERATION |
2021-04-18 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY OPPOSITE 175 |
2021-04-18 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Water cut sealed. |
2021-04-18 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKINGS RESTORED |
2021-04-17 | No data | MACON STREET, FROM STREET NOSTRAND AVENUE TO STREET VERONA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk and in the parking lane is flush to grade. |
2021-04-17 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ASPHALT INSTALLED ON A CONCRETE SLAB |
2021-04-17 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated in the parking lane. |
2021-04-16 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found the roadway resurfaced. |
2021-04-16 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | both perm restoration in the r/w are sealed |
2021-04-16 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-11’ 6”Width of the cut-3’ 10”Depth of the cut-4’W.D-120.6/124.8D.D-111/114.8M.D.D-118.5/122.5A.M-8.7%/8.7%1st lift-98.3%last lift-98.1% |
2021-04-16 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 perm restoration in the r/w & gas cut on top water cut in p/l |
2021-04-15 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade |
2021-04-15 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-04-15 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2021-04-15 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & SWK - NP |
2021-04-15 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLEASE REMOVE "RAISE PLOW BLADE" SIGN POSTED OPPOSITE 15 GARDEN PLACE BETWEEN JORALEMON STREET & STATE STREET (WINTER MORATORIUM ENDED MARCH 31, 2021). |
2021-04-14 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts. |
2021-04-14 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade |
2021-04-14 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work covered by BPP |
2021-04-14 | No data | GREENE AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found no work done between the cross streets on this permit |
2021-04-14 | No data | 215 STREET, FROM STREET 40 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to builder's pave at 40-12 |
2021-04-14 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk and in the parking lane is flush to grade. |
2021-04-13 | No data | EAST 11 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please remove raise plow sign posted at 38 Stratford Rd |
2021-04-13 | No data | 21 AVENUE, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New construction. Sidewalk flag to be replaces after completion of construction. |
2021-04-13 | No data | BAY 23 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2021-04-13 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfiil Completed Cut1 : L16ft2inxW3ft6inxD4ft2inCut2 : L6ft2inxW4ftin3inxD3ft1st Lift: 98.7 2nd: 98.3 , Cut 2 1st Lift 97.7 |
2021-04-12 | No data | WEST 13 STREET, FROM STREET AVENUE Z TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The roadway was resurfaced by NYC DOT on permit # B152018320A34 |
2021-04-12 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2021-04-11 | No data | EAST 26 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2021-04-10 | No data | WEST 54 STREET, FROM STREET 8 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed |
2021-04-09 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2021-04-09 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway extending into the parking lane in front of building #729 LIBERTY AVENUE |
2021-04-09 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RE-PAVE AT NEW BUILDING AT 153 GRAND ST ON PERMIT#B012021068D35 EXP 3/31/21 |
2021-04-09 | No data | MONROE STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the parking lane is plated and flush |
2021-04-08 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the roadway. |
2021-04-08 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF SIDEWALK |
2021-04-08 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill behind active BO is in compliance |
2021-04-08 | No data | EAST 55 STREET, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site with open excavation in the RW and steel plate on SW, active permit on file |
2021-04-07 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White spaced out lane markings missing from roadway. In front of 7. |
2021-04-07 | No data | EAST 31 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT FAILED TO SEAL AND MAINTAIN THE WEARING COURSE. CAR#20217390005 WAS ISSUED. PERMIT #B012021004B96 IS USED TO IDENTIFY THE ABOVE RESPONDENT. |
2021-04-07 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temporary Restoration Overdue for FINAL RESTORATION. Roadway is currently plated with PNYCI steel plate and marked with temporary green color code marker. |
2021-04-07 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired, newer permit on file, B012021056B96. |
2021-04-07 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The cited address BPP restoration has resurfaced the Street, and the water cut is no longer visible. |
2021-04-06 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BIKE LANE MARKINGS RESTORED |
2021-04-06 | No data | MORRIS AVENUE, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected |
2021-04-06 | No data | 1 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: LL14 | Department of Transportation | L- 4’ 4” W- 4’ D- 10” |
2021-04-06 | No data | EAST 135 STREET, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates removed |
2021-04-06 | No data | 83 STREET, FROM STREET 159 AVENUE TO STREET 160 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE PERM TRENCH 23' X 4' SUNKEN ONE AND A HALF INCHES IN DRIVING LANE |
2021-04-06 | No data | BELMONT AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Temporary Pedestrian Walk observed on the street or sidewalk i/f/o 430 Belmont Avenue |
2021-04-06 | No data | 52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied. Sidewalk flag belongs to Plumbing NYC. |
2021-04-05 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found respondent failed to apply bike lane markings in the roadway CAR #20201360011 was issued 12/27/2020 prior to NOV being written. |
2021-04-05 | No data | CLINTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started. |
2021-04-04 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please remove “RAISE PLOW” sign posted on drive-rail as per the ending of the winter moratorium policy severing no purpose in front of property #1543 EAST 2 STREET, in a timely fashion. CAR issued |
2021-04-04 | No data | 49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in compliance |
2021-04-04 | No data | MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-04-03 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration at 373 |
2021-04-03 | No data | EAST 9 STREET, FROM STREET AVENUE I TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2021-04-03 | No data | EAST 4 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway extending into the parking lane opposite from property #1813 EAST 4 STREET |
2021-04-03 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new sidewalk installed |
2021-04-02 | No data | WEST 10 STREET, FROM STREET AVENUE S TO STREET HIGHLAWN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, in front of 1840 West 10 Street. |
2021-04-02 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Please remove raise plow sign on pole located opposite 3014 Ave M |
2021-04-02 | No data | SOMERS STREET, FROM STREET BEND TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started. New Permit Number: B012021077A82. |
2021-04-02 | No data | 52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration sunken down 4” in the sidewalk within the required time. Nov D4F issued overdue for final |
2021-04-02 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plated excavation on the rw opposite 3012 |
2021-04-01 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #1621 50 STREET & 3 brand new sidewalk flags installed with water valve expansion joints sealed in between the sidewalk in compliance. |
2021-04-01 | No data | ATLANTIC AVENUE, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance. |
2021-04-01 | No data | 58 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC INC has restored/repaired permanent water-sewer restoration flush to grade in the roadway extending into the parking lane/driving lane in front of property #1121 58 STREET in compliance |
2021-04-01 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #1621 50 STREET & 3 brand new sidewalk flags installed with water valve expansion joints sealed in between the sidewalk in compliance. |
2021-04-01 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated restorations in the roadway. New active permit on file. |
2021-04-01 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance |
2021-04-01 | No data | LINDEN BOULEVARD, FROM STREET 192 STREET TO STREET 193 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Cut size 8'x6'x11' |
2021-03-31 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk restored and perm in roadway parking lane. |
2021-03-31 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved over by BPP |
2021-03-31 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE PARKING LANE OPPOSITE #206. |
2021-03-31 | No data | SHORE BOULEVARD, FROM STREET GIRARD STREET TO STREET HASTINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & perm trench in the r/w |
2021-03-31 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COUNTER SUNKEN STEEL PLATED EXCAVATION IN THE PARKING LANE OPPOSITE #206. NEW PERMIT ON FILE |
2021-03-30 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not visible due to builder's pave at 42-24 Crescent St |
2021-03-29 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane opposite from property #1544 41 STREET |
2021-03-29 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 13.9 x 5.7 x 4.7 x 5.1 tested 98.5 98.1 |
2021-03-29 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating sidewalk with plated excavations in the roadway. |
2021-03-29 | No data | CROSS BRONX EXPRESSWAY, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the sidewalk i/f/o 1847 Cross Bronx Expressway |
2021-03-29 | No data | 32 AVENUE, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | temp walkway acceptable |
2021-03-28 | No data | 58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-03-28 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of building #1567 63 STREET & sidewalk flags installed in compliance |
2021-03-28 | No data | EMMONS AVENUE, FROM STREET BATCHELDER STREET TO STREET BROWN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w |
2021-03-28 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, water install ...cut now plated .. |
2021-03-28 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of building #1567 63 STREET & sidewalk flags installed in compliance |
2021-03-28 | No data | 60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2+5 course in compliance |
2021-03-28 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2021-03-28 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the parking lane opposite from building #1408 47 STREET in compliance |
2021-03-27 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane in front of property #1722 53 STREET in compliance |
2021-03-27 | No data | 51 STREET, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer restorations flush to grade in the roadway of the driving lane/parking lane in front of property #1714 51 STREET in compliance |
2021-03-27 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway of the driving lane/parking lane in front of property #1880 60 STREET in compliance |
2021-03-27 | No data | 61 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind BPP 1/2 +5 course in compliance |
2021-03-27 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 perm water restorations flush to grade in the roadway of the parking lane in front of property #1777-1785 59 STREET IN COMPLIANCE |
2021-03-27 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE OPPOSITE BUILDING # 115 STANWIX.TWO NEW FLAGS AROUND WATER VALVES. |
2021-03-27 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #5424 18 AVENUE in compliance |
2021-03-27 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane in front of property #2013 53 STREET in compliance |
2021-03-27 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2021-03-27 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #1868 48 STREET in compliance |
2021-03-27 | No data | EAST 22 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across the roadway |
2021-03-26 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1) - Wearing course breaking away: A portion of asphalt is broken out within a permanent restoration.2) Seal hairline cracks in the permanent restoration. |
2021-03-26 | No data | 9 STREET, FROM STREET 38 AVENUE TO STREET 40 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | not onsite |
2021-03-26 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-12’ 10”Width of the cut-4’Depth of the cut-10’W.D-123.9D.D-115.2M.D.D-120.5A.M-7.5%1st lift-98%last lift-98.6% |
2021-03-26 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP on roadway. |
2021-03-25 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2021-03-25 | No data | NEW YORK AVENUE, FROM STREET CARROLL STREET TO STREET CROWN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE ACTIVELY WORKING. ACTIVE PERMIT EXIST AT TIME OF INSPECTION. |
2021-03-25 | No data | NEW YORK AVENUE, FROM STREET CARROLL STREET TO STREET CROWN STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE ACTIVELY WORKING. |
2021-03-25 | No data | BEACH 12 STREET, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent failed to obtain conformation number |
2021-03-25 | No data | COURTLANDT AVENUE, FROM STREET EAST 162 STREET TO STREET EAST 163 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2021-03-25 | No data | HANCOCK STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut was done roadway |
2021-03-25 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of s.w acceptable |
2021-03-25 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent has a temporary sewer/water trench across the roadway mounded 3 inches. The respondent temporary restoration not flush with surrounding area. I identify by the above permit . No one on site |
2021-03-25 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Active | Department of Transportation | Permanent water restoration acceptable |
2021-03-24 | No data | 32 AVENUE, FROM STREET 98 STREET TO STREET POWER ROAD | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sw acceptable |
2021-03-24 | No data | EAST 26 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2021-03-24 | No data | 83 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2021-03-24 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE OPPOSITE HOUSE # 583. |
2021-03-24 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass. Start: 11:40AM End: 1:50PML: 14FT. 0IN. W: 4FT. 0IN. D: 10FT. 0IN.WD: 119.4 DD: 109.8 MD: 116.0 MST: 8.7%Compaction: 1. 97.8% 2. 96.1%Cut is in the parking/driving lane, in front of 1567 63 Street. |
2021-03-24 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking lane/driving lane in compliance |
2021-03-23 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ON THE ROADWAY |
2021-03-23 | No data | EAST 3 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-14’Width of the cut-4’Depth of the cut-10’W.D-124.8D.D-114.8M.D.D-122.5A.M-8.7%1st lift-97.7%last lift-98.3% |
2021-03-23 | No data | VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut opposite of house #30 new permit on file under B012021064C89 |
2021-03-22 | No data | LAFAYETTE STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced BPP |
2021-03-22 | No data | OCEAN PARKWAY, FROM STREET AVENUE I TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway extending into both parking lane adjacent to the building AKA #921 OCEAN PARKWAY in compliance |
2021-03-22 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #681 EAST 3 STREET in compliance |
2021-03-22 | No data | DAHILL ROAD, FROM STREET 50 STREET TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-03-21 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #1543 EAST 2 STREET in compliance |
2021-03-21 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #1058 EAST 3 STREET in compliance |
2021-03-20 | No data | 215 STREET, FROM STREET 15 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to materials & equipment stored in the roadway ifo 214-10 (Active B.O.) at this time. |
2021-03-18 | No data | HASTINGS STREET, FROM STREET HAMPTON AVENUE TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-03-18 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2021-03-18 | No data | OXFORD STREET, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-03-18 | No data | 251 STREET, FROM STREET 64 AVENUE TO STREET CULLMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection, cannot verify work due to commercial refuse container placed over cut. |
2021-03-18 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed that the respondent has 3 steel plates and temp mac stored the parking lane. VIOlATING STPULATION 78. . No one site |
2021-03-17 | No data | KATONAH AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Wearing course not properly rolled but no action at this time in front of 4255-57 |
2021-03-17 | No data | FRANKLIN AVENUE, FROM STREET BOWNE STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed in compliance. (14'9" X 4' X 4'6" & 11' X 4' X 4'6") |
2021-03-17 | No data | WEST 54 STREET, FROM STREET 8 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 254, NOV for a "NYCPI" marked countersunk steel plate over ongoing Water Repair work. Respondent failed to post “Steel Plates Ahead” or “Raise Plow” sign as per Winter Moratorium which commenced on 12/1/2020. |
2021-03-17 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of building #1567 63 STREET “RAISE PLOW” sign posted ahead as per the WINTER MORATORIUM POLICY |
2021-03-17 | No data | EAST 3 STREET, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued |
2021-03-17 | No data | BATCHELDER STREET, FROM STREET EMMONS AVENUE TO STREET GUNNISON COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-03-16 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2021-03-16 | No data | TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV written for open excavation with no valid permit |
2021-03-16 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit Q012020349D80 expired 12/26/20. |
2021-03-16 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2021-03-16 | No data | TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | The respondent has an open roadway excavation covered with steel plates marked with company lettering without a valid NYC DOT permit to do so. Permit # X012021047A93 expired 3/14/2021 |
2021-03-16 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken down 4 1/2’ on a protected street. Nov issued |
2021-03-16 | No data | CLINTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (2 Cuts) found to be in compliance |
2021-03-16 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK CUTS WITH HARDWARE AND PERM RESTORATIONS THE DRIVING LANE. |
2021-03-15 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #1621 50 STREET & 3 brand new sidewalk flags installed with water valve expansion joints sealed in between the sidewalk in compliance. |
2021-03-15 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #1621 50 STREET & 3 brand new sidewalk flags installed with water valve expansion joints sealed in between the sidewalk in compliance. |
2021-03-15 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane opposite from property #1544 41 STREET |
2021-03-15 | No data | KNICKERBOCKER AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW FLAG AROUND WATER VALVE. |
2021-03-15 | No data | ST JOHNS PLACE, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway and on the sidewalk |
2021-03-14 | No data | GREENPOINT AVENUE, FROM STREET DEAD END TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway |
2021-03-13 | No data | 4 AVENUE, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2021-03-13 | No data | 157 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade cut in the parking lane i/f/o house# 43-65. |
2021-03-13 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR HOUSE #306. |
2021-03-13 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2021-03-13 | No data | WOODHULL STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut missing color code and needs to be reseal |
2021-03-13 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2021-03-12 | No data | LEONARD STREET, FROM STREET NASSAU AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane, sidewalk flag flush and sealed |
2021-03-12 | No data | KENT STREET, FROM STREET BODY OF WATER TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work believe to be done behind fence and barriers. |
2021-03-12 | No data | 150 STREET, FROM STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by new building BPP paving at location. |
2021-03-12 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by new building BPP paving at location. |
2021-03-12 | No data | GATES AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2021-03-11 | No data | 51 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 2:28pm to 2:55pm one cut in the parking lane length 5ft width 4ft depth 3ft 5inches. |
2021-03-11 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Active | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway of the driving lane in front of property #1919 EAST 5 STREET in compliance |
2021-03-11 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill CompleteCut 1 13'1x8'2x10'1WD 123.9DD 114.0 MD 120.5AM 8.7Compaction 96.098.3 |
2021-03-10 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to countersink all the steel plates flush with the roadway as per the WINTER MORATORIUM POLICY BEGINS 12-1-2020 ENDING 3-31-2021. Nov issued |
2021-03-10 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of building #1567 63 STREET “RAISE PLOW” sign posted ahead as per the WINTER MORATORIUM POLICY |
2021-03-10 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal street cut |
2021-03-09 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable |
2021-03-09 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-03-09 | No data | NOSTRAND AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAG WITH GAS HARDWARE. NO WORK OBSERVED IN THE ROADWAY. RESURFACED OBSERVED. |
2021-03-09 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK IS NOT DONE ON SEGMENT. NO WORK FOUND. |
2021-03-09 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut partially covered by BPP |
2021-03-09 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2021-03-08 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | water connection ....still plated |
2021-03-08 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2021-03-07 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file plated cut in parking lane |
2021-03-07 | No data | WEST 18 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2+5' BPP and sidewalk reconstruction for new building completed. Water repair cut no longer exist. New roadway and sidewalk IFO 515 West 18 St. |
2021-03-07 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in parking lane |
2021-03-07 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PASS.. Perm cut on the roadway |
2021-03-06 | No data | EAST 7 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-03-05 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done. |
2021-03-05 | No data | LINCOLN PLACE, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance |
2021-03-05 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, water connection cut ...still plated |
2021-03-05 | No data | LOTT AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2021-03-02 | No data | GREENPOINT AVENUE, FROM STREET DEAD END TO STREET WEST STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den119.4, Dry-Den-111.0 MAC. Dry-Den-116.0, Act. Moist-7.5, Material- Clean fill, Test- Sand cone, Lab - Exclusive Testing Labs, Lab tech- Pedro, Compaction results -(97.5, 98.7) |
2021-03-02 | No data | EAST 11 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired newer permit on file, B012021007A29. |
2021-03-02 | No data | CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk and roadway resurfaced by BPP. |
2021-03-01 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | STEEL PLATES WERE REMOVED - NOW PERMANENT RESTORATIONS IN RWY. IN-COMPLIANCE. |
2021-03-01 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATES WERE REMOVED - NOW PERMANENT RESTORATIONS IN RWY. IN-COMPLIANCE. |
2021-03-01 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2021-02-28 | No data | 51 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #1159 51 STREET “RAISE PLOW” sign posted ahead as per the WINTER MORATORIUM POLICY |
2021-02-28 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #1621 50 STREET “RAISE PLOW” sign posted ahead as per the WINTER MORATORIUM POLICY |
2021-02-28 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration found on the roadway |
2021-02-28 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway plated excavation countersink |
2021-02-27 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2021-02-27 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated excavation new permit on file |
2021-02-27 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY. |
2021-02-27 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK STARTED- BUT MARKED OUT |
2021-02-27 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAGS OK |
2021-02-27 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED- BUT MARKED OUT |
2021-02-27 | No data | NEWKIRK AVENUE, FROM STREET EAST 26 STREET TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN DRIVING LANE IFO 2621. |
2021-02-27 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to countersink all the steel plates flush with the roadway as per the WINTER MORATORIUM POLICY BEGINS 12-1-2020 ENDING 3-31-2021. Nov issued |
2021-02-26 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012016305B06 on file. |
2021-02-26 | No data | BEACH 87 STREET, FROM STREET DORMANS COURT TO STREET ROCKAWAY FREEWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete and acceptable. Cut size 16'x3'8''x3' Tests w/d 116.4, d/d 108.3, m/d/d 111.5, a/m 7.5 % and Lift 97.7 |
2021-02-25 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP AT 2133 |
2021-02-25 | No data | EAST 9 STREET, FROM STREET AVENUE I TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2021-02-25 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, plated... water connection ... cut .. |
2021-02-25 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plate |
2021-02-25 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Trench |
2021-02-24 | No data | LOUISIANA AVENUE, FROM STREET SEAVIEW AVENUE TO STREET TWIN PINES DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE ON S/W |
2021-02-24 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE- STEEL PLATED SWK - STEEL PLATED STREET OPENING WATER & SEWER- COUNTERSUNK WITH SIGNS |
2021-02-23 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2021-02-23 | No data | 41 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated water excavation countersunk in the driving lane with raise plow sign posted |
2021-02-23 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Verified. Opposite 151-56, There is a steel plate labeled "P NYC I", that is very loose and noisy, in the driving lane. Fix steel plate. |
2021-02-23 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY NO PERMIT |
2021-02-23 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed Cut1: L13ft1inxW4ft2inxD10ft1inWD:115.8DD:108.9MDD:111.4AM:6.4 |
2021-02-23 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across the roadway |
2021-02-22 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completecut 1 11'x4'5x9'cut 2 3'1x3'x2'1cut 3 2'1x2'2x2' WD 124.8DD 116.1MD 119.0AM 7.5Compaction 96.9/97.497.097.2 |
2021-02-22 | No data | WEST 10 STREET, FROM STREET AVENUE S TO STREET HIGHLAWN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass. Start: 12:48PM End: 1:40PML: 3FT. 9IN. W: 3FT. 0IN. D: 4FT. 0IN.WD: 124.2 DD: 113.0 MD: 121.5 MST: 9.9%Compaction: 1. 98.0% 2. 98.2%Cut is in the parking lane, in front of 1840 West 10 Street. |
2021-02-22 | No data | 193 STREET, FROM STREET 117 ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete and acceptable. Cut size 6'x4'x3'8'' Tests w/d 120.3, d/d 113.1, m/d/d 116.5, a/m 6.4 % and Lifts 96.8 & 98.5 respectively |
2021-02-22 | No data | JORALEMON STREET, FROM STREET GARDEN PLACE TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & NEW SWK FLAGS OFF NCL |
2021-02-22 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New building and street resurfaced |
2021-02-21 | No data | 133 STREET, FROM STREET DEAD END TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent to store excavated material on roadway surrounded by cones and failed to display required ID signs at work site. PNYCI sign on the plate and above DOT permit used to identify contractor. |
2021-02-20 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site did walk through for conditions to be remedied , work in sidewalk at BO |
2021-02-19 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew working in long water cut advised to post flagger for south bound right lane being utilized, other side plate is countersink. DEP is onsite |
2021-02-19 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Contractor will reschedule LL14 for a later date due to inclement weather conditions, No work done at this time |
2021-02-18 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | no walkway at this time |
2021-02-18 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Site appeared safe for public travel. Plated excavations were countersunk, & Raise plow signs were posted on both sides of the street. |
2021-02-18 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walkway placed in roadway at time of inspection. |
2021-02-18 | No data | EAST 240 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate recessed in the driving lane raise plow sign posted . Stipulation 020 contractor may contain a maximum of 25 linear feet during non working hours to restrict parking and for storage of excavated material. inspect and in compliance |
2021-02-18 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary sidewalk is installed |
2021-02-17 | No data | 58 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONplease restore/repair temporary water-sewer restoration in the roadway extending into the parking lane/driving lane in front of property #1121 58 STREET, in a timely fashion. CAR issued overdue |
2021-02-17 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flag okay r/w resurfaced |
2021-02-17 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT PLUMBING NYC, INC. REPAIR WATER RESTORATION DOWN 2 1/2 INCHES IN DRIVING LANE OF ROADWAY-IN FRONT OF 153 GRAND STREET BETWEEN BEDFORD AVENUE & BERRY STREET. PLEASE RESTORE ROADWAY TO GRADE. |
2021-02-17 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 steel plate in the roadway IFO 7 is in compliance |
2021-02-17 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 steel plate in the roadway IFO 7 is in compliance |
2021-02-16 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 2 STEEL PLATED EXCAVATIONS IN THE ROADWAY AND EXCAVATED SIDE WALK CUT CREW ON SITE PREPAIRING FOR BACK FILL |
2021-02-16 | No data | 21 STREET, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP | No data | Street Construction Inspections: Active | Department of Transportation | Plated water excavation countersunk on the roadway at 41-03 21St |
2021-02-16 | No data | CARROLL STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active site, crew is on site |
2021-02-16 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flush and color coded ifo 408 |
2021-02-16 | No data | AVENUE U, FROM STREET NYCTA SUBWAY TO STREET WEST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Squared cut in parking lane |
2021-02-16 | No data | LIBERTY AVENUE, FROM STREET ESSEX STREET TO STREET LINWOOD STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, water install ..sewer ...install..n/s of street... |
2021-02-16 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2021-02-16 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}11FT X {W}4FT X {D}9FT TEST 97.8 98.3 {L}5FT X {W}4FT X {D}4FT TEST 97.4 97.7 BASE SAW CUT BACKS WERE DONE ARRIVED 1230 FINISHED 300 |
2021-02-16 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane and restored sidewalk flags in compliance. |
2021-02-16 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There's a permanent cut flushed to grade in the driving lane. |
2021-02-14 | No data | COLUMBIA STREET, FROM STREET HAMILTON AVENUE TO STREET WOODHULL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration in roadway on Columbia Street & perm water restoration on Woodhull Street |
2021-02-10 | No data | FRANKLIN AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated (Reccessed) restoration found to be in roadway, restoration in compliance at this time |
2021-02-10 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects at time of inspection . |
2021-02-10 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, no work has started in front of 1919 East 5 Street. |
2021-02-10 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on s/w ifo 30 is good |
2021-02-10 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | 4’3x30 D4’5Compaction 96.4Pass |
2021-02-09 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2021-02-09 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2021-02-09 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2021-02-09 | No data | HUDSON STREET, FROM STREET CHARLES STREET TO STREET PERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started at this time. |
2021-02-09 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2021-02-09 | No data | COLUMBIA STREET, FROM STREET HAMILTON AVENUE TO STREET WOODHULL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 15ft by 3ft down 4ft |
2021-02-09 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY CUT ON SIDEWALK. PERM RESTORATION IN THE DRIVING LANE. |
2021-02-08 | No data | EAST 5 STREET, FROM STREET AVENUE R TO STREET AVENUE S | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, the sidewalk is currently not being occupied. |
2021-02-08 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway is not occupied |
2021-02-08 | No data | 14 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | 1 CUT OPP 4102 IN P/L 3 DAY NOTICE ISSUED D.E.P |
2021-02-08 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp 517 Permanent water restoration paved over along with several sidewalk flags in compliance. |
2021-02-07 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk open to public |
2021-02-05 | No data | 53 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found due to the snow. |
2021-02-05 | No data | 156 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Unable to fully inspect due to snow in the sidewalk & roadway at time of inspection. Valid permit on file. |
2021-02-05 | No data | 63 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | men on site work in cut in the ground, pkg lane |
2021-02-05 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completeCut 1 5'4x3'4x2'5 Cut 2 4'9x3'2x2'5 Cut 3 4'6x3'2x2'4 Cut 4'6x3'2x2'9 Cut 5 4'4x3'5x3'6 Cut 6 5'3x3'1x3'10 Cut 7 5'3x3'1x3'11 Cut 8 5'6x3'6x2'10Compaction 98.1,98.5,98.1,98.1,97.9,98.5,98.1,97.7 |
2021-02-05 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L17W4 D10’0Compaction 96.4 97.6Monitored 12:00-4:25Pass |
2021-02-05 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2021-02-04 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates countersunk |
2021-02-04 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walkway not found to be on roadway at this time |
2021-02-04 | No data | EAST 30 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | unable to complete an accurate inspection due to snow |
2021-02-04 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk open |
2021-02-03 | No data | 5 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Worksite not found due to snow |
2021-02-03 | No data | 50 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2021-02-03 | No data | EAST 32 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | Work not started |
2021-02-03 | No data | 41 AVENUE, FROM STREET 21 STREET TO STREET 22 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Skid resistance countersunk plated water restoration in the driving lane with plow sign posted for 21-03 41ave |
2021-01-31 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #89 MOFFAT STREET “RAISE PLOW” sign posted ahead as per the WINTER MORATORIUM POLICY in compliance |
2021-01-31 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2021-01-31 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2021-01-31 | No data | EAST 31 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration needs to be SealedPlease seal temp water cut found in front of 630 East 31 street |
2021-01-31 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2021-01-31 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no active permit on file |
2021-01-30 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut on the roadway |
2021-01-30 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2021-01-30 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-30 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk |
2021-01-30 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done and 1 roadway restoration ifo the hydrant in compliance |
2021-01-30 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut on the sidewalk is in compliance. |
2021-01-29 | No data | 54 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in the roadway is flush to grade. |
2021-01-29 | No data | BRAGG STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 DAYS NOTICE ISSUED RD/W CUT |
2021-01-29 | No data | SKILLMAN AVENUE, FROM STREET 40 STREET TO STREET 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut in the bike lane. |
2021-01-29 | No data | 21 STREET, FROM STREET 41 AVENUE TO STREET QNSBO BR UP RY ENTRANCE RAMP | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER-CREW ON WORKING IN OPEN EXCAVATION . INFORMED FOREMAN ABOUT 3PM STIPS. ALL STIPS IN COMPLIANCE. |
2021-01-28 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER |
2021-01-28 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 900 new york ave |
2021-01-28 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & SWK RESTORED ON SIDE OF 57 WILLOW ST (CORNER PROPERTY) |
2021-01-27 | No data | EAST 28 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2021-01-27 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2021-01-27 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | not verified. no steel plates in roadway at this time. plumber has completed work in roadway, work in sidewalk not completed at this time |
2021-01-27 | No data | VERNON BOULEVARD, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored around water valve expansion joints sealed |
2021-01-27 | No data | 1 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (P/L) found to be in compliance (2 Cuts) |
2021-01-27 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed a steel plate in the parking lane (not countersink) with cones around and a steel plate on the sidewalk properly ramp in compliance. |
2021-01-27 | No data | NEW YORK AVENUE, FROM STREET CARROLL STREET TO STREET CROWN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2021-01-26 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE PARKING LANE TEMP CUT ON THE SIDEWALK AROUND WATER VALVE COVER WITH A VALID PERMIT |
2021-01-26 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM WATER CUT IN THE PARKING LANE TEMP CUT ON THE SIDEWALK AROUND WATER VALVE COVER |
2021-01-26 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp water cut on roadway in front of 3511 farragut road |
2021-01-26 | No data | EAST 135 STREET, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2021-01-26 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed cutbacks was made concrete base will be restored waiting for truck cut will be left plated |
2021-01-25 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration going toward the double yellow line. |
2021-01-25 | No data | 58 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT OK NEW PERMIT B012021013A73 |
2021-01-25 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp water restoration in the roadway of the parking lane opposite from property #98 BLEECKER STREET & temp water restoration in the sidewalk |
2021-01-25 | No data | 58 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUT OK |
2021-01-25 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPLACE BIKE LANE MARKING IN FRONT OF HOUSE #1365 & 1359.RESEAL PERM RESTORATION IN FRONT OF 1369. |
2021-01-23 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2021-01-23 | No data | 16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | recessed plated excavation is found to be in roadway, restoration in compliance at this. (Active permit B012021013A72) |
2021-01-23 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration ( r/w & s/w) found to be in compliance |
2021-01-23 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2021-01-22 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 1245 |
2021-01-22 | No data | HYLAN BOULEVARD, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit updated S012021013A15 |
2021-01-22 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill has to be rescheduled due to no DEP inspection |
2021-01-22 | No data | 11 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pave |
2021-01-21 | No data | DOUGHTY STREET, FROM STREET BEND TO STREET ELIZABETH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAG |
2021-01-21 | No data | HENRY STREET, FROM STREET CLARK STREET TO STREET LOVE LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN DRIVING LANE OF RWY & NEW SWK FLAG OK |
2021-01-21 | No data | 38 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP |
2021-01-20 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance |
2021-01-20 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-124.0, Dry-Den-115.6, Max. Dry-Den-119.0, Act. Moist-6.4, Material- Clean fill, Test- Sand cone, Lab - Exclusive Testing Labs. Lab tech- Able, Compaction results - (97.0) |
2021-01-19 | No data | CHRISTIE AVENUE, FROM STREET 102 STREET TO STREET 103 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2021-01-19 | No data | EAST 22 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2021-01-19 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Two sewer backfills: 17' x 4' down 4'6" and 6'6" x 4' down 4' backfills, in the P/D/L i/f/o house# 149-54, complete and acceptable. |
2021-01-19 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-19 | No data | 38 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-19 | No data | WINDSOR PLACE, FROM STREET FULLER PLACE TO STREET HOWARD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane |
2021-01-18 | No data | 4 AVENUE, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work on r/w |
2021-01-18 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED BY NYC DOT |
2021-01-16 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAGS WITH HARDWARE. ROADWAY FOUND RESURFACED. |
2021-01-15 | No data | PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-116.4, Dry-Den-109.4, Max. Dry-Den-111.5, Act. Moist- 6.4, Material- Clean fill, Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Jason, Compaction results - (2 Cuts) Cut-1- (97.6, 98.3), Cut-2- (98.0) |
2021-01-14 | No data | 54 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP |
2021-01-13 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane opposite from property #98 BLEECKER STREET “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY |
2021-01-13 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE WORKING WITH A VALID PERMIT |
2021-01-13 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2021-01-13 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE PARKING LANE |
2021-01-12 | No data | TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration both on sidewalk and permit.Minimal roadway scarring |
2021-01-12 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new building area found repaved/ water valve installed on sidewalk |
2021-01-12 | No data | PROSPECT PARK WEST, FROM STREET 17 STREET TO STREET 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 large perm cuts in the pkg lane at 279 and opposite, micro trench through opposite cut. |
2021-01-11 | No data | DOUGHTY STREET, FROM STREET BEND TO STREET ELIZABETH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION AND NEW SWK FLAG |
2021-01-11 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-11 | No data | 68 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway in front 2167 68 Street was paved, found resurfaced. |
2021-01-11 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE |
2021-01-11 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurfaced. |
2021-01-10 | No data | MORRIS AVENUE, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | .My inspection and determination I/F/O West 528AA a restoration is not flush with surrounding area asphalt broken/crack out. |
2021-01-10 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #1064 HANCOCK STREET in compliance |
2021-01-10 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAGS -NP |
2021-01-10 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2021-01-10 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAGS -NP |
2021-01-10 | No data | MAUJER STREET, FROM STREET MORGAN AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of building #315 MAUJER STREET & temp water restoration in the sidewalk (NB required to restore sidewalk flags in kind upon completion) |
2021-01-10 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water restorations flush to grade in the roadway of both parking lanes in front of property #94 & temp water restoration in the sidewalk CORRECTIVE ACTION REQUEST ISSUED on latest permit on file expired # B012020301B72 overdue for final |
2021-01-10 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w |
2021-01-10 | No data | BUSHWICK AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #1176 BUSHWICK AVENUE & sidewalk flags installed expansion joints sealed in between the sidewalk & curb in compliance |
2021-01-10 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #98 BLEECKER STREET |
2021-01-10 | No data | EAST 7 STREET, FROM STREET AVENUE C TO STREET AVENUE D | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not able to find work done |
2021-01-10 | No data | JEFFERSON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-01-10 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance (NEW YORK PAVING SUBCONTRACTOR NATIONAL GRID MAJOR GAS INSTALLATIONS) |
2021-01-10 | No data | FLUSHING AVENUE, FROM STREET INGRAHAM STREET TO STREET SCOTT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of building #1267 FLUSHING AVENUE in compliance |
2021-01-09 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved during BPP |
2021-01-09 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in compliance (s/w only) |
2021-01-09 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONPlease restore/repair temporary water restoration in the sidewalk in front of property #94 WEIRFIELD STREET, in a timely fashion. CAR issued overdue for final |
2021-01-09 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire segment repaved |
2021-01-09 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-08 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2021-01-08 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE DRIVING LANE. |
2021-01-08 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & SWK RESTORED ON SIDE OF 57 WILLOW ST (CORNER PROPERTY) |
2021-01-08 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work resurfaced. |
2021-01-08 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in the parking lane and new sidewalk flags all found in front of location. |
2021-01-07 | No data | STANWIX STREET, FROM STREET FLUSHING AVENUE TO STREET MONTIETH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-01-07 | No data | PARK AVENUE, FROM STREET BROADWAY TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2021-01-07 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench flushed to grade IFO building 1950 running west to east |
2021-01-07 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2021-01-07 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2021-01-07 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012020358E65 active permit on file. plated excavation in the parking lane |
2021-01-07 | No data | MOFFAT STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane |
2021-01-07 | No data | WHITE STREET, FROM STREET 6 AVENUE TO STREET WEST BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2021-01-06 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER : cut has hairline cracks no C.A.R. issued at this time. |
2021-01-06 | No data | LAFAYETTE AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-01-06 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2021-01-06 | No data | 46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2021-01-06 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2021-01-06 | No data | BURKE AVENUE, FROM STREET COLDEN AVENUE TO STREET RADCLIFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2021-01-06 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... short water ... west side of street |
2021-01-06 | No data | GROVE PLACE, FROM STREET DEAD END TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PRIVATE STREET |
2021-01-06 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water sewer restoration flush to grade in the roadway extending into the parking lane in front of building #306 STOCKHOLM STREET in compliance |
2021-01-06 | No data | LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET BROOKLYN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT COVERD BY BPP FOR NEW BUILDING |
2021-01-06 | No data | UTICA AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the bus lane opposite House # 267 Utica Av |
2021-01-06 | No data | MORRIS AVENUE, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done opposite of the location |
2021-01-06 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no backhoe on site |
2021-01-05 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB TO CURB PERM RESTORATION IN THE DRIVING LANE IFO 143. NEW SWK INSTALLED AT NEW BUILDING |
2021-01-05 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 4423 avenue I |
2021-01-05 | No data | 46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway excavation plated |
2021-01-05 | No data | EAST 9 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane in compliance |
2021-01-05 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 brand new sidewalk flags installed with water valve in front of property #193 in compliance |
2021-01-04 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2021-01-04 | No data | EAST 22 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site working in r/w new permit on file |
2021-01-04 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint not verified - no steel plates f/o 149-46 Sanford av at this time.Plates f/o 149-54/56 Sanford Ave. not loose at this time. |
2021-01-03 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | steel plate found in parking lane counter sunken with roadway |
2021-01-03 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate found in parking lane counter sunken with roadway |
2021-01-03 | No data | DAVIS STREET, FROM STREET DEAD END TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM ROADWAY |
2020-12-19 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | THE SIDEWALK IS CURRENTLY OPEN. |
2020-12-19 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN BUS LANE IN RWY RE-PAINTED RED AT ENTRANCE TO BUILDING OPERATION AT 291 |
2020-12-19 | No data | 35 AVENUE, FROM STREET 108 STREET TO STREET 109 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the s/w,unable to see work on r/w due to snow - contractor has an active permit - # Q012020342B88 at this time. |
2020-12-19 | No data | 35 AVENUE, FROM STREET 108 STREET TO STREET 109 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work found on the s/w,unable to see work on r/w due to snow - permit active at this time. |
2020-12-18 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 3 steel plates marked PNYCI in the driving lane i/f/i 149-54 Sandford Avenue shifted and deflected. The plates were reset and the area was made safe |
2020-12-18 | No data | SANFORD AVENUE, FROM STREET 150 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates shifted and deflecting. Roadway and corner of plates showing signs of collapsing. Please make safe. |
2020-12-18 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site backfill cut 15 ft from bedford ave in the parking lane |
2020-12-18 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed on a cut in the parking lane 15 fr from bedford ave cutbacks was made concrete base will be restored cut will be left plated |
2020-12-18 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | snow in the parking lane |
2020-12-17 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the steel plate street opening counter sunken in the roadway. Nov issued |
2020-12-16 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut flush and sealed in the parking lane |
2020-12-16 | No data | KATONAH AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-12-16 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was paved by DOT (2018) and no work found on the sidewalk, found resurfaced. |
2020-12-16 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-12-16 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk clear. |
2020-12-16 | No data | 11 AVENUE, FROM STREET 55 STREET TO STREET 56 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw rw cuts ok |
2020-12-16 | No data | 196 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found, roadway resurfaced. |
2020-12-15 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the roadway in compliance. |
2020-12-15 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AREA REPAVED NEW BUILDING |
2020-12-15 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-12-15 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the roadway IFO 30. Sidewalk flags not yet fully restored refer to permit M012019087B86. |
2020-12-14 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O/ building #160 Broadway In the driving lane plumber restoration and I/F/O #6 Liberty Place plumber restoration in the parking lane are in compliance. |
2020-12-14 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. to post “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY starting 12-1-2020 TO 3-31-2021 ending. Nov issued |
2020-12-14 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY AT 12 |
2020-12-14 | No data | CANAL STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2020-12-12 | No data | CHURCH AVENUE, FROM STREET VERONICA PLACE TO STREET WOODS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY WAS RESURFACED BY B.P.P THERE IS A PERM WATER CUT IN THE OPPOSITE PARKING LANE |
2020-12-12 | No data | ST MARKS AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-12-11 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the RW |
2020-12-11 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut ok. |
2020-12-11 | No data | GRAND STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts, #1 (L) 9ft (W) 3ft 2in (D) 4ft, #2 (L) 9ft 6in (W) 4ft (D) 4ft. WD 114.0 DD 104.9 MD 112.5 AM 8.7 cut #1 lift 97.4 #2 97.1, steel plate over cement curing, in compliance at this time. |
2020-12-11 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building #7 plumbers restoration in the driving lane is in compliance. |
2020-12-10 | No data | DE GRAW STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notice issued repairs to sewer and water 2 cuts rd/w -s/w |
2020-12-10 | No data | DE GRAW STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill was completed on 1 cut in the parking lane cutbacks was made concrete truck on site for base cut will be left temp to grade |
2020-12-10 | No data | EAST 16 STREET, FROM STREET DITMAS AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill CompleteCut1 6'10x3'2x3'6 Comp. 96.1Cut2 3'1x2'8x2'10 Comp. 98.1Cut3 4'3x2'11x3'1 Comp. 98.2WD 126.0DD 115.9MD 118.9AM 8.7 |
2020-12-10 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy in compliance. |
2020-12-10 | No data | WEST 121 STREET, FROM STREET 8 AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill pass and complete IFO 300. Measurments: L-5ft 7in, W- 5ft 3in, W- 3ft 5in. Test: 96.5 2) L- 3ft 1in, W- 3ft 8in, D- 3ft. Test: 97.3 |
2020-12-10 | No data | HARMAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notice issued cut in rd/w opp . location |
2020-12-09 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O (AKA 11 Greene Street) permanent water repair in the driving/parking lane north/south is in compliance. |
2020-12-09 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobblestone restoration was made by Harris Water Main at 12 LW12 St. |
2020-12-09 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-12-08 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew is currently on site fix NICA condition that were previously reported. Will return for re-inspection. |
2020-12-08 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY |
2020-12-08 | No data | CARROLL STREET, FROM STREET FORD STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | TWO CUTS IN FRONT OF HOUSE# 1691. FIRST CUT 4FT BY 4FT. SECOND CUT 3FT BY 2FT. |
2020-12-08 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp repaved over water cut |
2020-12-08 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-12-08 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel Plates on the sidewalk in front of house 349 is unstable and falling in to the hole causing a 5 1/2 inch opening and pushing pedestrians to the roadway to pass. |
2020-12-08 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL PERM RESTORATION IN FRONT OF 1365/1369. |
2020-12-08 | No data | BROOKLYN AVENUE, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP COMPLETED ON ROADWAY |
2020-12-08 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 PLBGNYCINC steel plates countersunk 1 in the driving lane and the other in the parking lane behind BO barriers. |
2020-12-08 | No data | LEGION STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates have been made stable and secured for pedestrians to utilize the sidewalk fully. |
2020-12-07 | No data | BRONXWOOD AVENUE, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench with restored marking in compliance |
2020-12-07 | No data | ST MARKS AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 16ft by 4ft down 5ft 6ft by 5ft down3in |
2020-12-07 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY |
2020-12-07 | No data | MADISON AVENUE, FROM STREET EAST 61 STREET TO STREET EAST 62 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced. No defects to report |
2020-12-06 | No data | EAST 9 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | arrived on email complaint permit on file valid for barriers |
2020-12-06 | No data | LINDEN STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of building #400 in compliance |
2020-12-06 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN BUS LANE IN RWY RE-PAINTED RED AT ENTRANCE TO BUILDING OPERATION AT 291 |
2020-12-06 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was Resurfaced & No work found on the Existing Sidewalk |
2020-12-06 | No data | 68 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1/2 + 5 feet of the roadway in front of 2165/67 was paved by BPP, found resurfaced. |
2020-12-06 | No data | 204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012016291B51 on file. |
2020-12-06 | No data | EAST 22 STREET, FROM STREET AVENUE I TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2020-12-06 | No data | HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. to post “RAISE PLOW” sign ahead as per the WINTER MORATORIUM POLICY starting 12-1-2020 TO 3-31-2021 ending. Nov issued |
2020-12-06 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut in the driving lane with most of it covers by new B/O 1/2+5 pavement. |
2020-12-04 | No data | 162 STREET, FROM STREET 46 AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk not occupied |
2020-12-04 | No data | GROVE PLACE, FROM STREET DEAD END TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PRIVATE STREET |
2020-12-04 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED PK LANE & DRIVING AT BUILDING OPERATION ON SEC CORNER |
2020-12-03 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | bpp repaved over water cut |
2020-12-03 | No data | EAST 230 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration on the white plains rd side where massive double parking taking place.Unable to properly inspect |
2020-12-03 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate cut due to active B.O on site. |
2020-12-03 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance |
2020-12-03 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber restoration in the roadway/turning lane is in compliance. 58' east of 6th avenue. |
2020-12-03 | No data | 108 STREET, FROM STREET 37 AVENUE TO STREET 37 DRIVE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in roadway , one excavation made on roadway and one excavation to be made on sidewalk , 3 day notice issued. |
2020-12-03 | No data | HUNTER STREET, FROM STREET 28 STREET TO STREET QNSBORO BR UP RY APR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the parking park lane opposite of 42-62/64 sidewalk flag restored |
2020-12-03 | No data | ROGERS AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw work has been resurfaced and sidewalk flags installed |
2020-12-03 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Backhoe Visible Placed On Site At Time Of Inspection |
2020-12-02 | No data | EAST 9 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in compliance |
2020-12-02 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the roadway IFO 30. Sidewalk flags not yet fully restored refer to permit M012019087B86. |
2020-12-02 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut restoration flush in the driving lane. |
2020-12-02 | No data | EAST 9 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-12-02 | No data | 66 STREET, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 11'02"x 4'00" p/d/l.Perm concrete s/w. |
2020-12-02 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O BO paving done cannot see work |
2020-12-01 | No data | EAST NEW YORK AVENUE, FROM STREET ST MARKS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm restoration found in the roadway in front of 1611. |
2020-12-01 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | no work found |
2020-12-01 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation without a permit on file. |
2020-12-01 | No data | WHITE PLAINS ROAD, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Arrived at location to ensure compliance with sidewalk. Plumber currently on site |
2020-12-01 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work done on the sw at 287 |
2020-11-30 | No data | CALYER STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/18/2020. |
2020-11-29 | No data | 38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY - NEW SWK INSTALLED |
2020-11-29 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of building #1285 MADISON STREET & 1 sidewalk flag installed with water valve in compliance. |
2020-11-28 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in kind in prestigious condition in compliance |
2020-11-27 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-11-27 | No data | 16 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION WAS RE-SEALED OK OUTSIDE RE-PAVE OF RWY AT NEW BUILDING ON 16 STREET |
2020-11-26 | No data | BEDFORD AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING RESTORED |
2020-11-25 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags around water valve. |
2020-11-25 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | R/w resurfaced |
2020-11-25 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints. |
2020-11-25 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT ON CONCRETE ROADWAY |
2020-11-25 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIRS HAVE BEEN MADE IN 2 SECTIONS OF TRENCH |
2020-11-25 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in the roadway from 2239-2243 and sidewalk flags. |
2020-11-25 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new sidewalk flags around water valve. |
2020-11-25 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new sidewalk flags around water valve opposite 2137. |
2020-11-24 | No data | COURT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. |
2020-11-24 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-11-24 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk IFO active BO is flush to grade. |
2020-11-23 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut IFO active BO. In compliance. |
2020-11-22 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Cut in Compliance |
2020-11-22 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed |
2020-11-22 | No data | EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-21 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J/D1B project-D1J issued. |
2020-11-21 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire segment repaved by dot |
2020-11-20 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10ft by 4ft down 10ft 4ft by 3ft down 2ft 7in |
2020-11-20 | No data | BAY COURT, FROM STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber work not done at intersection of Bay court and Shore parkway - Building is located on shore parkway between Bay court and Sheepshead bay road - - The permit was taken for the wrong location |
2020-11-20 | No data | 66 STREET, FROM STREET 48 AVENUE TO STREET LAUREL HILL BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | no temp pedestrian walkway provided at location at this time. |
2020-11-19 | No data | POWELL STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not completed on this permit, newer permit on file. B012018128D14. |
2020-11-19 | No data | EAST 195 STREET, FROM STREET HOBART AVENUE TO STREET MAYFLOWER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the roadway, also on sidewalk |
2020-11-18 | No data | MORRIS AVENUE, FROM STREET EAST 148 STREET TO STREET EAST 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE RECESSED OPPOSITE BLDG # 528 |
2020-11-18 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Three perm sewer restorations in the roadway and sidewalk flags. |
2020-11-18 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for final. |
2020-11-18 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for finalNo |
2020-11-18 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 of 4 plates in the roadway shifted 4 inches in the roadway. |
2020-11-17 | No data | 41 AVENUE, FROM STREET FULLER PLACE TO STREET HAIGHT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2020-11-17 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water cuts on roadway. Temp sidewalk. Located IFO active BO. |
2020-11-16 | No data | ST MARKS AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-11-16 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY IN BUS LANE |
2020-11-16 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ARRIVE 1055- BACKFILL PASS- (L)5 FT,6 FT X (W)5FT,3 FT X (D) 4 FT, 4 FT; TESTS 96.5,97.4 + 96.2,96.6 -WD 123.6, DD 114.9, MD 119, AM 7.5-SAW CUTBACKS WERE BEING DONE AT BUILDING OPERATION- LEFT AT 1225 PM |
2020-11-15 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration remains flush. |
2020-11-15 | No data | MAUJER STREET, FROM STREET MORGAN AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of building #315 MAUJER STREET & temp water restoration in the sidewalk |
2020-11-15 | No data | KEAP STREET, FROM STREET GRAND STREET EXTENSION TO STREET SOUTH 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. |
2020-11-14 | No data | ELTON STREET, FROM STREET HEGEMAN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | perm roadway cut in compliance |
2020-11-14 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV WAS WRITTEN 11/10/20 |
2020-11-13 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-11-13 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Permit Number: B012020303D94. |
2020-11-13 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | the sidewalk is occupied |
2020-11-12 | No data | EAST 22 STREET, FROM STREET AVENUE I TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sealed and in compliance |
2020-11-12 | No data | 46 ROAD, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced since water restoration was done |
2020-11-12 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-11-12 | No data | SHORE PARKWAY, FROM STREET EAST 16 STREET TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed opening of street without DOT permit. Plated excavation in roadway without permit. Respondent was identified by markings (PNYCI) on steel plates and color code |
2020-11-10 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in compliance |
2020-11-10 | No data | CLARA STREET, FROM STREET CHESTER AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-11-10 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration resurfaced by new water restoration in front of new building. |
2020-11-10 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Complaint | Department of Transportation | I observed the above respondent with barricades and debris stored on roadway opposite above address without a valid permit on file. Permit #B012020220A21 which expired on 9/1/2020 was used for ID. |
2020-11-10 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ON THE ROADWAY |
2020-11-10 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-11-10 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND 2 SIDE WALK FLAGS INSTALLED |
2020-11-09 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED BUS LANE |
2020-11-09 | No data | BAYARD STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2020-11-09 | No data | BAYARD STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut-14’Width of the cut-4’Depth of the cut-6’W.D-124.2D.D-114.3M.D.D-121.5A.M-8.7%1st lift-98.1%last lift-98.7% |
2020-11-08 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway excavation plated and counter sunk |
2020-11-08 | No data | 44 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-11-06 | No data | 40 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass1 roadway cut15’L x 5’4”W x 8’DTest: 97.6% & 97.8%Departure time: 4:00pm3 loads of material were tested and used |
2020-11-06 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway excavation plated |
2020-11-06 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - Cut 1: L – 12ft 8in W – 9ft 2in D – 5ft 0in Lift One: 97.3% Lift Two: 97.1% Cut 2: L – 6ft 10in W – 3ft 6in D – 5ft 0in Lift One: 97.0% Lift Two: 97.1% Cut 3: L – 6ft 10in W – 3ft 6in D – 5ft 0in Lift One: 97.4% Lift Two: 97.3% |
2020-11-06 | No data | 41 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway excavation plated with a newer active permit on file |
2020-11-05 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave was done |
2020-11-05 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 3ft by 3ft down 4ft |
2020-11-05 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the roadway |
2020-11-04 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED WATER CUT IN THE ROADWAY |
2020-11-03 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-11-03 | No data | EAST 135 STREET, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE | No data | Street Construction Inspections: Complaint | Department of Transportation | 4 steel plates marked PNYC is loose and noisy as vehicles roll over. |
2020-11-02 | No data | 68 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - L – 12ft 4in W – 4ft 10in D – 8ft 8in Lift One: 98.5% Lift Two: 98.7% - Start Time: 11:50am Completed: 1:50pm |
2020-11-02 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new sidewalk flags around water valve. |
2020-11-02 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work completed. |
2020-11-02 | No data | AVENUE V, FROM STREET BRIGHAM STREET TO STREET KNAPP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway and new sidewalk flags around water valve. |
2020-11-02 | No data | KNAPP STREET, FROM STREET AVENUE V TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Work was completed. No pedestrian walkway needed. |
2020-11-02 | No data | BRIGHAM STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags around water valve. |
2020-11-02 | No data | BATHGATE AVENUE, FROM STREET BEND TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-02 | No data | WASHINGTON AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-11-01 | No data | MAUJER STREET, FROM STREET MORGAN AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #315 |
2020-11-01 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY IN BUS LANE-NEW PERMIT APPLIED FOR IN NYC STREETS |
2020-11-01 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | STEEL PLATE ON RWY IN PK LANE-NEW APPLIED FOR IN NYC STREET OLD EXPIRED 10/30/20 |
2020-10-31 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER CUT IN THE ROADWAY |
2020-10-31 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAG WITH HARDWARE OBSERVED IFO 327 ONLY. ROADWAY HAS BEEN REPAVED ONE HALF, PLUS FIVE FT. |
2020-10-31 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & NEW SWK FLAGS NOT SEALED |
2020-10-30 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & SIDEWALK AT BUILDING OPERATION OFF ECL OFF MYRTLE AVE |
2020-10-30 | No data | BLAKE AVENUE, FROM STREET OSBORN STREET TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2020-10-30 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION ACROSS RWY & NEW SWK FLAGS- DEBRIS WAS REMOVED |
2020-10-29 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the roadway IFO 30. Sidewalk flags not yet fully restored refer to permit M012019087B86. |
2020-10-29 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | No temp pedestrian walkway at this time. Sw is open to pedestrians |
2020-10-29 | No data | SOUTH 2 STREET, FROM STREET HOOPER STREET TO STREET KEAP STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane 55 FEET FROM CORNER OF KEAP STREET AKA PROPERTY #382 KEAP STREET in compliance |
2020-10-29 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plated excavation found in the parking lane |
2020-10-29 | No data | JAVA STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian observed i/f/o 189 Java Street |
2020-10-29 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Temporary walkway in compliance. |
2020-10-29 | No data | 72 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY AS STIPULATED /BARRIERS OCCUPANCY ROADWAY |
2020-10-29 | No data | 68 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is not being occupied at the moment, sidewalk is clear for pedestrians. |
2020-10-29 | No data | BRONXWOOD AVENUE, FROM STREET EAST 227 STREET TO STREET EAST 228 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sewer trench completed |
2020-10-29 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS OK OPP 718/720. SIDEWALK OK WITH HARDWARE. |
2020-10-28 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated water cut in the parking lane |
2020-10-28 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer in the roadway in front of 1106 door |
2020-10-28 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 perm water restorations flush to grade in the roadway of both parking lanes in front of property #94 & temp water restoration in the sidewalk |
2020-10-28 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in parking lane ok. Located IFO active BO. |
2020-10-28 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above responden fail to completely seal street cut (CAR #20207380375) issued on 3\12\2020 |
2020-10-28 | No data | WEST 187 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flags in compliance no defects |
2020-10-28 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated water cut in the parking lane with a valid permit B012020297D90 |
2020-10-28 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK FLAGS NOW SEALED |
2020-10-28 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration of BIKE LANE markings neededPlease restore/repair white divided bicycle lane marker over the permanent sewer restoration in the roadway of the driving lane in front of building #243, in a timely fashion. CAR issued |
2020-10-28 | No data | MAC DOUGAL STREET, FROM STREET BROADWAY TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FOR FINAL WATER CUT ON THE SIDE WALK |
2020-10-27 | No data | OVINGTON AVENUE, FROM STREET 7 AVENUE TO STREET STEWART AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration ok in d/l |
2020-10-27 | No data | EAST 135 STREET, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plates made secure. Contractor is on site. Area is in compliance, no action taken. |
2020-10-26 | No data | JAVA STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ARRIVES AT 12 PM-BACKFILL PASS (L)10,6 FT X (W)4, 4FT 7 IN X (D) 4FT 7IN, 4 FT- TEST 97.3,97 + 97.4,97.2- CUTBACKS DONE & CREW FOREMAN WAS INSTRUCTED TO JOIN 2 TRENCHES (LESS THAN 10 FEET) - CONCRETE INSTALLED(ON SITE) & WILL BE REPLATED |
2020-10-26 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench driving lane to parking lane. |
2020-10-26 | No data | JAVA STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | PLATED SWK & STEEL PLATED ACROSS ROADWAY |
2020-10-26 | No data | SOUTH 2 STREET, FROM STREET HOOPER STREET TO STREET KEAP STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 12ft (W): 4ft (D): 5ft 6in - 97.5%; 97.9%Cut #2: (L): 6ft (W): 4ft (D): 5ft 6in - 98.1%; 97.9%Located from curb to P/L adj to 382 Keap St.Cutbacks made.Arrival: 12:10PMDeparture: 2:40PM |
2020-10-26 | No data | 51 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 3:10pm to 3:45pm one cut in the parking lane length 5ft width 3ft depth 3ft 4inches. |
2020-10-26 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw cut ok |
2020-10-25 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2020-10-25 | No data | WEST 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-10-25 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-10-24 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE. |
2020-10-23 | No data | WEST 48 STREET, FROM STREET 5 AVENUE TO STREET ROCKEFELLER PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work has been covered by BPP. M012019183A07. |
2020-10-22 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 8ft by 7ft down 10ft cut |
2020-10-20 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED 3 ASPHALT RESTORATION ON A CONCRETE ROADWAY THE RESPONDENT FAILED TO RESTORED ROADWAY RESTORATION IN KIND “CONCRETE PANEL NEEDS TO BE RESTORED” (CAR #20204580127) WAS ISSUED 6/10/2020 |
2020-10-20 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO MAKE PERMANENT RESTORATION ACROSS ROADWAY DOWN 2 INCHES IN ROADWAY-IN FRONT 1089 DEKALB AVENUE WITH SURROUNDING AREA. (CAR #20204510850) WAS ISSUED ON 9/3/20 PERMITTEE ID BY COLOR CODE |
2020-10-20 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED WATER CUT IN THE OPPOSITE PARKING LANE |
2020-10-20 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut okay in r/w, scaffold still on location |
2020-10-19 | No data | BEDFORD AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20204510874-FAILED TO RESTORE WHITE LANE MARKING OVER PERMANENT PLUMBING NYC, INC. REPAIR WATER RESTORATION IN ROADWAY. |
2020-10-19 | No data | HANCOCK STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm water cut in the roadway |
2020-10-18 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-10-18 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-10-16 | No data | ELIOT AVENUE, FROM STREET 62 STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts to grade. |
2020-10-16 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | CREW ON SITE I SPOKE TO FOREMAN ALL CORRECT PERMIT ON FILE THERE IS A LANE FOR TRAFFIC CUT ON THE SIDEWALK REPAIR SEWER |
2020-10-16 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE EXCAVATION ON THE SIDEWALK REPAIR SEWER |
2020-10-15 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE. |
2020-10-15 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-10-15 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Lab tech not available at this time, contractor will reschedule LL14 for a later date |
2020-10-15 | No data | PLAINVIEW AVENUE, FROM STREET BEACH 19 STREET TO STREET BEACH 20 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to fully inspect due to cars in p/l at time of inspection. |
2020-10-15 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE. ACTIVE PERMIT EXIST AT TIME OF INSPECTION. |
2020-10-14 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | beneath builders paving |
2020-10-13 | No data | WILLOW STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED ON CORNER BUILDING |
2020-10-13 | No data | ANDROVETTE AVENUE, FROM STREET DEISIUS STREET TO STREET EYLANDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION ON ROADWAY |
2020-10-13 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut has been covered by BPP |
2020-10-13 | No data | RICHMOND ROAD, FROM STREET CUNARD PLACE TO STREET MARY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived @ 12:00. Opening size: 7'x4'. Backfill was completed & acceptable. Base to follow. |
2020-10-13 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-10-12 | No data | LYNCH STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK RESURFACED AT NEW BUILDING |
2020-10-12 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in RW, in compliance |
2020-10-11 | No data | WILLIAMS AVENUE, FROM STREET ATLANTIC AVENUE TO STREET EAST NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, crossing ....new water installed (sprinkler) |
2020-10-11 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-10-10 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final in compliance |
2020-10-10 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2020-10-09 | No data | AVENUE K, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Roadway resurfaced - B152018208A89 |
2020-10-09 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-10-09 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2020-10-09 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS ON THE ROADWAY 1 ON EACH SIDE OF THE STREET |
2020-10-09 | No data | SHELL ROAD, FROM STREET 86 STREET TO STREET BOUCK COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the work was done on the sidewalk |
2020-10-09 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE DRIVING LANE, TEMP CUT ON SIDEWALK IFO BO. |
2020-10-09 | No data | EAST 144 STREET, FROM STREET MDE NORTHBOUND EXIT 4 TO STREET GERARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance on the sidewalk and roadway |
2020-10-08 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE. |
2020-10-08 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restorations covered by a BPP |
2020-10-08 | No data | 72 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete and acceptable. Cut size 20'x7'x12' Tests w/d 124.8, d/d 117.3, m/d/d 122.5, a/m 6.4 % Lifts 96.2 & 96.5 |
2020-10-07 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2020-10-07 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-10-07 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB TO CURB PERM RESTORATION IN THE DRIVING LANE IFO 143. SIDEWALK FLAGS WITH HARDWARE. |
2020-10-07 | No data | EAST 126 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New roadway . Since been resurfaced sidewalk in compliance |
2020-10-07 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over by BPP. |
2020-10-06 | No data | 46 ROAD, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass start time= 12:00, end time= 1:00. Cut dimension=(1) 8'8'' x 4'4'' down 3', (2) 5'2'' x 2'10'' down 2' due to electric utility |
2020-10-06 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench flush to grade within the r/w. curb to curb. i/f/o 156 |
2020-10-06 | No data | 72 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew actively working on site at time of inspection. In compliance. |
2020-10-06 | No data | 72 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired- refer to latest permit Q012020273C03. |
2020-10-06 | No data | 46 ROAD, FROM STREET 204 STREET TO STREET CLEARVIEW EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | PLEASE DISREGARD PREVIOUS INSPECTION. THIS WAS NOT MONITORED AND INSPECTOR CODED THE WRONG CONFIRMATION IN ERROR. |
2020-10-05 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-10-05 | No data | GROVE PLACE, FROM STREET DEAD END TO STREET HANOVER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN RWY-PRIVATE STREET |
2020-10-05 | No data | GROVE PLACE, FROM STREET DEAD END TO STREET HANOVER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP RESTORATION IN RWY-PRIVATE STREET |
2020-10-05 | No data | 101 AVENUE, FROM STREET 109 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, premm.... |
2020-10-03 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bike logo applied |
2020-10-03 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half perm & half temp restoration in the r/w & new permit on file |
2020-10-03 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the roadway IFO 30. Sidewalk flags not yet fully restored refer to permit M012019087B86. |
2020-10-02 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER VALVE INSTALLED ON SIDEWALK |
2020-10-02 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw paved |
2020-10-02 | No data | ALBANY AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-10-02 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | half perm & half temp trench in the r/w curb to curb & water valve on s/w & new permit on file |
2020-10-01 | No data | CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2020-10-01 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the r/w curb to curb |
2020-10-01 | No data | QUEENS BOULEVARD, FROM STREET BEND TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found roadway could have been resurfaced |
2020-10-01 | No data | I 678, FROM STREET WHITESTONE EXPRESSWAY ET 17 SB TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area p/d/l paved to grade by the builder (BPP),new s/w. |
2020-09-30 | No data | EAST 19 STREET, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite 2736. |
2020-09-30 | No data | AVENUE I, FROM STREET EAST 45 STREET TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #4423 in compliance |
2020-09-29 | No data | 7 AVENUE, FROM STREET WEST 40 STREET TO STREET WEST 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 207 West 40th on 7th Ave, no work observed by this permittee at this time. Active permit M012020260B08 on file for possible future work, this permit has expired. |
2020-09-29 | No data | 43 AVENUE, FROM STREET 58 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut in the driving/parking lane & several sidewalk flags restore with expansion joint seal in compliance. |
2020-09-29 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve installed on sidewalk |
2020-09-29 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 207, NOV for 9 "PNYCI" marked steel plates fastened to the roadway and sidewalk area with no active NYC DOT permit on file for use / opening of a Protected Street on file. Cited permit expired on 9/28/2020. |
2020-09-29 | No data | BEACH 12 STREET, FROM STREET CHANNING ROAD TO STREET DINSMORE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete and acceptable. Cuts size 10'x7'x6.6', 10'x7'x6.6' & 4'x4'x3' Tests w/d 125.1, d/d 115.1, m/d/d 122.5, a/m 8.7 % and Lifts 96.2 & 96.0, 96.3 & 97.0 and 97.5 respectively. F/o 1147/1149. |
2020-09-28 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in RW, in compliance |
2020-09-28 | No data | 54 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench in roadway from curb to curb. |
2020-09-28 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recessed plated excavation found to be in roadway (P/L), temporary restoration in compliance at this time. (Active permit B012020261C15) |
2020-09-27 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass perm to grade Rw And SW |
2020-09-27 | No data | UTICA AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ON THE ROADWAY |
2020-09-26 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Active | Department of Transportation | 4 brand new sidewalk flags installed with water valve in front of property #193 in compliance |
2020-09-26 | No data | EAST 32 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut found on the rw |
2020-09-26 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL EXPANSION JOINT IN NEW REPAIR WATER SIDEWALK FLAGS- IN FRONT OF 220 HOOPER STREET BETWEEN MARCY AVENUE & LEE AVENUE. |
2020-09-25 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE IFO 385. |
2020-09-25 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the crosswalk missing lane markings active permit on file |
2020-09-25 | No data | 16 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the above respondents fail to reseal street cut CAR #20201670342) issued in 8\20\2020 street cut is on 16st between 4ave 5ave |
2020-09-25 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THIS IS A OLD SITUATION - JOE HOCK FIRST THEN SECONDLY GREG FOSTER-protest was accepted by greg foster. permitee not responsible |
2020-09-25 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not able to see water due to BO in progress |
2020-09-25 | No data | 38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pictures were wrong however sunken are was patched |
2020-09-25 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE IFO 385. |
2020-09-24 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush to grade in driving lane in front of 544 |
2020-09-24 | No data | 53 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 11:52am to 1:15pm one restoration between parking lane and driving lane length 10ft width 4ft depth 9ft. |
2020-09-24 | No data | 84 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been paved |
2020-09-23 | No data | PARKVILLE AVENUE, FROM STREET EAST 8 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced by BPP |
2020-09-23 | No data | 54 STREET, FROM STREET GRAND AVENUE TO STREET LONG ISLAND RAILROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill passed and completed. Two cuts. (13'8" x 4' x 4') & (5'6" x 4' x 4') |
2020-09-23 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - |
2020-09-23 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new building roadway repaved |
2020-09-23 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-09-23 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2020-09-22 | No data | 17 AVENUE, FROM STREET 76 STREET TO STREET 77 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk ok |
2020-09-22 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut going curb to curb, in compliance |
2020-09-22 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration wearing course not rolled enough, missing color codefound in front of 46-38 |
2020-09-22 | No data | EAST 2 STREET, FROM STREET AVENUE O TO STREET RYDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - L – 12ft 10in W – 4ft 6in D – 9ft 4in Lift One: 97.3% Lift Two: 97.7% |
2020-09-22 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY |
2020-09-21 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATE OVER CUT OK RW |
2020-09-21 | No data | JEFFERSON AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by national grid permanent restoration |
2020-09-21 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATE OVER CUT OK NEW PERMIT B012020260E37 |
2020-09-20 | No data | EAST 71 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve in s/w & new s/w flag, perm restoration in p/l at the corner of 7022 Avenue U |
2020-09-20 | No data | AVENUE U, FROM STREET EAST 70 STREET TO STREET EAST 71 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve in s/w & new s/w flag, perm restoration in p/l at the corner of 7022 Avenue U |
2020-09-20 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm gas restoration cut found on roadway in front of 1051 new york avenue |
2020-09-18 | No data | PRESIDENT STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4ft by 3ft 3ft 4ft by 3ft down 4ft |
2020-09-18 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2020-09-17 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut resurfaced by BPP |
2020-09-17 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | PLEASE REMOVE CONES, SAND, ASPHALT AND PAPERS IN FRONT OF #197 AND OPPOSITE #214 SERVING NO PURPOSE. NO ONE ON SITE. |
2020-09-17 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-11:05amcut-12'x4'x8'5'' test-96.7 & 97.5juanj.jETLabels.cc.fw-121.8d-115.7md-120am-5.3cutback in progress |
2020-09-16 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to permanently restore the temporary water restoration in the sidewalk within the required time. Nov D4F issued overdue for final |
2020-09-16 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp water cut in the parking lane under a park car that is over due for final. they fail to permanently restore their cut within the required time. they permit expired 12/31/19 used for ID only |
2020-09-16 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done under this permit. Harris did cobblestone restoration near 12 for water repair. |
2020-09-15 | No data | 156 STREET, FROM STREET BEECH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass start time= 11:50, end time= 12:13. Cut dimensions= 4'6'' x 3' down 4'7'' (NB 2 flags was replaced and cut is located in opp. p/d/l) |
2020-09-15 | No data | MULBERRY STREET, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER - SEWER: Resurfaced by BBP new building. |
2020-09-15 | No data | 57 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration from curb to curb. |
2020-09-15 | No data | LEXINGTON AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in PL, new SW flag around water valves |
2020-09-15 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | verified. an approx. 2'7" x 1'4" area of the roadway has caved in 2'9"found I/F/O 46-38 |
2020-09-15 | No data | 255 STREET, FROM STREET 57 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | full sidewalk flag replaced |
2020-09-15 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee cut out a 7'3" x 3'6" area filled and made perm forgot to add color code |
2020-09-15 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-131.7, Dry-Den-121.2, Max. Dry-Den-124.0, Act. Moist-8.7, Material- Clean fill (Blend), Test -Sand cone, Lab- Exclusive Testing Labs Inc. - Lab tech- Chris Compaction results (97.0, 97.8) |
2020-09-15 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for pave |
2020-09-15 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for pave |
2020-09-15 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repairs in the driving lane extending into the fence area active B.O. is flush to grade. |
2020-09-14 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2020-09-14 | No data | 233 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2019 work found due to newer work being conducted. |
2020-09-14 | No data | EAST 19 STREET, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2020-09-14 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Recessed plated excavation found to be in roadway (P/L), temporary restoration in compliance at this time. (Active permit B012020253B48) |
2020-09-13 | No data | WEST 76 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012020230A86-latest permit |
2020-09-13 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on roadway |
2020-09-13 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-09-13 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, there was no work found. |
2020-09-13 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench flush to grade. |
2020-09-12 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp sewer restoration in the roadway extending into the bicycle lane/parking lane in front of property #243 & temp sewer restoration in the sidewalk, valid dot permit on file #B012020253B47 |
2020-09-12 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK FLAG WITH HARDWARE. ROADWAY RECENTLY RESURFACED. |
2020-09-12 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of building #193 |
2020-09-12 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | an attempt was made but both cuts weren't fully sealed both cuts need to be fully sealed |
2020-09-12 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | an attempt was made but both cuts weren't fully sealed both cuts need to be fully sealed |
2020-09-12 | No data | COURT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work Found on the Existing Roadway/Sidewalk |
2020-09-12 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration permanently restored. |
2020-09-12 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp sewer restoration in the roadway extending into the bicycle lane/parking lane in front of property #243 & temp sewer restoration in the sidewalk |
2020-09-12 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2020-09-11 | No data | GRAHAM AVENUE, FROM STREET MOORE STREET TO STREET SEIGEL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by BPP. |
2020-09-11 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 460 ( Oppo 475 - aka MPG Parking Garage Entrance Ramp ), perm 2020 cut within South Side of roadway near NYC Sewer access cover is flush to grade. Active permit M012020235A60 on file at this time. |
2020-09-11 | No data | BEDFORD AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN DRIVING & PK LANE OF RWY |
2020-09-11 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the roadway IFO 30. Sidewalk flags not yet fully restored refer to permit M012019087B86. |
2020-09-11 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane in compliance. |
2020-09-10 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for pave |
2020-09-10 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS ON THE ROADWAY 1 ON EACH SIDE OF THE STREET |
2020-09-10 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Major Gas Installation is found to be in progress within this segment of roadway at this time (B012020219B96) |
2020-09-10 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK OPEN TO PEDESTRIANS. |
2020-09-10 | No data | STERLING PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE AND SIDE WALK FAG INSTALLED AROUND WATER CAP COVER |
2020-09-10 | No data | READE STREET, FROM STREET BROADWAY TO STREET CHURCH STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair on the roadway extending into active B.O fence area is flush to grade. |
2020-09-09 | No data | ARCHER AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Light tower obstructing p/l of segment with no dot permit on file. Permittee representative, Rocco, was notified of light tower obstructing the roadway without a permit on file on 8/18/20 at 1129 hrs. Condition remains. i/f/o 149-03 |
2020-09-09 | No data | PENN STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway and new swk flags in compliance. Located IFO active BO. |
2020-09-09 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #BIKE02, create a temporary bike-way around the work-zone delineated by cones or similar vertical traffic devices. Nov issued |
2020-09-09 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in front of 220 77 Street was partially paved by BPP, found resurfaced. |
2020-09-09 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-09-09 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permittee has placed Backhoe on wrong segment. Backhoe is currently stored at Archer ave between 149th street and 150th street i/f/o 149-03. Permittee will be contacted to amend location on permit. |
2020-09-08 | No data | 57 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration from curb to curb. |
2020-09-08 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. 26'x4'x8'11" |
2020-09-08 | No data | LEXINGTON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2020-09-07 | No data | 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-09-07 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp work on the roadway |
2020-09-07 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work in parking lane |
2020-09-07 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cut ok |
2020-09-07 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit B012020232A53 temp cut ok |
2020-09-07 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to obtain a valid DOT permit on file for the 2 steel plate street openings in the roadway down 1‘ on a protected street. Nov issued |
2020-09-06 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Installation of Curb In Compliance |
2020-09-06 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION MADE PERM AGAIN |
2020-09-05 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC has sealed all outer edges of the permanent sewer restoration with liquid asphalt seal in the roadway of the driving lane in front of building #639 in compliance |
2020-09-05 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WHITE LANE MARKING RESTORED |
2020-09-04 | No data | WEST 48 STREET, FROM STREET 5 AVENUE TO STREET ROCKEFELLER PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 12 permanent water restoration is in compliance |
2020-09-04 | No data | ATLANTIC AVENUE, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | EXPANSION JOINT SEALED |
2020-09-04 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw found resurfaced 1/2+5 covering previous work |
2020-09-04 | No data | WEST 40 STREET, FROM STREET LINC TUNNEL BUS APPROACH TO STREET LINCOLN TUNNEL BUS EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate restoration however there is an active permit on file |
2020-09-04 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT ON CONCRETE ROADWAY |
2020-09-04 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to restore the bicycle lane marker over the permanent restoration prior to notified via CORRECTIVE ACTION REQUEST#20207380937. Nov issued |
2020-09-04 | No data | ALBANY AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN 2 STREET OPENINGS IN RWY & SWK FOR BUILDING OPERAION OFF BERGEN STREET OFF ECL- HALF PLATED SWK |
2020-09-04 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations between p/l and the d/l in front of 1748 and 1750 72 Street. |
2020-09-04 | No data | CHURCH AVENUE, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC, INC has restored/repaired the permanent sewer restoration sunken down 3“ to grade in the roadway of the driving lane flush with the roadway in front of property #1634 in compliance |
2020-09-04 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible water work. |
2020-09-04 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & TEMP SWK AT BUILDING OPERATION -NP |
2020-09-04 | No data | UNION STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY OFF SCL 50 FT WEST OF COURT ST AND 2 NEW SWK FLAGS |
2020-09-04 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION RWY & TEMP SWK RESTORATION AT BUILDING OPERATION |
2020-09-03 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION ACROSS ROADWAY DOWN 2 INCHES IN ROADWAY-IN FRONT 1089 DeKALB AVENUE BETWEEN MALCOLM X BLVD. & STUYVESANT AVENUE. RESTORE ROADWAY TO GRADE. |
2020-09-03 | No data | BATCHELDER STREET, FROM STREET EMMONS AVENUE TO STREET GUNNISON COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-09-03 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible water work. |
2020-09-03 | No data | LYNCH STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2020-09-03 | No data | JEFFERSON AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water valve on SW |
2020-09-02 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN THE PARKING LANE. |
2020-09-02 | No data | WILSON AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by b.p.p |
2020-09-02 | No data | WILSON AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the parking lane |
2020-09-02 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2020-09-02 | No data | WILSON AVENUE, FROM STREET COVERT STREET TO STREET SCHAEFER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2020-09-02 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving lane and sidewalk flags. |
2020-09-02 | No data | JEROME AVENUE, FROM STREET MT HOPE PLACE TO STREET WEST 177 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plumber on site, work in progress |
2020-09-02 | No data | ELTON AVENUE, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not found |
2020-09-02 | No data | CALYER STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK ON CALYER ST- PERM RESTORATION IN IN RWY OPP PK & DRIVING LANE AND NEW SWK AT 33 FRANKLIN STREET |
2020-09-02 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking lane. |
2020-09-01 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway. In compliance. |
2020-09-01 | No data | WILLOUGHBY AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Plated s/w & rwy 2 cuts opp of each other. |
2020-09-01 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut1-6’ 3”/cut2-12’ 3”Width of the cut1-4’ 11”/cut2-4’ 8”Depth of the cut1-3’/cut2-9’ 8”W.D-112.2D.D-104.3M.D.D-107.5A.M-7.5%1st lift-96%/cut2-96.6%last lift cut2-97.2% |
2020-09-01 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in driving lane and sidewalk flags. |
2020-09-01 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations in the p/l opposite 1946 and 1950 80th Street. |
2020-09-01 | No data | MACON STREET, FROM STREET NOSTRAND AVENUE TO STREET VERONA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN OPPOSITE PK LANE |
2020-09-01 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #023, maintain one 11 FOOT lane for all ongoing vehicular traffic. Nov issued |
2020-09-01 | No data | LEXINGTON AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in RW, in compliance |
2020-08-31 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two cuts in the p/l opposite 1946 and 1950 80th street |
2020-08-31 | No data | PROSPECT PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN PK LANE OF RWY AT BO |
2020-08-31 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway is resurfaced |
2020-08-31 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway |
2020-08-31 | No data | WILLOUGHBY AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 open water cuts in the roadway 1 on the sidewalk contractor my have broken the gas line NGRID on site verify that there is a gas leak FDNY have shut off the gas to buildings 1350, 1354, & 1356 |
2020-08-30 | No data | EAST 8 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane in front of property #949 in compliance |
2020-08-30 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane in front of property #3008 in compliance |
2020-08-30 | No data | BAYARD STREET, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SWK & RWY RESURFACED AT NEW BUILDING |
2020-08-30 | No data | EAST 14 STREET, FROM STREET AVENUE M TO STREET ELM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #1306 in compliance |
2020-08-30 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk cut made final |
2020-08-29 | No data | MOORE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION IN RWY 75 FT WEST OF GRAHAM AVE AT NEW BUILDING |
2020-08-29 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration |
2020-08-29 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration on r/w. |
2020-08-29 | No data | MOORE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY 75 FT WEST OF GRAHAM AVE AT NEW BUILDING |
2020-08-29 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm sewer restorations flush to grade in the roadway of the driving lane/parking lane in front of property #104 & 1 sidewalk flag installed with water valve in compliance |
2020-08-29 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for pave |
2020-08-28 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-10:15amcut-7'x6'x2'7'' test- 97.3%valentinej.jETL inctroysand coneC.Fw-109.5d-104md-107.5am-5.3%cutbacks in progress |
2020-08-28 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. |
2020-08-27 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5/FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2020-08-27 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w mill for pave |
2020-08-27 | No data | EAST 4 STREET, FROM STREET AVENUE S TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 restorations on the speed bump |
2020-08-27 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1 - 10' X 4' X 4' Test 1 - 98.6Cut 2 - 4' x 4' x 3' Test 2 - 97.8Supervisor - GermanJumping JackExclusive labsTechnician - JasonSand ConeClean fillWD 107.1DD - 100.7MDD - 103.0AM - 6.4 |
2020-08-27 | No data | EAST 101 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in the parking lane that extends out into the driving lane marked for coring, located at 1834 3rd Avenue, on East 101st Street side. |
2020-08-27 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced from BPP. Water cut not visible. |
2020-08-27 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced by BPP, water valve installed on SW |
2020-08-27 | No data | ONDERDONK AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt sealer edges not sealed IFO 455 on perm cutRestore BIKE02 Lane marking IFO 455 |
2020-08-26 | No data | WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 64 ( closer to 6th Ave ), 2 perm cuts in roadway are flush to grade. North Side cut has lane marking in compliance, unable to fully view South Side cut at this time due to parked Truck. |
2020-08-26 | No data | JEFFERSON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced by D.O.T in 2020 |
2020-08-26 | No data | MOORE STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway ok. |
2020-08-25 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5/FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2020-08-25 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced BBP |
2020-08-25 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial cut covered by BPP |
2020-08-25 | No data | CARROLL STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2020-08-25 | No data | EAST 101 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I’m unable to properly inspect due to ongoing new building construction. |
2020-08-25 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 10:55am to 1:05pm two cuts between p/l and d/l cut number 1 length 12ft width 4ft depth 9ft second cut length 5ft width 5ft depth 3ft 6inches. |
2020-08-25 | No data | WEST 43 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done permit expired |
2020-08-25 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Backhoe On Site At Time Of Inspection |
2020-08-24 | No data | 157 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible On Site At Time Of Inspection |
2020-08-24 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water restorations in the roadway. |
2020-08-24 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE EXCAVATING PK LANE OF RWY AT 163 |
2020-08-24 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CONCRETE PAD & NEW SWK FLAGS AT BANK OF AMERICA |
2020-08-24 | No data | OCEAN PARKWAY, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | crew on site waiting to work 1 sidewalk and 2 plated roadway excavations. |
2020-08-24 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NYC labeled plate behind occupancy of roadway. Perm still active near 7th Ave. |
2020-08-23 | No data | VAN SICKLEN STREET, FROM STREET AVENUE S TO STREET LLOYD COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance |
2020-08-23 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restoration cuts found on roadway |
2020-08-23 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work not done, and the permit has expired. |
2020-08-23 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance |
2020-08-22 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration acceptable |
2020-08-22 | No data | SHELL ROAD, FROM STREET 86 STREET TO STREET BOUCK COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 sidewalk flag in compliance |
2020-08-22 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw mill for pave |
2020-08-22 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed, possibly resurfaced |
2020-08-22 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK OBSERVED IFO 344. |
2020-08-21 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROCCO STATED NO WORK DONE DUE TO LOGISTICS OF MOVING CARS OFF SUPER TIGHT ROADWAY- 6 PERMITS NO WORK DONE BUT MARKED OUT |
2020-08-21 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE UNDER THIS PERMIT |
2020-08-21 | No data | EAST 32 STREET, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2020-08-21 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered by BPP |
2020-08-21 | No data | MAIN STREET, FROM STREET BLOSSOM AVENUE TO STREET CHERRY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Temp Ped Walkway Visible Sidewalk Open To Pedestrian Traffic At Time Of Inspection |
2020-08-21 | No data | 3 STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok rw |
2020-08-20 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane |
2020-08-20 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane. |
2020-08-20 | No data | 16 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal cut on the street |
2020-08-20 | No data | ST NICHOLAS AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE CUT WAS MADE ON THE SIDE OF THE BUILDING |
2020-08-20 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2020-08-20 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2020-08-20 | No data | HART STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE BACKFILL CUT WAITING ON CONCRETE TRUCK |
2020-08-19 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water restorations in roadway. |
2020-08-19 | No data | DWIGHT STREET, FROM STREET COFFEY STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w s\w |
2020-08-19 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2020-08-19 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w |
2020-08-19 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2020-08-19 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated on the roadway, active permit on file B012020220D14. |
2020-08-19 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Most of plumber's cut overlapped by BPP. |
2020-08-18 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to permit M012020182A93. Work is behind building operations. |
2020-08-18 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit expired, Backhoe stored off segment within the p/l, archer ave between 149th street & 150th street. Due to mayoral executive order, no action will be taken at time of inspection. Permittee will be notified. i/f/o 149-03 |
2020-08-18 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L12’0 W4’0 D11’0Compaction 96.9 96.3 97.0 Monitored 10:00-14:30 |
2020-08-17 | No data | BEDFORD AVENUE, FROM STREET SOUTH 8 STREET TO STREET SOUTH 9 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, excavating rwy ifo #422. water leak repair, 3day, confirmed. |
2020-08-17 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code marker has been applied |
2020-08-16 | No data | 38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2'x2' area within cut sunken down 1 1/2'' |
2020-08-16 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE WHITE BIKE LANE MARKINGS & BIKE LANE ICON OVER NEW PERMANENT RESTORATION IN ROADWAY, IN FRONT OF 776 FRANKLIN AVENUE BETWEEN LINCOLN PLACE & ST JOHNS PLACE. |
2020-08-16 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in-kind in prestigious condition in compliance |
2020-08-15 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on s/w & 2 perm restoration in the r/w |
2020-08-15 | No data | 72 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water perm restoration from bike lane to curb is in compliance. |
2020-08-15 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation on roadway - newer active permit on file |
2020-08-15 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on roadway |
2020-08-15 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer perm trench in driving lane partially paved over by Nat Grid trench is in compliance. |
2020-08-14 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration in roadway and sidewalk in front of 1780 Sheepshead Bay street. |
2020-08-14 | No data | 72 AVENUE, FROM STREET 161 STREET TO STREET 162 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp Ped Walkway On Site At Time Of Inspection |
2020-08-14 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in Pl, new fags around water valve, in compliance |
2020-08-14 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway in compliance. |
2020-08-14 | No data | STERLING PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE AND SIDE WALK FAG INSTALLED AROUND WATER CAP COVER |
2020-08-13 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2020-08-13 | No data | BAYARD STREET, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane, sidewalk flag flush and sealed. |
2020-08-13 | No data | 56 DRIVE, FROM STREET 58 PLACE TO STREET MELVINA PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cuts |
2020-08-13 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR pass. Cut re-paved, wearing course acceptable. |
2020-08-13 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #072, WORK 9 AM - 4 PM, MONDAY TO FRIDAY. Nov issued foreman on site has informed me due to backfill he must work late |
2020-08-13 | No data | 58 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced from BPP. No visible water work. |
2020-08-13 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE15FT0IN X 5FT7IN X 4FT6IN C:96.4 (1); 97.1 (2)WD:123.9; DD:116.5; MDD:120.5; MST:6.4%START 12:59 END 1:52 |
2020-08-13 | No data | BATCHELDER STREET, FROM STREET EMMONS AVENUE TO STREET GUNNISON COURT | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 12:50pm to 2:55pm two restorations in the driving lane cut number 1 length 7ft width 4ft depth 8ft second cut length 8ft width 4ft depth 7ft |
2020-08-12 | No data | PACIFIC STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved |
2020-08-12 | No data | 58 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible water work. |
2020-08-12 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated cut in the parking lane with a valid permit B012020220D15 |
2020-08-12 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in the parking lane |
2020-08-12 | No data | UNION STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION IN PK LANE OF RWY OFF SCL 50 FT WEST OF COURT ST AND 2 NEW SWK FLAGS |
2020-08-12 | No data | LOUISIANA AVENUE, FROM STREET SEAVIEW AVENUE TO STREET TWIN PINES DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water valve in s/w & perm restoration in p/l i/f/o be'er hagolah institutes |
2020-08-12 | No data | GREENE AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway work not visible covered by water main trench |
2020-08-11 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN PARKING LANE. |
2020-08-11 | No data | LEWIS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-08-11 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no OCCUPANCY OF SIDEWALK |
2020-08-11 | No data | REGENT PLACE, FROM STREET EAST 21 STREET TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing work/excavating in the roadway of the parking lane in front of building #2109 in a efficient manner in compliance |
2020-08-11 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2020-08-11 | No data | DALY AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the roadway |
2020-08-10 | No data | PENN STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | a-10:40amcut-12'x4'x4' test- 96.4% & 97.2%angelj.jE.T.Labelsand coneclean fillw-123.6d-116.2md-120am-6.4%1 of 2 cuts done due to D.E.P inspector not showing up in time |
2020-08-10 | No data | JEFFERSON AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed cutbacks made concrete truck schedule to arrive at 2pm for the base cut will be left plated. |
2020-08-10 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}23FT 3IN X {W}4FT 4IN X {D}11FT 2IN TEST 97.4 97.2 BASE SAW CUT BACKS ARE BEING DONE.BACK FILL STARTED 1110AM FINISHED 150PM STAYING FOR BASE |
2020-08-10 | No data | 6 AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w mill for pave |
2020-08-10 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration in compliance |
2020-08-10 | No data | 61 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags. Roadway resurfaced. |
2020-08-10 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED TRENCH EXCAVATION ACROSS THE ROADWAY IN FRONT OF #352 AND STEEL PLATED EXCAVATION IN THE ROADWAY OPPOSITE #350 CREW ON SITE |
2020-08-09 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration, in the parking lane, was temporarily restored to grade, condition corrected. Area made safe. |
2020-08-09 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm sewer restoration in the roadway of the driving lane in front of building #639 |
2020-08-09 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in the roadway of the driving lane in front of building #639 |
2020-08-09 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking lane, was sunken down 8 inches. Temporary asphalt was placed over the condition. Please permanently restore the area to grade.In front of 39 87 Street between Colonial Road and Narrows Avenue. |
2020-08-08 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING HAS BEEN RESTORED |
2020-08-08 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to provide enough temporary asphalt to condition to make the area safe / flush with the roadway. roadway is now down 4''. respondent (rocco) was previously notified on 8/8/2020 @10:16am and condition remains |
2020-08-08 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-08-08 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | respondent failed to seal 2 water cuts on the roadway after being previously notified on 3/21/2020 by CAR #20207380375 |
2020-08-08 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2020-08-08 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A 7 inch in diameter portion of perm restoration has collapsed and a sinkhole has formed. Down at least 8 inches. In front of 39 87 Street. |
2020-08-08 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WRONG PERMITTEE |
2020-08-06 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE SPOKE TO FOREMAN ABOUT KEEPING 2 LANES OF TRAFFIC AT ALL TIMES AND HAVING FLAGMAN POSTED AT INTERSECTION. FOREMAN UNDERSTOOD AND WILL DO HIS BEST TO KEEP TRAFFIC MOVING SMOOTHLY |
2020-08-06 | No data | OXFORD STREET, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains. Reissuing CAR. |
2020-08-06 | No data | BEDFORD AVENUE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Perm water restoration flush to grade in in the bicycle lane extending into the parking lane in front of property #2329 && 4 brand new sidewalk flags installed with water valve expansion joints sealed in between the sidewalk & curb in compliance |
2020-08-06 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area of roadway found to be resurfaced BPP (B012020205A37) |
2020-08-06 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration is still mounded 1&1/2in. NOV to be issued. |
2020-08-06 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer restoration in driving lane mounded 1&1/2 inches. NOV issued. |
2020-08-05 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk sealed |
2020-08-05 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut has been sealed |
2020-08-05 | No data | LEXINGTON AVENUE, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work don in the parking lane |
2020-08-05 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WHITE LANE MARKING RESTORED |
2020-08-05 | No data | HALSEY STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2020-08-05 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing work in the roadway of the driving lane in front of property #104, flag personnel on site directing all ongoing vehicular traffic in a efficient manner |
2020-08-05 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RE-PAINTED RED |
2020-08-04 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2020-08-04 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT FAILED TO RESTORE CONCRETE IN THE BUS PAD. TEMPORARY CUT IN THE BUS PAD OPP 230 OBSERVED WITH A GREEN TAG USED TO IDENTIFY RESPONDENT. CAR #20201670158 WAS ISSUED ON 4/21/2020. ABOVE PERMIT EXPIRED ON 7/31/2017. |
2020-08-04 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition corrected |
2020-08-03 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-08-03 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site work in a cut on the sidewalk cut in the roadway is plated |
2020-08-03 | No data | PARK AVENUE, FROM STREET DELMONICO PLACE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced by BPP |
2020-08-02 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY CURB TO CURB & 4 NEW SWK FLAGS OPPOSITE 56 |
2020-08-02 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERMIT ISSUED B012020197A87 |
2020-08-02 | No data | MORRIS PARK AVENUE, FROM STREET FILLMORE STREET TO STREET UNIONPORT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in compliance |
2020-08-02 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2020-08-02 | No data | HENDRICKSON STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in front of 4202, sealed and flush. |
2020-08-01 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by 2020 water restoration. |
2020-08-01 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED. |
2020-08-01 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plate street openings counter sunken in the roadway of the driving lane/parking lane in front of property #104 |
2020-08-01 | No data | AVENUE S, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced by DOT |
2020-07-31 | No data | ATLANTIC AVENUE, FROM STREET SACKMAN STREET TO STREET SHERLOCK PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAG INSTALLED WITHOUT EXPANSION JOINT BEING SEALED |
2020-07-31 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ACROSS THE ROADWAY |
2020-07-31 | No data | UNION STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | BASE RESTORATION IN PK LANE(BARRICADED)- STEEL PLATED & TEMP SWK (SEARCH TO SEWER SERVICE LINE)ON SIDE OF 348 COURT ST |
2020-07-31 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE WHITE LANE MARKINGS IN BUS STOP IN PK LANE OVER PERMANENT RESTORATION IN ROADWAY- IN FRONT OF 187 KENT AVENUE BETWEEN METROPOLITAN AVENUE & NORTH 3 STREET. |
2020-07-30 | No data | ROCHESTER AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | CREW ON SITE WORKING IN OPEN EXCAVATION IN THE ROADWAY ABOUT 30FT FROM THE CORNER OF ST JOHNS PL. INFORMED FOREMAN TO REMOVE PAPER SIGNS FROM POLES {STATING NO PARKING} HE CAN ONLY RESTRICT PARKING FOR LOCATION WHERE CUT IS. |
2020-07-30 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Work is behind active building operations. |
2020-07-30 | No data | UNION STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROCCO'S CREW ON SITE CAPPING WATER TO 348 COURT ST -WORKING ON UNION STREET 80 FEET WEST OF COURT ST OFF SCL |
2020-07-30 | No data | WEST 48 STREET, FROM STREET 5 AVENUE TO STREET ROCKEFELLER PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway appears to be resurfaced due to BPP |
2020-07-30 | No data | UNION STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ARRIVE AT 1030AM; BACKFILL PASS-CAP WATER (L) 4 FT 6 IN X (W) 2 FT 6 IN X (D) 4 FT 5 IN- TESTS 97.9+98.1; WD 123.3, DD 113.4, MD 120.5, AM 8.7- SAW CUTBACKS WERE DONE AWAITING CONCRETE FOR BASE |
2020-07-29 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 460 permanent sewer restoration is in compliance |
2020-07-29 | No data | 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-07-29 | No data | EAST 4 STREET, FROM STREET GREENWOOD AVENUE TO STREET VANDERBILT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass.1 roadway cut.12’L x 4’W x 7”DTest: 98.3% & 98.0%.Arrival 11:08am.Departure 12:40pm. |
2020-07-28 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-07-28 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2020-07-28 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-07-28 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Bike LanePlease restore/repair bicycle logo lane marker over the permanent sewer restoration in the roadway opposite from property #2512, in a timely fashion. CAR issued |
2020-07-28 | No data | 70 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the p/l ok |
2020-07-28 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I Observed Respondent failed to comply with terms and conditions of DOT permit .violated stipulation 072 which states work 9AM -4PM Respondent was still working on site at 5:00pm. |
2020-07-28 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill: PASS - Cut 1: L – 4ft 4in W – 3ft 2in D – 4ft 0in One Lift: 99.6% Cut 2: L – 4ft 0in W – 3ft 0in D – 4ft 0in One Lift: 97.3% Cut 3: L – 3ft 0in W – 2ft 6in D – 4ft 0in One Lift: 99.8% Start Time: 2:30pm Completed: 3:30pm |
2020-07-28 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway is paved |
2020-07-27 | No data | QUAY STREET, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERM LONG WATER RESTORATION IN RWY PK LANE DRIVING LANE OPPOSITE 33 FRANKLIN AVE& 2 NEW SWK FLAGS |
2020-07-27 | No data | FRANKLIN STREET, FROM STREET CALYER STREET TO STREET QUAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERM LONG WATER RESTORATION IN RWY PK LANE DRIVING LANE OPPOSITE 33 FRANKLIN AVE& 2 NEW SWK FLAGS |
2020-07-26 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Restoration needs to be SealedPlease seal all outer edges of the permanent sewer restoration with liquid asphalt seal in the roadway of the driving lane in front of building #639, in a timely fashion. CAR issued |
2020-07-26 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permit check, rwy plated. Active, |
2020-07-25 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 139, perm plumbers cut ( worn green color codes ) within North side of Roadway is flush to grade. |
2020-07-25 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill complete 12' 5" L 4' 2" W 8' 8" D 6 inches cut back done |
2020-07-23 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w & s/w plated, Application Tracking Number: 2020072100301470Application Type: ReissueApplication Status: Payment ReadyApplication Submitted By: MURDOCCA, ROCCO (Permittee)Application Submitted On: 7/21/2020 9:47 AM |
2020-07-23 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent sewer restorations across the roadway d/l and p/l ok in front of 1748 and 1750 72 street. |
2020-07-23 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the p/l ok |
2020-07-23 | No data | 67 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the p/l sidewalk ok |
2020-07-23 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in RW, in compliance |
2020-07-23 | No data | BEDFORD AVENUE, FROM STREET ALBEMARLE ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued |
2020-07-23 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY IN PK LANE & DRIVING LANE (SWK RESURFACED) |
2020-07-23 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2020-07-23 | No data | SENECA AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade water/sewer trench across roadway, SWK flag restored around water valve |
2020-07-23 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY OFF WCL |
2020-07-23 | No data | 55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE14FT8IN X 4FT0IN X 5FT9IN C:98.1 (1); 98.3 (35FT8IN X 5FT3IN X 3F4IN C:98.1WD: 122.4; DD:112.6; MDD:120.5; MST:8.7%START 10:41 END 12:21 |
2020-07-22 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration across the roadway d/l and p/l in front of 1748 72 street ok. |
2020-07-22 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk in compliance |
2020-07-22 | No data | WILLOUGHBY AVENUE, FROM STREET FRANKLIN AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | no OCCUPANCY OF SIDEWALK |
2020-07-22 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-07-22 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 6ft (W): 4ft (D): 4ft - 97.2%; 97.4%Cut #2: (L): 13ft (W): 4ft (D): 4ft - 97.1%; 97.0%Located in both P/L-D/L IFO 220.Base cutbacks made.Arrival: 11:05AMDeparture: 1:20PM |
2020-07-21 | No data | PLAINVIEW AVENUE, FROM STREET BEACH 19 STREET TO STREET BEACH 20 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-07-21 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I FOUND THE ABOVE RESPONDENT WITH 2 STEEL PLATES OVER 2 STREET OPENINGS WITHOUT A VALID PERMIT TO DO. PERMIT ABOVE EXPIRED 7/20/20. I IDENTIFIED BY PERMIT ABOVE AND NAME ON STEEL PLATE. |
2020-07-21 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in opposite parking lane. |
2020-07-21 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY B.P.P |
2020-07-21 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER RESTORATION AT CROSSWALK ON 8TH AVE IS OK |
2020-07-21 | No data | EMMONS AVENUE, FROM STREET BATCHELDER STREET TO STREET BROWN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags. |
2020-07-20 | No data | DEAN STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE |
2020-07-20 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK RESURFACED AT NEW BUILDINGS |
2020-07-19 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane opp #236. |
2020-07-19 | No data | EAST 162 STREET, FROM STREET MORRIS AVENUE TO STREET TELLER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2020-07-19 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway of the driving lane in front of property #1127 in compliance |
2020-07-19 | No data | EAST 34 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2020-07-18 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY MTA, CE & VERIZO |
2020-07-18 | No data | BEDFORD AVENUE, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-07-18 | No data | BEACH 19 STREET, FROM STREET PLAINVIEW AVENUE TO STREET SEAGIRT BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on P/D/L, SWK flag restored around water valve |
2020-07-17 | No data | SENECA AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill completed & acceptable. 13' x 4'6'' x 9'cut. |
2020-07-17 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in opposite parking lane. |
2020-07-17 | No data | HALSEY STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway was resurfaced in 2017 by d.o.t |
2020-07-16 | No data | SHORE BOULEVARD, FROM STREET GIRARD STREET TO STREET HASTINGS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane/parking lane. |
2020-07-16 | No data | HASTINGS STREET, FROM STREET HAMPTON AVENUE TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane/driving lane. |
2020-07-16 | No data | WEST 92 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt Restoration within sidewalk flag is overdue for final IFO 146. |
2020-07-15 | No data | 4 AVENUE, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-07-15 | No data | JORALEMON STREET, FROM STREET GARDEN PLACE TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS RWY & NEW SWK FLAGS OFF NCL |
2020-07-15 | No data | HEWES STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PK LANE & DRIVING LANE OF RWY ON WCL & NEW SWK FLAGS AT BUILDING OPERATION |
2020-07-14 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1 - 13' x 4' x 4' 5' First lift - 97.4 Last Lift - 97.1Cut 2 - 3' x 3' x 3' Lift - 97.3Exclusive testing labs.AndrewSand Cone. WD - 113.4DD - 104.3MDD - 106.5AM - 8.7. |
2020-07-13 | No data | WEST 76 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locare cut, possibly under vehicle |
2020-07-12 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced by d.o.t |
2020-07-12 | No data | AVENUE S, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | the roadway was resurfaced by DOT. |
2020-07-12 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY IN FRONT OF 899 NEW YORK AVE |
2020-07-12 | No data | ROGERS AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed |
2020-07-11 | No data | 27 AVENUE, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP done in compliance |
2020-07-11 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Street resurfaced by BPP. |
2020-07-11 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 STEEL PLATED STREET OPENINGS WITH "AWS" ON STEEL PLATE |
2020-07-11 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 STEEL PLATED STREET OPENINGS WITH "AWS" ON STEEL PLATE-NEW PERMIT ON FILE |
2020-07-11 | No data | HENRY STREET, FROM STREET CLARK STREET TO STREET LOVE LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN DRIVING LANE OF RWY & NEW SWK FLAG OK |
2020-07-11 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No occupancy observed at this time |
2020-07-11 | No data | HENRY STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY AND SWK RESURFACED AT 70 AT NEW BUILDING |
2020-07-10 | No data | AMSTERDAM AVENUE, FROM STREET WEST 156 STREET TO STREET WEST 157 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site, cut in parking . |
2020-07-10 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 1227 Broadway on W29th, perm 2019 trench to North Curb. Wearing course does show some wear but not CAR worthy at this time. |
2020-07-10 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-07-09 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent Cut that is flush to grade in the crosswalk at Leonard Street. |
2020-07-09 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY PK LANE & DRIVING LANE AT 26 COURT ST |
2020-07-09 | No data | HOYT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-07-09 | No data | BUSHWICK AVENUE, FROM STREET CORNELIA STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back-fill was completed cutbacks was made cut will be left plated in the parking lane cut on sidewalk made perm |
2020-07-09 | No data | HENRY STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY AND SWK RESURFACED AT 70 |
2020-07-08 | No data | 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 8ft by 3ft down 10ft |
2020-07-08 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW INSTALLING BACKFILL IN STREET OPENING IN PK LANE & STEEL PLATED DRIVING LANE & OPPOSITE PK LANE AT BUILDING OPERATION OF NEW BUILDING. |
2020-07-08 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-07-08 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | entire street has been milled. |
2020-07-07 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2020-07-06 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts. |
2020-07-06 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN THE ROADWAY EXTENDING INTO THE BIKE LANE IN FRONT OF ADDRESSES |
2020-07-06 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY ON ECL |
2020-07-06 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY ON ECL |
2020-07-06 | No data | CHAUNCEY STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by B.P.P |
2020-07-06 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed |
2020-07-04 | No data | CHURCH AVENUE, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration SunkenPlease restore/repair the permanent sewer restoration sunken down 3“ to grade in the roadway of the driving lane in front of property #1634 (flush with the roadway/surrounding areas) CAR issued |
2020-07-04 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY DOT |
2020-07-04 | No data | SOUTH 4 STREET, FROM STREET BEND TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROCCO'S CREW INSTALLED NEW SEWER DRAIN IN SIDEWALK TRANSFORMER VAULT AT 277 SOUTH 5 STREET |
2020-07-04 | No data | EAST 18 STREET, FROM STREET CHURCH AVENUE TO STREET TENNIS COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of building #91 in compliance |
2020-07-04 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK RESURFACED AT NEW BUILDING |
2020-07-04 | No data | HOPE STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY & SWK RESURFACED AT NEW BUILDING |
2020-07-03 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-07-03 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 0115P - REPAIR WATER - SEWER - PROTECTED/sewer repaired /Roadway resurfaced |
2020-07-03 | No data | AVENUE I, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #2402 in compliance |
2020-07-02 | No data | UTICA AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE BUS LANE |
2020-07-02 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the roadway |
2020-07-02 | No data | HART STREET, FROM STREET BROADWAY TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water service leak on sidewalk. 3 day DEP notice issued. 2 open excavation on sidewalk and one excavation made on roadway, crew on site |
2020-07-02 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing final restoration work for the permanent sewer restoration in the roadway of the driving lane in front of building #639 |
2020-07-02 | No data | 3 AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade ifo 2610. |
2020-07-01 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut repaved over |
2020-07-01 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-06-30 | No data | WILSON AVENUE, FROM STREET COVERT STREET TO STREET SCHAEFER STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service. Water was Shut Off by Dep After Issued 3 Day Notice. Work Crew Currently Working in the Roadway & Sidewalk |
2020-06-30 | No data | ALDERTON STREET, FROM STREET 66 AVENUE TO STREET ELLWELL CRESCENT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags restored in kind. Unable to confirm roadway work due to parked vehicles. |
2020-06-30 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair in the roadway for new building #217 |
2020-06-30 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restorations in r/w are ok |
2020-06-30 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in d/l partially covered by bug trench |
2020-06-30 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 533 permanent sewer restoration is in compliance |
2020-06-30 | No data | CLINTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN DRIVING LANE OF ROADWAY OFF ECL |
2020-06-29 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration in parking/driving lane and sidewalk flags. |
2020-06-29 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY B.P.P |
2020-06-29 | No data | MYRTLE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RW resurfaced |
2020-06-29 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing work in the roadway in front of property #639 with flag-personnel on site in a efficient manner |
2020-06-29 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-06-29 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2020-06-29 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway is paved |
2020-06-28 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed curb to curb. |
2020-06-28 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in-kind BPP 1/2+5 course in compliance |
2020-06-28 | No data | 83 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water perm restoration in parking lane is in compliance |
2020-06-27 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 5 WALK TO STREET KINGSBOROUGH 6 WALK | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY PARTIALLY COVERED BY BPP |
2020-06-27 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 132, perm 2019 trench into ongoing B/O ( South Curb ) from WSNY square cover. |
2020-06-26 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair in the roadway however unable to inspect sidewalk due to garbage on the sidewalk. |
2020-06-26 | No data | LOTT AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced |
2020-06-26 | No data | HERZL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | segment found resurfaced |
2020-06-26 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been milled and resurfaced. No defects to report |
2020-06-26 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk under construction DDC contractor. |
2020-06-26 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the driving lane ifo #79,, portion in the parking lane is paved over by permanent gas. |
2020-06-25 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-06-25 | No data | BLAKE AVENUE, FROM STREET OSBORN STREET TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK PREVIOUSLY DONE NO LONGER VISIBLE/ ROADWAY HAS BEEN RESURFACED |
2020-06-25 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut going across RW, in compliance |
2020-06-25 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration going to the BPP |
2020-06-25 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET WEST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no restorations |
2020-06-24 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk work in compliance in front of 30 |
2020-06-24 | No data | LAFAYETTE AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the parking lane |
2020-06-24 | No data | 182 STREET, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | installation of water and sewer service perm restoration |
2020-06-24 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (2 Cuts) found in compliance |
2020-06-24 | No data | 182 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | time of inspection new building ,roadway paved over by BPP |
2020-06-24 | No data | WEST 125 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration in d/l is good |
2020-06-24 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | The backfill was started at 12:44pm, due to DEP inspector showing up at 12:30pm.2 roadway cuts.Cut 1: 9’10”L x 5’W x 5’D.Test: 97.8% & 98.1%.Cut 2: 9’L x 5’W x 7’D.Test: 97.7% & 97.9%.Departure 2:24pm. |
2020-06-24 | No data | CHAUNCEY STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2020-06-24 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work is in progress crew is on site installation water and sewer |
2020-06-23 | No data | ROGERS AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC INC failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued Foreman on site has informed me he was told to close sidewalk |
2020-06-23 | No data | DR M L KING JR BOULEVARD, FROM STREET HALL OF FAME TERRACE TO STREET WEST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-23 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench is flush and color coded in the roadway ifo#350 |
2020-06-23 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS IN THE D/L OK |
2020-06-23 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent trench that is flushed to grade in the parking lane, which extends into the driving lane. |
2020-06-23 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT FOUND ON ROADWAY |
2020-06-23 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found on the roadway |
2020-06-23 | No data | GREENE AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2020-06-23 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent asphalt restoration in roadway, Restoration needs to be re-sealed |
2020-06-23 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in the PL / DL. |
2020-06-23 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATE IN PSRKING LANE IN FRONT OF 353 RUTLAND ROAD. NEW PERMIT ON FILE:B012020174A32 |
2020-06-22 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2020-06-22 | No data | BROOKLYN AVENUE, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #082, WORK 7 AM - 4 PM, MONDAY THROUGH FRIDAY. Nov issued foreman on site has informed me GC told him to stay longer to complete work |
2020-06-22 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway |
2020-06-22 | No data | BROOKLYN AVENUE, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE19FT0IN X 4FT0IN X 9FT0IN C:96.5 (1); 95.3 (2)WD:116.1; DD:109.3; MDD:115.4; MST:6.2% SANDWD:122.4; DD:113.8; MDD:119.4; MST:7.5% C/FSTART 12:20 END 3:32 (Sewer trench only) |
2020-06-22 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-06-22 | No data | DR M L KING JR BOULEVARD, FROM STREET HALL OF FAME TERRACE TO STREET WEST 183 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repaired |
2020-06-22 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAVE BEEN RESURFACED |
2020-06-22 | No data | EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2020-06-22 | No data | 16 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-06-21 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in rw...sw has patchwork, but fence indicates BO site,,Sw will be replace upon completion |
2020-06-21 | No data | AVENUE K, FROM STREET EAST 8 STREET TO STREET EAST 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & resurfaced restored in-kind BPP 1/2+5 course in compliance |
2020-06-21 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking/driving lane, sidewalk repaved by BPP. |
2020-06-21 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water-sewer restoration flush to grade in the roadway extending into the parking lane in front of property #944 in compliance |
2020-06-21 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade trench across the Southbound lanes of roadway. |
2020-06-20 | No data | EAST 9 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm sewer restorations flush to grade in the roadway extending into the both parking lanes in front of property #1565 in compliance |
2020-06-20 | No data | 11 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer two perm restorations from each curb. Sewer cut from driving lane to curb. Long water in opposite parking lane. In compliance. |
2020-06-20 | No data | BAYARD STREET, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration flush in the parking lane, active permit on file B012020169A52 |
2020-06-20 | No data | KOSCIUSKO STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE |
2020-06-20 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway |
2020-06-20 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 1227 Broadway ( closer to Broadway ), perm 2019 trench from Driving Lane to North Curb. Wearing course is starting to pit / kick out but not CAR worthy at this time. Next inspection, please pay attention to this. |
2020-06-20 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2020-06-20 | No data | QUINCY STREET, FROM STREET CLASSON AVENUE TO STREET DOWNING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB TO CURB PERM RESTORATION & SIDEWALK FLAG |
2020-06-19 | No data | RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in parking lane in compliance. |
2020-06-19 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | X012019299A00 up to date permit on file perm to trench |
2020-06-19 | No data | NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway ifo #50 (garage). |
2020-06-19 | No data | ALBANY AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2020-06-18 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the respondent with a temp water cut in the parking lane in front of 1285 madison st that was over due for final that fail to permanently restore their cut within the required time. their permit expired 12/31/19 |
2020-06-18 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN ROADWAY. |
2020-06-18 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2020-06-18 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: LL14 | Department of Transportation | Base: Pass – L – 12ft 6in W – 5ft 0in D – 1ft 2in – C – 10in WC – 4in Start Time: 12:30pm Completed: 1:40pm |
2020-06-18 | No data | BRIGHTON 5 STREET, FROM STREET BRIGHTON BEACH AVENUE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway at 422 Oceanview. |
2020-06-18 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade , no defects at time of inspection. |
2020-06-18 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2020-06-18 | No data | BROOKLYN AVENUE, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing work in the roadway of the driving lane in front of property #1351 with flag personnel on site redirecting all ongoing vehicular traffic |
2020-06-17 | No data | HALSEY STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced roadway |
2020-06-17 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed @ 1249, Passed Cut#1: 9'6" x 4'6" x 6' Cut#2 : 5'3" x 3'8" x 3' |
2020-06-17 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway/swk ok. |
2020-06-16 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w flags ifo 30 is flush with sealed expansion joints |
2020-06-16 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane. |
2020-06-16 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the parking lane in front of property #104 & 1 brand new sidewalk flag installed |
2020-06-16 | No data | PARKVILLE AVENUE, FROM STREET EAST 8 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway currently milled down 3 inches BPP 1/2+ 5 course |
2020-06-16 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #265 & 2 sidewalk flags installed in compliance |
2020-06-16 | No data | EAST 7 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer restoration flush to grade in the roadway extending into the parking lane in front of property #1686 & 2 sidewalk flags installed in compliance |
2020-06-16 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street is currently milled. |
2020-06-15 | No data | NORTH 5 STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w occupancy in compliance |
2020-06-15 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-06-14 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-06-14 | No data | ST JOHNS PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-06-14 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #154 in compliance |
2020-06-14 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-06-13 | No data | CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over by BPP |
2020-06-13 | No data | 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #199 |
2020-06-12 | No data | WEST 92 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush in the parking lane/driving lane. Temporary restoration around water valve on the sidewalk. New permit on file. |
2020-06-12 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking lane, sidewalk flush and sealed. |
2020-06-12 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in DL |
2020-06-12 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the roadway, ifo 201 |
2020-06-12 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active b.o |
2020-06-12 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation found in the parking lane |
2020-06-11 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w flags ifo 30 is flush with sealed expansion joints |
2020-06-11 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flush and sealed in the parking lane, sidewalk flush and sealed. |
2020-06-11 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done on r/w nor s/w |
2020-06-11 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway is up to grade. In front of 842. |
2020-06-11 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent failed to permanently restore their temporary, over due for final, water restoration on the sidewalk adjacent to their cut on the roadway, within the required time. Respondent Id’ed by permit on file M012018331A39 expired on 12/15/18. |
2020-06-10 | No data | UNION AVENUE, FROM STREET JACKSON STREET TO STREET WITHERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flush and sealed in the parking/driving lane. |
2020-06-10 | No data | 60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w pave by building pavers |
2020-06-10 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov will be issued. |
2020-06-10 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue for final. |
2020-06-10 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THERE IS 3 TEMP SEWER CUTS IN A CONCRETE ROADWAY THAT WAS NOT RESTORED IN KIND WITH CONCRETE N.O.V WILL BE ISSUED AS A POST AUDIT |
2020-06-10 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 ASPHALT RESTORATION ON A CONCRETE ROADWAY NOT ACCEPTABLE PLEASE COMPLY WITH DETAIL DRAWING 1042-B FULL CONCRETE PANEL NEEDS TO BE RESTORED |
2020-06-10 | No data | DE KALB AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane and sidewalk |
2020-06-10 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-10 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-06-09 | No data | LAWRENCE AVENUE, FROM STREET 47 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-06-09 | No data | STERLING PLACE, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, 2" sprinkler install ..., for building ... |
2020-06-09 | No data | FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO INSPECT LOCATION. CONTRACTORS WORKING IN PARKING LANE IFO 639. |
2020-06-09 | No data | TRUXTON STREET, FROM STREET EASTERN PARKWAY TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over due to bpp ... new building install.. |
2020-06-09 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2020-06-08 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk was entirely repaired and 1/2 + 5 feet of the roadway was paved, in front of 1215 82 Street. Found resurfaced. |
2020-06-08 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2020-06-08 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS IN THE D/L ONE CUT IS PARTIALLY PAVED OVER. |
2020-06-08 | No data | LAWRENCE AVENUE, FROM STREET 47 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cutn ok |
2020-06-08 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN THE ROADWAY (CONCRETE ROADWAY) AND SIDEWALK |
2020-06-08 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE WHITE LANE MARKING OVER NEW PERMANENT RESTORATION IN ROADWAY- IN FRONT OF 143 PARK AVENUE BETWEEN CARLTON AVENUE & CUMBERLAND STREET. |
2020-06-07 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-07 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-06-07 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane |
2020-06-06 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2020-06-06 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2020-06-06 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Bus LanePlease restore/repair red bus pad lane marker over the permanent water restoration in front of property #275 LIVINGSTON STREET , in a timely fashion. CAR issued |
2020-06-06 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the bicycle lane in front of property #346 in compliance |
2020-06-06 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway parking lane |
2020-06-05 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN ROADWAY DOWN 3 INCHES IN ROADWAY, AT OPPOSITE 978 KENT AVENUE BETWEEN DeKALB AVENUE & WILLOUGHBY AVENUE. PLEASE RESTORE ROADWAY TO GRADE. |
2020-06-05 | No data | BAYARD STREET, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w not occupied |
2020-06-05 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Construction barrel removed from r/w |
2020-06-05 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS IN THE D/L ONE CUT IS PARTIALLY PAVED OVER |
2020-06-05 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street had being milled and being repave |
2020-06-05 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration needs to be resealed |
2020-06-05 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection previous inspectors leave no detailed descriptions in where exact work was finalized & no PDF sketchers were found via NYC night streets |
2020-06-05 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET MAUJER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-06-05 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition not verified. No barricades or construction sign observed. Plated excavation, pinned and ramped in the r/w |
2020-06-05 | No data | 44 STREET, FROM STREET 17 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-06-05 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #163 in compliance |
2020-06-05 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut paved by building pavers |
2020-06-05 | No data | JEFFERSON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY BEING RESURFACED |
2020-06-05 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-06-05 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-06-04 | No data | GREENE AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-04 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY- SWK REPLACED |
2020-06-04 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ENTIRE SEGMENT RESURFACED BY NYC DOT ON FLUSHING AVENUE |
2020-06-04 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on r/w |
2020-06-04 | No data | FLUSHING AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ENTIRE RWY RESURFACED BY NYC DOT |
2020-06-04 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY NYC DOT |
2020-06-04 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 35, roadway has been resurfaced and no work observed on sidewalk by this permittee. This permit has expired. |
2020-06-03 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted, joint field meeting was held. DEP performed a dye test and the dye showed inside the city sewer. DEP will repair the condition. |
2020-06-03 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Re-install missing color code marker from permanent restoration. |
2020-06-03 | No data | WEST 125 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water cut made final. No defects to report |
2020-06-03 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2020-06-03 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY |
2020-06-03 | No data | CUMBERLAND STREET, FROM STREET GREENE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-06-03 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY AT OPPOSITE SIDES OF ROADWAY INSTALL NEW SERVICE FOR BUILDING OPERATION |
2020-06-02 | No data | KNICKERBOCKER AVENUE, FROM STREET CORNELIA STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2020-06-02 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-02 | No data | 27 AVENUE, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK |
2020-06-02 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #163, valid dot permit on file #B012020149C18 |
2020-06-02 | No data | MALCOLM X BOULEVARD, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the roadway with a plated gas trench covering it at this time |
2020-06-02 | No data | 43 AVENUE, FROM STREET 91 PLACE TO STREET GLEANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RESTORATION COVERED BY 2020 PERM GAS RESTORATION I/F/O ADDRESS. PERM SIDEWALK FLAGS IN COMPLIANCE. |
2020-06-02 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-06-02 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #163 |
2020-06-02 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work covered by gas work |
2020-06-01 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-06-01 | No data | 41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP. No visible cuts. |
2020-06-01 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found an area within the edge of a permanent restoration that was recently patched with temporary asphalt in response to a C.A. R which has asphalt broken 10’’ below grade in the driving lane. |
2020-06-01 | No data | TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 1365 perm to grade |
2020-06-01 | No data | UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE15FT0IN X 4FT0IN X 11FT0IN C:96.8 (1); 95.5 (2)WD:120.3; DD:111.9; MDD:118.8; MST:7.5%START 10:53 END 12:23 |
2020-06-01 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w flags ifo 30 is flush with sealed expansion joints |
2020-05-31 | No data | 4 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2020-05-31 | No data | BRUCKNER BOULEVARD, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-05-31 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found a permanent restoration that is flushed to grade in the turning lane. |
2020-05-31 | No data | FLUSHING AVENUE, FROM STREET INGRAHAM STREET TO STREET SCOTT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm Water Cut in Compliance |
2020-05-30 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-05-30 | No data | WEST 76 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There was not any work found on the sidewalk or roadway at time of inspection. |
2020-05-29 | No data | FLUSHING AVENUE, FROM STREET INGRAHAM STREET TO STREET SCOTT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in the Roadway. 3 Day Dep Notice Issued. |
2020-05-29 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway excavation |
2020-05-29 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway excavation plated with a newer permit on file. |
2020-05-29 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-05-29 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration sunken 1" |
2020-05-29 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in r/w |
2020-05-28 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w cut ok |
2020-05-28 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: Unable to do inspection due to an ongoing B.O. at this location. |
2020-05-27 | No data | LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate in p/l & new permit on file |
2020-05-27 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-05-27 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavate in the r/w i/f/o 345 & 355 |
2020-05-26 | No data | 131 STREET, FROM STREET FOWLER PATH TO STREET AVERY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not visible |
2020-05-26 | No data | PARSONS BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent long water flush to grade |
2020-05-26 | No data | EAST 135 STREET, FROM STREET MAJOR DEEGAN EP SB EN E 135 ST TO STREET 3 AVENUE BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2020-05-26 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-05-26 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration and countersunk steel plate in the driving lane, in front of 1748 - 1752 72 Street. There is a permit ready for payment in NYCStreets. |
2020-05-24 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plate street openings ramped & pinned in the roadway extending into the parking lane in front of property #659 |
2020-05-24 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #658 |
2020-05-24 | No data | 47 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-05-24 | No data | 61 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flush to grade in the roadway extending into both parking lanes in front of property #741 in compliance |
2020-05-24 | No data | 53 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #450 in compliance |
2020-05-23 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONPLUMBING NYC , INC. please restore temporary water restoration in the sidewalk in front of property #724, in a timely fashion. CAR issued |
2020-05-21 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in the R/W is flush and color coded |
2020-05-21 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #383 in compliance |
2020-05-21 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway/swk in compliance. |
2020-05-20 | No data | CHAUNCEY STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2020-05-20 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #41 in compliance |
2020-05-20 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION ACROSS RWY ON WESTBOUND RWY & NEW SWK FLAG & NEW MEDIAN FLAG AT 143 |
2020-05-20 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 steel plates found on roadway, new permit on file:B012020114A76 |
2020-05-19 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This segment was resurfaced on 5/21/2019 any roadway cuts completed prior to this date no longer exist on the segment. |
2020-05-18 | No data | KOSCIUSKO STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site actively working. New Permit Number: B012020139A29. |
2020-05-16 | No data | 46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-05-16 | No data | STERLING PLACE, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RESTORATIONS IN BOTH PK LANES & NEW SWK FLAGS AT 632 |
2020-05-16 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT (RED) PERMANENT RESTORATION IN BUS LANE OF ROADWAY, AT LIVINGSTON STREET BETWEEN HANOVER PLACE & NEVINS STREET. |
2020-05-15 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-05-15 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects observed observed at time of inspection. |
2020-05-14 | No data | EAST 2 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway & sidewalk |
2020-05-14 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest x r/w |
2020-05-14 | No data | TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2020-05-14 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2020-05-14 | No data | WEST 76 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started on sidewalk or roadway at time of inspection. |
2020-05-14 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation with a newer active permit on file |
2020-05-13 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work resurfaced due to bbp . |
2020-05-11 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE WHITE LANE MARKING OVER PERMANENT RESTORATION IN ROADWAY, AT 128 PACIFIC STREET BETWEEN HENRY ST & CLINTON st |
2020-05-11 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut nok r\w |
2020-05-09 | No data | BRONX BOULEVARD, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway newly paved |
2020-05-09 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2020-05-08 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
2020-05-08 | No data | BAYARD STREET, FROM STREET BQE WB EN MC GUINNESS BLVD S TO STREET GRAHAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the p/l, active permit on file B012020119A37 |
2020-05-07 | No data | WEST 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 131, newer sidewalk work possibly done under permit M042020069A08 ( different permittee ) and condition has been corrected. CAR passed out. |
2020-05-06 | No data | KOSCIUSKO STREET, FROM STREET LEWIS AVENUE TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Permit Number: B012020114A75. |
2020-05-05 | No data | OXFORD STREET, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied. The year old sidewalk restoration is the responsibility of the permittee. |
2020-05-05 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION & SEAL OK |
2020-05-05 | No data | JACKSON STREET, FROM STREET HUMBOLDT STREET TO STREET WOODPOINT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Overdue |
2020-05-04 | No data | 67 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY AT 1415- SWK REPLACED |
2020-05-04 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition was corrected |
2020-05-04 | No data | HEYWARD STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 sidewalk flush, permanent water cut in the p/l opp 98 IFO 125 |
2020-05-04 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not repaired upon initial CAR re-inspection. New CAR was issued: Wearing course was rough & breaking away. Please mill it out and repave providing a smooth riding surface. |
2020-05-04 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Not repaired upon initial CAR re-inspection. New CAR was issued: Wearing course was rough & breaking away. Please mill it out and repave providing a smooth riding surface. |
2020-05-04 | No data | HEWES STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the rd/w &on s/w is flush and sealed. |
2020-05-01 | No data | EAST 3 STREET, FROM STREET AVENUE J TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION WAS RECTIFIED PERMANENT RESTORATION IN THE DRIVING LANE HAS BEEN RESEALED. |
2020-05-01 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition still exists, CAR will be issued |
2020-05-01 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION WAS RECTIFIED PERMANENT RESTORATION IN THE DRIVING LANE WAS REPAIRED FLUSH WITH AREA. |
2020-05-01 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IS MOUNDED 1/1/2 INCHES IN THE DRIVING LANE. |
2020-05-01 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMANENT RESTORATION IS MOUNDED 1/1/2 INCHES IN THE DRIVING LANE. |
2020-05-01 | No data | WEST 14 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | next permit with con# |
2020-05-01 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued for re seal of permanent restoration |
2020-04-30 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/22/20. |
2020-04-30 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DELINQUENT CONFIRMATION |
2020-04-30 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk expansion joints sealed and and sunken footprints has been remove. |
2020-04-29 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rd/w perm cut |
2020-04-29 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC , INC. currently has a missing IBM color code marker in the permanent water restoration in the roadway extending into the parking lane in front of property #163, CAR being reissued |
2020-04-29 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration Missing Color CodePLUMBING NYC , INC. please install IBM color code marker in the permanent water restoration in the roadway extending into the parking lane in front of property #163, in a timely fashion. CAR reissued |
2020-04-29 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC , INC. has immediately resealed permanent water restoration with liquid asphalt seal around or outer edges flush with the roadway in front of building #96 in compliance |
2020-04-29 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC , INC. has immediately installed 3 brand new sidewalk flags with water valve in front of property #40 in compliance |
2020-04-28 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival at time of inspection respondent PLUMBING NYC , INC. has immediately removed the wood-shoring from occupying the sidewalk in front of property #10 in compliance |
2020-04-28 | No data | AVENUE J, FROM STREET EAST 14 STREET TO STREET EAST 15 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [3/3/2020]. |
2020-04-28 | No data | MOTHER GASTON BOULEVARD, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupancy in-compliance. |
2020-04-28 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane opposite from property #198 in compliance |
2020-04-26 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints not sealed |
2020-04-26 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints not sealed |
2020-04-23 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Concrete restoration must follow standard detail H-1042 B/ sewer cut off, cuts not restored cuts remain temp .. |
2020-04-23 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new c-a-r issued , spoke to L Grinnage regarding contacting plb, to have concrete restored |
2020-04-23 | No data | MOTHER GASTON BOULEVARD, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, sewer relay perm .. |
2020-04-22 | No data | 55 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration made flush with the surrounding area |
2020-04-22 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut repaired |
2020-04-22 | No data | CONOVER STREET, FROM STREET DIKEMAN STREET TO STREET WOLCOTT STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2020-04-21 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE CONCRETE BUS STOP PAD, PERMANENT ASPHALT RESTORATION NOT ACCEPTABLE, LONG WATER PLUG SERVICE RESTORATION, AT OPPOSITE 230 CLASSON AVENUE BETWEEN WILLOUGHBY AVENUE & MYRTLE AVENUE(CODE DB4-34 RCNY 2-11(e)(13)(v) ). |
2020-04-21 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new car issued |
2020-04-21 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 perm restorations in both sides of parking lanes in compliance with color codes applied. |
2020-04-21 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass, re-topped .. |
2020-04-20 | No data | RALPH AVENUE, FROM STREET BAINBRIDGE STREET TO STREET CHAUNCEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass, plate removed |
2020-04-19 | No data | 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2020-04-19 | No data | 11 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MARKED OUT- NO CUTS RWY OR SWK - WORK NOT STARTED |
2020-04-18 | No data | WEST 92 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO building 146 temp water cut on sidewalk is flushed to grade, rdwy is perm. Trench |
2020-04-18 | No data | WEST 92 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO building 146 temp water cut on sidewalk is flushed to grade, rdwy is perm. Trench. Under M012020097A67 |
2020-04-17 | No data | LEXINGTON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a plated cut in the roadway with a valid permit. |
2020-04-17 | No data | JEFFERSON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the roadway |
2020-04-17 | No data | LEXINGTON AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | there is a plated cut in the roadway |
2020-04-17 | No data | JEFFERSON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012020094B19 active permit on file |
2020-04-16 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed |
2020-04-15 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-04-15 | No data | STANHOPE STREET, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2020-04-15 | No data | GRAND ST EXTENSION, FROM STREET HOOPER STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in compliance Contractors restoration is within STP area of roadway, |
2020-04-14 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN RWY OPP 1752, PERM RESTORATION ACROSS RWY AT 1750 & TEMP RESTORATION SWK AT 1750 |
2020-04-14 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | passing this out due to new building being erected and a BPP would eventually have to be done. |
2020-04-13 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk made final |
2020-04-10 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found on the roadway |
2020-04-10 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2020-04-10 | No data | PARKVILLE AVENUE, FROM STREET EAST 8 STREET TO STREET OCEAN PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway extending into the parking lane in front of building #210 |
2020-04-10 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Disregard previous inspection no work done at time of inspection in front of property #265 |
2020-04-09 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in DL, in compliance |
2020-04-09 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags are flush with sealed expansion joints ifo 30 |
2020-04-08 | No data | NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on the roadway |
2020-04-08 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut found on the rw |
2020-04-07 | No data | WEST 187 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flags have been fully replaced. |
2020-04-05 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION ACROSS RWY ON (NCL), NEW MEDIAN SIDEWALK FLAG & TEMPORARY RESTORATION IN SIDEWALK IN FRONT OF 143-NP |
2020-04-05 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERMANENT RESTORATION ACROSS RWY ON (NCL), NEW MEDIAN SIDEWALK FLAG & TEMPORARY RESTORATION IN SIDEWALK IN FRONT OF 143 |
2020-04-04 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration flush to grade IFO 15. |
2020-04-03 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut ok. |
2020-04-03 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water trench in d/l in compliance. |
2020-04-03 | No data | 4 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2020-04-02 | No data | EAST 7 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work was done on s/w or r/w |
2020-04-02 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED ROADWAY |
2020-04-02 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2020-03-28 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work covered up by new work on the rw |
2020-03-27 | No data | STERLING PLACE, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation on the rw and temp restoration on the sw |
2020-03-27 | No data | SOUTH 1 STREET, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #352 in compliance |
2020-03-27 | No data | GRAND STREET EXTENSION, FROM STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the intersection in compliance |
2020-03-27 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONPLUMBING NYC , INC. please restore temporary water restoration in the sidewalk in front of property #40, in a timely fashion. CAR issued |
2020-03-26 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & STEEL PLATED SWK FLAG(MEDIAN) FOR BUILING OPERATION-NP |
2020-03-26 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found on the rw |
2020-03-26 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2020-03-26 | No data | PARK AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & STEEL PLATED SWK FLAG(MEDIAN) FOR BUILING OPERATION |
2020-03-26 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-26 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-03-25 | No data | BAINBRIDGE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on roadway |
2020-03-25 | No data | 14 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #459 in compliance |
2020-03-24 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #187 in compliance |
2020-03-24 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp water restoration in the sidewalk in front of property #40 |
2020-03-24 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #163 in compliance |
2020-03-24 | No data | ROOSEVELT AVENUE, FROM STREET 147 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the r/w, countersunk and signs posted |
2020-03-24 | No data | PARK AVENUE, FROM STREET BROADWAY TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-03-24 | No data | LEXINGTON AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Crew Currently Installing New Domestic Water & Sanitary Sewer into Property. Work Zone in Compliance |
2020-03-22 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ifo 233 is flush and color coded |
2020-03-22 | No data | RUTLAND ROAD, FROM STREET EAST 51 STREET TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate street opening counter sunken in the roadway of the driving lane in front of property #867 & temp water restoration in the sidewalk |
2020-03-22 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway plated |
2020-03-21 | No data | 57 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag replaced |
2020-03-21 | No data | 59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut r\w ok |
2020-03-21 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration needs to be SealedPLUMBING NYC , INC. please seal 2 permanent water restorations in the roadway of both parking lanes with a liquid asphalt seal around all outer edges in front of property #572, in a timely fashion. CAR issued |
2020-03-21 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w sw |
2020-03-21 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Trench in Compliance |
2020-03-20 | No data | CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the roadway |
2020-03-20 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench d/l, sidewalk flag with hardware. |
2020-03-20 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done roadway |
2020-03-20 | No data | AVENUE I, FROM STREET EAST 45 STREET TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #4423 in compliance |
2020-03-20 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-03-19 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | complete |
2020-03-19 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work complete |
2020-03-19 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. No visible cuts. |
2020-03-19 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane near Kent ave. |
2020-03-19 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of building #3508 in compliance |
2020-03-19 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway is up to grade. Sidewalk however looks like will be re done with building operations. In front of 215. |
2020-03-18 | No data | 228 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade trench partially visible cause new B/O 1/2+5" pavement covers it with car park in the parking lane over cut. |
2020-03-18 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced |
2020-03-18 | No data | 13 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W repaved, new s/w put in. |
2020-03-18 | No data | 64 AVENUE, FROM STREET 220 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012018285C84 on file. |
2020-03-18 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2020-03-18 | No data | DAVIDSON AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate due to doble parked cars |
2020-03-18 | No data | FLUSHING AVENUE, FROM STREET CLASSON AVENUE TO STREET TAAFFE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of property |
2020-03-18 | No data | 27 AVENUE, FROM STREET HARWAY AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was Resurfaced & No work found on the Existing Sidewalk |
2020-03-18 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-03-18 | No data | 51 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway excavation counter sunk. |
2020-03-18 | No data | BRUCKNER BOULEVARD, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a PNYCI labeled steel plate pinned and ramped in driving lane ifo 109, respondent has failed to countersink plate during winter moratorium. |
2020-03-17 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 35, roadway has been resurfaced and no sidewalk work observed. Work no longer visible. |
2020-03-17 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Half of water cut in roadway has been made perm to grade in roadway. However the rest of the trench is behind a major building operation. Unable to fully inspect. |
2020-03-17 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut |
2020-03-17 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag. Perm cut d/l |
2020-03-17 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk flag/perm cut d/l |
2020-03-17 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | 4 temp water restorations in the sidewalk in front of property #192 |
2020-03-17 | No data | 77 AVENUE, FROM STREET 217 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New B/O 1/2+5 pavement covers all previous cuts at this time. |
2020-03-16 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New 1/2+5 B/O pavement covers all previous cuts. |
2020-03-16 | No data | QUEENS BOULEVARD, FROM STREET BEND TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced. |
2020-03-16 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2020-03-15 | No data | WEST 17 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-03-15 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | counter sunk steel plate in r/w new permit on file |
2020-03-15 | No data | EAST 12 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-03-15 | No data | OXFORD STREET, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork on driveway is not acceptable - Flags must be restored in kind |
2020-03-14 | No data | WEST 9 STREET, FROM STREET HIGHLAWN AVENUE TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-03-14 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #2177 in compliance |
2020-03-14 | No data | DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Roadway in Compliance |
2020-03-13 | No data | MOTHER GASTON BOULEVARD, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Construction material on PL IFO building operations |
2020-03-12 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 11ft (W): 4ft (D): 6ft - 97.3%; 97.0%Cut #2: (L): 4ft (W): 3ft 6in (D): 4ft - 97.1%; 97.3%Located in both P/L and D/L IFO 56.Arrival: 11:30AMDeparture: 2:25PM |
2020-03-12 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm water trench in d/l is good. |
2020-03-12 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation okay |
2020-03-12 | No data | EAST 9 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Active | Department of Transportation | Crew actively working. |
2020-03-11 | No data | CLINTON AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in the Roadway. 3 Day Dep Notice Issued. |
2020-03-11 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway/swk ok. |
2020-03-11 | No data | 139 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work covered by BPP also DDC water trench. |
2020-03-11 | No data | ARCHER AVENUE, FROM STREET 139 STREET TO STREET 143 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut covered by BPP. |
2020-03-11 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved by building pavers |
2020-03-11 | No data | LEEDS ROAD, FROM STREET BEND TO STREET LEITH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade d/l. |
2020-03-11 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CUTS VISIBLE DUE TO BUILDER'S PAVEMENT PLAN |
2020-03-10 | No data | WASHINGTON AVENUE, FROM STREET EAST 164 STREET TO STREET WEIHER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-03-10 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-03-10 | No data | ANDROVETTE AVENUE, FROM STREET DEISIUS STREET TO STREET EYLANDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w rest ok. |
2020-03-10 | No data | NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must paint bus lane properly. |
2020-03-10 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2020-03-10 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway; sealed nd flush |
2020-03-10 | No data | 91 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in the Roadway 3 Day Dep Notice Issued |
2020-03-10 | No data | WEST 17 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS RESURFACED |
2020-03-10 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water trench in d/l is ok. |
2020-03-10 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED ROADWAY |
2020-03-10 | No data | MALCOLM X BOULEVARD, FROM STREET JEFFERSON AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the roadway & sidewalk |
2020-03-09 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration is mounded 1 1/2 inches. |
2020-03-09 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 368 REPAIR WATER with a 2019 color code marker As per staff insp. Mejia I was told that it is ok for a cut to have an old marker early in the new year. |
2020-03-09 | No data | 255 STREET, FROM STREET 57 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition corrected - area temp. to grade, no trip condition for the pedestrians at this time. |
2020-03-09 | No data | ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-03-09 | No data | 255 STREET, FROM STREET 57 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Replace full sidewalk flags in kind after NICA condition was corrected. |
2020-03-09 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | installing wood sheating in exc., warned Foreman about Backhoe on s/w |
2020-03-08 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #020, restore all travel lanes to all ongoing vehicles during non-work hours. Nov issued |
2020-03-08 | No data | 255 STREET, FROM STREET 57 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/o 57-31 255 st repaired sidewalk flag 1 inc below grade on one side, creating a trip hazard for the pedestrians. |
2020-03-08 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of building #495 in compliance |
2020-03-08 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #1255 in compliance |
2020-03-08 | No data | THROOP AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r//w |
2020-03-07 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUMBING NYC, INC crew on site currently performing work in the roadway of the parking lane in front of property #192, valid dot permit on file #B012020057E78 |
2020-03-07 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway is found to be resurfaced BPP (B012020002A76) |
2020-03-07 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing work in the roadway of the parking lane in front of property #192 |
2020-03-07 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration overlapped by major gas installation in front of property #145 THE HUNTINGTON |
2020-03-07 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Temporary Restoration Overdue for FINAL RESTORATIONPLUMBING NYC , INC. please restore temporary water restoration in the sidewalk in front of property #443, in a timely fashion. CAR issued |
2020-03-07 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2020-03-07 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-03-07 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. failed to comply with terms & conditions of stipulation #020, restore all travel lanes to all ongoing vehicles during non-work hours. Nov issued |
2020-03-06 | No data | SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | L10’0 W3’10 D10’0Compaction 97.9 98.1Monitored 10:00-150 |
2020-03-06 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #100 in compliance |
2020-03-06 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC crew is on site preparing to commence work in the roadway/sidewalk in front of property #40, currently entire roadway/sidewalk is open to all ongoing pedestrians/vehicles in compliance |
2020-03-06 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench across the roadway |
2020-03-05 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #163 in compliance |
2020-03-04 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site currently performing work in the sidewalk in front of property #40 with a closure of the entire sidewalk with signs posted at the work-zone & at both intersections |
2020-03-04 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... new permit obtained .... |
2020-03-03 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 601 Washington on Leroy, unable to fully view cobble stones due to ongoing B/O along North Curb. Stones appear ok. |
2020-03-03 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 8ft x 5ft 7in x 4ft 96.7% 97.6% |
2020-03-03 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-03-03 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk was closed. Spoke to foreman and he reopened it. |
2020-03-02 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway . |
2020-03-02 | No data | VERONICA PLACE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2020-03-01 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patchwork still remains on the sidewalk but It will be restored under BPP once the building operation is complete. |
2020-02-29 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-02-29 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-29 | No data | 39 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-29 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2020-02-28 | No data | CONEY ISLAND AVENUE, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts d/l. p/l. #1) 3 1/2ft x 2 1/2ft, down 3 1/2ft. 95.9% #2) 6FT X 4FT, down 3 1/2ft. 96.2% Cleanfill. WET 122.7 DRY 115.3 MAX 119.2 MOISTURE 6.4% |
2020-02-28 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012017284C53 on file. |
2020-02-28 | No data | WALWORTH STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2020-02-28 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway trench in compliance. |
2020-02-28 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane IFO 346. |
2020-02-27 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2020-02-27 | No data | LORIMER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-02-27 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed under permit M012018256B21 |
2020-02-27 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench d/l |
2020-02-27 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane. IFO 1127. IBM tags observed. |
2020-02-27 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY REPAVED |
2020-02-27 | No data | 27 STREET, FROM STREET 42 ROAD TO STREET QNSBORO BR UP RY APR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Covered by BPP |
2020-02-27 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completd |
2020-02-26 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass... |
2020-02-26 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking/driving lane, in front and opposite of 6703 13 Avenue. |
2020-02-26 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, plated ....new sprinkler svc ... |
2020-02-25 | No data | EAST 7 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2020-02-25 | No data | AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Onsite plating sidewalk opposite 56 AinslieSt |
2020-02-25 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water trench across roadway from parking lane to parking lane. |
2020-02-24 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2020-02-24 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut ok. |
2020-02-24 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(10’)W(5’)D(8’)TEST#1=97.2TEST#2=97.4CUT#2=L(8’)W(4’)D(3’)TEST#1=97.1SAW CUTS SPRAYED BACKFILL PASS |
2020-02-23 | No data | ELTON AVENUE, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut found |
2020-02-23 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5 perm water restorations flush to grade in the roadway of the driving lane/parking lane in front of property #275 &308 in compliance |
2020-02-23 | No data | CLASSON AVENUE, FROM STREET FLUSHING AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-02-23 | No data | BRUCKNER BOULEVARD, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site, sidewalk closed, but walkway in roadway with flag person, site in compliance. |
2020-02-22 | No data | HOYT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #318 in compliance |
2020-02-22 | No data | 87 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer perm trench from driving lane to the curb is in compliance. |
2020-02-22 | No data | WEST 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 131, open CAR under later permit M012019288C47. Expansion joints sealed on sidewalk at this time. Perm 2019 restoration in parking lane. |
2020-02-22 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area Perm flush at active building operation. |
2020-02-21 | No data | 63 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R\W PAVED |
2020-02-21 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not started |
2020-02-21 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by B.P.P |
2020-02-21 | No data | 54 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-19 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not found |
2020-02-19 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Actively working within roadway excavation. Traffic moving. In compliance. |
2020-02-19 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM WATER CUTS FOUND ON ROADWAY |
2020-02-19 | No data | MYRTLE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-02-19 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2020-02-19 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started |
2020-02-19 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w pave |
2020-02-19 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012019218A93) |
2020-02-19 | No data | 160 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 9 x 4 perm cut in r/w |
2020-02-19 | No data | MARCY AVENUE, FROM STREET MARTIN L KING PLACE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway ok. |
2020-02-18 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cuts ok. |
2020-02-18 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pave by billings pavers |
2020-02-18 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-02-18 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed |
2020-02-18 | No data | 57 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-18 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found due to active BO. |
2020-02-18 | No data | 12 AVENUE, FROM STREET 38 STREET TO STREET 39 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working with flagmen posted |
2020-02-18 | No data | 39 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-18 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2020-02-17 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #12 & 1 blue stone sidewalk flag installed with water valve in compliance |
2020-02-17 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-02-17 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the segment of the crosswalk near corner of LIVINGSTON STREET aka property #76 aka BANK OF AMERICA Financial center in compliance |
2020-02-17 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit obtained-Q012019357A05 |
2020-02-16 | No data | ST NICHOLAS AVENUE, FROM STREET GATES AVENUE TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on opposite sidewalk of address |
2020-02-16 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #26 in compliance |
2020-02-16 | No data | JORALEMON STREET, FROM STREET GARDEN PLACE TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #89 in compliance |
2020-02-16 | No data | DOUGHTY STREET, FROM STREET BEND TO STREET ELIZABETH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane 55 FEET from corner of ELIZABETH PLACE in compliance |
2020-02-16 | No data | HENRY STREET, FROM STREET CLARK STREET TO STREET LOVE LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #132 & 4 sidewalk flags installed in compliance |
2020-02-16 | No data | WILLOW STREET, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-16 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BPP 1/2+5 in compliance |
2020-02-15 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench ok r\w |
2020-02-15 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on rw |
2020-02-15 | No data | 55 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-15 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-02-15 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-02-15 | No data | WEST 41 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Full depth cut-backs performed. |
2020-02-15 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repave street cut asphalt broken \cracked |
2020-02-13 | No data | LYNCH STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-126.0, Dry-Den-114.7, Max. Dry-Den-119.5, Act. Moist-9.9, Material- Clean fill (Blend), Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Chris, Compaction results-(97.3, 97.9) |
2020-02-13 | No data | LYNCH STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on site doing 6” base cutbacks, in compliance. |
2020-02-13 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway in compliance. CAR for defective sidewalk will be issued once scaffolding is removed. |
2020-02-13 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on s/w |
2020-02-12 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r.w has been resurfaced |
2020-02-12 | No data | MARCY AVENUE, FROM STREET MARTIN L KING PLACE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut ok. |
2020-02-12 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced,new s/w. |
2020-02-12 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify 2017 work at this time. |
2020-02-12 | No data | 150 STREET, FROM STREET 17 AVENUE TO STREET 17 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration in roadway |
2020-02-12 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12ft 3in x 4ft x 7ft 8in 98.9% , 98.0% |
2020-02-12 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane ok. |
2020-02-11 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP. |
2020-02-11 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw resurfaced |
2020-02-10 | No data | 48 AVENUE, FROM STREET 92 STREET TO STREET 93 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in r/w and s/w. Contractor was no show for b/f scheduled for 11:30 am |
2020-02-10 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS IN THE D/L |
2020-02-10 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of perm restoration in roadway viewed at time of inspection. |
2020-02-10 | No data | THROOP AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway. In compliance. |
2020-02-10 | No data | TRUXTON STREET, FROM STREET EASTERN PARKWAY TO STREET SACKMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water / sewer cut in the roadway |
2020-02-10 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2020-02-10 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in driving lane. |
2020-02-10 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut opp 1466 ok |
2020-02-09 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found roadway |
2020-02-09 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #12 & 1 blue stone sidewalk flag installed with water valve in compliance |
2020-02-09 | No data | HUNTS LANE, FROM STREET DEAD END TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway directly in front of property #13 in compliance |
2020-02-09 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #111 in compliance |
2020-02-08 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #161 & 1 sidewalk flag installed with water valve in compliance |
2020-02-08 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #96 AMITY STREET in compliance |
2020-02-08 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | P/L PERM CUT I/F/O LAUNDROMAT |
2020-02-08 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #24 & 1 sidewalk flag installed with water valve in compliance |
2020-02-07 | No data | FAIRVIEW AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent long water |
2020-02-07 | No data | WOODWARD AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in roadway |
2020-02-07 | No data | DEAN STREET, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... |
2020-02-06 | No data | LIBERTY AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN RESURFACED |
2020-02-06 | No data | MOFFAT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | re-scheduled |
2020-02-06 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2020-02-06 | No data | VAN SICKLEN STREET, FROM STREET AVENUE S TO STREET LLOYD COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK |
2020-02-05 | No data | 139 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2020-02-05 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ACROSS 3/4 OF ROADWAY PERMANENTLY RESTORED TO GRADE AT 986 |
2020-02-05 | No data | MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved by building pavers |
2020-02-04 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway and sidewalk |
2020-02-04 | No data | WEST 17 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY IS RESURFACED |
2020-02-04 | No data | 61 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed. Start: 10:15AM End: 12:45PM Cut#1: L: 12FT. 0IN. W: 4FT. 0IN. D: 10FT. 6IN. (98.0% & 98.1%)Cut#2: L: 5FT. 4IN. W: 4FT. 6IN. D: 4FT. 3IN. (97.6% & 98.1%)WD: 123.0 DD: 113.2 MD: 119.0 MST: 8.7%2 cuts, IFO & OPP of 1770 61 St |
2020-02-03 | No data | EAST 4 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Active | Department of Transportation | active worksite restoration is plated crew is on site |
2020-02-03 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced roadway |
2020-02-02 | No data | 14 AVENUE, FROM STREET 116 STREET TO STREET 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest (aka 14-02 116 st) corner property |
2020-02-02 | No data | TOMPKINS PLACE, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2020-02-02 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the parking lane in front of property #67 in compliance |
2020-02-02 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #24 in compliance |
2020-02-02 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway of the driving lane in front of property #40 in compliance |
2020-02-02 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #96 in compliance |
2020-02-02 | No data | 116 STREET, FROM STREET 14 AVENUE TO STREET 14 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest p/l in 14 ave (corner property) |
2020-02-02 | No data | 2 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced on a DDC contract |
2020-02-01 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-02-01 | No data | 58 STREET, FROM STREET 16 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-02-01 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #128 in compliance |
2020-02-01 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the of the driving lane opposite from property #96 in compliance |
2020-02-01 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #450 in compliance |
2020-02-01 | No data | TIFFANY PLACE, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #36 in compliance |
2020-02-01 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At measurements provided, cobble stones within ongoing building operation appear to be in compliance. Unable to fully view at this time. |
2020-02-01 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane opposite from property #100 in compliance |
2020-02-01 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-02-01 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm water restorations flush to grade in the roadway of the parking lane opposite from property #135-139 in compliance |
2020-01-31 | No data | EAST 126 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration located 75’ east of north corner of 3 avenue. Short water has been made final. No defects to report |
2020-01-31 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plug sewer work was done on the sidewalk |
2020-01-31 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUT IN THE SIDEWALK FOR SHORT WATER SERVICE TO 471. |
2020-01-31 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plate is half in roadway the other half behind building operations. Perm active countersunk with raise plow signs. Aka 217 Pearl St. |
2020-01-31 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2020-01-31 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temporary asphalt applied to permanent restoration is mounded over 1 inch and needs to be be rolled and made flush with the roadway. |
2020-01-31 | No data | WEST 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 131, installed expansion joints within sidewalk work are missing permanent sealer. |
2020-01-30 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by half plus five. |
2020-01-30 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 373 classon avenue |
2020-01-30 | No data | PARK AVENUE, FROM STREET DELMONICO PLACE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2020-01-30 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opposite 672 |
2020-01-29 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w ok |
2020-01-29 | No data | CHAUNCEY STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE BACK-FILL CUT WAITING FOR CONCRETE TRUCK |
2020-01-29 | No data | CHAUNCEY STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK-FILL COMPLETED CUTBACKS WAS MADE THERE WILL BE A CONCRETE BASE RESTORED TRUCK IS NOT ON SITE YET CUT WILL BE LEFT TEMP TO GRADE |
2020-01-29 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut ok. |
2020-01-29 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-01-29 | No data | BATHGATE AVENUE, FROM STREET BEND TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-29 | No data | 37 STREET, FROM STREET 31 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done beneath builders paving |
2020-01-29 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-01-29 | No data | WASHINGTON AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-29 | No data | ST JOHNS PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, plated ... new water (sprinkler) svc ... |
2020-01-28 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway in front of 140 -A lexington avenue, water valve found on sidewalk iin front of 157 |
2020-01-27 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration resurfaced due to BPP |
2020-01-27 | No data | 52 STREET, FROM STREET 20 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 13ft by 5ft down 8ft 5ft by4ft down 3ft |
2020-01-27 | No data | 157 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number . |
2020-01-26 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced |
2020-01-25 | No data | WEST 125 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates on the roadway. Work site is not active |
2020-01-25 | No data | COFFEY STREET, FROM STREET DWIGHT STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #10 |
2020-01-25 | No data | VAN BRUNT STREET, FROM STREET BEARD STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BPP 1/2+5 in compliance |
2020-01-25 | No data | DWIGHT STREET, FROM STREET COFFEY STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #175 in compliance |
2020-01-25 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #163 & 1 sidewalk flag installed in compliance |
2020-01-24 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE COUNTERSUNK IN ROADWAY (WATER SERVICE CUT BY NATIONAL GRID SUB-CONTRACTOR ?) |
2020-01-24 | No data | ROCHESTER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass.... ok |
2020-01-24 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 12:15P End: 1:45PL: 9FT. 0IN. W: 5FT. 6IN. D: 10FT. 0IN.WD: 124.8 DD: 113.6 MD: 121.5 MST: 9.9%Compaction: 1. 98.0% 2. 97.8%Cut is in the parking/driving lane, in front of 1463 61 Street. |
2020-01-24 | No data | 182 STREET, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department . |
2020-01-23 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobble stone roadway stored in kind in front of property #76-84 in compliance |
2020-01-23 | No data | QUINCY STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-116.7, Dry-Den-108.5, Max. Dry-Den-111.5, Act. Moist- 7.5, Material- Clean fill, Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Troy, Compaction results - (2-Cuts) Cut-1-(97.7, 98.0), Cut-2-(98.8) |
2020-01-23 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VIOLATION D1J / PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAG INSTALLED |
2020-01-22 | No data | WEST 122 STREET, FROM STREET MANHATTAN AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the department. |
2020-01-22 | No data | LAFAYETTE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2020-01-21 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore wearing course of permanent restoration,re-seal street opening joints and replace color code marker. |
2020-01-21 | No data | 55 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 1133 55 street -found permanent restoration asphalt broken out (spalling) and sunken 1" and half at driving lane of roadway. |
2020-01-20 | No data | KINGS HIGHWAY, FROM STREET STILLWELL AVENUE TO STREET WEST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #137 |
2020-01-20 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front opposite property #2040 in compliance |
2020-01-20 | No data | 39 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-01-20 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the driving lane IFO 350. |
2020-01-19 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of perm trench sunken 2'' in localized area and also plug spike holes. |
2020-01-19 | No data | VILLAGE ROAD SOUTH, FROM STREET GRAVESEND CEMETERY BOUNDARY TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #2390 aka property #2378 MCDONALD AVENUE in compliance |
2020-01-19 | No data | MC DONALD AVENUE, FROM STREET GRAVESEND NECK ROAD TO STREET VILLAGE ROAD SOUTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #2378 |
2020-01-19 | No data | 76 AVENUE, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012019087F11 on file. |
2020-01-17 | No data | 15 DRIVE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 8.0' x 6 1/2' x 12'' |
2020-01-17 | No data | YORK AVENUE, FROM STREET EAST 74 STREET TO STREET EAST 75 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration in p/l is good. (OPP of 1402) |
2020-01-16 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 11:20AM End: 11:40AL: 4FT. 0IN. W: 3FT. 7IN. D: 3FT. 3IN.WD: 112.2 DD: 106.6 MD: 110.5 MST: 5.3%Compaction: 97.8%Cut is in the parking lane, in front of 1036 East 3 Street. |
2020-01-16 | No data | RALPH AVENUE, FROM STREET BAINBRIDGE STREET TO STREET CHAUNCEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a steel plate that was left in the parking lane opposite of 231 that needs to be removed |
2020-01-16 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2020-01-15 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts. #1 11ft x 4ft, down 7ft. 98.4% & 97.9% #2 5ft x 4ft, down 3ft. 98.2% Cleanfill. WET 124.8 DRY 113.6 MAX 120.5 MOISTURE 9.9% Driving lane. |
2020-01-15 | No data | EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-01-15 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway cut ok. |
2020-01-15 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP IFO new building. |
2020-01-15 | No data | CHURCH AVENUE, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site excavating the s/w to install new sewer |
2020-01-15 | No data | 182 STREET, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER -CREW ON SITE. OPEN EXCAVATION IN THE ROADWAY. CREW WORKING IN SIDEWALK AREA. ALL STIPULATION IN COMPLIANCE. |
2020-01-15 | No data | VERONICA PLACE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w okay |
2020-01-14 | No data | 182 STREET, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012020006C57 on file. |
2020-01-14 | No data | 182 STREET, FROM STREET LIE EB ENTRANCE UTOPIA PKWY TO STREET 64 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersink steel plates in driving/parking lane with signs in compliance. |
2020-01-13 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving an emergency permit number.Emergency permit obtained by respondent on 12/30/19 |
2020-01-13 | No data | EAST 7 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 Length 10' 3" Width 4' Depth 7' 1", First lift 97.6 Last Lift 98.0. Cut #2 Length 3' Width 2' 8" Depth 3' 5", First lift 97.9 Last Lift 98.2. |
2020-01-13 | No data | 15 DRIVE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken domestic water service, leak visible in roadway |
2020-01-13 | No data | EAST 72 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway opp of #252. |
2020-01-13 | No data | EAST 7 STREET, FROM STREET AVENUE O TO STREET AVENUE P | No data | Street Construction Inspections: Active | Department of Transportation | crew excavate the r/w & s/w |
2020-01-12 | No data | ST NICHOLAS AVENUE, FROM STREET GATES AVENUE TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2020-01-12 | No data | EAST 28 STREET, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2020-01-11 | No data | 53 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-01-11 | No data | 61 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut r\w ok |
2020-01-11 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-01-11 | No data | 57 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-01-11 | No data | 72 AVENUE, FROM STREET 163 STREET TO STREET 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-01-11 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut on r\w |
2020-01-11 | No data | MADISON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk and work done in the parking lane |
2020-01-11 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-01-11 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2020-01-10 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been repaved by BPP. |
2020-01-10 | No data | DALY AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2020-01-10 | No data | ATHENA PLACE, FROM STREET FINE BOULEVARD TO STREET MOTLEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration along parking lane, Sidewalk replaced in kind by homeowner |
2020-01-10 | No data | 188 STREET, FROM STREET 87 DRIVE TO STREET HILLSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #188 HILLSIDE AVENUE in compliance |
2020-01-09 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway in front of 771; sealed and flush. |
2020-01-09 | No data | HILLSIDE AVENUE, FROM STREET 188 STREET TO STREET 189 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #188-11 in compliance |
2020-01-09 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 115 , Permanent Restoration in the Roadway and sidewalk flags around water valves in compliance. |
2020-01-09 | No data | WEST 187 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temporary sidewalk restorations over due for final. Located ifo 536 west 187 street. |
2020-01-08 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active site new permit B012019357B47 |
2020-01-08 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | asphalt broken ont down 1 1\2 in |
2020-01-08 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm is in compliance |
2020-01-08 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2020-01-08 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Roadway in Compliance |
2020-01-08 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water/sewer combo restoration is the driving lane is in compliance |
2020-01-07 | No data | EAST 3 STREET, FROM STREET AVENUE F TO STREET DITMAS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10ft by 4ft down 9in |
2020-01-07 | No data | WILSON AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-121.8, Dry-Den-112.1, Max. Dry-Den-117.0, Act. Moist-8.7, Material- Clean fill (Blend), Test- Sand cone, Lab Exclusive Testing Labs, Lab tech- Andrew, Compaction results - (97.1, 97.4) |
2020-01-07 | No data | EAST TREMONT AVENUE, FROM STREET BOSTON ROAD TO STREET BRYANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2020-01-07 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 57 permanent voltage restoration is in compliance |
2020-01-07 | No data | SOUTH OXFORD STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-01-07 | No data | AVENUE I, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 CUTS. #1 5ft x 3 1/2ft, down 4ft, Blend. 97.2 & 98.1% #2 6ft x 4ft, down 4 1/2ft. 95.3% & 97.1%WET 126.0 DRY 119.7 MAX 125.5 MOISTURE 5.3% |
2020-01-06 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 18ft (W): 4ft (D): 8ft - 96.8%; 97.7%Cut #2: (L): 7ft (W): 5ft (D): 4ft - 97.5%; 98.7%Located in both P/L and D/L IFO 986.Arrival: 9:35AMDeparture: 2:05PM |
2020-01-06 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new catch basin |
2020-01-06 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut 09........water c/o ... |
2020-01-05 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2020-01-05 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane opposite from property #236 |
2020-01-05 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-01-05 | No data | COOK STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-01-05 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway restoration |
2020-01-05 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut on roadway |
2020-01-05 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind in compliance |
2020-01-05 | No data | INGRAHAM STREET, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #77 MORGAN AVENUE |
2020-01-05 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2020-01-04 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2020-01-04 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Trench runs south from AKA 11 Green street in the West bound driving lane. |
2020-01-04 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #19 |
2020-01-04 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved 1/2 plus 5ft. No plumber's cut observed. Hardware on sidewalk. |
2020-01-02 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2020-01-01 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BBP 1/2+5 |
2019-12-31 | No data | EAST 8 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-12-31 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | No blockage of driveway, in front of 1635, plumber cut plated and countersink, raise plow signs also posted |
2019-12-31 | No data | GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut found on roadway |
2019-12-31 | No data | AVENUE I, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plate okay |
2019-12-30 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced. cut no longer visible. |
2019-12-30 | No data | PUTNAM AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Excavation in the Roadway Steel Plated & Countersunk in Compliance at opp 471. |
2019-12-29 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-29 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-29 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-12-29 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the r/w |
2019-12-29 | No data | KENT AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-29 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway sealed and flush in front of 289 |
2019-12-28 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CAR#20194310298 WAS WRITTEN 12/5/19 |
2019-12-28 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #79-81 in compliance. |
2019-12-27 | No data | DOSCHER STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER & SEWER CUT IN THE ROADWAY |
2019-12-27 | No data | 55 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill rescheduled. |
2019-12-27 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC Fail to comply with terms and conditions of stipulation#ocmc12, post signs at the work-zone & at both intersections redirecting all ongoing pedestrians to the opposite sidewalk. Nov issued |
2019-12-27 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | W.D-113.1D.D-106.3M.D.D-110.5A.C-6.4%1st lift-98%last lift-98.7%Length of the cut-15 Feet 10 inches Width of the cut-6 Feet 1 inchDepth of the cut-8 Feet |
2019-12-27 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water repair found in the driving lane. |
2019-12-27 | No data | 71 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration in parking/driving lane opposite of address. |
2019-12-26 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation ifo 540 on the sidewalk |
2019-12-26 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit on file |
2019-12-26 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Trench runs from AKA 108 Leonard Street East, with Con Ed trench running through. |
2019-12-26 | No data | LIBRARY AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Cut plated in the roadway and countersink, raise plow signs posted. |
2019-12-25 | No data | WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-25 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-25 | No data | EAST 11 STREET, FROM STREET CORTELYOU ROAD TO STREET SLOCUM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-12-25 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND REPAVED |
2019-12-25 | No data | NORTH 8 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-25 | No data | NORTH 4 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-25 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-25 | No data | RIVER STREET, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #200 KENT AVENUE |
2019-12-24 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #127 |
2019-12-24 | No data | EAST 14 STREET, FROM STREET AVENUE M TO STREET ELM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-12-23 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | OPEN SIDEWALK & RWY STREET OPENINGS |
2019-12-22 | No data | EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-22 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-22 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-22 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-22 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #163 |
2019-12-22 | No data | RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY REPAVED |
2019-12-22 | No data | MEEKER AVENUE, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BBP 1/2+5 |
2019-12-22 | No data | LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BBP 1/2+5 |
2019-12-22 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #56 |
2019-12-22 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-21 | No data | FROST STREET, FROM STREET MANHATTAN AVENUE TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flushed to grade in the roadway extending into the parking lane in front of property #108 |
2019-12-21 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC failed to comply with the terms and conditions of stipulation#020, restore all travel lanes to all ongoing vehicles during non-work hours. Nov issued |
2019-12-21 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W flags with hardware. Roadway found resurfaced. |
2019-12-20 | No data | 12 AVENUE, FROM STREET 38 STREET TO STREET 39 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 16ft 4ft down 9ft |
2019-12-19 | No data | 3 STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 4ft 3in bt 3ft 7in down3ft 2in |
2019-12-19 | No data | WILSON AVENUE, FROM STREET BLEECKER STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, new sewer connection ... |
2019-12-19 | No data | BANK STREET, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut is up to grade in roadway in front of 10 which is currently an active sidewalk job. |
2019-12-19 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway/swk in compliance. |
2019-12-18 | No data | POWERS STREET, FROM STREET LEONARD STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 13ft (W): 4ft (D): 6ft - 97.9%; 98.3%Located in P/L-D/L IFO 79-81.Arrival: 10:40AMDeparture: 1:35PM |
2019-12-18 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk joints not seal |
2019-12-17 | No data | QUINCY STREET, FROM STREET CLASSON AVENUE TO STREET DOWNING STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC failed to countersink all steel plate street openings flush with the roadway as per 2019 winter moratorium policy. Nov issued a a |
2019-12-17 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC Crew on site excavating in the roadway installed new water & sewer line in a efficient manner in front of property #986 |
2019-12-16 | No data | MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP restoration 1/2 plus 5 feet. |
2019-12-16 | No data | WEST 16 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Perm roadway cut restore to grade in p/l. |
2019-12-16 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | 2 PERM RESTORATIONS IN RWY |
2019-12-15 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm water cut found on roadway |
2019-12-15 | No data | 43 AVENUE, FROM STREET 58 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway in compliance at time of inspection |
2019-12-14 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Haft, plus 5 of roadway resurfaced ifo new BO. |
2019-12-14 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. Half plus 5 |
2019-12-14 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-14 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION D/L |
2019-12-13 | No data | WEST 35 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration on the Roadway with Binder Base Restoration around a water box on the Sidewalk, no action taken due to vacant building. |
2019-12-13 | No data | EAST 7 STREET, FROM STREET CATON AVENUE TO STREET FRIEL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-12-13 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1. 5x3x47” 2. 5x6x6’7” site plated for concrete curing cutbacks made on base only. |
2019-12-12 | No data | COLLEGE POINT BOULEVARD, FROM STREET 15 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | sidewalk flags restored in concrete |
2019-12-12 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | sidewalk and roadway restored |
2019-12-12 | No data | WINDSOR PLACE, FROM STREET FULLER PLACE TO STREET HOWARD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #167 |
2019-12-12 | No data | WEST 163 STREET, FROM STREET BROADWAY TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | DEP has canceled this LL14 |
2019-12-11 | No data | LAFAYETTE AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance. |
2019-12-11 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent has a plated long distance restoration on the roadway without a valid permit on file. permit on file expired on 11/22/19. permit# used to I.D contractor |
2019-12-10 | No data | THROOP AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Swk in compliance. |
2019-12-08 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Restoration now perm and sealed; color code installed. |
2019-12-08 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-12-08 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-12-08 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Restoration Breaking up |
2019-12-07 | No data | 11 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-12-07 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed in front of property #413 in compliance |
2019-12-07 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | New CAR #20195250443 has been issued. BNP2019341A12. |
2019-12-07 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Binder cut in front of 3506 Farragut Rd is overdue for final. |
2019-12-07 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | 1 Permanent Restoration in the Crosswalk at Leonard street. |
2019-12-07 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2019-12-07 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2019-12-07 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | S\W CUT PERM |
2019-12-05 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2019 cut on the r\w |
2019-12-05 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt restoration, overdue for final restoration (Previously reported) |
2019-12-05 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR issued with incorrect 34 (work procedures) defect code. CAR to be re-issued with 1042 defect code to allow for re-inspection assignments. |
2019-12-04 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Restoration now perm; cement replaced for bus stop. |
2019-12-04 | No data | WEST 30 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Final Restoration completed. |
2019-12-04 | No data | EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 14' by 5' backfill |
2019-12-04 | No data | RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Length of the cut- 12 Feet Width of the cut- 4 Feet Depth of the cut- 7 Feet Wet density- 125.1Dry density- 115.1Max dry density- 122Actual moisture- 8.7%1st lift- 98.7%last lift- 98.5% |
2019-12-03 | No data | KOSCIUSKO STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway.. Partially resurfaced by BPP. |
2019-12-03 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway ok. |
2019-12-02 | No data | HEWES STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cuts found on roadway |
2019-12-02 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane. |
2019-12-01 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is flushed and color coded ifo 531 |
2019-12-01 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2019-12-01 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced |
2019-11-30 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2019-11-30 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-30 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #168 |
2019-11-30 | No data | THROOP AVENUE, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-30 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED |
2019-11-29 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2019-11-29 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was repaved. |
2019-11-28 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2019-11-28 | No data | LAFAYETTE AVENUE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-28 | No data | CLIFTON PLACE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-27 | No data | AVENUE M, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is sealed and in compliance |
2019-11-26 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-11-26 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Crosswalk at Leonard street. |
2019-11-26 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found in parking lane |
2019-11-26 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR for location under Harris. M012019288B98 In front of 12. |
2019-11-26 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | crew excavate the r/w & s/w |
2019-11-26 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 Length 16' 2" Width 4' 3" Depth 10', First lift 98.1 Last Lift 97.9. Cutback & base was done. |
2019-11-25 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced. |
2019-11-25 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade in he crosswalk of St Nic. |
2019-11-25 | No data | SOUTH 4 STREET, FROM STREET BEND TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut found on roadway |
2019-11-24 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel plated street openings counter sunken in the roadway of the parking lane in front of property #776 |
2019-11-24 | No data | CUMBERLAND STREET, FROM STREET GREENE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #314 |
2019-11-24 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #417 |
2019-11-24 | No data | LEGION STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED CUT COVERED BY BPP |
2019-11-24 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-24 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ALL RESTORATIONS WERE RE-PAINTED RED |
2019-11-23 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed with water valve in front of property #110 in compliance |
2019-11-23 | No data | WHITE PLAINS ROAD, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway, with temp cut on sidewalk, seems Con Edison,also doing gas work, will research |
2019-11-23 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-23 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken out of temporary (binder) cut, locally, down 2 inches ifo 3514. Make flush with surrounding area. |
2019-11-22 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re-surfaced by BPP |
2019-11-22 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 12:50P End: 2:10P#1: L: 4FT. 0IN. W: 3FT. 6IN. D: 4FT. 0IN. (96.7% & 97.3%)#2: L: 4FT. 5IN. W: 3FT. 10IN. D: 3FT. 6IN. (95.8% & 96.5%)WD: 112.5 DD: 104.6 MD: 109.0 MST: 7.5%2 cuts but no pipe in the excavations. |
2019-11-21 | No data | BROOKLYN AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to comply with terms & conditions of DOT permits violating STP#083. WORK 9AM TO 2PM MONDAY TO FRIDAY. RESPONDENT ON SITE WORKING @2:45PM |
2019-11-21 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench ok r\w |
2019-11-21 | No data | 60 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 roadway excavations plated |
2019-11-21 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2019-11-20 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #978 |
2019-11-20 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind BBP 1/2+5 |
2019-11-20 | No data | PRESIDENT STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | radway was repaved |
2019-11-20 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White lane marking restored. Slightly peeling off will monitor. |
2019-11-20 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in front of building #96 needs to be re-sealed |
2019-11-20 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC Failed to comply with terms and conditions of stipulation#bike03, Post the sign assembly Sc-151 & sc-152 at the work-zone & sign assembly sc-145. |
2019-11-19 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2019-11-19 | No data | CELESTE COURT, FROM STREET BIJOU AVENUE TO STREET CHANNEL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Sidewalk flags |
2019-11-19 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:40A End: 1:25PCut#1: L: 20FT. 0IN. W: 5FT. 8IN. D: 9FT. 8IN. (97.3% & 97.5%)Cut#2: L: 5FT. 0IN. W: 5FT. 0IN. D: 3FT. 2IN. (97.0%)#1: W: 116.4 D: 105.9 MD: 111.5 MST: 9.9%#2: W: 102.9 D: 94.7 MD: 98.5 MST: 8.7% |
2019-11-19 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-19 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #436 |
2019-11-19 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL JOINTS IN PERMANENT REPAIR WATER & SEWER RESTORATION IN ROADWAY & INSTALL PROPER COLOR CODE- IN FRONT OF 163 COURT ST BETWEEN DEAN STREET & PACIFIC STREET. |
2019-11-19 | No data | CHANNEL AVENUE, FROM STREET BEVY COURT TO STREET CELESTE COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk flags around corner property 73 as per specific location on permit. |
2019-11-18 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm water cut found on roadway in front of 114 south 1 st |
2019-11-17 | No data | GREENE AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #18-13 |
2019-11-17 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a temporary restoration on the roadway. Respondent failed to permanently restore cut within required time, permit expired on 11/6/2019. Cited permit used for ID. |
2019-11-17 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade of the driving lane in front of property #162 |
2019-11-17 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #373 |
2019-11-17 | No data | 47 AVENUE, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012017066A04 on file. |
2019-11-17 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #476 |
2019-11-17 | No data | HALL STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #77 |
2019-11-16 | No data | MERMAID AVENUE, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway/Sidewalk |
2019-11-16 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts on cobble stone roadway in compliance |
2019-11-16 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Approx. 40' from Pearl St ( I/F/O aka 217 Pearl ), perm 2019 curb to curb trench. Note: Cut will be resurfaced in future as per New Building BPP and work will be no longer visible. |
2019-11-16 | No data | FLUSHING AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #376 |
2019-11-16 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #436 |
2019-11-16 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-11-15 | No data | 66 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm roadway cut has been sealed. |
2019-11-15 | No data | LORIMER STREET, FROM STREET GRAND STREET TO STREET MAUJER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working. |
2019-11-15 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found newly resurfaced. |
2019-11-14 | No data | MALCOLM X BOULEVARD, FROM STREET HANCOCK STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found to be in compliance |
2019-11-14 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance (P/L) |
2019-11-13 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER : work on sidewalk. work in the street is covered by Con Edison work |
2019-11-13 | No data | POWELL STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2019-11-12 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Contractor has responded to this request, roadway found to be restored in kind (concrete) |
2019-11-11 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC Failed to comply with the terms and conditions of stipulation#ocmc12, Post signs at the work-zone & at both intersections redirecting all on going pedestrians. Nov issued |
2019-11-11 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm water restorations flushed to grade in the roadway of the parking lane in front of property #385 & 4 sidewalk flags installed with water valve in compliance |
2019-11-11 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumbing NYC crew on site excavating in the sidewalk in front of property#691 |
2019-11-11 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway |
2019-11-11 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-11-10 | No data | NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-11-10 | No data | EASTERN PARKWAY, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-10 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SW acceptable |
2019-11-10 | No data | CARROLL STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #1251 |
2019-11-09 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | PERMIT CHECK > TEMP CUT, D/L. 50' FROM HYLAN X/WALK |
2019-11-09 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | 0115 - REPAIR WATER - SEWER /plated excavation |
2019-11-09 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #443 |
2019-11-09 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work on cobble stone in compliance |
2019-11-08 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Missing expansion joint seal around sidewalk flags, area within a sidewalk flag with two footprints sunken 1/2" below grade. |
2019-11-08 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC Failed to comply with terms and conditions of stipulation#ocmc12, Post signs at the work-zone & at both intersections redirecting or ongoing pedestrians. Nov issued |
2019-11-07 | No data | WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The white solid line lane markings has been restored on a permanent restoration which is located in the parking/driving lane. |
2019-11-07 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water repair acceptable lane markers restored |
2019-11-07 | No data | 3 PLACE, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC , INC. Fail to comply with terms and conditions of stipulations#112, Maintain one 11 foot on a one-way to all on going vehicular traffic. Nov issued |
2019-11-07 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WITH DEP INSPECTING TAP OPEN TRENCH SWK & RWY |
2019-11-06 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | . Permit expired 10/24/19 .Respondent failed to obtain a confirmation number from the department . |
2019-11-05 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYCCrew on site excavating in the roadway extending into the parking lane in front of building #1781 |
2019-11-05 | No data | EAST 74 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L IN COMPLIANCE |
2019-11-05 | No data | FARRAGUT ROAD, FROM STREET BROOKLYN AVENUE TO STREET EAST 35 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | a-1127amcut-4'x4'x4'7'' - 98.4%2-4'x4'x4'7''- 96.7%3-4'4''x3'10''x4'7''- 97.3%4-4'7''x4'x4'7''-98.7%valintineJ.JETLjoels.ccleanfillw-120.3d-110.7md-113.6am-8.7% 6'' cutback in progress |
2019-11-05 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC Fail to comply with terms and conditions of stipulation#ocmc12, Post signs at the work zone & at both intersections redirecting all ongoing pedestrians to the opposite sidewalk. Nov issued |
2019-11-04 | No data | DEAN STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent PLUMBING NYC Failed to comply with the terms and conditions of stipulation#bike02, Create a temporary bike way around the work zone delineated by cones or similar vertical traffic devices. Nov issued |
2019-11-04 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-04 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-11-04 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway cuts have been sealed. |
2019-11-03 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work in parking lane |
2019-11-03 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2019-11-03 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration sealed. |
2019-11-03 | No data | NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #570 |
2019-11-03 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #412 |
2019-11-03 | No data | PRESIDENT STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w was resurfaced n no work on s/w |
2019-11-03 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work on cobblestone in compliance |
2019-11-02 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration (concrete) found in compliance |
2019-11-02 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to view work due to active construction site. |
2019-11-02 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has responded to this request, roadway found to be restored in kind (concrete) |
2019-11-02 | No data | EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/5/19. Respondent failed to obtain a confirmation number from the department. |
2019-11-02 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor has complied to this request, roadway markings have been restored to roadway in compliance. |
2019-11-02 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit exist.. Perm trench, plated excavation in driving lane. |
2019-11-02 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench repaired |
2019-11-02 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench & plated excavation in the driving lane. |
2019-11-01 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent restored a permanent cut using asphalt within a concrete bus pad. Respondent was notified to make correction via (CAR #20194510628) on 7/15/19 and failed to do so. |
2019-11-01 | No data | POWELL STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT IN THE PARKING LANE IS PERM AND HAVE BEEN SEALED |
2019-11-01 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. crew on site preparing to install new water service into property#390 |
2019-11-01 | No data | PALMETTO STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new svc ..... |
2019-11-01 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed and sealed in the crosswalk of 8th Ave. |
2019-10-31 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | VIOLATION D1B STEEL PLATED EXCAVATION IN THE PARKING LANE NEW PERMIT PERMIT ON FILE |
2019-10-31 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench almost curb to curb I/F/O 368, active B.O. on site. |
2019-10-31 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/14/2019. |
2019-10-31 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2019-10-30 | No data | 59 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Roadway open to vehicular traffic, the crew is working on a sewer installation for 4 houses. |
2019-10-30 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. permit expired 10/22/2019 |
2019-10-30 | No data | ROCHESTER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2019-10-30 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - crew on site.Spoke with Silvero. |
2019-10-28 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sunken portion of cut has been made flush |
2019-10-28 | No data | EAST 8 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IS IN COMPLIANCE |
2019-10-27 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-10-27 | No data | 38 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit # Q012019232D26 on file. |
2019-10-27 | No data | PACIFIC STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane opposite from property #920 |
2019-10-27 | No data | DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #800 |
2019-10-26 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag with water hardware. Roadway milled. |
2019-10-26 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 3206 . Water hardware on sidewalk. Paving done 1/2 plus 5 in the roadway. IFO new BO. |
2019-10-26 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation |
2019-10-26 | No data | MULBERRY STREET, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for this work. |
2019-10-26 | No data | EAST 3 STREET, FROM STREET AVENUE J TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration needs to be sealed |
2019-10-26 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O aka 346 Broadway / 108 Leonard ( crosswalk of Leonard St ), 3'4"L x 4'W cut in roadway. Base being saw cut. ( Cobble Stones in Base within North part of cut ) Backfill was NOT to repair water but to record LL14 inspection for protected street. |
2019-10-26 | No data | CHAUNCEY STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway restoration found in compliance |
2019-10-26 | No data | WEST 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Tech on Location, Material(BLEND)passed. Wet Density: 122.1, Dry Density: 112.3, Max Dry Density: 117.5, Actual Moisture: 8.7%. Excavation is 6'8"X6'4"X3'6" - Deep, 1 Lift 1 Test. 96.9. BAC was saw cut and chipped out for BSE. |
2019-10-26 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-10-25 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on roadway active permit on file |
2019-10-25 | No data | QUINCY STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced BPP (B012019098D40) |
2019-10-24 | No data | WEST 30 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate work on the South side next Broadway due to active construction site. |
2019-10-24 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated street opening in the roadway of the parking lane in front of property #776 |
2019-10-24 | No data | WEST 14 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated restoration on sidewalk and roadway acceptable |
2019-10-24 | No data | LEGION STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY BPP |
2019-10-23 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-10-23 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #805 |
2019-10-23 | No data | IRVING PLACE, FROM STREET GATES AVENUE TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #37 |
2019-10-23 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk and roadway |
2019-10-23 | No data | ST JOHNS PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #816 |
2019-10-23 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm restoation acceptable lane markers also restored |
2019-10-23 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway recently repaved |
2019-10-23 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #1134 |
2019-10-23 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #1245 |
2019-10-23 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration rwy and 150' East of Kent ave. on NCL |
2019-10-23 | No data | 3 AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | WET DENSITY 119/ DRY DENSITY 108.4 MAX. DRY DENSITY 114 actual moisture 9.9% first lift 97.1 % last lift 96.4%. Exclusive Testing Lab Inc. Lab Technician Mr. Andrew Rosado |
2019-10-23 | No data | LINCOLN PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #805 |
2019-10-23 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | PLUMBING NYC , INC crew on site preparing to install new water services in front of property #385, Permit is valid at time of inspection in compliance. |
2019-10-23 | No data | 3 AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 141 STREET | No data | Street Construction Inspections: Active | Department of Transportation | install water service on the S/W/and roadway |
2019-10-22 | No data | 11 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 Sewer cut extending from the parking lane and into the driving lane across the roadway and the next water cut is located in the parking lane , opposite of property. |
2019-10-22 | No data | 71 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L |
2019-10-22 | No data | 56 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-10-22 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway perm sidewalk ttg, this is a new construction. |
2019-10-22 | No data | 57 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2019-10-22 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration |
2019-10-21 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restorations |
2019-10-21 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 PERM CUT FOUND IN INTERSECTION IN FRONT OF 200 MIDDLETON STREET |
2019-10-21 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Emergency Con Ed gas work on top of water cut. Permit M012019293A00. |
2019-10-21 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Portion of perm water restoration has been excavated in the parking lane due to gas emergency under permit #M012019293A00. Sidewalk flag is acceptable. |
2019-10-20 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-10-20 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front building #495 |
2019-10-20 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated street opening in the roadway of the parking lane in front of property #776 |
2019-10-20 | No data | DEAN STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l & b/l |
2019-10-20 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/o 45-45/51 perm. cuts to grade p/d/l,new Con Edison's work on top loc. areas - active BO. |
2019-10-20 | No data | DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #800 |
2019-10-20 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent trench that is flushed to grade in the bus lane however, a portion of the trench is overlapped by a Con Edison 2019 trench and there are also 4 sidewalk flags that were restored. |
2019-10-20 | No data | STERLING PLACE, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind |
2019-10-19 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration partially covered by BPP. |
2019-10-19 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #1134 |
2019-10-19 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #1134 |
2019-10-19 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | Roadway plated |
2019-10-19 | No data | BAY 23 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in the roadway |
2019-10-19 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Trench in the driving / parking lanes unable to fully see work due to parked Vehicle. |
2019-10-19 | No data | BROADWAY, FROM STREET CORNELIA STREET TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration concrete roadway and sidewalk are found to be in compliance |
2019-10-19 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018303B80-paved over by BPP |
2019-10-18 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | No blocked construction observed at time of inspection . Contractor on site working at time of inspection foreman is Sliver . |
2019-10-18 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #192 |
2019-10-18 | No data | PROSPECT PARK WEST, FROM STREET 15 STREET TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | No work done at time of inspection in front of property #192 |
2019-10-18 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING NYC , INC. Crew on site excavating in the roadway of the parking lane in front of property#385 |
2019-10-18 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade , PL. |
2019-10-17 | No data | PARSONS BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/l - active BO. |
2019-10-17 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance no defects |
2019-10-17 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair water cut that is flushed to grade in the turning lane. |
2019-10-17 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M022019267D30-unable to inspect due to active B.O. |
2019-10-16 | No data | BUEL AVENUE, FROM STREET HUSSON STREET TO STREET HYLAN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site with open excavation in the roadway. |
2019-10-15 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2019-10-15 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane marker on perm restoration has been restored |
2019-10-15 | No data | NEW YORK AVENUE, FROM STREET SNYDER AVENUE TO STREET TILDEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts. #1). 17ft x 4ft, down 10ft. 96.5% & 95.8% #2)7ft x 3 1/2ft, down 3ft, 10 inches. 96.9% Cleanfill WET 110.4 DRY 101.6 MAX 105.0 MOISTURE 8.7% |
2019-10-15 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2019-10-15 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(4’)W(5’)D(4’) TEST#1=95.8TEST#2=97.4CUT#1=L(4’)W(5’)D(4’) TEST#1=95.7TEST#2=98.2BACKFILL PASSBASE PASSSAW CUTS DONE |
2019-10-15 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | arrived crew on site |
2019-10-15 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. Sidewalk restoration is in compliance. STreet has been resurfaced. |
2019-10-15 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | Failure to permanently restore cut within required time |
2019-10-14 | No data | HOWARD PLACE, FROM STREET PROSPECT AVENUE TO STREET WINDSOR PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-10-13 | No data | 4 AVENUE, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #155 |
2019-10-13 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the bike lane in front of property #346 |
2019-10-13 | No data | 11 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp Sidewalk in Compliance |
2019-10-13 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced, by keyspan after 30" gas main ...install. |
2019-10-12 | No data | POWELL STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | TEMP SIDE WALK CUTS OVER DUE FOR FINAL |
2019-10-12 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | new permit B022019233C63 |
2019-10-12 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2019-10-12 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | LL14 Backfill pass and complete in the driving lane/parking lane IFO 1227 Broadway. Measurements: L-6ft,W-14ft, D-5ft. Test:96.4, 97.5. |
2019-10-12 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | LL14 Base pass and complete in the driving lane/parking lane IFO 1227 Broadway. Measurements: L-7ft,W-15ft 1in, D-10in. |
2019-10-11 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut ok |
2019-10-11 | No data | BEDFORD AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut. p/l/bike lane opp 2512. 3ft x 3ft, down 2 1/2ft. BLEND 98.7% WET 123.9 DRY 115.2 MAX 120.5 MOISTURE 7.5% |
2019-10-11 | No data | WEST 13 STREET, FROM STREET AVENUE P TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration on the sidewalk (2 flags). AKA 137 Kings Highway. |
2019-10-11 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway reset |
2019-10-11 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152019273A01-r/w resurfaced |
2019-10-10 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water cuts found in roadway |
2019-10-10 | No data | 16 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file |
2019-10-10 | No data | EMMONS AVENUE, FROM STREET BATCHELDER STREET TO STREET BROWN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cut on rw and sw temp to grade |
2019-10-09 | No data | 20 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent failed to display required ID signs at work site with permittee name,permit number,type of work,start and complete date.Nobody on site at this time. |
2019-10-08 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway is paved by BPP |
2019-10-08 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cobblestone okay |
2019-10-08 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration appears to have been done in the same area as permit #M012019063B80 |
2019-10-06 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in front of 6014. |
2019-10-05 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane marking for right turning lane is restored. |
2019-10-05 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent trenches in the Parking/Driving lane. However unable to fully inspect due to parked vehicles. |
2019-10-05 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2019-10-05 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-10-05 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017317B16-Latest permit |
2019-10-05 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration in the Roadway. However unable to fully view due to active BO Barricades. |
2019-10-04 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobblestone roadway in compliance |
2019-10-04 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2019-10-04 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plated and lined / ramped |
2019-10-04 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed - 14'6"x4'x8' and 7'4"x4'x4'10" cuts.Scheduled for 10:00 am,arrived at 10:30 am - first lift backfilled only upon arrival,observed the temping and the compaction test and the rest of the backfill.Base to follow. |
2019-10-04 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | entire street paved . by ny paving , after keyspan 30" gas main install .. |
2019-10-04 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(13’)W(5’)D(5’) TEST#1=97.0TEST#2=96.7CUT#=L(4’)W(5’)D(5’) TEST#1=97.2TEST#2=97.7Backfill pass saw cuts done |
2019-10-03 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found the sunken area fully restored flush to grade and in compliance. |
2019-10-03 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White lane markings have been restored. |
2019-10-02 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IFO 259 repair the missing white parking lane stripe in your water restoration (CAR re issued due to respondent making an attempt) |
2019-10-02 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #346 |
2019-10-02 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 259 repair the missing white parking lane stripe in your water restoration (CAR re issued due to respondent making an attempt) |
2019-10-02 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At the time of inspection, I found a permanent color code marker installed and the restoration has been sealed. |
2019-10-01 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-10-01 | No data | ROCHESTER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench in the roadway |
2019-09-30 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 Length 10' 4" Width 4' 5" Depth 9' 7". First lift 99.5 Last lift 98.6. Cutback & base was done. I left backfill at 1:20 |
2019-09-30 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects at time of location. |
2019-09-30 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway I/F/O 124 heavily patched small water cut possibly just outside the Parking lane |
2019-09-30 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to observed within active BO. |
2019-09-30 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway |
2019-09-30 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP on the roadway |
2019-09-30 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | crew excavate the r/w & s/w at the corner 570 Nostrand ave |
2019-09-30 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new sidewalk installed by PRESTIGE CONSTRUCTION NY LLC under permit b042019245A02. |
2019-09-30 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018303B80-resurfaced by BPP |
2019-09-30 | No data | 45 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway & sidewalk |
2019-09-29 | No data | EVERGREEN AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED PK LANE |
2019-09-29 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resrurfaced |
2019-09-29 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway |
2019-09-29 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway |
2019-09-29 | No data | WALTON STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm water cut found in parking lane |
2019-09-28 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequently secured permit for this work. |
2019-09-28 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the roadway ifo 771. Active permit exist at time of inspection. |
2019-09-28 | No data | EAST 32 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation d/l |
2019-09-28 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2019-09-28 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench ok r\w |
2019-09-28 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012019137B26 EXP 6/5/19 WAS USED FOR ID |
2019-09-28 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation d/l |
2019-09-28 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #633A |
2019-09-28 | No data | CARLTON AVENUE, FROM STREET BEND TO STREET CUMBERLAND WALK | No data | Street Construction Inspections: Active | Department of Transportation | Plate countersunk in driving/parking lane. |
2019-09-28 | No data | WEST 6 STREET, FROM STREET HIGHLAWN AVENUE TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2019-09-28 | No data | NORTH 10 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Not visible. |
2019-09-27 | No data | NEW LOTS AVENUE, FROM STREET BERRIMAN STREET TO STREET SHEPHERD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration work done on the roadway |
2019-09-27 | No data | EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not found permit expired |
2019-09-27 | No data | NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate in r/w & new permit on file B012019255C13 |
2019-09-27 | No data | HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work was done |
2019-09-27 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NEW PERMIT# B012019262C74 EXP 10/21/19 |
2019-09-27 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l |
2019-09-27 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M152018303B11-r/w resurfaced |
2019-09-27 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w okay |
2019-09-26 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the respondent maintaining a Construction equipment (Steel plate) marked "PNYCI" in the roadway without a valid NYC DOT Permit on file. The respondent was ID by the permit cited above which has expired on 9/22/2019. |
2019-09-25 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance |
2019-09-25 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 18, Two water cuts in the d/l is ok. Water restoration eroded. |
2019-09-25 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent with a temporary water restoration in the roadway of the parking lane over due for final. Respondent failed to permanently restore the restoration within the required time. Permit #B012019169D43 expired on 7-6-2019 |
2019-09-25 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-09-25 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #383 |
2019-09-24 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet density-121.2Dry density- 115.1Max dry density- 119.5Actual moisture- 5.3%1st lift- 95.1%last lift- 97.2%Length of the cut- 3’4/ cut2- 3’7Width of the cut- 3’/cut2- 3’Depth of the cut- 2’11/ cut2- 3’5 |
2019-09-24 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working actively at itme |
2019-09-24 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - CUT #1(L)17ft (W)4ft 1in (D)9ft 6in - CUT #2(L)3ft 3in (W)3ft (D)2ft 6in - (WD)114.9 (DD)108.0 (MD)111.5 (AM)6.4 - Cutbacks to be soon after. |
2019-09-24 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER: Resurfaced by 2019 Con Edison work. |
2019-09-24 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-09-24 | No data | WEST 142 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving lane/parking lane with sidewalk flags restored. |
2019-09-24 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY ASPHALT INSTALLED IN CONCRETE PAD TO FINISH OFF CUT WHICH IS NOT ALLOWED |
2019-09-24 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade in the PL / SW flag is sealed . |
2019-09-23 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration of LANE markings needed |
2019-09-23 | No data | SHORE PARKWAY, FROM STREET 18 AVENUE TO STREET BAY 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane underneath car. New sidewalk flag in front of property fence. |
2019-09-23 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | MADE SAFE |
2019-09-23 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the roadway. |
2019-09-23 | No data | MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area of roadway found to be resurfaced (B012019066D58) |
2019-09-22 | No data | EAST 26 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-09-22 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-09-22 | No data | DAHILL ROAD, FROM STREET 50 STREET TO STREET AVENUE I | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk excavation plated and ramped. |
2019-09-22 | No data | DAHILL ROAD, FROM STREET 50 STREET TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk excavation plated with a newer permit on file |
2019-09-22 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp water cut in parking lane, Work Start:9/23/2019 Work End:10/22/2019 Status:PERMIT HELD FOR EXTERNAL REVIEW |
2019-09-21 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found a permanent Trench in the driving / parking lanes with Sidewalk Temp. Active construction site with new Building going up. |
2019-09-20 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary asphalt restoration found to be in concrete roadway N.O.V. issued to permit B012017256D04 for this overdue condition. |
2019-09-20 | No data | 70 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:00A End: 10:30AL: 3FT. 3IN. W: 3FT. 3IN. D: 3FT. 10IN.WD: 124.2 DD: 115.5 MD: 121.0 MST: 7.5%Compaction: 1. 96.2% 2. 96.8%Cut is in the parking lane, in front of 1345 70 Street. |
2019-09-19 | No data | WEST 35 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plates for DDC work in Roadway unable to located. |
2019-09-19 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent sewer/water restoration is flushed to grade IFO building #302, S/S of street. |
2019-09-19 | No data | HEWES STREET, FROM STREET BQE EB EN WILLIAMSBURG STREET E TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 water cut found in roadway in front of 102 Hewes street and 1 water main installed on sidewalk in front of 90 Hewes street |
2019-09-19 | No data | BROADWAY, FROM STREET WEST 79 STREET TO STREET WEST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaved by bpp |
2019-09-18 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are 2 permanent cuts that are flushed to grade in the driving lane. |
2019-09-18 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY ASPHALT INSTALLED IN CONCRETE PAD TO FINISH OFF CUT WHICH IS NOT ALLOWED |
2019-09-18 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced by bpp |
2019-09-18 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of address, new building has resurfaced the roadway, 1/2 plus 5ft. Water hardware on sidewalk. |
2019-09-17 | No data | AVENUE I, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2019-09-17 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST DENIED DUE TO ANY WORK DONE IN THE CONCRETE BUS PAD MUST RESTORE THE FULL PANEL OF THE BUS PAD FROM JOINT TO JOINT REGARDLESS OF ANY ASPHALT EXISTING IN IT PRIOR. YOUR WORK MAKES YOU RESPONSIBLE FOR THE CORRECT RESTORATION. |
2019-09-17 | No data | BROOKLYN AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating in the parking lane. |
2019-09-17 | No data | AVENUE I, FROM STREET BEDFORD AVENUE TO STREET EAST 24 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(15’)W(4’)D(5’) TEST#1=97.0TEST#2=96.9CUT#1=L(3’)W(4’)D(4’) TEST#1=97BACKFILL PASS SAW CUTS DONE |
2019-09-17 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sealer in front entrance sidewalk expansion joints. |
2019-09-16 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found active building operations at location I/F/O building 112 (764) |
2019-09-16 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut backs done |
2019-09-16 | No data | 6 AVENUE, FROM STREET 8 STREET TO STREET 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-16 | No data | 107 STREET, FROM STREET 97 AVENUE TO STREET 101 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. Cut 1) 5'3" x 3'5" x 4'3" Cut 2) 4'7" x 4'0" x 2'8". |
2019-09-15 | No data | 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #205 |
2019-09-15 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION TO GRADE |
2019-09-15 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair cut in roadway |
2019-09-15 | No data | UNION STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE ON THE SIDEWALK |
2019-09-15 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration on the roadway was resealed, condition corrected. |
2019-09-15 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | protest was accepted by greg foster. permitee not responsible |
2019-09-15 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED |
2019-09-15 | No data | BUTLER STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags installed in front of property #339 in compliance. |
2019-09-15 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #588 |
2019-09-15 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Street was resurfaced. |
2019-09-14 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway re-surfaced by BPP |
2019-09-14 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESEAL 2 PERM RESTORATION ON ROADWAY AT 123. |
2019-09-14 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench Must Be Repaired in 3 Areas inside Trench Asphalt Broken Out |
2019-09-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-14 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-14 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of driving lane in front of property #814 |
2019-09-14 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #847 |
2019-09-14 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joint in bus stop sealed |
2019-09-14 | No data | EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PLATE HAS BEEN REMOVED |
2019-09-14 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area restored to grade. |
2019-09-13 | No data | WALTON STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 gas restoration cut found in parking lane in front of 47 walton street |
2019-09-13 | No data | POWELL STREET, FROM STREET HEGEMAN AVENUE TO STREET NEW LOTS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP SIDE WALK CUTS OVER DUE FOR FINAL |
2019-09-13 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-09-13 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front building #862 |
2019-09-13 | No data | LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET BROOKLYN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | found crew on site excavating open roadway trench for sewer installation |
2019-09-13 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal restoration in roadway. |
2019-09-13 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O aka 217 Pearl St, perm 2019 curb to B/O concrete barriers trench in roadway and countersunk steel plate ( closer to Pearl - East of perm trench ) with active permit M012019232B38 on file. |
2019-09-12 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found at this time. |
2019-09-12 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of roadway found resurfaced due to new building. |
2019-09-12 | No data | NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut was partly resurfaced |
2019-09-12 | No data | ONDERDONK AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 16.5x5.3x6 and 3 for water cleanfill and sand was used |
2019-09-12 | No data | FLUSHING AVENUE, FROM STREET CLASSON AVENUE TO STREET TAAFFE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #345 |
2019-09-12 | No data | HALL STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #77 |
2019-09-12 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush to grade in the driving lane.. |
2019-09-11 | No data | LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET BROOKLYN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut d/l, p/l. 20ft x 3ft, 9 in, down 7ft. Blend 97.3% & 97.7%. WET 118.2 DRY 108.7 MAX 115.0 MOISTURE 8.7% |
2019-09-11 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumbing work subsurface crew on site commencing to excavate in the roadway of the parking lane in front of property #1019 |
2019-09-11 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored to grade in kind |
2019-09-11 | No data | DEAN STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway |
2019-09-10 | No data | LEFFERTS AVENUE, FROM STREET BALFOUR PLACE TO STREET BROOKLYN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent commencing work during non-restricted hours how to comply with the terms and conditions of stipulation #087, work 9 AM to 3 PM Monday to Friday. Nov issued |
2019-09-09 | No data | ROGERS AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2019-09-09 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2019-09-09 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully inspect roadway due to active building operation and material at this time. |
2019-09-09 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | SIDEWALK UNDER CONSTRUCTION (CON EDISON INSTALLING SIDEWALK TRANSFORMER VAULT)-PASS |
2019-09-09 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade across roadway. |
2019-09-08 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm Water Cut & Temp Sidewalk Flag in Compliance |
2019-09-08 | No data | WEST 16 STREET, FROM STREET MERMAID AVENUE TO STREET NEPTUNE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in the Roadway & Temp Sidewalk in Compliance ( Active Permit in System) |
2019-09-08 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | okay |
2019-09-08 | No data | MORRIS PARK AVENUE, FROM STREET FILLMORE STREET TO STREET UNIONPORT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | n work found IFO 631 |
2019-09-08 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was Resurfaced & No Work found on the Existing Sidewalk |
2019-09-07 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway/Sidewalk |
2019-09-07 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I observed the above respondent with a temporary water restoration in the roadway of the parking lane over due for final. Respondent failed to permanently restore the restoration within the required time. Permit #B012019169D43 expired on 7-6-2019 |
2019-09-07 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flush in the parking lane with sidewalk flags restored and expansion joints sealed. |
2019-09-07 | No data | 14 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #459 |
2019-09-07 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was Resurfaced by BPP no work found on the Existing Sidewalk |
2019-09-07 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | reSPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012019137B26 EXP 6/5/19 WAS USED FOR ID |
2019-09-07 | No data | MERMAID AVENUE, FROM STREET WEST 15 STREET TO STREET WEST 16 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway/Sidewalk |
2019-09-06 | No data | WEIRFIELD STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | new sewer install, now remains plated .... |
2019-09-06 | No data | STERLING PLACE, FROM STREET FRANKLIN AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1 Length 6' Width 5' Depth 3'8" first lift 97.1 last lift 96.9. Cut #2 Length 3'10" Width 3' Depth 4' first lift 96.0 last lift 96.7. Cutback & base was done. |
2019-09-05 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 6 Maiden Lane, perm 2018 trench within driving / parking lane to South Curb. Work observed within 2 sidewalk flags around 2 Water valves. Scaffolding present on sidewalk at this time and newer Con Ed work in 1 flag. |
2019-09-05 | No data | 66 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Reseal perm cut joints. |
2019-09-05 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-PAINT 3 PERMANENT RESTORATIONS RED IN BUS LANE OF ROADWAY, OPPOSITE 303, 308, 312 LIVINGSTON STREET BETWEEN HANOVER PLACE & NEVINS STREET. |
2019-09-04 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | STREET CUT IS FINALIZED |
2019-09-04 | No data | WEST 16 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair water-sewer restoration that is flushed to grade in the parking/driving lane. |
2019-09-04 | No data | WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The white solid line lane marking for the parking lane needs to be reinstate on a permanent repair water restoration in the driving/parking lane which is located opposite of building # 64. |
2019-09-03 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temporary Restoration in the Roadway. |
2019-09-03 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary Restoration in the Roadway with active permit # M012019242B11 on file. |
2019-09-03 | No data | PALMETTO STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, perm water svc ...install |
2019-09-02 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #197 |
2019-09-02 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plated street openings in the roadway of the parking lane in front of property #1241 |
2019-09-01 | No data | 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #205 |
2019-09-01 | No data | BALTIC STREET, FROM STREET HICKS STREET TO STREET WARREN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-09-01 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | NOV issued on 9/1/2109. |
2019-08-31 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #145 |
2019-08-31 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, hydrant relocation ... 09 |
2019-08-31 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flushed to grade in the roadway of the driving lane in front of opposite property #40 |
2019-08-31 | No data | BOERUM PLACE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #111 |
2019-08-31 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #163 |
2019-08-31 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #100 |
2019-08-31 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #112 (aka 5 river park) |
2019-08-30 | No data | FULTON STREET, FROM STREET ARLINGTON PLACE TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No cut found at location |
2019-08-30 | No data | NEW LOTS AVENUE, FROM STREET BERRIMAN STREET TO STREET SHEPHERD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane |
2019-08-30 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm ... |
2019-08-30 | No data | 43 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway excavation in the driving lane. |
2019-08-30 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #172 |
2019-08-30 | No data | 6 AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-29 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobble stone roadway restored in kind. |
2019-08-29 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane is in compliance. |
2019-08-29 | No data | BROWN PLACE, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BRUCKNER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crane on roadway can not locate cut. |
2019-08-29 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area within your permanent repair Water- Sewer Restoration located in the driving / parking lanes, sunken 2" below Roadway surface. |
2019-08-29 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 s/w flags appear recently replaced. Cut adjacent in street has been done by different contractor as per IBM code. Active permit remains on file. |
2019-08-28 | No data | LITTLE WEST 12 STREET, FROM STREET 9 AVENUE TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work not done and the permit has expired. |
2019-08-28 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts remain bumpy & sunken. |
2019-08-28 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration is in compliance |
2019-08-28 | No data | BANK STREET, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair water restoration that is flushed to grade in the parking/driving lane and 2 sidewalk flags were restored. |
2019-08-27 | No data | FULTON STREET, FROM STREET ARLINGTON PLACE TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Rw resurfaced |
2019-08-27 | No data | 1 AVENUE, FROM STREET EAST 33 STREET TO STREET EAST 34 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate counter sunk I/F/O 589 |
2019-08-27 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway in front of property #267 |
2019-08-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I was unable to locate the repair water work due to the roadway that is barricaded. |
2019-08-26 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate on site. In compliance. |
2019-08-26 | No data | CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass, steel plate on site . |
2019-08-25 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | A CAR will be issued to seal the roadway restoration |
2019-08-25 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #2250 |
2019-08-25 | No data | WEST 18 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defects found in area |
2019-08-25 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal roadway restorations |
2019-08-24 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-08-24 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2019-08-24 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE WHITE LANE MARKING OVER PERMANENT RESTORATION IN ROADWAY (LANE MARKING FOR RIGHT TURNING LANE), IN FRONT OF 692 ST MARKS AVENUE BETWEEN NOSTRAND AVENUE & ROGERS AVENUE. |
2019-08-24 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced |
2019-08-23 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut slighty covered by BPP |
2019-08-23 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY IN FRONT OF BUILDING OPERATION |
2019-08-23 | No data | NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}10FT X {W}5FT X {D}10FT TEST 97.1 97.7 EXCAVATION HAD MUD AND WATER INSIDE CONTRACTOR SPENT 30 MINUTES TAKING IT OUT. BASE SAW CUT BACKS ARE BEING DONE. ARRIVED 1030 FINISHED BACK FILL 1245 STAYING FOR BASE |
2019-08-23 | No data | NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN THE ROADWAY FOR NEW BUILDING OPERATION CUT IS NEXT DOOR TO #52 CREW ON SITE AWAITING BACK FILL |
2019-08-23 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced |
2019-08-22 | No data | PRESIDENT STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced by new building half +5 |
2019-08-22 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | On going project, Vaild permits on file M012019232A83 |
2019-08-22 | No data | WEST 16 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This condition is inside of an Active BO, no defects found in area at time of inspection |
2019-08-21 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-21 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Contractor will be placed on hold. |
2019-08-21 | No data | ELTON AVENUE, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2019-08-21 | No data | ELTON AVENUE, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cut |
2019-08-21 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent came out to restore sealing around restorations and attempted to restore lane markings however lane markings came off and needs to be re-applied. Please restore white lane markings seperating parking lane and driving lane. |
2019-08-21 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water/Sewer Trench needs to be sealed and have a permanent pavement marker "color code" applied as required... I/F/O 455 |
2019-08-21 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent sealed street opening joints as requested and appear to have attempted to restore lane markings on cut however, lane markings are have come off again. CAR to be issued to re apply lane markings. |
2019-08-21 | No data | HOYT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION NEW SWK FLAG |
2019-08-20 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plates on the roadway. application submitted on nyc Streets. |
2019-08-20 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-20 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway |
2019-08-20 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | : I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [5/18/2019 ]. |
2019-08-20 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restoration in r/w |
2019-08-20 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration in the driving lane is in compliance (IFO USPS station) |
2019-08-19 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perms found in driving lane in front of 445 blake avenue |
2019-08-19 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O building 157 there is a depression in the roadway sunken 3 inches abutting the curb that needs to be repaired (KM) |
2019-08-19 | No data | OCEAN PARKWAY, FROM STREET AVENUE I TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Completed. Start: 12:45P End: 1:50P#1 L: 3FT. 8IN. W: 3FT. 0IN. D: 5FT. 8IN. (97.0% & 97.4%)#2 L: 3FT. 6IN. W: 3FT. 6IN. D: 3FT. 7IN. (98.1% & 98.2%)WD: 116.1 DD: 108.0 MD: 111.0 MD: 7.5%2 cuts in the parking lane, IFO & OPP of 921. |
2019-08-19 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm restoration on r/w |
2019-08-19 | No data | PALMETTO STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(10’)W(4’)D(9’)TEST#1=98.2TEST#2=98.3 CUT#2= L(4’)W(4’)D(3’)TEST#1=98.2BACKFILL PASS SAW CUTS DONE |
2019-08-19 | No data | PALMETTO STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2019-08-19 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-08-18 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo respondent had an active construction site excavating open roadway cut without without a valid dot permit to do so no active nor valid permits were on file at time of inspection permit expired 7-21-19 |
2019-08-18 | No data | 8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The white parking lane marking has been restored to the Roadway, I/F/O 401... (CAR Re-inspection Pass) |
2019-08-18 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts have been combined, restoration is flush to grade, I/F/O 842... (CAR Re-inspection Pass) |
2019-08-18 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY CLOSER TO METROPOLITAN CORNER |
2019-08-17 | No data | 45 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #1677 |
2019-08-17 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings APPLIED |
2019-08-17 | No data | 18 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT REPAIRED |
2019-08-17 | No data | 42 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #1668 |
2019-08-16 | No data | HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-16 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied, after viewing the location, researching permit history and checking google map, the cut belongs to Plumbing NYC, Inc. |
2019-08-16 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-15 | No data | 84 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done in r/w or s/w |
2019-08-15 | No data | BLAKE AVENUE, FROM STREET JUNIUS STREET TO STREET POWELL STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut #1: Length 9'9" x Width 4'1" x Depth 5'0"Cut #2: Length 7'3" X Width 7'0" X Depth 3'10" Wet Density:117.0Dry density: 107.6Max dry density: 114.5Actual Moisture:8.7%First Lift: 97.5/98.7Last Lift: 98.1/98.6 |
2019-08-15 | No data | AVENUE I, FROM STREET EAST 45 STREET TO STREET TROY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #4423 |
2019-08-15 | No data | BANK STREET, FROM STREET GREENWICH AVENUE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Base IFO 10 is in compliance |
2019-08-15 | No data | WASHINGTON AVENUE, FROM STREET EAST 164 STREET TO STREET WEIHER COURT | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I discovered the above respondent failed to provide proper drainage at work site.There a large pile of excavated material obstructing the gutter. This preventing flow of accumulating water between the curb and gutter, the site is unattended. |
2019-08-15 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No confirmation number |
2019-08-14 | No data | EAST 16 STREET, FROM STREET AVENUE H TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced by BPP |
2019-08-13 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw has been resurfaced |
2019-08-13 | No data | 65 PLACE, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in parking lane acceptable. |
2019-08-13 | No data | 50 AVENUE, FROM STREET 65 PLACE TO STREET 66 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in parking lane acceptable. |
2019-08-13 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-08-13 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION ON R/W |
2019-08-12 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #197 |
2019-08-12 | No data | EAST 7 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W in compliance |
2019-08-12 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway for #30-38 Morningside Drive. |
2019-08-11 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #1359 |
2019-08-11 | No data | 63 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration is resealed and permanently restored to grade. |
2019-08-10 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM TRENCH. RED BUS STOP COLOR NEEDS TO BE RESTORED |
2019-08-10 | No data | GATES AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration resealed. |
2019-08-10 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut has been sealed swk also sealed |
2019-08-09 | No data | 44 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plates ramped & pinned in the roadway of the driving lane in front of property #1174 |
2019-08-09 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT #1 LENGTH 3 FT 9 IN WIDTH 4 FT 4 IN DEPTH 4 FT 3 IN CUT #2 LENGTH 4 FT 0 IN WIDTH 3 FT 5 IN DEPTH 2 FT 6 IN CUT #3 LENGTH 2 FT 9 IN WIDTH 3 FT 5 IN DEPTH 4 FT 5 IN CUT #4 LENGTH 3 FT 1 IN WIDTH 3 FT 0 IN DEPTH 3 FT 9 IN WET DENSITY 123. |
2019-08-09 | No data | 44 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 steel plates ramped & pinned in the roadway of the driving lane in front of property #1174. Crew on site NOV issued failed to comply with terms & stipulation #013 a minimum of 5 feet clear passage shall remain open to all oncoming pedestrians. |
2019-08-09 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway milled down ready to be paved & restored in kind |
2019-08-09 | No data | 20 AVENUE, FROM STREET 61 STREET TO STREET 62 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway; sealed and flush |
2019-08-09 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #1127 |
2019-08-09 | No data | 11 AVENUE, FROM STREET 51 STREET TO STREET 52 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #1102 |
2019-08-09 | No data | 61 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill Pass - 3ft 10in(L)..2ft 9in(W)..4ft(D)....122.4(WD)..112.8(DD)..118.5(MD)..8.7%(AM) - cutbacks and base done same day |
2019-08-09 | No data | BROWN PLACE, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BRUCKNER BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2019-08-08 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass - 5ft(L)..5ft(W)..4ft 2in(D)....123.6(WD)..114.9(DD)..120.5(MD)..7.5%(AM) - cutbacks and base done. |
2019-08-08 | No data | 54 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #1258 |
2019-08-08 | No data | CLAY STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE |
2019-08-08 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two steel plate in roadway; active permit B012019205A51 issued |
2019-08-08 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plate in roadway; active permit B012019211B12 issued |
2019-08-08 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file. M012019217B39 |
2019-08-08 | No data | 51 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at time of inspection in front of property #1259 |
2019-08-07 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet Density - 114Dry Density - 103.7Max Dry Density - 111.5Actual Density - 9.9Length of cut 1 - 4 FeetWidth of cut 1 - 4 FeetDepth of cut 1 - 2 Feet 10 inches1st lift - 96.8% |
2019-08-07 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance bppmplan done but sidewalk in compliance |
2019-08-07 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 17, Please restore lane marking in roadway. Also, reseal your permanent water restoration in the areas needed. |
2019-08-07 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Dry Density - 103.7Max Dry Density - 111.5Actual Density - 9.9Length of cut 1 - 4 FeetWidth of cut 1 - 4 FeetDepth of cut 1 - 2 Feet 10 inches1st lift - 96.8% |
2019-08-06 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on roadway |
2019-08-06 | No data | LYNCH STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY AND SIDE WALK CREW ON SITE |
2019-08-06 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 s/w flag. Roadway found resurfaced. |
2019-08-06 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut and temp sidewalk due to scaffolding . Active pertmi remains on file M012019213B59. |
2019-08-06 | No data | LYNCH STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}14FT X {W]4FT X {D}7FT TEST 96.9 97.3 BASE SAW CUT BACKS ARE BEING DONE ARRIVED 100PM FINISHED BACK FILL 250PM STAYING FOR BASE |
2019-08-05 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW WORKING IN 2 OPEN TRENCHES IN DRIVING LANE OPP 304 & 306 WITH NEW PERMIT |
2019-08-05 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN 2 OPEN TRENCHES IN DRIVING LANE- OPP 304 & 306- HAD CREW PUT CONES OUT TO MAINTAIN 2 LANES FOR TRAFFIC |
2019-08-05 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore lane markings in your permanent water restoration IFO 219. |
2019-08-04 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM |
2019-08-04 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk sealed |
2019-08-04 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION TO GRADE AND SEALED |
2019-08-04 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway extending into the parking lane in front of property #758 & temp water restoration on the sidewalk. |
2019-08-04 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - In Driving Lane/ plated sewer connection, steel plate in need of re-set ...due to falling within opening... |
2019-08-04 | No data | 57 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flushed to grade in the roadway extending into the parking lane in front of property #1238 |
2019-08-04 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates reset and made secure |
2019-08-03 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk possibly restored by this permittee, because the roadway restoration has a different IBM marker installed. |
2019-08-03 | No data | 72 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #187 |
2019-08-03 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration made final. |
2019-08-02 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done; permit expired. Active permit on file. M012019199A57 (Active BO as well.) |
2019-08-02 | No data | 67 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in d/l & p/l |
2019-08-02 | No data | DEAN STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2019-08-01 | No data | LIVINGSTON STREET, FROM STREET HANOVER PLACE TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLUG WATER TO BUILDINGS SLATED FOR DEMOLITION |
2019-08-01 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival temp water restoration in the roadway of the parking lane over due for final. Nov issued permit is expired. |
2019-08-01 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm water restorations flushed to grade in the roadway of the parking lane in front of opposite property # 1233 - 1229 |
2019-08-01 | No data | 50 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated street opening on the sidewalk in front of property #1225 |
2019-08-01 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 Sidewalk flag installed , 1 perm cut found on roadway |
2019-08-01 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut missing color code and lane markings. Asphalt starting to break out. |
2019-08-01 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in majority of driving lane is in compliance. |
2019-08-01 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #1311 |
2019-08-01 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the parking lane in front of property #1229 |
2019-07-31 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway sealed and flush |
2019-07-31 | No data | 63 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced; no cuts in road |
2019-07-31 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-07-31 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flushed to grade in the roadway of the driving lane in front of property #197 |
2019-07-31 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in roadway to grade |
2019-07-31 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced |
2019-07-31 | No data | SHORE PARKWAY, FROM STREET OCEAN AVENUE TO STREET SHEEPSHEAD BAY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway/Sidewalk |
2019-07-30 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 17(1) Restore your permanent water restoration with lane marking.(2) Restore defective sidewalk in kind. |
2019-07-30 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PROTEST ACCEPTED DUE TO ASPHALT IN THE CONCRETE BUS PAD ALWAYS EXISTED SINCE 2009 SHOWN IN GOOGLE MAPS AND HAS BEEN MAINTAINED THE SAME SINCE. |
2019-07-29 | No data | AVENUE I, FROM STREET EAST 45 STREET TO STREET TROY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | VIOLATION OF STIP 020 OF THEIR PERMIT. THAT STATES 25 LINEAR FT CAN BE USED. FOR STORING BACK-FILL MATERIAL. THEY EXCEEDED THEIR LIMIT AND CLOSE 74 FT WITH THEIR MATERIAL PARKING LANE WAS CLOSE FROM HOUSE 4423 TO 4415 |
2019-07-29 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | portion of roadway ok, other portion within construction zone. |
2019-07-29 | No data | TRUXTON STREET, FROM STREET EASTERN PARKWAY TO STREET SACKMAN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(20’)W(4’)D(5’) TEST#1=96.6TEST#2=97.2BACKFILL and SAWCUTS DONE |
2019-07-29 | No data | TRUXTON STREET, FROM STREET EASTERN PARKWAY TO STREET SACKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | arrived crew on site awaiting backfill |
2019-07-29 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in d/l & p/l |
2019-07-29 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT |
2019-07-29 | No data | EAST 45 STREET, FROM STREET AVENUE H TO STREET AVENUE I | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK DONE THERE IS ONLY CONES IN THE PARKING LANE HOLDING THE SPACE |
2019-07-29 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found, M012019205A13. |
2019-07-28 | No data | 82 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk/roadway cut perm state |
2019-07-28 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2019-07-28 | No data | WEST 13 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was Resurfaced & No work found on the Existing Sidewalk |
2019-07-27 | No data | ROGERS AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file B012019205A48 |
2019-07-27 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent asphalt roadway restoration found to be in compliance |
2019-07-27 | No data | 157 STREET, FROM STREET 35 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade on P/L(side of 156-19 Northern blvd,Bagel store) |
2019-07-27 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2019 perm restoration in p/l |
2019-07-27 | No data | STANWIX STREET, FROM STREET FLUSHING AVENUE TO STREET MONTIETH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP |
2019-07-27 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2019-07-27 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved & re-surfaced restored in kind. |
2019-07-27 | No data | 16 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by new NatGrid cut |
2019-07-26 | No data | PALMETTO STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2019-07-25 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}5FT X {W}6FT 6IN X {D}4FT TEST 970 97.4 ARRIVED 1130 BACK FILL COMPLETE AT 120 STAYING FOR BASE |
2019-07-25 | No data | EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - PROTECTED |
2019-07-25 | No data | 72 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:20A End: 10:40AL: 3FT. 10IN. W: 3FT. 6IN. D: 3FT. 3IN.WD: 114.6 DD: 103.1 MD: 105.0 MST: 11.1%Compaction: 97.1%Cut is in the parking lane, in front of 187 72 Street. |
2019-07-25 | No data | PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2019-07-25 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2019-07-25 | No data | EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET JEROME AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - REPAIR WATER - PROTECTED |
2019-07-25 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN THE PARKING LANE CREW ON SITE AWAITING BACK FILL |
2019-07-25 | No data | WOODBINE STREET, FROM STREET CYPRESS AVENUE TO STREET ST NICHOLAS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration going across roadway in compliance at time of inspection. |
2019-07-24 | No data | TRUXTON STREET, FROM STREET EASTERN PARKWAY TO STREET SACKMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working on sewer |
2019-07-24 | No data | LORIMER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm ...ok .. |
2019-07-24 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (CAR) was Issued on Prior Inspection for Reseal. |
2019-07-24 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SR#311-00171120 1FT X 8IN CAVE IN DOWN 6 INCHES ADJACENT TO PERMITTEE PERM CUT OPPOSITE #51 |
2019-07-24 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2019-07-23 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2019-07-22 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent with a perm cut on the street down 2 in fail to respond to a CAR #20194960136 issued on 6\11\2019 |
2019-07-22 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2019-07-22 | No data | EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to remove plating and decking after final restoration or prior to D.O.T. permit expiration |
2019-07-21 | No data | DITMARS BOULEVARD, FROM STREET GCP EASTBOUND EXIT 6 TO STREET 93 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway cut in d/l re-sealed by permittee. |
2019-07-21 | No data | GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water sprinkler cut ...paved over due to ...BPP , new building .. |
2019-07-21 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2019-07-20 | No data | CANAL STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequently secured permit for the work at this location. |
2019-07-20 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm .... 09 .... |
2019-07-20 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag around water restored. |
2019-07-20 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, sidewalk , roadway ....... |
2019-07-20 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please Reseal Perm Sanitary Sewer Trench in the Roadway. |
2019-07-20 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement curb to median restoration full width of property. |
2019-07-19 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut okay |
2019-07-19 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration partially covered by BPP |
2019-07-19 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE ON THE ROADWAY |
2019-07-19 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work behind active BO |
2019-07-19 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway, sealed and fush |
2019-07-19 | No data | ELTON AVENUE, FROM STREET EAST 154 STREET TO STREET EAST 155 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to double parking |
2019-07-18 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | crew on site excavation in the roadway is plated there are cleaning up for the day |
2019-07-18 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2019-07-18 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w RESURFACED |
2019-07-18 | No data | DEAN STREET, FROM STREET SACKMAN STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2019-07-18 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the d/l pinned and ramped active permit on file Q012019191C07 |
2019-07-17 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced |
2019-07-17 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been milled and paved |
2019-07-16 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active BO in area, mentioned area is behind BO. Work not observed at this time. Active permit remains on file M012019184B57. |
2019-07-16 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush in the Bus lane. |
2019-07-16 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Entire roadway resurfaced |
2019-07-16 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | SR #(311-00067187 steel plates and surrounding area are free of defect |
2019-07-15 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE CONCRETE BUS STOP PAD, PERMANENT ASPHALT RESTORATION NOT ACCEPTABLE, LONG WATER PLUG SERVICE RESTORATION, AT OPPOSITE 230 CLASSON AVENUE BETWEEN WILLOUGHBY AVENUE & MYRTLE AVENUE(CODE DB4-34 RCNY 2-11(e)(13)(v) ). |
2019-07-15 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | temp cut that was in the bus pad have been made final |
2019-07-15 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration partially covered by BPP |
2019-07-13 | No data | 39 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving lane, cut on the sidewalk around water valve |
2019-07-13 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION & NEW SWK FLAG |
2019-07-13 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm flush w/color codes. |
2019-07-13 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area acceptable within active building operation. |
2019-07-13 | No data | PROSPECT PARK SOUTHWEST, FROM STREET GREENWOOD AVENUE TO STREET REEVE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2019-07-12 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 535, PNYCI marked plates in the Roadway with active permit #M012019189C29 on file. |
2019-07-12 | No data | WEST 48 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 535, PNYCI marked plates in the Roadway. |
2019-07-12 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not found permit expired |
2019-07-11 | No data | WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass. 2 Excavation 1 on the North side and 1 on the South side. |
2019-07-11 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cuts were resealed. New CAR issued for perm r/w cuts bumpy & sunken in different spots. |
2019-07-11 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates and surrounding area with no defect |
2019-07-11 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in roadway is covered up by BBP sidewalk is restored in kind. New permit M012016365A23. |
2019-07-11 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts across roadway in front 157 |
2019-07-11 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts were resealed. New CAR issued for perm r/w cuts bumpy & sunken in different spots. |
2019-07-11 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 11:30A End: 1:30P#1: L: 15FT. W: 4FT. D: 10FT. 4IN. (96.3% & 96.5%)#2: L: 4FT. 4IN. W: 4FT. D: 3FT. 4IN. (97.0%)BLEND: WD: 123.3 DD: 113.4 MD: 119.5 MST: 8.7%CLEANFILL: WD: 135.0 DD: 122.9 MD: 124.5 MST: 9.9% |
2019-07-10 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW CONCRETE BUS PAD NOT SEALED |
2019-07-10 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO PERMANENTLY RESTORE A TEMPORARY REPAIR WATER RESTORATION IN ROADWAY WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT# |
2019-07-10 | No data | WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-07-10 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced. |
2019-07-10 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp plate in roadway in front of 1751; active permit B012019184E00 issued |
2019-07-10 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVERDUE FOR FINAL |
2019-07-10 | No data | DAHILL ROAD, FROM STREET 50 STREET TO STREET AVENUE I | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway |
2019-07-10 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 78, newer Con Ed work around electric manhole over old Plumber cut. |
2019-07-10 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 flag s/w |
2019-07-10 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active B.O at this time. Unable to fully inspect. |
2019-07-10 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp to grade cut on the sidewalk within active B.O. site, no roadway excavation at this time only markout, active permit maintained on file... (M012019169B85) |
2019-07-10 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration unable to fully see work due to heavy traffic. |
2019-07-09 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut needs to be resealed |
2019-07-09 | No data | ROGERS AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP |
2019-07-09 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w in compliance r/w was repaved |
2019-07-09 | No data | WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak..3 day notice |
2019-07-09 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent water restoration is missing lane markings. There is an active permit on file |
2019-07-08 | No data | SNYDER AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work was done |
2019-07-08 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No water cut in roadway possibly covered by bbp in front of 50 sidewalk is restored in kind. |
2019-07-08 | No data | 57 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway, sealed and flush |
2019-07-08 | No data | KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW CUTTING RWY 40 FT NORTH OF METROPOLITAN AVE ON ECL |
2019-07-07 | No data | CLASSON AVENUE, FROM STREET FLUSHING AVENUE TO STREET WALLABOUT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, c/o water building demo .. |
2019-07-07 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO Building 259-257, (1) Seal street opening joints on two restored sewer/water cuts in the roadway (2) Restore white lane marking divider for parking and driving lane. |
2019-07-07 | No data | EAST 72 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT 2019 sewer restoration flushed to grade in the driving lane adjacent to double yellow solid lines OPPOSITE building 250 |
2019-07-07 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water trench in roadway |
2019-07-06 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found Resurfaced by BPP |
2019-07-06 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | a 4'x4.6' area of asphalt cracked and broken down adjacent to Steel plates in the driving lane. |
2019-07-06 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in p/l opposite 289 covered by car |
2019-07-06 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-07-06 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | crew on site making repairs |
2019-07-05 | No data | 59 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NATIONAL GRID RESTORATION COVER THE RESTORATION |
2019-07-05 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No evidence of recent work on file. Permit expired. Current permit M012019184B59 on file |
2019-07-05 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut may have been resurfaced M152017326A07. |
2019-07-05 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway sealed and flush |
2019-07-05 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved by builder |
2019-07-04 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp restoration in r/w & new permit on file PERMIT#: B01-2019158-D56 |
2019-07-04 | No data | EAST 28 STREET, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2019-07-03 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | found crew on site valid permit excavating open roadway cut to installed new sewer and water service to building operation |
2019-07-03 | No data | BAY 23 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2019-07-03 | No data | EAST 25 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w opposite 458 |
2019-07-03 | No data | 50 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration ok sw at BO left temp should be monitored for when scaffolding removed |
2019-07-03 | No data | 58 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway in front of property |
2019-07-03 | No data | FLEET STREET, FROM STREET 66 AVENUE TO STREET GROTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut to grade |
2019-07-03 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved Q012018278B52 |
2019-07-03 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w has been resurfaced |
2019-07-02 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent water restoration in the driving lane has been resealed. In compliance. |
2019-07-02 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES ON THE ROADWAY |
2019-07-02 | No data | MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2019-07-02 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTERSUNK PLATE IN RWY |
2019-07-02 | No data | THROOP AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code added in restoration |
2019-07-02 | No data | 61 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane |
2019-07-01 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 11:20AM End: 12:40PCUT#1- L: 10FT. 4IN. W: 4FT. 6IN. D: 4FT. 5IN. (97.8% & 96.0%)CUT#2- L: 3FT. 0IN. W: 2FT. 8FT. D: 4FT. 0IN. (96.9% & 98.2%)CUT#3: 7FT. 0IN. W: 4FT. 0IN. D: 4FT. 6IN. (96.8% & 97.4%) |
2019-07-01 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag in compliance roadway was resurfaced |
2019-07-01 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I WAS RELIEVED BY JORGE |
2019-07-01 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMIT IN NYC STREETS "FEE REVIEW" OPEN SIDEWALK & ROADWAY TRENCHES OFF RIVER STREET ON NCL |
2019-07-01 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 214, found a permanent Restoration behind Construction Barricades with a parked truck. Unable to view work properly. Active permit # M012019177A63 on file. |
2019-07-01 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Opposite 214, found a permanent Restoration behind Construction Barricades with a parked truck. Unable to fully Restoration. |
2019-06-30 | No data | BROADWAY, FROM STREET HEYWARD STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, perm .. |
2019-06-30 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not done |
2019-06-30 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-06-30 | No data | PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK FOUND |
2019-06-29 | No data | WINTHROP STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2019-06-29 | No data | EAST 126 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water restoration flush in driving lane. |
2019-06-29 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk expansion joint sealed |
2019-06-29 | No data | 55 AVENUE, FROM STREET 90 STREET TO STREET JUSTICE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-06-29 | No data | HANCOCK STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-06-29 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut r\w ok |
2019-06-29 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut resealed. |
2019-06-29 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED ROADWAY & SWK BY RIVER ST ON NCL |
2019-06-29 | No data | RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE PARKING LANE |
2019-06-28 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut acceptable |
2019-06-27 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CREW ON SITE WORKING- EXCAVATING BUS STOP -CONCRETE ROADWAY 75 FEET WEST OF BEDFORD AVE ON NCL WITH NEW PERMIT |
2019-06-27 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates have been reset with temporary asphalt applied |
2019-06-27 | No data | 63 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt broken out and cracked throughout restoration please correct and follow sketche 3 restoration and upon completion add color code markings |
2019-06-27 | No data | 64 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration acceptable |
2019-06-27 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm ...09 |
2019-06-27 | No data | EAST 5 STREET, FROM STREET AVENUE M TO STREET AVENUE N | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2019-06-27 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING- EXCAVATING BUS STOP -CONCRETE ROADWAY 75 FEET WEST OF BEDFORD AVE ON NCL |
2019-06-27 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sign removed |
2019-06-27 | No data | GATES AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration needs to be seal. |
2019-06-27 | No data | WEST 90 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully inspect roadway of location due to perm con ed restoration covering majority of cut. |
2019-06-26 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut repaired |
2019-06-26 | No data | CLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | made perm to grade |
2019-06-26 | No data | 53 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | opening was 9ft by 3ft 6in 8ft 7in after cutting out the undermine condition cut is 14ft bt 14ft |
2019-06-26 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk flags in compliance |
2019-06-26 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass... |
2019-06-26 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | re-inspected location to assure the debris removed. |
2019-06-26 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 of 4 plates in the roadway marked PNY is sunken 3 inches in the roadway |
2019-06-26 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT WITH A STEEL PLATED EXCAVATION ON THE ROADWAY.RESPONDENTS PLATES ARE NOT PROPERLY PLACED.1 OF THE STEEL PLATES IS SUNKEN 2 INCHES IN THE ROADWAY CAUSING A HAZARD FOR MOTORIST. RESPONDENT WAS NOTIFIED ON NICA# |
2019-06-26 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A.T.PO I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO THE CORRECTIVE ACTION REQUEST (CAR issued 4\2\1 19 car #20196780154)FAILED TO RESTORE IN KIND ALL ROADWAY PAVEMENT MARKINGS. |
2019-06-26 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT, P/L. |
2019-06-25 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST #20185270829 RESPONDENT FAILED TO SEAL EXPANSION JOINTS BETWEEN THE CURB AND SIDEWALK A VIOLATION OF SECTION/RULE 34RCNY2-09{F}{4}{V}. EXPIRED DOT PERMI |
2019-06-25 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESPONDENT HAS 2 WATER REPAIR CUTS WITH PLUMBING NYC COLOR CODE MARKINGS LESS THAN 10' AWAY FROM EACH OTHER NOT CONNECTED INTO 1 UNIFIED CUT UPON COMPLETION OF RESTORATION FAILING TO COMPLY WITH H1042D NOTE 9. PRIOR CAR 20186720297 ISSUED 12/13/18 |
2019-06-25 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | SHIFTED PLATES OPEN 3IN IN THE ROADWAY |
2019-06-25 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate countersunk |
2019-06-25 | No data | 18 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO C.A.R) 20183140080) issued on 12\9\2018 2 perm cuts mounded 1 1\2 in |
2019-06-25 | No data | 45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | r\w pave by building pavers |
2019-06-25 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2019-06-24 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in front of B.O, planned half plus 5 |
2019-06-24 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm ......cut |
2019-06-24 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm to grade |
2019-06-24 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-06-23 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY PLATED |
2019-06-23 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench. |
2019-06-22 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration perm flush with color code. |
2019-06-22 | No data | 3 AVENUE, FROM STREET EAST 26 STREET TO STREET EAST 27 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2019-06-22 | No data | ANDROVETTE AVENUE, FROM STREET DEISIUS STREET TO STREET EYLANDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration acceptable |
2019-06-22 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Arrived at re-dig 830am contractor completed removing soil at 1140am departing location 11:54am |
2019-06-22 | No data | 12 AVENUE, FROM STREET 63 STREET TO STREET 64 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No Installation of Domestic Water & Sewer Found |
2019-06-21 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking/driving lane, in front and opposite of 6703 13 Avenue. |
2019-06-21 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway in front of 1854 |
2019-06-21 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | having a cut temporary restored with binder sunken 3" - 7", after being notified by NICA #20194580180 at 3:20pm on 6/20/19, and condition remains. Respondent failed to make cut flush with adjacent surface. |
2019-06-20 | No data | AVENUE K, FROM STREET EAST 31 STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w) found to be in compliance |
2019-06-20 | No data | 22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (Permit check) rdwy plated |
2019-06-20 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work Crew in the Process of Installing a Domestic Water & Sewer into Property |
2019-06-20 | No data | EAST 71 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Start 11:20a Plumbing nyc foreman fernando 2 cuts in driving lane IFO 257-259. Cut 1 L=4' W=3' D=2'8" Cut 2 L=4' W=4' D=3'Test 96.9/97.3 Exclusive testing labs Chris with SAND CONE. Material blend pass 6" Cut back sawcut and 12" sawcut |
2019-06-20 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water perm cut to grade in the p/l opposite of 41-04 |
2019-06-20 | No data | 12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2019-06-20 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent repair water trench that is flushed to grade in the parking lane which extends into the driving lane. |
2019-06-20 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | there is a perm sewer cut in the driving lane that is sunken 3 to 4 inches in the D/L in the parking lane looks to be down 6 to 7 inches |
2019-06-19 | No data | OCEAN AVENUE, FROM STREET AVENUE W TO STREET AVENUE X | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temporary asphalt has been applied to restoration no longer sunken. |
2019-06-19 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/21/19. |
2019-06-19 | No data | LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2019-06-19 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-12:15pmcut-5'5''x2'9''x3'7'' test- 97.2% & 97.6%luisjumping jackETLchrissand conew-117.3d-106.7md-111am-9.9% |
2019-06-19 | No data | OCEAN AVENUE, FROM STREET AVENUE W TO STREET AVENUE X | No data | Street Construction Inspections: Complaint | Department of Transportation | Portion of temporary restoration around plated excavation is down 10 inches in front of driveway |
2019-06-18 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT IN CONCRETE BUS PAD LANE IN REQUIRED TIME. EXPIRED DOT PERMIT # B012017192C26 EXPIRED ON 7/31/17 USED FOR ID. |
2019-06-17 | No data | PROSPECT AVENUE, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated roadway excavations |
2019-06-17 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | In front of 45-49. Started at 12:30. 13’x4’x7’ trench backfill completed. Departed 2:01 |
2019-06-17 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found or started at this time. |
2019-06-16 | No data | 14 AVENUE, FROM STREET 116 STREET TO STREET 117 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest (aka 14-02 116 st) corner property |
2019-06-16 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | CONDITION REMAIN THE SAME NOV WILL BE ISSUED |
2019-06-16 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012019158D54 active permit on file |
2019-06-16 | No data | 116 STREET, FROM STREET 14 AVENUE TO STREET 14 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest 14 ave ( corner property ) |
2019-06-15 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: NOV Re-Inspect | Department of Transportation | condition still remain the same n.o.v will be issued as a post audit inspection |
2019-06-15 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the respondent was a asphalt water cut in a concrete base pad that was over due for final. their permit expired on 4-11-18 they fail to permanently restore the concrete pad |
2019-06-14 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced roadway |
2019-06-14 | No data | 67 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:37A End: 3:10PL: 16FT. 0IN. W: 6FT. 9IN. D: 8FT. 8IN.WD: 114.9 DD: 108.0 MD: 112.5 MST: 6.4%WD: 118.8 DD: 109.3 MD: 114.5 MST: 8.7%Compaction: 1. 97.0% 2. 97.6%Cut is in the parking/driving lane, IFO 1415 67 St |
2019-06-13 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair on r/w acceptable, s/w Flags are I/F/O Active BO, upon completion sidewalk should be replaced. |
2019-06-12 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY AT 360 |
2019-06-12 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restorations flushed IFO 55 |
2019-06-12 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in compliance. Partially covered at time due to vehicle. Active permit remains on file #M012019155B41. |
2019-06-12 | No data | 63 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-123.9, Dry-Den-114.0, Max. Dry-Den-120.5, Act. Moist-8.7, Material- Clean fill (Blend), Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Denise, Compaction Results- (98.0, 98.2) |
2019-06-12 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration is missing lane markings. there is an active permit on file |
2019-06-12 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/3/19. |
2019-06-12 | No data | EVERGREEN AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-06-11 | No data | MENAHAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by BPP |
2019-06-11 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | •4.5'x3.5' area of perm cut sunken 2" |
2019-06-10 | No data | LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2019-06-10 | No data | PARSONS BOULEVARD, FROM STREET ASH AVENUE TO STREET BEECH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER- CREW ON SITE. EXCAVATING THE SIDEWALK. NOT ABLE TO MAINTAIN 5 FT CLEAR SIDEWALK DUE TO SIDEWALK BEING ONLY 5 FT. TEMP RESTORATION ON THE ROADWAY. STIPS IN COMPLIANCE. |
2019-06-10 | No data | SMART STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER -BACK-FILL COMPLETE ON 13' 6'' X 4' X 7' 6'' EXCAVATION |
2019-06-10 | No data | RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm ... |
2019-06-09 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway cut permanently restored IFO #50 acceptable. Sidewalk temp to grade. Scaffolding foot located within sidewalk flag - not able to full restore area. |
2019-06-09 | No data | ST NICHOLAS AVENUE, FROM STREET GATES AVENUE TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-06-09 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, flags repaired .. |
2019-06-09 | No data | 64 STREET, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2019-06-08 | No data | WOODHAVEN BOULEVARD, FROM STREET 88 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade d/l. |
2019-06-08 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-06-08 | No data | SULLIVAN STREET, FROM STREET BROOME STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway milled and paved in 2018 |
2019-06-08 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found in front of address 52-58 |
2019-06-08 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR previously issued. Temporary area of permanent trench needs to be restored |
2019-06-08 | No data | RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION |
2019-06-08 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag at 445 has concrete patchwork and needs a full flag restoration |
2019-06-08 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag at 445 has concrete patchwork and needs a full flag restoration |
2019-06-07 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT, P/L. opp #213 |
2019-06-07 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b d1j project pass |
2019-06-06 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER -PERM SIDEWALK. NO WORK FOUND IN THE ROADWAY |
2019-06-06 | No data | MIDDLETON STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, sidewalk restored ...still curing ... |
2019-06-06 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, hydrant install ... |
2019-06-06 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, new hydrant install ... |
2019-06-06 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNable to view cut due to other work in the vicinity. |
2019-06-06 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk excavated around new water valves. .A.K.A 1134 Fulton St |
2019-06-06 | No data | LAFAYETTE STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | location of cut behind active BO |
2019-06-06 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | three steel plates within active B.O site, Code 53 mark out on the roadway but no road way excavation, new permit on file (M012019155B40) |
2019-06-06 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b d1j project pass |
2019-06-05 | No data | EAST 12 STREET, FROM STREET AVENUE A TO STREET AVENUE B | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2019-06-05 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/28/19 |
2019-06-05 | No data | EVERGREEN AVENUE, FROM STREET HIMROD STREET TO STREET STANHOPE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 3/7/2019. |
2019-06-05 | No data | WEST 30 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATIONS FINALIZED |
2019-06-05 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2019-06-05 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in crosswalk area of roadway at Morningside Drive . |
2019-06-05 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane of roadway with patch work on sidewalk.....sidewalk will be restored once inside renovations and facade are complete with scaffold remove. |
2019-06-05 | No data | SULLIVAN STREET, FROM STREET BROOME STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | road paved and milled in 2018 |
2019-06-05 | No data | HOLLY AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement covering work |
2019-06-05 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2019-06-05 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active BO covering restoration |
2019-06-04 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 95% of crosswalk lane markings in roadway with perm restoration in bus lane; red paint and other lane markings restored at this time. |
2019-06-04 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | temp s/w..car parked over r/w cut |
2019-06-04 | No data | SHEEPSHEAD BAY ROAD, FROM STREET EMMONS AVENUE TO STREET SHORE PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-115.2, Dry-Den-104.8, Max. Dry-Den-107.5, Act. Moist-9.9, Material- Clean fill (Blend), Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Chris, Compaction Results-(97.5) |
2019-06-04 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [3/2/19]. |
2019-06-04 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [2/10/19]. |
2019-06-03 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2019-06-03 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Yellow double line restored to perm restoration in driving lane at this time. |
2019-06-03 | No data | 63 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2019-06-03 | No data | SMART STREET, FROM STREET LABURNUM AVENUE TO STREET NEGUNDO AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived at 9:46am. Started 10:26. 10’x4’x6’ trench backfill completed. Binder base to follow |
2019-06-03 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found, however building operation active |
2019-06-02 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2019-06-02 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore sidewalk flags around water valve I/F/O 797 in-kind |
2019-06-02 | No data | 8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore the solid white lane marking to the roadway, I/F/O 401... (CAR Re-inspection FAIL) |
2019-06-01 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 1/19/2019. |
2019-06-01 | No data | 160 STREET, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two permanent cuts |
2019-06-01 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates have been removed, r/w is now perm to grade |
2019-06-01 | No data | EAST 22 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION RESTORED TO GRADE |
2019-05-31 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 1/27/2019. |
2019-05-31 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES IN ROADWAY DEFLECTING .VERY HEAVY TRAFFIC WEST AND EAST BOUND . REPAIRS NEEDED A.S.A.P |
2019-05-31 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-05-31 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on roadway acceptable |
2019-05-31 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. |
2019-05-30 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced with work completed during 9/2018 to 10/2018. |
2019-05-30 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [2/26/19] |
2019-05-30 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on roadway acceptable |
2019-05-29 | No data | EAST 9 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced, B.U.G. permanent roadway restoration Major Gas Installation (B012018345F22) |
2019-05-29 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut made safe with temporary asphalt. |
2019-05-29 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in roadway and sidewalk |
2019-05-28 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 5'2"x5' water cut sunken 3" NICA issued to company. |
2019-05-28 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 11ft x 3ft 10in x 6ft Pass: 97.9% 96.0% |
2019-05-28 | No data | 51 AVENUE, FROM STREET 2 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2019-05-26 | No data | BROADWAY, FROM STREET PARK AVENUE TO STREET PARK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w currently milled |
2019-05-25 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-05-25 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please re-seal both perm cuts. |
2019-05-25 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street area resurfaced |
2019-05-25 | No data | DOUGHTY STREET, FROM STREET BEND TO STREET ELIZABETH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAG |
2019-05-24 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-05-24 | No data | ST NICHOLAS AVENUE, FROM STREET GATES AVENUE TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work Not Done |
2019-05-24 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration leading from curb to driving lane needs to be properly resealed. |
2019-05-23 | No data | FAYETTE STREET, FROM STREET BEAVER STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work Not Done. |
2019-05-23 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 214, Permanent Restoration in the Roadway however unable to properly view Restoration due to Barriers and Container. |
2019-05-23 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition remains |
2019-05-23 | No data | 39 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM RESTORATIONS ROADWAY & SIDEWALK DONE BY JOSEPH BALKIN .CONTRACTOR TOOK OVER JOB. |
2019-05-23 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair acceptable |
2019-05-23 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED ROADWAY & EXCAVATED MATERIAL ON RWY WITH STIP 020- OK |
2019-05-23 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates on roadway exposing excavation with shoring shifted 13" other side shifted 3". Please reset and secure |
2019-05-23 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work found |
2019-05-22 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | concrete restoration is in compliance |
2019-05-22 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w across fulton st. |
2019-05-22 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012019130B30 on file with no repair sewer work started at this time. |
2019-05-22 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE |
2019-05-22 | No data | WILLOW STREET, FROM STREET CLARK STREET TO STREET PIERREPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY RESURFACED BY DOT IN 2018 |
2019-05-21 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 17'10" x 5' x 11'10" back-fill was completed cutbacks are being made concrete truck on site for the base cut will be left plated in front of 1250 |
2019-05-21 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent restorations should be restored as one . |
2019-05-21 | No data | OXFORD STREET, FROM STREET ORIENTAL BOULEVARD TO STREET SHORE BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut / D/L. 25ft x 3ft, 9 inches, down 4ft. Blend. 97.4% 98.0% 98.1% Wet 123.9/116.7 Dry 115.2/108.5 Max 120.5/115.5 Moisture 7.5%/7.5% |
2019-05-21 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed respondent with a PLATED excavation, without a Valid DOT permit on file to do so. Permit was Identified through above permit which expired on 5/20/2019, and Markings on STEEL PLATES. |
2019-05-21 | No data | WASHINGTON AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-05-21 | No data | WILLIAMS AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 24ft (W): 6ft (D): 6ft - 96.1%; 96.0%Cut #2: (L): 21ft (W): 5ft (D): 6ft - 96.9%; 96.6%Located from P/L to P/L IFO 272.Cutbacks being made.Arrival: 9:35AMDeparture: 2:00PM |
2019-05-20 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating roadway. |
2019-05-20 | No data | 67 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plate in the parking lane, in front of 1415 67 Street. New permit on file, B012019127C50 exp. 6/8/2019. |
2019-05-20 | No data | STOCKHOLM STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane. |
2019-05-20 | No data | WILLIAMS AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | bkfill rescheduled dur to no show for the lab tech to test soil |
2019-05-19 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated in Compliance |
2019-05-19 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut slightly covered by con ed okay |
2019-05-19 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-05-19 | No data | 11 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in roadway |
2019-05-19 | No data | LAFAYETTE AVENUE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY |
2019-05-19 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY OPPOSITE #672 |
2019-05-19 | No data | 50 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench & Sidewalk Flag in Compliance |
2019-05-19 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel Plated Excavation in the Roadway is Sticking up from the Roadway & Must be Reset to be Level with the Existing Roadway. |
2019-05-18 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plates reset. |
2019-05-18 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started |
2019-05-18 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cuts perm sealed;w/color codes. |
2019-05-18 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for the work at this location. |
2019-05-18 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut in the Bus Pad, 543 Albany Ave |
2019-05-18 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings restored |
2019-05-18 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ICA was issued in ERROR. Plates belong to Lospano. NICA re-issued to Lospano. |
2019-05-18 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 steel plates marked E.I.C. in the driving lane i/f/o 108 Leonard street. 1 of the plates shifted 5" causing a dangerous condition for the motorists. Also asphalt broken out down 4" below roadway surface i/f/o of 1 07 the plates. |
2019-05-18 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved |
2019-05-17 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut is in compliance |
2019-05-17 | No data | BAINBRIDGE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench in the roadway |
2019-05-16 | No data | EAST 4 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Cut 40 Feet off 18th Ave in Compliance |
2019-05-16 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm east side of 146 street near 34 Ave. portion covered by BPP |
2019-05-16 | No data | WEST 16 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w restored |
2019-05-16 | No data | HOYT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENTS SUB-CONTRACTORS IN VIOLATION OF OCMC STIP ID#13 FAILED TO MAINTAIN MINIMUM 5 FOOT CLEAR SIDEWALK DOT PERMIT B012019129A28 EXP 6/2/2019 USED FOR ID |
2019-05-16 | No data | HOYT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PLATES BEING RESET |
2019-05-16 | No data | 13 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | entire block under construction |
2019-05-16 | No data | 65 PLACE, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill has to be rescheduled no one showed up |
2019-05-16 | No data | MARYLAND AVENUE, FROM STREET ABBOTT STREET TO STREET BAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2019-05-16 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plates in the roadway and on the sidewalk are in compliance with an active permit on file |
2019-05-16 | No data | HOYT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | ifo 318 Hoyt st 1 of 2 steel plates with PNYCI marked is deflecting 2'' and is very noisy when driven over |
2019-05-15 | No data | DEMEREST ROAD, FROM STREET BEND TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w restored |
2019-05-15 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Parking Lane Steel Plated in Compliance |
2019-05-15 | No data | EAST 3 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Excavation in the Parking Lane Steel Plated in Compliance ( Active Permit in System) |
2019-05-15 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM CUT IN THE PARKING LANE AND TEMP CUT IN THE BUS PAD OPPOSITE #436 |
2019-05-15 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TEMP CUT IN THE BUS PAD OPPOSITE #436 NEW PERMIT ON FILE |
2019-05-15 | No data | 37 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2019-05-15 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Ongoing sewer-water installation for new building at 217 Pearl St. acceptable. Roadway plated about 30' WWC of Pearl St. |
2019-05-15 | No data | 11 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2019-05-15 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY |
2019-05-14 | No data | RIVER STREET, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO & TRAINEES ARRIVE AT 1145AM, BACKFILL A PASS-(L)13 FT X (W) 4 FT X (D)4 FT 4 IN-TESTS 97.9+97.7; WD 124.8,DD 114.8,MD 120,AM 8.7- SAW CUT CUTBACKS WERE DONE & LEFT AT 130 PM |
2019-05-14 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY BY RIVER ST ON NCL |
2019-05-14 | No data | RIVER STREET, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated street opening on rwy |
2019-05-14 | No data | 191 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2019-05-14 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Adding to previous backfill inspection. I monitored the backfill except the last lift and compaction, due to leaving to a joint meeting which was approved by by supervisors. I took pictures of the lab technicians paper work. |
2019-05-14 | No data | CLARENDON ROAD, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 11:25AL: 24FT. 0IN. W: 5FT. 6IN. D: 7FT. 6IN.SAND: WD:114.0 DD: 107.2 M: 110.5 MST: 6.4%BLEND: WD: 111.9 DD: 104.1 MD: 110.0 MST: 7.5%Compaction: 1. 97.5% 2. 98.1% |
2019-05-14 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 17ft (W): 5ft (D): 11ft - 97.7%; 97.9%Located in P/L-D/L IFO 1248, 1250.Base cutbacks made.Arrival: 10:40AMDeparture: 2:30PM |
2019-05-13 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-05-12 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER -NO WORK DONE |
2019-05-11 | No data | 84 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work Found on the Existing Roadway or Sidewalk. |
2019-05-11 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | all equipment has been removed |
2019-05-11 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT MADE FLUSH |
2019-05-10 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water-sewer cut restoration have multiple damaged cobble stones - not acceptable. Please replace damaged stones IFO 11 Greene St. |
2019-05-10 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water-sewer restoration with multiple damaged cobble stones present. CAR reported under latest permit M012019119C13. |
2019-05-09 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMP RESTORATION IN PK LANE |
2019-05-09 | No data | SOUTH ELLIOTT PLACE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY ON ECL |
2019-05-09 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in r/w slightly covered by BPP |
2019-05-09 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in roadway not sealed at this time. Active permit Q012019115B17 |
2019-05-09 | No data | 28 AVENUE, FROM STREET LITTLE NECK BOULEVARD TO STREET PEDESTRIAN OVERPASS | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway not sealed at this time. Active permit Q012019115B17 |
2019-05-09 | No data | LEXINGTON AVENUE, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 PERM RESTORATIONS IN THE ROADWAY 2 SIDE WALK FLAGS ARE CURING AT TIME OF INSPECTION |
2019-05-09 | No data | 78 STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l,s/w flag concrete to grade. |
2019-05-09 | No data | NORTH 12 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway partially covered by BPP. |
2019-05-09 | No data | 191 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2019-05-09 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted. Plates belong to Lospano. NICA issued to Lospano by night crew. |
2019-05-09 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION |
2019-05-09 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION |
2019-05-09 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a permanent repair water trench that is flushed to grade in the parking lane which extends into the driving lane. |
2019-05-09 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | I Observed the above respondent working in an open sewer/water excavation on a protected street without an active NYCDOT permit on file. Respondent's most recent permit Q012019099B98 on file expires on 5/8/2019 was used for ID purpose. |
2019-05-08 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 108 Leonard, steel plates have shifted 5" and exposing open excavation and creating a dangerous condition for vehicles. Shifted plates causing asphalt to break out. Properly fasten plates over entire excavation and make area safe ASAP. |
2019-05-08 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced with work completed during 9/2018 to 12/2018. |
2019-05-08 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started at this time. |
2019-05-08 | No data | 23 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the d/l |
2019-05-08 | No data | NEW YORK AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Crew actively working on site. Traffic moving both ways... New Permit Number: B012019122B72. |
2019-05-08 | No data | 12 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-05-08 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane with patch work on sidewalk...CAR on permit M012019087B86 at this time. |
2019-05-08 | No data | 37 AVENUE, FROM STREET 12 STREET TO STREET 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-05-08 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. permit stips in-compliance. |
2019-05-07 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER: I/F/O # 435 East 13 st |
2019-05-07 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two (2) Cobblestone cuts in roadway restore in kind. |
2019-05-07 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane of roadway with CAR on permit M012019087B86 for patch work on sidewalk flags . |
2019-05-06 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | two plated cuts in the rd/w. |
2019-05-06 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permit still active. NEXT INSPECTOR:Temp cut slightly sunken, expansion joints need to be recess and sealed. |
2019-05-05 | No data | 76 AVENUE, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm roadway trench has been sealed. |
2019-05-05 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUTS COVERED BY BPP |
2019-05-04 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk ok |
2019-05-03 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem to grade |
2019-05-03 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water restoration is in compliance |
2019-05-02 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builders pavement in roadway |
2019-05-02 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2019-05-02 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I found the roadway resurfaced. |
2019-05-02 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement work not visible. |
2019-05-02 | No data | CONCORD AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved 2018 |
2019-05-02 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 214, Permanent Restoration in the Roadway however unable to properly view Restoration due to Barriers and Container.(Insp.#746) |
2019-05-02 | No data | 64 AVENUE, FROM STREET 220 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm roadway trenches and sidewalk cuts are restored to grade. |
2019-05-02 | No data | 34 STREET, FROM STREET STARR AVENUE TO STREET VAN DAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l sidewalk flags restored around valve |
2019-05-02 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit M012018033A99 |
2019-05-02 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-05-02 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER |
2019-05-01 | No data | CANAL STREET, FROM STREET CHURCH STREET TO STREET GREENE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in west bound driving lane acceptable |
2019-05-01 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit X012018250A89 |
2019-05-01 | No data | 5 AVENUE, FROM STREET EAST 30 STREET TO STREET EAST 31 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no excavation work has been done how ever code 753 has been marked out in parking/bus lane I/F/O 292 5th ave |
2019-05-01 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT TRENCH IN ROADWAY |
2019-05-01 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 separate water cuts on roadway need to be connected and 1 flag left temp needs to be restored perm. Current permit M012019108B26 on file |
2019-05-01 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed patch work crossing the sidewalk i/f/o #30 Morningside Drive. Respondent failed to permanently restore all sidewalk flags in kind at this time. Please address condition and restore all sidewalk flags were work was done. |
2019-04-30 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CUT STILL NOT FINALIZED IN BUS PAD NOV BEING WRITTEN UNDER POST AUDIT AS PER POLICY |
2019-04-30 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT IN CONCRETE BUS PAD LANE IN REQUIRED TIME. EXPIRED DOT PERMIT # B012017192C26 EXPIRED ON 7/31/17 USED FOR ID. |
2019-04-28 | No data | JENNINGS STREET, FROM STREET HOE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found later work done new roadway base installed new DDC capital project, area under construction |
2019-04-27 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BRUNO ON SITE STARTED AT 1145 AM FOR BASE A PASS-(L) 16 FT X (W) 7 FT 10 X (D) 9 INCHES-CUTBACKS WERE DONE -HD ASPHALT WAS INSTALLED AS BASE- BRUNO LEFT AT 1225 PM |
2019-04-27 | No data | LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-04-27 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in roadway with light cracks along seams. no action taken at this time |
2019-04-27 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO RESTORE ENTIRE PAVEMENT IN KIND (CAR #20186760216) WAS ISSUED 4/24/2018 |
2019-04-27 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | found crew on site excavating open roadway cut |
2019-04-26 | No data | WILLIAMS AVENUE, FROM STREET BELMONT AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site sewer excavation in the roadway |
2019-04-26 | No data | 83 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Restoration in p/l made perm, no sealer applied as of now acceptable for now |
2019-04-26 | No data | EAST 18 STREET, FROM STREET CHURCH AVENUE TO STREET TENNIS COURT | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak 3 day notice |
2019-04-25 | No data | 77 AVENUE, FROM STREET 217 STREET TO STREET 220 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement plumber's restoration not visible. |
2019-04-25 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED OVER BY BUILDERS PAVERS |
2019-04-25 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced |
2019-04-25 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ON R/W |
2019-04-24 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on rd/w, and cut on sidewalk. |
2019-04-24 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway cuts ok. some asphalt broken out on rd/w cut, but not enough to warrant CAR. |
2019-04-24 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION OPP 70 HENRY ST OFF SCL & OUTSIDE RESURFACING OF RWY |
2019-04-24 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench in steel plate, Closer to Pearl st. inside of BO's Fenced in area. |
2019-04-24 | No data | POWERS STREET, FROM STREET BUSHWICK AVENUE TO STREET JUDGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2019-04-24 | No data | ST NICHOLAS AVENUE, FROM STREET 8 AVENUE TO STREET WEST 122 STREET | No data | Street Construction Inspections: Active | Department of Transportation | O work started |
2019-04-24 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pins were reset and ramping Material placed on areas around Plate. |
2019-04-24 | No data | 51 STREET, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the parking/driving lane, opposite of 1714 and on the sidewalk (1 flag curing) in front of 1714. |
2019-04-23 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#M012019108A32 for #442, and permit#M012019107B41 for #436 |
2019-04-23 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | new permits on file |
2019-04-23 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | duplicated |
2019-04-23 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a permanent that is flushed trench in the driving lane which extends into a construction barricaded area within the parking lane. |
2019-04-23 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated r/w at this time. |
2019-04-23 | No data | BATHGATE AVENUE, FROM STREET BEND TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CORE SAMPLES DONE ON PERM CUT IN D/L THAT PASS. |
2019-04-23 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w |
2019-04-23 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file |
2019-04-23 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | specific location -132 west 28 st b/t 6 ave & 7 ave found 2 steel plates marked PNYC I with spikes raise 2" up creating dangerous condition to motorists drive over at driving lane of roadway |
2019-04-23 | No data | PINE STREET, FROM STREET PEARL STREET TO STREET WILLIAM STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, rd/w too narrow must remain closed. |
2019-04-22 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | believed to be 15' from Pearl st, cut is plated. |
2019-04-22 | No data | 50 AVENUE, FROM STREET 65 PLACE TO STREET 65 STREET | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection crew working at site |
2019-04-22 | No data | EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove a (PCM) marked steel plate from the roadway, serving no purpose.In front of 1025 East 7 Street between Avenue I and Avenue J. |
2019-04-22 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate work due to active building operation. |
2019-04-22 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IS IN COMPLIANCE |
2019-04-22 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found. |
2019-04-21 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore lane markings over permanent restoration on the roadway.In front of 1574 60 Street between 16 Avenue and LIRR BAY RIDGE DIV. |
2019-04-21 | No data | THROOP AVENUE, FROM STREET GATES AVENUE TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MISSING IBM TAG IN PERM RESTORATION |
2019-04-21 | No data | 45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking/driving lane is sunken down 2.5 inches.Permanent restoration needs to be resealed.In front of 1795 45 Street between 17 Avenue and 18 Avenue. |
2019-04-21 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has a steel plate countersunk into the roadway, without a valid DOT permit on file. Expired permit, #B012019011C29 exp. 2/6/2019, used for ID. |
2019-04-21 | No data | BROADWAY, FROM STREET BROOKLYN QNS EXPRESSWAY TO STREET RODNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in r/w has color code but missing sealer, new permits on file |
2019-04-21 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#M012019108A32 |
2019-04-20 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w pave |
2019-04-20 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Emergeny repairs was made. Plated excavation in the roadway. Crew on site cleaning up |
2019-04-20 | No data | MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the parking lane |
2019-04-20 | No data | 21 AVENUE, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THE SIDEWALK SHOULD BE REPLACED AFTER (NEW CONSTRUCTION) |
2019-04-20 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag expansion joints sealed. |
2019-04-20 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2019-04-20 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway Currently Being Pumped out. Dep South Work on Site. 3 Day Dep Notice Issued. |
2019-04-19 | No data | EAST 144 STREET, FROM STREET MDE NORTHBOUND EXIT 4 TO STREET GERARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 cut in the parking lane color coded. 2 flags on the sidewalk no action based on the condition of the sidewalk. |
2019-04-19 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must reseal water cut in the driving lane. |
2019-04-19 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | made safe by contractor it's not theres. |
2019-04-19 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temporay concrete sidewalk flag not leveled areas below grade 1-2". |
2019-04-19 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (5ft. x 2ft.) area within a permanent restoration is broken/cracked out and down 2.5 inches.In front of 1572 61 Street between 15 Avenue (AKA Bend) and 16 Avenue. |
2019-04-19 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Countersunk steel plate in the parking/driving lane without an active permit on file, in front of 1751 48 Street. A NOV (DO1 - use/opening of street without a permit) was issued on 4/17/2019. |
2019-04-18 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2019-04-18 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway and sidewalk in compliance |
2019-04-18 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | current building operation in progress at this time...possible perm restoration in roadway unable to see color code in restoration at this time. |
2019-04-18 | No data | 50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plumber cut - building site - work is in progress |
2019-04-18 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION RWY, NEW SIDEWALK FLAG |
2019-04-18 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed in compliance. |
2019-04-18 | No data | DITMARS BOULEVARD, FROM STREET GCP EASTBOUND EXIT 6 TO STREET 93 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Broken seal around perm r/w cut. |
2019-04-18 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate removed |
2019-04-17 | No data | 48 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed opening of street without DOT permit. Countersunk steel plate in roadway without DOT permit.Previous permit B012019011C29 to work at location expired 2/6/2019. Expired permit and Markings on steel plate (PWI) use for Identification |
2019-04-17 | No data | WASHINGTON AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-04-17 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | In compliance |
2019-04-17 | No data | BATHGATE AVENUE, FROM STREET BEND TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2019-04-17 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Remove ''RAISE PLOW BLADE" sign posted at lamp post in front of house 1747 48 street - serving no purpose - The sign must be removed at the end of the Winter Moratorium Period |
2019-04-16 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 3' X 3' RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT#B012019087C80 EXP 4/14/2019 USED FOR ID. |
2019-04-16 | No data | WEBSTER AVENUE, FROM STREET ALDEN PLACE TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2019-04-16 | No data | 58 AVENUE, FROM STREET 230 STREET TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Builders pavement in roadway |
2019-04-16 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer trench going across the roadway not sealed |
2019-04-16 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed from the roadway |
2019-04-16 | No data | 51 AVENUE, FROM STREET 2 STREET TO STREET 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the p/l counter sunk active permit on file Q012019087F10 |
2019-04-16 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed to grade in the DL. |
2019-04-15 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration is flushed and sealed in the DL. |
2019-04-15 | No data | BATHGATE AVENUE, FROM STREET BEND TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane / 2 flags on sidewalk no action taken / contractor will demo building and build new apartments |
2019-04-14 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | CUT OPPOSITE LOCATION DOES CONFORM TO TO DOT STANDARDS |
2019-04-14 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on r/w |
2019-04-14 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on r/w active permit on file |
2019-04-14 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING AND CUT OPPOSITE IN BUS PAD WITH COLOR CODE NOT DONE TO STANDARDS.{LONG WATER CUT} CAR ISSUED TO LATEST PERMIT |
2019-04-13 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO FULLY SEAL PARKING LANE RESTORATION THAT WAS LEFT HALF WAY DONE AND SIDEWALK EXPANSION . CAR #20185270829 WAS ISSUED ON 9/1/2018 |
2019-04-13 | No data | LOUISIANA AVENUE, FROM STREET SEAVIEW AVENUE TO STREET TWIN PINES DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut, r/w, s/w flags |
2019-04-13 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints sealed |
2019-04-12 | No data | NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway |
2019-04-12 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2019-04-12 | No data | 45 AVENUE, FROM STREET BOWNE STREET TO STREET SMART STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER - BACKFILL COMPLETE ON 13' 3'' X 5' X 6' EXCAVATION. (19' 6'' X 7' X 1' 3'' )AFTER CUT-BACK. |
2019-04-12 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Cement truck late. Took lunch on site of backfill for extra grace time. Now departing from location. Approved by Mr. Hock. |
2019-04-12 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 14ft (W): 7ft (D): 8ft - 97.4%; 97.1%Cut #2: (L): 9ft (W): 6ft (D): 3ft 6in - 97.1%Located in both P/L-D/L IFO 900.Base cutbacks made.Arrival: 9:40AMDeparture: 2:55PM |
2019-04-12 | No data | KENT AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2019-04-11 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found roadway refaced |
2019-04-11 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane mostly resurfaced by con edison restoration. |
2019-04-11 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAGS NOT SEALED |
2019-04-10 | No data | METROPOLITAN AVENUE, FROM STREET ARNOLD AVENUE TO STREET GRANDVIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No visible work done at this time. |
2019-04-10 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2019-04-09 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water installation ongoing on sidewalk area. Roadway plated for cobble stones curing. Acceptable. |
2019-04-09 | No data | WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced due to BPP |
2019-04-08 | No data | 18 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to repair CAR #20183140080. Respondent has a permanent restoration on the roadway mounded 1.5 to 2 inches above the roadway, not flush with the surrounding area. Permit, B012018221C41 exp. 9/6/2018, used for ID. |
2019-04-08 | No data | JUNO STREET, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Roadway cut found perm to grade with paving marker. No cause for complaint. |
2019-04-08 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water- sewer installation for new building at 11 Greene St. ongoing. Area closed to 15 Greene St. is currently plated (2) - west side of cobble stones roadway. Acceptable. |
2019-04-07 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This condition has been addressed, Expansion Joints have been sealed. |
2019-04-07 | No data | EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restored to grade. |
2019-04-07 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO SEAL EXPANSION JOINT ON SIDEWALK AS PER CAR#20181670764 ISSUED ON 12/11/18 |
2019-04-06 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found the respondent failed to integrate / make into one, two permanent repair Water Sewer Restorations measured 6' 2' apart from each other as required by H 1042 D note 9. CAR # 20185180107 was issued prior on 3/24/2018 to correct this condition. |
2019-04-06 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings not restored. |
2019-04-06 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | countersunk steel plate, new permits on file |
2019-04-06 | No data | NORTHERN BOULEVARD, FROM STREET 146 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER - PLATED EXCAVATION IN THE DRIVING LANE. NO CREW ON SITE. |
2019-04-06 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings restored |
2019-04-06 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET TROUTMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, cut now perm .. |
2019-04-05 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore Yellow double lane marker. 120 ft west of Morning side opp of 400 west 113 street. |
2019-04-05 | No data | FRANKLIN AVENUE, FROM STREET FULTON STREET TO STREET LEFFERTS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-10:25amcut- 18'x4'x4' test 97.3% & 97%cut2- x4' test 97.5% & 97.4%germanjumping jackexclusive testing labandrewsand conecleanfillw-107.4d-101md-105am-9.4% |
2019-04-05 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass, ... |
2019-04-05 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permittee failed to re-apply color code marker after being notified on 2/6/19 by CAR #20194570037. |
2019-04-05 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION WAS RECTIFIED PERM RESTORATION HAS BEEN RESEALED DRIVING LANE |
2019-04-05 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sleeve removed |
2019-04-04 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings has been applied to restoration |
2019-04-04 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sidewalk flag flushed and sealed . |
2019-04-04 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(14’)W(4’)D(10’)TEST#1= 96.4TEST#1= 97.3Backfill pass saw cuts done |
2019-04-04 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 13ft by 4ft down 7ft 6in |
2019-04-04 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE |
2019-04-03 | No data | 8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found the respondent failed to restore white lane on a permanent repair water- sewer Restoration in the Roadway. Respondent was notified to correct this condition prior via CAR # 20186030895 on 10/31/2018. |
2019-04-03 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings restore |
2019-04-03 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut made final in roadway / driving lane |
2019-04-03 | No data | WEST 30 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to apply Color Code Markers on their permanent repair Water- Sewer restorations in the Roadway. CAR # 20196040004 was issued prior on 1/3/2019 to correct this condition. |
2019-04-03 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition corrected pin holes in roadway plugged . |
2019-04-03 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | area acceptable perm restoration and s.w ok |
2019-04-03 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CONDITION WAS RECTIFIED PERM CUT REPAIRED FLUSH WITH AREA IN D/L |
2019-04-03 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O aka 108 Leonard, NOV issued for 2 permanent Water cuts 4 feet apart. Respondent notified via CAR 20186720297 on 12/13/2018 and failed to conform with Standard Detail Drawing H-1042A note 9. All conditions remain from CAR. ( 3 cuts total ) |
2019-04-03 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane marking restored. |
2019-04-02 | No data | BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work |
2019-04-01 | No data | WEST STREET, FROM STREET CALYER STREET TO STREET OAK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2019-04-01 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site finishing restoring cobble stones roadway water cut for building aka 601 Washington St. Acceptable. Notification received (via email) as of 3/29/19. |
2019-03-31 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2019-03-31 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking / bike lane. |
2019-03-31 | No data | LAFAYETTE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT MOSTLY COVERED BY GAS CUT |
2019-03-31 | No data | 66 ROAD, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cannot find work at this time - permit active. |
2019-03-31 | No data | 37 AVENUE, FROM STREET 12 STREET TO STREET 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2019-03-31 | No data | 76 AVENUE, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, perm trench to grade in d/p/l. |
2019-03-31 | No data | EAST 22 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration in the parking/driving lane, in front of 1103 East 22 Street. A CAR was issued on a newer permit for restoration overdue for final, Permit B012018360D37 exp. 1/25/2019 (CAR #20196780096). |
2019-03-31 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration, in the parking/driving lane, has a (3ft. x 2ft.) area that is broken/cracked out and down 1.5 inches.In front of 944 East 23 Street between Avenue I and Avenue J. |
2019-03-30 | No data | GRAND STREET EXTENSION, FROM STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-03-30 | No data | GRAND ST EXTENSION, FROM STREET HOOPER STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut white lane markings ok |
2019-03-30 | No data | 58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2019-03-30 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w. |
2019-03-30 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER - PERM RESTORATION ON THE ROADWAY |
2019-03-30 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Tech on location, material (BLEND)passed. Wet Density: 124.2, Dry Density: 114.3, Max Dry Density: 117.5, Actual Moisture: 8.7%. Excavation is 11'5"X5'9" - 4' Deep. 2 Lifts 2 Tests 97.5, 97.7. BAC was saw cut and chipped out for BSE. |
2019-03-30 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2019-03-30 | No data | SOUTH 1 STREET, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance white lane markings okay |
2019-03-30 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm cut on r/w.. needs to be sealed and color code applied |
2019-03-29 | No data | ST JOHNS PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut to grade. new building in progress at this location |
2019-03-29 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew working on site, excavation in the parking/driving lane, with a flag person on site. |
2019-03-28 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160, portion of perm 2018 trench in driving lane. Newer 2018 Con Ed restoration at East Curb around S-4 box and BUS LANE re-painted Red by DOT. |
2019-03-27 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION DOWN 1 1/2 INCHES AT 92A AMITY STREET (RESTORE TO GRADE)& SEAL JOINTS OF NEW PERMANENT RESTORATIONS IN ROADWAY AT 96 AMITY STREET BETWEEN HENRY STREET & HICKS STREET. |
2019-03-27 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm SEWER repair acceptable |
2019-03-27 | No data | VAN BRUNT STREET, FROM STREET BEARD STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm trench on r/w |
2019-03-27 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY OPPOSITE #672 |
2019-03-27 | No data | FLUSHING AVENUE, FROM STREET THORNTON STREET TO STREET WHIPPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION IN THE ROADWAY OPPOSITE #672 |
2019-03-27 | No data | EASTHAMPTON BOULEVARD, FROM STREET 57 ROAD TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced, work under builders pave at time of inspection. |
2019-03-27 | No data | OCEAN AVENUE, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L |
2019-03-26 | No data | FLUSHING AVENUE, FROM STREET BROADWAY TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | ifo 797 plated excavation s/w |
2019-03-26 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2019-03-25 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY & SWK |
2019-03-25 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | update permit found. |
2019-03-25 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm cut on r.w.. no backfill called in under any previous permit. |
2019-03-25 | No data | NORTH 7 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED RWY & SWK-NEW PERMIT |
2019-03-24 | No data | EAST 193 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street resurfaced |
2019-03-24 | No data | 76 AVENUE, FROM STREET 226 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway is missing seal. Apply seal to joints. |
2019-03-23 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2019-03-22 | No data | NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2019-03-21 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work in progress - steel plated p/l.Signs posted,contractor has an active permit at this time. |
2019-03-21 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work was paved over as building was a new build and Permittee was responsible for new sidewalk and resurfacing of roadway. |
2019-03-21 | No data | JEWEL AVENUE, FROM STREET 108 STREET TO STREET 110 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - steel plated p/l.Signs posted,permit active at this time. |
2019-03-20 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 roadway cuts restored. |
2019-03-20 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. 1 eleven foot lane maintained. |
2019-03-20 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Perm Sewer restorations in the parking lane and roadway IFO 17. |
2019-03-19 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2016 work found, permit expired. 2017 work found, completed by different permittee. |
2019-03-19 | No data | EAST 22 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration, in the parking/driving lane, overdue for final.(3ft. x 2ft.) area within the restoration is broken out and down 2 inches.In front of 1103 East 22 Street between Avenue J and Avenue K. |
2019-03-19 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Due to activities at building operation, its hard to see if any work was done |
2019-03-19 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L |
2019-03-19 | No data | 64 AVENUE, FROM STREET 220 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts to grade in the d/p/l. |
2019-03-18 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Valid permit#B012019070A79; work in progress |
2019-03-16 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O building operation at aka 215 Pearl, countersunk steel plate ( extending into roadway occupancy ) with RAISE PLOW sign posted. Active permit M012019074A95 on file for ongoing work. |
2019-03-16 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Closer to Platt ( I/F/O B/O at 215 ), crew actively working within trench. Work was perm and now working in same excavation. Permit active at this time. |
2019-03-16 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plates safely countersunk. |
2019-03-16 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Closer to Platt ( I/F/O B/O at 215 ), crew actively working within trench. Work was perm and now working in same excavation. Active permit M012019074A93 at this time. |
2019-03-16 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp Sewer & Water Cut in the Roadway in Compliance |
2019-03-16 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequently secured permit for the work at this location. |
2019-03-16 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION IN THE ROADWAY |
2019-03-15 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - Pass(L): 15ft (W): 7ft (D): 7ft - 96.2%; 96.7%Located in P/L - D/L IFO 3206.Cutbacks being made.Arrival: 10:40AMDeparture: 1:55PM |
2019-03-15 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE CENTER OF THE ROADWAY NEW PERMIT ON FILE |
2019-03-15 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY |
2019-03-14 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plate on roadway counter sunken and not making any noise at this time |
2019-03-14 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the d/l |
2019-03-13 | No data | 182 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut flush to grade in d/p/l. |
2019-03-13 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den115.8, Dry-Den-107.9, Max. Dry-Den-112.5, Act. Moist-6.4, Material- Clean fill (Blend), Test- Sand cone, Lab - Exclusive Testing Labs, Lab tech- Albert, Compaction Results - (96.3, 96.7) |
2019-03-13 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE INSTALL EXPANSION JOINTS AT CURB LINE AND SEAL PERMANENT RESTORATION ON ROADWAY INPARKING/DRIVING LANE IN FRONT OF 1843 48TH STREET. |
2019-03-13 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK FLAGS INSTALLED JOINTS HAVE BEEN SEALED |
2019-03-12 | No data | 55 AVENUE, FROM STREET BEND TO STREET JUSTICE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition corrected and made safe for pedestrian |
2019-03-12 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate marked "PWI" along driving lane deflectin(bouncing)1-2" as traffic travels over it |
2019-03-12 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site working within steel plates . |
2019-03-12 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew is working on site. Roadway is clear for traffic. Flagmen provided. |
2019-03-12 | No data | 55 AVENUE, FROM STREET BEND TO STREET JUSTICE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary restoration in sidewalk below grade approx. 2'' posing a trip hazard to pedestrian |
2019-03-12 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 cobble stone cuts on roadway restored. |
2019-03-11 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill - PassCut #1: (L): 13ft (W): 8ft (D): 7ft - 96.8%; 96.2%Cut #2: (L): 8ft (W): 3ft 6in (D): 3ft - 97.4%Located in both P/L extending into D/L IFO 896.Base cutbacks made.Arrival: 10:40AMDeparture: 3:45PM |
2019-03-11 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 Steei plate defecting 2"as cars pass over plate |
2019-03-11 | No data | FULTON STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAS FAILED TO PROPERLY PLACE STEEL PLATING IN THE ROADWAY. STEEL PLATE IS RAISED 1'' 1/4 AND NOT FLUSH WITH THE SURROUNDING AREA. RESPONDENT WAS NOTIFIED ON NICA 20194610030 AND FAILED TO TAKE ACTION. PERMIT |
2019-03-09 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work seen over lapped by later work |
2019-03-08 | No data | 46 AVENUE, FROM STREET 202 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced. There is a builders pave over old work at time of inspection. Unable to fully inspect opp p/l due to ice and cars in the p/l. |
2019-03-08 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}16FT 11IN X {W}4FT 2IN X {D}11FT TEST 96.5 97.0 |
2019-03-08 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and roadway plated over excavation. Steel plates marked P N.Y.C. New permit on file. |
2019-03-08 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk and roadway plated over excavation. Steel plates marked P N.Y.C. |
2019-03-08 | No data | EAST 230 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | work started |
2019-03-08 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Near crosswalk of Platt, perm 2018 restoration within bike lane ( sprayed date 3.8.2019 ) cut is irregular in shape however permit is still active at this time. No CAR issued. |
2019-03-08 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Near crosswalk of Platt, perm 2018 restoration within bike lane ( sprayed date 3.8.2019 ) cut is irregular in shape however active permit M012019059A50 at this time. No CAR issued. |
2019-03-08 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY AND STEEL PLATED SIDE WALK CREW ON SITE AWAITING BACK FILL |
2019-03-08 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN THE ROADWAY AND SIDE WALK NEW PERMIT ON FILE |
2019-03-07 | No data | DEAN STREET, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in bike / parking lane |
2019-03-07 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012019056B95 |
2019-03-06 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:45A End: 12:45PCUT#1: L: 15FT. 6IN. W: 4FT. 0IN. D: 7FT. 0IN. - 97.2% & 96.1%CUT#2: L: 3FT. 10IN. W: 3FT. 6IN. D: 3FT. 2IN. - 96.8%Full trenching not done due to gas mains obstructing the excavation. |
2019-03-05 | No data | EAST 230 STREET, FROM STREET BARNES AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plumber steel plate countersunk, also raise plow signs posted |
2019-03-05 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | After performing research in the DASH database I observed the above respondent failed to submit an application for a regular permit within two business days of receiving an emergency permit number.. |
2019-03-05 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DUPLICATE |
2019-03-04 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | SPOKE WITH FOREMAN ABOUT MAINTAINING A CLEAR 5 FOOT WALK WAY ON THE SIDE WALK. AT THIS TIME CREW IS ON SITE EXCAVATING THE ROADWAY WITH SIGNS AND FLAGMAN POSTED. THERE IS A CLEAR 5 FOOT WALK WAY FOR PEDESTRIANS |
2019-03-04 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair (installation) for new property aka 601 Washington St. ongoing. Area plated with three still plates. Raise Plow sign posted. Acceptable. |
2019-03-04 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair ongoing. Raise Plow sign posted. 3 Steel Plates covering area. Please refer to active permit M012019053B45. Work acceptable. |
2019-03-02 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk and parking lane plated. |
2019-03-01 | No data | EASTHAMPTON BOULEVARD, FROM STREET 57 ROAD TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced, builders pave is covering old cuts at time of inspection. |
2019-03-01 | No data | 56 DRIVE, FROM STREET 58 PLACE TO STREET MELVINA PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in Basement went in to Verify. |
2019-02-28 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | most of plumber restoration paved over by Con Edison, only a 3' x 3' area in the roadway |
2019-02-28 | No data | COFFEY STREET, FROM STREET CONOVER STREET TO STREET FERRIS STREET | No data | Street Construction Inspections: Active | Department of Transportation | cobblestone roadway restored in kind. 2 cuts |
2019-02-28 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the sidewalk |
2019-02-28 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 8:15-4:00 Redig site. being relived my richard donato. crew ran into complications with tamper and running out of material. waiting on more material all info has been given to richie. |
2019-02-28 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No evidence of water-sewer work found IFO #11. Work not done, permit expired. |
2019-02-27 | No data | DR M L KING JR BOULEVARD, FROM STREET HALL OF FAME TERRACE TO STREET WEST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew is on site install water service |
2019-02-27 | No data | DR M L KING JR BOULEVARD, FROM STREET HALL OF FAME TERRACE TO STREET WEST 183 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - PROTECTED |
2019-02-26 | No data | 13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak..3 day notice |
2019-02-26 | No data | MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH ROADWAY DURING THE WINTER MORATORIUM PERIOD THAT COMMENCED ON DECEMBER 1, 2018 AND ENDS ON MARCH 31, 2019. A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2019-02-26 | No data | 10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2cut 3ft by 4ft down 2ft 11in 1cut 3ft by5ft down 2ft 11in |
2019-02-26 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Pending car in system car#20195180040 issued 2/14/19 |
2019-02-26 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm curb to curb trench. |
2019-02-25 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew was on site earlier pouring concrete, had to leave site due to a joint inspection - upon follow up crew is no longer on site and roadway is fully open... Cut is inside of active B.O. |
2019-02-25 | No data | MYRTLE AVENUE, FROM STREET BROADWAY TO STREET LEWIS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site open excavation in driving lane |
2019-02-25 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit renewed prior to expiration d1B project |
2019-02-24 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | countersunk steel plate okay |
2019-02-23 | No data | 124 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the parking lane |
2019-02-23 | No data | DASH PLACE, FROM STREET BEND TO STREET WEST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut was Resurfaced |
2019-02-22 | No data | GRAND STREET EXTENSION, FROM STREET SOUTH 1 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 7 feet 6 inches x (W) 4 feet x (D) 4 feet.. compaction of 97.3 and 97.0%.. monitored from 9:40am-11:10am.. |
2019-02-22 | No data | PRINCE STREET, FROM STREET 35 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not visible new sidewalk by builder. |
2019-02-22 | No data | DOWNING STREET, FROM STREET 31 ROAD TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag restored in kind. |
2019-02-21 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 STEEL PLATES COUNTERSUNK ON ROADWAY IN THE PARKING/DRIVING LANES |
2019-02-21 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH RESTORATION IN THE PARKING/DRIVING LANES |
2019-02-21 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water restoration |
2019-02-21 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | B012019049A12 active permit on file no work done |
2019-02-21 | No data | BROADWAY, FROM STREET DE KALB AVENUE TO STREET DODWORTH STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2019-02-21 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT ASPHALT IS BROKEN OUT IN THE DRIVING LANE |
2019-02-20 | No data | 48 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:40-12:30 L-10'4"x W-6'4"x D-10' Tests: 96.6%/96.9% Cut is located in the parking/driving lane I/F/O 1843 48th street. |
2019-02-20 | No data | NEVINS STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2019-02-20 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass2 Cut size:16 Feet by 4 Feet 2 inches Down 4 Feet 1 inches6 Feet 10 inches by 5 Feet 5 inches Down 4 Feet 1 incheslift – 96.1%;95.8;99.0;96.0WD – 129.0; DD – 120.0; Max D – 124.5 , AM – 7.5%AR: 11:40AM; DP: 2:55PM |
2019-02-19 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER. PLATES REMOVED. BINDER RESTORATIONS TO-GRADE . |
2019-02-19 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm flushed, updated permit on file |
2019-02-17 | No data | 160 STREET, FROM STREET 90 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on permit |
2019-02-17 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | The respodent failed to post raise plow signs ahead. The respondent is working on sewer. As per the DOT winter moratorium starting on 12/1/18 - 3/31/19. |
2019-02-17 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-02-17 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY |
2019-02-16 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK CURING ATOI |
2019-02-16 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160, perm 2018 trench. Newer 2018 Con Ed restoration in East curb and BUS lane has been painted red by DOT. |
2019-02-16 | No data | GREENE STREET, FROM STREET CANAL STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work started for water-sewer installation for #11 - new building. Permit expired. |
2019-02-16 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 6 Maiden Lane, perm trench within driving / parking lanes |
2019-02-15 | No data | WALWORTH STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2019-02-15 | No data | COURT STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts on r/w |
2019-02-15 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notice confirmed, long water both p/l and s/w excavated. Crew is backfilling using material that was dug up which is wet and putting back massive size rocks in the process, email sent to the borough |
2019-02-14 | No data | 100 STREET, FROM STREET 4 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASS3’3”L X 2’8”W X 3’DTEST: 98.7%DEPARTURE 4:25PM |
2019-02-14 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut sunken down 2in in the roadway |
2019-02-14 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cut on roadway . speed bump was resurfaced |
2019-02-14 | No data | 55 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS4’10”L X 2’10”W X 3’10”DTEST: 95.9% & 97.0%ARRIVAL 11:35AMDEPARTURE 1:30PM |
2019-02-14 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced |
2019-02-14 | No data | LEONARD STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation |
2019-02-13 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED EXCAVATION IN THE BUS PAD OPPOSITE PROPERTY NEW PERMIT ON FILE |
2019-02-13 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Pending CAR #20195710011 on file |
2019-02-13 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair/installation ongoing. Refer to active permit M012019039B02. NOV issued for not posting "Raise Plow" sign. |
2019-02-13 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to Raise Plow sign five feet prior to location of plates(2). NOV issued. |
2019-02-13 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONSECUTIVE PERMIT ON FILE |
2019-02-13 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 out of 2 " P NYC I " marked Steel Plates countersunk into the Roadway is not properly secured in the Roadway to prevent movements. Said Plate is giving movements and making noise when driven over by traffic in the Bus lane. |
2019-02-13 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I of 2 Steel Plates marked " P NYC I " with area which was previously collapsed repaired. Plate reset / countersunk into the Roadway. |
2019-02-12 | No data | 43 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service. Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2019-02-12 | No data | 195 STREET, FROM STREET 56 AVENUE TO STREET 58 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | domestic water leaking in grass area on 1'' copper line, 2 excavations to be made on roadway, 3 day notice issued from DEP. |
2019-02-12 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No repairs made; I found a 2'9" x 3" area collapsed and down 2' below the roadway surface next to one of 2 PNCYI marked Steel Plates countersunk into the Roadway, creating a dangerous condition for vehicular traffic in the driving lane.. |
2019-02-12 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Active | Department of Transportation | please remove Unused and Serving no purpose Water valve sleeve left on sidewalk causing a trip hazard for people walking on the sidewalk. |
2019-02-12 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration finalized under newer permit |
2019-02-12 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | renewed prior to expiration d1b project |
2019-02-11 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A 2'9" x 3" area collapsed and down 2' below the roadway surface next to one of 2 PNCYI marked Steel Plates countersunk into the Roadway, creating a dangerous condition for vehicular traffic in the driving lane. |
2019-02-11 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | atpo i observed the above respondent failed to properly place and countersink steel plate marked "P NYC I" in the bus lane. NICA was issued at 2:14 pm respondent failed to make repairs |
2019-02-11 | No data | 83 STREET, FROM STREET 159 AVENUE TO STREET 160 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 18' x 4' perm restoration in r/w |
2019-02-11 | No data | PRESIDENT STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | countersunk plate on r./w |
2019-02-11 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW COMPLETED BACKFILL INSTALLING BINDER NO CONCRETE WORK AT 92A |
2019-02-10 | No data | 182 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued on active permit #Q012019022G00. |
2019-02-10 | No data | 182 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Active | Department of Transportation | I observed the respondent failed to countersink 2 steel plates in the roadway during the winter moratorium that is in effect from December 1, 2018 through March 31, 2019. |
2019-02-10 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES ON ROADWAY DURING WINTER MORATORIUM(DECEMBER 1,2018 TO MARCH 31,2019)-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2019-02-09 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut restoration in the driving lane flush to grade. |
2019-02-09 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts |
2019-02-09 | No data | WASHINGTON STREET, FROM STREET LEROY STREET TO STREET MORTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK SEEN ACTIVE B.O |
2019-02-08 | No data | 51 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2019-02-08 | No data | 27 AVENUE, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete sidewalk restoration found to be in compliance |
2019-02-07 | No data | 182 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the respondent failed to countersink 2 steel plates in the roadway during the winter moratorium that is in effect from December 1, 2018 through March 31, 2019. |
2019-02-07 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | only in rd/w , s/w was taken over by sidewalk contractor. |
2019-02-07 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found. |
2019-02-07 | No data | ABERDEEN ROAD, FROM STREET KENT STREET TO STREET SURREY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, no 2016 work found due to major sewer work overlapping. |
2019-02-07 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w |
2019-02-07 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | countersunk plate on r/w. |
2019-02-07 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-02-06 | No data | 55 AVENUE, FROM STREET BEND TO STREET JUSTICE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on-site new active permit on file |
2019-02-06 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut needs to be re-sealed & color code marker needs to be re-applied |
2019-02-06 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5 day permit |
2019-02-06 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT ACROSS FROM 599 IN PARKING LANE AND WORK IS FINAL AND IN FAIR CONDITION |
2019-02-06 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-02-05 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plates in driving lane acceptable |
2019-02-05 | No data | CLARKSON AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2019-02-05 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH CURB TO CURB IN THE ROADWAY |
2019-02-05 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane flush with roadway. |
2019-02-05 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-02-04 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | Rocco's crew working on installing new sewer & water service at 90 amity st in sidewalk area(fence taken down) |
2019-02-04 | No data | GREENE AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | 2 OPEN EXCAVATIONS IN THE PARKING LANE AND TEMP TO GRADE CUT ON THE SIDE WALK CREW ON SITE AWAITING BACKFILL |
2019-02-04 | No data | GREENE AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OPEN EXCAVATION IN THE PARKING LANE NEW PERMIT ON FILE |
2019-02-04 | No data | JUSTICE AVENUE, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench lane marking restore |
2019-02-04 | No data | GREENE AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL RESCHEDULED DUE TO DEP HAVING WRONG TIME FOR INSPECTION. NEW TIME WILL BE 3PM |
2019-02-03 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The work was not done, permit has expired. |
2019-02-03 | No data | LINCOLN PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the dept. |
2019-02-02 | No data | GREENE AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plate on roadway .backfill scheduled for Monday. |
2019-02-01 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE PREPAIRING FOR BACK FILL |
2019-02-01 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}17FT X {W}4FT X {D}4FT 6IN TEST 97.5 97.1 CUT 2 {L}5FT 11IN X {W}5FT {D}4FT 6IN TEST 97.7 97.3 ARRIVED 940 LEFT 1240 |
2019-01-31 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATIONS IN THE ROADWAY STEEL PLATES ARE COUNTER SUNKEN |
2019-01-31 | No data | DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY |
2019-01-31 | No data | MIDDLETON STREET, FROM STREET THROOP AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work done |
2019-01-31 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [11/10/18]. |
2019-01-31 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to post “Steel Plates Ahead” or “Raise Plow” sign; failure to countersink plates flush with roadway |
2019-01-31 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2019-01-31 | No data | EAST 46 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active BO unable to see roadway . D1B |
2019-01-31 | No data | EAST 43 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2019-01-31 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Nov issued for the respondent having 2 steel plate which are countersunk to the level of the roadway in the bus and parking lane that is not skid- resistant. |
2019-01-30 | No data | EAST 39 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 DAY PERMIT |
2019-01-30 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the dept. |
2019-01-30 | No data | DR M L KING JR BOULEVARD, FROM STREET HALL OF FAME TERRACE TO STREET WEST 183 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - PROTECTED |
2019-01-30 | No data | 63 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [12/14/18]. |
2019-01-29 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT #1 LENGTH 3 FT 1 IN WIDTH 3 FT 6 IN DEPTH R FT 4 IN WET DENSITY 122.1DRY DENSITY 113.6MAX DRY DENSITY 120ACTUAL MOISTURE 7.5FIRST LIFT 97.3LAST LIFT 98.2 |
2019-01-29 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN THE ROADWAY |
2019-01-29 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench.. lane markings.. |
2019-01-29 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY PARTIALLY COVERED BYGAS TRENCH AND CON EDISON TRENCH |
2019-01-29 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [12/29/18]. |
2019-01-28 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-28 | No data | 18 AVENUE, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [11/14/18]. |
2019-01-28 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | countersunk steel plate on roadway. new valid permit on file. |
2019-01-28 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plate on r/w |
2019-01-28 | No data | OCEAN PARKWAY, FROM STREET AVENUE I TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [1/12/19]. |
2019-01-27 | No data | GRAHAM AVENUE, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-27 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Respondent failed to obtain a confirmation number from the dept. |
2019-01-26 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in the roadway marked "PWI" in front of 3206/08 Glenwood Road not countersink flush with the roadway as per the winter moratorium period. ID by permit #B012019003A09 valid until 1/30/2019 |
2019-01-25 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: LL14 | Department of Transportation | 9:30-1:45 Cut1: L-14'x W-5'x D-3'9" Tests: 96.5%/98.3% Cut2: L-9'x W-6'6"x D-4'4" Tests: 97.1%/98.4% long water cuts are located in the parking/driving lanes I/F/O 1570 60th street. |
2019-01-25 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2019-01-25 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, street cut ......perm .. |
2019-01-25 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [1/15/19]. |
2019-01-24 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Updated permit on file...D1B project. |
2019-01-24 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2019-01-24 | No data | SOUTH 1 STREET, FROM STREET GRAND STREET EXTENSION TO STREET HOOPER STREET | No data | Street Construction Inspections: Active | Department of Transportation | CALLED ROCCO TO AMEND PERMIT- STEEL PLATED STREET OPENING AT 352 SOUTH 1 STREET EXTENDS OUT INTO INTERSECTION OF GRAND STREET EXTENSION & SOUTH 1 STREET |
2019-01-24 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Respondent failed to obtain a confirmation number from the dept. |
2019-01-24 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street |
2019-01-24 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:00-10:30 Backfill has to be re-scheduled due to contractor/crew not showing up to backfill location. Most likely due to inclement weather. |
2019-01-24 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN THE ROADWAY {LONG WATER CUT} |
2019-01-24 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | PLATES AT THIS TIME OF INSPECTION ARE SECURE AND NOT LOOSE AND NOISY |
2019-01-23 | No data | 28 AVENUE, FROM STREET 214 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts perm |
2019-01-23 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Condition Previously Reported: 1 Out Of 2 Steel Plates Marked "PWI" Loose & Noisy In The Driving Lane I/F/O 3206 Glenwood Rd CAR#20195710011 Was Issued |
2019-01-23 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O 236 WEST 23 ST., •1 Countersunken, inadequately secured "CWS" steel plate at excavation in Bus Lane very loose & noisy when rolled upon by heavy vehicular traffic. |
2019-01-23 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found a permanent repair water sewer trench flushed to grade in the parking and driving lane. Also the trench was not seal. There is also a temporary restoration on the sidewalk around a water valve. |
2019-01-23 | No data | STAGG STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done in roadway by this permittee |
2019-01-23 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN PARKING LANE |
2019-01-23 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [1/5/19]. |
2019-01-23 | No data | VAN BRUNT STREET, FROM STREET BEARD STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm trenches on r/w |
2019-01-23 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on rw. |
2019-01-23 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water repair work ongoing. Two "PNYCI" marked plates present over cobble stones roadway area. This is for property AKA 601 Washington st. Photos taken. |
2019-01-22 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 Out Of 2 Steel Plates Marked "PWI" Loose & Noisy In The Driving Lane I/F/O 3206 Glenwood Rd |
2019-01-22 | No data | WEST 71 STREET, FROM STREET RIVERSIDE BOULEVARD TO STREET WEST END AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water leaking in basement due to frozen broken pipe.. DEP 3-Day notice confirmed.. Excavation in the Parking Lane within a B.O.'s barricades... I/F/O 146 |
2019-01-22 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W resurfaced (PBP). |
2019-01-22 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Tech on location, Material(CLEAN FILL)passed. Wet Density: 125.1, Dry Density: 116.3, Max Dry Density: 122.5, Actual Moisture: 7.5%. Condition is 1st. 9'10"X4'6"X4'6" deep, 2nd. 5'9"X4'X4' deep, 4 lifts 4 tests 96.8, 96.2, 96.1, 96.5 |
2019-01-22 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Nov issued for the respondent having a steel plate marked CWS which is countersink to the level of the roadway in the bus lane that is not skid- resistant. |
2019-01-22 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the time of inspection, I found a steel plate marked CWS which is countersink in the bus lane and there is also a raise plow sign posted. There is a temporary restoration located on the sidewalk which is flushed to grade. |
2019-01-21 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair cut IFO 108 Leonard st acceptable. Cut falls between barricaded south parking lane and adjacent driving lane. ID marker confirmed plumber's cut. |
2019-01-21 | No data | LAFAYETTE AVENUE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2019-01-18 | No data | WYTHE AVENUE, FROM STREET NORTH 12 STREET TO STREET NORTH 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r.w |
2019-01-17 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed and sealed in the DL. |
2019-01-17 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway pass. |
2019-01-17 | No data | OCEAN PARKWAY, FROM STREET AVENUE I TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill re-scheduled due to material not showing up on site. 30 minute grace period is over. |
2019-01-17 | No data | 55 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notice confirmed, p/l & s/w excavated |
2019-01-16 | No data | HERZL STREET, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | 3 day notice confirmed, p/l being excavated |
2019-01-16 | No data | 19 AVENUE, FROM STREET 74 STREET TO STREET BAY RIDGE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No sewer repair found at location |
2019-01-16 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fail to install expansion joint at the curb |
2019-01-15 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Complaint | Department of Transportation | Countersunk steel plate, in the driving lane, is loose and noisy. In front of 1560 60 Street between 16 Avenue and LIRR BAY RIDGE DIV (AKA 15 Avenue). |
2019-01-15 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation on the roadway marked P NYC. Respondent failed to countersink plates flush to the level of the roadway. As per the department's annual winter moratorium period which commence December 1,2018 to March 31,2019. ID by above permit |
2019-01-15 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR(HALLEN)FAILED TO COUNTERSINK STEEL PLATES ON ROADWAY DURING WINTER MORATORIUM(DECEMBER 1,2018 TO MARCH 31,2019)-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2019-01-15 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2019-01-15 | No data | AMITY STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew working in sidewalk install water & sewer- roadway steel plated |
2019-01-14 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water-sewer installation for new building aka 601 Washington st. not started. |
2019-01-14 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water-sewer new service installation for new building aka 601 Washington st not done, permit expired. New active permit M012019011B46 on file. |
2019-01-13 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade in the parking and driving lane, new concrete sidewalk flag flush and sealed |
2019-01-13 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I found respondent failed to adhere to the terms and conditions of the D.O.T. permit. Respondent failed to maintain three 11' lanes for traffic. Therefore respondent is in violation of stip ID# 025 "maintain three 11' lanes." |
2019-01-12 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEWR PERMIT ON FILE |
2019-01-12 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATES RAMPED AND NO SIGN TO RAISE PLOW ACROSS FROM 2266 PACIFIC STREET |
2019-01-10 | No data | EAST 12 STREET, FROM STREET BEVERLY ROAD TO STREET SLOCUM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in the roadway |
2019-01-10 | No data | JUSTICE AVENUE, FROM STREET 54 AVENUE TO STREET 55 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at time of inspection, permit expired |
2019-01-10 | No data | 83 STREET, FROM STREET 159 AVENUE TO STREET 160 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut to grade |
2019-01-10 | No data | DOUGHTY STREET, FROM STREET BEND TO STREET ELIZABETH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY & NEW SWK FLAG |
2019-01-09 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - REPAIR WATER -PERM ROADWAY |
2019-01-09 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT. opp #213 |
2019-01-09 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects to report. |
2019-01-09 | No data | 44 ROAD, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER-PERM RESTORATION NEAR 23 ST. PART OF RESTORATION VISIBILITY BLOCKED BY CONSTRUCTION FENCE. |
2019-01-08 | No data | MONTROSE AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATE FLUSH WITH ROADWAY DURING WINTER MORATORIUM POLICY WHICH COMMENCED FROM 12/1/18-3/31/19. |
2019-01-07 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2019-01-07 | No data | 51 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Steel plates countersunk in the roadway (raise plow sign posted). New permit on file, B012019004C02 exp. 2/1/2019. |
2019-01-07 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O 236 WEST 23 ST.,•1 Countersunken, inadequately secured "PNYCI" steel plate at excavation in roadway very loose & noisy when rolled upon by vehicular traffic. |
2019-01-06 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking/driving lane, in front of 1333 56 Street. New permit on file, B012018360D53 exp. 1/7/2019. |
2019-01-06 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a steel plate countersunk into the roadway but failed to post "Steel Plates Ahead" or "Raise Plow" signs. Permit, #B012018361D79 exp. 1/12/2019, used for ID. |
2019-01-06 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO VISIBLE WORK DONE |
2019-01-06 | No data | 50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving lane has a (3ft. x 3ft.) area in which the asphalt is broken/cracked out and down 3 inches. Area needs to be restored to grade.Located in front of 1549 50 Street between 15 Avenue and 16 Avenue. |
2019-01-06 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At the time of inspection, I found the permittee on site excavating in the bus lane to prepare for a new water connection. Also there is no excavation made on the sidewalk. |
2019-01-05 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, new water ...svc ,,,.... |
2019-01-05 | No data | WEST 17 STREET, FROM STREET MERMAID AVENUE TO STREET SURF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2019-01-05 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK FOUND ON SIDEWALK NEW FLAGS AND JOINTS SEALED |
2019-01-05 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 16’x7’ Permanent asphalt restoration, Restoration needs to be re-sealed |
2019-01-05 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, water sprinkler svc......installs .... |
2019-01-04 | No data | MERCER STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut acceptable |
2019-01-04 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o I observed the above respondent with a plated excavation on the roadway without a valid NYC DOT permit on file, the Permittee was identified by a previously issued permit. permit # B012018325D44 exp 12/31/2018 |
2019-01-04 | No data | EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway need to be sealed please send out repair crew to seal trench |
2019-01-04 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | wrong location |
2019-01-03 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on roadway, restore double yellow line. |
2019-01-03 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on r/w new permit on file |
2019-01-03 | No data | WEST 30 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are 2 of 3 temporary water and sewer cuts in the driving lane that is overdue for a final restoration. Also the permanent color coding marker needs to be reinstated on the permanent restoration. |
2019-01-02 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore lane markings over permanent restoration, on the roadway.In front of 3602 14 Avenue between 36 Street and 37 Street. 50 feet from 36 Street. |
2019-01-02 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O The above respondent having a steel plate in roadway over a water cut. Upon Inspection no valid DOT permit was found for such plate. permittee id by Markings on plate "PNYC INC. |
2019-01-02 | No data | CLIFTON PLACE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(3’)W(3’)D(3’)TEST#1=97.2Backfill pass saw cuts done |
2019-01-02 | No data | CLIFTON PLACE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2019-01-02 | No data | 14 STREET, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work in p/l |
2019-01-01 | No data | DE KALB AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W OKAY |
2018-12-31 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance |
2018-12-31 | No data | CLASSON AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved by contractor, no visble cuts |
2018-12-31 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in compliance no defects |
2018-12-31 | No data | 83 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den- 117.0, Dry-Den-107.6, Max. Dry-Den-110.5, Act. Moist-8.7, Material-Sand, Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Andrea, Compaction Results- (97.0, 97.5) |
2018-12-30 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a steel plate countersunk into the roadway and failed to post "Steel Plates Ahead" or "Raise Plow" signs, during the DOT Winter Moratorium (12/1/2018 - 3/31/2019). Permit, #B012018353D18 exp. 1/5/2019, used for ID. |
2018-12-30 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 permanent restorations in the parking/driving and a countersunk steel plate in the driving lane. In front of 1555 - 1575 61 Street. New permit on file, B012018353D18 exp. 1/5/2019. |
2018-12-28 | No data | PULASKI STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH ROADWAY DURING THE WINTER MORATORIUM PERIOD THAT COMMENCED ON DECEMBER 1, 2018 AND ENDS ON MARCH 31, 2019. A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. DOT |
2018-12-27 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT HAS BEEN COVERED BY BBP FOR PROPERTY |
2018-12-27 | No data | WEST 60 STREET, FROM STREET BROADWAY TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | active permit for sewer repair on file no work started yet |
2018-12-27 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water-sewer work not started for 601 Washington street. Pre-ID photos taken. |
2018-12-26 | No data | MADISON STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two s/w flags repaired in kind i/f/o 16-81 |
2018-12-26 | No data | ATLANTIC AVENUE, FROM STREET BEACH 40 STREET TO STREET BEACH 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY & SIDEWALK WAS RECENTLY DONE. |
2018-12-26 | No data | DOUGLASS STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2018-12-26 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pin holes not plugged around perm trench across r/w. |
2018-12-26 | No data | CYPRESS AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water cut perm to grade i/f/o 788 |
2018-12-24 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | MISSING LANE MARKINGS FOR BIKE |
2018-12-23 | No data | WEST 23 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done, permit has expired. |
2018-12-22 | No data | EASTHAMPTON BOULEVARD, FROM STREET 57 ROAD TO STREET 58 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer Permit on fIle |
2018-12-21 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | street openings , remain plated ... |
2018-12-19 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway plated counter sunk. Current permit M012018347B82 on file |
2018-12-19 | No data | NEPTUNE AVENUE, FROM STREET WEST 5 STREET TO STREET WEST 6 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew is on site working on building property signs have been posted stips in compliance |
2018-12-19 | No data | 21 AVENUE, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Patch work on sidewalk is not acceptable. Full flag restoration is required. Also expansion joint must be installed between curb and sidewalk flag |
2018-12-19 | No data | LEONARD STREET, FROM STREET BENSON PLACE TO STREET LAFAYETTE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway acceptable |
2018-12-18 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-12-18 | No data | WEST 132 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please seal sidewalk expansion joints and repair concrete sidewalk boot imprints on sidewalk causing trip hazard. please make concrete sidewalk flush. |
2018-12-18 | No data | DITMARS BOULEVARD, FROM STREET GCP EASTBOUND EXIT 6 TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please reseal permanent cut joints in roadway. |
2018-12-18 | No data | BAY RIDGE PARKWAY, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber cut partially overlapped by a B.U.G cut |
2018-12-17 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now plated ...new permit obtained ...installing water |
2018-12-17 | No data | GREENE AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r.w has been resurfaced |
2018-12-16 | No data | PARK AVENUE, FROM STREET DELMONICO PLACE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok |
2018-12-15 | No data | WOODRUFF AVENUE, FROM STREET CLARKSON AVENUE TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the roadway |
2018-12-15 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2018-12-14 | No data | HENRY STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RWY AND SWK RESURFACED AT 70 |
2018-12-14 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 12 FEET X (w) 4 FEET X (d) 5 FEET..COMPACTION OF 96.7 AND 97.7%(L) 4 FEET X (w) 4 FEET X (d) 4 FEET...COMPACTION OF 96.6 AND 97.7% |
2018-12-14 | No data | 95 STREET, FROM STREET 162 AVENUE TO STREET 163 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | half of perm cut to grade in the r/w. half of cut being covered by builders pave. |
2018-12-14 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on the roadway |
2018-12-14 | No data | 77 STREET, FROM STREET BROADWAY TO STREET WOODSIDE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the r/w |
2018-12-13 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file countersunk plate ok |
2018-12-13 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 108 Leonard, 1 perm water cut in crosswalk does not meet Standard detail drawing H-1042A note 6, missing crosswalk lane markings and IBM pavement marker. Also 2 perm water cuts do not meet H-1042A note 9. ( 3 cuts in total ) |
2018-12-13 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | all plates reset, water as well as sprinkler svc .....being installed , plates counter sunk.... |
2018-12-12 | No data | EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway need to restore lane markings new permit on file B022018331C14 |
2018-12-12 | No data | EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | permanent trench in roadway need lane markings |
2018-12-12 | No data | EAST 21 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2018-12-12 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | stip on permit |
2018-12-12 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-12-12 | No data | READE STREET, FROM STREET BROADWAY TO STREET ELK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 29 ( oppo 22 ), perm 2016 restoration in driving lane extending under concrete barriers for active B/O. |
2018-12-11 | No data | 58 AVENUE, FROM STREET 230 STREET TO STREET EASTHAMPTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 13x8 area along 25 ft sewer cut in driving lane overdue( binder ) along with sidewalk . |
2018-12-11 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plate on roadway |
2018-12-11 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plate on roadway new permit on file B012018325D44 |
2018-12-11 | No data | CLARENDON ROAD, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER CUT IN THE ROADWAY |
2018-12-11 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2CUTS IN ROADWAY LONG WATER CUT 1: 11FT BY 3FT DOWN 4FT 5INCHS CUT 2: 5FT 4INCHS BY 3FT DOWN 4FT 5INCHS LIFTS CUT 1:(96.0 -96.8) CUT 2:(96.8-97.0) AND CUTS BACKS MARKED AND DONE |
2018-12-11 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm work on roadway |
2018-12-11 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk joint not seal |
2018-12-11 | No data | WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work seen at time of inspection , No valid permit on file . |
2018-12-10 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Crew is currently working on location. Foreman is aware of the NICA and will be working to get the plates secure by restoring the asphalt around the excavation. |
2018-12-09 | No data | 44 ROAD, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-BUILDING OPERATION BLOCKING MAJORITY OF VISIBILITY OF THE ROADWAY. |
2018-12-09 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATE FLUSH WITH ROADWAY DURING WINTER MORATORIUM POLICY 12/1/18-3/31/19. |
2018-12-09 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATES FLUSH WITH ROADWAY DURING THE WINTER MORATORIUM PERIOD THAT COMMENCED ON DECEMBER 1, 2018 AND ENDS ON MARCH 31, 2019. A VIOLATION OF THE ABOVE |
2018-12-09 | No data | 18 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Trench & Sidewalk Flag in Compliance |
2018-12-09 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | area around steel plate is broken/cracked. area needs to be made safe for vehicles to travel over located in front of 970 gates ave. |
2018-12-08 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w restored full view not available due to active construction |
2018-12-08 | No data | VAN BRUNT STREET, FROM STREET BEARD STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Active | Department of Transportation | plate over cut ok |
2018-12-08 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160, perm 2018 water trench in driving lane to bus lane ( painted RED by DOT ) and portion of trench worked over by newer 2018 Con Ed Gas work. |
2018-12-08 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied. Restoration should be squared off. T shaped restoration not acceptable. At a minimum the northern most portion of the restoration should have been restored from the outermost point saw cut straight to the curb. |
2018-12-07 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w cut ok |
2018-12-07 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY RESTORATION MADE FINAL |
2018-12-07 | No data | STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD FAILED TO RAMP THE PEDESTRIAN WALKWAY AT ENTRY. A VIOLATION TO THE TERMS & CONDITIONS OF STIPULATION 014 OF ABOVE DOT PERMIT WHICH WAS USED FOR ID |
2018-12-07 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM RESTORATION IN THE ROADWAY |
2018-12-07 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, install sewer, ...crew on location,.... |
2018-12-06 | No data | EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass2 Cut size:14 Feet 2 inches by 5 Feet Down 4 Feet 2 inches 6 Feet 2 inches by 5 Feet Down 4 Feet 10 incheslift – 97.0%;97.9,96.0;96.6WD – 133.5; DD – 121.5; Max D – 124.0 , AM – 9.9%AR: 11:30AM; DP: 2:25PM |
2018-12-05 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please seal expansion joints in front of |
2018-12-05 | No data | CLAVER PLACE, FROM STREET FULTON STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED BY DOT IN-HOUSE PAVING |
2018-12-05 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in sidewalk. in compliance |
2018-12-05 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found M012018316A16 |
2018-12-04 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: LL14 | Department of Transportation | At-Den-123.0, Dry-Den-111.9, Max. Dry-Den-116.0, Act. Moist-9.9, Material- Clean fill(Blend), Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Denise, Compaction Results- (98.1, 97.7) |
2018-12-04 | No data | 28 AVENUE, FROM STREET 214 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut partial cut paved over |
2018-12-04 | No data | COLLEGE POINT BOULEVARD, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm to grade |
2018-12-04 | No data | WEST 5 STREET, FROM STREET NEPTUNE AVENUE TO STREET WEST AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERMIT TO BE AMENDED DUE TO WRONG SEGMENT WORK LOCATION IS WEST 5TH ST BETWEEN NEPTUNE AVE & WEST BRIGHTON AVE. THE DREW ON SITE COUNTER SINKING THE [PLATE AND LEAVING THE LOCATION. |
2018-12-04 | No data | WASHINGTON AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY- IN-COMPLIANCE |
2018-12-04 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: LL14 | Department of Transportation | contr: plumbing nycsup: silveriocomp dev: j jack-lab comp: exclusive lab tech: abletest dev: s conecut size: 13'x4' d 5' 4" material clean filllift 98.8-96.4comments:crew mentioned about doing cut back however i did not witness |
2018-12-03 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | rw resurfaced |
2018-12-03 | No data | EAST 74 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L |
2018-12-02 | No data | HOOPER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH. |
2018-12-01 | No data | 84 ROAD, FROM STREET LANDER STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2018-12-01 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temp water cuts in the roadway |
2018-12-01 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed prior to expiration date- d1b project |
2018-12-01 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTER SINK STEEL PLATED IN ROADWAY OVER EXCAVATION DURING WINTER MORATORIUM MONTHS. |
2018-11-30 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent with a permanent WATER repair, with Wearing Course not Flush with surrounding area. Permittee was issued CAR#20185910161, on 4/20/2018, to correct condition, but failed to do so |
2018-11-30 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sealed |
2018-11-30 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | no excavator stored |
2018-11-29 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued |
2018-11-29 | No data | PROSPECT PLACE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | please remove cold patch bags full and empty and wood from sidewalk |
2018-11-29 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest denied and now repaired. The permit expired on 11/3/2018 before the embargo commenced on 11/14/2018. The holes have been repaired for now. CAR is closed. |
2018-11-29 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(10’)W(6’)D(9')TEST#1=9TEST#2=9CUT#1=L(7’)W(6’)D(4')TEST#1=9TEST#2=Backfill passSaw cuts done2 different materials |
2018-11-29 | No data | CHURCH AVENUE, FROM STREET VERONICA PLACE TO STREET WOODS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration on roadway |
2018-11-29 | No data | LORIMER STREET, FROM STREET CONSELYEA STREET TO STREET METROPOLITAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2018-11-28 | No data | 17 AVENUE, FROM STREET 76 STREET TO STREET 77 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Original flag - no sawcut sign observed - |
2018-11-28 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION HAS BEEN BROUGHT FLUSH TO GRADE WITH SURROUNDING ASPHALT. |
2018-11-28 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING RESTORED |
2018-11-28 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A.T.P.O. The respondent failed to restore white pedestrian crosswalk marking on their plumbers cut made final. CORRECTIVE ACTION REQUEST issued 4.4.18-CAR #20185860190 |
2018-11-28 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cutback done 00099 color marker present |
2018-11-28 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane Markings in the Roadway were Restored |
2018-11-28 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut on r/w has been sealed |
2018-11-28 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION HAS BEEN RE-PAVED AND FLUSH TO GRADE WITH SURROUNDING ASPHALT. |
2018-11-27 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION OK |
2018-11-27 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMANENT RESTORATION HAS BEEN BROUGHT FLUSH TO GRADE WITH SURROUNDING ASPHALT. |
2018-11-27 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore lane marking in kind after final restoration. Respondent was notified to make correction via (CAR #20185270267) on 3/26/18 and failed to do so. |
2018-11-27 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has fail to replace this white lane marking, as per CAR# 21083690108 dated 6/18/2018. |
2018-11-26 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION HAS BEEN MADE PERM TO GRADE WITH SURROUNDING ASPHALT. |
2018-11-26 | No data | NEWKIRK AVENUE, FROM STREET EAST 26 STREET TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working. |
2018-11-26 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | This is a gas cut not a water cutThis is on the opposite side of the water main |
2018-11-25 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At the time of inspection, I found the street opening joints on a permanent repair water cut which located in the driving lane sealed. |
2018-11-24 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I found respondent failed to restore two permanent ( Water-sewer) restoration in the roadway measuring 6' apart into one continuous restoration as per H-1042D Note #9. respondent was previously notified to correct the condition by via (CAR #2018 |
2018-11-23 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street found resurfaced. |
2018-11-23 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | inspected expired permit |
2018-11-23 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit found M012018311A81 |
2018-11-21 | No data | VERNON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut okay |
2018-11-20 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 7/31/2018. |
2018-11-20 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 7/28/2018. |
2018-11-20 | No data | ANDROVETTE AVENUE, FROM STREET DEISIUS STREET TO STREET EYLANDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm rwy |
2018-11-20 | No data | PARK AVENUE, FROM STREET BROADWAY TO STREET MARCUS GARVEY BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, .. |
2018-11-19 | No data | EAST 3 STREET, FROM STREET AVENUE J TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | a-9:20amcut-12'x4'x11' test- 97.1 & 983juanjumping jackexclusive testingdenisesand coneblendw-122.7d-111.7md-115.5am-9.9%backfill passes |
2018-11-19 | No data | 55 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 10ft 4in x 4ft 5in x 10ft Pass: 96.5% 96.8% |
2018-11-18 | No data | LINCOLN PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/22/2018. |
2018-11-18 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET MERCER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2018-11-17 | No data | PLATT STREET, FROM STREET GOLD STREET TO STREET PEARL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work observed in front of 2 |
2018-11-17 | No data | GLENWOOD ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY |
2018-11-17 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. |
2018-11-16 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/29/2018. |
2018-11-15 | No data | GREENE AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/17/2018. |
2018-11-15 | No data | LAFAYETTE STREET, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O aka 108 Leonard, NOV issued for a PNYCI marked steel plate fastened to the roadway with no active NYC DOT permit on file for use / opening of the street. |
2018-11-15 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN ROADWAY |
2018-11-15 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER |
2018-11-15 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Contractor has 410 stip. |
2018-11-14 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill will be rescheduled for later as per office |
2018-11-14 | No data | EAST 4 STREET, FROM STREET 18 AVENUE TO STREET AVENUE F | No data | Street Construction Inspections: Active | Department of Transportation | Temporary pedestrian walk on the street AKA 4030-4034 18 avenue |
2018-11-14 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/23/2018. |
2018-11-13 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in sidewalk in compliance |
2018-11-13 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in sidewalk in compliance |
2018-11-13 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated permit M012018311A81 |
2018-11-13 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | restoration in parking lane made final. active status no action taken |
2018-11-13 | No data | NEWKIRK AVENUE, FROM STREET EAST 26 STREET TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway. |
2018-11-13 | No data | HOPE STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/17/2018. |
2018-11-11 | No data | 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired [8/11/18]. |
2018-11-11 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [10/10/18]. |
2018-11-10 | No data | HANCOCK STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations to grade i/f/o active B/O |
2018-11-09 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Re-inspection - Mr. Spiegel's request - perm. cut to grade p/d/l at this time. |
2018-11-09 | No data | WEST 113 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | The respondent has opened the roadway and created an excavation for the purpose of working with the buildings water connection without a valid NYC DOT permit to do so. permit #M012018303B47 handed to me by foreman on site and used as I.D. |
2018-11-08 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass D1B project. |
2018-11-08 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Mr. Spiegel's request - work in progress,crew on site. |
2018-11-08 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The above respondent has backfilled an opening on a protected street but failed to obtain a confirmation # at least two hours prior to the commencement of the backfill. Permit expired 8/1/2018. Failed to obtain a confirmation # from the department. |
2018-11-08 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm in parking lane of 57 acceptable |
2018-11-08 | No data | LORIMER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration driving lane |
2018-11-08 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass D1B project. |
2018-11-08 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | a-9:18amcut-4'x4'x4' test- 95.9 & 98.6plumbing worksjosejumping jackexclusive testing labkevinsand conew-110.4d-104.9md-109.5am-5.3%backfill passes |
2018-11-08 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-11-08 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B ISSUED. |
2018-11-07 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1- Please fill and seal all pin holes.2- Perm water cut not in compliance with 1042D specifications as per note#3. Cut is not saw cut straight and not properly squared off. |
2018-11-07 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued. |
2018-11-07 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | a-10:30amcut- 8'x8'x9' test-96.4 & 97cut2- 3'x3'x 2' test-96.7plumbing worksangeljumping jackexclusive testing lababelsand conecleanfillw-123.6d-114.9md-116am-7.5 |
2018-11-04 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | installing new water/sprinkler svc combine....active permit.. |
2018-11-04 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sprinkler svc connection ..now plated as well as temped to grade ....new permit obtained |
2018-11-01 | No data | 215 STREET, FROM STREET 40 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site ,,, sewer |
2018-11-01 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#M012018292C21 |
2018-11-01 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurf, BPP |
2018-11-01 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration almost covered found by new building half +5 |
2018-11-01 | No data | 215 STREET, FROM STREET 40 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit issued sewer cut rd/w open |
2018-10-31 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pinned and ramped steel plate in the parking/driving lane. In front of 1333 56 Street. |
2018-10-31 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water acceptable |
2018-10-31 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK |
2018-10-31 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY |
2018-10-31 | No data | KNICKERBOCKER AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and swk ok. |
2018-10-31 | No data | MC DONALD AVENUE, FROM STREET 24 AVENUE TO STREET RYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2018-10-31 | No data | 8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The Solid white lane marking needs to be restored over one of the water cuts and the other needs to be sealed along the W/S of the cut. Once sealed restore the lane marking over that cut also... I/F/O 401 |
2018-10-31 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET MERCER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced, cut not visible. Sidewalk in compliance. No defects. |
2018-10-31 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found on given segment. The work location may be for on 48 Ave. btwn. 210 St. & 211 St. Also permittee has new active permit # Q012018303D03 . |
2018-10-31 | No data | EAST 14 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DDC project in progress |
2018-10-30 | No data | EAST 7 STREET, FROM STREET CATON AVENUE TO STREET FRIEL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench d/l |
2018-10-29 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut okay |
2018-10-29 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP resurfaced. |
2018-10-27 | No data | EAST 11 STREET, FROM STREET AVENUE X TO STREET AVENUE Y | No data | Street Construction Inspections: Active | Department of Transportation | Pedestrian walkway not provided on roadway at this time, clear and unobstructed |
2018-10-27 | No data | JAMAICA AVENUE, FROM STREET 160 STREET TO STREET 161 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Clear roadway at time of inspection |
2018-10-26 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w open to Pedestrian traffic at time of inspection |
2018-10-25 | No data | 54 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | At time of inspection, I observed a (Plumbing NYC, INC) crew working on site. The roadway and sidewalk is entirely opened for vehicles and pedestrians. Respondent is in compliance with stipulation 013 and 023. NYC DEP is also on site. |
2018-10-25 | No data | DITMARS BOULEVARD, FROM STREET 23 ROAD TO STREET 102 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cuts on P/D/L |
2018-10-24 | No data | 149 STREET, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations restored in kind i/f/o both 42-29 and 42-31 |
2018-10-24 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Binder used as a final restoration. Replace with wearing course. |
2018-10-24 | No data | EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite 323 perm restoration flushed to grade in the driving lane. |
2018-10-23 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced |
2018-10-23 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please restore all white lane markings that divide travel lane from parking lane ON 2 PLUMBERS CUTS ON ROADWAY |
2018-10-23 | No data | COSTER STREET, FROM STREET RYAWA AVENUE TO STREET VIELE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane of roadway. |
2018-10-22 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/wlane markings put down |
2018-10-22 | No data | EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP , street resurfaced |
2018-10-22 | No data | WALWORTH STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of the sidewalk in compliance at time of inspection |
2018-10-22 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COVERED BY NEW BUILDING HALF +5 |
2018-10-20 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160, perm 2018 restoration curb to curb and SCE crew performing Gas work over portion of Water trench. |
2018-10-20 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2018-10-20 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done at 210-02 to 210-10 48 avenue, permanent restorations water and sewer in good condition color coded and sealed |
2018-10-20 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP, street resurfaced |
2018-10-20 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Part of Roadway was Resurfaced, No work Found on the Existing Sidewalk |
2018-10-20 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 6 Maiden Lane, perm 2018 restoration to South Curb within driving / parking lanes. |
2018-10-20 | No data | WINDSOR PLACE, FROM STREET FULLER PLACE TO STREET HOWARD PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE |
2018-10-19 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASED {L}4FT 10IN X {W}4FT 6IN X {D}3FT 6IN TEST 97.5 BASE SAW CUT BACKS ARE BEING DONE ARRIVED AT 930 FINISHED 1130. STAYING FOR BASE. |
2018-10-19 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, repair water .....new building rehab . |
2018-10-19 | No data | 20 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permittee on site workingpermittee fixed tap valve that D.E.P inspector broke |
2018-10-19 | No data | LAFAYETTE AVENUE, FROM STREET CLASSON AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w. |
2018-10-19 | No data | MANHATTAN AVENUE, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED EXCAVATION IN THE PARKING LANE AND STEEL PLATED SIDE WALK CREW ON SITE AWAITING BACK FILL |
2018-10-18 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN RWY BY HENRY ST |
2018-10-17 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaved 2017 |
2018-10-17 | No data | 34 AVENUE, FROM STREET LEAVITT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced, roadway milled for repave, temp s/w flag around water valve ifo active B.O. |
2018-10-17 | No data | 54 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, there is no backhoe placed on the street. |
2018-10-17 | No data | WEST 30 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Overdue for Final Water Cuts I/F/O 302 |
2018-10-17 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate on the roadway was properly and completely ramped around all 4 sides. Steel plate is also pinned into the roadway, to prevent movement. In front of 1572 61 Street between 16 Avenue and 15 Avenue (BEND). |
2018-10-17 | No data | SKILLMAN AVENUE, FROM STREET 40 STREET TO STREET 41 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | REPAIR WATER-PERM SIDEWALK EXPANSION JOINT SEALED |
2018-10-17 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 6 Steel plated excavation on the roadway with 1 steel plate marking "pnyc" with corner edge of plate raise 2"off roadway surface and bouncing as cars roll over plate. IFO 570 |
2018-10-16 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW PERM RESTORATION IN RWY, NEW SWK FLAGS |
2018-10-16 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2018-10-16 | No data | 64 AVENUE, FROM STREET 220 STREET TO STREET SPRINGFIELD BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill complete and acceptable |
2018-10-16 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp cut okay |
2018-10-15 | No data | 52 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH RESTORATION IN PARKING/DRIVING LANE |
2018-10-15 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | clear |
2018-10-15 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent/ respondent's sub-contractor working in an open excavation without a valid DOT permit on file to do so. Permittee ID by expired DOT permit#B012018249C43 Exp.10/4/18 |
2018-10-14 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent to grade cut in driving/parking lane. (opposite side of address.) |
2018-10-14 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO respondent failed to comply with the standard details of #H-1042D cutbacks on non protected roadways , a (CAR #20185440121) was issued on 6/25/18. |
2018-10-14 | No data | WEST 24 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The wearing course street opening joints needs to be sealed at the edge of the cut with a liquid asphaltic cement to prevent water seepage. opp 157. |
2018-10-13 | No data | GREENE AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done under paved area of roadway at time of my inspection . |
2018-10-12 | No data | EAST 4 STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-10-12 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please re-seal the permanent water cut, street joints are exposed. |
2018-10-12 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT, P/L. NEXT TO D/WAY ENTRANCE |
2018-10-12 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway plated in front of building operation. New application submitted |
2018-10-11 | No data | ELIZABETH STREET, FROM STREET BLEECKER STREET TO STREET EAST HOUSTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no TEMPORARY PEDESTRIAN WALK |
2018-10-10 | No data | WEST 13 STREET, FROM STREET AVENUE Z TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-10-10 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done temp to grade r/w |
2018-10-10 | No data | 57 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 9:35am Departure: 12:35pmCut #1: 10' x 4' x 10'Cut #2: 4' x 5' x 4'Compaction: 97.4%, 96.9% 96.5%, 97.0%Wet: 121.5, Dry: 113.0, Max: 116.5, Moisture: 7.5% |
2018-10-10 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street milled |
2018-10-09 | No data | LAFAYETTE STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work behind active B.O |
2018-10-09 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (27ft. x 18ft.) permanent restoration in the parking/driving lane and sidewalk. |
2018-10-08 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway |
2018-10-07 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore the base between 2 water cuts, I/F/O 842... (CAR Re-inspection FAIL) |
2018-10-07 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration in Compliance |
2018-10-07 | No data | 79 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Cut in Compliance |
2018-10-07 | No data | 71 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cuts in Compliance |
2018-10-07 | No data | WEST 30 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Overdue for Final Water Cuts I/F/O 302 |
2018-10-07 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued to the respondent for failing to restore concrete panels in kind. |
2018-10-06 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: LL14 | Department of Transportation | I/F/O 439 ( aka 435 New Building ), new sewer trench with multiple conduits ( gas, electric & fiber ) throughout cut. Work on sidewalk as well near light pole. Base saw cut and void addressed. |
2018-10-06 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 160, dashed lane markings have been restored in KIND and concrete bus pad has been painted RED. |
2018-10-06 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 6'x4' portion of perm trench across roadway sunken 21/2'' IFO 210-12(CONDITION REPAIRED) |
2018-10-06 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | expansion joints sealed |
2018-10-06 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work there |
2018-10-03 | No data | 50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pinned and ramped steel plate in the parking/driving lane, in front of 1549 50 Street. |
2018-10-03 | No data | 50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pinned and ramped steel plate in the parking/driving lane, in front of 1549 50 Street. New permit on file, B012018269D58 exp. 10/23/2018. |
2018-10-03 | No data | LEGION STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file |
2018-10-03 | No data | 161 STREET, FROM STREET LABURNUM AVENUE TO STREET OAK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Resurfaced |
2018-10-03 | No data | STANWIX STREET, FROM STREET FLUSHING AVENUE TO STREET MONTIETH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done work done on flushing |
2018-10-03 | No data | 52 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking/driving lane, in front of 1327 52 Street. |
2018-10-02 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection crew was on site for emergency work steel plates shifted and street sinking |
2018-10-01 | No data | 230 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | MADE FINAL |
2018-10-01 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plataed cut in r/w |
2018-09-30 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There are two permanent restoration in the parking/driving lane, there is also two temporary restoration overdue for final within barricaded area on the sidewalk. |
2018-09-30 | No data | 74 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area was Recently Resurfaced |
2018-09-30 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2018-09-29 | No data | 17 AVENUE, FROM STREET 76 STREET TO STREET 77 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Installation of Full Sidewalk Flag is Required at All Times ( Patch Work) is not Acceptable. |
2018-09-28 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut d/l, IFO 715. 17ft x 4ft, down 10ft. Cleanfill 96.9% & 96.6%. WET 126.6 DRY 116.5 MAX 123.5 MOISTURE 8.7% |
2018-09-28 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the driving lane, partially covered by builders pavement |
2018-09-28 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Water installation - new building. Cobble stones restoration for building on east side (aka 298 Lafayette st.). Met with Karl B. at location to go over restoration. Acceptable. |
2018-09-28 | No data | EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied as stipulated. |
2018-09-28 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE WHITE LANE MARKING OVER PERMANENT RESTORATION IN ROADWAY, AT 128 PACIFIC STREET BETWEEN HENRY ST & CLINTON STREET. |
2018-09-27 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (13ft. x 8ft.) permanent restoration in the parking/driving lane. 50 Feet from 14 Avenue and 36 Street. |
2018-09-27 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass1 Cut size:6 Feet 11 inches by 5 Feet Down 2 Feet 2 inches lift – 96.2%; WD – 123.6; DD – 114.9; Max D – 120.5 , AM – 7.5%AR: 11:30AM; DP: 12:30PM |
2018-09-27 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation is in compliance |
2018-09-27 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration on the sidewalk, in front of 1146 47 Street. |
2018-09-26 | No data | EAGLE STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-09-26 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced by new building half +5 |
2018-09-26 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | 6'x5'5" cobble stone restoration in driving lane. CS restoration complete. Residual stones towards curb. Restoration acceptable. |
2018-09-26 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut okay, swk flags are in compliance |
2018-09-25 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No backhoe stored on the roadway, at time of inspection. |
2018-09-25 | No data | LINCOLN PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no TEMPORARY PEDESTRIAN WALK, offsite |
2018-09-25 | No data | LINCOLN PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. in d/l, s/w open |
2018-09-25 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | in compliance |
2018-09-25 | No data | INGRAHAM STREET, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT IN-HOUSE PAVING |
2018-09-24 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced by new building half +5 |
2018-09-23 | No data | WOODBINE STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway. Partially resurfaced. New swk flags ok. |
2018-09-23 | No data | 19 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2018-09-23 | No data | HANCOCK STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb-to-curb trench in roadway ok. |
2018-09-23 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New sidewalk |
2018-09-22 | No data | ST JOHNS PLACE, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm cut on r/w |
2018-09-22 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation pinned/ramped. |
2018-09-21 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. in r/w, s/w temp |
2018-09-21 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE PINNED/RAMPED IN PARKING/DRIVING LANE |
2018-09-21 | No data | BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET FULTON STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 5ft 7in x 4ft 5in x 3ft 10in Pass: 97.0% 97.8% |
2018-09-21 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated excavation pinned and ramped, new permits on file |
2018-09-20 | No data | EAST 5 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY |
2018-09-20 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | DOT IN-HOUSE paving |
2018-09-20 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL RESCHEDULED DUE TO CONTRACTOR NO BEING GIVEN GO AHEAD BY DEP INSPECTOR |
2018-09-20 | No data | WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN OPEN EXCAVATION IN THE ROADWAY BEHIND BARRICADES |
2018-09-19 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway found resurfaced in front of new building operation. |
2018-09-19 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018256B21- valid permit 2 temp cuts |
2018-09-18 | No data | PARK STREET, FROM STREET BEAVER STREET TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway in compliance |
2018-09-18 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV ISSUED ON NEWER PERMIT |
2018-09-17 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKINGS HAVE BEEN APPLIED TO PERMANENT RESTORATION |
2018-09-17 | No data | CLAVER PLACE, FROM STREET FULTON STREET TO STREET JEFFERSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IS IN COMPLIANCE |
2018-09-17 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temp repaired now flush |
2018-09-16 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench is mostly resurfaced by BPP at 306. |
2018-09-16 | No data | THOMPSON STREET, FROM STREET BLEECKER STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced after this condition |
2018-09-16 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Bike lane markings restored. |
2018-09-16 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore lane marking in kind after final restoration. Respondent was notified to make correction via (CAR #20185270267) on 3/26/18 and failed to do so. |
2018-09-16 | No data | EAST 193 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | R/W has been resurfaced as per DOT permit # X152018221A54 . |
2018-09-15 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent restoration on the roadway is now completely and properly sealed. |
2018-09-15 | No data | THOMPSON STREET, FROM STREET BLEECKER STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced after this condition |
2018-09-15 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BACKFILL COMPLETED ON LATER PERMIT |
2018-09-15 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit updated M012018256B07, not sure if work was started or not due to building operation , possibly behind fence. |
2018-09-15 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012018250A58- recent permit on file but cut is sunken 4 inches in driving lane |
2018-09-15 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A PLUMBERS CUT FOUND SUNKEN TEMP IN DRIVING LANE 4”(50FT NORTH OF THE NORTH CURB OF EAST 125TH AND 15FT WEST OF THE EAST CURB OF 3RD AVE) |
2018-09-15 | No data | EAST 126 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp 2x2 cut in roadway |
2018-09-15 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Active | Department of Transportation | Contractor on location at this time |
2018-09-14 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway milled |
2018-09-14 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plate shifted in roadway |
2018-09-14 | No data | PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | final restoration work found in roadway |
2018-09-14 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (Re-dig) Backfill Completed. Start: 10:42A End: 12:00PL: 8FT. 0IN. W: 7FT. 0IN. D: 8FT. 8IN.WD: 122.7 DD: 116.6 MD: 118.0 MST: 5.2%Compaction: 1. 97.0% 2. 96.6%Cutback for concrete base in process. |
2018-09-14 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | (Re-Dig) Base completed. Concrete Truck - All American Transit Mix (Arrived at 2:42P)Start: 2:46P End: 3:00PL: 9FT. 0IN. W: 7FT. 6IN. D: 1FT. 0IN. |
2018-09-13 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Not started |
2018-09-13 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 plates in the roadway marked PW are shifted 1 foot exposing excavation that is sunken 4 feet with plates moving as cars drive over |
2018-09-13 | No data | CROSBY STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Failure to comply with stip. 105. NOV issued. Water installation ongoing - plated. |
2018-09-13 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Monitored the re-dig for this location. The crew on site excavated the restoration down to the sewer pipe but will re-schedule the backfill for another day. The measurements of the re-dig: L: 8FT. W: 7FT. D: 9FT. (Start: 10:58A End: 2:10P). |
2018-09-12 | No data | EAST 126 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | clear- no walkway |
2018-09-12 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible work done |
2018-09-12 | No data | BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In compliance. |
2018-09-12 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no ped walk- sidewalk clear |
2018-09-12 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut |
2018-09-12 | No data | FLATBUSH AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2018-09-11 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by BPP. |
2018-09-11 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | PART OF A PERMANENT ROADWAY RESTORATION (TRENCH) SUNKEN 2"BELOW THE SURROUNDING ROADWAY, PLEASE MAKE THE RESTORATION FLUSH WITH THE SURROUNDING ROADWAY. |
2018-09-11 | No data | MOORE STREET, FROM STREET BUSHWICK AVENUE TO STREET WHITE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-09-11 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | monitored BF from 1048-1135 am, BF acceptable |
2018-09-11 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT THAT WAS PATCHED NEEDS TO RESTORED |
2018-09-11 | No data | MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut on roadway needs to be sealed, located in front of 859 myrtle ave |
2018-09-11 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway in front of 115 stanwix |
2018-09-11 | No data | REEVE PLACE, FROM STREET EAST 7 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2018-09-11 | No data | OLINVILLE AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Not started |
2018-09-10 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3FT X 2FT AREA DEPRESSED WITH A CAVE IN |
2018-09-10 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area made flush to grade with temporary asphalt. |
2018-09-10 | No data | WASHINGTON AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk |
2018-09-09 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway ok. |
2018-09-09 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts is in compliance |
2018-09-08 | No data | DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut okay |
2018-09-08 | No data | MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated excavation okay, new permits on file |
2018-09-08 | No data | 58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cu in roadway |
2018-09-07 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area within perm Trench repaired temp to grade. |
2018-09-07 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY |
2018-09-07 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane is in compliance |
2018-09-07 | No data | BUTLER STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAGS SEALED |
2018-09-07 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SWK FLAGS |
2018-09-07 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O Building # 420, temporary area which was previously repaired via Nica Car # 20185180503 needs to be resore in kind or as per NYC DOT final wearing course policy on your permanent Trench. |
2018-09-07 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2018-09-07 | No data | 235 STREET, FROM STREET 118 AVENUE TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B Issued. Permit expired 6/15/2018. Respondent failed to obtain a confirmation number from the department. |
2018-09-07 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Complaint | Department of Transportation | I/F/O Building # 420, area within your permanent repair water-sewer Restoration sunken 7" below Roadway surface in the driving lane. |
2018-09-06 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2018-09-06 | No data | ROGERS AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in bus/parking lane. |
2018-09-06 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(12’)W(4’)D(7’)TEST#1= 96.7TEST#1= 97.1BACKFILL WAS DONE IN 2 PARTS DUE TO TRAFFIC CONDTIONSCUT#2=L(7’)W(6’)D(5’)TEST#1= 96.6TEST#1= 97BACKFILL PASS |
2018-09-06 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2018-09-04 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm was resealed and color code in place. |
2018-09-04 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/8/2018. Respondent failed to obtain a confi |
2018-09-04 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in parking lane |
2018-09-04 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH ON R.W |
2018-09-03 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A PLUMBING NYC,INC STEEL PLATE PINNED INTO THE ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO. PINNED STEEL PLATE INTO ROADWAY-NO PERMIT. EXPIRED DOT PERMIT#B01 |
2018-09-03 | No data | EAST 125 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit M012018242C45 on file. Two steel plates properly secured on roadway and one on sidewalk. |
2018-09-02 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent/respondent's sub-contractor with a steel plate pinned and ramped in the roadway without a valid DOT on file to do so. Permittee ID by DOT permit#B012018214C46 Exp.8/21/18 |
2018-09-02 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/ respondent's sub-contractor had debris and rocks on roadway obstructing gutter. Permittee identified by DOT permit#B012018243C28 Exp.9/14/18 |
2018-09-02 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to restore the base between 2 water cuts, I/F/O 842... (CAR Re-inspection FAIL) |
2018-09-02 | No data | KNICKERBOCKER AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT LONG WATER RESTORATION IN ROADWAY |
2018-09-02 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2018-09-01 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation d/l. Active permit exist. |
2018-09-01 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 temporary restorations in the parking lane and on the sidewalk in front and opposite of 1146 47 Street. A NOV was previously issued on a newer permit for, failing to restore cut within required time. Expired permit B012018222B67 exp. 8/28/2018 |
2018-09-01 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No ped walkway on site. Sidewalk open. |
2018-09-01 | No data | EAST 22 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. |
2018-09-01 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | seal 2 perm cut on roadway and also expansion joint on sidewalk |
2018-08-31 | No data | VAN DAM STREET, FROM STREET 34 STREET TO STREET STARR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued |
2018-08-31 | No data | JENNINGS STREET, FROM STREET HOE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on southern blvd. i.f.o. 1348 |
2018-08-31 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway. |
2018-08-31 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk |
2018-08-31 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut sunken 2 inches locally. Reseal street opening joints around perm cut. |
2018-08-31 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 160, NOV issued for a permanent water restoration missing dashed roadway pavement lane marking and failed to restore in kind. Expansion joints within concrete bus pad still not sealed at this time. |
2018-08-30 | No data | HOPE STREET, FROM STREET HAVEMEYER STREET TO STREET ROEBLING STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 12 feet x (W) 4 feet x (D) 10 feet. compaction of 96.8 and 97.2%.. monitored from 11:47am- 2:20pm. |
2018-08-30 | No data | 45 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (8ft. x 6ft.) permanent restoration in the parking lane and sidewalk (1 flag), in front of 1365 45 Street. |
2018-08-29 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent blocked/closed off 58 feet by 6 feet of roadway during non-work hours; failed to adhere to terms and conditions of stipulation 020 of DOT permit#B012018215D44 Exp. 8/31/18 |
2018-08-29 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent has a temporary restoration on the sidewalk. Failed to permanently restore cut within required time (by expiration of permit). Expired permit, #B012018222B67 exp. 8/28/2018, used for ID. |
2018-08-28 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | d1b |
2018-08-28 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavations in opposite side P/D/L and sidewalk (i/f/o 60-79). |
2018-08-28 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2018-08-28 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced by new building half +5 |
2018-08-28 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | This condition was reported on 8/24/2018 and a NICA was issued. Permanent restoration on the roadway had a (4ft. x 3ft.) area that collapsed down 1.5ft. The respondent made the area temporary to grade and a re-dig form was issued on 8/27/2018. |
2018-08-28 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Next permit M012018123B59 renews 5-3-18 Expired 5-1-18 |
2018-08-28 | No data | LEGION STREET, FROM STREET PITKIN AVENUE TO STREET SUTTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walkway in place |
2018-08-28 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done, permit expired. |
2018-08-27 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent long water restoration on roadway and new sidewalk flag in compliance |
2018-08-26 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 5/25/2018. Respondent failed to obtain a conf |
2018-08-26 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent/respondent's sub-contractor with a steel plate pinned and ramped in the roadway without a valid DOT on file to do so. Permittee ID by DOT permit#B012018214C46 Exp.8/21/18 |
2018-08-26 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 7/12/2018. Respondent failed to obtain a conf |
2018-08-26 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit has been renewed (D1B PROJECT INSPECTION) Perm to grade I/F/O 414. |
2018-08-25 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Domestic Sanitary Sewer Trench Sunken/ Cave in 1 Foot in the Parking Lane. Found no Evidence of Concrete Base. Therefore, Redig is Required and an Inspector must be Present. |
2018-08-25 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD A PLUMBING NYC,INC STEEL PLATE PINNED INTO THE ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO. PINNED STEEL PLATE INTO ROADWAY-NO PERMIT. EXPIRED DOT PERMIT#B012018214B14 |
2018-08-25 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Domestic Sanitary Sewer Trench was Made Safe with Temporary Asphalt. |
2018-08-25 | No data | PEARL STREET, FROM STREET FLETCHER STREET TO STREET PLATT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit updated M012018236C32 |
2018-08-24 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Asphalt broken & caved in, in front of plumber's steel plate. 2ft x 2 1/2ft, down 5 feet. |
2018-08-24 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway milled |
2018-08-24 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the parking/driving lane has a (4ft. x 3ft.) area down 1.5ft.In front of 5422 18 Avenue between 54 Street and 55 Street. |
2018-08-24 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION HAS NOT BEEN CUTBACK. CAR #20183160386 WAS ISSUED ON 4-22-18. |
2018-08-24 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates have been reset over cave in. |
2018-08-24 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restored perm without Backfill confirmation on protected roadway . D1J issued. |
2018-08-24 | No data | 71 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | long water cut in p/l cut 1 3' by3' down 3.2 --- test 197.2 test 2 96.6cut 2 3.6 by 3.1 down 2.11 ---- test 1 96.4 |
2018-08-24 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | more recent permit on file- nov issued |
2018-08-24 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The above respondent failed to comply with DOT stipulation 024 of permit. Upon Inspection Plumber did not maintain 2 11ft lanes for traffic. Only 1 11ft lane was maintained for traffic. |
2018-08-24 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY |
2018-08-23 | No data | EAST 27 STREET, FROM STREET AVENUE J TO STREET AVENUE K | No data | Street Construction Inspections: Active | Department of Transportation | Crew actively working. |
2018-08-23 | No data | EAST 3 STREET, FROM STREET AVENUE C TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED |
2018-08-23 | No data | HENDRICKSON STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: LL14 | Department of Transportation | MONITORED BACKFILL FROM 10:35AM TO 2:15PM ONE CUT IN THE D/L AND P/L LENGTH 22FT WIDTH 6FT DEPTH 7FT |
2018-08-23 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 4/19/2018. Respondent failed to obtain a c |
2018-08-23 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 10:45A End: 12:05PL: 14FT. 0IN. W: 4FT. 0IN. D: 10FT. 0IN.WD: 113.4 DD: 105.5 MD: 108.6 MST: 8.5%Compaction: 1. 98.1% 2. 97.1% |
2018-08-22 | No data | EASTERN PARKWAY, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in parking lane |
2018-08-22 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit on file extended on 7/10/2018 permit Q012018191A03 |
2018-08-22 | No data | 6 AVENUE, FROM STREET 8 STREET TO STREET 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/19/2018. Respondent failed to obtain a conf |
2018-08-22 | No data | 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:30-12:50 L-14'x W-4'2"x D-4'4" Tests: 97.0%/97.4% Cut is located in the parking/driving lane I/F/O 845 58th street. |
2018-08-22 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J Issued. Permit expired 4/19/2018. Respondent failed to obtain a confirmation number from the department. |
2018-08-21 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE APPLY BIKE LANE MARKINGS TO PERMANENT RESTORATION ON THE SIDE OF 4102 8TH AVENUE. (CORNER PROPERTY) |
2018-08-21 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT WITH EXCAVATION ON SIDEWALK WITHOUT A VALID DOT PERMIT TO DO SO PERMIT EXPIRED 08/17/18 USED FOR ID |
2018-08-20 | No data | AVENUE K, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in the r/w. |
2018-08-19 | No data | HENDRICKSON STREET, FROM STREET AVENUE T TO STREET AVENUE U | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway |
2018-08-19 | No data | GATES AVENUE, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new svc expected ,....hole remains plated ... |
2018-08-18 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | final restoration work found in driving lane in front of 172 |
2018-08-18 | No data | POWELL STREET, FROM STREET GLENMORE AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved over by con edison curb to curb I/F/O 127 |
2018-08-18 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FINAL RESTORATION WORK FOUND IN PARKING AND DRIVING LANE IN FRONT OF 128 |
2018-08-18 | No data | COLLEGE POINT BOULEVARD, FROM STREET 15 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the r/w |
2018-08-18 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FINAL RESTORATION WORK FOUND ON ROADWAY IN FRONT OF 55 |
2018-08-18 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent had a 5' X 4' area of permanent restoration sunken 4 inches, permittee failed to respond to CAR # 20186770195 |
2018-08-18 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Has Been Repaved |
2018-08-17 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT SEALED |
2018-08-17 | No data | FLUSHING AVENUE, FROM STREET FRANKLIN AVENUE TO STREET KENT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew doing backfill of roadway & sidewalk - had them comply with stipulation 027 |
2018-08-17 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Section of perm trench sunken 2"1/2. |
2018-08-16 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts going across road |
2018-08-16 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated r.w |
2018-08-15 | No data | 38 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (9ft. x 7ft.) permanent restoration in the parking lane and sidewalk (1 flag), in front of 1256 38 Street.(11ft. x 8ft.) permanent restoration in the parking lane, in front of 1250 - 1252 38 Street. |
2018-08-15 | No data | COURT STREET, FROM STREET CONGRESS STREET TO STREET WYCKOFF STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R\W PAVED |
2018-08-15 | No data | BUTLER STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new swk flags for warehouse building not sealed |
2018-08-15 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary restoration on the sidewalk, in front of 1146 47 Street. Temporary restoration in the parking lane, opposite of 1146 47 Street. New permit on file, B012018222B67 exp. 8/28/2018. |
2018-08-15 | No data | EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration d/l |
2018-08-14 | No data | KNICKERBOCKER AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Permit Number: B012018214B17. |
2018-08-14 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2018-08-14 | No data | DASH PLACE, FROM STREET BEND TO STREET WEST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2018-08-14 | No data | AVENUE S, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET | No data | Street Construction Inspections: Active | Department of Transportation | failed to comply with stips |
2018-08-14 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm water trenches in the bus pad. Bus pad to be replaced to the next joint.Specific location: 210-14/16 48 ave. |
2018-08-14 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the roadway |
2018-08-14 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm cuts re-sealed. |
2018-08-14 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration cut On the Roadway In front of 111 Is Flush To Grade |
2018-08-13 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the respondent maintaining three steel plates marked "PNYCI" pinned and ramped in the roadway, without a valid NYC DOT Permit on file for use of the street. Cited permit for repair water-sewer work had expired on 8/1/2018. |
2018-08-13 | No data | 18 AVENUE, FROM STREET 54 STREET TO STREET 55 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work found at this location |
2018-08-13 | No data | 18 AVENUE, FROM STREET 53 STREET TO STREET 54 STREET | No data | Street Construction Inspections: Active | Department of Transportation | no work done |
2018-08-12 | No data | LAFAYETTE STREET, FROM STREET EAST HOUSTON STREET TO STREET JERSEY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back-filled to grade within enclosed building operation fence. |
2018-08-12 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Plates removed. Trench restored to grade. |
2018-08-12 | No data | PROSPECT PARK SOUTHWEST, FROM STREET SEELEY STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in bus stop |
2018-08-12 | No data | EMMONS AVENUE, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2018-08-12 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FALIED TO SEAL SIDEWALK EXPANSION JOINTS. (CAR #20185270513) WAS ISSUED 4/24/18 , I/F/O 1508 |
2018-08-12 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO respondent failed to comply with the standard details of #H-1042D cutbacks on non protected roadways , a (CAR #20185440121) was issued on 6/25/18. |
2018-08-11 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | roadway refurface due to new building |
2018-08-11 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Perm restorations d/l |
2018-08-10 | No data | SKILLMAN AVENUE, FROM STREET 40 STREET TO STREET 41 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joint installed between s/w and curb is not sealedfound approx. 80' from 40 st on North side of segment 40-05 |
2018-08-10 | No data | WALLABOUT STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane okay |
2018-08-09 | No data | NASSAU STREET, FROM STREET BQE EASTBOUND ENTRANCE SANDS ST TO STREET DUFFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration new swk flags- 75 ft east of duffield st |
2018-08-08 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-08-08 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file |
2018-08-08 | No data | LINDEN BOULEVARD, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working |
2018-08-07 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-APPLY LANE MARKING TO PERMANENT RESTORATION IN THE PARKING/DRIVING LANE IN FRONT OF 4713 7TH AVENUE. |
2018-08-07 | No data | BROADWAY, FROM STREET CATHERINE LANE TO STREET LEONARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new plumber work observed at proposed location at this time. Permit expired. |
2018-08-07 | No data | MULBERRY STREET, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration acceptable |
2018-08-07 | No data | PITKIN AVENUE, FROM STREET CROSS BAY BOULEVARD TO STREET REDDING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water restoration flushed to grade in d/l |
2018-08-07 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore lane marking in kind after final restoration. Respondent was notified to make correction via (CAR #20185270267) on 3/26/18 and failed to do so. |
2018-08-07 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been sealed. |
2018-08-06 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate on roadway newer permit number on file B012018214B14 |
2018-08-06 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass:1 Cut size:19 Feet 4 inches by 4 Feet 1 inches Down 9 Feet lift – 97.0%; 96.8WD – 118.2; DD – 112.3; Max D – 115.0 , AM – 5.2%AR: 10:45AM; DP: 1:10PM |
2018-08-06 | No data | EAGLE STREET, FROM STREET FRANKLIN STREET TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in roadway |
2018-08-05 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Yellow lanes restored |
2018-08-05 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings have been restored |
2018-08-05 | No data | GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2018-08-05 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Nov issued for the respondent maintaining three steel plates marked "PNYCI" pinned and ramped in the roadway, without a valid NYC DOT Permit on file for use of the street. Cited permit for repair water-sewer work had expired on 8/1/2018. |
2018-08-05 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway overlapped by Con Edison |
2018-08-05 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition restored |
2018-08-04 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench has been resealed and is now in compliance |
2018-08-04 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration resealed |
2018-08-04 | No data | HENRY STREET, FROM STREET CLARK STREET TO STREET LOVE LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BIKE LANE HAS BEEN RE-PAINTED AND LANE MARKINGS HAS BEEN RESTORED |
2018-08-04 | No data | 59 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TO PERM CUTS IN ROADWAY |
2018-08-03 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent has fail to apply, the white parking lane marking, to their final restoration, as per CAR# 20183690180,dated 6/18/2018. Since respondent fail to comply, this summons was issued. |
2018-08-03 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Broken/cracked areas within restoration were patched, in compliance. |
2018-08-03 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration Cut On the Roadway In the Parking/driving lane In Front Of 26 Is Flush To Grade |
2018-08-03 | No data | 60 STREET, FROM STREET 15 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: LL14 | Department of Transportation | Spec location 1578 60 St. 4 cuts.6 1/2ft x4ft, down 4ft, 97.0%, 97.6%; 5ftx4 1/2ft, down 3ft,8in. 97.4%,97.1%; 14ftx3ft,down 41//2ft, 97.1%,97.5%; 10ftx3ft,down 4ft,3in. 97.6%,97.3%.WET109.2/112.2;DRY101.6/106.0 MAX106.0, 106.0 MOIST 7.8%,8.7% Blend. |
2018-08-03 | No data | 34 STREET, FROM STREET STARR AVENUE TO STREET VAN DAM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | not plumbers s/w work |
2018-08-03 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Has Been Repaved |
2018-08-03 | No data | JORALEMON STREET, FROM STREET GARDEN PLACE TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration Trench On The Roadway In The Driving Lane In Front Of 89 Is Flush To Grade |
2018-08-02 | No data | NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2018-08-02 | No data | BAY 47 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm rw cut |
2018-08-01 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent has 4 pinned and ramped steel plates over an excavation on a protected street, without a valid DOT permit on file. Respondent identified by (PNYCI) markings on steel plates. |
2018-08-01 | No data | WEST 25 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two steel plates marked "PNYCI" pinned and ramped in the driving lane. |
2018-08-01 | No data | GREENE AVENUE, FROM STREET CARLTON AVENUE TO STREET CUMBERLAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at this time |
2018-07-31 | No data | 58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATE IN PARKING LANE PINNED AND RAMPED |
2018-07-31 | No data | 2 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 8ft by 5ft down 2ft 8in |
2018-07-31 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts d/l, p/l IFO 1127 & opposite 1127.Gravel only has been used to backfill both cuts. Plated restoration.DEP issue. 18 1/2ft x 3 1/2ft, down 3 1/2ft & 9ft, 8 in x 5 1/2ft, down 4ft, 7 in.Concrete base to follow and will be plated. Safety issue. |
2018-07-30 | No data | 60 AVENUE, FROM STREET 84 PLACE TO STREET 84 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - BACK-FILL COMPLETE AND ACCEPTABLE ON 2 EXCAVATIONS IN THE ROADWAY. |
2018-07-30 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway and swk ok. |
2018-07-30 | No data | 84 STREET, FROM STREET 60 AVENUE TO STREET 60 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - BACK-FILL COMPLETE AND ACCEPTABLE ON 1 EXCAVATIONS IN THE ROADWAY. |
2018-07-28 | No data | 4 AVENUE, FROM STREET DE GRAW STREET TO STREET DOUGLASS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2018-07-28 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (15ft. x 5ft.) permanent restoration in the parking/driving lane and sidewalk (2 flags), in front of 1648 61 Street. |
2018-07-28 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2018-07-28 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Platd excavation d/l ifo 615. |
2018-07-28 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flush in the rd/w. |
2018-07-28 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION DOWN 3 INCHES IN CENTER OF ROADWAY.PLEASE RESTORE TO GRADE. |
2018-07-28 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY RESTORE TO GRADE W/ TEMP ASPHALT |
2018-07-27 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench acfoss R/W(note r/w heavily damaged ) |
2018-07-27 | No data | 45 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pinned and ramped steel plate in the parking lane, in front of 1365 45 Street |
2018-07-27 | No data | PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway. |
2018-07-27 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2018-07-26 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work Found |
2018-07-26 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cant see work due to active b.o. at location |
2018-07-26 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE |
2018-07-26 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation d/l |
2018-07-26 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2018-07-25 | No data | CLARKSON AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration opp. 221 |
2018-07-25 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut 2 1/2 inches above grade,not sealed - open CAR under the previous permit at this time. |
2018-07-25 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water and sewer restoration on street - building site |
2018-07-25 | No data | MEEKER AVENUE, FROM STREET BQE WB ENTRANCE MEEKER AVE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED BY NEW BUILDING HALF +5 |
2018-07-24 | No data | BUTLER STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A\T/P/O I OBSERVED THE ABOVE RESPONDENT HAD full sidewalk closing in violation of stipulation 013 |
2018-07-24 | No data | LINCOLN PLACE, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts in d/l |
2018-07-24 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l. |
2018-07-23 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade in roadway |
2018-07-23 | No data | JORALEMON STREET, FROM STREET GARDEN PLACE TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 2 CUTS, Cut1-(L)7FT 7IN (W)4FT (D)4FT 5IN, Cut2-(L)9FT 9IN (W)6FT 7IN (D)3FT 5IN WET DENSITY-114DRY DENSITY-104.9MAX DRY DENSITY-112.5ACTUAL MOISTURE-8.7TEST1-97.0/97.5TEST2-97.1SPRAYED FOR CUT BACKS |
2018-07-23 | No data | CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A- 9:25pmcut-13'x4'x9' test 97.2% & 98.3%germanjumping jackexclusiveshakeelsand conew-112.2d-104.3md-110.5am-7.5%cutbacks in progress |
2018-07-23 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway ok. |
2018-07-23 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l. |
2018-07-23 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade - REPAIR SEWER |
2018-07-23 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut is in compliance |
2018-07-23 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD A STEEL PLATED STREET OPENING ON A PROTECTED STREET IN THE BUS LANE WITHOUT A DOT PERMIT TO DO SO; ABOVE EXPIRED PERMIT EXPIRES 7/8/2018 USED FOR ID. |
2018-07-22 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts on r/w. |
2018-07-22 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2018-07-21 | No data | KINGSTON AVENUE, FROM STREET MAPLE STREET TO STREET MIDWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced. |
2018-07-21 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sanitary Sewer Trench in the Roadway must be Resealed. |
2018-07-21 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012018191F51 |
2018-07-21 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed to make proper cut backs |
2018-07-21 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the r/w |
2018-07-20 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water restoration remain in compliance |
2018-07-20 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent with a permanent WATER repair, with Wearing Course not Flush with surrounding area. Permittee was issued CAR#20185910161, to repair condition, which respondent failed to do so. |
2018-07-20 | No data | WASHINGTON AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-07-19 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | RESTORATION MADE TO GRADE |
2018-07-19 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 'backfill completed(10:00 - 13:50)/ long water servicecut#1 size - 6'6" x 4'8" x 3'10"cut #2 size - 13' x 6'2" x 5'2" |
2018-07-19 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2018-07-17 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/respondent's sub-contractor failed to maintain 2 lanes for traffic, 1 lane in each direction. Failed to adhere to terms & conditions of stipulation 027. Permittee ID by DOT permit#B012018191F51Exp.8/8/18 |
2018-07-17 | No data | ROGERS AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Re-scheduled due to continuous water flowing into the trench. |
2018-07-17 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN THE PARKING LANE. PLATED EXCAVATION IN THE PARKING LANE OPPOSITE #1582 CREW ON SITE AWAITING BACK FILL |
2018-07-17 | No data | 214 STREET, FROM STREET 64 AVENUE TO STREET 67 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water restoration flushed to grade in p/l aligned with water service valve in dirt area. |
2018-07-17 | No data | BAY 23 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway |
2018-07-17 | No data | PROSPECT PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}10FT 2IN X {W]4FT 2IN X {D}4FT 11IN TEST 96.4 97.3 CUT 2 {L}5FT 4IN X {W}4FT X {D}4FT 7IN TEST 97.0 96.9 BASE SAW CUT BACKS ARE BEING DONE. CUTS IN BOTH PARKING LANES AND PLATED SIDE WALK IN FRONT OF ADDRESS |
2018-07-17 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (30ft. x 6ft.) permanent restoration in the parking/driving lane, in front of 1243 45 Street. |
2018-07-17 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway. Located IFO BO. |
2018-07-16 | No data | HICKS STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration Cut On The Roadway Is Flush to Grade |
2018-07-16 | No data | ROGERS AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working |
2018-07-16 | No data | NORTH 8 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w |
2018-07-16 | No data | 35 AVENUE, FROM STREET BELL BOULEVARD TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | timemof inspection perm trench cut in roadway |
2018-07-16 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | barricades in roadway |
2018-07-16 | No data | LOUISIANA AVENUE, FROM STREET SEAVIEW AVENUE TO STREET TWIN PINES DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway in place at this time |
2018-07-15 | No data | 72 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced - B152018131B07 DOT IN-HOUSE PAVING AND MILLINGPERMIT VALID FROM: 5/17/2018 TO: 5/25/2018 |
2018-07-15 | No data | LOTT AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk clear |
2018-07-15 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R Re-inspection passed. The white lettering lane markings has been restored. |
2018-07-14 | No data | 52 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pinned and ramped steel plate in the parking lane, in front of 1327 52 Street. |
2018-07-13 | No data | ROGERS AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/ respondent's sub-contractor working on Friday at 3:05PM; failed to adhere to terms & conditions of stipulation 088, allow work 10AM-3PM, Monday thru Friday. |
2018-07-13 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in parking lane. Opp #289 |
2018-07-13 | No data | GREENE AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate on roadway in compliance. |
2018-07-13 | No data | CLARA STREET, FROM STREET CHESTER AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:00-12:05 L-11'x W-4'x D-10' Tests: 97.5%/96.3% Cut is located in the parking/driving lane I/F/O 83 Clara Street. |
2018-07-13 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | taken over by updated water only permits. |
2018-07-12 | No data | 3 AVENUE, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET | No data | Street Construction Inspections: Active | Department of Transportation | clear |
2018-07-12 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1st cut: (L) 18 feet x (W) 4 feet x (D) 9 feet..compaction of 96.4 and 97.7%.. 2nd cut: (L) 4 feet 6 inches x (w) 3 feet x(d) 3 feet.. compaction 95.5%... monitored job from 9:27-1:00pm. |
2018-07-12 | No data | NEW YORK AVENUE, FROM STREET CHURCH AVENUE TO STREET MARTENSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012018191F51 |
2018-07-11 | No data | LOUISIANA AVENUE, FROM STREET SEAVIEW AVENUE TO STREET TWIN PINES DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site making repairs in the parking lane and cut on sidewalk |
2018-07-11 | No data | GRAND STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT ON R/W |
2018-07-09 | No data | 38 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 9:40-11:45 Cut1: L-3'4"x W-2'11"x D-3'10" Tests: 97.2%/97.0% Cut2: L-8'x W-4'x D-4' Tests: 96.9%/97.4% Cuts are located in the parking lanes I/F/O 1250.1252 38th street. |
2018-07-08 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to fully inspect due to active B.O. occupied in the r/w |
2018-07-08 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Trench in Compliance |
2018-07-07 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition still exist. NOV will be issued. |
2018-07-07 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2018-07-07 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent/respondent's sub-contractor failed to permanently restore roadway restoration in required time. Restoration was left to grade with temporary asphalt. Permittee ID by DOT permit#B012018073A43 Exp.4/11/18 |
2018-07-07 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed |
2018-07-07 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Restoration must be Resealed. |
2018-07-06 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160 Broadway1. Restore dashed roadway lane marking adjacent to bus pads2. Seal installed expansion joints within concrete bus pad |
2018-07-06 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary restoration on the sidewalk leading to a permanent restoration on roadway with green plastic color code not permanently restored within the required time. Permit expired 12/28/2017. |
2018-07-06 | No data | 58 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew working on site, all stipulations in compliance. At time of inspection, entire sidewalk is opened (No work is being done on sidewalk). |
2018-07-05 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | there is a 2' X 2' inside of a 10' X 8' permanent restoration that is down 3" that was temporary asphalt in it there is a possible water leak please send out a repair crew |
2018-07-05 | No data | EAST 193 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 Plumber permanent restoration,on non protected street, less than 4 feet apart, needs to combine into one restoration, as per dot H 1042 (d)3, Also cut with temporary asphalt, on the sidewalk, overdue for final restoration. |
2018-07-05 | No data | EAST 193 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Plumber permanent restoration,on non protected street, less than 5 1/2 feet apart, needs to combine into one restoration, as per dot H 1042 (d) note # 9 , Also cut with temporary asphalt, on the sidewalk, overdue for final restoration. |
2018-07-05 | No data | EAST NEW YORK AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel Plated Excavations on the roadway in the driving lane in front of 1543 |
2018-07-05 | No data | 149 STREET, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no s/w occupancy at time of inspection |
2018-07-03 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file by DEP |
2018-07-03 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2018-07-03 | No data | LOTT AVENUE, FROM STREET AMBOY STREET TO STREET HERZL STREET | No data | Street Construction Inspections: Active | Department of Transportation | stip violation #027 |
2018-07-03 | No data | LOUISIANA AVENUE, FROM STREET SEAVIEW AVENUE TO STREET TWIN PINES DRIVE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway in place at this time |
2018-07-03 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent trench 48" in width. Failed to perform proper cutbacks. Irregular shape on trench. Must restore with proper cutbacks. |
2018-07-03 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway ifo 264 acceptable |
2018-07-03 | No data | COURT STREET, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 1 CUT IN THE DRIVING LANE (L) 5FT 2IN (W) 4FT 6IN (D) 3FT WET DENSITY-108.9DRY DENSITY-103.5MAX DRY DENSITY-107.5ACTUAL MOISTURE-5.3TEST1-98.8 |
2018-07-03 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore solid white lane marking in bike lane. |
2018-07-03 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut has been made final |
2018-07-03 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench in roadway. New active Permit Number: B012018171C70. |
2018-07-02 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK |
2018-07-02 | No data | EAST 19 STREET, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w), found in compliance Opp. 2736 |
2018-07-01 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway overlapped by BPP. i/f/o 237-239 |
2018-06-30 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Pick-Up | Department of Transportation | I observed the above respondent has 2 pinned and ramped steel plates over an excavation on a protected street, without a valid DOT permit on file. (PNYCI) marked steel plates, used for ID. |
2018-06-30 | No data | 64 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2018-06-30 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut on r/w |
2018-06-30 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (5ft. x 3ft.) permanent restoration in the parking lane, opposite of 1230 48 Street. |
2018-06-30 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway restored |
2018-06-30 | No data | 61 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-06-29 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 3 feet x (W) 3 feet x (D) 3 feet.. compaction of 97.4% |
2018-06-29 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in roadway |
2018-06-29 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (27ft. x 18ft.) permanent restoration in the parking/driving lane and sidewalk. Restoration needs to be sealed. In front of 6004 16 Avenue New permit on file. Permit, B012018155A92 exp. 7/10/2018. |
2018-06-28 | No data | 19 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-06-28 | No data | JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET HUMBOLDT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | no crew on site.. waited 30 min grace period. |
2018-06-28 | No data | BLAKE AVENUE, FROM STREET OSBORN STREET TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No pedestrian walkway in place at this time |
2018-06-28 | No data | 52 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-06-28 | No data | AVENUE K, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install drop curb for driveway entrance. Install expansion joint. |
2018-06-28 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to seal expasion joints on the sidewalk for water repair as per sub section. A CAR was issued on 3/24/18 , CAR # 5010069. |
2018-06-27 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut in P/L |
2018-06-27 | No data | JORALEMON STREET, FROM STREET GARDEN PLACE TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | active site ok |
2018-06-26 | No data | HANCOCK STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in roadway ok. |
2018-06-26 | No data | 47 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | -No sidewalk occupancy at this time. |
2018-06-26 | No data | BLAKE AVENUE, FROM STREET OSBORN STREET TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | MONITORED BACKFILL FROM 8:53AM TO 10:30AM ONE CUT IN THE DRIVING LANE LENGTH 16FT WIDTH 4FT DEPTH 6FT SPRAYED THE CUTBACKS |
2018-06-25 | No data | BLAKE AVENUE, FROM STREET OSBORN STREET TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | reschedule due to hour stipulation on the permit. |
2018-06-25 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above failed to restore their white crosswalk markings where plumbing work was done. respondent was notified on 4/4/18 via CAR# 20175010167 about condition |
2018-06-25 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a perm water cut that has exposed open joints and needs to be resealed , also contractor must comply with the standard details of 1042D cutbacks on non protected roadways,respondent has a T shape perm water cut that should be uniformed |
2018-06-25 | No data | 47 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS.12’4”L X 5’W X 5’D = 96.8% & 97.1%10’L X 5’2”W X 4’D = 97.8% & 97.0%ARRIVAL 10:32AM.DEPARTURE 1:20PM. |
2018-06-24 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (27ft. x 18ft.) permanent restoration in the parking/driving lane and sidewalk. Restoration needs to be sealed. In front of 6004 16 AvenueNew permit on file. Permit, B012018150D05 exp. 6/26/2018 |
2018-06-24 | No data | 235 STREET, FROM STREET 118 AVENUE TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flushed to grade in the roadway. I/F/o Bus stop |
2018-06-23 | No data | MADISON STREET, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass..... |
2018-06-23 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20181670385;FAILED TO RESTORE ASPHALT RESTORATION IN CONCRETE BUS PAD AS PER DOT CONCRETE PAVEMENT RESTORATION DRAWING#H-1042B-A VIOLATION OF SECT |
2018-06-23 | No data | 11 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts to grade in the p/d/l |
2018-06-23 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FOUND RESURFACED |
2018-06-23 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp to grade ...../pass.. |
2018-06-22 | No data | WEST 16 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition previously reported. |
2018-06-22 | No data | PRESIDENT STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed |
2018-06-22 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY |
2018-06-22 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY |
2018-06-22 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BIKE LANE MARKING RESTORED |
2018-06-21 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-06-21 | No data | BRUCKNER BOULEVARD, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO 25, perm to grade |
2018-06-21 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Jersey barriers takes up all the parking lane in front of a B/O at this time. |
2018-06-21 | No data | WINDSOR PLACE, FROM STREET FULLER PLACE TO STREET HOWARD PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | 4'3''x3'3''x3'4''cutbacks in progress |
2018-06-21 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to restore lane marking in kind after final restoration. Respondent was notified to make correction via (CAR #20185270267) on 3/26/18 and failed to do so. |
2018-06-20 | No data | CARROLL STREET, FROM STREET BROOKLYN AVENUE TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Pass:1 Cut size:3 Feet 4 inches by 3 Feet 3 inches Down 3 Feet 3 inches lift – 95.4%;97.2%WD – 115.8; DD – 108.9 ; Max D – 112.0 , AM – 6.4%AR: 10:30AM; DP: 12:00PM |
2018-06-19 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (30ft. x 7ft.) & (30ft. x 9ft.) permanent restorations on the roadway from curb to curb, in front of 1178 - 1180 47 Street.2 temporary restorations to grade on the sidewalk. |
2018-06-19 | No data | 61 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY; SIDEWALK INSTALLED |
2018-06-19 | No data | 34 STREET, FROM STREET STARR AVENUE TO STREET VAN DAM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At the corner of Starr Ave & 34th Street, Install expansion joints as per subsection along the s/w. |
2018-06-18 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | was made final. |
2018-06-18 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued for respondent failure to restore two permanent ( Water-sewer) restoration in the roadway measuring 6' apart into one continuous restoration as per H-1042D Note #9. respondent was previously notified to correct the condition. |
2018-06-18 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above a cut on the roadway with no sealer around the restoration. Respondent was notified to make correction via (CAR #20185270449) on 4/17/18 and failed to do so. |
2018-06-18 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re-apply white parking lane marking. |
2018-06-17 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO respondent failed to comply with the standard details of H-1042D cutbacks on non protected roadways,respondent has a T shape perm water cut that should be a uniform cut square or rectangular, a CAR 20186040176 was issued on 4/5/18. |
2018-06-16 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | cut in p/l---- 17.2 by 3.2 down 2.6 test one 95.5. i did not witness backfill i got to location too late. other then depth or witdth my info is from tester and plumber |
2018-06-16 | No data | 2 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found at time of inspection |
2018-06-15 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE. STIPS ARE IN COMPLIANCE WITH PERMIT ACTIVITY. ADVISED TO CHECK PAST 2 LOCATIONS FROM BARRY SPITZER COMMUNIUTY BOARD 12 |
2018-06-15 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to properly fasten steel plate securely to roadway, steel plate deflecting 1'' when vehicles go over it.NICA#20184130148 issued 6/14/2018 and Rocco from "Plumbing NYC, Inc." notified at 20:18hrs. Condition remains the same. |
2018-06-14 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATIONS IN BOTH PARKING LANES |
2018-06-14 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plate marked "PNYCI" shifted 8" and is deflecting 1" as traffic travels over it. |
2018-06-14 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 14 feet x (W) 4 feet x (D) 10 feet 6 inches.. compaction of 96.6 and 97.1%.. monitored from 9:50 am-12:15pm |
2018-06-14 | No data | HANCOCK STREET, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED CUT 1 {L{4FT 8IN X {W}3FT 6IN X {D}3FT TEST 98.2 CUT 2 {L}5FT X {W}3FT X {D}4FT TEST 97.9 97.5 BASE SAW CUT BACKS SPRAYED. BASE SAW CUT BACKS ARE BEING DONE. ARRIVED 945 LEFT 1110 |
2018-06-13 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm restoration flushed with its surrounding area and restored to grade in the driving lane. |
2018-06-12 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2018-06-11 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | counter sunk plate is in compliance new permits on file |
2018-06-11 | No data | 160 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No temporary pedestrian walkway in place at this time |
2018-06-11 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (13ft. x 8ft.) permanent restoration in the parking/driving lane. 50 Feet from 14 Avenue and 36 Street. |
2018-06-11 | No data | EAST NEW YORK AVENUE, FROM STREET ST MARKS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cave-in next to restoration i/f/o 1611 E. NY Ave |
2018-06-11 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | met with Barry spitzer at location crew is in compliance with permit activity |
2018-06-10 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Trench in Compliance |
2018-06-10 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Cut in Compliance |
2018-06-10 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench has been re-sealed. |
2018-06-10 | No data | 218 STREET, FROM STREET 134 ROAD TO STREET MERRICK BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates in roadway. Active permit on file Q012018134E68 |
2018-06-10 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NEW CONSTRUCTION A BUILDERS PAVEMENT PLAN 1/2 PLUS 5 FT WILL CORRECT THIS PROBLEM. |
2018-06-10 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the respondent failed to restore lane markings in roadway. Failure to restore double yellow lane markings. Notified prior by car#20184890162 dated 3/23/2018 |
2018-06-10 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | white lane markings is in compliance |
2018-06-09 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates pinned and ramped in the roadway, in front of 1242 45 Street. New permit on file, B012018150D04 exp. 6/13/2018 |
2018-06-09 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade, sidewalk under construction (B O) |
2018-06-09 | No data | COURT STREET, FROM STREET FULTON STREET TO STREET REMSEN STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site repairing water leak on service. DEP three day notice on site. Excavation in the roadway. |
2018-06-09 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Asphalt Inside Perm Trench Broken Out must be Repaired. |
2018-06-09 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Side of 83-28 Daniels St. on Coolidge Ave. I observed a permanent cut on the roadway.The above respondent failed to seal wearing course after CAR # 20185340065 was issued on 05/02/18. |
2018-06-09 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Side of 83-28 Daniels St. on Coolidge Ave. I observed a permanent cut 2 1/2" above grade.The above respondent failed to flush wearing course with the surrounding area after CAR # 20185340065 was issued on 05/02/18. |
2018-06-09 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2018-06-09 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2018-06-09 | No data | 49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in Compliance |
2018-06-08 | No data | 16 AVENUE, FROM STREET 82 STREET TO STREET 83 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable |
2018-06-08 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent/respondent's sub-contractor failed to permanently restore a roadway restoration in required time. A CAR#20186260259 was issued 4/11/18 |
2018-06-08 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2018-06-08 | No data | 38 AVENUE, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway at location repaved by New Building repavement. |
2018-06-08 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COMPLY WITH DOT STANDARD SPECS, AS PER STANDARD DETAIL DRAWING #1042D FOR CUTBACKS ON BASE AND W/C OF PERMANENT RESTORATION (3' 6" X 2' 2"). AT THIS TIME RESTORATION HAS NOT BEEN CUTBACK |
2018-06-07 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to properly inspect due to b.o. active |
2018-06-07 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent/respondent's sub-contractor failed to permanently restore a roadway restoration in required time; Restoration was left to grade with temporary asphalt. A CAR#20186620140 was issued on 4/20/18 |
2018-06-07 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent with a permanent WATER repair, was issued CAR#20185910161, to repair condition, which respondent failed to do so. |
2018-06-07 | No data | FLUSHING AVENUE, FROM STREET BUSHWICK AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | 3 Out Of 4 Countersunken Steel Plates Marked “PNYCI” Very Loose & Noisy In Driving Lane At The Side Of 115 Stanwix St |
2018-06-07 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bus lane is painted red |
2018-06-07 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. New summons to be issued. |
2018-06-07 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a sidewalk flag with with temporary asphalt easing to restoration in roadway overdue for final restoration. Permit expired 12/28/2017. |
2018-06-07 | No data | 160 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | start 10:30 13.0x 4.0 x 7.6 , 11.0 x 4.0 x 6.0 |
2018-06-07 | No data | WEST 90 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration mostly paved over by con ed IFO #50, s/w flush |
2018-06-07 | No data | BERGEN STREET, FROM STREET KINGSBOROUGH 5 WALK TO STREET KINGSBOROUGH 6 WALK | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED CUT 1 {L}6FT X {W]3FT 11IN X {D}5FT TEST 98.4 98.2 CUT 2 {L}13FT X {W}4FT 3IN X {D}5FT 4IN TEST 97.7 97.9 BASE SAW CUT BACKS ARE BEING DONE. ARRIVED 1240 LEFT 220 |
2018-06-06 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Nov issued for the respondent failure to restore the white lettering lane markings Y and O in the word ONLY on a permanent Water restoration in the driving/turning lane. |
2018-06-06 | No data | 35 AVENUE, FROM STREET BELL BOULEVARD TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | time of inspection active perm on file # Q012018150J96 |
2018-06-06 | No data | 35 AVENUE, FROM STREET BELL BOULEVARD TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection plated excavation pin and rampin roadway |
2018-06-06 | No data | FLUSHING AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated r.w |
2018-06-06 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED TO MAKE WEARING COURSE FLUSH WITH SURROUNDING AREA, ASPHALT BREAKING OUT OF PERM TRENCH DOWN 1in. (CAR #20185270511) WAS ISSUED 4/24/18 |
2018-06-05 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Active | Department of Transportation | I/F/O 160, perm trench in driving lanes, portion of trench is temp asphalt within concrete bus pad. Permit active at this time. |
2018-06-05 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed wearing course not flush with surrounding area. Portion of permanent plumber cut is sunken 1 inch in roadway. Notified prior by car#20184890245 dated 3/31/2018 |
2018-06-05 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The respondent failed to flush surrounding area on a previously patched 6'6'' x 4'7'' permanent sewer rstoration. Respondent was notified prior by (CAR #20186190143) on 03/29/18 to repair condition and didn't do so. |
2018-06-05 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT FAILED RESPOND TO CORRECTIVE ACTION REQUEST(#20185270239); FAILED TO PROPERLY SEAL EDGES OF CUT-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. EXPIRED DOT PERMIT #B012017339B27 EXP 12/19/2017 USED FOR ID. |
2018-06-05 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 160, no steel plates present and roadway area made perm. |
2018-06-04 | No data | WEST 16 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observe the above respondent maintaining a temporary cut in the roadway. The respondent failed to permanently restore it's cut within the required time. The respondent was notified prier by CAR #20180320178, but the condition remains. |
2018-06-04 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to properly seal and maintained wearing course; CAR#20186260248 was issued on 4/10/2018. |
2018-06-04 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT HAD FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST #20175270756; FAILED TO RESTORE YELLOW LANE MARKINGS; A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. ABOVE PERMIT WAS USED FOR ID. |
2018-06-04 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm final color coded |
2018-06-03 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2018-06-03 | No data | THROOP AVENUE, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2018-06-02 | No data | LINDEN BOULEVARD, FROM STREET CATON AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak at the Curb Valve. 3 Day Dep Notice Issued. Property Owner on Site |
2018-06-02 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATIONS IN THE ROADWAY {LONG WATER CUT} |
2018-06-02 | No data | VAN DAM STREET, FROM STREET 34 STREET TO STREET STARR AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done at time of inspection, permit expired |
2018-06-02 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway resurfaced at one piint but side restroation no defects |
2018-06-02 | No data | DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET TIFFANY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk cut ok |
2018-06-02 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance |
2018-06-01 | No data | FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (13ft. x 6ft.) permanent restoration in the driving/bike lane, in front of 3119 Ft Hamilton Parkway |
2018-06-01 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pinned and ramped steel plate in the driving lane, opposite of 1242 45 Street |
2018-06-01 | No data | MENAHAN STREET, FROM STREET CYPRESS AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in parking lane, sidewalk flag restored. |
2018-05-31 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water-Sewer" restoration flush to grade in the parking/driving lane and a Temporary cut on the sidewalk, however the sidewalk will be restored by B.O upon completion of project. |
2018-05-31 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plate in p/l. |
2018-05-30 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No defects to short water cut. |
2018-05-30 | No data | YELLOWSTONE BOULEVARD, FROM STREET JUNO STREET TO STREET SELFRIDGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/l, two sidewalk flags restored around the water valve |
2018-05-30 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and pass start time= 12:25, end time=2:15 |
2018-05-30 | No data | WYCKOFF AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut ok. |
2018-05-30 | No data | 212 STREET, FROM STREET 32 AVENUE TO STREET 33 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench across roadway |
2018-05-29 | No data | 46 AVENUE, FROM STREET 202 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to see restoration due to new builders pave |
2018-05-29 | No data | 149 STREET, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER. PLATED EXCAVATIONS IN THE ROADWAY I/F/O OPP. 42-29/31 149 STREET. BIO SWALES IN COMPLIANCE. |
2018-05-29 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re dig will be re issued to correct permitee |
2018-05-29 | No data | ORCHARD STREET, FROM STREET CANAL STREET TO STREET DIVISION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work behind fence acceptable, Active BO |
2018-05-29 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | IFO Building #302, 3 steel plates marked "PNYCI" counter sunk in the roadway, running towards active building operation on sidewalk. Respondent has active permit on file under permit number M012018143C80 |
2018-05-29 | No data | EAST 96 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | IFO Building #302, 3 steel plates marked "PNYCI" counter sunk in the roadway, running towards active building operation on sidewalk. Respondent has active permit on file under permit number M012018143C80 |
2018-05-29 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (15ft. x 5ft.) permanent restoration in the parking/driving lane, in front of 1229 45 Street |
2018-05-29 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | edit made on insp remarks. original remarks written were not for this location they were for permit number S012018149A26 . Correct insp was made at 2:45 crew was on site making repair in rw opp address |
2018-05-29 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation ifo. BO. |
2018-05-29 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation ifo. BO. active permit on file |
2018-05-28 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'x4' portion of perm trench across roadway sunken 21/2'' IFO 210-12 |
2018-05-28 | No data | MORRIS PARK AVENUE, FROM STREET FILLMORE STREET TO STREET UNIONPORT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut i/f/o 631 in complaince |
2018-05-27 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway paved final. Bus pad is temp to grade and will need to restored in concrete. |
2018-05-27 | No data | NORTH 13 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm on r/w |
2018-05-26 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut on sw with active permit on file |
2018-05-26 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp water cut in driving lane over due for final. I/F/O 400-408 W 114 street |
2018-05-26 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Restoration in Compliance |
2018-05-26 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced |
2018-05-26 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 35'ft 7" L x 6'ft 9" W excavation extending from east curb into bus lane |
2018-05-26 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2018-05-25 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 2 LONG WATER CUTS CUT 1 - 23.10 BY 4.3 DOWN 4.2 TEST 1 96.7 â TEST 2 95.5CUT 2 â 25.1 BY 3.11 DOWN 4.3 TEST 1 96.0 â TEST 2 97.8 BACK FILL WAS DELAYED DUE TO HAVING TO WAIT FOR A SECOND BATCH OF MATERAIL ( JOE HOCK OK) |
2018-05-24 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 Steel plates in the parking/driving lane. 1 plate is countersunk and the other 2 are pinned and ramped. New permit on file, B012018143F05 exp. 6/21/2018 |
2018-05-24 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 Steel plates in the parking/driving lane. 1 plate is countersunk and the other 2 are pinned and ramped. |
2018-05-24 | No data | 108 STREET, FROM STREET 66 AVENUE TO STREET 66 ROAD | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER. BIO SWELL I/F/O 66-20 108 STREET IN COMPLIANCE. NO WORK DONE. NO CREW ON SITE. |
2018-05-24 | No data | CLIFTON PLACE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | leak on service 3 day notice confirmed, rdwy excavated |
2018-05-24 | No data | LORIMER STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane okay, has yellow lane markings |
2018-05-23 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut 6'8" width (don't have the original opening) to grade p/d/l. |
2018-05-23 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane ifo 60 acceptable |
2018-05-23 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | TEMP WATER & SEWER CUT IN PL/DL MADE FINAL BF, BASE & WC |
2018-05-23 | No data | LIBERTY AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in p/l |
2018-05-22 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started at this location; new permit on file B012018141F36 |
2018-05-21 | No data | ROCKWELL PLACE, FROM STREET DE KALB AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6FT X 15FT PERM RESTORATION TRENCH ON THE ROADWAY IN THE PARKING/DRIVING LANE I/F/O 31 |
2018-05-21 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed a plated roadway excavation without a valid DOT permit on file. Expired permit and plate marking used to ID. |
2018-05-21 | No data | WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water" restoration flush to grade in the driving lane. Opp 517. |
2018-05-21 | No data | HENRY STREET, FROM STREET CLARK STREET TO STREET LOVE LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL JOINTS AROUND NEW PERMANENT RESTORATION IN ROADWAY, RESTORE WHITE BIKE LANE MARKINGS & RE-PAINT BIKE LANE GREEN (IN KIND), AT 132 HENRY STREET BETWEEN LOVE LANE & CLARK STREET. |
2018-05-20 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in parking lane |
2018-05-19 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Complaint | Department of Transportation | Plumbers on location spoke with contractor about the noisy steel plates , he stated that he will reset them to reduce the noise. |
2018-05-18 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied at itme |
2018-05-18 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO DEFECTS ALL IN COMPLIANCE |
2018-05-18 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation (2) in roadway |
2018-05-17 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut p/l opp 1127. |
2018-05-17 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Start: 1:45P End: 3:50PL: 8FT.8IN. W: 4FT.4IN. D: 10FT.0IN.WD: 113.4 DD: 102.1 MD: 109.5 MST: 11.1Compaction: 1. 98.1% 2. 97.1% |
2018-05-17 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent working at 4:10PM, past their stipulation hours. In violation of stipulation 072 which states, Work 9AM-4PM, Monday To Friday. Permit, B012018135D32 exp. 5/29/2018, used for ID. |
2018-05-17 | No data | WASHINGTON AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work being done close to Gates Ave. Bike share station is at opposite corner at Greene Ave. |
2018-05-17 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm cut in parking lane. Bike lane left clear and uneffected. In compliance. |
2018-05-16 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (21ft. x 7ft.) perm restoration in the parking/driving lane. New permit on file, B012018128D13 exp. 5/20/2018 |
2018-05-16 | No data | 39 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer cut across roadway flush to grade |
2018-05-16 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill Complete and Acceptable. 11'6'' x 4' and 6' x 3'10'' cuts in the roadway. Arrival Time 11:30am - Backfill Complete Time 2:45pm |
2018-05-16 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm restorations d/l |
2018-05-15 | No data | 38 DRIVE, FROM STREET 233 STREET TO STREET 234 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flushed to grade in roadway. |
2018-05-15 | No data | EAST 144 STREET, FROM STREET MDE NORTHBOUND EXIT 4 TO STREET GERARD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable / 3'.7" by 3'.7" |
2018-05-15 | No data | GERARD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 146 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Base rescheduled |
2018-05-14 | No data | STANWIX STREET, FROM STREET FLUSHING AVENUE TO STREET MONTIETH STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2018-05-14 | No data | MULBERRY STREET, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to bo going on and cars |
2018-05-14 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not visible due to new builders pave |
2018-05-14 | No data | 235 STREET, FROM STREET 118 AVENUE TO STREET CROSS ISLAND PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfil completed and acceptable. 7'x5'x10" |
2018-05-14 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | COUNTERSUNK STEEL PLATE IN P/L. |
2018-05-13 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane ok |
2018-05-13 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in the roadway |
2018-05-13 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at this time. (Ifo. B/O) |
2018-05-13 | No data | HANCOCK STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut is in compliance |
2018-05-13 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation ifo. B.O |
2018-05-13 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm restoration temp. s/w to grade |
2018-05-13 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Active | Department of Transportation | Perm long water trench acceptable |
2018-05-12 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted. Numerous restorations at location overlapping each other. Unable to fully determine exact shape f restoration given subsequent different plumber cuts and Con Ed work. |
2018-05-11 | No data | HENRY STREET, FROM STREET CLARK STREET TO STREET LOVE LANE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 2 CUTS IN THE PARKING/DRIVING LANE, CUT1- (L)9FT (W) 4FT 6IN (D) 4FT 9IN , CUT2-(L) 3FT 6IN (W) 3FT (D) 3FT 5IN WET DENSITY-108.3DRY DENSITY-101.8MAX DRY DENSITY-106.0ACTUAL MOISTURE-6.4TEST1-97.3/98.2TEST2-97.7 |
2018-05-11 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Restoration cut on the roadway in the parking lane i/f/o 24 is flush to grade |
2018-05-10 | No data | 46 AVENUE, FROM STREET 202 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Backfill completed on prior permit confirmation Q201801081 |
2018-05-10 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | perm cut localized area 10' x 5' sunken 2'' in r/w and bus lane , need to be made fluush and resealed cut in r/w |
2018-05-10 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/23/2018. |
2018-05-10 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 1/26/2018. Respondent failed to obtain a conf |
2018-05-10 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed on 2/13/2018 |
2018-05-10 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway |
2018-05-10 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | I observed the above respondent/ respondent's sub-contractor working on Thursday at 3:15PM during school time; failed to adhere to terms & conditions of stipulation 083, allow work 9AM-2PM, |
2018-05-10 | No data | EAST 193 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Plumber permanent restoration,on non protected street, less than 4 feet apart, needs to combine into one restoration, as per dot H 1042 (d)3, Also cut with temporary asphalt, on the sidewalk, overdue for final restoration. |
2018-05-09 | No data | ST JOHNS PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found resurfaced |
2018-05-09 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated water and sewer excavation |
2018-05-09 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/7/2018. Respondent failed to obtain a conf |
2018-05-09 | No data | THROOP AVENUE, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/3/2018. Respondent failed to obtain a confi |
2018-05-08 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass/09 ...perm .... |
2018-05-08 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Short water restoration flushed to grade from p/l to d/l. |
2018-05-08 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in parking /driving lane. |
2018-05-08 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk ok joints seal |
2018-05-08 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New Permit#B012018116B79 |
2018-05-08 | No data | CHURCH AVENUE, FROM STREET VERONICA PLACE TO STREET WOODS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}18FT 4IN X {W}4FT X {D}4FT 2IN TEST 97.8 98.2 CUT 2 {L}6FT 10IN X {W}5FT 4IN X {D}4FT 6IN TEST 97.0 98.6 BASE SAW CUT BACKS WERE SPRAYED. BASE SAW CUT BACKS ARE BEING DONE |
2018-05-07 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (18ft. x 6ft.) perm restoration in the parking/driving lane and sidewalk, in front of 1423 45 Street |
2018-05-07 | No data | PROSPECT PARK WEST, FROM STREET 17 STREET TO STREET 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN A CONFIRMATION NUMBER PRIOR TO THE EXPIRATION OF SUCH PERMIT AS REQUIRED. PERMIT EXPIRED 2/1/2018. RESPONDENT FAILED TO |
2018-05-07 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavations |
2018-05-07 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/11/2018. Respondent failed to obtain a conf |
2018-05-07 | No data | 47 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | NICA WAS ISSUED TO PERMITTEE LAST WEEK AREA HAS BEEN BROUGHT FLUSH TO GRADE WITH COLD PATCH |
2018-05-06 | No data | BRONX BOULEVARD, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in compliance |
2018-05-06 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration on roadway. |
2018-05-06 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012017256D05 |
2018-05-05 | No data | 53 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced by DOT, Permit B152016211A77. August 2016 |
2018-05-05 | No data | LAFAYETTE AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/14/2018. Respondent failed to obtain a conf |
2018-05-05 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2018-05-05 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TRENCH OK R\W |
2018-05-05 | No data | 47 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION MADE FLUSH WITH COLD PATCH |
2018-05-04 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 3/3/2018. Respondent failed to obtain a confi |
2018-05-04 | No data | 47 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | there is a 3.5' by 2' cave in thats down 4' in front of this locatiom possible water leak. cave in has a undermined condition. |
2018-05-04 | No data | WASHINGTON AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut driving lane |
2018-05-04 | No data | BATHGATE AVENUE, FROM STREET BEND TO STREET EAST 178 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the driving lane I/F/O 1949. |
2018-05-04 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Renew on 2/13/2018 |
2018-05-03 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | above respondent has backfilled an opening on protected street but failed to obtain a confirmation number at least 2 hours prior to the commencement of backfill Permit expired 2-3-18 Respondent failed to obtain confirmation number from department |
2018-05-03 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please fully replace two sidewalk flags that are overdue for final. At time of inspection temp asphalt found installed on concrete sidewalk. |
2018-05-03 | No data | 38 DRIVE, FROM STREET 233 STREET TO STREET 234 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water restoration flushed to grade across roadway from 233-33. |
2018-05-03 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm long water trench in front of 442 this is for buildings 442 and 436 East 13th street acceptable |
2018-05-03 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work completed under later permit |
2018-05-03 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway |
2018-05-03 | No data | SUMMIT AVENUE, FROM STREET WEST 162 STREET TO STREET WEST 164 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress with crew on site |
2018-05-02 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 26' x 21' perm restoration is mounded 2 1/2", has no seal, wearing course cutbacks are done incorrectlyfound 100' west of Daniels st |
2018-05-02 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 6 Maiden Lane, perm trench within driving / parking lanes free of defects. |
2018-05-02 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occ of r/w - Barriers |
2018-05-02 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. permit expired 2/11/ 2018. Respondent failed to obtain a confirmation number |
2018-05-02 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit#B012018116B79 |
2018-05-01 | No data | CHURCH AVENUE, FROM STREET VERONICA PLACE TO STREET WOODS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate excavation in roadway plumbers hit electric line con ed on site repairing line |
2018-05-01 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M012018121B20 |
2018-05-01 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit M012018046A42 with conf# M201805325 |
2018-04-30 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BIKE LANE MARKING NEED TO BE RESTORED |
2018-04-30 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | oppistie 263 infront of church perm restoration acceptable |
2018-04-29 | No data | VAN DOREN STREET, FROM STREET LONG ISLAND EXPWY ET 22 A WB TO STREET SAULTELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate work at present time |
2018-04-28 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Cut @ opp 208 19th Street in Compliance |
2018-04-28 | No data | OCEAN AVENUE, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2018-04-27 | No data | CLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-04-27 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 temporary cuts ifo 615. |
2018-04-26 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plates reset and secured over excavation - |
2018-04-26 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file M012018085C11 following by M012018103B33 |
2018-04-26 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates not properly pinned and ramp over plated excavation- One of the corner of the steel plates is not sitting flat and raised 2 inches in driving lane- observed 1 1/2 to 2 inches gap between the plates |
2018-04-25 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Long water Restoration in P/L - D/L |
2018-04-25 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (21ft. x 7ft.) perm restoration in the roadway, in front of 2040 57 Street |
2018-04-25 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway has been resurfaced, condition no longer exists in the Segment... (CAR Passed Out) |
2018-04-25 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed opening of street without a DOT permit. Plated excavation in roadway (excavation is down 3ft9in) without permit. Previous permit B012018081E68 to install water/sewer at location expired 4/18/2018. Name (PNYCI) printed on plates use for Id |
2018-04-25 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 3 STEEL PLATES IN THE PARKING/DRIVING LANE OK. 2 ARE PINNED AND RAMPED 1 IS COUNTERSUNK. |
2018-04-25 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Active | Department of Transportation | 1 out of 4 countersunk steel plates loose and noisy. Please secure. |
2018-04-24 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2018-04-24 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Steel plate properly ramped. Condition made safe. |
2018-04-24 | No data | LAFAYETTE AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2018-04-24 | No data | WOODWARD AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 10'x4' perm cut p/l |
2018-04-24 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate on the sidewalk needs to be properly ramped. Part of the steel plate is 2 inches raised above the surrounding area. Making it a trip condition for pedestrians.In front of 1423 45 Street between 14 Avenue and 15 Avenue. |
2018-04-24 | No data | BROADWAY, FROM STREET GRANITE STREET TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I observed the above respondent installed asphalt on a concrete roadway. Failed to adhere to terms & conditions of NYC DOT highway rules above stating "asphalt restorations will not be permitted in concrete streets or concrete bus stop areas." |
2018-04-24 | No data | SHELL ROAD, FROM STREET 86 STREET TO STREET BOUCK COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found no cuts on r/w and entire s/w has been redone at location. so i cant tell if there was any work on s/w |
2018-04-24 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | F/o 18-14 area p/d/l paved to grad by the builder,perm. cut opp. 18-14 to grade d/l,new s/w. |
2018-04-24 | No data | 77 AVENUE, FROM STREET 217 STREET TO STREET 220 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | SEWER TRENCH BF TAMPED TESTED CUT BACK & BASE & WC |
2018-04-24 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | seal expnasion joint at curb in front of 1506 and 1508. |
2018-04-24 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Complaint | Department of Transportation | asphalt breaking out of perm trench down 1'' and also spralling and needs to be repaved. |
2018-04-24 | No data | QUEENS BOULEVARD, FROM STREET BEND TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade across roadway. |
2018-04-22 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Final restoration measures 3'8'x2'6" failing to be at minimum 54" (4'6") Please make required cutbacks on the base(6") & wearing course(12") as to DOT Standard Detail Drawings #H-1042 D. Pass old CAR #20175840287 and issue new one as per CAR project. |
2018-04-22 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Final restoration measures 3'8'x2'6" failing to be at minimum 54" (4'6") Please make required cutbacks on the base(6") & wearing course(12") as to DOT Standard Detail Drawings #H-1042 D. Pass old CAR #20175840287 and issue new one as per CAR project. |
2018-04-22 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the driving/parking lane. In front (26ft. x 8ft.) and opposite (8ft. x 6ft.) of 4527 18 Avenue. |
2018-04-22 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM RESTORATIONS IN THE ROADWAY. ONE IN FRONT OF #287 AND #289 |
2018-04-21 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Shut-off water valve/connection cut restored. Acceptable. |
2018-04-21 | No data | 38 AVENUE, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration asphalt broken out also must re-seal seam between parking lane and driving lane of roadway. |
2018-04-21 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defect ifo 286 lenox |
2018-04-20 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 14x4x10 sewer completed |
2018-04-20 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | TEMPORARY PEDESTRIAN WALK WAY IN THE ROADWAY |
2018-04-20 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | OVER DUE FINAL |
2018-04-20 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, sidewalk is not being used |
2018-04-20 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | countersunk steel plate in p/l. |
2018-04-20 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2018-04-20 | No data | EAST 17 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill to be rescheduled. |
2018-04-20 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 734 Broadway 1- multiple areas of asphalt broken out and cracked adjacent to curb causing water ponding.2- restore full flag around MTA vault (patch work), expansion joints not installed between curb line.(20185440056)- |
2018-04-20 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, will be re-issued. |
2018-04-20 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate in parking lane is in compliance, new permits on file |
2018-04-19 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BUILDERS PAVE DONE OVER WATERCUTS. |
2018-04-19 | No data | FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN THE PARKING LANE. INITIALLY THOUGHT THEY WERE EXCAVATING SIDEWALK IN GRASS AREA, BUT THEY WERE JUST PUTTING SEED DOWN ON GRASS. SPOKE WITH HOME OWNER. |
2018-04-19 | No data | EAST NEW YORK AVENUE, FROM STREET ST MARKS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | perm cut |
2018-04-19 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PED WALKWAY CLEAR |
2018-04-19 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Patched up. (ACTIVE BUILDING OPERATION) |
2018-04-19 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY FLUSH TO GRADE |
2018-04-18 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-04-18 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BUS LANE MISSING RED PAINT. please restore in kind. |
2018-04-18 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | BUS LANE MISSING RED PAINT. please restore in kind. |
2018-04-18 | No data | 119 STREET, FROM STREET 29 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2018-04-18 | No data | WEST 16 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut overdue for final. |
2018-04-18 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-10amcut- 14'x4'x10'3''- test 97% & 97.4%josejumping jackexclusiveabelsand conew-125.1d-117.6md-120am-6.4%cutback in progress |
2018-04-17 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent cut found in the parking-lane; seal street joints. OPPOSITE 308 JEFFERSON ST. |
2018-04-17 | No data | 21 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in the driving lane, in front of 5705 21 Avenue. Restoration in front of (16ft. x 7ft.) and opposite (9ft. x 9ft.) |
2018-04-17 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | trench needs to be sealed on roadway. |
2018-04-17 | No data | DEMEREST ROAD, FROM STREET BEND TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut to grade |
2018-04-17 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit updated M012018106A99 |
2018-04-17 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut found in the parking-lane; seal street joints. OPPOSITE 308 JEFFERSON ST. |
2018-04-17 | No data | ASTORIA BOULEVARD, FROM STREET 12 STREET TO STREET BEND | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut resealed |
2018-04-16 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | installing sewer/ouppy permit |
2018-04-16 | No data | LAWRENCE AVENUE, FROM STREET 47 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (14ft. x 4ft.) perm restoration in the parking/driving lane and sidewalk flag, in compliance. In front of 15 Lawrence Avenue |
2018-04-16 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway. |
2018-04-16 | No data | 6 AVENUE, FROM STREET 8 STREET TO STREET 9 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM CUT GOOD IN ROADWAY/PARKING LANE. WORK WAS DONE ON 6TH AVE BETWEEN 8TH AND 9TH ST |
2018-04-15 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | cuts on r/w |
2018-04-15 | No data | 149 STREET, FROM STREET ASH AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER OF SEWER-PLATED EXCAVATION IN THE PARKING LANE . NO CREW ON SITE. |
2018-04-15 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Trench is irregular and unacceptable, trench needs to be properly squared off in accordance with Standard Detail H-1042D note #3, I/F/O 50... (20176550311) |
2018-04-15 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR passed out during cleanup, to be re-issued. |
2018-04-15 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut on r/w. |
2018-04-15 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway by Hallen |
2018-04-14 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm r/w and sidewalk. |
2018-04-14 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2018-04-14 | No data | 46 ROAD, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No steel plate at this time. |
2018-04-14 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work beinging done roadway |
2018-04-14 | No data | 42 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (16ft. x 8ft.) perm restoration in the parking/driving lane, in front of 1526 42 Street |
2018-04-14 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new car issued |
2018-04-14 | No data | EAST 7 STREET, FROM STREET CATON AVENUE TO STREET FRIEL PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench d/l, temp cut on s/w ifo 190, new BO. |
2018-04-14 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE ENTIRE CONCRETE BUS STOP FLAG, ASPHALT RESTORATION IS UNACCEPTABLE IN CONCRETE BUS PAD, OPPOSITE 230 CLASSON AVE BETWEEN WILLOUGHBY AVE & MYRTLE AVE.car 20174511024 issued on11\26\2017 |
2018-04-14 | No data | EAST 7 STREET, FROM STREET CATON AVENUE TO STREET FRIEL PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench d/l, temp cut on s/w |
2018-04-13 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work found at time of inspection. |
2018-04-13 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 6 Maiden Lane, perm trench in roadway is free of defects. |
2018-04-13 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Disregard previous inspection. Put street instead of Avenue,4 plated excavations in the parking lane, in front of 6004, 6010, 6014 & 6020 16 Avenue (New Building). |
2018-04-13 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4 plated excavations in the parking lane, in front of 6004, 6010, 6014 & 6020 16 Avenue (New Building). New permit on file, B012018093D76 exp. 4/16/2018. |
2018-04-13 | No data | 45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent working at 2:15PM, past their stipulation hours. Failed to comply with stipulation 083 which states, WORK 9AM TO 2PM MONDAY TO FRIDAY. Permit, B012018100C18 exp. 5/5/2018, used for ID. |
2018-04-13 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO TEMPORARY PEDESTRIAN WALK |
2018-04-12 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 160, 2 countersunk steel plates in the roadway with active permit # M012018085C11 on file at time of inspection. |
2018-04-12 | No data | STOCKHOLM STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found. |
2018-04-12 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | REPAIR WATER - SEWER ON PROTECTED ROADWAY. BACKFILL COMPLETE ON 3 EXCAVATIONS IN THE DRIVING LANE. BASE AFTER CUT-BACKS. |
2018-04-12 | No data | 46 ROAD, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 RESTORATIONS MADE INTO ONE RESTORATION. ONLY 2 RESTORATIONS LEFT ON THE ROADWAY. |
2018-04-12 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later permit on file |
2018-04-11 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR will be reissued. |
2018-04-11 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I/F/O 531 please make final a long water cut that is overdue for final during the winter moratorium. Original CAR 20184330044 issued 1-31-18 |
2018-04-11 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on location .pass... |
2018-04-11 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2018-04-11 | No data | WEST 48 STREET, FROM STREET 5 AVENUE TO STREET ROCKEFELLER PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration flush to grade I/F/O active Building operation |
2018-04-11 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench, which is missing sealer, is sunken 1" in localized areas. F/O 140 MARTENSE STREET. Restore accordingly. *Previous CAR #20176620177 closed. |
2018-04-11 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 531 please make final a long water cut that is overdue for final during the winter moratorium. Original CAR 20184330044 issued 1-31-18 |
2018-04-10 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains. CAR will be reissued. |
2018-04-10 | No data | RUTLAND ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK STARTED |
2018-04-10 | No data | 46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | seal ok |
2018-04-10 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation the roadway |
2018-04-10 | No data | CENTRAL AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work started as of yet. Area sprayed out. |
2018-04-10 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal street opeing joints of two permanent long water cuts. F/O 3222 CORTELYOU ROAD. Previous CAR #20176620166 closed. |
2018-04-10 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER & SEWER - PLATED EXCAVATIONS ON THE ROADWAY. NO CREW ON SITE. |
2018-04-10 | No data | 6 AVENUE, FROM STREET 8 STREET TO STREET 9 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION GOOD IN ROADWAY, TEMP ASPHALT GOOD ON SIDEWALK |
2018-04-10 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | re-sealed ok |
2018-04-10 | No data | BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET | No data | Street Construction Inspections: Active | Department of Transportation | two steel counter sunken plates occupying driving and parking lane acceptable |
2018-04-09 | No data | UTICA AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RED BUS LANE RESTORED MARKING RESTORED |
2018-04-09 | No data | ST JOHNS PLACE, FROM STREET UNDERHILL AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permanent restoration in roadway and temporary sidewalk flag |
2018-04-08 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut sealed. |
2018-04-08 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm plumber cut - sealer re-applied |
2018-04-08 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Acceptable |
2018-04-07 | No data | WEBSTER AVENUE, FROM STREET ALDEN PLACE TO STREET EAST 178 STREET | No data | Street Construction Inspections: Active | Department of Transportation | full width of sidewalk open |
2018-04-07 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No new work found in the segment at time of inspection. |
2018-04-07 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Short water cut has been sealed. |
2018-04-07 | No data | 42 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | (17ft. x 8ft.) perm restoration in the parking/driving lane, in front of 1526 42 Street |
2018-04-06 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERMANENTLY ROADWAY RESTORATION (TRENCH) MOUNDED 1"ABOVE THE SURROUNDING ROADWAY, PLEASE MAKE THE RESTORATION FLUSH WITH THE SURROUNDING ROADWAY. PREVIOUS CAR # 20184890013. |
2018-04-06 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 4 plated excavations in the parking lane, in front of 6004, 6010, 6014 & 6020 16 Street (New Building) |
2018-04-06 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK DONE IN THE ROADWAY |
2018-04-06 | No data | ALBANY AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET MAPLE STREET | No data | Street Construction Inspections: Active | Department of Transportation | 10FT X 6FT PERM RESTORATION IN CENTER OF ROADWAY. TEMP TO GRADE RESTORATION IN THE PARKING INSIDE TEMPORARY PEDESTRIAN WALK WAY |
2018-04-06 | No data | WEBSTER AVENUE, FROM STREET ALDEN PLACE TO STREET EAST 178 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | late for BF did not monitor... Jennifer Ortiz, Exclusive Testing, Sand Cone.... Proctor test of Blend:Wet Density 128.4%, Dry Density 118.1%, Max Dry 122.5%, Moisture 8.7%.... first lift 96.6%, last lift 96.3%... cut size 5'x3'x8' |
2018-04-06 | No data | SHELL ROAD, FROM STREET BEND TO STREET SHORE PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition restored |
2018-04-06 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENTLY ROADWAY RESTORATION (TRENCH) MOUNDED 1"ABOVE THE SURROUNDING ROADWAY, PLEASE MAKE THE RESTORATION FLUSH WITH THE SURROUNDING ROADWAY. PREVIOUS CAR # 20184890013. |
2018-04-05 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent T shaped restoration running across the roadway not conform with H-1042D Note 3.restoration has broken/cracked asphalt that needs to be milled & repaved. street opening joints needs to be resealed. please refer to previous(CAR #20176200267) |
2018-04-05 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition remains the same |
2018-04-05 | No data | 6 AVENUE, FROM STREET 8 STREET TO STREET 9 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut AKA 375 9 Street. P/L. 5ft x 5ft, down 2ft on top of sprinkler. 97.5% WET 122.7 DRY 115.3 MAX 118.0 MOISTURE 6.4% CLEANFILL |
2018-04-05 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. 16' x 4' x 3' |
2018-04-05 | No data | LINDEN STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work found as of yet. |
2018-04-05 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R Re-inspection failed. T shape trench not restored as per H-1042D Note 3. New Car will be reissued for T shaped trench not conform with H-1042D # 3. street opening joints needs resealing. asphalt broken/cracked needs to be milled & repaved. |
2018-04-04 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore the portion of white crosswalk lane markings to short water cut |
2018-04-04 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please restore the portion of white crosswalk lane markings to short water cut |
2018-04-04 | No data | 45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA-FAILED: Temp restoration on the sidewalk remains sunken 2 inches. |
2018-04-04 | No data | MULBERRY STREET, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work plated, permit updated M012018082C35 |
2018-04-03 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm trench sealed. |
2018-04-03 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | JOINT AND SEALED |
2018-04-03 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plate removed |
2018-04-03 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp cut in roadway and swk. In compliance. Permit still active. |
2018-04-03 | No data | 45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | I observed the above respondent failed to respond to priority one CAR # 20185980064 on 4/2/2018. Failed to restore to grade a temporary restoration in the sidewalk, that is down 2 inches. Expired permit, B012017341A03 exp. 1/2/2018, used for ID. |
2018-04-03 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RE-SEALED OK |
2018-04-03 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | re-seal ok |
2018-04-02 | No data | 45 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2018-04-02 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate in r/w countersunk and in compliance |
2018-04-02 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane markings restored |
2018-04-02 | No data | 42 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp water cut on the s/w. |
2018-04-01 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut paved over location in compliance. |
2018-04-01 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 countersunk steel plates over excavation in the roadway, raise plow signs posted |
2018-04-01 | No data | DE KALB AVENUE, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sewer relay .../now plated |
2018-03-31 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent plumber cut in roadway. Binder material use for final restoration is not acceptable. Asphalt must be used and properly rolled |
2018-03-31 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent plumber cut in roadway - color code is missing. Portion of permanent plumber cut is sunken 1 inch |
2018-03-31 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber cut in roadway - color code is missing. Portion of permanent plumber cut is sunken 1 inch |
2018-03-31 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber cut in roadway. Binder material use for final restoration is not acceptable. Asphalt must be used and properly rolled |
2018-03-30 | No data | 6 AVENUE, FROM STREET 8 STREET TO STREET 9 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | plated excavation on the sidewalk |
2018-03-30 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PORTION OF PERMANENT RESTORATION IN THE DRIVING LANE IS DOWN 3 AND A HALF INCHES BELOW GRADE OF ROADWAY IN FRONT OF 220 77TH STREET BETWEEN RIDGE BLVD AND 3RD AVENUE. |
2018-03-30 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | permanent restoration has been brought flush to grade |
2018-03-30 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in parking lane ifo 35 acceptable. |
2018-03-29 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition remains the same. New CAR issued |
2018-03-29 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'6'' x 4'7'' patch work done on the permanent restoration in the driving lane, the roadway wearing course needs to be fully restored in kind and flush to grade. Located opposite of 53-03 Douglaston Pkwy. Please restore |
2018-03-28 | No data | MULBERRY STREET, FROM STREET JERSEY STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started i/f/o 264, valid permit M012018081A96 on file |
2018-03-28 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench sealed. |
2018-03-28 | No data | GREENPOINT AVENUE, FROM STREET FRANKLIN STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated excavations on the r/w raise plow sign |
2018-03-28 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sealer re-applied |
2018-03-26 | No data | HALSEY STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk flag ok. |
2018-03-26 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restore solid white lane marking on roadway. |
2018-03-26 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench sealed and perm to grade, in compliance with CAR |
2018-03-26 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore solid white lane marking on roadway. |
2018-03-25 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R Re-inspection failed. restoration has been seal, however T shaped restoration not conform with H-1042D Note 3. New Car will be issued. |
2018-03-25 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a plated excavation in the roadway without a valid DOT permit on file. Plate marked "P NYC" and expired permit used to ID. |
2018-03-25 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | updated active permit on file. |
2018-03-25 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the parking/bike lane. |
2018-03-24 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two Restorations 6' apart each other must be made into one restoration, missing Street opening Joints from both Restorations and Asphalt broken out and down 1 1/2" below Roadway surface within one of the said restoration. |
2018-03-24 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No repairs made, new Car will be issued for two cuts 6' apart must made into one cut, missing Street opening Joints seal and Asphalt broken out and down 1 1/2" below grade within one of Restorations. |
2018-03-24 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | most of per restoration was paved over by more recent con ed |
2018-03-24 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White Lane Markings were not restored new Car will be issued to restore White Lane Markings. |
2018-03-24 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | White Lane Markings in the driving / partially right turning Lanes needs to be restored on your repair water Restoration. the letters "Y" and "O" |
2018-03-24 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ISSUE NICA |
2018-03-24 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restore double yellow lane marking on roadway. |
2018-03-24 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore double yellow lane marking on roadway. |
2018-03-24 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION DOWN 3 INCHES IN CENTER OF ROADWAY, IN FRONT OF 2074 57 STREET BETWEEN 21 AVENUE & 20 AVENUE. PLEASE RESTORE TO GRADE. |
2018-03-24 | No data | EAST NEW YORK AVENUE, FROM STREET ST MARKS AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued |
2018-03-23 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Restoration made safe. Condition corrected |
2018-03-23 | No data | WEST 18 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew at site working excavation p/l |
2018-03-23 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A CAR WAS ISSUED ON A NEWER PERMIT |
2018-03-23 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE DOUBLE YELLOW LANE MARKINGS ON THE FINAL RESTORATION, PREVIOUS CAR #20173720531 |
2018-03-23 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced after this condition |
2018-03-23 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | asphalt breaking out of perm trench down 2'' and also reseal 2 trenches. |
2018-03-23 | No data | EAST 13 STREET, FROM STREET 1 AVENUE TO STREET AVENUE A | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work to continue under permit#M012018067B92 |
2018-03-23 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | asphalt breaking out of perm trench down 2'' and also reseal 2 trenches. |
2018-03-22 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | attempt made to correct. condition worsening creating 3" wide crack in asphalt 2' long |
2018-03-22 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | WAS RE-SEALED OK |
2018-03-21 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | buckling asphalt surrounding countersunk plated water cut down 2" exposing lip of plate. please make safe |
2018-03-21 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Attempt made. Condition failed and is getting worse. Exposed space now 6" wide. |
2018-03-21 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, no work visible (if any) due to snow covering roadway and sidewalk. |
2018-03-21 | No data | EAST 75 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR Project-Condition corrected, Grating made flush with s/w. |
2018-03-20 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Re-issue C.A.R. |
2018-03-20 | No data | CANAL STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable |
2018-03-20 | No data | THOMPSON STREET, FROM STREET BLEECKER STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water repair work done on the SW in front of 207 Thompson street , contractor must reseal exposed expansion joint. |
2018-03-20 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp asphalt on a concrete sidewalk overdue for final, need to store 2 full concrete sidewalk flags on the sidewalk i/f/o 276, permit expired on 12/28/17. |
2018-03-19 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass car |
2018-03-19 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE WHITE LANE MARKINGS WITHIN 2 PERM TRENCHES ON ROADWAY. |
2018-03-19 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent plumber cut need roadway sealer |
2018-03-19 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORE WHITE LANE MARKINGS WITHIN 2 PERM TRENCHES ON ROADWAY. |
2018-03-19 | No data | 59 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | NO WORK DONE. MARKINGS ON THE ROADWAY I/F/O BUILDING OPERATION. REPAIR WATER - SEWER |
2018-03-18 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway. Ok |
2018-03-18 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR issued for double yellow lane markings under newer permit |
2018-03-17 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w okay |
2018-03-17 | No data | MAIDEN LANE, FROM STREET BROADWAY TO STREET LIBERTY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site excavating street IFO 6 Maiden Lane. Acceptable. |
2018-03-17 | No data | ROOSEVELT AVENUE, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest p/l d/l |
2018-03-17 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front 734 Broadway in the parking lane there is a perm water cut with multiple areas of asphalt that's brokenout and crack , also sidewalk flag around water valve cover with patch work and missing expansion joint near curb-line must be corrected. |
2018-03-16 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the crosswalk |
2018-03-16 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation on the roadway marked "PNYC" to install water and sewer . Respondent failed to countersink plate flush with roadway, as per the department's annual winter moratorium period. IFO 1408 47TH Street.NOV issued |
2018-03-15 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2017 cuts found on roadway |
2018-03-15 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ONE CUT IN THE OPPOSITE PARKING LANE. ROADWAY BEING MILLED FOR BPP IN FRONT OF #239 |
2018-03-15 | No data | MARCY AVENUE, FROM STREET MARTIN L KING PLACE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W OKAY |
2018-03-15 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | 1/18/2018 7:12:29 AM 489 - Marcus Joseph Complaint CAR (Other) [#20184890013] PERMANENTLY ROADWAY RESTORATION (TRENCH) MOUNDED 1"ABOVE THE SURROUNDING ROADWAY, PLEASE MAKE THE RESTORATION FLUSH WITH THE SURROUNDING ROADWAY |
2018-03-15 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by BPP. |
2018-03-14 | No data | THROOP AVENUE, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 12 feet 6 inches x (W) 4 feet x (D) 9 feet .. compaction 97.2 and 97.8%.. monitored from 9:50am-11:55am. |
2018-03-14 | No data | CUMBERLAND STREET, FROM STREET GREENE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | PLUMBING NYC INC CUMBERLAND GREENE AVE LAFAYETTE AVE CUT#1 4 FT 6 IN WIDTH 3 FT 4 IN DEPTH 3 FT 9 IN BACKFILL MATERIAL BLEND WET DENSITY 119.4DRY DENSITY 112.2 MAX DRY DENSITY 115.5ACTUAL MOISTURE 6.3 FIRST LIFT 97.9 LAST LIFT 98.2 |
2018-03-14 | No data | PROSPECT PARK SOUTHWEST, FROM STREET GREENWOOD AVENUE TO STREET REEVE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in roadway.OK |
2018-03-14 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | time of inspection perm cut in r/w |
2018-03-13 | No data | MAPLE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING IN OPEN EXCAVATION IN SIDE WALK. IN FRONT OF #287 |
2018-03-13 | No data | 124 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l |
2018-03-13 | No data | EAST 17 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l, p/l opp 1127 |
2018-03-13 | No data | BOWNE STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued for failing to comply with the 2017/2018 winter moratorium. |
2018-03-13 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | CAR ISSUED PREVIOUSLY |
2018-03-13 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH IN THE ROADWAY. PARTIALLY COVERED BY CON ED TRENCH |
2018-03-13 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2018-03-13 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2018-03-12 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Area has been patched and made safe. In compliance. |
2018-03-12 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temporary cuts in driving lane and sidewalk are overdue for final restoration. Must restore permanently. |
2018-03-12 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was resurfaced by BPP. |
2018-03-12 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO VISIBLE CUTS DUE TO BPP |
2018-03-12 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER-PERM |
2018-03-12 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â PassCut #1: (L): 12ft (W): 4ft (D): 6ft â 96.3%; 97.4%Cut #2: (L): 5ft (W): 4ft (D): 3ft 6in â 96.7%Located in both P/L-D/L IFO 1108.Cutbacks made (curb-to-curb).Arrival: 10:30AMDeparture: 1:50PM |
2018-03-11 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One steel plate marked "PNYCI" countersink flush in the bike lane with the surrounding roadway surface with later permit on file. |
2018-03-11 | No data | WEBSTER AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later work done by JLJ |
2018-03-11 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a 4ft x 3ft area within a temporary trench that is sunken down approximately 7 inches. Major hazard for drivers. Trench and sidewalk flag are also overdue for final restoration. Must restore permanently to grade immediately. Opp 16 Harrison. |
2018-03-11 | No data | INGRAHAM STREET, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. |
2018-03-11 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane opp 366. |
2018-03-11 | No data | CLIFTON PLACE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | countersunk plate in parking lane okay. new permit on file |
2018-03-11 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED RW EXCAVATION WITH A RAISE PLOW SIGN POSTED |
2018-03-11 | No data | 47 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 COUNTER SUNK PLATED ROADWAY EXCAVATION WITH RAISE PLOW SIGN POSTED |
2018-03-11 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in compliance sidewalk flags restored. |
2018-03-10 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench Sunken 2 Inches in the Roadway. Also, Entire Trench must be Fully Repaved Due to Asphalt Broken out Through out the Restoration and Thus, must be in Compliance as per DOT Stardard Specs. |
2018-03-10 | No data | 37 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the d/l |
2018-03-10 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 Steel plates countersunk in the driving lane , sidewalk plated and raise plow sign posted |
2018-03-10 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Steel plates countersunk in the driving lane and sidewalk plated . Raise plow sign posted |
2018-03-10 | No data | FAIRVIEW AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts if & opp. address |
2018-03-09 | No data | 54 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING |
2018-03-09 | No data | CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the driving/parking lane |
2018-03-09 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE LANE MARKING FOR THE BIKE LANE. |
2018-03-09 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w resurfaced after this condition |
2018-03-09 | No data | 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking/driving lane. Opposite of 826 52 Street |
2018-03-08 | No data | DONGAN AVENUE, FROM STREET POYER STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane in compliance at time of inspection. |
2018-03-08 | No data | WEST 48 STREET, FROM STREET 5 AVENUE TO STREET ROCKEFELLER PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit on file,roadway i/f/o 12 plated |
2018-03-07 | No data | 38 AVENUE, FROM STREET 215 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The respondent failed to countersink steel plates on the roadway water cuts. As per the winter moratorium states begining 12/1/17 - 4/3//18. |
2018-03-06 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (14ft. x 7ft.) perm restoration in the parking/driving lane. In front of 949 59 Street |
2018-03-06 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit#B012016315A28 on file. |
2018-03-06 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working within roadway/sidewalk trench. Signs posted. |
2018-03-05 | No data | 41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flag around water access cover, in compliance.Roadway was paved by builder's paving |
2018-03-05 | No data | THROOP AVENUE, FROM STREET GREENE AVENUE TO STREET VAN BUREN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cuts on r/w or swk |
2018-03-04 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway/Sidewalk. |
2018-03-04 | No data | QUINCY STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit renewed |
2018-03-04 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway/ Sidewalk |
2018-03-04 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane ok. |
2018-03-03 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water Repair was Resurfaced By National Grid |
2018-03-03 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobble stoneST OK |
2018-03-02 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary restoration on the the sidewalk overdue for final |
2018-03-02 | No data | 54 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunk steel plate in the roadway, raise plow signs at site |
2018-03-01 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2018-03-01 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm has been updated |
2018-03-01 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Plated water cut acceptable |
2018-03-01 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in compliance. Located IFO BO. |
2018-02-28 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL PERMANENT RESTORATION IN THE PARKING/DRIVING LANE IN FRONT OF 4516 18TH AVENUE. |
2018-02-28 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS IN BOTH PARKING LANES THAT NEEDS TO BE RESEALED. SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER. CAR ISSUED UNDER LATEST PERMIT |
2018-02-28 | No data | PROSPECT PARK WEST, FROM STREET 17 STREET TO STREET 18 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6ft 4ft down3ft 14 ft 3ft down 4ft 4ft 3ft down 4ft |
2018-02-28 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES ARE PLACED CORRECTLY AND ARE COUNTERSUNK ON ROADWAY |
2018-02-28 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in the r/w. |
2018-02-28 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | In front of 4518, (Brenda's) there are Plumbing Works steel plates which are shifted 1" and raised 1.5" in the r/w, causing vehicles to dip in motion. |
2018-02-28 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION FROM CURB TO CURB OK |
2018-02-28 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CUT ON THE ROADWAY IN THE PARKING/DRIVING LANE IS FLUSH TO GRADE |
2018-02-28 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut covered by BPP |
2018-02-27 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM RESTORATION CUT ON THE ROADWAY IN THE PARKING/DRIVING LANE IS FLUSH TO GRADE |
2018-02-27 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(10â)W(4â)D(3â)TEST#1=97.1Backfill pass saw cuts done |
2018-02-27 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts to grade in the p/l opposite 33-27/29 |
2018-02-27 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2018-02-27 | No data | EASTERN PARKWAY, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY. SIDE WALK FLAG INSTALLED AROUND WATER CAP COVER |
2018-02-27 | No data | THOMPSON STREET, FROM STREET BLEECKER STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Not a build it back project. |
2018-02-27 | No data | THOMPSON STREET, FROM STREET BLEECKER STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | There is a temp water cut on the SW that is over due for final in front of 211 Thompson street. |
2018-02-27 | No data | 101 AVENUE, FROM STREET 109 STREET TO STREET 110 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | start 12:00 5.0 x4.0 x 3.0. On the second lift the clean fill material became spongy. The material was removed and sand was used. It then passed |
2018-02-27 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Start: 11:30A End: 1:35PCut 1: L:11FT.4IN W:6FT.2IN D:4FT.7INCut 2: L:6FT.5IN W:5FT.0IN D:4FT.8INCleanfill : WD:124.5 DD:114.5 MD:120.0 MST:8.7%Blend: WD:125.1 DD:113.8 MD:118. MST:9.8%Cut 1: 1.96.9% 2. 97.2%Cut 2: 96.3% 2. 97.1% |
2018-02-27 | No data | ALDERTON STREET, FROM STREET 66 AVENUE TO STREET ELLWELL CRESCENT | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway 3 Day Dep Notice Issued |
2018-02-27 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave over water restoration |
2018-02-26 | No data | 58 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO 2017 CUTS FOUND ON ROADWAY |
2018-02-26 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | (14ft. x 7ft.) permanent restoration in the roadway in front of 949 59 Street |
2018-02-26 | No data | BALTIC STREET, FROM STREET HICKS STREET TO STREET WARREN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFICED |
2018-02-26 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PARKING/DRIVING LANE |
2018-02-26 | No data | SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway Water Currently Being Pumped out of Roadway. Property Owner on Site |
2018-02-26 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp to grade parking-lane cut. Debris stored (stip. 020).*valid permit on file. |
2018-02-26 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunken plated excavation (opp. 1108). RAISE PLOW SIGN POSTED. |
2018-02-25 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench |
2018-02-25 | No data | 54 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the roadway, in front of 1258 54 Street |
2018-02-25 | No data | 57 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restorations in the parking lane |
2018-02-25 | No data | POWERS STREET, FROM STREET BUSHWICK AVENUE TO STREET JUDGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found. Possibly resurfaced. |
2018-02-25 | No data | PROSPECT PARK WEST, FROM STREET 17 STREET TO STREET 18 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS FAILED TO COUNTERSINK PLUMBING NYC, INC STEEL PLATES DURING WINTER MORATORIUM (DECEMBER 1,2017 TO APRIL 1, 2018)-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. DOT PERMIT# |
2018-02-25 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit secured for the work. |
2018-02-24 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2018-02-24 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP IN THE PARKING LANE LONG WATER CUT |
2018-02-24 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w |
2018-02-24 | No data | CORNELIA STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Road paved BPP, half plus 5' , new building 1487 Broadway |
2018-02-24 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION DOWN 1 1/2- 2 INCHES IN DRIVING LANE OF ROADWAY, IN FRONT OF 720 LAFAYETTE AVE BETWEEN TOMPKINS AVENUE & THROOP AVENUE. PLEASE RESTORE TO GRADE. |
2018-02-23 | No data | 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Perm restorations in the roadway in front of 953-955 50 Street |
2018-02-23 | No data | SACKETT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6 cuts on the street ok |
2018-02-23 | No data | MERMAID AVENUE, FROM STREET WEST 32 STREET TO STREET WEST 33 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 1/6/2018. Respondent failed t |
2018-02-23 | No data | PROSPECT PARK WEST, FROM STREET 17 STREET TO STREET 18 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT DID NOT PROPERLY COUNTERSINK PLATES;THE WINTER MORATORIUM BEGINS 12/01/2017 - 4/30/2018, FAILED TO COUNTERSINK PLATES FLUSH WITH ROADWAY. DOT PERMIT#B0120180052A01 EXP 3/9/2018 NAME ON STEEL PLATE USED FOR ID. |
2018-02-23 | No data | LORIMER STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | countersunk plate on r.w |
2018-02-23 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut P/L, Bus pad. 6ft x 4ft. down 4ft. 97.4% & 97.2% WET 121.5 DRY 111. 8 MAX 117.0 MOISTURE 8.7% CLEANFILL. |
2018-02-23 | No data | EAST 52 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN D/L |
2018-02-22 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway was paved |
2018-02-22 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking-lane cut. |
2018-02-22 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm gas cut in the r/w. |
2018-02-22 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration on roadway in compliance. |
2018-02-22 | No data | 17 STREET, FROM STREET 10 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/24/17. Respondent failed |
2018-02-21 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal permanent restoration in the roadway.In front of 825 53 Street between 9 Avenue and 8 Avenue |
2018-02-21 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 10/21/2017. Respondent failed to obtai |
2018-02-21 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO NEW WORK FOUND - REPAIR WATER - SEWER |
2018-02-21 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER OF SEWER-PERM |
2018-02-21 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6ft \3ft\down 4ft \4ft\2ft down 4ft |
2018-02-21 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 11/1/2017. Respondent faile |
2018-02-21 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | One steel plate marked "PNYCI" countersink flush in the bike lane with the surrounding roadway surface with later permit on file. |
2018-02-21 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | ARRIVAL/ACTUAL START: 11:40AM/12:15PMDEPARTURE: 2:15PMDIMENSIONS: A. (L)13âX(W)4âX(D)8â B. (L)7âX(W)4âX(D)3â6âCOMPACTION(S): 97.7% / 97.5% / 96.7%/ 96.9%NOTES: F/O 850 PUTNAM AVE (PARKING/DRIVING LANE). CUTBACKS SPRAYED. |
2018-02-20 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working in front of location to repair a service leak . 3 day notice.. |
2018-02-20 | No data | EAST 75 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please repair and properly flush with the surrounding area a grate located on the sidewalk that is "1 above grade causing a trip hazard for pedestrians. |
2018-02-19 | No data | 3 AVENUE, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESTORATION |
2018-02-19 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | STEEL PLATED SIDEWALK & ROADWAY WITH A VALID DOT PERMIT. |
2018-02-18 | No data | 12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane, in compliance. In front of 5706 12 Avenue |
2018-02-18 | No data | 11 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in the parking lane |
2018-02-17 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 EXCAVATIONS COUNTER SUNK RAISE PLOW SIGN POSTED |
2018-02-17 | No data | WEST 13 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 prem cuts on r/w |
2018-02-16 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...09 ...perm ... |
2018-02-16 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE TWO TEMP CUTS IN BOTH PARKING LANES. CREW JUST FINISHED BACK FILL |
2018-02-16 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill Pass2 Cut size:7 Feet 3 inches by 2 Feet 9 inches Down 3 feet 10 inches.6 Feet by 4 Feet 5 inches Down 3 Feet 10 inches1. First lift â 96.5%; Last 97.0 %2. First lift â 96.3%; Last 97.6 %AR: 9:29AMDP: 11:30AM |
2018-02-16 | No data | 11 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane |
2018-02-16 | No data | NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT CLOSED THE ENTIRE SIDE WALK TO PEDESTRIANS. WITH BARRICADES WHILE WORKING IN A OPEN EXCAVATION IN THE SIDE WALK AND ROADWAY. AND FAILED TO ADHERE TO TERMS AND CONDITIONS OF STIPULATION 013. PERMIT |
2018-02-16 | No data | 84 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water and sewer plugs / under parked and sidewalk |
2018-02-16 | No data | 64 STREET, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade p/d/l - seal slightly sunken,no CAR needed at this time. |
2018-02-16 | No data | LAFAYETTE AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | bkfill notes: (L) 3.2 FT (W) 3.2 FT (D) 3.6 FT ..ACTUAL START TIME 3:22 PM ..COMPACTION: 97.5% / 97.4% |
2018-02-15 | No data | 49 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance, expansion joints sealed |
2018-02-15 | No data | 137 STREET, FROM STREET 32 AVENUE TO STREET 34 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builder's pave |
2018-02-15 | No data | 35 AVENUE, FROM STREET FARRINGTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water perm cut to grade in the p/l |
2018-02-15 | No data | EAST 75 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags have been fully replaced and are in compliance. Expansion joints have been recessed and sealed. |
2018-02-15 | No data | PRINCE STREET, FROM STREET 35 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water permcut to grade in the p/l on 35ave |
2018-02-15 | No data | CANAL STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED RESPONDENT FAILED TO PROVIDE RAISED PLOW SIGNS OVER COUNTERSUNK STEEL PLATES COVERING WATER REPAIR EXCAVATION ON ROADWAY. NYCDOT PERMIT M012018036B63 USED FOR IDENTIFICATION PURPOSE ONLY |
2018-02-14 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm |
2018-02-14 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain confirmation number |
2018-02-14 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired 12/27/2017. Respondent failed to obtain a confirmation number from the department. |
2018-02-14 | No data | 41 AVENUE, FROM STREET FULLER PLACE TO STREET HAIGHT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2018-02-13 | No data | DOWNING STREET, FROM STREET 31 ROAD TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not visible due to park cars , at time of inspection |
2018-02-13 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in parking lane. |
2018-02-13 | No data | CANAL STREET, FROM STREET ELIZABETH STREET TO STREET MOTT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 lift 2 test. Tester leaves and replaced by partner. Waited for NYPD to remove car from location. Base Cutback marked out. Proceed to base cutback |
2018-02-13 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY HAS BEEN REPAVED |
2018-02-13 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Re-scheduled due to concrete curing. |
2018-02-12 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plumbing work is in progress - sidewalk is closed - signs posted - flagperson on site |
2018-02-12 | No data | 11 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in the roadway and temporary sidewalk trench.Active B/O |
2018-02-12 | No data | UTICA AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Active | Department of Transportation | restore perm cut in kind. red bus stop paint must be placed. |
2018-02-11 | No data | SHELL ROAD, FROM STREET BEND TO STREET SHORE PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w has areas that have cracked and need repair also there are areas of r/w 12" outside of cut that have cracked and also need repair |
2018-02-11 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install and seal expansion joint between sidewalk and curb. |
2018-02-10 | No data | SHELL ROAD, FROM STREET 86 STREET TO STREET BOUCK COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found no cuts on r/w or s/w |
2018-02-10 | No data | MYRTLE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane okay |
2018-02-10 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway or Suidewalk |
2018-02-10 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM RWY RESTORATIONS AND 2 TEMP SWK RESTORATION(BUILDING OPERATION) |
2018-02-09 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut is in compliance |
2018-02-09 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut needs to be re-sealedc.a.r issued to newer permit |
2018-02-09 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO PERMIT |
2018-02-09 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut covered by BPP |
2018-02-08 | No data | ORANGE STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBER COUNTERSUNK STEEL PLATE IN RWY 30 WEST OF HENRY ST |
2018-02-08 | No data | BROADWAY, FROM STREET WEST 79 STREET TO STREET WEST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE B/O IFO location; unable to fully inspect cut. |
2018-02-08 | No data | 17 AVENUE, FROM STREET 76 STREET TO STREET 77 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site making repair in rw |
2018-02-08 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway in compliance |
2018-02-08 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restorations in roadway. New permit on file, B012018016D00 |
2018-02-08 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, perm restorations in roadway |
2018-02-08 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 1 CUT IN THE PARKING LANE (L) 5FT (W) 4FT 1IN (D) 3FT 8IN WET DENSITY-119.1DRY DENSITY-110.8MAX DRY DENSITY-117.5ACTUAL MOISTURE-7.5FIRST LIFT-96.6LAST LIFT-97.0SPRAYED OUT FOR BASE CUT BACKS |
2018-02-08 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is covered by BPP |
2018-02-08 | No data | 46 AVENUE, FROM STREET 202 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. |
2018-02-08 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration I/F/O 130 |
2018-02-07 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on r/w. |
2018-02-06 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 12/22/2017. Respond |
2018-02-06 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permits on file |
2018-02-06 | No data | UTICA AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new cut on utica |
2018-02-06 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway, in compliance |
2018-02-06 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent trench in roadway needs to be resealed |
2018-02-06 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/6/2017. Respondent fai |
2018-02-06 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l |
2018-02-06 | No data | PRESIDENT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Active | Department of Transportation | APPROVED FOR NOT COUNTERSINKING PLATES 2-6-18 (JOE YACCA) |
2018-02-05 | No data | CROTONA PARKWAY, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2018-02-05 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 11/14/. |
2018-02-05 | No data | WEST 48 STREET, FROM STREET 5 AVENUE TO STREET ROCKEFELLER PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | unable to do full inspection due to active B.O |
2018-02-05 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench. |
2018-02-04 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 cuts needed to be re-sealed.C.A.R was issued under a newer permit |
2018-02-03 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk opp of New Building , Raise plow sign posted. Steel plate in front of 771, opp of New Building. |
2018-02-03 | No data | BROADWAY, FROM STREET ASTOR PLACE TO STREET WAVERLY PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Active work in location, 2 line open for traffic. |
2018-02-03 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut in roadway and sidewalk , ok |
2018-02-03 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Roadway Trench must be Repaved & Resealed due to Asphalt Broken |
2018-02-03 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the Respondent had an Steel Plated Open Excavation in the Roadway with out an Valid Permit. Enclosed Permit Expired on 1/26/18. |
2018-02-03 | No data | 8 AVENUE, FROM STREET 41 STREET TO STREET 42 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2018-02-03 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plate countersunk opp of New Building , Raise plow sign post. Steel plate in front of 771, opp of New Building. New permit on file |
2018-02-02 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNK PLATED EXCAVATION WITH A RAISE PLOW SIGN POSTED |
2018-02-02 | No data | PACIFIC STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Long water perm cut in front of 920 in compliance. |
2018-02-02 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2018-02-02 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER: New permit # M012018033A99 |
2018-02-01 | No data | NORTH 8 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-11:30amcut- 4'x4'x3'- test- 97.3 797.8cut2-5'3''x3'x4' - test- 96.8 & 97.7georgejumping jackexclusive testing labandrewsand conew-112.2d-103.3md-105.5am-8.7mg |
2018-02-01 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 11/10/17. Respondent failed to obtain a confirmation number. |
2018-02-01 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SEWER CUT IN THE D/L AND P/L |
2018-01-31 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway in compliance. |
2018-01-31 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill Pass2 Cuts size:14 Feet 1 inches by 4 Feet 8 inches Down 10 feet 7 Feet by 4 Feet 5 inches Down 3 Feet 5 inches1.First lift â 96.2 % Last Lift â 96.9% 2. 97.3WD â 124.50,DD â 117.0,Max D â 118.0,AM â 6.4Concrete base was install |
2018-01-31 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp trench overdue for final |
2018-01-30 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Workers on site at time of inspection. |
2018-01-30 | No data | 38 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut to grade d/l visible - the rest of the area p/d/l paved by the builder,new gas work inside the area,new s/w. |
2018-01-30 | No data | HERKIMER STREET, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newer permit on file. Workers on site at time of inspection. |
2018-01-30 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2018-01-29 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2018-01-29 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOT COUNTER SUNK |
2018-01-29 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway in compliance |
2018-01-29 | No data | WASHINGTON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2018-01-29 | No data | METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET RIVER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2018-01-28 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway Recently Resurfaced |
2018-01-28 | No data | CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass.....09 ...n/s of street .. |
2018-01-28 | No data | ASTORIA BOULEVARD, FROM STREET 12 STREET TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opp. 8-63 perm. cut to be resealed loc. areas,cracked edges. |
2018-01-27 | No data | CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane paved and new sidewalk , New Building |
2018-01-27 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sw r\w paved |
2018-01-27 | No data | 12 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water leak on sprinkler. DEP three day notice on site. Excavation on the sidewalk and in the roadway. |
2018-01-27 | No data | SPRING STREET, FROM STREET CLEVELAND PLACE TO STREET MULBERRY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site, water leak on service. DEP three day notice on site. Excavation in the driving / parking lane. |
2018-01-26 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plates marked PNYC/PWI not countersink at driving lane of roadway(plow sign posted) respondent failed to comply with DOT winter moratorium policy |
2018-01-26 | No data | 21 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut#1: L: 14ft.0in. W: 4ft.2in. D:10ft.6in. 1st Lift: 97.7 Last Lift: 97.0Cut#2: L:5ft.10in. W: 3ft.5in. D: 4ft.10in. 1st Lift: 97.8 Last Lift: 97.3WD: 120.6 DD: 111.0 MDD: 116.O MST: 8.7%Start Time: 11:19am End Time: 2:38pm |
2018-01-25 | No data | INGRAHAM STREET, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | A.T.P.O I observed the above respondent failed to begin emergency work within 2 hours after authorization at of the above location. During inspection there was no excavation made in roadway , side walk or surrounding area of above location |
2018-01-25 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration in roadway in compliance |
2018-01-24 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is sealed and in compliance |
2018-01-24 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut across roadway flused to grade color coded and sealed |
2018-01-24 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in roadway in compliance. |
2018-01-24 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING, SIDEWALK CLOSED STIP 112 ALLOWS THIS, FLAGMAN POSTED. |
2018-01-24 | No data | 228 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed in compliance. (4'4" X 3'8" X 4'10" & 14'2" X 4'4" X 4'10") |
2018-01-24 | No data | HARRISON PLACE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working in front of location to repair a leak in basement. 3 day notice.. Cut in roadway opposite of # 16 |
2018-01-23 | No data | 39 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMANENT RESTORATION IN PARKING/DRIVING LANE |
2018-01-23 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE STIPS IN COMPLIANCE |
2018-01-23 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO SEAL ON RESTORATION |
2018-01-23 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut crew on site |
2018-01-22 | No data | 228 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER. 2 plated excavation in the roadway. 1 open excavation on the sidewalk. Crew on the site. |
2018-01-21 | No data | 41 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway to grade |
2018-01-20 | No data | PRESIDENT STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w cut ok |
2018-01-20 | No data | PACIFIC STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water trench in the roadway |
2018-01-19 | No data | DECATUR STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Countersunken plated excavation (opp. 1108). RAISE PLOW SIGN POSTED |
2018-01-19 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | not permittee cut info sent by Mr. bergin summons unit manager1-19-108 via e-mail |
2018-01-18 | No data | 139 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Builder's pavement roadway work not visible. |
2018-01-18 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CUT ON THE ROADWAY IN THE BUS PAD IS FLUSH TO GRADE |
2018-01-18 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w is sealed and in compliance |
2018-01-18 | No data | 196 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued |
2018-01-18 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | PERMANENTLY ROADWAY RESTORATION (TRENCH) MOUNDED 1"ABOVE THE SURROUNDING ROADWAY, PLEASE MAKE THE RESTORATION FLUSH WITH THE SURROUNDING ROADWAY. |
2018-01-17 | No data | DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the parking lane |
2018-01-17 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Driving lane excavation . |
2018-01-16 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the driving lane Opp 325 |
2018-01-16 | No data | DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done in the roadway |
2018-01-16 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | by crosswalk next to rogers ave |
2018-01-15 | No data | 74 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE11FT0IN X 4FT0IN X 11FT4IN C:96.9 (1), 97.2 (2)11FT0IN X 4FT0IN X 11FT4IN C:96.6 (1), 96.3 (2)6FT0IN X 4FT6IN X 5FT0IN C:96.7 (1), 97.0 (2)WD:122.7; DD:112.9; MDD:115.0; MST:8.7%START 11:34 END 4:24 |
2018-01-12 | No data | WILLOW STREET, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | found in front of 76 willow st crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file |
2018-01-12 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On sidewalk, - Temporary Restoration Overdue for FINAL RESTORATION |
2018-01-11 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the respondent with 2 plated excavation in the roadway without an active permit. No active permit on file. |
2018-01-11 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site ATOI. Steel plated excavations in the r/w, crew on site, work in progress. Perm water trench in the r/w, curb to curb. |
2018-01-11 | No data | 228 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER - PLATED EXCAVATION IN THE ROADWAY COUNTERSUNK. NO CREW ON SITE. |
2018-01-10 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cuts are perm but damaged permit active no car while permit active |
2018-01-10 | No data | 18 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2018-01-09 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE ROADWAY FLUSH TO GRADE |
2018-01-09 | No data | FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERMANENT RESTORATION IN THE PARKING/DRIVING LANE. PERMITTEE SAID THEY WERE DOING THE BASE ALSO THAT DAY. I TOLD THEM THEY MUST USE CONCRETE AS THE BASE THEY HAD TO RESCHEDULE THE WORK DUE TO NOT HAVING CONCRETE. BASE WAS NEVER RECORDED. |
2018-01-08 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTERSUNK PLATE ON ROADWAY. |
2018-01-07 | No data | 228 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER & SEWER -ROADWAY AND SIDEWALK COVERED WITH SNOW. NO VISIBILITY. |
2018-01-06 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the above respondent has a shifted plated excavation in the driving lane without a active DOT permit to do so. Permit expired 11/14/2017. |
2018-01-06 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates are flushed and area made safe |
2018-01-06 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 46-39, There is a shifted steel plate labeled "PWI" that is exposing a 5' deep excavation in the driving lane. Restore roadway with surrounding area and countersink steel plates ASAP. |
2018-01-05 | No data | WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET MORNINGSIDE DRIVE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leaking inside the basement , 1 excavation being made to turn off water, driving lane cut located next to WSNY manhole . |
2018-01-05 | No data | MORNINGSIDE DRIVE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Water leak inside the basement , excavation made on the sidewalk around water valve to turn off the water. . Excavation located 15-20 feet from DOCTORS LICENSE Plate only parking sign, between two big trees. |
2018-01-03 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 COUNTERSUNK STEEL PLATED EXCAVATIONS IN THE PARKING LANE |
2018-01-03 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2018-01-03 | No data | GRAND STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2018-01-03 | No data | EAST 12 STREET, FROM STREET AVENUE A TO STREET AVENUE B | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of sewer cut acceptable |
2018-01-03 | No data | PROSPECT PARK WEST, FROM STREET 17 STREET TO STREET 18 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working in front of location to repair a service leak . 3 day notice.. |
2018-01-03 | No data | RIDGE BOULEVARD, FROM STREET 95 STREET TO STREET SHORE ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK INSTALLED EXPANSION JOINTS SEALED |
2018-01-02 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(8â)W(5â)D(9â)TEST#1=97.2TEST#2=96.8BACKFILL PASS SAWCUTS SPRAYED LEAVING NOW |
2018-01-02 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done on sidewalk at laundromat, roadway paved |
2018-01-02 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 ROADWAY CUTS1/ 10â8âL X 5â8âW X 11âD = 97.4% & 97.9%2/ 4â6âL X 4â6âW X 3âD = 97.9%3/ 3âL X 3âW X 3âD = 97.8%ARRIVAL 1050AMDEPARTURE 225PM |
2018-01-02 | No data | DWIGHT STREET, FROM STREET COFFEY STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in sidewalk okay |
2018-01-02 | No data | COFFEY STREET, FROM STREET DWIGHT STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk cut okay |
2018-01-02 | No data | FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:30-12:50 L-9'7"x W-3'2"x D-3'5" Tests: 95.7%/97.5% Cut is located in the parking/driving lane I/F/O 3119 Ft. Hamilton Pkwy. |
2018-01-02 | No data | 27 STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | vehicle park unable to inspect |
2018-01-02 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site awaiting backfill |
2018-01-02 | No data | 46 ROAD, FROM STREET 11 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plate noisy a vehicles roll over |
2017-12-30 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | permit active no car today however cuts less than 10ft apart. also double yellow line marking missing also mounde 1-2" CAR monday |
2017-12-30 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working |
2017-12-29 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm sewer cut in the roadway. |
2017-12-29 | No data | HALSEY STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1. Full sidewalk flag restoration is required; patchwork is not acceptable. 34 RCNY 2-09(f)(4)(viii).2. Install and seal expansion joint at the curb. 34 RCNY2-09(f)(4)(v). |
2017-12-28 | No data | MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION MISSING SEALER |
2017-12-28 | No data | WEST 125 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please re install white crosswalk lane markings that previously exised- about 7-8 inches of markings missing |
2017-12-27 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm in roadway flush to grade. |
2017-12-27 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT PAVED OVER BY CON ED |
2017-12-27 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway acceptable. portion of cut remains on temp due to active BO. |
2017-12-27 | No data | QUINCY STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...09 .... |
2017-12-27 | No data | DWIGHT STREET, FROM STREET COFFEY STREET TO STREET VAN DYKE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags in compliance, expansion joints sealed |
2017-12-27 | No data | COFFEY STREET, FROM STREET DWIGHT STREET TO STREET OTSEGO STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2017 plumber cut in front of this location |
2017-12-26 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass....09. water svc .... |
2017-12-26 | No data | SWINTON AVENUE, FROM STREET LAWTON AVENUE TO STREET MILES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | On sidewalk, - Temporary Restoration Overdue for FINAL RESTORATION |
2017-12-25 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-12-24 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is sealed and in compliance |
2017-12-24 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAD A STEEL PLATED STREET OPENING, DOWN 3 FEET IN ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO A VIOLATION OF ADMINISTRATIVE CODE 19-102(i). EXPIRED DOT PERMIT#(B012017352B06) EXP 12/18/2017 WAS USED FOR ID. |
2017-12-24 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in P/L close to Johnson. |
2017-12-24 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-12-22 | No data | EAST 16 STREET, FROM STREET AVENUE H TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect, vehicles parked. |
2017-12-22 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12:35-3:20 Cut1: L-11'x W-4'1"x D-8'5" Tests: 97.7%/97.0% Cut2: L-5'x W-4'x D-3' Test: 97.2%. Long water cut located in parking/driving lanes I/F/O 2040 57th street. |
2017-12-22 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE STIPS IN COMPLIANCE |
2017-12-22 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in the driving lane missing sealer to grade overdue (WINTER POLICY) CAR # 20175150457 ISSUED ON 12/13/2017 ISSUED UNDER EXPIRED PERMIT # B012017277C95 |
2017-12-20 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water" Cut flush to grade in the roadway. |
2017-12-20 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS NEEDS TO BE SEALED |
2017-12-20 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDE WALK FLAGS INSTALLED |
2017-12-20 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS IN THE ROADWAY |
2017-12-20 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut. CAR issued under a later permit. |
2017-12-20 | No data | FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS A COUNTERSUNK STEEL PLATE ON THE ROADWAY, BUT FAILED TO APPLY A RAISE PLOW SIGN NEAR WORK SITE DURING THE WINTER MORATORIUM POLICY THAT COMMENCED ON 12/1/2017 AND ENDS ON 3/31/2018. ACTIVE PERMIT B |
2017-12-19 | No data | OCEANIA STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2016 work found, roadway resurfaced. |
2017-12-19 | No data | 46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-SEAL PERMANENT RESTORATION IN THE PARKING LANE ON 46TH STREET WITH THE AKA ADDRESS OF 4529 16 avenue (CORNER PROPERTY) |
2017-12-19 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber cut in roadway - color code is missingPortion of permanent plumber cut is sunken 1 inch |
2017-12-19 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 cuts ifo 239/237 & 240 Hawthorne Street. 11ft x 6ft, down 9 1/2ft 97.8% & 97.3%; 4ft x 4ft, down 4ft 97.6%; 5ft x 3 1/2ft, down 3 1/2ft 97.5%; WET 122.7 DRY 114.1 MAX 121.0 MOISTURE 7.5% CLEANFILL. |
2017-12-19 | No data | VAN BUREN STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | counter sunk plate in r/w under new permit okay |
2017-12-18 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | a-11:25amcut- 12'x4'x5' test-97.0 7 97.4juanjumping jackexclusive testingabelsand conew-115.8d-110md-115am-5.2overall cut should be 14'10''x8'10'' |
2017-12-18 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2017-12-17 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SEWER - PERM RESTORATION IN THE ROADWAY |
2017-12-17 | No data | LEEDS ROAD, FROM STREET BEND TO STREET LEITH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER-PERM IN THE ROADWAY |
2017-12-17 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water-Sewer" restoration flush to grade in the roadway and temp on the sidewalk with sidewalk shed. |
2017-12-17 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2017-12-17 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm /rests opp 33-27,29 ,31 |
2017-12-16 | No data | EAST 23 STREET, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration needs to be sealed. 2017 IBM tag inserted. |
2017-12-16 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut remains the same. |
2017-12-16 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2017-12-16 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATES NOT COUNTER SUNK |
2017-12-15 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | SIDEWALK TEMP TO GRADE WITH ASPHALT THIS IS A NEW BUILDING WITH A SIDE WALK RESTORATION PERMIT ON FILE |
2017-12-15 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w. |
2017-12-14 | No data | 38 AVENUE, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration p/d/l |
2017-12-14 | No data | HAWTHORNE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATIONS IN BOTH PARKING LANES. NEW PERMIT ON FILE |
2017-12-14 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway resurfaced - unable to check sidewalk due to snow - B152017286A58DOT IN-HOUSE PAVING AND MILLINGPERMIT VALID FROM: 10/16/2017 TO: 10/18/2017 |
2017-12-13 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permittee on site working under newer active permit (B012017331B41) on file |
2017-12-13 | No data | MANHATTAN AVENUE, FROM STREET BAYARD STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permitee on site working |
2017-12-13 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut in the driving lane missing sealer to grade overdue (WINTER POLICY) |
2017-12-13 | No data | HALSEY STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Sidewalk temporarly closed (signs posted) due to the nature of work. |
2017-12-13 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts to grade |
2017-12-13 | No data | BUSHWICK AVENUE, FROM STREET MADISON STREET TO STREET WOODBINE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY/SIDEWALK RESURFACED UNDER BPP. |
2017-12-13 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RE-APPLY LANE MARKING AND RE-SEAL PERMANENT RESTORATION IN THE PARKING/DRIVING LANE IN FRONT OF 4713 7TH AVENUE. |
2017-12-13 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut adjacent to water hardware on sidewalk overdue for final , the rest of the roadway repaved by BPP permit M042017167A01 |
2017-12-12 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench curb to curb. |
2017-12-12 | No data | 61 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERMANENT RESTORATIONS IN PARKING/DRIVING LANE |
2017-12-12 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A.T.P.O I observed the above respondent closed off the entire sidewalk without posting any signs directing pedestrian to opposite sidwalk as stated in OCMC12 - OCMC - Streets in front of the above location. |
2017-12-12 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2017-12-12 | No data | UNION STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2017-12-12 | No data | 43 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOV issued due to not complying with 2017 Winter Moratorium |
2017-12-11 | No data | CORTELYOU ROAD, FROM STREET EAST 32 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION NOT SEALED |
2017-12-11 | No data | 52 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS.2 ROADWAY CUTS.4â8âL X 4â10âW 4âD TEST = 96.1% & 96.9%3â4âL X 3âW X 4âDTEST = 97.2% & 97.7%ARRIVAL 1145AMDEPARTURE 215PM |
2017-12-11 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cuts okay |
2017-12-11 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal street joints and apply lane marking (solid white). F/O 367 KNICKERBOCKER. |
2017-12-10 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in Compliance |
2017-12-10 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONDITION PREVIOUSLY REPORTED |
2017-12-10 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no visible cuts on r/w |
2017-12-10 | No data | WAVERLY AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-12-09 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in roadway acceptable. |
2017-12-09 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-12-09 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut ok |
2017-12-08 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O The respondent failed to countersink plates flush with the roadway as per winter months require 12/1/17 - 4/1/17. |
2017-12-08 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit on file |
2017-12-08 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2017-12-08 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable |
2017-12-08 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent plumber cut in roadway. Binder material use for final restoration is not acceptable. Asphalt must be used and properly rolled |
2017-12-08 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Length- 7 Feet Width- 4 Feet 10 Inches Depth- 3 Feet 10 Inches |
2017-12-08 | No data | IRVING PLACE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable |
2017-12-08 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore double yellow lane marking on roadway. |
2017-12-08 | No data | KOSCIUSKO STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/l ok |
2017-12-08 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk and raise plow sign posted |
2017-12-08 | No data | 12 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plates countersunk and raise plow sign posted |
2017-12-08 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH |
2017-12-08 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O The respondent failed to countersink plates flush with the roadway as per winter months require 12/1/17 - 4/1/17. |
2017-12-08 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lager plates placed. |
2017-12-07 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 of 3 trenches on roadway made permanent, crew on site completing last 1 will be done in next 2 hours and site will be completely clean. 1 11ft lane maintained for traffic. |
2017-12-07 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration needs to be sealed and rolled in the driving lane . IFO 531 |
2017-12-07 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Steel plates caving into excavation. |
2017-12-07 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ONSITE, WATERMAIN LEAK FROM ANOTHER CONNECTION WHICH CAUSED CREW NOT TO ABLE TO COMPLETE BACKFILL TODAY UNTIL DEP ARRIVES. |
2017-12-06 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1=L(12â)W(4â)D(9â)TEST#1=96.8TEST#2=96.1CUT#1=L(4â)W(3â)D(3â)TEST#1=96.7BACKFILL PASS SAW CUTS DONE |
2017-12-06 | No data | DE KALB AVENUE, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking-lane trench/sidewalk. 70' SSC ST NICHOLAS & 5' EWC DEKALB |
2017-12-06 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to restore lane markings (double yellow lines) |
2017-12-06 | No data | 37 AVENUE, FROM STREET 10 STREET TO STREET 11 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | arrival at back fill 10:00 27' by 4.6' down 4.0' completed and acceptable 2:00 |
2017-12-06 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Covered by barricades |
2017-12-06 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in front of re surfaced |
2017-12-06 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new re surfaced r/w |
2017-12-05 | No data | EAST 16 STREET, FROM STREET AVENUE H TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Joint inspection with supervisor. |
2017-12-03 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Block segment milled in preparation for repaving. |
2017-12-02 | No data | 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PARKING/DRIVING LANE |
2017-12-02 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO COMPLY WITH DOT STANDARD SPECS, AS PER STANDARD DETAIL DRAWING #1042C FOR CUTBACKS ON BASE AND W/C OF PERMANENT RESTORATION (3' 6" X 2' 2"). AT THIS TIME RESTORATION HAS NOT BEEN CUTBACK. CAR #20175840287 WAS ISSUED ON 7-12-17. |
2017-12-02 | No data | COLLEGE POINT BOULEVARD, FROM STREET 15 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent fail to permanently restore cut within the required time (Temporary sidewalk not restored in kind ) Permit expired on 11/28/2017 . Repair Sewer |
2017-12-02 | No data | 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut resealed |
2017-12-02 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2017-12-01 | No data | FT HAMILTON PARKWAY, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | found in front of 3119 ft hamilton parkway crew on site excavating open roadway and sidewalk cut to repair water leak to water service dep three day notice on file |
2017-12-01 | No data | 27 AVENUE, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i observed the above respondent failed to permanently restore a temporary plumbers excavation on the roadway within the time of the last permit on file B012017279C40 which expired 11/11/17 expired permit is used as id |
2017-12-01 | No data | 35 AVENUE, FROM STREET BELL BOULEVARD TO STREET CORPORAL STONE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new work found |
2017-12-01 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-12-01 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cobble stone restored, |
2017-11-30 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in the r/w. |
2017-11-30 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated exc. p+d/l |
2017-11-30 | No data | HUMBOLDT STREET, FROM STREET MESEROLE STREET TO STREET MONTROSE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts on rw. |
2017-11-30 | No data | 44 STREET, FROM STREET 17 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2017-11-30 | No data | STERLING PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 1 CUT IN THE PARKING/DRIVING LANE (L) 16FT 1IN (W) 5FT 11IN (D) 9FT 4IN WET DENSITY-122.7/119.1DRY DENSITY-115.3/110.8MAX DRY DENSITY-119/116.5ACTUAL MOISTURE-6.4/7.5FIRST LIFT-96.6LAST LIFT-97.1 NEW MATERIAL TESTED |
2017-11-30 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in the r/w. New permit B012017317C84 on file. |
2017-11-30 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm parking-lane/sidewalk cut. |
2017-11-29 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN PARKING/DRIVING LANE |
2017-11-29 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cuts in r/w. Swk ok. |
2017-11-29 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in r/w. Partially resurfaced by DEP. |
2017-11-29 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION COVERED BY TRUCKS |
2017-11-29 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER RD/W |
2017-11-29 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-11-29 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-11-29 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm |
2017-11-28 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect due to active B.O. |
2017-11-27 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | up to date permit of file |
2017-11-27 | No data | 46 ROAD, FROM STREET 211 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration resealed |
2017-11-27 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKLFILL COMPLETEARRIVAL/ACTUAL START: 9:55AM/10:30AMDEPARTURE: 1:00PMDIMENSIONS: A. (L)4âX(W)3â6âX(D)2â B. (L)14âX(W)4âX(D)9âCOMPACTION(S): 96.6% / 96.7% / 973% NOTES: F/O 718/720 LAFAYETTE AVE. TWO MATERIALS USED; BOTH PASSED PROCTOR. |
2017-11-27 | No data | 82 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew are on site - work is in progress - permit was renewed and still valid B012017317C92 exp 11/28/17 |
2017-11-26 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Not corrected, NOV issued |
2017-11-26 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE ENTIRE CONCRETE BUS STOP FLAG, ASPHALT RESTORATION IS UNACCEPTABLE IN CONCRETE BUS PAD, OPPOSITE 230 CLASSON AVE BETWEEN WILLOUGHBY AVE & MYRTLE AVE. |
2017-11-25 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l |
2017-11-25 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut |
2017-11-25 | No data | BERGEN STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced |
2017-11-25 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In Front of property has been paved, new building construction |
2017-11-25 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NOV issued for failure to restore in kind all roadway pavement markings, The respondent permanent water restoration in the driving lane is missing white lane pavement markings for both turning and straight lanes. |
2017-11-25 | No data | 160 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w , 1 s/w flag restored(concrete still curing) |
2017-11-24 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No 2017 cut in front 633A Baltic Street |
2017-11-22 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site, shoring in street opening , new permits on file |
2017-11-22 | No data | DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut covered by BPP is okay |
2017-11-22 | No data | QUEENS BOULEVARD, FROM STREET BEND TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer trench to grade in d/p/l. |
2017-11-22 | No data | THROOP AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cuts on r/w , swk flag around water hardware okay |
2017-11-22 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed a permanent cut in the parking lane that was not properly sealed. Respondent was notified to make correction via (CAR #20176260378) on 9/22/17 and failed to do so. |
2017-11-22 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site worksite is in compliance |
2017-11-22 | No data | MONROE STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, shoring in street opening |
2017-11-21 | No data | KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench is in compliance |
2017-11-20 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed a temporary binder trench in the roadway that was not permanently restored within the required time of the above DOT permit (exp. 11/12/17). Permit and green color code marker used to ID. |
2017-11-20 | No data | ST NICHOLAS AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New swk. In compliance. |
2017-11-20 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Opposite building #136 street opening joints on permanent water restoration need to be sealed. |
2017-11-19 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent Cuts measured 6' apart in the roadway needs to be restored integrally into one restoration. The street opening joints on both said cuts needs to be sealed. both cuts partial areas starting to sink 1/2 inch below roadway surface. |
2017-11-19 | No data | PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-11-19 | No data | DASH PLACE, FROM STREET BEND TO STREET WEST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2017-11-19 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | CAR SHOULDN'T HAVE BEEN ISSUED, LANE MARKING VISIBLE |
2017-11-18 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2017-11-18 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed one (3ft x 3ft) permanent restoration that is not in compliance with DOT Standard Detail Drawing #H-1042D (Note 6). With cutbacks, restorations are to be no smaller than 54in x 54in. Respondent was notified to re-do |
2017-11-18 | No data | 60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/1/2017. Respondent |
2017-11-18 | No data | 60 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/16/2017. Respondent |
2017-11-18 | No data | 1 AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1- perm water cut was never sealed upon completion, please seal.2- restore white diagonal parking lane marker 3-T- shaped cut not in compliance with 1042D procedures, proper cutbacks not made cut needs to be squared or rectangular shaped. (301) |
2017-11-18 | No data | 37 AVENUE, FROM STREET 12 STREET TO STREET 13 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street resurfaces,new lanes. |
2017-11-17 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/2/2017. Respondent failed to |
2017-11-17 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/13/2017. Re |
2017-11-16 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE ROADWAY |
2017-11-16 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | ROADWAY NOT CLOSED ATOI, CREW ON SITE WORKING |
2017-11-15 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts okay in p/l & d/l. |
2017-11-15 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT HAS CLOSED OFF 50 FEET OF THE ROADWAY(EXCEEDING 25 LINEAR FEET) WITH CONSTRUCTION MATERIALS DURING NON-WORKING HOURS; FAILED TO COMPLY WITH STIPULATION 020 RESTORE ALL TRAVEL LANES TO TRAFFIC DOT PERMIT# |
2017-11-15 | No data | GATES AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in parking lane is in compliance |
2017-11-15 | No data | EAST 74 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm in p/l loosing seal no car at time |
2017-11-15 | No data | UNION STREET, FROM STREET HOLLY AVENUE TO STREET LABURNUM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent with 2 open excavations (plated) in the street without a DOT permit. Permit #Q012017278C36 expired 11/3/2017. No active permit on file. |
2017-11-15 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active permit on file. |
2017-11-14 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/30/17. Respondent fail |
2017-11-14 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent cut sealed. |
2017-11-14 | No data | HENRY STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/7/2017. Responden |
2017-11-14 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration across r/w. Conf # 27857 on next permit |
2017-11-13 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 8/27/2017. Respondent failed to obtain a |
2017-11-13 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer cut in the r/w. Permit taken out on 9/1/2017. |
2017-11-13 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/27/17. Respondent |
2017-11-13 | No data | HALL STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-11-13 | No data | PARK AVENUE, FROM STREET HALL STREET TO STREET RYERSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cuts on r/w |
2017-11-13 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 8/1/17. |
2017-11-12 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIGN REMOVED |
2017-11-12 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | swk has been sealed |
2017-11-12 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk has been replaced |
2017-11-12 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut is in compliance |
2017-11-12 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO RESTORE STREET IN KIND BY NOT APPLYING RED PAINT TO BUS STOP PAD AS PER CAR#10146 ISSUED ON 9/13/17. |
2017-11-12 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut was re-sealed |
2017-11-12 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - In Driving Lane - Perm Restoration Sunken 2'' in Localized Area |
2017-11-11 | No data | SKILLMAN STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w is currently milled |
2017-11-11 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION RESEALED |
2017-11-11 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-11-10 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm |
2017-11-10 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | arr at 945, 18ft x 4ft 5in down 9ft(96.7/96.5) |
2017-11-10 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent failed to obtain a confirmation number from the department. |
2017-11-10 | No data | DEAN STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-11-09 | No data | 2 AVENUE, FROM STREET EAST 12 STREET TO STREET EAST 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR - make cut uniform rectangular in shape according to DOT's 1042D Specifications. Also, please restore bus lane marking/painting. |
2017-11-09 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 7/31/2017. Respondent fai |
2017-11-08 | No data | PUTNAM AVENUE, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no wk seen |
2017-11-08 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation. Active permit in file |
2017-11-08 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permit expired 10/02/2017. Respondent failed to obtain a confirmation number from the department. |
2017-11-08 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/13/2017. Respondent |
2017-11-08 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 9/13/2017. Respondent |
2017-11-07 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS20âL X 5âL X 9âDTEST: 97.2% & 96.3%ARRIVAL TIME 1000AMDEPARTURE 130PMFOREMAN: SILVERIO |
2017-11-06 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | failed to obtain confirmation number |
2017-11-06 | No data | HEWES STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS ON R/W. |
2017-11-05 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORE WHITE LANE MARKING ON ROADWAY. |
2017-11-04 | No data | FULTON STREET, FROM STREET ARLINGTON PLACE TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE P/L |
2017-11-04 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent has backfilled an opening on a protected street but failed to obtain a conformation number at least 2 hours prior to the commencement of the backfill. Permit expired 08/29/17. Respondent failed to obtain a number from the department. |
2017-11-03 | No data | MONTGOMERY STREET, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO SIDE WALK FLAGS INSTALLED PERM CUT COVERED BY DOUBLE PARK CARS |
2017-11-03 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New building owner will take responsibility of restoring concrete roadway 1/2 +5 upon BPP restoration Supplied letter from DG1191 Broadway management taking responsibility of restoring concrete roadway |
2017-11-03 | No data | 77 STREET, FROM STREET 3 AVENUE TO STREET RIDGE BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY PLATED |
2017-11-03 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please follow requirement of 1042 specifications for cut back ifo 50 bowery |
2017-11-03 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | gas company has plates on location |
2017-11-01 | No data | ABERDEEN ROAD, FROM STREET KENT STREET TO STREET SURREY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | multiple cracking on roadway C.A.C. INDUSTRIES INC. is doing DEP CONTRACTOR MAJOR INSTALLATION SEWER permit active till 12/31/2017 . |
2017-11-01 | No data | STERLING PLACE, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-11-01 | No data | 19 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | paved over by builder ( BPP ) |
2017-11-01 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench (awaiting sealer/lane marking). Temp sidewalk. Valid permit on file. |
2017-11-01 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE OPPOSITE #289 COVERED BY CAR |
2017-11-01 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Install expansion joint between the sidewalk and curb. F/O 1294 PUTNAM AVE. |
2017-10-31 | No data | WARREN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED BY GAS TRENCH ON THE ROADWAY IN THE PARKING LANE I/F/O 610 |
2017-10-31 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /resurfaced new building |
2017-10-30 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed that the respondent failed to perform the required cutbacks on the permanent restoration of a protected street despite prior notification in C A R #20174250205) DATED 8/4/17 |
2017-10-30 | No data | LIBERTY AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE P/L OK |
2017-10-30 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | s/w replace |
2017-10-29 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass/sewer sprinkler install .... |
2017-10-29 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance |
2017-10-28 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CUT ON THE ROADWAY IN THE PARKING LANE I/F/O 601 IS FLUSH TO GRADE |
2017-10-28 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-10-28 | No data | AVENUE K, FROM STREET EAST 8 STREET TO STREET EAST 9 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New DOB. No plumber's cut observed. Keyspan plates at location in parking lane. |
2017-10-28 | No data | DE GRAW STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w paved |
2017-10-27 | No data | WEST 128 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | repair water work is plated |
2017-10-26 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Water restoration was backfilled and cutback was done. Arrived @ 10:40am-1:10pm |
2017-10-25 | No data | WEST 142 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench was sealed |
2017-10-25 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in roadway in compliance. |
2017-10-25 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permittee maintain a plated roadway excavation in d/l with active permit. |
2017-10-24 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 4FT X 7FT PERM RESTORATION CUT ON THE ROADWAY IN THE PARKING LANE I/FO 657 IS FLUSH TO GRADE |
2017-10-23 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-10-22 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w |
2017-10-21 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Active | Department of Transportation | 2 plated plumbers excavations on r/w |
2017-10-21 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2017-10-21 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway cut not sealed asphalt starting to breakout. |
2017-10-21 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new sewer....perm ... |
2017-10-21 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wood removed between curb ,expansion joints installed and sealed. CAR corrected |
2017-10-21 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l |
2017-10-21 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2017-10-21 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new active pernit on file B012017286B59 - 2 plated cuts on r/w |
2017-10-20 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-10-20 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit issued |
2017-10-20 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition made safe. Crew on site |
2017-10-20 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm gas cut acceptable |
2017-10-19 | No data | 59 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w (Curb to Curb) |
2017-10-19 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. restoration f/o 1629-31 in compliance. |
2017-10-19 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Permanent water restoration sunken 6'' in the driving lane i/f/o 210-02 48 St causing vibration to residents homes when nyc buses or vehicles drive over the defect. |
2017-10-19 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent installed aphalt (wearing-course) on a concrete street. Permit B012017256D04, which expired on 10/13/2017, and IBM tag (33387) was used to ID. |
2017-10-19 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple permanent water restorations to grade and sealed in the p/d/l of the segment |
2017-10-19 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-10-19 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET SOUTH 1 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | found in front of 320 wythe ave crew on site excavating open roadway cut to repair water leak to property dep three day notice on file |
2017-10-18 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in compliance at time of inspection. |
2017-10-18 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV ISSUED ON NEWER EXPIRED PERMIT (D01) FOR STEEL PLATED EXCAVATION ON ROADWAY |
2017-10-18 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT WITH A STEEL PLATED EXCAVATION DOWN 10' WITHOUT A VALID/ACTIVE DOT PERMIT TO DO SO. EXPIRED PERMIT B012017275A11 EXPIRED 10/17/17 USED FOR ID. |
2017-10-18 | No data | WEST 142 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration however open CAR found on later permit M012017228A17. Defect was repaired |
2017-10-17 | No data | LAFAYETTE AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane is in compliance |
2017-10-17 | No data | CONCORD AVENUE, FROM STREET EAST 149 STREET TO STREET EAST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-10-17 | No data | 47 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE STIPS IN COMPLIANCE |
2017-10-17 | No data | WEST 19 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done in front of 455 BO, permit expired. |
2017-10-17 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration flushed in the parking/driving lane ( active B.O) adjacent to #525 |
2017-10-17 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O, cannot inspect at current time. |
2017-10-17 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER. |
2017-10-17 | No data | 18 AVENUE, FROM STREET 86 STREET TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done - No such house # 8661 (Found house # 8659 - then 8671) |
2017-10-16 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Active | Department of Transportation | workers onsite active permit on file. |
2017-10-16 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation |
2017-10-16 | No data | 32 STREET, FROM STREET 36 AVENUE TO STREET 37 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation. Active permit in file |
2017-10-16 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect cut due active B.O. occupying the r/w with barriers. |
2017-10-16 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prior permit on file new active permit on file Q012017284C53 valid till 11/8/2017. |
2017-10-16 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO 2017 CUTS FOUND ON ROADWAY |
2017-10-16 | No data | 60 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO 2017 CUTS FOUND ON ROADWAY |
2017-10-16 | No data | 60 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO 2017 CUTS FOUND ON ROADWAY |
2017-10-15 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane ok |
2017-10-15 | No data | 149 STREET, FROM STREET BARCLAY AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | not found |
2017-10-15 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-10-15 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-10-15 | No data | 13 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-10-14 | No data | QUEENS BOULEVARD, FROM STREET BEND TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation across the R/W, Active permit on file. |
2017-10-14 | No data | EAST 12 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found to be in compliance |
2017-10-14 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut is in compliance |
2017-10-14 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-10-14 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut is in compliance |
2017-10-14 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | New permit: B012017277B52 |
2017-10-14 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2017-10-14 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2017 cut on the street |
2017-10-14 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-10-13 | No data | WOODWARD AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | short water perm cut sealed p/l |
2017-10-13 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 8FT X 7FT PERM CUT IN THE PARKING LANE OPPOSITE #289 |
2017-10-13 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm SEWER repair acceptable |
2017-10-12 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed the above respondent excavating two water cuts in the roadway without a permit on file. |
2017-10-12 | No data | BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at this location |
2017-10-12 | No data | 4 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | found in front of 4914 4 ave crew on site roadway restoration in temporary state completed upon arrival |
2017-10-12 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 7ft 4ft down 4ft |
2017-10-12 | No data | 46 ROAD, FROM STREET 211 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent water cut needs to be sealed in front of 211-07 46 Road |
2017-10-12 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued on permit QNP2017285A03 at this time of inspection |
2017-10-11 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 6ft 4ft 4in down 5ft |
2017-10-11 | No data | 95 STREET, FROM STREET 162 AVENUE TO STREET 163 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | half of perm cut to grade in the r/w. half of cut being covered by builders pave. |
2017-10-11 | No data | 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent has a temporary restoration on roadway and failed to permanently restore restoration by expiration of permit B012017256C88 expired 10/8/2017. Expired permit B012017256C88 expired 10/8/2017 and temp |
2017-10-10 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permittee maintain one plated roadway excavation in driving lane ; with active permit # Q012017277A28 EXP. 11/2/17. |
2017-10-10 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut r/w,new permit |
2017-10-10 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER RESTORATION AT THE BUILDING OPERATION |
2017-10-10 | No data | 125 STREET, FROM STREET 20 AVENUE TO STREET 22 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Check permit, repair water & sewer permittee maintain one plated roadway excavation in driving lane with active permit. |
2017-10-09 | No data | LIBERTY AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a/t/p/o i found the above respondent failed to permanently restore temportary cut within the required time.the above permit for id,the above permit exp 8/1/2017 |
2017-10-09 | No data | ARCHER AVENUE, FROM STREET 139 STREET TO STREET 143 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l. |
2017-10-08 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w replace vehicle park |
2017-10-07 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT IN CONCRETE BUS PAD LANE IN REQUIRED TIME. EXPIRED DOT PERMIT # B012017192C26 EXPIRED ON 7/31/17 USED FOR ID. |
2017-10-06 | No data | 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp restoration in parking lane ok |
2017-10-06 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY RESTORATION |
2017-10-05 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavation plated pin and ramp |
2017-10-05 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2017-10-05 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restore the white line lane markings on a Permanent "Water" restoration partially in the turning lane and the letter "Y" in the word "ONLY" . located i/f/o 53. |
2017-10-05 | No data | JENNINGS STREET, FROM STREET HOE AVENUE TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/F/O 1348 Southern blvd 1 R/W Trench O.K. |
2017-10-05 | No data | ARCHER AVENUE, FROM STREET 148 STREET TO STREET 149 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file |
2017-10-04 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file. cut still needs white lane markings |
2017-10-04 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate secured to r/w opposite #136 |
2017-10-03 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN THE PARKING LANE |
2017-10-02 | No data | BRUCKNER BOULEVARD, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm final color coded |
2017-10-02 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plate in r/w |
2017-10-02 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plate in r/w |
2017-10-02 | No data | BRUCKNER BOULEVARD, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass perm final |
2017-10-02 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â Pass(L): 14ft (W): 7ft 6in (D): 10ft â 96.4%; 96.8%Located IFO 633 â P/L to D/L.Cutbacks made.Arrival: 11:40AMDeparture: 2:50PM |
2017-10-02 | No data | EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench color coded |
2017-10-02 | No data | EAST 134 STREET, FROM STREET ALEXANDER AVENUE TO STREET LINCOLN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm trench color coded |
2017-09-30 | No data | 139 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l, On Archer Ave. |
2017-09-30 | No data | BERGEN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2017 cut on the street |
2017-09-30 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Restoration needs to be Sealed |
2017-09-28 | No data | ASTORIA BOULEVARD, FROM STREET 12 STREET TO STREET BEND | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Basement. Went into Basement to Confirm. 3 Day Dep Notice Issued |
2017-09-28 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane is in compliance |
2017-09-28 | No data | 46 ROAD, FROM STREET 211 STREET TO STREET BELL BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration to grade in the d/p/l. Restoration NOT sealed at this time. Active permit Q012017256C81 on file |
2017-09-27 | No data | WEST 136 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site working i/f/o location to repair a service leak 3 day notice. |
2017-09-27 | No data | LAFAYETTE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IS IN COMPLIANCE |
2017-09-27 | No data | KINGSTON AVENUE, FROM STREET MAPLE STREET TO STREET MIDWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 12 FOOT X 5 FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT# B012017216A30 EXP 8/31/2017 |
2017-09-27 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable |
2017-09-27 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/l i/f/o 47-31 210 St |
2017-09-27 | No data | 48 AVENUE, FROM STREET 210 STREET TO STREET 211 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No signs of work done in the r/w or s/w. Active permit Q012017269B47 on file |
2017-09-27 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane ok |
2017-09-26 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated cut in the driving-lane. |
2017-09-26 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated cut in the driving-lane; F/O 236. Valid permit on file. |
2017-09-26 | No data | 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2:30-4:00 L-6'x W-4'x D-4'4" Tests: 95.5%/96.9% Cut is located in parking lane I/F/O 521 |
2017-09-25 | No data | WILLOW STREET, FROM STREET CLARK STREET TO STREET PIERREPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2017-09-25 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts |
2017-09-25 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area behind fence. Building operation |
2017-09-24 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found |
2017-09-24 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent "Water" trench in the parking lane that extends out into the driving lane flush to grade in the roadway and temp on the sidewalk with sidewalk shed. Later permit on file. |
2017-09-23 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w cut ok |
2017-09-23 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated p/l. |
2017-09-23 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit on file Q012017256C79 |
2017-09-23 | No data | QUEENS BOULEVARD, FROM STREET BEND TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated excavation in the p/d/l, Crew on site excavating R/W for sewer installation, Active permit on file. |
2017-09-22 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut found in the parking-lane; seal street joints. OPPOSITE 308 JEFFERSON ST. |
2017-09-22 | No data | 61 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm restorations in parking/driving lane |
2017-09-22 | No data | BOX STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w & s/w in compliance |
2017-09-21 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the Driving lane. |
2017-09-21 | No data | UNION STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW SIDEWALK FLAGS INSTALLED HAS EXPANSION SEAL AROUND JOINTS IN GOOD CONDITION |
2017-09-21 | No data | WEST 126 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut in D/L adjacent to construction site |
2017-09-21 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in the driving-lane. F/O 127-129 |
2017-09-21 | No data | 13 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway flush to grade and temporary restoration on sidewalk.Active B/O |
2017-09-21 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane ok |
2017-09-21 | No data | 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation in parking lane. NOV issued on 9/16 for no name on steel plate. |
2017-09-21 | No data | HENRY STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2017-09-21 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | contractors on site, spoke to supervisor about maintaining 5 feet on sidewalk for pedestrians they complied immediately. |
2017-09-21 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | refer to active permit M012017264A03 |
2017-09-20 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2017-09-20 | No data | KNICKERBOCKER AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in r/w. Temp swk. New permit: B012017256C91. |
2017-09-20 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN PARKING LANE NOT SEALED |
2017-09-20 | No data | 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut on roadway needs to be re-sealed |
2017-09-20 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Lane marking worn down. Please apply new lane marking to permanent restoration in front of 4713 7th avenue. |
2017-09-19 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | A/T/P/O I observed the respondent with a unmarked steel plate in the roadway without a valid NYC DOT permit to do so. Permit M012017256F17 expired on 9/18/2017 |
2017-09-19 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | pass backfill two cuts at 98 and 96.4ecxlusive testing foreman for plumbing nyc inc silver |
2017-09-19 | No data | 121 STREET, FROM STREET 12 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one perm roadway cut is to grade in d/p/l. |
2017-09-18 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Prior permit on file new permit Q012017256B87 valid till 9/27/2020. |
2017-09-18 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm cut on roadway not seal valid permit on file. |
2017-09-18 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in parking lane ok. |
2017-09-18 | No data | GREENE AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w is in compliance |
2017-09-18 | No data | WARWICK STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane /driving lane |
2017-09-17 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in r/w in compliance. |
2017-09-17 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cuts due to road being resurfaced |
2017-09-17 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w ok. |
2017-09-17 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut in r/w in compliance. |
2017-09-17 | No data | 39 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway cut is to grade in d/p/l. |
2017-09-17 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-09-17 | No data | WALTON STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench. |
2017-09-16 | No data | 4 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued |
2017-09-16 | No data | 57 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observe the above respondent has a steel plate pinned/ramped failing to weld or stamp correct name on steel plate. Subsection 2-11(e)(10)(viii)All plating and decking must identify the name of the owner of such plating or decking. Act |
2017-09-16 | No data | ARCHER AVENUE, FROM STREET 139 STREET TO STREET 143 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l. |
2017-09-16 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Active | Department of Transportation | roadway plated |
2017-09-16 | No data | MYRTLE AVENUE, FROM STREET DECATUR STREET TO STREET FRESH POND ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway plated new permit on file Q012017256C31 |
2017-09-15 | No data | 19 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cuts in the r/w. |
2017-09-15 | No data | KINGSTON AVENUE, FROM STREET MAPLE STREET TO STREET MIDWOOD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY 12 FOOT X 5 FOOT RESTORATION ON (ROADWAY IN PARKING LANE) WITHIN REQUIRED TIME(BY EXPIRATION OF DOT PERMIT). EXPIRED DOT PERMIT# B012017216A30 EXP 8/31/2017 AND GREEN |
2017-09-15 | No data | HANCOCK STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut is in compliance |
2017-09-14 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint sealed on sidewalk. |
2017-09-14 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated |
2017-09-14 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated |
2017-09-14 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm partly covered by builders pave |
2017-09-14 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT IN CONCRETE BUS PAD LANE IN REQUIRED TIME. EXPIRED DOT PERMIT # B012017192C26 EXPIRED ON 7/31/17 USED FOR ID. |
2017-09-14 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | Contractor working on site at time of inspection. Inspector informed forman to place flag man at site forman complied Silerio. |
2017-09-14 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway and sidewalk, Expansion joint in compliance. |
2017-09-14 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | contractors failed to remove wood and install and seal expansion joints for sidewalk flag restoration in front of 130 |
2017-09-14 | No data | EAST 35 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | utility work not visible |
2017-09-13 | No data | FLEET STREET, FROM STREET 66 AVENUE TO STREET GROTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway restoration permanent to grade and sidewalk restoration completed in compliance with expansion joint seal. |
2017-09-13 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BUS LANE MISSING RED PAINT |
2017-09-13 | No data | KENT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | STEEL PLATED STREET OPENING IS IN COMPLIANCE , NEW PERMITS ON FILE |
2017-09-12 | No data | EAST 35 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water restoration in driving lane |
2017-09-11 | No data | LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED R/W. |
2017-09-10 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | crew was installing new water service for new building,excavator on site.. lil noisy when dumping debris in truck |
2017-09-10 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...now perm .... |
2017-09-10 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT IN CONCRETE BUS PAD LANE IN REQUIRED TIME. PERMIT EXPIRED ON 7/31/17 |
2017-09-10 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut. |
2017-09-08 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 Steel plated excavations in the r/w. |
2017-09-08 | No data | NOSTRAND AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | CUT#1 - L(3')W(3')D(4')TEST#1 - 96.2TEST#2 - 96.5BACKFILL PASS SAW CUTS DONE |
2017-09-07 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated cut in the driving-lane. |
2017-09-07 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp trench to grade across the r/w, NOV issued on earlier permit. |
2017-09-07 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut, 44"x40", is sunken 2.25" in the driving-lane. F/O 236 STAGG. |
2017-09-06 | No data | 4 PLACE, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plate over excavation in compliance |
2017-09-06 | No data | EASTERN PARKWAY, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 8FT X 6FT PERM CUT IN THE ROADWAY AND NEW SIDE WALK FLAG AROUND WATER CAP VALVE |
2017-09-06 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in roadway flush to grade |
2017-09-06 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builders pave over cut location in compliance. |
2017-09-05 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE10FT8IN X 4FT2IN X 10FT5IN C:98.2 (1), 98.0 (2)4FT2IN X 3FT8IN X 4FT0IN C:98.1 (1), 98.2 (2)WD:120.0; DD:110.4; MDD:116.0; MST:8.7%START 12:04 END 1:43 |
2017-09-05 | No data | WEST 142 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Action will be taken on later permit M012017228A17 |
2017-09-03 | No data | 59 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-09-03 | No data | 49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-09-03 | No data | KNICKERBOCKER AVENUE, FROM STREET CORNELIA STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w. Partially resurfaced by Con Ed trench. New swk flag. |
2017-09-03 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-09-03 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, now plated .....new sprinklersvc to be installed .. |
2017-09-03 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-09-03 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Finalized |
2017-09-03 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent fail to seal street cut after previously being notified by CAR #20174570146 on 7/7/17 and condition remains |
2017-09-02 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | signs removed |
2017-09-02 | No data | 27 STREET, FROM STREET 42 ROAD TO STREET QNSBORO BR UP RY APR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/l |
2017-09-02 | No data | HANCOCK STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane marking restored. |
2017-09-02 | No data | BRONX BOULEVARD, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street cut re-sealed |
2017-09-02 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit B012017243C06 steel plate over cut |
2017-09-02 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | plate over cut |
2017-09-02 | No data | PARSONS BOULEVARD, FROM STREET 71 AVENUE TO STREET 72 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP went over plumbers restoration. |
2017-09-02 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent failed to comply with DOT Standard Specifications as per 1042D note #3. Permanent water cut not in uniformed and not restored to a square or rectangular shape. Respondent was notified by CAR#20176400302 on 5/4/2017 |
2017-09-01 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane ok |
2017-09-01 | No data | UNION STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated cut ,new permit |
2017-08-31 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in r/w ok. |
2017-08-31 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Contractor had restored as per instructions at time . |
2017-08-31 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm long water cuts. Perm. No expanion joints installed on the sidewalk, however, active gas work is found in the vicinty. F/O 172 |
2017-08-30 | No data | THROOP AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cuts on r/w due to resurfacing |
2017-08-30 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer restoration work observed extending from west curb into driving lane |
2017-08-29 | No data | EAST TREMONT AVENUE, FROM STREET BOSTON ROAD TO STREET BRYANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in roadway |
2017-08-29 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The plates are removed and parts of the r/w are temp and others perm to grade. |
2017-08-29 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench curb to curb ok |
2017-08-29 | No data | EASTERN PARKWAY, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 10FT X 6FT PERM TRENCH IN THE ROADWAY AND NEW SIDE WALK FLAG |
2017-08-29 | No data | 52 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS1 ROADWAY CUT7âL X 3âW X 3â4âDLIFTS: 97.5%ARRIVAL 1230PMDEPARTURE 112PM |
2017-08-29 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill pass sawcuts sprayedCUT#1 â L(11â) W(4â) D(4â5â)TEST#1 â 96.8TEST#2 â 97.3CUT#2 â L(4â) W(5â) D(4â5â)TEST#1 â 97.1TEST#2 â 97.4 |
2017-08-28 | No data | MC GUINNESS BOULEVARD, FROM STREET EAGLE STREET TO STREET FREEMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done at this time |
2017-08-28 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 14FT X 10FT PERM TRENCH IN THE ROADWAY |
2017-08-28 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2017-08-28 | No data | 11 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2017-08-28 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2017-08-28 | No data | HOYT AVENUE, FROM STREET 18 STREET TO STREET 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6'x5' perm cut over speed bump |
2017-08-28 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plates have been removed. perm water trench is sealed and has been made final. in compliance |
2017-08-28 | No data | TOMPKINS AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated street opening is pinned and ramped, new permits on file |
2017-08-27 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED STREET OPENING |
2017-08-27 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed two (3ft x 3ft) permanent restorations that are not in compliance with DOT Standard Detail Drawing #H-1042D (Note 6). With cutbacks, restorations are to be no smaller than 54in x 54in. |
2017-08-27 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | area 2'8'' is exposing concrete base 2 of 3 PWI marked plates area down 3'' condition is creating a hazard to vehicles |
2017-08-27 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R was defective. picture does not match with the area at this location c.a.r will be closed out |
2017-08-26 | No data | 2 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found |
2017-08-26 | No data | 26 AVENUE, FROM STREET 1 STREET TO STREET 2 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w closed. Building operation |
2017-08-26 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 13FT X 6FT PERM RESTORATION TRENCH ON THE ROADWAY IN THE DRIVING LANE I/F/O 280 IS FLUSH TO GRADE IN GOOD CONDITION |
2017-08-26 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 temp cuts on r/w |
2017-08-26 | No data | 25 STREET, FROM STREET 42 ROAD TO STREET QNSBORO BR UP RY APR | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the p/d/l |
2017-08-26 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/W found resurfaced and S/W in compliance |
2017-08-26 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flushed to grade in roadway. |
2017-08-26 | No data | WEST 9 STREET, FROM STREET HIGHLAWN AVENUE TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w and s/w |
2017-08-26 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Partial perm. flags on S/W . Entire flags need to be placed |
2017-08-26 | No data | BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street found resurfaced |
2017-08-25 | No data | 19 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm water cut in the r/w. |
2017-08-25 | No data | WEIRFIELD STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by 1/2+5 paving. |
2017-08-25 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been sealed. |
2017-08-25 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade i/f/o 47-33 210 St |
2017-08-25 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED TO COMPLY WITH DOT STANDARD SPECIFICATIONS, STANDARD DETAIL DRAWING #1042C FOR CUTBACKS ON BASE AND W/C OF PERMANENT RESTORATION (3' 6" X 2' 2"). AT THIS TIME RESTORATION IS HAS NOT BEEN CUTBACK. CAR #20175840287 WAS ISSUED ON 7-12-17. |
2017-08-25 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated in r/w |
2017-08-25 | No data | BROADWAY, FROM STREET LAFAYETTE AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in r/w |
2017-08-24 | No data | FROST STREET, FROM STREET MANHATTAN AVENUE TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 27FT X 8FT PERM RESTORATION IN THE ROADWAY OK |
2017-08-23 | No data | MURRAY STREET, FROM STREET 17 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway perm . |
2017-08-22 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem trench p/l and d/l |
2017-08-22 | No data | MARCY AVENUE, FROM STREET MARTIN L KING PLACE TO STREET STOCKTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/ww |
2017-08-22 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATE PINS LOWERED INTO ROADWAY. |
2017-08-22 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Trench was resealed O.K. |
2017-08-22 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition previously reported |
2017-08-22 | No data | 38 AVENUE, FROM STREET 147 STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated roadway excavation active permit # Q012017228A14 expires 8/31/17 on file . |
2017-08-22 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in p/l |
2017-08-21 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 3 pins sticking out of plate raised 2 inches causing dangerous condition. Plate marked PWI |
2017-08-20 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done permit expired |
2017-08-20 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE TEMPORARY CUT IN CONCRETE BUS PAD LANE IN REQUIRED TIME. PERMIT EXPIRED ON 7/31/17. |
2017-08-20 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed 5/22/17 |
2017-08-20 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration in parking lane |
2017-08-19 | No data | 64 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-08-19 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2017-08-19 | No data | PLAZA STREET, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE AT THIS LOCATION |
2017-08-18 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number |
2017-08-18 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2017-08-18 | No data | 19 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut d/l. PLUG. 3ft x 3ft, down 4 1/2ft 95.3% & 97.8% Wet. 119.7 Dry. 107.7 Max. 112.0. Moisture 11.11% |
2017-08-17 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut flush in roadway. |
2017-08-17 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â Pass(L): 11ft (W): 5ft (D): 9ft â 97.8%; 97.6%Located IFO 129 â P/L to D/L.Cutbacks being made.Arrival: 10:30AMDeparture: 1:15PM |
2017-08-17 | No data | HENRY STREET, FROM STREET CRANBERRY STREET TO STREET ORANGE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | at the time of inspection street and sidewalk open |
2017-08-16 | No data | CORBIN PLACE, FROM STREET BRIGHTON 15 STREET TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut 13.7 by 5.1 down 6.3 test 1 96.4 test 2 95.1 |
2017-08-16 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to locate "PLUG SEWER" restoration due active building operation shanty or trailer on the roadway. |
2017-08-15 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No plumbing work done. New active permit# M012017201C30 pulled to do work. |
2017-08-15 | No data | COOLIDGE AVENUE, FROM STREET DANIELS STREET TO STREET MAIN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1-13'7'' x 4' x 7'2'' Cut 2-13'3'' x 3'2'' x 4'6'' Cut 3- 7'3'' 3'9'' x 5'6'' One lift done at time of arrival. |
2017-08-14 | No data | EAST 135 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work completed under later permit. |
2017-08-13 | No data | BRIGHTON 5 STREET, FROM STREET BRIGHTON 4 LANE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number, wrong segment. |
2017-08-13 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w...permit renewed before expiration |
2017-08-13 | No data | MADISON STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work on location |
2017-08-13 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in driving lane |
2017-08-13 | No data | CHAUNCEY STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 6/17/17. |
2017-08-12 | No data | LIBERTY AVENUE, FROM STREET CLEVELAND STREET TO STREET ELTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO PERMANENTLY RESTORE A CUT IN THE DRIVING LANE WITH IN THE REQUIRED TIME TO DO SO ,ABOVE PERMIT # EXPIRED ON 8/1/17,ABOVE PERMIT # USED TO IDENTIFY THE RESPONDENT |
2017-08-12 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | prem trench has been sealed |
2017-08-12 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | prem cut has been resealed |
2017-08-11 | No data | COURT STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut in both driving lanes in front of 621 is in compliance |
2017-08-11 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | prem cut has been resealed |
2017-08-11 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 17FT X 7FT PERM RESTORATION CUT ON THE ROADWAY IN THE PARKING/DRIVING LANE NEAR THE CROSSWALK OF ROGERS AVE |
2017-08-11 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required. Permit expired on 7/22/17. |
2017-08-11 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit renewed before expiration of permit. |
2017-08-11 | No data | 53 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 1 cut opp 450. 5ft x 3 1/2ft, down 4 1/2ft. 95.4% & 99.2%. Wet 115.5 Dry 106.3 Max. 113.5 Moisture 8.7% Blend. |
2017-08-10 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a Confirmation number on a Protected Street. |
2017-08-10 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM CUTS OK PASS IN THE D/L |
2017-08-10 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â Pass(L): 12ft (W): 5ft (D): 10ft 6in â 97.3%; 97.8%Located from P/L to D/L IFO 127.Cutbacks being made.Arrival: 12:40PMDeparture: 2:35PM |
2017-08-10 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair OPP 5th Police Pct., acceptable |
2017-08-10 | No data | BROADWAY, FROM STREET CORNELIA STREET TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | re surfaced r/w |
2017-08-10 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6X3 steel plated street opening in driving lane , new permit # B012017219A36 on file, plate is in compliance |
2017-08-10 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2017 cuts found on roadway |
2017-08-09 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO, I observed above respondent open the street without a permit. Plated excavation in the roadway in front of above address. Permit expired on 7/17/17 and is used to ID above respondent. |
2017-08-09 | No data | FLATBUSH AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in d/l. |
2017-08-09 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut p/l ifo 829 |
2017-08-09 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm WATER repair acceptable |
2017-08-08 | No data | LAFAYETTE AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 3 PLATED CUTS ON R/W. |
2017-08-08 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to respondent for having a backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 6/17/17 |
2017-08-07 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over by building pavers |
2017-08-06 | No data | GATES AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work building operation |
2017-08-05 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMIT RENEW 4/28/17. |
2017-08-05 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number |
2017-08-05 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut has been resealed |
2017-08-05 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to respond to Corrective Action Request# 20174890196 issued on 6/10/2017 to remove raise plow sign from pole serving no purpose. |
2017-08-04 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A.T.P.O. I observed permanent water cut on roadway with 2017 color coded marker with # 33387 - no DOT street opening permit for water work for this contractor found for this site.All contractors's permit for the site are for repairing sewer only. |
2017-08-04 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B project |
2017-08-04 | No data | 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2017-08-04 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | C.A.R Re-inspection passed, Trench was uniformly squared off as per dot drawing H-1042D. |
2017-08-04 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required. Permit expired on 5/27/17. |
2017-08-04 | No data | TROUTMAN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OPEN EXCAVATION IN ROADWAY CREW ON SITE INSTALLING WATER SERVICE |
2017-08-03 | No data | 61 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in parking/driving lane |
2017-08-02 | No data | 53 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Excavation in the Roadway Steel Plated & Sidewalk Flag Temp. |
2017-08-02 | No data | NEWELL STREET, FROM STREET MESEROLE AVENUE TO STREET NORMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2017-08-02 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | crew on site stips in compliance |
2017-08-02 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut r/w |
2017-08-01 | No data | 53 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. Emergency permit-street needs to be closed. spoke with operator 166 from central. |
2017-08-01 | No data | 53 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill re-scheduled due to elbow joint not fitting on pipe. |
2017-07-31 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE SEAL SIDEWALK EXPANSION JOINTS AFTER WATER CUT WAS DONE ON SIDEWALK |
2017-07-31 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify 2017 water/sewer work on the segment at this time. |
2017-07-31 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PLEASE SEAL SIDEWALK EXPANSION JOINTS AFTER WATER CUT WAS DONE ON SIDEWALK |
2017-07-30 | No data | 51 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-30 | No data | KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w. |
2017-07-30 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-30 | No data | 46 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2017-07-30 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut |
2017-07-29 | No data | 76 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk repair |
2017-07-27 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts ok r\w |
2017-07-27 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in parking lane |
2017-07-26 | No data | 49 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NOVC issued yesterday for incorrect name on steel plate |
2017-07-26 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | NICA condition was corrected and made safe |
2017-07-25 | No data | 3 AVENUE, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumber cut request for coring d/l |
2017-07-25 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 steel plates shifted on roadway 4' x 10' of roadway breaking out and caving in must be made flush with surrounding area. |
2017-07-25 | No data | 4 AVENUE, FROM STREET 22 STREET TO STREET 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2017-07-25 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUT IN NUS PAD LANE. |
2017-07-25 | No data | EAST 52 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2017-07-25 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trenches ifo B.O |
2017-07-25 | No data | WYTHE AVENUE, FROM STREET SOUTH 2 STREET TO STREET SOUTH 3 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | plated excavatin in roadway |
2017-07-25 | No data | 49 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observe the above respondent has a steel plated excavation and failed to weld or stamp correct name on steel plate. Subsection 2-11(e)(10)(viii) All plating and decking must identify the name of the owner of such plating or decking. A |
2017-07-24 | No data | 4 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2017-07-24 | No data | 55 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in parking/driving lane ok |
2017-07-24 | No data | 19 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench is 4' ft wide, 12" inch wearing course cutback wasn't made |
2017-07-24 | No data | EAST 129 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017181C37- UPDATED PERMIT FOUND- RESTORATION FINAL |
2017-07-23 | No data | HANCOCK STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must restore bike lane marking. |
2017-07-23 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w. Located IFO BO. |
2017-07-23 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | failed car reinspection. |
2017-07-22 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut ok |
2017-07-22 | No data | 35 AVENUE, FROM STREET FARRINGTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest d/l |
2017-07-22 | No data | KNICKERBOCKER AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in opp P/L. New swk flag. |
2017-07-22 | No data | PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in r/w. New swk flag. |
2017-07-21 | No data | WEST 90 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | partly resurfaced |
2017-07-21 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-21 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | THERE IS A 10FT X 6FT PERM CUT IN THE PARKING LANE OK |
2017-07-21 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Incorrect name on steel plate. |
2017-07-20 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-20 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 10FT X 6FT STEEL PLATED EXCAVATION STREET OPENING ON THE ROADWAY, I/F/O 470 IS IN GOOD CONDITON, NEW ACTIVE PERMIT ON FILE |
2017-07-20 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-19 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane acceptable. |
2017-07-19 | No data | 81 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair - ok |
2017-07-19 | No data | DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut is sealed and up to grade |
2017-07-19 | No data | AVENUE D, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w acceptable |
2017-07-19 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk ok joints sealed |
2017-07-19 | No data | 41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation on roadway |
2017-07-18 | No data | DEAN STREET, FROM STREET 6 AVENUE TO STREET FLATBUSH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 10FT 6IN X 6FT 5IN STEEL PLATED EXCAVATION STREET OPENING I/F/O 470 IS PINNED AND RAMPED IN THE PARKING/DRIVING LANE |
2017-07-18 | No data | GARDEN PLACE, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated street opening down 6 feet in right parking lane is pinned and ramped , new permits on file. |
2017-07-18 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-18 | No data | 64 AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in driving lane |
2017-07-18 | No data | 41 STREET, FROM STREET 9 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observe the above respondent has a steel plated excavation and failed to weld or stamp correct name on steel plate. Subsection 2-11(e)(10)(viii) All plating and decking must identify the name of the owner of such plating or decking |
2017-07-17 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm water cut in the r/w and s/w work finalized. |
2017-07-17 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | COME AND RESEAL PERM CUT IN FRONT OF 308 JEFFERSON ST. |
2017-07-17 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permittee on site working |
2017-07-17 | No data | NOBLE STREET, FROM STREET FRANKLIN STREET TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | wrong permittee color tag marker in cut. color tag marked 22396 was put down and need to be removed |
2017-07-16 | No data | EAST 3 STREET, FROM STREET AVENUE C TO STREET CORTELYOU ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-15 | No data | 47 AVENUE, FROM STREET 202 STREET TO STREET 204 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Area p/d/l paved to grade by the builder. |
2017-07-14 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN PARKING LANE OK |
2017-07-14 | No data | LAFAYETTE AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION CUTS IN THE ROADWAY OPP OF 568 IS FLUSH TO GRADE IN GOOD CONDITION |
2017-07-14 | No data | 46 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2016 cuts found on roadway |
2017-07-14 | No data | 41 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working stips in compliance |
2017-07-13 | No data | EASTERN PARKWAY, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW WORKING IN OPEN STREET OPENING AT BUILDING OPERATION |
2017-07-13 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-12 | No data | BEACH 146 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | 3' x 2' x 3' |
2017-07-12 | No data | DRIGGS STREET, FROM STREET OSBORN AVENUE TO STREET WIMAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PROPER CUTBACKS IN ACCORDANCE TO STANDARD SPECS 1042 ( 6" FOR BASE & 12" FOR W/C ALL AROUND) WERE NEVER MADE. CUT IS CURRENTLY 2' 2" WIDE. opp #68 |
2017-07-12 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT NOW PATCHED UP AFTER NICA ISSUED BUT TEMPORARY ASPHALT BEGINNING TO SINK NEEDS TO BE RESTORED IN FINAL RESTORATION. |
2017-07-12 | No data | EAST 52 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE WORKSITE RESTORATION IS PLATED IN THE DRIVING LANE |
2017-07-12 | No data | BRONX BOULEVARD, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must seal street opening cut |
2017-07-12 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane |
2017-07-12 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cant see work due to active b.o. at location |
2017-07-12 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM CUT NOW PATCHED UP AFTER NICA ISSUED BUT TEMPORARY ASPHALT BEGINNING TO SINK NEEDS TO BE RESTORED IN FINAL RESTORATION. |
2017-07-11 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN ROADWAY OK |
2017-07-11 | No data | 19 AVENUE, FROM STREET 149 STREET TO STREET 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in roadway at this time, new permit Q012017181B92 |
2017-07-11 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-07-11 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | perm cut in bike lane 2 foot x 1 foot caved in down 14'' needs to be repaired. |
2017-07-11 | No data | CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | found upon arrival at 1040 open roadway trench 8 ft by 4 ft down 10 ft clean fill was used and cut back marking made al morales on jobsite compaction testes were acceptable backfill acceptable |
2017-07-10 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Only one square different from rest no expansion joint btw s/w & curb did not issue not sure others passed |
2017-07-10 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on 210 st bet 47 av & 48 av - work is on 210 st bet 48 av & 50 av - spoke with the contractor - permit for the correct segment is issued.Front addresses are correct. |
2017-07-10 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No work on 210 st bet 47 av & 48 av - work is on 210 st bet 48 av & 50 av - spoke with the contractor - permit for the correct segment is issued.Front addresses are correct. |
2017-07-10 | No data | 57 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm cuts in parking lane |
2017-07-10 | No data | FRESH POND ROAD, FROM STREET 71 AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut to grade in parking lane, three sidewalk flags restored around water value . |
2017-07-10 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permittee on site workin |
2017-07-10 | No data | 61 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking driving lane ok |
2017-07-09 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut p/d/l |
2017-07-09 | No data | CLASSON AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CUT IN BUS PAD LANE. |
2017-07-08 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed two (3ft x 3ft) permanent restorations that are not in compliance with DOT Standard Detail Drawing #H-1042D (Note 6). With cutbacks, restorations are to be no smaller than 54in x 54in. Respondent was notified to re-do both cuts |
2017-07-07 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench from curb to curb. Was dealing with an inspection needed of this site from roadway maintenance. letting them know that there is an issue next to plumbers cut that DEP has done. |
2017-07-07 | No data | 82 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water cut is sealed and up to grade |
2017-07-07 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK COVERED BY BUILDERS PAVERS |
2017-07-07 | No data | DIAMOND STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts needs to be re-sealed |
2017-07-06 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking lane |
2017-07-06 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT COVERED BY BUILDERS PAVERS FOR #991 |
2017-07-05 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT IN ROADWAY PARTIALLY COVERED BY BUILDERS PAVERS |
2017-07-05 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cut on r/w |
2017-07-05 | No data | BAY RIDGE PARKWAY, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer perm restoration in parking lane are up to grade |
2017-07-05 | No data | DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION TRENCH IN THE ROADWAY IN FRONT OF 800 IS FLUSH TO GRADE IN GOOD CONDITION |
2017-07-05 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - steel plated p/d/l. |
2017-07-05 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in parking/driving lane |
2017-07-05 | No data | 60 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | near b.o. sidewalk flags ok |
2017-07-03 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over by building pavers |
2017-07-03 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2017-07-03 | No data | 57 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:45-12:30 Cut1: L-4'x W-3'6"x D-3' Test:97.8% Cut2: L-4'x W-3'x D-3'6" Tests:96.4%/97.6% Cut3: L-4'4"x W-3'4"x D-3' Test: 97.5%. 3 cuts located in parking lane. |
2017-07-03 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 water cuts in r/w and s/w in compliance |
2017-07-03 | No data | 57 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site stips in compliance |
2017-07-01 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING |
2017-07-01 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the edges of a permanent restoration with green plastic color code being broken and cracked needing to be resealed as per CAR #20176490108 issued 5/2/2017 |
2017-07-01 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | STEEL PLATED RWY 100 FT WEST OF 13 AVE ON NCL |
2017-07-01 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | M012017180C35 ACTIVE PERMIT ON FILE R/W PLATED |
2017-06-30 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-30 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back Fill Pass: 2 Cuts12âL x 5âW x 9â6âD = 98.1% &98.2%4âL x 3â10âW x 3âD = 97.3%After Cut Backs, Both Cuts Are Going To Be Less Than 10ft Apart.Thereâs Going To Be 1 Large Rectangular Shaped Roadway Restoration From Curb To Curb.Dep. 115pm |
2017-06-29 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut r/w |
2017-06-29 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working |
2017-06-29 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Above permit expired found active permit M012017150C46 on file |
2017-06-28 | No data | 11 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated excavation in parking lane active permit on file B012017171A74 |
2017-06-28 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-28 | No data | CLARA STREET, FROM STREET 36 STREET TO STREET CHESTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-06-28 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-28 | No data | 11 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation in parking lane ok |
2017-06-27 | No data | 54 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane |
2017-06-27 | No data | BRIGHTON 5 STREET, FROM STREET BRIGHTON 4 LANE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2017-06-27 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-27 | No data | LAFAYETTE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in parking lane |
2017-06-27 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on r/w |
2017-06-27 | No data | 19 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-27 | No data | LAFAYETTE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASSED {L}5FT 7IN X {W}4FT 1IN X {D} 4FT 6IN TEST 96.1 BASE SAW CUT BACKS ARE BEING DONE AT THIS TIME. ARRIVED AT BACK FILL 10:40AM LEFT BACK FILL AT 12:05PM |
2017-06-26 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new flag on s/w the rear of laundromat , roadway newly paved |
2017-06-26 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE WORKSITE WORK IS IN PROGRESS CREW IS ON SITE FLAGMAN IS POSTED |
2017-06-26 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASSED 1 CUT IN THE DRIVING/PARKING LANE (L) 4FT 4IN (W) 2FT 8IN (D) 3FT 2IN WET DENSITY - 110.7DRY DENSITY - 103.0MAX DRY DENSITY - 108.0ACTUAL MOISTURE - 7.5LAST LIFT - 96.5 |
2017-06-26 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-26 | No data | 46 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | found upon arrival at 1000 open roadway cut 15 ft by 4 ft down 8 ft cut back marks made and clean fill was used steel plate over open sidewalk cut compaction testes were acceptable backfill acceptable |
2017-06-26 | No data | SUYDAM STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â PassCut #1: 6ft (W): 3ft 6in (D): 3ft â 97.0%Cut #2: 6ft (W): 5ft 6in (D): 2ft â 97.4%Located in both parking lanes IFO 172.Cutbacks marked.Arrival: 10:50AMDeparture: 11:55AM |
2017-06-26 | No data | 48 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-26 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-25 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PERM SIDEWALK T/T/G NEW BUILDING. |
2017-06-25 | No data | 44 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY NEWER PERMIT ON FILE |
2017-06-25 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | condition resolved |
2017-06-25 | No data | ARCHER AVENUE, FROM STREET 139 STREET TO STREET 143 STREET | No data | Street Construction Inspections: Active | Department of Transportation | excavation plated at time of inspection temporary color code in place |
2017-06-25 | No data | KNICKERBOCKER AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Resurfaced by 1/2+5 paving. |
2017-06-25 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED ROADWAY EXCAVATION |
2017-06-25 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY PERM SIDEWALK T/T/G NEW BUILDING. |
2017-06-24 | No data | KNICKERBOCKER AVENUE, FROM STREET CORNELIA STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cut has been re-topped and made into square shape. All in compliance. |
2017-06-24 | No data | BOOTH MEMORIAL AVENUE, FROM STREET 183 STREET TO STREET 184 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Cannot identify 2017 work at this time. |
2017-06-24 | No data | DONGAN AVENUE, FROM STREET POYER STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in the d/l. Two sidewalk flags restored in kind |
2017-06-24 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Active | Department of Transportation | one excavation plated one temp/rest p/l |
2017-06-24 | No data | HORACE HARDING EXPRESSWAY, FROM STREET 183 STREET TO STREET 185 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress - steel plated p/d/l. |
2017-06-24 | No data | 20 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one excavation plated one temp/rest p/l w/ active permit q012017174c56 |
2017-06-23 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working stips in compliance |
2017-06-23 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 11:30-2:00 L-11'6"x W-5'x D-10'. Tests: 97.6%/98.1% cut is located in parking/driving lane. |
2017-06-22 | No data | 210 STREET, FROM STREET 47 AVENUE TO STREET 48 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work on 210 st bet 47 av & 48 av - work is on 210 st bet 48 av & 50 av - spoke last week with the contractor - permit for the correct segment is issued.Front addresses are correct. |
2017-06-22 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT OK PASS IN THE D/L |
2017-06-22 | No data | 71 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 PERM CUTS FOUND ON R/W : BOTH SEALED AND UP TO GRADE |
2017-06-22 | No data | BROADWAY, FROM STREET WEST 79 STREET TO STREET WEST 80 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Active B.O. at location cant see work |
2017-06-22 | No data | READE STREET, FROM STREET BROADWAY TO STREET ELK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm watercut ifo 29 on active work site BO in drive lane acceptable AKA 49-51 chambers st. |
2017-06-22 | No data | 61 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 perm cuts in parking/driving lane |
2017-06-22 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE |
2017-06-21 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM RESTORATION IN ROADWAY COVERED BY BUILDERS PAVERS |
2017-06-21 | No data | 19 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 11:40am Departure: 4:05pmCut #1: L 18' W 4 ' D 10' 98.3% 97.8%Cut #2: L 4' W 4' D 4' 97.7% 97.2%Cut #3: L 3' 6" W 3' 6" D 4' 98.3% 97.8%Sprayouts have been made for cutbacks... |
2017-06-21 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R.W. |
2017-06-21 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | WORK IS IN PROGRESS CREW IS ON SITE FLAGMAN IS POSTED |
2017-06-20 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-20 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERMIT RENEWED TO M012017108A34 |
2017-06-20 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please come re-seal cut in roadway |
2017-06-20 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane marking restored over permanent cut. |
2017-06-19 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM RESTORATIONS IN DRIVING LANE AND PARKING LANE ARE OK |
2017-06-19 | No data | EAST 12 STREET, FROM STREET AVENUE A TO STREET AVENUE B | No data | Street Construction Inspections: Post-Audit | Department of Transportation | small portion of rdwy cut visible after DEP work unable to tell if color code is installed due to parked car and s/w appears acceptable garbage bags currently placed on top of flags |
2017-06-19 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut on r/w in compliance |
2017-06-19 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cut on r/w |
2017-06-18 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation w/o a permit. |
2017-06-18 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in bus stop/driving lane. New swk flags. |
2017-06-18 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION. |
2017-06-18 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition remains no NOV will be issued at this time due to BO barriers on containers |
2017-06-18 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Trench in Good Condition. However, Gas Co cut into its Cut. |
2017-06-17 | No data | 14 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W repaired. |
2017-06-17 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2017-06-17 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work found on the Existing Roadway or Sidewalk. |
2017-06-16 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in driving lane acceptable. |
2017-06-16 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM TRENCH FOUND IN FRONT OF 2050 GOING CURB TO CURB; SEALED AND UP TO GRADE |
2017-06-15 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Due to the fact that Con ED went over 95% on their cut i will accept the protest |
2017-06-15 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R/W |
2017-06-15 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please come seal trench in front of 2050 |
2017-06-14 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-13 | No data | NORTH 12 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2017-06-13 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in front of 2166 has expantion joint and sealer installed; is to grade |
2017-06-13 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE COME AND RE-SEAL WATER CUT IN ROADWAY |
2017-06-13 | No data | 210 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm. cut p/l,asphalt cut to grade on s/w - permit active,active BO. |
2017-06-13 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT FOUND IN PARKING LANE; IS UP TO GRADE |
2017-06-13 | No data | 79 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut found in driving lane ; is up to grade |
2017-06-11 | No data | QUINCY STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration covered by temp trench |
2017-06-10 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | color code applied |
2017-06-10 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | raise plow sign serving no purpose. |
2017-06-09 | No data | 16 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-09 | No data | NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | ACTIVE WORKSITE TWO CUTS IN THE PARKING LANE ARE PLATED |
2017-06-09 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation w/o a permit. |
2017-06-08 | No data | LEFFERTS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm 20'x11' trench; F/O 742. **Temp gas cut overlapping. |
2017-06-08 | No data | HENRY STREET, FROM STREET AMITY STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2016 plumbers cuts found |
2017-06-08 | No data | 27 AVENUE, FROM STREET HARWAY AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | at this time cut is to grade |
2017-06-07 | No data | BRIGHTON 5 STREET, FROM STREET BRIGHTON BEACH AVENUE TO STREET OCEAN VIEW AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Wet-Den-122.1, Dry-Den-116.0, Max. Dry-Den-119.5, Act. Moist- 5.2, Material- Clean fill, Test- Sand cone, Lab- Exclusive Testing Labs, Lab tech- Able, Compaction results, (2 Cuts) cut-1-(97.3), 2-(96.8), cut-2-(96.3), (97.5) |
2017-06-07 | No data | DOSCHER STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 2 CUTS ... CUT#1 (L) 10 FT (W) 4.4FT (D) 4FT...CUT #2 (L) 4.9 FT (W) 4.2FT (D) 5FT ...ACTUAL START TIME 11:00 AM ..COMPACTION: (1) 96.4%/97.4% (2) 97.1%/98.0% |
2017-06-07 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent sewer cut in d/l and p/l |
2017-06-07 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | 6 steel plates in roadway acceptable |
2017-06-07 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway plated, active permit on file M012017151A29 |
2017-06-06 | No data | DOSCHER STREET, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE BKFILL WAS CALLED IN ACCIDENTALLY FOR 6/6/17 BUT IS REALLY FOR 6/7/17 |
2017-06-06 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | NYC PLUMBING CREW PLACED TEMPORARY ASPHALT ON SUNKEN RWY AT 450 |
2017-06-06 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-06 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-05 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-05 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore cut within required time. Temporary plumber cut in roadway overdue for final restoration. Previous permit B012017123A24 to work at location expired 5/20/2017. Expired permit use for Id |
2017-06-05 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-06-05 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok |
2017-06-04 | No data | 191 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restorations at address 40-17 in good condition color coded and sealed |
2017-06-04 | No data | 42 AVENUE, FROM STREET 196 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent to grade water cut in the D/L partially covered by Building Paved ifo 196-11 and 196-13 . |
2017-06-04 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest p/l d/l |
2017-06-03 | No data | 27 AVENUE, FROM STREET HARWAY AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | both cuts have been sealed |
2017-06-03 | No data | AVENUE U, FROM STREET EAST 19 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (r/w & s/w), found in compliance |
2017-06-03 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration flushed to grade in roadway. |
2017-06-03 | No data | 74 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk repair 1518 & 1520 |
2017-06-03 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20175270199; FAILED TO CONFORM TO APPLICABLE STANDARD DETAIL DRAWING#H-1042B-A VIOLATION OF SECTION/RULE 34RCNY2-11(e)(13)(vi)(MUST REPLACE CONCRETE SLAB, JOINT |
2017-06-03 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING RESTORED |
2017-06-03 | No data | 1 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp restoration flushed to grade in roadway. |
2017-06-03 | No data | 1 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Refer to latest permit on file Q012017137B62. |
2017-06-03 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Sign removed |
2017-06-01 | No data | 249 STREET, FROM STREET 41 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway is milled |
2017-06-01 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w flags, r/w resurfaced |
2017-06-01 | No data | MARYLAND AVENUE, FROM STREET ABBOTT STREET TO STREET BAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM WATER CUT IN D/L OK |
2017-05-31 | No data | HUNTS LANE, FROM STREET DEAD END TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in driving lane |
2017-05-30 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-05-30 | No data | 139 STREET, FROM STREET 91 AVENUE TO STREET ARCHER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 8'x5'x2'6" backfill passed and acceptable |
2017-05-30 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | THE RESPONDENTS STREET CUT FAILED TO FOLLOW STANDARD DETAIL OF CONSTRUCTION DRAWING 1042D NOTE #3 "ALL RESTORATIONS SHALL BE SQUARED OR RECTANGULAR SHAPED" RESPONDENT WAS NOTIFIED BY CAR #20174060027 ON 1/20/17. PERMIT EXPIRED 11/19/16 |
2017-05-29 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Cuts in good condition. |
2017-05-28 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit: B012017135B64 |
2017-05-28 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-28 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in r/w. All in compliance. |
2017-05-28 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit: B012017135B61 |
2017-05-28 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Two temp cuts in r/w. All in compliance. |
2017-05-28 | No data | 46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-28 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-28 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-27 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Excavation in the Roadway Steel Plated Active Permit in System. |
2017-05-27 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts r\w ok |
2017-05-27 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING RESTORED |
2017-05-27 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES COUTERSUNK. |
2017-05-27 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequent permit secured for work at this location. |
2017-05-27 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done |
2017-05-27 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Steel Plated. |
2017-05-26 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | non skid plate |
2017-05-26 | No data | 150 STREET, FROM STREET 17 AVENUE TO STREET 17 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm to grade restoration in roadway |
2017-05-26 | No data | CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFACED DUE TO BPP |
2017-05-26 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation |
2017-05-26 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plate covering excavation on roadway, active permit on file |
2017-05-25 | No data | UNION STREET, FROM STREET SCHENECTADY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new s/w ,no r/w |
2017-05-25 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-05-25 | No data | ATHENA PLACE, FROM STREET FINE BOULEVARD TO STREET MOTLEY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway final / sidewalk temp / active BO |
2017-05-25 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-24 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut d/l, p/l. 10ft x 4ft, down 10ft. 97.2%, 98.2%, 98.5%. Arrival 9:36am to 12:15pm. |
2017-05-24 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-955amcut- 6'5''x6'5''x4' test- 97.4 & 97.1cut-11'9''x2'8''x3'7'' test- 97.4 & 97.1plumbing worksjumping jackexclusiveabelsand coneclean fillw-123.6D-117.4MD-121.0AM-5.2cut backs in progress and sprayed |
2017-05-24 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-05-24 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a plate mark(hallen) on top of cut |
2017-05-24 | No data | AMITY STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been repaved |
2017-05-24 | No data | AMITY STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been repaved |
2017-05-24 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR has been issued to permittee about final restoration cut down 2 inches |
2017-05-24 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumbing restoration in sidewalk and two long water cuts in roadway in compliance |
2017-05-23 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-22 | No data | PACIFIC STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-05-21 | No data | BERGEN STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | R/w has been repaved by DOT. |
2017-05-20 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 prem trenchs on r/w |
2017-05-20 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w |
2017-05-20 | No data | HUDSON STREET, FROM STREET BROOME STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | Spoke with valinetine foreman from plumbing works about maintaining a 5' pedestrians walk as stated on permit, he then said that he Will comply |
2017-05-20 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM TRENCH IN P/L... |
2017-05-20 | No data | OCEANIA STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cuts to grade p/d/l - parked cars p/l at this time. |
2017-05-20 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | New ConEd cut over plumber's cut CAR defect found. Condition repaired by other permittee. |
2017-05-20 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed two (3ft x 3ft) permanent restorations that are not in compliance with DOT Standard Detail Drawing #H-1042D (Note 6). Respondent failed to cutback wearing course and concrete base. Respondent was notified to re-do both cuts |
2017-05-20 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut r/w |
2017-05-19 | No data | 41 AVENUE, FROM STREET FULLER PLACE TO STREET HAIGHT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permanent cut to grade. |
2017-05-18 | No data | TIFFANY PLACE, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2017-05-17 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2 steel plates marked âPWIâ are loose and noisy as traffic travels over them. (04/05/17 â Emergency Telephone #917-613-6525 â Notified: Voicemail left for Mr. Rocco at 22:45hrs)(condition repaired) |
2017-05-17 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/f/o 2211 3 ave on East 121 street side 2 permanent water restorations that are 2ft apart need to be made into 1 restoration. |
2017-05-16 | No data | 12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | WATER LEAK 3 DAY DEP NOTICE |
2017-05-15 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:00-11:55. L-7'10"x W-4'x D-4'6" test1: 96.1% Test2: 96.9% Cut is located in parking/driving lane |
2017-05-15 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site stips in compliance |
2017-05-15 | No data | CLARENDON ROAD, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT OK PASS IN P/L IN FRONT OF 5603 CLARENDON RD |
2017-05-15 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-05-15 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to inspect location due to active building operation |
2017-05-14 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY |
2017-05-13 | No data | CROTONA PARKWAY, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2017-05-13 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored expansion joints sealed |
2017-05-13 | No data | SPENCER STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNK PLATED IN R/W. |
2017-05-13 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | trench made perm to grade |
2017-05-13 | No data | PRESIDENT STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | PERM RESTORATION AND TEMP SWK |
2017-05-13 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cobble stone restored |
2017-05-12 | No data | MERCER STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk acceptable |
2017-05-12 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the driving/parking lane of roadway. |
2017-05-12 | No data | DEMEREST ROAD, FROM STREET BEND TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut d/l |
2017-05-12 | No data | WEST 16 ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET BODY OF WATER | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut d/l |
2017-05-12 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | later permit M012017111B23 |
2017-05-12 | No data | LEEDS ROAD, FROM STREET BEND TO STREET LEITH PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent cut in driving lane |
2017-05-10 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | found upon arrival at 1000 am open roadway cut 10 ft by 4 ft down 8 ft clean fill was used and cut back marking made compaction tester were all acceptable grace period given to wait for tester contactor ran out of material waited for more materials |
2017-05-10 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | 3 steel plated excavations on cobble stone roadway ok |
2017-05-10 | No data | WEST 21 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | unable to locate possibly under material/equpiment |
2017-05-10 | No data | KNICKERBOCKER AVENUE, FROM STREET CORNELIA STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to comply with SD Drawing #1042-D (Note 3) - All restorations must be square or rectangle shaped. |
2017-05-09 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut crew on site |
2017-05-08 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | pending car 20171240047 on 4/25/17 |
2017-05-08 | No data | 76 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumer - work is in progress |
2017-05-08 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation - there is an application on file - ready for payment - no action |
2017-05-06 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Trench in good condition. |
2017-05-06 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates have been removed and restoration made perm...CAR on file under permit M012017101A21 for failure to conform with1042D |
2017-05-06 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER. Perm roadway restoration opposite 1940 to plug demolished site is in compliance |
2017-05-06 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut # 1 4'7"x 3'8"x3'6" Cut # 2 4'10"x 3'10"x3'6" Long Water cut in the driving and parking lane I/F/O 18 |
2017-05-06 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut on r/w and s/w flag replaced |
2017-05-05 | No data | AVENUE T, FROM STREET EAST 1 STREET TO STREET WEST STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w and backfill material stored on r/w |
2017-05-05 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in r/w |
2017-05-04 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill pass15â3âL x 4â1âW x 10âD= 97.5% & 98.2%.Departure time: 1:00pm. |
2017-05-04 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | comply with 1042D, restoration needs to be uniformed and finish in a square or rectangle with only one maneuver, restoration appears to have 4 |
2017-05-04 | No data | EAST 130 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal the roadway joints, in relation to work water cut.Your temporary sidewalk restoration is overdue for final concrete restoration, but scaffold may be in your way. |
2017-05-04 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut in the d/l, s/w flushed expansion joints sealed. |
2017-05-04 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair , perm cut in roadway |
2017-05-03 | No data | 77 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site making repair in rw |
2017-05-03 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored. |
2017-05-03 | No data | 3 AVENUE, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut crew on site |
2017-05-03 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cuts have been resurfaced by new bioswell. |
2017-05-02 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plumb cut in compliance in roadway |
2017-05-02 | No data | VANDAM STREET, FROM STREET GREENWICH STREET TO STREET HUDSON STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm water cut in roadway acceptable, however there is 5'X3' temp cut on sidewalk around water valve. Permit still active. |
2017-05-02 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway found resurfaced. |
2017-05-02 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | A-120pmcut- 8'x5'x6' - test- 96.9 & 97.3cut 2 ? was plated upon arrival juanjumping jackexclusivedenisesand conew-122.7d-113.6md-120.5am-7.9 |
2017-05-02 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Must reseal street opening joints on perm water restoration in the driving/ parking lane I/F/O 2338. |
2017-04-30 | No data | 41 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm roadway cut is to grade in d/p/l. |
2017-04-30 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site actively working , excavating sidewalk area |
2017-04-30 | No data | BALTIC STREET, FROM STREET HICKS STREET TO STREET WARREN PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | PERM RESTORATION GOOD |
2017-04-30 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration squared. |
2017-04-30 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-04-29 | No data | HENRY STREET, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY |
2017-04-29 | No data | 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in the parking lane |
2017-04-29 | No data | EAST 121 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BF arrival time 12:13 and finish time 5:30pm. 6" cuts was done. Three excavations in the roadway behind barriers. |
2017-04-28 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation in parking lane expired 4/27 renewed permit on NYC streets says: "Fee Review" |
2017-04-28 | No data | 162 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/w resurfaced |
2017-04-28 | No data | EAST 74 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: LL14 | Department of Transportation | start time 1225 end time 1330 size 3' 6" x 3' x 3' x 4' 96.7% compaction Dirt & sand Blend Actual Moisture 8.7 % |
2017-04-27 | No data | EAST 74 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Active | Department of Transportation | Arrived at location of BACK FILL temporary cut in p/l |
2017-04-26 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway/sidewal cut crew on site valid permit of file |
2017-04-26 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | pass, 14x8x7' /13x 8x 6' ....sewer and water ..sprinkler connection .....installed ....2 propertys ... |
2017-04-26 | No data | CORTELYOU ROAD, FROM STREET EAST 2 STREET TO STREET EAST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut dep permit 796140 crew on site |
2017-04-26 | No data | CLARKSON AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut opp. 221. |
2017-04-26 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation p/l |
2017-04-25 | No data | 60 STREET, FROM STREET 16 AVENUE TO STREET LIRR BAY RIDGE DIV | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-04-25 | No data | 3 AVENUE, FROM STREET 68 STREET TO STREET BAY RIDGE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Ask foreman to remove material from street and to provide one lane in each direction - Will return to site |
2017-04-25 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | found roadway restoration in permanent state down two inches in need of reseal and re top |
2017-04-24 | No data | DEAN STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm |
2017-04-24 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sewer crew on site |
2017-04-24 | No data | PROSPECT PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATED RWY PK LANE ON NCL |
2017-04-23 | No data | ABERDEEN ROAD, FROM STREET KENT STREET TO STREET SURREY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l, s/w temp to grade ifo active B.O..in compliance |
2017-04-23 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Perm water cut has been resealed |
2017-04-22 | No data | 84 ROAD, FROM STREET LANDER STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration flushed to grade in roadway. |
2017-04-22 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | covered by newer work 2017 |
2017-04-21 | No data | BERGEN STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w milled |
2017-04-21 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to comply with DOT standard specifications as per stipulation #105. No call made to schedule an inspector prior to cobble stones restoration. NOV issued. |
2017-04-21 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-04-21 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | At time of issuance the permit was still valid stip 020 allows for the storage of debris |
2017-04-21 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated excavation in parking lane |
2017-04-21 | No data | 37 AVENUE, FROM STREET 12 STREET TO STREET 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass this permit car to newer permit. |
2017-04-20 | No data | NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | confirmation under previous permit. |
2017-04-20 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Extra layer of asphalt added to portion of cut causing that area of the restoration to be mounded 1". |
2017-04-20 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Extra layer of asphalt added to portion of cut causing that area of the restoration to be mounded 1". |
2017-04-20 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer cut in the driving lane is sunken 3.5" . restore to grade |
2017-04-20 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm /rest to grade w/ temp. asphalt pavement |
2017-04-20 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-04-19 | No data | SOUTH 1 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm it renewed next day. |
2017-04-19 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B: PLATED ROADWAY EXCAVATION. |
2017-04-19 | No data | 53 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-04-19 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 2/9/17. |
2017-04-19 | No data | 2 AVENUE, FROM STREET 49 STREET TO STREET 50 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp r/w cut to grade |
2017-04-19 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | contractor on site working within stips |
2017-04-19 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-04-19 | No data | 12 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 12-02 37 AVENUE perm cuts to grade |
2017-04-19 | No data | ROBINSON STREET, FROM STREET 45 AVENUE TO STREET HOLLY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and pass. |
2017-04-19 | No data | CLARENDON ROAD, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut ok pass |
2017-04-18 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in r/w. |
2017-04-18 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New permit: B012017087A85 |
2017-04-17 | No data | FAIRVIEW AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cuts p/d/l |
2017-04-17 | No data | 49 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B: SIDEWALK. |
2017-04-17 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J: ROADWAY RESTORATION. |
2017-04-17 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2017-04-17 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1J: ROADWAY. |
2017-04-16 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in parking and driving lane , active permit on file |
2017-04-15 | No data | WEST 142 STREET, FROM STREET 8 AVENUE TO STREET BRADHURST AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate water cut at this time due to container in the rd/w & parked cars.. |
2017-04-15 | No data | WEST 80 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | respondent has backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 3/24/17. Respondent failed to obtain a confirmation number |
2017-04-15 | No data | DE KALB AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLEASE RESTORE LANE MARKING OVER PERMANENT RESTORATION IN ROADWAY, IN OPPOSITE OF 717 DEKALB AVE BETWEEN MARCY AVE & TOMPKINS AVE. |
2017-04-15 | No data | MILL ROAD, FROM STREET 27 AVENUE TO STREET BAY 44 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | mill road is a dirt road and does not have sidewalk. so im unable to distinguish if there was any work done. no visible cuts in dirt road |
2017-04-15 | No data | 27 AVENUE, FROM STREET HARWAY AVENUE TO STREET MILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 prem plumbers cuts on roadway are not sealed. please seal both cuts |
2017-04-14 | No data | 150 STREET, FROM STREET 17 AVENUE TO STREET 17 ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill complete and acceptable 17'9"x6'11" |
2017-04-14 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced ....due to c of o .. |
2017-04-14 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, 09 ..water svc ... |
2017-04-14 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Final restoration cut has no color code marking to ID the permittee. |
2017-04-13 | No data | WEBSTER AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 199 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B issued |
2017-04-13 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated plumber excavation in d/l |
2017-04-13 | No data | FULTON STREET, FROM STREET ARLINGTON PLACE TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w just repaved |
2017-04-13 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent did not cut back concrete and asphalt while performing restorations. Both permanent cuts in roadway are 4ft x 3ft. According to SD - all restorations must be a minimum of 54" x 54". Must re-do BOTH cuts. |
2017-04-13 | No data | 16 AVENUE, FROM STREET 82 STREET TO STREET 83 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk replace and in compliance |
2017-04-12 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Protest accepted. Sidewalk flags in question were restored by the new building construction. |
2017-04-12 | No data | 16 AVENUE, FROM STREET 82 STREET TO STREET 83 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk construction crew on site warning signs posted |
2017-04-11 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w.. permit renewed. |
2017-04-11 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in r/w.. confirmation under new permit.. b201705423. |
2017-04-11 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | permittee on site full sidewalk closure excavated sidewalk |
2017-04-11 | No data | WALTON STREET, FROM STREET MARCY AVENUE TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/4/17. |
2017-04-11 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a Confirmation number on a Protected Street |
2017-04-10 | No data | STAGG STREET, FROM STREET BUSHWICK AVENUE TO STREET WATERBURY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR #20176370069 issued on B012017026B76. |
2017-04-10 | No data | EAST 74 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2017-04-09 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D1B/D1J project - previous permit #Q012017006B63 valid from 1/15/17 to 1/30/17 was called for backfill - conf. # Q01201703002 on 1/30/17. |
2017-04-09 | No data | WEST STREET, FROM STREET CALYER STREET TO STREET OAK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w repaved |
2017-04-09 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to comply with DOT Standard Detail 1042A note #3 (critical roadway) -- wearing course cutbacks not straight and squared. NOV issued. |
2017-04-09 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTORS HAD FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20176260028; FAILED TO FAILED TO RESTORE LANE MARKING OVER RESTORATION- A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES. |
2017-04-09 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-04-09 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED R.W.. PERMIT RENEWED IN TIME |
2017-04-06 | No data | DEAN STREET, FROM STREET GRAND AVENUE TO STREET WASHINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE |
2017-04-06 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated excavation in the r/w. New permit B012017094A59 on file. Plates countersunk, raise plow sign posted. |
2017-04-06 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color coded at this time. |
2017-04-05 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | IN COMPLIANCE WITH CAR, SEALER APPLIED |
2017-04-05 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Complaint | Department of Transportation | Steel plates marked âPWIâ are loose and noisy as traffic travels over them. |
2017-04-05 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | At time of inspection plates are making minimal noise..loud noise is coming from when box trucks speed over and loose cargo or metal loading dock on back of the truck bouncing. |
2017-04-05 | No data | PALMETTO STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Color code marker installed. |
2017-04-04 | No data | WEST 159 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Active | Department of Transportation | no plbg work done |
2017-04-04 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | AKA 50 Bowery, Sidewalk expansion joints need to be sealed. please correct. |
2017-04-04 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm sewer cut remains sunken 2' |
2017-04-04 | No data | FENIMORE STREET, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4X4 Cut in the parking lane venting. |
2017-04-04 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | upon complaint inspection plates are not shifted and securely counter sunk |
2017-04-04 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates are securely counter sunk and making minimal noise at time of inspection |
2017-04-04 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Cuts have been conjoined. |
2017-04-04 | No data | STERLING PLACE, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2017-04-03 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Failure to Square off an irregular Shaped Trench in the Roadway, I/F/O 322 West 52nd Street. (CAR Re-inspection FAIL) |
2017-04-03 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please refer to Permit #(M012016308A72) |
2017-04-02 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench flush to grade in the driving lane/parking lane. |
2017-04-02 | No data | 38 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut to grade half covered |
2017-04-01 | No data | GRAND STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W |
2017-04-01 | No data | PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in the roadway |
2017-04-01 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | remove debris from roadway serving purpose roadway restoration in permanent state |
2017-04-01 | No data | DOWNING STREET, FROM STREET 31 ROAD TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest d/l |
2017-04-01 | No data | PRINCE STREET, FROM STREET 35 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest s/w driveway |
2017-03-31 | No data | HUNTS LANE, FROM STREET DEAD END TO STREET HENRY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site making repair |
2017-03-30 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 10:38 pm Departure: 2:10 pmCut: #1: L 11' W 5' D 10' 95.1% 95.4%Cut #2: L 4' W 6' D 5' 6" 96.1% 97.9% |
2017-03-30 | No data | 41 AVENUE, FROM STREET FULLER PLACE TO STREET HAIGHT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut 4' to 6.5' width not cut back as per LL14 - CAR issued under the newest permit. |
2017-03-29 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w. |
2017-03-29 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut ok |
2017-03-29 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the parking lane 2 cuts |
2017-03-29 | No data | BERGEN STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore bike lane markings as well as roadway lane marking missing with perm cut |
2017-03-29 | No data | MERCER STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to comply with DOT sstandard specifications as per stip 105 "CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT." - NOV issued. Confirmed with permittee they didn't called/notified HIQA. |
2017-03-29 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut crew on site |
2017-03-29 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been paved today 3/29/2017 |
2017-03-28 | No data | STAGG STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r.w. |
2017-03-28 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway at time of inspection. |
2017-03-28 | No data | NORTH 4 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in r/w opp in front of address |
2017-03-27 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been paved |
2017-03-27 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W |
2017-03-26 | No data | FULTON STREET, FROM STREET ARLINGTON PLACE TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in p/l |
2017-03-26 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Condition was previously reported and no repairs had been made at this time. |
2017-03-25 | No data | 48 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in good condition. |
2017-03-25 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut , sidewalk and roadway |
2017-03-25 | No data | BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut |
2017-03-25 | No data | GRAND STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway. |
2017-03-25 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer & Water Trench in good condition. |
2017-03-24 | No data | CORNELIA STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in d/l in compliance |
2017-03-23 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Upon complaint inspection plates are safely counter sunk and making minimal noise however permittee was notified of noise created when vehicular traffic drives over under permit M012017034B65 |
2017-03-23 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Water and sewer plugs - work not done yet |
2017-03-23 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Water cut acceptable |
2017-03-23 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp sidewalk restoration overdue for final |
2017-03-23 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut on r/w |
2017-03-23 | No data | NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in r/w. |
2017-03-22 | No data | WYCKOFF STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in the Sidewalk. 3 Day Dep Notice Issued. |
2017-03-22 | No data | 11 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No work has been started at time of inspection, permit still active |
2017-03-21 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Perm water cut in the d/l. |
2017-03-21 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the p/l. |
2017-03-20 | No data | 59 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway |
2017-03-20 | No data | 49 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-03-20 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-03-20 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-03-18 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to inspect. Snow / ice p/l. |
2017-03-18 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | STEEL PLATES RE-SET SWK & RWY |
2017-03-17 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in the roadway |
2017-03-17 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done |
2017-03-17 | No data | ASTORIA BOULEVARD, FROM STREET 32 STREET TO STREET 33 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut to grade |
2017-03-16 | No data | LAFAYETTE AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 5 feet x (W) 5 feet x (D) 3 feet and (L) 5 feet x (W) 3 feet x (D) 3 feet.... compaction of 97.7.96.5,97.0 and 96.1%... |
2017-03-16 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not started at time of inspection. |
2017-03-16 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | COUNTER SUNK PLATED EXCAVATION WITH RAISE PLOW SIGN POSTED. |
2017-03-16 | No data | 57 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE13FT0IN X 4FT1IN X 9FT10IN C:97.5 (1), 96.6 (2) 5FT4IN X 3FT6IN X 3FT11IN C:97.2 (1), 96.8 (2)WD:123.0; DD:114.4; MDD:121.0; MST:7.5%START 10:44 END 2:02 |
2017-03-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plates on the roadway not counter sunken in the bus stop . 1 out of 4 plates shifted 2â exposing 2â of the excavation, raise plow sign on site |
2017-03-13 | No data | 53 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE13FT0IN X 4FT0IN X 10FT11IN C:98.1 (1) 97.0 (2)6FT3IN X 5FT0IN X 3FT10IN C:95.8 (1) 96.6 (2)WD:108.3; 101.8; 113.5; MST:6.4%START 10:39 END 1:02 |
2017-03-13 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass perm ... |
2017-03-12 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-03-12 | No data | 13 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-03-11 | No data | PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE ON THE SIDEWALK |
2017-03-11 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pass |
2017-03-11 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | lane marking ok |
2017-03-09 | No data | 57 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sewer cut, crew on site |
2017-03-08 | No data | CLAY AVENUE, FROM STREET BEND TO STREET EAST 169 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-03-08 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-03-08 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut |
2017-03-08 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no defect found |
2017-03-08 | No data | GREENE AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut ok |
2017-03-08 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed atoi. |
2017-03-07 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working.. |
2017-03-07 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | having a non-counter sunken steel plated excavation in roadway without "Raise Plow" signs posted. Respondent failed to countersink steel plates flush with pavement & post "Raise Plow" signs during 2016/2017 Winter Moratorium. |
2017-03-07 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | two plates marked PW in the roadway loosed and noisy |
2017-03-05 | No data | 119 STREET, FROM STREET 29 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Perm. cut to grade p/d/l,temp. asphalt to grade on s/w - permit active,new BO. |
2017-03-03 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plumber cut in roadway overdue for final restoration |
2017-03-03 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE10FT0IN X 4FT4IN X 11FT11IN C:96.6 (1), 95.3 (2)WD:116.4; DD:107.1; MDD:114.5; MST:8.7%START 10:18 END 12:21 |
2017-03-03 | No data | CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2017-03-03 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2017-03-02 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | MR. DEMOLITION INC. did in fact repair the sidewalk after the plumbing company did the repairs. |
2017-03-02 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CAR on file under permit M012016142A10 |
2017-03-02 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PREM R/W CUT |
2017-03-02 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | start time 10:05 AM end 12:50 PM cut 1. 11' x 4' x 5' 98.0% & 97.8% compaction cut 2. 6' x 5' x 3' 96.2% compaction due to undermining btw cuts requested removal & joint of both cuts in to trench done |
2017-03-02 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN P.L |
2017-03-02 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | At time of Bac opening Between the two openings has undermined the base therefore they will be opening the other 3' of roadway w/c & base join the cuts in to one trench |
2017-03-02 | No data | BALTIC STREET, FROM STREET HICKS STREET TO STREET WARREN PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restore wearing course asphalt not rolled properly. |
2017-03-01 | No data | LEROY STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | Ongoing sewer repairs for BO - New building being erected. Acceptable. Cobble stones roadway area plated (2). |
2017-03-01 | No data | LAFAYETTE AVENUE, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to display a raise plow sign at steel plated excavation that was countersunk on the roadway during Winter Moratorium Policy. Active permit# B012017045A40 used for ID. |
2017-02-28 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-02-28 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Temp s/w cut made perm. |
2017-02-28 | No data | EAST 24 STREET, FROM STREET AVENUE V TO STREET AVENUE W | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration found in compliance (r/w only) |
2017-02-27 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | counter sunk plated excavation, with a raise plow sign posted. |
2017-02-27 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation |
2017-02-27 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation |
2017-02-27 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | counter sunk plated excavation, with a raise plow sign posted. |
2017-02-26 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-25 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | S/W IN COMPLIANCE |
2017-02-25 | No data | 23 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration color coded and sealed in driving lane |
2017-02-25 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER: Crew is ion site Working. |
2017-02-25 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER: New permit # M012017045A58 |
2017-02-25 | No data | PROSPECT AVENUE, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk repair |
2017-02-25 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ,PERMITTEE SHOULD COMPLY WITH ALL APPLICABLE SECTIONS OF THESES RULES,THE STANDARD DETAIL DRAWING#H-1042 AND ALL APPLICABLE LAWS AND RULE SECTION 2-11(E)(12)(IV),cuts are 2' apart,CAR #20175150005 ISSUED ON 1/5/17 |
2017-02-24 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done. |
2017-02-23 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plates re-set |
2017-02-23 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent Trench at the corner of Wellbrook Av has Wearing Course crumbling away opening up a (1.5'x1') area down 1.5in. Wearing Course needs to be replaced, other 2 Permanent Restorations are 9ft apart and need to be combined into 1 as per Rule 1042 |
2017-02-23 | No data | THROOP AVENUE, FROM STREET KOSCIUSKO STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working stips in compliance |
2017-02-23 | No data | GEORGIA ROAD, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | restoration made flush to grade |
2017-02-23 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Cut flush to grade in the turning lane. |
2017-02-23 | No data | 16 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-02-23 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 17 FEET X (W) 4 FEET X (d) 11 FEET DEEP... COMPACTION OF 95.6 AND 96.6%.. MOINITORED FROM 10:50AM-3:00PM. |
2017-02-22 | No data | DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut partially paved over by building pavers in driving lane |
2017-02-22 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | INSTALING NEW WATER/SEWER LINE.. NEW PERMIT ON FILE. |
2017-02-22 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates re-set |
2017-02-22 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration flush to grade at the entrance of active B.O |
2017-02-22 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | car wrote on newer permit |
2017-02-22 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE AT THIS TIME.. INSTALLING WATER/SEWER. |
2017-02-21 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...09...water install.... |
2017-02-21 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 out of 3 steel plates marked PWI 718 8566216 shifted exposing excavation driving lane of roadway posing dangerous condition to the public |
2017-02-21 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 out of 3 steel plates marked PWI 718 8566216 shifted exposing excavation driving lane of roadway posing dangerous condition to the public |
2017-02-21 | No data | AVENUE X, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced |
2017-02-20 | No data | WEST 6 STREET, FROM STREET HIGHLAWN AVENUE TO STREET KINGS HIGHWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | water leak..3 day notice |
2017-02-19 | No data | 40 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-19 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-18 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | LANE MARKING RESTORED |
2017-02-18 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | (2) counter-sunk steel plates (marked âPWâ)which are deflecting and noisy as traffic passes over them. |
2017-02-18 | No data | MYRTLE AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | counter sunk plate in r/w. |
2017-02-18 | No data | PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LONG WATER CUT IN THE PARKING LANE |
2017-02-17 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-17 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut p/l |
2017-02-17 | No data | 61 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-02-17 | No data | HOLLY AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut overlapped by bpp |
2017-02-16 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-1120amcut - 4'8''x 3'3''x 2'9'' test- 97.4juanjumping jackexclusive testing labbashirisand coneclean fillW-114.6D-107.7MD-117.0AM-6.3cut backs in progress |
2017-02-16 | No data | 160 STREET, FROM STREET 24 AVENUE TO STREET 24 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w , 1 s/w flag restored(concrete still curing) |
2017-02-16 | No data | BEDFORD AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts. |
2017-02-16 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER - SEWER |
2017-02-16 | No data | 49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 10:30 am Departure: 1:55 pmCut #1: L 10' W 5' D 8' 5 96.4% 96.5%Cut #2: L 4.5' W 4' D 4' 97.8% 97.7% |
2017-02-15 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | at time of inspection plates are secured and making minimal noise when vehicular traffic drives over...addition temp asphalt was added |
2017-02-15 | No data | 49 STREET, FROM STREET 18 AVENUE TO STREET OLD NEW UTRECHT ROAD | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in roadway - one steel plate is not countersunk - request approved - no action - raise plow sign posted |
2017-02-15 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in parking/driving lane ok |
2017-02-15 | No data | PALMETTO STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l missing color code with ibm tag to identify permittee |
2017-02-14 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | a/t/p/o i observed the respondent failed to provide adequate protection at worksite by not securing bouncing steel plates with PW logo NICA was issued on 2/13/2017 at 2:20 am, condition remains |
2017-02-14 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l |
2017-02-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | steel plates re-set with no counter sunk waiver |
2017-02-14 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-14 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm ..09 |
2017-02-14 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | upon inspection found condition of steel plates to remain the same loose & noisy & bouncing when cars pass over NOV was issued at 7:09 AM on 2/14/2017 |
2017-02-13 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Temp area 4'x2.5' ifo a PW marked steel plate is down 4'' causing vehicles to jolt |
2017-02-12 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rests r/w s/w |
2017-02-12 | No data | 12 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate countersunk in the parking lane and raise plow sign posted |
2017-02-11 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in the r/w. Raise plow sign posted, plate countersunk. |
2017-02-11 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in the driving lane. Plate is countersunk and a raise plow sign. New permit B012017034C28 on file. |
2017-02-11 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Steel plated, excavation in the r/w. Plate countersunk, raise plow sign posted. |
2017-02-11 | No data | LEEDS ROAD, FROM STREET BEND TO STREET LEITH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | roadway and sidewalk covered with snow unable to inspect |
2017-02-10 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plates in roadway reset by workers in bus stop lane. plates on no counter sunk waiver. |
2017-02-10 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | workers on site signs posted & Flag persons at site open road & s/w at this time |
2017-02-10 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 1 Countersunken Steel Plate With The Letters PW Written On It In Driving Lane Loose & Noisy Needs To Be Made More Secure I/F/O 222 East 13th St Btwn 2nd Ave & 3rd Ave. |
2017-02-09 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | It doesn't fit the NICA criteria. 1.8" temp ashpelt down adjacent to steel plat. Raise plow signs up. steel plat is countersink and skid resistant. |
2017-02-08 | No data | SULLIVAN STREET, FROM STREET BROOME STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-02-08 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | A 2â.6âx3â.6â Temp Cut Sunken 3â Adj To Countersunken Steel Plate With The Letters PW Written On It In Driving Lane Plate Is Also Loose & Noisy Needs To Be Made More Secure I/F/O 222 East 13th St Btwn 2nd Ave & 3rd Ave. |
2017-02-06 | No data | LUQUER STREET, FROM STREET CLINTON STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2017-02-06 | No data | LUQUER STREET, FROM STREET COURT STREET TO STREET DENNETT PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass sidewalk |
2017-02-06 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass....new sewer ,,. |
2017-02-06 | No data | 43 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-05 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway restoration sewer trench crossing the roadway in good condition color coded and sealed |
2017-02-05 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-02-05 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE PARKING LANE |
2017-02-05 | No data | WEST 8 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut r/w and prem s/w cut |
2017-02-04 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w cut ok |
2017-02-04 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | builders pave over perm cut, color code is marked in the roadway, in compliance |
2017-02-04 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut is in compliance |
2017-02-04 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Active | Department of Transportation | Water & Sewer Cut Currently Steel Plated & Countersunk. |
2017-02-04 | No data | PROSPECT AVENUE, FROM STREET 8 AVENUE TO STREET PROSPECT PARK WEST | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk repair |
2017-02-03 | No data | BRUCKNER BOULEVARD, FROM STREET HAVEMEYER AVENUE TO STREET BRUCKNER EXPWY ET EB | No data | Street Construction Inspections: Active | Department of Transportation | Excavation flushed in the roadway and sidewalk |
2017-02-03 | No data | 22 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavated with 2 raise plow signs posted. |
2017-02-02 | No data | 23 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated roadway excavation with raise plow sign posted. |
2017-02-02 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Active building op taking responsibility for depression |
2017-02-01 | No data | 45 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut crew on site |
2017-02-01 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND RESURFaced by street paving |
2017-02-01 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2017-02-01 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in d/l valid permit (on list unable to countersink)waiver |
2017-02-01 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in d/l under valid dot permits on file (on list unable to countersink) |
2017-02-01 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2017-02-01 | No data | NORTH 4 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm cut opposite side for cut off w/c sporing no car at time 1/s/w square ok |
2017-01-31 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been repaved |
2017-01-31 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-31 | No data | NEW LOTS AVENUE, FROM STREET BERRIMAN STREET TO STREET SHEPHERD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut r/w. New swk flags. |
2017-01-30 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. |
2017-01-30 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection, crew on site, work in progress. |
2017-01-29 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 permanent restorations missing the required PERMANENT designated color code in the roadway |
2017-01-29 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | action taken permit # Q012017026A57 |
2017-01-29 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | failed to post raise plow sign at two way street ( Leavitt st south bound), respondent had 2 steel plates countersunken at site. respondent failed to comply with DOT's winter moratorium policy. |
2017-01-29 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed respondent made a sewer install on the sidewalk after contractor built sidewalk the area has installed expansion joints and are not reduced & sealed previous request by car # 20160920544 No repairs made to date |
2017-01-28 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | pin removed |
2017-01-28 | No data | EAST 13 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk repair |
2017-01-28 | No data | 41 AVENUE, FROM STREET 154 STREET TO STREET MURRAY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w repaved NB |
2017-01-28 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequenly secured permit for work. |
2017-01-28 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Site safely maintained to stipulations. |
2017-01-28 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut re-sealed |
2017-01-27 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Sidewalk. 3 Day Dep Notice Issued. |
2017-01-27 | No data | MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETEARRIVAL/ACTUAL START: 2:55PM/3:30PMDEPARTURE: 4:30PMDIMENSIONS: (L)5â4âX(W)3âX(D)4âCOMPACTION(S): 96.1 / 97.0 |
2017-01-27 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Active | Department of Transportation | two rd/w temp cut one s/w cut. |
2017-01-27 | No data | LENOX AVENUE, FROM STREET WEST 124 STREET TO STREET WEST 125 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Two rd/w temp/flush cuts and one temp/flush cut on the sidewalk. |
2017-01-26 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | water repair work adjacent to curb |
2017-01-26 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut on r/w |
2017-01-26 | No data | NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill â PassCut #1: (L): 7ft (W): 5ft (D): 3ft â 97.9%Cut #2: (L): 7ft (W): 5ft (D): 3ft â 97.2%Arrival: 10:30AMDeparture: 12:40PM |
2017-01-25 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w. |
2017-01-25 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in p/l |
2017-01-24 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore white lane marking over permanent restoration, opposite 112 Pacific St between Henry St & Clinton St. |
2017-01-22 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade..Wearing course starting to break out check next inspection |
2017-01-22 | No data | 17 AVENUE, FROM STREET 70 STREET TO STREET 71 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-01-22 | No data | CLINTON STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut |
2017-01-21 | No data | WASHINGTON AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2017-01-21 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 23'X 4'X 4'6"- wet-134.1/dry-123.1/max-126'5/moisture-8.9 1st test 97.7/ last test 97.1 Cut back not applied at this time/area sprayed for 6" cut back. |
2017-01-21 | No data | DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET TIFFANY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer |
2017-01-21 | No data | EAST 13 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no cut found |
2017-01-21 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved by Builder |
2017-01-21 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | R/W PLATED |
2017-01-21 | No data | WEST 40 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ACTIVE PERMIT ON FILE M012017019A77 |
2017-01-21 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm long water cut ok |
2017-01-21 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the above respondent failed to respond to corrective action request#20164510975 and permanently restore both double yellow lane markings in center of roadway-a violation of above section/rule of Highway Rules. Expired Dot |
2017-01-20 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site making repair within gas cut, damage caused by gas work |
2017-01-20 | No data | 58 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated excavation in the r/w. Raise Plow sign posted. |
2017-01-20 | No data | FRANKLIN AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent cut in the parking lane; restore lane markings. 770 Franklin Av. |
2017-01-20 | No data | 57 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2017-01-20 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-01-20 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | As per new DOT policy as of 08/08/16, all cuts should be square or rectangular and no more irregular shapes. |
2017-01-20 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Approved- Plates do not have to be counter sunken. |
2017-01-20 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts now perm .. |
2017-01-19 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in parking lane |
2017-01-19 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm plumber cuts in front of address - one gas perm cut over one plumber cut |
2017-01-19 | No data | EAST 35 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate work due to an active B.O fence on roadway at this time of inspection. |
2017-01-18 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass final cut |
2017-01-18 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN COMPLIANCE |
2017-01-18 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated r.w new permit on file |
2017-01-18 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a steel plate on the roadway not counter sunken. permittee failed to post raise plow signs during the winter moratorium policy. |
2017-01-18 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | I/f/o 130 there is one flag belong to water cut needs to be sealed , please correct |
2017-01-18 | No data | ELIOT AVENUE, FROM STREET 85 STREET TO STREET 86 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued. |
2017-01-17 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 120.6110.7114.38.997.9pass one cut in parking lane |
2017-01-17 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | long water perm cut to grade in the p/l opposite of 41-04 |
2017-01-17 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cut and seeal expansion joint at curb |
2017-01-17 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-17 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I observed the above respondnet steel plates not countersunken on a cobblestone roadway during winter moratorium. |
2017-01-17 | No data | 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | ARRIVED-11:41L-5FFET 3INCHES W-3FEET 4INCHE D-4FEET L-4FEET 6 INCHES W-3FEET 5INCHES D-4FEETL-3FEET W-3FEET- D5FEETCOMPACTION-96.6 AND 95.195.8 AND 9695.5 AND 96.4DEPARTED-2PM |
2017-01-17 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-17 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water disconnection - perm |
2017-01-17 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE BUS LANE |
2017-01-17 | No data | ASTORIA BOULEVARD, FROM STREET 32 STREET TO STREET 33 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm. cut on r/w,steel plated on s/w - permit active. |
2017-01-16 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest p/l d/l |
2017-01-16 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo i observed the above respondent had left a roadway restoration in a binder state down two in half inches not flush with roadway surface id by permit on file |
2017-01-16 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-15 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm r.w trench |
2017-01-14 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut acceptable |
2017-01-14 | No data | WEST 13 STREET, FROM STREET AVENUE U TO STREET AVENUE V | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 prem cuts on r/w |
2017-01-13 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ifo 60 canal street. the plumber coverd his excavation with temp asphalt and sealed it with color code. work needs to be perm please correct. |
2017-01-13 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm plumber cut in roadway - cut overlapped one yellow line- permit is still valid - no action at this moment |
2017-01-12 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 PLATES NOT COUNTER SUNKEN |
2017-01-12 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 4 plates in roadway marked PWI pinned and ramped and have been reset by crew |
2017-01-11 | No data | KOSCIUSKO STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2:00-3:00. 1 cut in parking lane L-3'6"x W-2'8" xD-4' |
2017-01-11 | No data | NEW LOTS AVENUE, FROM STREET BERRIMAN STREET TO STREET SHEPHERD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. Work in progress. |
2017-01-11 | No data | HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over by building pavers |
2017-01-11 | No data | 47 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-11 | No data | PENNSYLVANIA AVENUE, FROM STREET FULTON STREET TO STREET J ROBINSON PARKWAY APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in r/w. |
2017-01-11 | No data | KOSCIUSKO STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 12:00-12:45 backfill has been rescheduled due to no tester being availible. 1 cut in parking lane L-3'6"x W-2'8" D-4' |
2017-01-10 | No data | 14 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk |
2017-01-10 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Unable to inspect. Snow in roadway. |
2017-01-09 | No data | COFFEY STREET, FROM STREET RICHARDS STREET TO STREET VAN BRUNT STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | ATPO I observed the above respondent having a plated excavation in the roadway and working in a open sidewalk excavation. cobblestone roadway permittee failed to notifyBKLN hiqa office in reference to permit release. permittee on site |
2017-01-09 | No data | TOMPKINS PLACE, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: Active | Department of Transportation | final roadway paving |
2017-01-08 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | plates...now re-set .......street fully open to traffic ... |
2017-01-08 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | - In Driving Lane - Steel Plate(s) shifted in r/w needs re-set....../installl rasie plow signage.... |
2017-01-07 | No data | 28 AVENUE, FROM STREET 214 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UNABLE TO INSPECT DUE TO SNOW |
2017-01-06 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w |
2017-01-06 | No data | AMITY STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2017-01-05 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the driving lane (counter sunken) under valid dot permits on file |
2017-01-05 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in the d/l counter sunken in compliance |
2017-01-05 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A 5X5 DEFECTIVE SIDEWALK FLAG WITH GRAFFITI MARKINGS ,RESTORE SIDEWALK FLAG......... / ACTUAL LOCATION IS 270 JEFFERSON ST BTWN KNICKERBOCKER AVE & IRVING LAVE |
2017-01-05 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WATER CUT /SEWER CUTS IN THE DRIVING LANE LESS THAN 3 FT APART ,JOIN CUTS TOGETHER AS PER STANDARD DETAIL DRAWINGS #H-1042 |
2017-01-05 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2017-01-04 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, .....crew on site ..new permit obtained ... |
2017-01-04 | No data | 159 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | street paved |
2017-01-04 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-04 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut crew on site |
2017-01-04 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, crrew on site ....insyalling sewer...connection ,,, |
2017-01-04 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2017-01-04 | No data | 53 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Heavy Leak @ Tap. 3 Day Dep Notice Issued. |
2017-01-04 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | atpo i observed the above respondent had left a roadway restoration in a binder state down two in half inches not flush with roadway surface as per winter restoration policy |
2017-01-03 | No data | EAST 7 STREET, FROM STREET AVENUE K TO STREET AVENUE L | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut d/l |
2016-12-31 | No data | 64 STREET, FROM STREET 50 AVENUE TO STREET 51 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the p/d/l, s/w flag restored, joints sealed |
2016-12-31 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restorations in the r/w, builders pave over half of cuts, in compliance |
2016-12-30 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water repair acceptable |
2016-12-30 | No data | IRVING PLACE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass cut |
2016-12-30 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Active | Department of Transportation | steel plate in roadway marked Plumbing Works (PWI) are flushed with roadway and acceptable |
2016-12-29 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration paved over on S/W & R/W |
2016-12-29 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cuts r\w ok |
2016-12-29 | No data | JOHNSON AVENUE, FROM STREET BOGART STREET TO STREET MORGAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | APPROVED NOT TO COUNTERSINK STEEL PLATES ON THE ROADWAY. SEE EMAIL DATED 12/29/2016 FROM MSIMMONS. |
2016-12-29 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway /sidealk cut crew on site |
2016-12-29 | No data | 59 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway |
2016-12-29 | No data | HANCOCK STREET, FROM STREET FRANKLIN AVENUE TO STREET SPENCER PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | longwater cut ok in parking lanes |
2016-12-28 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2016-12-28 | No data | 11 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-12-27 | No data | 38 AVENUE, FROM STREET 32 STREET TO STREET 33 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2016-12-27 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2016-12-27 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to properly inspect due active Building operation @ bldg # 20 East End. (BRAVO BUILDERS, L .L .C Permittee #: 32712) |
2016-12-26 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | site plate countersunken d/l w/ raise plow sign post ext permit Q012016336B18 |
2016-12-26 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | site plate countersunken d/l w/ raise plow sign post |
2016-12-26 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent with a steel plate on the roadway not counter sunken. permittee failed to post raise plow signs during the winter moratorium months (12/1/16 - 5/1/17) |
2016-12-26 | No data | HARRISON AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file |
2016-12-24 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration d/l |
2016-12-23 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION FLUSH WITH THE R/W |
2016-12-23 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL IN PROGRESS - MONITORED SEWER CUT ONLY 5 LIFTS15FT4IN X 4FT0IN X 9FT0IN C:96.6 (1)7FT0IN X 4FT0IN X 5FT3INWD:124.2; DD:111.8; MMD:116.0 MST:11.1START 12:34 - STILL IN PROGRESS - INSP. RICARDO IS ON SITE |
2016-12-23 | No data | BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED |
2016-12-23 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | cancelled due to water |
2016-12-22 | No data | TOMPKINS PLACE, FROM STREET DE GRAW STREET TO STREET KANE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETEACTUAL START: 11:00AMDEPARTURE: 2:00PMDIMENSIONS: CUT1: (L)13âX(W)4âX(D)9âCUT2: (L)6â6âX(W)5â6âX(D)3âCOMPACTION(S): 98.5% / 97.6% / 97.1% / 98.0%*Note: Cutbacks sprayed. |
2016-12-22 | No data | PACIFIC STREET, FROM STREET CLINTON STREET TO STREET HENRY STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-330pm4'x4'x4' - test - 97.0 & 97.1plumbing works subsurfacenicholasjumping jackexclusive testinglambertsand coneW-131.1D-122.2md-126.0am-6.3cutbacks in progress |
2016-12-21 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-12-21 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Unable to see where work was done due to parked Trucks. |
2016-12-21 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 perm trench on roadway in driving lane in front of 290 Tompkins avenue ok |
2016-12-20 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | new sprinkler , svc ...job remains plated...... |
2016-12-20 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway paved off by building operation. |
2016-12-20 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | remove metal pin from roadway |
2016-12-20 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway/sidewalk cut crew on site |
2016-12-20 | No data | COSTER STREET, FROM STREET RYAWA AVENUE TO STREET VIELE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass |
2016-12-20 | No data | STERLING PLACE, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site. Permit submitted. 2016121900515787. Advised crew that all cuts should be square/rectangular. |
2016-12-20 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, excavvation remains plated ..new permit obtained .. |
2016-12-20 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-12-19 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, 1cut perm , 1 street open remains plated ....new permit obtained ... |
2016-12-19 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reseal portion of cut near curb |
2016-12-19 | No data | UTICA AVENUE, FROM STREET BEVERLY ROAD TO STREET TILDEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12 ft x 4ft down 5 1/2 ft.,(96.9/97.5) |
2016-12-19 | No data | ST JOHNS PLACE, FROM STREET BUFFALO AVENUE TO STREET RALPH AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated cut |
2016-12-18 | No data | 39 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in roadway. |
2016-12-18 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved over by BPP. |
2016-12-17 | No data | ELIZABETH STREET, FROM STREET BAYARD STREET TO STREET CANAL STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2016-12-17 | No data | LEEDS ROAD, FROM STREET BEND TO STREET LEITH PLACE | No data | Street Construction Inspections: Active | Department of Transportation | unable to see if work has started. snow |
2016-12-16 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer Trench in good condition. |
2016-12-16 | No data | EAST 12 STREET, FROM STREET AVENUE A TO STREET AVENUE B | No data | Street Construction Inspections: Active | Department of Transportation | cut on sdwk left steel plated |
2016-12-16 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance |
2016-12-16 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | WORK DONE IN THE ROADWAY |
2016-12-16 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETEACTUAL START: 11:30AMDEPARTURE: 12:15PMDIMENSONS: (L)3â5âX(D)2â7âX(D)2âCOMPACTION: 97.5%*Note: Cutbacks sprayed. |
2016-12-15 | No data | READE STREET, FROM STREET BROADWAY TO STREET ELK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm gas cut in roadway i/f/o 29 leads beyond barriers in roadway of active building operation |
2016-12-15 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | new sprinkler , svc ...job remains plated... |
2016-12-15 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in road ok s/w squares expansion joints not sealed CAR on later permit active |
2016-12-14 | No data | CONGRESS STREET, FROM STREET HENRY STREET TO STREET HICKS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 new sidewalk flags ok |
2016-12-14 | No data | DE GRAW STREET, FROM STREET COURT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway in driving /parking lane ok also 4 new sidewalk flags ok |
2016-12-14 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore lane marking over permanent restoration, in front of 15 Vanderbilt ave between Flushing Ave and Park Ave. |
2016-12-14 | No data | 14 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working |
2016-12-14 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm plumber cut |
2016-12-14 | No data | NEVINS STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-12-13 | No data | AVENUE D, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sdwk acceptable |
2016-12-13 | No data | 161 STREET, FROM STREET LABURNUM AVENUE TO STREET OAK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | street paved |
2016-12-12 | No data | POWERS STREET, FROM STREET BUSHWICK AVENUE TO STREET JUDGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIT EXPIRED ON 7/31/16. |
2016-12-12 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site repairing sewer/water bkfill dated for 12/13/16 |
2016-12-12 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Replace full sidewalk flag |
2016-12-12 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repair water |
2016-12-12 | No data | 124 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in compliance at time of inspection in front of 2210 |
2016-12-12 | No data | NEW LOTS AVENUE, FROM STREET BERRIMAN STREET TO STREET SHEPHERD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in r/w. |
2016-12-12 | No data | GATES AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | temporary sidewalk cut at building operation is to grade. |
2016-12-11 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number. |
2016-12-11 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm cuts to grade in opposite side D/P/L. |
2016-12-10 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done. permit expired |
2016-12-10 | No data | DITMARS BOULEVARD, FROM STREET GCP EASTBOUND EXIT 6 TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found in r/w, s/w newly restored |
2016-12-09 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN D/L P/L IN COMPLIANCE |
2016-12-09 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-12-09 | No data | WEST 90 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed. Site Will be made final. Cutbacks have been made. Color coding marker has been installed. |
2016-12-09 | No data | WARREN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in parking/driving lane |
2016-12-08 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIT EXPIRED ON 8/6/16. |
2016-12-08 | No data | POWERS STREET, FROM STREET BUSHWICK AVENUE TO STREET JUDGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIT EXPIRED ON 7/17/16. |
2016-12-08 | No data | 48 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-12-08 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no 2016 cuts on the roadway |
2016-12-08 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-12-08 | No data | NEVINS STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-12-07 | No data | 16 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-12-07 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 2050 a permanent restoration is mounded 1 and a half inches and not flush with surrounding area. Mill restoration and install wearing course flush to grade. |
2016-12-07 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway in parking lane and driving lane ok |
2016-12-07 | No data | BOERUM PLACE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench on roadway in parking lane and drive lane with two new sidewalk flags ok in front of listed address on permit |
2016-12-07 | No data | BOWERY, FROM STREET CANAL STREET TO STREET MANHATTAN BRIDGE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut acceptable |
2016-12-07 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts on the r\w ok |
2016-12-07 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent with an open excavation without an active permit. Permit #Q012016281B05 expired 10/29/2016. No active permit on file. |
2016-12-07 | No data | COURT STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 new sidewalk flags ok |
2016-12-07 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-12-07 | No data | COURT STREET, FROM STREET CONGRESS STREET TO STREET WYCKOFF STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 sidewalk flag and 1 perm cut on roadway in parking lane in front of 189 court street |
2016-12-07 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm plumber cut in r/w |
2016-12-07 | No data | CROTONA PARKWAY, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Pass, cars parked on street |
2016-12-06 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number. |
2016-12-06 | No data | STERLING PLACE, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | steel plated flush w/sign |
2016-12-06 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 12'8" of temp asphalt needs to be removed from portion of water cut. Please restore roadway in kind. |
2016-12-06 | No data | COURT STREET, FROM STREET 3 PLACE TO STREET 4 PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Whole sidewalk ok joints are sealed |
2016-12-06 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no confirmation number. |
2016-12-06 | No data | 4 PLACE, FROM STREET COURT STREET TO STREET NYCTA SUBWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 7 new sidewalk flags threw out front property |
2016-12-06 | No data | HUNTINGTON STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two new sidewalk flags in font of 164 b |
2016-12-06 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak in the Roadway. 3 Day Dep Notice Issued. |
2016-12-06 | No data | WEST 5 STREET, FROM STREET LAKE PLACE TO STREET LAMA COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved over by BPP. |
2016-12-06 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN COMPLIANCE |
2016-12-05 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please restore double yellow lines over permanent restoration and liquid asphalt joint sealer, in front of 228 Livingston St between Elm Place and Hoyt St. |
2016-12-05 | No data | 71 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water long cut is in compliance. Two perm roadway restorations and perm sidewalk flag. Defects on surrounding roadway unrelated. |
2016-12-03 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | double yellow line has been reinstalled |
2016-12-02 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water cut acceptable however portion of cut is slightly mounded, lane markings and color code installed. |
2016-12-02 | No data | 12 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm longwater cuts to grade in the p/d/l |
2016-12-02 | No data | 11 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site working under new permit B012016333A57 |
2016-12-02 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Trench in good condition. |
2016-12-01 | No data | BEACH 132 STREET, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved newer sidewalk flags at water valve |
2016-12-01 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIT EXPIRED ON 10/11/16. |
2016-11-30 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIT EXPIRED ON 8/6/16. |
2016-11-30 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER. |
2016-11-30 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in compliance, No defects. |
2016-11-30 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit for location permit B012016326A76 |
2016-11-30 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cuts on r/w and s/w |
2016-11-30 | No data | BOWERY, FROM STREET CANAL STREET TO STREET HESTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 78 bowery st. there is a perm water cut not uniform with the new cutback regulation needs to be corrected. |
2016-11-30 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER. |
2016-11-30 | No data | DONGAN AVENUE, FROM STREET POYER STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in d/l to grade / sidewalk perm |
2016-11-29 | No data | 204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required.Permit expired on 10/03/2016. |
2016-11-29 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut |
2016-11-29 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-11-29 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon arrival contractor restored area with temp asphalt with proper color code failing to remove prior false color code. lane markings restored. did not correct and unifor restoration as per requirement standards. |
2016-11-29 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restorations |
2016-11-29 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required.Permit expired on 08/14/2016. |
2016-11-29 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-11-29 | No data | GEORGIA ROAD, FROM STREET BURLING STREET TO STREET PARSONS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sewer cut sinking 2" in localized area entire wearing course needs replacing no patching top cut allowed. |
2016-11-28 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER. |
2016-11-28 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints on sidewalk portion were plumber worked are not reduced & sealed must reduce & seal your part of work on sidewalk Permit expired September 2016 |
2016-11-27 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER |
2016-11-27 | No data | WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | EXCAVATION ON SWK AND 2 PLATES IN RWY AT TIME OF INSPECTION. |
2016-11-26 | No data | 37 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w |
2016-11-26 | No data | 35 AVENUE, FROM STREET FARRINGTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest d/l |
2016-11-26 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | Steel plated d/l. |
2016-11-26 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required.Permit expired on 10/08/2016. |
2016-11-25 | No data | SHORE PARKWAY, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | FOUND NO CUTS R/W OR S/W |
2016-11-25 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass cut |
2016-11-25 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE IN COMPLIANCE |
2016-11-25 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm plumbers trench across r/w curb-curb i/f/o 57-10 roosevelt ave |
2016-11-25 | No data | SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass...new sewer...... |
2016-11-24 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | bus lane re-painted |
2016-11-24 | No data | PLAZA STREET, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | all work performed on Sterling St under permit# B012016328B86 |
2016-11-24 | No data | STERLING PLACE, FROM STREET BUTLER PLACE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Water repair work along driving lane plated(counter-sunk). |
2016-11-23 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO CONFIRMATION NUMBER. |
2016-11-23 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done at this location. |
2016-11-22 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required.Permit expired on 08/27/2016. |
2016-11-22 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIT EXPIRED ON 9/14/16. RESPONDENT FAILED TO OBTAIN A CONFIRM. |
2016-11-22 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2016-11-22 | No data | 79 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer is in compliance. Perm restoration in driving lane by recently completed building operation. |
2016-11-22 | No data | 46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2016-11-22 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway at time of inspection. |
2016-11-21 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Lane markings was added on. |
2016-11-21 | No data | HOLLY AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | part of location covered by pavers plan. |
2016-11-21 | No data | WARREN STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-11-20 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Broken out asphalt area restored. However, lane marking not restored as required - NOV issued. Also, incorrect color code ID marker not replaced and new restoration has scarfs from & slightly mounded. |
2016-11-19 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION MADE FINAL |
2016-11-19 | No data | 249 STREET, FROM STREET 41 AVENUE TO STREET DEPEW AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway has been milled |
2016-11-18 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Permit was valid till 11/10/16 CAR was issued on 11/1/16 also a new permit was issued on 11/11 after field meeting with Angel from plumbing works to verify restoration in bus pad |
2016-11-18 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT OBTAINED A STREET OPENING PERMIT ON A PROTECTED STREET BUT FAILED TO OBTAIN CONFIRMATION NUMBER PRIOR TO EXPIRATION OF SUCH PERMIT, AS REQUIRED. PERMIR EXPIRED ON 9/15/16. RESPONDENT FAILED TO OBTAIN A CONFIRM |
2016-11-17 | No data | SOUTH ELLIOTT PLACE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench on roadway in parking lane |
2016-11-17 | No data | NORTH 4 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | start time 1155 am end time 1230 PM size 3' x 3' x 4' clean fill 97.0% compaction |
2016-11-17 | No data | PENNSYLVANIA AVENUE, FROM STREET FULTON STREET TO STREET J ROBINSON PARKWAY APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in r/w. |
2016-11-15 | No data | 42 AVENUE, FROM STREET 196 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | TWO PERM TO GRADE WATER CUTS IN THE D/L PARTIALLY COVERED BY BUILDING PAVE IFO 196-11 AND 196-13 |
2016-11-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill a pass cut #1 (L) 18 FT X (W) 4 Ft 5 Inches X (D) 7 Ft97.3 % 97.1% |
2016-11-14 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site trench on roadway in parking and driving lane |
2016-11-14 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | White Lane markings restored. |
2016-11-13 | No data | EAST 66 STREET, FROM STREET OHIO WALK TO STREET WHITMAN DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sanitary sewer on sidewalk |
2016-11-12 | No data | PRESIDENT STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no cuts on the r\w |
2016-11-12 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration d/l |
2016-11-11 | No data | PRINCE STREET, FROM STREET 33 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Report to the location to monitor a back fill restoration work started at 12:15 pm and ended at 13:25 pm. |
2016-11-11 | No data | EASTERN PARKWAY, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-11-10 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W. |
2016-11-10 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in p/l |
2016-11-10 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | ARRIVED:12PML-5 FEET 9 INCHESW-4 FEET 8 INCHESD-4 FEET 5 INCHESCOMPACTION-97.1 AND 96.6DEPARTED-2:15 |
2016-11-10 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | condition previously reported |
2016-11-10 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in p/l in compliance |
2016-11-09 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Trench in r/w. |
2016-11-08 | No data | KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in r.w |
2016-11-08 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working |
2016-11-07 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in parking/driving lane i/f/o GRITISDES GROCERY STORE. |
2016-11-07 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration in the roadwy i/f/o EAST END KITCHEN. |
2016-11-06 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent repair water restoration flushed to grade in the parking lane. |
2016-11-06 | No data | FLEET STREET, FROM STREET 66 AVENUE TO STREET GROTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one permanent roadway restoration color coded and sealed , sidewalk has newly installed concrete around water valve box at curb , expansion joints sealed at time of my inspection . |
2016-11-05 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | sidewalk sealed |
2016-11-05 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | full width of s/w was closed which caused problem with GC permittee reopened full width of sidewalk no action taken at this time |
2016-11-05 | No data | HANCOCK STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE IN COMPLIANCE |
2016-11-05 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site |
2016-11-05 | No data | VAN DOREN STREET, FROM STREET LONG ISLAND EXPWY ET 22 A WB TO STREET SAULTELL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | two perm cuts to grade on the r/w |
2016-11-05 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 rw cuts ok |
2016-11-04 | No data | NORTH 10 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued. |
2016-11-04 | No data | WESTCHESTER AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET GLEBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk and portion of roadway |
2016-11-04 | No data | BRIGHTON 1 LANE, FROM STREET BRIGHTON 1 PLACE TO STREET BRIGHTON 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-11-03 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2016-11-03 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION I N THE PARKING LANE UNDER VALID DOT PERMIT ON FILE |
2016-11-03 | No data | BOGART STREET, FROM STREET BOERUM STREET TO STREET JOHNSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN P/L |
2016-11-02 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | street paving now being preformed .......after installl... |
2016-11-02 | No data | 64 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the p/l, d/l. |
2016-11-02 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed.Work for 57-04 Woodside av on Roosevelt av.Two cuts 4' in between f/o and opp. 57-10 Roosevelt av - have to be combined in one after WC restoration - 7'7"x5' and 21'x4'2" cuts,cut backs painted. |
2016-11-02 | No data | WILLOW STREET, FROM STREET CLARK STREET TO STREET PIERREPONT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass re pair water |
2016-11-02 | No data | 149 STREET, FROM STREET BARCLAY AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT TO GRADE IN THE D/P/L |
2016-11-01 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | final restoration should be restored full concrete depth |
2016-11-01 | No data | 27 STREET, FROM STREET 3 AVENUE TO STREET DEAD END | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk work ok |
2016-11-01 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill will be re-schedule.. |
2016-10-31 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | pass, crew on location ......installing svc .. |
2016-10-31 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L IN COMPLIANCE S/W AS WELL |
2016-10-31 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Multiple perm cuts in roadway at time of inspection. |
2016-10-31 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass cut |
2016-10-30 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION. |
2016-10-29 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Monitored backfill from 10:30amt to 12:50pm |
2016-10-29 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 5ft 5ft down 2 ft 10 in |
2016-10-29 | No data | PRINCE STREET, FROM STREET 39 AVENUE TO STREET ROOSEVELT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidealk flag restored |
2016-10-29 | No data | EAST 136 STREET, FROM STREET RIDER AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2016-10-28 | No data | 37 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk flag restored |
2016-10-28 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | One countersunk Plate marked PWI in the Roadway and a Temp cut in the Sidewalk. (Inspector#652) |
2016-10-27 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sidewalk flags |
2016-10-27 | No data | 12 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp. cuts to grade p/d/l,temp. asphalt to grade on sidewalk - permit active. |
2016-10-27 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE REPAIRING WATER |
2016-10-27 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in the driving lane of roadway leading to curb.....active con ed work being done, temp trench on top of plumbers cut. |
2016-10-27 | No data | BOERUM PLACE, FROM STREET DEAN STREET TO STREET PACIFIC STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | a:1020am10'x4'x9' test1-96.4 test2- 95.2plumbing nyc incsirveriojumping jackexclusive testinglanbertsand coneW-114.6d-105.4md-112.0am-8.7unable to spray out cut do to rain |
2016-10-26 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | paved over, dueto c of o...new building ... |
2016-10-26 | No data | EAST 81 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Update permit found M012016274A40. |
2016-10-25 | No data | COSTER STREET, FROM STREET RYAWA AVENUE TO STREET VIELE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly restored permanent restoration missing green plastic color code with I me and year. |
2016-10-25 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut due to darkness and parked cars |
2016-10-25 | No data | EAST END AVENUE, FROM STREET EAST 81 STREET TO STREET EAST 82 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Restoration I/F/O Gristedes supermarket. |
2016-10-25 | No data | COSTER STREET, FROM STREET RYAWA AVENUE TO STREET VIELE AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Newly restored permanent restoration missing green plastic color code with I me and year. |
2016-10-25 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water & Sewer cut in good condition. |
2016-10-24 | No data | GATES AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 6' x 4' temporary sidewalk cut is sunken 2'' at a building operation in progress i/f/o 1814/16 Gates ave |
2016-10-24 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to provide proper drainage at work site.There a large pile of excavated material obstructing the gutter( no pipe installed .)This preventing flow of accumulating water/rain between the curb and gutter. |
2016-10-24 | No data | EVERGREEN AVENUE, FROM STREET JEFFERSON STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE IN COMPLIANCE |
2016-10-24 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Many perm trenches on VANDERBILT AVENUE ok |
2016-10-24 | No data | CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the d/l in compliance |
2016-10-24 | No data | 52 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-10-24 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-10-23 | No data | 67 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2016-10-23 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | The asphalt in the parking lane remains broken out but has not deteriorated. An NOV is not warranted at this time. The site will be monitored throughout the guarantee period. |
2016-10-23 | No data | 56 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY RESURFACED |
2016-10-22 | No data | 204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT TO GRADE IN THE D/P/L. TEMP SIDEWALK FLAG. ACTIVE B/O. ACTIVE PERMIT ON FILE |
2016-10-22 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w s/w |
2016-10-22 | No data | 204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM CUT TO GRADE IN THE D/P/L. TEMP SIDEWALK FLAG TO GRADE. ACTIVE B/O |
2016-10-22 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm /rest r/w s/w |
2016-10-22 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w s/w |
2016-10-21 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration (curb to curb) |
2016-10-20 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated. |
2016-10-20 | No data | ROCKAWAY AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New swk. |
2016-10-19 | No data | MARYLAND AVENUE, FROM STREET ABBOTT STREET TO STREET BAY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site work not started. |
2016-10-19 | No data | 162 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut 1-7'2''x 4' x 3'2'' Cut 2- 3'5'' x 2'11'' x 4'5'' Backfill complete and acceptable. |
2016-10-18 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN THE PARKING LANE |
2016-10-18 | No data | PROSPECT PARK SOUTHWEST, FROM STREET GREENWOOD AVENUE TO STREET REEVE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ATPO, I observed above respondent failed to permanently restore cut within required time. Above permit #b012016270A35 expired on 10/8/16. Plated excavation pinned & ramped, marked PWI is used to ID above respondent |
2016-10-18 | No data | PROSPECT PARK SOUTHWEST, FROM STREET SEELEY STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration bus stop. |
2016-10-18 | No data | 25 STREET, FROM STREET 42 ROAD TO STREET QNSBORO BR UP RY APR | No data | Street Construction Inspections: Active | Department of Transportation | crew onsite.valid permit |
2016-10-17 | No data | BAY 47 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer (plug) is in compliance. Perm restoration in driving lane and perm sidewalk flag by building operation. |
2016-10-17 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION W/O A PERMIT. |
2016-10-17 | No data | EAST 134 STREET, FROM STREET MDE SOUTHBOUND EXIT 1 TO STREET BROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | excavated material in parking lane of roadway and 2 fiber glass plates on sidewalk at building 500, pedestrian walkway maintained at this time. |
2016-10-16 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | repaired ok |
2016-10-16 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w & s/w |
2016-10-16 | No data | 53 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ROADWAY FOUND RESURFACED. |
2016-10-16 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm cuts in r/w not sealed..permit still valid |
2016-10-15 | No data | FLATBUSH AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint sealed. |
2016-10-15 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Roadway scarring repaired. |
2016-10-15 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W. |
2016-10-14 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated. |
2016-10-14 | No data | 204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | length 18' width 6' 11" depth 10' 11"wet: 117.9 dry: 109.6 max: 112.0 moisture: 7.5lift 1: 97.4lift 2: 97.6from 11:30 to 2:55 |
2016-10-13 | No data | GATES AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 5' x 6' and 6' x 12' perm roadway cuts, Restoration needs to be sealed; also Remove Ramping Material left on roadway I/F/O 18-16/14 GATES AVE. |
2016-10-13 | No data | WEST 52 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plattes |
2016-10-12 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO PERMANENTLY RESTORE SIDEWALK RESTORATION WITHIN REQUIRED TIME, LAST PERMIT ON FILE #B012016201D25 EXPIRED 8/17/2016 |
2016-10-12 | No data | SOMERS STREET, FROM STREET ROCKAWAY AVENUE TO STREET MOTHER GASTON BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | sewer/water cut now plated .... |
2016-10-12 | No data | PERRY STREET, FROM STREET WAVERLY PLACE TO STREET WEST 4 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | newer permit on file M012016271A63 |
2016-10-12 | No data | 13 AVENUE, FROM STREET 67 STREET TO STREET OVINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work has not commenced at building operation. |
2016-10-11 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 13ft 8in x 4ft 9in x 8ftPass: 97.8% , 97.4% |
2016-10-11 | No data | 191 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT TO GRADE IN THE P/D/L IFO 40-17. ACTIVE B/O |
2016-10-10 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Uneven water-sewer wearing course restoration with broken out asphalt & not flush with surrounding roadway surface. White water base paint used for lane marking (unacceptable). Incorrect ID marker 24516 used. Correct ID tag is 33387. Please correct. |
2016-10-10 | No data | CROTONA PARKWAY, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-10-10 | No data | KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench in r.w |
2016-10-10 | No data | DEAN STREET, FROM STREET EASTERN PARKWAY TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | a/t/p/o i found the above respondent working on roadway without permit the above permit shown on site exp 10/9/16 |
2016-10-09 | No data | GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-10-08 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in good condition. |
2016-10-08 | No data | BAY 13 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done at the time of this inspection. |
2016-10-08 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway has been resurfaced. |
2016-10-07 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 366 Avenue Y restore double yellow lines over permanent restoration. |
2016-10-07 | No data | WEST STREET, FROM STREET CALYER STREET TO STREET OAK STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new Building connection DDC Capital project area s/w & road under construction to be paved |
2016-10-06 | No data | EMMONS AVENUE, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-10-06 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site |
2016-10-05 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file B012016274A49 |
2016-10-05 | No data | MERMAID AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation on r/w in front of active building operation |
2016-10-04 | No data | BERGEN STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-10-03 | No data | 161 STREET, FROM STREET LABURNUM AVENUE TO STREET OAK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3x3 cut needs sealing no sealer placed around cut. |
2016-10-03 | No data | STATE STREET, FROM STREET CLINTON STREET TO STREET COURT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2016-10-03 | No data | CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 11.6 FT (W) 4ft (D) 8.6 ft...actual start time 11:22 am...COMPACTION: 97.6% / 97.5% |
2016-10-03 | No data | 35 AVENUE, FROM STREET FARRINGTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in opposite driving lane. |
2016-10-03 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BIOSWALE TREE PIT ...S/W EXTENDED UNABLE TO SEE CUTS (RESURFACED ) |
2016-10-01 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY TEMP TO GRADE |
2016-10-01 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | work behind fence |
2016-10-01 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work behind fence extended permit Q012016267C01 |
2016-10-01 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w s/w plated |
2016-10-01 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm /rest r/w plated excavation s/w |
2016-10-01 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest r/w s/w |
2016-10-01 | No data | WEST 28 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued. |
2016-10-01 | No data | 82 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work in s/w area ok |
2016-09-30 | No data | PROSPECT PARK SOUTHWEST, FROM STREET GREENWOOD AVENUE TO STREET REEVE PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 12:30 pm Departure: 2:00 pmCut #1: L 7' 5" W 5' D 3'96.5% |
2016-09-30 | No data | CHAUNCEY STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE POURING CONCRETE BASE |
2016-09-29 | No data | 137 STREET, FROM STREET 32 AVENUE TO STREET 34 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm. cut 5' width to grade p/d/l,temp. asphalt cut to grade on sidewalk - active BO. |
2016-09-29 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in p/l |
2016-09-29 | No data | 191 STREET, FROM STREET 42 AVENUE TO STREET STATION ROAD | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O, I observed the respondent failed to post ID signs at the work site that show the name of the permittee , phone# for contracting permit# type of work being performed start and completion dates of project and subcontractor name if needed. |
2016-09-28 | No data | 12 STREET, FROM STREET 37 AVENUE TO STREET 38 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench to grade. |
2016-09-28 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated Building Operation. |
2016-09-28 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated with an active permit on file at a Building Operation. |
2016-09-27 | No data | SHORE PARKWAY, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem r/w cut |
2016-09-27 | No data | 27 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new water work observed on segment |
2016-09-27 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Steel plate for sidewalk removed, concrete sidewalk now curing. One cut perm to grade, second cut temp to grade |
2016-09-27 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 15 FT (W) 8.5FT (D) 5FT ..ACTUAL START TIME 11:27 AM ...COMPACTION: 97.3% / 97.6% |
2016-09-26 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench temp swk |
2016-09-26 | No data | 168 STREET, FROM STREET 29 AVENUE TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair was done, expansion joints needs to be recess and sealed. |
2016-09-26 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLUMBING ROADWAY EXCAVATION |
2016-09-26 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | there is a temp cut on the sdwk that for now is acceptable also there is a dep steel plate that is properly countersunk in the bike lane/ turning la. |
2016-09-26 | No data | 59 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: E-Number | Department of Transportation | Crew on site making repair in parking lane. |
2016-09-26 | No data | PACIFIC STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site ..bkfill for tomorrow |
2016-09-25 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED ROADWAY EXCAVATIONS. |
2016-09-25 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | found roadway resurface |
2016-09-25 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Full length of the work requires curb to curb restoration. SKT010. |
2016-09-25 | No data | 48 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 PLATED EXCAVATIONS |
2016-09-24 | No data | HAROLD STREET, FROM STREET BRADLEY AVENUE TO STREET WELLBROOK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | trench perm / sidewalk plated and barricaded |
2016-09-24 | No data | GATES AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation pin and ramped in the d/l valid permit on file |
2016-09-24 | No data | 37 AVENUE, FROM STREET 12 STREET TO STREET 13 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench to grade. |
2016-09-23 | No data | COURT STREET, FROM STREET LIVINGSTON STREET TO STREET SCHERMERHORN STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated concrete pad rwy |
2016-09-22 | No data | GREENWOOD AVENUE, FROM STREET PROSPECT PARK SOUTHWEST TO STREET SHERMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew working in opening on side of 829- 100 ft west of inter PPW and greenwood |
2016-09-22 | No data | WEST STREET, FROM STREET CALYER STREET TO STREET OAK STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site open excavation with sheeting and shoring installing water mains for new building permit expires today with extention |
2016-09-22 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN THE D/L IN COMPLIANCE |
2016-09-22 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not started |
2016-09-22 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk and roadway are in compliance |
2016-09-21 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew working in 2 open street excavations opp 762 & 774 B flaggers and signs |
2016-09-21 | No data | BEDFORD AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cut & cap water service to 814 bedford ave-open swk and opp driving lane next to bus stop |
2016-09-21 | No data | CLARENDON ROAD, FROM STREET EAST 56 STREET TO STREET EAST 57 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no wk seen |
2016-09-21 | No data | BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew working in 2 open street excavations opp 762 & 774 B flaggers and signs |
2016-09-21 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer (plug) perm parking lane restoration is in compliance. |
2016-09-20 | No data | COURT STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | in compliance |
2016-09-20 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway ok |
2016-09-20 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | BPP paving complete and in compliance. |
2016-09-20 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer has been paved over by BPP. |
2016-09-20 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut to grade on the sdwk and steel plate in the rdwy newer permit is on file thats active M012016246B28 |
2016-09-20 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on the sdwk is acceptable and steel plate on the roadway |
2016-09-20 | No data | JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L IN COMPLIANCE |
2016-09-20 | No data | OCEANIA STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 3 perm Long water cuts flush to grade. |
2016-09-19 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | maintained a plated sidewalk excavation with valid permit. |
2016-09-19 | No data | 82 STREET, FROM STREET 23 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Crew backfilling sidewalk opening and temp to grade street opening. Long water. |
2016-09-19 | No data | PACIFIC STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | resurfaced |
2016-09-18 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r.w |
2016-09-18 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm Water & Sewer Trench in Good Condition. |
2016-09-18 | No data | 15 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATED ROADWAY EXCAVATION |
2016-09-17 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY EXCAVATIONS PLATED. |
2016-09-17 | No data | BAY RIDGE PARKWAY, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade..Keyspan worked in cut |
2016-09-17 | No data | STAGG STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w |
2016-09-16 | No data | 61 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION |
2016-09-16 | No data | WOODHAVEN BOULEVARD, FROM STREET 88 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in the d/l i/f/o 87-34 |
2016-09-16 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Cut size: 9ft 4in x 4ft 2in x 11ft 4ft 6in x 4ft 2in x 4ft Pass: 96.0% 96.7% 97.2% 96.5% |
2016-09-16 | No data | UNION STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2016-09-14 | No data | 41 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2016-09-14 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new work visable vehicle park |
2016-09-13 | No data | BAY 28 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Paved over by BPP. |
2016-09-13 | No data | 47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED ROADWAY EXCAVATION. |
2016-09-13 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass cut |
2016-09-12 | No data | COSTER STREET, FROM STREET RYAWA AVENUE TO STREET VIELE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent trench with green plastic color code is sunken 2" in the driving lane of roadway. Opposite 215-225 |
2016-09-12 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | As per foreman Angel backfill will be rescheduled until DEP inspection is complete. |
2016-09-11 | No data | KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING PLATED EXCAVATION ON ROADWAY WITHOUT VALID PERMIT TO DO SO. ABOVE PERMIT EXPIRED ON 9/10/16 USED FOR I.D. |
2016-09-11 | No data | FULTON STREET, FROM STREET ARLINGTON PLACE TO STREET BEDFORD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | remove barricade from sidewalk. |
2016-09-10 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced. |
2016-09-09 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfced. |
2016-09-09 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 CUTS. 9ft x 4ft, down 10 1/2ft, 96.1% & 96.7%; 5ft x 4ft, down 3 1/2 ft, 96.4% & 96.3% Arrival 10:55 to 2:45pm |
2016-09-08 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | arrived at 1030permittee ran out of material and said it going to take and hour to get here.cut dimensions were left at 11'x7'9''x3' permittee has 2' left of material to put inspoke with staff inspector carmen about situation. |
2016-09-08 | No data | DEAN STREET, FROM STREET BOERUM PLACE TO STREET SMITH STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-1030-pm11'x6'9''x8'4'' test- 96.6, 97.4, 97.8mr.silveradojumping jackexclusive testingchrissand conew-110/116.7D-103.2/107.4md-110.0/114.5am-7.5/8.7 cut backs in progress new material was brought to the site for the last lift |
2016-09-08 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway Trench in Good Condition. |
2016-09-07 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Duplicate permit on file |
2016-09-07 | No data | DASH PLACE, FROM STREET BEND TO STREET WEST 240 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in the driving lane i/f/o 9. |
2016-09-06 | No data | EAST 36 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm. restoration okay in d/l & p/l at B.O. |
2016-09-06 | No data | PACIFIC STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r\w mill for pave |
2016-09-06 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site actively working. |
2016-09-06 | No data | KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | open trench on side of 368 throop ave, crew on site |
2016-09-06 | No data | KOSCIUSKO STREET, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | bruno and trainees arrive at 1130am, backfill a pass on (L)14ft6in X (W)4ft X (D)9ft, tests 96.4& 97.0-saw cut cutbacks wrere properly done and concrete to be installed as base |
2016-09-06 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated sewer excavation |
2016-09-05 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway repaved |
2016-09-04 | No data | 13 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway at time of inspection. |
2016-09-04 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | steel plates has been removed |
2016-09-03 | No data | PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water in roadway and temp sidewalk |
2016-09-03 | No data | CLARKSON AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 Perm cuts in the roadway , 3'.1"inches apart |
2016-09-02 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failed to restore lane markings |
2016-09-02 | No data | 57 STREET, FROM STREET 11 AVENUE TO STREET FT HAMILTON PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | ARRIVED- 11:38L-9FEET 4 INCHES W-4 FEET 5 INCH D-7 FEET L-4 FEET 2INCHES W-4 FEET 2 INCH D-3 FEETCOMPACTION1-97.5 AND 97.3COMPACTION2-96.4DEPART-3:15 |
2016-09-02 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | Actual start time - 09:50am - Wet-Den-117.9,Dry-Den-108.5,Max. dry-Den-116.0,Act. Moist.-8.7, Material-Clean fill, Test-Sand cone, Lab-Exclusive Testing Labs,- Lab-Tech-Chris, (2 cuts) Compaction results-96.6, 97.6, second cut-96.4, 97.7 |
2016-09-01 | No data | BERGEN STREET, FROM STREET ROCHESTER AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, now perm ....new building |
2016-09-01 | No data | GREENE AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | now perm ....water install |
2016-08-31 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress |
2016-08-31 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut ok |
2016-08-30 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway Secured. |
2016-08-30 | No data | 204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | At time of inspection, crew on site, work in progress, location in compliance. |
2016-08-29 | No data | DOUGLASTON PARKWAY, FROM STREET 52 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench to grade in D/P/L i/f/o 52-68 not 52-58. |
2016-08-29 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-08-28 | No data | 44 ROAD, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in d/l, lane marking restore |
2016-08-27 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | short water cut in the parking lane |
2016-08-27 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation in parking lane permit expires 9/13/16 |
2016-08-27 | No data | WEST 29 STREET, FROM STREET 6 AVENUE TO STREET BROADWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | cut back for concrete base was done. |
2016-08-27 | No data | UNION STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s\w ok |
2016-08-26 | No data | 85 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1:00-3:40 Cut 1: L: 4 ft 1 in. W: 3 ft 2 in. D: 2 ft 8 in. Cut 2: L: 9 ft W: 3 ft 10 in. D: 8 ft. Cut backs underway. |
2016-08-26 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair scarring of roadway caused by pins used to secure steel plates with a fine asphalt concrete mix. |
2016-08-25 | No data | PRINCE STREET, FROM STREET 37 AVENUE TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street resurfaced. |
2016-08-25 | No data | GATES AVENUE, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation pin and ramp in the d/l |
2016-08-25 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L P/L IN COMPLIANCE |
2016-08-25 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | A-1125amD-7'x4'x3'8'' test1-97.4 test 2-97.2plumbing nyc incnicholasexclusive labanthonysand coneW-107.4D-102MD-115.5Am-5.2cut backs in progress |
2016-08-25 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in parking lane, sidewalk temp to grade at new family dollar building |
2016-08-25 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration |
2016-08-24 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp cut on the roadway |
2016-08-24 | No data | 84 ROAD, FROM STREET LANDER STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK REPAIRED IN KIND. EXPANSION JOINTS SEALED |
2016-08-24 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-08-24 | No data | DOWNING STREET, FROM STREET 31 ROAD TO STREET 32 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/w flags concrete to grade. |
2016-08-24 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated |
2016-08-24 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated |
2016-08-23 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Restoration paved final. No base or wearing course times called in as per DASH. Photos taken to present to supervisors to discuss appropriate course of action. |
2016-08-23 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new sewer work visable |
2016-08-22 | No data | ABERDEEN ROAD, FROM STREET KENT STREET TO STREET SURREY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | one 10' x 7' permcut on r/w |
2016-08-22 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to crew foreman on site and detailed new backfill procedures for upcoming backfill. |
2016-08-22 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 12:20-4:10 PM. L: 11 ft 5 in. w: 4 ft. D: 8 ft. Cut backs performed. No base in stalled. Informed Foreman that binder would not be acceptable as base material. |
2016-08-21 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway. Active permits on file. |
2016-08-20 | No data | 39 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site - spoke to Mike. |
2016-08-20 | No data | HENRY STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy |
2016-08-20 | No data | 6 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work at location of permit. |
2016-08-20 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest d/l |
2016-08-19 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2 cuts (1)3 1/2ft x 2 1/2 down 3 1/2 (96.4) (2) 16ft x 4ft down 4ft 6in(96.9/97.3) all cut back done and plated will do base/wearing course at another time |
2016-08-18 | No data | 7 AVENUE, FROM STREET 47 STREET TO STREET 48 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE12FT7IN X 4FT3IN X 9FT0INWD:126.3; DD:117.5; MDD:120.0; MOIST:7.5% 1)97.4 ; 2)97.5START 12:14 END 2:02 |
2016-08-18 | No data | POWERS STREET, FROM STREET BUSHWICK AVENUE TO STREET JUDGE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | real block location is powers BTW Bus hwick Ave & HUMBOLDT St Now just resurfaced segment |
2016-08-18 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench |
2016-08-17 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | responding to complaint crew on site open s/w 4 steel plates on road back Ho truck parking limited with jersey barriers waiting for DEP |
2016-08-16 | No data | PARKSIDE AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | LONG WATER CUT IN THE PARKING LANE |
2016-08-16 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench |
2016-08-16 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway plated. |
2016-08-16 | No data | 60 STREET, FROM STREET 10 AVENUE TO STREET 11 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Building construction - work done on sidewalk |
2016-08-15 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new cuts now paved ....new svc .... |
2016-08-15 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, cuts from new svc ,....cuts perm.... |
2016-08-15 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restortion in the parking lane and perm. sidewalk flag i/f/o 623 |
2016-08-12 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 trench d/l 17ft x 4ft, down 4 1/2ft. Ifo 62 Arrival 11:40 to 1:45pm |
2016-08-11 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed above respondent has a steel plate over a open excavation opposite side water main new install opposite side steel plate not ramp properly (Subsection ii ) improperly pin (subsection iii) ID markings on plate |
2016-08-11 | No data | ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | MONITORED BACKFILL FROM 950AM TO 1245PM ONE RESTORATION IN BT PARKING LANE AND DRIVING LANE LENGTH 12FT WIDTH 4FT DEPTH 9FT MONITORED THE CUTBACKS |
2016-08-10 | No data | EAST 3 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plug water and sewer long cut. Perm roadway restoration and perm sidewalk flag is in compliance. |
2016-08-10 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway in driving and parking lane. |
2016-08-09 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass, new svc relay new permit obtained ... |
2016-08-09 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, crew expected to pave.........cuts ... |
2016-08-09 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | At time of inspection half perm restoration with permanent IBM color code is not flush with surrounding area sunken 1 3/4 " and missing seal |
2016-08-09 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. S/W water work finalized. |
2016-08-08 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut made final in parking lane |
2016-08-08 | No data | SHEEPSHEAD BAY ROAD, FROM STREET SHORE PARKWAY TO STREET VOORHIES AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:00-3:45 PM L: 9 ft 2 in. W: 4 ft. D: 5 ft 8 in. |
2016-08-07 | No data | EAST 12 STREET, FROM STREET BEVERLY ROAD TO STREET SLOCUM PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subcontractor (ADC Construction) trenched over plumber's cut ifo 245. |
2016-08-07 | No data | 34 AVENUE, FROM STREET 145 PLACE TO STREET 146 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2016-08-07 | No data | 146 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2016-08-06 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R/W. |
2016-08-05 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer trench in the d/l, p/l. |
2016-08-03 | No data | STUYVESANT AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site working at this time. |
2016-08-03 | No data | 80 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer plug perm restoration in driving lane is in compliance. |
2016-08-03 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | UPDATED PERMIT ON FILE |
2016-08-03 | No data | BUSHWICK AVENUE, FROM STREET AINSLIE STREET TO STREET POWERS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut off cut resurfaced over by National Grid permanent restoration in front of Hydrant |
2016-08-03 | No data | 55 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2016-08-03 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed above respondent placed a steel plate over a open excavation in the driving and parking lane the side of the water main asphalt ramp missing on 3 sides not in compliance with ramp(subsection ii) ID made by color code & permit |
2016-08-02 | No data | COOK STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-08-02 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated |
2016-08-02 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated on the sidewalk and roadway |
2016-08-02 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | now perm , all s/w flag restored .. |
2016-08-02 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | now perm ...09 .... |
2016-08-01 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in compliance. |
2016-07-31 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2016-07-30 | No data | DE GRAW STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-07-30 | No data | BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W. |
2016-07-30 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Plated roadway in driving lane. Subsequent expired permit secured at location. |
2016-07-30 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway in driving lane. |
2016-07-30 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | Plated roadway from driving lane to parking lane. |
2016-07-30 | No data | GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk repair |
2016-07-29 | No data | FLATBUSH AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal expansion joint between red bricks & flag. |
2016-07-29 | No data | 48 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED ROADWAY EXCAVATION |
2016-07-29 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | new sewer sprinker combine.....13x4x7' ..all cut backs preformed ...n/s of street ... |
2016-07-29 | No data | EAST 21 STREET, FROM STREET CATON AVENUE TO STREET WOODRUFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation, d/l |
2016-07-28 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass cut |
2016-07-27 | No data | 81 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE12FT5IN X 5FT0IN X 11FT0INWD:124.8; DD:116.1; MDD:122.0; MST:7.5 - C:96.8 (1); 96.2 (2)START 12:30 END 2:53 |
2016-07-27 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I observed the respondent failed to permanently restore a temporary asphalt water/sewer cut within the required time to do so. The above permit expired on 7/18/16. |
2016-07-27 | No data | OCEAN AVENUE, FROM STREET AVENUE I TO STREET AVENUE J | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Found resurfaced. Flag ok |
2016-07-27 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp cut on s/w ifo 1131. (Building operation) |
2016-07-27 | No data | DOUGLASTON PARKWAY, FROM STREET 53 AVENUE TO STREET THORNHILL AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. |
2016-07-25 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | current permit M012016196A14 |
2016-07-25 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2016-07-25 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation at sidewalk temp. in compliance. |
2016-07-24 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Repairs made at this time ok |
2016-07-22 | No data | WHITE PLAINS ROAD, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut plated on the sidewalk |
2016-07-22 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R.W |
2016-07-21 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 10.10 FT (W) 4 FT (D) 10 FT ...ACTUAL START TIME 12:50..COMPACTION: 98.5% / 97.6% |
2016-07-21 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | plates |
2016-07-20 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO WORK DONE. |
2016-07-20 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway plated. |
2016-07-20 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In front of 2166 the wearing course of a permanent restoration is broken, cracked and not providing a smooth surface as required. Mill restoration and install new wearing course. |
2016-07-18 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 11 FT (W) 4FT (D) 9 FT...ACTUAL START TIME 12:47 PM ..COMPACTION 97.8% / 96.7% |
2016-07-17 | No data | 81 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk repair corner property is in compliance. |
2016-07-15 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT HAS EXCAVATED MATERIAL PLACE IN THE PARKING LANE WITHOUT A VALID PERMIT ON FILE. DOT PERMIT # M012016167A16 WAS USED FOR I.D |
2016-07-15 | No data | COURT STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut in r/w 50' from bay st |
2016-07-15 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE RESPONDENT HAS A PLATED WATER EXCAVATION ON A SPEED BUMP IN THE DRIVING LANE WITHOUT A VALID PERMIT ON FILE. STEEL PLATE "P.W.I" WAS USED FOR I.D. PERMIT ON FILE EXPIRED 7/14/16 |
2016-07-15 | No data | 46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE6FT2IN X 4FT0IN X 4FT5INWD:110.7; DD:105.2; MDD:116.5 ; MST:5.2; C:97.5 (1) ; 97.3 (2)START 12:47 END 1:38 |
2016-07-13 | No data | 27 STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration around NYC sewer access cover |
2016-07-09 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated exacavtion in the roadway and temp cut on the sidewalk are in compliance |
2016-07-09 | No data | PRINCE STREET, FROM STREET 35 AVENUE TO STREET LINNEAUS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm /rest driveway |
2016-07-08 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass cut |
2016-07-06 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work started valid permit on file |
2016-07-06 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Active | Department of Transportation | no work started |
2016-07-06 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work in progress. Crew on site. |
2016-07-05 | No data | 20 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy |
2016-07-05 | No data | 101 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Building paving done in front of 33-14/33-18/33-20. |
2016-07-02 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | contractor in compliance with stips |
2016-07-02 | No data | DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET TIFFANY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk |
2016-07-02 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp plated, countersunk. |
2016-07-02 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequent permit secured for work. |
2016-07-02 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sewer and water |
2016-07-01 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1st cut: length 14' 5" x width: 4' 3" x depth: 4' 10". first lift: 96.9 last lift: 97.12nd cut: length: 6' 5" x width: 5' 4" x depth: 4' 8" .first lift: 96.4 last lift: 97.0wet: 115.8 dry: 106.5 max: 114.5 moisture:8.7 time:10:32 to 13:15 |
2016-06-30 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | CREW ON SITE ROADWAY IS OPEN ALSO SIGNS ARE POSTED MEET REQUIREMENTS FOR PERMIT IN COMPLIANCE |
2016-06-30 | No data | ST MARKS AVENUE, FROM STREET UNDERHILL AVENUE TO STREET VANDERBILT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | install sewer on sidewalk w/signs crew on site |
2016-06-30 | No data | EAST 21 STREET, FROM STREET AVENUE S TO STREET AVENUE T | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w restoration found in compliance (P/L) |
2016-06-29 | No data | 95 STREET, FROM STREET 162 AVENUE TO STREET 163 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut on roadway sidewalk cut has to be redone new building operation |
2016-06-29 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r.w |
2016-06-28 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLATED R/W.. |
2016-06-28 | No data | 53 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | The wearing course of a permanent restoration has been damaged by tires and is 1 1/2 inches below grade in front of 1631 53 Street. |
2016-06-28 | No data | BROOKLYN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway repaved as per BPP. Perm sidewalk. |
2016-06-28 | No data | FREEMAN STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm |
2016-06-28 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway at time of inspection. |
2016-06-27 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trenches and steel plated street opening |
2016-06-27 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm trench and steel plated street opening |
2016-06-26 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway plated in the driving lane. |
2016-06-26 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | SIDEWALK RESTORED |
2016-06-26 | No data | WEST 8 STREET, FROM STREET AVENUE P TO STREET QUENTIN ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sewer perm driving lane and perm sidewalk restorations are in compliance. |
2016-06-26 | No data | 41 AVENUE, FROM STREET KISSENA BOULEVARD TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | address is incorrect |
2016-06-26 | No data | LEAVITT STREET, FROM STREET CARLTON PLACE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm water and sewer cut in the roadway |
2016-06-25 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. |
2016-06-25 | No data | WOODRUFF AVENUE, FROM STREET CLARKSON AVENUE TO STREET EAST 21 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts d/l |
2016-06-25 | No data | 11 AVENUE, FROM STREET 59 STREET TO STREET 60 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Sewer Trench in good condition. |
2016-06-24 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer at active building operation at 1259/61 70 Street. Two perm driving lane restorations are in compliance. Container at site covering parking lane. |
2016-06-24 | No data | EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET | No data | Street Construction Inspections: Active | Department of Transportation | material place in the parking lane. contractor in compliance with stips |
2016-06-23 | No data | WOODHAVEN BOULEVARD, FROM STREET 88 AVENUE TO STREET JAMAICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp tp grade |
2016-06-23 | No data | 28 AVENUE, FROM STREET 214 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | repaired water and sewer perm roadway & sdewalk cuts are to grade in d/p/l. |
2016-06-23 | No data | AVENUE P, FROM STREET EAST 21 STREET TO STREET EAST 22 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm r/w restoration (P/L) found to be in compliance |
2016-06-23 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent roadway cut and temporary sidewalk cut building operation.scaffolding overhead |
2016-06-22 | No data | POWERS STREET, FROM STREET BUSHWICK AVENUE TO STREET JUDGE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 12.6 FT (W) 4 FT (D) 9.6 FT ...ACTUAL START TIME 11:00 AM ...COMPACTION: 97.6% / 97.4% |
2016-06-21 | No data | AVENUE X, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | prem cut r/w |
2016-06-18 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Please apply color code and paint restoration red on bus lane. |
2016-06-18 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION SEALED. |
2016-06-18 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Please apply color code and paint restoration red on bus lane. |
2016-06-17 | No data | ST MARKS AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w. |
2016-06-16 | No data | PALERMO STREET, FROM STREET BEND TO STREET KENO AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site; visible water leak--3 day notice on site--crew on site is excavating with alot of water coming out, lending them to believe leak may be at the tap--not sure yet |
2016-06-16 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut d/l |
2016-06-16 | No data | NEWELL STREET, FROM STREET DRIGGS AVENUE TO STREET NASSAU AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plate in r/w with new permit |
2016-06-16 | No data | 74 STREET, FROM STREET 37 ROAD TO STREET BEND | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no visible cuts on the roadway or sidewalk . trucks are parked on the parking lane unable to see under. |
2016-06-15 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cuts in roadway and perm cuts in r.w |
2016-06-15 | No data | MAIN STREET, FROM STREET 58 AVENUE TO STREET 58 ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk restored |
2016-06-15 | No data | ROOSEVELT AVENUE, FROM STREET 57 STREET TO STREET 58 STREET | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection crew work at site. |
2016-06-15 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass |
2016-06-14 | No data | NORTH 12 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp cut ,with new permit (exp 6/15/16) |
2016-06-14 | No data | 28 AVENUE, FROM STREET 214 PLACE TO STREET 215 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill completed and acceptable. |
2016-06-14 | No data | PENNSYLVANIA AVENUE, FROM STREET FULTON STREET TO STREET J ROBINSON PARKWAY APPROACH | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-06-14 | No data | CYPRESS AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work found at time of inspection |
2016-06-13 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN R/W ON SPEED BUMP |
2016-06-13 | No data | BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS 2 CUTS15'L X 4'W X 5'D = 98.3% & 98.0%15'L X 4'W X 4'D = 97.9% & 98.2%DEPARTURE TIME: 310PM |
2016-06-12 | No data | 37 AVENUE, FROM STREET COLLEGE POINT BOULEVARD TO STREET PRINCE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in roadway |
2016-06-11 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Thank You for repairing permanent sewer restoration in roadway, could you please return and re-paint bus lane red, in front of 228 Livingston st between Elm Place & Hoyt st. |
2016-06-11 | No data | 84 ROAD, FROM STREET LANDER STREET TO STREET MAIN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed |
2016-06-11 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut sealed |
2016-06-10 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm sewer trench in r/w. |
2016-06-10 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | 2â Diameter area of temp cut on sidewalk at building operation now temp to grade. |
2016-06-10 | No data | 7 AVENUE, FROM STREET WEST 23 STREET TO STREET WEST 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | water work is plated time of inspection |
2016-06-10 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site plugging water/sewer line. |
2016-06-10 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY |
2016-06-09 | No data | BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Active | Department of Transportation | STEEL PLATES "PWI" PINNED AND RAMPED ACROSS ROADWAY - OK |
2016-06-09 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | having an area of temp. cut on sidewalk 2" under grade with surrounding pavement. Respondent failed to maintain cut stay flush with surrounding pavement until wearing course installed, after NICA notifications at 1:59am & 2:16am on 6/9/16. |
2016-06-09 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2â Diameter area of temp cut on sidewalk with temp material broken out 2â-depth â Notified: Voicemail left at 0159hrs on 06/09/16 â Telephone #718-875-6262 |
2016-06-09 | No data | AVENUE D, FROM STREET EAST 3 STREET TO STREET EAST 4 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work in progress |
2016-06-09 | No data | PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in r/w. |
2016-06-07 | No data | HICKS STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration in roadway at time of inspection. |
2016-06-06 | No data | EAST 233 STREET, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2016-06-04 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm trench by 293 |
2016-06-04 | No data | 53 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | active site ok plates over cuts |
2016-06-04 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk left in temp and restoration has no color code ID...permit still active acceptable for now |
2016-06-02 | No data | COLUMBIA HEIGHTS, FROM STREET ORANGE STREET TO STREET PINEAPPLE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | arrival: 12:25pcut1: 8'x 8'x 8'cut2: 2'x 2'x 4'departure: 2:38p |
2016-06-01 | No data | NASSAU STREET, FROM STREET BQE EASTBOUND ENTRANCE SANDS ST TO STREET DUFFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | nov previously written called Rocco will return in 7 days to make sure temp restoration is permanently restored |
2016-06-01 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | active permit for this location B012016144D28 |
2016-05-27 | No data | GRAFTON STREET, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill passed (first material failed) 1 cut 4.1 by 3 down 4.2 test 1 98.3 test 2 98.0 |
2016-05-25 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I observed the permanent restoration has the wearing course sunken 2" in driving lane in Bike lane High 2" not flush with surrounding areas previously notified By CAR # 20160920114 no repairs made at this time overdue for repairs |
2016-05-25 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | restoration in p/l. |
2016-05-25 | No data | EAST 35 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed on the Roadway due to an active B.O Fence on the street. |
2016-05-24 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | repairs done |
2016-05-24 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS1 CUT3'2"L X 3'W X 3'D = 97.5%.ARRIVAL 1149AMDEPARTURE 104PM. |
2016-05-24 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | time of inspection crew working at site |
2016-05-23 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Perm water cut in the d/l. |
2016-05-23 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Repair sewer plated in driving lanes. |
2016-05-23 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | time of inspection permittee working at site within compliance no blocking of traffic |
2016-05-23 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the d/l. |
2016-05-22 | No data | MT HOPE PLACE, FROM STREET MORRIS AVENUE TO STREET WALTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2016-05-22 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway at time of inspection. |
2016-05-21 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A/T/P/O I observed Respondent has a plated excavation in the roadway with no permit. Respondent was identified using permit number Q012016092D74 that expired 04/23/16 showing work was started at this location. |
2016-05-21 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | perm cut in roadway |
2016-05-21 | No data | 9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Sidewalk and parking / driving lane being excavated, D.E.P issued a 3 day notice for service water leak . |
2016-05-21 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | a summons was written for not having an updated permit on file for this location, work not completed plated excavation |
2016-05-19 | No data | BUSHWICK AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 4 FT (W) 4FT (D) 4FT...ACTUAL START TIME 12:22 PM.... COMPACTION: 96.6% ,96.3% |
2016-05-19 | No data | 23 STREET, FROM STREET 41 AVENUE TO STREET QUEENS PLAZA NORTH | No data | Street Construction Inspections: Active | Department of Transportation | site plated |
2016-05-18 | No data | DONGAN AVENUE, FROM STREET POYER STREET TO STREET QUEENS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade in driving lane |
2016-05-18 | No data | COURT STREET, FROM STREET 4 PLACE TO STREET LUQUER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk in compliance. |
2016-05-18 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | water cut acceptable |
2016-05-18 | No data | WOODRUFF AVENUE, FROM STREET CLARKSON AVENUE TO STREET EAST 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm restoration d/l |
2016-05-17 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut, d/l 12ft x 4ft, down 7ft. aka 4023 Glenwood Road. 96.9% & 97.2% Arrival 11:22am to 1:20pm. |
2016-05-17 | No data | AVENUE X, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Temp Water Cut in the Roadway Flush to Grade & Excavation in the Roadway, Properly Barricaded. |
2016-05-17 | No data | 59 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS2 CUTS1. 12'L X 4'W X 8'D = 98.1% & 97.8%2. 3'L X 3'W X 3'D = 98.3%DEPARTURE 215PM. |
2016-05-16 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R/W. FLUSH |
2016-05-16 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade.. B.O walkway |
2016-05-15 | No data | DITMARS BOULEVARD, FROM STREET GCP EASTBOUND EXIT 6 TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No plumbing work found on roadway. Sidewalk recently replaced/restored. |
2016-05-15 | No data | WOODRUFF AVENUE, FROM STREET CLARKSON AVENUE TO STREET EAST 21 STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation p/l, s/w |
2016-05-15 | No data | ALBANY AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | PLATED EXCAVATION IN THE ROADWAY |
2016-05-14 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in r/w. |
2016-05-14 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PERM TRENCH IN R/W. |
2016-05-14 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | permit valid or permittee maintaining a plate at location |
2016-05-13 | No data | READE STREET, FROM STREET BROADWAY TO STREET ELK STREET | No data | Street Construction Inspections: Active | Department of Transportation | water cut acceptable |
2016-05-13 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut on roadway in compliance |
2016-05-13 | No data | COSTER STREET, FROM STREET RYAWA AVENUE TO STREET VIELE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 1 R/W Cut opp 220 O.K. |
2016-05-13 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Respondent fail to permanently restore 3 water cuts within required time. permit expired on 5/4/16. |
2016-05-13 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Location is btwn Knickerbocker Avenue & Irving not Wilson Avenue 2 perms one in each P/l loosing seal below grade 3/4" no car at this time ok |
2016-05-13 | No data | FLATBUSH AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench d/l |
2016-05-12 | No data | 64 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut p/l . 5ft x 4ft, down 3 1/2ft. 96.5%. Arrival 1:24pm to 2:28pm |
2016-05-12 | No data | 124 STREET, FROM STREET 22 AVENUE TO STREET 23 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut to grade in P/D/L. |
2016-05-12 | No data | MERCER STREET, FROM STREET BROOME STREET TO STREET GRAND STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, water repairs in compliance. Cobblestones area covered with steel plate. 453 Broome st. corner property. |
2016-05-12 | No data | MERCER STREET, FROM STREET BROOME STREET TO STREET SPRING STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, wrong street segment for water repair work since 453 Broome st is a corner property and it's located on street segment of Mercer st. bet. Broome st. & Grands st. work not done, permit expired. |
2016-05-12 | No data | HOLLY AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade |
2016-05-12 | No data | WOOD AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | R/WAY WAS RESURFACED VIA DOT IN HOUSE PAVING > #S152016090A05 |
2016-05-11 | No data | CANAL STREET, FROM STREET ALLEN STREET TO STREET ORCHARD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | unable to locate cut..could be under martial building opp is storing |
2016-05-11 | No data | GREENE AVENUE, FROM STREET MARCUS GARVEY BOULEVARD TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | water install 2'' line ...due to fire install ....line ...job site found in order .. |
2016-05-10 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TIME OF INSPECTION PLATED OPEN EXCAVATION IN R/W |
2016-05-10 | No data | PENNSYLVANIA AVENUE, FROM STREET FULTON STREET TO STREET J ROBINSON PARKWAY APPROACH | No data | Street Construction Inspections: LL14 | Department of Transportation | MONITORED BACKFILL FROM 952AM TO 1155AM ONE RESTORATION IN THE DRIVING LANE LENGTH 16FT WIDTH 5FT DEPTH 6FT |
2016-05-09 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated |
2016-05-09 | No data | SOUTH 6 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated |
2016-05-09 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | FAILED CAR RE-INSPECTION. EXPANSION JOINTS NO SEALED. |
2016-05-09 | No data | 71 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water long cut. Two perm roadway restorations and perm sidewalk flag. Roadway has defects related to DEP major sewer repair trench. |
2016-05-09 | No data | 17 AVENUE, FROM STREET 70 STREET TO STREET 71 STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued. |
2016-05-09 | No data | 17 AVENUE, FROM STREET 70 STREET TO STREET 71 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 2:55-4:00 L:4 ft W: 3 ft. D: 4 ft 1 in. |
2016-05-09 | No data | 58 STREET, FROM STREET 4 AVENUE TO STREET GOWANUS EXPWY EB EN BELT PKWY | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued. |
2016-05-08 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench in roadway at time of inspection. |
2016-05-08 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water cut in good condition. |
2016-05-07 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew restoring sidewalk on the weekend . |
2016-05-06 | No data | GRAND STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated |
2016-05-06 | No data | NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed. 1 vehicle parked in front of address. Unable to give a full inspection of r/w |
2016-05-06 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | installing new sewer; crew working in open rwy trench |
2016-05-06 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number - protected street |
2016-05-06 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, water cuts 09... |
2016-05-04 | No data | DITMARS BOULEVARD, FROM STREET GCP EASTBOUND EXIT 6 TO STREET 93 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work done on sidewalk. Flags inside property line recently replaced/restored. |
2016-05-03 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | last inspection was put in by mistake...... 2 cuts back filled in the driving lane. (1) 3'5" x 3'2" (2) 4'3" x 3'9" |
2016-05-03 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Plated excavation in roadway |
2016-05-03 | No data | 46 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation on 8 avenue - there is a valid permit on file - B012016117C08 for 4509 8 avenue |
2016-05-03 | No data | WEST 19 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 cuts back filled in the driving lane. (1) 3'5" x 3'2" (2) 4'3" x 3'9" |
2016-05-02 | No data | 64 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY EXCAVATION PLATED. |
2016-05-02 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | having loose steel plates at two plated excavations in the roadway where plates were noisy from movement when rolled upon by traffic. Respondent failed to protect plates to prevent movement as per subsection (iii) |
2016-05-02 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETEACTUAL START: 11:30AMDEPARTURE: 1:10PMDIMENSIONS: CUT1: (L)17âX(W)4âX(D)4â6â CUT2: (L)7âX(W)4âX(D)3âCOMPACTION(S): 98.4/98.2/97.9 |
2016-05-02 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permanent restoration down 2 inches in bus lane, in front of 228 Livingston st between Elm Place and Hoyt st. |
2016-05-01 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w at thi stime |
2016-04-30 | No data | CLINTON STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | RESTORATION IN COMPLIANCE. |
2016-04-30 | No data | PACIFIC STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-04-30 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please seal permanent trench, in front of 37 remsen st. |
2016-04-30 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | new swk flags |
2016-04-29 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESTORATION IN COMPLIANCE. |
2016-04-29 | No data | MALCOLM X BOULEVARD, FROM STREET MADISON STREET TO STREET MONROE STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, water line combie sprinkler.....now plated .. |
2016-04-29 | No data | 149 STREET, FROM STREET BARCLAY AVENUE TO STREET SANFORD AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Back fill complete and acceptable. |
2016-04-29 | No data | NORTH 6 STREET, FROM STREET HAVEMEYER STREET TO STREET MEEKER AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (l) 12' X (w) 4' X (d) 9'.. COMPACTION OF 98.1 AND 98.3%.. |
2016-04-29 | No data | NORTH 13 STREET, FROM STREET BERRY STREET TO STREET WYTHE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain confirmation number two hours prior to the commencement of a back fill on a protected street |
2016-04-28 | No data | PITKIN AVENUE, FROM STREET CROSS BAY BOULEVARD TO STREET REDDING STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | temp flush to grade restoration in r/w and on s/w--long water job |
2016-04-28 | No data | VAN WICKLEN ROAD, FROM STREET CROSS BAY BOULEVARD TO STREET REDDING STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | A 4'X3' TEMP ASPHALT WATER RESTORATION IN CROSSWALK OF VAN WICKLEN RD AND REDDING ST WITHOUT A PERMIT ON FILE FOR THIS LOCATION--LONG WATER JOB |
2016-04-28 | No data | NASSAU STREET, FROM STREET BQE EASTBOUND ENTRANCE SANDS ST TO STREET DUFFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Atpo I observed the above respondent failed to permanently restore a temporary repair water restoration in roadway within required time (by expiration of Dot permit). Expired Dot permit# B01 2015 331A93 exp 12/16/15 was used for ID. |
2016-04-28 | No data | BROOKLYN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk partially closed off for concrete curing. Walkway maintained on sidewalk. Perm. restoration on roadway. |
2016-04-27 | No data | HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in rw.. |
2016-04-27 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Plumbing INC has a valid permit, installing new sewer service line w/signs |
2016-04-26 | No data | NEVINS STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok r\w |
2016-04-26 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed above respondent obtained a street opening permit on a protected street and completed the backfill ,but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required.Permit expired on 4/9/16. |
2016-04-26 | No data | WILLOUGHBY AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in d/l & p/l 1 s/w starting to go down B/O in finals no car at this time ok |
2016-04-26 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew digging swk signs posted at both ends of intersections at 650 |
2016-04-26 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut ok |
2016-04-25 | No data | 220 STREET, FROM STREET 64 AVENUE TO STREET HORACE HARDING EXPRESSWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | Report to the location to monitor a back fill work at 12:56 pm; i left the back fill at 2:05 pm supervisor Lashawn wanted to see me |
2016-04-24 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joint installed and sealed. |
2016-04-23 | No data | REEVE PLACE, FROM STREET EAST 7 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts dl/ |
2016-04-23 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number - protected street |
2016-04-22 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm to grade |
2016-04-22 | No data | DE GRAW STREET, FROM STREET BOND STREET TO STREET HOYT STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 2:18aCut1: 5'x 5'x 4'= 97.1Cut2: 2'x 2'x 4'= 97.2Departure: 3:29p |
2016-04-22 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. |
2016-04-22 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Failure to obtain a confirmation number - protected street |
2016-04-21 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET MERCER STREET | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, street plated. Water installation in progress, Acceptable. Roadway was milled by the city for resurfaced. |
2016-04-21 | No data | BROOME STREET, FROM STREET GREENE STREET TO STREET MERCER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Upon inspection, street plated. Water installation in progress. Valid permit M012016112B53 on file. Acceptable. Roadway is milled for resurfaced. |
2016-04-21 | No data | MADISON STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A.T.P.O. I observed above respondent obtained a street opening permit on a protected street and completed the backfill ,but failed to obtain a confirmation number from DOT prior to the expiration of such permit as required.Permit expired on 3/25/16. |
2016-04-21 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench new swk flags |
2016-04-21 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 4 steel plated rwy street opening and open trench behind fence |
2016-04-20 | No data | 159 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | part of cut covered by pavers plan |
2016-04-20 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | valid perimt on file.. crew on site 2 perm cuts in r.w |
2016-04-20 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site.. 2 perm cuts in roadway |
2016-04-20 | No data | BROOKLYN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETEACTUAL START: 11:00AMDEPARTURE: 12:10PMDIMENSIONS: (L)9âX(W)9âX(D)5âCOMPACTION(S): 96.4/97.2 |
2016-04-19 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Repair water and sewer plated excavations in each parking lane. |
2016-04-19 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NOV issued to respondent for failing to obtained a street opening permit on a protected street and completed the backfill, but failed to obtain a confirmation number prior to the expiration of such permit, as required. Permit expired 3/17/16 |
2016-04-19 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | Crew on site clearing debris from roadway. Foreman opened roadway upon request. Foreman instructed to have roadway remain open and broom swept clean. |
2016-04-16 | No data | IRVING PLACE, FROM STREET EAST 18 STREET TO STREET EAST 19 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 3'x3'9" cut back filled in the driving lane. |
2016-04-16 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | 10'x5' cut backfilled in the driving / parking lane. |
2016-04-16 | No data | 67 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O/ I observed the respondent failed to permanently restore cut within required time |
2016-04-15 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: Active | Department of Transportation | uneven rough wearing course please restore final pavement |
2016-04-14 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site work in progress |
2016-04-13 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS FILED TO POST SIGNS MEETING NYCDOT SPECS AT WORK ZONE AND AT BOTH INTERSECTIONS DIRECTING PEDS TO OPPOSITE SIDEWALK. SIGNS WERE NEVER POSTED AT BOTH INTERSECTION IN VIOLATION. |
2016-04-13 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Various locations of permanent trench lost wearing Course below grade 2" and lost seal for 2nd time along edge in different locations must repair and seal |
2016-04-13 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE D/L IN COMPLIANCE |
2016-04-13 | No data | 70 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sewer ,crew on site |
2016-04-13 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-04-13 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Various locations of permanent trench lost wearing Course below grade 2" and lost seal for 2nd time along edge in different locations must repair and seal |
2016-04-11 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 1st cut: (L): 4ft (W): 3ft 6in (D): 4ft -- 2nd cut: (L): 14ft (W): 4ft (D): 9ft -- Backfill is a pass. |
2016-04-10 | No data | REEVE PLACE, FROM STREET EAST 7 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Holes sealed. |
2016-04-10 | No data | 79 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer perm restoration in driving lane is in compliance. |
2016-04-09 | No data | GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cuts in r/w.. |
2016-04-09 | No data | READE STREET, FROM STREET BROADWAY TO STREET ELK STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Excavation in the Roadway, Steel Plated/ |
2016-04-08 | No data | CARROLL STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy |
2016-04-08 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE - WATER - SEWER10FT0IN X 5FT0IN X 6FT0IN 6FT2IN X 5FT0IN X 4FT1INSTART 12:22 END 2:00 |
2016-04-08 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Plates on roadway. No active work at this time. Work active for weekends only. Loose and noisy steel plate on roadway ifo of work site. Needs to be re secure. |
2016-04-07 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | lane markings not restore in kind un able to issue car do to car on file. |
2016-04-07 | No data | 42 AVENUE, FROM STREET 196 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in the driving underneath building pavement |
2016-04-06 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | ATPO I observed the above respondent with a temporary cut around a water valve on the sidewalk.The respondent failed to permanently restore it's cut within the required time. the respondent was notified prior by CAR #20166230025 on 2/11/2016 . |
2016-04-06 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated swk and rwy street opening |
2016-04-05 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | cut perm |
2016-04-05 | No data | 43 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS11'6"L X 3'10"W X 8'4"D = 97.2% & 96.8%DEPARTURE: 1245PM |
2016-04-04 | No data | KNICKERBOCKER AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued. |
2016-04-04 | No data | 13 AVENUE, FROM STREET 80 STREET TO STREET 81 STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk construction crew on site |
2016-04-03 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Street has been partial pave |
2016-04-02 | No data | 44 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavation |
2016-04-02 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trenches new swk flag |
2016-04-01 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Long cut. Plated in driving lane. |
2016-04-01 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CR |
2016-04-01 | No data | 67 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Temp to grade parking lane. DEP permit active at location. |
2016-04-01 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | per cut r/w - temp s/w building construction site |
2016-03-31 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restoration in the parking lane i/f/o 1518. |
2016-03-30 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | A/T/P/O I OBSERVED RESPONDENT WITH 2 COUNTERSUNK STEAL PLATES MARKED PM IN FRONT OF PROPERTY WITHOUT A VALID NYCDOT PERMIT. PRIOR PERMIT EXPIRED 3/27/16. NO NEW PERMIT ISSUED. PERMIT USED FOR ID PURPOSE ONLY. |
2016-03-30 | No data | WESTCHESTER AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET GLEBE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CONDITION IS GOOD. |
2016-03-30 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT P/L AND D/L |
2016-03-29 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Flag on sidewalk has deep footprints. Seal expansion joints. |
2016-03-29 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrival: 10:33 am Departure: 12:36pmCut #1: L 11' W 4' D 4' 97.0% 97.2%Cut #2: L 6' W 7.3' D 4' 97.2% 97.2% |
2016-03-29 | No data | 8 AVENUE, FROM STREET 45 STREET TO STREET 46 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING |
2016-03-29 | No data | 67 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap , 3 Day DEP Notice Issued. |
2016-03-28 | No data | HALSEY STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COUNTERSINK STEEL PLATE FLUSH IN ROADWAY DURING WINTER MORATORIUM POLICY. ABOVE PERMIT USED FOR ID. |
2016-03-27 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Cut in good condition. |
2016-03-26 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut d/l |
2016-03-26 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | portion of permanent restoration n temporary stage..parking lane portion restore in kind. |
2016-03-25 | No data | FRANKLIN AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no work started. |
2016-03-25 | No data | 41 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Cannot identify work at this time - commercial area,parked cars on r/w & s/w. |
2016-03-25 | No data | GLADWIN AVENUE, FROM STREET AUBURNDALE LANE TO STREET FRESH MEADOW LANE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. Property Owner on Site. |
2016-03-24 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in the p/l in compliance ... |
2016-03-24 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Active | Department of Transportation | 2 steel plates in curb lane serving no purpose. identified by contractor of new building that it belongs to plumber working at site |
2016-03-24 | No data | EMMONS AVENUE, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-03-23 | No data | 35 AVENUE, FROM STREET FARRINGTON STREET TO STREET PRINCE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | backfill completed and pass. |
2016-03-23 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated sewer excavation opposite and adjacent but opposite and I/F/O perm water restorations new permit on file |
2016-03-23 | No data | PROSPECT PARK SOUTHWEST, FROM STREET SEELEY STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in bus stop |
2016-03-23 | No data | BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated sewer excavation opposite and adjacent but opposite and I/F/O perm water restorations |
2016-03-22 | No data | NORTH HENRY STREET, FROM STREET ENGERT AVENUE TO STREET MEEKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-03-21 | No data | MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET PULASKI STREET | No data | Street Construction Inspections: Active | Department of Transportation | counter sunk plate in roadway plus sign |
2016-03-20 | No data | REMSEN STREET, FROM STREET HICKS STREET TO STREET MONTAGUE TERRACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temporary sidewalk sewer restoration trench-overdue for final, please seal permanent restoration trench in roadway, in front of 37 remsen st. New Sidewalk installation IA Construction permit#B04 2016 026A14 exp2/17/16 was not done. |
2016-03-19 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 cuts on the r\w ok |
2016-03-19 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 cuts on the r\w ok |
2016-03-18 | No data | HOLLY AVENUE, FROM STREET 137 PLACE TO STREET KISSENA BOULEVARD | No data | Street Construction Inspections: LL14 | Department of Transportation | start 11:05 12.3 x 3.10 x 4.0 back fill2 flags sidewalk cuts. contractor back fill with large pieces of asphalt and concrete.And was asked to remove but refused,saying its not protected. |
2016-03-18 | No data | CLINTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap 3 Day DEP Notice Issued. |
2016-03-18 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP NEW BUILDING FOUND RESURFACED |
2016-03-16 | No data | EAST 19 STREET, FROM STREET 3 AVENUE TO STREET IRVING PLACE | No data | Street Construction Inspections: Active | Department of Transportation | no cut found |
2016-03-16 | No data | 64 STREET, FROM STREET 24 AVENUE TO STREET DAHILL ROAD | No data | Street Construction Inspections: E-Number | Department of Transportation | crew on site no rw / sw cut have been made at this time, visible break at curb info property. |
2016-03-16 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal expansion joint installed between the curb and the sidewalk. |
2016-03-16 | No data | CLINTON STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent restorations sunken 2" in driving lane |
2016-03-16 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm Water & Sewer Trench Recently Paved. |
2016-03-16 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w.. |
2016-03-14 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | In The driving lane permanent trench below grade 1 3/4" in the bike lane permanent trench High 2" not smooth with surrounding roadway and the rest of the bike lane all should be flush with rest of road specially Bike Lane |
2016-03-14 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm restoration and plated restoration. Subsequent expired permits secured at location. |
2016-03-14 | No data | 40 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL COMPLETE5FT2IN X 4FT5IN X 4FT2INSTART 12:47 END 1:25 |
2016-03-10 | No data | JEFFERSON STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in p/l on both sides ok |
2016-03-09 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work done |
2016-03-08 | No data | 79 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: LL14 | Department of Transportation | 11:35-12:25 Backfill re-scheduled for 2:20 PM. |
2016-03-06 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN PARKING LANE. |
2016-03-05 | No data | PACIFIC STREET, FROM STREET BOND STREET TO STREET NEVINS STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated rwy and swk at 445 |
2016-03-04 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cuts in r/w. |
2016-03-04 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | No work at site. |
2016-03-04 | No data | DUFFIELD STREET, FROM STREET FULTON STREET TO STREET WILLOUGHBY STREET | No data | Street Construction Inspections: E-Number | Department of Transportation | Excavation in the Roadway Steel Plated & Countersunk. |
2016-03-04 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2016-03-04 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Active | Department of Transportation | open sewer trench , crew on site w/ proper signage |
2016-03-03 | No data | PROSPECT PARK SOUTHWEST, FROM STREET SEELEY STREET TO STREET TERRACE PLACE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS3'10"L X 3'3"W X 4'D = 96.7% & 97.0%.ARRIVAL 210PMDEPARTURE 312PM |
2016-03-02 | No data | BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut |
2016-02-29 | No data | 137 STREET, FROM STREET 32 AVENUE TO STREET 34 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill completed |
2016-02-29 | No data | WYCKOFF AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | wrong permittee |
2016-02-29 | No data | WYCKOFF AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plate shift in parking lane..nov issued for(failed to pin and ramp ,plated cut exp permit) |
2016-02-28 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY FINAL, SIDEWALK TEMP TO GRADE WITH ASPHALT. |
2016-02-28 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY FINAL, SIDEWALK TEMP TO GRADE WITH ASPHALT. NEWER PERMIT ON FILE. |
2016-02-28 | No data | COURT STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLUMBING NYC , INC. HAS 4 TEMP RESTORATIONS ON THE SIDEWALK THAT'S OVERDUE FOR FINAL. PERMIT EXPIRED 1/23/2016. |
2016-02-27 | No data | TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway partially resurfaced infront of newly constructed building |
2016-02-26 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 trench d/l 16ft x 4ft down, 6 1/2 ft. Arrival 10:50am to 1:30pm |
2016-02-26 | No data | 79 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BACKFILL PASSED |
2016-02-24 | No data | 14 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING. |
2016-02-23 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site backfilling roadway excavation. |
2016-02-23 | No data | 79 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Water and sewer install to new building. Plated in driving lane. Fill in parking lane. |
2016-02-22 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Active | Department of Transportation | Excavation - water and sewer countersunk |
2016-02-22 | No data | BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: (L) 10 FT (W) 9 FT (D) 9 FT ...ACTUAL START TIME 11:58 AM |
2016-02-21 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy |
2016-02-20 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew is on sight working on the water repair. There are two excavations at this time, one in the roadway and one on the sidewalk. |
2016-02-20 | No data | BUSHWICK AVENUE, FROM STREET HARMAN STREET TO STREET LAFAYETTE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is currently plated |
2016-02-20 | No data | VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp swk and plated rwy at 15 |
2016-02-19 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY NEWER PERMIT ON FILE. |
2016-02-19 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING. |
2016-02-17 | No data | DE KALB AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Arrived:12:04cut 1: L-5 FEET W-4 FEET D-4 FEETcut 2: L- 13 FEET W-5 FEET D-6 FEETCompaction: 95.3 & 96.5Compaction: 96.1 & 96.7Departed: 3 pm |
2016-02-16 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN R/W.. |
2016-02-16 | No data | OCEAN PARKWAY, FROM STREET AVENUE C TO STREET BEVERLY ROAD | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut d/l 3ft x 2 1/2ft., down 4ft. Arrival 11:43am to 12:40pm |
2016-02-16 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | ROADWAY |
2016-02-15 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | respondent's crew failed to paint a temporary color code next to steel plated street opening(no ID on plate), opposite 599 baltic st. |
2016-02-14 | No data | TOMPKINS AVENUE, FROM STREET LEXINGTON AVENUE TO STREET QUINCY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | counter sunk plate in roadway. |
2016-02-14 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm trench in r/w. |
2016-02-13 | No data | STAGG STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm cut in p/l.. |
2016-02-13 | No data | OCEAN AVENUE, FROM STREET FARRAGUT ROAD TO STREET GLENWOOD ROAD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work observed at time of inspection. |
2016-02-13 | No data | 42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PLATED EXCAVATION NEWER PERMIT ON FILE. |
2016-02-12 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATE COUNTER SUNK SIGN POSTED. |
2016-02-12 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | perm plumber cut in driving lane |
2016-02-12 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Crew on site operating within roadway excavation. Signs posted. Active permit on record. |
2016-02-12 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site operating within roadway excavation. Signs posted. |
2016-02-11 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench to grade in the p/d/l |
2016-02-11 | No data | 36 STREET, FROM STREET 13 AVENUE TO STREET CLARA STREET | No data | Street Construction Inspections: Active | Department of Transportation | PLATE COUNTER SUNK SIGN POSTED. |
2016-02-10 | No data | OCEANIA STREET, FROM STREET 50 AVENUE TO STREET 53 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | contractor on site excavating in p/l |
2016-02-10 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY PLATE COUNTER SUNK. SIGNS POSTED. EXCAVATED MATERIAL STORED. |
2016-02-09 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Excavation in the Roadway, Steel Plated. |
2016-02-09 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm anent trench in driving lane and parking lane not sealed permit expired permanent IBM color code applied no active permit on file must seal entire restoration |
2016-02-09 | No data | 161 STREET, FROM STREET LABURNUM AVENUE TO STREET OAK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp to grade in roadway |
2016-02-08 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | 2 counter sunken âpwiâ marked steel plates making no noise |
2016-02-08 | No data | 56 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | D05 - fail to provide adequate protection |
2016-02-07 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pass. |
2016-02-07 | No data | STAGG STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done permit expired. |
2016-02-07 | No data | PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | cuts 09.....new svc .. |
2016-02-06 | No data | WEST 27 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | REPAIR WATER: Crew is on site at time of inspection. |
2016-02-06 | No data | LIVINGSTON STREET, FROM STREET ELM PLACE TO STREET HOYT STREET | No data | Street Construction Inspections: Active | Department of Transportation | open sewer trench , crew on site |
2016-02-05 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site, repair water-sewer. |
2016-02-05 | No data | BAY RIDGE PARKWAY, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer perm restoration in parking lane. |
2016-02-04 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Active | Department of Transportation | No plumbing work performed at location. |
2016-02-04 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Subsequent expired permit secured at location. |
2016-02-04 | No data | BALTIC STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ATPO I OBSERVED THE ABOVE RESPONDENT FAILED TO PROVIDE ADEQUATE PROTECTION AT THEIR WORKSITE BY FAILUNG TO PROPERLY BARRICADE MATERIALS ON ALL FOUR SIDES |
2016-02-04 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site in compliance to remove planks of wood and shoring in the parking used to hold parking so they can work on the sewer and water main , |
2016-02-04 | No data | SHORE PARKWAY, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2016-02-04 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | at time of inspection location incompliance, crew on site valid permit |
2016-02-03 | No data | PATCHEN AVENUE, FROM STREET MARION STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | pass, new water svc ...... |
2016-02-03 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done on stagg st opp 20 , swk and rwy and behind fence |
2016-02-03 | No data | STAGG STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | (L) 3' x (W) 3' x (D) 3'.. compaction of 96.5%..monitored from 2:50-4:00 |
2016-02-03 | No data | HOYT AVENUE, FROM STREET 23 STREET TO STREET 24 STREET | No data | Street Construction Inspections: Active | Department of Transportation | at time of inspection location incompliance, crew on site |
2016-02-03 | No data | 41 STREET, FROM STREET 35 AVENUE TO STREET 36 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site. |
2016-02-02 | No data | GREENWICH STREET, FROM STREET BEACH STREET TO STREET HUBERT STREET | No data | Street Construction Inspections: Active | Department of Transportation | Work not yet started. |
2016-02-02 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pem cuts in r.w |
2016-01-29 | No data | FLATBUSH AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD | No data | Street Construction Inspections: Active | Department of Transportation | Unable to fully inspect, ice/snow in r/w |
2016-01-27 | No data | 23 AVENUE, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Perm driving lane sewer restoration into nearly complete building operation. |
2016-01-27 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. repair water. flagmen on site. |
2016-01-26 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated r/w. |
2016-01-26 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3' X 3' cut in the roadway at the driveway of 41 down 3 feetone test....96.7%, see back fill sheet for details. |
2016-01-22 | No data | LEXINGTON AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | open swk and steel plated rwy trenches-crew on site |
2016-01-21 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cuts in roadway. |
2016-01-20 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS CLOSED THE STREET WITHOUT A DOT PERMIT NOR EMERGENCY NUMBER. THE ABOVE RESPONDENT HAS CLOSED OFF SUMMIT STREET BETWEEN COLUMBIA STREET & HAMITLTON AVENUE. |
2016-01-20 | No data | TEN EYCK STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started permit still valid. |
2016-01-16 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS IN ROADWAY. |
2016-01-16 | No data | JEFFERSON STREET, FROM STREET EVERGREEN AVENUE TO STREET STANWIX STREET | No data | Street Construction Inspections: Active | Department of Transportation | plated cut in r/w. |
2016-01-15 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restortion in the parking lane and perm. sidewalk flag i/f/o 623. |
2016-01-15 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two perm cuts in the roadway. |
2016-01-15 | No data | 42 AVENUE, FROM STREET 196 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Complaint | Department of Transportation | crew on site, stips being followed |
2016-01-14 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Two permanent cuts in the roadway. |
2016-01-14 | No data | WEST 5 STREET, FROM STREET LAKE PLACE TO STREET LAMA COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Roadway paved over by BPP. |
2016-01-12 | No data | COOK STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | 2 perm cuts in roadway |
2016-01-11 | No data | 83 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No work performed at location. |
2016-01-10 | No data | NASSAU STREET, FROM STREET BQE EASTBOUND ENTRANCE SANDS ST TO STREET DUFFIELD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN THE PARKING LANE. |
2016-01-08 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | This work was final now open for install under active permit # B012015357B05 expires 1/16/16 |
2016-01-07 | No data | COURT STREET, FROM STREET BAY STREET TO STREET SIGOURNEY STREET | No data | Street Construction Inspections: Active | Department of Transportation | steel plated rwy and opening swk crew on site- 50 ft south of bay st |
2016-01-07 | No data | 42 AVENUE, FROM STREET 196 STREET TO STREET FRANCIS LEWIS BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | plated excavations in r/w |
2016-01-06 | No data | GRAND STREET, FROM STREET BUSHWICK AVENUE TO STREET OLIVE STREET | No data | Street Construction Inspections: Active | Department of Transportation | Crew on site working inside opening previously steel plated and sign for plow plate countersunk in bike lane and flag persons posted |
2016-01-04 | No data | BRIGHTON 1 LANE, FROM STREET BRIGHTON 1 PLACE TO STREET BRIGHTON 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2015-12-28 | No data | WYTHE AVENUE, FROM STREET GRAND STREET TO STREET NORTH 1 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm sewer trench in r.w |
2015-12-21 | No data | SCHOLES STREET, FROM STREET BEND TO STREET LORIMER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway at time of inspection. |
2015-12-21 | No data | CROTONA PARKWAY, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM FINAL |
2015-12-20 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm Water Cut in the Roadway in good condition |
2015-12-16 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 12:50-2:30 L: 7 ft 6 in. W: 5 ft 6 in. D: 3 ft 10 in. |
2015-12-16 | No data | 49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Plumber - crew on site - work in progress |
2015-12-15 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent long water restorations on roadway and sidewalk in compliance i/f/o 1056. |
2015-12-11 | No data | REEVE PLACE, FROM STREET EAST 7 STREET TO STREET PROSPECT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Seal pin holes used to secure steel plates. |
2015-12-11 | No data | ST MARKS AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent having a counter-sunken plated excavation on the roadway and has failed to post "RAISE PLOW" or "STEEL PLATES AHEAD" signs during winter moratorium. Permit used to id. |
2015-12-09 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm water cut in the r/w. |
2015-12-07 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm trench in roadway |
2015-12-07 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | please place permanent color code for ID purpose on water cut |
2015-12-04 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CREW ON SITE WORKING |
2015-12-04 | No data | 46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | Backfill complete12ft0in x 7ft5in x 11ft0instart 11:53 end 2:40 |
2015-12-02 | No data | UNION STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | crew on site. new permit obtained B012015331A94 |
2015-12-02 | No data | UNION STREET, FROM STREET HOYT STREET TO STREET SMITH STREET | No data | Street Construction Inspections: Active | Department of Transportation | crew on site. |
2015-12-02 | No data | COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT I/F/O 213. |
2015-12-02 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut in rw. |
2015-11-29 | No data | CRESCENT STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm trench to grade in driving lane |
2015-11-28 | No data | 27 STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut to grade around N.Y.C sewer |
2015-11-20 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 3 cuts on roadway. cut # 1 - 11 foot by 4.4 foot down 3.6 foot test 1 - 98.5 test 2 - 96.7cut # 2. 9.8 foot by 4.2 foot down 3.6 foot test 1 - 96.7 test 2 - 95.6 cut # 3. 9.1 foot by 4.1 foot down 3.4 foot test 1. 97.8 test 2. 98.5 |
2015-11-19 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | active site ok |
2015-11-17 | No data | AVENUE Y, FROM STREET WEST 2 STREET TO STREET WEST 3 STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 10:50-1:30. 2 cuts for long sewer. Cut 1: L: 20 ft 6 in. W: 5 ft 4 in. D: 4 ft. Cut 2: L: 11 ft 6 in. W: 3 ft 6 in. D: 3 ft. 2 in. |
2015-11-15 | No data | EAST 35 STREET, FROM STREET 1 AVENUE TO STREET F D R DRIVE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR WATER - SEWER |
2015-11-13 | No data | NASSAU STREET, FROM STREET BQE EASTBOUND ENTRANCE SANDS ST TO STREET DUFFIELD STREET | No data | Street Construction Inspections: Active | Department of Transportation | ATPO. I observed respondent failed to provide adequate protection at work site by, failing to properly fenced or barricaded 4 sides around construction debris stored in the roadway. respondent ID permit number |
2015-11-13 | No data | BAY 28 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | found upon arrival at 1100 am roadway trench 22 ft by 4 ft down 6 ft dep permit 737811 clean fill was used and cut back marking made al morales on site bottom test 97.2 top test 97.7 back fill acceptable see back fill report site was left safe |
2015-11-10 | No data | HICKS STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Perm cut in roadway at time of inspection. |
2015-11-10 | No data | 38 AVENUE, FROM STREET 32 STREET TO STREET 33 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2015-11-10 | No data | SUMMIT STREET, FROM STREET COLUMBIA STREET TO STREET HAMILTON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Workers on site at time of inspection. |
2015-11-09 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEWER INSTALLED N TRENCH TO GRADE |
2015-11-08 | No data | GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2015-11-08 | No data | SHORE PARKWAY, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2015-11-05 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | cut..for new sewer.... |
2015-11-04 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Perm trench in roadway. |
2015-11-03 | No data | BAY 47 STREET, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer (plug) perm restoration in driving lane and perm sidewalk flag is in compliance. |
2015-10-30 | No data | BEDFORD AVENUE, FROM STREET HEWES STREET TO STREET PENN STREET | No data | Street Construction Inspections: Active | Department of Transportation | perm sewer trench in r/w. |
2015-10-27 | No data | DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET TIFFANY PLACE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | pass |
2015-10-22 | No data | 55 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm restoration in r/w |
2015-10-19 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w of B.0., temp to grade |
2015-10-09 | No data | WYCKOFF AVENUE, FROM STREET GROVE STREET TO STREET MENAHAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUT IN PARKING LANE IN COMPLIANCE |
2015-10-09 | No data | EAST 80 STREET, FROM STREET EAST END AVENUE TO STREET YORK AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | back fill passed |
2015-10-07 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w perm to grade, s/w plated new permit issued |
2015-10-07 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w plated |
2015-10-05 | No data | 101 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Post-Audit | Department of Transportation | perm cut along driving/parking lane and temp cut on sidewalk active b/o |
2015-10-05 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | r/w perm to grade, s/w has new permit |
2015-10-05 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Active | Department of Transportation | s/w work in progress |
2015-10-05 | No data | 71 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap. |
2015-10-02 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crew on location ..installing sewer.... |
2015-09-29 | No data | QUINCY STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | st plated rwy |
2015-09-27 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM CUTS ON ROADWAY |
2015-09-25 | No data | WEST 5 STREET, FROM STREET LAKE PLACE TO STREET LAMA COURT | No data | Street Construction Inspections: LL14 | Department of Transportation | found upon arrival at 145 roadway opening 6 ft by 8 ft down 4 ft dep permit 734551 cut back marking made grace period given permit tee compressor went down waited for new one first test first lift 96.0 second test 97 back fill acceptable |
2015-09-22 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | work not done |
2015-09-22 | No data | CROTONA PARKWAY, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE | No data | Street Construction Inspections: Active | Department of Transportation | pass |
2015-09-21 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Permanent restorations on roadway i/f/o 114. |
2015-09-21 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restorations on roadway i/f/o 114. |
2015-09-18 | No data | ROCKAWAY AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 19ft x 9ft down 5ft (96.9/97.7) |
2015-09-18 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work not started |
2015-09-17 | No data | EAST 233 STREET, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work done OK |
2015-09-17 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | Permanent restoration in the parking lane i/f/o 1518. |
2015-09-14 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BKFILL NOTES: 2 CUTS...CUT#1 (L) 11.2 FT (W) 4.4 FT (D) 3.6 FT...CUT #2 (L) 5.5 FT (W) 5 FT (D) 2.6 FT...ACTUAL START TIME 3:52 PM |
2015-09-14 | No data | 83 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair water and sewer perm restoration at building operation is in compliance. |
2015-09-13 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | ROADWAY TEMP TO GRADE. |
2015-09-12 | No data | WEST 5 STREET, FROM STREET LAKE PLACE TO STREET LAMA COURT | No data | Street Construction Inspections: Active | Department of Transportation | Active permit on file. |
2015-09-12 | No data | PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Work not done by permittee, work was done by 24516 - PLUMBING WORKS, INC. |
2015-09-11 | No data | CLINTON STREET, FROM STREET PRESIDENT STREET TO STREET UNION STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | BACKFILL PASS2 CUTS1. 10'4"X4'3"X4'6"=96.7%&97.2%2. 5'X4'X4'=96.7%&97.0% |
2015-09-10 | No data | 27 STREET, FROM STREET 42 ROAD TO STREET QUEENS PLAZA | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I observed the above respondent failed to provide adequate protection for two open excavations covered with wood in the parking lane. |
2015-09-10 | No data | 60 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | 2:05-3:00. DEP no show. |
2015-09-09 | No data | 45 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE | No data | Street Construction Inspections: LL14 | Department of Transportation | BACK FILL PASS 96.8%CUT SIZE 4FT 3" X 3FT 2" X 2FT 11" DOWN |
2015-09-09 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | cut made final plumber on site corking joint on s/w |
2015-09-09 | No data | 3 AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no new sewer work roadway or sidewalk |
2015-09-07 | No data | EMMONS AVENUE, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | roadway cut |
2015-09-04 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | plated excavation in the parking lane under valid permits on file |
2015-09-04 | No data | WOODBINE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated excavated in the parking lane |
2015-09-03 | No data | EAST 233 STREET, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work not started in front of building . work been done at rear of building # 951 |
2015-09-03 | No data | HICKS STREET, FROM STREET JORALEMON STREET TO STREET STATE STREET | No data | Street Construction Inspections: LL14 | Department of Transportation | 1 cut d/l 4ft x 3 1/2ft. Arrival 2:06 to 3:00 |
2015-09-03 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | renewed permit on file |
2015-09-03 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | long water cut plated in r/w and s/w. rear of building # 951 east 233 st. laundromat |
2015-08-31 | No data | 159 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | plated cut d/l |
2015-08-29 | No data | BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE | No data | Street Construction Inspections: E-Number | Department of Transportation | Broken Domestic Water Service Leak @ Tap, 3 Day DEP Notice Issued. |
2015-08-26 | No data | 101 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD | No data | Street Construction Inspections: Active | Department of Transportation | spot check for permits |
2015-08-25 | No data | EDENWALD AVENUE, FROM STREET BOYD AVENUE TO STREET EAST 233 STREET | No data | Street Construction Inspections: Active | Department of Transportation | work done in r/w opposite side |
2015-08-25 | No data | EAST 233 STREET, FROM STREET EDENWALD AVENUE TO STREET GUNTHER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | work started on EAST 233 ST. WORK STARTS AT EDENWALD AVENUE BOYD AVE EAST 233 ST |
2015-08-24 | No data | EMMONS AVENUE, FROM STREET EAST 21 STREET TO STREET OCEAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway cut |
Number | Adjudicates | Phase | Disposition | Date | Fine amount | Date fine paid | description |
---|---|---|---|---|---|---|---|
TWC-225469 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-12-22 | 1500 | 2023-03-27 | It shall be unlawful for any person to operate a business for the purpose of the collection of trade waste from the premises of a commercial establishment required to provide for the removal of such waste pursuant to the provisions of section 16-116 of this code, or the removal or disposal of trade waste from such premises, or to engage in, conduct or cause the operation of such a business, without having first obtained a license therefor from the commission pursuant to the provisions of this chapter. Notwithstanding the provisions of this subdivision, a business solely engaged in the removal of waste materials resulting from building demolition, construction, alteration or excavation shall be exempt from the licensing provisions of this subdivision where, except in regard to the principals of a business solely in either or both of the class seven or the class three category of licensees as defined in rules previously promulgated by the commissioner of consumer and worker protection pursuant to subchapter eighteen of chapter two of title twenty of this code, no principal of such applicant is a principal of a business or a former business required to be licensed pursuant to this chapter or such former subchapter eighteen. Grant of such exemption shall be made by the commission upon its review of an exemption application, which shall be in the form and contain the information prescribed by rule of the commission and shall be accompanied by a statement by the applicant describing the nature of the applicant's business and listing all principals of such business. |
TWC-224579 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-08-01 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-224498 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-07-08 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223935 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-05-05 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223921 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-04-23 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223701 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-04-02 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223662 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-03-28 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223609 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-03-22 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223544 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-03-03 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223559 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-02-22 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223368 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-02-10 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223556 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-02-01 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223217 | Office of Administrative Trials and Hearings | Issued | Settled | 2022-01-11 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223130 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-12-21 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-223027 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-12-10 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222905 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-11-09 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222890 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-11-05 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222844 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-10-27 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222748 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-10-02 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222606 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-09-18 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222580 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-09-11 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222379 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-08-14 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222370 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-08-12 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222346 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-08-11 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222276 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-31 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222217 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-28 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-222194 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-07-12 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221963 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-06-18 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221923 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-06-15 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221854 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-06-07 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221742 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-19 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221715 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-15 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221726 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-14 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221649 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-06 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221650 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-04 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221645 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-04 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221526 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-05-01 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221408 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-16 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221420 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-14 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221400 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-04-12 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221184 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-03-20 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221188 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-03-19 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221204 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-03-15 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221124 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-03-06 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221116 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-03-02 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221025 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-26 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-221026 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-24 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220987 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-17 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220962 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-13 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220965 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-11 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220967 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-06 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220894 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-02-04 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220891 | Office of Administrative Trials and Hearings | Issued | Settled | 2021-01-28 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220732 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-11-23 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220669 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-11-09 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-220291 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-09-30 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-219693 | Office of Administrative Trials and Hearings | Issued | Settled | 2020-07-15 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-214270 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-10-26 | 3500 | 2017-04-25 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-214020 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-08-25 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-214012 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-08-17 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-213938 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-08-13 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-213373 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-03-30 | 0 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-213309 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-03-23 | No data | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-212885 | Office of Administrative Trials and Hearings | Issued | Settled | 2016-01-04 | 3000 | 2016-06-14 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-210969 | Office of Administrative Trials and Hearings | Issued | Settled | 2014-11-14 | 2500 | 2015-04-20 | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
TWC-9542 | Office of Administrative Trials and Hearings | Issued | Settled | 2013-02-12 | 2500 | No data | Removed collected or disposed of trade waste or without the proper Commission issued license or exemption from licensing requirements |
ROCCO MURDOCCA
CALL THE PLUMBER CORPORATION PLUMBING WORKS, INC. NYC PLUMBING WORKS INC. INTERIOR AUTOMATIC SPRINKLER, INC.THE CORPORATION
ARSHIA DESIGNS INC. AAA VACUUM CORP. ATLANTICA TELECOM, INC. MISTY SPORTSWEAR, INC. INRACKS, INC. FAT JAMS ELECTRONICS INC. CROQUEMBOUCHE, INC. LONG BEACH PEDIATRIC GROUP, P.C. LAW OFFICES OF JOSEPH A. GRECO, P.C. TEREZ, INC.7622 17TH AVENUE, BROOKLYN, NY, United States, 11214
PLUMBING WORKS SUBSURFACE CORP. STEEL TONE CONSTRUCTION INC. J. CRIOS CONSTRUCTION, INC. CASANOVA UNLIMITED, INC. 17TH AVENUE BROKERAGE, INC. LPT IMPORT INC. NICE OIL, CORP. FRONT DESK SERVICES, INC.142 5TH STREET, BROOKLYN, NY, United States, 11215
NEW STOCK KITCHEN INC. WXM REALTY MANAGEMENT CORP. ELEGANTE TOURS AND TRANSPORTATION, INCDate of last update: 06 Nov 2024
Sources: New York Secretary of State
© 2024 nycompanysearch.com